Form Name: Amendment to Master Consultant Agreement – RWF Capital Projects Page: 1 of 4 Form/File No.: T-40716\2059975
City Attorney Approval Date: February 2023
First Amendment to Master Consultant Agreement – RWF Capital Projects
Consultants Name: Consolidated Engineering Laboratories
(CPMS Contract No. 8753-3)
(Master Agreement AC No. 29374)
Second
Third
This Amendment to the Master Agreement is made and entered into this ___day of__________. The City and the Consultant amend the above-referenced agreement as set forth herein.
1. Capitalized words in this Amendment have the same meaning as in the Master Agreement.
2. The provisions of this Master Agreement (including any previous amendments) not modified by this Amendment remain in full force and effect.
3. The provisions of this Amendment are effective upon execution of the Amendment by both parties.
4. Agreement Term: Section 2 is amended to extend the expiration date from ____ 12/31/2023___ to ____12/31/2026___.
5. Maximum Total Compensation: Subsection 10.1 is amended to Increase Decrease the Maximum Total Compensation from $___________________ to $___________________.
6. Agreement Section(s): Section(s) _____2______ is/are amended to read as set forth in Attachment A of the Amendment.
7. Basis of Compensation – Exhibit B: The original First Revised Second Revised Exhibit B is amended to read as set forth in the attached First Second Third Revised Exhibit B, which is incorporated by reference into this Amendment.
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
CPMS Contract No. 8753-3
Master Agreement AC No. 29374
Consultant: Consolidated Engineering Laboratories
Form Name: Amendment to Master Consultant Agreement (Capital Projects) Form/File No.: T-40716\2059975
City Attorney Approval Date: October 2015
Page: 2 of 4
This Amendment is executed by the authorized representatives of the City and Consultant as follows:
City of San José
By
Name: Toni J. Taber
Title: City Clerk
Consultant
By
Name: Gary M. Cappa
Title: President/CEO
Approval as to Form (City Attorney):
Form Approved by the Office of the City Attorney.
(Maximum Total Compensation, as amended, is $100,000 or less, and the provisions of the form are not altered.)
Approved as to Form:
By:
Name: Rosalía Burgueño Tapia
Title: Sr. Deputy City Attorney
By
Name: Charlie Brice
Title: CFO
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
CPMS Contract No. 8753-3
Master Agreement AC No. 29374
Consultant: Consolidated Engineering Laboratories
Form Name: Amendment to Master Consultant Agreement – RWF Capital Projects Page: 3 of 4 Attachment A: Agreement Provisions Amendment
Form/File No.: .T-40716\2059975
City Attorney Approval Date: February 2023
First
Attachment A
Agreement Provision Amendment(s)
Second
Third
This Attachment A is an attachment to the First Second Third amendment to Master Agreement.
The Section(s) set forth in the original Master Agreement, or in any previous amendment to the original Master Agreement, is/are amended as follows:
2. Agreement Term
The term of this master agreement is from the contract date to December 31, 2026, inclusive, unless terminated earlier pursuant to Section 19 below.
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
CPMS Contract No. 8753-3
Master Agreement AC No. 29374
Consultant: Consolidated Engineering Laboratories
Form Name: Amendment to Master Consultant Agreement – RWF Capital Projects Page: 4 of 4 Revised Exhibit B: Basis of Compensation
Form/File No.: T-40716\2059975
City Attorney Approval Date: February 2023
First
Revised Exhibit B: Basis of Compensation Second
Third
This revised Exhibit B is an attachment to the First Second Third amendment to Master Agreement.
The basis of compensation set forth in the original Exhibit B, or in any previous amendment to the original Exhibit B, is amended as follows:
Effective January 1, 2024: Hourly rates for field inspections increased. Rate increases are aligned with prevailing wage increases for 2024, 2025, and 2026. See updated fee schedule on following pages.
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
ENGINEERING SERVICES UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Principal/Principal Engineer 206.00$ hour 212.18$ hour 218.55$ hour Geotechnical Engineer 185.40$ hour 190.96$ hour 196.69$ hour Senior Engineer 185.40$ hour 190.96$ hour 196.69$ hour Project Engineer/Geologist 154.50$ hour 159.14$ hour 163.91$ hour Staff Engineer/Project Manager 133.90$ hour 137.92$ hour 142.05$ hour Assistant Engineer 123.60$ hour 127.31$ hour 131.13$ hour Safety Manager 154.50$ hour 159.14$ hour 163.91$ hour Field Supervisor 123.60$ hour 127.31$ hour 131.13$ hour Safety Confined Space Extraction & Rescue (2 Person Crew) 252.35$ hour 259.92$ hour 267.72$ hour
INSPECTION SERVICES UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT ICC/AWS Inspector with NDT Equipment 105.58$ hour 108.74$ hour 112.00$ hour ICC/AWS Inspector (Visual Only) 100.94$ hour 103.97$ hour 107.09$ hour ICC Certified Inspector (Special Inspector) 100.94$ hour 103.97$ hour 107.09$ hour Proofload Testing/Anchor Installation Inspector 100.94$ hour 103.97$ hour 107.09$ hour Waterproofing 100.94$ hour 103.97$ hour 107.09$ hour Mechanical 105.06$ hour 108.21$ hour 111.46$ hour Electrical 108.15$ hour 111.39$ hour 114.74$ hour Plumbing Inspector 108.15$ hour 111.39$ hour 114.74$ hour Smoke Control & Systems 100.94$ hour 103.97$ hour 107.09$ hour OSHPD IFC Premier Certified Firestop Inspector 113.30$ hour 116.70$ hour 120.20$ hour Soils Inspector with Nuclear Gauge 100.94$ hour 103.97$ hour 107.09$ hour
SPECIALIZED SERVICES UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Pachometer 113.30$ hour 116.70$ hour 120.20$ hour In-Place Brick Shear Tests (Masonry) - Two-Person Crew (4-hour minimum) 200.85$ hour 206.88$ hour 213.08$ hour Ground Penetrating Radar (GPR)
- One Man Crew 200.85$ hour 206.88$ hour 213.08$ hour - Two Man Crew 298.70$ hour 307.66$ hour 316.89$ hour Floor Flatness Testing:
- Surveying/Inspection 164.80$ hour 169.74$ hour 174.84$ hour Phased Array Technician 128.75$ hour 132.61$ hour 136.59$ hour Profileograph Technician 128.75$ hour 132.61$ hour 136.59$ hour Profileograph Equipment
CORING SERVICES UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Coring Machine Operator 139.05$ hour 143.22$ hour 147.52$ hour Helper (add per hour) 92.70$ hour 95.48$ hour 98.35$ hour Diamond Drill Bit Charges, per inch to 5" 6.18$ inch 6.37$ inch 6.56$ inch Diamond Drill Bit Charges, per inch 6" and over
CONCRETE UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT
Concrete Mix Design Review 257.50$ each 265.23$ each 273.18$ each Trial Batches, Prepared in Laboratory C192 927.00$ each 954.81$ each 983.45$ each Length Change of Concrete (Shrinkage), set of 3, ASTM C157, CT 530 432.60$ each 445.58$ each 458.95$ each Compression, 6X12 Cylinders, ASTM C 39, CT 521 36.05$ each 37.13$ each 38.25$ each Compression 4x8 Cylinders ASTM C 39 36.05$ each 37.13$ each 38.25$ each Compression, Core (including end preparation), ASTM C 42 103.00$ each 106.09$ each 109.27$ each Compression, 3X6 Cylinders Lightweight Insulating Concrete, ASTM C 495 66.95$ each 68.96$ each 71.03$ each Grout Compression, 2X2 Cubes, each age, ASTM C 109 51.50$ each 53.05$ each 54.64$ each Epoxy Grout 2x2 Cube Compression ASTM C 579 36.05$ each 37.13$ each 38.25$ each Cylinders, Stored 60 days (hold cylinders) 36.05$ each 37.13$ each 38.25$ each Splitting TensileStrength, 6X12 Cylinders, ASTM C 496 129.78$ each 133.67$ each 137.68$ each Unit Weight of Concrete Cylinders, ASTM C 567 86.52$ each 89.12$ each 91.79$ each Unit Weight of Lightweight Insulating Concrete, ASTM C 495 86.52$ each 89.12$ each 91.79$ each Compression Test of Lightweight Insulating Concrete, ASTM C 495 86.52$ each 89.12$ each 91.79$ each Flexural Strength of Concrete, ASTM C 78 205.49$ each 211.65$ each 218.00$ each Shotcrete Pre-Production Panel Evaluation, Up to 12" Thick 1,236.00$ each 1,273.08$ each 1,311.27$ each Shotcrete Pre-Production Panel Evaluation, 12" to 24" Thick 1,854.00$ each 1,909.62$ each 1,966.91$ each 2024 2025 2026
SAN JOSE - SANTA CLARA REGIONAL WASTE WATER FACILITIES CAPITAL IMPROVEMENTS - ESD #8753 2024 PUBLISHED FEE SCHEDULE
CONSTRUCTION INSPECTION AND MATERIALS TESTING
Effective January 1, 2024 through December 31, 2026
Quotation on Request
Quotation on Request
Quotation on Request
Quotation on RequestQuotation on Request
Quotation on Request
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 2024 2025 2026
SAN JOSE - SANTA CLARA REGIONAL WASTE WATER FACILITIES CAPITAL IMPROVEMENTS - ESD #8753 2024 PUBLISHED FEE SCHEDULE
CONSTRUCTION INSPECTION AND MATERIALS TESTING
Effective January 1, 2024 through December 31, 2026
Shotcrete Panel Core Compression Test, ASTM C 42 113.30$ each 116.70$ each 120.20$ each Chloride Ion Content, AASHTO T260 216.30$ each 222.79$ each 229.47$ each
SOIL MECHANICS UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Moisture/Density Curve
Standard Proctor ASTM D 698 309.00$ each 318.27$ each 327.82$ each Modified Proctor ASTM D 1557 309.00$ each 318.27$ each 327.82$ each Checkpoint (ASTM or Caltrans) 149.35$ each 153.83$ each 158.45$ each California Impact, CT 216 319.30$ each 328.88$ each 338.75$ each Rock Correction for Oversize Material, ASTM D4718/CT216 103.00$ each 106.09$ each 109.27$ each Sieve Analysis
Bulk Sample Gradation, ASTM C 136/C117/CT202 185.40$ each 190.96$ each 196.69$ each Material Finer than #200 Sieve, ASTM C 117 97.85$ each 100.79$ each 103.81$ each Soil Mechanics
“R” Value, ASTM D 2844/CT 301 412.00$ each 424.36$ each 437.09$ each Sand Equivalent, ASTM D 2419/CT 217 113.30$ each 116.70$ each 120.20$ each Liquid Limit, Plastic Limit, & P.I. Atterberg Limits ASTM D4318 154.50$ each 159.14$ each 163.91$ each California Bearing Ratio, 1 pt. (ASTM D1883) 257.50$ each 265.23$ each 273.18$ each California Bearing Ratio, 3 pt. (ASTM D1883) 721.00$ each 742.63$ each 764.91$ each California Bearing Ratio, 3 pt. (ASTM D1883) w/ 96 hour soak 824.00$ each 848.72$ each 874.18$ each Moisture-Density Sample Tubes ASTM D2937 66.95$ each 68.96$ each 71.03$ each
AGGREGATES UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Sieve Analysis, Bulk Sample Gradation (Coarse & Fine), ASTM C136/C117/CT202 185.40$ each 190.96$ each 196.69$ each Sieve Analysis, Material Finer than #200 Sieve, ASTM C 117/CT202 87.55$ each 90.18$ each 92.88$ each Sieve Analysis, Coarse Agg (3" to #4), ASTM C136/CT202 164.80$ each 169.74$ each 174.84$ each Sieve Analysis, Fine Agg (#4 to #200), ASTM C136/CT202 164.80$ each 169.74$ each 174.84$ each Specific Gravity (Coarse), ASTM C 127/CT 206 133.90$ each 137.92$ each 142.05$ each Specific Gravity (Fine), ASTM C 128/CT 207 154.50$ each 159.14$ each 163.91$ each Absorption, Coarse Agg or Fine Agg , ASTM C 127/ASTM C 128 103.00$ each 106.09$ each 109.27$ each Organic Impurities in Concrete Sand, ASTM C 40/ CT213 103.00$ each 106.09$ each 109.27$ each L.A. Rattler, ASTM C 131 or C535/CT 211 (500 rev) 257.50$ each 265.23$ each 273.18$ each Clay Lumps & Friable Particles ASTM C142 154.50$ each 159.14$ each 163.91$ each Fractured Particles in Coarse Agg ASTM D5821 169.95$ each 175.05$ each 180.30$ each Lightweight Particles in Aggregate ASTM C123 133.90$ each 137.92$ each 142.05$ each Staining of Lightweight Aggregate ASTM C641 257.50$ each 265.23$ each 273.18$ each Sulfate Soundness (per sieve size), ASTM C 88 128.75$ each 132.61$ each 136.59$ each Unit Weight of Aggregates, ASTM C 29 103.00$ each 106.09$ each 109.27$ each % Crushed Particles, CT 205 257.50$ each 265.23$ each 273.18$ each Cleanness Value, CT 227 154.50$ each 159.14$ each 163.91$ each Sand Equivalent, ASTM D 2419/CT 217 133.90$ each 137.92$ each 142.05$ each Durability Index (Coarse or Fine Agg) ASTM D 3744/CT 229 185.40$ each 190.96$ each 196.69$ each Moisture Content of Aggregate ASTM C566 51.50$ each 53.05$ each 54.64$ each Potential Alkali Reactivity of Aggregates ASTM C1260 978.50$ each 1,007.86$ each 1,038.09$ each C33 Coarse Aggregate Qualification Testing (ASTM C33) 3,090.00$ each 3,182.70$ each 3,278.18$ each C33 Fine Aggregate Qualification Testing (ASTM C33) 2,781.00$ each 2,864.43$ each 2,950.36$ each
HOT MIX ASPHALT (HMA) UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Bulk Sp. Gravity of Compacted HMA (Plant Mix) ASTM D2726/ CT 304, CT308 103.00$ each 106.09$ each 109.27$ each Bulk Sp. Gravity of Compacted HMA (Lab Mix) ASTM D2726/ CT 304, CT308 97.85$ each 100.79$ each 103.81$ each Theoretical Max Spec. Gravity (Rice Density) ASTM D2041/ CT 309 169.95$ each 175.05$ each 180.30$ each Stabilometer Value including Compaction, ASTM D1560/ CT 366, per point 169.95$ each 175.05$ each 180.30$ each Asphalt Content (Ignition Oven Method) ASTM D 6307/ CT382 154.50$ each 159.14$ each 163.91$ each Ignition Oven Calibration Factor ASTM D6307/ CT382 278.10$ each 286.44$ each 295.04$ each Asphalt Content (Solvent Extraction Method) ASTM D2172 257.50$ each 265.23$ each 273.18$ each Sieve Analysis of Extracted Aggregate, ASTM D5444/CT 202 175.10$ each 180.35$ each 185.76$ each Caltrans Complete HMA Tests (Rice or BSG, S-Value, Ignition, Extracted Gradation) 978.50$ each 1,007.86$ each 1,038.09$ each Marshall Compaction (Lab Mix), set of 3, ASTM D 6926 396.55$ each 408.45$ each 420.70$ each Marshall Compaction (Plant Mix), set of 3, ASTM D 6926 278.10$ each 286.44$ each 295.04$ each
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 2024 2025 2026
SAN JOSE - SANTA CLARA REGIONAL WASTE WATER FACILITIES CAPITAL IMPROVEMENTS - ESD #8753 2024 PUBLISHED FEE SCHEDULE
CONSTRUCTION INSPECTION AND MATERIALS TESTING
Effective January 1, 2024 through December 31, 2026
Marshall Flow and Stability, per point, ASTM D 6926 87.55$ each 90.18$ each 92.88$ each Effect of Moisture on AC (Tensile Strength Ratio) ASTM D4867/ CT 371 1,854.00$ each 1,909.62$ each 1,966.91$ each Swell of Bituminous Mixtures, CT 304/305 231.75$ each 238.70$ each 245.86$ each
ASPHALTIC CEMENT UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Penetration of Bituminous Materials at 77°F, ASTM D5/AASHTO T49 73.13$ each 75.32$ each 77.58$ each Penetration of Bituminous Materials at 32°F to 158°F, ASTM D 5/AASHTO T49 108.15$ each 111.39$ each 114.74$ each Kinematic Viscosity of Asphalt, ASTM D 2170/AASHTO T201 175.10$ each 180.35$ each 185.76$ each Absolute Viscosity of Asphalt, ASTM D2170/AASHTO T201 175.10$ each 180.35$ each 185.76$ each Viscosity (Asphalt Institute Method) 200.85$ each 206.88$ each 213.08$ each Rolling Thin Film Test, ASTM 2872/Cal 346/AASHTO T240 185.40$ each 190.96$ each 196.69$ each Residue by Evaporation, ASTM D244/AASHTO T59 226.60$ each 233.40$ each 240.40$ each Extraction and Recovery, ASTM D2172/ASTM D 1856 875.50$ each 901.77$ each 928.82$ each
MASONRY UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT
Concrete Blocks
Compression, Gross Area, ASTM C 140 118.97$ each 122.53$ each 126.21$ each Compression, Gross Area, Unusual Shape, ASTM C 67 118.97$ each 122.53$ each 126.21$ each Compression, Net Area, ASTM C 140 108.15$ each 111.39$ each 114.74$ each Absorption and Moisture, ASTM C 140 162.23$ each 167.09$ each 172.10$ each Linear Shrinkage ASTM C 426 173.04$ each 178.23$ each 183.58$ each Dimensional Measurement of Masonry Units ASTM C 140 70.30$ each 72.41$ each 74.58$ each Bricks
Absorption, with saturation Coefficient, ASTM C 67 118.97$ each 122.53$ each 126.21$ each Compression, ASTM C 67 91.93$ each 94.69$ each 97.53$ each Modulus of Rupture, ASTM C 67 43.26$ each 44.56$ each 45.89$ each Grout
Compression, Grout Prisms, ASTM C 1019 66.95$ each 68.96$ each 71.03$ each Compression, Mortar Cylinders, ASTM C 780 56.65$ each 58.35$ each 60.10$ each Compression, Composite Prisms, ASTM C 1314 164.80$ each 169.74$ each 174.84$ each Compression, Masonry Core, ASTM C 140 108.15$ each 111.39$ each 114.74$ each Shear, Masonry Core, CCR Title 24 123.60$ each 127.31$ each 131.13$ each REINFORCING STEEL - ASTM A 615/A706 UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Tensile Strength and Bend Test
Samples, Size #3 - #10 97.85$ each 100.79$ each 103.81$ each Samples, Size #11 118.45$ each 122.00$ each 125.66$ each Samples, Size #14 216.30$ each 222.79$ each 229.47$ each Samples, Size #18 (Full Section) 489.25$ each 503.93$ each 519.05$ each PRESTRESSING STEEL - ASTM A 416 UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Uncoated 7 Wire Strand, 1/4" to 1/2"
Yield Strength, Breaking Strength, and Elongation (Note: for Vinyl Coated Strands, 309.00$ each 318.27$ each 327.82$ each (add $ 45.00 per test; for Modulus of Elasticity, add $ 45.00 per test) Breaking Strength Only 200.85$ each 206.88$ each 213.08$ each STRUCTURAL STEEL (mild steel not over one inch thick) UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Tensile Strength, ASTM A 370 (test only)
Samples, Under 1-1/2 square inch in cross section 146.00$ each 150.38$ each 154.89$ each Samples, 1-1/2 square inch and over in cross section 200.08$ each 206.08$ each 212.26$ each Chemical Analysis 216.30$ each 222.79$ each 229.47$ each Bending 91.93$ each 94.69$ each 97.53$ each Anchor Bolts, ASTM F1554, tensile 216.30$ each 222.79$ each 229.47$ each High Strength Bolts, Nuts, and Washers, ASTM A 325, A 490, A 449 Bolt Assembly Test 281.19$ each 289.63$ each 298.31$ each Bolts Proof Load and Ultimate 118.97$ each 122.53$ each 126.21$ each Nuts Proof Load 64.89$ each 66.84$ each 68.84$ each Hardness (Rockwell) 32.45$ each 33.42$ each 34.42$ each WELDMENT TESTING (mild steel not over one inch thick) UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Transverse Tensile 139.05$ each 143.22$ each 147.52$ each Transverse Side Bend 103.00$ each 106.09$ each 109.27$ each
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 2024 2025 2026
SAN JOSE - SANTA CLARA REGIONAL WASTE WATER FACILITIES CAPITAL IMPROVEMENTS - ESD #8753 2024 PUBLISHED FEE SCHEDULE
CONSTRUCTION INSPECTION AND MATERIALS TESTING
Effective January 1, 2024 through December 31, 2026
Transverse Root and Face Bend 103.00$ each 106.09$ each 109.27$ each Macroetch 103.00$ each 106.09$ each 109.27$ each
0.505" Tensile Specimen 139.05$ each 143.22$ each 147.52$ each Charpy V-Notch Specimen
Preparation of WPS, PQR, or Welder Certificate 128.75$ each 132.61$ each 136.59$ each
NONDESTRUCTIVE TESTING UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Radiography
Radiographic Testing-Weld Procedure Qualification (physical testing not included) 566.50$ each 583.50$ each 601.00$ each Consultation 133.90$ hour 137.92$ hour 142.05$ hour One-Person Crew 133.90$ hour 137.92$ hour 142.05$ hour Film 20.60$ each 21.22$ each 21.85$ each Magnetic Particle Level III (ASNT) 133.90$ hour 137.92$ hour 142.05$ hour Magnetic Particle Level II (ASNT) 105.58$ hour 108.74$ hour 112.00$ hour Ultrasonic Level III (ASNT) 133.90$ hour 137.92$ hour 142.05$ hour Ultrasonic Level II (ASNT) 110.73$ hour 114.05$ hour 117.47$ hour Dye Penetrant Level III (ASNT) 133.90$ hour 137.92$ hour 142.05$ hour Dye Penetrant Level II (ASNT) 105.58$ hour 108.74$ hour 112.00$ hour
ROOFING UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT
Ply Count and Asphalt by Difference, ASTM D 2829 154.50$ each 159.14$ each 163.91$ each Weight Analysis, ASTM D 2829 82.40$ each 84.87$ each 87.42$ each
FIREPROOFING UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Density of Sprayed on Fireproofing, ASTM E 605/UBC 43-8 77.25$ each 79.57$ each 81.95$ each Cohesion/Adhesion, ASTM E 736 77.25$ each 79.57$ each 81.95$ each
FIRE/LIFE SAFETY SYSTEMS UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Fire/Life Safety Systems Inspection 111.24$ hour 114.58$ hour 118.01$ hour Mechanical Engineer 252.35$ hour 259.92$ hour 267.72$ hour Staff Engineer 185.40$ hour 190.96$ hour 196.69$ hour Final Affidavit (Request 6 Working Days Advance Notice) 515.00$ each 530.45$ each 546.36$ each
GEOTEXTILE FABRIC UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Tensile Strength by Grab Method 381.10$ each 392.53$ each 404.31$ each Puncture Resistance, Index, ASTM D 4833 261.62$ each 269.47$ each 277.55$ each Trapezoidal Tear 289.43$ each 298.11$ each 307.06$ each Mass Per Unit Area, ASTM D 3776 193.64$ each 199.45$ each 205.43$ each Simulated Asphalt Retention, ASTM D 4830 476.89$ each 491.20$ each 505.93$ each Unit Weight Analysis, ASTM S 2329 82.40$ each 84.87$ each 87.42$ each Ply Count and Void Analysis, ASTM D 2329 154.50$ each 159.14$ each 163.91$ each
CEMENT UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT
Storage of Grab Sample, 60 days 22.66$ each 23.34$ each 24.04$ each Cement Content of Hardened Concrete, ASTM C 1084 2,533.80$ each 2,609.81$ each 2,688.11$ each
GFRC PANEL TEST UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Flexural Testing, per P.C.I Recommended Practice 73.13$ each 75.32$ each 77.58$ each Pullout Testing of Anchors, per P.C.I. Recommended Practice 119.48$ each 123.06$ each 126.76$ each Fiberwrap Testing (ASTM D3039) 628.30$ set 647.15$ set 666.56$ set
SPECIALTY GEOTECHNICAL TESTING UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Sieve Analysis, Minus #200 by Wash ASTM D1140 82.40$ each 84.87$ each 87.42$ each Consolidation (ASTM D2435, D4546) 185.40$ each 190.96$ each 196.69$ each Time-Consolidation (ASTM D2435) 82.40$ each 84.87$ each 87.42$ each Collapse/Swell (ASTM D4546) 97.85$ each 100.79$ each 103.81$ each Unconfined Compressive Strength (ASTM D2166) 113.30$ each 116.70$ each 120.20$ each Direct Shear (3 pt.) 1,030.00$ each 1,060.90$ each 1,092.73$ each California Bearing Ratio, 1 pt. (ASTM D1883) 257.50$ each 265.23$ each 273.18$ each California Bearing Ratio, 3 pt. (ASTM D1883) 618.00$ each 636.54$ each 655.64$ each Water Soluble Sulfate 57.68$ each 59.41$ each 61.19$ each pH (ASTM D4972) 77.25$ each 79.57$ each 81.95$ each Lab Resistivity 95.79$ each 98.66$ each 101.62$ each Quotation on RequestQuotation on RequestQuotation on Request
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 2024 2025 2026
SAN JOSE - SANTA CLARA REGIONAL WASTE WATER FACILITIES CAPITAL IMPROVEMENTS - ESD #8753 2024 PUBLISHED FEE SCHEDULE
CONSTRUCTION INSPECTION AND MATERIALS TESTING
Effective January 1, 2024 through December 31, 2026
MISCELLANEOUS GEOTECHNICAL CHARGES UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT All Other Direct Project Expenses
Clerical Services 80.34$ hour 82.75$ hour 85.23$ hour
MISCELLANEOUS TESTS & INSPECTIONS UNIT RATE UNIT UNIT RATE UNIT UNIT RATE UNIT Calibration of Hydraulic Rams 257.50$ each 265.23$ each 273.18$ each Universal Testing Machine with Technician 283.25$ hour 291.75$ hour 300.50$ hour Instron Testing Machine with Technician 283.25$ hour 291.75$ hour 300.50$ hour Windsor Test Probes 406.85$ each 419.06$ each 431.63$ each Weld Procedure Review 257.50$ each 265.23$ each 273.18$ each Expert Witness 3,090.00$ day 3,182.70$ day 3,278.18$ day
BASIS OF CHARGES
Work from 0 to 4 Hours
Work from 4 to 8 Hours
Show-Up Time
Sample Pick-Up 77.25$ trip 79.57$ trip 81.95$ trip Technician with Nuclear Gauge
Final Affidavit per each Applicable Permit (Request 6 working days in advance) 412.00$ each 424.36$ each 437.09$ each Extra Copies (Over 4 per Issue Date) of Inspection Reports and Final Affidavit 20.60$ each 21.22$ each 21.85$ each Reports on CD 154.50$ each 159.14$ each 163.91$ each Project Engineering and Management/Admin Fee
Reimbursables (refer to MCA 10.2.3 Client Limits)
QA/QC Plan Written Procedures 2,987.00$ each 3,076.61$ each 3,168.91$ each Out of Area Services - Mileage and travel related expenses must conform to MCA
10.5.3 Travel Time (100 miles outside of city limits)
Mileage
Per-diem, Including Lodging
Outside Consultants
Work Over 8 Hours per Day
Work Over 12 Hours, Monday through Friday
Work on Saturdays
Work Over 8 Hours on Saturday
Work on Sundays/Holidays
Swing or Graveyard Shift Premium
Per MCA 10.2.3: In case of a discrepancy between Schedule of Rates and Charges and MCA, the MCA governs.
Additional $10.00 per hour
Time and One-Half
Double Time
Time and One-Half
Double Time
Double Time
Additional $10.00 per hour
per MCA Section 10
4-Hour Minimum Billing
8-Hour Minimum Billing
2-Hour Minimum Billing
Portal-to-Portal
8% of Fees
per MCA
As Listed Below:
per MCA
per MCA
per MCA
per MCA
Time and One-Half
Double Time
Time and One-Half
Double Time
Double Time
As Listed Below:
per MCA
per MCA
per MCA
per MCA
8-Hour Minimum Billing
2-Hour Minimum Billing
Portal-to-Portal
8% of Fees
per MCA
per MCA Section 10
4-Hour Minimum Billing
Double Time
Additional $10.00 per hour
per MCA
Time and One-Half
Double Time
Time and One-Half
Double Time
per MCA
As Listed Below:
per MCA
per MCA
per MCA
Portal-to-Portal
per MCA Section 10
8% of Fees
Per amended Premium Pay allowance as noted in 10.2.1.
4-Hour Minimum Billing
8-Hour Minimum Billing
2-Hour Minimum Billing
The proposed unit rates will be in effect through December 31, 2026 per City of San Jose MCA 10.2.2.
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.