TO: HONORABLE MAYOR FROM: John Ristow
AND CITY COUNCIL Matt Loesch

SUBJECT: SEE BELOW DATE: May 1, 2023

Approved Date
5/9/23

SUBJECT: REPORT ON BIDS AND AWARD OF CONTRACT FOR THE 2023

LOCAL STREETS REMOVE AND REPLACE PAVEMENT PROJECT

RECOMMENDATION

a) Report on bids and approve award of contract for the 2023 Local Streets Remove and Replace Pavement Project, to the low bidder, O’Grady Paving, Inc., in the amount of $3,833,200 and;

b) Approve a 10% contingency in the amount of $383,000.

SUMMARY AND OUTCOME

Approval of this contract provides required asphalt concrete pavement repairs along the 51 miles of Local and Neighborhood Streets Network to be sealed in the 2023 construction season.

Approval of the 10% contingency provides funding for any unanticipated work necessary for the proper completion or construction of the project.

BACKGROUND

The Department of Transportation (DOT) will maintain approximately 161 miles of streets on the Local and Neighborhood Streets Network in the 2023 construction season: 110 miles will be resurfaced due to their poor to failed condition and 51 miles will be sealed.

Pavement maintenance is typically performed in two separate phases: preparation and a final surface application. The preparation phase consists of the installation or upgrade of Americans with Disabilities Act curb ramps and the removal and replacement of failed asphalt pavement.

The Americans with Disabilities Act work is conducted in advance using minor contracts to provide more opportunities for local and small businesses. Streets to be sealed will also require COUNCIL AGENDA: 05/23/23
FILE: 23-747
ITEM: 5.3

HONORABLE MAYOR AND CITY COUNCIL
May 1, 2023
Subject: 2023 Local Streets Remove and Replace Pavement Project

Page 2 ends

the removal and replacement of any structurally failed areas of pavement prior to the final surface application phase. The final surface application phase is also known as sealing application, which provides of a thin layer of asphalt emulsion blended with rock approximately 3/8 an inch in depth to the pavement.

The City’s Local and Neighborhood Streets Network is organized into 135 geographically contiguous Pavement Maintenance Zones. The Pavement Maintenance Zones were established several decades ago to support efficient planning and delivery of paving projects, maximize the amount of paving work completed at one time within a neighborhood area, and provide geographic spread of pavement maintenance across the City.

DOT utilizes a Pavement Management System to collect and store roadway condition data that is used to generate a candidate list of streets to be considered for the annual pavement maintenance program. The candidate list is then thoroughly analyzed by staff using the following criteria to create the final list of streets:

• Funding availability and funding use restrictions
• Streets on the Local Street Network
• Streets not affected by current or future street related projects • Maintenance history and prescribed treatment schedules • Streets associated with planned safety, bikeway, or other “complete streets” projects • Community and City Council office feedback regarding roadway conditions and priority street segments;
• Relative location of street segments to create multiple, continuous segments, consistency within neighborhoods, and project efficiency; and
• Multi-year geographic spread across the City and street network.

In 2021, DOT added equity as a criterion for zone selection. DOT staff cross-referenced the selected zones with census tracts designated by the Metropolitan Transportation Commission as “Equity Priority Communities” (EPC), formerly known as “Communities of Concern”, to better track equity in service delivery. Results confirmed that 313 out of 354 miles (roughly 88%) of local and neighborhood streets designated in EPC areas will be maintained by the end of the current three-year plan (2025). DOT anticipates completing pavement maintenance for nearly 76% of the local street network in this same timeframe.

DOT has maintained a total of 214 EPC miles since 2019 and will be maintaining an additional 22 EPC miles in 2023, which is about 14% of the 161 miles of Local and Neighborhood Streets selected for maintenance in 2023. This project includes seven EPC miles, which is about 14% of the anticipated 51 sealing miles.

The attachment to this memorandum contains the list of streets to be resurfaced (Refer to Attachment – List of Streets). The list may change if unforeseen circumstances arise or new information regarding other projects becomes available.

HONORABLE MAYOR AND CITY COUNCIL
May 1, 2023
Subject: 2023 Local Streets Remove and Replace Pavement Project

Page 3 ends

ANALYSIS

Bids for the 2023 Local Streets Remove and Replace Pavement Project were opened on April 6, 2023, with the following results:

Contractor Bid Amount Variance
Amount
Over/(Under)
Percent
Engineer's Estimate $3,273,200 -- --
Radius Earthwork, Inc.
(Campbell, CA) $3,641,560 $368,360 11
O’Grady Paving, Inc.
(Mountain View, CA) $3,833,200 $560,000 17

The responsive low bid submitted by O’Grady Paving, Inc. is $3,833,200 and is 17% above the Engineer’s Estimate. The higher-than-anticipated costs are attributable to the demand for paving contractors in the region. The Engineer’s Estimate for this project is $3,273,200. The estimate is based on bids received from similar past projects and current estimated construction prices.

Radius Earthwork, Inc. did have the lowest bid for $3,641,560. However, the contractor’s Statement of Bidder’s Experience did not meet the procurement requirements. The bid from O’ Grady Paving, Inc., as the next responsive bidder, is considered acceptable for the work involved in the project. Staff recommends that the construction contract be awarded to O’Grady Paving, Inc.

O’Grady Paving, Inc. has previously completed multiple major paving project for the City of San José. In the 2022 construction season, O’Grady Paving, Inc. performed removal and replacement of asphalt pavement works on approximately 82 miles of City streets through two different major projects.

Construction is scheduled to begin in July 2023 and be completed by the end of September 2023.

Contingency

San José Municipal Code Section 27.04.050 provides for a standard contingency of 10% on all public works contracts except those involving the renovation of building or buildings. The standard contingency is appropriate for this project

Project Labor Agreement Applicability

The Project Labor Agreement is applicable to this project as the Engineer’s Estimate is over $1.2 million.

HONORABLE MAYOR AND CITY COUNCIL
May 1, 2023
Subject: 2023 Local Streets Remove and Replace Pavement Project

Page 4 ends

Local and Small Business Outreach

Public Works procurement staff used Biddingo to outreach to local and small business enterprises. Chapter 4.12 of the San José Municipal Code defines a “local business enterprise” as one with a legitimate business presence in Santa Clara County and “small business enterprise” as a local business enterprise with 35 or fewer employees. Procurement staff sent bid invitations to 9,126 vendors, and documents were downloaded by 11 vendors, one of which was located within Santa Clara County. The recommended contractor is not a local or a small business enterprise.

The listed subcontractor, Graham Contractors, is a local business from San José. Graham Contractors portion of work will be for crack filling, making up roughly 20% of the projects scope of work.

EVALUATION AND FOLLOW-UP

DOT provides an ongoing evaluation of the City’s pavement conditions and provides periodic reports on this topic to the Transportation and Environmental Committee. In addition to the project discussed in this memorandum, three additional major street projects consisting of 75 miles and six additional local and neighborhood street pavement maintenance projects totaling 133 miles are scheduled for City Council action this spring.

COST SUMMARY/IMPLICATIONS

This project supports the Transportation and Aviation Services City Service Area goal to Preserve and Improve Transportation Assets and Facilities. By performing pavement maintenance with this project, the extension of the useful life of the project streets will defer more costly reconstruction. The source of funding for this project is through the 465 – VTA Measure B 2016 Fund. This project will have no net operating and maintenance costs to the General Fund.

1. TOTAL COST OF PROJECT:

Programmatic Project Delivery Estimate* (10%) $383,000 Construction Contract $3,833,200
Contingency (10%) $383,000
TOTAL PROJECT COSTS: $4,599,200

*
Programmatic Project Delivery Estimate includes approximately $153,000 (4%) for design services and $230,000 (6%) for construction management and inspection services.

HONORABLE MAYOR AND CITY COUNCIL
May 1, 2023
Subject: 2023 Local Streets Remove and Replace Pavement Project

Page 5 ends

2. COST ELEMENTS OF CONTRACT:

Contract Elements Extension
Mobilization $64,800
Materials and Placement $3,604,000
Utility Adjustments $76,000
Striping/Markings $88,400
TOTAL AGREEMENT/CONTRACT AMOUNT $3,833,200

BUDGET REFERENCE

The table below identifies the fund and appropriation to fund the contract recommended as part of this memorandum.

COORDINATION

This memorandum has been coordinated with the City Attorney’s Office, the City Manager’s Budget Office, and the Department of Planning, Building and Code Enforcement.

PUBLIC OUTREACH

This memorandum will be posted on the City’s Council Agenda website for the May 23, 2023 City Council meeting.

To solicit contractors, this project was listed on an online bid solicitation website, Biddingo, where bid packages were made available to download for contractor organizations and builders’ exchange. When the project commences, the contractor will provide advance notification regarding working hours, duration of project, and any appropriate schedule and lane closures to affected businesses and residents, as stated in the specifications.

Fund
#
Appn
#

Appn Name
Total
Appn
Amt. for
Contract
2022-23
Adopted
Capital
Budget Page
Last
Budget
Action
(Date,
Ord. No.)
Source of New Funding
486 403Q
Pavement
Maintenance – VTA
Measure B 2016
$40,278,956 $3,833,200.00 1083 10/18/202
2, 30833
Total Current Funding Available $40,278,956 $3,833,200.00

HONORABLE MAYOR AND CITY COUNCIL
May 1, 2023
Subject: 2023 Local Streets Remove and Replace Pavement Project

Page 6 ends

COMMISSION RECOMMENDATION AND INPUT

No commission recommendation or input is associated with this action.

CEQA

Environmental status granted by the Planning, Building and Code Enforcement Department.

Exempt, File No. ER23-009, CEQA Guidelines Section 15301(c), Existing Facilities.

PUBLIC SUBSIDY REPORTING

This item does not include a public subsidy as defined in section 53083 or 53083.1 of the California Government Code or the City’s Open Government Resolution.

/s/ /s/

MATT LOESCH JOHN RISTOW
Acting Director of Public Works Director of Transportation

For questions, please contact Frank Farshidi, DOT Division Manager, at [email protected] or (408) 794-1945.

ATTACHMENT: List of Streets

ATTACHMENT
Subject: 10269 – 2023 Local Streets R&R Project

Page 1 of 8 ends

List of Streets
Street Name Street From Street To Council District
BAYWOOD AV S WILLIAMS RD S END 1
CENTRAL AV N WESTFIELD AV ALMARIDA DR 1
CLOVER AV S WILLIAMS RD S END 1
DAVID AV MONICA LN WINCHESTER BL 1

DRIFTWOOD DR WINCHESTER BL S
1135'E/WINCHESTER
BL S 1
FIRESIDE DR REDOAKS DR WINCHESTER BL 1
GREENTREE WY WINCHESTER BL WESTFIELD AV 1
MONICA LN 130'N/DAVID AV DAVID AV 1
MONROE ST S MOORPARK AV WILLIAMS RD 1
MONROE ST S WILLIAMS RD S END 1
NEAL AV DANIEL WY S GENEVIEVE LN S 1
NEAL AV GENEVIEVE LN S MONROE ST S 1
SANFILIPPO CT GREENBRIAR AV W END 1
ADRAGNA CT SNELL AV S END 2
BLUEFIELD DR VISTAPARK DR ROSENBAUM AV 2
CORKWOOD CT SILVERBERRY DR W END 2
HOLYCON CR BRANHAM LN BRANHAM LN 2
ILLSLEY CT SKYWAY DR S END 2
JUNEBERRY CT SNELL AV E END 2
LOST TRAIL CT BRANHAM LN N END 2

PARK BOLTON PL

PARK SOMMERS
WY E END 2
PARK BRISTOL PL PARK BOLTON PL N END 2
PARK CONCORD PL PARK SHARON DR N END 2

PARK DARTMOUTH
PL

PARK SOMMERS
WY E END 2
PARK DOUGLAS PL PARK SHARON PL N END 2
PARK ESSEX PL PARK PAXTON PL N END 2
PARK FLETCHER PL PINON PL N END 2
PARK GROTON PL PARK PAXTON PL N END 2
PARK PAXTON PL SKYWAY DR PARK SHARON DR 2
PARK SHARON DR PARK ELLEN DR PARK PLAXTON PL 2
PARK SHARON DR PARK PAXTON PL N END 2

PARK SOMMERS
WY SKYWAY DR PARK ELLEN DR 2
PARK VILLAGE PL PARK PAXTON PL N END 2
PARK WARREN PL PARK PAXTON PL N END 2
PINON PL SKYWAY DR N END 2
PITCH PINE CT SKYWAY DR N END 2
POINSETTIA CT SKYWAY DR S END 2
RIVER ASH CT STONE CANYON DR E END 2

ATTACHMENT
Subject: 10269 – 2023 Local Streets R&R Project

Page 2 of 8 ends

Street Name Street From Street To Council District
ROSENBAUM AV SNELL AV E END 2
SHELLBARK DR STONE CANYON DR PINON PL 2
SILVERBERRY DR SKYWAY DR SNELL AV 2
SMOKE TREE CT SILVERBERRY DR W END 2
SPOONWOOD CT SUGAR MAPLE DR N END 2
STONE CANYON DR SKYWAY DR N END 2
SUGAR MAPLE DR STONE CANYON DR SNELL AV 2
SWEETBERRY CT STONE CANYON DR W END 2
WOLFBERRY CT SNELL AV E END 2
FORESTDALE AV S END 100'N/JEANNE AV 3
JEANNE AV MELBOURNE BL FORESTDALE AV 3
ALICANTE DR PALMILLA DR 220 W/ ZANKER RD 4
ALICANTE DR EB 220'W/ZANKER RD ZANKER RD 4
ALICANTE DR WB ZANKER RD 220 W/ ZANKER RD 4
BAYPOINTE DR 1ST ST N BAYPOINTE PY 4
BAYPOINTE DR 1ST ST N BAYPOINTE PY 4
BAYPOINTE PY BAYPOINTE DR TASMAN DR E 4
BAYPOINTE PY BAYPOINTE DR S END 4
BRISAS DR RIO ROBLES EAST BAYPOINTE DR 4
CARRAGATA DR VERDIGRIS CR RENAISSANCE DR 4
CASA VERDE ST E TASMAN DR N END 4
CHAMPION CT TASMAN DR N END 4
CISCO WY RIVER OAK PKWY TASMAN DR 4

CRESCENT
VILLAGE CL VILAGGIO ST LOGGIA ST 4

CRESCENT
VILLAGE CL VILAGGIO ST RIVER OAKS PY 4

CRESCENT
VILLAGE CL LOGGIA ST RIVER OAKS PY 4
DAGGETT DR ZANKER RD N 1ST ST 4
DESCANO DR PALMILLA DR BAYPOINTE PKWY 4
DESCANSO DR 1ST ST N BAYPOINTE PY 4
ESTANCIA DR ZANKER RD PALMILLA DR 4
FEAFEL CT FEAFEL DR S END 4
FEAFEL DR VERDIGRIS CR VERDIGRIS CR 4
IRON POINT DR RIVER OAKS PY E END 4

LOGGIA ST

CRESCENT
VILLAGE CL INNOVATION DR 4
MIRADA DR DESCANSO DR S END 4
ORCHARD DR MONTAGUE EX ORCHARD PY 4
PALMILLA DR RIO ROBLES EAST ESTANCIA DR 4
PALMILLA DR DESCANO DR ALICANTE DR 4
PLUMERIA DR EB ORCHARD PY N 1ST ST 4
PLUMERIA DR WB N 1ST ST ORCHARD PY 4

ATTACHMENT
Subject: 10269 – 2023 Local Streets R&R Project

Page 3 of 8 ends

Street Name Street From Street To Council District
RIO ROBLES EAST 1ST ST N BAYPOINTE PY 4
RIO ROBLES EAST BAYPOINTE PKWY PALMILLA DR 4
RIVER OAKS PL RIVER VIEW PY W END 4
RIVER OAKS PL N 1ST ST RIVER VIEW PY 4
RIVER VIEW PY RIVER OAKS PL HUGHES ST 4
RIVER VIEW PY BRANDON ST SKYTOP ST 4
RIVER VIEW PY HUGHES ST BRANDON ST 4
SKYTOP ST LILY WY RIVER VIEW PY 4
SKYTOP ST LUMIN WY LILY WY 4
SKYTOP ST N 1ST ST LUMIN WY 4
TORRENZIA DR RENAISSANCE DR VERDIGRIS CR 4
VERDIGRIS CR TORRENZIA DR TORRENZIA DR 4

VILAGGIO ZANKER RD

CRESCENT
VILLAGE CL 4
ARCHANGEL DR TRINITY PARK DR N TRINITY PARK DR S 4
ARCHER ST GRAND BL N END 4
BAYTECH DR FORTRAN DR E END 4
CATHERINE ST HOPE ST LIBERTY ST 4
DISK CT NORTECH PY S END 4
DISK DR NORTECH PY GRAND BL 4
DISK DR GRAND BLVD DISK DR 4
EL DORADO ST MOFFAT ST N END 4
ESSEX ST STATE ST GRAND BL 4
GOLD ST CATHERINE ST N TAYLOR ST 4
HOPE ST N END CATHERINE ST 4
HOPE ST CATHERINE ST TAYLOR ST N 4
HOPPE ST LIBERTY ST GOLD ST 4
LIBERTY ST 1ST ST N MOFFAT ST 4
LIBERTY ST CATHERINE ST 1ST ST N 4
MICHIGAN AV TAYLOR ST N SPRECKLES AV 4
MOFFAT ST GOLD ST LIBERTY ST 4
MOFFAT ST EL DORADO ST GOLD ST 4
PACIFIC AV N END GRAND BL 4
STATE ST CATHERINE ST SPRECKLES AV 4
TAYLOR ST N EL DORADO ST GOLD ST 4
TRINITY PARK DR 1ST ST N GRAND BL 4
WABASH ST SPRECKLES AV W END 4
ALEXANDER AV MADDEN AV MUELLER AV 5

ALUM ROCK
FRONTAGE RD CEDAR LN E END 5

ALUM ROCK

FRONTAGE RD

PLEASANT RIDGE
AV CEDAR LN 5

ALUM ROCK

FRONTAGE RD BIRCH LN

PLEASANT RIDGE
AV 5

ATTACHMENT
Subject: 10269 – 2023 Local Streets R&R Project

Page 4 of 8 ends

Street Name Street From Street To Council District

ALUM ROCK
FRONTAGE RD W END BIRCH LN 5
AVENUE C W END E END 5

BIRCH LN GAY AV

ALUM ROCK
FRONTAGE RD 5
CAMELFORD WY ALPINE AV ELK CREEK PL 5
CONCETTA CT ZORIA FARMS LN W END 5
ELK CREEK PL CAMELFORD WY N END 5
GIUSEPPE CT ZORIA FARMS LN W END 5
HYLAND AV CITY LIMIT CITY LIMIT 5
MADELINE DR BARLETTA LN STAPLES AV 5
MADELINE DR MARIAN LN BARLETTA LN 5
NICASIO CT ZORIA FARMS LN W END 5
PALA AV RIVERRUN DR GAY AV 5
PENNYHILL DR RIVERRUN DR N END 5
PRAIRIE LN SHOSHONE DR END 5
PRAIRIE VIEW CT MCKEE RD END 5
PRAIRIEWOOOD CT PRAIRIE LN END 5
RIVERRUN DR PALA AV N CAPITOL AV 5
SHOSHONE DR PRAIRIE LN N END 5
SORGE PARK PL MCKEE RD END 5
ZORIA FARMS LN CONCETTA CT GAY AVE 5
ROSEMAR AV JULIET AV 815'N/JULIET AV 5
ROSEMAR AV 815'N/JULIET AV N END 5
CATHAY DR NAPLES DR OCALA AV 5
SEAVIEW DR CATHAY DR BERMUDA WY 5
AVIATION AV COLEMAN AV N END 6
MARTIN AV BROKAW RD REED ST 6
TECHNOLOGY DR SKYPORT DR SONORA AV 6
ADELE PL GEORGETTA DR DRY CREEK RD 6
ARROYO SECO DR LEIGH AV HURST AV 6
CAMPBELL AV E HURST AV LEIGH AV 6
CHERRY GROVE DR HURST AV MERIDIAN AV 6
GEORGETTA DR MARQUE AV BOOKSIN AV 6

HURST AV HAMILTON AV
150 S/ HAMILTON
AV 6
HURST AV 150'S/HAMILTON AV CHERRY GROVE DR 6
HURST AV CHERRY GROVE DR MCBAIN AV 6
HURST AV MCBAIN AV ARROYO SECO DR 6
LEIGH ANN PL LEIGH AV E END 6
PARK ROYAL DR DORRANCE DR N END 6
PARK ROYAL DR PARK ROYAL DR W END 6
SWEETBRIAR DR CURTNER AV BOOKSIN AV 6

ATTACHMENT
Subject: 10269 – 2023 Local Streets R&R Project

Page 5 of 8 ends

Street Name Street From Street To Council District

WHISPERING
WILLOW PL S END LENN DR 6
CHATSWORTH PL MOORPARK AV S END 6
CRESTMONT DR WESTPARK DR HARRIS AV 6
GLENKIRK CT GLENKIRK DR E END 6
GLENKIRK DR MAYKIRK RD MERIDIAN AV 6
LOMA PARK CT LOMA PARK DR W END 6
PAGE ST SAN CARLOS ST DOUGLAS ST 6
SCHOOLDALE DR WESTPARK DR CURTNER AV 6
ALKAE CT MEDLEY DR S END 7
BRODIE DR KAUAI DR CLEAR BROOK CT 7
CARRIAGE COVE CT LANTERN WY S END 7
CLEAR BROOK CT BRODIE DR S END 7
COACHLIGHT DR LANTERN WY SINGLETON RD 7
DAWNBROOK CT YERBA BUENA RD N END 7
DEEP HARBOR CT BRODIE DR S END 7
EMANUEL CT ALVERNAZ DR N END 7
JANMARIE CT MCLAUGHLIN AV W END 7
JENNINGS DR BRODIE DR VERDI DR 7
LANTERN WY SINGLETON RD LANTERN CT 7
LARRY CT ALVERNAZ DR N END 7
LINDMUIR DR MEDLEY DR ISENGARD CT 7
LOCKE DR SINGLETON RD E END 7
MEDLEY CT MEDLEY DR E END 7
MEDLEY DR ALKAE CT MEDLEY CT 7
MISTY GLEN CT BRODIE DR S END 7
MURIEL CT MCLAUGHLIN AV W END 7
PITCAIRN WY BAYOU DR SINGLETON RD 7
PITCAIRN WY VERDI DR BAYOU DR 7
RAPOSA CT RAPOSA DR S END 7
RAPOSA DR MCLAUGHLIN AV TUERS RD 7
ROYALBROOK CT KAUAI DR E END 7
RUNSHAW PL MCLAUGHLIN AV S END 7
SAFE HAVEN CT BRODIE DR S END 7
SEABROOK CT KAUAI DR E END 7
SUNBROOK CT YERBA BUENA RD N END 7
SWEET BROOK CT BRODIE DR S END 7
VANGORN CT BRANDYBUCK WY S END 7
VANGORN WY BRANDYBUCK WY MEDLEY DR 7
FLINTCREST DR HAYWORTH DR FLINTHAVEN DR 8
FLINTMONT DR FLINT AV 825'W/FLINT AV 8
CEDAR KNOLL CT DEANS PLACE WY N END 8
DEANS PLACE WY YERBA BUENA RD CEDAR KNOLL CT 8
IVY CANYON CT DEANS PLACE WY N END 8

ATTACHMENT
Subject: 10269 – 2023 Local Streets R&R Project

Page 6 of 8 ends

Street Name Street From Street To Council District
MUIR PLACE CT RAVENS PLACE WY S END 8
POLTON PLACE WY DEANS PLACE WY DEANS PLACE WY 8
SILVER CREEK CT SILVER CREEK RD W END 8
ANDORA DR COLDWATER DR HAYWORTH DR 8
COLDWATER DR HAYWORTH DR WHITE RD S 8

CUNNINGHAM
LAKE CT WHITE RD E END 8
FERNISH DR GULUZZO DR RUBION DR 8
FLINTBURY CT FLINTCREST DR N END 8
FLINTCREST CT FLINTCREST DR N END 8
FLINTDALE DR FLINTMONT DR HAYWORTH DR 8
FLINTHAVEN DR HAYWORTH DR WHITE RD S 8
FLINTMONT CT FLINTMONT DR N END 8
FLINTMONT DR 825'W/FLINT DR FLINTDALE DR 8
GAMAY CT FERMISH DR N END 8
Pleasant Lake Ln S White Rd Pleasant Lake Ct 8
Pleasant Lake Ln Lake Vista Ct Pleasant Lake Ct 8
BAGPIPE WY LOCH NESS WY LOCH NESS WY 8
BOSWALL CT BRIGADOON WY E END 8
CHENLAN CT WENDOVER LN E END 8
CHISIN ST NIEMAN BL YERBA BUENA RD 8
DANDERHALL WY TURNHOUSE LN ABORN RD 8
DUNDONALD CT TURNHOUSE LN S END 8
GLENGARRY DR THAINWOOD WY GLENGROVE WY 8
GLENGROVE WY ASHRIDGE LN YERBA BUENA RD 8
LADDIE WY NIEMAN BL BRIGADOON WY 8
LADDIE WY BRIGADOON WY LOCH NESS WY 8
LINTON CT THAINWOOD WY S END 8
LOCH NESS WY BAGPIPE WY MAPLE LEAF CT 8
MAPLE LEAF CT N END LOCH NESS WY 8
MAPLE LEAF CT LOCH NESS WY W END 8
MARS CT MILKY WY S END 8
MILKY WY NIEMAN BL VENUS CT 8
PINE SPRING CT LOCH NESS WY TURNHOUSE LN 8
PINE SPRING CT TURNHOUSE LN N END 8
POLTONHALL CT TURNHOUSE LN N END 8
QUAIL BLUFF CT QUAIL BLUFF LN N END 8
QUAIL BLUFF LN NIEMAN BL TERRA PL 8
REXWOOD CT YERBA BUENA RD N END 8
SHIANGZONE CT ASHRIDGE LN S END 8
TEOLA WY NIEMAN BL S END 8

TERRA BRAVA PL

TERRENA VALLEY
DR W END 8
TERRA CL TERRA PL N END 8

ATTACHMENT
Subject: 10269 – 2023 Local Streets R&R Project

Page 7 of 8 ends

Street Name Street From Street To Council District

TERRA PL WOODBURY LN

TERRENA VALLEY
DR 8

TERRENA VALLEY
DR NIEMAN BL TERRA PL 8

TERRENA VALLEY
DR TERRA PL N END 8
THAINWOOD WY YERBA BUENA RD GLENGARRY DR 8

THREADNEEDLE
WY FIRTH WY BAGPIPE WY 8
TURNHOUSE LN PINE SPRING CT BRIGADOON WY 8
VENUS CT MILKY WY N END 8
WENDOVER LN NIEMAN BL W END 8
WOODBURY LN NIEMAN BL CHISIN CT 8
CARM AV LAURINDA DR LG ALMADEN RD 9

CATRINA CT

LOS GATOS-
ALMADEN RD W END 9
CLARINDA WY EMILINE DR SANDY LN 9
GABLE LN MARY JO WY HARLOW WY 9
HARLOW WY GABLE LN BLOSSOM HILL RD 9
KENSINGTON WY HERSHNER DR CITY LIMIT 9
LAURA DR KAY DR ANNE WY 9
NOELLA WY LG ALMADEN RD LAURINDA DR 9

RUCKER DR

LOS GATOS
ALMADEN RD CHEVALIER DR 9
SANDY LN ROSSWOOD AV LAURINDA DR 9

SELINDA LN

LOS GATOS
ALMADEN RD N END 9
SHARON LN ANNE WY KAY DR 9

WILLOW DR LAURINDA DR

LOS GATOS
ALMADEN RD 9
BOURET DR SCOSSA AV JARVIS 9
BOURET DR JARVIS AV ANNAPOLIS WY 9
CAPAY CT CAPAY DR S END 9
CAPAY DR BRANHAM LN BOURET DR 9
CHERRYVIEW LN RUSSO DR 1160'E/RUSSO DR 9
CHERRYVIEW LN 1160'E/RUSSO DR CHERRY AV 9
CONISTON CT CONISTON WY W END 9
CONISTON WY RIDGEWOOD DR BLOSSOM HILL RD 9
DENTWOOD DR MERIDIAN AV E END 9
DENTWOOD DR AYRSHIRE DR E END 9
GEOMAX CT CHERRY AV N END 9
GLEN BRAE LN CLOVERCREST DR AYRSHIRE WY 9
GREENBANK CT IRONBRIDGE WY S END 9
HAMMERTON CT AYRSHIRE DR E END 9

ATTACHMENT
Subject: 10269 – 2023 Local Streets R&R Project

Page 8 of 8 ends

Street Name Street From Street To Council District
IRONBRIDGE WY AYRSHIRE DR SOUTHBRIDGE PL 9
JARVIS AV BRANHAM LN LANSING AV 9
JOPLIN DR CHERRY AV CAPAY DR 9
LUNING AV JARVIS AV SUTCLIFF AV 9
SANTA FE DR BOURET DR JARVIS AV 9
SHAWN DR CAPAY DR CHERRY AV 9
SOUTHBRIDGE PL RIDGEWOOD DR AYRSHIRE DR 9
SOUTHRIDGE CT RIDGEWOOD DR S END 9
STANWOOD DR DELLWOOD WY KOOSER RD 9
AARON PL BAYLISS DR S END 10
ABRA CT BAYLISS DR S END 10
ALDER SPRINGS WY CHANTILLEY LN SPRUCEMONT PL 10
ARBOR VALLEY DR MUSCAT DR VINEYARD DR 10
ARBOR VALLEY PL ARBOR VALLEY DR S END 10
AREQUIPA CT CIELITO WY N END 10
AVENIDA ESPANA SANTA TERESA BL KEELER CT 10
BAYLISS DR KEELER CT SANTA TERESA BL 10
BEECHVALE CT ENDMOOR DR S END 10
BERNAL RD HEATON MOOR DR CITY LIMIT 10
BOLADO DR BERNAL RD DEL RIO DR 10

BROMLEY CROSS
DR HEATON MOOR DR AINTREE DR 10
BURNING TREE CT BURNING TREE DR S END 10
CHELTENHAM PL PHINNEY WY SANTA TERESA BL 10
DEL RIO DR BURNING TREE DR MARTINVALE LN 10
DRUMM PL BAYLISS DR S END 10
GOLF COURSE LN BERNAL RD CHANTILLEY LN 10
GOLF COURSE LN CHANTILLEY LN STILLWATER LN 10
MANRESA CT BAYLISS DR W END 10
NORRED CT HEATON MOOR DR W END 10
ORONSAY CT ORONSAY WY N END 10
ORONSAY WY SAN IGNACIO AV PRAGUE DR 10
PHINNEY PL BAYLISS DR S END 10
PHINNEY WY BAYLISS DR AVENIDA ESPANA 10
PRAGUE CT PRAGUE DR S END 10
PRAGUE DR ORONSAY WY SAN IGNACIO AV 10
RAWLS CT DOWNS DR E END 10
RAWLS WY RAWLS CT AVENIDA ESPANA 10
SPRUCEMONT PL ALDER SPRING WY DOWNS DR 10
SPRUCEMONT PL DOWNS DR S END 10
STILLWATER LN GOLF COURSE LN ROSENCRANS WY 10
TURNER CT PHINNEY WY S END 10
VARIAN CT PRAGUE DR E END 10

← All documents from this meeting