RESOLUTION NO. _______
A RESOLUTION OF THE COUNCIL OF THE CITY OF
SAN JOSE CERTIFYING THE 1312 EL PASEO & 1777
SARATOGA AVENUE MIXED-USE VILLAGE:
ENVIRONMENTAL IMPACT REPORT (FILE NO. PDC19-
049) AND MAKING CERTAIN FINDINGS CONCERNING
SIGNIFICANT IMPACTS, MITIGATION MEASURES, AND
ALTERNATIVES, AND A MITIGATION MONITORING AND
REPORTING PROGRAM, ALL IN ACCORDANCE WITH
THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, AS
AMENDED
WHEREAS, the proposed 1312 El Paseo and 1777 Saratoga Avenue Mixed-Use Village Project includes a Planned Development Zoning from the CG Commercial General Zoning District and CP Commercial Pedestrian Zoning District, and the demolition of existing buildings totaling 126,345 square feet and the development of one of two project options (Non-Education Mixed-Use Option or Education Mixed-Use Option), both of which include development scenarios consisting of residential and commercial uses (max of 1,100 multifamily residential units, max of 165,000 square feet of general commercial space) where the Education Mixed-Use Option would include up to 730 multifamily units, 66,000 square feet of general commercial space, a K-12 educational facility and 200 dorm units, the removal of 135 on-site trees, 30 of which are ordinance-sized trees, and associated modifications on the existing parking and landscaping (under either development scenario) on two sites totaling approximately
10.7 gross acres located at the southeast corner of Saratoga Avenue and Quito Road (1312 EL Paseo de Saratoga) and north of the intersection of Saratoga Avenue and Lawrence Expressway (1777 Saratoga Avenue) (Assessor Parcel Numbers 403-33- 014, 386-10-033, 386-10-036, 386-10-044, 386-10-045, 386-10-046) in the City of San José, which real property is sometimes referred to herein as the “subject property”; and the proposed 1312 El Paseo and 1777 Saratoga Avenue Mixed-Use Village Project referred to herein as the “Project”; and
NVF:MJV:JMD
6/9/2022
2 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
WHEREAS, approval of 1312 El Paseo and 1777 Saratoga Avenue Mixed-Use Village Project would constitute a project under the provisions of the California Environmental Quality Act of 1970, together with related state and local implementation guidelines and policies promulgated thereunder, all as amended to date (collectively, "CEQA"); and
WHEREAS, the City of San José (“City”) prepared, completed, and adopted in accordance with CEQA the Final Environmental Impact Report for the 1312 El Paseo and 1777 Saratoga Avenue Mixed-Use Village Project (“1312 El Paseo and 1777 Saratoga Avenue Mixed-Use Village Project FEIR”), and
WHEREAS, the City of San José (“City”) acting as lead agency under the California Environmental Quality Act of 1970, together with State and local guidelines implementing said Act, all as amended to date (collectively “CEQA”), prepared the Draft Environmental Impact Report (“DEIR”) for the 1312 El Paseo and 1777 Saratoga Avenue Mixed-Use Village Project (Planning File Nos. PDC19-049 and PD20-006); and
WHEREAS, a First Amendment to the DEIR was prepared that included responses to comments received during the public comment period; and
WHEREAS, the First Amendment and the DEIR together comprise the Final Environmental Impact Report (FEIR) for the Project; and
WHEREAS, the FEIR concluded that implementation of the Project could result in certain significant effects on the environment and identified mitigation measures that would reduce each of those significant effects to a less-than-significant level; and
WHEREAS, on May 25, 2022, the Planning Commission of the City of San José reviewed the FEIR prepared for the Project and recommended to the City Council that it NVF:MJV:JMD
6/9/2022
3 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
finds that the FEIR was completed in accordance with the requirements of CEQA and further recommended the City Council adopt a resolution certifying the FEIR; and
WHEREAS, whenever a lead agency approves a project requiring the implementation of measures to mitigate or avoid significant effects on the environment, CEQA also requires a lead agency to adopt a mitigation monitoring and reporting program to ensure compliance with the mitigation measures during project implementation, and such a mitigation monitoring and reporting program has been prepared for the Project for consideration by the decision-maker of the City of San José as lead agency for the Project (the “Mitigation Monitoring and Reporting Program”); and
WHEREAS, CEQA requires that, in connection with approval of a project for which an environmental impact report has been prepared that identifies one or more significant environmental effects of the project, the decision-making body of a public agency make certain findings regarding those effects and adopt avoidance measures to minimize impacts consistent with City policies and requirements and a statement of overriding considerations for any impact that may not be reduced to a less than significant level;
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SAN JOSE:
1. That the above recitals are true and correct; and
2. That the City Council does hereby find and certify that the FEIR has been prepared and completed in compliance with CEQA; and
3. That the City Council was presented with, and has independently reviewed and analyzed, the FEIR and other information in the record and has considered the information contained therein, including the written and oral comments received at the public hearings on the FEIR and the Project, prior to acting upon and approving the Project, and has found that the FEIR represents the independent judgment of the City, as lead agency for the Project, and designates the Director of Planning, Building and Code Enforcement at the Director’s office at 200 East NVF:MJV:JMD
6/9/2022
4 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Santa Clara Street, 3rd Floor Tower, San José, California, 95113, as the custodian of documents and record of proceedings on which the decision of the City is based; and
4. That the City Council does hereby find and recognize that the FEIR contains additions, clarifications, modifications, and other information in its response to comments on the Draft EIR or obtained by the City after the Draft EIR was issued and circulated for public review and does hereby find that such changes and additional information are not significant new information as that phrase is described under CEQA because such changes and additional information do not indicate that any of the following would result from approval and implementation of the Project: (i) any new significant environmental impact or substantially more severe environmental impact not already disclosed and evaluated in the Draft EIR, (ii) any feasible mitigation measure considerably different from those analyzed in the Draft EIR that would lessen a significant environmental impact of the Project has been proposed and would not be implemented, or (iii) any feasible alternative considerably different from those analyzed in the Draft EIR that would lessen a significant environmental impact of the Project has been proposed and would not be implemented; and
5. That the City Council does hereby find and determine that recirculation of the FEIR for further public review and comment is not warranted or required under the provisions of CEQA; and
6. That the City Council does hereby make the following findings with respect to significant effects on the environment of the Project, as identified in the FEIR, with the understanding that all the information in this Resolution is intended as a summary of the full administrative record supporting the FEIR, which full administrative record should be consulted for the full details supporting these findings.
1312 EL PASEO & 1777 SARATOGA AVENUE MIXED-USE VILLAGE PROJECT
SIGNIFICANT ENVIRONMENTAL IMPACTS
Air Quality
Impact: AIR-1: Both Options: The emissions resulting from the construction of the project (under both options) would exceed the Bay Area Air Quality Management District (BAAQMD) threshold of 54 pounds per day of ROG emissions and 54 pounds per day of NOx emissions. Under the non- NVF:MJV:JMD
6/9/2022
5 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
education mixed-use option, the project construction in 2024 and 2025 would exceed the ROG emissions threshold by 38.83 pounds and 81.63 pounds, respectively. Under the education mixed-use option, the project construction in 2024 and 2025 would exceed the ROG emissions threshold by 127.68 pounds and 11.59 pounds, respectively. Under the non-education mixed-use option, the project construction in 2023 would exceed the NOx threshold by 9.44 pounds and under the education mixed-use option, the project construction in 2023 and 2024 would exceed the NOx threshold by 18.28 pounds and 12 pounds, respectively.
Mitigation: MM AIR-1.1: Both Options: Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the project applicant shall implement the following additional best management practices identified by the BAAQMD in order to reduce fugitive dust. • All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered at a frequency adequate to maintain minimum soil moisture of 12 percent (i.e., three times a day). Moisture content shall be verified by lab samples or moisture probe.
• All vehicle speeds on unpaved roads shall be limited to 15 mph. • The Air District’s phone number shall be visible on a sign at the construction site to ensure compliance with applicable regulations. • All excavation, grading, and/or demolition activities shall be suspended when average wind speeds exceed 20 miles per hour and visible dust extends beyond site boundaries.
• The simultaneous occurrence of excavation, grading, and ground- disturbing construction activities on the same area at any one time shall be limited. Activities shall be phased to reduce the amount of disturbed surfaces at any one time.
• Avoid tracking of visible soil material on to public roadways by employing the following measures if necessary: (1) Site accesses up to a distance of 100 feet from public paved roads shall be treated with a six to 12-inch compacted layer of wood chips, mulch, or gravel and (2) washing truck tires and construction equipment of prior to leaving the site.
• Wind breaks (e.g., trees, fences) shall be installed on the windward side(s) of actively disturbed areas of construction adjacent to sensitive receptors. Wind breaks should have at maximum 50 percent air porosity.
NVF:MJV:JMD
6/9/2022
6 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
MM AIR-1.2: Both Options: Construction Equipment. Prior to issuance of any demolition, grading and/or building permits (whichever occurs earliest), the project applicant shall submit a construction management plan to the Director of Planning, Building and Code Enforcement or the Director’s designee for review and approval. The construction management plan shall demonstrate that the off-road equipment used onsite to construct the project would achieve a fleet-wide average of 85 percent reduction in PM2.5 exhaust emissions or more. Options to achieve this reduction could include, but are not limited to, the following:
• All mobile diesel-powered off-road equipment larger than 25 horsepower and operating on the site for more than two days shall meet U.S. EPA particulate matter emissions standards for Tier 4 engines or equivalent.
• Use of equipment that includes California Air Resources Board (CARB)-certified Level 3 diesel particulate filters or alternatively-fueled equipment (i.e., non-diesel).
• Use of added exhaust muffling and filtering devices.
• The plan shall also verify that the equipment included in the plan meets the standards set forth in these mitigation measures:
o If use of Tier 4 equipment is not available, alternatively use equipment that meets U.S. EPA emission standards for Tier 3 engines and include particulate matter emissions control equivalent to CARB Level 3 verifiable diesel emission control devices that altogether achieve an 85 percent reduction in particulate matter exhaust in comparison to uncontrolled equipment. The use of Tier 3 equipment shall not exceed five percent of all equipment usage (described in terms of total horsepower hours during a phase). o Use of alternatively fueled equipment with lower NOx emissions that meet the NOx and PM reduction requirements above.
o Diesel engines, whether for off road equipment or on road vehicles, shall not be left idling for more than two minutes, except as provided in exceptions to the applicable state regulations (e.g., traffic conditions, safe operating conditions). The construction sites shall have posted legible and visible signs in designated queuing areas and at the construction site to clearly notify operators of idling limit.
o Provide line power to the site during the early phases of construction to minimize the use of diesel-powered stationary NVF:MJV:JMD
6/9/2022
7 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
equipment, such as generators, concrete/industrial saws, welders, and air compressors.
o Cranes and aerial lifts shall be powered by electricity.
MM AIR 1.3: Both Options: Architectural Coating: Prior to the issuance of any building permits, the project applicant (under either option) shall submit a list of intended coatings for interior and exterior surfaces to the Director of Planning, Building and Code Enforcement or Director’s designee, demonstrating the use of low volatile organic compound or VOC (i.e., ROG) coatings that are below current BAAQMD requirements (i.e., Regulation 8, Rule 3: Architectural Coatings), for at least 90 percent of all residential and nonresidential interior paints and 90 percent of exterior paints. This includes all architectural coatings applied during both construction and reapplications throughout the project’s operational lifetime. At least 90 percent of coatings applied must meet a “super- compliant” VOC standard of less than 10 grams of VOC per liter of paint.
For reapplication of coatings during the project’s operational lifetime, the Declaration of Covenants, Conditions, and Restrictions shall contain a stipulation for low VOC coatings to be used.
MM AIR-1.4: Both Options: Construction diesel trucks: Prior to the issuance of any demolition or grading permits (whichever is earliest), the project applicant shall submit a list of all on-road heavy duty diesel trucks intended to be used at the project sites to the Director of Planning, Building and Code Enforcement or Director’s designee for review and approval. All on-road heavy duty diesel trucks with a gross vehicle weight rating of 33,000 pounds or greater (EMFAC Category MHDDT or HHDDT) used at the project sites (such as haul trucks, water trucks, dump trucks, and concrete trucks) shall be model year 2015 or newer.
Finding: Implementation of Mitigation Measures AIR-1.1 through AIR-1.3 would reduce construction ROG emissions by approximately 82% and NOx emissions by approximately 96 percent and below the BAAQMD ROG construction emissions threshold of 54 pounds per day and NOX emissions threshold of 54 pounds per day. Mitigation Measure AIR-1.4 would further reduce NOx emissions by 20 percent and ROG emissions by 30 percent. This would result in a less than significant impact during construction and operation of the project. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: Under either option, implementation of BAAQMD best management practices and standard conditions to reduce fugitive NVF:MJV:JMD
6/9/2022
8 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
dust alone, would not be enough to reduce construction emissions below the BAQQMD thresholds. Therefore, measures AIR-1.1 through AIR-1.4 were selected to further reduce construction emissions under either project and below BAQQMD thresholds (54 pounds per day of NOx emissions and 54 pounds per day of ROG emissions).
As discussed in Air Quality, Section 3.3.1.2 (Regulatory Framework) of the DEIR, the goals of the 2017 CAP include 1) protecting public health by making progress towards attaining air quality standards and eliminating health risk and 2) protecting the climate. If a project exceeds the BAAQMD thresholds of significance, its emissions are considered to result in significant adverse air quality impacts to the region’s existing air quality conditions. Similarly, if the project exceeds the BAAQMD community health risk threshold of significance, the project would result in a community health risk. The California Emissions Estimator model (CalEEMod) Version 2016.3.2 was used to estimate emissions from project construction activities. Project construction emissions were modeled based on the equipment list and schedule information provided by the applicant. Under the non-education mixed-use option, the project construction in 2024 and 2025 would exceed the ROG emissions threshold by 38.83 pounds and 81.63 pounds, respectively. Under the education mixed-use option, the project construction in 2024 and 2025 would exceed the ROG emissions threshold by 127.68 pounds and 11.59 pounds, respectively. Under the non-education mixed-use option, the project construction in 2023 would exceed the NOx threshold by 9.44 pounds and under the education mixed-use option, the project construction in 2023 and 2024 would exceed the NOx threshold by 18.28 pounds and 12 pounds, respectively.
Implementation of AIR-1.1 would reduce project construction emissions, but not below the BAQQMD thresholds. Therefore, in addition to implementing BAAQMD best management practices and standard conditions, the project applicant shall adhere to measures AIR-1.2-1.4 to ensure the construction of the project, under either option, will not exceed the Bay Area Air Quality Management District (BAAQMD) construction emissions thresholds of 54 pounds per day of ROG emissions and 54 pounds per day of NOx emissions. Therefore, the impacts with respect to air quality would be reduced to a less than significant level.
NVF:MJV:JMD
6/9/2022
9 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Biological Resources
Impact: BIO-1: Both Options: Project construction (under either option) could result in impacts to nesting birds, if present on or adjacent to the sites at the time of construction.
Mitigation: MM BIO-1.1: Both Options: Prior to issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the project applicant shall schedule demolition and construction activities to avoid the nesting season. The nesting season for most birds, including most raptors in the San Francisco Bay area, extends from February 1 through August 31, inclusive.
MM BIO-1.2: Both Options: If demolition and construction cannot be scheduled between September 1 and January 1 (inclusive), pre- construction surveys for nesting birds shall be completed by a qualified ornithologist to ensure that no nests are disturbed during project implementation. This survey shall be completed no more than 14 days prior to the initiation of construction activities during the early part of the breeding season (February 1 through April 30 inclusive) and no more than 30 days prior to the initiation of these activities during the late part of the breeding season (May 1 through August 31 inclusive). During this survey, the ornithologist shall inspect all trees and other possible nesting habitats immediately adjacent to the construction areas for nests.
MM BIO-1.3: Both Options: If an active nest is found sufficiently close to work areas to be disturbed by construction, the ornithologist, in consultation with the California Department of Fish and Wildlife (CDFW), shall determine the extent of a construction free buffer zone to be established around the nest to ensure that bird nests shall not be disturbed during project construction.
MM BIO-1.4: Both Options: Prior to any tree removal, or approval of any grading or approval of any grading or demolition permits (whichever occurs first), the ornithologist shall submit a report indicating the results of the survey and any designated buffer zones to the City’s Director of Planning, Building and Code Enforcement or the Director’s designee.
NVF:MJV:JMD
6/9/2022
10 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Finding: Implementation of Mitigation Measures BIO-1.1 through BIO-1.4 would reduce impacts during construction to nesting birds on or adjacent to the site. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: Conducting pre-construction surveys and implementing a construction-free buffer zone around any migratory bird nests will ensure that raptor or migratory bird nests are not disturbed during project construction pursuant to the Migratory Bird Treaty Act and California Fish and Game Code. The size of the buffer zones will be determined in consultation between the qualified ornithologist and the California Department of Fish and Wildlife, and based on scientific evidence and best management practices. Implementation of Mitigation Measures MM BIO-1.1 through MM BIO-1.4 will reduce or avoid construction-related impacts to nesting raptors, and other migrating and nesting birds to less than significant level.
Hazards and Hazardous Materials
Impact: HAZ-1: Both Options: Project construction (under either option) could result in exposure of construction workers, adjacent uses, and the environment to soil contamination from historic agricultural use, including residual contamination from organochlorine pesticides, herbicides, and fertilizers.
Mitigation: HAZ-1.1: Both Options: Prior to issuance of any demolition or grading permits, the project applicant shall prepare a Site Management Plan (SMP) and Health and Safety Plan (HSP) to guide activities during demolition, excavation, and initial construction to ensure that potentially contaminated soils are identified, characterized, removed, and disposed of properly. The purpose of the SMP and HSP is to establish appropriate management practices for handling impacted soil or other hazardous materials that may be encountered during construction activities. The SMP shall provide the protocols for sampling of in-place soil to facilitate the profiling of the soil for appropriate off-site disposal or reuse, and for construction worker safety, dust mitigation during construction and potential exposure of contaminated soil to future users of the site. The soil profiling shall include (but not limited to) the collection of shallow soil samples (upper one foot) and analyses for lead and organochlorine pesticides. The soil profiling shall be performed prior to any significant earthwork.
NVF:MJV:JMD
6/9/2022
11 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
If there are no contaminants identified on the project sites that exceed regulatory screening levels for construction workers and residential users published by the Regional Water Quality Control Board, Department of Toxic Substances Control, and/or Environmental Protection Agency, the SMP does not need to be submitted to an oversight agency and only submitted to the City prior to construction earthwork activities. If contaminants are identified at concentrations exceeding regulatory screening levels, the project applicant shall enter the Santa Clara County Department of Environmental Health (SCCDEH) Site Cleanup Program.
The SMP and planned remedial measures shall be reviewed and approved by the SCCDEH. A copy of the SMP and HSP shall be submitted to the Supervising Environmental Planner of the Department of Planning, Building and Code Enforcement and the Supervising Environmental Compliance Officer in the City of San José’s Environmental Services Department.
Finding: Implementation of Mitigation Measure HAZ-1.1 would reduce any potential impacts to construction workers, adjacent uses, and the environment from contaminants such as organochlorine pesticides, herbicides, and fertilizers associated with the historic agricultural use of the sites to less than significant levels. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: As described in Section 3.9.1.2 Existing Conditions of the DEIR, the project sites were historically used for agricultural purposes until the 1960s. Historic agricultural use can result in residual contamination due to prior application of organochlorine pesticides, herbicides, and fertilizers. When soil disturbance occurs, these contaminants can become airborne and pose a health hazard to construction workers, nearby sensitive receptors, and the environment.
Because the project, under either option, includes demolition of existing structures, the project applicant shall prepare a Site Management Plan and Health and Safety Plan to guide activities during demolition, excavation, and initial construction to ensure that potentially contaminated soils are identified, characterized, removed, and disposed of properly. The Site Management Plan includes protocols for sampling of in-place soil to facilitate the profiling of the soil for appropriate off-site disposal or reuse, construction worker safety, and dust mitigation during construction and potential exposure of contaminated soil to future users of the site. The mitigation measure stipulates that the soil sampling must be done prior to any major earthwork activity. The measure also includes a contingency plan if contaminants identified exceed the regulatory screening levels.
Therefore, contaminated soils on-site would be properly identified, NVF:MJV:JMD
6/9/2022
12 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
characterized, removed and disposed of properly prior to ground- disturbing activities, thus preventing exposure of construction workers, nearby sensitive receptors, and the environment to soil contaminants from construction of the project (under either option).
Noise Impacts
Impact: NOI-1: Both Options: Project construction (under either option) would exceed the City’s construction noise threshold of significance of 60 dBA Leq at residential land uses and places of worship or 70 dBA Leq at commercial land uses by five dBA Leq or more at various times throughout construction for over a year.
Mitigation: NOI-1.1: Both Options: Prior to issuance of any demolition or grading permits, a qualified acoustical consultant shall prepare a construction noise logistics plan specifying the hours of construction as well as the noise and vibration minimization measures. Posting or notification of construction schedules is required to be in place prior to the start of construction and implemented during construction to reduce noise impacts on neighboring residents and other uses. The construction noise logistics plan shall require, but not be limited to, the following:
• Construction shall be limited to the hours of 7:00 a.m. to 7:00 p.m.
Monday through Friday for any on-site or off-site work within 500 feet of any residential unit. Construction outside of these hours may be approved through a development permit based on a site-specific “construction noise mitigation plan” and a finding by the Director of Planning, Building and Code Enforcement that the construction noise mitigation plan is adequate to prevent noise disturbance of affected residential uses.
• The contractor shall use “new technology” power construction equipment with state-of-the-art noise shielding and muffling devices.
All internal combustion engines used on the project site shall be equipped with adequate mufflers and shall be in good mechanical condition to minimize noise created by faulty or poorly maintained engines or other components.
• The unnecessary idling of internal combustion engines shall be prohibited.
NVF:MJV:JMD
6/9/2022
13 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
• Staging areas and stationary noise-generating equipment shall be located as far as possible from noise-sensitive receptors such as residential uses (a minimum of 200 feet)
• The surrounding neighborhood shall be notified early and frequently of the construction activities.
• A “noise disturbance coordinator” shall be designated to respond to any local complaints about construction noise. The disturbance coordinator would determine the cause of the noise complaints (e.g., beginning work too early, bad muffler, etc.) and institute reasonable measures warranted to correct the problem. A telephone number for the disturbance coordinator would be conspicuously posted at the construction site and included in the noise logistics plan.
Findings: Implementation of Mitigation Measure NOI-1.1, under both options, would reduce project construction noise to less than significant levels during the standard construction schedule (Monday through Friday, 7:00 a.m. to 7:00 p.m.). (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: Project construction is anticipated to take a total of approximately 52 months to complete under the non-education mixed-use option and 46 months to complete under the education mixed-use option.
The project, under either option, would be completed in two major phases:
Phase 1: Demolition, grading, excavation, foundation, podium construction; and
Phase 2: Construction of all buildings.
Project construction, under either option, would occur concurrently at both project sites. To determine potential project construction noise, a detailed list of construction equipment expected to be used during each phase was provided by the applicant and used for modeling purposes. The Federal Highway Administration’s (FHWA’s) Roadway Construction Noise Model (RCNM) was used to calculate the hourly average noise levels for each phase of construction, assuming every piece of equipment would operate simultaneously, which would represent the worst-case scenario.
Noise-sensitive uses surrounding the El Paseo site include single-family residential uses approximately 220 feet from the center of construction to the south, commercial uses approximately 300 feet to the north, approximately 220 feet to the east, and approximately 350 feet to the west. These surrounding uses fall within the City’s significant noise impact NVF:MJV:JMD
6/9/2022
14 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
range of 500 feet for residences but outside the City’s significant impact range of 200 feet from commercial uses. Noise-sensitive uses surrounding the 1777 Saratoga Avenue site include commercial uses approximately 170 feet from the center of construction to the west, a place of worship approximately 150 feet to the north, commercial uses approximately 300 feet to the east, and single-family residences approximately 300 feet to the southwest. These surrounding uses fall within the City’s significant noise impact range of 200 feet from commercial uses.
The City of San José considers a significant noise impact to occur where temporary construction-related noise exceeds ambient noise levels by five dBA Leq or more and exceed the normally acceptable levels of 60 dBA Leq at the nearest noise-sensitive land uses or 70 dBA Leq at office or commercial land uses for a period of more than 12 months.
As described in the Noise impact discussion, Section 3.13.2 of the DEIR, construction noise levels from the El Paseo site (under either option) are calculated to range from 67 to 82 dBA Leq at nearby residential uses and from 63 to 85 at nearby commercial uses for more than a 12-month period. Construction noise levels from the 1777 Saratoga Avenue site (under either option) is calculated to range from 63 to 74 dBA Leq at nearby residential uses and 63 to 82 dBA Leq at nearby commercial uses for more than a 12-month period. Project construction activities, therefore, would temporarily exceed the normally acceptable levels of 60 dBA Leq at residential land uses and places of worship or 70 dBA Leq at commercial land uses by five dBA Leq or more at various times throughout construction (under either option) for over a year.
The project (under either option) in conformance with the General Plan Policy E.C-1.7, the Municipal Code, the City’s standard permit conditions, and mitigation measure MM NOI-1.1 above would have a less than significant temporary construction noise impact by using best available noise suppression devices and techniques.
Impact: NOI-2: Both Options: Nighttime project construction activities, specifically concrete pours during the evening hours (7:00 p.m. to 9:00 p.m.), could result in hourly average noises levels exceeding 60 dBA at the first row of residences located south of the El Paseo site.
Mitigation: MM NOI-2.1: Both Options: Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the project applicant shall implement the following measures during nighttime (7:00 p.m. to 9:00 p.m.) construction activities:
NVF:MJV:JMD
6/9/2022
15 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Limit the active equipment to as few pieces of equipment as possible.
Utilize ‘quiet’ models of air compressors and other stationary noise sources where technology exists.
To the extent consistent with applicable regulations and safety considerations, operation of back-up beepers shall be avoided near sensitive receptors during nighttime hours to the extent feasible, and/or the work sites shall be arranged in a way that minimizes the need for any reverse motions of trucks or the sounding of any reverse motion alarms during nighttime work. If these measures are not feasible, equipment and trucks operating during the nighttime hours with reverse motion alarms must be outfitted with Society of Automotive Engineering J994 Class D alarms (ambient-adjusting, or “smart alarms” that automatically adjust the alarm to five dBA above the ambient near the operating equipment).
Limit nighttime concrete pouring to the northernmost equipment location or a minimum distance of 100 feet from the southern boundary of the El Paseo site, where feasible.
o If the concrete pumping operation is located within 100 feet of the southern boundary of the El Paseo site, when feasible install temporary noise barriers around the concrete pumping
operation to control the noise levels at the source.
Residences or other noise-sensitive land uses within 500 feet of construction sites should be notified of the nighttime construction schedule, in writing, prior to the beginning of construction. This notification shall specify the dates for all nighttime construction.
Designate a “construction liaison” that would be responsible for responding to any local complaints about nighttime construction noise.
The liaison would determine the cause of the noise complaints (e.g., starting too early, bad muffler, etc.) and institute reasonable measures to correct the problem. Conspicuously post a telephone number for the liaison at the construction site.
Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the project applicant shall submit a report to the Director of Planning, Building and Code Enforcement or Director’s designee documenting the equipment used and the location of concrete pouring equipment and temporary noise barriers, and including the time and date of notification of residents within 500 feet of the construction sites.
NVF:MJV:JMD
6/9/2022
16 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Finding: Implementation of Mitigation Measure NOI-1.2 would reduce the nighttime noise impacts to a less than significant level. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: The project, under either option, proposes nighttime construction for a 15-day period in order to construct the parking garage at the El Paseo site. This would involve 15-hour concrete pours between 6:00 a.m. and 9:00 p.m. daily over a 15-day period.
The City of San José does not identify noise limits for construction occurring outside of the allowable hours of construction (7:00 a.m. to 7:00 p.m., Monday through Friday). Generally, steady noises above approximately 35 dBA and fluctuating noise levels above approximately 45 dBA have been shown to negatively affect sleep. Assuming standard residential construction, which typically provides a 25 dBA exterior-to- interior noise reduction (with windows closed), sleep disturbance may result when exterior noise levels exceed 60 dBA for steady noises and 70 dBA for fluctuating noises at the property line. The RCNM was used to calculate the hourly average noise levels during nighttime construction activities of the project (under either option). The model showed that the first row of residences located south of the El Paseo site would experience hourly average noise levels of up to 62 dBA at the property line as a result of project construction (under either option). The nearby commercial uses would not be impacted by nighttime construction since operational hours of these buildings would occur during daytime hours only.
With implementation of mitigation measure MM NOI-2.1, noise generated by nighttime project construction activities (under either option) would be reduced to below 60 dBA Leq by limiting and restricting use of equipment near residences and installing temporary noise barriers (when appropriate), thus reducing the impact to a less than significant level.
Impact: NOI-3: Both Options: The project (under either option) would exceed the City’s vibration limit of 0.2 in/sec PPV for buildings of conventional construction at adjacent places of worship and commercial uses to the north and east.
Mitigation: MM NOI-3.1: Both Options: Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the project applicant shall contract with a licensed Professional Structural Engineer in the State of California to prepare a construction vibration monitoring plan that includes measures to reduce vibration impacts to achieve vibration levels below the City’s vibration limit of 0.2 in/sec PPV. During NVF:MJV:JMD
6/9/2022
17 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
construction, the project applicant (under either option) shall implement the following vibration reduction measures:
• Limit the use of vibratory rollers, hoe rams, large bulldozers, and caisson drilling, and avoid clam shovel drops within 15 feet of the property lines shared with residences and commercial structures adjacent to the site.
• Place operating equipment on the construction site as far as possible from vibration-sensitive receptors.
• Use smaller equipment to minimize vibration levels below the limits. • Select demolition methods not involving impact tools. • Avoid dropping heavy objects or materials near vibration sensitive locations.
• A list of all heavy construction equipment to be used for this project known to produce high vibration levels (tracked vehicles, vibratory compaction, jackhammers, hoe rams, etc.) shall be submitted to the City by the contractor. This list shall be used to identify equipment and activities that would potentially generate substantial vibration and to define the level of effort required for continuous vibration monitoring. • A construction vibration-monitoring plan shall be implemented to document conditions at the residences and commercial structures adjacent to the site prior to, during, and after vibration generating construction activities. All plan tasks shall be undertaken under the direction of a licensed Professional Structural Engineer in the State of California and be in accordance with industry accepted standard methods. The construction vibration monitoring plan shall be implemented to include the following tasks:
o Identification of sensitivity to ground-borne vibration of the residences and commercial structures adjacent to the sites. A vibration survey (generally described below) shall be performed. o Performance of a photo survey, elevation survey, and crack monitoring survey for the residences and commercial structures adjacent to the sites. Surveys shall be performed prior to and after completion of vibration generating construction activities located within 25 feet of the structure. The surveys shall include internal and external crack monitoring in the structure, settlement, and distress, and shall document the condition of the foundation, walls and other structural elements in the interior and exterior of the structure.
NVF:MJV:JMD
6/9/2022
18 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
o Conduct a post-survey on the structure where either monitoring has indicated high levels or complaints of damage. Make appropriate repairs where damage has occurred as a result of construction activities.
o The results of any vibration monitoring shall be summarized and submitted in a report shortly after substantial completion of each phase identified in the project schedule. The report shall include a description of measurement methods, equipment used, calibration certificates, and graphics as required to clearly identify vibration- monitoring locations. An explanation of all events that exceeded vibration limits shall be included together with proper documentation supporting any such claims.
o Designate a person responsible for registering and investigating claims of excessive vibration. The contact information of such person shall be clearly posted on the construction site.
Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the project applicant shall submit the construction vibration monitoring plan to satisfaction of the Director of Planning, Building and Code Enforcement or Director’s designee.
Findings: Implementation of Mitigation Measure NOI-3.1 would reduce the construction vibration impacts to buildings of conventional construction at adjacent places of worship and commercial uses to the north and east of the 1777 Saratoga Avenue site, under either option, to a less than significant level. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: As stated above, project construction is anticipated to take a total of approximately 52 months to complete under the non- education mixed-use option and 46 months to complete under the education mixed-use option. The project, under either option, would be completed in two major phases:
Phase 1: Demolition, grading, excavation, foundation, podium construction; and
Phase 2: Construction of all buildings.
Project construction, under either option, would occur concurrently at both project sites. Construction activities generate considerable amounts of noise, especially during earth-moving activities when heavy equipment is used. During each stage of construction, there would be a different mix of NVF:MJV:JMD
6/9/2022
19 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
equipment operating, and noise levels would vary by stage and vary within stages, based on the amount of equipment in operation and the location at which the equipment is operating. Most demolition and construction noise falls within the range of 80 to 90 dBA at a distance of 50 feet from the source.
Construction activities (under either option) would include site demolition work, preparation work, excavation, foundation work, and new building framing and finishing. Impact pile driving (which generates substantial vibration) is not proposed as a method of construction for either project option. According to General Plan Policy EC-2.3, a continuous vibration limit of 0.2 in/sec PPV is used to minimize damage at buildings of conventional construction. The vibration limits contained in this policy are conservative and designed to provide the ultimate level of protection for existing buildings in San José.
Groundborne vibration levels from project construction (under either option) would be anticipated to exceed 0.5 in/sec PPV when construction is located within 12 feet of the structures adjacent to the El Paseo site to the north and east (existing commercial buildings) and adjacent to the 1777 Saratoga site to the north and west (place of worship building).
Vibration levels may still be perceptible in areas further from the site during periods of heavy construction but would not be expected to cause structural damage. Implementation of MM NOI-3.1 would reduce construction vibration generated by the project (under either option) below the City’s vibration limits and to a less than significant level by implementing a vibration monitoring plan and best available vibration suppression techniques that would ensure that construction-related vibration is below the City’s threshold of 0.2 in/sec PPV.
Transportation and Traffic
Impact: TRN-1: Both Options: The residential component of the project (under either option) would generate 11.07 VMT per capita, which exceeds the City’s residential threshold of 10.12 VMT per capita.
Mitigation: MM TRN-1.1: Both Options: The project shall implement the following pedestrian network improvements to reduce the project’s VMT per capita from 11.07 to 10.63 VMT per capita.
NVF:MJV:JMD
6/9/2022
20 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
The project applicant shall implement the following pedestrian network improvements to reduce the project’s VMT per capita from 11.07 to
10.63 VMT per capita.
o Modify the existing signal to provide a 5-phase signal operation; o Provide a signalized pedestrian crosswalk for the south leg; o Provide bike signal heads at near and far sides for eastbound through bicycle movement;
o Install new signal poles with mast arms lengths shadowing opposing left-turn pockets at the northwest and southeast intersection corners; construct two new directional ADA curb ramps at the southeast corner and one new directional ADA curb ramp at the northwest corner;
o Install a new signal pole with mast arm at the southwest intersection corner; construct new directional ADA curb ramp; o Replace the existing signal pole at the north leg of the intersection with a signal pole and mast arm for the northbound Campbell Avenue movements;
o Remove the existing signal poles from the raised medians along Campbell Avenue;
o Construct a new ADA directional curb ramp at the northeast corner; o Retain the existing accessible pedestrian signal equipment for all pedestrian crosswalks and existing video detection for all intersection approaches;
o Existing signal cabinet(s) to be maintained where feasible, per PW Final Memo conditions;
o Construct a 550-foot-long, 10-foot wide sidewalk with a curb/gutter along eastbound Campbell Avenue with tree wells at 35 feet off- center;
o Remove existing asphalt concrete along the portion of Campbell Avenue being abandoned and replace with decomposed granite; As part of the removal of the pork chop island, the project applicant shall retain the existing 30-foot reinforced concrete pipe located along the portion of Campbell Avenue being abandoned, and maintain existing drainage conform;
The project applicant shall also complete streetlight improvements and protect existing communications conduits , which include providing a NVF:MJV:JMD
6/9/2022
21 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
new streetlight every 150 feet along the new sidewalk along eastbound Campbell Avenue and providing LED lighting for each new signal pole.
All outdoor lighting shall comply with applicable regulations including the Municipal Code and Council Policy 4-3.
Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the project applicant shall submit a report describing the plans and schedules for completing the agreed-upon improvements to the Director of Public Works, or the Director’s designee, for review and approval. A copy of the report shall also be provided to the Director of Planning, Building and Code Enforcement or the Director’s designee.
MM TRN-1.2: Non-Education Mixed-Use Option only: Prior to the issuance of any occupancy permits (temporary or final), the final project shall implement a Transportation Demand Management (TDM) plan that provides unbundled on-site parking costs, which would allow residents without cars to rent a unit without having to pay for a parking spot and reduce the project’s VMT per capita with implementation of mitigation measure TRN-1.1 from 10.63 to 10.09 VMT per capita, which would be below the Citywide average VMT per capita minus 15 percent (10.12) threshold.
Prior to the issuance of any occupancy permits, the project applicant shall submit the TDM plan to the Director of Department of Public Works or Director’s designee and the Director of Planning, Building and Code Enforcement or Director’s designee. The TDM Plan shall include a trip cap for VMT monitoring purposes. The trip cap is 475 AM peak-hour trips and 633 PM peak-hour trips for the Non-Education Option or 1,614 AM peak- hour trips and 646 PM peak-hour trips for the Education Option. Annual trip monitoring reports shall be submitted that demonstrate that project VMT is below threshold. If the annual trip monitoring report finds that the project is exceeding the established trip cap, the project applicant shall be required to submit a follow-up report that demonstrates compliance with the trip cap requirements within a 6-month grace period. Penalties, as defined in the Council Policy 5-1, shall be assessed if a project does not meet the trip cap requirements by the end of the grace period. Penalties for non-compliance shall be assessed by the City as defined in the Council Policy 5-1.
NVF:MJV:JMD
6/9/2022
22 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Finding: Implementation of Mitigation Measure TRN-1.1 and TRN-1.2 would reduce the residential-related VMT impacts to a less than significant level. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: The City’s residential threshold for VMT is 10.12 per capita. As discussed under the project impacts for Transportation/Traffic, Section 3.17.2.1 of the DEIR and in Appendix I (Transportation Analysis, prepared by Hexagon Transportation Consultants Inc.), the City has developed the San José VMT Evaluation Tool to streamline the analysis for residential, office, and industrial projects. For mixed-use projects, such as the proposed project, each land use is analyzed independently. The City’s VMT Evaluation Tool was used to evaluate the proposed residential uses under both project options.
The results of the VMT evaluation indicate that the residential component of the project (under either option) is projected to generate 11.07 VMT per capita, which exceeds the City’s residential threshold of 10.12 VMT per capita. Therefore, the residential component of the project (under either option) would result in a significant VMT impact without mitigation. As analyzed in Transportation Analysis Report prepared by Hexagon Transportation Consultants, Inc., and as presented in the DEIR (Transportation/Traffic, Project Impacts, Section 3.17.2.1), the combination of the mitigation measures would reduce the project VMT per capita by 2.21 (or 18%) as compared to the area VMT and would reduce the project VMT per capita to 10.09, which would make the project impact less than significant. As detailed in measure TR-1.2, for the non-education mixed-use option only, a Transportation Demand Management Plan (TDM) shall include a trip cap for monitoring purposes. As defined by the City’s Council Policy 5-1, a trip cap is the maximum number of vehicle trips that a project can generate on any given day. Annual trip monitoring reports shall be submitted to the Director of Public Works and the Director of Planning, Building and Code Enforcement or the Director’s designee that demonstrate residential VMT is below the identified threshold (10.12 minus 15 percent). If the annual trip monitoring report finds that the project is exceeding the established trip caps, under either project, the project applicant shall be required to submit a follow-up report that demonstrates compliance with the trip cap requirements within a six-month grace period.
Penalties shall be assessed if a project does not meet the trip cap requirements by the end of the grace period. Therefore, with the implementation of TRN-1.1 and TRN-1.2, the residential VMT impact is NVF:MJV:JMD
6/9/2022
23 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
less than significant (under both projects). (Less than Significant Impact with Mitigation)
Impact: TRN-2: Non-Education Option only: The commercial office component of the project would generate 13.38 VMT per employee which exceeds the Citywide average of 12.21 VMT per employee resulting in a significant impact.
Mitigation: MM TRN-2.1: Non-Education Mixed-Use Option only: Prior to the issuance of any occupancy permits (temporary of final), the project applicant shall implement a TDM plan that provides the following measures to reduce the project’s VMT per employee by 1.35, from 13.38 to 12.15 VMT per employee, which would be below the Citywide average
12.21 VMT per employee:
Commute Trip Reduction Marketing and Education. The office would be required to routinely provide a commute trip reduction marketing/educational campaign to employees to promote the use of transit, shared rides, walking, and bicycling, therefore lowering the number of single occupancy vehicle (SOV) trips and VMT. Telecommuting and Alternative Work Schedule Program. The office tenants would be required to implement a flexible work schedule to encourage employees telecommuting, commuting outside of peak congestion periods, or working with alternative schedules. This program would allow some employees to work a few days from home, and thus reducing the number of trips and VMT.
Prior to the issuance of any occupancy permits (temporary or final), the project applicant shall submit the TDM plan to the Director of Public Works or the Director’s designee. The TDM Plan shall include a trip cap for VMT monitoring purposes. The trip cap is 475 AM peak-hour trips and 633 PM peak-hour trips for the Non-Education Option. Annual trip monitoring reports shall be submitted that demonstrate that project VMT is below threshold. If the annual trip monitoring report finds that the project is exceeding the established trip cap, the project applicant shall be required to submit a follow-up report that demonstrates compliance with the trip cap requirements within a grace period, which typically will not exceed six months. Penalties shall be assessed if a project does not meet the trip cap requirements by the end of the grace period. Penalties for non-compliance shall be assessed by the City as defined in the Council Policy 5-1.
NVF:MJV:JMD
6/9/2022
24 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Finding: Implementation of Mitigation Measure TRN-2.1 would reduce the commercial office-related VMT impacts, under the Non-Education Mixed- Use Option, to a less than significant level. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: For the office use, the threshold of significance is the regional average VMT per employee minus 15 percent, which calculates to 12.21 daily miles per employee. The City’s Travel Demand Model was used to determine the project-generated VMT for the commercial and office component of the Non-Education Mixed-Use Option, and the educational component of the Education Mixed-Use Option.
Vehicle trips generated by the medical office were converted to an equivalent office square footage, for which the City has established a screening criterion and threshold of significance. The project VMT estimated by the evaluation tool is 13.38 per employee, which is lower than the area VMT for employment uses (13.50 per employee) in the project vicinity. This is because the project would result in an increase in development diversity and employment density. However, the VMT is above the threshold of 12.21 VMT per employee.
As discussed in the Transportation Analysis prepared by Hexagon Transportation Consultants, Inc., if a project is found to have a significant impact on VMT, the impact must be reduced by modifying the project to reduce its VMT to an acceptable level (below the established thresholds of significance applicable to the project) and/or mitigating the impact through multimodal transportation improvements or establishing a trip cap. The VMT evaluation tool was used to identify the possible mitigation measures. Based on the list of selected VMT reduction measures included in the VMT evaluation tool, it was recommended the project implement the TR-2.1 to reduce the significant VMT impact. With implementation of a Transportation Demand Management Plan outlining and enforcing a Commute Trip Reduction Marketing and Education Program and Telecommuting and Alternative Work Schedule Program, the VMT associated with the commercial office component under the non-education mixed-use option would be reduced from 13.38 to 12.15 VMT per employee, which is below the Citywide average 12.21 VMT per employee.
Again, the TDM Plan includes a trip cap for VMT monitoring purposes.
The project applicant is required to submit annual trip monitoring reports to the Director of Public Works and the Director of Planning, Building and Code Enforcement or Directors’ designees that demonstrate the project VMT is below the 12.15 threshold. If the annual trip monitoring report finds NVF:MJV:JMD
6/9/2022
25 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
that the project is exceeding the established trip cap, the project applicant must submit a follow-up report that demonstrates compliance with the trip cap requirements within a six-month grace period. By achieving a 12.15 VMT per employee, the project would have a less than significant commercial office VMT impact (under the Non-Education Mixed Use Option).
Impact: TRN-3: Education Mixed-Use Option only: The educational component would result in 8.75 VMT per student, which is a net increase in VMT compared with the 7.85 VMT per student average for regional private schools.
Mitigation: MM TRN-3.1: Education Mixed-Use Option only: Prior to the issuance of any occupancy permits (temporary or final), the project applicant shall implement a Transportation Demand Management (TDM) plan that offers the following commute trip reduction measures to all students and employees to reduce the project’s VMT per student by 10.3 percent, from
8.75 to 7.84 VMT per student, which would be below the average VMT per student for regional private schools.
The project applicant shall provide commute trip reduction marketing and education. The school shall routinely provide commute trip reduction marketing/educational campaign to faculty, staff, student drivers, and parents to promote the use of transit, shared rides, walking, and bicycling.
The project applicant shall provide a rideshare/carpool program. The school shall implement a rideshare/carpool program to coordinate carpools amongst parents, student drivers, and employees.
Prior to the issuance of any occupancy permits, the project applicant shall submit the TDM plan to the Director of Department of Public Works or the Director’s designee. The TDM Plan shall include a trip cap for VMT monitoring purposes. The trip cap is 1,614 AM peak-hour trips and 646 PM peak-hour trips. Annual trip monitoring reports shall be submitted that demonstrate that project VMT is below threshold. If the annual trip monitoring report finds that the project is exceeding the established trip cap, the project applicant shall be required to submit a follow-up report that demonstrates compliance with the trip cap requirements within a 6- month grace period is required. Penalties, as defined in the Council Policy 5-1, shall be assessed if a project does not meet the trip cap requirements by the end of the grace period.
NVF:MJV:JMD
6/9/2022
26 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Finding: Implementation of Mitigation Measure TRN-3.1 would reduce the education-related VMT impact, under the education mixed-use option, to a less than significant level. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: The per-student VMT generated by the proposed school (8.75) would exceed the existing per-student VMT (7.85) and therefore, would generate a VMT impact. The applicant, under the Education Mixed-Use Option only, would be required to implement TR-3.1 to reduce the school VMT by 10.3 percent from 8.75 to 7.84 VMT per student, which would be below the average VMT per student for regional private schools.
. The project is expected to draw students mostly from Santa Clara County, Redwood City, and Fremont vicinities. As analyzed in the Transportation Analysis Report prepared by Hexagon Transportation Consultants, Inc., the TDM plan would apply to 95 percent of the students and employees.
The VMT estimate also assumes that 2 percent of the students and employees would participate in the rideshare/carpool program. With implementation of TR-3.1, the City’s VMT Evaluation Tool predicts that the TDM Plan mitigation measures described above would reduce the project’s VMT per student by 10.44 percent, from 8.75 to 7.84 VMT per student, which would be below the average VMT per student for regional private schools. Therefore, as VMT per student would be below the regional average, the educational component of the Education Mixed-Use Option would result in a less than significant impact with mitigation incorporated.
The TDM plan for monitoring, reporting, compliance, and funding will be provided for the life of the Education Mixed-Use project. Annual trip monitoring reports will demonstrate adherence to the established trip cap.
If the annual trip monitoring report finds that the project is exceeding the trip cap, a follow-up report prepared by the project applicant must demonstrates compliance with the trip cap requirements within a six- month grace period. Penalties, as defined in the Council Policy 5-1, would be assessed if a project does not meet the trip cap requirements by the end of the grace period.
FINDINGS CONCERNING ALTERNATIVES
In order to comply with the purposes of CEQA, it is important to identify alternatives that reduce the significant impacts that are anticipated to occur if the project is implemented and to try to meet as many of the project’s objectives as possible. The CEQA NVF:MJV:JMD
6/9/2022
27 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Guidelines emphasize a common-sense approach – the alternatives should be reasonable, should “foster informed decision making and public participation,” and should focus on alternatives that avoid or substantially lessen the significant impacts.
The alternatives analyzed in the DSEIR were developed with the goal of being at least potentially feasible, given Project objectives and site constraints, while avoiding or reducing the Project’s identified environmental effects.
The following alternatives were considered and rejected:
Location Alternative—This alternative was not considered further because of the lack of available land to support the proposed Signature project with mixed-use options with adequate transit and roadway access and utility capacity.
Furthermore, it is unlikely that an alternative location anywhere in the City of San José would substantially lessen the identified impacts, including impacts pertaining to construction-related air quality, construction-related noise, and potential impacts to nesting birds or hazardous materials. Substantially Reduced Development Alternative – This alternative was not considered further because it requires approximately one-third reduction in project size, resulting in approximately 366 multifamily units and 55,000 square feet of commercial space. The primary intent with this alternative is to reduce construction emissions below the BAAQMD thresholds without mitigation; however, construction of a parking podium would result in a similar construction impacts to the proposed project (under either option). Therefore, this alternative was rejected from further analysis because it would not substantially lessen any significant effects of the project and would not be consistent with the General Plan land use designation and vision for the project sites. One Hundred (100) Percent [Deed-Restricted] Affordable Housing Alternative – This alternative was not considered further because it would not be able to meet the City’s Signature Project criteria and would be inconsistent with IP-5.12 requirements, one of which restricts a 100 percent affordable housing project on a project site located on identified key employment opportunity sites or located at major intersections for which there is anticipated market demand for commercial uses within the next 10 to 15 years, such as the project sites. Furthermore, a 100 percent deed-restricted affordable housing development would be limited to the smaller 1777 Saratoga Avenue project site (designated
Neighborhood/Community Commercial in the 2040 General Plan). This alternative would reduce the project’s residential Vehicle Miles Traveled (VMT) impact, but would be inconsistent with the General Plan and the project’s basic objectives.
NVF:MJV:JMD
6/9/2022
28 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
The applicant’s objectives for the project are as follows:
1. Provide a high-quality, mixed use Signature Project for the Paseo de Saratoga Urban Village (Horizon 3) in accordance with the City of San José’s General Plan’s Major Strategy #5. 153
2. Redevelop the project sites with a mix of uses that includes over 700 market- rate, multifamily residential units and 165,000 square feet of commercial retail uses or a K-12 educational facility and 60,000 square feet of commercial retail uses to meet the demand for these land uses in the site area;
3. Increase housing opportunities in the City of San José and expand the supply of higher density housing product by providing approximately 700-1,100 multifamily units;
4. Redevelop the underutilized project sites to allow for new retail, higher density housing, and possibly educational use on a Signature site near existing residential and commercial uses and major transportation thoroughfares including SR 85, Saratoga Avenue, and Lawrence Expressway in western San José;
5. Provide a mix of land uses and public amenities that promote walking, bicycling, telecommuting, transit, and other transportation alternatives;
6. Respect the surrounding neighborhood and community through quality design, materials, and landscaping;
7. Implement sustainable building practices promoting energy and water efficiency;
8. Create new outdoor plaza and publicly-accessible open space areas to allow for the passive enjoyment by all residents and educational facility/office building users as well as the general public.
The following are evaluated as alternatives to the proposed Project:
1. No Project/ No New Development
2. No Project Redevelopment
3. Reduced Development
1. No Project/No New Development Alternative
A. Description of Alternative: The El Paseo Site (part of the larger El Paseo de Saratoga Shopping Center) is developed with three commercial buildings totaling approximately 96,440 square feet. The 1777 Saratoga Avenue site is developed with four office buildings totaling approximately 25,184 square feet. The project sites are located within the Envision San José 2040 General Plan’s Paseo de NVF:MJV:JMD
6/9/2022
29 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
Saratoga Urban Village growth area (Horizon 3) and are designated Regional Commercial and Neighborhood/Community Commercial, respectively. Under the No Project Alternative, the project sites could remain and be leased as is with commercial and/or office uses consistent with the sites’ General Plan designations and zoning districts (CG Commercial General and CP Commercial Pedestrian, respectively).
B. Comparison of Environmental Impacts: The No Project Alternative would avoid most of the environmental impacts of the project, assuming the continued occupancy or re-occupancy of the existing buildings. Since the project site will not be redeveloped under this alternative, the project will also avoid construction and operational impacts to neighboring residential uses.
C. Findings: This alternative would not meet any of the project objectives. The existing vacant buildings would continue unoccupied until a lessee is found. The buildings would remain as they currently exist (i.e., developed with a total of 96,440 square feet of existing commercial uses and 25,184 square feet of office development). The preferred non-education mixed-use option could not be accommodated on the existing site and would need to find an alternative location. The No Project alternative does not support the broader Urban Village plan strategy which calls for an urban form that supports walking, transit use and public interaction and accommodates growth in jobs and housing and it will not redevelop the project sites with a high-quality, sustainable, mixed-use Signature Project that provides a mix of uses and public amenities and supports a variety of transportation alternatives. In addition, this alternative will not increase homeownership opportunities or expand the supply of higher density housing in San José or deliver a signature project that creates new outdoor plazas and publicly accessible open spaces. Therefore, this alternative is rejected.
2. No Project Redevelopment Alternative
A. Description of the Alternative: The El Paseo Site is developed with three commercial buildings totaling approximately 96,440 square feet and the 1777 Saratoga Avenue site is developed with four office buildings totaling approximately 25,184 square feet. Given the project sites’ land use designations and location within the Paseo de Saratoga Urban Village, a wholly commercial development could be developed on the project sites. Based on the Regional Commercial and Neighborhood/Community Commercial designations and the underlying zoning districts of CG Commercial General and CP Commercial Pedestrian, the project sites could be developed with 571,624 square feet of commercial uses (office and retail, no residential or educational uses).
NVF:MJV:JMD
6/9/2022
30 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
B. Comparison of Environmental Impacts: The No Project Redevelopment Alternative assumed that the project sites would be developed with 571,624 square feet of commercial uses, without any residential or educational uses.
The No Project Redevelopment Alternative would have similar impacts to the preferred project; however, this alternative would result in a new commercial VMT impact. Specifically, the alternative’s construction-related air quality and noise impacts would be comparable to the project (under either option) because amount of demolition and grading and proximity to sensitive receptors would be the same. The amount of excavation would be reduced because it is assumed less below-ground parking would be required compared to the project because there would be less development to park. Since there would be less development, it is assumed the construction duration of the No Project Redevelopment Alternative would be less than the project (under either option).
As a result, construction noise impacts would be similar though slightly less than the project (under either option). Construction-related air pollutant emissions under this alternative would exceed the significance thresholds and be mitigated to below the threshold, same as the project (under either option). Therefore, the construction-related air quality impacts for this alternative would be comparable to the project’s impacts. Other identified mitigated impacts to biological resources and hazardous materials would remain the same as the project (under either option) because this alternative would also include grading and excavation, as well as removal of all landscaping trees on-site. Furthermore, the proposed project (under either option) would result in a mitigable VMT impact. This is due to the project sites’ location in a VMT area where the existing per capita VMT is greater than the thresholds of significance. The project sites are located in an area where the current VMT level per worker is close to the average VMT level but may be greater than the thresholds of significance depending on the types of employment uses. According to the City’s VMT Policy, small retail developments (i.e., 100,000 square feet or less) are considered local-serving and result in less- than-significant VMT impacts according to the screening criteria. Therefore, under the No Project, Redevelopment Alternative, the proposed 571,624 square feet of commercial uses would result in a significant VMT impact.
C. Finding: Under this alternative, the project would meet some of the project objectives (i.e., 6,7,8) by providing quality design, materials and landscaping, implementing sustainable building practices, and creating publicly accessible outdoor spaces. This alternative could partially meet objective five by providing amenities that promote transportation alternatives, but it would not include a mix of land uses on the sites. This alternative would not redevelop the project sites with a mixed-use Signature Project that provides a mix of uses (which includes higher density residential uses and commercial uses) and, therefore, this NVF:MJV:JMD
6/9/2022
31 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
alternative would not meet objectives one through four. The education and non- education mixed-use options would need to find an alternative location. The No Project Redevelopment Alternative does not support the mixed-use residential/commercial strategy for urban villages. Therefore, this alternative is rejected.
3. Reduced Development Alternative
A. Description of the Alternative: Under this alternative, the project sites will be developed with a mixed-use project at the minimum density and square footages stipulated in the General Plan for Signature Projects. General Plan Policy IP-5.10 states the minimum density for projects in Local Transit and Commercial Corridor and Center Villages is 55 dwelling units per acre, which equates to 586 residential units on the project sites. Under General Policy IP-5.10, a site must replace the commercial square footage that would be removed by redevelopment of that site (there is 121,624 square feet of existing commercial uses).
Additionally, the project would be required to include 43,304 square feet of new commercial square footage, for a minimum requirement totaling 164,928 square feet of commercial uses on the project sites. In total, under this Alternative, the project sites will be developed to meet the minimum requirement of 586 residential units and 164,928 square feet of commercial uses. It is assumed the building footprints will be similar to the project (under either option) with a reduction in the number of stories, from nine to 12 stories to four to eight stories.
B. Comparison of Environmental Impacts: The Reduced Development Alternative assumes that less development would result in less impacts. The project sites would still be redeveloped under this Alternative; therefore, the Reduced Development Alternative’s construction-related air quality and noise impacts would be comparable to the project (under either option) because the amount of demolition and grading and proximity to sensitive receptors would be the same as under the project (under either option). Since there would be less development, however, it is assumed the construction duration of the Reduced Development Alternative would be less than the project (under either option).
This alternative would also require nighttime construction for a 15-day period. As a result, construction noise impacts would be similar though slightly less than the project (under either option). Construction-related air pollutant emissions under this alternative would exceed the significance thresholds and be mitigated to below the threshold, same as the project. Therefore, as stated above, construction-related air quality impacts for this alternative would be comparable to the project’s. The project’s other identified mitigated impacts to biological resources and hazardous materials would remain the same under the Reduced Development Alternative because this alternative would redevelop the same NVF:MJV:JMD
6/9/2022
32 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
project sites with the same building footprints as the project, requiring excavation for utility improvements and below ground parking structures. Any alternative with residential uses proposed at the project sites (regardless of size or scale) would result in the same mitigable residential VMT impact as the project (under either option) due to the project sites’ location in a high VMT area where the existing VMT is greater than the thresholds of significance. For this reason, the Reduced Development Alternative would result in the same residential VMT impact as the project. As with the project (under either option), the commercial component of the Reduced Development Alternative would result in a less than significant VMT impact.
C. Finding: This Alternative would meet project objectives four, five, six and seven by intensifying development on the project sites and developing a mixed-use project near existing residential and commercial uses and major transportation thoroughfares. This Alternative could also meet objective eight in that it would provide an outdoor plaza and open space (per Signature Project requirements), although not to the extent proposed under the project. This Alternative would not provide the approximately 900 residential units under the non-education mixed use project or approximately 700 residential units and the K-12 educational facility under the education mixed-use option. The education mixed-use option will have to find an alternative location. Therefore, this alternative is rejected.
Environmentally Superior Project
The No Project/No Development Alternative would avoid all project impacts. However, CEQA requires that when the No Project alternative is the environmentally superior alternative, another alternative shall be identified as the environmentally superior alternative.
Following the No Project – No Development Alternative, the Reduced Development Alternative would be the next environmentally superior alternative.
The Reduced Development Alternative would include redevelopment of both sites similar to the proposed project. The Reduced Development Alternative would have the same less than significant impacts, under both projects, with respect to construction- related Air Quality, Biological Resources (i.e., nesting bird impacts), Hazards and Hazardous Materials (i.e., on-site soil contamination), construction-related noise impacts (including nighttime impacts), and Transportation VMT Residential impact. The Reduced Development Alternative would not have a Transportation VMT impact for an educational facility. The Reduced Development Alternative would meet most of the objectives of the proposed project, except that it would not maximize both sites and NVF:MJV:JMD
6/9/2022
33 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
reach the development potential envisioned for Signature Projects specifically and urban village projects generally. Namely, the Reduced Development Alternative would result in approximately 314 residential units less than the non-education mixed use option and approximately 114 residential units less than the education mixed-use option. The commercial square footage would be similar under the non-education mixed-use option (approximately 165,000 square feet) and approximately 65,000 more than the education mixed-use option.
This Reduced Development Alternative would achieve most of the project objectives with the least amount of project impacts. Therefore, this alternative is the environmentally superior alternative.
MITIGATION MONITORING AND REPORTING PROGRAM
Attached to this Resolution as Exhibit “A” and incorporated and adopted as part of this Resolution herein is the Mitigation Monitoring and Reporting Program (“MMRP”) for the Project required under Section 21081.6 of the CEQA Statute and Section 15097(b) of the CEQA Guidelines. The MMRP identifies impacts of the Project, corresponding mitigation, designation for responsibility for mitigation implementation and the agency responsible for the monitoring action.
LOCATION AND CUSTODIAN OF RECORDS
The documents and other materials that constitute the record of proceedings on which the City Council based the foregoing findings and approval of the Project are located at the Department of Planning, Building and Code Enforcement, 200 East Santa Clara Street, 3rd Floor Tower, San José, CA 95113.
//
//
//
//
NVF:MJV:JMD
6/9/2022
34 T-51008.001 \ 1927043.doc
Council Agenda: 06-21-2022
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
ADOPTED this ____ day of _________, 2022, by the following vote:
AYES:
NOES:
ABSENT:
DISQUALIFIED:
SAM LICCARDO
Mayor
ATTEST:
TONI J. TABER, CMC
City Clerk
MITIGATION MONITORING AND REPORTING PROGRAM
El Paseo & 1777 Saratoga Avenue Mixed-Use Village Project File No. PDC19-049
May 2022
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 1 File No.: PDC19-049
PREFACE
Section 21081.6 of the California Environmental Quality Act (CEQA) requires a Lead Agency to adopt a Mitigation Monitoring and Reporting Program (MMRP) whenever it approves a project for which measures have been required to mitigate or avoid significant effects on the environment.
The purpose of the monitoring and reporting program is to ensure compliance with the mitigation measures during project implementation.
The Environmental Impact Report (EIR) prepared for the El Paseo & 1777 Saratoga Avenue Mixed-Use Village project concluded that the implementation of the project could result in significant effects on the environment and mitigation measures were incorporated into the proposed project or are required as a condition of project approval. This MMRP addresses those measures in terms of how and when they will be implemented.
This document does not discuss those subjects for which the EIR concluded that the impacts from implementation of the project would be less than significant.
I, Allison Koo
, the applicant, on the behalf of El Paseo Property Owner, LLC , hereby agree to fully implement the mitigation measures described below which have been developed in conjunction with the preparation of an EIR for my proposed project. I understand that these mitigation measures or substantially similar measures will be adopted as conditions of approval with my development permit request to avoid or significantly reduce potential environmental impacts to a less than significant level.
Project Applicant’s Signature _____________________________________________ Date____06/02/2022_______________________________________________________ EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 2 File No.: PDC19-049
El Paseo & 1777 Saratoga Avenue Mixed-
Use Village Project / File No. PDC19-049
MITIGATIONS MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
AIR QUALITY
Impact AIR-1: Both Options: The emissions resulting from the construction of the project (under either option) would exceed the Bay Area Air Quality Management District (BAAQMD) threshold of 54 pounds per day of ROG emissions and 54 pounds per day of NOx emissions.
MM AIR-1.1: Both Options: Prior to the issuance of
any demolition, grading and/or building permits
(whichever occurs earliest), the project applicant
(under either option) shall implement the following
additional best management practices identified by the
BAAQMD in order to reduce fugitive dust.
• All exposed surfaces (e.g., parking areas,
staging areas, soil piles, graded areas, and
unpaved access roads) shall be watered at a
frequency adequate to maintain minimum soil
moisture of 12 percent (i.e., three times a
day). Moisture content shall be verified by lab
samples or moisture probe.
• All vehicle speeds on unpaved roads shall be
limited to 15 mph.
• The Air District’s phone number shall be
visible on a sign at the construction site to
ensure compliance with applicable
regulations.
Incorporate the fugitive dust
measures into the
construction management
plan (described in MM AIR-
1.2) and communicate to all
workers.
All measures shall be printed
on all construction
documents, contracts, and
project plans.
Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
earliest); best
management
practices shall be
implemented during
the demolition and
construction phases.
Director of Planning,
Building and Code
Enforcement or the
Director’s designee.
Review and
approve the
construction
management plan.
Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs earliest);
during the
demolition and
construction
phases.
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 3 File No.: PDC19-049
• All excavation, grading, and/or demolition
activities shall be suspended when average
wind speeds exceed 20 miles per hour and
visible dust extends beyond site boundaries.
• Wind breaks (e.g., trees, fences) shall be
installed on the windward side(s) of actively
disturbed areas of construction adjacent to
sensitive receptors. Wind breaks should have
at maximum 50 percent air porosity.
• The simultaneous occurrence of excavation,
grading, and ground-disturbing construction
activities on the same area at any one time
shall be limited. Activities shall be phased to
reduce the amount of disturbed surfaces at any
one time.
• Avoid tracking of visible soil material on to
public roadways by employing the following
measures if necessary: (1) Site accesses up to
a distance of 100 feet from public paved roads
shall be treated with a six to 12-inch
compacted layer of wood chips, mulch, or
gravel and (2) washing truck tires and
construction equipment of prior to leaving the
site.
MM AIR-1.2: Construction Equipment (Both
Options): Prior to issuance of any demolition, grading
and/or building permits (whichever occurs earliest), the project applicant shall submit a construction
management plan to the Director of Planning, Building
and Code Enforcement or the Director’s designee for
review and approval. The construction management
plan shall demonstrate that the off-road equipment
used onsite to construct the project would achieve a
fleet-wide average 85-percent reduction in PM2.5
exhaust emissions or more. Options to achieve this
reduction could include, but are not limited to, the
following:
• All mobile diesel-powered off-road equipment
larger than 25 horsepower and operating on
the site for more than two days shall meet
Submit a construction
management plan to the
Director of Planning,
Building and Code
Enforcement or the
Director’s designee that
outlines how the project will
achieve a fleet-wide average
85-percent reduction in
PM 2.5 exhaust emissions or
more.
All measures shall be printed
on all construction
documents, contracts, and
project plans.
Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
earliest).
Director of Planning,
Building and Code
Enforcement or the
Director’s designee.
Review and
approve the
construction
management plan.
Prior to the
issuance of any
demolition,
grading, and/or
building permits.
(whichever
occurs earliest).
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 4 File No.: PDC19-049
U.S. EPA particulate matter emissions
standards for Tier 4 engines or equivalent.
• Use of equipment that includes California Air
Resources Board (CARB)-certified Level 3
diesel particulate filters or alternatively-fueled
equipment (i.e., non-diesel).
• Use of added exhaust muffling and filtering
devices.
• The plan shall also verify that the equipment
included in the plan meets the standards set
forth in these mitigation measures:
o If use of Tier 4 equipment is not
available, alternatively use equipment
that meets U.S. EPA emission standards
for Tier 3 engines and include particulate
matter emissions control equivalent to
CARB Level 3 verifiable diesel emission
control devices that altogether achieve
an 85 percent reduction in particulate
matter exhaust in comparison to
uncontrolled equipment. The use of Tier
3 equipment shall not exceed five
percent of all equipment usage
(described in terms of total horsepower
hours during a phase).
o Use of alternatively fueled equipment
with lower NOx emissions that meet the
NOx and PM reduction requirements
above.
o Diesel engines, whether for off road
equipment or on road vehicles, shall not
be left idling for more than two minutes,
except as provided in exceptions to the
applicable state regulations (e.g., traffic
conditions, safe operating conditions).
The construction sites shall have posted
legible and visible signs in designated
queuing areas and at the construction site
to clearly notify operators of idling limit.
o Provide line power to the site during the
early phases of construction to minimize
the use of diesel-powered stationary
equipment, such as generators,
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 5 File No.: PDC19-049
concrete/industrial saws, welders, and air
compressors.
o Cranes and aerial lifts shall be powered
by electricity.
MM AIR-1.3: Architectural Coatings (Both Options):
Prior to the issuance of any building permits, the
project applicant (under either option) shall submit a
list of intended coatings for interior and exterior
surfaces to the Director of Planning, Building and
Code Enforcement or Director’s designee,
demonstrating the use of low volatile organic
compound or VOC (i.e., ROG) coatings that are below
current BAAQMD requirements (i.e., Regulation 8,
Rule 3: Architectural Coatings), for at least 90 percent of all residential and nonresidential interior paints and 90 percent of exterior paints. This includes all
architectural coatings applied during both construction and reapplications throughout the project’s operational lifetime. At least 90 percent of coatings applied must
meet a “super-compliant” VOC standard of less than
10 grams of VOC per liter of paint. For reapplication
of coatings during the project’s operational lifetime,
the Declaration of Covenants, Conditions, and
Restrictions shall contain a stipulation for low VOC
coatings to be used.
Submit a list of all intended
coatings used for interior and
exterior surfaces to the
Supervising Environmental
Planner and the Director of
Planning, Building and Code
Enforcement or Director’s
designee that demonstrates
90 percent of all coatings are
low volatile organic
compound or VOC coatings,
that are below current
BAAQMD requirements.
All measures shall be printed
on all construction
documents, contracts, and
project plans.
Prior to the issuance
of any building
permits.
Director of Planning,
Building and Code
Enforcement or the
Director’s designee.
Review and
approve the
coatings list.
Prior to the
issuance of any
building permits.
MM AIR-1.4: Construction diesel trucks (Both
Options): Prior to the issuance of any demolition or
grading permits (whichever is earliest), the project
applicant shall submit a list of all on-road heavy duty diesel trucks intended to be used at the project sites to the Director of Planning, Building and Code
Enforcement or Director’s designee for review and
approval. All on-road heavy duty diesel trucks with a
gross vehicle weight rating of 33,000 pounds or greater (EMFAC Category MHDDT or HHDDT) used at the
project sites (such as haul trucks, water trucks, dump
trucks, and concrete trucks) shall be model year 2015
or newer.
The project applicant shall
submit a list with the make,
model, and year of all on-
road heavy duty diesel trucks
with a gross vehicle weight
rating of 33,000 pounds or
greater (EMFAC Category
MHDDT or HHDDT) used
at the project sites to the
Supervising Environmental
Planner that demonstrates
that all qualifying vehicles
are model year 2015 or
newer.
Prior to the issuance
of any demolition or
grading permits
(whichever occurs
earliest).
Director of Planning,
Building and Code
Enforcement or the
Director’s designee.
Review and
approve the vehicle
list.
Prior to the
issuance of any
demolition or
grading permits
(whichever
occurs earliest).
BIOLOGICAL RESOURCES
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 6 File No.: PDC19-049
Impact BIO-1: Both Options: Project construction (under either option) could result in impacts to nesting birds, if present on or adjacent to the sites at the time of construction.
MM BIO-1.1: Both Options: Prior to the issuance of
any demolition, grading, and/or building permits
(whichever occurs earliest), the project applicant shall schedule demolition and construction activities to
avoid the nesting season. The nesting season for most
birds, including most raptors in the San Francisco Bay
area, extends from February 1 through August 31
(inclusive).
Notify the City’s
Supervising Environmental
Planner of approximate start
and end date of site
disturbance activities.
Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
earliest).
Director of Planning,
Building and Code
Enforcement or the
Director’s designee
(Supervising
Environmental
Planner).
Confirm start of
construction
activities is outside
of nesting season.
Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs earliest).
MM BIO-1.2: Both Options: If demolition and
construction cannot be scheduled between September 1
and January 31 (inclusive), pre-construction surveys
for nesting birds shall be completed by a qualified
ornithologist to ensure that no nests are disturbed
during project implementation. This survey shall be
completed no more than 14 days prior to the initiation
of construction activities during the early part of the breeding season (February 1 through April 30
inclusive) and no more than 30 days prior to the
initiation of these activities during the late part of the breeding season (May 1 through August 31 inclusive).
During this survey, the ornithologist shall inspect all trees and other possible nesting habitats immediately
adjacent to the construction areas for nests.
The qualified ornithologist
to complete pre-construction
surveys in accordance with
MM BIO-1.2. If active nests
are discovered close to work
areas, MM BIO-1.3 shall be
initiated. The results of the
pre-construction surveys
shall be described in the
report required by MM BIO-
1.4. Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
earliest).
Director of Planning,
Building and Code
Enforcement or the
Director’s designee
(Supervising
Environmental
Planner).
Receive the
ornithologist
report.
Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs earliest).
MM BIO-1.3: Both Options: If an active nest is found
sufficiently close to work areas to be disturbed by
construction, the ornithologist, in consultation with the California Department of Fish and Wildlife (CDFW),
shall determine the extent of a construction free buffer zone to be established around the nest to ensure that
bird nests shall not be disturbed during project
construction.
The ornithologist in
consultation with the
California Department of
Fish and Wildlife, shall
determine the extent of a
construction free buffer zone
to be established around the
nest to ensure that bird nests
shall not be disturbed during
project construction. The
construction free buffer
zones shall be described in
the report required by MM
BIO-1.4.
Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
earliest).
Director of Planning,
Building and Code
Enforcement or the
Director’s designee
(Supervising
Environmental
Planner) .
Receive the
ornithologist
report.
Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs earliest).
MM BIO-1.4: Both Options: Prior to any tree removal,
or approval of any grading or demolition permits
Following completion of
MM BIO-1.2 and MM BIO-
Prior to the issuance
of any demolition,
Director of Planning,
Building and Code
Receive the
ornithologist report
Prior to the
issuance of any
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 7 File No.: PDC19-049
(whichever occurs first), the ornithologist shall submit a report indicating the results of the survey and any
designated buffer zones to the City’s Director of
Planning, Building and Code Enforcement or the
Director’s designee.
1.3, the ornithologist shall
submit a report indicating
the results of the survey and
any designated buffer zones
to the City’s Director of
Planning, Building and Code
Enforcement or the
Director’s designee.
All measures shall be printed
on all construction
documents, contracts, and
project plans.
grading, and/or
building permits
(whichever occurs
earliest).
Enforcement or the
Director’s designee
(Supervising
Environmental
Planner).
for consistency
with MM BIO-1.2
through MM BIO-
1.4. demolition,
grading, and/or
building permits
(whichever
occurs earliest).
HAZARDS AND HAZARDOUS MATERIALS
Impact HAZ-1: Both Options: Project construction (under either option) could result in exposure of construction workers, adjacent uses, and the environment to soil contamination from historic agricultural use, including residual contamination from organochlorine pesticides, herbicides, and fertilizers.
MM HAZ-1.1: Both Options: Prior to issuance of
demolition or grading permits, the project applicant
shall prepare a Site Management Plan (SMP) and
Health and Safety Plan (HSP) to guide activities during demolition, excavation, and initial construction to
ensure that potentially contaminated soils are
identified, characterized, removed, and disposed of
properly. The purpose of the Site Management Plan
and Health and Safety Plan is to establish appropriate
management practices for handling impacted soil or
other materials that may be encountered during
construction activities. The Site Management Plan
shall provide the protocols for sampling of in-place soil to facilitate the profiling of the soil for appropriate off- site disposal or reuse, and for construction worker
safety, dust mitigation during construction and
potential exposure of contaminated soil to future users of the site. The soil profiling shall include (but not
limited to) the collection of shallow soil samples
(upper one-foot) and analyses for lead and
organochlorine pesticides. The soil profiling shall be
performed prior to any significant earthwork.
If there are no contaminants identified on the project
sites that exceed regulatory screening levels for
Submit a Site Management
Plan and Health and Safety
Plan to the Supervising
Environmental Planner,
Supervising Environmental
Compliance Officer, and the
Santa Clara County
Department of
Environmental Health (if
contaminants are identified
on the project sites that
exceed applicable screening
levels). All measures shall
be printed on all construction
documents, contracts, and
project plans.
Prior to the issuance
of any demolition or
grading permits
(whichever occurs
earliest).
Director of Planning,
Building and Code
Enforcement or the
Director’s designee
(City of San José
Supervising
Environmental
Planner)
City of San José
Environmental
Compliance Officer
Santa Clara County
Department of
Environmental Health
Receive the
approved Site
Management Plan
and the Health and
Safety Plan and
review for
compliance with
MM HAZ-1.1.
Review and
approve Site
Management Plan
and oversee
remediation
activity.
Prior to the
issuance of any
demolition and
grading permits
(whichever
occurs earliest).
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 8 File No.: PDC19-049
construction workers and residential users published by the Regional Water Quality Control Board, Department
of Toxic Substances Control, and/or Environmental
Protection Agency, the SMP does not need to be
submitted to an oversight agency and only submitted to
the City prior to construction earthwork activities. If contaminants are identified at concentrations exceeding regulatory screening levels, the project applicant shall enter the Santa Clara County Department of
Environmental Health (SCCDEH) Site Cleanup
Program. The SMP and planned remedial measures
shall be reviewed and approved by the SCCDEH. A
copy of the SMP and HSP shall be submitted to the
Supervising Environmental Planner of the Department
of Planning, Building and Code Enforcement and the
Supervising Environmental Compliance Officer in the
City of San José’s Environmental Services
Department.
NOISE AND VIBRATION
Impact NOI-1: Both Options: Project construction (under either option) would exceed the City’s construction noise threshold of significance of 60 dBA Leq at residential land uses and places of worship or 70 dBA Leq at commercial land uses by five dBA Leq or more at various times throughout construction for over a year.
MM NOI-1.1: Both Options: Prior to issuance of any
demolition or grading permits, a qualified acoustical
consultant shall prepare a construction noise logistics plan specifying the hours of construction as well as the noise and vibration minimization measures. Posting or
notification of construction schedules is required to be in place prior to the start of construction and
implemented during construction to reduce noise
impacts on neighboring residents and other uses. The
construction noise logistics plan shall require, but not be limited to, the following:
• Construction shall be limited to the hours of
7:00 a.m. to 7:00 p.m. Monday through Friday
for any on-site or off-site work within 500 feet
of any residential unit. Construction outside of
these hours may be approved through a
development permit based on a site-specific
“construction noise mitigation plan” and a
finding by the Director of Planning, Building
The qualified acoustical
consultant to prepare a
construction noise logistics
plan. Submit the
construction noise logistics
plan to the Supervising
Environmental Planner.
All measures shall be printed
on all construction
documents, contracts, and
project plans.
Prior to the issuance
of any demolition or
grading permits
(whichever occurs
earliest).
The plan shall be
implemented during
construction.
Director of Planning,
Building and Code
Enforcement or the
Director’s designee
(Supervising
Environmental
Planner).
Receive and review
the construction
noise logistics plan
for compliance
with MM NOI-1.1.
Prior to the
issuance of any
demolition or
grading permits
(whichever
occurs earliest).
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 9 File No.: PDC19-049
and Code Enforcement that the construction
noise mitigation plan is adequate to prevent
noise disturbance of affected residential uses.
• The contractor shall use “new technology”
power construction equipment with state-of-
the-art noise shielding and muffling devices.
All internal combustion engines used on the
project site shall be equipped with adequate
mufflers and shall be in good mechanical
condition to minimize noise created by faulty
or poorly maintained engines or other
components.
• The unnecessary idling of internal combustion
engines shall be prohibited.
• Staging areas and stationary noise-generating
equipment shall be located as far as possible
from noise-sensitive receptors such as
residential uses (a minimum of 200 feet).
• The surrounding neighborhood shall be
notified early and frequently of the
construction activities.
• A “noise disturbance coordinator” shall be
designated to respond to any local complaints
about construction noise. The disturbance
coordinator would determine the cause of the
noise complaints (e.g., beginning work too
early, bad muffler, etc.) and institute
reasonable measures warranted to correct the
problem. A telephone number for the
disturbance coordinator would be
conspicuously posted at the construction site
and included in the noise logistics plan.
Prior to issuance of any demolition or grading permits, the project applicant shall submit a copy of the noise
logistics plan to the Director of Planning, Building and Code Enforcement or the Director’s designee.
Impact NOI-2: Both Options: Nighttime project construction activities, specifically concrete pours during the evening hours (7:00 p.m. to 9:00 p.m.), could result in hourly average noise levels exceeding 60 dBA at the first row of residences located south of the El Paseo site.
MM NOI-2.1: Both Options: Prior to the issuance of
any demolition, grading, and/or building permits
(whichever occurs earliest), the project applicant shall All measures outlined in
MM NOI-2.1 shall be
printed on all construction
Prior to the issuance
of any demolition,
grading, and/or
Director of Planning,
Building and Code
Enforcement or the
Receive and review
the report for
Prior to the
issuance of any
demolition,
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 10 File No.: PDC19-049
implement the following measures during nighttime
(7:00 p.m. to 9:00 p.m.) construction activities:
• Limit the active equipment to as few pieces of
equipment as possible.
• To the extent consistent with applicable
regulations and safety considerations,
operation of back-up beepers shall be avoided
near sensitive receptors during nighttime
hours to the extent feasible, and/or the work
sites shall be arranged in a way that minimizes
the need for any reverse motions of trucks or
the sounding of any reverse motion alarms
during nighttime work. If these measures are
not feasible, equipment and trucks operating
during the nighttime hours with reverse
motion alarms must be outfitted with Society
of Automotive Engineering J994 Class D
alarms (ambient-adjusting, or “smart alarms”
that automatically adjust the alarm to five
dBA above the ambient near the operating
equipment).
• Limit nighttime concrete pouring to the
northernmost equipment location or a
minimum distance of 100 feet from the
southern boundary of the El Paseo site, where
feasible.
o If the concrete pumping operation is
located within 100 feet of the
southern boundary of the El Paseo
site, when feasible install temporary
noise barriers around the concrete
pumping operation to control the
noise levels at the source.
• Residences or other noise-sensitive land uses
within 500 feet of construction sites should be
notified of the nighttime construction
schedule, in writing, prior to the beginning of
construction. This notification shall specify
the dates for all nighttime construction.
Designate a “construction liaison” that would
be responsible for responding to any local
complaints about nighttime construction
documents, contracts, and
project plans.
Submit a report to the
Supervising Environmental
Planner documenting the
equipment used and the
location of concrete pouring
equipment and temporary
noise barriers. Inform the
Supervising Environmental
Planner of the time and date
of notification of residents
within 500 feet of the
construction sites.
building permits
(whichever occurs
earliest).
Director’s designee
(Supervising
Environmental
Planner).
compliance with
MM NOI-2.1.
grading, and/or
building permits
(whichever
occurs earliest).
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 11 File No.: PDC19-049
noise. The liaison would determine the cause
of the noise complaints (e.g., starting too
early, bad muffler, etc.) and institute
reasonable measures to correct the problem.
Conspicuously post a telephone number for
the liaison at the construction site.
Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the
project applicant shall submit a report to the Director of Planning, Building and Code Enforcement or
Director’s designee documenting the equipment used
and the location of concrete pouring equipment and
temporary noise barriers, and including the time and
date of notification of residents within 500 feet of the construction sites.
Impact NOI-3: Both Options: The project (under either option) would exceed the City’s vibration limit of 0.2 in/sec PPV for buildings of conventional construction at adjacent places of worship and commercial uses to the north and east.
MM NOI-3.1: Both Options: Prior to the issuance of
any demolition, grading, and/or building permits
(whichever occurs earliest), the project applicant shall contract with a licensed Professional Structural
Engineer in the State of California to prepare a
construction vibration monitoring plan that includes
measures to reduce vibration impacts to achieve
vibration levels below the City’s vibration limit of 0.2 in/sec PPV. During construction, the project applicant
(under either option) shall implement the following
vibration reduction measures:
• Limit the use of vibratory rollers, hoe rams,
large bulldozers, and caisson drilling, and
avoid clam shovel drops within 15 feet of the
property lines shared with residences and
commercial structures adjacent to the site.
• Place operating equipment on the construction
site as far as possible from vibration-sensitive
receptors.
• Use smaller equipment to minimize vibration
levels below the limits.
• Select demolition methods not involving
impact tools.
Contract with a licensed
Professional Structural
Engineer in the State of
California to prepare a
construction vibration
monitoring plan that
includes the measures
outlined in MM NOI-3.1; the
plan shall be submitted to
the Supervising
Environmental Planner.
Implement vibration
reduction measures.
All measures shall be printed
on all construction
documents, contracts, and
project plans.
Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
earliest).
The plan shall be
implemented during
all phases of
construction.
Director of Planning,
Building and Code
Enforcement or the
Director’s designee
(Supervising
Environmental
Planner).
Receive and review
the construction
vibration
monitoring plan for
compliance with
MM NOI-3.1.
Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs earliest).
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 12 File No.: PDC19-049
• Avoid dropping heavy objects or materials
near vibration sensitive locations.
• A list of all heavy construction equipment to
be used for this project known to produce high
vibration levels (tracked vehicles, vibratory
compaction, jackhammers, hoe rams, etc.)
shall be submitted to the City by the
contractor. This list shall be used to identify
equipment and activities that would
potentially generate substantial vibration and
to define the level of effort required for
continuous vibration monitoring.
• A construction vibration-monitoring plan shall
be implemented to document conditions at the
residences and commercial structures adjacent
to the site prior to, during, and after vibration
generating construction activities. All plan
tasks shall be undertaken under the direction
of a licensed Professional Structural Engineer
in the State of California and be in accordance
with industry accepted standard methods. The
construction vibration monitoring plan shall
be implemented to include the following
tasks:
o Identification of sensitivity to ground-
borne vibration of the residences and
commercial structures adjacent to the
sites. A vibration survey (generally
described below) shall be performed.
o Performance of a photo survey, elevation
survey, and crack monitoring survey for
the residences and commercial structures
adjacent to the sites. Surveys shall be
performed prior to and after completion
of vibration generating construction
activities located within 25 feet of the
structure. The surveys shall include
internal and external crack monitoring in
the structure, settlement, and distress,
and shall document the condition of the
foundation, walls and other structural
elements in the interior and exterior of
the structure.
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 13 File No.: PDC19-049
o Conduct a post-survey on the structure
where either monitoring has indicated
high levels or complaints of damage.
Make appropriate repairs where damage
has occurred as a result of construction
activities.
o The results of any vibration monitoring
shall be summarized and submitted in a
report shortly after substantial
completion of each phase identified in
the project schedule. The report shall
include a description of measurement
methods, equipment used, calibration
certificates, and graphics as required to
clearly identify vibration-monitoring
locations. An explanation of all events
that exceeded vibration limits shall be
included together with proper
documentation supporting any such
claims.
o Designate a person responsible for
registering and investigating claims of
excessive vibration. The contact
information of such person shall be
clearly posted on the construction site.
Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the
project applicant shall submit the construction
vibration monitoring plan to satisfaction of the Director of Planning, Building and Code Enforcement or
Director’s designee.
TRANSPORTATION
Impact TRN-1: Both options: The residential component of the project (under either option) would generate 11.07 VMT per capita, which exceeds the City’s residential threshold of 10.12 VMT per capita.
MM TRN-1.1: Both options: The project shall
implement the following pedestrian network
improvements to reduce the project’s VMT per capita
by from 11.07 to 10.63 VMT per capita.
Coordinate with the City in
implementing or paying in-
lieu fees contributing to the
implementation of the
Prior to the issuance
of any demolition,
grading, and/or
building permits
Director of Public
Works or the
Director’s designee
Director of Planning,
Building and Code
Review and
approve the report
identified in MM
TRN-1.1.
Prior to the
issuance of any
demolition,
grading, and/or
building permits
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 14 File No.: PDC19-049
• The project applicant shall implement the
following pedestrian network improvements
to reduce the project’s VMT per capita from
11.07 to 10.63 VMT per capita.
o Modify the existing signal to provide a
5-phase signal operation;
o Provide a signalized pedestrian
crosswalk for the south leg;
o Provide bike signal heads at near and far
sides for eastbound through bicycle
movement;
o Install new signal poles with mast arms
lengths shadowing opposing left-turn
pockets at the northwest and southeast
intersection corners; construct two new
directional ADA curb ramps at the
southeast corner and one new directional
ADA curb ramp at the northwest corner;
o Install a new signal pole with mast arm
at the southwest intersection corner;
construct new directional ADA curb
ramp;
o Replace the existing signal pole at the
north leg of the intersection with a signal
pole and mast arm for the northbound
Campbell Avenue movements;
o Remove the existing signal poles from
the raised medians along Campbell
Avenue;
o Construct a new ADA directional curb
ramp at the northeast corner;
o Retain the existing accessible pedestrian
signal equipment for all pedestrian
crosswalks and existing video detection
for all intersection approaches;
o Existing signal cabinet(s) to be
maintained where feasible, per PW Final
Memo conditions.
o Construct a 550-foot-long, 10-foot wide
sidewalk with a curb/gutter along
eastbound Campbell Avenue with tree
wells at 35 feet off-center;
improvements identified in
MM TRN-1.1.
Submit a report outlining
plans and schedules for
completing the agreed-upon
improvements to the
Department of Public
Works.
(whichever occurs
earliest).
Enforcement or
Director’s designee.
Receive a copy of
the report.
(whichever
occurs earliest).
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 15 File No.: PDC19-049
o Remove existing asphalt concrete along
the portion of Campbell Avenue being
abandoned and replace with decomposed
granite;
• As part of the removal of the pork chop
island, the project applicant shall retain the
existing 30-foot reinforced concrete pipe
located along the portion of Campbell Avenue
being abandoned and maintain existing
drainage conform;
• The project applicant shall also complete
streetlight and protect existing
communications conduits, which include
providing a new streetlight every 150 feet
along the new sidewalk along eastbound
Campbell Avenue and providing LED lighting
for each new signal pole. All outdoor lighting
shall comply with applicable regulations
including the Municipal Code and Council
Policy 4-3.
Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs earliest), the
project applicant shall submit a report describing the
plans and schedules for completing the agreed-upon
improvements to the Director of Public Works, or the
Director’s designee, for review and approval. A copy
of the report shall also be provided to the Director of Planning, Building and Code Enforcement or the
Director’s designee.
MM TRN-1.2: Both Options: Prior to the issuance of
any occupancy permits (temporary or final), the project applicant shall implement a Transportation Demand
Management (TDM) plan that provides unbundled on-
site parking costs, which would allow residents without cars to rent a unit without having to pay for a parking spot and reduce the project’s VMT per capita with
implementation of mitigation measure MM TRN-1.1
from 10.63 to 10.09 VMT per capita, which would be
below the Citywide average VMT per capita minus 15
percent (10.12) threshold.
Submit the TDM Plan and
annual trip monitoring
reports from issuance of
Certificate of Occupancy
that demonstrate that project
VMT is below threshold to
the Supervising
Environmental Planner.
.
If the annual trip monitoring
report finds that the project
is exceeding the established
Prior to the issuance
of any occupancy
permits and
monitoring
throughout the
lifetime of the
project.
Director of
Department of Public
Works or Director’s
designee and the
Director of Planning,
Building and Code
Enforcement, or
Director’s designee
(Supervising
Environmental
Planner).
Review the annual
trip monitoring
reports and assess
penalties for non-
compliance in
accordance with
Council Policy 5-1,
if warranted.
Prior to the
issuance of any
occupancy
permits and
monitoring
throughout the
lifetime of the
project.
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 16 File No.: PDC19-049
Prior to the issuance of any occupancy permits, the
project applicant shall submit the TDM plan to the
Director of Department of Public Works or Director’s
designee and the Director of Planning, Building and
Code Enforcement or Director’s designee. The TDM
Plan shall include a trip cap for VMT monitoring
purposes. The trip cap is 475 AM peak-hour trips and
633 PM peak-hour trips for the Non-Education Option
or 1,614 AM peak-hour trips and 646 PM peak-hour
trips for the Education Option. Annual trip monitoring
reports shall be submitted that demonstrate that project VMT is below threshold. If the annual trip monitoring
report finds that the project is exceeding the established trip cap, the project applicant shall be required to
submit a follow-up report that demonstrates
compliance with the trip cap requirements within a 6-
month grace period, which typically will not exceed six months. Penalties, as defined in the Council Policy 5-1, shall be assessed if a project does not meet the trip cap requirements by the end of the grace period. Penalties
for non-compliance shall be assessed by the City as
defined in the Council Policy 5-1.
trip cap, submit a follow-up
report that demonstrates
compliance with the trip cap
requirements within a grace
period, which typically will
not exceed six months.
Impact TRN-2: Non-Education Option only: The commercial office component of the project would generate 13.38 VMT per employee which exceeds the City’s employee threshold of 12.21 VMT per employee resulting in a significant impact.
MM TRN-2.1: Non-Education Mixed-Use Option
only: Prior to the issuance of any occupancy permits
(temporary or final), the project applicant shall
implement a TDM plan that provides the following
measures to reduce the project’s VMT per employee by
1.35, from 13.38 to 12.15 VMT per employee, which
would be below the Citywide average 12.21 VMT per
employee:
• Commute Trip Reduction Marketing and
Education. The office would be required to
routinely provide a commute trip reduction
marketing/educational campaign to
employees to promote the use of transit,
shared rides, walking, and bicycling,
therefore lowering the number of single
occupancy vehicle (SOV) trips and VMT.
Submit the TDM plan to the
Supervising Environmental
Planner, including the trip
cap for VMT monitoring
purposes.
Submit annual trip
monitoring reports on
anniversary of building
occupancy demonstrating the
project VMT is below
threshold. If the annual trip
monitoring report finds that
the project is exceeding the
established trip cap, submit a
follow-up report that
demonstrates compliance
with the trip cap
Prior to the issuance
of any occupancy
permits (temporary
or final) and
throughout the
lifetime of the
project.
Director of
Department of Public
Works or Director’s
designee and the
Director of Planning,
Building and Code
Enforcement, or
Director’s designee
(Supervising
Environmental
Planner).
Review the annual
trip monitoring
reports and assess
penalties for non-
compliance in
accordance with
Council Policy 5-1,
if warranted.
Prior to the
issuance of any
occupancy
permits
(temporary or
final) and
throughout the
lifetime of the
project.
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 17 File No.: PDC19-049
• Telecommuting and Alternative Work
Schedule Program. The office tenants would
be required to implement a flexible work
schedule to encourage employees
telecommuting, commuting outside of peak
congestion periods, or working with
alternative schedules. This program would
allow some employees to work a few days
from home, and thus reducing the number of
trips and VMT.
Prior to the issuance of any occupancy permits
(temporary or final), the project applicant shall submit the TDM plan to the Director of Public Works or the
Director’s designee. The TDM Plan shall include a trip
cap for VMT monitoring purposes. The trip cap is 475
AM peak-hour trips and 633 PM peak-hour trips for
the Non-Education Option. Annual trip monitoring
reports shall be submitted that demonstrate that project VMT is below threshold. If the annual trip monitoring
report finds that the project is exceeding the established trip cap, the project applicant shall be required to
submit a follow-up report that demonstrates
compliance with the trip cap requirements within a
grace period, which typically will not exceed six
months. Penalties shall be assessed if a project does not meet the trip cap requirements by the end of the grace
period. Penalties for non-compliance shall be assessed
by the City as defined in the Council Policy 5-1.
requirements within a grace
period, which typically will
not exceed six months.
Impact TRN-3: Education Mixed-Use Option only: The educational component would result in 8.75 VMT per student, which is a net increase in VMT compared with the 7.85 VMT per student average for regional private schools.
MM TRN-3.1: Education Mixed-Use Option only:
Prior to the issuance of any occupancy permits
(temporary or final), the project applicant shall
implement a Transportation Demand Management
(TDM) plan that offers the following commute trip
reduction measures to all students and employees to
reduce the project’s VMT per student by 10.3 percent,
from 8.75 to 7.84 VMT per student, which would be
below the average VMT per student for regional
private schools.
Submit the TDM plan to the
Supervising Environmental
Planner, including a trip cap
for VMT monitoring
purposes.
Submit annual trip
monitoring reports from
anniversary of building
occupancy to the Director of
Department of Public Works
Prior to the issuance
of any occupancy
permits (temporary
or final) and
throughout the
lifetime of the
project.
Director of
Department of Public
Works or Director’s
designee and the
Director of Planning,
Building and Code
Enforcement, or
Director’s designee
(Supervising
Review the annual
trip monitoring
reports and assess
penalties for non-
compliance in
accordance with
Council Policy 5-1,
if warranted.
Prior to the
issuance of any
occupancy
permits
(temporary or
final) and
throughout the
lifetime of the
project.
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)
Page | 18 File No.: PDC19-049
• The project applicant shall provide commute
trip reduction marketing and education. The
school shall routinely provide commute trip
reduction marketing/educational campaign to
faculty, staff, student drivers, and parents to
promote the use of transit, shared rides,
walking, and bicycling.
• The project applicant shall provide a
rideshare/carpool program. The school shall
implement a rideshare/carpool program to
coordinate carpools amongst parents, student
drivers, and employees.
Prior to the issuance of any occupancy permits, the
project applicant shall submit the TDM plan to the
Director of Department of Public Works or the
Director’s designee. The TDM Plan shall include a trip cap for VMT monitoring purposes. The trip cap is
1,614 AM peak-hour trips and 646 PM peak-hour trips.
Annual trip monitoring reports shall be submitted that
demonstrate that project VMT is below threshold. If
the annual trip monitoring report finds that the project is exceeding the established trip cap, the project
applicant shall be required to submit a follow-up report that demonstrates compliance with the trip cap
requirements within a grace period, which typically
will not exceed six months. Penalties shall be assessed if a project does not meet the trip cap requirements by the end of the grace period. Penalties for non-
compliance shall be assessed by the City as defined in
the Council Policy 5-1.
or Director’s designee and
the Director of Planning,
Building and Code
Enforcement or Director’s
designee that demonstrates
that project VMT is below
threshold. If the annual trip
monitoring report finds that
the project is exceeding the
established trip cap, submit a
follow-up report that
demonstrates compliance
with the trip cap
requirements within a grace
period, which typically will
not exceed six months.
Environmental
Planner).
Source: City of San José. Draft Environmental Impact Report for the El Paseo & 1777 Saratoga Avenue Mixed-Use Village. May 2022.
EXHIBIT "A"
(File Nos. PDC19-049; PD20-006)