NVF:KWF:AHT
3/21/2022
T-36883/1914075 1
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
RESOLUTION NO.
A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN
JOSE APPROVING A LIST OF PAVEMENT
MAINTENANCE PROJECTS ELIGIBLE FOR SAN JOSE’S
2022-2023 ALLOCATION OF THE ROAD MAINTENANCE
AND REHABILITATION ACCOUNT FUNDING, WHICH
WAS MADE AVAILABLE BY THE APPROVAL OF
SENATE BILL NO. 1, OTHE RWISE KNOWN AS THE
ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, on April 28, 2017, Governor Jerry Brown signed Senate Bill No. 1, otherwise known as the Road Repair and Accountability Act of 2017, which created the Road Maintenance and Rehabilitation Account (“RMRA”) to address deferred maintenance on the state highway and local streets and roads systems; and
WHEREAS, prior to receiving an apportionment of RMRA funds in a fiscal year, the City of San José (“City”) is required to submit to the California Transportation Commission (“CTC”) a list of projects proposed to be completed with these funds (“List of Projects”); and
WHEREAS, the City will use its 2022-2023 RMRA funds for pavement maintenance projects on the City’s major streets; and
WHEREAS, the tentative List of Projects, as shown in Attachment A, recommended for submission to the CTC is intended to identify streets that would be eligible for an estimated $23,473,532 in RMRA funds;
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SAN JOSE THAT:
The List of Projects eligible for San Jose’s 2022-2023 allocation of Road Maintenance and Rehabilitation Account funding is hereby approved, as shown in Attachment A.
NVF:KWF:AHT
3/21/2022
T-36883/1914075 2
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
ADOPTED this _____ day of ___________, 2022, by the following vote:
AYES:
NOES:
ABSENT:
DISQUALIFIED:
SAM LICCARDO
Ma
yor
ATTEST:
TONI J. TABER, CMC
Cit
y Clerk
NVF:KWF:AHT
3/21/2022
T-36883/1914075 3
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
ATTACHMENT A
List of Projects
CD STREET NAME BEGIN
LOCATION END LOCATION SCHEDULE DESCRIPTION
OF PROJECT
PREDICTED
USEFUL
LIFE
4 1ST ST S NORTECH
PKWY SOUTHBAY DR SUMMER/FALL
2023
STREET
SEALING 7 YEARS
3 21ST ST N N BAYSHORE
RD W TAYLOR ST E SUMMER/FALL
2023
STREET
RESURFACING
20 YEARS
8 ABORN RD RUBY AV MURILLO AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
6,9 ALMADEN RD WILLOW GLEN
WY
ALMADEN
AV/ALMADEN
EXPY
SUMMER/FALL
2023
STREET
SEALING 7 YEARS
2 BAILEY RD MCKEAN RD MONTEREY RD SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
3 BERRYESSA
RD MABURY RD LUNDY AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
10 BLOSSOM HILL
RD
SANTA TERESA
BL BLOSSOM AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
9 BLOSSOM HILL
RD
BLOSSOM DALE
DR
FRANCIS OAK
WY
SUMMER/FALL
2023
STREET
SEALING
7 YEARS
1 BUCKNALL RD SAN TOMAS
AQUINO RD FULTON ST SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
6 CAMPBELL AV
E CITY LIMIT NEWHALL ST SUMMER/FALL
2023
STREET
SEALING
7 YEARS
9 CARLTON AV NATIONAL AV 130’ W/O
WINTON WY
SUMMER/FALL
2023
STREET
SEALING
7 YEARS
6 CHERRY AV CURTNER AV DRY CREEK RD SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
NVF:KWF:AHT
3/21/2022
T-36883/1914075 4
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
CD STREET NAME BEGIN
LOCATION END LOCATION SCHEDULE DESCRIPTION
OF PROJECT
PREDICTED
USEFUL
LIFE
8 CLASSICO AV FOWLER RD EVERGREEN
VILLAGE SQ
SUMMER/FALL
2023
STREET
SEALING
7 YEARS
9 CLOVERCREST
DR DENTWOOD DR BLOSSOM HILL
RD
SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
3 COMMERCIAL
ST 4TH ST 10TH ST N SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
6,9 COTTLE AV PINE AV KOCH LN SUMMER/FALL
2023
STREET
SEALING
7 YEARS
2 COYOTE RD BLOSSOM HILL
RD FONICK DR SUMMER/FALL
2023
STREET
SEALING
7 YEARS
2 COYOTE RD SNOW DR FONICK DR SUMMER/FALL
2023
STREET
SEALING
7 YEARS
2 COYOTE RD SENTER RD SNOW DR SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
10 ELWOOD RD ECHO VALLEY
DR
OLIVE BRANCH
LN
SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
2 EMBEDDED
WY HELLYER AV W END SUMMER/FALL
2023
STREET
SEALING
7 YEARS
8 EVERYGREEN
VILLAGE SQ RUBY AV CLASSICO AV SUMMER/FALL
2023
STREET
SEALING 7 YEARS
1 FENIAN DR RINCON AV 230’ S/O KEITH
DR
SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
5 FLEMING AV STORY RD CITY LIMIT SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
4 FLICKINGER
AV NB DOXEY PL HOSTETTER RD SUMMER/FALL
2023
STREET
SEALING
7 YEARS
8 FOWLER RD SAN FELIPE RD BIANCO WY SUMMER/FALL
2023
STREET
SEALING
7 YEARS
NVF:KWF:AHT
3/21/2022
T-36883/1914075 5
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
CD STREET NAME BEGIN
LOCATION END LOCATION SCHEDULE DESCRIPTION
OF PROJECT
PREDICTED
USEFUL
LIFE
6 GISH RD E N 1ST ST KOLL CIR SUMMER/FALL
2023
STREET
SEALING
7 YEARS
3 GOODYEAR ST 1ST ST S GRAHAM AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
3 GRAHAM AV GOODYEAR ST WILLOW ST SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
1 HAMILTON AV CAMPBELL AV
W
400’ E/O BECK
DR
SUMMER/FALL
2023
STREET
SEALING
7 YEARS
1 HARRIET AV KEITH DR SAN TOMAS
AQUINO RD
SUMMER/FALL
2023
STREET
SEALING
7 YEARS
9 HARWOOD RD BLOSSOM HILL
AV
LITTLE
BRANHAM LN
SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
4 HOLGER WY 1ST ST ZANKER RD SUMMER/FALL
2023
STREET
SEALING
7 YEARS
4 HOSTETTER
RD PIEDMONT RD OLD PIEDMONT
RD
SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
3 JULIAN ST E 6TH ST HWY 101 SUMMER/FALL
2023
STREET
SEALING
7 YEARS
5 KIRK AV CITY LIMIT MADELINE DR SUMMER/FALL
2023
STREET
SEALING
7 YEARS
6 LEIGH AV SOUTHWEST
EXPY HAMILTON AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
6 LELONG AV WILLOW ST ALMA AV W SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
9 LOS GATOS
ALMADEN RD
50’ E/O AURORA
LN LEIGH AV SUMMER/FALL
2023
STREET
SEALING 7 YEARS
3 MABURY RD BERRYES SA RD OAKLAND RD SUMMER/FALL
2023
STREET
SEALING
7 YEARS
NVF:KWF:AHT
3/21/2022
T-36883/1914075 6
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
CD STREET NAME BEGIN
LOCATION END LOCATION SCHEDULE DESCRIPTION
OF PROJECT
PREDICTED
USEFUL
LIFE
3 MARKET ST SANTA CLARA
ST REED ST SUMMER/FALL
2023
STREET
SEALING
7 YEARS
6 MATRIX BL AIRPORT PKWY 4TH ST SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
7 MCLAUGHLIN
AV TUERS RD CAPITOL EXPY SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
6 MERIDIAN AV PARK AV FRUITDALE AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
6 PARKMOOR AV BASCOM AV
CITY LIMIT (630’
E/O MACARTHUR
AV)
SUMMER/FALL
2023
STREET
SEALING 7 YEARS
6 PARKMOOR AV LINCOLN AV MERIDIAN AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
6 PRUNERIDGE
AV WESTRIDGE DR WINCHESTER BL
N
SUMMER/FALL
2023
STREET
SEALING
7 YEARS
6 RACE ST SAN CARLOS ST
W PARK AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
8 RUBY AV ABORN RD EVERGREEN
VILLAGE SQ
SUMMER/FALL
2023
STREET
SEALING
7 YEARS
3,6 SAN CARLOS
ST SUNOL ST 3RD ST SUMMER/FALL
2023
STREET
SEALING
7 YEARS
1 SAN TOMAS
AQUINO RD
340’ N/O
BUCKNALL RD RINCON AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
1 SARATOGA AV WILLIAMS RD
460’ S/O
LAWRENCE
EXPY
SUMMER/FALL
2023
STREET
SEALING 7 YEARS
4 SOMERSET DR BURGUNDY DR SUNCREST AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
NVF:KWF:AHT
3/21/2022
T-36883/1914075 7
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
CD STREET NAME BEGIN
LOCATION END LOCATION SCHEDULE DESCRIPTION
OF PROJECT
PREDICTED
USEFUL
LIFE
6 STOKES ST SOUTHWEST
EXPY LEIGH AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
5 STORY RD CAPITOL EXPY CLAYTON RD SUMMER/FALL
2023
STREET
SEALING
7 YEARS
4 SUNCREST AV PIEDMONT RD BOULDER DR SUMMER/FALL
2023
STREET
SEALING
7 YEARS
6 TAYLOR ST E THE ALAMEDA STOCKTON AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
7 TULLY RD MONTEREY RD ALVIN AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
5,7,8 TULLY RD ALVIN AV CAPITOL EXPY SUMMER/FALL
2023
STREET
SEALING
7 YEARS
10 VIA DEL ORO SAN IGNACIO
AV BERNAL RD SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
3 VIRGINIA ST W PREVOST ST 5TH ST SUMMER/FALL
2023
STREET
SEALING
7 YEARS
9 WAYLAND AV CHERRY AV LANSING AV SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
1 WESTMONT AV HARRIET AV QUITO RD SUMMER/FALL
2023
STREET
SEALING
7 YEARS
6 WILLOW GLEN
WY BIRD AV ALMADEN AV SUMMER/FALL
2023
STREET
SEALING
7 YEARS
3,6 WILLOW ST LELONG ST 1ST ST SUMMER/FALL
2023
STREET
SEALING
7 YEARS
8 YERBA BUENA
RD VILLA VISTA RD SAN FELIPE RD SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
4 ZANKER RD HWY 237 MONTAGUE
EXPY
SUMMER/FALL
2023
STREET
RESURFACING 20 YEARS
NVF:KWF:AHT
3/21/2022
T-36883/1914075 8
Council Agenda: 4/26/2022
Item No.: 2.9
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Description of Project:
Street Resurfacing: Projects that may consist of removal of failed top layer of asphalt, cold-in place recycling, overlay with hot-mix asphalt or rubberized hot-mix asphalt, striping and bike lane enhancements, and Americans with Disabilities Act (ADA) curb ramp upgrades
Street Sealing: Projects that may consist of removal of failed areas of asphalt, application of a thin layer of emulsified asphalt mixture to protect streets from water penetration and provide a new wearing surface, striping and bike lane enhancements, and ADA curb ramp upgrades.