Cities Index.
Resolution

San Jose City Council
April 26, 2022

Document
Resolution
Meeting
April 26, 2022
Body
San Jose City Council
Original file
94 KB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

NVF:KWF:AHT
3/21/2022

T-36883/1914075 1
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

RESOLUTION NO.

A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN

JOSE APPROVING A LIST OF PAVEMENT
MAINTENANCE PROJECTS ELIGIBLE FOR SAN JOSE’S
2022-2023 ALLOCATION OF THE ROAD MAINTENANCE

AND REHABILITATION ACCOUNT FUNDING, WHICH

WAS MADE AVAILABLE BY THE APPROVAL OF
SENATE BILL NO. 1, OTHE RWISE KNOWN AS THE
ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017

WHEREAS, on April 28, 2017, Governor Jerry Brown signed Senate Bill No. 1, otherwise known as the Road Repair and Accountability Act of 2017, which created the Road Maintenance and Rehabilitation Account (“RMRA”) to address deferred maintenance on the state highway and local streets and roads systems; and

WHEREAS, prior to receiving an apportionment of RMRA funds in a fiscal year, the City of San José (“City”) is required to submit to the California Transportation Commission (“CTC”) a list of projects proposed to be completed with these funds (“List of Projects”); and

WHEREAS, the City will use its 2022-2023 RMRA funds for pavement maintenance projects on the City’s major streets; and

WHEREAS, the tentative List of Projects, as shown in Attachment A, recommended for submission to the CTC is intended to identify streets that would be eligible for an estimated $23,473,532 in RMRA funds;

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SAN JOSE THAT:

The List of Projects eligible for San Jose’s 2022-2023 allocation of Road Maintenance and Rehabilitation Account funding is hereby approved, as shown in Attachment A.

NVF:KWF:AHT
3/21/2022

T-36883/1914075 2
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

ADOPTED this _____ day of ___________, 2022, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

SAM LICCARDO
Ma
yor
ATTEST:

TONI J. TABER, CMC
Cit
y Clerk

NVF:KWF:AHT
3/21/2022

T-36883/1914075 3
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

ATTACHMENT A
List of Projects

CD STREET NAME BEGIN

LOCATION END LOCATION SCHEDULE DESCRIPTION

OF PROJECT

PREDICTED
USEFUL
LIFE
4 1ST ST S NORTECH

PKWY SOUTHBAY DR SUMMER/FALL
2023
STREET
SEALING 7 YEARS
3 21ST ST N N BAYSHORE

RD W TAYLOR ST E SUMMER/FALL
2023
STREET

RESURFACING
20 YEARS
8 ABORN RD RUBY AV MURILLO AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
6,9 ALMADEN RD WILLOW GLEN
WY

ALMADEN

AV/ALMADEN
EXPY

SUMMER/FALL
2023
STREET
SEALING 7 YEARS
2 BAILEY RD MCKEAN RD MONTEREY RD SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
3 BERRYESSA

RD MABURY RD LUNDY AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
10 BLOSSOM HILL
RD

SANTA TERESA

BL BLOSSOM AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
9 BLOSSOM HILL
RD

BLOSSOM DALE
DR

FRANCIS OAK
WY

SUMMER/FALL
2023
STREET

SEALING
7 YEARS
1 BUCKNALL RD SAN TOMAS

AQUINO RD FULTON ST SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
6 CAMPBELL AV

E CITY LIMIT NEWHALL ST SUMMER/FALL
2023
STREET

SEALING
7 YEARS
9 CARLTON AV NATIONAL AV 130’ W/O

WINTON WY

SUMMER/FALL
2023
STREET

SEALING
7 YEARS
6 CHERRY AV CURTNER AV DRY CREEK RD SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
NVF:KWF:AHT
3/21/2022

T-36883/1914075 4
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CD STREET NAME BEGIN

LOCATION END LOCATION SCHEDULE DESCRIPTION

OF PROJECT

PREDICTED
USEFUL
LIFE
8 CLASSICO AV FOWLER RD EVERGREEN

VILLAGE SQ

SUMMER/FALL
2023
STREET

SEALING
7 YEARS
9 CLOVERCREST

DR DENTWOOD DR BLOSSOM HILL
RD

SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
3 COMMERCIAL
ST 4TH ST 10TH ST N SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
6,9 COTTLE AV PINE AV KOCH LN SUMMER/FALL
2023
STREET

SEALING
7 YEARS
2 COYOTE RD BLOSSOM HILL

RD FONICK DR SUMMER/FALL
2023
STREET

SEALING
7 YEARS
2 COYOTE RD SNOW DR FONICK DR SUMMER/FALL
2023
STREET

SEALING
7 YEARS
2 COYOTE RD SENTER RD SNOW DR SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
10 ELWOOD RD ECHO VALLEY
DR

OLIVE BRANCH
LN

SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
2 EMBEDDED

WY HELLYER AV W END SUMMER/FALL
2023
STREET

SEALING
7 YEARS
8 EVERYGREEN

VILLAGE SQ RUBY AV CLASSICO AV SUMMER/FALL
2023
STREET
SEALING 7 YEARS
1 FENIAN DR RINCON AV 230’ S/O KEITH
DR

SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
5 FLEMING AV STORY RD CITY LIMIT SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
4 FLICKINGER

AV NB DOXEY PL HOSTETTER RD SUMMER/FALL
2023
STREET

SEALING
7 YEARS
8 FOWLER RD SAN FELIPE RD BIANCO WY SUMMER/FALL
2023
STREET

SEALING
7 YEARS
NVF:KWF:AHT
3/21/2022

T-36883/1914075 5
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CD STREET NAME BEGIN

LOCATION END LOCATION SCHEDULE DESCRIPTION

OF PROJECT

PREDICTED
USEFUL
LIFE
6 GISH RD E N 1ST ST KOLL CIR SUMMER/FALL
2023
STREET

SEALING
7 YEARS
3 GOODYEAR ST 1ST ST S GRAHAM AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
3 GRAHAM AV GOODYEAR ST WILLOW ST SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
1 HAMILTON AV CAMPBELL AV
W
400’ E/O BECK
DR

SUMMER/FALL
2023
STREET

SEALING
7 YEARS
1 HARRIET AV KEITH DR SAN TOMAS

AQUINO RD

SUMMER/FALL
2023
STREET

SEALING
7 YEARS
9 HARWOOD RD BLOSSOM HILL
AV
LITTLE

BRANHAM LN

SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
4 HOLGER WY 1ST ST ZANKER RD SUMMER/FALL
2023
STREET

SEALING
7 YEARS
4 HOSTETTER

RD PIEDMONT RD OLD PIEDMONT
RD

SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
3 JULIAN ST E 6TH ST HWY 101 SUMMER/FALL
2023
STREET

SEALING
7 YEARS
5 KIRK AV CITY LIMIT MADELINE DR SUMMER/FALL
2023
STREET

SEALING
7 YEARS
6 LEIGH AV SOUTHWEST

EXPY HAMILTON AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
6 LELONG AV WILLOW ST ALMA AV W SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
9 LOS GATOS

ALMADEN RD
50’ E/O AURORA

LN LEIGH AV SUMMER/FALL
2023
STREET
SEALING 7 YEARS
3 MABURY RD BERRYES SA RD OAKLAND RD SUMMER/FALL
2023
STREET

SEALING
7 YEARS
NVF:KWF:AHT
3/21/2022

T-36883/1914075 6
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CD STREET NAME BEGIN

LOCATION END LOCATION SCHEDULE DESCRIPTION

OF PROJECT

PREDICTED
USEFUL
LIFE
3 MARKET ST SANTA CLARA

ST REED ST SUMMER/FALL
2023
STREET

SEALING
7 YEARS
6 MATRIX BL AIRPORT PKWY 4TH ST SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
7 MCLAUGHLIN

AV TUERS RD CAPITOL EXPY SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
6 MERIDIAN AV PARK AV FRUITDALE AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
6 PARKMOOR AV BASCOM AV
CITY LIMIT (630’

E/O MACARTHUR
AV)

SUMMER/FALL
2023
STREET
SEALING 7 YEARS
6 PARKMOOR AV LINCOLN AV MERIDIAN AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
6 PRUNERIDGE

AV WESTRIDGE DR WINCHESTER BL
N

SUMMER/FALL
2023
STREET

SEALING
7 YEARS
6 RACE ST SAN CARLOS ST

W PARK AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
8 RUBY AV ABORN RD EVERGREEN

VILLAGE SQ

SUMMER/FALL
2023
STREET

SEALING
7 YEARS
3,6 SAN CARLOS
ST SUNOL ST 3RD ST SUMMER/FALL
2023
STREET

SEALING
7 YEARS
1 SAN TOMAS

AQUINO RD
340’ N/O

BUCKNALL RD RINCON AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
1 SARATOGA AV WILLIAMS RD
460’ S/O

LAWRENCE
EXPY

SUMMER/FALL
2023
STREET
SEALING 7 YEARS
4 SOMERSET DR BURGUNDY DR SUNCREST AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
NVF:KWF:AHT
3/21/2022

T-36883/1914075 7
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CD STREET NAME BEGIN

LOCATION END LOCATION SCHEDULE DESCRIPTION

OF PROJECT

PREDICTED
USEFUL
LIFE
6 STOKES ST SOUTHWEST

EXPY LEIGH AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
5 STORY RD CAPITOL EXPY CLAYTON RD SUMMER/FALL
2023
STREET

SEALING
7 YEARS
4 SUNCREST AV PIEDMONT RD BOULDER DR SUMMER/FALL
2023
STREET

SEALING
7 YEARS
6 TAYLOR ST E THE ALAMEDA STOCKTON AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
7 TULLY RD MONTEREY RD ALVIN AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
5,7,8 TULLY RD ALVIN AV CAPITOL EXPY SUMMER/FALL
2023
STREET

SEALING
7 YEARS
10 VIA DEL ORO SAN IGNACIO

AV BERNAL RD SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
3 VIRGINIA ST W PREVOST ST 5TH ST SUMMER/FALL
2023
STREET

SEALING
7 YEARS
9 WAYLAND AV CHERRY AV LANSING AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
1 WESTMONT AV HARRIET AV QUITO RD SUMMER/FALL
2023
STREET

SEALING
7 YEARS
6 WILLOW GLEN

WY BIRD AV ALMADEN AV SUMMER/FALL
2023
STREET

SEALING
7 YEARS
3,6 WILLOW ST LELONG ST 1ST ST SUMMER/FALL
2023
STREET

SEALING
7 YEARS
8 YERBA BUENA

RD VILLA VISTA RD SAN FELIPE RD SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
4 ZANKER RD HWY 237 MONTAGUE
EXPY

SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
NVF:KWF:AHT
3/21/2022

T-36883/1914075 8
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Description of Project:

Street Resurfacing: Projects that may consist of removal of failed top layer of asphalt, cold-in place recycling, overlay with hot-mix asphalt or rubberized hot-mix asphalt, striping and bike lane enhancements, and Americans with Disabilities Act (ADA) curb ramp upgrades
Street Sealing: Projects that may consist of removal of failed areas of asphalt, application of a thin layer of emulsified asphalt mixture to protect streets from water penetration and provide a new wearing surface, striping and bike lane enhancements, and ADA curb ramp upgrades.

← All documents from this meeting