Gensler
550 E BROKAW
A new Urban Campus in North San Jose
City Council Meeting | 02/28/23

Gensler

1. Contribute to the public realm and the urban context

2. Integrating high quality outdoor spaces as key amenity

3. Attract world-class tenants to the San Jose and Silicon Valley market

4. Design for workplace that is “future” ready

5. Embrace environmental conditions to reach optimal energy efficiency

PROJECT GOALS
Located in Northern San Jose, historically a
heavy industrial usage zone.

Proximities:

Light Rail : 0.9 miles
San Jose International Airport: 2 miles
Berryessa BART Station: 3.5 miles
Downtown San Jose: 4.5 miles
Diridon Station: 5 miles

PROJECT LOCATIONS AND CONNECTIONS
N
Light RaiL
CaLtRain
amtRak
BaRt
highway
Coyote CReek tRaiL
Gensler

SITE PLAN Gensler

Gensler

INTERCONNECTED

OUTDOOR SPACES THAT BRING PEOPLE TOGETHER

INTERCONNECTED OUTDOOOR TERRACES

BETWEEN BUILDINGS
Gensler
Gensler

SCALE / MASSING

SHAPING THE MASSING TO A

HUMAN SCALE
VIEWS

TRANSPARANCY AND INDOOR

EXPERIENCE

CONSTRUCTABILITY

REPETITION AND VARIATION

MATERIALITY

TEXTURE AND ATMOSPHERE

ACTIVATION OF PUBLIC SPACE

GROUND FLOOR ACCESS AND

BUILDING PROGRAM

HEAT GAIN/ ORIENTATION

PROTECTING THE INTERIOR FROM THE

SOLAR GAIN

ENVIRONMENTAL RESPONSE OF THE BUILDINGS
Gensler

QUALITY OUTDOOR SPACES CONNECTING

BUILDINGS TOGETHER

GenslerCENTRAL DROP OFF AREA

Gensler
Gensler

GenslerPROJECT GOALS

1. Contribute to the public realm and the urban context

2. Integrating high quality outdoor spaces as key amenity

3. Attract world-class tenants to the San Jose and Silicon Valley market

4. Design for workplace that is “future” ready

5. Embrace environmental conditions to reach optimal energy efficiency

APPENDIX

SHEET NOTES

GENERAL NOTES

KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2015
Rockridge Geotechnical Inc.
270 Grand Avenue
Oakland, CA 94610
Lodan Medeiros
United States
Tel 510.420.5738
Hexagon Transportation
Consultants
8070 Santa Terasa Blvd., Suite
230
Gilroy, CA 95020
United States
Tel 408.846.7410

NOT FOR

CONSTRUCTION
Tel 408.885.8100
Fax 408.885.8199
225 West Santa Clara Street
Suite 1100
San Jose, CA 95113
United States
CBG
263 Camino Ramon Suite 350
San Ramon, CA 94583
United States
Ryan Hansen
Tel 925.866.0322
David J Powers & Associates
1736 Franklin Street
Suite 300
Oakland, CA 94612
United States
Tel 510.902.5852
DCI Engineers
135 Main Street Suite 1800
San Francisco, CA
United States
Steve Lepisto
Tel 415.638.8915
The Guzzardo Partnership Inc.
181 Greenwich Street
San Francisco, CA 94111
United States
Colin Bly
Tel 415.336.9564
ACIES Engineering
3371 Olcott Street
Santa Clara, CA 95054
United States
Srdjan Rebraca
Tel 408.522.5255
7/2/2020 7:44:25 PM
BIM 360://035.4712.000 - Bay West 550 E. Brokaw/BW-XX-GEN-AR-SITE.rvt G0.501

PHASING PLAN

35.4712.000
550 East Brokaw

CARACOL PROPERTY

OWNER LLC
550 E Brokaw Rd,
San Jose, CA 95112

07.02.20 75% Schematic Design
GenslerPHASING PLAN