(a) Resolution

San Jose City Council
June 13, 2023

Document
(a) Resolution
Meeting
June 13, 2023
Body
San Jose City Council
Original file
1.4 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

NVF:AXY:DJF
5/1/23

1 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

RESOLUTION NO. ______

A RESOLUTION OF THE COUNCIL OF THE CITY OF

SAN JOSE CERTIFYING THE BERRYESSA MIXED USE

DEVELOPMENT PROJECT ENVIRONMENTAL IMPACT

REPORT AND MAKING CERTAIN FINDINGS

CONCERNING SIGNIFICANT IMPACTS, MITIGATION

MEASURES, AND ALTERNATIVES, AND ADOPTING A

RELATED MITIGATION MONITORING AND REPORTING

PROGRAM, ALL IN ACCORDANCE WITH THE

CALIFORNIA ENVIRONMENTAL QUALITY ACT

WHEREAS, the City of San José (“City”), acting as lead agency under the California Environmental Quality Act (“CEQA”), prepared an environmental impact report (“EIR”) for the Berryessa Mixed Use Development Project (File Nos. PDC18-036, PD21-009, and PT21-030); and

WHEREAS, the EIR analyzed the environmental impacts of a Planned Development (PD) Zoning for development of approximately 850 residential units, 480,000 square feet of commercial space, and a 0.9-acre park on a 13-acre site located at 1655 Berryessa Road in the City of San José, California (the “Project”), which was a slightly a higher intensity development than the 455,000 square feet of commercial space, 820 dwelling units, and a 0.92-acre park noted in the PD21-009 permit; and

WHEREAS, the EIR concluded that implementation of the Project could result in certain significant effects on the environment and identified mitigation measures that would reduce those significant effects to a less-than-significant level; and

WHEREAS, the City is the lead agency for the Project and has prepared a Final Environmental Impact Report for the Project pursuant to and in accordance with CEQA, which the Final EIR is comprised of the Draft EIR and the First Amendment to the Draft EIR (collectively, the “FEIR”); and
NVF:AXY:DJF
5/1/23

2 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

WHEREAS, the FEIR concluded that implementation of the Project could result in certain significant effects on the environment and identified mitigation measures that would reduce all of those significant impacts to a less than significant level; and

WHEREAS, whenever a lead agency approves a project requiring the implementation of measures to mitigate or avoid significant effects on the environment, CEQA also requires a lead agency to adopt a mitigation monitoring and reporting program to ensure compliance with the mitigation measures during project implementation, and such a mitigation monitoring and reporting program has been prepared for the Project for consideration by the decision-maker of the City of San José as lead agency for the Project (the “Mitigation Monitoring and Reporting Program”); and

WHEREAS, on May 10, 2023, the Planning Commission of the City of San José reviewed the FEIR prepared for the Berryessa Mixed Use Development Project and recommended to the City Council that it finds the environmental clearance for the proposed Project was completed in accordance with the requirements of CEQA and further recommended the City Council adopt a resolution certifying the FEIR;

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SAN JOSE:

1. That the above recitals are true and correct and incorporated herein as if fully set forth in the body of this Resolution; and

2. That the City Council does hereby find and certify that the FEIR has been prepared and completed in compliance with CEQA; and

3. The City Council was presented with, and has independently reviewed and analyzed the FEIR and other information in the record and has considered the information contained therein, including the written and oral comments received at the public hearings on the FEIR and the Project, prior to acting upon or approving the Project, and has found that the FEIR represents the independent judgment of the City of San José (“City”) as lead agency for the Project, and designated the Director of Planning, Building, and Code Enforcement at the Director’s Office at 200 East Santa Clara Street, 3rd Floor Tower, San José, California 95113, as the NVF:AXY:DJF
5/1/23

3 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
custodian of documents and record of proceedings on which the decision of the City is based; and

4. That the City Council does hereby find and recognize that the FEIR contains additions, clarifications, modifications, and other information in its response to comments on the Draft EIR or obtained by the City after the Draft EIR was issued and circulated for public review and does hereby find that such changes and additional information are not significant new information as that phrase is described under CEQA because such changes and additional information do not indicate that any of the following would result from approval and implementation of the Project: (i) any new significant environmental impact or substantially more severe environmental impact not already disclosed and evaluated in the Draft EIR, (ii) any feasible mitigation measure considerably different from those analyzed in the Draft EIR that would lessen a significant environmental impact of the Project has been proposed and would not be implemented, or (iii) any feasible alternative considerably different from those analyzed in the Draft EIR that would lessen a significant environmental impact of the Project has been proposed and would not be implemented; and

5. That the City Council does hereby find and determine that recirculation of the FEIR for further public review and comment is not warranted or required under the provisions of CEQA; and

6. That the City Council does hereby make the following findings with respect to the significant effects of the environment of the Project, as identified in the FEIR with the understanding that all of the information in this Resolution is intended as a summary of the full administrative record supporting the FEIR; which full administrative record should be consulted for the full details supporting these findings.

BERRYESSA MIXED USE DEVELOPMENT PROJECT

SIGNIFICANT ENVIRONMENTAL IMPACTS

Air Quality
Impact: Impact AIR-1: Construction period emissions would exceed Bay Area Air Quality Management District (BAAQMD) thresholds of 54 pounds per day for reactive organic gas (ROG) exhaust by 21.25 pounds per day, during the final year of construction, which would result in a cumulatively considerable impact to regional ROG emissions.

Mitigation: MM AIR-1.1: Prior to the issuance of any demolition, grading and/or building permits (whichever occurs first), the project applicant shall prepare a construction equipment plan that includes specifications of the equipment to be used during construction. The plan shall be accompanied by a letter NVF:AXY:DJF
5/1/23

4 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
signed by a qualified air quality specialist, verifying that the equipment included in the plan meets the standards set forth below:
 All construction equipment larger than 25 horsepower used at the site for more than two continuous days or 20 hours total shall meet U.S. EPA Tier 4 emission standards for ROG, NOx, and PM (PM10 and PM2.5), if feasible, as confirmed by a qualified air quality consultant and submitted to the City, otherwise:
 If use of Tier 4 equipment is not available, alternatively use equipment that meets U.S. EPA emission standards for Tier 2 or 3 engines and include particulate matter emissions control equivalent to CARB Level 3 verifiable diesel emission control devices that altogether achieve a 60 percent reduction in particulate matter exhaust in comparison to uncontrolled equipment; alternatively (or in combination):
 Use alternatively fueled equipment with lower emissions that meet the reduction requirements above.

Prior to issuance of any demolition, grading, and/or building permits, whichever occurs first, the project applicant shall submit a copy of the construction equipment plan to the Director of Planning, Building and Code Enforcement or Director’s designee, for review and approval.

MM AIR-1.2: Prior to the issuance of any demolition, grading and/or building permits (whichever occurs first), the project applicant shall prepare a construction equipment plan that includes a description of the location of construction site signs to be posted restricting idling of diesel-operated equipment to two minutes or less with clearly listed exceptions based on applicable state regulations. The project applicant shall submit the construction equipment plan to the Director of Planning, Building and Code Enforcement or the Director’s designee. Diesel engines, whether for off- road equipment or on-road vehicles, shall not be left idling for more than two minutes, except as provided in exceptions to the applicable state regulations (e.g., traffic conditions, safe operating conditions). The construction sites shall have posted legible and visible signs in designated queuing areas to clearly notify operators of idling limit.

Prior to issuance of any demolition, grading, and/or building permits, whichever occurs first, the project applicant shall submit a copy of the construction equipment plan to the Director of Planning, Building and Code Enforcement or Director’s designee, for review and approval.

MM AIR-1.3: Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs first), the project applicant shall include in the construction equipment plan a description of the electrical source of power that the powerline will connect to and identify the approximate route of the powerline through the construction site, and submit to the Director of Planning, Building and Code Enforcement or the Director’s designee. The NVF:AXY:DJF
5/1/23

5 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
line power to the site shall be provided during the early phases of construction to minimize the use of diesel-powered stationary equipment.

Prior to issuance of any demolition, grading, and/or building permits, whichever occurs first, the project applicant shall submit a copy of the construction equipment plan to the Director of Planning, Building and Code Enforcement or Director’s designee, for review and approval.

MM AIR-1.4: Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs first), the project applicant shall include a stipulation in the Declaration of Covenants, Conditions, and Restrictions requiring the use of low volatile organic compound or VOC (i.e., ROG) coatings, that are below current BAAQMD requirements (i.e., Regulation 8, Rule 3: Architectural Coatings), for at least 90 percent of all residential and nonresidential interior paints and 90 percent of exterior paints. This includes all architectural coatings applied during both construction and reapplications throughout the project’s operational lifetime. At least 90 percent of coatings applied must meet a “super-compliant" VOC standard of less than 10 grams of VOC per liter of paint. For reapplication of coatings during the project’s operational lifetime, the Declaration of Covenants, Conditions, and Restrictions shall contain a stipulation for low VOC coatings to be used. Examples of “super-compliant” coatings are contained on the South Coast Air Quality Management District’s website.

Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs first), the project applicant shall submit all construction documents and plans, including the Declaration of Covenants, Conditions, and Restrictions, shall be submitted to the Director of Planning, Building and Code Enforcement, or the Director’s designee for review and approval.

Finding: With implementation of mitigation measures MM AIR-1.1 through MM AIR-

1.4, on-site construction ROG emissions would be reduced by 85 percent and would be below the BAAQMD significant threshold. The project would result in less than significant ROG emissions impacts. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: The project’s annualized construction ROG emissions are predicted to exceed the BAAQMD significance thresholds for ROG during the year 2026. Implementation of mitigation measures MM AIR-1.1 through MM AIR-1.4 would reduce ROG emissions to below the BAAQMD threshold of 54 pounds per day during construction by requiring use of equipment that meets U.S. EPA standards for emissions, compliance with a construction equipment plan that restricts idling, and use of low VOC paint coatings. The California Emissions Estimator Model (CalEEMod) was used to estimate the effectiveness of mitigation measures MM AIR-1.1 through MM AIR-1.3 using Tier 4 interim construction equipment. In addition, the CalEEMod model was used to estimate the effectiveness of MM AIR-1.4 using 90 percent interior and exterior super-compliant VOC coatings. These NVF:AXY:DJF
5/1/23

6 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
measures together were found to reduce on-site construction ROG emissions by 85 percent and below the BAAQMD significant threshold, or average construction emissions of 11.23 pounds of ROG per day during.

Therefore, with the implementation of MM AIR-1.1 through MM AIR-1.4 during project construction, the project would not result in a significant ROG emissions impact.

Biological Resources
Impact: Impact BIO-1: Development of the proposed project and proposed tree removals would result in impacts to nesting birds, if present on the site at the time of construction.

Mitigation: MM BIO-1.1: Prior to the issuance of any tree removal, demolition, or grading permits (whichever occurs first), the project applicant shall schedule demolition and construction activities to avoid the nesting season. The nesting season for most birds, including most raptors in the San Francisco Bay area, extends from February 1 through August 31, inclusive.

MM BIO-1.2: If demolition and construction cannot be scheduled between September 1 and January 31, inclusive, pre-construction surveys for nesting birds shall be completed by a qualified ornithologist to ensure that no nests shall be disturbed during project implementation. This survey shall be completed no more than 14 days prior to the initiation of construction activities during the early part of the breeding season (February 1 through April 30 inclusive) and no more than 30 days prior to the initiation of these activities during the late part of the breeding season (May 1 through August 31 inclusive). During this survey, the ornithologist shall inspect all trees and other possible nesting habitats immediately adjacent to the construction areas for nests.

MM BIO-1.3: If an active nest is found sufficiently close to work areas to be disturbed by construction, the ornithologist, in consultation with the California Department of Fish and Wildlife, shall determine the extent of a construction free buffer zone to be established around the nest, typically 250 feet, to ensure that raptor or migratory bird nests shall not be disturbed during project construction.

MM BIO-1.4: Prior to any tree removal, or approval of any grading or demolition permits (whichever occurs first), the ornithologist shall submit a report indicating the results of the survey and any designated buffer zones to the satisfaction of the City’s Director of Planning, Building and Code Enforcement or the Director’s designee.

Finding: With implementation of mitigation measures MM BIO-1.1 through MM BIO-

1.4, the project’s impact to nesting birds would be less than significant. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: Development of the project would result in the removal of trees on the project site. Trees could provide nesting habitat for birds, NVF:AXY:DJF
5/1/23

7 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
7including migratory protected species under provisions of the e federal Migratory Bird Treaty Act and California Department of Fish and Wildlife code. Construction disturbance during the breeding season could result in the incidental loss of fertile eggs or nestlings, or otherwise lead to nest abandonment. Disturbance that causes abandonment and/or removal and site grading that disturbs a nesting bird on-site or immediately adjacent to the construction zone would constitute a significant impact. The mitigation measure would require pre-construction surveys and appropriate buffers to ensure nesting birds are not impacted during construction.

Cultural Resources
Impact: Impact CUL-1: Subsurface archaeological resources could be encountered during project construction.

Mitigation: MM CUL-1.1: Prior to the issuance of any grading permits and prior to construction-related ground disturbance, a qualified archaeologist in coordination with a Native American Tribal Representative shall complete mechanical presence/absence exploration to explore for buried historical and Native American resources. Subsurface exploration shall be completed by an archaeologist trained in current California methods for prehistoric and historic archaeological resources. All crews and individuals who will be moving any earth shall be cultural sensitivity trained. Narrow, deep trenches shall be created to search for Native American use of this site, and shallower, wide trenches employed near the potentially sensitive historic areas.

The results of the presence/absence exploration shall be submitted to the Director of Planning, Building and Code Enforcement or the Director’s designee and the City’s Historic Preservation Officer for review and approval prior to issuance of any grading permit. Based on the findings of the presence/absence exploration, an archaeological resources treatment plan (as described in mitigation measure MM CUL-1.2) shall be prepared by a qualified archaeologist in consultation with the Native American Tribal representative, if necessary.

MM CUL-1.2: If required by mitigation measure MM CUL1-1, the project applicant, prior to issuance of any grading permits, shall retain a qualified archaeologist to prepare a treatment plan in consultation with a Tribal representative that reflects the permit-level detail pertaining to depths and locations of all ground disturbing activities. The treatment plan shall be submitted to the Director of Planning, Building and Code Enforcement or the Director’s designee and the City’s Historic Preservation Officer prior to approval of any grading permit. The treatment plan shall contain, at a minimum:
 Identification of the scope of work and range of subsurface effects (including location map and development plan), including requirements for preliminary field investigations.

NVF:AXY:DJF
5/1/23

8 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
 Description of the environmental setting (past and present) and the historic/prehistoric background of the parcel (potential range of what might be found).
 Development of research questions and goals to be addressed by the investigation (what is significant vs. what is redundant information).  Detailed field strategy to record, recover, or avoid the finds and address research goals.
 Analytical methods.
 Report structure and outline of document contents.
 Disposition of the artifacts.
 Appendices: all site records, correspondence, and consultation with Native Americans, etc.

Implementation of the plan, by a qualified archaeologist, shall be required prior to the issuance of any grading permits. The treatment plan shall utilize data recovery methods to reduce impacts to subsurface resources. The project applicant shall submit copies of the treatment plan to the Director of Planning, Building and Code Enforcement or the Director’s designee.

MM CUL-1.3: Prior to issuance of any grading permits, the project applicant shall report any preliminary field investigation, grading, or other construction activities findings to the Director of Planning, Building and Code Enforcement or the Director’s designee. Any historic or prehistoric material identified in the project area during the preliminary field investigation and/or during excavation activities shall be evaluated for eligibility for listing in the California Register of Historic Resources as determined by the California Office of Historic Preservation. The techniques used for data recovery shall follow the protocols identified in the approved treatment plan. All documentation and recordation shall be submitted to the Northwest Information Center and Native American Heritage Commission/Sacred Land Files prior to the issuance of an occupancy permit. A copy of the evaluation shall be submitted to the Director of Planning, Building and Code Enforcement or the Director’s designee, and the Tribe.

Finding: With implementation of mitigation measures MM CUL-1.1 through MM CUL-

1.3, the project’s impact to unknown buried archaeological resources (if present on-site) would be less than significant. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: Development of the project would require construction activities such as grading and excavation, which could result in the accidental destruction or disturbance of archaeological sites that could convey important information about San José’s history. Due to the project site’s proximity to Upper Penitencia Creek and Coyote Creek (located 105 feet south and 2,000 feet west of the project site, respectively), both of which are considered sensitive areas for buried prehistoric/Native American resources, there is a moderate to high potential to contain historic-era NVF:AXY:DJF
5/1/23

9 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
archaeological features. Implementation of measures CUL-1.1 through CUL-1.3 would reduce impacts to buried archaeological resources to less than significant levels by conducting a presence/absence exploration and developing an archaeological treatment plan if necessary to ensure any resources encountered are appropriately treated.

Hazards and Hazardous Materials
Impact: Impact HAZ-1: Residual concentrations of hazardous chemicals and metals including organochlorine pesticides and pesticide-related metals (in the southern portion of the site) from prior agricultural use, underground storage tanks (UST), and truck parking and storage at the site could expose construction workers, neighboring uses, and the environment to hazardous materials.

Mitigation: MM HAZ-1.1: Prior to issuance of any demolition or grading permits (whichever occurs first), the project applicant shall enter into an agreement with the Santa Clara County Department of Environmental Health’s (SCCDEH’s) Site Cleanup Program to provide regulatory oversight. The applicant shall meet with the SCCDEH and perform additional soil and groundwater sampling and testing to adequately define the known and suspected contamination. A Corrective Action/Risk Management Plan (e.g., Remedial Action Work Plan and/or Soil Management Plan) shall be prepared and submitted to the agency for their approval to demonstrate that cleanup standards shall be met for the development of the site. The Corrective Action/Risk Management Plan shall describe measures necessary to protect the health and safety of construction workers and future site occupants and establish appropriate management practices for handling and monitoring impacted soil, soil vapor and groundwater that potentially may be encountered during construction activities. The Correction Action/Risk Management Plan will also include measures to prevent the discharge of contaminants from dewatering. The dewatering system would be designed so that the volume and duration of dewatering are minimized to the greatest extent possible. All measures identified in the plan(s) shall be implemented during all phases of construction, as applicable. The Corrective Action/Risk Management Plan shall also describe protocols for profiling of soil planned for off-site disposal. The plan shall be prepared by an environmental professional and submitted to the SCCDEH.

MM HAZ-1.2: Prior to issuance of any demolition or grading permits (whichever occurs first), a Health and Safety Plan (HASP) shall be prepared to establish health and safety protocols for construction workers at the site.

All measures identified in the plan(s) shall be implemented during all phases of construction, as applicable. The HASP shall be prepared by an environmental professional and submitted to the SCCDEH.

NVF:AXY:DJF
5/1/23

10 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

MM HAZ-1.3: Prior to issuance of any demolition or grading permits (whichever occurs first), additional shallow soil sampling shall be completed at the southern portion of the site including areas near the existing industrial buildings and former residence and outbuildings. The site shall be sampled for organochlorine pesticides and associated metals (including lead and arsenic). If elevated concentrations of these contaminants are discovered, the project applicant shall notify the Director of Planning, Building and Code Enforcement or the Director’s Designee and SCCDEH and prepare a remedial action plan in accordance with SCCDEH requirements. The sampling, preparation of the remedial action plan, and remediation shall be completed by an environmental professional, under the oversight of SCCDEH.

Finding: Implementation of mitigation measures MM HAZ-1.1 through MM HAZ-1.3 will reduce the significant impact to construction workers and neighboring uses from residual concentrations of hazardous chemicals and metals stated above to a less than significant level. (Less than Significant Impact with Mitigation)
Facts in Support of the Finding: As discussed in Section 3.9 of the Draft EIR, soil samples from the project site were collected and analyzed for organochlorine pesticides due to the site’s former agricultural uses, and soil and groundwater samples were analyzed for total petroleum hydrocarbons (TPH) due to former USTs and the truck parking and storage uses on-site.

Based on 2011 and 2018 soil sampling results, the site’s soils on the northern section of the site contain organochlorine pesticide and polychlorinated biphenyls (PCB) concentrations above regulatory screening levels. Samples for TPHs were collected in soil and groundwater beneath the site; however, based on the results, no samples of TPHs were detected above regulatory screening levels. Since the samples were primarily collected in the northern portion of the site, there is a potential for contaminated soils in other portions of the site. The release of these contaminants could be hazardous to construction workers and adjacent residences. With implementation of MM HAZ-1.1 through MM HAZ-1.3, the project applicant will enter into an agreement with the Santa Clara County Department of Environmental Health’s (SCCDEH’s) Site Cleanup Program and would complete soil sampling to determine if elevated pesticide, pesticide-related metals, lead, and TPH are present in other soils on site.

By implementing these measures, the project would not create a significant hazard to the public or environment from hazardous materials. Therefore, the impacts of the project related to hazardous materials would be less than significant.

Impact: Impact HAZ-2: Project construction could expose construction workers to potential TPHs in the soil beneath the oil-water separator.

NVF:AXY:DJF
5/1/23

11 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Mitigation: MM HAZ-2.1: Prior to issuance of any grading permits, upon removal of the site’s oil-water separator, soil underlying the separator shall be evaluated for the presence of TPH, volatile organic compounds (VOCs), and metals. The confirmation sampling shall be completed by an environmental professional following commonly accepted sampling protocols which shall be coordinated with SCCDEH and the City of San José Environmental Services Department. The sampling data shall be provided to SCCDEH, and approval shall be received prior to issuance of any grading permits. If elevated concentrations of these contaminants are discovered, the project applicant shall notify the Director of Planning, Building and Code Enforcement or Director’s designee and the SCCDEH, prior to issuance of a grading permit, and prepare a remedial action plan in accordance with SCCDEH requirements. The sampling, preparation of the remedial action plan, and remediation shall be completed by an environmental professional, under the oversight of SCCDEH.

Finding: Implementation of mitigation measure MM HAZ-2.1 will avoid or reduce the potential impact of TPHs on construction workers, neigh to a less than significant level. (Less than Significant Impact with Mitigation) Facts in Support of the Finding: An oil-water separator is present on-site on the north side of the industrial building occupied by AT&T (which is the northernmost building on-site). The oil-water separator was cleaned out and filled with concrete during the late 1990s. The project proposes to remove the oil- water separator located near the AT&T industrial building. Soil beneath the oil-water separator could contain concentrations of TPHs which could affect construction workers, neighboring residents, and the environment.

Mitigation measure MM HAZ-2.1 requires soil underlying the separator shall be evaluated for the presence of TPH, volatile organic compounds (VOCs), and metals prior to the issuance of any grading permits. If elevated concentrations of these contaminants are discovered, the project applicant would notify the Director of Planning, Building, and Code Enforcement or Director’s Designee and the SCCDEH and prepare a remedial action plan in accordance with SCCDEH requirements With implementation of MM HAZ-2.1, the proposed project would not result in significant impacts to construction workers, neighboring residents, or the environment due to the release of contaminated soil or groundwater resulting from the removal of the oil separator. Therefore, the impacts of the project related to hazardous materials would be less than significant.

Noise
NVF:AXY:DJF
5/1/23

12 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Impact: Impact NOI-1: Project construction would result in elevated noise levels of five dBA or more above ambient conditions at nearby residences for a period exceeding 12 months.

Mitigation: MM NOI-1.1: Prior to the issuance of any demolition or grading permits (whichever occurs first), an acoustic engineer shall prepare and implement a construction noise logistics plan, in accordance with General Plan Policy EC-1.7, prior to issuance of any demolition or grading permits. A typical construction noise logistics plan will include, but is not limited to, the following measures to reduce construction noise levels:
 Construction shall be limited to the hours of 7:00 AM to 7:00 PM Monday through Friday for any on-site or off-site work within 500 feet of any residential unit. Construction outside of these hours may be approved through a development permit based on a site-specific “construction noise mitigation plan” and a finding by the Director of Planning, Building and Code Enforcement that the construction noise mitigation plan is adequate to prevent noise disturbance of affected residential uses.  The contractor shall use “new technology” power construction equipment with state-of-the-art noise shielding and muffling devices. All internal combustion engines used on the project site shall be equipped with adequate mufflers and shall be in good mechanical condition to minimize noise created by faulty or poorly maintained engines or other components.
 The unnecessary idling of internal combustion engines shall be prohibited.
 Staging areas and stationary noise-generating equipment shall be located as far as possible from noise-sensitive receptors such as residential uses (a minimum of 200 feet).
 The surrounding neighborhood shall be notified early and frequently of the construction activities.
 A “noise disturbance coordinator” shall be designated to respond to any local complaints about construction noise. The disturbance coordinator would determine the cause of the noise complaints (e.g., beginning work too early, bad muffler, etc.) and institute reasonable measures warranted to correct the problem. A telephone number for the disturbance coordinator would be conspicuously posted at the construction site.
 Implementation of a construction noise logistics plan, which would include the following measures:
o Utilize “quiet” models of air compressors and other stationary noise sources where technology exists.
o Equip all internal combustion engine-driven equipment with mufflers, which are in good condition and appropriate for the equipment.

NVF:AXY:DJF
5/1/23

13 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
o Construct temporary noise barriers, where feasible, to screen stationary noise-generating equipment when located within 200 feet of adjoining sensitive land uses. Temporary noise barrier fences would provide at least a 5 dBA noise reduction if the noise barrier interrupts the line-of-sight between the noise source and receptor and if the barrier is constructed in a manner that eliminates any cracks or gaps. A typical temporary construction noise barrier reaching 14 feet in height shall be installed along the northern and western borders of the site to provide up to 14 dBA of noise reduction.
o If stationary noise-generating equipment must be located near receptors, adequate muffling of the equipment (with enclosures where feasible and appropriate) shall be used. Any enclosure openings or venting shall face away from sensitive receptors. o Ensure that generators, compressors, and pumps are housed in acoustical enclosures.
o Locate cranes as far from adjoining noise-sensitive receptors as possible.
o During final grading, substitute graders for bulldozers, where feasible. Wheeled heavy equipment are quieter than track equipment and should be used where feasible.
o Substitute nail guns for manual hammering, where feasible. o Substitute electrically powered tools for noisier pneumatic tools, where feasible.
o The contractor shall prepare a detailed construction plan identifying the schedule for major noise-generating construction activities. The construction plan shall identify a procedure for coordination with adjacent residential land uses so that construction activities can be scheduled to minimize noise disturbance.

Finding: With implementation of mitigation measure MM NOI-1.1 and standard permit conditions, the project would have a less than significant construction noise impact. (Less than Significant Impact with Mitigation Incorporated)
Facts in Support of the Finding: As discussed in Section 3.13 of the Draft EIR and the supporting Noise and Vibration Assessment prepared for the Project (Appendix H of the Draft EIR), the Project is located within 25 feet of existing residences. Construction of the Project within 500 feet of any residential unit is limited to the hours of 7:00 a.m. and 7:00 p.m. Construction-related noise would exceed ambient noise levels by five dBA for a period of more than 12 months, which exceeds City thresholds defined in General Plan Policy EC-

1.7 which considers significant construction impacts to occur if a project is located within 500 feet of residential uses or 200 feet of commercial or office uses and involves substantial noise generating activities continuing for NVF:AXY:DJF
5/1/23

14 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
more than 12 months. Implementation of the MM NOI-1.1, including installing temporary construction noise barriers reaching 14 feet in height along the northern and western borders of the site, using quiet models of air compressors and other stationary noise sources, and using new technology power construction equipment with noise shielding and muffling devices, construction noise levels would be reduced by up to 14 dBA, below ambient levels. The mitigation measure also includes preparation and implementation of a construction noise logistics plan which would manage any noise complaints for the duration of construction. With inclusion of the implementation of the measures included in MM NOI-1.1 and compliance with General Plan Policy EC-1.7 and the City’s Municipal Code, construction-related noise impacts would be less than significant.

Impact: Impact NOI-2: Noise from the project’s mechanical equipment could exceed 55 dBA DNL at sensitive residential noise-receptors near the project site.

Mitigation: MM NOI-2.1: Prior to the issuance of any demolition or grading permits (whichever occurs first), the project applicant shall select and design mechanical equipment and generators to reduce excessive noise levels at the nearby noise-sensitive land uses to meet the City’s 55 BA DNL noise level requirement. A qualified acoustical consultant shall be retained to review mechanical noise as these systems are selected to determine specific noise reduction measures necessary to reduce noise to comply with the City’s Municipal Code noise level requirements. Noise reduction measures could include, but are not limited to, selection of equipment that emits low noise levels and installation of noise barriers, such as enclosures and parapet walls, to block the line-of-sight between the noise source and the nearest receptors. Other alternate measures may be optimal, such as locating equipment in less noise-sensitive areas, such as along the building facades farthest from adjacent neighbors, where feasible. The proposed mechanical equipment shall be approved by the City’s Director of Planning, Building and Code Enforcement.

Finding: Implementation of mitigation measure MM NOI-2.1 would reduce noise impacts from mechanical equipment to a less than significant level. (Less than Significant Impact with Mitigation Incorporated)
Facts in Support of the Finding: As discussed in Section 3.13 of the Draft EIR and supporting Noise and Vibration Assessment prepared for the Project (Appendix H of the Draft EIR), construction of the project includes heating, ventilation, and air conditioning (HVAC) equipment that would produce noise levels of about 66 dBA at a distance of three feet during operation. An emergency backup generator associated with the commercial building is also included as part of the project. Noise levels resulting from operation of HVAC equipment alone would not result in noise levels exceeding General Plan or Municipal Code standards. However, with a worst-case, two-hour NVF:AXY:DJF
5/1/23

15 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
test of a 1,000-kilowatt generator, the 55 dBA DNL criterion would be exceeded at multiple residences near the project site. Implementation of MM NOI-2.1 would ensure mechanical equipment would comply with the City’s noise standards, and the permanent increase in noise due to the project’s mechanical equipment would result in less than significant impacts.

Impact: Impact NOI-3: Vibration levels would have the potential to exceed San José’s General Plan guidelines at residential uses in the site vicinity (0.2 in/sec PPV) and could result in damage to nearby structures.

Mitigation: MM NOI-3.1: Prior to the issuance of any demolition or grading permits (whichever occurs first), a qualified professional structural engineer, licensed in the State of California, shall prepare a construction vibration monitoring plan to reduce construction-related vibration impacts below 0.2 in/sec PPV. The plan shall include, but is not limited to, the following measures:
 Prohibit impact pile driving as a method of construction within 125 feet of any surrounding vibration-sensitive building. Prohibit vibratory pile driving as a method of construction within 85 feet of any surrounding vibration-sensitive building. As an alternative, drilled piles, which generate substantially lower levels of vibration, may be used.  Limit the use of vibratory rollers, hoe rams, large bulldozers, and caisson drilling, and avoid clam shovel drops within 20 feet of the property lines shared with residences and commercial structures adjacent to the site.  Place operating equipment on the construction site at least 30 feet from vibration-sensitive receptors.
 Use a smaller vibratory roller, such as the Caterpillar method CP433E vibratory compactor, when compacting materials within 30 feet of adjacent buildings. Only use the static compaction mode when compacting materials within 15 feet of buildings.
 Select demolition methods not involving impact tools.  Avoid dropping heavy objects or materials within 30 feet of vibration sensitive locations.
 A list of all heavy construction equipment to be used for this project known to produce high vibration levels (tracked vehicles, vibratory compaction, jackhammers, hoe rams, etc.) shall be submitted to the City by the contractor. This list shall be used to identify equipment and activities that would potentially generate substantial vibration and to define the level of effort required for continuous vibration monitoring.  A construction vibration-monitoring plan shall be implemented to document conditions at the residences and commercial structures adjacent to the site prior to, during, and after vibration generating construction activities. All plan tasks shall be undertaken under the direction of a licensed professional structural engineer in the State of NVF:AXY:DJF
5/1/23

16 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

California and be in accordance with industry accepted standard methods. The construction vibration monitoring plan should be implemented to include the following tasks:
o Identification of sensitivity to ground-borne vibration of the residence and commercial structures adjacent to the site. A vibration survey would need to be performed.
o Performance of a photo survey, elevation survey, and crack monitoring survey for the residences and commercial structures nearest to the site. Surveys shall be performed prior to and after completion of vibration generating construction activities located within 20 feet of the structure. This distance shall be extended to 80 feet for vibratory pile driving and 120 feet for impact pile driving. The surveys shall include internal and external crack monitoring in the structure, settlement, and distress, and shall document the condition of the foundation, walls, and other structural elements in the interior and exterior of the structure.
o Conduct a post-survey on the structure where either monitoring has indicated high levels or complaints of damage. Make appropriate repairs where damage has occurred as a result of construction activities.
o The results of any vibration monitoring shall be summarized and submitted in a report shortly after substantial completion of each phase identified in the project schedule. The report shall include a description of measurement methods, equipment used, calibration certificates, and graphics as required to clearly identify vibration- monitoring locations. An explanation of all events that exceeded vibration limits shall be included together with proper documentation supporting any such claims.
o Designate a person responsible for registering and investigating claims of excessive vibration. The contact information of such person shall be clearly posted on the construction site.

Implementation of the construction vibration monitoring plan shall occur during construction activities to reduce vibration levels below 0.2 in/sec PPV.

Prior to issuance of any demolition or grading permits, the project applicant shall submit the construction vibration monitoring plan to the Director of Planning, Building and Code Enforcement or the Director’s designee for review and approval.

Finding: Implementation of mitigation measure MM NOI-3.1 would reduce impacts from construction-related groundborne vibration and noise levels to a less than significant level. (Less than Significant Impact with Mitigation Incorporated)
NVF:AXY:DJF
5/1/23

17 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Facts in Support of the Finding: As discussed in Section 3.13 of the Draft EIR and supporting Noise and Vibration Assessment prepared for the project (Appendix H of the Draft EIR), construction of the project would generate vibration when heavy equipment or impact tools are used. Construction activities would include the demolition of existing structures, site preparation work, excavation of the below-grade parking level, foundation work, and new building framing and finishing. Construction vibration levels could exceed the 0.2 in/sec PPV threshold, for buildings of conventional construction, at residences to the northwest and southwest. Mitigation measure MM NOI-3.1 requires a professional structural engineer to prepare a construction vibration monitoring plan to reduce construction-related vibration impacts below 0.2 in/sec PPV. The measures in the plan would include limiting the use of vibratory rollers, hoe rams, large bulldozers, and caisson drilling, within 20 feet of the property lines shared with structures adjacent to the site, completing a vibration survey to identify the sensitivity to groundborne vibration of the adjacent structures, and selecting demolition methods not involving impact tools. Implementation of MM NOI-

3.1 would reduce construction vibration levels at nearby buildings to below the 0.2 in/sec PPV threshold, which would reduce the impact from groundborne construction vibration to less than significant.

FINDINGS CONCERNING ALTERNATIVES

To comply with the purposes of CEQA, it is important to identify alternatives that reduce the significant impacts that are anticipated to occur if the project is implemented and to try to meet as many of the project’s objectives as possible. The CEQA Guidelines emphasize a commonsense approach -- the alternatives should be reasonable, should “foster informed decision making and public participation,” and should focus on alternatives that avoid or substantially lessen the significant impacts.

The alternatives analyzed in the DEIR were developed with the goal of being at least potentially feasible, given Project objectives and site constraints, while avoiding or reducing the Project’s identified environmental effects. The following are evaluated as alternatives to the proposed Project:

1. No Project – No Development Alternative

2. No Project – Existing Plans and Policies Alternative

3. Reduced Parking Alternative

Project Objectives
The project applicant’s objectives for the Project are:

NVF:AXY:DJF
5/1/23

18 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

1. Construct residential development with connection to public transit, open space and creeks, and existing neighborhoods;

2. Use the area adjacent to the Berryessa BART Station for Transit Oriented Development;

3. Provide housing with accessibility to alternative forms of transportation including public transit, walking, and cycling;

4. Enhance pedestrian-oriented design by providing residential uses proximate to commercial development;

5. Achieve sustainability policies, goals, and standards of the Berryessa BART Uran Village Plan by achieving the residential density and commercial development intensity envisioned by the Berryessa BART Urban Village Plan (BBUV);

6. Increase access to local and regional trail systems by improving sidewalks;

7. Provide opportunities for job creation via additional commercial development consistent with the BBUV requirements.

Selection of Alternatives
CEQA, the CEQA Guidelines, and case law on the subject have found that feasibility can be based on a wide range of factors and influences. The CEQA Guidelines advise that such factors can include (but are not necessarily limited to) the suitability of an alternative site, economic viability, availability of infrastructure, consistency with the general plan or other plans or regulatory limitations, jurisdictional boundaries, and whether the project proponent can “reasonably acquire, control or otherwise have access to the alternative site” (Section 15126.6[f][1]).

1. No Project – No Development Alternative

A. Description of Alternative: The No Project – No Development Alternative would retain the existing land uses on-site as is, with predominantly impervious surfaces, and would continue to operate as an industrial use. If the project site were to remain undeveloped as is, the significant impacts resulting during construction and operation of the proposed project would not occur.

B. Comparison of Environmental Impacts: Implementation of the No Project – No Development Alternative would avoid all the significant environmental impacts of the Project in the areas of air quality (construction TACs and operational emissions of ROG), biological resources (on-site man-made pond and nesting birds), cultural resources (archaeological resources and tribal cultural resources), hazardous materials (soil and groundwater quality), and noise (construction noise and vibration).

C. Finding: This alternative would largely maintain the baseline conditions described throughout this EIR and avoid the significant impacts resulting during construction and operation of the proposed project. However, this alternative would not meet any of the project objectives. Therefore, because this alternative would not meet the project objectives, this alternative is rejected.

NVF:AXY:DJF
5/1/23

19 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

2. No Project – Existing Plans and Policies Alternative

A. Description of Alternative: Under this alternative, the project site would be developed consistent with the existing capacity and density permitted by the BBUV Plan. Under the BBUV Plan, eight acres of the site is designated Urban Residential, 2.1 acres of the site is designated Transit Employment Center, 2.0 acres of the site is designated Mixed-Use Neighborhood, and 0.9 acres of the site is proposed to be Open Space, Parkland, and Habitat. The remaining four acres of the site is designated for internal roadways. This Alternative would allow for development of up to 1,000 multifamily units, 60 units of townhouses and/or single- family houses, and 480,000 square feet of commercial space at the project site.

Given the site is currently zoned Light Industrial and Agricultural Land, this alternative would also require a Planned Development Rezoning and Planned Development Permit.

B. Comparison of Environmental Impacts: The No Project – Existing Plans and Policies Alternative and proposed project are both consistent with the BBUV Plan and policies. However, the BBUV Plan allows for a greater residential density than what is proposed by the Project. The Project would consist of 802 multi-family residential units under the Urban Residential designation, which would equate to approximately 200 units per acre. The Existing Plans and Policies Alternative would allow up to 250 units per acre resulting in approximately 1,000 multifamily units. This alternative would also allow approximately 60 units of townhouses and/or single-family houses (within the Mixed-Use Neighborhood designation), compared to the proposed project, which proposes 24 single family units and 24 townhouse units. The VMT per capita per resident for the proposed project would be 8.02, which is below the 10.12 VMT per resident threshold. Given the alternative would have the same proximity to transit, the project alternative would result in approximately the same VMT per capita when compared to the proposed project.

Given this alternative would be slightly larger in size when compared to the proposed project, the alternative would have a slightly longer construction duration, resulting in slightly longer exposure of the adjacent residences to construction emissions and noise. However, the alternative would implement the same standard permit conditions and mitigation measures MM AIR-1.1 through MM AIR-

1.4, MM NOI-1.1 and MM NOI-2.1 to reduce construction emissions and construction noise/vibration impacts to less than significant.

The project alternative would increase the number of trips generated from 14,240 net new trips generated by the proposed project to approximately 15,338 net new trips under this alternative. The alternative could result in an increase in operational emissions. Similar to the proposed project, operational criteria pollutant (ROG) emissions would be reduced to a less than significant impact through compliance NVF:AXY:DJF
5/1/23

20 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
with the TDM measures set forth by the BBUV Parking and TDM Plan, which would reduce vehicle trips and emissions by 30 percent.

Similar to the proposed project, the No Project – Existing Plans and Policies Alternative would entail similar development activity and disturbance across the project site. Therefore, this alternative would have impacts similar to the proposed project related to biological resources, cultural resources, geology and soils, hazards and hazardous materials, hydrology and water quality, and tribal cultural resources.

C. Finding: The No Project – Existing Plans and Policies Alternative could achieve all of the project objectives including meeting the sustainability policies, goals, and standards of the Berryessa BART Urban Village Plan by achieving the residential density and commercial development intensity envisioned by the BBUV Plan and including housing with accessibility to alternative forms of transportation including public transit, walking, and cycling. However, this alternative would result in increased air quality impacts, as it would increase operational emissions with increased vehicle trips. Therefore, because this alternative is not environmentally superior, and in some instances would cause greater environmental impacts, this alternative is rejected.

3. Reduced Parking Alternative

A. Description of Alternative: The project proposes to develop up to 850 residential units and 480,000 square feet of commercial space. The multi-family residential buildings would have up to two levels of underground parking and the commercial building would have up to three levels of underground parking and two levels of above ground parking. The Reduced Parking Alternative would include one less underground parking level at the proposed commercial building, thereby reducing the amount of construction activity required, and the amount of trips to the site.

B. Comparison of Environmental Impacts: The Reduced Parking Alternative would reduce operational vehicle ROG emissions. This alternative would include the removal of one commercial parking level, which would reduce the number of cars parked on-site by approximately 12 percent, resulting in a reduction in operational vehicle emissions by approximately 12 percent (assuming site commercial occupants and visitors/clients/customers would travel to the site via alternate modes of travel due to reduced parking). This project alternative would be required to implement BBUV Parking and TDM measures, as this is required for all developments in the BBUV, which would reduce the operational ROG emissions by 30 percent (resulting in a less than significant impact). Removal of one of the three commercial parking levels would result in an approximate additional 12 percent reduction in emissions. This project alternative, however, would not substantially lessen the project’s impacts to biological resources, cultural resources (archaeological resources), or hazardous materials (soil and groundwater quality). This project alternative would implement mitigation NVF:AXY:DJF
5/1/23

21 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
measures to reduce these above impacts to less than significant. This project alternative would reduce construction emissions, as the amount of soil required for excavation would be reduced by 35 percent (to 100,000 cubic yards of soil), resulting in fewer truck trips and less emissions; however, mitigation measures to reduce emissions would still be required, resulting in less than significant impacts.

C. Finding: This alternative would meet all of the project objectives and would reduce operational and construction ROG emissions; however, it would not substantially reduce any impacts to avoid the need for mitigation measures related to air quality, biological resources, cultural resources, hazards and hazardous materials, and noise. Reducing the number of parking spaces by 240 spaces in the commercial parking garage would reduce the parking ratio to two (2) spaces per 1,000 square feet. Although this alternative would not achieve the 20 percent VMT per capita reduction parking goal, the alternative would result in a lower VMT per capita than the proposed project (given that less parking spaces would result in less trips). While this alternative is considered an environmentally superior alternative, its rejected from further consideration as the viability of leasing commercial space with less parking is uncertain. Moreover, The reduction in parking incrementally reduces the degree of some impacts identified for the Project, but still requires the same mitigation measures. Therefore, this alternative is rejected from further consideration.

Environmentally Superior Alternative

The CEQA Guidelines mandate that an EIR identify an environmentally superior alternative if the project would result in one or more significant unavoidable impact. Based on the foregoing, the environmentally superior alternative is the No Project – No Development Alternative. When that is the case, the CEQA Guidelines require that an additional alternative be identified that is also an environmentally superior alternative. (Section 15126.6(e)(2).) The Reduced Parking Alternative is the environmentally superior alternative to the proposed project because it would reduce operation and construction ROG emissions and operational VMT and would support all of the project’s objectives.

MITIGATION MONITORING AND REPORTING PROGRAM

Attached to this Resolution as Exhibit “A” and incorporated and adopted as part of this Resolution herein is the Mitigation Monitoring and Reporting Program (MMRP) for the Project required under Section 21081.6 of the CEQA Statute and Section 15097(b) of the CEQA Guidelines. The MMRP identifies impacts of the Project, corresponding mitigation, designation of responsibility for mitigation implementation and the agency responsible for the monitoring action.

LOCATION AND CUSTODIAN OF RECORDS

NVF:AXY:DJF
5/1/23

22 T-52008.001 / 2017627_2
Council Agenda: 06/13/2023
Item No.: 10.2(a)
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

The documents and other materials that constitute the record of proceedings on which the City Council based the foregoing findings and approval of the Project are located at the Department of Planning, Building and Code Enforcement, 200 East Santa Clara Street, Third Floor Tower, San José, CA 95113.

ADOPTED this ____ day of _______, 2023, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

MATT MAHAN
Mayor
ATTEST:

TONI J. TABER, CMC
City Clerk

MITIGATION MONITORING AND REPORTING PROGRAM
Berryessa Road Mixed Use Development Project
File Nos. PDC18-036, ER20-260, PD21-009, and PT21-030
April 2023
Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule

AIR QUALITY
Impact AIR-1: Construction period emissions would exceed BAAQMD thresholds of 54 pounds per day for ROG exhaust by 21.25 pounds per day, during the final year of construction, which would result in a cumulatively considerable impact to regional ROG emissions.

MM-AIR-1.1: Prior to the issuance of any
demolition, grading and/or building permits (whichever
occurs first), the project applicant shall prepare a
construction equipment plan that includes
specifications of the equipment to be used during
construction. The plan shall be accompanied by a letter signed by a qualified air quality specialist, verifying that the equipment included in the plan meets the
standards set forth below:
• All
construction equipment larger than 25
horsepower used at the site for more than two
continuous days or 20 hours total shall meet
U.S. EPA Tier 4 emission standards for ROG,
NOx, and PM (PM10 and PM2.5), if feasible,
as confirmed by a qualified air quality
consultant and submitted to the City,
otherwise.
• If use of Tier 4 equipment is not available,
alternatively use equipment that meets U.S.

EPA emission standards for Tier 2 or 3
Prepare a construction
equipment plan
demonstrating that
construction equipment used
on-site would achieve a low
diesel particulate matter
exhaust and NOx emissions.

The construction equipment
plan shall be verified by a
qualified air quality
consultant and submitted to
the Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

All
measures shall be printed
on all construction
documents, contracts, and
project plans.

Construction
documents and
plans shall be
submitted for
review and approval
prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
first).

Const
ruction
equipment measures
shall be
implemented during
all phases of
construction.

Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the construction
equipment plan.

Ens
ure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs first).

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
engines and include particulate matter
emissions control equivalent to CARB Level
3 verifiable diesel emission control devices
that altogether achieve a 60 percent reduction
in particulate matter exhaust in comparison to
uncontrolled equipment; alternatively (or in
combination).
• Use
of alternatively fueled equipment with
lower emissions that meet the reduction
requirements above.

Prior
to issuance of any demolition, grading, and/or
building permits, whichever occurs first, the project
applicant shall submit a copy of the construction
equipment plan to the Director of Planning, Building
and Code Enforcement or Director’s designee, for
review and approval.

MM-AIR-1.2: Prior to the issuance of any
demolition, grading and/or building permits (whichever
occurs first), the project applicant shall prepare a
construction equipment plan that includes a description of the location of construction site signs to be posted restricting idling of diesel-operated equipment to two
minutes or less with clearly listed exceptions based on applicable state regulations. The project applicant shall submit the construction equipment plan to the Director
of Planning, Building and Code Enforcement or the
Director’s designee. Diesel engines, whether for off-
road equipment or on-road vehicles, shall not be left
Prepare a construction
equipment plan
demonstrating the location
of construction site signs to
be posted restricting idling
for more than two minutes
with clearly listed exceptions
based on applicable state
regulations.

All measures shall be printed
on all construction
Construction
documents and
plans shall be
submitted for
review and approval
prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
first).

Dire ctor of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the construction
equipment plan.

Ens
ure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs first).

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
idling for more than two minutes, except as provided in exceptions to the applicable state regulations (e.g.,
traffic conditions, safe operating conditions). The
construction sites shall have posted legible and visible signs in designated queuing areas to clearly notify
operators of idling limit.

P
rior to issuance of any demolition, grading, and/or
building permits, whichever occurs first, the project
applicant shall submit a copy of the construction
equipment plan to the Director of Planning, Building
and Code Enforcement or Director’s designee, for
review and approval.
documents, contracts, and
project plans.

Construction sign
measures shall be
implemented during
all phases of
construction.

MM-AIR-1.3: Prior to the issuance of any
demolition, grading and/or building permits (whichever
occurs first), the project applicant shall prepare
a
c
onstruction equipment plan that includes a description
of the electrical source of power that the powerline will connect to and identifies the approximate route of the
powerline through the construction site to the Director of
Planning, Building and Code Enforcement or the
Director’s designee. The line power to the site shall be provided during the early phases of construction to
minimize the use of diesel-powered stationary
equipment.

Prior to issuance of any demolition, grading, and/or
building permits, whichever occurs first, the project
applicant shall submit a copy of the construction
Prepare a construction
equipment plan shall
demonstrate the electrical
source of power that the
powerline will connect to
and the approximate route of
the powerline through the
construction site.

C
onstruction documents and
plans shall be submitted to
the Director of Planning,
Building and Code
Enforcement for review and
approval.

Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
first).

Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the construction
plan.

E
nsure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs first).

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
equipment plan to the Director of Planning, Building
and Code Enforcement or Director’s designee, for
review and approval.

MM-AIR-1.4: Prior to the issuance of any
demolition, grading, and/or building permits
(whichever occurs first), the project applicant shall
include a stipulation in the Declaration of Covenants,
Conditions, and Restrictions requiring the use of low
volatile organic compound or VOC (i.e., ROG
)
c
oatings that are below current BAAQMD
requirements (i.e., Regulation 8, Rule 3: Architectural Coatings), for at least 90 percent of all residential and nonresidential interior paints and 90percent of exterio r
p
aints. This includes all architectural coatings applied during both construction and reapplications throughout
the project’s operational lifetime. At least 90 percent of coatings applied must meet a “super-compliant" VO
C
s
tandard of less than 10 grams of VOC per liter of
paint. For reapplication of coatings during the project’s operational lifetime, the Declaration of Covenants,
Conditions, and Restrictions shall contain a stipulation for low VOC coatings to be used. Examples of “super-
compliant” coatings are contained in the South Coast
Air Quality Management District’s website.

Prior to the issuance of any demolition, grading, and/or building permits (whichever occurs first), the project
applicant shall submit all construction documents and
plans, including the Declaration of Covenants,
Conditions, and Restrictions, shall be submitted to the Include a stipulation in the
Declaration of Covenants,
Conditions, and Restrictions
to require low-VOC coatings
meeting “super-compliant”
standard based on
BAAQMD and as noted in
the mitigation measure in all
phases of the project.

C
onstruction documents and
plans, including the
Declaration of Covenants,
Conditions, and Restrictions,
shall be submitted to the
Director of Planning,
Building and Code
Enforcement, or the
Director’s designee for
review and approval.

A
ll measures shall be printed
on all construction
documents, contracts, and
project plans.

Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
first).

D irector of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the construction
plan.

E
nsure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Co
nfirm the
stipulation is
included in
Declaration of
Covenants,
Conditions, and
Restrictions.

Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs first).

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
Director of Planning, Building and Code Enforcement,
or the Director’s designee for review and approval

BIOLOGICAL RESOURCES
Impact BIO-1: Development of the proposed project and proposed tree removals would result in impacts to nesting birds, if present on the site at the time of construction.

MM BIO-1.1: Prior to the issuance of any tree
removal, demolition, or grading permits, the project
applicant shall schedule demolition and construction
activities to avoid the nesting season. The nesting
season for most birds, including most raptors in the
San Francisco Bay area, extends from February 1st
through August 31st, inclusive.

Avoid construction activities
during nesting seasons
(February 1 through August
31, inclusive).

A
ll measures shall be printed
on all construction
documents, contracts, and
project plans.

Prior to the issuance
of any tree removal,
demolition, or
grading permits.

Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

R
eview and approve
the pre-construction
survey report.

E
nsure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
tree removal,
demolition, or
grading permits
MM BIO-1.2: If demolition and construction cannot
be scheduled between September 1st and January 31st,
inclusive, pre-construction surveys for nesting birds
shall be completed by a qualified ornithologist to
ensure that no nests shall be disturbed during project
implementation. This survey shall be completed no
more than 14 days prior to the initiation of construction activities during the early part of the breeding season (February 1st through April 30th inclusive) and no
more than 30 days prior to the initiation of these
activities during the late part of the breeding season
(May 1st through August 31st inclusive). During this
Submit the ornithologist’s
report indicating the results
of the survey and any
designated buffer zones to
the City’s Director of
Planning, Building, and
Code Enforcement or the
Director’s designee.

P rior to the issuance
of any tree removal,
demolition, or
grading permits
Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

R eview and approve
the pre-construction
survey report.

E
nsure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
tree removal,
demolition, or
grading permits
Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
survey, the ornithologist shall inspect all trees and
other possible nesting habitats immediately adjacent to the construction areas for nests.

MM BIO-1.3: If an active nest is found sufficiently
close to work areas to be disturbed by construction, the ornithologist, in consultation with the California
Department of Fish and Wildlife, shall determine the
extent of a construction free buffer zone to be
established around the nest, typically 250 feet, to
ensure that raptor or migratory bird nests shall not be disturbed during project construction.

Submit the ornithologist’s
report indicating the results
of the survey and any
designated buffer zones to
the City’s Director of
Planning, Building and Code
Enforcement or the
Director’s designee.

P rior to the issuance
of any tree removal,
demolition, or
grading permits
Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

R eview and approve
the pre-construction
survey report.

E
nsure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
tree removal,
demolition, or
grading permits
MM BIO-1.4: Prior to any tree removal, or
approval of any grading or demolition permits
(whichever occurs first), the ornithologist shall submit a report indicating the results of the survey and any
designated buffer zones to the satisfaction of the City’s Director of Planning, Building and Code Enforcement
or Director’s designee.

Submit the ornithologist’s
report indicating the results
of the survey and any
designated buffer zones to
the City’s Director of
Planning, Building and Code
Enforcement or the
Director’s designee.

P rior to the issuance
of any tree removal,
demolition, or
grading permits
Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

R eview and approve
the pre-construction
survey report.

E
nsure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

P rior to the
issuance of any
tree removal,
demolition, or
grading permits
Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule

CULTURAL RESOURCES
Impact CUL-1: Subsurface archaeological resources could be encountered during project construction.

MM CUL-1.1: Prior to issuance of any grading
permits and prior to construction-related ground
disturbance, a qualified archaeologist in coordination
with a Native American Tribal Representative shall
complete mechanical presence/absence exploration to
explore for buried historical and Native American
resources. Subsurface exploration shall be completed
by an archaeologist trained in current California
methods for prehistoric and historic archaeological
resources. All crews and individuals who will be
moving any earth shall be cultural sensitivity trained.

Narrow, deep trenches shall be created to search for
Native American use of this site, and shallower, wide
trenches employed near the potentially sensitive
historic areas.

The results of the presence/absence exploration shall
be submitted to the Director of Planning, Building and
Code Enforcement or the Director’s designee and the
City’s Historic Preservation Officer for review and
approval prior to issuance of any grading permit. Based on the findings of the presence/absence exploration, an archaeological resources treatment plan (as described
in MM CUL-1.2) shall be prepared by a qualified
A subsurface exploration at
the site shall be completed,
by a qualified archaeologist
in consultation with Native
American representative,
prior to any excavation
activities. If any
archaeological resources are
exposed, these should be
briefly documented, tarped
for protection, and left in
place.

Prior to issuance of
any grading
permits.

Director of Planning,
Building and Code
Enforcement or the
Director’s designee.

C
ity of San José
Historic Preservation
Officer
Review and approve
documentation of a
mechanical
presence/absence
exploration and any
treatment
recommendations.

Prior to issuance
of any grading
permits.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
archaeologist in consultation with the Native American
Tribal representative, if necessary.

MM CUL-1.2: If required by MM CUL-1.1, the
project applicant, prior to issuance of any grading
permits, shall retain a qualified archaeologist to prepare a treatment plan in consultation with a Tribal
representative that reflects the permit-level detail
pertaining to depths and locations of all ground
disturbing activities. The treatment plan shall be
submitted to the Director of Planning, Building and
Code Enforcement or the Director’s designee and the
City’s Historic Preservation Officer prior to approval of any grading permits. The treatment plan shall contain,
at a minimum:
• I
dentification of the scope of work and range
of subsurface effects (including location map
and development plan), includi
ng
r
equirements for preliminary field
investigations.
• Description of the environmental setting (past
and present) and the historic/prehistoric
background of the parcel (potential range of
what might be found).
• Development of research questions and goals
to be addressed by the investigation (what is
significant vs. what is redundant information).
• Detailed field strategy to record, recover, or
avoid the finds and address research goals.

If any archaeological
resources are exposed,
prepare a treatment plan that
reflects permit-level detail
pertaining to depths and
locations of excavation
activities.

Prior to any
issuance of any
grading permits.

Director of Planning,
Building and Code
Enforcement or the
Director’s designee;
City of San José
Historic Preservation
Officer
Review and approve
the treatment plan.

Prior to issuance
of any grading
permits.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
• Analytical methods.
• Report structure and outline of document
contents.
• Disposition of the artifacts.
• Appendices: all site records, correspondence,
and consultation with Native Americans, etc.

I
mplementation of the plan, by a qualified
archaeologist, shall be required prior to the issuance of any grading permits. The treatment plan shall utilize
data recovery methods to reduce impacts to subsurface
resources. The project applicant shall submit copies of the treatment plan to the Director of Planning, Building and Code Enforcement or the Director’s designee.

MM CUL-1.3: Prior to issuance of any grading
permits, the project applicant shall report any
preliminary field investigation, grading, or other
construction activities findings to the Director of of
Planning, Building, and Code Enforcement or
Director’s designee. Any historic or prehistoric
material identified in the project area during the
preliminary field investigation and/or during
excavation activities shall be evaluated for eligibility for listing in the California Register of Historic
Resources as determined by the California Office of
Historic Preservation. The techniques used for data
recovery shall follow the protocols identified in the
approved treatment plan. All documentation and
recordation shall be submitted to the Northwest
Information Center and Native American Heritage
Evaluate any historic or
prehistoric material
identified in the project area
during the preliminary field
investigation and during
excavation activities for
eligibility for listing in the
California Register of
Historic Resources as
determined by the California
Office of Historic
Preservation.

During any
preliminary field
investigation,
grading, or other
construction
activities and prior
to the issuance of an
occupancy permit.

Director of Planning,
Building, and Code
Enforcement or
Director’s designee.

Ci
ty’s Historic
Preservation Officer,
Northwest
Information Center
and Native American
Heritage Commission
(NAHC) Sacred Land
Files.

Receive copies of all
documentation and
recordation of any
historic or
prehistoric material
identified in the
project area and data
recovery methods
and techniques.

During any
preliminary field
investigation,
grading, or other
construction
activities and
prior to the
issuance of an
occupancy
permit.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
Commission\ Sacred Land Files prior to the issuance of
an occupancy permit. A copy of the evaluation shall be
submitted to the Director of Planning, Building, and
Code Enforcement or Director’s designee, and the
Tribe.

HAZARDS AND HAZARDOUS MATERIALS
Impact HAZ-1: Residual concentrations of hazardous chemicals and metals including organochlorine pesticides and pesticide-related metals (in the southern portion of the site) from prior agricultural use, USTs and truck parking and storage at the site could expose construction workers, neighboring uses, and the environment to hazardous materials.

MM HAZ-1.1: Prior to the issuance of any
demolition or grading permits, the project applicant
shall enter into an agreement with the Santa Clara
County Department of Environmental Health’s
(SCCDEH’s) Site Cleanup Program to provide
regulatory oversight. The applicant shall meet with the SCCDEH and perform additional soil and groundwater
sampling and testing to adequately define the known
and suspected contamination. A Corrective
Action/Risk Management Plan (e.g., Remedial Action
Work Plan and/or Soil Management Plan) shall be
prepared and submitted to the agency for their approval to demonstrate that cleanup standards shall be met for
the development of the site. The Corrective
Action/Risk Management plan shall describe measures
necessary to protect the health and safety of
construction workers and future site occupants and
establish appropriate management practices for
handling and monitoring impacted soil, soil vapor and
groundwater that potentially may be encountered
during construction activities. The Correction
Coordinate with SCCDEH to
develop a Corrective
Action/Risk Management
Plan (CA/RMP).

S
ubmit the CA/RMP, as
applicable, to the City of San
José Environmental
Compliance Officer and
SCCDEH for review.

A
qualified environmental
professional shall complete
any further work required by
the SCCDEH.

A
ll measures shall be printed
on all construction
Prior to the issuance
of any grading or
demolition permits.

SCCDEH and City of
San José
Environmental
Compliance Officer
Receive a copy of
the CA/RMP.

E
nsure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

R
eview the
CA/RMP.

Prior to the
issuance of any
grading or
demolition
permits.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
Action/Risk Management Plan will also include
measures to prevent the discharge of contaminants
from dewatering. The dewatering system would be
designed so that the volume and duration of dewatering
are minimized to the greatest extent possible. All
measures identified in the plan(s) shall be implemented during all phases of construction, as applicable. The
Corrective Action/Risk Management Plan shall also
describe protocols for profiling of soil planned for off- site disposal. The plan shall be prepared by an
environmental professional and submitted to the
SCCDEH.
documents, contracts, and
project plans.

MM HAZ-1.2: Prior to the issuance of any
demolition or grading permits, a Health and Safety
Plan (HASP) shall be prepared to establish health and
safety protocols for construction workers at the site.

All measures identified in the plan(s) shall be
implemented during all phases of construction, as
applicable. The HASP shall be prepared by an
environmental professional and submitted to the
SCCDEH.

A qualified environmental
professional shall prepare a
HASP and submit it to the
SCCDEH.

A
ll measures shall be printed
on all construction
documents, contracts, and
project plans.

Prior to the issuance
of any demolition or
grading permits.

SCCDEH and City of
San José
Environmental
Compliance Officer
Receive a copy of
the HASP. Ensure
that all measures are
printed on all
construction
documents,
contracts, and
project plans.

P rior to the
issuance of any
grading permits.

MM HAZ-1.3: Prior to the issuance of any
demolition or grading permits, additional shallow soil
sampling shall be completed at the southern portion of
the site including areas near the existing industrial
buildings and former residence and outbuildings. The
site shall be sampled for organochlorine pesticides and associated metals (including lead and arsenic). The
A qualified environmental
professional shall complete
the soil sampling and submit
it to the SCCDEH and
submit SCCDEH’s approval
to the City of San José
Compliance officer.

P rior to the issuance
of any demolition or
grading permits.

SCCDEH and City of
San José
Environmental
Compliance Officer
Receive approval
from SCCDEH.

Ensure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
demolition or
grading permits.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
sampling shall be completed by an environmental
professional, under the oversight of SCCDEH.

All measures shall be printed
on all construction
documents, contracts, and
project plans.

Impact HAZ-2: Project construction could expose construction workers to potential total petroleum hydrocarbons (TPH) in the soil beneath the oil-water separator.

MM HAZ-2.1: Prior to the issuance of any grading
permits, upon removal of the site’s oil-water separator soil separator, soil underlying the separator shall be
evaluated for the presence of TPH, volatile organic
compounds (VOCs), and metals. The confirmation
sampling shall be completed by an environmental
professional following commonly accepted sampling
protocols which shall be coordinated with SCCDEH
and the City of San José Environmental Services
Department. The sampling data shall be provided to
SCCDEH, and approval shall be received prior to
issuance of any grading permits. If elevated
concentrations of these contaminants are discovered,
the project applicant shall notify the Director of
Planning, Building, and Code Enforcement or
Director’s Designee and the SCCDEH, prior to
issuance of a grading permit, and prepare a remedial
action plan in accordance with SCCDEH requirements.

The sampling, preparation of the remedial action plan,
and remediation shall be completed by an
Following the removal of the
oil-water separator, a
qualified environmental
professional shall
coordinate
with the San José Fire
Department and SCCDEH to
follow appropriate protocols
for sampling the soil for
contaminants.

S
ubmit findings to San José
Fire Department and
SCCDEH
P
rior to the issuance
of any grading
permits.

SCCDEH and City of
San José
Environmental
Services Department
Receive a copy of
the supplemental
sampling results or
analysis of existing
sampling results.

R
eview the
supplemental results
and/or analysis of
testing results.

Prior to the
issuance of any
grading permits.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
environmental professional, under the oversight of
SCCDEH.

NOISE AND VIBRATION
Impact NOI-1: Project construction would result in elevated noise levels of five dBA or more at nearby residences for a period exceeding 12 months.

MM NOI-1.1: Prior to the issuance of any
demolition or grading permits, an acoustic engineer
shall prepare and implement a construction noise
logistics plan, in accordance with General Plan Policy
EC-1.7. A typical construction noise logistics plan
includes, but is not limited to, the following measures to reduce construction noise levels:
• C
onstruction shall be limited to the hours of
7:00 AM to 7:00 PM Monday through Friday
f
or any on-site or off-site work within 500 feet
of any residential unit. Construction outside of
these hours may be approved through a
development permit based on a site-specific
“construction noise mitigation plan” and a
finding by the Director of Planning, Building,
and Code Enforcement that the construction
noise mitigation plan is adequate to prevent
noise disturbance of affected residential uses.
• The contractor shall use “new technology”
power construction equipment with state-of-
the-art noise shielding and muffling devices.

All internal combustion engines used on the
project site shall be equipped with adequate
Prepare and submit a
construction noise logistics
plan.

A
ll measures shall be printed
on all construction
documents, contracts, and
project plans.

Prior to issuance of
any demolition or
grading permits.

A
ll measures shall
be printed on all
measures shall be
printed on all
construction
documents,
contracts, and
project plans.

D irector of Planning,
Building and Code
Enforcement, or the
Director’s designee.

R eview and approve
the construction
noise logistics plan.

E
nsure that all
measures are printed
on all construction
documents,
contracts, and
project plans.

Prior to the
issuance of any
demolition or
grading permits.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
mufflers and shall be in good mechanical
condition to minimize noise created by faulty
or poorly maintained engines or other
components.
• The unnecessary idling of internal combustion
engines shall be prohibited.
• Staging areas and stationary noise-generating
e
quipment shall be located as far as possible
from noise-sensitive receptors such as
residential uses (a minimum of 200 feet).
• The surrounding neighborhood shall be
notified early and frequently of the
construction activities.
• A “noise disturbance coordinator” shall be
designated to respond to any local complaints
about construction noise. The disturbance
coordinator would determine the cause of the
noise complaints (e.g., beginning work too
early, bad muffler, etc.) and institute
reasonable measures warranted to correct th
e
pr
oblem. A telephone number for the
disturbance coordinator would be
conspicuously posted at the construction site.
• Implementation of a constriction noise
logistics plan, which would include th
e
f
ollowing measures:
o Utilize “quiet” models of air
compressors and other stationar
y
noi
se sources where technology
exists.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
o Equip all internal combustion
engine-driven equipment with
m
ufflers, which are in good
condition and appropriate for the
equipment.
o Construct temporary noise barriers,
where feasible, to screen stationary
noise-generating equipment whe
n
l
ocated within 200 feet of adjoining
se
nsitive land uses. Temporary noise
barrier fences would provide at least
a 5 dBA noise reduction if the noise
barrier interrupts the line-of-sight
between the noise source and
receptor and if the barrier is
constructed in a manner that
eliminates any cracks or gaps. A
typical temporary construction noise
barrier reaching 14 feet in height
shall be installed along the northern
a
nd western borders of the site to
provide up to 14 dBA of noise
reduction.
o If stationary noise-generating
e
quipment must be located near
receptors, adequate muffling of the
equipment (with enclosures where
feasible and appropriate) shall be
use
d. Any enclosure openings or
venting shall face away from
sensitive receptors.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
o Ensure that generators, compressors,
and pumps are housed in acoustical
enclosures.
o Locate cranes as far from adjoining
noi
se-sensitive receptors as possible.
o During final grading, substitute
graders for bulldozers, where
feasible. Wheeled heavy equipment
are quieter than track equipment an
d
s
hould be used where feasible.
o Substitute nail guns for manual
hammering, where feasible.
o Substitute electrically powered tools
for noisier pneumatic tools, where
feasible.
o The contractor shall prepare a
detailed construction plan identifying
the schedule for major noise-
generating construction activities.

The construction plan shall identify a
procedure for coordination wit
h
a
djacent residential land uses so that
construction activities can be
scheduled to minimize noise
disturbance.

Impact NOI-2: Noise from the project’s mechanical equipment could exceed 55 dBA DNL at sensitive residential noise-receptors near the project site.

MM NOI-2.1: Prior to the issuance of any
demolition or grading permits, the project applicant
shall select and design mechanical equipment and
generators to reduce excessive noise levels at the
Project applicant shall
provide the Director of
Planning, Building and Code
Enforcement or the
Prior to the issuance
of any demolition or
grading permits.

Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the proposed
mechanical
equipment.

Prior to the
issuance of any
demolition or
grading permits.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
nearby noise-sensitive land uses to meet the City’s 55
dBA DNL noise level requirement. A qualified
acoustical consultant shall be retained to review
mechanical noise as these systems are selected to
determine specific noise reduction measures necessary
to reduce noise to comply with the City’s Municipal
Code noise level requirements. Noise reduction
measures could include, but are not limited to,
selection of equipment that emits low noise levels and
installation of noise barriers, such as enclosures and
parapet walls, to block the line-of-sight between the
noise source and the nearest receptors. Other alternate measures may be optimal, such as locating equipment
in less noise-sensitive areas, such as along the building façades farthest from adjacent neighbors, where
feasible. The proposed mechanical equipment shall be
approved by the City’s Director of Planning, Building,
and Code Enforcement.

Director’s designee with a
list of mechanical equipment
and generators reviewed by a
qualified acoustical
consultant.

T
he list of approved
mechanical equipment and
generators shall be printed
on all construction
documents, and contracts.

The list of approved
mechanical
equipment and
generators shall be
printed on all
construction
documents, and
contracts.

Impact NOI-3: Vibration levels would have the potential to exceed San José’s General Plan guidelines at residential uses in the site vicinity (0.2 in/sec PPV) and could result in damage to nearby structures.

MM NOI-3.1: Prior to the issuance of any demolition
or grading permits, a qualified Professional Structural Engineer, licensed in the State of California, shall
prepare a construction vibration monitoring plan to
reduce construction-related vibration impacts by
below 0.2 in/sec PPV. The plan shall include, but is
not limited to, the following measures:

R
etain a licensed
Professional Structural
Engineer in the State of
California to prepare and
submit a construction
vibration monitoring plan
including all the measures
listed.

P
rior to the issuance
of any demolition or
grading permits.

T
he plan shall be
implemented during
construction.

Director of Planning,
Building and Code
Enforcement, or the
Director’s designee.

Review and approve
the construction
vibration monitoring
plan.

Ensure that all
measures are printed
on all construction
documents,
Prior to the
issuance of any
demolition or
grading permits.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
• Prohibit impact pile driving as a method of
construction within 125 feet of any
surrounding vibration-sensitive building.

Prohibit vibratory pile driving as a method of
construction within 85 feet of any surrounding
vibration-sensitive building. As an alternative,
drilled piles, which generate substantially
lower levels of vibration, may be used.
• Limit the use of vibratory rollers, hoe rams,
large bulldozers, and caisson drilling, and
avoid clam shovel drops within 20 feet of the
property lines shared with residences and
co
mmercial structures adjacent to the site.
• Place operating equipment on the construction
s
ite at least 30 feet from vibration-sensitive
receptors.
• Use a smaller vibratory roller, such as the
Caterpillar model CP433E vibratory
co
mpactor, when compacting materials within
30 feet of adjacent buildings. Only use the
statis compaction mode when compacting
m
aterials within 15 feet of buildings.
• Select demolition methods not involving
impact tools.
• Avoid dropping heavy objects or materials
within 30 feet of vibration sensitive locations.
• A list of all heavy construction equipment to
be used for this project known to produce high
vi
bration levels (tracked vehicles, vibratory
co
mpaction, jackhammers, hoe rams, etc.)
shall be submitted to the City by the
Implement a construction
vibration monitoring plan.

A
ll measures shall be printed
on all construction
documents, contracts, and
project plans.
contracts, and
project plans.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
contractor. This list shall be used to identify
equipment and activities that would
potentially generate substantial vibration and
to define the level of effort required for
continuous vibration monitoring.
• A construction vibration-monitoring plan shall
be implemented to document conditions at the
residences and commercial structures adjacent
to the site prior to, during, and after vibration
generating construction activities. All plan
tasks shall be undertaken under the direction
of a licensed Professional Structural Engineer
in the State of California and be in accordan
ce
w
ith industry accepted standard methods. The
construction vibration monitoring plan should
b
e implemented to include the following
tasks:
o Identification of sensitivity to
ground-borne vibration of the
residences and commercial structures
adjacent to the site. A vibration
survey would need to be performed.
o Performance of a photo survey,
elevation survey, and crack
monitoring survey for the residences
and commercial structures nearest to
the site. Surveys shall be performed
prior to and after completion of
vibration generating constructi
on
a
ctivities located within 20 feet of
the structure. This distance shall be
Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
extended to 80 feet for vibratory pile
driving and 120 feet for impact pile
driving. The surveys shall include
internal and external crack
monitoring in the structure,
settlement, and distress, and shall
document the condition of the
foundation, walls, and other
structural elements in the interior and
exterior of the structure.
o Conduct a post-survey on the
structure where either monitoring has
indicated high levels or complaints
of damage. Make appropriate repairs
where damage has occurred as
a
r
esult of construction activities.
o The results of any vibration
m
onitoring shall be summarized and
submitted in a report shortly after
s
ubstantial completion of each phase
identified I the project schedule. The
re
port shall include a description of
measurement methods, equipment
used, calibration certificates, and
graphics as required to clearly
identify vibration-monitoring
locations. An explanation of all
events that exceeded vibration limits
shall be included together with
proper documentation supporting an
y
such claims.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

MITIGATIONS

MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
Or Mitigation Action
Timing of
Compliance
Oversight
Responsibility Actions/Reports
Monitoring
Timing or
Schedule
o Designate a person responsible for
registering and investigating claims
of excessive vibration. The contact
information of such person shall be
clearly posted on the construction
s
ite.

Implementation of the construction vibration
monitoring plan shall occur during construction
activities to reduce vibration levels below 0.2 in/sec
PPV.

P
rior to the issuance of any demolition or grading
permits, the project applicant shall submit the
construction vibration monitoring plan to the Director
of Planning, Building and Code Enforcement or
Director’s designee for review and approval.

S
ource: City of San José. Berryessa Mixed Use Development Project Environmental Impact Report. April 26, 2023.

Exhibit "A"
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.