TO: HONORABLE MAYOR

AND CITY COUNCIL
FROM: John Ristow
Matt Loesch

SUBJECT: Report on Bids and Award
of Contract for the 10489 –
2025 – 2027 LS Resurfacing
(Multi-Term) Project
DATE: April 1, 2025

Approved :

Date:
4/9/25

COUNCIL DISTRICT: 2, 9 , & 10

RECOMMENDATION

a) Report on bids and award a contract for the construction of 10489 – 2025-2027 LS Resurfacing (Multi -Term) Project, to the lowest responsive, responsible bidder, MCK Services, Inc., in the amount of $14,522,607.

b) Approve a 10% contingency in the amount of $1,452,260.

c) Adopt a resolution authorizing the Director of Transportation to:
1) Exercise up to two one-term options (2026 and 2027) for a total amount not to exceed $15,000,000 for each option term period, contingent on the appropriation of funds; and
2) Establish a construction contingency for any option year of up to 10% of the contract amount, not to exceed $1,500,000 for each option term, contingent on the appropriation of funds.

SUMMARY AND OUTCOME

Award of the contract to MCK Services, Inc. enables the construction of the 10489 – 2025-2027 LS Resurfacing (Multi -Term) Project (Project), which will provide needed resurfacing of approximately 28 miles of the Local and Neighborhood Streets Network during the initial term in 2025. It is also estimated that an additional 28 miles could be resurfaced with each subsequent one- term option period if exercised. Approval of the 10% contingency will provide funding for any unanticipated work necessary for the proper completion or construc tion of each project.

COUNCIL AGENDA: 4/22/25
FILE: 25-404
ITEM: 5.1

HONORABLE MAYOR AND CITY COUNCIL
April 1, 2025
Subject: Report on Bids and Award of Contract for the 10489 – 2025 – 2027 LS Resurfacing (Multi - Term) Project

Page 2 ends

BACKGROUND

The Department of Transportation (DOT) will maintain approximately 228 miles of roadway during the 2025 construction season, including 53 miles on the Major Street Network and 175 miles on the Local and Neighborhood Streets Network. As part of this effort, the Local and Neighborhood Streets Network plans to resurface 109 miles of streets in poor to failed condition and seal 66 miles to extend pavement life and improve overall roadway conditions.

Pavement maintenance is typically performed in two separate phases: preparation and a final surface application. The preparation phase consists of the installation and upgrade of Americans with Disabilit ies Act-compliant (ADA) curb ramps. The ADA work is conducted in advance u sing minor contracts to provide more job opportunities for local and small businesses. The final surface application phase is known as resurfacing, which consists of removing several inches of damaged or degraded roadway and installing a new layer of asphalt, followed by the installation of new striping and markings. To complete 109 miles of resurfacing work in one construction season, all 2025 resurfacing work will be divided into four separate projects and implemented concurrently.

The City’s Local and Neighborhood Street s Network is organized into 135 geographically contiguous Pavement Maintenance Zones. The P avement Maintenance Zones were established several decades ago to support efficient planning and delivery of paving projects, maximize the amount of paving work completed at one time within a neighborhood area, and provide geographic spread of pavement maintenance across the city.

DOT utilizes a pavement management system software called StreetSaver (owned by Metropolitan Transportation Commission) to collect and store roadway condition data.

This data is then used to generate a candidate list of streets to be considered for the annual pavement maintenance program. The candidate list is thoroughly analyzed by staff using the following criteria to create the final list of streets .

• Funding availability and funding use restrictions ;
• Streets on the Local and Neighborhood Street s Network; • Streets not affected by current or future street related projects; • Maintenance history and prescribed treatment schedules ; • Streets associated with planned safety, bikeway, or other “complete streets” projects;
• Community and City Council O ffice feedback regarding roadway conditions and priority street segments;
• Relative location of street segments to create multiple, continuous segments, consistency within neighborhoods, and project efficiency; and • Multi-year geographic spread across the city and street network.

HONORABLE MAYOR AND CITY COUNCIL
April 1, 2025
Subject: Report on Bids and Award of Contract for the 10489 – 2025 – 2027 LS Resurfacing (Multi - Term) Project

Page 3 ends

In 2021, DOT added equity as a criterion for zone selection. DOT staff cross-referenced the selected zones with census tracts designated by the Metropolitan Transportation Commission as “Equity Priority Communities” (EPC), formerly known as “Communities of Concern ,” to better track equity in service delivery. Results confirmed that 256 out of 266 miles (roughly 96%) of local and neighborhood streets designated in EPC areas will be maintained by the end of the current three- year plan (2028). DOT anticipates completing pavement maintenance for nearly 91% of the local street network in this same timeframe.

DOT has maintained a total of 198 EPC miles since 2019 and will maintain an additional 30 EPC miles in 202 5, which is about 17 % of the 175 miles of Local and Neighborhood Streets Network selected for maintenance in 2025 . This project includes 1.5 of the 30 EPC miles.

The attachment to this memorandum contains the list of streets to be resurfaced as part of this Project (Attachment). The list may change if unforeseen circumstances arise or new information regarding other projects becomes available.

Construction is scheduled to begin in May 2025, with substantial completion by December 2025.

ANALYSIS

Bids were opened on January 23, 2025, with the following results:

Contractor
Bid Amount Variance
Amount
Over/(Under)
Percent
MCK Services, Inc.
(Concord) $14,522,607 ($1,477,524) (9)
DeSilva Gates Construction, Inc.
(Dublin) $14,967,860 ($1,032,271) (6)
O'Grady Paving, Inc.
(Mountain View ) $15,111,080 ($889,051) (6)
Engineer’s Estimate $16,000,131 -- --
A. Teichert & Son, Inc.
(Pleasanton) $16,196,965 $196,834 1
McGuire and Hester
(Oakland) $18,857,845 $2,857,714 18

The lowest bid submitted by MCK Services, Inc. is 9% below the Engineer’s Estimate.

The estimate is based on bids received from similar past projects and most current

HONORABLE MAYOR AND CITY COUNCIL
April 1, 2025
Subject: Report on Bids and Award of Contract for the 10489 – 2025 – 2027 LS Resurfacing (Multi - Term) Project

Page 4 ends

estimated construction prices. This bid is considered acceptable for the work involved in the Project.

MCK Services, Inc. has completed multiple multi- term projects since the City introduced this contracting approach in 2020. Notably, the company has completed two of the three years of the 2023–2025 LS Resurfacing (Multi-Term) Project and is currently working on the final term, scheduled f or completion in 2025. The scope and scale of th e Project are comparable to past resurfacing efforts, including:

• 2020–2022 LS Resurfacing (Multi -Term) Project: 20 miles in 2020, 25 miles in 2021, and 24 miles in 2022;
• 2022–2024 LS Resurfacing (Multi -Term) Project: 26 miles in 2022, 25 miles in 2023, and 30 miles in 2024; and
• 2023–2025 LS Resurfacing (Multi -Term) Project: 30 miles in 2023, 27 miles in 2024, and a projected 30 miles by May 2025.

The contract will have an initial term starting upon City Council approval and ending on December 31, 2025, with two additional one- term extension options. Unit prices in the Schedule of Q uantities for the initial term will remain applicable for each option year, subject to price adjustments based on the California Statewide Crude Oil Price Index and the California Construction Cost Index. The scope of work during the extension years will remain consistent, covering different locations with approximately the same mileage. The Director of Transportation will have the discretion to extend the contract, contingent on funding availability and appropriation.

To streamline operations and ensure cost efficiency, DOT recommends that the City Council adopt a resolution authorizing the Director of Transportation to execute the two one-term extension options as needed. This approach secures favorable pricing in future years and allows paving operations to begin earlier by reducing procurement - related delays. This contract procurement method was first piloted in 2020 and has proven successful, enabling the efficient resurfacing of 69 miles of local streets over three years.

Contingency

San José Municipal Code Section 2 7.04.050 provides for a standard contingency of 10% on all public works contracts except those involving the renovation of a building or buildings. The standard contingency is appropriate for this project.

Wage Theft Prevention Policy Check

The Office of Equality Assurance reviewed bidders for compliance with the City’s Wage Theft Prevention Policy on January 23, 2025 and again on February 12, 2025. No wage theft issues were identified.

HONORABLE MAYOR AND CITY COUNCIL
April 1, 2025
Subject: Report on Bids and Award of Contract for the 10489 – 2025 – 2027 LS Resurfacing (Multi - Term) Project

Page 5 ends

Project Labor Agreement Applicability

The City’s Project Labor Agreement is applicable to this project because the Engineer’s Estimate is over $1.21 million.

Local and Small Business Analysis

The recommended contractor is not a local or a small business enterprise. No local or small business enterprises were listed as subcontractors.

EVALUATION AND FOLLOW-UP

DOT provides an ongoing evaluation of the City’s pavement conditions and provides periodic reports on this topic to the Transportation and Environmental Committee. In addition to the project discussed in this memorandum, three additional major street projects and four additional local and neighborhood street pavement maintenance projects are scheduled for City Council action this spring.

COST SUMMARY/IMPLICATIONS

These projects support the Transportation and Aviation Services City Service Area goal to Preserve and Improve Transportation Assets and Facilities . By performing pavement maintenance, the extension of the useful life of the project streets will defer more costly reconstruction. The source of funding for these projects is through the 489 – Pavement Maintenance Measure T Bond. These projects will have a net zero impact to the General Fund as the standard in -house operating and maintenance costs are already included in DOT's annual budget.

1. TOTAL COST OF PROJECT:

Programmatic Project Delivery Estimate* (10%) $1,452,260 Construction $14,522,607
Contingency ( 10%) $1,452,260
TOTAL PROJECT COSTS $17,427,127
*Programmatic Project Delivery Estimate includes approximately $580,904 (4%) for design services and $871,356 (6%) for construction management and inspection services.

HONORABLE MAYOR AND CITY COUNCIL
April 1, 2025
Subject: Report on Bids and Award of Contract for the 10489 – 2025 – 2027 LS Resurfacing (Multi - Term) Project

Page 6 ends

2. COST ELEMENTS OF AGREEMENT/CONTRACT AS RECOMMENDED AS PART OF THE MEMORANDUM:

Mobilization $94,000
Materials and Placement $11,536,107
Utility Adjustment $1,981,000
Pavement Striping/Markings $911,500

TOTAL AGREEMENT/CONTRACT AMOUNT $14,522,607

BUDGET REFERENCE

The table below identifies the fund and appropriations to fund the contract recommended as part of this memorandum and remaining project costs, including project delivery, construction, and contingency costs.

Fund
#
Appn.
# Appropriation Name Total
Appropriation
Amount for
Contract
2024-2025
Capital
Budget
Page
Last Budget
Action (Date,
Ord. No.)
489 415Y
Pavement
Maintenance
Measure T Bond
$41,595,200 $14,522,607 945
02/11/2025,
Ord. No.
31176
Total Current Funding Available $41,595,200 $14,522,607

COORDINATION

This memorandum has been coordinated with the City Attorney’s Office, the City Manager’s Budget Office, and the Planning, Building, and Code Enforcement Department.

PUBLIC OUTREACH

This memorandum will be posted on the City’s Council Agenda website for the April 22, 2025 City Council meeting.

When the project commences, the contractor will provide advance notification regarding Project working hours, duration, and any appropriate schedule and lane closures to affected businesses and residents, as stated in the specifications. To inform traveling motorists of upcoming construction activities and potential traffic delays, changeable

HONORABLE MAYOR AND CITY COUNCIL
April 1, 2025
Subject: Report on Bids and Award of Contract for the 10489 – 2025 – 2027 LS Resurfacing (Multi - Term) Project

Page 7 ends

message signs may be used on selected streets stating the scheduled date and time for work to occur on the street.

COMMISSION RECOMMENDATION AND INPUT

No commission recommendation or input is associated with this action.

CEQA

Environmental status granted by the Planning, Building and Code Enforcement Department. Categorically Exempt, File No. ER24-313, CEQA Guidelines Section 15301(c), Existing Facilities.

PUBLIC SUBSIDY REPORTING

This item does not include a public subsidy as defined in section 53083 or 53083.1 of the California Government Code or the City’s Open Government Resolution .

/s/ /s/

JOHN RISTOW MATT LOESCH
Director of Transportation Director of Public Works

For questions, please contact Jennifer Seguin, Deputy Director, Department of Transportation at [email protected] or Mathew Nguyen, Deputy Director, Department of Public Works at [email protected] .

ATTACHMEN T: List of Streets

ATTACHMENT

Page 1 of 7 ends

List of Streets
Street Name Street From Street To CD
ERSKINE CT CALERO AV N END 2
ALBY CT FARADAY DR E END 9
ANDOVER LN E END FARADAY DR 9
ANDOVER LN FARADAY DR ROSS AV 9
BLOOMFIELD DR SALISBURY DR HENDRIX CT 9
CEFALU DR GLENVILLE DR WILLOWMONT AV 9
DONNA LN KERSTEN DR ROSS AV 9
EWER DR RONDEAU DR ROSS AV 9
FARADAY CT FARADAY DR E END 9
FARADAY DR LIVERPOOL AV ANDOVER LN 9
FARADAY DR ANDOVER LN ALBY CT 9
FARADAY PL ALBY CT S END 9
FORMAN AV KIRK RD RONDEAU DR 9
GLENVILLE DR SORCI DR CEFALU DR 9
HALLMARK LN ROSS AV WOODFORD DR 9
HALLMARK LN WOODFORD DR GAVOTA AV 9
HENDRIX WY BLOOMFIELD DR SALISBURY DR 9
JUSTINE DR KERSTEN DR HALLMARK LN 9
KERSTEN DR LEDGEWOOD DR HALLMARK LN 9
LEDGEWOOD DR ROSS AV KERSTEN DR 9
LEDGEWOOD DR KERSTEN DR MANDA DR 9
LIVERPOOL AV BLOOMFIELD DR FARADAY DR 9
LOLLIE CT KIRK RD W END 9
MATSON DR 440'S/YORK ST KIRK RD 9
MATSON DR YORK ST 440 S. OF YORK ST 9
OAKWOOD AV PALADIN DR ROSS AV 9
PALADIN DR EWER DR OAKWOOD AV 9
RONDEAU DR LIVERPOOL AV EWER DR 9
SALISBURY DR KIRK RD BLOOMFIELD DR 9
SWANGATE WY KIRK RD S END 9
TAWNYGATE WY KIRK RD W END 9
TOWN CLUB DR MATSON DR W END 9
WILLOWMONT AV MERIDIAN AV KIRK RD 9

ATTACHMENT

Page 2 of 7 ends

Street Name Street From Street To CD
WILLOWMONT AV KIRK RD GAVOTA AV 9
WOODFORD DR EWER DR HALLMARK LN 9
WOODFORD DR HALLMARK LB MANDA DR 9
YORK ST MERIDIAN AV 870 W OF MERIDIAN AV 9
YORK ST 870 W OF MERIDIAN AV MATSON DR 9
ADDIEWELL PL PASO LOS CERRITOS DESERT FLAME DR 10
ALVARADO CT COLEMAN RD E END 10
ARABIAN CT ARABIAN ST N END 10
ARABIAN ST SORREL AV DUNN AV 10
ARIEL CT ARIEL DR N END 10
ARIEL DR SNELL AV 785' N/OF CALERO AV 10
ARIEL DR 785' N/OF CALERO AV CALERO AV 10
ASHBURTON DR HENDERSON DR SANTA TERESA BL 10
BAGSHAW CT LEAN AV E END 10
BAY ST BRIDLE WY CALERO AV 10
BIG TALK CT FIREFLY DR W END 10
BIGELOW CT SANTA TERESA BL N END 10
BLACKLOCK CT SANTA TERESA BL N END 10
BOYD CT SANTA TERESA BL N END 10
BRIAN CT LARCHMONT DR E END 10
BRIDLE WY CALERO AV N END 10
BUFKIN CT CALERO AV N END 10
BUFKIN DR CALERO AV SURBER DR 10
BUFKIN DR SURBER DR CONESTOGA WY 10
BURCHELL AV OAKGLEN WY KINSPORT LN 10
BURCHELL CT BURCHELL AV W END 10
BURNBANK PL SALVATORE DR S END 10
BUTTERFLY DR SILBERMAN DR FIREFLY DR 10
CALERO AV HOLGATE AV LEAN AV 10
CALLE ALEGRE CALLE ESPERANZA W END 10
CALLE BONITA PASO LOS CERRIT CERRO VERDE 10
CALLE DE LA PAZ CALLE ESPERANZA W END 10
CALLE DEL CONEJO 566 W/OF VIA DE LAS ABEJAS VIA DE LAS ABEJAS 10 CALLE DEL CONEJO VIA DE LOS REYES 566 W/OF VIA DE LAS ABEJAS 10

ATTACHMENT

Page 3 of 7 ends

Street Name Street From Street To CD
CALLE ESPERANZA PASO LOS CERRIS REDMOND AV 10
CAMINO ROBLES CT CAMINO ROBLES W S END 10
CAMINO ROBLES WY CERRO VERDE PASO LOS CERRIS 10
CAMINO ROBLES WY PASO LOS CERRIS FRANCISCAN WY 10
CASTELLO DR REDMOND AV GOLDEN OAK WY 10
CECALA DR GOLDEN OAK WY REDMOND AV 10
CERRO VERDE PASO LOS CERRITOS SKYFARM CT 10
CHRISMARA CT CASTELLO DR W END 10
CLYDESDALE AV CALERO AV ARABIAN ST 10
CONESTOGA WY PINELAND AV DUNN AV 10
CONESTOGA WY DUNN AV LEAN AV 10
CORTE BONITA CALLE BONITA W END 10
CORTE CAMULA MANCUSO ST W END 10
CORTE DE BELLEZA MANCUSO ST W END 10
CORTE DE LA REINA REDMOND AV S.END 10
CORTE DE ROSA VIA DEL LOS GRE S END 10
CORTE DEL CONEJO CALLE DEL CONEO S END 10
COTTON CT SANTA TERESA BL N END 10
CRESTOAK CT REDMOND AV N END 10
CROSSGATES LN FIREFLY DR MCABEE RD 10
CUERNAVACA CT PASO LOS CERRIT N END 10
DE PALMA CT DE PALMA DR S END 10
DE PALMA DR FRANCISCAN WY LOS RIOS DR 10
DEB CT MCABEE RD W END 10
DESERT FLAME DR CAMDEN AV NANCARROW WY 10
DESERT FLAME DR NANCARROW WY 488 N/O NANCARROW WY 10
DESERT FLAME DR 488'N/NANCARROW WY FIREFLY DR 10
DORN CT LARCHMONT DR N END 10
DOT CT MERIDIAN AV W END 10
DUET CT BURNBANK PL W END 10
DUNN AV CLYDESDALE AV CONESTOGA WY 10
DUNN AV CONESTOGA WY SANTA TERESA BL 10
EMLYN CT SANTA TERESA BL N END 10
FIREFLY DR REDMOND AV BUTTERFLY DR 10

ATTACHMENT

Page 4 of 7 ends

Street Name Street From Street To CD
FIREFLY DR BUTTERFLY DR NANCARROW WY 10
FIREFLY DR NANCARROW WY CAMDEN AV 10
FLAX MOSS CT DESERT FLAME DR W END 10
FRANCISCAN CT FRANCISCAN WY E END 10
FRANCISCAN WY MONTELEGRE DR CAMINO ROBLES 10
FRANCISCAN WY CAMINO ROBLES PASO LOS CERRITOS 10
GLEN HARBOR DR SANTA TERESA BL CONESTOGA WY 10
GOLDEN OAK WY MCABEE RD PASEO PUEBLO DR 10
GONDOLA WY CAMDEN AV NANCARROW WY 10
GUADALAJARA CT CAMDEN AV S END 10
GUADALAJARA DR CAMDEN AV VIA MADERO DR 10
GUADALUPE MINES CT GUADALUPE MINES RD E END 10
GUADALUPE MINES RD CAMDEN AV 1370'S/CAMDEN AV 10
HARVEST OAK WY OAK FOREST WY SAGE OAK WY 10
HICKS RD CAMDEN AV BURKE RD 10
HILLBRIGHT CR ARIEL DR ARIEL DR 10
HILLBRIGHT CT HILLBRIGHT CR E END 10
HILLBRIGHT PL HILLBRIGHT CR N END 10
HOLGATE AV SURBER DR CALERO AV 10
HORTON CT SANTA TERESA BL N END 10
KINSPORT LN BURCHELL AV BURCHELL AV 10
KNOLL PARK CT GOLDEN OAK WY S END 10
LARCHMONT CT LARCHMONT DR N END 10
LARCHMONT DR COTTLE RD SANTA TERESA BL 10
LARCHMONT DR LARCHMONT DR N END 10
LINDAHL CT SILBERMAN DR W END 10
LOS RIOS CT LOS RIOS DR E END 10
LOS RIOS DR CAMDEN AV DE PALMA DR 10
LOS RIOS DR DE PALMA DR MONTEVERDE DR 10
MACADAM CT CALERO AV N END 10
MACADAM CT MACADAM CT E END 10
MADISON CT SANTA TERESA BL N END 10
MANCUSO ST NANCARROW WY 580' N/NANCARROW WY 10
MANCUSO ST 580' N/NANCARROW WY REDMOND AV 10

ATTACHMENT

Page 5 of 7 ends

Street Name Street From Street To CD
MANICHETTI CT CALERO AV N END 10
MCABEE CT (N) MCABEE RD E END 10
MCABEE CT (S) MCABEE RD E END 10
MCGILVRA CT CALERO AV N END 10
MEDALLION DR BURCHELL AV REDMOND AV 10
MENORCA CT MONTORO DR W END 10
MONTALBAN DR CAMDEN AV MONTEVERDE DR 10
MONTELEGRE DR CALLE ESPERANZA MONTELLANO DR 10
MONTELLANO DR CAMDEN AV MONTELEGRE DR 10
MONTEVAL CT CAMDEN AV S END 10
MONTEVAL LN COLEMAN RD CAMDEN AV 10
MONTEVERDE DR REDMOND AV MONTELEGRE DR 10
MONTEVERDE DR MONTELEGRE DR DE PALMA DR 10
MONTORO CT MONTELEGRE DR S END 10
MONTORO DR MONTELEGRE DR REDMOND AV 10
MOSS OAK WY REDMOND AV OAK FOREST WY 10
NANCARROW CT MANCUSO ST W END 10
NANCARROW WY FIREFLY DR DESERT FLAME 10
NANCARROW WY DESERT FLAME MANCUSO ST 10
OAK FOREST WY MOSS OAK WY 885'N/MOSS OAK 10
OAK FOREST WY 885'N/MOSS OAK HARVEST OAK WY 10
OAKGLEN WY MERIDIAN AV 670'E/MERIDIAN 10
OAKGLEN WY 670'E/MERIDIAN SALVATORE DR 10
OSTENBERG DR REDMOND AV GOLDEN OAK WY 10
PASEO PUEBLO CT PASEO PUEBLO DR W END 10
PASEO PUEBLO DR GOLDEN OAK WY REDMOND AV 10
PASO LOS CERRITOS CALLE ESPERANZA MERIDIAN AV 10
PASO LOS CERRITOS CAMDEN AV CALLE ESPERANZA 10
PERALTA CT MCABEE RD W END 10
PERNICH CT SILBERMAN DR W END 10
PINELAND AV SANTA TERESA BL SHAWCROFT DR 10
PONTIUS CT CALERO AV N END 10
PUERTO VALLARTA DR VERA CRUZ DR CAMDEN AV 10
PUERTO VALLARTA DR CAMDEN AV 366'E/GUADALUPE MINES RD 10

ATTACHMENT

Page 6 of 7 ends

Street Name Street From Street To CD
PUERTO VALLARTA DR 366'E/GUADALUPE MINES RD GUADALUPE MINES RD 10 RACHEL CT ARIEL DR N END 10
RHINECASTLE WY MCABEE RD SYLVANER WY 10
RIDGE OAK CT MCABEE RD W END 10
RIDGEFARM DR ARIEL DR SNELL AV 10
ROADING DR SNELL AV RIDGEFARM DR 10
ROAN ST BAY ST BRIDLE WY 10
ROYAL ACORN PL MOSS OAK WY N END 10
SAFARI DR SHAWCROFT DR PINELAND AV 10
SAGE OAK WY HARVEST OAK WY ROYAL ACORN PL 10
SALVATORE CT BURNBANK PL W END 10
SALVATORE DR CASTELLO DR BURNBANK PL 10
SANTA MESA DR DUNN AV SANTA TERESA BL 10
SHAWCROFT DR SNELL AV PINELAND AV 10
SHAWCROFT DR PINELAND AV CALERO AV 10
SILBERMAN DR REDMOND AV NANCARROW WY 10
SKYFARM CT CAMDEN AV N END 10
SORREL AV CONESTOGA WY CALERO AV 10
SPRINGER WY HENDERSON DR SANTA TERESA BL 10
STANLEY CT SANTA TERESA BL N END 10
STELLA CT SANTA TERESA BL N END 10
STRELOW CT REDMOND AV S END 10
SURBER DR BUFKIN DR LEAN AV 10
SURBER DR LEAN AV HOLGATE AV 10
SYLVANER WY RHINECASTLE WY ZINFANDEL WY 10
TERRIER CT SANTA TERESA BL N END 10
TORRINGTON CT MERIDIAN AV W END 10
TREE TOP CT CALERO AV N END 10
TUSCARORA DR SHAWNEE LN 580'E/OF SNELL AV 10
TWEEDHOLM CT MERIDIAN AV S END 10
VERA CRUZ DR MONTEVERDE DR COLEMAN RD 10
VIA DE ADRIANNA PASO LOS CERRIT CERRO VERDE 10
VIA DE LAS ABEJAS REDMOND AV PASO LOS CERRITOS 10
VIA DE LOS REYES REDMOND AV VIA DE LAS ABEJAS 10

ATTACHMENT

Page 7 of 7 ends

Street Name Street From Street To CD
VIA DE LOS REYES VIA DE LAS ABEJAS CALLE DEL CONJO 10
VIA DEL LOS GRANDE CERRO VERDE CERRO VERDE 10
VIA MADERO DR COLEMAN RD PUERTO VALLARTA DR 10
VIA MADERO DR PUERTO VALLARTA DR MONTELLANO DR 10
VILMAR AV BURCHELL AV REDMOND AV 10
VINCENT CT SANTA TERESA BL N END 10
WOODRUFF DR MERIDIAN AV BURNBANK PL 10
ZINFANDEL WY SYLVANER WY MCABEE RD 10