Cities Index.
Presentation - est. 5 minutes

San Jose City Council
March 14, 2023

Document
Presentation - est. 5 minutes
Meeting
March 14, 2023
Body
San Jose City Council
Original file
7.7 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

Lake Cunningham Shoreline and
Water Quality Study
City Council
March 14, 2023
Presented by:

Sara Sellers, Interim Deputy Director, [email protected] 1 Lake Cunningham
Master Plan
• Guided development
of flood detention
basin; and
• Recreational facility.
2 3
Shoreline and Water
Quality Study
Analysis:
• Water Quality
• Water Sources
• Water Quality
Recommendations
• Shoreline Erosion
• Rough Order of
Magnitude
Construction Costs
4 4
Water Quality Issues are
primarily from:
• Physicochemical Parameters:

Increased lake water temperatures
and thermal stratification.
• Geochemical Parameters: Elevated
pH levels.
• Trophic Parameters: Increased levels
of nitrogen and phosphorus which
contribute to increased algae
growth.
• Pathogens: Increased fecal bacteria.
5 Alternative 1:

Internal Treatments
and Focused Park
Improvements
• Algaecide treatments
• Treatment of lakebed sediments
• Turf replacement
• Fertilizer reduction
• Bioswale implementation
Construction Rough Order of
Magnitude:
• $1.2M to $1.8M
• Excludes City soft costs, consultant
fees and hardcost contingency

RECOMMENDATIONS
6 Alternative 2:

Internal Treatments, Focused Park
Improvements, Path Stabilization, and
Shoreline Wetlands
• Builds on Alternative 1;
• Regrade northeastern hills;
• Relocate shoreline path;
• Create wetland bench along shoreline;
• Plant riparian and upland trees.

Construction Rough Order of Magnitude:
• $5M to $9M for 10 acres of shoreline
wetland;
• $12M to $20M for 17.5 acres of shoreline
wetland;
• Excludes City soft costs, consultant fees,
and hardcost contingency.
7 Alternative 3:

Internal Treatments, Focused Park Improvements,
Path Stabilization, Shoreline Wetlands, and Big
Meadow Wetland Enhancement
• Builds off Alternative 1 and 2;
• Construct flow-through wetland in Big
Meadow.

Construction Rough Order of Magnitude:
• $5M to $9M for 10 acres of shoreline wetland;
• $12M to $20M for 17.5 acres of shoreline
wetland;
• $3M to $5M for concurrent 19-acre Big
Meadow wetland
• Excludes City soft costs, consultant fees, and
hardcost contingency.
8 Conclusion
• Staff will continue to work
with Consultant to conduct
further water quality tests,
refine cost estimates, and
establish a recommended
phasing approach.
9 Lake Cunningham Shoreline and
Water Quality Study
City Council
March 14, 2023
Presented by:

Sara Sellers, Interim Deputy Director, [email protected] 10

← All documents from this meeting