TO: HONORABLE MAYOR

AND CITY COUNCIL
FROM: John Ristow
Matt Loesch

SUBJECT: See Below DATE: February 24, 2025

Approved

Date:
3/5/25

COUNCIL DISTRICT: Citywide

SUBJECT: Report on Bids and Award of Contract for the 10493 – 2025 Local Streets Remove and Replace Project

RECOMMENDATION

a) Report on bids and award a contract for the construction of 10493 – 2025 Local Streets Remove and Replace Project, to the lowest responsive, responsible bidder, MCK Services, Inc., in the amount of $3,870,050.

b) Approve a 10% contingency in the amount of $387,005.

SUMMARY AND OUTCOME

Award of the contract to MCK Services, Inc. enables the construction of the 10493 – 2025 Local Streets Remove and Replace Project (Project), which will provide needed asphalt concrete pavement repairs along 66 miles of the Local and Neighborhood Streets Network to be sealed in the 2025 construction season. Approval of the 10% contingency provides funding for any unanticipated work necessary for the proper completion or construction of the Project.

BACKGROUND

The Department of Transportation (DOT) will maintain approximately 228 miles of roadway during the 2025 construction season, including 53 miles on the Major Street Network and 175 miles on the Local and Neighborhood Streets Network. As part of this effort, the Local and Neighborhood Streets Network plans to resurface 109 miles of streets in poor to failed condition and seal 66 miles to extend pavement life and improve overall roadway conditions.

COUNCIL AGENDA: 3/18/25
FILE: 25-240
ITEM: 2.10

HONORABLE MAYOR AND CITY COUNCIL
February 24, 2025
Subject: Report on Bids and Award of Contract for the 10493 – 2025 Local Streets Remove and Replace Project

Page 2 ends

Pavement maintenance is typically performed in two separate phases: preparation and a final surface application. The preparation phase consists of the installation or upgrade of Americans with Disabilities Act - compliant curb ramps and the removal and replacement of failed asphalt pavement. The Americans with Disabilities Act work is conducted in advance using minor contracts to provide more job opportunities for local and small businesses. Streets to be sealed will also require the removal and replacement of any structurally failed areas of pavement prior to the final surface application phase. The final surface application phase is known as a sealing application, which provides a thin layer of asphalt emulsion blended with rock approximately 3/8 of an inch in thickness to the pavement.

The City’s Local and Neighborhood Streets Network is organized into 135 geographically contiguous Pavement Maintenance Zones. The Pavement Maintenance Zones were established several decades ago to support efficient planning and delivery of paving projects, maximize the amount of paving work completed at one time within a neighborhood area, and provide geographic spread of pavement maintenance across the City.

DOT utilizes a pavement management system to collect and store roadway condition data. This data is then used to generate a candidate list of streets to be considered for the annual pavement maintenance program. The candidate list is thoroughly analyzed by staff using the following criteria to create the final list of streets.

• Funding availability and funding use restrictions;
• Streets on the Local Street Network;
• Streets not affected by current or future street related projects; • Maintenance history and prescribed treatment schedules; • Streets associated with planned safety, bikeway, or other “complete streets” projects;
• Community and City Council Office feedback regarding roadway conditions and priority street segments;
• Relative location of street segments to create multiple, continuous segments, consistency within neighborhoods, and project efficiency; and • Multi-year geographic spread across the City and street network.

In 2021, DOT added equity as a criterion for zone selection. DOT staff cross-referenced the selected zones with census tracts designated by the Metropolitan Transportation Commission as Equity Priority Communities (EPCs), formerly known as Communities of Concern, to better track equity in service delivery. Results confirmed that 256 out of 266 miles (roughly 96%) of local and neighborhood streets designated in EPC areas will be maintained by the end of the current three-year plan (2028). DOT anticipates completing pavement maintenance for nearly 91% of the local street network in this same timeframe.

HONORABLE MAYOR AND CITY COUNCIL
February 24, 2025
Subject: Report on Bids and Award of Contract for the 10493 – 2025 Local Streets Remove and Replace Project

Page 3 ends

DOT has maintained a total of 198 EPC miles since 2019 and will be maintaining an additional 30 EPC miles in 2025, which is about 17% of the 175 miles of local and neighborhood streets selected for maintenance in 2025. This project includes 11 EPC miles, which is about 17% of the anticipated 66 sealing miles.

The Attachment – List of Streets contains the list of streets to be sealed as part of this Project. The list may change if unforeseen circumstances arise or new information regarding other projects becomes available.

Construction is scheduled to begin in late April 2025 with a substantial completion in August 2025.

ANALYSIS

Bids were opened on February 6, 2025, with the following results:

Contractor
Bid Amount Variance
Amount
Over/(Under)
Percent
MCK Services, Inc.
(Concord) $3,870,050 -$640,250 (14%)
Engineer’s Estimate $4,510,300 -- --
O'Grady Paving, Inc.
(Mountain View) $4,581,300 $71,000 2%
G. Bortolotto & Company, Inc.
(San Carlos)
$4,608,980 $98,680 2%
Radius Earthwork Inc.
(Campbell)
$5,371,265 $860,965 19%

The lowest bid submitted by MCK Services, Inc. is $3,870,050 and is 14% below the Engineer’s Estimate. The estimate is based on bids received from similar past projects and most current estimated construction prices. The bid is considered acceptable for the work involved in the Project.

One potential reason bids came in lower than the Engineer’s Estimate, is due to the timing of when the Project was advertised. This Project advertised earlier in the year compared to the 2024 contract which was advertised later in the calendar year closer to when contractors were into their construction season. This earlier advertisement led to a higher number of bid submissions and more competitive pricing, as many contractors had not yet committed to other projects and still had available capacity.

MCK Services, Inc. has a strong track record, successfully completing multiple pavement projects. Notably, the company has completed two of the three years of the

HONORABLE MAYOR AND CITY COUNCIL
February 24, 2025
Subject: Report on Bids and Award of Contract for the 10493 – 2025 Local Streets Remove and Replace Project

Page 4 ends

2023–2025 Local Streets Resurfacing (Multi-Term) Project and is currently working on the final term, scheduled for completion in 2025.

Contingency

San José Municipal Code Section 27.04.050 provides for a standard contingency of 10% on all public works contracts except those involving the renovation of building or buildings. The standard contingency is appropriate for this project.

Wage Theft Prevention Policy Check

The Office of Equality Assurance reviewed bidders for compliance with the City’s Wage Theft Prevention Policy on February 6, 2025, and again on February 12, 2025. No wage theft issues were identified.

Project Labor Agreement Applicability

The City’s Project Labor Agreement is applicable to this project because the Engineer’s Estimate is over $1.21 million.

Local and Small Business Analysis

The recommended contractor is not a local or a small business enterprise. There is one local business listed as a subcontractor. Graham Contractors (San José) will perform crack filling work valued at approximately $877,500.

EVALUATION AND FOLLOW-UP

DOT provides an ongoing evaluation of the City’s pavement conditions and provides periodic reports on this topic to the Transportation and Environment Committee. In addition to the project discussed in this memorandum, three additional major street projects and four additional local and neighborhood street pavement maintenance projects are scheduled for City Council action this spring.

COST SUMMARY/IMPLICATIONS

These projects support the Transportation and Aviation Services City Service Area’s goal to Preserve and Improve Transportation Assets and Facilities. By performing pavement maintenance, the extension of the useful life of the project streets will delay the need for more costly reconstruction. The source of funding for these projects is through the 486 – VTA Measure B 2016 (Complete Streets - use for residential) fund.

HONORABLE MAYOR AND CITY COUNCIL
February 24, 2025
Subject: Report on Bids and Award of Contract for the 10493 – 2025 Local Streets Remove and Replace Project

Page 5 ends

These projects will have a net zero impact to the General Fund as the standard in- house operating and maintenance costs are already included in DOT's annual budget.

1. TOTAL COST OF PROJECT:

Programmatic Project Delivery Estimate* $ 387,000 Construction 3,870,050
Contingency (10%) 387,000
TOTAL PROJECT COSTS $4,644,050
* Programmatic project delivery estimate includes approximately $154,000 for design services and $232,000 for construction management and inspection services.

2. COST ELEMENTS OF CONTRACT AS RECOMMENDED AS PART OF THE MEMORANDUM:

Mobilization $ 39,600
Materials and Placement 3,351,450
Utility Adjustment 216,000
Pavement Striping/Markings 263,000
TOTAL CONTRACT AMOUNT $3,870,050

BUDGET REFERENCE

The table below identifies the fund and appropriations to fund the contract recommended as part of this memorandum and remaining project costs, including project delivery, construction, and contingency costs.

Fund
#
Appn
#
Appropriation
Name Total Appropriation Amount for
Contract
2024-2025
Capital
Budget
Page
Last Budget
Action (Date,
Ord. No.)
486 403Q
Pavement
Maintenance –
VTA 2016 Measure
B
$36,075,725 $3,870,050 1014
02/11/2025,
Ord. No.
31176
Total Current Funding Available $36,075,725 $3,870,050

HONORABLE MAYOR AND CITY COUNCIL
February 24, 2025
Subject: Report on Bids and Award of Contract for the 10493 – 2025 Local Streets Remove and Replace Project

Page 6 ends

COORDINATION

This memorandum has been coordinated with the City Attorney’s Office, the City Manager’s Budget Office, and the Planning, Building, and Code Enforcement Department.

PUBLIC OUTREACH

This memorandum will be posted on the City’s Council Agenda website for the March 18, 2025 City Council meeting.

When the Project commences, the contractor will provide advance notification regarding Project working hours, duration, and any appropriate schedule and lane closures to affected businesses and residents, as stated in the specifications. To inform traveling motorists of upcoming construction activities and potential traffic delays, changeable message signs may be used on selected streets stating the scheduled date and time for work to occur on the street.

COMMISSION RECOMMENDATION AND INPUT

No commission recommendation or input is associated with this action.

CEQA

Environmental status granted by the Planning, Building and Code Enforcement Department. Categorically Exempt, File No. ER24-313, CEQA Guidelines Section 15301(c), Existing Facilities.

PUBLIC SUBSIDY REPORTING

This item does not include a public subsidy as defined in section 53083 or 53083.1 of the California Government Code or the City’s Open Government Resolution.

/s/ /s/

JOHN RISTOW MATT LOESCH
Director of Transportation Director of Public Works

HONORABLE MAYOR AND CITY COUNCIL
February 24, 2025
Subject: Report on Bids and Award of Contract for the 10493 – 2025 Local Streets Remove and Replace Project

Page 7 ends

For questions, please contact Jennifer Seguin, Deputy Director, Department of Transportation at [email protected] or Mathew Nguyen, Deputy Director, Department of Public Works at [email protected].

ATTACHMENT: List of Streets

ATTACHMENT

Page 1 of 14 ends

List of Streets
Street Name Street From Street To CD
CAMINA ESCUELA MOORPARK AV BLACKFORD AV 1
CAMINA ESCUELA BLACKFORD AV STRAWBERRY PK DR 1
CASITA CT LA HONDA AV S END 1
DEERFIELD DR WELLFLEET WY PILGRIM AV 1
ELMHURST DR BRENTWOOD DR CAMINA ESCUELA 1
GRAYWOOD DR TARTARIAN WY ROYAL ANN DR 1
MANZANITA DR SARATOGA AV PINEWOOD DR 1
OAK GROVE DR STRAWBERRY PK DR BLACKFORD AV 1
PILGRIM AV DEERFIELD DR TARTARIAN WY 1
PINEWOOD DR WILLIAMS RD MOORPARK AV 1
PLYMOUTH WY PETAL WY DEERFIELD DR 1
PROVINCETOWN DR PROSPECT RD PILGRIM AV 1
PROVINCETOWN DR N/S PILGRIM AV WELLFLEET WY 1
ROCKWOOD DR BLACKFORD AV STRAWBERRY PK DR 1
ROYAL ANN CT ROYAL ANN DR S END 1
STRAWBERRY PARK DR SARATOGA AV PINEWOOD DR 1
STRAWBERRY PARK DR PINEWOOD DR BRENTWOOD DR 1
WELLFLEET WY DEERFIELD DR TARTARIAN WY 1
AMBLER CT AMBLER WY N END 2
AMBLER WY HELLYER AV SARK WY 2
ASHTON CT CHILTON CT S END 2
ASHTON LN SYLVANDALE AVE S END 2
BROCK WY SYLVANDALE AV AMBLER WY 2
BURMAN DR AMBLER WY PALISADE DR 2
CHILTON CT ASHTON LN W END 2
FARIS DR PALISADE DR AMBLER WY 2
HONOLULU CT PARK JOHNSON PL S END 2
HONOLULU DR SYLVANDALE AV PARK JOHNSON PL 2
KEEWAYDIN CT LA TORRE AV E END 2
MASTERS CT SYLVANDALE AV S END 2
MAUAI CT OAHU DR S END 2
MAUI DR SYLVANDALE AV OAHU DR 2
NASH CT SYLVANDALE AV S END 2

ATTACHMENT

Page 2 of 14 ends

Street Name Street From Street To CD
OAHU DR MAUI DR KAUAI DR 2
PALA MESA DR N END S END 2
PALISADE DR HELLYER AV N END 2
PALM VALLEY BL PALMIA DR LA STRADA DR 2
PALMIA DR NB PALM VALLEY BL COTTLE RD 2
PARK CHARLES CT PARK JOHNSON PL S END 2
PARK JOHNSON PL SENTER RD MAUI CT 2
SACRAMENTO AV AMBLER WY HELLYER AV 2
TRIMAR CT PARK JOHNSON PL S END 2
30TH ST N FIVE WOUNDS LN ST JAMES ST E 3
ADOLFO DR CARMINE WY LOO LN 3
AVALANI AV RIPLEY DR SCHULTE DR 3
BULLDOG BLVD N 24th ST W END 3
CARMINE WY DELUCA DR LOO LN 3
CASTLEBROOK CT LOCHRIDGE DR N END 3
CHAVEZ CT CHAVEZ WY SOUTH END 3
CHAVEZ WY TOWNSEND AV E END 3
DE FALCO WY TOWNSEND PK CR STANTON WY 3
DELUCA DR SAJAK DR MURPHY AV 3
DOBBIN DR KING RD N E END 3
EAST CT E JULIAN ST N END 3
EDWARDS AV PALM ST HARLISS AV 3
EDWARDS AV HARLISS AV MCLELLAN AV 3
FINEO CT CHAVEZ WY SOUTH END 3
FIVE WOUNDS LN 28TH ST N 30TH ST N 3
GEYSER DRIVE LEAFTREE CIR. LUNDY AV 3
GIGUERE CT LAS PLUMAS AV N END 3
JULIAN ST E EAST CT W END 3
LEAFTREE CR CHAVEZ WY CHAVEZ WY 3
LEAFTREE CT LEAFTREE CR E END 3
LOO LN SAJAK AV N END 3
LOO LN CARMINE WY S END 3
MARBURG WY N 240' S OF LAS PLUMAS AV S END (GATE) 3
MAXWELL WY TOWNSEND PK CR DE FALCO WY 3

ATTACHMENT

Page 3 of 14 ends

Street Name Street From Street To CD
MCLELLAN AV EDWARDS AV WILLOW ST 3
MISSION SPRINGS CR SAJAK AV SAJAK AV 3
MISSION SPRINGS CT MISSION SPRINGS CR N END 3
MONTCOURSE LN PARKMONT DR OYAMA DR 3
NEWBURY PARK DR MIDNIGHT CL SQUIRE AV 3
NEWBURY PARK DR BLACKBURY LN MIDNIGHT CL 3
NEWBURY PARK DR N KING RD BLACKBURY LN 3
NICORA AV LENFEST RD W END 3
NIPPER AV LAS PLUMAS AV S END 3
NOBU DR CARMINE WY ADOLFO DR 3
NORSEMAN DR EDUCATIONAL PARK DR UNDAJON DR 3
OYAMA DR SAJAK AV MURPHY AV 3
OYAMA PL OYAMA DR S END 3
PARKMONT CT PARKMONT DR E END 3
PARKMONT DR SAJAK AV MONTCOURSE LN 3
PINE HOLLOW CL EDUCATIONAL PARK DR EDUCATIONAL PARK DR 3 RINGWOOD AV MURPHY AV SAJAK AV 3
SAJAK AV LUNDY AV TOWNSEND AV 3
SAJAK AV TOWNSEND AV OYAMA DR 3
SAJAK AV OYAMA DR PARKMONT DR 3
ST JAMES ST E 30TH ST N 28TH ST N 3
STANTON WY DE FALCO WY TOWNSEND PK CR 3
TANAKA DR TOWNSEND AV SAJAK AV 3
TOWNSEND AV LUNDY AV TOWNSEND PK CR 3
TOWNSEND AV TOWNSEND PK CR SAJAK AV 3
TOWNSEND PARK CL TOWNSEND AV FAIRWAY GREEN CR 3
TOWNSEND PARK CL FAIRWAY GREEN CR MAXWELL WY 3
UNDAJON DR PINE HOLLOW CR PINE HOLLOW CR 3
WAYNE AV RINGWOOD AV OAKLAND RD 3
WAYNE CIR WAYNE AVE WAYNE AVE 3
ASHFORD CT HAZLETT WY S END 4
ATTEBERRY LN OAKLAND RD W END 4
ATTEBERRY LN DEL FRANCO ST OAKLAND RD 4
BANYAN CT SILK WOOD LN BANYAN CT 4

ATTACHMENT

Page 4 of 14 ends

Street Name Street From Street To CD
BELLEMEADE ST SIERRA RD N CHESSINGTON DR 4
BRAMBLE WOOD LN BRIGHT WILLOW CIR SILK WOOD LN 4
BRIGHT WILLOW CIR TIGER LILY LN TIGER LILY LN 4
BRUZZONE WY LEE PL MERCADO WY 4
BRUZZONE WY LEE PL NELEIGH PL 4
BRUZZONE WY NELEIGH PL SHORE DR 4
CALLE ARTIS OAKLAND RD DEL FRANCO ST 4
CHANNING AV SEABOARD AV SEABOARD AV 4
CHESSINGTON DR NOTTING HILL DR SIERRA RD 4
COTTON WOOD CT BRIGHT WILLOW CIR E END 4
DEL FRANCO ST CALLE ARTIS ATTEBERRY LN 4
FARGATE CR VALLEY CREST DR VALLEY CREST DR 4
FEASEL CT WAYNE AVE N END 4
FOX DR FOX LN RIDDER PARK DR 4
FOX LN OAKLAND RD 630' W/OF OAKLAND RD 4
FOX LN 630' W /OF OAKLAND RD FOX DR 4
FUMIA CT FUMIA PL S END 4
FUMIA DR WAYNE AVE FUMIA PL 4
FUMIA PL FUMIA DR S END 4
FUMIA PL FUMIA DR FUMIA CT 4
HAREFIELD CT HAREFIELD DR EAST END. 4
HAREFIELD DR HAZLETT WY CHESSINGTON DR 4
HAZLETT CT HAZLETT WY EAST END 4
KARINA CT EB W END 1ST ST N 4
KARINA CT WB 1ST ST N W END 4
LITTLETON DR CHESSINGTON DR HAZLETT WY 4
MAPLETON CT SILK WOOD LN MAPLETON CT 4
MAYBERRY LN BELLEMEADE ST BELLEMEADE ST 4
MCNEAL ST MERCADO WY MURASKY PL 4
MCNEAL ST MURASKY PL LEE PL 4
MCNEAL ST LEE PL VENDRE PL 4
MCNEAL ST VENDRE PL NELEIGH PL 4
MCNEAL ST NELEIGH PL SHORE DR 4
MERCADO WY ONOFRIO LN ABRUZZO LN 4

ATTACHMENT

Page 5 of 14 ends

Street Name Street From Street To CD
MERCADO WY MCNEAL ST GABBIANO LN 4
MERCADO WY BELLANTE LN ONOFRIO LN 4
MERCADO WY ABRUZZO LN MCNEAL ST 4
MERCADO WY GABBIANO LN GIACOMO LN 4
MERCADO WY BRUZZONE WY SIERRA RD 4
MERCADO WY SIERRA RD EAGLE WY 4
MERCADO WY GIACOMO LN E END 4
MERCADO WY EAGLE WY BELLANTE LN 4
MERCADO WY BERRYESSA RD BRUZZONE WY 4
NOTTING HILL DR HAZLETT WY CHESSINGTON DR 4
O NEL DR NB KARINA CT GUADALUPE PY 4
O NEL DR SB GUADALUPE PY KARINA CT 4
PARAGON DR CHARCOT AV O'TOOLE AV 4
RIDDER PARK DR FOX LN BROKAW RD 4
RINCON CL O'TOOLE AV O'TOOLE AV 4
ROCK AV OLD OAKLAND RD 600'W/O OAKLAND 4
ROCK AV 600'W/O OAKLAND O'TOOLE AV 4
SEABOARD AV TRIMBLE RD E END 4
SEAREEL LN ATTEBERRY LN OAKLAND RD 4
SEAREEL PL SEAREEL LN W END 4
SILK WOOD LN OAKLAND RD ROCK AV 4
TIGER LILY LN ROCK AVE BRIGHT WILLOW CIR 4
VALLEY CREST CT BRIARCREST DR. E.END 4
VALLEY CREST DR BRIARCREST DR BELLEMEADE ST 4
BLUE MOUNTAIN DR HARVEST DR MT MCKINLEY DR 5
CANNIKIN CT CANNIKIN DR N END 5
CANNIKIN DR PACKING PL PRESERVATION DR 5
COOLEY CT LYNETTE WY E END 5
DUFFY CT DUFFY WY N END 5
DUFFY WY KING RD S LYNETTE WY 5
GALEWOOD CT LOCHRIDGE DR W END 5
HARVEST DR CLAYTON RD MT PLEASANT RD 5
HELLER PL STOWE AV S END 5
KENTUCKY PL ALUM ROCK AV S END 5

ATTACHMENT

Page 6 of 14 ends

Street Name Street From Street To CD
LINKHORNE CT SCHULTE DR S END 5
LOCHRIDGE DR SCHULTE DR SOUTH END 5
LYNETTE WY COOLEY DR WILLIAM ST E 5
LYNETTE WY WILLIAM ST E SAN ANTONIO ST E 5
MARIGOLD CT LOCHRIDGE DR W END 5
MCCREERY AV SAN ANTONIO ST ALUM ROCK AV 5
MT FRAZIER DR MT MCKINLEY DR BLUE MOUNTAIN DR 5
MT MADONNA DR MT RUSHMORE DR MT KENYA DR 5
MT RUSHMORE DR MARTEN AV ROCKY MTN DR 5
MT ST HELENA DR MT KENYA DR MT MADONNA DR 5
OAKLAND AV KAMMERER AV SAN ANTONIO ST E 5
OAKLAND AV STOWE AV SAN ANTONIO ST E 5
PACKING PL SAN ANTONIO ST E S END 5
PACKING PL PRESERVATION DR S END 5
PRESERVATION DR PACKING PL 240 W/OF PACKING PL 5
PRESERVATION DR 240'W/PACKING PL CANNIKIN DR 5
PRESERVATION DR CANNIKIN DR SAN ANTONIO ST E 5
RYEGATE CT EDUCATIONAL PARK DR RYEGATE CT 5
RYEGATE CT N END S END 5
STOWE AV W END MCCREERY AV 5
STOWE AV MCCREERY AV SUNSET AV 5
TIERRA ENCANTADA WY MCCREERY AVE E END 5
WILLIAM ST E LYNETTE WY KING RD S 5
WOODSET DR JACKSON AV S N END 5
ARDILLA CT VIA CODORNIZ W END 6
BUENA LUNA CT BORELLO DR N END 6
CALMA CT VIA CODORNIZ W END 6
CAMINO CERRADO BORELLO DR S END 6
DILLARD CT SPRUANCE ST S END 6
EL RIO DR CURTNER AV CELESTINE AV 6
EL RIO DR SPADAFORE AV CELESTINE AV 6
LIVINGSTON AV SHIBLEY AV CHERRY AV 6
LUJOSO CT HUERTO DR S END 6
MARKHAM AV MAYETTE AV CURTNER AV 6

ATTACHMENT

Page 7 of 14 ends

Street Name Street From Street To CD
MAXINE AV PLUMMER AV CHERRY AV 6
MAYETTE AV RICHLAND AV COTTLE AV 6
MAZZAGLIA AV CURTNER AV MAYETTE AV 6
MINARDI AV JENVEY AV PLUMMER AV 6
MOORPARK AV E/S LEIGH AV MENKER AV 6
PASCOE AV RADIO AV LINCOLN AV 6
RAMITA CT BORELLO DR S END 6
REDBUD CT SPRUANCE ST W END 6
ROJO PL BORELLO DR S END 6
SPRUANCE ST ARAM AV TOLWORTH AV 6
STOKES ST SPRUANCE ST BASCOM AV S 6
VIA CANCION BORELLO DR S END 6
VIA CONTENTA BORELLO DR S END 6
WESTGATE AV HUSTED AY CURTNER AV 6
WOODING CT SPRUANCE ST W END 6
ASCOT LN BETH DR SOUTHSIDE DR 7
AUSTIN CT SANBORN AV W END 7
BELLEVUE AV MONTEREY RD POMONA AV 7
BETH DR DURANT AV ASCOT LN 7
DURANT AV SOUTHSIDE DR HAGA DR 7
HAGA DR SINGLETON RD SOUTHSIDE DR 7
KAUAI DR OAHU DR YERBA BUENA RD 7
RODEO CT RODEO DR S END 7
SOUTHSIDE DR SENTER RD DURANT AV 7
SOUTHSIDE DR DURANT AV GARDEN AV 7
SOUTHSIDE DR GARDEN AV MONTEREY RD 7
WENTWORTH WY CLAYBURN LN MCLAUGHLIN AV 7
ANDARE CT ASHLEY WY W END 8
ASHLEY CT ASHLEY WY E END 8
ASHLEY RIDGE CT HILLSTONE DR S END 8
ASHLEY WY THE VILLAGES PKWY SILVER ESTATES 8
ASTIN CANYON CT INDIGO OAK LN S END 8
BEAUMONT CANYON DR SILVER CREEK VALLEY RD CRYSTAL HILLS CT 8 BEL AIRE HILLS DR BENTLEY RIDGE DR SILVER CREEK VALLEY RD 8

ATTACHMENT

Page 8 of 14 ends

Street Name Street From Street To CD
BELLINGTON CT S END 374 E/OF WHITETAIL LN 8
BELLINGTON CT WHITETAIL LN 374 E/OF WHITETAIL LN 8
BELLINGTON CT WHITETAIL LN W END 8
BENTLEY RIDGE DR BEAUMONT CANYON DR 2050 S/OF LARKSPUR CANYON DR 8 BENTLEY RIDGE DR CONCORD RIDGE CT HILLSTONE DR 8
BRIAR HILLS CT BEAUMONT CANYON DR N END 8
BRIDGEVIEW CT BRIDGEVIEW LN S END 8
BRIDGEVIEW LN HASSLER PKWY BRIDGEVIEW CT 8
BRIDGEVIEW TR BRIDGEVIEW LN S END 8
BRIDLE RIDGE CT SHADOW RIDGE WY E END 8
BROOK ESTATES CT CREEK ESTATES E END 8
BYINGTON DR YERBA BUENA RD 308 S/OF YERBA BUENA RD 8
BYINGTON DR 308'S/YERBA BUENA RD HILLSTONE DR 8
CLARA SMITH PL SAN FELIPE RD W END 8
CRANE RIDGE CT CRYSTAL HOLLOW PL W END 8
CRANE RIDGE LN INDIGO OAK LN CRYSTAL HOLLOW PL 8
CREEK ESTATES SILVER ESTATES PARK ESTATES WY 8
CREEK ESTATES CT CREEK ESTATES N END 8
CRYSTAL HOLLOW PL CRANE RIDGE LN S END 8
DARYLVIEW CT SILVER CREEK VALLEY RD W END 8
ECHO CANYON CT CRYSTAL HOLLOW PL W END 8
GARDENSIDE PL HASSLER PKWY E END 8
GEORGE BLAUER PL SAN FELIPE RD W END 8
GREY CLIFFS CT INDIGO OAK LN S END 8
HILL TOP VIEW CT HILL TOP VIEW LN S END 8
HILL TOP VIEW LN HASSLER PKWY S END 8
HILL TOP VIEW TR HILL TOP VIEW LN S END 8
HILLSTONE DR SILVER CREEK VALLEY RD S END 8
HOUNDS ESTATE THE VILLAGES PY SILVER ESTATES 8
HOUNDS ESTATES CT HOUNDS ESTATES E END 8
INDIGO OAK CT CRANE RIDGE LN S END 8
INDIGO OAK LN GREY CLIFFS CT CRANE RIDGE LN 8
JASPER HILL WY SAN FELIPE RD W END 8
KING ESTATES HOUNDS ESTATES SILVER ESTATES 8

ATTACHMENT

Page 9 of 14 ends

Street Name Street From Street To CD
KING ESTATES CT KING ESTATES E END 8
LAUREL CANYON DR BENTLEY RIDGE DR BEAUMONT CANTON DR 8
LAURELWOOD CROSSING PL RANGEWOOD DR E END 8
LAURELWOOD CROSSING TR RANGEWOOD DR E END 8
MANDELAY PL SHADOW RIDGE WY N END 8
MARE PLACE CT YERBA BUENA RD S END 8
MOUNTAIRE CT MOUNTAIRE LN S END 8
MOUNTAIRE LN SADDLE PARK AVE MOUNTAIRE PL 8
MOUNTAIRE PL MOUNTAIRE LN S END 8
PARK ESTATES WY SAN FELIPE RD SUNNY CREEK DR 8
PARK ESTATES WY SUNNY CREEK DR E END 8
PRINCE ESTATES CT KING ESTATES DARYLVIEW CT 8
QUIET POND LN SILVER RANCH LN SILVER RANCH PL 8
RANGEWOOD DR HASSLER PKWY N END 8
SADDLE PARK AVE SHADY GROVE CT S END 8
SADDLE PARK PL SAN FELIPE RD SADDLE PARK AVE 8
SHADOW RIDGE CT SHADOW RIDGE WY W END 8
SHADOW RIDGE WY HILLSTONE DR SILVER CREEK VALLEY RD 8
SHADY GROVE CT SADDLE PARK AV N END 8
SHADY GROVE PL SADDLE PARK AV S END 8
SHADY MEADOWS PL SADDLE PARK AVE N END 8
SHEFFIELD RIDGE CT WYNFAIR RIDGE WY N END 8
SHILOH PL HASSLER PKWY N 8
SILVER ESTATES PARK ESTATES WY KING ESTATES 8
SILVER ESTATES KING ESTATES KNIGHTS ESTATES 8
SILVER POND LN SILVER RANCH LN SILVER RANCH PL 8
SILVER RANCH LN SILVER RANCH PL HASSLER PKWY 8
SILVER RANCH PL QUIET POND LN SILVER RANCH LN 8
SILVER VIEW CT BEAUMONT CANYON DR N END 8
STONEYFORD CT SILVER CREEK VALEEY RD E END 8
THE VILLAGES PY EB SAN FELIPE RD HOUNDS ESTATE 8
THE VILLAGES PY WB HOUNDS ESTATE SAN FELIPE RD 8
THORN CREEK CT SAN FELIPE RD S END 8
TROVATA CT ASHELEY WY E END 8

ATTACHMENT

Page 10 of 14 ends

Street Name Street From Street To CD
VILLA VISTA RD YERBA BUENA RD S/END 8
WHEATLEY PL GREENYARD ST W END 8
WHINNEY PLACE WY S END YERBA BUENA RD 8
WHITETAIL LN SILVER CREEK VALLEY RD BELLINGTON CT 8
WYNFAIR RIDGE WY BYINGTON DR S END 8
ALMADEN RD DELYNN WY KOCH LN 9
APSIS AV AQUILA AV BASCOM AV S 9
APSIS CT AQUILA AV E END 9
AQUILA AV WHITE OAKS AV HECATE PL 9
BRIARGLEN DR PROSPER AV 375'N/PROSPER AV 9
BRIARGLEN DR 375'N/PROSPER AV 65'E/BRIARGLEN CT 9
CALAIS CT WYNDHAM DR END 9
CALVELLI CT MT DAVIDSON DR S END 9
CANBERRA CT WYNDHAM DR END 9
CANBERRA DR KLIPSPRINGER DR CANBERRA CT 9
CARRIE LEE WY GARDENDALE DR ALMADEN RD 9
CHERRY GARDEN LN CHERRY AV LAMBERT LN 9
CRANFORD CR WHITE OAKS AV WHITE OAKS AV 9
DESIN DR BRANHAM LN MONTMORENCY DR 9
FAIRCREST DR JACKSOL DR WHITE OAKS AV 9
FAIRCREST DR JACKSOL DR SALINA DR 9
FALLSTONE CT MARBELLA DR N END 9
GEORGE OAKS DR BRANHAM LN PROSPER AV 9
GLADSTONE AV ROSS AV MARLOWE DR 9
GLENHURST DR SORCI DR CEFALU DR 9
GLENROY DR CEFALU DR SORCI DR 9
HALKINS DR MONACO DR WHITE OAKS AV 9
HAVEN CT FAIRCREST DR S END 9
HECATE CT AQUILA AV E END 9
HECATE PL AQUILA AV W END 9
HENDRIX CT BLOOMFIELD DR W END 9
HUSTED AV RICHLAND AV COTTLE AV 9
JACKSOL DR WOODARD RD BARRETT AV 9
JACKSOL DR BARRETT AV FAIRCREST AV 9

ATTACHMENT

Page 11 of 14 ends

Street Name Street From Street To CD
JACKSOL DR FAIRCREST DR S END 9
JANIS WY RICHLAND AV MARSHA WY 9
KINER AV LANDSFORD AV CHERRY AV 9
KIRK CT KIRK RD W END 9
KLIPSPRINGER DR KIRK RD TUPELO DR 9
LA MESA LN OAKWOOD AV PALADIN DR 9
LAMBERT LN CHERRY GARDEN HUSTED AV 9
LANDSFORD AV HUSTED AV 520'S/HUSTED AV 9
LANDSFORD AV 520'S/HUSTED AV KOCH LN 9
LAPRIDGE LN SHELLEY AV MT DAVIDSON DR 9
LASCAR CT AQUILA AV E END 9
LASCAR PL AQUILA AV W END 9
LIZZIE LN PROSPER AV BRANHAM LN 9
LOMENT CT AQUILA AV E END 9
LOMENT PL AQUILA AV W END 9
LYNHURST CT LYNHURST WY W END 9
LYNHURST WY BRIARGLEN DR VISTAMONT DR 9
MANDRILL CT WYNDHAM DR S END 9
MARBELLA CT MARBELLA DR N END 9
MARBELLA DR SALINA DR MARBELLA CT 9
MARLOWE DR GLADSTONE AV ANDOVER LN 9
MCCOPPIN PARK CT MT DAVIDSON DR S END 9
MONACO DR WHITE OAKS DR HALKINS DR 9
MONTMORENCY CT PROSPER AV S END 9
MONTMORENCY DR 940' E/OF CHERRY AV PROSPER AV 9
MT DAVIDSON CT MT DAVIDSON DR S END 9
MT DAVIDSON DR NOVA SCOTIA AV BASCOM AV S 9
NOVA SCOTIA AV N END S END 9
ORIN CT WHITE OAKS AV W END 9
PROSPER AV GEORGE OAKS DR ALMADEN EXP 9
RANWICK CT PROSPER AV N END 9
SALINA DR N END MARBELLA DR 9
SHELLEY AV BASCOM AV S NOVA SCOTIA AV 9
SORCI DR JACOB AV WILLOWMONT AV 9

ATTACHMENT

Page 12 of 14 ends

Street Name Street From Street To CD
ST CROIX CT PROSPER AV N END 9
TUPELO DR KIRK RD BRANHAM LN 9
VISTAMONT DR S END (ROSS CREEK) LINDSAY WY 9
WHITE OAKS AV TWILIGHT DR S END 9
WOODCREST DR HILLSDALE AV MARY LEE WY 9
WOODMONT DR MARY LEE WY HILLSDALE AV 9
WYNDHAM DR KIRK RD CANBERRA CT 9
ABBEYFIELD CT PASO LOS CERRIS S END 10
ALMADEN VALLEY DR COLEMAN RD WEIMAR AV 10
ASTER DR HUCKLEBERRY DR PRIMROSE DR 10
ATHENOUR CT MONTEVERDE DR E END 10
BALDERSTONE DR MERIDIAN AV PASO LOS CERRITOS 10
BEATTIE CT MERIDIAN AV S END 10
BLACKBIRD CT CRIMSON DR W END 10
BLUERING CT CRIMSON DR W END 10
BRIANA CT GRAYSTONE LN S END 10
BURCHELL AV MERIDIAN AV OAKGLEN WY 10
COFFEEBERRY DR TULIPTREE DR E END 10
COLORVIEW CT OAKGLEN WY S END 10
CONLIN CT SNELL AV E END 10
COVINA AV SHAWCROFT DR TUSCARORA DR 10
CRIMSON DR REDMOND AV OAKGLEN WY 10
CRUMP CT THE STRAND AV N END 10
DAISY DR WILDFLOWER DR ASTER DR 10
DASH CT KEW GARDENS CT N END 10
DESERT WILLOW DR PRIMROSE DR COFFEEBERRY DR 10
ELSMAN CT MONTEVERDE DR W END 10
FLEET ST SENTINEL ST THE STRAND AV 10
GARDENIA DR WILDFLOWER DR PRIMROSE DR 10
GLOWING CT OAKGLEN WY S END 10
GOLDEN OAK WY CASTELLO DR MCABEE RD 10
GRAYSTONE LN CITY LIMIT CITY LIMIT 10
GUADALUPE MINES RD 1370'S/CAMDEN AV S END 10
HENDERSON DR SANTA TERESA BL VALE DR 10

ATTACHMENT

Page 13 of 14 ends

Street Name Street From Street To CD
HUCKLEBERRY DR WILDFLOWER DR ASTER DR 10
KEW GARDENS CT MERIDIAN AV N END 10
LA STRADA DR PALA MESA DR PALM VALLEY BL 10
LARABEE CT ALMADEN VALLEY DR E END 10
LAVENDER CREEK GUADALUPE MNES RD SYCAMORE CREEK 10
MAJORCA CT REDMOND AV S END 10
MANITOU CT SENTINEL ST W END 10
MCABEE ESTATES PL MCABEE RD W END 10
MEANDER DR THE STRAND AV COLEMAN RD 10
MONTALBAN DR CAMDEN AV S END 10
MONTELLANO CT CAMDEN AV S END 10
MONTEVERDE DR REDMOND AV ALMADEN VALLEY 10
NESBIT CT WEIMAR AV W END 10
NORELIUS CT MERIDIAN AV W END 10
OAKGLEN WY BURCHELL AV MERIDIAN AV 10
PALMIA DR SB PALM VALLEY BL COTTLE RD 10
PASO LOS CERRITOS DESERT FLAME DR MERIDIAN AV 10
PRIMROSE DR PALMIA DR LA STRADA DR 10
SAGE DR PRIMROSE DR COFFEEBERRY DR 10
SENTINEL ST COLEMAN RD FLEET ST 10
SHAWNEE LN SNELL AV TUSCARORA DR 10
STRADA ALMADEN MCABEE RD N END 10
SYCAMORE CREEK THYME CREEK LAVENDER CREEK 10
SYCAMORE CREEK CLOVER CREEK THYME CREEK 10
SYCAMORE CREEK SAGE CREEK CLOVER CREEK 10
SYCAMORE CREEK ASPEN CREEK SAGE CREEK 10
SYCAMORE CREEK GUADALUPE MINES RD ASPEN CREEK 10
TEXAS CT FLEET ST N END 10
THE STRAND AV FLEET ST BURCHELL AV 10
TULIPTREE DR PRIMROSE DR COFFEEBERRY DR 10
TUSCARORA CT TUSCARORA DR N END 10
TUSCARORA DR SNELL AV 580'E/OF SNELL AV 10
VALE DR LEAN AV SANTA TERESA BL 10
VIA CAMPAGNA VIA CAMPO AUREO 203'E/GUADALUPE MINES RD 10

ATTACHMENT

Page 14 of 14 ends

Street Name Street From Street To CD
VIA CAMPAGNA 203'E/GUADALUPE MINES RD GUADALUPE MINES RD 10 VIA CAMPO AUREO S END E END 10
VIA CAMPO VERDE W END S END 10
VIA CAMPO VERDE VIA CAMPAGNA 230'N/VIA CAMPAGNA 10
VIA CAMPO VERDE VIA CAMPO VERDE S END 10
VIA CORTINA N END E END 10
VIA FORTUNA VIA CORTINA END 10
VIA LUGANO GUADALUPE MINES RD E END 10
VIA MAGGIORE VIA LUGANO VIA CORTINA 10
VIA PALOMA VIA FORTUNA VIA CAMPAGNA 10
WEIMAR AV ALMADEN VALLEY MEDALION DR 10
WILDFLOWER DR LA STRADA DR HUCKLEBERRY DR 10
YELLOWBIRD CT CRIMSON DR W END 10