NVF:JVP:JMD
7/28/2022

1 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

RESOLUTION NO._______

A RESOLUTION OF THE COUNCIL OF THE CITY OF

SAN JOSE CERTIFYING THE CAMBRIAN PARK MIXED-

USE VILLAGE ENVIRONMENTAL IMPACT REPORT AND

MAKING CERTAIN FINDINGS CONCERNING

SIGNIFICANT IMPACTS, MITIGATION MEASURES AND

ALTERNATIVES, AND ADOPTING A RELATED

MITIGATION MONITORING AND REPORTING PROGRAM,

ALL IN ACCORDANCE WITH THE CALIFORNIA

ENVIRONMENTAL QUALITY ACT, AS AMENDED

WHEREAS, the City of San José (“City”) acting as lead agency under the California Environmental Quality Act of 1970, together with State and local guidelines implementing said Act, all as amended to date (collectively “CEQA”), prepared the Environmental Impact Report (EIR) for the Cambrian Park Mixed-Use Village (Planning File Nos.

PDC17-040, PD20-007, and Cambrian 37), and

WHEREAS, the Environmental Impact Report (EIR) analyzed the environmental impacts of a Planned Development Rezoning and Planned Development Permit (PDC17-040 and PD20-007) and other discretionary decisions by the City and other agencies required for the demolition of an existing commercial shopping plaza and surface parking lot and construction of a mixed-use development consisting of an approximately 131,380 square foot hotel, 305 residential apartment units with approximately 50,990 square feet of commercial space, an approximately 184,060 square foot assisted living facility or approximately 160,000 square feet of office space, 25 residential townhomes, 48 single- family homes including 27 accessory dwelling units, and over 10 acres of open space including a public park, a dog park, and commercial/residential common and private open space on an approximately 18.1-acre site located at the southeast corner of Camden avenue and Union Avenue in the Cambrian Park neighborhood (APNs: 419-08-012, 419- 08-013) in the City of San José, (collectively referred to herein as the “Project”); and

NVF:JVP:JMD
7/28/2022

2 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

WHEREAS, approval of the Project would constitute a Project under the provisions of the California Environmental Quality Act of 1970, together with related state and local implementation guidelines and policies promulgated thereunder, all as amended to date (collectively, "CEQA"); and

WHEREAS, the City is the lead agency for the Project, and has prepared a Final Environmental Impact Report (FEIR) for the Project pursuant to and in accordance with CEQA, which the Final Environmental Impact Report is comprised of the Draft Environmental Impact Report for the Project (the “Draft EIR”), together with the First Amendment to the Draft EIR (collectively, all of said documents are referred to herein as the “FEIR”); and

WHEREAS, the FEIR concluded that implementation of the Project could result in certain significant effects on the environment and identified mitigation measures that would reduce those significant effects to a less-than-significant level; and

WHEREAS, whenever a lead agency approves a project requiring the implementation of measures to mitigate or avoid significant effects on the environment, CEQA also requires a lead agency to adopt a mitigation monitoring and reporting program to ensure compliance with the mitigation measures during project implementation, and such a mitigation monitoring and reporting program has been prepared for the Project for consideration by the decision-maker of the City of San José as lead agency for the Project (the “Mitigation Monitoring and Reporting Program”); and

WHEREAS, on July 13, 2022, the Planning Commission of the City of San José reviewed the FEIR prepared for the Project, and recommended to the City Council that it find the environmental clearance for the proposed Project was completed in accordance with the requirements of CEQA and further recommended the City Council adopt a resolution certifying the FEIR; and
NVF:JVP:JMD
7/28/2022

3 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

WHEREAS, CEQA requires that, in connection with the approval of a project for which an environmental impact report has been prepared which identifies one or more significant environmental effects of the project, the decision-making body of a public agency make certain findings regarding those effects and adopt a mitigation or monitoring program.

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SAN JOSÉ:

1. That the above recitals are true and correct; and

2. That the City Council does hereby find and certify that the FEIR has been prepared and completed in compliance with CEQA; and

3. The City Council was presented with, and has independently reviewed and analyzed, the FEIR and other information in the record and has considered the information contained therein, including the written and oral comments received at the public hearings on the FEIR and the Project, prior to acting upon or approving the Project, and has found that the FEIR represents the independent judgment of the City of San José (“City”) as lead agency for the Project, and designated the Director of Planning, Building and Code Enforcement at the Director’s office at 200 East Santa Clara Street, 3rd Floor Tower, San José, California, 95113, as the custodian of documents and record of proceedings on which the decision of the City is based; and

4. That the City Council does hereby find and recognize that the FEIR contains additions, clarifications, modifications, and other information in its response to comments on the Draft EIR or obtained by the City after the Draft EIR was issued and circulated for public review and does hereby find that such changes and additional information are not significant new information as that phrase is described under CEQA because such changes and additional information do not indicate that any of the following would result from approval and implementation of the Project: (i) any new significant environmental impact or substantially more severe environmental impact not already disclosed and evaluated in the Draft EIR, (ii) any feasible mitigation measure considerably different from those analyzed in the Draft EIR that would lessen a significant environmental impact of the Project has been proposed and would not be implemented, or (iii) any feasible alternative considerably different from those analyzed in the Draft EIR that would lessen a significant environmental impact of the Project has been proposed and would not be implemented; and
NVF:JVP:JMD
7/28/2022

4 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

5. That the City Council does hereby find and determine that recirculation of the FEIR for further public review and comment is not warranted or required under the provisions of CEQA; and

6. The City Council does hereby make the following findings with respect to the impacts, mitigation, and significant effects of the environment of the Project, as identified in the FEIR, with the understanding that all of the information in this Resolution is intended as a summary of the full administrative record supporting the FEIR, which full administrative record should be consulted for the full details supporting these findings.

CAMBRIAN PARK MIXED-USE VILLAGE

ENVIRONMENTAL EFFECTS FOUND NOT TO BE SIGNIFICANT

Through project scoping and the environmental analysis contained within the FEIR, it was determined that the Project would not result in a potential significant effect on the environment with respect to aesthetics, agricultural and forestry resources, energy, geology and soils and minerals, greenhouse gas emissions, hydrology and water quality, land use and planning, population and housing, public services, recreation, transportation, tribal cultural resources, utilities and service systems, wildfire, and unplanned growth. A summary of the reasons for this determination can be found in Chapters 3.1, 3.2, 3.6, 3.7, 3.8, 3.10, 3.11, 3.13, 3.14, 3.15, 3.16, 3.17, 3.18, 3.18, and

4.0 of the Draft EIR. No further findings are required for these subject areas.

FINDINGS FOR SIGNIFICANT BUT MITIGATED IMPACTS

Air Quality

Impact: Impact AIR-1: Project construction could result in significant fugitive dust (Diesel Particulate Matter [DPM] and Particulate Matter less than 10 microns [PM10]) emissions.

Mitigation: MM AIR-1.1: Prior to the issuance of any demolition or grading permits, a qualified air quality consultant shall prepare a Construction Dust Control Plan and implement the following dust (DPM and PM10) control measures during the construction period:
 All exposed surfaces (e.g. parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered at a NVF:JVP:JMD
7/28/2022

5 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
frequency adequate to maintain minimum soil moisture of 12 percent. Moisture content can be verified by lab samples or moisture probe
 All haul trucks transporting soil, sand, or other loose material off-site shall be covered.
 All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.
 All vehicle speeds on unpaved roads shall be limited to 15 mph.  All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.  Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points.
 All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation.
 Post a publicly visible sign at the project site with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations.
 All excavation, grading, and/or demolition activities shall be suspended when average wind speeds exceed 20 mph and visible dust extends beyond site boundaries.
 Wind breaks (e.g., trees, fences) shall be installed on the windward side(s) of actively disturbed areas of construction adjacent to sensitive receptors. Wind breaks should have at maximum 50 percent air porosity.
 Vegetative ground cover (e.g., fast-germinating native grass seed) shall be planted in disturbed areas as soon as possible and watered appropriately until vegetation is established.

NVF:JVP:JMD
7/28/2022

6 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
 The simultaneous occurrence of excavation, grading, and ground- disturbing construction activities on the same area at any one time shall be limited. Activities shall be phased to reduce the amount of disturbed surfaces at any one time.
 Avoid tracking of visible soil material on to public roadways by employing the following measures if necessary: (1) Site accesses to a distance of 100 feet from public paved roads shall be treated with a 6 to 12-inch compacted layer of wood chips, mulch, or gravel and (2) washing truck tires and construction equipment of prior to leaving the site.
 Sandbags or other erosion control measures shall be installed to prevent silt runoff to public roadways from sites with a slope greater than one percent.

Prior to the issuance of any grading or demolition permits, the project applicant shall submit a copy of the Construction Dust Control Plan to the Director of Planning, Building and Code Enforcement or the Director’s designee for review and approval.

Finding: Impacts related to fugitive dust and DPM to the community from construction would be less than significant with implementation of Mitigation Measure MM AIR-1.1. (Less Than Significant Impact with Mitigation Incorporated)

Facts in Support of Finding: These measures are consistent with recommendations in the Bay Area Air Quality Management District’s (BAAQMD) CEQA Guidance for providing “best management practices” to control construction emissions for fugitive dust. For fugitive dust emissions, the BAAQMD recommends following the current best management practices approach which has been a pragmatic and effective approach to the control of fugitive dust emissions. Studies underlying the BAAQMD’s recommendation have demonstrated that the application of best management practices at construction sites significantly control fugitive dust emissions. Individual measures have been shown to reduce fugitive dust by anywhere from 30 percent to more than 90 percent. In the aggregate, the BAAQMD concluded that best management practices substantially reduce fugitive dust emissions from construction sites. Studies underlying the BMPs support the conclusion that projects implementing construction best management practices reduce fugitive dust emissions to a less than significant level.

Impact: Impact AIR-2: Emissions from construction activities would exceed the BAAQMD criteria pollutant threshold of 54 pounds per day for NOx NVF:JVP:JMD
7/28/2022

7 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
emissions for the first two years of construction by up to 47 pounds per day for both project variants (Alternatives 1 and 2).

Mitigation: MM AIR-2.1: Prior to the issuance of any demolition or grading permits (whichever occurs first), a qualified air quality consultant shall prepare a construction operations plan demonstrating use of construction equipment that has low diesel particulate matter exhaust and Nitrogen Oxide (NOx) emissions. The plan shall be accompanied by a letter signed by an air quality specialist, verifying that the equipment included in the plan meets the standards set forth below.

 All diesel construction equipment larger than 25 horsepower used at the site for more than two continuous days or 20 hours total shall meet U.S. EPA Tier 4 emission standards (i.e., Tier 4 Interim or Final engine standard) for NOx and PM (PM10 and PM2.5), if feasible, otherwise,
o If use of Tier 4 equipment is not available, alternatively use equipment that meets U.S. EPA emission standards for Tier 3 engines and include particulate matter emissions control equivalent to CARB Level 3 verifiable diesel emission control devices that altogether achieve an 85 percent reduction in particulate matter exhaust in comparison to uncontrolled equipment; alternatively (or in combination). The use of Tier 3 equipment shall not exceed 5 percent of all equipment usage (described in terms of total horsepower hours during a phase). o Use of alternatively fueled equipment with lower NOx
emissions that meet the NOx and PM reduction requirements above.
 Provide line power to the site during the early phases of construction to minimize the use of diesel-powered stationary equipment, such as generators, welders, and air compressors.

The project applicant shall submit a construction operations plan prepared by the construction contractor that outlines how the contractor will achieve the measures outlined in this mitigation measure. The plan shall include but not be limited to the following:
 List of activities and estimated timing.
 Equipment that would be used for each activity.
 Manufacturer’s specifications for each equipment that provides the emissions level; or the manufacturer’s specifications for devices that NVF:JVP:JMD
7/28/2022

8 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
would be added to each piece of equipment to ensure the emissions level meet the thresholds in the mitigation measure.
 How the construction contractor will ensure that the measures listed are monitored.
 How the construction contractor will remedy any exceedance of the thresholds.
 How often and the method the construction contractor will use to report compliance with this mitigation measure

The plan shall be submitted to the Director of Planning, Building and Code Enforcement or the Director’s designee prior to the issuance of any demolition, grading and/or building permits (whichever occurs earliest) for review and approval.

Finding: Impacts related to NOx from construction would be less than significant with implementation of Mitigation Measure MM AIR-2.1. (Less Than Significant Impact with Mitigation Incorporated)

Facts in Support of Finding: With the implementation of Mitigation Measure MM AIR-

2.1, assuming use of Tier 4 Interim equipment, the project’s construction NOx emissions in 2021 and 2022 would be reduced from 99 pounds per day and 58 pounds per day to 54 pounds per day and 47 pounds per day, respectively. As a result, the project’s construction criteria pollutant emissions would be reduced below the BAAQMD single-source thresholds.

BAAQMD’s CEQA thresholds are set to be protective of human health, and therefore the project’s criteria air pollutant emissions from construction, with implementation of this mitigation measure and MM AIR 1.2 and MM AIR-

1.3, the project’s construction NOx emissions impacts would be reduced to a less than significant level and would not cause significant adverse health impacts.

Impact: Impact AIR-3: Project construction activities would exceed BAAQMD single-source thresholds for lifetime excess cancer risk (10 in one million) and annual PM2.5 (0.3 µg/m3).

Mitigation: Mitigation measures identified for AIR-1.1 and AIR-2.1 (detailed above).

Finding: Impacts related to excess cancer risk and annual PM2.5 from construction would be less than significant with implementation of Mitigation Measures MM AIR-1.1 and MM AIR-2.1. (Less Than Significant Impact with Mitigation Incorporated)

NVF:JVP:JMD
7/28/2022

9 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

Facts in Support of Finding: With implementation of Mitigation Measures MM AIR-1.1 and MM AIR-2.1, the increased cancer risk from project construction and operation under the Assisted Living Variant would be reduced from 70.46 to 8.02 cases per million and the annual PM2.5 concentration would be reduced from 0.49 to 0.15 µg/m3. Under the Office Variant, the prescribed mitigation would reduce the cancer risk from 70.49 to 8.05 cases per million and the annual PM2.5 concentrations from 0.49 to 0.16 µg/m3. These values would not exceed the lifetime excess cancer risk threshold of 10 cases per million or the annual PM2.5 threshold of 0.3 µg/m3. Therefore, the health risk impacts from project-related air emissions would be less than significant with mitigation incorporated.

Impact: Cumulative Impacts: The project would not result in a cumulatively considerable contribution to a significant cumulative air quality impacts with implementation of MM AIR-1.1 and 2.1.

Mitigation: Mitigation measures identified for AIR-1.1 and AIR-2.1 (detailed above).

Finding: With implementation of MM AIR-1.1 and 2.1, the project would not make a cumulatively considerable contribution to significant cumulative air quality impacts.

Facts in Support of Finding: The analysis of criteria air pollutants is inherently cumulative. The proposed project would not exceed BAAQMD thresholds for construction criteria air pollutants with implementation of mitigation measures MM AIR-1.1 and 2.1. Operationally, the project would not exceed BAAQMD thresholds for operational criteria air pollutants or the cumulative threshold for toxic air contaminants, and would not result in cumulative odor impacts. For the reasons stated above, MM AIR-1.1 and 2.1 will effectively reduce the project’s contribution to cumulative impacts related to fugitive dust, NOx, and cancer risk during construction.

Biological Resources

Impact: Impact BIO-1: Construction activities associated with the proposed project could result in an impact to nesting birds due to the loss of eggs or nestlings, or otherwise lead to nest abandonment.

Mitigation: MM BIO-1.1: The project applicant shall schedule demolition and construction activities to avoid the nesting season. The nesting season for most birds, including most raptors in the San Francisco Bay area, extends from February 1st through August 31st (inclusive), as amended.

NVF:JVP:JMD
7/28/2022

10 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

MM BIO-1.2: If demolition and construction activities cannot be scheduled to occur outside of the breeding season (September 1 to January 31), pre- construction surveys for nesting birds shall be completed by a qualified ornithologist for each construction phase to ensure that no nests are disturbed during project demolition or construction. This survey shall be completed for the applicable construction phase no more than 14 days prior to the initiation of grading, tree removal, or other demolition or construction activities during the early part of the breeding season (February 1 through April 30) and no more than 30 days prior to the initiation of these activities during the late part of the breeding season (May 1 through August 31).

During this survey, the ornithologist shall inspect all trees and other possible nesting habitats on the project site and within 250 feet of the construction areas for nests. If an active nest is found and in the ornithologist’s opinion is sufficiently close to work areas to be disturbed by construction, the ornithologist shall determine the extent of a construction-free buffer zone to be established around the nest, typically 250 feet, in consultation with California Department of Fish and Wildlife (CDFW), to ensure that the nest will not be disturbed during project construction.

MM BIO-1.3: The qualified ornithologist shall submit a report indicating the results of the survey(s) described in MM BIO-1.2 and any designated buffer zones to the satisfaction of the Director of Planning, Building and Code Enforcement, or Director’s designee, prior to issuance of any grading or demolition permits for the applicable construction phase.

Finding: The impact to nesting birds would be less than significant with implementation of Mitigation Measures MM BIO-1.1 through MM BIO-1.3. (Less Than Significant Impact with Mitigation Incorporated)

Facts in Support of Finding: Conducting pre-construction surveys and implementing a construction-free buffer zone around any migratory bird nests will ensure that raptor or migratory bird nests are not disturbed during project construction pursuant to the Migratory Bird Treaty Act and California Fish and Game Code. The size of the buffer zones will be determined in consultation between the qualified ornithologist and the California Department of Fish and Wildlife and based on scientific evidence and best management practices. Implementation of Mitigation Measures MM BIO-

1.1 through MM BIO-1.3 will reduce or avoid construction-related impacts to nesting raptors, and other migrating and nesting birds to less than significant level.

NVF:JVP:JMD
7/28/2022

11 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

Impact: Cumulative Impacts: The project would not result in a cumulatively considerable contribution to a significant cumulative biological resources impacts with MM BIO 1.1–1.3.

Mitigation: Mitigation measures identified for Impact BIO-1 (detailed above).

Finding: With the incorporation of mitigation measures, discussed above, as well as Standard Permit Conditions for tree replacement and Habitat Plan compliance, the proposed project would make a less than cumulatively considerable contribution to significant cumulative impacts related to biological resources.

Facts in Support of Finding: For the reasons stated above, MM BIO 1.1–1.3 will effectively reduce the project’s contribution to cumulative impacts related to nesting birds to a less than significant level. Compliance with City standard permit conditions for tree replacement and the Santa Clara Valley Habitat Conservation Plan (Santa Clara HPC) would also prevent the project from contributing to significant biological impacts. The Santa Clara HPC is an HPC and a natural community conservation plan (NCCP). An HCP meets federal Endangered Species Act (ESA) requirements and enables local agencies to allow projects and activities to occur in endangered species’ habitats. In exchange, those projects and activities must incorporate HCP- prescribed measures to avoid, minimize, or compensate for adverse effects on natural communities and endangered species, which prevents increasing biological impacts. A NCCP is the state counterpart to the federal HCP. It provides a means of complying with the Natural Community Conservation Planning Act (NCCP Act) and securing take authorization at the State level. The NCCP Act is broader than ESA and the California Endangered Species Act (CESA). Compliance with a NCCP ensures improvement of the overall conditions of species.

Cultural Resources

Impact: Impact CUL-1: The project proposes to relocate and retain the existing carousel sign on-site, which appears individually eligible as a City Landmark.

Mitigation: MM CUL-1.1: Prior to the issuance of any demolition, grading, or building permit (whichever occur first), preparation of a full photo-documentation of the carousel sign and shopping center context that surrounds and supports the carousel sign is required using the Secretary of Interior’s Standards and Guidelines for Architectural and Engineering Documentation: Historic American Buildings Survey/ Historic American Engineering Record NVF:JVP:JMD
7/28/2022

12 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
(HABS/HAER) Standards and shall be submitted to the City’s Historic Preservation Officer. The documentation shall be of archival quality according to a scope approved by the Historic Preservation Officer (HPO), or HPO’s designee, and be archived at a local repository such as the Archives at History San José.

MM CUL-1.2: Prior to the issuance of any demolition, grading, or building permits (whichever occur first), a Historic Resources Protection Plan (HRPP) shall be prepared to ensure the carousel sign is not damaged when it is relocated. The Plan shall establish procedures to protect the carousel sign from direct or indirect impacts during construction (including relocation) activities (i.e., due to damage from operation of construction equipment, staging, and material storage). The HRPP shall specify how the sign shall be dismantled, stored, and reassembled and shall be approved by the HPO, or HPO’s designee, and implemented during construction activities.

MM CUL-1.3: Prior to construction activities (including ground-disturbing work) within 100 feet of the carousel sign, the project permittee, in consultation with a qualified historic preservation professional, shall remove the sign from the site in accordance with the approved HRPP. In accordance with the HRPP, storage shall be located in a secure location that is indoors and protected from weather, impacts, and vandalism. The location of the storage facility shall be communicated to the Director of Planning, Building, and Code Enforcement or the Director’s designee.

Relocation of the sign to its final location shall be completed in accordance with the HRPP prior to the issuance of an Occupancy permit, or as determined by the Director of Planning, Building, and Code Enforcement or Director’s designee. The signage relocation shall also include interpretive signage indicating the sign’s age, association and original location at the base of the structural support.

Finding: Implementation of Mitigation Measures MM CUL-1.1 through 1.3 would reduce potential impacts to the carousel sign to a less than significant level. (Less Than Significant Impact with Mitigation Incorporated)

Facts in Support of Finding: The demolition of Cambrian Park Plaza as presently proposed in concept would result in an adverse environmental effect on the carousel sign were it not retained as a part of the project. The carousel sign is a historical resource under CEQA and is eligible for listing on the San José Historic Resources Inventory as a San José City Landmark Structure.

With the implementation of mitigation measures MM CUL-1.1 through 1.3, the project would reduce its impact to the carousel sign to a less than significant level by documenting the historic character of the Cambrian Park NVF:JVP:JMD
7/28/2022

13 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

Plaza carousel sign, relocating and preserving the carousel sign in compliance with the Secretary of Interior’s Standards and a Historic Resources Protection Plan. This mitigation includes retention, relocation and restoration of the sign, with its three-sided message boards and rotating carousel feature on top, which will provide a highly visible and recognizable link to the site’s former use as the Cambrian Park Plaza shopping center and would maintain sufficient integrity per California Code of Regulations Section 4852(c) to avoid impacting the carousel sign’s City Landmark eligibility. As a result, implementation of the mitigation measures would result in a less than significant impact on the historic carousel sign.

Impact: Cumulative Impacts: The proposed project could potentially make a cumulatively considerable contribution to a significant cumulative impact to cultural resources.

Mitigation: Mitigation measures identified for Impact CUL-1 (detailed above).

Finding: Implementation of MM CUL-1.1 through 1.3 together with Standard Permit Conditions to reduce potentially significant impacts to historic and prehistoric cultural resources would ensure the project would not make a cumulatively considerable contribution to significant cumulative cultural resource impacts.

Facts in Support of Finding: MM CUL-1.1 through 1.3 would prevent the project from having a significant impact on historic resources. The proposed project would adhere to Standard Permit Conditions and state laws to reduce potentially significant impacts to historic and prehistoric cultural resources.

These conditions and laws prevent impacts to unanticipated cultural resource discoveries and human remains. Projects in the area would be required, through the City’s development review process, to adhere to similar conditions and identify mitigation measures, if necessary, to minimize their respective impacts to cultural resources.

Hazards and Hazardous Materials

Impact: Impact HAZ-1: Implementation of the proposed project could release chemicals from on-site soils into the environment, and expose construction workers to residual hydrocarbon, tetrachloroethylene (PCE), and/or agricultural soil contamination above their respective environmental screening levels.

NVF:JVP:JMD
7/28/2022

14 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

Mitigation: MM HAZ-1.1: Prior to issuance of any grading or demolition permits, the project applicant shall prepare a site-specific site management plan (SMP) to manage potentially impacted soil and soil vapor, under Santa Clara County Department of Environmental Health (SCCDEH) oversight.

Documentation developed with the County relating to SMPs or Site Cleanup shall be submitted to the Supervising Planner of the City of San Jose’s Department of Planning, Building, and Code Enforcement and the Environmental Services Department Municipal Compliance Officer.

MM HAZ-1.2: Prior to the issuance of any grading permits, shallow soil samples will be taken in the near surface soil in the project area and tested for organochlorine pesticides and pesticide-based metals arsenic and lead to determine if contaminants from previous agricultural operations occur at concentrations above established construction worker safety and commercial/industrial standard environmental screening levels. The result of soil sampling and testing will be provided to the Supervising Planner of the City of San Jose’s Department of Planning, Building, and Code Enforcement and the Environmental Services Department Municipal Compliance Officer.

Finding: Implementation of Mitigation Measures MM HAZ-1.1 through MM HAZ-1.2 described above would reduce potential impacts from onsite soil contamination to a less than significant level. (Less than Significant Impact with Mitigation)

Facts in Support of Finding: As part of the Phase I Environmental Site Assessment (ESA) completed for the project site, a review of federal, State, and local regulatory agency databases was completed to evaluate the likelihood of contamination incidents at and near the project site. The purpose of the records review was to obtain available information to help identify recognized environmental conditions. As analyzed in the Draft EIR, the project site was formerly used for agricultural purposes and a dry cleaning facility, indicating the potential for residual pesticides, hydrocarbon, and/or tetrachloroethene (PCE) in on-site soils. The proposed ground disturbing activities could expose construction workers and the public to hazards from residual pesticides, hydrocarbon, and/or tetrachloroethene (PCE) during excavation and grading. Therefore, the project would result in a significant impact with regard to exposure of construction workers and adjacent sensitive receptors to residual pesticides in the soil.

Because the project site has the potential for residual pesticides, hydrocarbon, and/or tetrachloroethene (PCE) in the soil, Mitigation Measures HAZ-1.1 and HAZ-1.2 would ensure that the project site is evaluated for contamination levels, and an approved remediation plan is put NVF:JVP:JMD
7/28/2022

15 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
in place to clean up any contamination that might be present. These actions would ensure that the project site is safe for construction workers and future residents of the project.

Impact: Impact HAZ-2: Soil vapor intrusion from contaminated soils on-site could result in a health hazard to future occupants of the site.

Mitigation: MM HAZ-2.1: Prior to the issuance of any grading permits, a qualified environmental professional shall evaluate prior soil vapor investigations to determine if supplemental investigations are necessary. All existing and/or supplemental soil vapor sampling shall be analyzed and compared to the most current risk-based screening levels set forth by the San Francisco Bay Area Regional Water Quality Control Board (SFRWQCB) or other appropriate regulatory agencies. The results of any supplemental sampling, and/or confirmation that existing sampling results are adequate to make a determination of appropriate mitigation shall be provided to the Director of Planning, Building and Code Enforcement or Director’s designee prior to the issuance of grading permits. SFRWQCB is the lead environmental agency for this mitigation.

MM HAZ-2.2: If existing and/or supplemental soil vapor sampling determines that vapor intrusion exceeds the most current risk-based screening levels, the project applicant, prior to issuance of any grading permits, shall implement measures to reduce vapor intrusion; these measures could include underground parking, vapor barriers, passive venting, sub-slab depressurization, and/or building over-pressurization, depending on a toxicological review of the sampling data collected for MM HAZ-1.1. The appropriate measures shall be identified by a qualified environmental professional and incorporated into the SMP described under mitigation measure MM HAZ-1.2, subject to review and approval by the Director of Planning, Building and Code Enforcement or Director’s designee prior to the issuance of grading permits. SFRWQCB is the lead environmental agency for this mitigation.

Finding: Implementation of mitigation Measures MM HAZ-2.1 through MM HAZ-2.2 will reduce the impacts of potential soil vapor intrusion to a less than significant level. (Less than Significant Impact with Mitigation)

Facts in Support of Finding: With the implementation of Mitigation Measures MM HAZ-

2.1 and MM HAZ-2.2, the project would not create a significant soil vapor intrusion hazard to the public or environment. These measures require soil vapor investigations to determine if supplemental investigations are necessary. All existing and/or supplemental soil vapor sampling will be NVF:JVP:JMD
7/28/2022

16 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
analyzed and compared to the most current risk-based screening levels set forth by the San Francisco Bay Regional Water Quality Control Board or other appropriate regulatory agencies. If existing and/or supplemental soil vapor sampling determines that vapor intrusion exceeds the most current risk-based screening levels, the project applicant, prior to issuance of any grading permits, will implement measures to reduce vapor intrusion, resulting in a less than significant impact on the public and environment due to vapor intrusion. Vapor intrusion barrier systems and other similar systems are commonly used and effective at preventing vapor intrusion.

Noise

Impact: Impact NOI-1: Construction noise levels at nearby residential and commercial land uses would exceed the ambient noise environment by at least five dBA Leq for a period exceeding 12 months.

Mitigation: MM NOI-1.1: Prior to the issuance of any demolition or grading permits, the project applicant shall adhere to the following construction best management practices to reduce construction noise levels emanating from the site and minimize disruption and annoyance at existing noise-sensitive receptors in the project vicinity.
 Construction shall be limited to the hours of 7:00 AM to 7:00 PM Monday through Friday for any on-site or off-site work within 500 feet of any residential unit. Construction outside of these hours may be approved through a development permit based on a site-specific “construction noise mitigation plan” and a finding by the Director of Planning, Building and Code Enforcement or Director’s designee that the construction noise mitigation plan is adequate to prevent noise disturbance of affected residential uses. Work outside of the allowable hours of operation would not be allowed and would be corrected by the disturbance coordinator if violated.
 The contractor shall use “new technology” power construction equipment with state-of-the-art noise shielding and muffling devices.

All internal combustion engines used on the project site shall be equipped with adequate mufflers and shall be in good mechanical condition to minimize noise created by faulty or poorly maintained engines or other components.
 The unnecessary idling of internal combustion engines shall be prohibited.

NVF:JVP:JMD
7/28/2022

17 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
 Staging areas and stationary noise-generating equipment shall be located as far as possible from noise-sensitive receptors such as residential uses (a minimum of 200 feet).
 The surrounding neighborhood shall be notified early and frequently of the construction activities
 A “noise disturbance coordinator” shall be designated to respond to any local complaints about construction noise. The disturbance coordinator would determine the cause of the noise complaints (e.g., beginning work too early, bad muffler, etc.) and institute reasonable measures warranted to correct the problem. A telephone number for the disturbance coordinator shall be conspicuously posted at the construction site.

MM NOI-1.2: Prior to the issuance of any demolition or grading permits, a qualified acoustical consultant shall develop a construction noise logistics plan, that includes measures to ensure construction noise would not exceed 5 dBA Leq over ambient the ambient daytime average Leq for a period exceeding 12 months. The plan shall consist of noise reduction measures, including, but not limited to, the following available controls; that the project applicant shall implement the plan during all phases of construction activity to reduce the noise exposure to neighboring properties:
 Utilize ‘quiet’ models of air compressors and other stationary noise sources where technology exists.
 Equip all internal combustion engine-driven equipment with mufflers, which are in good condition and appropriate for the equipment.  Construct temporary noise barriers, where feasible, to screen stationary noise-generating equipment when located within 200 feet of adjoining sensitive land uses. Temporary noise barrier fences would provide a five dBA noise reduction if the noise barrier interrupts the line-of-sight between the noise source and receptor and if the barrier is constructed in a manner that eliminates any cracks or gaps.
 If stationary noise-generating equipment must be located near receptors, adequate muffling (with enclosures where feasible and appropriate) shall be used. Any enclosure openings or venting shall face away from sensitive receptors.
 Ensure that generators, compressors, and pumps are housed in acoustical enclosures.

NVF:JVP:JMD
7/28/2022

18 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
 Locate cranes as far from adjoining noise-sensitive receptors as possible.
 During final grading, substitute graders for bulldozers, where feasible. Wheeled heavy equipment are quieter than track equipment and should be used where feasible.
 Substitute nail guns for manual hammering, where feasible.  Substitute electrically powered tools for noisier pneumatic tools, where feasible.

The construction noise logistic plan, inclusive of the above shall be signed by a qualified acoustical specialist verifying that the implementation measures included in this plan meets the reduction to noise levels as required by this mitigation measure. The verified construction noise logistic plan shall be submitted to the Director of Planning, Building, and Code Enforcement or Director’s designee for review and approval prior to the issuance of grading and/or building permits (whichever occurs first).

Finding: Implementation of Mitigation Measures NOI-1.1 and NOI-1.2 would reduce ambient noise levels in the project area due to construction to a less than significant level. (Less than Significant Impact with Mitigation)

Facts in Support of Finding: The proposed project would be constructed in approximately 28 months, which exceeds the 12-month construction noise threshold pursuant to General Plan Policy EC-1.7. To comply with MM NOI-

1.1 and NOI-1.2, the project applicant would be required to submit and implement a construction noise logistics plan and adhere to best management practices which would include: specific hours of construction, noise and vibration minimization measures, posting and notification of construction schedules, equipment to be used, and designation of a noise disturbance coordinator. The project applicant shall submit the noise logistic plan to the Director or Director’s designee of the Department of Planning, Building and Code Enforcement prior to the issuance of any grading or demolition permits. Implementation of Mitigation Measures NOI-1.1 and NOI-1.2 would reduce noise impacts to a less than significant level.

Impact: Impact NOI-2: Residential and commercial uses adjacent to the proposed project could be exposed to mechanical equipment noise in excess of 55 dBA Leq and 60 dBA Leq, respectively.

Mitigation: MM NOI-2.1: Prior to the issuance of any building permits, the project applicant shall select mechanical equipment designed to reduce impacts on surrounding uses to meet the City’s requirements. A qualified acoustical NVF:JVP:JMD
7/28/2022

19 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
consultant shall be retained by the project applicant to review mechanical noise as the equipment systems are selected in order to determine specific noise reduction measures necessary to reduce noise to comply with the City’s 55 dBA Leq (residential) or 60 dBA Leq (commercial) noise limit at the shared property line. Noise reduction measures could include, but are not limited to, selection of equipment that emits low noise levels and/installation of noise barriers such as enclosures and parapet walls to block the line of sight between the noise source and the nearest receptors.

Finding: Implementation of mitigation measure MM NOI-2.1 will reduce mechanical equipment noise impacts to a less than significant level. (Less than Significant Impact with Mitigation)

Facts in Support of Finding: The specifications of mechanical equipment will not be known until submittal of applications for building permits. The review of the specifications of proposed mechanical equipment by a qualified acoustical consultant and confirmation by the Director of Planning, Building, and Code Enforcement or the Director’s Designee will ensure equipment complies with General Plan Policy EC-1.3, which limits mechanical equipment noise to 55 dBA Leq at noise-sensitive land uses and 60 dBA Leq at commercial land uses in the immediate project vicinity.

Impact: Impact NOI-3: Construction-generated vibration would exceed the 0.2 in/sec PPV threshold and would be capable of cosmetically damaging the adjacent residential and commercial buildings to the east and south.

Mitigation: MM NOI-3.1: Prior to the issuance of any grading or building permits, whichever occurs first, the project applicant shall incorporate the following measures into the construction noise logistics plan described previously in mitigation measure MM NOI-1.2. A qualified acoustical consultant shall provide a signed letter confirming that construction equipment would not exceed the 0.2 in/sec PPV threshold at residential receptors pursuant to the City’s General Plan Policy EC-2.3.
 Prohibit the use of heavy vibration-generating construction equipment within 30 feet of adjacent commercial or residential buildings. This would apply to equipment similar to vibratory rollers, hoe rams, large bulldozers, drills, loaded trucks, and jackhammers.  Use a smaller vibratory roller, such as the Caterpillar model CP433E vibratory compactor, when compacting materials within 30 feet of adjacent commercial buildings. Only use the static compaction mode when compacting materials within 15 feet of residential buildings.

NVF:JVP:JMD
7/28/2022

20 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
 Avoid dropping heavy equipment and use alternative methods for breaking up existing pavement, such as a pavement grinder, instead of dropping heavy objects, within 30 feet of adjacent residential buildings.
 Designate a person responsible for registering and investigating claims of excessive vibration. The contact information of such person shall be clearly posted on the construction site.

Prior to the issuance of any building or grading permits, whichever occurs first, the project applicant shall submit the construction noise logistics plan and the signed letter from the qualified acoustical consultant to the Director of Planning, Building and Code Enforcement, or Director’s designee.

Finding: Mitigation measure MM NOI-3.1 will reduce construction vibration impacts to adjacent structures a less than significant level. (Less than Significant Impact with Mitigation)

Facts in Support of Finding: With implementation of the mitigation measures described above, the proposed project would not generate excessive construction vibration levels at nearby sensitive land uses. The prohibition of heavy vibration-generating equipment, use of smaller vibratory rollers and compactors, and use of alternative methods of breaking up pavement within proximity (30 feet) of existing offsite buildings are enforceable measures that would minimize prevent construction vibration from exceeding 0.2 in/sec PPV, which is the threshold for cosmetic damage.

FINDINGS CONCERNING ALTERNATIVES

In order to comply with the purposes of CEQA, it is important to identify alternatives that reduce the significant impacts that are anticipated to occur if the Project is implemented and to try to meet as many of the Project’s objectives as possible. The CEQA Guidelines emphasize a common sense approach -- the alternatives should be reasonable, should “foster informed decision making and public participation,” and should focus on alternatives that avoid or substantially lessen the significant impacts.

The alternatives analyzed in the Draft SEIR were developed with the goal of being at least potentially feasible, given Project objectives and site constraints, while avoiding or reducing the Project’s identified environmental effects. five alternatives were explored, including a Location Alternative and Existing Santa Clara County Zoning Alternative that NVF:JVP:JMD
7/28/2022

21 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
were determined to be infeasible and considered rejected. The following are evaluated as alternatives to the proposed Project:

1. No Project

2. Existing Plans Alternative

3. Reduced Grading and Excavation Alternative

1. No Project Alternative

A. Description of Alternative: The No Project Alternative would retain the existing commercial/retail shopping center and surface parking lot. If the project site were to remain as is, there would be no new impacts.

B. Comparison of Environmental Impacts: The No Project Alternative would avoid all of the project’s environmental impacts.

C. Finding: The No Project Alternative would avoid all of the Project’s less than significant impacts with mitigation. The No Project Alternative would not meet any of the proposed Project’s specific objectives because it would not meet any of the City’s strategies and goals. Specifically, the No Project Alternative would not create a new mixed-use Signature Project in a designated Urban Village area, would not add housing in close proximity to food and retail services in the area, would not result in sustainable buildings, would not relocate parking underground, and would not contribute to the City satisfying its Regional Housing Needs Assessment.

Because this alternative would not meet any of the proposed Project’s specific objectives, this alternative is rejected.

2. Existing Plan Alternative

A. Description of Alternative: The Existing Plans Alternative would consist of annexation of the site and buildout under a City zoning district that would be consistent with the existing City General Plan designation of Neighborhood Community Commercial (NCC), such as an all-commercial non-Signature project.

There are four City commercial zoning districts that would conform to the current Neighborhood Community Commercial (NCC) General Plan designation on the site – CO Commercial Office, CP Commercial Pedestrian, CN Commercial Neighborhood, and CG Commercial General. All four would allow general or professional office uses, such as the office use proposed in the office variant of the proposed project, as a permitted use. The NCC designation has a maximum FAR of 3.5 (1 to 5 story buildings), which would allow up to approximately 2.6 million square feet of office use on the 17.2-acre site. However, typical office development NVF:JVP:JMD
7/28/2022

22 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
in the area would be two stories in height (as in the existing office park located at Union Avenue and Logic Drive, approximately 1/3-mile south of the site), with the resulting FAR of approximately 0.35. Using an FAR of 0.35, a reasonable design for the Existing Plans Alternative project on the site could consist of approximately 262,230 square feet of office development, configured in two-story buildings with surface parking.

B. Comparison of Environmental Impacts: The proposed mixed-use project complying with the City’s goals and requirements would result in significant impacts to air quality, nesting birds, cultural resources, hazards and hazardous materials, and operational and construction-related noise, all of which would be mitigated to less than significant with mitigation. The Existing Plans Alternative would substantially decrease the overall building square footage compared to the original project (262,230 square feet versus the proposed Signature Project total of 905,278 square feet), resulting in a substantial reduction of construction activity and consequently a reduction in construction-related criteria pollutant emissions.

The Existing Plans Alternative assumes that all of the existing trees would be removed, and that construction-related impacts to nearby off-site trees would remain the same as with the proposed project. Therefore, the impacts to nesting birds would remain the same as with the proposed Project. The Existing Plans Alternative would involve demolition of the existing buildings on the site, grading, and subsurface excavation for utility trenching. Impacts to archaeological resources would potentially be reduced by using above-ground parking (vs. excavating for below-ground parking) and historic resources such as the carousel sign would remain the same as the proposed project. Impacts to construction workers related to soil and groundwater contamination could potentially be less, due to the shallower depths of excavation, however, potential impacts to future occupants of the site would be the same as with the original project, and the same mitigation measures would be required to reduce impacts to a less than significant level. Because the Existing Plans Alternative would consist solely of office uses with no residential, restaurant or entertainment uses, the potential operational noise impacts, including traffic noise, would be reduced from the proposed project.

The Existing Plans Alternative would result in reductions in construction-related air quality emissions, and operational and construction noise and vibration impacts but all other impacts would remain the same as the proposed project.

C. Finding: The Existing Plans Alternative would meet or partially meet two of the Project’s 11 objectives. The fourth objective establishes the goals of providing a location for future employees within close proximity to available housing, parks, schools and multiple food and retail services along the Camden Avenue/Hillsdale Avenue corridor and situating the mixed-use village near, or adjacent to, existing traffic arterials (such as Highway 17), and bus connection services in order to allow for multi-modal transit mechanisms for site accessibility. The Existing Plans NVF:JVP:JMD
7/28/2022

23 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

Alternative would be consistent, to some degree, with these goals. In addition, the Alternative would be consistent with the fifth objective, which is to meet high sustainability and green building standards by designing the development to meet US Green Building Code LEED and Cal-Green standards for new construction.

The Existing Plans Alternative would result in approximately 262,230 square feet of office development, configured in two-story buildings with surface parking which would not meet the intent of the first three project objectives, which seek to further the Envision San José 2040 General Plan Land Use Element Goal LU-2, Major Strategy #5 and Implementation Policy IP-5.10 by establishing new mixed-use neighborhoods and promoting the development of a Signature Project in an Urban Village that provides an active, walkable, bicycle-friendly, mixed-use setting for new housing and job growth. Additionally, the Existing Plans Alternative would be inconsistent with objectives six and seven of providing mostly subsurface parking to reduce the impact of above-ground parking and provide more open space for the benefit of the community. The Existing Plans Alternative, which consists of office uses only, would be inconsistent with project objectives eight through 11 that seek to provide housing for the purpose of enhancing of the character of the neighborhood by providing common open space areas (town square and community park), increase residential density in close proximity to transportation corridors, commercial centers and jobs, and assist the City in satisfying its Regional Housing Needs Allocation for market rate housing units.

The Existing Plans Alternative would result in reductions in construction-related air quality emissions, and operational and construction noise and vibration impacts.

However, this Alternative would not meet the most critical of the applicant or City’s project objectives, which are to redevelop the site as an Urban Village with a mixed-use signature project that provides a mix of residential, commercial, and employment uses, consistent with the General Plan.

3. Reduced Grading and Excavation Alternative

A. Description of Alternative: The Reduced Grading and Excavation Alternative would consist of a mixed-use urban village development but having a reduced amount of grading and excavation than the proposed project in order to reduce construction air quality impacts. This analysis is based on a project alternative that substantially reduces the amount of grading and excavation by replacing the proposed below-ground parking structures with an above-ground structure(s). The new parking structure(s) would contain five stories, and their placement above- ground on the site would result in a reduced amount of public park area and reduced sizes of the hotel and assisted living/office buildings. The Reduced Grading and Excavation Alternative project would consist of the same amount of retail space (55,600 square feet), and same number of apartment units (305), single-family homes (48) and townhomes (25) as the proposed project. However, NVF:JVP:JMD
7/28/2022

24 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
it would have a 0.77-acre community park, 135,740 gross square feet of hotel space (193 rooms), and 144,060 gross square feet of assisted living/office space.

The community park area would be reduced by approximately 0.83 acres, or approximately 48 percent, from the proposed project. The hotel square footage represents a reduction of approximately 16 percent from the proposed project, and the assisted living/office space represents a reduction of approximately 22 percent from the proposed project. Taken together, this reflects an overall reduction in the mixed-use development program of about six percent but would entail a substantial reduction in construction activity by not excavating substantial below-grade parking areas,

B. Comparison of Environmental Impacts: The purpose of the Reduced Grading and Excavation Alternative 1 is to minimize the project’s construction air quality impacts by replacing the proposed Project’s below-ground parking structure with above-ground parking structures. Eliminating excavation and off-haul activities for the construction of below-ground parking garages in favor of constructing above- ground structured parking as proposed with this Alternative would constitute a substantial reduction in the amount of grading for the project, and related reduction in the significance of construction emissions. Because of the proximity of the project site to sensitive receptors, there is no meaningful alternative that would avoid construction risk impacts for increased cancer risk without the required mitigation measures, therefore, community risk would remain the same under this Alternative as the proposed Project. Impact to nesting birds would also remain the same as the proposed Project because this Alternative assumed that all existing trees would be removed. The Reduced Grading and Excavation Alternative would involve demolition of the existing buildings on the site, grading, and subsurface excavation for building foundations and utility trenching. Impacts to archaeological resources would potentially be reduced by using above-ground parking (vs. excavating for below-ground parking) and historic resources such as the carousel sign would remain the same as the proposed project. Additionally, Impacts to construction workers related to soil and groundwater contamination could potentially be less, due to the shallower depths of excavation, however, potential impacts to future occupants of the site would be the same as with the original project, and the same mitigation measures would be required to reduce impacts to a less than significant level. reducing the amount of construction by replacing below-ground parking with above-ground structured parking as proposed would reduce some of the noise and a significant amount of the vibration impacts to surrounding areas by eliminating the excavation activities and reducing the number of truck trips off-hauling excavated material.

The Reduced Grading and Excavation Alternative project would result in a minimal reduction in the overall square footage of the proposed project but would reduce the amount of construction air pollutant emissions and consequent reduction in air NVF:JVP:JMD
7/28/2022

25 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.
quality impacts. In addition, it would result in reduced noise and vibration impacts by eliminating the below-ground excavation activities and truck trips.

C. Finding: This Reduced Grading and Excavation Alternative would meet or partially meet seven of the 11 stated Project objectives. The Reduced Grading and Excavation Alternative would continue to provide a substantial amount of residential units, commercial (including retail and hotel square footage) and office space to effectively be consistent with the General Plan Land Use Goal of focusing new growth into this identified Growth Area. However, the tradeoff for reducing grading activity by replacing underground parking with above-ground parking would be inconsistent with Project objectives 1, 3, 6, and 7 which aim for consistency with existing neighborhood character, providing high quality architectural landscape and site design features, and providing 1.6 acres of publicly accessible open space. The Reduced Grading and excavation Alternative would include new five-story, above ground parking structure(s), resulting in a 48 percent reduction in the community park. These parking structures would be visible from the surrounding community and would not have the same beneficial impacts as the proposed project in reducing the impact of above-ground parking by placing the majority of parking underground, allowing for more public park space and pedestrian and bicycle accessibility.

The Reduced Grading and Excavation Alternative would not generate emissions of construction criteria air pollutants that exceed BAAQMD thresholds without mitigation. In addition, it would reduce construction noise and vibration impacts caused by extensive below-ground excavation activities and off-hauling of excavated material. However, this Alternative would represent a diminished opportunity to intensify job-creating commercial and office growth within the Camden Avenue/Hillsdale Avenue Urban Village growth area and would be inconsistent with the Signature Project objectives of demonstrating high-quality architectural, landscape and site design by adding large unsightly parking structures to the site. This alternative also would be inconsistent with the goals of providing a 1.6-acre community park and plaza and placing a majority of parking underground to reduce visual impacts to the adjacent community and increase open space.

Environmentally Superior Alternative

The CEQA Guidelines state that an EIR shall identify an environmentally superior alternative. Based on the discussion of project alternatives, the environmentally superior alternative to the project is the No Project Alternative because it would avoid all of the Project’s significant environmental impacts. CEQA Guidelines Section 15126.6(e)(2) states that “if the environmentally superior alternative is the No Project Alternative, the NVF:JVP:JMD
7/28/2022

26 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

EIR shall also identify an environmentally superior alternative among the other alternatives.” Therefore, in addition to the No Project Alternative, the Reduced Grading and Excavation Alternative would be the environmentally superior alternative as it would reduce the amount of construction air pollutant emissions and consequent reduction in air quality impacts. In addition, it would result in reduced noise and vibration impacts by eliminating the below-ground excavation activities and truck trips. This Alternative, however, would change the overall project design by including large above-ground parking structures to accommodate the project’s parking requirements, which would be inconsistent with overall design concept of compact, integrated mixed use development that de-emphasizes the presence of automobiles, and would make the project inconsistent with the Signature Project objectives of demonstrating high-quality architectural, landscape and site design features.

MITIGATION MONITORING AND REPORTING PROGRAM

Attached to this Resolution as Exhibit “A” and incorporated and adopted as part of this Resolution herein is the Mitigation Monitoring and Reporting Program (“MMRP”) for the Project required under Section 21081.6 of the CEQA Statute and Section 15097(b) of the CEQA Guidelines. The MMRP identifies impacts of the Project, corresponding mitigation, designation of responsibility for mitigation implementation and the agency responsible for the monitoring action.

LOCATION AND CUSTODIAN OF RECORDS

The documents and other materials that constitute the record of proceedings on which the City Council based the foregoing findings and approval of the Project are located at the City’s Department of Planning, Building and Code Enforcement, San José City Hall, 200 East Santa Clara Street, 3rd Floor Tower, San José, California, 95113, and are also available for viewing electronically on the Department of Planning, Building and Code Enforcement website. The City Council hereby designates the City’s Director of Planning, Building, and Code Enforcement at the Director’s office at 200 East Santa Clara Street, 3rd Floor Tower, San José California, 95113, as the custodian of documents and records of proceedings on which this decision is based.

NVF:JVP:JMD
7/28/2022

27 T-51008.001/1943062_2
Council Agenda: 08-09-2022
Item No.: 10.4(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or CityClerk@sanJoséca.gov for final document.

ADOPTED this ___ day of _________, 2022, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

SAM LICCARDO
Mayor
ATTEST:

TONI J. TABER, CMC
City Clerk

MITIGATION MONITORING AND REPORTING PROGRAM
Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007
June 2022
DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 7/7/2022
EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 2 File No. PDC17-040 and PD20-007

PREFACE

Section 21081.6 of the California Environmental Quality Act (CEQA) requires a Lead Agency to adopt a Mitigation Monitoring and Reporting Program (MMRP) whenever it approves a project for which measures have been required to mitigate or avoid significant effects on the environment.

The purpose of the monitoring and reporting program is to ensure compliance with the mitigation measures during project implementation.

The Environmental Impact Report (EIR) prepared for the Cambrian Park Mixed-Use Village concluded that the implementation of the project could result in significant effects on the environment and mitigation measures were incorporated into the proposed project or are required as a condition of project approval. This MMRP addresses those measures in terms of how and when they will be implemented.

This document does not discuss those subjects for which the EIR concluded that the impacts from implementation of the project would be less than significant.

I, , the applicant, on the behalf of , hereby agree to implement the mitigation measures described below which have been developed in conjunction with the preparation of an EIR for my proposed project. I understand that these mitigation measures or substantially similar measures will be adopted as conditions of approval with my development permit request to avoid or significantly reduce potential environmental impacts to a less than significant level.

Project Applicant’s Signature _____________________________________________

Date_________________________________________________________________

Weingarten Nostat, Inc.Michael Strahs
DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 7/7/2022
EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 3 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule

AIR QUALITY
Impact AIR-1: Project construction could result in significant fugitive dust (DPM and PM10) emissions.

MM-AIR-1.1: Prior to the issuance of any
demolition or grading permits, a qualified air quality
consultant shall prepare a Construction Dust Control
Plan and implement the following dust (DPM and
PM10) control measures during the construction period:

1. All exposed surfaces (e.g., parking areas,
staging areas, soil piles, graded areas, and
unpaved access roads) shall be watered at a
frequency adequate to maintain minimum soil
moisture of 12 percent. Moisture content can
be verified by lab samples or moisture probe.

2. All haul trucks transporting soil, sand, or
other loose material off-site shall be covered.

3. All visible mud or dirt track-out onto adjacent
public roads shall be removed using wet
power vacuum street sweepers at least once
per day. The use of dry power sweeping is
prohibited.

4. All vehicle speeds on unpaved roads shall be
limited to 15 mph.

5. All roadways, driveways, and sidewalks to be
paved shall be completed as soon as possible.

Prepare a plan demonstrating
that dust (DPM and PM10)
control measures are
implemented to achieve the
performance criteria
identified in this measure.

The plan shall be prepared
by a qualified air quality
consultant and submitted to
the City.

Print all measures on all
construction documents,
contracts, and project plans.

Construction
documents and
plans shall be
submitted for
review and approval
prior to the issuance
of any demolition or
grading permits.

Construction
equipment measures
and control
measures shall be
implemented during
all phases of
construction.

Director of PBCE or
the Director’s
designee.

Review and approve
the construction
equipment plan and
dust control
measures plan.

Ensure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
demolition or
grading permits.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 4 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
Building pads shall be laid as soon as possible
after grading unless seeding or soil binders are
used.

6. Idling times shall be minimized either by
shutting equipment off when not in use or
reducing the maximum idling time to 5
minutes (as required by the California
airborne toxics control measure Title 13,
Section 2485 of California Code of
Regulations [CCR]). Clear signage shall be
provided for construction workers at all access
points.

7. All construction equipment shall be
maintained and properly tuned in accordance
with manufacturer’s specifications. All
equipment shall be checked by a certified
mechanic and determined to be running in
proper condition prior to operation.

8. Post a publicly visible sign at the project site
with the telephone number and person to
contact at the Lead Agency regarding dust
complaints. This person shall respond and
take corrective action within 48 hours. The
Air District’s phone number shall also be
visible to ensure compliance with applicable
regulations.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 5 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule

9. All excavation, grading, and/or demolition
activities shall be suspended when average
wind speeds exceed 20 mph and visible dust
extends beyond site boundaries.

10. Wind breaks (e.g., trees, fences) shall be
installed on the windward side(s) of actively
disturbed areas of construction adjacent to
sensitive receptors. Wind breaks should have
at maximum 50 percent air porosity.

11. Vegetative ground cover (e.g., fast-
germinating native grass seed) shall be
planted in disturbed areas as soon as possible
and watered appropriately until vegetation is
established.

12. The simultaneous occurrence of excavation,
grading, and ground-disturbing construction
activities on the same area at any one time
shall be limited. Activities shall be phased to
reduce the amount of disturbed surfaces at any
one time.

13. Avoid tracking of visible soil material on to
public roadways by employing the following
measures if necessary: (1) Site accesses to a
distance of 100 feet from public paved roads
shall be treated with a 6 to 12-inch compacted
layer of wood chips, mulch, or gravel and (2)

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 6 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
washing truck tires and construction
equipment of prior to leaving the site.

14. Sandbags or other erosion control measures
shall be installed to prevent silt runoff to
public roadways from sites with a slope
greater than one percent.

Prior to the issuance of any grading or demolition
permits, the project applicant shall submit a copy of the Construction Dust Control Plan to the Director of
Planning, Building and Code Enforcement or the
Director’s designee for review and approval.

Impact AIR-2: Emissions from construction activities would exceed the BAAQMD criteria pollutant threshold of 54 pounds per day for NOx emissions for the first two years of construction by up to 47 pounds per day for both project variants (Alternatives 1 and 2).

MM AIR-2.1: Prior to the issuance of any demolition
or grading permits (whichever occurs first), a qualified air quality consultant shall prepare construction
operations plan demonstrating use of construction
equipment that has low diesel particulate matter
exhaust and NOx emissions. The plan shall be
accompanied by a letter signed by an air quality
specialist, verifying that the equipment included in the plan meets the standards set forth below.

1. All diesel construction equipment larger than
25 horsepower used at the site for more than
two continuous days or 20 hours total shall
meet U.S. EPA Tier 4 emission standards (i.e.,
A plan demonstrating that
construction equipment used
on-site would achieve the
required diesel particulate
matter exhaust and NOx
emission reductions shall be
prepared by a qualified air
quality consultant and
submitted to the City.

All measures shall be printed
on all construction
documents, contracts, and
project plans.

Construction
documents and
plans shall be
submitted for
review and approval
prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
first).

Construction
equipment measures
Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the construction
equipment plan.

Ensure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs first).

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 7 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
at least Tier 4 Interim engine standard) for
NOx and PM (PM10 and PM2.5), if feasible,
otherwise,

a. If use of Tier 4 equipment is not
available, alternatively use
equipment that meets U.S. EPA
emission standards for Tier 3 engines
and include particulate matter
emissions control equivalent to
CARB Level 3 verifiable diesel
emission control devices that
altogether achieve an 85 percent
reduction in particulate matter
exhaust in comparison to
uncontrolled equipment; alternatively
(or in combination). The use of Tier
3 equipment shall not exceed 5
percent of all equipment usage
(described in terms of total
horsepower hours during a phase).

b. Use of alternatively fueled
equipment with lower NOx
emissions that meet the NOx and PM
reduction requirements above.

2. Provide line power to the site during the early
phases of construction to minimize the use of
shall be
implemented during
all phases of
construction.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 8 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
diesel-powered stationary equipment, such as
generators, welders, and air compressors.

The project applicant shall submit a construction
operations plan prepared by the construction contractor that outlines how the contractor will achieve the
measures outlined in this mitigation measure. The plan
shall include but not be limited to the following:
• List of activities and estimated timing.
• Equipment that would be used for each
activity.
• Manufacturer’s specifications for each
equipment that provides the emissions level;
or the manufacturer’s specifications for
devices that would be added to each piece of
equipment to ensure the emissions level meet
the thresholds in the mitigation measure.
• How the construction contractor will ensure
that the measures listed are monitored.
• How the construction contractor will remedy
any exceedance of the thresholds.
• How often and the method the construction
contractor will use to report compliance with
this mitigation measure.

The plan shall be submitted to the Director of Planning, Building and Code Enforcement or the Director’s
designee prior to the issuance of any demolition,
grading and/or building permits (whichever occurs
earliest) for review and approval.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 9 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
Impact AIR-3: Project construction activities would exceed BAAQMD single-source thresholds for lifetime excess cancer risk (10 in one million) and annual PM2.5 (0.3 µg/m3).

MM AIR-3.1: Prior to the issuance of any
grading or demolition permits, the project
applicant shall implement Mitigation
Measures MM AIR-1.1 and MM AIR-2.1.

See MM AIR-1.1 and MM
AIR 2.1
See MM AIR-1.1
and MM AIR 2.1
See MM AIR-1.1 and
MM AIR 2.1
See MM AIR-1.1
and MM AIR 2.1
See MM AIR-

1.1 and MM
AIR 2.1

BIOLOGICAL RESOURCES
Impact BIO-1: Construction activities associated with the proposed project could result in an impact to nesting birds due to the loss of eggs or nestlings, or otherwise lead to nest abandonment.

MM BIO-1.1: The project applicant shall schedule
demolition and construction activities to avoid the
nesting season to the extent feasible. The nesting
season for most birds, including most raptors, in the
San Francisco Bay area extends from February 1
through August 31.

Avoid construction activities
during the nesting season to
the extent feasible.

All measures shall be printed
on all construction
documents, contracts, and
project plans.

Prior to issuance of
any tree removal,
demolition, or
grading permits.

Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Confirm that
construction
activities are
scheduled outside of
the nesting season.

Prior to the
issuance of any
tree removal,
demolition, or
grading permits.

MM BIO-1.2: If demolition and construction activities
cannot be scheduled to occur outside of the breeding
season (September 1 to January 31), pre-construction
surveys for nesting birds shall be completed by a
qualified ornithologist for each construction phase to
ensure that no nests are disturbed during project
demolition or construction. This survey shall be
completed for the applicable construction phase no
more than 14 days prior to the initiation of grading,
tree removal, or other demolition or construction
activities during the early part of the breeding season If construction cannot be
scheduled to occur outside of
the nesting season, retain a
qualified ornithologist to
complete pre-construction
surveys and, as necessary,
establish buffer zones
around active nests in
coordination with the
The pre-
construction
surveys shall be
completed no more
than 14 days prior
to the initiation of
construction
activities.

Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the pre-construction
survey plan and any
designated buffer
zones.

Ensure that all
measures are printed
on all construction
documents,
Prior to the
issuance of any
tree removal,
demolition, or
grading permits.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 10 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
(February 1 through April 30) and no more than 30
days prior to the initiation of these activities during the late part of the breeding season (May 1 through August
31). During this survey, the ornithologist shall inspect all trees and other possible nesting habitats on the
project site and within 250 feet of the construction
areas for nests. If an active nest is found and in the
ornithologist’s opinion is sufficiently close to work
areas to be disturbed by construction, the ornithologist shall determine the extent of a construction-free buffer zone to be established around the nest, typically 250
feet, in consultation with California Department of Fish and Wildlife (CDFW), to ensure that the nest will not
be disturbed during project construction.

California Department of
Fish and Wildlife.

All measures shall be printed
on all construction
documents, contracts, and
project plans.

The
recommendations of
the pre-construction
survey report shall
be implemented
during construction.
contracts, and
project plans

MM BIO-1.3: The qualified ornithologist shall submit
a report indicating the results of the survey(s) described in MM BIO-1.2 and any designated buffer zones to the
satisfaction of the Director of Planning, Building and
Code Enforcement, or Director’s designee, prior to
issuance of any grading or demolition permits for the
applicable construction phase.

Submit the ornithologist’s
report indicating the results
of the survey and any
designated buffer zones to
the City’s Director of PBCE
or the Director’s designee.

Prior to the issuance
of any tree removal,
demolition, or
grading permits
Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the pre-construction
survey report.

Ensure that all
measures are printed
on all construction
documents,
contracts, and
project plans
Prior to the
issuance of any
tree removal,
demolition, or
grading permits

CULTURAL RESOURCES
Impact CUL-1: The project proposes to relocate and retain the existing carousel sign on-site, which appears individually eligible as a City Landmark.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 11 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
MM CUL-1.1: Prior to the issuance of any demolition,
grading, or building permit (whichever occur first),
preparation of a full photo-documentation of the
carousel sign and shopping center context that
surrounds and supports the carousel sign is required
using the Secretary of Interior’s Standards and
Guidelines for Architectural and Engineering
Documentation: Historic American Buildings Survey/
Historic American Engineering Record (HABS/HAER)
Standards and shall be submitted to the City’s Historic Preservation Officer. The documentation shall be of
archival quality according to a scope approved by the
Historic Preservation Officer (HPO), or HPO’s
designee, and be archived at a local repository such as the Archives at History San José.

Prepare photo-
documentation of the
Cambrian Park Plaza
carousel sign using
HABS/HAER Standards.

Prior to the issuance
of any demolition,
grading, or building
permit (whichever
occur first),
Historic Preservation
Officer, or HPO’s
designee
Review and approve
documentation of
historical
significance of
Cambrian Park
Plaza carousel sign,
archive
documentation at
appropriate local
repository
Prior to the
issuance of any
demolition,
grading, or
building permit
(whichever
occur first),
MM CUL-1.2: Prior to the issuance of any demolition,
grading, or building permits (whichever occur first), a Historic Resources Protection Plan (HRPP) shall be
prepared to ensure the carousel sign is not damaged
when it is relocated. The Plan shall establish
procedures to protect the carousel sign from direct or
indirect impacts during construction (including
relocation) activities (i.e., due to damage from
operation of construction equipment, staging, and
material storage). The HRPP shall specify how the sign
shall be dismantled, stored, and reassembled and shall
be approved by the HPO, or HPO’s designee, and
implemented during construction activities.

Prepare a HRPP. Prior to the issuance
of any demolition,
grading, or building
permit (whichever
occur first),
Historic Preservation
Officer, or HPO’s
designee
Review and approve
HRPP.

Prior to the
issuance of any
demolition,
grading, or
building permit
(whichever
occur first),

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 12 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
MM CUL-1.3:

Prior to construction activities (including ground-
disturbing work) within 100 feet of the carousel sign,
the project permittee, in consultation with a qualified historic preservation professional, shall remove the
sign from the site in accordance with the approved
HRPP. In accordance with the HRPP, storage shall be
located in a secure location that is indoors and
protected from weather, impacts, and vandalism. The
location of the storage facility shall be communicated
to the Director of Planning, Building, and Code
Enforcement or the Director’s designee. Relocation of
the sign to its final location shall be completed in
accordance with the HRPP prior to the issuance of an
Occupancy permit, or as determined by the Director of
Planning, Building, and Code Enforcement or
Director’s designee. The signage relocation shall also
include interpretive signage indicating the sign’s age, association and original location at the base of the
structural support.

Remove, store, and relocate
the carousel sign.

Removal prior to
construction
activities (including
ground-disturbing
work) within 100
feet of the carousel
sign.

Relocation of the
sign to its final
location in
accordance with the
HRPP prior to the
issuance of an
Occupancy permit,
or as determined by
the Director of
Planning, Building,
and Code
Enforcement or
Director’s designee.

Director of Planning,
Building, and Code
Enforcement or the
Director’s designee
Approve the
relocation of the
carousel sign.

Prior to
construction
activities
(including
ground-
disturbing work)
within 100 feet
of the carousel
sign.

HAZARDS AND HAZARDOUS MATERIALS
Impact HAZ-1: Implementation of the proposed project could release chemicals from on-site soils into the environment, and expose construction workers to residual hydrocarbon, tetrachloroethylene (PCE), and/or agricultural soil contamination above their respective environmental screening levels.

MM HAZ-1.1: Prior to issuance of any grading or
demolition permits, the project applicant shall prepare a site-specific soil management plan (SMP) to manage
potentially impacted soil and soil vapor, under Santa
Coordinate with SCCDEH to
develop an SMP.

Prior to the issuance
of any grading or
demolition permits.

Supervising Planner
of the City of San
Jose’s Department of
Planning, Building,
Receive a copy of
the SMP.

Prior to the
issuance of any
grading or

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 13 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
Clara County Department of Environmental Health
(SCCDEH) oversight. Documentation developed with
the County relating to SMPs or Site Cleanup shall be
submitted to the Supervising Planner of the City of San Jose’s Department of Planning, Building, and Code
Enforcement and the Environmental Services
Department Municipal Compliance Officer.

Submit the SMP, as
applicable, to the City of San
José Environmental
Compliance Officer and
SCCDEH for review.

A qualified environmental
professional shall complete
any further work required by
the SCCDEH.

All measures shall be printed
on all construction
documents, contracts, and
project plans.
and Code
Enforcement and the
Environmental
Services Department
Municipal
Compliance Officer.

Ensure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Review the SMP.
demolition
permits.

MM HAZ-1.2: Prior to the issuance of any grading
permits, shallow soil samples will be taken in the near surface soil in the project area and tested for
organochlorine pesticides and pesticide-based metals
arsenic and lead to determine if contaminants from
previous agricultural operations occur at concentrations above established construction worker safety and
commercial/industrial standard environmental
screening levels. The result of soil sampling and
testing will be provided to the Supervising Planner of
the City of San Jose’s Department of Planning,
Building, and Code Enforcement and the
Environmental Services Department Municipal
Compliance Officer.

Collect soil samples and test
for the presences of
organochlorine pesticides
and pesticide-based metals
arsenic and lead. Evaluate
results based upon worker
safety and environmental
screening levels.

Prior to the issuance
of any grading
permits.

Supervising Planner
of the City of San
Jose’s Department of
Planning, Building,
and Code
Enforcement and the
Environmental
Services Department
Municipal
Compliance Officer.

Receive a copy of
the testing results.

Ensure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Review the testing
results.

Prior to the
issuance of any
grading permits.

Impact HAZ-2: Soil vapor intrusion from contaminated soils on-site could result in a health hazard to future occupants of the site.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 14 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
MM HAZ-2.1: Prior to the issuance of any grading
permits, a qualified environmental professional shall
evaluate prior soil vapor investigations to determine if supplemental investigations are necessary. All existing and/or supplemental soil vapor sampling shall be
analyzed and compared to the most current risk-based
screening levels set forth by the San Francisco Bay
Area Regional Water Quality Control Board
(SFRWQCB) or other appropriate regulatory agencies.

The results of any supplemental sampling, and/or
confirmation that existing sampling results are
adequate to make a determination of appropriate
mitigation shall be provided to the Director of
Planning, Building and Code Enforcement or
Director’s designee prior to the issuance of grading
permits. SFRWQCB is the lead environmental agency
for this mitigation.

Evaluate prior soil vapor
testing results and make
determination if additional
soil vapor testing is
necessary. Compare results
to risk-based screening
levels.

Testing to be conducted by a
qualified environmental
professional.

Prior to the issuance
of any grading
permits.

Director of Planning,
Building and Code
Enforcement or
Director’s designee
Receive a copy of
the supplemental
sampling results or
analysis of existing
sampling results.

Review the
supplemental results
and/or analysis of
testing results.

Prior to the
issuance of any
grading permits.

MM HAZ-2.2: If existing and/or supplemental soil
vapor sampling determines that vapor intrusion
exceeds the most current risk-based screening levels,
the project applicant, prior to issuance of any grading permits, shall implement measures to reduce vapor
intrusion; these measures could include underground
parking, vapor barriers, passive venting, sub-slab
depressurization, and/or building over-pressurization,
depending on a toxicological review of the sampling
data collected for MM HAZ-1.1. The appropriate
measures shall be identified by a qualified
environmental professional and incorporated into the
SMP described under mitigation measure MM HAZ-
If needed, implement
measures to reduce impacts
of soil vapor on future
occupants of the site. Utilize
best practices based upon an
analysis of results of soil
vapor test and review of the
Phase II subsurface
investigation.

A qualified environmental
professional shall
Prior to the issuance
of any grading
permits.

Director of Planning,
Building and Code
Enforcement or
Director’s designee
Receive copy of the
updated SMP that
incorporates
appropriate
measures to reduce
soil vapor impacts
by future occupants.

Review and approve
the updated SMP.

Prior to the
issuance of any
grading permits.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 15 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule

1.2, subject to review and approval by the Director of
Planning, Building and Code Enforcement or
Director’s designee prior to the issuance of grading
permits. SFRWQCB is the lead environmental agency
for this mitigation.
incorporate the results into
the Site Management Plan.

All measures shall be printed
on all construction
documents, contracts, and
project plans

NOISE
Impact NOI-1: Construction noise levels at nearby residential and commercial land uses would exceed the ambient noise environment by at least five dBA Leq for a period exceeding 12 months.

MM NOI-1.1: Prior to the issuance of any demolition
or grading permits, the project applicant shall adhere to the following construction best management practices
to reduce construction noise levels emanating from the
site and minimize disruption and annoyance at existing
noise-sensitive receptors in the project vicinity.

• Construction shall be limited to the hours of
7:00 AM to 7:00 PM Monday through Friday
for any on-site or off-site work within 500 feet
of any residential unit. Construction outside of
these hours may be approved through a
development permit based on a site-specific
“construction noise mitigation plan” and a
finding by the Director of Planning, Building
and Code Enforcement or Director’s designee
Implement Construction
Best Management Practices.

All measures shall be printed
on all construction
documents, contracts, and
project plans.

Implemented during
construction.

Measures shall be
printed on all
documents prior to
the issuance of any
demolition or
grading permits.

Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the construction
noise logistics plan.

Ensure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
demolition or
grading permits.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 16 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
that the construction noise mitigation plan is
adequate to prevent noise disturbance of
affected residential uses. Work outside of the
allowable hours of operation would be
corrected by the disturbance coordinator if
violated.

• The contractor shall use “new technology”
power construction equipment with state-of-
the-art noise shielding and muffling devices.

All internal combustion engines used on the
project site shall be equipped with adequate
mufflers and shall be in good mechanical
condition to minimize noise created by faulty
or poorly maintained engines or other
components.

• The unnecessary idling of internal combustion
engines shall be prohibited.

• Staging areas and stationary noise-generating
equipment shall be located as far as possible
from noise-sensitive receptors such as
residential uses (a minimum of 200 feet).

• The surrounding neighborhood shall be
notified early and frequently of the
construction activities.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 17 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
• A “noise disturbance coordinator” shall be
designated to respond to any local complaints
about construction noise. The disturbance
coordinator would determine the cause of the
noise complaints (e.g., beginning work too
early, bad muffler, etc.) and institute
reasonable measures warranted to correct the
problem. A telephone number for the
disturbance coordinator shall be
conspicuously posted at the construction site.

MM NOI-1.2: Prior to the issuance of any demolition
or grading permits, a qualified acoustical consultant
shall develop a construction noise logistics plan that
includes measures to ensure construction noise would
not exceed 5 dBA Leq over the ambient daytime
average Leq for a period exceeding 12 months. The
plan shall consist of noise reduction measures,
including, but not limited to, the following available
controls; the project applicant shall implement the plan during all phases of construction activity to reduce the noise exposure to neighboring properties.

• Utilize ‘quiet’ models of air compressors and
other stationary noise sources where
technology exists.

• Equip all internal combustion engine-driven
equipment with mufflers, which are in good
condition and appropriate for the equipment.

Retain a qualified acoustical
consultant to prepare and
submit a construction noise
logistics plan including all
the measures listed.

All measures shall be printed
on all construction
documents, contracts, and
project plans.

Prior to the issuance
of any demolition or
grading permits.

The plan shall be
implemented during
construction.

Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the construction
noise logistics plan.

Ensure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
demolition or
grading permits.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 18 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
• Construct temporary noise barriers, where
feasible, to screen stationary noise-generating
equipment when located within 200 feet of
adjoining sensitive land uses. Temporary
noise barrier fences would provide a five dBA
noise reduction if the noise barrier interrupts
the line-of-sight between the noise source and
receptor and if the barrier is constructed in a
manner that eliminates any cracks or gaps.

• If stationary noise-generating equipment must
be located near receptors, adequate muffling
(with enclosures where feasible and
appropriate) shall be used. Any enclosure
openings or venting shall face away from
sensitive receptors.

• Ensure that generators, compressors, and
pumps are housed in acoustical enclosures.

• Locate cranes as far from adjoining noise-
sensitive receptors as possible.

• During final grading, substitute graders for
bulldozers, where feasible. Wheeled heavy
equipment are quieter than track equipment
and should be used where feasible.

• Substitute nail guns for manual hammering,
where feasible.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 19 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule

• Substitute electrically powered tools for
noisier pneumatic tools, where feasible.

The construction noise logistic plan, inclusive of the
above shall be signed by a qualified acoustical
specialist verifying that the implementation measures
included in this plan meets the reduction to noise levels as required by this mitigation measure. The verified
construction noise logistic plan shall be submitted to
the Director of Planning, Building, and Code
Enforcement or Director’s designee for review and
approval prior to the issuance of grading and/or
building permits (whichever occurs first).

Impact NOI-2: Residential and commercial uses adjacent to the proposed project could be exposed to mechanical equipment noise in excess of 55 dBA Leq and 60 dBA Leq, respectively.

MM NOI-2.1: Prior to the issuance of any building
permits, the project applicant shall select mechanical
equipment designed to reduce impacts on surrounding
uses to meet the City’s requirements. A qualified
acoustical consultant shall be retained by the project
applicant to review mechanical noise as the equipment
systems are selected in order to determine specific
noise reduction measures necessary to reduce noise to
comply with the City’s 55 dBA Leq (residential) or 60
dBA Leq (commercial) noise limit at the shared
property line. Noise reduction measures could include,
but are not limited to, selection of equipment that emits low noise levels and/installation of noise barriers such as enclosures and parapet walls to block the line of
Retain a qualified acoustical
consultant to review
mechanical noise and
provide detailed acoustical
study during final building
design.

Submit a plan set showing
the location and type of
mechanical equipment,
along with a signed letter
from a qualified acoustical
consultant detailing that
impacts to residential
Prior to the issuance
of any building
permits.

Noise reduction
measures shall be
installed during
construction.

Director of Planning,
Building and Code
Enformcement, or the
Director’s designee.

Review and approve
the plan set.

Receive a copy of
the acoustical
consultant’s letter,
and noise reduction
measures (as
applicable).

Ensure that all
measures are printed
on all construction
documents,
Prior to the
issuance of any
building permits.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 20 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
sight between the noise source and the nearest
receptors.

Once the mechanical equipment has been selected, a
plan set showing the location and type of mechanical
equipment, along with a signed letter by a qualified
acoustical consultant stating whether the equipment
will comply with the City’s 55 dBA Leq noise limit at
the shared property line shall be submitted to the
satisfaction of the Director of Planning, Building, and Code Enforcement or Director’s designee prior to
issuance of any building permits.
receptors would not exceed
55 dBA DNL, to the
Director of PBCE or the
Director’s designee.

Notify adjacent land uses of
the proposed generator
testing schedule and avoid
noise-sensitive hours.

All measures shall be printed
on all construction
documents, contracts, and
project plans.
contracts, and
project plans.

Impact NOI-3: Construction-generated vibration would exceed the 0.2 in/sec PPV threshold and would be capable of cosmetically damaging the adjacent residential and commercial buildings to the east and south.

MM NOI-3.1: Prior to the issuance of any grading or
building permits, whichever occurs first, the project
applicant shall incorporate the following measures into the construction noise logistics plan described
previously in mitigation measure MM NOI-1.2. A
qualified acoustical consultant shall provide a signed
letter confirming that construction equipment would
not exceed the 0.2 in/sec PPV threshold at residential
receptors pursuant to the City’s General Plan Policy
EC-2.3.

• Prohibit the use of heavy vibration-generating
construction equipment within 30 feet of
adjacent commercial or residential buildings.

Incorporate measures into
the construction noise
logistics plan. Implement
measures during project
construction.

Submit a plan set showing
the location and type of
mechanical equipment,
along with a signed letter
from a qualified acoustical
consultant detailing that
impacts to residential
receptors would not exceed

0.2 in/sec PPV threshold, to
Prior to the issuance
of any building or
grading permits,
whichever occurs
first.

Vibration reduction
measures shall be
installed during
construction.

Director of Planning
Building and Code
Enforcement or the
Director’s designee.

Review and approve
the plan set.

Receive copy of
acoustical
consultant’s letter,
and construction
noise logistics plan
that includes the
vibration reduction
measures.

Ensure that all
measures are printed
Prior to the
issuance of any
building or
grading permits,
whichever
occurs first.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 21 File No. PDC17-040 and PD20-007

Cambrian Park Mixed-Use Village
File Nos. PDC17-040 and PD20-007

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
This would apply to equipment similar to
vibratory rollers, hoe rams, large bulldozers,
drills, loaded trucks, and jackhammers.

• Use a smaller vibratory roller, such as the
Caterpillar model CP433E vibratory
compactor, when compacting materials within
30 feet of adjacent commercial buildings.

Only use the static compaction mode when
compacting materials within 15 feet of
residential buildings.

• Avoid dropping heavy equipment and use
alternative methods for breaking up existing
pavement, such as a pavement grinder, instead
of dropping heavy objects, within 30 feet of
adjacent residential buildings.

• Designate a person responsible for registering
and investigating claims of excessive
vibration. The contact information of such
person shall be clearly posted on the
construction site.

Prior to the issuance of any building or grading
permits, whichever occurs first, the project applicant
shall submit the construction noise logistics plan and
the signed letter from the qualified acoustical
consultant to the Director of Planning, Building and
Code Enforcement, or Director’s designee.
the Director of PBCE or the
Director’s designee.

All measures shall be printed
on all construction
documents, contracts, and
project plans.
on all construction
documents,
contracts, and
project plans.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)

Page | 22 File No. PDC17-040 and PD20-007
Source: City of San José. Cambrian Park Mixed-Use Village Project Environmental Impact Report. November 2021.

DocuSign Envelope ID: 4874EBC6-77B8-4083-A96B-4A31D0E0B427 EXHIBIT "A"
(File Nos. PDC17-040; PD20-007)