SUBJECT: FINAL PUBLIC HEARING AND APPROVAL OF THE FISCAL YEAR 2022-23 ANNUAL ACTION PLAN
RECOMMENDATION
(a) Adopt a resolution to:
(1) Approve the Fiscal Year 2022-23 Annual Action Plan; (2) Authorize the Director of Housing to submit the Fiscal Year 2022-23 Annual Action Plan to HUD; and
(3) Authorize the Director of Housing to negotiate and execute agreements with grantees for the activities identified in the Fiscal Year 2022-23 Annual Action Plan and all related contract amendments, extensions, and changes; and
(b) Adopt the following Fiscal Year 2022-2023 Appropriation Ordinance Amendments in the Community Development Block Grant Fund:
(1) Decrease the Unrestricted Ending Fund Balance by $42,754; (2) Decrease the Plaza Hotel Rehabilitation appropriation by $1,000,000; (3) Decrease the Rental Support Case Management appropriation by $211,224; (4) Decrease the Contractual Community Services appropriation by $146,022; and (5) Establish a Haven Rehabilitation appropriation to the Housing Department in the amount of $1,400,000.
COUNCIL AGENDA: 6/21/2022
FILE: 22-982
ITEM: 8.5
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
OUTCOME
This final publicly noticed hearing on the Fiscal Year (FY) 2022-23 Annual Action Plan (Action Plan) provides an opportunity to the City Council and the public to provide comments on the final Action Plan before it is submitted to the U.S. Department of Housing and Urban Development (HUD).
Upon the City Council adoption of the final Action Plan, the Housing Department will submit the final federally mandated document to HUD by the revised August 16, 2022, deadline.
Meeting this deadline enables the City to remain eligible to receive approximately $14.4 million in federal housing and community development funds in FY 2022-23.
EXECUTIVE SUMMARY
This is the fifth, and final, hearing on the FY 2022-23 Annual Action Plan and Action Plan funding priorities. This action requests approval of the proposed funding plan in the City’s FY 2022-23 Annual Action Plan. It also provides authorization to submit the plan to HUD by the revised August 16, 2022 deadline, and to execute agreements with grantees for the activities identified in the Action Plan. The action also includes an appropriation action to enable disbursements from a previously approved Action Plan.
This memorandum summarizes the strategies on the use of $14.4 million in new funding that the City will receive in FY 2022-23. The Action Plan includes updated formula allocation numbers and fund balance numbers from those contained in the memorandum for the April 26, 2022 City Council meeting. The updated amounts reflect the planned adjustments explained in the supplemental memorandum for that City Council meeting. The total amount being programmed is $29 million.
This report details an itemized description of the proposed activities and funding recommendations for each of the four federal funds the City receives by formula from HUD:
Community Development Block (CDBG); HOME Investment Partnership Program (HOME); Housing Opportunities for Persons with AIDS (HOPWA); and Emergency Solutions Grant (ESG) funding.
CDBG funding is focused on three funding categories: 1) Public Services, including homeless services, neighborhood engagement/leadership development, senior services, fair housing, and other legal support services; 2) Community Development Investments (CDI), including enhanced code enforcement, minor home repairs, and community and infrastructure improvements; and 3) Administrative activities. HOME funds help create new affordable housing developments, including some apartments for residents who have experienced homelessness, and time-limited rent subsidies to help low-income residents afford market-rate apartments. HOPWA funds are used for rent subsidies and supportive services. ESG funds are targeted to outreach to residents who are experiencing homelessness in San José and for homelessness prevention programs.
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
BACKGROUND
As a HUD entitlement jurisdiction, the City receives federal formula grants each year from HUD for housing and community development activities. The funding is allocated to the City based on several factors including population, poverty, and housing statistics.
Every five years, HUD requires entitlement jurisdictions to develop a Five-Year Consolidated Plan (Consolidated Plan). The Consolidated Plan assesses San José’s current housing market, analyzes demographic, race, and socio-economic conditions, and identifies populations within the City that have the greatest community and housing needs. It also defines the City's priority needs, strategies, and objectives for reducing the most prevalent barriers to housing and services in our community.
In August 2020, the City Council adopted the City’s Consolidated Plan for the FY 2020-25 period. The City participated in a countywide collaboration to analyze data on housing needs and to develop this cycle's Consolidated Plan. Staff then refined and prioritized the identified broad regional objectives to establish four major goals, which meet both regional and local priorities:
1. Prevent and Address Homelessness – Increase housing opportunities and self- sufficiency for homeless populations and assist in the prevention of homelessness for at- risk individuals and families.
2. Create and Preserve Affordable Housing – Create new affordable housing opportunities and preserve existing affordable housing.
3. Promote Fair Housing – Promote fair housing and lowered barriers to housing.
4. Strengthen and Stabilize Communities – Strengthen and stabilize communities’ conditions and help to improve residents’ opportunities such as the ability to increase their employment prospects and grow their assets.
The first three priorities are the same as for the previous Consolidated Plan cycle for FY 2015-20 as they continue to be of paramount importance for the City. While the fourth priority still allows for investment in community infrastructure as it did last cycle, it also allows for investments focused on improving residents’ economic opportunities and resilience. It is a people-focused plan. As the COVID-19 pandemic has exacerbated inequities in our society, it has become apparent that the City must do all it can to strengthen opportunities for low-income residents in San José. The FY 2020-25 Consolidated Plan enables the City to pay for a range of services to help those who are unhoused, paying too much for housing, in need of legal assistance to keep their housing, and in need of support to improve their employment prospects.
In each of the five years in the Consolidated Plan, HUD requires entitlement jurisdictions to submit an Action Plan which identifies a one-year strategy for meeting the goals contained in the Consolidated Plan. While FY 2020-21 would have been the first annual plan under the new Consolidated Plan, priorities quickly shifted in early 2020 to address the growing impacts of the COVID-19 pandemic. In addition to the City’s annual formula allocations of
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
federal funds, the City received $48,160,981 in one-time CDBG and ESG CARES Act funding that the Housing Department is still contracting and monitoring. Additionally, the City received over $30 million in Rental Assistance funds directly from the U.S. Department of Treasury to address the effects and financial impact of the COVID-19 pandemic on City residents. Finally, the Housing Department has $22 million in American Rescue Plan funds for various homeless and eviction prevention programs for which the Department is still contracting.
As City staff continues to implement new and complex programs and services responding to and recovering from the COVID-19 pandemic, the capacity to conduct robust community outreach, release new requests for proposals, and solicit feedback on potential new funding priorities is limited. Therefore, the new Action Plan continues priorities and activities consistent with the FY 2019-20 Action Plan, the last Action Plan to receive full community input and approval prior to the pandemic. The FY 2022-23 funding priorities are based on stakeholder outreach conducted prior to the pandemic in conjunction with the FY 2019-20 Action Plan. While most contract renewals with grantees will be similar to those in previous years, some scopes of service may be altered to reflect current COVID-19 pandemic response and recovery priorities, and some performance measures may be changed to better demonstrate outcomes.
On April 26, 2022, the City Council held a public hearing and approved the proposed draft Action Plan, including the contingency plan on how staff would adjust amounts to be awarded per final HUD allocations. On May 13, 2022, the City received notice of its final formula allocation amounts for FY 2022-23. The revised Action Plan includes these final formula allocation amounts as well as updated fund balance numbers.
ANALYSIS
The City will receive approximately $14.4 million in CDBG, HOME, HOPWA, and ESG entitlement grants. While the total is only approximately $9,517 less than the total of last year’s allocations, the changes were not universal – HOME and HOPWA allocations increased, while CDBG and ESG allocations decreased. The focus of this memorandum is the new annual federal allocations. However, the FY 2022-23 Action Plan also programs carryover funding from previous years and program income from loan repayments. Table 1 below summarizes the changes in each source from April estimates, and the total federal funding to be programmed for FY 2022-23.
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
Table 1: FY 2022-23 Federal Funding Levels
Program
Previous
Estimated
Allocation
Actual FY
2022-23
Allocation
Change
from
Estimate
%
Change
Fund
Balance &
Program
Income
Total to
Program
CDBG $8,890,526 $8,454,606 ($435,920) -4.90% $4,059,707 $12,514,313 HOME $3,221,675 $3,564,527 $342,852 10.64% $10,555,787 $14,120,314 HOPWA $1,553,405 $1,652,667 $99,262 6.39% $3,391 $1,656,058 ESG $763,052 $747,341 ($15,711) -2.06% $18,000 $765,341 Total $14,428,658 $14,419,141 ($9,517) -0.07% $14,636,885 $29,056,026
The supplemental memorandum for the April 26, 2022, City Council meeting identified which uses would increase or decrease once final HUD allocations were awarded. Accordingly, the revised funding levels identified below reflect the changes in each program allocations. Some also have been adjusted for grantees’ capacity to spend funds promptly.
FY 2022-23 Action Plan
The FY 2022-23 Action Plan contains a description of all activities recommended for funding.
Each of the activities detailed in the draft FY 2022-23 Action Plan are aligned with the four goals of the Consolidated Plan and contribute to the City’s five-year objectives. The draft FY 2022-23 Action Plan aligns the City’s available resources with the planned activities that will enable the City to meet its annual goals. Completing the required annual plan enables the City to stay on target to meet its five-year plan goals. The expenditure plans for CDBG, HOME, HOPWA, and ESG are provided below.
CDBG Program
CDBG is a flexible funding source that supports the development of viable urban communities by providing decent housing, encouraging a suitable living environment, and expanding economic opportunities, principally for lower-income households.
As the largest and most flexible of the four federal grants, CDBG funds are divided into three categories of eligible uses. These include Public Services, CDI, and Administrative activities.
Public services are limited to 15% of the annual allocation plus the previous year’s program income, and Administrative activities are limited to 20%. The CDI category includes two types of activities: construction projects and non-construction projects. Construction projects consist of capital projects that directly fund physical improvements such as facility or infrastructure improvements. Non-construction projects include programs and other services, such as job training, provided to low- and moderate-income households.
Table 2 below outlines the City’s planned CDBG expenditures for the coming year by category and activity. Overall, CDBG was cut by 4.9% from last year’s allocation, but fund balance and
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
program income are additive, making $12.5 million total available to program. Additional detail on these activities is provided in subsequent tables in this memorandum.
Table 2: Proposed CDBG Activities by Category for FY 2022-23 Category CDBG Activities by Category Recommended
Funding
Public Services Senior Services $302,875
Public Services Neighborhood Engagement and Leadership Training $190,200 Public Services Services for Homeless and Unhoused Populations $380,385 Public Services Citywide Legal Services for Low-income Tenants and Landlords
$454,730
CDI Place-based Street and Infrastructure Enhancements $4,800,784 CDI Soft Story Program $481,012
CDI Targeted Code Enforcement $1,266,728
CDI Acquisition, Rehabilitation, and Infrastructure
Improvements
$1,300,003
CDI Minor Home Repair $1,566,675
Administrative Fair Housing $190,200
Administrative Grants Management $1,580,721
Total Programmed Activities $12,514,313
FY 2022-23 CDBG Allocation $8,454,606
Estimated Program Income $400,000
Prior Years’ Approx. Uncommitted / Unspent Fund Balance $3,659,707 Total Available to Program $12,514,313
CDBG – Public Services
CDBG funds can support a variety of services for low-income individuals. Program regulations require that funding for Public Services be capped at 15 percent of the annual allocation combined with the prior year’s program income. Program income is primarily comprised of repayments of loans made from federal funds. Services are generally funded on a three- to five- year funding cycle to provide predictability in service delivery and to support organizational capacity of service providers.
Table 3 below lists existing services and service providers currently under contract. Staff recommends extending those same services through FY 2022-23. Individual grantee funding levels will be approximately comparable to their FY 2021-22 levels. However, the figures below have been adjusted for CDBG’s reduction and program income and fund balances to spend. The Housing Department will open up a competitive request for proposals to solicit new programs and proposals for FY 2023-24 Action Plan funding.
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
Table 3: Existing Service Providers in CDBG Contract Funding Cycle Service Type Agency Program FY 2022-23
(recommended)
Senior
Services
The Health Trust Meals on Wheels –
Senior Services
$182,100
Senior
Services
Portuguese
Organization for Social
Services Opportunities
(POSSO)
Senior Access and
Health Support
$120,775
Legal
Services
San José Housing
Rights Consortium
Legal Services for
Low-Income Tenants
& Landlords
$454,730
Neighborhood
Engagement
SOMOS Mayfair Home Grown Talent
Project
$118,875
Neighborhood
Engagement
CommUniverCity Community
Leadership
Development
$71,325
Homeless
Services
HomeFirst Citywide Outreach &
Shelter
$380,385
Total $1,328,190
CDBG – CDI
CDI funds can be used to fund public infrastructure and other needs that serve low-income individuals. There is no limit on the amount of funding that may be dedicated to the CDI category. The proposed funding priorities in this category include the following CDI activities:
Priority Projects – Housing Department staff coordinates with other City departments to identify infrastructure and other capital projects eligible for CDBG that benefit the City’s lower-income communities. Since 2012, CDBG resources have leveraged investments in the Santee/McKinley, Mayfair, and Five Wounds/Brookwood Terrace neighborhoods to create clean and engaged neighborhoods. In FY 2018-19, the Housing Department broadened its neighborhood focus to link federal funds with City investments or programs to address underserved needs in a low- resourced neighborhood. Examples of this include providing infrastructure investments adjacent to the planned housing developments for formerly homeless residents at Evans Lane in FY 2021-
22. The Department will continue to invest in neighborhoods where City programs are aligned and can be leveraged. Potential projects could include, but are not limited to, improvements to a City-owned swim center, community center, park, and/or nonprofit facilities; the purchase of fire station equipment serving eligible low-income areas; or new infrastructure investments such as street trees in low-income areas experiencing heat effects.
The Housing Department will continue to coordinate with the City Manager’s Budget Office and other City departments to identify projects that meet all eligibility criteria and federal spending deadlines. Therefore, the FY 2022-23 Action Plan allocates a capital reserve in FY 2022-23 for proposed City priority projects. Staff is currently analyzing projects proposed by the Parks,
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
Recreation and Neighborhood Services Department for enhancements at Fair Swim Center and the Library for community WiFi in the Eastside Union High School District. Once eligibility is finalized for these two projects, staff will seek the City Council’s approval separately. Finally, the Mayor’s June Budget Message for Fiscal Year 2022-2023 identifies three potential projects that may be eligible for CDBG funding, including installing signs and solar powered lighting in the Guadalupe Washington neighborhood, tree planting in lower income neighborhoods, and improvements at Emma Prusch Farm Park and Veggielution. While these projects appear to be eligible, staff still needs to complete a more detailed analysis to ensure CDBG funds can be used to support these activities. In advance of the discussion on the June Budget Message, $700,000, was moved from the CDI Acquisition, Rehabilitation, and Infrastructure Improvements to a separate reserve to accommodate these potential projects. Should the City Council modify the current direction in the June Budget Message and opt to not fund these projects, the Administration will work to identify other applicable projects for City Council consideration and future action.
An activity has been added to the CDI budget for the Soft Story Retrofit Program in the amount of $481,012. CDBG funds will pay the first portion of a 25% required match for the City’s grant from the California Office of Emergency Services. The purpose of the grant is to develop a City program and ordinance to improve seismic safety on ‘soft story’ buildings. 1 This work was
previously identified as City Council priority #6. Staff applied for the grant in 2018 and finally received the grant last year, so the matching funds are now needed to be programmed for FY 2022-23. The funds will support staff work in FY 2022-23. Additional funds in future years will partially fund more staff work and a pilot building rehabilitation rebate program.
Table 4: CDI Place-based Projects
Project Description FY 2022-23
(recommended)
Fair Swim Center
Community
Wi-Fi
Acquisition, Rehabilitation and
Infrastructure for Affordable Housing Sites
and Public Facilities
$3,100,784
Soft Story
Retrofit Program
Soft Story Retrofit Program Matching
Funds
$481,012
Haven
Rehabilitation
Rehabilitation of traditional shelter and
triplex
$1,000,000
Reserve Reserve for CDI projects $700,000
Total $5,281,796
1 See staff memo to the City Council Community and Economic Development Committee, File no. CC 19-079, April 22, 2019, https://sanjose.legistar.com/LegislationDetail.aspx?ID=3899144&GUID=0869AFE2-B32A-4563- 96A4-705A80FDD536&Options=&Search=
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
Additionally, the Housing Department is continuing work on projects that have funds committed in past grant years, and therefore do not show on Table 4. This memorandum includes an appropriation action for rehabilitation of the Haven, a City-owned property containing a five-unit building and a three-unit triplex. On November 27, 2018, 2 the City Council approved a
groundlease to the County of Santa Clara for use of the property for the provision of transitional housing. The rehabilitation scope was estimated in 2018 to cost $1.2 million total and rehabilitation would occur over a two-year period. The City Council approved $300,000 of CDBG funds for the property’s first year rehabilitation costs in the City’s FY 2018-19 Annual Action Plan. In subsequent minor amendments to Action Plans, an additional $1.1 million was designated for this project out of the Place-based Street and Infrastructure reserves, for a total of $1.4 million. The funds initially appropriated for the work were later zeroed out because the rehabilitation was delayed. The rehabilitation is finally anticipated to start in FY 2022-23.
Therefore, this memorandum contains an appropriation action for $1.4 million to enable the CDBG funds committed in FY 2019-20 to be used in FY 2022-23. As construction costs have escalated significantly since the original project estimate, $1,000,000 was moved from CDI Acquisition, Rehabilitation and Infrastructure Improvements in the FY2022-23 Action Plan to accommodate the additional costs for The Haven shelter rehabilitation project. The total project cost is anticipated at $2.4 million.
Nonprofit Facility Rehabilitation – Community-based organizations provide vital services for the residents of San José. They offer services that are often not feasible for public or private organizations to administer. Many community-based organizations struggle to raise the revenue needed to provide basic essential services for the City’s most at-risk residents. This ongoing lack of resources leaves many agencies with the inability to maintain or improve the facilities where their staff are located and where direct services to clients are provided. CDI funding for nonprofit facilities has been identified as a critical need by many of the nonprofit agencies in San José and has been listed as a priority by the Silicon Valley Council of Nonprofits. Accordingly, the FY 2022-23 Action Plan identifies funds that will be allocated for nonprofit facilities in Table 5.
This amount has not been reduced, despite cuts to CDBG funding.
Table 5: CDI Nonprofit Facility Rehabilitation
Agency Program FY 2022-23
(recommended)
TBD Acquisition and Rehabilitation of Nonprofit
Facilities
$1,300,003
Total $1,300,003
The Housing Department has received a funding request from Sacred Heart Community Services for the rehabilitation and renovation of its main service center. Per direction in the Mayor’s
2 Staff memo, File No. 18-1559, Nov. 27, 2018,
https://sanjose.legistar.com/View.ashx?M=F&ID=6791234&GUID=79DBAECB-50DD-494D-A1E6- 6051F3979B07
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
March Budget Message, staff prepared Manager’s Budget Addendum #113 analyzing the use of CDBG funds to meet Sacred Heart’s request. Presuming the Sacred Heart request is eligible for CDBG funds, that request will come to the City Council for approval. If there are remaining CDI funds, the Department will release a formal solicitation to nonprofits for letters of interest in the funds and would return to the City Council in fall 2022 with results and recommendations.
CDI-Funded Non-Construction – Non-construction CDI projects include programs and other indirect services benefitting low- and moderate-income individuals and households. Enhanced code enforcement and job creation are two of the only “service” activities that can be funded with CDI funds. For enhanced code enforcement to be eligible, it must be proactive and linked with a special program, such as the City’s Place-Based Neighborhood Initiative and Project Hope I and II. The City’s Planning, Building and Code Enforcement Department will use CDBG resources for enhanced code enforcement in four specific neighborhoods that include Santee, Five Wounds/Brookwood Terrace, Cadillac/Winchester - Project Hope, and Roundtable - Project Hope II. When additional Planning, Building, and Code Enforcement Department (PBCE) staff are hired, Code Enforcement inspectors will also work in the Poco Way neighborhood, another Project Hope neighborhood. Table 6 provides a list of the programs to be funded under the CDI category. Note that the Enhanced Code Enforcement in Targeted Neighborhoods line item has been updated to match the proposed FY 2022-23 City budget figure.
Table 6: Proposed CDI Non-construction Projects
Agency Program FY 2022-23
(recommended)
PBCE Enhanced Code Enforcement in Targeted
Neighborhoods
$1,266,728
Rebuilding
Together Silicon
Valley
Minor Repair and Limited Rehab for Low-
Income Homeowners Program
$1,044,450
Habitat for
Humanity
Minor Repair and Limited Rehab for Low-
Income Homeowners Program
$522,225
Total $2,833,403
Administrative – Recognizing the significant requirements associated with managing CDBG funds, HUD allows funding of administrative planning and oversight using up to 20% of the sum of the annual allocation plus the current year’s program income. In addition to grant planning and oversight, fair housing is the sole service that can be paid from the Administrative category as well as the Public Services category. In FY 2022-23, some Administrative funds will go towards fair housing programs listed below and will pay other City departments’ staff’s work on CDBG-related activities. This includes the City Attorney’s Office work to perform legal reviews of all federal contracts, and PBCE’s work to provide required environmental review support for all federally funded projects. The Housing Department line item also includes staff work on the Assessment of Fair Housing and Housing Element.
3 Manager’s Budget Addendum #11, Community Development Block Grant Eligibility for Community Facilities, https://www.sanjoseca.gov/home/showpublisheddocument/86033/637885797784970000
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
Table 7: Proposed FY 2022-23 CDBG Administrative Activities Agency Program FY 2022-23
(recommended)
Housing Department CDBG Administration $1,537,926
City Attorney’s Office Legal Staffing $19,020
PBCE Environmental Reviews $23,775
Law Foundation of Silicon
Valley - Four Agency
Consortium
Fair Housing $190,200
Total $1,770,921
HOME Program
The HOME program provides financial assistance to help increase the supply of affordable rental and homeownership housing for low-income households through the acquisition, rehabilitation, or construction of affordable housing and through the provision of tenant-based rental assistance.
The amount of HOME available increased over previous estimates by more than 10%. In addition, HOME program income was greater than expected due to an existing HOME-funded development, Leigh Avenue Seniors, being scheduled to pay a significant amount of interest due to the City on its existing loan. Table 8 indicates that HOME funds will be used mostly for new affordable apartments, but also for fair housing services and program administration, in FY 2022-23.
Table 8: Proposed FY 2022-23 HOME Activities
Project FY 2022-23
(recommended)
New Affordable Housing Development
(including project delivery)
$13,763,861
Program Administration $ 135,169
Fair Housing Services $ 221,284
Total HOME $14,120,314
New Affordable Housing Development – HOME rules require that new affordable housing developments must have all other financing obtained and be able to start construction within one year of committing the funds. For this reason, the Housing Department must sometimes hold a significant portion of funds until a project is almost ready to start construction. In December 2021, staff released a $150 million Notice of Funding Availability (NOFA) and will request that the City Council commit available funding to one or more projects selected that are eligible both under the City’s NOFA and HOME criteria.
4 4 As HOME funds are required to be committed right before construction closes on a development, the Director’s Delegation of Authority is typically used to effectuate the final HOME commitment instead of the much earlier City Council memorandum.
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
HOPWA Program
The HOPWA program provides local jurisdictions and nonprofits with resources and incentives to support long-term strategies for meeting the housing needs of low-income individuals living with HIV/AIDS and their families.
The Health Trust was selected though a previous federally funded services request for proposals to provide rental assistance and supportive housing services. Staff recommends continuing funding to The Health Trust to administer HOPWA activities at the following levels through FY 2022-23. Additionally, as the nearest metropolitan statistical area, the City administers the HOPWA grant funding for San Benito County. The Housing Department coordinates with San Benito County staff to administer approximately $73,000 in rental assistance in that County.
Table 9: Proposed FY 2022-23 HOPWA Activities
Proposed Activity Allocated Amount
Rental Assistance and Supportive Services – Health Trust and San Benito County
$ 1,609,991
City Administration $ 46,067
Total HOPWA $ 1,656,058
ESG Program
The ESG program provides matching grants to help pay for shelter operating expenses and for other essential services to serve individuals and families experiencing homelessness.
In FY 2018-19, staff issued a request for proposals for outreach and homeless prevention services. Contracts were awarded to People Assisting the Homeless (PATH) and Bill Wilson Center. Staff recommends continued funding to PATH and Bill Wilson Center to administer ESG activities at the following levels through FY 2022-23. Activities and grantees proposed for FY 2022-23 include:
Table 10: Proposed FY 2022-23 ESG Activities
Proposed Activity Agency Description FY 2022-23
(recommended)
Street Outreach
PATH
Street-based outreach, engagement,
and case management for the
unhoused population
$430,254
Homeless
Prevention Program
for Youth and
Families
Bill
Wilson
Center
Rental assistance and support for
households at risk of becoming
homeless, including victims of
intimate partner violence
$127,445
County Homeless
Management
Information System
County of
Santa
Clara
Operation of the Homeless
Management Information System
(secure web-based database) in
compliance with HUD
$150,332
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
Proposed Activity Agency Description FY 2022-23
(recommended)
City Administration
City
City grant administration, compliance
monitoring, environmental review,
legal service support, and planning
$57,310
Total $765,341
Meeting the Needs of Families
The proposed FY 2022-23 Action Plan provides more than $4.8 million in funding for nine programs serving families (see Table 11 below). This amount has increased by almost $47,000 over staff’s April estimate. The Housing Department holds regular meetings with the Santa Clara County Office of Education (SCCOE) McKinney Vento staff to identify service gaps and needs.
The Housing staff also has regular conversations with domestic violence service providers to identify their needs. The domestic violence service providers reported that levels of violence escalated during the COVID-19 pandemic and there has been a need for additional motel vouchers to safely shelter victims. As a result of the conversations with SCCOE and domestic violence service providers, the Housing Department has funded community wireless network and emergency motel vouchers for families.
For the coming year, the draft Action Plan proposes these family-serving programs:
Table 11: Proposed FY 2022-23 Annual Action Plan Family-serving Programs Grantee Purpose FY 2022-23
(recommended)
SOMOS Mayfair Home Grown Talent program, neighborhood
engagement
$118,875
CommUniversity Neighborhood engagement $71,325
San José Housing Rights
Consortium
Legal services for low-income tenants $454,730
Law Foundation Silicon
Valley
Fair housing services $411,484
PBCE Enhanced code enforcement in Project Hope
neighborhoods
$1,266,728
Rebuilding Together &
Habitat for Humanity
Single family home repairs $1,566,675
Bill Wilson Center Family homeless prevention $127,445
HomeFirst Homeless outreach and engagement (citywide) $380,385 PATH Homeless outreach and engagement
(downtown)
$430,254
Total $4,827,901
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
FY 2022-23 Action Plan Implementation
Once the FY 2022-23 Action Plan is approved by the City Council, staff will work with service providers to develop or extend agreements that include finalized scopes of service, contract budgets, performance measures, goals, and outcomes. Upon approval of the FY 2022-23 Action Plan by HUD, staff will work with agencies identified in this plan to finalize service agreements in preparation for execution in July 2022.
Additionally, capital projects identified in the FY 2022-23 Action Plan will require further development. Upon approval of the FY 2022-23 Action Plan by the City Council, staff – a collaborative effort led by the Housing Department in close coordination with the City Manager’s Budget Office – will work with stakeholders to develop the final project scopes and will take all necessary steps to ensure compliance with funding and project requirements. Staff will coordinate environmental reviews in compliance with the California Environmental Quality Act (CEQA) and the National Environmental Policy Act clearances before final commitment of funds via contract.
CONCLUSION
This publicly noticed public hearing provides an opportunity to the City Council and the public to provide comment on the proposed funding priorities and the draft FY 2022-23 Action Plan.
The feedback provided by the City Council on the funding priorities for the draft FY 2022-23 Action Plan will inform the development of the City’s FY 2022-23 Action Plan. Final approval of the FY 2022-23 Action Plan will enable staff to submit the federally mandated document to HUD by the August 16, 2022 deadline. Meeting this deadline will enable the City to remain eligible to receive approximately $14.4 million in federal housing and community development funds in FY 2022-23.
EVALUATION AND FOLLOW-UP
Capital project commitments identified in the FY 2022-23 Action Plan require further development. Staff is currently analyzing projects proposed in the Mayor’s June Budget Message and by the Parks, Recreation and Neighborhood Services Department and the Library for CDBG eligibility and CDBG budget availability. Once eligibility is finalized, staff will seek the City Council’s approval separately. Should the City Council modify the current direction in the Mayor’s June Budget Message and opt to not fund these projects, the Administration will work to identify other applicable projects for City Council consideration and future action.
Staff will continue to work with the Sacred Heart on its service center rehabilitation request and any project would come to City Council for approval. For any remaining nonprofit CDI funds, the Department will release a formal solicitation to nonprofit organizations for letters of interest for the funds and would return to the City Council in the fall with results and recommendations.
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
The approved FY 2022-23 Action Plan must be submitted to HUD by its deadline, 60 days after it announces final formula allocation amounts. Once approved by HUD, the final Action Plan will be available on the Housing Department's website
(www.sanjoseca.gov/housingconplan),
or by U.S. mail at the public's request.
At the end of each Action Plan period, the City is required to submit its Consolidated Annual Plan Evaluation Report (CAPER) which summarizes the City’s progress in meeting its goals as indicated in the prior year Annual Action Plan. The Housing Department will present the FY 2022-23 CAPER in fall 2023.
The Housing Department will open up a competitive request for proposals to solicit new programs and proposals for FY 2023-24 Annual Action Plan funding.
CLIMATE SMART SAN JOSÉ
The recommendation in this memorandum has no effect on Climate Smart San José energy, water, or mobility goals.
PUBLIC OUTREACH
Federal regulations require that jurisdictions hold at least two public hearings to receive public comment for the FY 2022-23 Action Plan and funding priorities. The City’s adopted Citizen Participation Plan requires three public hearings including one prior to the release of the draft FY 2022-23 Action Plan. This year, the City will hold a total of five public hearings on the FY 2022-23 Action Plan. The first two public hearings were held before the Housing and Community Development Commission (Commission) on March 10, 2022 and the City Council on March 22, 2022, where the Housing Department presented the draft funding strategies and priorities to solicit feedback. The third hearing, on April 14, 2022, was also at the Commission and included the draft FY 2022-23 Action Plan for comment. The fourth public hearing, on April 26, 2022, was the City Council’s consideration of the draft FY 2022-23 Action Plan. This action is the fifth and final public hearing, at which time the City Council must adopt the final FY 2022-23 Action Plan. The Housing Department then will submit the FY 2022-23 Action Plan to HUD in time to meet its deadline.
Staff published official notices required by HUD, in the Mercury News, of the public meetings. These notices were translated into Spanish, Vietnamese, Chinese, and Tagalog and also were published in the El Observador, Vietnam Daily News, World Journal, and the Asian Journal newspapers. City staff also sent e-mail announcements of the public hearings on the draft FY 2022-23 Action Plan to over 2,600 organizations and individuals concerned about affordable housing and community development issues. The e-blasts were also posted on the Housing Department’s website at www.sjhousing.org
, and were turned into news briefs that
were automatically sent to media outlets.
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
All public comments provided to the City both verbally and in writing will be included in the appendices of the FY 2022-23 Action Plan together with staff's responses when the FY 2022- 23 Action Plan is submitted to HUD.
COORDINATION
This item has been coordinated with the City Attorney’s Office.
COMMISSION RECOMMENDATION/INPUT
The Commission considered the draft Action Plan at its virtual meeting on April 14, 2022 at 5:45 p.m. A supplemental memorandum summarizing the Commission’s feedback was included with the action on the April 26, 2022, City Council meeting agenda.
FISCAL/POLICY ALIGNMENT
/
This action is consistent with the City's Consolidated Plan 2020-25, adopted by the City Council on August 11, 2020, and with the City's Adopted Housing Element 2014-2023, in that the action provides services to very low-income households and homeless residents. It also furthers the advancement of the Community Plan to End Homelessness approved by the City Council in August 2020. The timely submittal of the FY 2022-23 Action Plan to HUD will enable the City to receive and distribute more than $14 million in entitlement funds for the CDBG, HOME, HOPWA, and ESG programs for FY 2022-23.
COST SUMMARY/IMPLICATIONS
This report summarizes the expenditure plan for the City's federal formula funds received from HUD, for a total allocation of new 2022-2023 funding of $14.4 million and a combined program from previous years’ funding that totals $29.1 million. The recommended actions in this memorandum create a new Haven Rehabilitation appropriation in the CDBG fund in the amount of $1,400,000, which will enable the Housing Department to initiate the Haven Rehabilitation project at a City-owned property containing a five-unit building and a three-unit triplex that is providing transitional housing. Additional commitments proposed in this FY 2022-23 Action Plan will be brought forward to City Council for separate approval in separate actions. There is no ongoing fiscal impact to the General Fund as a result of these actions.
HONORABLE MAYOR AND CITY COUNCIL
June 9, 2022
Subject: Final Public Hearing on the FY 2022-23 Annual Action Plan
BUDGET REFERENCE
The table below identifies fund and appropriations proposed to fund the actions recommended as part of this memorandum.
Fund
#
Appn
#
Appn Name
Proposed
2022-2023
Total Appn
Rec. Budget
Action
2022-2023
Proposed
Operating
Budget
Page*
Last
Budget
Action
(Date,
Ord. No.)
441 215B Plaza Hotel
Rehabilitation
$1,000,000 ($1,000,000) 855 N/A
441 215H Rental Support Case
Management
$211,224 ($211,224) 855 N/A
441 0055 Contractual
Community Services
$1,474,212 ($146,022) 855 N/A
441 8999 Unrestricted Ending
Fund Balance
$251,660 ($42,754) 855 N/A
441 New Haven Rehabilitation $0 $1,400,000 N/A N/A
* The 2022-2023 Proposed Operating Budget is scheduled for approval on June 14, 2022 and adoption on June 21, 2022 by the City Council.
CEQA
Not a Project, File No. PP17-009, Staff Reports, Assessments, Annual Reports, and Informational Memos that involve no approvals of any City action. Specific development projects that are funded as a result of the Annual Action Plan are subject to project-specific CEQA clearance.
/s/
JACKY MORALES FERRAND JIM SHANNON
Director of Housing Budget Director
For questions, please contact Ragan Henninger, Deputy Director, at [email protected]
.