Cities Index.
Public Comments

Transportation and Environment Committee (t&e)
September 9, 2024

Document
Public Comments
Meeting
September 9, 2024
Body
Transportation and Environment Committee (t&e)
Original file
301 KB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

[External Email]
From:

To:

Cc:

Subject:

Date:

TEPublicComment
Smith, Ryan; Laveroni, Kyle
From BPAC a Public Comment Item (d)(2) King Road Sept Ninth T&E Committee Meeting Monday, September 9, 2024 7:51:52 AM
(d) Reports to Committee

2. CC 24-378 King Road Complete Streets Plan Status Report Good afternoon, My name is Diane Solomon. I’m here on behalf of your Bicycle and Pedestrian Advisory Committee.

Your BPAC received a report and presentation from staff on this project at our January 29th meeting. Our BPAC supports the King road complete streets project. In February our letter of support accompanied our City’s application for funding to the United States Department of Transportation, to help pay for this project.

On January 29th we were told of the many elements of this project. Staff told us that to reduce speeds and increase traffic safety, King Road’s traffic lanes would be reduced, .

We whole-heartedly support this; however, we were shown two design concepts. One design concept had a dedicated bus lane and a separated bike lane, which we support.

Slide six of their January 29th slide deck presentation (which differs from today’s slide deck found online) proposes a quote “Peak period shared bus and bike lane” unquote. Staff explained that this design would have one traffic lane, at different times of day shared by both buses and bicyclists.

Online, I reviewed today’s slide show presentation, and noticed that this mixed-use lane concept was absent.

Also, Staff's Report "King Road Complete Streets Plan Status Report" dated August 19th and posted online for today’s Sept 9th T&E Committee Meeting doesn't mention the mixed-use design concept.

I hope that's because staff abandoned the mixed-use concept after hearing feedback from BPAC and Silicon Valley Bicycle Coalition members at our January 29th meeting.

A mixed-use lane by bus and bicyclists will not be safe—even if its part time—especially between Story Road and Lavonne Avenue—where motorists are entering or leaving Highway Diane Solomon
This message is from outside the City email system. Do not open links or attachments from untrusted sources.
680. We respectfully request no part-time bus lane, yes, full time designated bike lanes that are not shared with busses.

My written comment which I submitted this morning has the URL’s to both of these presentations.

Thank you,
Relevent URLs"
The Jan 29th Presentation to BPAC slides
https://www.sanjoseca.gov/home/showpublisheddocument/109126/638436753882700000 Here is the January slide six’s URL with visual of shared bus/bike lane:
https://www.sanjoseca.gov/home/showpublisheddocument/109126/638436753882700000 Presentation for Sept 9th T&E Committee Meeting
https://sanjose.legistar.com/View.ashx?M=F&ID=13287518&GUID=06AC8F28-60F9- 465B-9EBE-E5DF8CF1C6C7
August 19 Report posted online for Sept 9th T&E Committee Meeting:Doesn’t mention a mixed use lane:
https://sanjose.legistar.com/View.ashx?M=F&ID=13269521&GUID=DA8F9E5D6B58-40EC-85C0-459CBA246738

From: Jordan Moldow
To: TEPublicComment; District4; DistrictS; District8; Tam, Wilson; Madou, Ramses Subject:

Date:

Public Comment - T&E 9/9 - Item (d)2 "King Road Complete Streets Plan Status Report." Monday, September 9, 2024 10:09:03 AM
Attachments: ATT0000l.htrn
[External Email]
I Some people who received this message don't often get email from 1mportant
I earn why this is
Thank you for the staff repo1t. I'm excited about this project, and eager to provide feedback on the next round of design concepts when they become available. King Road deserves to be a safe and comfo1table street for All Ages and Abilities and all modalities, that meets the needs of the community who live, work, attend school, or play in and around the conidor. This must be done by reducing the speed of motor vehicles through lane width reductions, lane diets, road diets, and other fo1ms of physical infrastmcture traffic calming, and giving the extra space to pedestrians, cyclists, and transit. I look fo1ward to this project becoming a reality.

I am confused to not see an update about the prelimina1y design concepts, which were distributed for community engagement and public comment in the winter, between December 2023 and March 15, 2024. The eight high-priority improvements had ah-eady been identified (from the Summer 2023 Visioning and Needs engagement) and incorporated into those preliminaiy design concepts, and the public was asked to give feedback and public comments on the designs. There were two different designs, one for the wider segments of King Road, and one for the nanower segments.

For me, the concepts for the wider segments seemed like they did a good job of addressing all the project priorities. Whereas I believed that alternatives needed to be explored for the naiTower segments. That concept tried to achieve a compromise between bus lanes, pai·king lanes, and bicycle lanes, but ended up with a result that was poor for all three use-cases, and has the potential to be more dangerous than the cunent common configuration.

Can staff share the feedback they received on the preliminaiy design concepts? What did staff leain from the feedback, and how is that feedback (including feedback from BPAC's Januaiy meeting) being incorporated into the next draft of the conceptual designs? And is there an estimate of when in Fall 2024 these draft conceptual designs will be released? Thank you,
Jordan Moldow (speaking on behalf of himself)
District 3

← All documents from this meeting