Prepared for the
CITY OF SAN JOSÉ
By
RHAA Landscape Architects and Planning
Master Plan Update Report
Overfelt Gardens Park
Master Plan Update
July 10, 2024
Attachment A
ii OVERFELT GARDENS PARK MASTER PLAN UPDATE
Prepared for the
CITY OF SAN JOSÉ
By
RHAA Landscape Architects and Planning
MASTER PLAN UPDATE
Approved by the City of San José
Parks, Recreation and Neighborhood Services:
July 10, 2024
FINAL
July 10, 2024
Overfelt Gardens Park
Master Plan Update
This Master Plan Update supercedes prior plans that have guided development and operations at the park, and which are more fully described in Section 2.3 of this document iv OVERFELT GARDENS PARK MASTER PLAN UPDATE
Table of Contents ............................................. v List of Figures ..................................................... vii List of Abbreviations and Acronyms ........... ix
Section 1: Executive Summary ............................... 1
1.1 Purpose
Section 2: Site Context ........................................... 4
2.1 Regional
2.2 Neighborhood
2.3 History and Previous Plans
2.4 Park Context
2.5 Site Analysis
Section 3: Planning Process ................................. 28
3.1 Approach
3.2 Goals & Vision
3.2.1 ActivateSJ and General Plan
Goals
3.2.2 Vision
3.3 Stakeholder Outreach
3.3.1 Approach
3.3.2 Technical Advisory Committee
(TAC) Identify and Issues
3.3.3 Community Meetings and
Surveys
3.3.4 General Conclusions
3.4 Ponds Study
Section 4: Park Plan ............................................. 47
4.1 Master Plan Update Concept
4.1.1 Farmhouse District
4.1.2 Botanical Garden District
4.1.3 Chinese Cultural Gardens District
4.1.4 Nature District
4.1.5 Civic District
4.2 Recommended Improvements
4.3 Programming
Section 5: Development Guidelines .................... 72
5.1 Design Themes & Materials
5.2 Planting
Section 6: Implementation ................................... 80
6.1 Estimated Capital Cost and
Prioritization
6.2 Operations & Maintenance
6.3 Revenue Generation
Appendix ................................................................ 91
TABLE OF CONTENTS
OVERFELT GARDENS PARK MASTER PLAN UPDATE v
vi OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 2.1.A
FIGURE 2.1.B
FIGURE 2.2.A
FIGURE 2.2.B
FIGURE 2.2.C
FIGURE 2.2.D
TABLE 2.4.A
FIGURE 2.4.A
FIGURE 2.4.B
TABLE 2.5.A
FIGURE 2.5.A
FIGURE 2.5.B
FIGURE 2.5.C
FIGURE 2.5.D
FIGURE 2.5.E
FIGURE 2.5.F
TABLE 3.1.A
TABLE 3.2.A
TABLE 3.3.A
TABLE 3.3.B
FIGURE 3.3.A
FIGURE 3.3.B
FIGURE 3.3.C
FIGURE 3.3.D
FIGURE 3.3.E
FIGURE 3.3.F
FIGURE 3.3.G
FIGURE 3.3.H
FIGURE 3.3.I
FIGURE 3.3.J
FIGURE 3.3.K
FIGURE 3.3.L
FIGURE 3.3.M
FIGURE 3.3.N
5 7
8 9
9 9
12 13
14 16-27
17 18
20 23
23 25
29 30-31
32 33-34
35 36
36 36
37 37
37 38
38 39
39 39
40 40
LIST OF FIGURES/TABLES
Regional Context Map .....................................................................................................................................................
City of San Jose and Council District 5 Map ...........................................................................................................
Neighborhood Context Map ........................................................................................................................................
Demographic Diagrams - Population Density .......................................................................................................
Demographic Diagrams - Age and Sex ...................................................................................................................
Demographic Diagrams - Ethnicity ............................................................................................................................
Park Context .........................................................................................................................................................................
Park Context Map .........................................................................................................................................
Access and Transit Map....................................................................................................................................................
Site Analysis .....................................................................................................................................................................
Existing Layout and Topography ....................................................................................................................................
Opportunities and Constraints .....................................................................................................................................
Existing Site Features .........................................................................................................................................................
Cultural History Map ..........................................................................................................................................................
Existing Tree Locations and Canopy ...........................................................................................................................
Existing Circulation and Access ....................................................................................................................................
Planning Proccess Tasks and Time Frame ................................................................................................................
Goals and Vision ............................................................................................................................................................
Technical Advisory Committee .....................................................................................................................................
Focus Group Meetings ................................................................................................................................................
Survey #1 - Age & Ethnicity .............................................................................................................................................
Survey #1 - Party Size & Age ...........................................................................................................................................
Survey #1 - Distance & Visitation Frequency ...........................................................................................................
Survey #1 - Reasons for Visiting ....................................................................................................................................
Survey #1 - Favorite Features..........................................................................................................................................
Survey #1 - Desired Park Features ...............................................................................................................................
Survey #1 - Desired Improvments ................................................................................................................................
Survey #2 - Age & Ethnicity .............................................................................................................................................
Survey #2 - Visitation Frequency...................................................................................................................................
Survey #2 - Operations & Maintenance....................................................................................................................
Survey #2 - Facility Improvements................................................................................................................................
Survey #2 - Enhanced Program....................................................................................................................................
Survey #2 - Preferred Amphitheater Locations.......................................................................................................
Survey #2 - Visitation..........................................................................................................................................................
OVERFELT GARDENS PARK MASTER PLAN UPDATE vii
viii OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 3.4.A
FIGURE 3.4.B
FIGURE 3.4.C
FIGURE 3.4.D
FIGURE 4.1.A
FIGURE 4.1.B
FIGURE 4.1.C
FIGURE 4.1.D
FIGURE 4.1.E
FIGURE 4.1.F
FIGURE 4.1.G
FIGURE 4.1.H
FIGURE 4.1.I
FIGURE 4.1.J
FIGURE 4.1.K
FIGURE 4.1.L
FIGURE 4.1.M
FIGURE 4.1.N
FIGURE 4.1.O
FIGURE 4.1.P
TABLE 4.2.A
FIGURE 4.1.Q
FIGURE 5.1.A
TABLE 5.1.A
TABLE 6.1.A
TABLE 6.1.B
TABLE 6.2.A
TABLE 6.3.A
Pond A & B Study Diagram .............................................................................................................................................
Pond C Study Diagram ....................................................................................................................................................
Pond D Study Diagram ......................................................................................................................................................
Combined Pond System Storm Catchment Area ................................................................................................
Rendered Plan Foldout .....................................................................................................................................................
Concept Diagram ..............................................................................................................................................................
Proposed Districts ...............................................................................................................................................................
Proposed Circulation .........................................................................................................................................................
Rendered Plan Foldout - Farmhouse District .................................................................................................................
Rendered View - Proposed Outdoor Classroom ...................................................................................................
Rendered View - Proposed Overfelt House Garden .............................................................................................
Rendered Plan Foldout - Botanical Garden District .............................................................................................
Rendered View - Restored Botanical Garden .........................................................................................................
Rendered View - Proposed Children’s Garden .......................................................................................................
Rendered Plan Foldout - Chinese Cultural Gardens District ............................................................................
Rendered View - Restored Reflecting Pool ...............................................................................................................
Rendered Plan Foldout - Nature District.....................................................................................................................
Rendered Plan Foldout - Civic District ........................................................................................................................
Rendered View - New Park Entrance Path.................................................................................................................
Rendered View - Civic Performance Area ................................................................................................................
Recommended Improvements ...............................................................................................................................
Proposed Circulation ......................................................................................................................................................... (5) Proposed Distinct Park Districts ..............................................................................................................................
Design Themes and Materials .................................................................................................................................
Capital Improvements ......................................................................................................................................................
Capital Improvements - Itemized Breakdown ........................................................................................................
Operations and Maintenance ......................................................................................................................................
Event Space Capacities ..................................................................................................................................................... 43 43
44 44
46 48
49 50
51 53
53 54
56 56
57 59
60 63
65 65
66-70
71 73
74-77
82 83
86 87
OVERFELT GARDENS PARK MASTER PLAN UPDATE ix
x OVERFELT GARDENS PARK MASTER PLAN UPDATE
AC
ADA
BMP
CEQA
CY
DOT
EA
LF
LS
NTS
PCC
ROW
SJ
SF
Asphalt Concrete (paving)
Americans with Disabilities Act
Best Management Practices
California Environmental Quality Act
Cubic Yard
Department of Transportation
Each
Linear Foot
Lump Sum
Not To Scale
Portland Cement Concrete (paving)
Right Of Way
San Jose
Square Foot
LIST OF ABBREVIATIONS AND ACRONYMS
OVERFELT GARDENS PARK MASTER PLAN UPDATE xi
xii OVERFELT GARDENS PARK MASTER PLAN UPDATE
IN THIS SECTION:
1.1 Purpose
1.1 PURPOSE
The Department of Parks, Recreation and Neighborhood Services (PRNS) has prepared this Master Plan Update to prioritize restoration of park features and guide the design and construction of new amenities at Overfelt Gardens Park. The goal is to preserve, restore and enhance this regional park. New amenities are anticipated to encourage and support greater usage of the park by offering refreshed park features and unique attractions and programming to both local users and regional visitors.
This Master Plan Update provides a framework for revitalizing Overfelt Gardens Park, a special space with a pleasing, timeless design that can be retained and celebrated without significant design intervention. This document is informed by community input and ActivateSJ goals.
Section 2 describes the park’s location in East San Jose and surrounding land uses, which include residential, education and medical. The park’s origins and several previous Master Plans are outlined, as well as nearby park offerings. A detailed Site Analysis exploring opportunities and constraints for the park is provided.
Section 3 details the Planning Process, which was guided by ActivateSJ and General Plan Goals and led to a vision for the Master Plan Update to ensure the park’s future as:
• An outstanding, passive, garden-focused park;
• A cultural destination;
• An icon for San Jose’s identity; and
• A place to visit over and over again.
The outreach program included a variety of City and outside agency stakeholders, as well as the community at large. Three community meetings and two surveys were conducted to inform and solicit feedback from the public. This section also includes a discussion of the technical study of the existing ponds that was completed as part of this process.
Section 4 describes the overall concept for the Master Plan, which includes the designation of 5 distinct districts within the park: Farmhouse District, Botanical Garden District, Chinese Cultural Gardens District, Nature District, and Civic District. Recommended improvements are described, along with the ActivateSJ principles they support. A discussion of recommended programming is also provided.
1. EXECUTIVE SUMMARY
Existing Conditions
1 Executive Summary
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Existing Conditions
Section 5 provides materials and furnishings recommendations for each district, selected to support an identifiable sense of place within the park, while retaining a unified overall aesthetic. General landscape planting guidance is provided, while specific plant selection is deferred to the PRNS Park Design Guidelines, which are currently under revision.
Section 6 offers an implementation plan with Rough Order of Magnitude costs for the recommended improvements and prioritization based on impact to the park aesthetic and experience, community desire based on survey feedback and the goal of revitalizing key features of the park before adding new improvements. A discussion of operations and maintenance requirements, with emphasis on additional staffing needed is provided, as well as potential revenue generating opportunities.
2 OVERFELT GARDENS PARK MASTER PLAN UPDATE
SITE CONTEXT
OVERFELT GARDENS PARK MASTER PLAN UPDATE 3
4 OVERFELT GARDENS PARK MASTER PLAN UPDATE
2 . S I T E C O N T E X T
IN THIS SECTION:
2.1 Regional
2.2 Neighborhood
2.3 History and Previous
Plans
2.4 Park Context
2.5 Site Analysis
FIGURE 2.1.A Regional Context Map
2.1 REGIONAL
Overfelt Gardens Park is a 33-acre Regional Park situated within Council District 5 of the City of San Jose, an area known as “East San Jose”. The City of San Jose is located at the southern edge of San Francisco Bay in Santa Clara County. It is the largest city in the Bay Area. 5 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Aerial - San Jose, CA
Aerial - The San Francisco Bay. San Jose is located in what is referred to locally as the “South Bay”
City Hall, San Jose, CA
San Jose has a Mediterranean climate with warm to hot,
dry summers and mild to cool, wet winters. Park usage
throughout the year is enjoyable with an annual mean
temperature of 60.5 °F.
6 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 2.1.B City of San Jose and Council District 5 Map Aerial - San Jose, CA
7 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2.2 NEIGHBORHOOD
Overfelt Gardens Park is situated centrally between highways I-680 and I-101 in the “McKee/Jackson” neighborhood of Council District 5.
Rectangular in form, the park is bordered by Independence High School and Educational Park Branch Library to the north, Santa Clara County Health Department to the east, McKee Road to the south, and Educational Park Drive to the west. The park shares a parking lot with the Library. The Regional Medical Center of San Jose is located across McKee Road at the corner of Jackson Avenue. The remainder of the area is largely residential.
McKee Road functions as a major thoroughfare along which small commercial buildings and apartments are situated. This is contrasted by Educational Park Drive which serves as a residential street lined with singlefamily homes. The park’s primary frontage along McKee Road is largely shielded from view by shrubs and trees. Modest signage announces the park, but there is little indication to pedestrians and drivers of the park’s size, features and attractions.
Based on the 2020 Census, the residential community in the immediate area of the park closely mirror both the age and ethnic distributions of the City as a whole.
FIGURE 2.2.A Neighborhood Context Map
8 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 2.2.B Demographic Diagrams - Population Density
FIGURE 2.2.C Demographic Diagrams - Age and Sex
FIGURE 2.2.D Demographic Diagrams - Ethnicity
9 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Friendship Gate, dedicated in 1977
Central Pond (1of 3), 1975
2.3 HISTORY AND PREVIOUS PLANS
William and Mary Overfelt farmed grain and dairy on approximately 160 acres in the late 1800’s as early San Jose pioneers. In 1959, their daughter, Mildred Overfelt, granted 33 acres of that land to the City of San Jose for a park to be developed in honor of her parents. Mildred specified that the goal of the future park would be “to provide a place of rest, relaxation, aesthetic, and other enjoyment for the people of San Jose”. Included in the deed is the restriction that “the City shall have no right to construct or establish, nor permit the construction or establishment of any football, baseball, basketball, soccer, or tennis fields or courts”, thus formalizing the passive intent for the park.
In the early 1960s, the City developed plans for annual-perennial, palm desert, and California native plant gardens within the southern eight acres of the property. The park and its collections of gardens opened to the public in 1966. One of the early and unique features of Overfelt Gardens was the Fragrance Garden for the Blind. The Fragrance Garden opened in 1971 and featured a variety of plants picked for their capacity to engage the sight-impaired through fragrance and texture, with braille coded signage for plant identification.
Chinese culture became an integral part of the park’s identity in the early 1970s. The Chinese Cultural Garden was made possible through a partnership between the park planners, San Jose residents and friends of Mildred Overfelt, Frank and Pauline Lowe, and Dr. Chen Li-Fu of Taiwan.
Chinese-style art and structures were installed with a vision to broaden the understanding between Eastern and Western societies in a tranquil setting.
The Chinese Cultural Garden spans five acres in the park.
San Jose City Council has approved several master plans over the past 50 years, each with a specific objectives and goals. A 1972 Master Plan led to further park development in 1974, with construction of three ponds and a reflecting pool. These bodies of water framed by rolling topography provide the structure for the park’s current layout.
The 1974-75 Master Plan sought to provide a framework for the park’s varied amenities:
• Offer a place for educational and scientific activities; • Label plants for awareness, critical examination and scientific study; • Provide gardens as a cultural center with facilities such as an amphitheater, demonstration gardens, conservatory, library and the Chinese Cultural Garden area; and
• Operate and maintain with an assigned supervisor, staff and labor force.
10 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Chiang Kai-Shek Pavilion, dedicated in 1984
Overfelt House, 1985
Sun Yat-Sen Memorial Hall, dedicated in
1984
A number of improvement projects followed this Master Plan, including two additions to the Chinese Cultural Gardens; the Chiang Kai-Shek Pavillion and the Sun Yat Sen Memorial in 1983.
In 1989, a Master Plan was prepared for the site that emphasized the park as a botanical garden. The plan’s goals included, among others, the following:
• Re-establish and enhance the botanical nature of Overfelt Gardens;
• Enhance, enrich and provide for adequate maintenance and programs within the cultural elements and garden areas of the park;
• Protect, preserve and enhance the natural areas and wildlife species; and
• Promote public safety within the park.
The plan recommended the addition of multiple buildings that were never added to the park. These include a Botanical Center, a Conservatory, an Office/Service Building, and a Storage Building at an estimated total cost of $2,325,000 in 1989 dollars.
The Overfelt family home, constructed in 1876, is located on the park site. In 1985 it was designated as Historic Landmark No. 30 by San Jose City Council. In 2006, a restoration of the structure was completed, which included space for programmed uses including a visitor center, offices, meeting and classrooms, kitchen and restrooms.
In recent years, the City prepared a Conditions Assessment of the monuments in the Chinese Cultural Gardens. Staff sought to determine actions needed to ensure the sustainable preservation of these important structures. Over the same timeframe, it became clear that the existing water supply to the ponds was unreliable and that the ponds were declining as a result. It was decided to prepare an Master Plan Update to reflect the current realities of the park.
1989 Master Plan
11 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Park Park type Acreage
Driving
Distance
(miles) Amenities
Penitencia Creek
County Park
Linear Park and Regional
Trail
163 1.0 • Multi-use trail
• Native & developed open
space
Plata Arroyo Park Community 106 0.7 • Picnic areas with BBQ (non-reservable)
• Exercise Course
• Skate Park
• Basketball Courts (2)
• Playground (2-5 years)
• Playground (5-12 years)
• Restrooms
• Street Parking
Jackson Madden
Park
Neighborhood 0.31 0.7 • Picnic areas (non reservable)
• Playground (2-5 years)
Watson Park Community 27 2.7 • Picnic areas with BBQ
(non-reservable)
• Soccer Fields (2)
• Basketball Courts (2)
• Playground (2-5 years)
• Playground (5-12 years)
Penitencia Creek County Park
Plata Arroyo Park
2.4 PARK CONTEXT
In the context of the parks and open space in the area, Overfelt Gardens Park is unique in character and what it offers to the community. The park offers cultural elements that provide visitors a space for learning, reflection and a serene, natural environment. The passive nature of
Overfelt Gardens, the historic farmhouse, unique Chinese cultural monuments, ponds, and meandering paths within
abundant mature trees contrast with the active nature
of other parks in the area. Several parks exist within a two-mile radius and provide a range of active recreation opportunities, including soccer fields, basketball courts, exercise equipment, playgrounds and a skate park.
Nearby parks and their amenities are summarized in the
table below.
Table 2.4.A
12 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Plata Arroyo Park
Watson Park
FIGURE 2.4.A Park Context Map
13 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 2.4.B Access and Transit Map
14 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
15 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Description Opportunities & Constraints
Existing Layout & Topography Opportunities & Constraints • Park is comprised of rolling hills (21 acres), three
“percolation” ponds (4 acres), flat and gently
rolling turf (7 acres) with remaining acreage in
parking and meandering pathways.
• The existing layout of ponds, meandering walks,
rolling topography and flat grassy areas within the
park represents a pleasing, timeless design that
can be retained and celebrated without significant
design intervention.
• The ponds set within undulating topography
create visual interest and a sense of discovery.
• These basic elements of the park alone (water
features, gardens, turf areas, trees and understory)
require a considerable amount of ongoing
investment in maintenance to keep the park
welcoming.
• A berm and abundant mature trees in the
southeast corner of the park buffer the park from
the busy street but block views and do not foster
an inviting presence from the street.
• Park edges could be improved to announce the
park’s presence as a public space, make park
more inviting and facilitate pedestrian access from
surrounding uses.
Parking Lot (shared with Library) Opportunities & Constraints • Concrete park name sign is small and outdated
and does not visually convey the grandeur and
character of the park.
• Paid parking could discourage disuse but may
also discourage park users.
• Pavement in poor condition, striping faded. • Library could validate parking for park and library users.
• Does not visually enhance the park. • Refurbishment of parking lot would express a higher quality space in keeping with the special
nature of the park.
• Used by high school students and unhoused,
reducing available spaces for park users
Entries Opportunities & Constraints
Primary Entry (Educational Park Drive)
• Existing primary entry kiosk is unused.
• Steps limit accessibility.
• Lacks cohesive design and does not visually
convey the character of the park.
McKee Road Entry
• Existing entry consists of a modest opening in
the chain link fence.
• Existing entries could be enhanced with
distinctive, unified design elements that convey the
park’s character.
• Additional entries would facilitate pedestrian access to the surrounding community and enhance the
park’s presence in the area, potentially encouraging
greater use.
Independence High School
• Existing entry consists of a modest opening in
the chain link fence.
Service Gate
• A vehicular service gate is accessed from the
County Health Services building. This is for
authorized personnel only.
Table 2.5.A
2.5 SITE ANALYSIS
The following table describes various elements of the park and potential opportunities for improvements as well as constraints identified during on-site reconnaissance of the park. 16 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 2.5.A Existing Layout and Topography
Existing Parking Lot
Existing Primary Entry at Educational Park Drive
17 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 2.5.B Opportunities and Constraints
18 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
19 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt House Opportunities & Constraints
• The Overfelt House was built in 1876 and is a
designated historical landmark by the City of
San Jose.
• The house is in good condition following the
renovation and has good potential to be further
celebrated as a feature of the park.
• The house was restored in 2006 and now
houses offices and supplies for park staff.
• The renovation intended for it to be used as a Park
Visitor Center for the public. This function has not
yet been implemented but could be in the future.
• The house itself is a visual attraction but
currently offers little visitor experience.
• The area around the house could be enhanced
to provide a unique event space creating an
opportunity for the community to enjoy this historic
resource.
• The house is surrounded by unattractive
service yard buildings, service parking,
dumpsters and fenced areas for storage with
unsightly shipping containers, which detract
from the experience of the home for park
users.
Overfelt House Today
FIGURE 2.5.C Existing Site Features
20 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Ponds Opportunities & Constraints
• Three ponds with surface areas of 1.1 acres
1.14 acres and 1.9 acres create a central
design element of the park.
• Recycled water was brought to the park in late
2020 providing connections for park irrigation and
the reflecting pool and also provides a possible
new water source for the ponds.
• Ponds have not received a water supply from
Penitencia Creek for several years and Santa
Clara Valley Water District (Water District) has
indicated that no future water supply from
them should be expected.
• Use of recycled water to fill the ponds will likely
trigger Santa Clara Valley Water District
involvement in the design of the features.
• Ponds are in decline and at times emit foul
odors. They do not fill adequately during
rainy seasons and at least one has almost no
ponding during extended dry periods.
Picnic & Restrooms Opportunities & Constraints
• A reservable group picnic shelter is located in
the gardens area of the park. It is aging and
lacking in distinctive character. There is no
barbeque, as barbeques are not permitted at
Overfelt Park.
• A renovation of this area would improve the
aesthetic character and functionality of the space
to create better unity between the elements and
provide more useability for visitors.
• A restroom building is located near the group
picnic area. The restroom building has four
stalls for men and women. The building has a
mural painted on the side. The building is
aging and reflects an outdated design
aesthetic.
• Beautifying the area and allowing additional uses,
such as barbecue installations, would likely attract
reservations and draw revenue.
• There is little design character or aesthetic
unity between these structures.
Existing Restroom Building
Existing Pond (1 of 3)
Existing Picnic Structure
21 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Chinese Cultural Gardens Opportunities & Constraints
Includes the following monuments:
1. The Sun Yat-sen Memorial Hall (constructed
1983-84)
2. Chiang Kai-shek Pavilion (constructed
1983-84)
3. Plum Pavilion (constructed 1986-87)
4. Friendship Gate
5. Confucius Statue & Reflecting Pool
6. The Sundial
In 2014 and 2017 two reports1 were prepared providing
condition assessments and recommendations for
safeguarding the preservation of some of the
monuments:
• Sun Yat Sen Memorial Hall
• Chiang Kai-shek Pavilion
• Plum Pavilion
• Friendship Gate
• The first four monuments in the list above
were assessed in 2014 and 2017 and were
found to have various deficiencies, including
roof leaks, tile damage, water damage and
cracked mortar.
• Recommended improvements in the reports could
be prioritized and implemented as part of the
Master Plan Update.
• A concrete lined reflecting pool is located
under the Confucius Statue. It is currently
drained and in need of resurfacing, creating
a sense of blight within the park.
• A recycled water connection was brought to the
system serving the reflecting pool. The pool could be
resurfaced and served by this recycled water,
returning to its former beauty.
Landscape/ Botanical Gardens Opportunities & Constraints • Oak trees are the predominant tree but
other native and non-native trees are
present on the site.
• Abundant mature trees provide environmental
benefits and support the park’s status as a natural
place for passive recreation.
• Native and non-native species provide
understory for habitat and park character.
• Two recycled water irrigation connections were
added to the park in 2020, meaning that the
parks irrigation system is not using potable water,
reducing, though not eliminating, the concern about
the landscape’s consumption of water.
• A palm garden with numerous palm species
remains from the original botanical garden.
• A large number of trees need to be monitored and
maintained for tree health and user safety.
• Other former gardens are no longer present
or are in decline.
• Existing and future plantings should be considered
for both drought and recycled water tolerance.
• Signage identifying plant material is
damaged or missing.
• A turf lawn is located in the botanical
gardens area. Its placement, size and
orientation do not convey that it is a central
gathering space for events or an element to
orientate users within the park.
1 Historic Chinese Hall and Pavilions Condition Assessment and Treatment Recommendations, 2014 and Supplementary Report – Chinese Hall Pavilions and Gateway Roofs”, 2017
22 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 2.5.D Cultural History Map
FIGURE 2.5.E Existing Tree Locations and Canopy
23 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Circulation Opportunities & Constraints
• A range of path types exist within the park.
The paths vary in width, condition and
material.
• A “walking loop” could be identified and marked
with distance markers, adding a simple program
element at relatively low cost.
• The meandering layout of the paths are
pleasing and support the gardenesque
nature of the park.
• Existing circulation should be assessed for ADA
compliance.
• Routes needed for service vehicles should be vehicle
rated, including any bridges
Service & Storage Opportunities & Constraints
• The primary service yard for the park is
located near Overfelt House. The house is
currently being used by staff rather than for
park visitors.
• Service yard and staff space is needed but could be
consolidated and reallocated for efficiency.
• Service yard includes several aging and
mismatched structures, fencing, storage
containers and visible dumpsters, all of
which obscure views of the house.
• Frontage along Educational Park Drive impacts park
aesthetics and park visitor experience as they reach
primary entrance gate/parking lot. Improvements to
this area could consider aesthetics from said street
to improve visitor experience.
• The location directly adjacent to and visible
from Educational Park Drive and near the
park’s primary entry detract from the entry
experience and does not celebrate Overfelt
House to its maximum potential.
• Service vehicles enter the service area off
the parking lot. There is a vehicular
connection to the park from the service
area.
• A vehicular gate for staff only exists off the
parking lot for the County Health Facility to
the east of the park.
Existing Service Area, looking towards
Overfelt House
Service Area Secured Gate Existing Service Area
24 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Fencing Opportunities & Constraints
• The perimeter of the park is fenced and can
be closed at night.
• Harmonizing and enhancing the fence could help
define the park’s edges, and create a more unified
aesthetic and better convey the park’s character.
• Fence design lacks consistency, with the
majority being chain link and not attractive.
• Perimeter planting and berms make
observation of the park from the street
difficult.
• Selective openings and enhancing of views into the
park to attractive park amenities while retaining
sufficient edge planting to maintain the secluded
feel within the park could improve the park’s
presence in the neighborhood, attract users and
support a sense of safety.
Existing wood guardrails at pedestrian
bridges
Existing fencing at park entry perimeter Existing chainlink fencing at park entry kiosk
FIGURE 2.5.F Existing Circulation and Access
25 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Site Furnishings Opportunities & Constraints
• There is a limited amount of site furniture in
the park, consisting mainly of picnic tables
and benches.
• Harmonization and careful selection of materials
and theming for site furnishings could enhance the
park aesthetic and sense of place.
• Locations do not maximize primary views. • Carefully sited seating nodes could improve enjoyment of the park’s key features.
• Styles vary and do not relate to adjacent
buildings or landscapes.
• Donor benches or other donor recognition
elements, consistent with the PRNS donor policy,
could be implemented for fundraising and to
promote a sense of ownership of the park.
• Condition and manufacturers vary, with
much of the furnishings aging and in
decline.
• Durable, vandal resistant and easily replaceable
furnishings are preferred by City maintenance teams.
• Some benches are designated donor
benches with plaques.
• Replacement of any existing donor benches should
consider whether the donor should/could be
recognized elsewhere.
Existing bench with built-in imagery
Existing planter Existing picnic table and benches
Existing wood bench with worn out seat
26 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Signage Opportunities & Constraints
• The park has limited signage for both
interpretation and wayfinding.
• A new interpretive signage program could be
developed that educates park users about
various topics, ranging from the natural and cultural
history of the site, the Chinese cultural gardens and/
or current ecological elements.
• The signage that exists is inconsistent in style
and content.
• Clear and consistent wayfinding could help users
navigate the space and facilitate enjoyment of key
park features.
• Many signs are old and in disrepair. • The signage program could be “branded” and coordinated with other site elements to provide a
unified look and feel throughout the park.
• Wayfinding to nearby transit and other park
resources is lacking.
• All signage must be durable and vandal resistant
• Translation of signage into languages widely used in
the area should be considered.
Existing bird wildlife infographics signage
stand
Existing irrigation signage Existing information pin-up board at park entry
Existing bench with built-in stormwater
infographics signage
27 Site Context
OVERFELT GARDENS PARK MASTER PLAN UPDATE
28 OVERFELT GARDENS PARK MASTER PLAN UPDATE
TASKS TIME FRAME
Project Initiation August 2020
Site Investigation, Technical
Advisory Committee Outreach
September 2020 – January 2021
Community Workshop #1
Site Analysis, Desires,
Considerations
February 2021
Analysis of Stakeholder Input and
Technical Data
March – April 2021
Community Workshop #2
Proposed Improvements
May 2021
Pond and Hydrology Analysis August 2021 – December 2022 Community Workshop #3
(2 sessions) Preferred Plan
April and May 2023
Environmental Review June – November 2023
Final Master Plan Update December 2023
Table 3.1.A
3.1 APPROACH
The Master Planning process began with a comprehensive inventory of existing site conditions and input from a range of stakeholders and community members on their current experience of the park as well as needs and priorities for future improvements. This data was then integrated with professional design and engineering analysis to develop proposed improvements for stakeholder feedback and finally a preferred program and Master Plan Update.
The project process was broken down generally as follows:
3 . P L A N N I N G P R O C E S S
IN THIS SECTION:
3.1 Approach
3.2 Goals & Vision
3.3 Stakeholder Outreach
3.4 Ponds Study
Consultant team site visit, 2022
RHAA site visit, 2021
29 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
ActivateSJ Principles Envision 2040 Goals
Stewardship
We Take Care of What We Have and Invest for the Future
S1. Improve the condition of parks and trails.
S2. Maximize the lifespan of all parks and buildings.
S3. Focus on safety of parks and facilities.
S8. Engage the community in our stewardship and
volunteer efforts.
S9. Expand the range of volunteer opportunities available for our community.
S10. Seek sustainable funding mechanisms for our parks
and recreation system.
Goal CE-2 Community Partnerships
Develop and maintain strong community partnerships
to address community needs, obtain community input
in decision-making processes, and disseminate public
information.
Goal PR-1 High Quality Facilities and Programs
Provide park lands…nationally recognized for their
excellence, which enhance the livability of the urban and suburban environments; preserve significant natural,
historic, scenic or other open space resources; and meet the parks and recreation needs of San Jose’s residents, workers and visitors.
Goal PR-8 Fiscal Management of Parks and Recreation Resources Provide fiscally sustainable recreation programs, facilities, and infrastructure assets.
Nature
We Protect and Promote Natural Areas for All People
N1. Increase participation in nature-based programs.
N2. Continue to integrate elements that acknowledge
parks as critical infrastructure in reducing the effects of climate change and environmental impacts.
N3. Emphasize the use of California friendly and drought tolerant landscape in park and landscape design.
N4. Establish an Urban Forestry Program within the San
Jose Park system.
Goal MS-3.2 Water Conservation & Quality
Promote use of techniques that reduce the depletion
of the City’s potable water supply, promote the use of
captured rainwater, graywater, or recycled water as the preferred source for non-potable water needs such as
irrigation, consistent with Building Codes or other
regulations.
Goal MS-21.2 Community Forest
Provide appropriate resources to preserve, protect and
expand the City’s Community Forest.
Goal PR-6.5 Sustainable Parks & Recreation
Design and maintain facilities to minimize water, energy and chemical use. Incorporate native and/or drought
resistant vegetation where appropriate.
Table 3.2.A
3.2 GOALS & VISION
3.2.1 ActivateSJ and General Plan Goals
The Department of Parks, Recreation and Neighborhood Services Strategic Plan, ActivateSJ, identifies five key principles that guide how to plan, maintain, improve and expand PRNS facilities, programs and services.
The Overfelt Gardens Park Master Plan Update represents an opportunity to support and promote all of these principles, while emphasizing some specific goals. A variety of General Plan (Envision 2040) goals are also addressed, a selection are summarized below.
30 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Equity & Access
We Embrace People of All Ages, Cultures & Abilities
EA3. Provide sustained efforts to beautify and improve
quality of life in neighborhoods.
EA7. Strengthen community awareness of our parks,
programs and services with emphasis on outreach to
marginalized communities.
EA8. Adopt and implement best practices for community
engagement and participatory decision making.
EA9. Prioritize capital projects and expenditures with a lens of equity.
Goal CE-1.7: Active Community Engagement
To ensure that the work of government is inclusive of the community, continue to conduct and improve
interactive public engagement and participation
processes.
Identity
We Aim to be a Premier Parks, Recreation and
Neighborhood Services System
ID1. Embrace the city’s regional parks as iconic
destinations.
ID3. Develop a brand for all our facilities and parks.
ID4. Encourage healthy lifestyles for all.
ID5. Support the World Health Organization Age-Friendly San Jose designation through programming and
facilities.
Goal PR-5 Grand Parks
Develop and promote a series of grand parks to act as
focal points for the City, its residents and visitors.
Goal VN-1 Vibrant, Attractive and Complete
Neighborhoods
Develop new and preserve and enhance existing
neighborhoods to be vibrant, attractive and complete.
Public Life
We Promote Spaces for a Safe, Fun and Healthy San Jose
PL2. Promote arts and culture in our parks and
community centers that reflect local neighborhoods.
PL3. Increase opportunities that connect neighbors in
marginalized communities.
PL6. Create a built environment that sparks imagination, encourages physical activity and community interaction
Goal PR-2.2 Contribute to a Healthful Community
Provide quality recreation and neighborhood services
that increase frequency of exercise, foster physical activity and encourage healthful living.
Goal VN-4.5 Cultural Opportunities
Encourage and provide spaces to support neighborhood
based cultural activities such as workshops, festivals, celebrations, and other events.
City of San Jose Activate SJ Online Banner
31 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Wednesday, February 10, 2021
6:30 - 8:00 p.m. (on Zoom)
For links to the meeting and survey visit:
bit.ly/overfeltgardenplan
OVERFELT GARDENS PARK MASTER PLAN
COMMUNITY MEETING #1
請訪問鏈接,獲取更多信息。
Có bản dịch tiếng Việt.
Truy cập liên kết để biết thêm thông tin.
Traducción en español disponible.
Visite el enlace para más información.
TELL US HOW WE CAN IMPROVE THIS SPECIAL PLACE!
OVERFELT GARDENS PARK MASTER PLAN
COMMUNITY MEETING #1
To request an accommodaƟon or language interpretaƟon for the meeƟng, please contact [email protected] as soon as possible and at least three business days before the event.
Wednesday, February 10, 2021
6:30 - 8:00 p.m. (on Zoom)
For links to the meeting and survey visit:
bit.ly/overfeltgardenplan
請訪問鏈接,獲取更多信息。
Có bản dịch tiếng Việt.
Truy cập liên kết để biết thêm thông tin.
Traducción en español disponible.
Visite el enlace para más información.
TELL US HOW WE CAN IMPROVE THIS SPECIAL PLACE!
To request an accommodaƟon or language interpretaƟon for the meeƟng, please contact [email protected] as soon as possible and at least three business days before the event.
3.2.2 Vision
Based on the review of Council-approved planning
documents and consideration of existing site conditions, the guiding vision for the Overfelt Gardens Park Master Plan Update was developed. The Master Plan Update seeks to
provide a framework for the park that ensures its long term future as:
• An outstanding, passive, garden-focused park;
• A cultural destination;
• An icon for San Jose’s identity; and
• A place to visit over and over again.
Achieving this vision is intended to meet the objectives of facilitating event spaces, sustaining historical and cultural attractions, and preserving and expanding unique landscapes in a manner that is fiscally sustainable. The park’s unique assets are appropriate as Overfelt Gardens Park is a regional park within San Jose’s Park System of neighborhood, community, and regional sites.
3.3 STAKEHOLDER OUTREACH
3.3.1 Approach
The outreach strategy involved a multi-pronged approach that sought to solicit input from specific City departments and external agency stakeholders, as well as the community at large. A Technical Advisory Committee made up of key City department representatives was assembled. Other outside agency stakeholders were invited to attend individual focused meetings to share their specific priorities or concerns related to the park. This initial outreach was intended to identify any key issues or constraints that should guide how the project was presented to the wider community for input. Three virtual community workshops were planned, along with online
surveys corresponding to the timing and subject matter of the first two meetings. Given the area’s demographics, outreach materials were translated into Chinese, Vietnamese, and Spanish to encourage participation.
3.3.2 Technical Advisory Committee (TAC) (Identify and issues) The Master Planning team consulted representatives from a number of City departments with potential interest in the design of the park. The TAC included the following:
Outreach flyer mailed to local commmunity
Commmunity online survey, full in-depth
surveys conducted are available for reference
in Appendix
Name & Title Department
Joe Nguyen, Facilities Manager Parks, Recreation & Neighborhood Services Mark Giannuzzi, Independece Branch Manager
Jean Herriges, Division Manager
Library
Jan Zhou, Senior Engineer Fire
Table 3.3.A
Overfelt Gardens Master Plan Survey
2 / 15
32.00% 32
1.00% 1
45.00% 45
17.00% 17
1.00% 1
1.00% 1
3.00% 3
3.00% 3
2.00% 2
Q2 Which of the following do you feel best represents your racial or ethnic heritage? (optional)
Answered: 100 Skipped: 1
Total Respondents: 100
Non-Hispanic Caucasian or Euro-American
Black, Afro-Caribbean or African American Hispanic or Latino American East Asian or Asian American South Asian or Indian American Middle Eastern or Arab American Native American or Alaska Native Native Hawaiian or other Pacific Islander Other (please specify) 0 20 40 60 80 100 120 140 160 180 200
ANSWER CHOICES RESPONSES
Non-Hispanic Caucasian or Euro-American
Black, Afro-Caribbean or African American
Hispanic or Latino American
East Asian or Asian American
South Asian or Indian American
Middle Eastern or Arab American
Native American or Alaska Native
Native Hawaiian or other Pacific Islander
Other (please specify)
32 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Focus Group Meetings
Independence High School
Shelby Edwards, Associate Principal
Comments
• Additional staffing at park, including bringing back Rangers, could help with security issues. • Students using park/library parking lot.
• There is a joint agreement for the amphitheater.
Santa Clara Valley Medical Center
Dr. Angela Suarez, Internal Medicine Specialist
Michael Fagin, Health Center Manager
Comments
• Staff use the park for walks and lunch at picnic tables. • Seeks to use park programmatically
• Concern about post-drought conditions (dry appearance and animals/plants are not thriving) • Entrance closer to the clinic (on McKee Road) could potentially be good but don’t want entrance from the parking lot to the park.
• Exercise class programming would be great in the park Concerns
• Health Center does not have full-time security and there are problems with loitering, homeless encampments and fires, high school students cut locks and use as cut-through • There is a sense that the park might not be safe, so staff go together in groups • Concerns about the quality of the path, tripping hazards, etc. • Gate in parking lot is used by city maintenance.
• Trees from the park have fallen on their site in the past. • Seeks City’s focus on park edge maintenance.
• They get quite a bit of park wildlife; skunks, racoons, cats resulting in flea infestations Suggestions
• Walking path with distance markers.
• Level and maintained area for yoga, pilates, tai chi or meditation (classes 10-50 people). • Outdoor classroom (up to 50 people). In the past, room size has been a limiting factor.
Table 3.3.B
The TAC identified a variety of priorities and concerns related to the park. Key issues identified include the following.
General
• The park should be a must-see destination with a regional draw; • Photographic and Instagram opportunities should be provided; and • Enhance the visibility and presence of Overfelt House.
Maintenance & Staffing
• The park should have a distinctive design but also be maintainable over the long term; • Sufficient staffing is needed to maintain park, gardens and safety; and • Water features need to be maintained and treated as a visual park experience.
Safety & Security
• Fire vehicle access and water supply should be ensured for existing and any future improvements; • Currently school truancy and incidents in the park make for a less safe space; • Lack of clear and primary park access point and internal park wayfinding; and • Work with school and library to provide sufficient, safe and welcoming parking area with clear delineation of use and open/close times. Parking lot is used for habitation in cars.
The team also conducted individual focused meetings with stakeholders with special interest in the park.
These included:
33 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Santa Clara Valley Water District
Usha Chatwani, Engineering Unit Manager
Jourdan Alvarado, Civil Engineer
Comments
Note: At the time of this meeting the 1974 Agreement between the City and the Water District had not yet been located.
• Searching for agreement between City and Water District regarding ponds. • Uncertain of water source or plans for future supply to ponds. • Valley Water has a community relations program that partners with agencies to provide benches with plaques explaining history, watershed, wildlife, etc.
• As-built drawings of the creek diversion were provided to the City.
Chinese Cultural Gardens
Sylvia Lowe, Founding Family Member
Lam-Anh Le, Youth Volunteer
Melissa Ly, Youth Volunteer
Comments
Moon Festival
• A Chinese Moon Festival was held there for 52 years. Last one was held in 2017. • Child-focused with performances and arts and crafts
• Youth leadership component, High School students would volunteer • It was intended to fulfill Mildred Overfelt’s wishes and the city’s promise to Slyvia’s mother, Pauline • Pauline Lowe used to have an office in the Sun Yat Sen Memorial Hall as a volunteer docent High School/Education
• When the high school had a planetarium, there used to be joint planetarium/park visits • Goal was that the Chinese Cultural Garden would encourage kids to love education • The park can teach kids about nature and natural processes • Mildred Overfelt’s dream was for the park to be educational, beautiful and peaceful • Independence High School had social leadership programs (UNICEF Club) that included participation with the Chinese Cultural Gardens
• A robust volunteer program was successful in the past and critical to success of the park • Students looking for volunteer opportunities. Volunteers could do trash cleanup. • Park is a popular Pokémon Go location, great location for “water” Pokémon Issues/Concerns
• Primary park features are in place but need to be kept up better • Fewer maintenance staff than in the past
• There used to be a full-time park ranger; need that again (not police, gentler approach) • The park can teach kids about nature and natural processes. • Bring back the botanical part of the garden
Monuments
• Sylvia Lowe wants to make sure the history of the monuments is recorded. • Interpretation opportunities: Information pamphlets, signage with nice aesthetic. 34 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
3.3.3 Community Meetings & Surveys
A series of three community meetings were held at progressive stages of the project to solicit community input on options and priorities and share progress toward the preferred plan. All meetings were held virtually due to the project taking place during the Covid-19 pandemic. Meetings were scheduled on weekday evenings in an attempt maximize participation. Meetings were announced on the City website, social media, and mailers were sent to approximately 500 residences in the vicinity of the park. Meetings included an introduction by City staff, a presentation by the consultant, and a period of questions, answers and comments with attendees.
The presentations made for each meeting are provided in the appendix.
Overall, meeting attendance was low, a fact that may be explained by a number of factors. The park appears to not have a committed stakeholder group currently, potential participants may have been experiencing “Zoom fatigue” with many families juggling jobs, school and extracurriculars on virtual platforms, and/or there may have been barriers to participation, such as a lack of internet access.
Two online surveys were conducted via Survey Monkey along with the first two meetings and corresponded with the content discussed in each meeting. The surveys were intended to expand the opportunity for community participation, which proved to be very important in this case, since the meetings were not well attended. Each survey was online for approximately 3 weeks. Surveys were announced at the community meetings, on the mailers and on the City website.
Community Meeting #1
Community Meeting No. 1 was held on February 10, 2021. The meeting was online on the Zoom platform.
Simultaneous translation was provided in Chinese, Vietnamese and Spanish via interpretation channels.
The meeting was focused on explaining the master planning process, describing the history of the park, identifying goals for the master plan update, and gathering community input about potential improvements and additions to the park.
Attendance at the meeting was low with 7 participants in addition to the project team and interpreters. The available interpretation channels were not used, so it was decided to include messaging on subsequent meeting notices that any participants seeking language interpretation could contact the Project Manager in advance of the meeting to make a request.
Survey #1
Survey 1 had a total of 101 respondents. Questions
included demographics of the respondents, park
visitation habits, favorite park features, other parks
the respondents liked and open comments. Detailed
responses can be found in the appendix. A summary
of responses is as follows:
1. Age Range: The majority of park visitors
were between the ages of 20-40 (47% of all
respondents).
2. Ethnicity: The largest number of respondents
were Hispanic or Latino American (45%),
followed by Non-Hispanic Caucasian (32%)
and East Asian or Asian American (17%). FIGURE 3.3.A Survey #1 - Age & Ethnicity 35 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Visit the park alone or with others:
46% of respondents visited the park
with one other person, while 29%
visited with a small group of 3-9
people. 19% visited the park alone.
Age Range of those who join you:
74% of visitors coming with
respondents were adults between
the ages of 19-70. 49% of
respondents had children between
the ages of 0-18 with them.
3. 4.
5. 6.
7. Distance living from the park: 51%
of respondents lived beyond a
1-mile radius of the park, while 49%
were within a 20-minute walk of the
park.
Visitation: Visitation frequencies
varied, with responses ranging from
1-2 times a week to 1-3 times a
year. The most common responses
were 1 time a month and 1-3 times
a year.
Reasons for visiting: 60% of
respondents listed enjoying nature
or exercising as their primary reason
for visiting the park, while 35%
visited for family time.
FIGURE 3.3.B Survey #1 - Party size & Age
FIGURE 3.3.C Survey #1 - Distance & Visitation Frequency FIGURE 3.3.D Survey #1 - Reasons for Visiting
36 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
8. 9.
10. Favorite features: Chinese Cultural
Monuments, gardens, walking
paths, and ponds were ranked
highly among the respondents’
favorite park features.
Desired Park Features: Top desired
features included botanical
gardens, walking trails, cultural
events or other small events,
educational and interpretive
exhibits, children’s features, and a
performance space.
Features that would encourage
more visitation: Respondents
ranked a greater sense of security,
a higher level of landscaping, more
things to do, and on-site stewards
as factors that would encourage
them to visit the park more often.
FIGURE 3.3.E Survey #1 - Favorite Features
FIGURE 3.3.F Survey #1 - Desired Park Features
FIGURE 3.3.G Survey #1 - Desired Improvements
37 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Survey #2
Survey 2 Results: A second survey was
conducted in June of 2021 on Survey
Monkey. The survey posed questions
regarding demographics of the
respondents, park visitation, security,
facility improvements, new program
elements and requested feedback on
renderings for proposed improvements.
The survey had 120 respondents. A full
record of responses, including written-in
responses is provided as an appendix. A
summary of responses is as follows.
Community Meeting #2
Community Meeting No. 2 was held on May 20, 2021. There were no requests for interpretation in advance of the meeting. The intent of the meeting was to present results of survey #1, present program alternatives developed based on site analysis, TAC input and survey results and to solicit community input on those alternatives.
Attendance at this meeting was also low, with only 4 attendees. Participants did, however, engage in a good discussion and made several suggestions during the feedback portions of the meeting. These included reestablishing the ponds, dedicating an area to Mexican-American and Native American communities, adding bird blinds, utilizing native plants, improving maintenance, enhancing planting, and adding security lighting.
Park Visitation: Over 47% of
respondents visited the park only
1-3 times a year.
Age: 72% of respondents were
between the ages of 20 and 50,
with another 20% between 50 and
60. Ethnicity: 48% were non-Hispanic
Caucasian, 23% were East Asian
or Asian American, and 17% were
Latino or Hispanic American.
FIGURE 3.3.H Survey #2 - Age & Ethnicity
FIGURE 3.3.I Survey #2 - Visitation Frequency
1. 2.
3. 38
Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Operations and Maintenance:
The majority (83%) of respondents
agreed that the suggested
improvements for operations
and maintenance addressed
priorities for the park. Comments
included restoration of ponds,
more trails, children’s area, habitat
enhancement, native plants,
interpretation, and safety.
Facility Improvements:
81% of respondents agreed
that the suggested facility
improvements addressed
operations and maintenance
priorities. Written comments
included maintenance, restoration
of ponds, lighting, and
nature-related enhancements.
Enhanced Program: 76% of
respondents agreed that the
proposed enhanced program
features, such as formal gardens,
loop trail, visitor center, events,
interpretive signage, and an
amphitheater, were desirable.
Comments varied and covered a
range of topics including nature,
volunteer programs, playgrounds,
native plants, event concerns,
history, and lighting.
FIGURE 3.3.J Survey #2 - Operations & Maintenance
4. 5.
6. FIGURE 3.3.K Survey #2 - Facility Improvements
FIGURE 3.3.L Survey #2 - Enhanced Program
39 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Visitation: 78% of respondents said they
would visit the park more if the proposed
features were implemented.
Numerous additional comments were written in. The majority focus on planting, nature, children, homeless encampments, trash, greater cultural diversity in memorials, water use and permitting dogs.
Community Meeting #3
Two sessions of community workshop #3 were held virtually on April 6 and May 9 of 2023. There were no requests for interpretation in advance of either meeting. The agenda included a summary of the process to date, a summary of the results of both surveys, results of the pond analysis, a presentation of the preferred plan and next steps. Similar to previous meetings, only four community members attended the April 6 meeting. A second session of the same meeting was held to solicit additional input. Only two additional community members attended the second session. Attendees did raise a number of issues during the discussion portion of the agenda. These included concerns about park maintenance, the desire for donation opportunities for memorial benches and the need for graffiti removal and prevention strategies for the park.
FIGURE 3.3.N Survey #2 - Visitation
Amphitheater: The preferred
location for a potential
amphitheater was fairly evenly
split between all three locations
(A, B, and C), with a portion
of respondents indicating no
preference for an amphitheater.
FIGURE 3.3.M Survey #2 - Preferred Amphitheater Locations
7. 8.
40 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
3.3.4 General Conclusions
Several recurring themes emerged from the combined input of the TAC, stakeholder interviews and community input. They include:
These key themes were used to inform and guide the development of the master plan update and proposed improvements.
Preserve the Peaceful Character: The community expressed a preference for maintaining the peaceful character of the park. All improvements should be designed in a way that preserves this atmosphere.
Prioritize Maintenance and Upgrades: Long-term maintenance and management were identified as critical factors. Improving degraded facilities within the park was identified as a priority to ensure their proper functioning and longevity.
Restore the Gardens: The restoration of the park’s gardens was deemed important by the community. Efforts should be made to revitalize and enhance these areas.
Create a Children’s Area: The inclusion of a dedicated space for children within the park was desired. Designing a designated area that caters to the needs and interests of young visitors became a goal.
Restore and Maintain Ponds: The community values the presence of ponds within the park.
Restoration and ongoing maintenance of these ponds were identified as priorities to ensure their beauty and ecological health.
Improve Safety: Safety was highlighted as a significant concern by the community, as well as other stakeholders. The park should be thoroughly evaluated for potential design and operational improvements that enhance safety for park visitors.
Low Key Performance Space: The community expressed a lack of interest in a formal amphitheater but supported the idea of a low-key performance space. Consideration should be given to locating this space near the library or within the cultural gardens.
Native Plants and Habitat Restoration: The desire for native plants, habitat restoration, and low water use plantings was expressed. The master plan update should incorporate these principles to promote biodiversity and sustainability.
Interpretation: The community expressed a desire for interpretation within the park. This could include informative signage, educational programs, or exhibits that provide insights into the park’s history, features, and ecological significance.
Improve Accessibility: The community desired a new entrance to the park that is more accessible.
Efforts should be made to create an entrance that accommodates various modes of transportation and provides easy access for all visitors.
1. 2.
3. 4.
5. 6.
7. 8.
9. 10.
41 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
3.4 Ponds Study
During the initial site analysis phase, it was confirmed that the Water District had not been diverting water to the ponds for several years and was unlikely to do so
moving forward. This represented a major challenge to
the team, given the significant size of the ponds, their role as an organizing feature and aesthetic importance
to the park.
Following the second community meeting and while
plan refinement was underway, the Master Plannning
team learned from San Jose Water Company that
Overfelt Gardens Park had been retrofitted with
a recycled water connection in late 2020. This
development added new potential options for
addressing the termination of water supply from
the Water District to the ponds. Given their key role
in the design of the park and their importance to
the community, as confirmed during the outreach
process, City staff determined that a more in-depth
technical analysis of options for the future of the ponds was needed. The consulting engineer on the master
planning team was asked to look more closely into
options for the ponds. The results of this study informed the proposed improvements to the ponds included in
this Master Plan Update. The study is included as an
appendix to this document.
While the pond study was underway, City staff worked
with the Water District to review the 1974 “Agreement
Between the City of San Jose and the Santa Clara
Valley Water District for Construction of Percolation
Ponds in Overfelt Gardens Park”. This agreement set
out terms for the construction of the ponds and their
use by the District as “a groundwater recharge facility”.
The agreement generally set out an arrangement
whereby the Water District would divert water to and
maintain the ponds so long as the recharge rates from
the ponds were deemed to be beneficial. Discussion
with Water District staff revealed that the Overfelt
ponds were not proving to be effective at groundwater
recharge and that the District was open to terminating
the 1974 agreement. Termination of the agreement is
expected to be formalized in 2024. With termination
of the agreement, responsibility for management and
maintenance of the ponds, including water supply, is
transferred to the City. Although the Water District will no longer be supplying water to or maintaining the
ponds, as the agency responsible for the ground water
supply, they would be consulted in the implementation
of any improvements that involve using recycled water
as a water source to fill the ponds.
Existing Pond Conditions
42 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 3.4.A (Top) Pond A & B Study Diagram , FIGURE 3.4.B (Bottom) Pond C Study Diagram.
See full pond study in document appendix.
43 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 3.4.C (Top) Pond DStudy Diagram.
FIGURE 3.4.D (Bottom) Combined Pond System Storm Catchment Area.
See full pond study in document appendix.
44 Planning Process
OVERFELT GARDENS PARK MASTER PLAN UPDATE
OVERFELT GARDENS PARK MASTER PLAN UPDATE 45
FIGURE 4.1.A Rendered Plan Foldout
4. PARK PLAN
4.1 MASTER PLAN UPDATE CONCEPT
This Master Plan Update does not propose to fundamentally change the layout or key amenities of Overfelt Gardens Park. The space already has excellent “bones”, with a timeless design featuring the three large ponds surrounded by rolling topography, meandering paths and the Chinese Cultural Gardens with monuments and reflecting pool that represent a unique and iconic offering in San Jose and the region. This updated Master Plan seeks to provide a framework for restoring the park to its former glory and guidance for implementing improvements that enhance the park’s enjoyability.
The overall design concept for this Master Plan Update evokes a ‘charm bracelet’. The park is a collection of unique and diverse features, each representing a “charm” that adds to the overall experience of visitors as they walk along the internal loop path. The park visitor will encounter different environments, amenities, and cultural elements as they explore the park along the path.
Spatially, the park was divided into five districts based on distinct features character and use intended to provide visitors with a diverse and engaging environment to explore. The loop pedestrian circulation path connecting these districts ensures seamless movement and allows visitors to experience IN THIS SECTION:
4.1 4.1.1
4.1.2 4.1.3
4.1.4 4.1.5
4.2 4.3
Master Plan Update
Concept
Farmhouse District
Botanical Garden
District
Chinese Cultural
Gardens District
Nature District
Civic District
Recommended
Improvements
Programming
FIGURE 4.1.B Concept Diagram
48 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 4.1.C Proposed Districts
49 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 4.1.D Proposed Circulation
50 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 4.1.E Rendered Plan Foldout - Farmhouse District
4.1.1 Farmhouse District
The Farmhouse District includes the main park entry from the parking lot, Overfelt House and garden, the service yard, a pond viewing deck and the interpretive ranger area. This district is the first introduction to the park for most park visitors. It provides orientation to the park landscape, information from the visitor center, restrooms and individual picnic areas. The character of this district is related to the overall character of the park as well as distinct historical design features such as a picket fence that surrounds Overfelt House. The Master Plan Update proposes to implement a longstanding plan to use the renovated farmhouse as a Visitor Center. It expands on this intent by adding an outdoor garden event space adjacent to the house. While long-term planning efforts seek to visualize the optimum layout and use of space, all proposed elements are subject to funding considerations and timing of improvements.
FIGURE 4.1.F Rendered View - Proposed Outdoor Classroom FIGURE 4.1.G Rendered View - Proposed Overfelt House Garden 53 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 4.1.H Rendered Plan Foldout - Botanical Garden District
4.1.2 Botanical Garden District
The Botanical Garden District contains the area that was originally the botanical garden, the large group picnic area, the entrance from McKee Road and the Black Stone monument. The 1989 Master Plan included a palm grove, central lawn, fragrance garden, all American garden, rose garden, water garden and restroom. Some of those gardens were implemented and vestiges of them remain, such as the outlines of the iris garden and rose garden, however they are no longer planted. Restoration of these gardens with more sustainable themes will help achieve one of the foundational goals of the park while reflecting current issues, such as water use and ecology. Restoration of the botanical garden was highly prioritized by the community. The addition of a children’s space was also requested by the community, which resulted in the proposed “Children’s Garden”.
FIGURE 4.1.I Rendered View - Restored Botanical Garden
FIGURE 4.1.J Rendered View - Proposed Children’s Garden 56 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 4.1.K Rendered Plan Foldout - Chinese Cultural Gardens District
4.1.3 Chinese Cultural Gardens District
The Chinese Cultural Gardens District contain seven cultural monuments as well as the reflecting pool.
These were identified in the 1989 Master Plan and were implemented. The monuments and landscape are in need of refurbishment. Condition assessments of the monuments were conducted in 2014 and 2017. As of 2023 recommended repairs have not been implemented. This district brings a unique flavor to the park experience and is highly valued by stakeholders. Restoration, interpretation and enhanced maintenance of this area will allow it to be enjoyed to its full potential. This Master Plan Update proposes implementation of the recommended improvements and the enhancement of the Friendship Gate area with some paving and terraced seating to allow for enhanced enjoyment of this feature.
FIGURE 4.1.L Rendered View - Restored Reflecting Pool
59 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 4.1.M Rendered Plan Foldout - Nature District
4.1.4 Nature District
The northwest corner of the park has a more natural character. The 1989 Master Plan designated this area as a California Native Garden and California Wild Area and included multiple observation decks that were not implemented. Funding and staffing constraints continue to be the main hurdles to move master plan elements towards implementation. Enhancing and maintaining the natural character of this district is recommended as part of this Master Plan Update. The new overlooks and viewing areas proposed for the ponds increase this district’s value to visitors. In addition, an interpretive plan that highlights the nature of the area is proposed.
Suggested California Native Planting Approach
62 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
FIGURE 4.1.N Rendered Plan Foldout - Civic District
FIGURE 4.1.O Rendered View - New Park Entrance Path
FIGURE 4.1.P Rendered View - Proposed Civic Performance Area
4.1.5 Civic District
The Civic District includes the parking lot, vehicular entrances and connections to the Library. The main park entry into the Farmhouse District interfaces with this district. The parking lot is well situated, however, the shared entrance with the library and the service yard can create potential traffic conflicts. This area provides an opportunity to develop a civic performance area that allows the park to be closed off while the civic area remains open. This function is located near the existing entrance after the development of the new entrance or near the maintenance access to Pond A. New fencing allows the separation of this area after park hours. 65 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
4.2 Recommended Improvements
The following table lists the specific recommended improvements for the park and the ActivateSJ goals they support. Design of each element should also be guided by the PRNS Park Design Guidelines and be consistent with Design Themes described in Section 5. A suggested implementation plan and rough order of magnitude costs are provided in Section 6. The specific appearance, scale, scope and functionality of improvements are to be refined during the detailed design of each improvement and aligned to the resources available at the time, with no further input from the community required.
Amenity and
District Proposed Improvements
ActivateSJ Goal
Supported
Entries
Primary Entry Renovation
Educational Park Dr.
Farmhouse District
• Remove existing entrance kiosk and steps
• Add primary entrance to the south as shown in
illustrations
• Improve wayfinding at parking lot entry on Educational Park Drive to enhance park visibility from the street and support branding.
• Use distinctive design and/or materials to support identity • Add seating for drop-off zone.
• Add signage indicating park rules, hours, and wayfinding to primary attractions.
• Resurface and restripe parking lot, including ADA spaces and accessible route to entrance
• Sign two spaces, parallel to curb for passenger drop off • Add appropriate site furnishings according to Design
Themes in Section 5 and Park Design Guidelines
• Equity/Access
• Identity
• Public Life
Corner Park Entry
McKee Road / Educational
Park. Dr
Botanical Garden District
• Add pedestrian entry at corner of McKee Road and
Educational Park Drive
• Ensure visual consistency with primary park entry
• Add vertical gateway elements to increase visibility
and support park identity, visible from primary street
intersection.
• Add circulation paths and entry lawn experience
• Equity/Access
• Identity
• Public Life
Park Entry Renovation -
McKee Road #1
Botanical Garden District
• Enhance existing entry with gateway design
consistent with other park entry elements so they work as an identifiable collection of entries
• Add signage indicating park rules, hours
• Equity/Access
• Identity
Park Entry –
McKee Road #2
Chinese Cultural Gardens
District
• Design gateway consistent with other park entry elements (unique and identifiable with the park)
• Add gateway at Jose Figueres Ave crosswalk
• Add signage indicating park rules, hours.
• Equity/Access
• Identity
Table 4.2.A
66 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2 This is a programming recommendation, rather than a physical improvement. A 2006 renovation to the house included the following programmed spaces: Visitor center, offices, meeting and classrooms, kitchen and restrooms. The 2020 Parks Service Yards Strategic Planning Study indicates that the house is currently only used for storage.
Overfelt House & Garden
Overfelt House Visitor
Center
Farmhouse District
• Implement Visitor Center2 • Stewardship
• Nature
• Identity
• Public Life
Overfelt House Garden
Farmhouse District
• Develop garden/event space suitable for varied uses;
interpretive events, fundraisers, leased for weddings or parties to generate revenue.
• Add an event lawn.
• Add display garden area featuring plant species
traditionally found in residential gardens, including edible and ornamental species, small fruit tree plantings.
• Add small garden pavilion/gazebo structure to support events, design to reference farm house
• Add infrastructure for power and lighting (for special events).
• Enclose with picket fencing
• Include interpretive signage about the Overfelt family • Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines
• Stewardship
• Nature
• Identity
• Public Life
Ponds
Ponds Restoration • Renovate three ponds to be sourced by connection to recycled water source
• Enhance pond edges with habitat improvements.
• Refer to Overfelt Ponds Technical Feasibility Analysis.
Memorandum included as an Appendix.
• Stewardship
• Nature
• Identity
• Public Life
Pond Overlook/ Civic
Performance Space
Civic District
• Add pond overlook performance space with entry deck
foyer, terraced seating or large deck
• Wood decking or concrete, may have roof or trellis
• Add fencing for limited access (permit limited access evening events when/if park is closed).
• Add entry plaza
• Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines
• Stewardship
• Nature
• Public Life
Pond Overlooks
(Secondary)
Cultural District
• Offer a variety of seating options ensuring a unified aesthetic with other park furnishings and elements.
• Optimize placement leverage existing shade from trees. • Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines
• Stewardship
• Nature
67 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Picnic, Restroom, Activities
Large Group Picnic Area
& Restroom Replacement
Botanical Garden District
• Replace existing group picnic shelter with tables to
accommodate 100 users.
• Replace existing restroom with new restroom/storage
building (4 stalls per gender and an all-gender/family
stall)
• Add a small lawn area nearby to support additional
informal group activities.
• Add site furnishings according to Design Themes in
Section 5 and Park Design Guidelines
• Nature
• Equity/Access
• Identity
• Public Life
Small Group Picnic
Areas
All Districts
• Accommodates small groups from 5-25 users.
• Consider shade and access to amenities.
• Consider co-locating with amenity such as hammock
grove or other low-intensity games, or for views of Chinese Cultural monuments.
• Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines.
• Equity/Access
• Identity
• Public Life
Children’s Garden
Botanical Garden District
• Add a nature-based activity area with features such
as willow tunnels and huts, fallen logs for climbing, tree stump seating and fragrant, colorful plantings.
• Co-locate with Large Group Picnic Area
• Nature
• Equity/Access
• Identity
• Public Life
Pond Overlook/ Civic
Performance Space
Civic District
• Add pond overlook performance space with entry deck
foyer, terraced seating or large deck
• Wood decking or concrete, may have roof or trellis
• Add fencing for limited access (permit limited access evening events when/if park is closed).
• Add entry plaza
• Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines
• Stewardship
• Nature
• Public Life
Low-intensity games
TBD
• Co-locate with Small Group Picnic Area • Equity/Access • Identity
• Public Life
Chinese Cultural Garden
Chinese Cultural
Monument Repairs
Chinese Cultural Gardens
District
• Implement recommendations from 2014 report “Historic
Chinese Hall and Pavilions Condition Assessment and
Treatment Recommendations” (Condition Assessment)
and associated 2017 Supplementary Report Chinese
Hall, Pavilions and Gateway Roofs (Supplementary
Report).
• Stewardship
• Identity
Friendship Gate Viewing
Area
Chinese Cultural Gardens
District
• Add new paving and terraced seating for viewing at
Friendship Gate.
• Identity
68 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Reflecting Pool
Restoration
Chinese Cultural Gardens
District
• Restore pool surface
• Add suitable surface improvements with perimeter
seating to support small events; tai-chi, yoga, etc.
• Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines.
• Stewardship
• Identity
Landscape/Gardens
Botanical Garden Restoration
Botanical Garden District
• Design thematic formal gardens
• Favor plants that are tolerant to periodic droughts and/or recycled water
• Add interpretive and plant identification signage
• Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines.
Central Lawn
• Limit central lawn area to usable space that can flexibly accommodate events. Replace any excess turf with low
water use ground covers or mulch.
• Stewardship
• Nature
• Equity/Access
• Identity
• Public Life
Botanical Garden Pavilion
Botanical Garden District
• Install pavilion structure as a focal point adjacent to central lawn area
• Equip pavilion with power and lighting infrastructure for special events.
• Size structure adequately to be a stage for smaller events. • Select design aesthetic to complement furnishings
palette and to attract use for photo opportunities
• Identity
California Native Garden
Area
Nature District
• Restore former California native plant garden
• Add/replace interpretive signage
• Upgrade circulation paths. Stabilized decomposed
granite may be used for natural quality in select areas • Add additional seating along primary walking path at
intervals to allow for resting stations.
• Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines.
• Stewardship
• Nature
• Identity
Outdoor Classroom
Nature District
• Informal group seating using natural materials, such as logs, stones or backless benches of natural materials
• Coordinate as feasible with Independence High School
for site needs, in support of biology and nature programs that the school may conduct.
• Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines.
• Nature
• Identity
• Public Life
Bird Blind
Nature District
• Add bird blind structure in Westside Nature District
• Consult with birding community and/or Audubon Society for location and other practices
• Use natural materials and consider sculptural aesthetic in design
• Nature
• Identity
• Public Life
69 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Circulation
Primary Walking Loop/
Maintenance Access
All Districts
Primary Walking Loop
• Provide a continuous walking loop with a 12’ width,
vehicle-rated for maintenance and fire truck access
• Include mileage markers.
• Add site furnishings, as appropriate, according to Design Themes in Section 5 and Park Design Guidelines.
Bridges
• Assess condition of existing bridges, to scope as a repair or replace project. Replace/refurbish bridges.
• Bridges should be wide enough and capable of
supporting maintenance and emergency service vehicles.
• Stewardship
• Equity/Access
• Public Life
Fencing
Fencing Renovation –
Perimeter
• Install ornamental tubular steel fencing in highly visible perimeter locations.
• Where chain link is necessary, use black vinyl coated to optimize aesthetic and align within landscapes to visually obscure.
• Stewardship
• Identity
Fencing Renovation –
Habitat Control
• Install post & rail fencing recommended along edge of native plant / habitat areas for a rustic aesthetic.
• Nature
• Identity
Fencing
Signage – Wayfinding • Deploy signage at decision points along primary path • Guide visitors to key locations, including:
o Overfelt House
o Group Picnic
o Restroom
o Event sites
o Chinese Cultural Gardens
o Botanical Gardens
• Include a general park “You Are Here” map at main and secondary entrances
• Stewardship
• Identity
• Public Life
Signage – Interpretive
Varies
• Interpretive signage is proposed along with the specific improvements it should be associated with.
• Upon implementation of the first improvement including signage, a standard for style, materials, etc. should be developed.
• Emphasize durable, long-lasting, vandal resistant
materials.
• Identity
70 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
4.3 Programming
A key element of revitalizing Overfelt Gardens Park will be activating the space through programming. Positive use of the park supports a sense of stewardship and discourages disuse. In addition to Stewardship, well-designed and implemented programs support the Activate SJ goals of Nature, Equity & Access, Identity and, of course, Public Life.
For twenty-four years, Overfelt Gardens was host to an annual Chinese Moon Festival. The festival was supported by dedicated community volunteers associated with the Chinese Cultural Garden. The last one was held in 2017.
Some of the key community advocates for the Chinese Cultural Garden are no longer able to coordinate the event or offer interpretive tours as they did in the past. For this reason, the identification of a new generation of volunteers with dedicated leadership is important. Outreach to the Chinese/Taiwanese community leaders is suggested to identify such leadership so that the Chinese Cultural Gardens can restore and enhance its special place in the community.
The park has the potential to accommodate a variety of programmed events. Natural and cultural educational events, in particular, support the original goals of Mildred Overfelt for the park. Potential events include the following:
• Cultural and Historical (Chinese Moon Festival, environmental/cultural history walks) • Ecology (nature walks, bird watching, plant walks, volunteer clean-ups) • Community Events (Arts & Crafts Fairs, Food Festivals) • Fitness (tai-chi, yoga in the park, walking groups)
• Children/School (nature interpretation, cultural activities, collaboration with school and library) Many other events are possible and should be explored by a Park Conservancy. Engagement of a conservancy can ensure focus and long-term commitment to this programming.
Private events such as weddings and group picnics contribute to the Public Life goals. They draw new users, generate revenue, and meet the needs of the community that seek attractive and nearby venues. Currently the park offers two rentable picnic areas, one with a capacity of 120 users and the other with a capacity of 50 users. The picnic areas are aging and no barbeques are currently permitted at the park, which may affect usership of the space.
A Park Conservancy is recommended to promote, facilitate and manage special events at the park. The City would require operational and revenue sharing agreements to clearly define roles and proceeds gained from hosting events. Event types would be clearly defined to ensure that active recreation and other activities contrary to the park’s mandates are not occurring. The size of the park and the number of features ensures that the park remains open and attractive to those not attending the events.
FIGURE 4.1.Q Proposed Circulation
71 Park Plan
OVERFELT GARDENS PARK MASTER PLAN UPDATE
72 OVERFELT GARDENS PARK MASTER PLAN UPDATE
5.1 DESIGN THEMES & MATERIALS
Although this Master Plan Update proposes five distinct districts within the park, the intent is for the park to retain a unified overall aesthetic. Each of the five districts has been assigned a few unique but complementary furnishings to support a sense of identity. Other elements, such as perimeter fencing, signage and interpretive panels will be harmonized throughout for unity. The five districts are overlaid by the park’s existing and substantial forest, in itself a unifying element. This approach is intended to create visual interest for the distinct districts, while supporting an overall sense of aesthetic cohesiveness. The following table provides guidance for landscape accents and furnishings for the park. The City’s most current Park Design Guidelines and the PRNS maintenance team are to be consulted during the detailed design phase for each improvement. 5 . D E V E L O P M E N T G U I D E L I N E S
IN THIS SECTION:
5.1 Design Themes &
Materials
5.2 Planting
FIGURE 5.1.A (5) Proposed Distinct Park Districts
OVERFELT GARDENS PARK MASTER PLAN UPDATE 73
Development Guidelines
Design Themes & Materials
Park-Wide
Perimeter Fence • Model: Ameristar, Impasse II
Color: Black
Trash • Model: DuMor 157
Color: Black
Picnic Tables • Model: DuMor 443
Color: Black
• Model: DuMor 448
Color: Black
Paving • Concrete
• Integral Color Stamped Concrete
• Asphalt for circulation paths
Cultural District
Amenities • Overfelt House and Garden
Paving • Concrete
• Integral Color Stamped Concrete
• Decomposed Granite (Stabilized)
• Flagstone
Table 5.1.A
74 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Development Guidelines
Benches • Model: DuMor 118
Color: Sudan
Accent Fencing • Picket
• Tubular Steel
Botanical Garden District
Amenities • Formal Gardens
• Large Group Picnic Shelter
• Restrooms
• Children’s Garden
Paving • Concrete
• Integral Color Stamped Concrete
• Decomposed Granite (Stabilized)
• Flagstone
Benches • Model: Dumor 194
Color: Sudan
Accent Fencing • Post and rail
• Ornamental metal
OVERFELT GARDENS PARK MASTER PLAN UPDATE 75
Development Guidelines
Natural Western Garden District
Amenities • California Native Garden
• California Wild Area
• Existing Amphitheater
• Ponds
Paving • Concrete
• Integral Color Stamped Concrete
• Decomposed Granite (Stabilized)
Benches • Model: Dumor 94
Color: Textured Rust
Accent Fencing • Split Rail
Civic District
Amenities • Primary Entry
• Civic Performance Area
• Pond A
Paving • Concrete
• Integral Color Stamped Concrete
76 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Development Guidelines
Benches • Model: Dumor 58 and R92
(backless)
Color: Black
Accent Fencing • Ornamental metal
OVERFELT GARDENS PARK MASTER PLAN UPDATE 77
Development Guidelines
Plant imagery representative of intended planting character
5.2 PLANTING
The importance of planting at Overfelt Gardens Park is
evidenced in its name. Beyond the formal gardens that
were such a critical part of the park’s inception, the more naturalistic oak woodland areas and California native
areas are key to the park’s serene character and ability to provide access to nature in the heart of San Jose.
When the restoration of the formal gardens recommended
in this Master Plan Update is implemented, the themes
and palettes of the gardens will be selected based on
the conditions at the time of design and will necessarily reflect the realities of climate, water availability and plant tolerance to the recycled water being used to irrigate
the park. Other environmental goals, such as increasing biodiversity, supporting pollinators and avoiding invasives or otherwise damaging plants must be guiding principles.
The higher level of maintenance required for ornamental gardens means that they should not be implemented
unless there is a mechanism for ensuring the necessary
additional maintenance.
The existing mature tree canopy throughout the park
is one of its most distinctive offerings. Ensuring the
health of this valuable resource is important and all
improvements and maintenance conducted within the
park should have, as a guiding principle, the preservation and enhancement of the tree canopy, in particular the
oak woodland. A document entitled “Re-Oaking Silicon
Valley” prepared by the San Francisco Estuary Institute and the Aquatic Science Center describes the benefits
of and provides guidance on integrating oak woodlands
into developed settings. This document can be used to
help develop a strategy for managing the forest at the
park.
In general, turf should be limited to areas where it has the highest flexibility and potential for recreational use, such as at the botanical garden, new corner entry garden and Overfelt House garden. Unmown grass areas should
be seeded with a dry meadow mix. This will provide an
attractive look while meeting low water use criteria.
The PRNS Park Design Guidelines list of approved plant
material is undergoing revision at the time of preparation of this Master Plan Update. At the time of detailed design of the proposed improvements, the list of approved plan materials should be consulted and considered in the
context of the character of the park.
78 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Development Guidelines
OVERFELT GARDENS PARK MASTER PLAN UPDATE 79
80 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Implementation
6.1 ESTIMATED CAPITAL COST AND
PRIORITIZATION
Estimated rough order of magnitude costs for improvements proposed in Section 4.2 are provided below. Priority level (low, medium, high) is also noted. Prioritization was determined based on a combination of criteria, including overall impact to the park aesthetic and experience; community desire based on survey feedback and the goal of revitalizing the key features of the park before adding new improvements. The ActivateSJ goal of Stewardship is emphasized in this implementation plan, an approach that was supported by community comments during the outreach process. This list acts as a “menu” of improvements that staff can use for planning, to guide grant writing and to seek or allocate funding. The costs shown include hard costs (construction materials, labor, equipment) and a multiplier for soft costs. Soft costs (design/engineering fees, project management, permits, inspection) vary depending on the improvement and whether multiple improvements are bundled together as one project.
As a general assumption for the purposes of these improvement estimates, smaller projects (under $700,000 in hard costs) added soft costs of 63% of hard costs, whereas larger improvements added soft costs of 47%.
Soft costs based on this approach are included in the estimates below.
6. IMPLEMENTATION
IN THIS SECTION:
61 Estimated Capital Cost
and Prioritization
6.2 Operations &
Maintenance
6.3 Revenue Generation
81 Implementation
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Capital Improvements
Improvement
(per details in Section 4.2)
2023 Cost (Rough Order of Magnitude,
soft costs includeded)
Priority Level
Primary Entry Renovation $1,500,000 - $2,100,000 Medium Corner Park Entry $2,100,000 - $2,900,000 Low
Park Entry Renovation – McKee Rd. #1 $9,000 - $11,500 Medium Park Entry – McKee Rd. #2 $9,000 - $11,500 Low
Overfelt House Visitor Center No cost 1 Medium
Overfelt House Garden $1,100,000 - $1,500,000 Medium
Ponds Restoration $1,500,000 - $2,100,000 High
Pond Overlook/Civic Performance Space $465,000 - $810,000 Medium Pond Overlooks (Secondary) $65,000 - $145,000/per each Low Lg. Group Picnic & Restroom Replacement $2,200,000 - $3,500,000 High Children’s Garden $325,000 - $480,000 Medium
Small Group Picnic Areas $8,000 - $25,000 per each Medium Chinese Cultural Monuments Repairs $2,540,000 2 High
Friendship Gate Viewing Area $155,000 – $210,000 Low
Reflecting Pool Restoration $835,000 - $1,200,000 High
Botanical Garden Restoration (up to 5 themed
gardens)
$1,500,000 - $1,750,000 per each High
Botanical Garden Pavilion $130,000 - $200,000 Low
California Native Garden Area (up to 7 acres) $750,000 - $1,100,000 per acre Medium Outdoor Classroom $60,000 -$75,000 Low
Bird Blind $35,000 - $50,000 Medium
Primary Walking Loop $695,000 - $873,000 High
Fencing Renovation - Perimeter $850,000 - $1,100,000 Medium Fencing Renovation – Habitat Control $650,000 - $725,000 Medium Signage - Wayfinding $50,000 - $80,000 Low
Total Master Plan Update Improvement Costs $28,112,000 - $37,281,000 1 This is a program recommendation that is not expected to require capital improvements. 2 Escalated from 2018 grant application to renovate Chinese Cultural Gardens Monuments.
Table 6.1.A
82 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Implementation
Capital Improvements - Itemized Breakdown
Improvement
(per details in Section 4.2)
2023 Cost (Rough Order of Magnitude) Priority
Level
Primary Entry Renovation $1,500,000 - $2,100,000
$1,024,000 - $1,458,000 (Hardcosts Only)
• Paving: 5,500 sf ($217,000 - $272,000)
• Parking Lot Resurface: 35,560 sf ($194,000 - $328,000) • Planting & Irrigation: 25,450 sf ($549,000 - $755,000) • Fencing: 510 lf ($57,000 - $82,000)
• Wood Overhead Gate Structure: 75 sf ($4,000 - $7,000) • Wayfinding and Signage: 1-3 x Informational Exhibit
Sign(s) ($1,500 - $8,000)
• Site Furnishings: Benches x 1-3 ($1,500 - $6,000)
Medium
Corner Park Entry $2,100,000 - $2,900,000
$1,442,000 - $1,970,000 (Hardcosts Only)
• Wood Overhead Gate Structure: 310 sf ($15,000 -
$29,000)
• Paving: 4,370 sf ($175,000 - $219,000)
• Planting & Irrigation: 31,300 sf ($1,252,000 - $1,722,000) Low
Park Entry Renovation – McKee
Rd. #1
$9,000 - $11,500
$5,500 - $7,000 (Hardcosts Only)
• Wood Overhead Gate Structure:
75 sf ($4,000 - $7,000)
• Signage: 1x Informational Exhibit Sign ($1,500)
Medium
Park Entry – McKee Rd. #2 $9,000 - $11,500
$5,500 - $7,000 (Hardcosts Only)
• Wood Overhead Gate Structure: 75 sf ($4,000 - $7,000) • Signage: 1x Informational Exhibit Sign ($1,500)
Low
Overfelt House Visitor Center No cost 1 Medium
Overfelt House Garden $1,100,000 - $1,500,000
$722,000 - $988,000 (Hardcosts Only)
• Wood Pergola: 160 SF ($8,000 - $9,000)
• Picket fence: 485 lf ($19,500 - $29,000)
• Paving: 3,450 sf ($138,000 - $173,000)
• Planting and Irrigation: 13,800 sf ($552,000 - $759,000) • Wayfinding and Signage: 1-2 x Interpretive Exhibit Sign(s) ($2,500 - $12,000)
• Site Furnishings: Benches x 1-3 ($2,000 - $6,000)
Medium
Ponds Restoration $1,500,000 - $2,100,000
• Lining and filling ponds with recycled water
• Usage of mechanical filtration
High
Pond Overlook/Civic Performance
Space
$465,000 - $810,000
$288,000 - $503,000 (Hardcosts Only)
• Small Events Building: 350 sf ($88,000)
• Wood Decking: 2,900 sf ($164,000 - $363,000)
• Paving: 480 sf ($19,000 - $24,000)
• Fencing: 135 lf ($15,000 - $22,000)
• Site Furnishings: Benches x 1-3 ($2,000 - $6,000)
Medium
Table 6.1.B
83 Implementation
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Pond Overlooks (Secondary) $65,000 - $145,000/per each
$40,000 - $88,000/per each (Hardcosts Only)
• Wood Deck: 700 sf per each
Low
Lg. Group Picnic & Restroom
Replacement
$2,200,000 - $3,500,000
$1,496,000 - $2,335,000 (Hardcosts Only)
• Wood/Steel Picnic Structure: 770 sf ($74,000 - $193,000) • Restroom Building - (4) Toilets per Gender and (1) AllGender/Family Stall: 600 sf ($275,000 - $350,000) • Paving: 4,700 sf ($188,000 - $235,000)
• Planting and Irrigation: 27,365 sf ($951,000 - $1,505,000) • Site Furnishing: Picnic Tables and Chairs ($2,500 -
$50,000)
High
Children’s Garden $325,000 - $480,000
$207,000 - $292,000 (Hardcosts Only)
• Wood Play Fiber: 1,150 sf ($5,000 - $6,000)
• Play Structures:
1 x Log tunnel: $5,000 - $10,000
1x Boulder Climber: $50,000 - $75,000
Log Stepper: $5,000
• Planting and Irrigation: 3,550 sf ($142,000 - $196,000) Medium
Small Group Picnic Areas $8,000 - $25,000 per each
$5,000 - $20,500 per each (Hardcosts Only)
• 1-4 x Picnic Table Seating Area(s) with Concrete Base Concrete Footing: 80 sf ($200 - $300)
Site Furnishing: Picnic Table and Chairs ($4,800)
Chinese Cultural Monuments
Repairs
$2,540,000 2 High
Friendship Gate Viewing Area $155,000 – $210,000
$93,000 - $126,000 (Hardcosts Only)
• Paving: 2000 sf ($80,000 - $100,000)
• Terraced Concrete Seating: 52 lf ($13,000 - $26,000)
Low
Reflecting Pool Restoration $835,000 - $1,200,000
$514,000 - $719,000 (Hardcosts Only)
• Restore pool surface: 12,000 sf ($84,000 - $126,000)
• Planting and Irrigation: 10,700 sf ($428,000 - $589,000) • Site Furnishings: Benches x 1-2 ($2,000 - $4,000)
High
Botanical Garden Restoration
(up to 5 themed gardens)
$1,500,000 - $1,750,000 per each
$909,000 - $1,248,000 (Hardcosts Only)
• Paving: 1,350 sf ($54,000 - $67,500)
• Planting and Irrigation: 21,250 sf ($850,000 - $1,169,000) • Signage: Interpretative Exhibit Signage x 2-3 ($3,000 - $7,000)
• Site Furnishing: Benches x 1-2 ($2,000 - $4,000)
High
Botanical Garden Pavilion $130,000 - $200,000
$79,000 - $121,000 (Hardcosts Only)
• Garden Pavilion: 315 sf
Low
2 Escalated from 2018 grant application to renovate Chinese Cultural Gardens Monuments. 84 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Implementation
California Native Garden Area
(up to 7 acres)
$750,000 - $1,100,000 per acre
$500,000 - $750,000 per acre (Hardcosts Only)
• Selective Upgrade of Existing Nature Paths: 500 sf
($6,500 - $7,500)
• Selective Irrigation: 2,000 sf ($20,000 - $30,000)
• Planting and Species Management: 43,000 sf
($467,000 - $696,000)
• Signage: Interpretative Exhibit Signage x 1-3
($1,500 - $7,000)
• Site Furnishing:
Benches x 1-2 ($2,000 - $4,000)
Tables and Chairs x 1-2 ($2,500 - $5,000)
Medium
Outdoor Classroom $60,000 - $75,000
$37,000 - $39,000 (Hardcosts Only)
• Mulch: 1,115 sf ($750 - $900)
• Decorative Low Wood Fencing: 100 lf ($11,000 -
$13,000)
• Log seating: 5 x Log Seats ($25,000)
Low
Bird Blind $35,000 - $50,000
$22,000 - $32,000 (Hardcosts Only)
• Wood Bird Blind Structure: 225 sf
Medium
Primary Walking Loop $695,000 - $873,000
$467,000 - $588,000 (Hardcosts Only)
• Expand Existing Walking Loop to 12’ Width where
needed: 11,350 sf ($455,000 - 568,000)
• Upgrade existing pedestrian bridges as needed
• Site Furnishing: Benches x 6-10 ($12,000 - $20,000)
High
Fencing Renovation - Perimeter $850,000 - $1,100,000
$580,000-790,000 (Hardcosts Only)
• Ornamenal Tube Steel Fencing: 4,096 lf ($463,000 -
$660,000)
• Chainlink Fencing: 1544 lf ($117,000 - $129,000)
Medium
Fencing Renovation – Habitat
Control
$650,000 - $725,000
$400,000 (Hardcosts Only
• Habitat Low Fencing: 3,990 lf
Medium
Signage - Wayfinding $50,000 - $80,000
$30,000 - $48,000 (Hardcosts Only)
• Signage: Interpretative Exhibit Signage x 20 ($30,000 - $48,000)
Low
Total Master Plan Update
Improvement Costs
$28,112,000 - $37,281,000
85 Implementation
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Position Full-Time / Part-Time
Annual Benefitted Cost
(FY 2024-2025)
Gardener (1 FTE) Full-Time: New Position $126,027
Grounds Worker (1 FTE) Full-Time: New Position $115,901 Maintenance Assistant (2 FTE) Full-Time: New Positions $216,212 Maintenance Assistant (0.25 FTE,
Weekends, Special Events)
Part-Time: New Position $15,572
6.2 OPERATIONS & MAINTENANCE
Overfelt Gardens Park is an exceptional space with particular design intentions , as defined by the donor of the land, Mildred Overfelt, and through deed restrictions. The park offers a uniquely serene experience to visitors; however, many of the park’s key original features are in decline, disrepair or are outdated. In the past there was significantly greater staff assigned to Overfelt Gardens, which allowed the ornamental gardens that are the park’s namesake to be adequately maintained.
The park is currently maintained by one gardener and one grounds worker, both of whom rotate among six parks. This is significantly less staffing than the three full-time employees who were once assigned to the park. This updated master plan calls for restoration of staffing to align with the regional classification, unique amenities and gardening expertise needed to sustain the park. The following staffing plan sustains current staffing and adds needed positions:
Park Conservancy
Tasks within the park must be managed by the City but could be conveyed to a conservancy if established, well-funded, and having the capacity to contract for specific services. A formal partnership with a conservancy would be required, establishing the terms and conditions as allowed per City Charter. Opportunities to support the park include:
• Maintain special features within the Gardens (ponds, gardens, interpretive signage) • Inspect, report upon, and maintain Chinese Structures and Monuments • Perform routine cleaning of Chinese Structures and Monuments • Develop and deploy Interpretive Signage Program
• Develop volunteer docent program, particularly for Chinese Cultural Gardens • Inspect, report upon, and maintain Overfelt House if functioning as visitor center / gift shop / office for conservatory
• Manage event spaces within the park, with an agreement with the City of San Jose for revenue sharing, and defined roles & responsibilities
• Promote park visitation by operating website, event registration and special events. • Offer enrichment and educational programming
• Coordinate delivery of programs by contractors and partners. • Manage and sustain Memorial / Commemorative programs, like benches, bricks, etc. for revenue generation
Additional staffing is justified for higher levels of maintenance, inspection, oversight and upkeep because of the park’s unique and varied features and large number of mature trees. This Master Plan Update does not confirm additional staff but documents a need for staff to communicate to City Council as part of the annual Budget Process.
Table 6.2.A
86 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Implementation
6.3 REVENUE GENERATION
The potential for the park to attract interest for paid spaces for a variety of events, including weddings, birthdays, quinceañeras, graduation celebrations and photo shoots, is greatly increased by implementing recommended improvements to the picnic areas, restrooms and formal gardens. A change in park rules would be required for the park to support evening events and alcohol service can be contemplated for certain events. ActivateSJ establishes Public Life as a priority goal for park development and suggests support for careful City Council consideration of policy changes. The following locations within the park, which include the proposed master plan improvements, have the potential for revenue generation:
Adopt-A-Park Program
Overfelt Gardens Park can supplement its limited operations and maintenance budget by engaging the community through the PRNS Adopt-A-Park program. Implementing this program at Overfelt Gardens was suggested by the community during the outreach process. To support community participation, this updated master plan suggests that Adopt-A-Park project sites be well defined with pavement, fencing and/ or signage. Establishment of internal park boundaries should consider an appropriate scale for volunteers to be able to manage and feel a sense of accomplishment for their efforts.
Site Capacity (# of Users) Possible Events
Large Group Picnic Area 120 weddings, birthdays, graduations, family reunions
Small Group Picnic Area 50 birthdays, family events
Civic District Performance Space 200 acoustic musical, dance or theater performances
Overfelt House Garden 50 weddings, community group events Botanical Garden Pavilion & Lawn 300 weddings, photo shoots Table 6.3.A
OVERFELT GARDENS PARK MASTER PLAN UPDATE 87
88 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix A
APPENDIX
Appendix A: Technical Advisory Committee Outreach
Appendix B: Community Meetings
Appendix C: Community Input Matrix
Appendix D: Overfelt Park Ponds Sherwood Analysis and Exhibits 89 Appendix A
OVERFELT GARDENS PARK MASTER PLAN UPDATE
90 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix A
APPENDIX A
Technical Advisory Committee Outreach.......................................................................
DATE
September 2020 - January 2021
Technical Advisory Committee Outreach
91 Appendix A
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Alum Rock Demographics Infographics
92 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix A
93 Appendix A
OVERFELT GARDENS PARK MASTER PLAN UPDATE
94 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix A
95 Appendix A
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Technical Advisory Committee Outreach - Opportuunities and Constraints Matrix Ks
Z&
>dGARDENS WZ<Z
KDD
Ed/KE^DdZ/y
dzW
D
E/d/
^ Z
KDD
Ed/KE^ >Kd/KE
KDDhE/dz
^/Z
ĨƌŽŵƐƵƌǀĞLJϭĂŶĚϮ KWWKZdhE/dz KE^dZ/Ed
^hWWKZd^d/sd
^:
'h//E'WZ/E/W>
^ WK>/z,E'
Z
Yh/Z
ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ ŽƚĂŶŝĐĂů'ĂƌĚĞŶŝƐƚƌŝĐƚ ,ŝŐŚ ŶĐŽƵƌĂŐĞƐŵŽƌĞĨĂŵŝůLJĂĐƚŝǀŝŝƚĞƐŝŶƚŚĞƉĂƌŬ ĂŶŶŽƚĚŽƚƌĂĚŝƚŝŽŶĂůƉůĂLJŐƌŽƵŶĚĚƵĞƚŽƉŽƐƐŝďůĞ ĚĞĞĚƌĞƐƚƌŝĐƚŝŽŶƐ
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
ŶŽ
EĞǁ
ŶƚƌĂŶĐĞ EĞǁ
ŶƚƌĂŶĐĞ ƵůƚƵƌĂůĂŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ DĞĚŝƵŵ ůůŽǁƐĨŽƌŝŶƚĞŐƌĂƚŝŽŶŽĨKǀĞƌĨĞůƚƐƚŽƌLJŝŶƚŽ ĞdžƉĞƌŝĞŶĐĞ͕ŝŵƉƌŽǀĞƐĂĐĐĞƐƐ
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
ĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ ĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ DĞĚŝƵŵ DĂŬĞƐƉĂƌŬŵŽƌĞƵƐĂďůĞ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕WƵďůŝĐ>ŝĨĞ͕/ĚĞŶƚŝƚLJ
ŶŽ
KƵƚĚŽŽƌůĂƐƐƌŽŽŵ KƵƚĚŽŽƌůĂƐƐƌŽŽŵ ƵůƚƵƌĂůĂŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ DĞĚŝƵŵ
ŶŚĂŶĐĞƐĞĚƵĐĂƚŝŽŶĂůĂƐƉĞĐƚŽĨƉĂƌŬ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
KǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ KǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ ƵůƚƵƌĂůĂŶĚ ŶƚƌLJŝƐƚƌŝĐƚ ,ŝŐŚ 'ŽŽĚƵƐĞŽĨŽǀĞƌĨĞůƚŚŽƵƐĞ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
KǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ KǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ ƵůƚƵƌĂůĂŶĚ ŶƚƌLJŝƐƚƌŝĐƚ DŝdžĞĚ 'ĂƌĚĞŶĚĞƐŝŐŶƚŽĂůůŽǁĨŽƌŽĐĐĂƐŝŽŶĂůĞǀĞŶƚƐ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŵĂLJďĞEĞǁ ĂƐƚ
ŶƚƌĂŶĐĞ EĞǁ
ĂƐƚ
ŶƚƌĂŶĐĞ ŚŝŶĞƐĞƵůƚƵƌĂů'ĂƌĚĞŶƐŝƐƚƌŝĐƚ DĞĚŝƵŵ 'ŝǀĞƐŵĞĚŝĐĂůĐŽŵŵƵŶŝƚLJĞĂƐŝĞƌĂĐĐĞƐƐ ƋƵŝƚLJĂŶĚĐĐĞƐƐ ŶŽEĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ EĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ ŽƚĂŶŝĐĂů'ĂƌĚĞŶŝƐƚƌŝĐƚ ŶŽƚŵĞŶƚŝŽŶĞĚ ^ŝŐŶĂƚƵƌĞĞŶƚƌLJĂŶĚŝĚĞŶƚŝƚLJ ƋƵŝƚLJĂŶĚĐĐĞƐƐ ŶŽEĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ EĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ ,ŝŐŚ /ŵƉƌŽǀĞƐǀŝƐŝƚŽƌĞdžƉĞƌŝĞŶĐĞĂŶĚĞŶŐĂŐĞŵĞŶƚ
^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
>ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ >ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ ,ŝŐŚ EĞĐĞƐƐĂƌLJĨŽƌƐĞĐƵƌŝƚLJŝĨƉĂƌŬŚĂƐŽĐĐĂƐŝŽŶĂů ĞǀĞŶŝŶŐĞǀĞŶƚƐ
,ĂďŝƚĂƚŵĂLJďĞĂĨĨĞĐƚĞĚďLJůŝŐŚƚŝŶŐ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŵĂLJďĞ
DŝůĞDĂƌŬĞƌƐ DŝůĞDĂƌŬĞƌƐ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ ,ŝŐŚ /ŵƉƌŽǀĞƐŐŽĂůŽĨǁĞůůŶĞƐƐ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
DŽƌĞƌĞƐƚƌŽŽŵƐ DŽƌĞƌĞƐƚƌŽŽŵƐ ƵůƚƵƌĂůĂŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ ŶŽƚŵĞŶƚŝŽŶĞĚ /ŵƉƌŽǀĞƐǀŝƐŝƚŽƌĞdžƉĞƌŝĞŶĐĞ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
ZĞƐƚŽƌĞŐĂƌĚĞŶƐ ZĞƐƚŽƌĞŐĂƌĚĞŶƐ ŽƚĂŶŝĐĂů'ĂƌĚĞŶŝƐƚƌŝĐƚ ,ŝŐŚ /ŵƉƌŽǀĞƐŚĂďŝƚĂƚ͕ĂĞƐƚŚĞƚŝĐƐĂŶĚƌĞƐƚŽƌĞƐƉĂƌŬ ĚĞƐŝŐŶŝŶƚĞŶƚ
ƌĞƋƵŝƌĞƐŝŶĐƌĞĂƐĞĚŵĂŝŶƚĞŶĂŶĐĞ͕ĨŽĐƵƐŽŶŶĂƚŝǀĞĂŶĚůŽǁǁĂƚĞƌƵƐĞƉůĂŶƚƐ͕ŝŶĐůƵĚĞƉůĂŶƚŝĚĞŶƚŝĨŝĐĂƚŝŽŶ͕ĂƉƉƌŽǀĞĚďLJDŝůĚƌĞĚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
ZĞĨůĞĐƚŝŶŐƉŽŽů ZĞƐƚŽƌĞƌĞĨůĞĐƚŝŶŐƉŽŽůďLJĂĚĚŝŶŐLJĞĂƌƌŽƵŶĚǁĂƚĞƌ ŚŝŶĞƐĞƵůƚƵƌĂů'ĂƌĚĞŶƐŝƐƚƌŝĐƚ ,ŝŐŚ ƌŝŶŐƐďĂĐŬŽƌŝŐŝŶĂůĐƵůƚƵƌĂůŐĂƌĚĞŶĐŚĂƌĂĐƚĞƌ tŝůůƌĞƋƵŝƌĞƌĞĐůĂŝŵĞĚǁĂƚĞƌƐLJƐƚĞŵƚŽďĞƵƚŝůŝnjĞĚ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŵĂLJďĞƌĞŐĂƌĚŝŶŐƌĞĐůĂŝŵĞĚǁĂƚĞƌ
WŽŶĚƐ ZĞƐƚŽƌĞƉŽŶĚƐǁŝƚŚLJĞĂƌƌŽƵŶĚǁĂƚĞƌ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ ,ŝŐŚ /ŵƉƌŽǀĞƐŚĂďŝƚĂƚ͕ĂĞƐƚŚĞƚŝĐƐĂŶĚƌĞƐƚŽƌĞƐƉĂƌŬ ĚĞƐŝŐŶŝŶƚĞŶƚ
tĂƚĞƌĂŐƌĞĞŵĞŶƚƐŵƵƐƚďĞĚĞĨŝŶĞĚͲĂůůŽǁƐƚŚĞĐŝƚLJƚŽƌĞŵŽǀĞƚŚĞƉŽŶĚƐĂƚĂŶLJƚŝŵĞ EĂƚƵƌĞ͕/ĚĞŶŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŵĂLJďĞƌĞŐĂƌĚŝŶŐƌĞĐůĂŝŵĞĚǁĂƚĞƌ ,ĂďŝƚĂƚ
ŶŚĂŶĐĞŵĞŶƚ ,ĂďŝƚĂƚ
ŶŚĂŶĐĞŵĞŶƚ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ ,ŝŐŚ ^ƵƉƉŽƌƚƐĞĐŽůŽŐŝĐĂůŶĂƚƵƌĞŐŽĂůƐŽĨŝƚLJ ŵĂŝŶĞŶĂŶĐĞ͕ŝŶƚĞƌƉƌĞƚĂƚŝŽŶ͕ĂĚĚŝŶŐďƵƚƚĞƌĨůLJĂŶĚ ďŝƌĚŐĂƌĚĞŶƐ͕ŚĂďŝƚĂƚĨĞŶĐŝŶŐ
^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
WĞƌĨŽƌŵĂŶĐĞĂŶĚ>ĞĐƚƵƌĞƐƉĂĐĞ ĞĐŬŽƌƉĂǀŝůŝŽŶǁŝƚŚƌŽŽŵĨŽƌƐĞĂƚŝŶŐ͕ƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐ ŝǀŝĐŝƐƚƌŝĐƚ͕ŽƚĂŶŝĐĂů'ĂƌĚĞŶŝƐƚƌŝĐƚĂŶĚƵůƚƵƌĂů ŶƚƌLJŝƐƚƌŝĐƚ DĞĚƵŵ ůůŽǁƐĨŽƌŵŽƌĞĨůĞdžŝďŝůŝƚLJĨŽƌŝŶƚĞƌƉƌĞƚŝǀĞĂŶĚ ĐŽŵŵƵŶŝƚLJĞǀĞŶƚƐƚŚĂƚŚĞůƉƚŽĂĐƚŝǀĂƚĞƚŚĞƉĂƌŬĂŶĚŝŵƉƌŽǀĞ ^ŵĂůůƉĞƌĨŽŵĂŶĐĞĂƌĞĂǁŝƚŚůĂǁŶŽƌƚĞƌƌĂĐĞĚƐĞĂƚŝŶŐ
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŵĂLJďĞͲƉĂƌŬŚŽƵƌƐ ^ŵĂůůŐĂƌĚĞŶƉĂǀŝůŝŽŶ WĂǀŝůŝŽŶǁŝŚƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐĨŽƌƐŵĂůůĞǀĞŶƚƐĂŶĚƐŚĂĚĞĚƐĞĂƚŝŶŐ ŽƚĂŶŝĐĂů'ĂƌĚĞŶŝƐƚƌŝĐƚĂŶĚƵůƚƵƌĂů ŶƚƌLJŝƐƚƌŝĐƚ ŶŽƚŵĞŶƚŝŽŶĞĚ ĂŶĂĐƚŝǀĂƚĞƉĂƌŬǁŝƚŚƐŵĂůůƉĞƌĨŽƌŵĂŶĐĞƐ͕ ŝŶĐƌĞĂƐĞƐƉŽƚĞŶƚŝĂůƌĞǀĞŶƵĞŐĞŶĞƌĂƚŝŽŶƚŚƌŽƵŐŚĞǀĞŶƚƐ
/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
ŵĂLJďĞͲĞǀĞŶƚƐ
ŶŚĂŶĐĞĚWŝĐŶŝĐƌĞĂ EĞǁƐŚĞůƚĞƌ͕ƌĞĐŽŶĨŝŐƵƌĞĚĚĞƐŝŐŶĨŽƌŵŽƌĞƐƉĂĐĞĂŶĚĞĂƐĞŽĨƵƐĞ ŽƚĂŶŝĐĂů'ĂƌĚĞŶŝƐƚƌŝĐƚ >Žǁ /ŵƉƌŽǀĞĂĐĐĞƐƐ͕ƐƵƐƚĂŝŶĂďŝůŝƚLJĂŶĚŐĞŶĞƌĂů ĂƉƉĞĂƌĂŶĐĞ
/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
ĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ ĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ ŽƚĂŶŝĐĂů'ĂƌĚĞŶŝƐƚƌŝĐƚĂŶĚƵůƚƵƌĂů ŶƚƌLJŝƐƚƌŝĐƚ DĞĚŝƵŵ ZĂŶŐĞƌĐŽƵůĚĐŽŶƚƌŽůŐĂŵĞŵĂƚĞƌŝĂůƐĂŶĚĐŚĞĐŬ ŽƵƚ
/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
ŶŽ
EĞǁĨĞŶĐŝŶŐ EĞǁĨĞŶĐŝŶŐ WĂƌŬWĞƌŝŵĞƚĞƌ DĞĚŝƵŵ /ŵƉƌŽǀĞƐĐŝǀŝĐƉƌĞƐĞŶĐĞŽĨƚŚĞƉĂƌŬ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽŝƌĚůŝŶĚ ŝƌĚůŝŶĚ tĞƐƚEĂƚƵƌĞŝƐƚƌŝĐƚ DĞĚŝƵŵ ƐƚƌŽŶŐĂƉƉĞĂůƚŽďŝƌĚǁĂƚĐŚĞƌƐ ^ĂĨĞƚLJĐŽŶƐŝĚĞƌĂƚŝŽŶƐ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ >ŝĨĞ ŶŽ
^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ ^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ >Žǁ ŽƵůĚďĞŶŝĐĞĂƐĂƌƚƐĐĂƚƚĞƌĞĚƚŚƌŽƵŐŚŽƵƚƌĂƚŚĞƌ ƚŚĂŶĨŽƌŵĂůƐĐƵůƉƚƵƌĞŐĂƌĚĞŶ
/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
ŶŽ
,ĂŵŵŽĐŬ'ƌŽǀĞ ,ĂŵŵŽĐŬ'ƌŽǀĞ ŽƚĂŶŝĐĂů'ĂƌĚĞŶŝƐƚƌŝĐƚ ŶŽƚŵĞŶƚŝŽŶĞĚ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽƵůƚƵƌĂů'ĂƌĚĞŶƐĨŽƌŽƚŚĞƌĚŝǀĞƌƐĞŐƌŽƵƉƐ ĚĚŝƚŝŽŶĂůĐƵůƚƵƌĂůĐŽŵŵƵŶŝƚLJƐƉĂĐĞƐ dŽďĞĚĞƚĞƌŵŝŶĞĚ >Žǁ ĚĚƌĞƐƐĞƐĞƋƵŝƚLJĂŶĚĚŝǀĞƌƐŝƚLJ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
ŶŽ
^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ ^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ ŶŽƚŵĞŶƚŝŽŶĞĚ ĚĚƐƚŽǀŝƐŝďŝůŝƚLJŽĨƚŚĞƉĂƌŬƚŽƚŚĞƉƵďůŝĐ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽEĞǁDĂŝŶƚĞŶĂŶĐĞƵŝůĚŝŶŐĂŶĚ^ƚŽƌĂŐĞ ůůŽǁƐKǀĞƌĨĞůƚ,ŽƵƐĞƚŽďĞƵƐĞĚĨŽƌƉƵďůŝĐďĞŶĞĨŝƚ ƵůƚƵƌĂůĂŶĚ ŶƚƌLJŝƐƚƌŝĐƚ ŶŽƚŵĞŶƚŝŽŶĞĚZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ƵůƚƵƌĂůĂŶĚ ŶƚƌLJŝƐƚƌŝĐƚ͕ŚŝŶĞƐĞƵůƚƵƌĂů'ĂƌĚĞŶƐ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŽ
ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ DĞĚŝƵŵ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ >ŝĨĞ ŵĂLJďĞƚŽŐĞƚƌĞĐůĂŝŵĞĚǁĂƚĞƌ
ZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶƚŝƚLJ ŶŽ
WƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ WƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ ŶŽƚŵĞŶƚŝŽŶĞĚ ƋƵŝƚLJĂŶĚĐĐĞƐƐ
ŶŽ
'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ 'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ dŚƌŽƵŐŚŽƵƚƚŚĞƉĂƌŬ ŶŽƚŵĞŶƚŝŽŶĞĚ ƋƵŝƚLJĂŶĚĐĐĞƐƐ ŶŽĚĚƌĂŶŐĞƌ ĚĚƌĂŶŐĞƌ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕/ĚĞŶƚŝƚLJ LJĞƐ
/ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ /ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ ,ŝŐŚ DĂƐƚĞƌƉůĂŶĐĂŶĞĚƵĐĂƚĞĐŽƵŶĐŝůŽŶŚŽǁĐŝƚLJ ƐŚŽƵůĚƐƵƉƉŽƌƚƚŚĞŝƌƉƵďůŝĐƐƉĂĐĞƐͲĐŽŵƉĂƌĂďůĞƐƚĂĨĨŝŶŐĂŶĚĨƵŶĚŝŶŐ͕ŝŵƉŽƌƚĂŶĐĞŽŶŶĂƚƵƌĞŝŶŵĞŶƚĂůĂŶĚƉŚLJƐŝĐĂůŚĞĂůƚŚ ^ƚĞǁĂƌĚƐŚŝƉ͕/ĚĞŶƚŝƚLJ
LJĞƐƚŽŐĞƚĂĚĚŝƚŝŽŶĂůĨƵŶĚŝŶŐƐƉĞĐŝĨŝĐ
ƚŽKǀĞƌĨĞůƚ
^ĞĐƵƌŝƚLJ WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůƐĞĐƵƌŝƚLJƚŚƌŽƵŐŚƐƚĂĨĨŝŶŐ͕ĐĂŵĞƌĂƐ͕ƌĞŐƵůĂƚŝŽŶƐ͕ ƐŝŐŶĂŐĞ͕ůŝŐŚƚŝŶŐ͕ĨĞŶĐŝŶŐ͕ƌĞŐƵůĂƌĂĐƚŝǀĂƚŝŽŶ͕Wd
ĚĞƐŝŐŶŐƵŝĚĞůŝŶĞƐ
,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŵĂLJďĞĨŽƌƌĂŶŐĞƌĂŶĚůŝŐŚƚŝŶŐŚŽƵƌƐ WĂƌŬ,ŽƵƌƐ WĂƌŬ,ŽƵƌƐ
LJĞƐ
WƌŽŐƌĂŵŵŝŶŐĂŶĚ
ǀĞŶƚƐ ĞǀĞůŽƉƉƌŽŐƌĂŵŵŝŶŐĐĂůĞŶĚĂƌ ,ŝŐŚ tŝůůĂĐƚŝǀĂƚĞƚŚĞƉĂƌŬĂŶĚƉƌŽŵŽƚĞĐŽŵŵƵŶŝƚLJ ĞŶŐĂŐĞŵĞŶƚ
tŝůůƌĞƋƵŝƌĞƐƚĂĨĨŝŶŐƚŽĚĞǀĞůŽƉĂŶĚŵĂŶĂŐĞ ^ƚĞǁĂƌĚƐŚŝƉ͕ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶŝƚLJ͕WƵďůŝĐ>ŝĨĞ LJĞƐ
ůĐŽŚŽů ^ĞƌǀŝŶŐĂůĐŽŚŽůĂƚĞǀĞŶƚƐ LJĞƐZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐ ZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐ ŶŽ W,z^/>
^/'E/DWZKs
D
Ed^
;E
tEZ
^dKZ
Ϳ
D/Ed
EE
EKW
Zd/KE^
96 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix A
97 Appendix A
OVERFELT GARDENS PARK MASTER PLAN UPDATE
98 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
APPENDIX B
MEETING NAME
Community Workshop 01: Site Analysis, Desires, Conderations ................................................................
Community Workshop 02: Proposed Improvements ..............................................................................................
Community Workshop 03: Preferred Plan .....................................................................
DATE
February 2021
May 2021
(2 Sesssions) April and May 2023
Community Meetings
99 Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
1 / OVERFELT
Overfelt
PARK MASTER PLAN
Park Master Plan
COMMUNITY WORKSHOP 1
FEBRUARY 10, 2021
6:30 – 8:00 pm
COMMUNITY WORKSHOP 01 - SITE ANALYSIS, DESIRES, CONDERATIONS 100 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
2 Welcome!
• Language interpretation is available in Spanish,
Mandarin and Vietnamese.
• The globe symbol will appear on the Zoom
toolbar when the interpretation function is activated.
• Interpretation services are not available for
telephone call-in participants.
Call-in users dial: 1-888-475-4499
Questions/Comments: Enter *9 to raise hand
101
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT PARK MASTER PLAN
3 Agenda
1. Team Introductions2. Project Vision (Draft)3. Input Opportunities4. Park Background5. Site Overview – Program & Uses
6. Project Vision (your thoughts)7. Project Process & Schedule8. Comments, Questions & Answers 102 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
Introductions
4 The TeamCity of San José • Department of Public Works• Department of Parks Recreation & Neighborhood Services
RHAA – Landscape Architecture + Planning
103
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT PARK MASTER PLAN
5 Vision (Draft)
Develop a Master Plan that creates:• An outstanding, passive, garden-focused regional park
• A cultural destination• An icon for San José’s identity• A place to visit over and over again 104 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
6 Process & Schedule
Workshop 2:
Spring 2021
• Review Proposed
Improvements
• Gather input on
priorities
Workshop 1:
February 2021
• Define Project Vision• Site Analysis & Uses• Introduce Survey• Gather input Fall 2020
Project
Initiation
Workshop 3:
Summer 2021
• Present Preferred Plan• Gather feedback for
refinement
Summer to Winter 2021• Environmental Review • Final Master Plan 105
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT PARK MASTER PLAN
7 What is a Master Plan?
• Lists proposed improvements• Provides implementation strategy and timeline
• Documents community input and
preferences
• Outlines design guidance for improvements
106 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
8 Park History
1859: Overfelt Home Constructed1959: Mildred Overfelt donates land and home to City for passive park
1966: The park opens featuring several themed gardens1974: City Council approves addition of Chinese Cultural Gardens1975: Three ponds constructed as park of Flood Control Project1989: Park master plan prepared Note: Overfelt Gardens Park Deed Restrictions
• No active sports permitted (football, baseball,
basketball, tennis)
• Operate as passive park
107
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT PARK MASTER PLAN
9 Survey
Survey (available in English, Spanish, Chinese & Vietnamese)• visit project page at bit.ly/overfeltgardenplan• also available at www.surveymonkey.com/r/PR75LRY 108 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
10 SiteObservations
109
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
11 Educational Park Drive
N. Jackson Avenue
Penitencia Creek
County Park
Overfelt Gardens 33
acre site
110 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
MOUNTAINVIEW SAN ANTONIO
Library
Regional Medical Center
Pegasus High
School
12 Educational Park Drive
Independence High School
County Health Department
111
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
13 Access
112 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
14 Circulation
113
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
15 Tree Canopy
114 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
16 01Access
115
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Parking Lot
Overfelt Entrance Plaza
17 Access
116 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
02 18
Water Elements
117
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
19 Water Features
1. Pond 4. Reflecting Pool 2. Pond 5. Creekbed3. Pond 6. Fountain 1 2
3 4
5 6
118 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
20 03Picnic Area
119
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
21 Recreational Areas
Picnic AreaWalking Trail
120 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
04 22
Special FeaturesChinese Cultural Garden
121
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Special Features
1 2
3 4
6 5
1. Chiang Kai Shek
Pavilion
2. Sun Yat Sen
Memorial Hall
3. Plum Pavilion4. Confucius Statue5. Black Stones
Sculpture
6. Friendship Gate
23 122 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
24 04 / Special Features - Chinese Cultural Garden
Friendship Gate (1977)Plum Pavilion designed to represent a plum blossom (1986) Gift to Mayor from Taiwan – 1 million+ years old(1980)
Confucius Statue (dedicated 1974)
Sun Yat Sen Memorial Hall (1984)
Chiang Kai Shek Pavilion – gift from
China (1984)
Reflecting Pool (1974)
123
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT PARK MASTER PLAN
25 05Gardens
124 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
26 125
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
27 Gardens
2 1
3 1. California Native Garden2. Palm Garden3. Rose Garden Iris Garden
Fragrance
Garden
California
Wild Area
Rose
Garden
California
Native
Garden
126 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
28 06Overfelt House and Service Yard
127
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
29 Overfelt Family Home
Commemorative PlaqueOverfelt Home & Side YardSide Yard
128 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
07 30
Immediate Context
129
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
31 Nearby Users
1. Library2. Independence High School3. County Health Department 1 2 3
4 6
130 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
32 Project VisionProgram & Uses
131
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT PARK MASTER PLAN
To be in
nature
other
To meditate
To visit
cultural
monuments
As part of a
school visit
To exercise To have a
picnic
To watch
birds
Why do you visit the park? What do you do in the park?
To
volunteer
132 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
What features do you value or use the most?
Cultural
features
Ponds
Specialty
gardens
Educational
and
interpretive
exhibits
Picnic area
Overfelt
House
Walking
trails
Other
133
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT PARK MASTER PLAN
What park features should be added?
More
cultural
features
Performance
space
Educational
and
interpretive
exhibits
Rental space
opportunities
More
picnic
areas
More
gardens
More
walking
trails
Things for
children
Waterfront
improvements
Passive
recreational
activities such as
croquet, bocce,
etc.
other
134 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
What would encourage you to visit the park more often?
Activities for
children
Other
Organized
educational
walks
Events
Improved
safety and
security
A park
ranger
Improved
maintenance
135
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT PARK MASTER PLAN
37 Vision (Draft)
Develop a Master Plan that creates:• An outstanding, passive, garden-focused regional park
• A cultural destination• An icon for San José’s identity• A place to visit over and over again 136 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
38 Questions/Comments?
PHOTO CREDIT: DARLENE TENES
Please take the survey!(available in English, Spanish, Chinese & Vietnamese)• visit project page at bit.ly/overfeltgardenplan• also available at www.surveymonkey.com/r/PR75LRY • Raise your hand to be invited to speak
• click raise hand icon• on mobile app click on 3 dots at bottom off screen, click on raise hand
• Call-in users enter *9OR
• Type question into Q&A
137
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT PARK MASTER PLAN
39 Process & Schedule
Workshop 2:
Spring 2021
• Review Proposed
Improvements
• Gather input on
priorities
Workshop 1:
February 2021
• Define Project Vision• Site Analysis & Uses• Introduce Survey• Gather input Fall 2020
Project
Initiation
Workshop 3:
Summer 2021
• Present Preferred Plan• Gather feedback for
refinement
Summer to Winter 2021• Environmental Review • Final Master Plan 138 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT PARK MASTER PLAN
40 Thank you for coming!
139
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Park Master Plan
OVERFELT GARDENS
PARK MASTER PLAN
Community Workshop 2
May 20, 2021
6:30 – 8:00 p.m.
/ OVERFELT GARDENS PARK MASTER PLAN
COMMUNITY WORKSHOP 02 - PROPOSED IMPROVEMENTS
140 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS 2
1) Team introductions2) Project background3) Survey results4) Program options5) Discussion / Listen6) Next steps Agenda
/ OVERFELT GARDENS PARK MASTER PLAN
141
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Introductions
The TeamCity of San José • Department of Public Works• Department of Parks Recreation & Neighborhood Services
RHAA – Landscape Architecture + Planning
/ OVERFELT GARDENS PARK MASTER PLAN
142 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Process and Schedule
Workshop 2:May 20, 2021Proposed Improvements
Workshop 1:February 2021Site Analysis, Desires, Considerations Project Initiation
Workshop 3:Fall 2021Preferred Plan
Environmental Review and Final Master Plan: Summer to Winter 2021/22 / OVERFELT GARDENS PARK MASTER PLAN
143
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Vision
Develop a Master Plan that guides:• An outstanding regional park• A cultural destination• An icon for San José’s identity• A place to visit over and over again / OVERFELT GARDENS PARK MASTER PLAN
144 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
What is a Master Plan?
• Planned improvements• Implementation strategy• Community input• Design Guidance / OVERFELT GARDENS PARK MASTER PLAN
145
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Input Opportunities
Community Meeting #2 (Today)• Review improvement options• Gather feedback and input on prioritiesCommunity Meeting #3 (Fall 2021)• Review proposed Master Plan• Gather feedback, refine / OVERFELT GARDENS PARK MASTER PLAN
Survey • visit project page at bit.ly/overfeltgardenplan• also available at www.surveymonkey.com/r/WXXR9PL 146 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Park History
/ OVERFELT GARDENS PARK MASTER PLAN
1859: Overfelt home constructed1959: Mildred Overfelt donates land and home 1966: Park opens featuring several themed gardens1974: Chinese Cultural Gardens added1975: Three ponds built as part of Flood Control Project1989: Park master plan preparedNOTE: Overfelt Gardens Park Deed Restrictions• Operate as a passive park• No active sports permitted (football, baseball, basketball, tennis)
147
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Educational Park Drive
N. Jackson Avenue
Penitencia Creek
County Park
Overfelt Gardens
/ OVERFELT GARDENS PARK MASTER PLAN
148 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
149
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
1939
/ OVERFELT GARDENS PARK MASTER PLAN
site
150 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
2021
/ OVERFELT GARDENS PARK MASTER PLAN
site
151
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ 13
OVERFELT GARDENS
OVERFELT GARDENS PARK MASTER PLAN
Survey Results
152 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Conclusions
• Diverse users in age and ethnicity• Half live within 20 minutes of park• Average visit once a month Who comes to the park?
/ OVERFELT GARDENS PARK MASTER PLAN
153
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Conclusions
• Most visit for exercise and to enjoy nature in
small groups or with family
• The cultural features, walking paths, gardens,
picnic area and nature including the ponds are the favorite features Why do you come and what do you like?
/ OVERFELT GARDENS PARK MASTER PLAN
154 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Conclusions
• A large majority would like to see the
botanical garden restored, more cultural events, more interpretation and more things for children • A rental space, performance space and small
games are also desired
• Maintenance and security are very important
to see increased use
What do you want to see in the park?
What else do you want?• More cultural aspects of park• Spaces for youth• Dogs allowed in park• Graffiti clean up• Native plants• Lighting• Geese control• Path of Peace with meditation stops / OVERFELT GARDENS PARK MASTER PLAN
155
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ 17
OVERFELT GARDENS
OVERFELT GARDENS PARK MASTER PLAN
Program Opportunities
156 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
CONSTRUCTED FEATURES EVENTS OPERATIONS AND
MAINTENANCE
STRATEGIC PARTNERSHIPS
/ OVERFELT GARDENS PARK MASTER PLAN
157
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/
19 Site Program Concepts
OVERFELT GARDENS
/ OVERFELT GARDENS PARK MASTER PLAN
158 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/
OVERFELT GARDENS
20 1) Culture/Learning/Health2) Park as Charm Bracelet3) Series of special places and experiences connected by loop path
4) Enhanced program5) Enhanced learning6) Enhanced features Conceptual Approach
/ OVERFELT GARDENS PARK MASTER PLAN
159
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT GARDENS PARK MASTER PLAN
160 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
•
•••••••••••••••••
/ OVERFELT GARDENS PARK MASTER PLAN
161
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
❑
❑❑❑❑❑❑
/ OVERFELT GARDENS PARK MASTER PLAN
162 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
163
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT GARDENS 25
New park entrance
OVERFELT GARDENS PARK MASTER PLAN
164 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Sketch of entry
/ OVERFELT GARDENS PARK MASTER PLAN
165
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT GARDENS 27
Overfelt House visitor center / ranger / event area
/ OVERFELT GARDENS PARK MASTER PLAN
166 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
167
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Mile markers and fitness path
/ OVERFELT GARDENS PARK MASTER PLAN
168 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
169
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/
Food trucks and farmers market
OVERFELT GARDENS PARK MASTER PLAN
170 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
171
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Children’s garden
/ OVERFELT GARDENS PARK MASTER PLAN
172 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
173
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT GARDENS PARK MASTER PLAN
Restore formal gardens
174 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Restore botanical garden
/ OVERFELT GARDENS PARK MASTER PLAN
175
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/
Outdoor classroom
OVERFELT GARDENS PARK MASTER PLAN
176 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
177
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT GARDENS PARK MASTER PLAN
Transform Confucious statue area
178 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
179
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT GARDENS PARK MASTER PLAN
180 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
181
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Cultural
District
Lakeview Terrace
Civic Activation
Key points1. Amphitheater at Friendship gate
creates active cultural district
2. Amphitheater is far from
parking and may be an issue
Key points1. Amphitheater at small
pond near entry allows for events when park is closed and sharing opportunities with school and library
2. Amphitheater close to
parking
Key points1. Amphitheater centrally located with
view of largest pond
2. Amphitheater close to Overfelt House
event space
/ OVERFELT GARDENS PARK MASTER PLAN
Cultural District
Lakeview Terrace Civic Activation
Potential Amphitheater Locations
182 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
Cultural District Amphitheater
183
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Sketch of amphitheater
/ OVERFELT GARDENS PARK MASTER PLAN
184 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
Lake Terrace Amphitheater
185
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT GARDENS PARK MASTER PLAN
186 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
/ OVERFELT GARDENS PARK MASTER PLAN
Civic Activation Amphitheater
187
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
/ OVERFELT GARDENS PARK MASTER PLAN
188 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Cultural
District
Lakeview Terrace
Civic Activation
Key points1. Amphitheater at Friendship gate
creates active cultural district
2. Amphitheater is far from
parking and may be an issue
Key points1. Amphitheater at small
pond near entry allows for events when park is closed and sharing opportunities with school and library
2. Amphitheater close to
parking
Key points1. Amphitheater centrally located with
view of largest pond
2. Amphitheater close to Overfelt House
event space
/ OVERFELT GARDENS PARK MASTER PLAN
Cultural District
Lakeview Terrace Civic Activation
Potential Amphitheater Locations
189
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
TENES
• Raise your hand to be invited to speak
• click raise hand icon• on mobile app click on 3 dots at bottom off screen, click on raise hand
• Call-in users enter *9OR
• Type question into Q&A
Questions and comments?
/ OVERFELT GARDENS PARK MASTER PLANPlease take the survey!• visit project page at bit.ly/overfeltgardenplan• also available at www.surveymonkey.com/r/WXXR9PL 190 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Process and Schedule
Workshop 2:May 20, 2021Proposed Improvements
Workshop 1:February 2021Site Analysis, Desires, Considerations Project Initiation
Workshop 3:Fall 2021Preferred Plan
Environmental Review and Final Master Plan: Summer to Winter 2021/22 / OVERFELT GARDENS PARK MASTER PLANPlease take the survey!• visit project page at bit.ly/overfeltgardenplan• also available at www.surveymonkey.com/r/WXXR9PL 191
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Thank you
for coming!
/ OVERFELT GARDENS PARK MASTER PLAN
192 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
193
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Master Plan Survey
1 / 15
0.00% 0
20.79% 21
26.73% 27
19.80% 20
13.86% 14
12.87% 13
5.94% 6
Q1 What is your age range?
Answered: 101 Skipped: 0
TOTAL 101
2222200000-----3333300000
3333311111-----4444400000
4444411111-----5555500000
5555511111-----6666600000
6666611111-----7777700000
7777700000+++++
ANSWER CHOICES RESPONSES
Under 20
20-30
31-40
41-50
51-60
61-70
70+
SURVEY 01 RESULTS
194 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Master Plan Survey
2 / 15
32.00% 32
1.00% 1
45.00% 45
17.00% 17
1.00% 1
1.00% 1
3.00% 3
3.00% 3
2.00% 2
Q2 Which of the following do you feel best represents your racial or ethnic heritage? (optional)
Answered: 100 Skipped: 1
Total Respondents: 100
Non-Hispanic Caucasian or Euro-American
Black, Afro-Caribbean or African American Hispanic or Latino American East Asian or Asian American South Asian or Indian American Middle Eastern or Arab American Native American or Alaska Native Native Hawaiian or other Pacific Islander Other (please specify) 0 20 40 60 80 100 120 140 160 180 200
ANSWER CHOICES RESPONSES
Non-Hispanic Caucasian or Euro-American
Black, Afro-Caribbean or African American
Hispanic or Latino American
East Asian or Asian American
South Asian or Indian American
Middle Eastern or Arab American
Native American or Alaska Native
Native Hawaiian or other Pacific Islander
Other (please specify)
195
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Master Plan Survey
3 / 15
19.00% 19
46.00% 46
29.00% 29
2.00% 2
19.00% 19
Q3 Consider your typical visit to Overfelt Park. Do you visit the park alone or with others?
Answered: 100 Skipped: 1
Total Respondents: 100
Alone
With one other
person
With a small
group (3-9...
With a large
group (10 or...
I don't
currently us...
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Alone
With one other person
With a small group (3-9 people)
With a large group (10 or more people)
I don't currently use the park
196 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Master Plan Survey
4 / 15
18.18% 18
23.23% 23
8.08% 8
21.21% 21
36.36% 36
16.16% 16
8.08% 8
21.21% 21
Q4 What are the age ranges of those who join you at the park? Check all that apply.
Answered: 99 Skipped: 2
Total Respondents: 99
0-5
6-12
13-18
19-30
31-50
51-70
71 or older
Not applicable
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
0-5
6-12
13-18
19-30
31-50
51-70
71 or older
Not applicable
197
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Master Plan Survey
5 / 15
20.00% 20
16.00% 16
13.00% 13
51.00% 51
Q5 How close do you live to Overfelt Park?
Answered: 100 Skipped: 1
TOTAL 100
In the
immediate ar...
In the
neighboring...
In the
surrounding...
In the wider
San Jose are...
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
In the immediate area: 2-5 minute walk, within a ¼ mile radius of the park In the neighboring area: 5-15 minute walk, within ½ mile radius of the park In the surrounding area: 15-20 minute walk, within a mile radius of the park In the wider San Jose area: beyond 1 mile radius of the park 198 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Master Plan Survey
6 / 15
4.95% 5
13.86% 14
23.76% 24
19.80% 20
21.78% 22
15.84% 16
Q6 How often do you visit Overfelt Park?
Answered: 101 Skipped: 0
TOTAL 101
Very
frequently (...
Frequently (1
time per week)
Often (1 time
per month)
Occasionally
(4 times a...
Infrequently
(1-3 times a...
I do not visit
the park (sk...
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Very frequently (2+ times per week)
Frequently (1 time per week)
Often (1 time per month)
Occasionally (4 times a year)
Infrequently (1-3 times a year)
I do not visit the park (skip to question 9)
199
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Master Plan Survey
7 / 15
61.80% 55
58.43% 52
34.83% 31
15.73% 14
15.73% 14
7.87% 7
Q7 Why do you visit Overfelt Park? (check all that apply) Answered: 89 Skipped: 12
Total Respondents: 89
To enjoy
nature (bird...
Exercise
(walking,...
Family time
(picnic, play)
Meditation
Special events
Other (please
specify)
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
To enjoy nature (bird watching, open space)
Exercise (walking, jogging)
Family time (picnic, play)
Meditation
Special events
Other (please specify)
200 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Master Plan Survey
8 / 15
Q8 What are your favorite features of Overfelt Park? Please rank in order of importance, with 1 being most important.
Answered: 90 Skipped: 11
Ranking
31.03%
27 12.64%
11 22.99%
20 20.69%
18 12.64%
11 87
29.41%
25 31.76%
27 20.00%
17 11.76%
10 7.06%
6 85
28.74%
25 16.09%
14 20.69%
18 22.99%
20 11.49%
10 87
18.18%
16 25.00%
22 21.59%
19 19.32%
17 15.91%
14 88
10.98%
9 9.76%
8 14.63%
12 17.07%
14 47.56%
39 82
Ranking
1 2 3 4 5
Chinese
Cultural...
Gardens
Paths
Ponds
Picnic Area
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
1 2 3 4 5 TOTAL
Chinese Cultural Pavilions and Monuments
Gardens
Paths
Ponds
Picnic Area
201
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Master Plan Survey
9 / 15
53.57% 45
65.48% 55
7.14% 6
34.52% 29
Q9 Which Bay Area regional parks do you like to visit? What do you do when you visit there?
Answered: 84 Skipped: 17
Total Respondents: 84
Golden Gate
Park
Vasona Park
Tilden Park
East Bay
Regional Parks
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Golden Gate Park
Vasona Park
Tilden Park
East Bay Regional Parks
202 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Master Plan Survey
10 / 15
Q10 Given that the deed for the park limits active uses (i.e., no sports fields or courts are permitted), are there any park features you would like to see added to the park?
Answered: 101 Skipped: 0
Botanical
garden
Walking trail
Cultural
events or ot...
Educational
and...
Children’s
features
Performance
space
Rental space
opportunitie...
Small group
games such a...
More picnic
areas
Other (please
specify)
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
203
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Master Plan Survey
11 / 15
71.29% 72
61.39% 62
54.46% 55
47.52% 48
38.61% 39
25.74% 26
24.75% 25
22.77% 23
20.79% 21
17.82% 18
Total Respondents: 101
ANSWER CHOICES RESPONSES
Botanical garden
Walking trail
Cultural events or other small events
Educational and interpretive exhibits
Children’s features
Performance space
Rental space opportunities for gatherings
Small group games such as bocce, croquet, horseshoes
More picnic areas
Other (please specify)
204 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Master Plan Survey
12 / 15
Q11 What would encourage you to visit the park more often? Please rank in order of importance, with 1 being most important.
Answered: 93 Skipped: 8
Ranking
45.35%
39 25.58%
22 17.44%
15 11.63%
10 86
37.08%
33 30.34%
27 15.73%
14 16.85%
15 89
20.51%
16 16.67%
13 21.79%
17 41.03%
32 78
18.52%
15 23.46%
19 32.10%
26 25.93%
21 81
Ranking
1 2 3 4
Greater sense
of security ...
Higher level
of landscapi...
More things to
do
On-site
stewards (Pa...
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
1 2 3 4 TOTAL
Greater sense of security and safety
Higher level of landscaping and maintenance
More things to do
On-site stewards (Park Ranger)
205
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Master Plan Survey
13 / 15
Q12 Would you be interested in participating in the stewardship of the park by joining a ‘Friends of Overfelt Park’ group or otherwise volunteering at the park? If so, please provide contact information.
Answered: 45 Skipped: 56
Overfelt Gardens Master Plan Survey
Q13 Do you have any additional comments or concerns that were not addressed above?
Answered: 48 Skipped: 53
Overfelt Gardens Master Plan Survey
Q14 Please provide your email address if you would like to be informed of future community meetings.
Answered: 37 Skipped: 64
206 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
207
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
SURVEY 02 RESULTS
Overfelt Gardens Park Master Plan
1 / 39
0.83% 1
15.83% 19
31.67% 38
15.00% 18
20.00% 24
8.33% 10
8.33% 10
Q1 What is your age range?
Answered: 120 Skipped: 1
TOTAL 120
Under 20
20-30
31-40
41-50
51-60
60-70
70 or older
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Under 20
20-30
31-40
41-50
51-60
60-70
70 or older
208 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
2 / 39
47.90% 57
0.00% 0
16.81% 20
22.69% 27
5.04% 6
2.52% 3
2.52% 3
4.20% 5
Q2 Which of the following do you feel best represents your racial or ethnic heritage?
Answered: 119 Skipped: 2
Total Respondents: 119
# OTHER (PLEASE SPECIFY) DATE
1 multi-racial 6/15/2021 1:31 PM
2 All Lives Matter 5/27/2021 6:50 PM
3 half Euro (first gen) half Asian (fourth gen) 5/25/2021 9:44 AM Non-Hispanic
Caucasian or...
Black,
Afro-Caribbe...
Latino or
Hispanic...
East Asian or
Asian American
South Asian or
Indian American
Middle Eastern
or Arab...
Native
American or...
Other (please
specify)
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Non-Hispanic Caucasian or Euro-American
Black, Afro-Caribbean or African American
Latino or Hispanic American
East Asian or Asian American
South Asian or Indian American
Middle Eastern or Arab American
Native American or Alaskan Native
Other (please specify)
209
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
3 / 39
4 Mixed 5/24/2021 8:16 PM
5 Saxon 5/20/2021 7:30 PM
Overfelt Gardens Park Master Plan
65.83% 79
14.17% 17
11.67% 14
8.33% 10
Q3 How many children do you care for?
Answered: 120 Skipped: 1
TOTAL 120
None
1 child
2 children
3+ children
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
None
1 child
2 children
3+ children
210 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
5 / 39
10.83% 13
9.17% 11
10.00% 12
6.67% 8
63.33% 76
Q4 What is the age range of your youngest child?
Answered: 120 Skipped: 1
TOTAL 120
Under 2 years
2-5 years
6-12 years
13+ years
Not applicable
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Under 2 years
2-5 years
6-12 years
13+ years
Not applicable
211
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
6 / 39
3.33% 4
2.50% 3
14.17% 17
15.83% 19
64.17% 77
Q5 What is the age range of your oldest child?
Answered: 120 Skipped: 1
TOTAL 120
Under 2 years
2-5 years
6-12 years
13+ years
Not applicable
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Under 2 years
2-5 years
6-12 years
13+ years
Not applicable
212 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
7 / 39
13.33% 16
10.83% 13
12.50% 15
63.33% 76
Q6 How close do you live to Overfelt Park?
Answered: 120 Skipped: 1
TOTAL 120
In the
immediate ar...
In the
neighboring...
In the
surrounding...
In the wider
San Jose are...
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
In the immediate area: 2-5 minute walk, within a ¼ mile radius of the park In the neighboring area: 5-15 minute walk, within ½ mile radius of the park In the surrounding area: 15-20 minute walk, within a mile radius of the park In the wider San Jose area: beyond 1 mile radius of the park 213
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
8 / 39
9.17% 11
7.50% 9
15.00% 18
21.67% 26
46.67% 56
Q7 How often do you visit Overfelt Park?
Answered: 120 Skipped: 1
TOTAL 120
Very
frequently (...
Frequently (1
time per week)
Often (1 time
per month)
Occasionally
(4 times a...
Infrequently
(0-3 times a...
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Very frequently (2+ times per week)
Frequently (1 time per week)
Often (1 time per month)
Occasionally (4 times a year)
Infrequently (0-3 times a year)
214 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
9 / 39
83.15% 74
16.85% 15
Q8 Based on the results of the previous survey we propose to include several recommendations related to park Operations & Maintenance in the Master Plan. These are: A Park Ranger to be dedicated to Overfelt Park Increased funding and personnel for maintenance to accommodate general cleanup, as well as enhanced care for proposed future formal gardens Natural habitat enhancement Do these items adequately address the Operations & Maintenance priorities for Overfelt Park?
Answered: 89 Skipped: 32
TOTAL 89
# IF YES, DO YOU HAVE ANY ADDITIONAL COMMENTS? IF NO, PLEASE EXPLAIN WHY NOT.
DATE
1 I would like to see the native habitat zone to be expanded into the pastoral area. Or, the pastoral area be vegetated with drought tolerant, CA native locality specific, meadow plants.
Hire nonprofits who organize the community to take care of the gardens (eg. trash cleanups, walking tours, volunteer gardeners, habitat restoration etc.) 6/15/2021 6:09 PM
2 What formal gardens will be added? I much prefer natural spaces to benefit the local wildlife, that is why I come to the park.
6/15/2021 6:00 PM
3 Please preserve such a wonderful park. 6/15/2021 5:56 PM 4 Include adopt-a-park and regular volunteer workdays for maintenance. 6/15/2021 1:34 PM 5 Too many bird poops. Also can we adds new facilities like place grounds, exercise place or tennis courts, basketball courts
6/12/2021 1:38 PM
6 Can you make the water body last year round? Have a stream running through the park all year long?
6/10/2021 11:59 PM
7 The park is not maintained in areas that are not the main path. For example near the back corners of the park there is no place to picnic because it is not maintained. And to much goose crap everywhere.
6/10/2021 1:46 PM
Yes
No
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Yes
No
215
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
10 / 39
8 There can be so much more. The proposed plans address cleanup, but doesn't address ways to make the park more desirable - increased walking trails, play area for children, any type of feature would be nice. The ponds are dried up due to the drought, and while a water feature would be nice, there are lots of things that could take it's place. 6/10/2021 12:07 PM
9 General maintenance is top priority (repairing paths, repainting of cultural areas, pest management). Restoring/enhancing gardens and natural areas is second. I am not familiar with the duties of a park ranger.
6/10/2021 10:08 AM
10 Please join our efforts in lobbying the San Jose Parks and Rec. and the all the City Council members and Mayor's office in banning the use of gas leaf blowers in San Jose. The use of these two-cycle gas machines creates destructive air pollution and noise pollution degrading our quality of life. You can sign our petition at https://sign.moveon.org/petitions/ban-gasleafblowers-in -Marty Stuczynski 6/8/2021 11:19 AM
11 Natural habitat should be native habitat. Natural non-natives can be more harmful than built infrstructire in some cases.
6/8/2021 8:00 AM
12 I think the natural habitat enhancement is very important. 6/7/2021 8:13 PM 13 Do something about the ponds and algae 6/7/2021 6:32 PM 14 native, drought resistant FLOWERING plants. it is so dry and uninviting now. A nature trail for younger children, signage (graffiti proof) identifying habitats or wildlife they might see 6/7/2021 6:30 PM
15 native plants and habitat for native species needs to have a higher priority 6/7/2021 5:58 PM 16 Natural habitat enhancement should be practiced throughout the park. Interpretive services and docented walks should be planned to educate and engage the public. Nonprofits like Audubon Society and California Native Plant Society should be consulted with early in the planning process.
6/7/2021 4:30 PM
17 My son loves this park so much and cleans it up about twice a month and loves the squirrels and wildlife He’s 10 and drying shelter in place we discovered this hidden gem!!! 6/7/2021 3:56 PM
18 Can we please get a play ground somewhere far away from the quiet zones 6/5/2021 11:20 AM 19 Increased funding for maintenance and clean up is very important. There are a lot of transients and locals in the area that tend to trash the street areas of the park. Monitoring people that go into the parks with dogs is also important. Unless the no dog policy has changed. 6/5/2021 10:18 AM
20 natural history signage, and mileage walking markers 6/4/2021 2:04 PM 21 Safety is an issue in the park. One park ranger, working alone, is not enough. Increased funding probably will not cover all the operations and maintenance needs. The park has looked terrible for many years. It is a big park and there will be lots to do--the council office should directly help with the financial burden that this large park creates. 5/27/2021 6:58 PM
22 We would have gone there more often if the park didn’t seem so run down. A park ranger would add such a nice element for someone to help oversee the space. The wooden fence by the pastoral area is completely broken. We saw dead geese by the ponds. It needs some much needed funding to make this place shine again.
5/27/2021 4:34 PM
23 Good amenities 5/27/2021 3:37 PM
24 Focus on native plants and passive operations, its crucial to have a peacfull neighboirhood park to visit to escape from noise and trash.
5/25/2021 5:09 AM
25 More natural habitat would be better. At least natural habitat elements should be sprinkled throughout the park.
5/24/2021 9:15 PM
26 Emphasize native plants and nature-based solutions, not a park ranger, perhaps a community garden as well
5/24/2021 7:43 PM
27 Park very much need park Rangers due to Safety and health issues. 1/- I have seen so many bicyclist biking even race in the parks. It is very dangerous for people walking in the parks.
Park Ranger can stop it by give real tickets to bicyclist or confiscate bicycles. I have been living in this area too long. Last park rangers about 4 years ago doing very good in keeping park safe and clean. * Dogs without leash running around in parks also are big concern. 5/22/2021 2:07 PM
28 Native CA plant species for the park should be a priority and restoration of water flow to ponds 5/21/2021 2:31 PM 216 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
11 / 39
29 increase native plant gardens, butterfly gardens 5/21/2021 7:43 AM 30 I just have questions about the park ranger and what else he would be doing in addition to what the park ranger we currently have does. I am in full agreement of natural maintenance of the park and would love it if that meant assuring the protection of native species already existing at the park and taking down the spaces not native to California or which require lots of water 5/20/2021 8:13 PM
31 only a parttime ranger should be necessary 5/20/2021 7:45 PM 32 The park is maintained well as is. Just add water. 5/20/2021 7:34 PM 33 Beyond the natural habitat, I'd like to see cultivated / manicured gardens as well. A set of visual attractions.
5/20/2021 6:45 PM
217
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
12 / 39
81.11% 73
18.89% 17
Q9 Based on the results of the previous survey we propose to include several recommendations regarding facility improvements in the Master Plan. These are: A distinctive and improved entry experience More inviting fencing Security and lighting enhancements Americans with Disabilities (ADA) improvements Visual connection to Penitencia Creek Do these items adequately address the Operations & Maintenance priorities for Overfelt Gardens Park?
Answered: 90 Skipped: 31
TOTAL 90
# IF YES, DO YOU HAVE ANY ADDITIONAL COMMENTS? IF NO, PLEASE EXPLAIN WHY NOT.
DATE
1 It would be good if parking lot could be extended during the school year during park open hours. Perhaps utilizing the area behind the white house. Parking is horrible. 6/17/2021 3:19 AM
2 There needs to be more pedestrian access from the apartments from McKee Rd to the Gardens. Maybe ped traffic crosswalks, or McKee road diet. 6/15/2021 6:09 PM
3 These items are not specific enough for me to approve. What type of fences, lighting? What does “visual connection to Penitencia Creek” mean? I would like to have that information before approving
6/15/2021 6:00 PM
4 Yes better entrant to the park, more inviting entrance and 6/12/2021 1:38 PM 5 I agree with improved entry and inviting fencing assuming there is already funding for general maintenance/repairs/refresh of existing park amenities. 6/10/2021 10:08 AM
6 The fencing or entry plans aren't important to me. I think it's fine as is. 6/7/2021 8:13 PM 7 How do you connect to Penintencia Creek? It is far away. Fancy fencing is expensive. Spend it on park. Fancy entrance not important. Repair park trails. Fix ponds. Spend money on the park. Plant new things. Take out dead trees. Fix pathways so don't trip. Don't need new gate.
Just another way for drug dealers to run away. McKee gate usually locked anyway. 6/7/2021 6:32 PM
Yes
No
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Yes
No
218 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
13 / 39
8 Native plants should be planted for ornamental as well as environmental value throughout the park.
6/7/2021 4:30 PM
9 Definitely having better entrances and signs for entrances to the park. 6/5/2021 10:18 AM 10 Fencing is fine, as is. More inviting fencing is wasting money. Deal with the graffiti by having someone local that can remove it quickly. Create more seating areas. 5/27/2021 6:58 PM
11 Yes to all of these! 5/27/2021 4:34 PM
12 Fencing should be conducive to ecological corridors and migration. Lighting should be limited to 2400Kelvin and have a warm glow, use timers, dimmers, and motion sensors, and only be used when and where it is really needed.
5/25/2021 6:22 PM
13 Please do not overlight the park unnecessarily in the evenings and at night. The new LED lights are super bright and glaring. We need dark skies, and parks and public spaces need less light for safety than one might think.
5/25/2021 10:40 AM
14 Create a more natural park with quite walks and a relaxing atmosphere 5/25/2021 5:09 AM 15 Lighting enhancements are of concern. Lighting should be limited to the minimum necessary for safety and should be shielded and directed and use wavelengths least harmful to wildlife.
Refer to Dark Sky recommendations.
5/24/2021 9:15 PM
16 I'm against lighting (pro dark sky) due to human health and wildlife impacts, as well as fencing - I'd like money to go toward natural habitat expansion 5/24/2021 7:43 PM
17 Make sure lighting is shielded downward and ~3k lumens 5/24/2021 7:42 PM 18 creek TRAIL :) 5/21/2021 12:50 PM
19 invest in nature not in structures and hardscape. Lighting is not needed in this park, it can only degrade it's quality
5/21/2021 7:43 AM
20 But I don't want anyone to harass homeless people parke nearby. They aren't harming anyone.
Quite frankly the parking for the parkshpuld be made available for homeless folks after park hours
5/20/2021 8:13 PM
21 too many proposed new entrances. 5/20/2021 7:45 PM
22 Finding a way to put water in at least the Confucious pond and later the percolation ponds should be the only priority beyond continued maintenance. 5/20/2021 7:34 PM
23 Improve quality of pathways, furniture and general aesthetics of the site. The landscape lacks interest and diversity.
5/20/2021 6:45 PM
219
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
14 / 39
75.56% 68
24.44% 22
Q10 Based on the results of the previous survey we propose to include recommendations for several new / enhanced program elements for Overfelt Gardens Park. Re-establish formal gardens Loop trail with mile markers Visitor center / event opportunities at Overfelt House Educational signage for Cultural, Historical and Natural features Amphitheater Additional / enhanced picnic facilities Art in the landscape Children’s nature element Event amenities (to support food trucks, markets, etc.) Do these items adequately address the program priorities for Overfelt Gardens Park?
Answered: 90 Skipped: 31
TOTAL 90
# IF YES, DO YOU HAVE ANY ADDITIONAL COMMENTS? IF NO, PLEASE EXPLAIN WHY NOT.
DATE
1 I am a little concerned about the event amenitites. The park is beautiful, peaceful and serene. I worry that encouraging large events wll take away from the peaceful atmosphere. I also hope that the biodiversity of the park will be maintained.
6/18/2021 4:52 PM
2 Work with community partners to establish a gardener/habitat restoration volunteer program 6/15/2021 6:09 PM 3 I prefer the more natural areas as opposed to formal gardens, amphitheater food trucks. 6/15/2021 6:00 PM 4 Consider ecosystem as a whole and how it relates to climate change. A visitor center, formal gardens, etc are great, but they should be built/enhanced with climate change in mind (lowwater plants, lots of shade, sustainable materials). 6/15/2021 1:34 PM
5 Playgrounds, added tennis courts, basketball courts 6/12/2021 1:38 PM 6 Signage that educates about the delicate life systems there and the need to tread gently 6/11/2021 12:01 PM 7 Water features actually filled or replaced with something that conserves water 6/10/2021 11:39 PM 8 I think event amenities is formal gardens are the most important in the list. 6/10/2021 10:08 AM Yes
No
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Yes
No
220 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
15 / 39
9 Native plants should get top priority for signage and should be spread throughout the entire garden in addition to the specifies native garden.
6/8/2021 8:00 AM
10 I have concerns about adding food truck and markets. This does not seem to be in line with the stated objective of a peaceful sanctuary from the stresses of city life. 6/7/2021 9:02 PM
11 I don't want to see an amphitheater, event amenities (for food trucks) or enhanced picnic facilities. I think they are in direct opposition to the stated will Mrs. Overfelt left. There are other parks with "amenities" this park is a place to seek calm, peace, and serenity. 6/7/2021 8:13 PM
12 Where theater? Chinese don't like next to their things.Keep park quiet. Nice. No flea markets in park. Bunch of trash. Food trucks dirty ruin park
6/7/2021 6:32 PM
13 It needs play structures for kids 1-13 5/30/2021 10:47 AM 14 Those planning the park should be more realistic. Art in the landscape will most likely be used for graffiti or damaged.
5/27/2021 6:58 PM
15 Live outdoor music events would be nice. Bird sanctuary. Lots of pollinators and pollinating gardens.
5/27/2021 4:50 PM
16 Yes please! This would be so wonderful 5/27/2021 4:34 PM 17 To respect and acknowledge the history and intent of the park, there should not be an amphitheater and event amenities should not be prioritized. This should be a place for meditation, respect, and intentional use. There should also be program elements to restore the percolation ponds, which are essential for restoring, protecting, and enhancing the ecosystem. 5/25/2021 6:22 PM
18 The focus should be on relaxation and nature, a place for the community to view wildlife and enjoy a peacefull walk
5/25/2021 5:09 AM
19 Amphitheater should be limited in size to limit impacts and should be geared to local community use, not to commercial events
5/24/2021 9:15 PM
20 Amphitheater not necessary and problematic 5/24/2021 9:14 PM 21 prefer emphasis on areas other than the amphitheater, which disturbs the quiet space 5/24/2021 8:23 PM 22 I am against the amphitheater and enhanced picnic facilities 5/24/2021 7:43 PM 23 nature area as it would be without "human touch" 5/24/2021 7:42 PM 24 I want a dog park, but I guess this isn’t the place for it. 5/22/2021 7:39 AM 25 DO NOT include an amphitheater 5/21/2021 2:31 PM
26 Large Childrens element for ^6^ft distance 5/21/2021 12:50 PM 27 this is too much. 5/21/2021 7:43 AM
28 yes I think giving access to local food trucks and markets would be great. one of those ponds should be used as a community garden space accessible to all 5/20/2021 8:13 PM
29 Market, truck access, ampitheatre can be handled by negotiating restored access with the high-school. Adding them to the park would destroy it. Mile markers should be explained in a plackard.
5/20/2021 7:34 PM
30 Fitness equipment, opportunities to be active in the space. 5/20/2021 6:45 PM 221
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
16 / 39
Q11 Comments on New Park Entrance
Answered: 44 Skipped: 77
# RESPONSES DATE
1 This new path seems to remove trees and other plants. Can some be kept? 6/17/2021 3:29 AM 2 What street is this on? 6/15/2021 5:41 PM
3 Seems drab, no interesting borders to welcome you to a special place. 6/15/2021 1:39 PM 4 Nice, may be a welcome nature trails that kids will like to climb, play like in Oakland zoo new develop area at the mountain
6/12/2021 1:47 PM
5 Inviting and clean but still historic with the building 6/11/2021 9:29 AM 6 Looks suitable. 6/11/2021 12:02 AM
7 Nice, good lighting, actually highlighting the overfelt house. Maybe a gate/archway to denote it as the entrance
6/10/2021 11:51 PM
8 Entering the park currently, has the feel of entering a crack den. To uninviting. 6/10/2021 1:54 PM 9 Wider walkways would be nice 6/10/2021 12:11 PM
10 I believe this adds seating and improves lighting. I think that is great. I am unsure of how many plants should be added in the area.
6/10/2021 10:28 AM
11 That's fine. A more wide open entrance that you can see through would be more inviting 6/10/2021 7:40 AM 12 Nothing particularly distinctive/new 6/10/2021 7:33 AM 13 Good 6/10/2021 12:52 AM
14 Looks great! 6/8/2021 2:20 PM
15 Spacious 6/8/2021 11:31 AM
16 It is a more pastoral, calming entrance than what is presently there. 6/7/2021 9:17 PM 17 It's not clear how this is the entrance, but it's ok. 6/7/2021 8:20 PM 18 Where are big garbage cans? Why is pond gone? People like pond. 6/7/2021 6:48 PM 19 Include native plants and wildflowers. Consult professionals with special expertise in native plants; not all are knowledgeable about native plants.
6/7/2021 4:36 PM
20 Love it 6/5/2021 10:21 AM
21 welcoming 6/4/2021 2:13 PM
22 So so .... It should be be better visually 6/4/2021 12:13 PM 23 No comment 6/4/2021 10:29 AM
24 Add more color to the park by adding more colorful flowers. 6/4/2021 10:13 AM 25 Fence off habitat restoration areas if they are in danger of being overrun. 5/27/2021 8:56 PM 26 Why put in a new path? The current one connects well with the other trails and is more centralized. When the ponds had lots of water, it was a grand entrance. Just remove that ticket booth and arbor so that it is open and welcoming.
5/27/2021 7:08 PM
27 Very friendly, inviting and just relaxing space 5/27/2021 4:38 PM 28 Not distinctive, and the areas to the side may get overgrown and not friendly. I recommend a wider area at the entrance that narrows to the walking path. Wider areas where the benches are too, so people walking don't have to worry about getting to close to those sitting. 5/27/2021 4:13 PM
222 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
17 / 39
29 N/a 5/27/2021 3:39 PM
30 Are the grasses and flowers that are being added native? How will they we watered and cared for?
5/26/2021 6:28 PM
31 make sure all plants are native. Lighting should be extremely intentional: only light when/what is needed, 2400Kelvin, warm glow, utilize dimmer, motion sensors, and timers. 5/25/2021 6:30 PM
32 It will be nice to highlight the house as a prominent feature of the park. 5/25/2021 10:47 AM 33 Not neccessary, a waste of money 5/25/2021 5:17 AM
34 Don't remove any native or mature trees if at all possible. 5/24/2021 9:24 PM 35 nice 5/24/2021 8:28 PM
36 No 5/24/2021 8:19 PM
37 I like the native plants, and small fence rather than a tall one 5/24/2021 7:47 PM 38 Use CA native plants 5/21/2021 2:40 PM
39 Trail benches are OUTDATEDf . Covid Safe Picnic bench a foot off the trail OR h e a v i l y distanced .
5/21/2021 12:57 PM
40 No need for change 5/21/2021 7:50 AM
41 Prioritize planting native plants or drought resistant plants 5/20/2021 8:20 PM 42 existing entrances are fine. 5/20/2021 7:50 PM
43 No. Just level the stump in the concreete or put something else there (even a concrete trash can) so people don't trip on it. Find a way to put water in the ponds instead of rennovating the enterance.
5/20/2021 7:34 PM
44 The entry looks informal and farm-like. Nice, but seems to lack the cultural elements to be found within the park. Recommend that the entrance offers a few clues about what will be found with further discovery.
5/20/2021 6:54 PM
223
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
18 / 39
Q12 Comments on Overfelt House Visitor Center / Event Area Answered: 38 Skipped: 83
# RESPONSES DATE
1 Meh 6/15/2021 5:41 PM
2 Very nice visitor with toilets and 6/12/2021 1:47 PM
3 Appropriate, maybe even a potential wedding venue 6/11/2021 12:02 AM 4 Cherry blossoms trees are cool, event space seems a bit small 6/10/2021 11:51 PM 5 Provide Lage areas and ensure proper shading so people can rent the space for events. Maybe a large gazebo like Lake Cunningham.
6/10/2021 1:54 PM
6 N/A 6/10/2021 12:11 PM
7 This looks like a great community space for events. 6/10/2021 10:28 AM 8 Good. A nice.patio area around the buildings and some shade would be good for events 6/10/2021 7:40 AM 9 Helps a LOT to see this area revitalized 6/10/2021 7:33 AM 10 Good 6/10/2021 12:52 AM
11 What a good idea! 6/8/2021 2:20 PM
12 MOre lights 6/8/2021 11:31 AM
13 Seems too much for a place that's supposed to be peaceful. 6/7/2021 8:20 PM 14 Looks like for rich white people only. Is it closed except for rich people ? Can we use without pay money.
6/7/2021 6:48 PM
15 That's great 6/5/2021 10:21 AM
16 rental options, weddings, and ceremonies, community vigils 6/4/2021 2:13 PM 17 so so 6/4/2021 12:13 PM
18 No comment 6/4/2021 10:29 AM
19 Nice! This is a great idea, if people feel safe enough to use it. Funding for parking lot safety should be included.
5/27/2021 7:08 PM
20 Yes! Please have another space for people to enjoy and have events! 5/27/2021 4:38 PM 21 The fence looks out of place. Can you use natural elements to create a defined space instead? The Event Area doesn't match the cultural area/artwork in the park. Looks boring vs memorable.
5/27/2021 4:13 PM
22 N/a 5/27/2021 3:39 PM
23 I would prefer to see the house turned into a museum to show and teach local children the history of Santa Clara County and San Jose's agricultural past rather than another venue for weddings.
5/26/2021 6:28 PM
24 make sure all plants are native. Lighting should be extremely intentional: only light when/what is needed, 2400Kelvin, warm glow, utilize dimmer, motion sensors, and timers. Also, what will the event area entail? Is this aligned with the history and intention of the park? 5/25/2021 6:30 PM
25 Looks like a good use of this area. 5/25/2021 5:42 PM 26 Nice. 5/25/2021 10:47 AM
27 not appropriate for a neighborbood park, we need a relaxing and peacfull city park to experience nature and relax
5/25/2021 5:17 AM
224 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
19 / 39
28 Minimize lighting, noise and nighttime operations. 5/24/2021 9:24 PM 29 looks ok 5/24/2021 8:28 PM
30 No 5/24/2021 8:19 PM
31 Native plants nice 5/24/2021 7:47 PM
32 Include Equity policies for example non-profits and grassroots can rent for reduced or free 5/21/2021 2:40 PM 33 Mesh netted picnic areas just outside of gathering square . 5/21/2021 12:57 PM 34 No need for change 5/21/2021 7:50 AM
35 Use the visitor center as a workshop space or gallery space for local art 5/20/2021 8:20 PM 36 ok 5/20/2021 7:50 PM
37 Yeah, that looks great. What do the people see if they turn around and look out over the pond? 5/20/2021 7:34 PM 38 I like the space - but seems only suitable for special events. What happens here on a weekday afternoon? How is it used and appealing during non-event times? 5/20/2021 6:54 PM
225
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
20 / 39
Q13 Comments on Loop Trail & Mile Markers
Answered: 39 Skipped: 82
# RESPONSES DATE
1 Seems silly as the park isn't that big. 6/22/2021 3:16 PM 2 Bring back the water that runs through the park in the little creeks 6/15/2021 5:41 PM 3 Can be bicycle trails as well. 6/12/2021 1:47 PM
4 Much needed! 6/11/2021 9:29 AM
5 Good idea 6/11/2021 12:02 AM
6 Like that it is stone and matches the aesthetics of the park. Would there actually be a separate trail for jogging/running or will it intersect with the main pathway? 6/10/2021 11:51 PM
7 Improved trails is a great idea. Ensure trash is not a problem by providing trash cans as well. 6/10/2021 1:54 PM 8 N/A 6/10/2021 12:11 PM
9 I do not run in this park, so I have no comments on the trail. 6/10/2021 10:28 AM 10 Not as important, but adding it would give repeat walkers and runners more reason to use the park daily
6/10/2021 7:40 AM
11 Trail is currently very rough 6/10/2021 7:33 AM
12 Good 6/10/2021 12:52 AM
13 Always good to know how much I'm walking ;^D 6/8/2021 2:20 PM 14 Markers to track distance 6/8/2021 11:31 AM
15 All trails should use permeable material and as little hard surface as possible. 6/8/2021 8:11 AM 16 Perhaps a descriptive name for each major mile marker, such as Heritage Oak, Pagoda, etc 6/7/2021 9:17 PM 17 no comment 6/7/2021 8:20 PM
18 Not that many white people in the park. 6/7/2021 6:48 PM 19 Can't wait! I love running and I would feel safe going into the park with marked trails and good lightning
6/5/2021 10:21 AM
20 mile markers a must 6/4/2021 2:13 PM
21 good 6/4/2021 12:13 PM
22 No comment 6/4/2021 10:29 AM
23 A good idea. 5/27/2021 7:08 PM
24 My kids would love that! We never know what is an official trail and wonder through the bushes 5/27/2021 4:38 PM 25 Looks good 5/27/2021 4:13 PM
26 Great for exercises 5/27/2021 3:39 PM
27 I love the idea of mile markers. My children love seeing how many miles they walked. 5/26/2021 6:28 PM 28 How do the trails encroach on or protect/preserve/respect/enhance the natural environment and ecosystem?
5/25/2021 6:30 PM
29 waste of money, provide signage to educate park users on plants and animals, the focus should be on education and nature
5/25/2021 5:17 AM
30 nice 5/24/2021 8:28 PM
226 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
21 / 39
31 No 5/24/2021 8:19 PM
32 Runners and bikes use same trail? 5/24/2021 7:50 PM
33 Gravel path superior to paved 5/24/2021 7:47 PM
34 s p i g o t s . 5/21/2021 12:57 PM
35 no need for change 5/21/2021 7:50 AM
36 Sure 5/20/2021 8:20 PM
37 not a good idea. 5/20/2021 7:50 PM
38 No. Running trails like that always turn to muck in the rain, then become maintenance nightmares as they age and brush encrouches.
5/20/2021 7:34 PM
39 Consider "Par Course" fitness stations along the fitness loop. 5/20/2021 6:54 PM 227
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
22 / 39
Q14 Comments
Answered: 36 Skipped: 85
# RESPONSES DATE
1 This does not look like a peaceful, serene way to enjoy nature. 6/18/2021 4:57 PM 2 I do not agree with the use of this space 6/15/2021 6:09 PM 3 Do not remove any of the trees. Keep the old monuments and features. Do not remove anything that is currently there. I’ve been going here since I was 4 years old and remember the park fondly with my parents and siblings.
6/15/2021 5:41 PM
4 Can have farmer market etc 6/12/2021 1:47 PM
5 Away from sensitive species in the park 6/11/2021 12:04 PM 6 good idea 6/11/2021 12:02 AM
7 Awesome, definitely needed especially with the flea market project. 6/10/2021 11:51 PM 8 Wide sidewalks for stalls to not be on the grass. 6/10/2021 1:54 PM 9 Could use wider walkways and more shade, and trash bins 6/10/2021 12:11 PM 10 Having a space for markets is great. 6/10/2021 10:28 AM 11 It would be nice to utilize the common grounds and area more 6/10/2021 7:40 AM 12 Excellent 6/10/2021 12:52 AM
13 I'd be open to that..! 6/8/2021 2:20 PM
14 Spacious 6/8/2021 11:31 AM
15 I am ok with a weekly farmers market but not with food truck unless parked along the main boundary roads. Food trucks mean generators, noise and air pollution. 6/7/2021 9:17 PM
16 NO. this isn't what the park was meant for. 6/7/2021 8:20 PM 17 Why are not any Mexicans? 6/7/2021 6:48 PM
18 Play ground please � 6/5/2021 11:22 AM
19 community events and annual fair traditions for wellness & chronic disease preventionpartnering with Regional Hospital, Valley Clinic, Behavioral Health, & Public health as a place to get well and be well.
6/4/2021 2:13 PM
20 ok 6/4/2021 12:13 PM
21 No comment 6/4/2021 10:29 AM
22 Farmers Market would be a great idea. 6/4/2021 10:13 AM 23 Is there enough parking for events? Safety again, will be critical for success. 5/27/2021 7:08 PM 24 I would love a farmers market or a place for the vendors from the pending close of the SJ flea market to come to that spce
5/27/2021 4:38 PM
25 Great for independence high school nearby 5/27/2021 3:39 PM 26 I am not sure I like the idea of food trucks in the park. I love how calm, quiet, and secluded the park is. The tranquility in the park from the busy streets and nearby freeways is what I seek. 5/26/2021 6:28 PM
27 I am not sure there should be major events, as the intention and history of the park is for respectful use and meditation. How will these events harm or protect the natural environment and wildlife?
5/25/2021 6:30 PM
228 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
23 / 39
28 not appropriate at this location, we need relaxation and a place to enjoy nature 5/25/2021 5:17 AM 29 Look forward to 5/24/2021 8:28 PM
30 No 5/24/2021 8:19 PM
31 Events would be great! 5/22/2021 7:40 AM
32 *.* 5/21/2021 12:57 PM
33 Keep to the existing parking lot 5/21/2021 7:50 AM
34 It would be great to have a monthly market. And as was already mentioned food trucks, street vendors, ice cream sellers
5/20/2021 8:20 PM
35 Nothing shown here couldn't happen as the park is today. This could be "catered" by trucks using the existing ranger's station driveways.
5/20/2021 7:34 PM
36 Looks like - but not convinced that this area of San Jose will draw crowds for shopping.
Perhaps align "Farmers Market" with an Art in the Park event, so there's multiple reasons to visit.
5/20/2021 6:54 PM
229
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
24 / 39
Q15 Comments on Children's Nature Element
Answered: 47 Skipped: 74
# RESPONSES DATE
1 I like this I just worry about the vandalism from the neighboring high school gangs. Lots of pot smoking during the school days.
6/22/2021 3:16 PM
2 Looks like fun! 6/18/2021 4:57 PM
3 Please include an awning for shade 6/17/2021 3:29 AM
4 Not very enriching. Not enough features, not really nature related 6/15/2021 6:09 PM 5 Again, don’t remove any of the stones or temples. 6/15/2021 5:41 PM 6 Nice to see that it is natural looking, What are the maintenance issues? Natural materials wear out.
6/15/2021 1:39 PM
7 Yes, please build more children nature for stairs, climb and play. Fountain river children can play.
6/12/2021 1:47 PM
8 This looks very interesting. Right now it is not very kid friendly to be honest. 6/11/2021 12:02 AM 9 Reminds me of some of the happy hollow children elements. Definitely provides a good dedicated area for children in the park
6/10/2021 11:51 PM
10 Lackluster. Designed for the Instagram parent but doesn't engage children at all 6/10/2021 12:11 PM 11 That doesn’t look very fun. “Here kids go outside and play with some logs and a thicket.” 6/10/2021 8:50 AM 12 A small area nearer the entrance would be preferred. Still would like to retain the original intention of the park
6/10/2021 7:40 AM
13 Could include more 6/10/2021 12:52 AM
14 It's always important to get kids involved in nature! 6/8/2021 2:20 PM 15 Playful and safe 6/8/2021 11:31 AM
16 Sculptures of local animals or information/ interactive elements should be a priority to include local birds.
6/8/2021 8:11 AM
17 I'm not sure. Something very, very minimal. Again, doesn't need a play area. Nature is enough entertainment.
6/7/2021 8:20 PM
18 Kids will break. Where is Mexicans? 6/7/2021 6:48 PM 19 Include interpretive signs on native plants, animals, and habitat value. 6/7/2021 4:36 PM 20 Yes thanks for including something for the children, because one reason we don't visit is the lack of a children's area
6/5/2021 11:22 AM
21 Great! 6/5/2021 10:21 AM
22 great interactive and clean -add extra cleaning and power washing to frequently used parks and with homeless population use. to maintain space and welcoming environement-parks in more dense areas of the city need more power washing and clean ups by city workers, and community day traditions to clean the park-have groups adopt a park and create that tradition. stewarding space.
6/4/2021 2:13 PM
23 good 6/4/2021 12:13 PM
24 No comment 6/4/2021 10:29 AM
25 I would love to see a playground for children. My kids would definitely enjoy the park more and we would visit more frequently. Maybe a nature themed playground. I like how SF Zoo has their 6/4/2021 10:13 AM
230 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
25 / 39
themed playgrounds.
26 Needs more of this 5/30/2021 10:49 AM
27 Great 5/27/2021 7:08 PM
28 Add ranger program and outdoor educational program to children's calendar of events. 5/27/2021 4:59 PM 29 My kids would love the playground! 5/27/2021 4:38 PM 30 Tree stumps for kids to hop across would be nice. Not sure what the round thing is, but a large climbing boulder would be good too.
5/27/2021 4:13 PM
31 Great options for children 5/27/2021 3:39 PM
32 Yes, a nature element/nature playground is a wonderful idea. 5/26/2021 6:28 PM 33 I like that the nature element is aligned with and mirrors the other natural elements of the park.
I think this is a good space to educate children on the history of the park and natural environment, and the importance of its preservation.
5/25/2021 6:30 PM
34 What a great idea! I grew up with a climbing tree in our nature center park that we called the "monkey tree". It was a huge hit with the kids.
5/25/2021 10:47 AM
35 need more focus on education for children to expereince nature 5/25/2021 5:17 AM 36 great! 5/24/2021 8:28 PM
37 No 5/24/2021 8:19 PM
38 The big ball in your photo is a rodent play toy from a pet shop - creative.. There's enough nature out there - don't put in hokey stuff instead of REAL nature.. 5/24/2021 7:50 PM
39 I like the natural elements for the children 5/24/2021 7:47 PM 40 That’s nice 5/22/2021 7:40 AM
41 SEE the Children's Discovery Area in front of the Visitor Center in Fremont Don Edwards San Francisco Bay
5/21/2021 2:40 PM
42 Sensory development sections for spec needs & educ devlp. for some these little things mean everything.
5/21/2021 12:57 PM
43 nature play us cool. No concrete and plastic please. 5/21/2021 7:50 AM 44 Sure 5/20/2021 8:20 PM
45 added insurance costs 5/20/2021 7:50 PM
46 No. Instead, how about a todler height plackard by the enterance benches that says, "Can you see the turtles?"
5/20/2021 7:34 PM
47 I like appearance of this playground, but feel that its visually inconsistent with the farmhouse and Chinese elements. Is nature a new theme, or build upon existing themes? 5/20/2021 6:54 PM
231
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
26 / 39
Q16 Comments on Formal Gardens
Answered: 46 Skipped: 75
# RESPONSES DATE
1 Will the formal gardens be at the expense of the nature areas? 6/18/2021 4:57 PM 2 Disagree with this. Formal gardens may require the use of toxic weed killers, pesticides, more upkeep. Let’s keep it natural
6/15/2021 6:09 PM
3 Keep everything the same and just enhance it as it stands. 6/15/2021 5:41 PM 4 Too much grass. Add trees to provide habitat and shade 6/15/2021 1:39 PM 5 Formal garden with lots of flower 6/12/2021 1:47 PM
6 Make sure plenty of easily accessible trash cans 6/11/2021 9:29 AM 7 Not really interested for my self and family but maybe others like it? 6/11/2021 12:02 AM 8 Not much of a garden. Needs more foliage and plants that are native to the area 6/10/2021 11:51 PM 9 I prefer less lawn and more interesting plants and seating areas to observe nature and relax. 6/10/2021 3:42 PM 10 This is a great improvement. 6/10/2021 10:28 AM
11 Is a formal garden defined by it’s structured plantings? This looks more like a fairway, a blank space you just pass through.
6/10/2021 8:50 AM
12 Not sure if needed, unless want to increase status of the park 6/10/2021 7:40 AM 13 More floral variety 6/10/2021 12:52 AM
14 Looks beautiful. 6/8/2021 2:20 PM
15 MOre greeneries and flowers 6/8/2021 11:31 AM
16 Incorporate a majority of native plants 8n all gardens, formal or natural. 6/8/2021 8:11 AM 17 Large areas of non-native grasses with rain deflecting hardscape are counter intuitive in our semi- permanent drought statue. Need to incorporate more permeable surface for pathways to maintain what rain we do get on site.
6/7/2021 9:17 PM
18 It can fit with the intended purpose, but I prefer native plants, drought resistant plants, and a more natural landscape.
6/7/2021 8:20 PM
19 Ugly. Take out path in center. Make place for play. You can put plants in middle. 6/7/2021 6:48 PM 20 Minimize turf. Increase native plant cover. Use native sod. 6/7/2021 4:36 PM 21 beautiful-peaceful. add signage with relaxation techniques that reduce stress and build wellness mental health-good and clean places to sit and reflect/meditate. 6/4/2021 2:13 PM
22 ok 6/4/2021 12:13 PM
23 No comment 6/4/2021 10:29 AM
24 Can this really be maintained? The park has had many gardens/growing areas over the years and none have been kept up. The roses were once beautiful, the Sensory Garden was great, around the house, natives have been planted a few times and they all die. Be realistic. 5/27/2021 7:08 PM
25 Use lot of California natives and drought tolerant landscaping. Add master gardener program. 5/27/2021 4:59 PM 26 I would be weary of having such a space when we have homeless who wander the space. 5/27/2021 4:38 PM 27 Statues/public art would be good. Less grass and more distinctive plants that create visual interest
5/27/2021 4:13 PM
232 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
27 / 39
28 Good 5/27/2021 3:39 PM
29 I remember how beautiful the rose garden area was as a child. The gardens definitely needs to be revamped.
5/26/2021 6:28 PM
30 Gardens should be native. 5/25/2021 6:30 PM
31 Not sure about the need for grass. We have far too many drought years now. 5/25/2021 10:47 AM 32 focus on more native species to attract wildlife, educate people on drought tolerant native plants and learn what platns are appropriate for planting in home gardens 5/25/2021 5:17 AM
33 Favor natural habitat over formal gardens and introduce habitat elements into any formal garden area.
5/24/2021 9:24 PM
34 Could the formal gardens utilize grass alternatives, or native grasses, and subsurface irrigation. An alternative could be a succulent/alpine plantings to use less water and still maintain the feeling of a formal garden area.
5/24/2021 8:47 PM
35 prefer natural landscaping 5/24/2021 8:28 PM
36 No 5/24/2021 8:19 PM
37 no lawns! 5/24/2021 7:50 PM
38 Please focus on native vegetation and bee/butterfly/pollinator friendly plants 5/24/2021 7:47 PM 39 Eh... not my cup of tea 5/22/2021 7:40 AM
40 Define "Formal Gardens" 5/21/2021 2:40 PM
41 NO FOOD OR DRINK 5/21/2021 12:57 PM
42 not sure what this means. Native plantings would be nice. 5/21/2021 7:50 AM 43 Native plants should be rpirtize and so should other drought resistant plants. We should be mindful of water usage
5/20/2021 8:20 PM
44 where does the water come from? 5/20/2021 7:50 PM
45 No, this would destroy the park. We already have formal gardens at the corners of the Mabury/Jackson Pennitencia creek park. Overfelt at present, looks a lot better. 5/20/2021 7:34 PM
46 I imagine visiting a variety of gardens that have a "room like" feeling, perhaps within hedges or other framing. This rendering suggests that a variety of plants will be found. Would prefer to see it in context of unique "gardens" within the park.
5/20/2021 6:54 PM
233
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
28 / 39
Q17 Comments on Outdoor Classroom
Answered: 43 Skipped: 78
# RESPONSES DATE
1 This would be great as the park has some great bird watching. Many species and many beautiful plants to learn about.
6/22/2021 3:16 PM
2 Nice idea. 6/18/2021 4:57 PM
3 Ok 6/15/2021 6:09 PM
4 Leave the reflecting pool at the Confucius statue area. If water is a concern, just make it more shallow. No need to remove. Please leave this alone.
6/15/2021 5:41 PM
5 Nice with ranger to get children educated on nature flower, animals. 6/12/2021 1:47 PM 6 Wonderful - hopefully including education about the species found here and around our wonderful area.
6/11/2021 12:04 PM
7 Great idea! 6/11/2021 9:29 AM
8 agree 6/11/2021 12:02 AM
9 Neutral, seems unnecessary if there is also an amphitheater already 6/10/2021 11:51 PM 10 Nobody wants to sit on round logs 6/10/2021 12:11 PM 11 Would be nice if goal is to put.it on list of field trip destinations 6/10/2021 7:40 AM 12 Stool for speaker 6/10/2021 12:52 AM
13 I'd be interested in taking a class! 6/8/2021 2:20 PM 14 Good activity area 6/8/2021 11:31 AM
15 Education is important, but again, does it fit with the intended purpose? 6/7/2021 8:20 PM 16 No Mexicans here. You see kids at high school---ALL Mexicans. 6/7/2021 6:48 PM 17 More interpretive signs on birds, animals, plants. 6/7/2021 4:36 PM 18 great. 6/4/2021 2:13 PM
19 good 6/4/2021 12:13 PM
20 No comment 6/4/2021 10:29 AM
21 Fantastic 5/30/2021 10:49 AM
22 That looks like foam. The truth is that area will get trashed. Standard decomposed granite would be more durable than resilient surface.
5/27/2021 8:56 PM
23 ok 5/27/2021 7:08 PM
24 Bird watching, astronomy events, ecology lessons. Horticulture, tree lectures. Local wildlife, pathways, and watershed. How is the South Bay connected to the larger northern California landscape?
5/27/2021 4:59 PM
25 What a thoughtful addition. 5/27/2021 4:38 PM
26 Will there be classes offered? 5/27/2021 3:39 PM
27 Yes, another wonderful addition along with park rangers to teach students about native California flora and fauna along with the area's past.
5/26/2021 6:28 PM
28 I like that the outdoor classroom incorporates natural props (tree benches) rather than incorporating more artificial structures.
5/25/2021 6:30 PM
234 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
29 / 39
29 I hope this can be utilized by Independence classes. 5/25/2021 5:42 PM 30 Great idea for scout troops and such. Youth ranger training, perhaps? Give kids a docent ranger badge and ask them to help be responsible for the care of the park. 5/25/2021 10:47 AM
31 Good idea 5/25/2021 5:17 AM
32 Minimize impact of outdoor classroom on any riparian areas and emphasize environmental education.
5/24/2021 9:24 PM
33 A small platform would be good so students/children can present/share. 5/24/2021 8:47 PM 34 Nice to have park ranger 5/24/2021 8:28 PM
35 No 5/24/2021 8:19 PM
36 we've had events out there and you don't need to put in "artificial" gathering areas.. 5/24/2021 7:50 PM 37 This is okay 5/24/2021 7:47 PM
38 Nice 5/22/2021 7:40 AM
39 City should provide a full time interpreter 5/21/2021 2:40 PM 40 Sounds good 5/20/2021 8:20 PM
41 vote no 5/20/2021 7:50 PM
42 No. This is silly, the picnic table area is easily accessable. No kid is going to think well of a field presenting itself as shown here. Biology, related fields and rangers are supposed to be practical and "down to earth."
5/20/2021 7:34 PM
43 Looks nice - just not sure if there's a "market" for this type of activity. 5/20/2021 6:54 PM 235
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
30 / 39
Q18 Comments on Confucius Statue Area
Answered: 49 Skipped: 72
# RESPONSES DATE
1 Good because it's an eye sore and a disapointment as it now stands. 6/22/2021 3:16 PM 2 Is there a way to do this without adding a water-intensive lawn? 6/18/2021 4:57 PM 3 Turf might take too much watering during drought. 6/17/2021 3:29 AM 4 No. Grass uses huge amounts of water and we need to reduce our lawns. You also show an image of non-environmental lanterns. Big NO on this one. It is irresponsible in these times. 6/15/2021 6:09 PM
5 Do not remove the reflecting pool. Make it more shallow if water is a concern. Do not change this. There is value in a reflecting pool for meditation and releases anxiety. By adding lawn/turf, won’t you just need more water?!? So how is removing the reflection pool cognizant when it comes to the drought. Not buying it. Leave the pool alone or make it more shallow. 6/15/2021 5:41 PM
6 With the drought and competing resources for water, grass does not seem to be optimal.
Perhaps use some other lower water need creeping ground cover 6/15/2021 1:39 PM
7 Nice, a turf can be great for all Chinese festival 6/12/2021 1:47 PM 8 Are these dissolvable, environmentally friendly lanterns? Otherwise, I would look for activities that set a good example of our responsibility and care of our environment. 6/11/2021 12:04 PM
9 Sad but responsible to lose the pond. Good Idea 6/11/2021 9:29 AM 10 yes, the current plain concrete is an eye sore. Maybe this new plan is good considering the drought status of the county
6/11/2021 12:02 AM
11 Definitely a good idea to replace if water features cannot happen. Not sure about that amount of artificial turf. Maybe pervious decorative paving included 6/10/2021 11:51 PM
12 Turf should not be considered water-wise. Instead of turf consider other features that are evocative of water such as a rock garden or dry stream. 6/10/2021 3:42 PM
13 Repair and color. Every statue should have color. 6/10/2021 1:54 PM 14 Consider adding a sand path to allow people to walk up closer to the statue. 6/10/2021 10:28 AM 15 I get it but even a small pond area hels with tranquility, given the need in neighborhood for a quiet spot. Shrunken down or relocation of pond would be preferred 6/10/2021 7:40 AM
16 Sad not to see the pool come back but it's necessary 6/10/2021 7:33 AM 17 Sounds good 6/10/2021 12:52 AM
18 I think as long as it's sustainable, I'm okay with whatever goes there. 6/8/2021 2:20 PM 19 There needs to be a process to clean up any released balloons or other aerial objects, hopefully be the folks who release them.
6/8/2021 8:11 AM
20 Once again I have concerns about such large areas of non-native grass. Would the frequency of weddings, tai chi or yoga classes and festivals be enough to out way the use of irrigation water and maintenance equipment needed to maintain it.
6/7/2021 9:17 PM
21 I'm not at all ok with the proposed uses of this area. Also lawns use a lot of water and maintenance which contributes to pollution (lawn mowers). Not a green plan! 6/7/2021 8:20 PM
22 Chinese don't like Mexicans near their things, they pray there. Yoga for white people. 6/7/2021 6:48 PM 23 Use native sod. 6/7/2021 4:36 PM
24 Please refill with recycled water 6/7/2021 3:57 PM
236 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
31 / 39
25 keep it but and add plaques that support wisdom/kindness/peace as an element of inclusion in our community...honor for all ...culture of wisdom & kindness. 6/4/2021 2:13 PM
26 So sensitive !!!! 6/4/2021 12:13 PM
27 No comment 6/4/2021 10:29 AM
28 Maybe an outdoor a large labyrinth for meditation and “reflection” would be better. The proposed is just turf area, nothing special
5/30/2021 10:49 AM
29 Isn't there already enough grass? With recurring drought, shouldn't we be going with more native plants? If this area is truly the best bet for wedding zones, fine. But please keep the turf area to a minimum.
5/27/2021 8:56 PM
30 Turf is expensive. Add DG-- that can withstand the event traffic. 5/27/2021 7:08 PM 31 Add square dancing, line dancing, and ballroom dancing sessions. 5/27/2021 4:59 PM 32 I like that this space be updated. I would actually like it if we changed it to a different asian american local figure instead of Confucius. I think it would be more meaningful to the local community.
5/27/2021 4:38 PM
33 Better landscaping at the base of the statue - more color consistent with Asian landscaping 5/27/2021 4:13 PM 34 That's understandable 5/27/2021 3:39 PM
35 I completely understand why the city can no longer maintain the pools of running water, but it will sorely be missed. I have many fond memories following the flowing water and watch the ducks as a child. Will the pond with the turtles remain? Filling the pools and place turf makes sense. I'm not sure if the last picture of lit lanterns being released should ever be performed.
The park is near neighborhoods, a school, and a hospital. With the dry climate, wind, and drought it does not seem safe.
5/26/2021 6:28 PM
36 The reflection pond should remain. It is an important part of the environment and ecosystem. 5/25/2021 6:30 PM 37 Nice in concept, but it seems like it would just become another neglected patch of grass and weeds that is so common in SJ parks.
5/25/2021 5:42 PM
38 Definitely a better use of the space. I was going to recommend tai chi and yoga classes at the park, and here it is already a possibility. Make it so. 5/25/2021 10:47 AM
39 Turf requires a significant amount of water, mowing, chemical fertilizers, how does removing the reflecting pond save water if its wasted on irrigation. 5/25/2021 5:17 AM
40 Minimize lighting, noise and nighttime events. Turf also requires water so consider minimizing turf, possibly mixing with permeable pavement and other planted areas. Gear operations towards local events in favor of large commercial events. 5/24/2021 9:24 PM
41 Could the turf include pollinator friendly groundcovers like thyme, clover, etc, so that it supports diversity and requires less chemical maintenance. 5/24/2021 8:47 PM
42 reasonable 5/24/2021 8:28 PM
43 No 5/24/2021 8:19 PM
44 Seriously?? Clearly going into another MAJOR drought and you're putting in lawn?? Which you'll maintain with chemicals right next to a creek?? Do you want people to take you seriously? Hire someone who has a clue or if you already have some people and just don't listen to them - you should NOT be in City Government.. Do you have a department that looks into "illegal donations?
5/24/2021 7:50 PM
45 I like the cultural aspect of this. 5/24/2021 7:47 PM 46 this is a lawn. Ii will become a sport field whether intended or not. Also concerned about activities at night I'd rather see it transformed to a natural area 5/21/2021 7:50 AM
47 Yes this works 5/20/2021 8:20 PM
48 Don't bother. You've failed at one of your primary tasks. Cut our losses by leaving it as it is. 5/20/2021 7:34 PM 49 I like this - good re-use of the space. But also like that the Chinese features become somewhat "lost" in the landscape so their discovery is interesting and rewarding. 5/20/2021 6:54 PM
237
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
33 / 39
22.97% 17
29.73% 22
22.97% 17
24.32% 18
Q19 Which amphitheater location do you prefer?
Answered: 74 Skipped: 47
TOTAL 74
I would prefer
to have no...
A
B
C
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
I would prefer to have no amphitheater.
A
B
C
238 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
34 / 39
77.63% 59
22.37% 17
Q20 Do you see yourself using the park more frequently if the proposed features are implemented?
Answered: 76 Skipped: 45
TOTAL 76
Yes
No
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES RESPONSES
Yes
No
239
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
35 / 39
Q21 Is there anything else you would like to see in the park that has not been addressed?
Answered: 41 Skipped: 80
# RESPONSES DATE
1 Sounds like all concerns will hopefully be covered. Safety, maintenance, enhanced gardens. 6/22/2021 3:19 PM 2 I visited the park for the first time earlier this week and was amazed at the natural beauty and the sense of serenity I felt while in the park. The park is an oasis of nature in a sea of concrete and traffic. Nature provides a source of inspiration and awe. Experiencing nature is also proven to help reduce stress and anxiety. There are plenty of places for events. There are few places for city dwellers to go to be with nature. Please do not turn this gem into an event center. I would be more likely to visit the park in the future as it is now than I would be if it were more developed. There was no mention in this survey about the three large ponds. I hope that they will be retained and filled with water as appropriate.
6/18/2021 5:20 PM
3 Plans to address graffiti, gang activity, school truancy, and unhoused people living in parking lot. Lack of parking during the school year.
6/17/2021 3:35 AM
4 How will the gardens be maintained during a long period of drought? I think the whole abandonment of landscape irrigation from the previous major drought was a bad move since a lot of of the garden was lost. I hope that there is some sort of resiliency plan in place (e.g. using recycled water, rainbarrel installation, drip irrigation, drought tolerant native plantings) to maintain key garden landscapes.
6/15/2021 6:15 PM
5 Leave the original integrity of the park. No need to remove anything, just enhance by updating all the old infrastructure.
6/15/2021 5:43 PM
6 Playgrounds. River/foundations children can play, tennis court, basketball filed , bicycle trials. 6/12/2021 1:50 PM 7 More kid friendly would be great.The wood board amphitheatre designs look more natural.
Please try to improve the duck pond as a year round waterbody. 6/11/2021 12:05 AM
8 Safer pedestrian connection to the park, some RVs block the sidewalk from the penetencia creek trail. More interaction between the nearby schools/library 6/10/2021 11:54 PM
9 An amphitheater would see more use if it had shade. None of the options A, B or C appeared to provide any shade.
6/10/2021 3:45 PM
10 More parking 6/10/2021 12:26 PM
11 It’s a park, there should be colorful plantings and moments of play. Are there new visual art objects being incorporated? Or, are the new arts event based in the new amphitheater? Sculptures could provide moments of visual focus and anchor points for plantings making the design richer.
6/10/2021 9:02 AM
12 Needs more traffic to increase safety. I would put some emergency fishing lights or contact stations. It just feels unsafe. Most of the comments I hear are not knowing about the park and lamenting how much potential it could have.
6/10/2021 7:43 AM
13 Would really like to see more flowers and native flora in areas closer to the parking lot & Independence High
6/10/2021 7:38 AM
14 Not at this time. 6/8/2021 2:21 PM
15 There needs to be a dedicated budget item for ongoing landscape maintenance beyond just mowing and blowing. Knowledgeable staff need to be trained to appreciate and keep the botanical and natural gardens in shape and not let them deteriorate as they have in the past decades.
6/7/2021 9:24 PM
16 I have truly enjoyed the park for its quiet - and often took my elderly mother there. We appreciated the paved walkways and frequent benches. We also appreciated the lack of noise, 6/7/2021 8:23 PM
240 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
Overfelt Gardens Park Master Plan
36 / 39
or too much activity. It has been a place of peace for us, which few parks are. 17 If gardens are planted to attract wildlife, having the amphitheater farther away would create less disturbance for them.
6/7/2021 6:36 PM
18 I would just like the park to be as welcoming and natural a site as possible. I would encourage the use of native plants to reduce water use and to support local wildlife. The park should be a happy habitat for people, birds, and other local fauna. 6/7/2021 5:55 PM
19 Ongoing programs at the park to engage the public. 6/7/2021 4:37 PM 20 Leave the squirrels alone don’t drive them out 6/7/2021 3:58 PM 21 open to music during nice weather months create point of destination 6/4/2021 2:15 PM 22 Why (only) Chinese represented exclusively ?! The park should be reflected and a showcase for all Asian cultures !!!
6/4/2021 12:18 PM
23 No 6/4/2021 10:31 AM
24 More children play areas. Provide play for all ages but especially 1-13 5/30/2021 10:51 AM 25 The parking lot near Educational Library needs to be monitored as the big reason we don’t go to the park is the RVs and people living in their cars who park there. The original people who were there during the pandemic were so nice and respectful but a new group is there now and they throw trash and do drugs right by the high school. Please address a space for those homeless to have space to shower or bathrooms. Please give them something as times are so tough.
5/27/2021 4:42 PM
26 better parking, more trees for natural shade, 5/27/2021 4:18 PM 27 No 5/27/2021 3:40 PM
28 Add more restrooms. 5/26/2021 6:37 PM
29 Preservation and enhancement of the percolation ponds. 5/25/2021 6:32 PM 30 One big reason I don’t go to Overfelt more is the hours. It would have been a great place to walk after dropping off kids at IHS, but it wasn’t open. I also am more likely to visit parks that allow dogs. Looking forward to seeing this beautiful park revitalized! 5/25/2021 5:50 PM
31 Focus on native plants, wildlife and education, this area should be used as an outdoor living lab to educate children from the adjacent schools and allow the local community to have a place to relax and enjoy nature
5/25/2021 5:20 AM
32 More focus on planting for biodiversity and supporting the local ecosystems. 5/24/2021 8:50 PM 33 No 5/24/2021 8:19 PM
34 Keep the focus on the outdoors - don't citify this with all the stuff that people want to get away from in your other parks.. Don't make it into an "artificial nature park" like Vasona has become.. Huge opportunity to make this area into an outdoor educational area/park which is easy access for the neighborhood around it where there are less fortunate people and kids who can't easily make a trip to a further away location. Thank you! 5/24/2021 7:58 PM
35 Pease focus on creating habitat for birds and insect pollinators and native plants as much as possible
5/24/2021 7:48 PM
36 It is important to have a space dedicated to the Latinx/Mexican-American community and the Indigenous tribe of Santa Clara Valley. Ask local artists and children to contribute to this space to show our heritage and contributions, as well.
5/21/2021 2:45 PM
37 B a a a a a a - d idea here . as a local . . whos experienced this park w family as a young child, an angsty teen runaway and now college student....i have to say . this smells like trouble.
5/21/2021 1:00 PM
38 I think some of these ponds should be repurposed. The maine one in the middle is for me but especially the one near the main entrance and the second one near the school are a waste of water. Once again it would be great to have more plants native to California planted there instead or to repupose as community gardens for community use. If we're gonna use water.
Let's use it for community benefit.
5/20/2021 8:28 PM
241
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Overfelt Gardens Park Master Plan
37 / 39
39 if you allow dogs, dogs will poop and pee on everything. Most people will not pickup after their pets, unless you provide poop bags (added cost). 70% of people will use bags, 30% will not.
Grass area where female dogs pee will die. A brown spot will appear and take time to regrow. 5/20/2021 7:55 PM
40 Dedicated address of the water issue is the best addition. Maintenance overhaul of the Chinese gate and building would be appreciated.
5/20/2021 7:37 PM
41 Would like to see plan discuss how to improve visual quality of the park. Low quality materials (chainlink fencing, common benches, signs on posts, etc) are typical of urban parks but make them ordinary. As a regional park, this site should have special and upgraded features. 5/20/2021 6:57 PM
242 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix B
243
Appendix B
OVERFELT GARDENS PARK MASTER PLAN UPDATE
244 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix C
APPENDIX C
MATRIX TYPE
Community Input Matrix
ActivateSJ Matrix
Prioritization Matrix
Implementation Matrix
City of San Jose Plant List - Quick Reference
Community Input Matrixes
245
Appendix C
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Ks
Z&
>dGARDENS WZ<Z
KDD
Ed/KE^DdZ/y
dzW
D
E/d/
^ Z
KDD
Ed/KE^
KDDhE/dz
^/Z
ĨƌŽŵƐƵƌǀĞLJϭĂŶĚϮ
ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ ,ŝŐŚEĞǁ
ŶƚƌĂŶĐĞ EĞǁ
ŶƚƌĂŶĐĞ DĞĚŝƵŵĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ ĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ DĞĚŝƵŵKƵƚĚŽŽƌůĂƐƐƌŽŽŵ KƵƚĚŽŽƌůĂƐƐƌŽŽŵ DĞĚŝƵŵKǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ KǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ ,ŝŐŚKǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ KǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ DŝdžĞĚEĞǁ ĂƐƚ
ŶƚƌĂŶĐĞ EĞǁ
ĂƐƚ
ŶƚƌĂŶĐĞ DĞĚŝƵŵEĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ EĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ ŶŽƚŵĞŶƚŝŽŶĞĚEĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ EĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ ,ŝŐŚ>ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ >ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ ,ŝŐŚDŝůĞDĂƌŬĞƌƐ DŝůĞDĂƌŬĞƌƐ ,ŝŐŚDŽƌĞƌĞƐƚƌŽŽŵƐ DŽƌĞƌĞƐƚƌŽŽŵƐ ŶŽƚŵĞŶƚŝŽŶĞĚZĞƐƚŽƌĞŐĂƌĚĞŶƐ ZĞƐƚŽƌĞŐĂƌĚĞŶƐ ,ŝŐŚZĞĨůĞĐƚŝŶŐƉŽŽů ZĞƐƚŽƌĞƌĞĨůĞĐƚŝŶŐƉŽŽůďLJĂĚĚŝŶŐLJĞĂƌƌŽƵŶĚǁĂƚĞƌ ,ŝŐŚWŽŶĚƐ ZĞƐƚŽƌĞƉŽŶĚƐǁŝƚŚLJĞĂƌƌŽƵŶĚǁĂƚĞƌ ,ŝŐŚ,ĂďŝƚĂƚ ŶŚĂŶĐĞŵĞŶƚ ,ĂďŝƚĂƚ
ŶŚĂŶĐĞŵĞŶƚ ,ŝŐŚWĞƌĨŽƌŵĂŶĐĞĂŶĚ>ĞĐƚƵƌĞƐƉĂĐĞ ĞĐŬŽƌƉĂǀŝůŝŽŶǁŝƚŚƌŽŽŵĨŽƌƐĞĂƚŝŶŐ͕ƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐ DĞĚŝƵŵ^ŵĂůůŐĂƌĚĞŶƉĂǀŝůŝŽŶ WĂǀŝůŝŽŶǁŝŚƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐĨŽƌƐŵĂůůĞǀĞŶƚƐĂŶĚƐŚĂĚĞĚƐĞĂƚŝŶŐ ŶŽƚŵĞŶƚŝŽŶĞĚ ŶŚĂŶĐĞĚWŝĐŶŝĐƌĞĂ EĞǁƐŚĞůƚĞƌ͕ƌĞĐŽŶĨŝŐƵƌĞĚĚĞƐŝŐŶĨŽƌŵŽƌĞƐƉĂĐĞĂŶĚĞĂƐĞŽĨƵƐĞ >ŽǁĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ ĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ DĞĚŝƵŵEĞǁĨĞŶĐŝŶŐ EĞǁĨĞŶĐŝŶŐ DĞĚŝƵŵŝƌĚůŝŶĚ ŝƌĚůŝŶĚ DĞĚŝƵŵ^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ ^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ >Žǁ,ĂŵŵŽĐŬ'ƌŽǀĞ ,ĂŵŵŽĐŬ'ƌŽǀĞ ŶŽƚŵĞŶƚŝŽŶĞĚƵůƚƵƌĂů'ĂƌĚĞŶƐĨŽƌŽƚŚĞƌĚŝǀĞƌƐĞŐƌŽƵƉƐ ĚĚŝƚŝŽŶĂůĐƵůƚƵƌĂůĐŽŵŵƵŶŝƚLJƐƉĂĐĞƐ >Žǁ^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ ^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ ŶŽƚŵĞŶƚŝŽŶĞĚEĞǁDĂŝŶƚĞŶĂŶĐĞƵŝůĚŝŶŐĂŶĚ^ƚŽƌĂŐĞ ůůŽǁƐKǀĞƌĨĞůƚ,ŽƵƐĞƚŽďĞƵƐĞĚĨŽƌƉƵďůŝĐďĞŶĞĨŝƚ ŶŽƚŵĞŶƚŝŽŶĞĚ W,z^/>
^/'E/DWZKs
D
Ed^
;E
tEZ
^dKZ
Ϳ
COMMUNITY INPUT MATRIX
246 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix C
Ő
Ő
Ɖ
ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ,ŝŐŚZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ DĞĚŝƵŵZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ ,ŝŐŚWƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ WƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ ŶŽƚŵĞŶƚŝŽŶĞĚ'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ 'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ ŶŽƚŵĞŶƚŝŽŶĞĚĚĚƌĂŶŐĞƌ ĚĚƌĂŶŐĞƌ ,ŝŐŚ/ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ /ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ ,ŝŐŚ^ĞĐƵƌŝƚLJ WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůƐĞĐƵƌŝƚLJƚŚƌŽƵŐŚƐƚĂĨĨŝŶŐ͕ĐĂŵĞƌĂƐ͕ƌĞŐƵůĂƚŝŽŶƐ͕ ƐŝŐŶĂŐĞ͕ůŝŐŚƚŝŶŐ͕ĨĞŶĐŝŶŐ͕ƌĞŐƵůĂƌĂĐƚŝǀĂƚŝŽŶ͕Wd
ĚĞƐŝŐŶŐƵŝĚĞůŝŶĞƐ
,ŝŐŚ
WĂƌŬ,ŽƵƌƐ WĂƌŬ,ŽƵƌƐWƌŽŐƌĂŵŵŝŶŐĂŶĚ
ǀĞŶƚƐ ĞǀĞůŽƉƉƌŽŐƌĂŵŵŝŶŐĐĂůĞŶĚĂƌ ,ŝŐŚůĐŽŚŽů ^ĞƌǀŝŶŐĂůĐŽŚŽůĂƚĞǀĞŶƚƐZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐ ZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐDŽŽŶ&ĞƐƚŝǀĂů DŽŽŶ&ĞƐƚŝǀĂů&ĂƌŵĞƌƐDĂƌŬĞƚ &ĂƌŵĞƌƐDĂƌŬĞƚ&ŽŽĚdƌƵĐŬƐ &ŽŽĚdƌƵĐŬƐ>ĞĂƐĂďůĞƐƉĂĐĞĨŽƌƉƌŝǀĂƚĞĞǀĞŶƚƐ >ĞĂƐĂďůĞƐƉĂĐĞĨŽƌƌĞǀĞŶƵĞŐĞŶĞƌĂƚŝŽŶZĂŶŐĞƌŝŶƚĞƌƉƌĞƚŝǀĞƚĂůŬƐ ZĂŶŐĞƌŝŶƚĞƌƉƌĞƚŝǀĞƚĂůŬƐKƵƚĚŽŽƌĂƌƚĐůĂƐƐĞƐ KƵƚĚŽŽƌĂƌƚĐůĂƐƐĞƐ D/Ed
EE
EKW
Zd/KE^
s
Ed^ͲWK^^/>
s
Ed^
D
Ed/KE
hZ/E'd,
WZK
^^
ŝƌĚtĂƚĐŚŝŶŐĞǀĞŶƚƐ ŝƌĚtĂƚĐŚŝŶŐĞǀĞŶƚƐ^ĐŚŽŽůĞǀĞŶƚƐ ^ĐŚŽŽůĞǀĞŶƚƐƵůƚƵƌĂůĂŶĚ,ŝƐƚŽƌLJtĂůŬƐ ƵůƚƵƌĂůĂŶĚ,ŝƐƚŽƌLJtĂůŬƐEĂƚŝǀĞWůĂŶƚtĂůŬƐ EĂƚŝǀĞWůĂŶƚtĂůŬƐEĂƚŝǀĞƐĞĞĚĐŽůůĞĐƚŝŽŶ EĂƚŝǀĞƐĞĞĚĐŽůůĞĐƚŝŽŶdĂŝĐŚŝŐĞƚƚŽŐĞƚŚĞƌƐ dĂŝĐŚŝŐĞƚƚŽŐĞƚŚĞƌƐzŽŐĂŝŶƚŚĞƉĂƌŬ zŽŐĂŝŶƚŚĞƉĂƌŬ ǀĞŶƚƐĨŽƌĂůůŝĞƐ
ǀĞŶƚƐĨŽƌĂůůŝĞƐ^ƚŽƌLJƚĞůůŝŶŐĨĞƐƚŝǀĂů ^ƚŽƌLJƚĞůůŝŶŐĨĞƐƚŝǀĂůƌƚĨĂŝƌ ƌƚĨĂŝƌŝŽďůŝƚnj ŝŽďůŝƚnjDƵƐĐŝĂŶƐŝŶƚŚĞƉĂƌŬ DƵƐĐŝĂŶƐŝŶƚŚĞƉĂƌŬ&ƌŝĚĂLJŶŝŐŚƚďĞĞƌŚĂůů &ƌŝĚĂLJŶŝŐŚƚďĞĞƌŚĂůůKĐƚŽďĞƌĨĞƐƚ KĐƚŽďĞƌĨĞƐƚDĂƌŝĂĐŚŝĨĞƐƚŝǀĂůƐ DĂƌŝĂĐŚŝĨĞƐƚŝǀĂůƐDĂŶLJĂĚĚŝƚŝŽŶĂůĐƵůƚƵƌĂů͕ŚŽůŝĚĂLJĂŶĚĐĞůĞďƌĂƚŽƌLJĞǀĞŶƚƐĂƌĞƉŽƐƐŝďůĞďƵƚǁĞƌĞŶŽƚĚŝƐĐƵƐƐĞĚ
s
Ed^ͲWK^^/>
s
Ed^
D
Ed/KE
hZ/E'd,
WZK
^^
247
Appendix C
OVERFELT GARDENS PARK MASTER PLAN UPDATE
ACTIVATESJ MATRIXX
Ks
Z&
>dGARDENS WZ<Z
KDD
Ed/KE^DdZ/y
dzW
D
E/d/
^ Z
KDD
Ed/KE^
^hWWKZd^d/sd
^:
'h//E'WZ/E/W>
^
ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ
EĞǁ
ŶƚƌĂŶĐĞ EĞǁ
ŶƚƌĂŶĐĞ
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ
ĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ ĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕WƵďůŝĐ>ŝĨĞ͕
/ĚĞŶƚŝƚLJ
KƵƚĚŽŽƌůĂƐƐƌŽŽŵ KƵƚĚŽŽƌůĂƐƐƌŽŽŵ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
KǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ KǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
KǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ KǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞEĞǁ ĂƐƚ
ŶƚƌĂŶĐĞ EĞǁ
ĂƐƚ
ŶƚƌĂŶĐĞ
ƋƵŝƚLJĂŶĚĐĐĞƐƐEĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ EĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ
ƋƵŝƚLJĂŶĚĐĐĞƐƐEĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ EĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
>ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ >ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
DŝůĞDĂƌŬĞƌƐ DŝůĞDĂƌŬĞƌƐ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕
ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
DŽƌĞƌĞƐƚƌŽŽŵƐ DŽƌĞƌĞƐƚƌŽŽŵƐ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕
ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
ZĞƐƚŽƌĞŐĂƌĚĞŶƐ ZĞƐƚŽƌĞŐĂƌĚĞŶƐ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
ZĞĨůĞĐƚŝŶŐƉŽŽů ZĞƐƚŽƌĞƌĞĨůĞĐƚŝŶŐƉŽŽůďLJĂĚĚŝŶŐLJĞĂƌƌŽƵŶĚǁĂƚĞƌ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞWŽŶĚƐ ZĞƐƚŽƌĞƉŽŶĚƐǁŝƚŚLJĞĂƌƌŽƵŶĚǁĂƚĞƌ EĂƚƵƌĞ͕/ĚĞŶŝƚLJ͕WƵďůŝĐ>ŝĨĞ,ĂďŝƚĂƚ ŶŚĂŶĐĞŵĞŶƚ ,ĂďŝƚĂƚ
ŶŚĂŶĐĞŵĞŶƚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ
WĞƌĨŽƌŵĂŶĐĞĂŶĚ>ĞĐƚƵƌĞƐƉĂĐĞ ĞĐŬŽƌƉĂǀŝůŝŽŶǁŝƚŚƌŽŽŵĨŽƌƐĞĂƚŝŶŐ͕ƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ
^ŵĂůůŐĂƌĚĞŶƉĂǀŝůŝŽŶ WĂǀŝůŝŽŶǁŝŚƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐĨŽƌƐŵĂůůĞǀĞŶƚƐĂŶĚƐŚĂĚĞĚƐĞĂƚŝŶŐ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ŶŚĂŶĐĞĚWŝĐŶŝĐƌĞĂ EĞǁƐŚĞůƚĞƌ͕ƌĞĐŽŶĨŝŐƵƌĞĚĚĞƐŝŐŶĨŽƌŵŽƌĞƐƉĂĐĞĂŶĚĞĂƐĞŽĨƵƐĞ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ ĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞEĞǁĨĞŶĐŝŶŐ EĞǁĨĞŶĐŝŶŐ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞŝƌĚůŝŶĚ ŝƌĚůŝŶĚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ >ŝĨĞ
^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ ^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ W,z^/>
^/'E/DWZKs
D
Ed^
;E
tEZ
^dKZ
Ϳ
248 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix C
,ĂŵŵŽĐŬ'ƌŽǀĞ ,ĂŵŵŽĐŬ'ƌŽǀĞ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞƵůƚƵƌĂů'ĂƌĚĞŶƐĨŽƌŽƚŚĞƌĚŝǀĞƌƐĞŐƌŽƵƉƐ ĚĚŝƚŝŽŶĂůĐƵůƚƵƌĂůĐŽŵŵƵŶŝƚLJƐƉĂĐĞƐ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ
^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ ^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ
EĞǁDĂŝŶƚĞŶĂŶĐĞƵŝůĚŝŶŐĂŶĚ^ƚŽƌĂŐĞ ůůŽǁƐKǀĞƌĨĞůƚ,ŽƵƐĞƚŽďĞƵƐĞĚĨŽƌƉƵďůŝĐďĞŶĞĨŝƚZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ^ƚĞǁĂƌĚƐŚŝƉ͕ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ >ŝĨĞ
ZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ ^ƚĞǁĂƌĚƐŚŝƉ͕ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶƚŝƚLJ
WƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ WƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ ƋƵŝƚLJĂŶĚĐĐĞƐƐ'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ 'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ ƋƵŝƚLJĂŶĚĐĐĞƐƐĚĚƌĂŶŐĞƌ ĚĚƌĂŶŐĞƌ ^ƚĞǁĂƌĚƐŚŝƉ͕/ĚĞŶƚŝƚLJ/ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ /ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ ^ƚĞǁĂƌĚƐŚŝƉ͕/ĚĞŶƚŝƚLJ^ĞĐƵƌŝƚLJ WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůƐĞĐƵƌŝƚLJƚŚƌŽƵŐŚƐƚĂĨĨŝŶŐ͕ĐĂŵĞƌĂƐ͕ƌĞŐƵůĂƚŝŽŶƐ͕ ƐŝŐŶĂŐĞ͕ůŝŐŚƚŝŶŐ͕ĨĞŶĐŝŶŐ͕ƌĞŐƵůĂƌĂĐƚŝǀĂƚŝŽŶ͕Wd
ĚĞƐŝŐŶŐƵŝĚĞůŝŶĞƐ
^ƚĞǁĂƌĚƐŚŝƉ͕
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ
WĂƌŬ,ŽƵƌƐ WĂƌŬ,ŽƵƌƐWƌŽŐƌĂŵŵŝŶŐĂŶĚ
ǀĞŶƚƐ ĞǀĞůŽƉƉƌŽŐƌĂŵŵŝŶŐĐĂůĞŶĚĂƌ ^ƚĞǁĂƌĚƐŚŝƉ͕
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶŝƚLJ͕WƵďůŝĐ>ŝĨĞ
ůĐŽŚŽů ^ĞƌǀŝŶŐĂůĐŽŚŽůĂƚĞǀĞŶƚƐZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐ ZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐ D/Ed
EE
EKW
Zd/KE^
249
Appendix C
OVERFELT GARDENS PARK MASTER PLAN UPDATE
PRIORITIZATION MATRIX
Ks
Z&
>dGARDENS WZ<Z
KDD
Ed/KE^DdZ/y
dzW
D
E/d/
^ Z
KDD
Ed/KE^
KDDhE/dz
^/Z
ĨƌŽŵƐƵƌǀĞLJϭĂŶĚϮ
^hWWKZd^d/sd
^:
'h//E'WZ/E/W>
^ WZ/KZ/dz
WZ/K
• Ad
ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ ,ŝŐŚ
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ ϭ
EĞǁ
ŶƚƌĂŶĐĞ EĞǁ
ŶƚƌĂŶĐĞ DĞĚŝƵŵ
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ ϭ
ĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ ĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ DĞĚŝƵŵ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕WƵďůŝĐ>ŝĨĞ͕
/ĚĞŶƚŝƚLJ ϭ
KƵƚĚŽŽƌůĂƐƐƌŽŽŵ KƵƚĚŽŽƌůĂƐƐƌŽŽŵ DĞĚŝƵŵ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
KǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ KǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
KǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ KǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ DŝdžĞĚ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ EĞǁ
ĂƐƚ
ŶƚƌĂŶĐĞ EĞǁ
ĂƐƚ
ŶƚƌĂŶĐĞ DĞĚŝƵŵ
ƋƵŝƚLJĂŶĚĐĐĞƐƐ ϭ
EĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ EĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ ŶŽƚŵĞŶƚŝŽŶĞĚ
ƋƵŝƚLJĂŶĚĐĐĞƐƐ ϭ
EĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ EĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
>ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ >ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
DŝůĞDĂƌŬĞƌƐ DŝůĞDĂƌŬĞƌƐ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕
ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
DŽƌĞƌĞƐƚƌŽŽŵƐ DŽƌĞƌĞƐƚƌŽŽŵƐ ŶŽƚŵĞŶƚŝŽŶĞĚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
ZĞƐƚŽƌĞŐĂƌĚĞŶƐ ZĞƐƚŽƌĞŐĂƌĚĞŶƐ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕ ƋƵŝƚLJĂŶĚ
ĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
ZĞĨůĞĐƚŝŶŐƉŽŽů ZĞƐƚŽƌĞƌĞĨůĞĐƚŝŶŐƉŽŽůďLJĂĚĚŝŶŐLJĞĂƌƌŽƵŶĚǁĂƚĞƌ ,ŝŐŚ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
WŽŶĚƐ ZĞƐƚŽƌĞƉŽŶĚƐǁŝƚŚLJĞĂƌƌŽƵŶĚǁĂƚĞƌ ,ŝŐŚ EĂƚƵƌĞ͕/ĚĞŶŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ ,ĂďŝƚĂƚ
ŶŚĂŶĐĞŵĞŶƚ ,ĂďŝƚĂƚ
ŶŚĂŶĐĞŵĞŶƚ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ ϭ
WĞƌĨŽƌŵĂŶĐĞĂŶĚ>ĞĐƚƵƌĞƐƉĂĐĞ ĞĐŬŽƌƉĂǀŝůŝŽŶǁŝƚŚƌŽŽŵĨŽƌƐĞĂƚŝŶŐ͕ƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐ DĞĚŝƵŵ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ Ϯ
^ŵĂůůŐĂƌĚĞŶƉĂǀŝůŝŽŶ WĂǀŝůŝŽŶǁŝŚƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐĨŽƌƐŵĂůůĞǀĞŶƚƐĂŶĚƐŚĂĚĞĚƐĞĂƚŝŶŐ ŶŽƚŵĞŶƚŝŽŶĞĚ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ Ϯ
ŶŚĂŶĐĞĚWŝĐŶŝĐƌĞĂ EĞǁƐŚĞůƚĞƌ͕ƌĞĐŽŶĨŝŐƵƌĞĚĚĞƐŝŐŶĨŽƌŵŽƌĞƐƉĂĐĞĂŶĚĞĂƐĞŽĨƵƐĞ >Žǁ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ Ϯ ĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ ĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ DĞĚŝƵŵ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ Ϯ EĞǁĨĞŶĐŝŶŐ EĞǁĨĞŶĐŝŶŐ DĞĚŝƵŵ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ Ϯ
ŝƌĚůŝŶĚ ŝƌĚůŝŶĚ DĞĚŝƵŵ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ >ŝĨĞ ϯ
^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ ^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ >Žǁ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϯ
,ĂŵŵŽĐŬ'ƌŽǀĞ ,ĂŵŵŽĐŬ'ƌŽǀĞ ŶŽƚŵĞŶƚŝŽŶĞĚ /ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϯ ƵůƚƵƌĂů'ĂƌĚĞŶƐĨŽƌŽƚŚĞƌĚŝǀĞƌƐĞŐƌŽƵƉƐ ĚĚŝƚŝŽŶĂůĐƵůƚƵƌĂůĐŽŵŵƵŶŝƚLJƐƉĂĐĞƐ >Žǁ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ ϯ
^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ ^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ ŶŽƚŵĞŶƚŝŽŶĞĚ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ
>ŝĨĞ ϯ
EĞǁDĂŝŶƚĞŶĂŶĐĞƵŝůĚŝŶŐĂŶĚ^ƚŽƌĂŐĞ ůůŽǁƐKǀĞƌĨĞůƚ,ŽƵƐĞƚŽďĞƵƐĞĚĨŽƌƉƵďůŝĐďĞŶĞĨŝƚ ŶŽƚŵĞŶƚŝŽŶĞĚ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ DĞĚŝƵŵ ^ƚĞǁĂƌĚƐŚŝƉ͕EĂƚƵƌĞ͕/ĚĞŶƚŝƚLJ͕WƵďůŝĐ >ŝĨĞ ϭ
ZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕ ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶƚŝƚLJ ϭ
WƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ WƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ ŶŽƚŵĞŶƚŝŽŶĞĚ ƋƵŝƚLJĂŶĚĐĐĞƐƐ
ϭ
'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ 'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ ŶŽƚŵĞŶƚŝŽŶĞĚ ƋƵŝƚLJĂŶĚĐĐĞƐƐ ϭ
ĚĚƌĂŶŐĞƌ ĚĚƌĂŶŐĞƌ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕/ĚĞŶƚŝƚLJ
ϭ
/ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ /ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕/ĚĞŶƚŝƚLJ ϭ
^ĞĐƵƌŝƚLJ WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůƐĞĐƵƌŝƚLJƚŚƌŽƵŐŚƐƚĂĨĨŝŶŐ͕ĐĂŵĞƌĂƐ͕ƌĞŐƵůĂƚŝŽŶƐ͕ ƐŝŐŶĂŐĞ͕ůŝŐŚƚŝŶŐ͕ĨĞŶĐŝŶŐ͕ƌĞŐƵůĂƌĂĐƚŝǀĂƚŝŽŶ͕Wd
ĚĞƐŝŐŶŐƵŝĚĞůŝŶĞƐ
,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶƚŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
WĂƌŬ,ŽƵƌƐ WĂƌŬ,ŽƵƌƐ
WƌŽŐƌĂŵŵŝŶŐĂŶĚ
ǀĞŶƚƐ ĞǀĞůŽƉƉƌŽŐƌĂŵŵŝŶŐĐĂůĞŶĚĂƌ ,ŝŐŚ ^ƚĞǁĂƌĚƐŚŝƉ͕
ƋƵŝƚLJĂŶĚĐĐĞƐƐ͕
/ĚĞŶŝƚLJ͕WƵďůŝĐ>ŝĨĞ ϭ
ůĐŽŚŽů ^ĞƌǀŝŶŐĂůĐŽŚŽůĂƚĞǀĞŶƚƐ
ZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐ ZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐ W,z^/>
^/'E/DWZKs
D
Ed^
;E
tEZ
^dKZ
Ϳ
D/Ed
EE
EKW
Zd/KE^
250 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix C
KZ/dzd
'KZz
ddress Health and Safety
WZ/KZ/dzd
'KZz
• Support Community Priorities
WZ/KZ/dzd
'KZz
• Address Activate SJ Guiding
WƌŝŶĐŝƉůĞƐ
WZ/KZ/dzd
'KZz
• Enhance Accessibility both
ƉŚLJƐŝĐĂůĂŶĚ:
/
ĚĚƌĞƐƐEĞĐĞƐƐĂƌLJ
DĂŝŶƚĞŶĂŶĐĞŽƌ
KƉĞƌĂƚŝŽŶƐ
ZĞƉĂŝƌŽƌZĞƉůĂĐĞ
džŝƐƚŝŶŐ&ĂĐŝůŝƚLJ
EĞǁŽŶƐƚƌƵĐƚŝŽŶ
ĂŶĚͬŽƌ
džƉĂŶƐŝŽŶŽĨ
WƌŽŐƌĂŵ
dž dž dž
dž dž dž
dž dž dž dž dž
dž dž dž dž
dž dž dž dž dž
dž dž
dž dž dž
dž dž dž
dž dž dž dž
dž dž dž dž dž
dž dž
dž dž
dž dž dž dž dž
dž dž
dž dž dž
dž dž dž dž
dž dž dž
dž dž
dž dž dž
dž dž dž
dž dž dž
dž dž
dž dž
dž dž
dž dž dž dž
dž dž
dž dž
dž y dž dž
dž y dž
dž
dž dž y dž dž dž
dž dž y dž
dž
dž dž y dž dž dž
dž dž y dž
dž dž y
dž
dž dž y dž
y
dž dž y dž
y
y
251
Appendix C
OVERFELT GARDENS PARK MASTER PLAN UPDATE
Ks
Z&
>dGARDENS WZ<Z
KDD
Ed/KE^DdZ/y
dzW
D
E/d/
^ Z
KDD
Ed/KE^ >Kd/K
ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ ŚŝůĚƌĞŶƐ'ĂƌĚĞŶ ŽƚĂŶŝĐĂů'
EĞǁ
ŶƚƌĂŶĐĞ EĞǁ
ŶƚƌĂŶĐĞ ƵůƚƵƌĂůĂŶ
ĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ ĚĚŝƚŝŽŶĂůƐĞĂƚŝŶŐ͕ǀŝĞǁŝŶŐĂƌĞĂƐĂŶĚƉŝĐŶŝĐƚĂďůĞƐ dŚƌŽƵŐŚŽƵ KƵƚĚŽŽƌůĂƐƐƌŽŽŵ KƵƚĚŽŽƌůĂƐƐƌŽŽŵ ƵůƚƵƌĂůĂŶ
KǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ KǀĞƌĨĞůƚ,ŽƵƐĞ/ŶƚĞƌƉƌĞƚŝǀĞĞŶƚĞƌĂŶĚZĂŶŐĞƌ^ƚĂƚŝŽŶ ƵůƚƵƌĂůĂŶ KǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ KǀĞƌĨĞůƚ,ŽƵƐĞ'ĂƌĚĞŶǁŝƚŚƉŽƚĞŶƚŝĂůĨŽƌĞǀĞŶƚƐ ƵůƚƵƌĂůĂŶ EĞǁ
ĂƐƚ
ŶƚƌĂŶĐĞ EĞǁ
ĂƐƚ
ŶƚƌĂŶĐĞ ŚŝŶĞƐĞƵ
EĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ EĞǁŽƌŶĞƌ
ŶƚƌĂŶĐĞĂŶĚ/ĚĞŶƚŝƚLJ ŽƚĂŶŝĐĂů'
EĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ EĞǁŝŶƚĞƌƉƌĞƚŝǀĞƐŝŐŶĂŐĞĂŶĚĞdžŚŝďŝƚƐ dŚƌŽƵŐŚŽƵ >ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ >ŝŐŚƚŝŶŐ/ŵƉƌŽǀĞŵĞŶƚƐ dŚƌŽƵŐŚŽƵ
DŝůĞDĂƌŬĞƌƐ DŝůĞDĂƌŬĞƌƐ dŚƌŽƵŐŚŽƵ
DŽƌĞƌĞƐƚƌŽŽŵƐ DŽƌĞƌĞƐƚƌŽŽŵƐ ƵůƚƵƌĂůĂŶ
ZĞƐƚŽƌĞŐĂƌĚĞŶƐ ZĞƐƚŽƌĞŐĂƌĚĞŶƐ ŽƚĂŶŝĐĂů'
ZĞĨůĞĐƚŝŶŐƉŽŽů ZĞƐƚŽƌĞƌĞĨůĞĐƚŝŶŐƉŽŽůďLJĂĚĚŝŶŐLJĞĂƌƌŽƵŶĚǁĂƚĞƌ ŚŝŶĞƐĞƵ WŽŶĚƐ ZĞƐƚŽƌĞƉŽŶĚƐǁŝƚŚLJĞĂƌƌŽƵŶĚǁĂƚĞƌ dŚƌŽƵŐŚŽƵ
,ĂďŝƚĂƚ
ŶŚĂŶĐĞŵĞŶƚ ,ĂďŝƚĂƚ
ŶŚĂŶĐĞŵĞŶƚ dŚƌŽƵŐŚŽƵ
WĞƌĨŽƌŵĂŶĐĞĂŶĚ>ĞĐƚƵƌĞƐƉĂĐĞ ĞĐŬŽƌƉĂǀŝůŝŽŶǁŝƚŚƌŽŽŵĨŽƌƐĞĂƚŝŶŐ͕ƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐ ŝǀŝĐŝƐƚƌŝ ^ŵĂůůŐĂƌĚĞŶƉĂǀŝůŝŽŶ WĂǀŝůŝŽŶǁŝŚƉŽǁĞƌĂŶĚůŝŐŚƚŝŶŐĨŽƌƐŵĂůůĞǀĞŶƚƐĂŶĚƐŚĂĚĞĚƐĞĂƚŝŶŐ ŽƚĂŶŝĐĂů'
ŶŚĂŶĐĞĚWŝĐŶŝĐƌĞĂ EĞǁƐŚĞůƚĞƌ͕ƌĞĐŽŶĨŝŐƵƌĞĚĚĞƐŝŐŶĨŽƌŵŽƌĞƐƉĂĐĞĂŶĚĞĂƐĞŽĨƵƐĞ ŽƚĂŶŝĐĂů' ĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ ĚĚƐŽŵĞƐŵĂůůŐĂŵĞĐŽƵƌƚƐͲďŽĐĐĞ͕ďĂĚŵŝŶƚŽŶ͕ƉŝŶŐƉŽŶŐ͕ĞƚĐ͘ ŽƚĂŶŝĐĂů' EĞǁĨĞŶĐŝŶŐ EĞǁĨĞŶĐŝŶŐ WĂƌŬWĞƌŝŵ
ŝƌĚůŝŶĚ ŝƌĚůŝŶĚ tĞƐƚEĂƚƵ
^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ ^ĐƵůƉƚƵƌĞ'ĂƌĚĞŶ dŚƌŽƵŐŚŽƵ
,ĂŵŵŽĐŬ'ƌŽǀĞ ,ĂŵŵŽĐŬ'ƌŽǀĞ ŽƚĂŶŝĐĂů'
ƵůƚƵƌĂů'ĂƌĚĞŶƐĨŽƌŽƚŚĞƌĚŝǀĞƌƐĞŐƌŽƵƉƐ ĚĚŝƚŝŽŶĂůĐƵůƚƵƌĂůĐŽŵŵƵŶŝƚLJƐƉĂĐĞƐ dŽďĞĚĞƚĞ ^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ ^ŽĐŝĂůŵĞĚŝĂƐĐĞŶŝĐŽƉƉŽƌƚƵŶŝƚŝĞƐ dŚƌŽƵŐŚŽƵ EĞǁDĂŝŶƚĞŶĂŶĐĞƵŝůĚŝŶŐĂŶĚ^ƚŽƌĂŐĞ ůůŽǁƐKǀĞƌĨĞůƚ,ŽƵƐĞƚŽďĞƵƐĞĚĨŽƌƉƵďůŝĐďĞŶĞĨŝƚ ƵůƚƵƌĂůĂŶ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞĐƵůƚƵƌĂůĨĞĂƚƵƌĞƐ ƵůƚƵƌĂůĂŶ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ ZĞƉĂŝƌĂŶĚƌĞƐƚŽƌĞƉĞƌĐŽůĂƚŝŽŶƉŽŶĚƐ dŚƌŽƵŐŚŽƵ ZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ ZĞƉĂŝƌĚĞŐƌĂĚĞĚƉĂƚŚƐĂŶĚĨĞĂƚƵƌĞƐ dŚƌŽƵŐŚŽƵ WƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ WƌŽǀŝĚĞĂĐĐĞƐƐŝďůĞĞŶƚƌĂŶĐĞ dŚƌŽƵŐŚŽƵ 'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ 'ĞŶĞƌĂůŝŵƉƌŽǀĞŵĞŶƚƐ dŚƌŽƵŐŚŽƵ ĚĚƌĂŶŐĞƌ ĚĚƌĂŶŐĞƌ
/ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ /ŶĐƌĞĂƐĞŵĂŝŶƚĞŶĂŶĐĞďƵĚŐĞƚĂŶĚƐƚĂĨĨŝŶŐ ^ĞĐƵƌŝƚLJ WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůƐĞĐƵƌŝƚLJƚŚƌŽƵŐŚƐƚĂĨĨŝŶŐ͕ĐĂŵĞƌĂƐ͕ƌĞŐƵůĂƚŝŽŶƐ͕ ƐŝŐŶĂŐĞ͕ůŝŐŚƚŝŶŐ͕ĨĞŶĐŝŶŐ͕ƌĞŐƵůĂƌĂĐƚŝǀĂƚŝŽŶ͕Wd
ĚĞƐŝŐŶŐƵŝĚĞůŝŶĞƐ
WĂƌŬ,ŽƵƌƐ WĂƌŬ,ŽƵƌƐ
WƌŽŐƌĂŵŵŝŶŐĂŶĚ
ǀĞŶƚƐ ĞǀĞůŽƉƉƌŽŐƌĂŵŵŝŶŐĐĂůĞŶĚĂƌ
ůĐŽŚŽů ^ĞƌǀŝŶŐĂůĐŽŚŽůĂƚĞǀĞŶƚƐ
ZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐ ZĞǀĞŶƵĞ͕ŐƌĂŶƚƐ͕ĐŽŶƐĞƌǀĂƚŽƌƐŚŝƉƐĂŶĚĞŶĚŽǁŵĞŶƚƐ W,z^/>
^/'E/DWZKs
D
Ed^
;E
tEZ
^dKZ
Ϳ
D/Ed
EE
EKW
Zd/KE^
IMPLEMENTATION MATRIX
252 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix C
KE
^ŚŽƌƚdĞƌŵƉŽƚĞŶƚŝĂůůLJ
ĂĐŚŝĞǀĂďůĞŝŶϬͲϱLJĞĂƌƐ
DĞĚŝƵŵdĞƌŵͲ
ƉŽƚĞŶƚŝĂůůLJĂĐŚŝĞǀĂďůĞ
ŝŶϱͲϭϬLJĞĂƌƐ
>ŽŶŐdĞƌŵͲƉŽƚĞŶƚŝĂůůLJ
ĂĐŚŝĞǀĂďůĞŝŶϭϬнLJĞĂƌƐ
KƚŚĞƌͲŽŶŐŽŝŶŐ͕ĂƐ
ƌĞƐŽƵƌĐĞƐĂůůŽǁŽƌƚŽ
ďĞŝŵƉůĞŵĞŶƚĞĚǀŝĂ
ůĂƌŐĞƌƉƌŽũĞĐƚ
'ĂƌĚĞŶŝƐƚƌŝĐƚ
ŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ
ƵƚƚŚĞƉĂƌŬ
ŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ
ŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ
ŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ
ƵůƚƵƌĂů'ĂƌĚĞŶƐŝƐƚƌŝĐƚ
'ĂƌĚĞŶŝƐƚƌŝĐƚ
ƵƚƚŚĞƉĂƌŬ
ƵƚƚŚĞƉĂƌŬ
ƵƚƚŚĞƉĂƌŬ
ŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ
'ĂƌĚĞŶŝƐƚƌŝĐƚ
ƵůƚƵƌĂů'ĂƌĚĞŶƐŝƐƚƌŝĐƚ
ƵƚƚŚĞƉĂƌŬ
ƵƚƚŚĞƉĂƌŬ
ŝĐƚ͕ŽƚĂŶŝĐĂů'ĂƌĚĞŶŝƐƚƌŝĐƚĂŶĚƵůƚƵƌĂů
ŶƚƌLJŝƐƚƌŝĐƚ
'ĂƌĚĞŶŝƐƚƌŝĐƚĂŶĚƵůƚƵƌĂů
ŶƚƌLJŝƐƚƌŝĐƚ
'ĂƌĚĞŶŝƐƚƌŝĐƚ
'ĂƌĚĞŶŝƐƚƌŝĐƚĂŶĚƵůƚƵƌĂů
ŶƚƌLJŝƐƚƌŝĐƚ
ŵĞƚĞƌ
ƵƌĞŝƐƚƌŝĐƚ
ƵƚƚŚĞƉĂƌŬ
'ĂƌĚĞŶŝƐƚƌŝĐƚ
ĞƌŵŝŶĞĚ
ƵƚƚŚĞƉĂƌŬ
ŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ
ŶĚ
ŶƚƌLJŝƐƚƌŝĐƚ͕ŚŝŶĞƐĞƵůƚƵƌĂů'ĂƌĚĞŶƐ
ƵƚƚŚĞƉĂƌŬ
ƵƚƚŚĞƉĂƌŬ dž
ƵƚƚŚĞƉĂƌŬ
ƵƚƚŚĞƉĂƌŬ dž
dž
ƚŽďĞĐŽŵƉůĞƚĞĚŝŶĨŝŶĂůŵĂƐƚĞƌƉůĂŶƐƚĂŐĞǁŝƚŚŝƚLJ
253
Appendix C
OVERFELT GARDENS PARK MASTER PLAN UPDATE
SAN JOSE PLANT LISTS Quick Reference
Genus Species Common name Height Width Water Req Sun Req Indigenous Character-type: Historic Neighborhoods
Habit
Festuca idahoensis Idaho fescue Grass 1 ft 1-2 ft Very Low Sun Part-shade California Helictotrichon sempervirens blue oat grass Grass 2-3 ft 2-3 ft Low Full sun Mediterranean Pennisetum x. advena 'Rubrum' purple fountain grass Grass 4-5 ft 3-4 ft Low Full sun Africa Ceratostigma plumbaginoides dwarf plumbago Groundcover 0.5-1 ft 1.5 ft Low Full sun East Asia Cotoneaster dammeri bearberry cotoneaster Groundcover 1 ft 8-10 ft Moderate Sun Part-shade Asia Juniperus chinensis 'San Jose' juniper Groundcover 2 ft 6-8 ft Low Full sun Hybrid Juniperus horizontalis 'Blue Chip' juniper Groundcover 1 ft 6-8 ft Low Full sun Hybrid Mahonia repens creeping mahonia Groundcover 1 ft 3 ft Low Sun Part-shade California Rosmarinus 'Prostratus' trailing rosemary Groundcover 2 ft 4-8 ft Low Full sun Hybrid Agapanthus orientalis lily-of-the-Nile Perennial 4-5 ft 2-3 ft Moderate Sun Part-shade South Africa Amaryllis belladona belladona lily Perennial 1-2 ft 1-2 ft Very Low Full sun South Africa Dietes vegeta fortnight lily Perennial 3 ft 2-3 ft Low Sun Part-shade East Africa Iris foetidissima Gladwin iris Perennial 1.5-2 ft 1 ft Low Sun Part-shade Europe Pelargonium x.hortorum garden geranium Perennial 1-2 ft 1-2 ft Low Sun Part-shade Hybrid Penstemon heterophyllus 'Blue Bedder' California beard tongue Perennial 1-2 ft 2-3 ft Low Full sun California Tulbaghia violacea society garlic Perennial 1-2 ft 1-2 ft Moderate Full sun South Africa Berberis thunbergii Japanese barberry Shrub 4-6 ft 4-6 ft Low Sun Part-shade East Asia Buddleja davidii butterfly bush Shrub 4-10 ft 4-10 ft Low Full sun East Asia Callistemon viminalis 'Little John' dwarf bottlebrush Shrub 3-6 ft 4-5 ft Low Full sun Australasia Chaenomeles 'Apple Blossom' flowering quince Shrub 6 ft 8 ft Low Sun Part-shade East Asia Lavandula stoechas 'Otto Quast' Spanish lavender Shrub 3 ft 2-3 ft Low Full sun Mediterranean Phlomis fruticosa Jerusalem sage Shrub 4 ft 6 ft Low Full sun Mediterranean Rhamnus californica 'Mound San Bruno' coffeeberry Shrub 4-6 ft 6-8 ft Low Sun Part-shade California San Jose Plant Lists December 2010 Page 1 of 2
CITY OF SAN JOSE PLANT LIST - QUICK REFERENCE
254 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix C
Genus Species Common name Height Width Water Req Sun Req Indigenous Character-type: Historic Neighborhoods
Habit
Ribes viburnifolium evergreen currant Shrub 3-6 ft 4-12 ft Low Sun Part-shade California Rosmarinus officinalis 'Tuscan Blue' rosemary Shrub 4-6 ft 3-5 ft Low Full sun Mediterranean Salvia clevelandii Cleveland sage Shrub 3-5 ft 3-5 ft Low Full sun California Callistemon citrinus lemon bottlebrush Shrub/Tree 6-12 ft 8-12 ft Low Full sun Australasia Lagerstroemia indica crape myrtle Shrub/Tree 25 ft 15-25 ft Low Full sun East Asia Pittosporum tobira 'Variegata' mock orange Shrub/Tree 5-10 ft 5-10 ft Low Sun Part-shade East Asia Vitex agnus-castus chaste tree Shrub/Tree 10-15 ft 10-15 ft Low Sun Part-shade Mediterranean Geijera parviflora Australian willow Tree 25-30 ft 20 ft Moderate Full sun Australasia Campsis radicans trumpet vine Vine 30-40 ft n/a Low Full sun North America Rosa banksiae Lady Bank's rose Vine 20 ft n/a Low Sun Part-shade East Asia Tecomaria capensis Cape honeysuckle Vine 15-30 ft n/a Moderate Sun Part-shade South Africa Wisteria sinensis Chinese wisteria Vine 30 ft n/a Moderate Sun Part-shade East Asia San Jose Plant Lists December 2010 Page 2 of 2
255
Appendix C
OVERFELT GARDENS PARK MASTER PLAN UPDATE
256 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
APPENDIX D
OVERFELT PARK POND ANALYSIS
Overfelt Ponds – Feasibility Analysis and Alternative Development ............................................................
Overfelt Park Ponds Water Resources and Sustainability Assessment......................................................
Overfelt Park Ponds Technical Feasibility Analysis Final Memorandum ...............................................
DATE
August 2021
October 2021
December 2022
257
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
258 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
1 3ZIVJIPX4SRHW
*IEWMFMPMX]%REP]WMWERH%PXIVREXMZI(IZIPSTQIRX
OVERFELT PONDS – FEASIBILITY ANALYSIS AND ALTERNATIVE DEVELOPMENT 259
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2 A
B
C
260 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
3 A
B
C
A
B
C
261
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
4 A
B
C
262 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
5 A
B
C
;%8)6:%908%2(:%0:)
;%8)6:%9084914%2(&%7-2
432(3:)6*03;
263
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
3VMKMREP-RJVEWXVYGXYVI4VSKVEQQMRK
1%&96=432(
264 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
7 265
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
8 (ITXLXS+VSYRH[EXIV “Overfelt ponds are not considered suitable candidates for an Indirect Potable Reuse (IPR) system, this reduces the recharge potential of IPR in the Penitencia
system...according to SCVWD’s previous study”
Source: South Bay Water Recycling - Strategic and Master Planning Report (2014)
Historically, recharge at the Overfelt Ponds has shown to be limited due to their location overlaying a confined aquifer and recharging the shallow aquifer. Groundwater flows (or seeps) laterally into Miguelita Creek which then feeds into Lower Silver Creek and Coyote Creek, all within the
confined zone. Therefore any recharge that occurs does not benefit our water supply, which is primarily derived from the deep aquifer (i.e. groundwater production wells).
Source: Santa Clara Valley Water District
266 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
9 3:)6*)08432(7%08)62%8-:)7
6)7836%8-32 7)%732%0:)62%04330,%&-8%8
-2*6%7869'896)348-1->%8-32 78361;%8)6%2(*033(1%2%+)1)28 %%1)2-8= '322)'8834)2-8)2'-%+6392(;%8)66)',%6+)7=78)1&%1)2-8= '322)'883)<-78-2+7%2.37)6)'='0)(;%8)67=78)1'%1)2-8= 327-8);%78);%8)686)%81)287=78)1 &%7)0-2) (3238,-2+
267
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
%PXIVREXMZI
7IEWSREP:IVREP4SSP,EFMXEX
10 268 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
11 %08)62%8-:) 6)7836%8-327)%732%0:)62%04330,%&-8%8 Existing Pond Flows (in million gallons per year, MGY)
● Pond Evaporation: 5.1 MGY (loss)
○ 4,000 gal - 24,000 gal/day
● Stormwater in: 2.0 MGY (inflow)
● Rainwater in: 1.6 MGY (inflow)
6)7836)2%896%0*92'8-323*6-4%6-%2'366-(367
*%-6=7,6-14,%&-8%86)7836%8-32
;-28)6 746-2+ 7911)6*%00
269
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
12 Source: Resilient Landscape Vision for Upper Penitencia Creek (SFEI 2018) 270 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
Southern San Diego County
Restore and enhance 5 acres of vernal pools and watersheds Project Activities:
● Restore and enhance vernal pools including topography repair, weeding, plant propagation, planting and seeding, and soil inoculation ● Restore and enhance degraded maritime succulent scrub uplands vegetation in vernal pool watersheds including topography repair, weeding, plant propagation, and planting and seeding.
● Directly increase populations of nine sensitive vernal pool animals and plants including Riverside fairy shrimp, San Diego fairy shrimp, little mousetail, Orcutt's grass, Otay Mesa mint; San Diego button-celery, spreading navarretia, toothed calico-flower, and vernal barley.
● Directly increase populations of common vernal pool crustaceans and other invertebrate animals and plants. Directly increase populations of twelve sensitive uplands plants in vernal pool watersheds. ● Indirectly benefit two sensitive vernal pool species (Two-striped garter snake and Western spadefoot toad) and nine sensitive uplands animals with habitat restoration. 13 %08)62%8-:) 6)7836%8-324VIGIHIRX 3XE]1IWE:IVREP4SSP6IWXSVEXMSR 271
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
%PXIVREXMZI
7XSVQ[EXIVERH*PSSH1EREKIQIRX
14 272 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
Source: Resilient Landscape Vision for Upper Penitencia Creek (SFEI 2018) 273
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
%08)62%8-:) -2*6%7869'896)348-1->%8-32
78361;%8)6%2(*033(1%2%+)1)28
274 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
%08)62%8-:) -2*6%7869'896)348-1->%8-32
4VIGIHIRX 'VSXSR;EXIV8VIEXQIRX4PERX
10 Acre Water Treatment PlantCompleted in 2018Sherwood Design Engineers + Grimshaw Architects ● Net-positive water management system that improved ecologically, experiential and function of the project while significantly reducing cost.
● Advanced stormwater management design aimed at collecting site groundwater and stormwater flows for irrigation and other on-site reuse.
○ Design not only collects the water, but treats it in a series of perimeter wetland cells - helps enhance the project aesthetic and create a native wetland habitat. ● WWTP is nine acres wide, 12 stories underground.
○ The roof - largest continuous living roof in North America - is used as a golf course where divots and depressions are used as stormwater detention and retention basins. 275
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
%PXIVREXMZI%
'SRRIGXMRKXS4IRMXIRGME+VSYRH[EXIV6IGLEVKI7]WXIQ
18 276 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
19 %08)62%8-:)% %1)2-8=/))48,)1*900
'322)'84)2-8)2'-%+;6463.)'8
● Title 22 of the CA Code does allow for the use of recycled water in a public park setting water feature, including human contact (not swimming). ● SCVWD has investigated opportunities to locate satellite advanced treatment facilities closer to the groundwater recharge systems to supply recycled water. ● Penitencia Creek was identified as a feasible satellite advanced treatment/groundwater recharge location.
● Penitencia production capacity would be initially limited to 2.2 MGD, though there are targets to increase production by 2025.
Source: South Bay Water Recycling - Strategic and Master Planning Report (2014) 277
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
20 7EXIPPMXI%;8
1EFYV]4SRH
3ZIVJIPX4EVO
%08)62%8-:)% %1)2-8=/))48,)1*900
'322)'84)2-8)2'-%+;6463.)'8
278 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
%PXIVREXMZI&
'SRRIGXMRKXS)\MWXMRK7.6IG]GPIH;EXIV7]WXIQ
21 279
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
22 %08)62%8-:)& %1)2-8=/))48,)1*900
)<4%2()<-78-2+6)'='0)(7=78)1
7SYVGI
7()
6IG]GPIH;EXIV0MRIW
6IG]GPIH;EXIV
1-0)7
1-0)7
Per Envision 2040: Reuse 100% of wastewaterPer Climate Smart SJ: Increase reused water sources from 5% to 23% by 2040 280 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
%PXIVREXMZI'
3R
7MXI;EWXI[EXIV8VIEXQIRX4PERX
23 281
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
%08)62%8-:)' %1)2-8=
/))48,)1*900
327-8)86)%81)28
Existing Pond Flows (in million gallons per year, MGY)
● Pond Evaporation: 5.1 MGY (loss)
○ 4,000 gal - 24,000 gal/day
● Stormwater in: 2.0 MGY (inflow)● Rainwater in: 1.6 MGY (inflow) However, note monthly imbalances → Additional supplies to maintain pond water level ● Assumes filling to completely full
○ Natural pond height fluctuates seasonally
● Adjacent school wastewater:
○ Potential for 5.0 MGY of recycled water○ Not available in summer months ● Residential wastewater
○ Consistent, daily flow○ ~50 gal/resident-d
On a net annual basis the school would provide more than enough recycled water, roughly 3.5 million gallon surplus. The summer month deficit (Jun, July, Aug) is < 1.6 million gallon. That would be about 1.2' of storage on the ponds.
Ponds can be overfilled during the winter and in the summer may get by without any residential scalping.
Note: Values presented are ROM estimates for concept level decision making. Further evaluation needed to refine water balance. 282 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
4%6/7'%0)
'SRWXVYGXIH;IXPERHW
;EWXI[EXIV8VIEXQIRX3TXMSRW
&9-0(-2+7'%0)
1IQFVERI&MSVIEGXSV
1&6
%1IQFVERI&MSVIEGXSV
1&6
MWXLIGSQFMREXMSRSJE
QIQFVERITVSGIWWPMOIQMGVSJMPXVEXMSR[MXLXLI
EGXMZEXIHWPYHKITVSGIWW;LIRYWIH[MXLHSQIWXMG
[EWXI[EXIV1&6TVSGIWWIWGERTVSHYGIIJJPYIRXSJ
LMKLUYEPMX]IRSYKLXSFIHMWGLEVKIHSVVIYWIHJSV
YVFERMVVMKEXMSR3XLIVEHZERXEKIWSJ1&6WSZIV
GSRZIRXMSREPTVSGIWWIWMRGPYHIWQEPPJSSXTVMRXIEW]
VIXVSJMXERHYTKVEHISJSPH[EWXI[EXIVXVIEXQIRX
TPERXW
8LIGLSMGISJ[EWXI[EXIVXVIEXQIRXPIWWHITIRHWSRXLIWGEPIMXGERVIEGLXSFYXQSVIHITIRHWSR XLIWTEGIGSRWXVEMRXWXLIIRIVK]KSEPWERHTVIJIVIRGISRWMXIMRXIKVEXMSR %GSRWXVYGXIH[IXPERHMWEREVXMJMGMEP[IXPERHXSXVIEX QYRMGMTEPSVMRHYWXVMEP[EWXI[EXIVKVI][EXIVSV
WXSVQ[EXIVVYRSJJThis more “passive” strategy allows
VIEGXMSRWXSSGGYVEXEREXYVEPVEXIEWQMGVSFIWHMKIWX RYXVMIRXWERHWSPMHW8VIEXQIRX[IXPERHWVIUYMVIE
larger area than “active” wastewater treatment
TVSGIWWIWXLEXEVIWYTTPIQIRXIH[MXLJSVGIHEMV
8LIWIW]WXIQWGEREPWSWIVZIEWLEFMXEXJSVMRWIGXW
FMVHWERHQEQQEPW
7);)61-2-2+
283
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
7MH[IPP*VMIRHW7GLSSP ;EWLMRKXSR('
● 3RWMXIXVIEXQIRXSJKVE][EXIVERH
FPEGO[EXIVJVSQWJI\MWXMRKFYMPHMRK[MXLRI[
WJRI[EHHMXMSR
● 8VIEXQIRXTVSGIWWMRGPYHIW
TVIXVIEXQIRXXEROXSVIQSZIWSPMHWWYFWYVJEGIJPS[[EWXI[EXIV[IXPERHWEHHMXMSREPJMPXVEXMSRERHHMWMRJIGXMSR ● ,68MR[IXPERHMWHE]WFIJSVI
IRXIVMRKWXSVEKIXEROMRFEWIQIRXSJFYMPHMRK;LIRXLIVIMWHIQERH[EXIVMWXLIRJMPXIVIHERHHMWMRJIGXIH ● 8VIEXIHIJJPYIRXYWIHJSVFYMPHMRK
HIQERHMRFEXLVSSQWERHGSSPMRKXS[IV
● 4VSGIWWIWKTHYRYWIH[EXIV
TEWWMZIP]SZIVJPS[WMRXSQYRMGMTEPGSQFMRIHWERMXEV]WXSVQW]WXIQ ● -RGSVTSVEXIWIQFIHHIHWIRWSVRIX[SVO
XSQSRMXSVXVIEXQIRXTIVJSVQERGI
4VIGIHIRX
284 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
(IGMWMSR1EXVM\
%PXIVREXMZIW
27 285
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
28 '32')480):)0;%8)6&%0%2')4SXIRXMEP3RWMXI6IYWI3TTSVXYRMXMIW Existing Pond Flows (in million gallons per year, MGY)
● Pond Evaporation: 5.1 MGY (loss)
○ 4,000 gal - 24,000 gal/day
● Stormwater in: 2.0 MGY (inflow)● Rainwater in: 1.6 MGY (inflow) However, note monthly imbalances → Additional supplies to maintain pond water level ● Assumes filling to completely full
○ Natural pond height fluctuates seasonally
● Adjacent school wastewater:
○ Potential for 5.0 MGY of recycled water○ Not available in summer months ● Residential wastewater
○ Consistent, daily flow○ ~50 gal/resident-d
Note: Values presented are ROM estimates for concept level decision making. Further evaluation needed to refine water balance.
Peak summer evaporation could be met
by wastewater from ~480 residents
(no students in summer months)
286 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
29 287
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
%TTIRHM\
%HHMXMSREP6IWSYVGIW
30 288 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
%IVMEP
31 289
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
4EVOWERH'VIIOW
32 290 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
8VII'SZIV
33 291
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
JX'SRXSYVW
34 292 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
%RRYEP*PSSH
35 293
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
'EXGLQIRX3YXJEPPW
36 294 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
(ITXLXS+VSYRH[EXIV
37 295
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
7ERMXEXMSR
38 296 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
7XSVQ[EXIV+VEZMX]1EMRW
39 297
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
7YVJEGI8IQTIVEXYVI
40 298 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
41 299
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
4 2
https://www.valleywater.org/sites/default/files/335%20P3%20Related%20Reports%20SBWR%20Stratigic%20and%20Master%20Plan%20-%20Report%20%28Vol.1%29%20%281%29.pdf 300 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
4 3
https://www.sfei.org/projects/upper-penitencia-creek-resilient-landscape-vision 301
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
302 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 1 / 11
Memorandum
October 25, 2021
To: Manuela King (RHAA Landscape Architects)
Cc: Kossen Miller (RHAA Landscape Architects)
From: Josiah Cain and Ian McRae (Sherwood Design Engineers) Project Number and Name: 21-214 Overfelt Park Ponds
RE: Overfelt Park Ponds Water Resources and Sustainability Assessment Ms. King,
This memorandum is an assessment of water resources and sustainability potential for the three percolation ponds that are located at Overfelt Park, within the City of San Jose. This involved re-envisioning the functional role and best uses for the three existing ponds to inform the development of a sustainably integrated water management approach. A feasibility analysis of different strategies was conducted to evaluate their ability to enhance the performance of the ponds for potential flood control, improved water quality, habitat creation and groundwater recharge.
This water resources and sustainability assessment was intended to underscore the opportunities that Overfelt Park has to utilize, feature and benefit from the unique and substantial water resource offered by the ponds. The goal of this engineering study is to assist RHAA Landscape Architecture in evaluating pond improvements that can elevate the hydrologic and ecological performance of the regional park.
CONTENTS:
1.0 RELEVANT BACKGROUND INFORMATION
1.1 EXISTING SITE CONDITIONS
1.2 AGREEMENTS
2.0 FEASIBILITY ANALYSIS
2.1 ALTERNATIVES EVALUATION
2.2 DECISION MATRIX
3.0 CONCLUSION AND NEXT STEPS
1.0 RELEVANT BACKGROUND INFORMATION
1.1 EXISTING SITE CONDITIONS
Documents were provided by the client to help establish contextual background information for the project, including (1) a 1974 agreement between the City of San Jose and the Santa Clara Valley Water District for the construction of percolation ponds in Overfelt Park and (2) construction documents from 1975 for the installation of a percolation turnout on Upper Penitencia Creek.
The three percolation ponds were constructed in the 1970’s to serve as groundwater recharge facilities and to provide an aesthetic amenity. The ponds were supplied with water from Penitencia Creek, to the North-West, approximately half a mile in distance and a little less than 10’ higher in elevation. A diversion pipe (referred to as a percolation turnout in the provided construction documents) from Penitencia Creek supplies the percolation ponds with water, but only after filling the Mabury groundwater recharge pond located on the Eastside Education Park adjacent to Overfelt Gardens Park.
Coordination with Santa Clara Valley Water District (SCVWD) has revealed that the Overfelt ponds are operated separately from the larger Penitencia Recharge System (which includes Mabury Pond), and are owned by the City of San Jose.
OVERFELT PARK PONDS WATER RESOURCES AND SUSTAINABILITY ASSESSMENT 303
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 2 / 11
FIGURE 1 - Penitencia Creek diversion pipe to Mabury Pond and conduit to Overfelt ponds A site visit was conducted in early August of 2021 to evaluate the state of the park and ponds, to understand surrounding site context, and to identify relevant water infrastructure systems that may contribute to the feasibility analysis of different alternatives.
Pond A: This pond is filled with vegetation and marsh plants, with no visible surface water. An AutoCAD file containing a base map of the project site was provided by the client, this file indicates that there is a 3’x4’ vault with a water valve located in the North-West portion of the pond. There is a channel connecting Pond A to Pond B, with embankments reinforced with concrete-filled bags and a precast concrete ditch. Pond A is also connected to Pond C by an earthenchannel. Pond A has a storage volume of approximately 2.6 million gallons (MG).
Pond B: This pond contains a low volume of stagnant water, with red algae growing along the water’s edge likely due to eutrophication promoted by waterfowl excrement. There is a channel connecting Pond B to Pond C that contains a stacked-stone check dam and channel reinforced with concrete-filled bags. Pond B has a storage volume of approximately 3.5 MG.
Pond C: This pond contains a low volume of stagnant and aromatic water full of green algae growing throughout the water edge likely due to eutrophication promoted by waterfowl excrement. There is one water outfall system with a 7’ diameter vault with water pump and a PVC pipe that flows into a large concrete basin on the south-east edge of the pond, though the water source is not known. In addition, there is a 4’Lx18”Wx14”H metal box with mesh grating embedded in mortaredstone along the western embankment of the pond, likely a pond overflow. There is a channel connecting Pond C to Pond A using an open earthen channel. Pond C has a storage volume of approximately 4.3 MG.
Chinese Culture Garden Reflecting Pool: This pond is a shallow concrete-lined basin that is absent of water, with an earthen channel beginning at the South-West edge that meanders through the park and ultimately meets up with Pond C at the same location as the water outfall system. Plans have been recently approved for the reflecting pool to use recycled water, though it is unknown at this time whether the pool will remain. 304 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 3 / 11
FIGURE 2 - State of the three ponds under summer drought conditions and open channel routing direction The three earthen percolation ponds, and the concrete-lined reflecting pool that is part of the Chinese Cultural Garden, are all connected to one another using open channels. Open channel routing and surveyed contours suggest that water flows from a vault into the northwest pond, where it then travels to the other two ponds clockwise.
Historically, recharge at the Overfelt Ponds has shown to be limited due to a portion of the ponds overlaying a confined aquifer and recharging the shallow aquifer. Some of the water that infiltrates from the percolation ponds flow (or seeps) laterally into Miguelita Creek which then feeds into Lower Silver Creek and Coyote Creek, all within the confined zone.
Therefore, any recharge that occurs does not fully benefit San Jose’s water supply, which is primarily derived from the deep aquifer (i.e. groundwater production wells), making Overfelt Park ponds a lower priority for SCVWD with respect to operations and maintenance of their groundwater recharge systems.
While SCVWD has the ability to divert locally stored water from Mabury Pond (which spills into the Overfelt ponds), this diversion has been out of operation since September 2018 due to low flows in Penitencia Creek driven by the prolonged drought that California has experienced in recent years.
Miquelita Creek, which flows along the border between Overfelt Park and Independence High School, was set below grade in a pipeline to replace the pre-existing open channel back in the 1970’s out of concern for student safety. It is daylit for ~650 feet from N. Jackson Avenue to the North-East corner of Overfelt Park, goes underground for 1,160 feet, and reemerges on the other side of Educational Park Drive in an earthen-bottom trapezoidal channel.
There are approximately 12 stormwater inlets along the streets and parking lots that frame Overfelt Park, some of which are labeled “Flows to Silver Creek” indicating that stormwater flows are not routed to the ponds within the park. Miguelita Creek is flowing due to a shallow groundwater table, which may also be contributing to the small amount of water that is present in Ponds B and C. The fact that Miguelita Creek is flowing is significant because Penitencia Creek was dry when the site visit was conducted.
305
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 4 / 11
FIGURE 3 - Miguelita Creek channel routing and site photos
1.2 AGREEMENTS
In order to fully understand what design alternatives are available for the Overfelt ponds, it is necessary to clarify the longstanding agreement (1974 and later amendments) between the City of San Jose, SCVWD and Santa Clara County to establish each party’s respective rights and obligations. 1974 (Pre-Construction)
• This was an agreement between the City of San Jose and SCVWD. • The initial desire was for the ponds to function as groundwater recharge and to provide an aesthetic amenity. • SCVWD paid for the construction costs of the ponds and diversion works, in addition, they provided the water resources.
• The City constructed a conduit bridging Mabury Pond to the Overfelt ponds. • SCVWD was responsible for draining and cleaning the ponds at their expense, and they were allowed free and unobstructed access for personnel and equipment to accomplish these tasks. • In the event that SCVWD determined they no longer were obtaining reasonable recharge rates in the three ponds, they could terminate the free delivery of water and the City could purchase water from SCVWD under existing SCVWD rules and regulations.
• In the event that SCVWD terminated the delivery of free water, or when they were released from the duty to drain and clean the ponds, SCVWD would no longer have free and unobstructed access to the ponds. • SCVWD has no property rights in any of the ponds and the City can remove any and all of the ponds at any time. • In the event of the removal of any or all three ponds, the City shall return to SCVWD 1/60th of the total water volume that SCVWD had supplied, this water shall be returned by the City for twenty years after such removal. 306 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 5 / 11
• The water that is to be delivered to the ponds is “raw water, untreated and impotable” and the City shall prevent any attempt to treat or purify the water or make any connection to potable supplies. • SCVWD will supply such water based on availability, with no guarantee of availability being made. 1977 (+ 2006 Amendment)
• In 2006, a tri-party agreement was renewed for the joint-use of lands along Upper Penitencia Creek by SCVWD, the City of San Jose and Santa Clara County.
• If this request was denied, it would have resulted in the closure of trails and jeopardized the ownership of lands needed by SCVWD for planned flood protection, since the City and County would be free to sell those lands. • In 1977 the county prepared a master plan that envisioned a cooperative joint-use of lands and the three parties first entered into the agreement in 1981 for a period of 25 years. • The parties agreed to cooperate in the joint-use of specified lands for parks, recreation, open space, flood management and water conservation purposes.
• In 1987, all parties adopted an addendum to this agreement that specified obligations and outlined improvement project responsibilities, maintenance responsibilities, funding contributions, and fee collection. • SCVW-Specific Responsibilities:
o Shall maintain the natural and constructed channel between the tops of banks of Upper Penitencia Creek and the recharge facilities for flood control and water conservation purposes in accordance with the applicable property interests.
o Maintain the channel of Penitencia Creek and the adjacent recharge facilities for flood control and water conservation purposes
o Construct and maintain recharge ponds on county and city owned lands where feasible and construction will be subject to the availability of existing or future water supplies o Shall regrade off-stream percolation ponds to provide an aesthetically pleasing contour in accordance with the master plan
• City-Specific Responsibilities:
o City shall maintain and operate all park facilities City constructs unless otherwise provided by written agreement with another party
2.0 FEASIBILITY ANALYSIS
2.1 ALTERNATIVES EVALUATION
Sherwood evaluated three alternatives and compared them with a baseline condition, which assumes no changes to the pond infrastructure and configuration. The development of these three alternatives was informed by client inquiry and opportunities identified by previous studies from SCVWD and the San Francisco Estuary Institute.
ALTERNATIVE 1. RESTORATION - ECOLOGICAL HABITAT
There is an opportunity to restore the ponds to have a heightened ecological value and encourage creation of native seasonal habitat. Mapping of historical ecologies from the Resilient Landscape Vision for Upper Penitencia Creek (SFEI 2018) shows that the region was largely composed of grassland and oak woodland, though areas immediately adjacent to Miguelita Creek may have been riparian forest.
In order to effectively re-establish a native habitat, the ecological system of interest must be one that can be supported by the region’s annual precipitation and geomorphological composition. A large portion of the park, including the three ponds, share the same soil type that are part of an alluvial fan – Urban Lands Steven Creek Complex – which is a well-draining soil with minimal runoff. It is unlikely that a vernal pool ecology existed here historically, which relies on clay soils that allow for the formation of seasonal surface ponding. Implementation would include detailed biological, geotechnical and hydrological engineering, significant grading and modification of pond volumes, and planting of native vegetation. This approach is highly feasible due to the required soft tactics that have minimal disruption to park programming, and would be a suitable compliment to other alternatives.
307
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 6 / 11
FIGURE 4 - Historical ecology map from “Resilient Landscape Vision for Upper Penitencia Creek” (SFEI 2018) ALTERNATIVE 2. INFRASTRUCTURE OPTIMIZATION - STORMWATER AND FLOOD MANAGEMENT The 30-acre park and three ponds, with a combined volume of 32 acre-ft, can potentially serve as a site for stormwater interception and detention to help mitigate downstream flood risks in the region. Overfelt Park does not fall within the 1% Annual Flood Zone (FEMA) though it is just upstream of flooded areas that occur along Coyote Creek where it meets with both Upper Penitencia Creek and Lower Silver Creek.
Implementation would include repair and maintenance of existing pond infrastructure to receive stormwater flows, regrading areas of the park to direct stormwater runoff, and expanding the pipe connection from the Mabury Pond diversion to increase flow volume. This approach is not very feasible due to the fact Overfelt Park and ponds are not deemed suitable by SCVWD because the park is located too far from Penitencia Creek and it is too low in the watershed to provide enough performative benefit to warrant the investment in necessary infrastructure. 308 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 7 / 11
FIGURE 5 - Mapping of the 100-year storm flood hazard area ALTERNATIVE 3. AMENITY
The ponds can continue to serve as a recreational amenity by keeping them full year-round, this study evaluated three ways that this can be achieved.
Sherwood performed a water balance to maintain the ponds, which included seasonal evaluation of demands (evaporative losses) and supplies (stormwater and rainwater). The required recycled water volume is the third supply and is deduced from the water balance calculations. Calculations show that the ponds will experience a collective evaporative loss of 5.1 million gallons per year (MGY), with stormwater inflows (precipitation runoff that flows into the pond) amounting to 2.0 MGY and rainwater inflows (precipitation that falls directly into the pond) amounting to 1.6 MGY under average annual conditions.
Implementation would include connecting the ponds to a source of recycled water and rerouting the pond overflow(s) to the sewer network to prevent mixing of recycled water with the natural water system. In order to prevent the infiltration of recycled water in the groundwater system, the ponds would need to have a liner installed, though a specific liner cannot be selected until analysis of groundwater quality, subsurface geology/soils makeup, and evaluation of contaminants (such as TCE) is determined.
309
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 8 / 11
FIGURE 6 - Water balance calculations to determine portfolio of water sources (stormwater and treated wastewater) to keep the ponds full year-round
3A. AMENITY - CONNECT TO EXISTING SAN JOSE RECYCLED WATER SYSTEM The ponds can serve as a recreational amenity for the community, by keeping them full year-round using recycled water generated from local wastewater treatment facilities. Title 22 of the California Code of Regulations allows for the use of recycled water in a public setting water feature that can involve human contact (swimming is not allowed).
San Jose Water has recently connected Overfelt Park to recycled water and records show that the park started using it for irrigation in the last quarter of 2020. South Bay Recycled Water stated that there is enough recycled water supply to fill the ponds and the cost of recycled water is currently $4.33 per HCF.
While the technical component of this approach is feasible due to the fact that the recycled water system already exists on-site and is connected to the city network, public agencies need to determine whether the ponds are no longer going to serve a role in groundwater recharge.
3B. AMENITY - CONNECT TO PENITENCIA GROUNDWATER RECHARGE SYSTEM In 2014, SCVWD investigated opportunities to construct a satellite advanced water treatment (AWT) facility along Penitencia Creek to supply the groundwater recharge system. The proposed AWT facility is significant because Mabury Pond was shown to be one of the potential recipients of the recycled water for groundwater recharge purposes, and it is directly connected to the Overfelt Park ponds.
310 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 9 / 11
The SCVWD determined the Overfelt ponds were a low priority for receiving water from the proposed AWT facility because the ponds infiltrate a shallow confined aquifer, making them less suitable for groundwater recharge to benefit San Jose’s water supply. Due to the Overfelt ponds' low priority for groundwater recharge, it would only receive excess water once all other higher priority ponds are filled.
FIGURE 7 - Map indicating SCVWD’s potential Penitencia advanced water treatment facility and groundwater recharge system from the “South Bay Water Recycling - Strategic and Master Planning Report” (2014) 3C. AMENITY - ON-SITE WASTEWATER TREATMENT SYSTEM
As an alternative to municipal recycled water supply, on-site wastewater treatment could be achieved through the design and construction of a treatment facility supplied by flows generated from the adjacent high school and from the surrounding residential community. Independence High School’s student and staff population is large enough to potentially generate the 5.1 MG needed to keep the ponds completely full year-round, but the school’s wastewater would not be available during the summer when school is out of session. This demand could be made-up by wastewater flows mined from the residential neighborhood, with approximately 480 San Jose residents being sufficient to provide the needed wastewater during the summer period.
ALTERNATIVE 4. BASELINE
The final alternative would be to leave the ponds as they are with no major updates to water infrastructure or pond performance. The water availability would rely on the existing seasonal hydrology, which is currently insufficient to make up the 5.1 MGY of evaporative losses. This alternative would likely involve a few updates such as the management of invasive plants and management of diminishing water quality due to nutrient loading and resulting eutrophication. Though this alternative is the easiest to implement, it is the least desirable from an aesthetic and performance standpoint. 311
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 10 / 11
2.2 DECISION MATRIX
A decision matrix has been developed for each alternative to provide additional information and metrics to facilitate comparison and evaluation of feasibility. The matrix was designed around water source and availability, with a range of associated criteria that included (1) a qualitative estimate of cost to implement and manage each alternative, (2) necessary resources for operation and maintenance, (3) resulting ecological potential, and (4) the feasibility of implementation that takes into consideration each of the preceding criteria. A value of “1” is low and a value of “4” is high.
FIGURE 8 - Decision Matrix
3.0 CONCLUSION AND NEXT STEPS
The assessment of water resources and feasibility analysis of the three alternatives suggests that the ponds can continue to serve as a recreational amenity by connecting to the existing City recycled water network (Alternative 3B), since the recycled water system already exists on-site for irrigation purposes. The ability to keep the ponds full year-round using City recycled water can be implemented in parallel with the restoration of native habitat (Alternative 1), since these two scenarios are both highly feasible and can complement one another. 312 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
21-214 – Overfelt Park Ponds MEMORANDUM | 11 / 11
To keep the ponds completely full year-round would require approximately 5.1 MG (make up water for evaporative losses only) annually, which amounts to about $28,000 per year. If the ponds are allowed to draw down 12" (~1.3 MG) to 24" (~2.5 MG) in the late summer, the savings could be significant. Each vertical foot of seasonal water level fluctuation allowed will reduce cost by approximately $7,000 annually. Sherwood does not recommend more than 24" of seasonal fluctuation, so the cost range might be $14k-$28k per year for makeup water to keep these ponds at a suitable water level year round. This cost determination is dependent upon verification of stormwater inflow as a source, as it impacts the volume of recycled water needed to provide make-up water.
A rough order of magnitude for capital cost to implement this alternative cannot be determined without a deeper understanding of how these features are integrated with the site plan (access, aesthetics, edge condition, water quality expectations). Most likely the ponds will need fine grading, recirculating pump, filtration systems, and aeration systems.
Integrated wetland features can potentially perform some of this work, as can stream flows between the ponds. A major design question might be whether they are treated as a single recirculating system, as independent water features, or a hybrid thereof.
Next steps would involve a more in-depth look into the technical feasibility and costs for (1) a habitat-based solution to support a resilient year-round pond ecology and (2) the necessary steps to utilize recycled water to fill the ponds while meeting local requirements. In addition, infrastructure optimization can be explored to maximize diversion of stormwater runoff to the ponds to reduce make-up water demands.
313
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
314 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Memorandum
December 8, 2022
To: Manuela King (RHAA Landscape Architects)
Cc: Urmila Venkat (RHAA Landscape Architects)
From: Josiah Cain and Ian McRae (Sherwood Design Engineers) Project Number and Name: 21-214.1 Overfelt Park Ponds
RE: Overfelt Park Ponds Technical Feasibility Analysis
Manuela,
This memorandum is a concept-level technical feasibility assessment of four strategies that will inform the design and programming of the ponds at Overfelt Park, within the City of San Jose. Three of these strategies had been identified in a previous “Water Resources and Sustainability Assessment” memorandum that was submitted by Sherwood Design Engineers in October of 2021. This analysis builds on the prior memorandum, providing supplemental technical analysis for three specific strategies of interest that came out of the last phase of work, and a fourth that was requested by the client. The strategies that are explored in further technical detail in this memo are:
1. Seasonal Fluctuation: Create an enhanced ecological value and encourage native seasonal habitat that is supported by precipitation, without the need for supplemental water.
2. Maximize Stormwater Opportunities: Regrade the park or improve stormwater infrastructure to increase stormwater runoff and capture in the ponds.
3. Supplement with Reclaimed Water: Supplement the ponds with recycled water to keep them full year-round and serving as open-water amenity ponds.
4. Pond Removal: Remove ponds, either partially or completely, to create opportunities for passive recreation in the former pond sites.
The goal of this study is to provide a range of technical solutions and corresponding evaluation factors to assist RHAA Landscape Architecture in assessing pond improvements that elevate the hydrologic and ecological performance of the ponds and integrate with the programming goals for the park. Evaluation factors include: technical approach, environmental permit and codes, maintenance impact, construction cost, and O&M cost. These strategies are not mutually exclusive, and the recommended approach integrates a combination of strategies that aim to optimize the project program and sustainability drivers.
The following sections of this memorandum include relevant background information, a technical feasibility analysis,evaluation matrix, recommended approach and corresponding concept-level cost estimate.
1 OVERFELT PARK PONDS TECHNICAL FEASIBILITY ANALYSIS FINAL MEMORANDUM 315
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
1.0 RELEVANT BACKGROUND INFORMATION
1.1 EXISTING SITE CONDITIONS
The three percolation ponds in Overfelt Park were constructed in the 1970s to serve as groundwater recharge facilities and to provide an aesthetic amenity. The ponds were supplied with water from Penitencia Creek, to the northwest, approximately half a mile in distance and a little less than 10’ higher in elevation.
Historically, recharge from the ponds in Overfelt Park has shown to be of limited value, presumably due to their location overlaying a shallow unconfined aquifer that flows (or seeps) laterally into Miguelita Creek (which then feeds into Lower Silver Creek and ultimately Coyote Creek). Park staff report an observed connection between Pond C and Miguelita Creek over many years. It does not appear that infiltration from these ponds can benefit San Jose’s water supply, which is primarily derived from the deep aquifer (i.e. groundwater production wells); as such the Overfelt Park ponds are of low priority for Santa Clara Valley Water District (SCVWD). SCVWD does store water in the nearby Mabury Pond, which has historically been used to supplement water in Overfelt Ponds. However, this diversion has been out of operation since September 2018 due to low flows in Penitencia Creek, driven by the prolonged drought that California has experienced in recent years. Mabury Pond does not appear to be a reliable source of water for Overfelt Park. It does appear that the Mabury Pond connection and Pond C overflow collectively provide the capability to transfer water from Penitencia Creek to Miguelita Creek. It is not clear whether this was ever an intended function of the pond systems and related infrastructure.
The three earthen ponds, and the concrete-lined reflecting pool that is part of the Chinese Cultural Garden, are connected via open channels. A review of the topographic survey of the channels between the ponds suggests that water flows from a vault into Pond A, then travels to the other two ponds as described below. The reflecting pool is connected only via an overflow channel to Pond C. The existing conditions of each pond are summarized below and in Exhibit 1. The working understanding of existing conditions, pond configuration, and existing utilities are based on as-built drawings from 1974 developed by the City of San Jose Parks and Recreation, a site survey developed by City of San Jose Public Works in December 2005 (provided in AutoCAD), and site observations from a site walk conducted by Sherwood Design Engineers and stakeholders in August of 2021.
Additional history and background information about Overfelt Park and ponds can be found in the previously prepared “Water Resources and Sustainability Assessment” memorandum (Sherwood Design Engineers,October 2021).
● Pond A: Pond A has a storage volume of approximately 2.6 million gallons (MG). At the time of the site visit, Pond A was dominated with riparian vegetation and wetland plants, and no surface water was visible. A 3’x4’ vault with a water valve is located in the northwest portion of the pond, which had been previously supplied by Mabury Pond for groundwater recharge purposes. A concrete drainage ditch connects Pond A to Pond B, with embankments reinforced with concrete-filled bags. Pond A is also connected to Pond C by an earthen channel. Overflow from Pond A to both Ponds B and C occurs when the water surface level rises to the inlet elevation of the channels, where it is then conveyed into both Ponds B and C. ● Pond B: Pond B has a storage volume of approximately 3.5 MG. At the time of the site visit, this pond contained a low volume of stagnant water, with red algae growing along the water’s edge, likely due to eutrophication catalyzed by waterfowl excrement. The outlet channel from Pond B to Pond C is a rock-lined channel situated between two low concrete sack walls. 2 316 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
● Pond C: Pond C has a storage volume of approximately 4.3 MG. Pond C receives overflow from Ponds A and B via open channels as described above. At the time of the site visit, this pond contained a low volume of stagnant and pungent water with prominent green algae, with signs of eutrophication likely promoted by waste from waterfowl. Two infrastructure components, shown in Exhibit 1 and 2, were observed during the site visit:
○ Overflow Structure: A concrete overflow structure located near the top of the embankment of the pond connects via an existing 12” concrete storm drain pipe to an outfall with riprap energy dissipation into Miguelita Creek at the northwest corner of the park (Exhibit 2)
○ Recirculation reservoir and pump vault: There are two adjacent structures on the south-eastern edge of the pond that are labeled “recirculation reservoir” and “Chinese Pond pump” in the 1974 as-built drawings. The recirculation reservoir is a large concrete basin located at the edge of the pond. The Chinese Pond Pump is housed in a 7-foot diameter vault, with a PVC pipe that connects to the recirculation reservoir. Though the exact function of the pump system is unknown, it appears that the system allows for water to be pumped into the concrete basin (recirculation reservoir), and then the water is conveyed (pond pump) to the Chinese reflecting pool (Exhibit 1). ● Chinese Culture Garden Reflecting Pool: The Reflecting Pool is a shallow concrete-lined pond that was absent of water at the time of the site visit, with an earthen channel beginning at the southwest edge of the pool that meanders through the park and ultimately terminates as an outfall in Pond C.
A Recycled Water Retrofit construction document for Overfelt Park that was prepared by the San Jose Water Company in 2018 indicates that there are three points of connection for recycled water to the park (Exhibit 3). Two points of connection are located along Educational Park Drive immediately adjacent to Educational Park Branch Library, and the third point of connection is along Mckee Road immediately next to the concrete lined shallow reflection pool. The document indicates that recycled water serves irrigation systems and the reflecting pond, but does not supply the three larger ponds. Many irrigation points of connection are labeled for recycled/non-potable water.
1.2 POND GEOMETRY / BATHYMETRY
A key component of this technical analysis is to better define the pond geometry and bathymetry in order to provide a more accurate assessment of the alternatives described in Section 2.0. The geometry of the ponds (bathymetry and volumes) was estimated using the 1974 as-built drawings and site topographic survey, which included topography to what is assumed to be the perimeter of the water surface level (WSL) at the time of the survey.
It is important to note that the surveyed WSL in each pond was significantly higher than the observed WSL at the time of the site visit sixteen years later. The site visit and photos (Figure 1) were used to aid in the estimation of the pond depth and embankment slopes below the surveyed WSL. For each pond, the geometry presented in Table 1 is approximated using the following information:
● Top of Bank Elevation: The top of bank elevation is based on the topographic survey, which delineates the edge of trees and vegetation as can be seen in Figure 1. 3 317
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
● Surveyed Water Surface Area: The area associated with the surveyed WSL, which is assumed to correspond with the limits of the topographic survey as noted above. ● Side Slope: The side slopes above the surveyed WSL are based directly on the topographic survey, measured from the top of bank contour to the surveyed WSL contour. The 1974 as-built drawings and site observations indicated that the embankment slope projects below the surveyed WSL at a relatively consistent slope to the maximum estimated depth, then flattens out to a relatively consistent pond bottom elevation.
● Maximum Pond Depth:The maximum pond depth was estimated primarily based on the 1974 as-built drawings, with minor adjustments to account for sediment accumulation (reduction in depth) over time.
● Bottom of Pond Surface Area: The embankment side slope is projected to the estimated maximum pond depth to approximate the bottom of pond surface area. ● Storage Volume: The storage volume (and stage-storage relationship) for each pond was then calculated based on these geometric assumptions using AutoCAD Civil 3D.
This method provided an assumed pond geometry that informed the water balance calculations and subsequent evaluation of each strategy. The accuracy of the pond geometry can be improved if additional survey work is completed.
Table 1 - Pond Geometry and Bathymetry
Top of Pond
(Surveyed WSL)
Estimated Geometry
(Below surveyed WSL)
Calculated Storage
Volume
Pond Elevation
(ft)
Surface
Area
(sf)
Side
Slope
Max
Depth (ft)
Bottom of
Pond
Surface
Area (sf)
Gallons Cubic
Yards
A 94.20 48,281 3:1 11 18,483 2,651,320 13,127
B 93.30 48,856 2:1 13 26,623 3,561,177 17,632
C 91.10 83,649 3:1 9 40,468 4,261,788 21,101
4 318 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Figure 1. Pond Geometry and Bathymetry Estimation
Above: Survey data, as-built drawings and estimated pond elevations Below: Site observations (Pond C, photo taken during mid-summer site visit) 5 319
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
1.3 WATER BALANCE MODEL
In addition to updating the pond geometry, the water balance model was refined from the very high-level average monthly water balance presented in the prior memorandum, to a more accurate model using 25-years of historical rainfall data from the NOAA Climate Data Online (CDO) website. 1 Pond evaporation
rates are based on monthly pan evaporation data obtained from the Western Regional Climate Center (WRCC) for Newark, CA. This updated water balance model allows for:
● More accurate characterization of event-based rainfall to runoff relationship, which improves the accuracy of the expected volumes of stormwater runoff into the ponds. Stormwater runoff is calculated using the TR-55 methodology and assuming Type C soils with a runoff curve number (CN) of 75, selected to reflect open park spaces with good soil condition and grass cover. ● More accurate estimation of evaporative losses, tied directly to the refined pond geometry and stage to open surface water area relationship.
2 ● Evaluation of dry, average and wet rainfall years to better understand how hydrologic conditions might vary in the ponds from year to year.
The updated water balance contributes to the technical evaluation of the first three alternatives presented in Section 2 - Technical Feasibility Analysis (seasonal fluctuation, maximized stormwater opportunities, and supplement with reclaimed water). Each alternative is evaluated using the three rainfall years, summarized in Table 2.
Table 2 - Water Balance Rainfall Analysis
Dry Average Wet
Percentile* 10th 50th 90th
Annual Rainfall (in) 8.2 12.1 15.7
Largest 24-hour**
rainfall event (in)
1.26 0.97 1.87
*Dry, Average and Wet rainfall years are determined from the total annual rainfall, and corresponding percentile rainfall year over the 25-years of historical rainfall data analyzed. **Rainfall distribution varies significantly from year-to-year; large 24-hour rainfall events could occur in any rainfall year and is not indicative of a drier or wetter year with regards to total rainfall. 2 United States Department of Agriculture, Urban Hydrology for Small Watersheds, Technical Release (TR)-55, June 1986. https://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb1044171.pdf 1 https://www.ncei.noaa.gov/cdo-web/, San Jose Airport (Station ID GHCND:USW00023293), 1997-2022. 6 320 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
It is important to note key assumptions and some limitations of the model:
● The water balance model is largely driven by the pond geometry and bathymetry. As noted in Section 1.2, pond bathymetry and geometry was informed by as-built drawings, site survey and site observations. Additional surveys of existing pond bathymetry would improve the accuracy of the calculations.
● The model assumes that the ponds will be lined with an impermeable liner in order to eliminate infiltration losses when calculating the water balance. The use of an impermeable liner would also prevent water from seeping upward from the aquifer.
● The model does not account for potential upwelling of groundwater from the underlying unconfined aquifer; site observations indicate that shallow groundwater may be a potential source of water that maintains pond levels higher than they would be if fed by surface stormwater alone.
If pond liners are not implemented, additional background data would be needed to better understand the impact of groundwater on pond hydrology. ● Because the open channels connecting the ponds are understood to flow only in “overflow” conditions (i.e. when each pond is full), the analysis assumes they function mostly independently with hydraulic connection only occurring in large storm events.
2.0 TECHNICAL FEASIBILITY ANALYSIS
This section provides key hydrologic metrics, and a summary of engineering interventions that would be needed to implement each strategy. The technical analysis provides a base for the recommended approach and cost estimate provided in Sections 3 and 4, respectively.
2.1 STRATEGY #1 - SEASONAL FLUCTUATION
The intent of this strategy is to develop an ecological approach for the three ponds in their existing locations and with their current geometry, with minimal modifications to grading or infrastructure. The strategy would allow for seasonal fluctuation in water levels to occur without the addition of supplemental water. The local hydrologic patterns, under various annual rainfall conditions, will inform the opportunities for year-round ecology and the development of a corresponding plant palette.
Water Balance:
The water balance model described in Section 1.3 is used to characterize the expected seasonal fluctuation in water level, assuming:
● Water “inflows” consist of rainfall falling directly on the pond surface and stormwater runoff from the catchment areas shown in Exhibit 4.
● Water “losses” consist of evaporation from the open water surface of the pond. ● As discussed in the summary section below, though it is possible that there is seasonal upwelling of groundwater from the unconfined aquifer, it was not included in the water balance model due to limited available data.
7 321
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
The assumed pond surface area and contributing drainage areas for each pond is shown in Table 1 of Exhibit 4 - Existing Topography and Drainage Conditions. The water model results (Table 3) indicate that direct rainfall on the ponds and stormwater runoff from the surrounding park provide minimal water supply relative to the volume and depth of the ponds. The seasonal fluctuations in water level for the dry, average and wet year for Pond C is shown in Figure 2, which illustrates that even in wetter years the pond is anticipated to have little to no water and will be dry for a significant portion of the year. The seasonal fluctuation follows a similar pattern for Ponds A and B (see Appendix A).
Table 3 - Water Model Results - Seasonal Fluctuation
Max Ponding Depth*
(ft)
Max Ponding Surface Area
(sq-ft)
% of Year Empty/Dry
POND A
Dry Year 0.67 20,400 61%
Average Year 1.17 21,600 34%
Wet Year 2.00 23,600 19%
POND B
Dry Year 0.33 27,600 67%
Average Year 0.83 27,900 51%
Wet Year 1.50 28,850 33%
POND C
Dry Year 0.50 46,100 66%
Average Year 0.83 47,500 47%
Wet Year 1.50 50,200 30%
*ponding depth is from bottom of pond elevation to maximum water surface level (as modeled) 8 322 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Dry Year
Average Year
Wet Year
Figure 2. Pond C Seasonal Flucationation for the Wet, Dry and Average Rainfall Year 9 323
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Summary:
The water model results are generally consistent with the site observations summarized in Section 1.1, however the model predicts that the ponds would be dry for the majority of the summer, which is inconsistent with observed water levels during the site visit in August 2021 and June 2022. The higher water levels observed in the middle of summer suggests that the pond levels may be influenced by upwelling from shallow groundwater that lies beneath, which appears to provide a baseline amount of water year-round. Should a liner be installed, pond levels may actually decrease relative to existing conditions by eliminating this water source via upwelling. Additional background data would be needed to better understand the impact of groundwater on pond hydrology. In any case, very low water levels could limit or prevent the possibility of planting in certain portions of the pond embankments for habitat creation and water quality management; without further measures, such as makeup water, filtration and/or recirculation, stagnant water and algae could persist. The current habitat that is supported by existing hydrologic conditions is most conducive to invasive plant species and there is not enough surface water at this time to support a native ecological outcome. It is recommended that the team further evaluate potential planting and ecological enhancement strategies given the hydrologic analysis presented herein.
2.2 STRATEGY #2 - MAXIMIZE STORMWATER OPPORTUNITIES
The intent of this strategy is to evaluate increasing stormwater runoff capture in the ponds through regrading and/or storm drain infrastructure adjustments. The value of this strategy is dependent on whether the additional stormwater runoff would be significant enough to impact the pond hydrology discussed in Section 2.1.
Through evaluation of the site topography and natural flow lines, eight subcatchments (Exhibit 4) were identified outside of the three ponds’ existing drainage areas that could either be re-graded or piped to the ponds. Subcatchments 1, 2 and 3 lie at the shared boundary with the adjacent high school and are not likely eligible for earth work improvements. There may be opportunities to implement surface drains to capture the water and direct it to the nearest ponds, but this option was not evaluated in depth because the benefit is minimal. Subcatchment 4 largely resides outside of the park extent, and though this subcatchment can be optimized to drain to Pond B, it would have minimal impact. Subcatchments 5, 6, 7, 8 could be incorporated into Pond C’s catchment area through regrading the subcatchments to drain towards Pond C, or by adding surface at existing low points in the subcatchments and piping the stormwater to outfall into Pond C.
Water Balance:
The impact of incorporating subcatchments 5 through 8 into the contributing drainage area for Pond C was evaluated using the water balance model. Pond C has an existing catchment area of approximately 360,000 square feet (8.25 acres) which would increase to 623,000 sf (14.30 acres) with the addition of subcatchments 5 through 8. The impact on the pond hydrology is minimal, however, due to the fact that the catchment area is largely pervious, vegetated area with minimal runoff in all but the largest storm events. The majority of the natural water supply comes from rainfall falling directly onto the pond surface.
In the average rainfall year, the model only predicts a very modest increase from 642,900 to 652,200 gallons (a 1.4% increase)
10 324 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Summary:
Implementation of this strategy is not recommended due to the minimal impact on the pond hydrology.
The cost of either regrading or rerouting runoff from the adjacent subcatchments to Pond C is high relative to the benefit of additional runoff into the pond. Furthermore, per conversations with RHAA and the City of San Jose, regrading of the park is not recommended due to potential disturbance to established vegetation, trails, and other park amenities.
2.3 STRATEGY #3 - SUPPLEMENT WITH RECLAIMED WATER
The intent of this strategy is to utilize City of San Jose recycled water to supplement ponds for year-round use as amenity ponds. The previous “Water Resources and Sustainability Assessment” memorandum stated “while the technical component of this approach is feasible due to the fact that the recycled water system already exists on-site and is connected to the City network, public agencies need to determine whether the ponds are no longer going to serve a role in groundwater recharge.” Since the release of that previous study, Valley Water has indicated they will relinquish the option to use the ponds for groundwater recharge purposes since they are deemed ineffective at recharging the groundwater aquifer.
To convert the ponds to year-round amenity ponds, a recycled water lateral extension will be required to provide make-up water to the ponds. The recommended point of connection is the existing Educational Drive irrigation connection ( “New POC - System A” in Exhibit 3) with approximately 310-ft of new pipe to convey recycled water to Pond A. Based on our understanding of the existing pond circulation, a single recycled make-up feed could be supplied to Pond A, which would then overflow to supplement Pond B and C via the existing open channel connections.
Once supplied with recycled water, it is recommended to evaluate rerouting the existing pond overflow infrastructure that discharges into Miguelita Creek to discharge into the City sanitary sewer system.
Though there are no city, county or state regulations that specifically prohibit discharging recycled water into a natural watercourse, it could complicate environmental review and permitting. And, if listed threatened or endangered species are found to be present in the receiving or downstream waterways, it is possible that recycled water discharge may not be allowed. The existing overflow structure in Pond C, which currently conveys overflow from the ponds to Miguelita Creek via an existing storm drain lateral, could be rerouted to connect to the City’s sanitary sewer system at the intersection of Educational Drive and Schulte Drive. Schematic routing for the recycled water make-up line and Pond C overflow reconfiguration are shown in Exhibit 5.
The subsequent analysis presented in this section builds on the evaluation presented in the prior “Water Resources and Sustainability Assessment” memorandum and includes:
● Updates to the water balance analysis to refine the expected make-up water volumes and impact of seasonal water-level fluctuation on make-up volumes and pond operations. ● Evaluation of water quality requirements, including an assessment of the quality of recycled water that is provided by South Bay Water Recycling (SBWR), as well as recommended ongoing water quality solutions (e.g., aeration, recirculation, filtration). ● Pond liner options and considerations.
11 325
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Water Balance
The volume of recycled water makeup water required to maintain pond-levels at or near the invert elevation of the pond’s overflow channels and structures is estimated using the water balance model for the dry, average and wet rainfall years. The water balance calculations show that the make-up water volume will vary significantly depending on rainfall in a given year, ranging from 3.4 to 4.6 million gallons per year (Table 4). Appendix B includes additional seasonal analysis of make-up water for the various rainfall years analyzed.
Table 4 - Recycled Water Make-up Volume and Cost
Rainfall Scenario*
Onsite Supply (Precipitation) Recycled Water Make-up
Direct Rainfall on
Ponds (MGY)
Stormwater
Runoff into
Ponds
(MGY)**
Additional
Volume
Required
(MGY)
Cost***
($/Year)
Dry Year 0.67 0.051 4.55 $20,687
Average Year 1.35 0.023 3.89 $17,687
Wet Year 1.76 0.14 3.37 $15,323
*Rainfall Scenarios in Table 2
**Based on catchment areas in Exhibit 4, Table 1
**Cost is based on a recycled water rate of $3.401/HCF in 2022 -https://www.sanjoseca.gov/your-government/environment/water-utilities/drinking-water/customer-service/recycled-wa ter-rates
The amount of make-up water required is impacted by the acceptable minimum water level and allowable fluctuation in water level throughout the year. Maintaining a lower water surface level reduces evaporative losses because the open water surface area decreases as the water level drops. Dropping the operational WSL in Ponds A and B, however, could require reconfiguration of the pond channels to allow for make-up water to be distributed from pond to pond (or extension of a make-up source to each individual pond, which is not desirable due to the additional infrastructure). Dropping the operational WSL in Pond C is more feasible because it is at the lowest elevation and contains the overflow structure that currently discharges any overflow to Miguelita Creek. As noted above, this overflow may need to be rerouted to the City sanitary sewer system. From an operational perspective, it would therefore be advisable to monitor and maintain Pond C WSL at an elevation sufficiently below the rim of the overflow structure such that peak discharge overflow to the City sanitary sewer system happens only in extreme, unintended events. Table 5 summarizes the operational storage for different storm event return periods. 12 326 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Table 5 - Pond C Operational Water Service Level
Return Period 24-hour Event Rainfall
Depth*
Precipitation + Runoff
Volume (gal)**
Operational Depth
(below overflow Rim
Elevation)
25-year 3.05 730,000 1.33
50-year 3.54 919,500 1.67
100-year 4.08 1,260,000 2.17
*Based on NOAA Atlas 14 Point Precipitation Frequency for San Jose, California **Total precipitation and runoff for Ponds A, B and C based on Exhibit 4 Water Quality Requirements and Considerations
Based on conversations with RHAA and the City of San Jose, if converted, the ponds would serve only as aesthetic amenity and would not be used for high-contact activities such as swimming or boating. Title 22 of the California Code of Regulations allows for the use of recycled water in public water features, with different levels of treatment required depending on the end-use and level of potential human contact (Table 6). The SBWR treats reclaimed water at the San Jose-Santa Clara Regional Wastewater Facility, where it implements tertiary treatment using gravel, sand and anthracite filters to remove suspended solids, serpentine tanks with chlorine to kill viruses and bacteria, then a final treatment stage to neutralized and remove residual chlorine. SBWR indicates their recycled water is “99% pure” with a total Coliform Count of <1 CFU/100ml. As such, the SBWR recycled water is in fact high enough quality for all proposed pond uses listed in Table 6 and is a suitable make-up water source.
Table 6 - California Title 22 Recycled Water Quality Requirements (Recreational Programs) Proposed Use of
Pond
Delegation under
Title 22
Treatment Level Required
Swimming
Non-restricted
recreational
impoundment
Disinfected tertiary
Boating, Fishing
Restricted recreational
impoundment
Disinfected secondary 2.2
Maximum Total Coliform Count 2.2 CFU/100ml
Aesthetic
Landscape
impoundment
Disinfected secondary 23
Maximum Total Coliform Count 23 CFU/100ml
Another important consideration is maintaining water quality in the ponds over time. As noted in Section
1.1, the ponds are currently stagnant and experience high-levels of algal growth. Though the supplemental recycled water source quality is high, without adequate aeration and recirculation, the water quality in the ponds is likely to experience similar challenges in the absence of filtration infrastructure.
At the national level, water quality in amenity ponds is governed by the Environmental Protection Agency’s (EPA) 2012 Recreational Water Quality Criteria. The Overfelt ponds would be categorized as “Secondary Contact Recreation,” facilities, where ingestion of water is possible but unlikely. There are no specific requirements or recommendations for water quality monitoring associated with Secondary 13 327
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Contact waters, though it is noted that water quality concerns should be considered if there is potential for harmful bacteria to be present in the water.
3 The EPA defers to the States to set specific recreational water quality criteria and requirements. At the state level, California’s region specific Water Quality Control Plans (Basin Plans) provide water quality objectives for varying uses of public surface waters, but does not set any specific monitoring requirements for non-contact recreational waters. One criterion to protect aesthetic water quality of non-contact recreational waters (where ingestion is not reasonably possible, i.e. hiking and camping) is preventing excessive algae growth by monitoring levels of chlorophyll-a.
Although there are no Federal or State regulatory requirements for ongoing treatment or water quality monitoring for non-contact recreational waters, it is highly recommended that the City implement basic treatment and recirculation to maintain the desired aesthetic quality in the ponds and minimize any potential risks to public health. The recommended systems will depend largely on the selected approaches for each of the ponds, but could include:
● Mechanical aeration (e.g. surface aeration or bottom diffusers) and filtration systems within each individual pond;
● A pumped system that provides filtration and circulates flow between all three ponds; ● A pumped system that provides natural treatment through planted wetland cells and circulates flow between all three ponds.
Any treatment system will require ongoing operations and maintenance by the City, but the design can prioritize systems that minimize infrastructure cost and ongoing maintenance needs (such as solar-operated pumps and natural treatment systems). Additional discussion and recommendations for a cohesive approach for all three ponds is included in Section 4.0 - Conclusions and Recommendations.
Pond Liner Considerations
If conversion to an amenity water feature is pursued, the installation of a pond liner is recommended to reduce make-up water demands by limiting infiltration losses from the ponds. Pond liner options are provided in Table 7, below, along with a characterization of opportunities and constraints for each option.
The installation of any type of liner will require the removal of all vegetation, rocks, sticks, and large bumps to create a smooth earthen surface that eliminates void spaces and potential for puncture of the liner. The top of the liner is typically located and anchored a minimum of 2” above the operational WSL.
For clay liners and clay-embedded geotextile liners that are not guaranteed to be wet year-round, a 12” layer of topsoil cover is recommended above the liner to maintain moisture, prevent cracking, and provide a planting medium. If the ponds are kept full year round, then the additional layer of topsoil would not be needed for maintaining moisture, but there may be consideration for benching and topsoil in some areas along the edge to facilitate planting. The thickness of clay liners is determined by the expected water depth and corresponding pressures on the clay. Pond liner destabilization due to groundwater upwelling can be mitigated if the liner is installed during the dry months, once the pond is filled with water the hydrostatic pressures on either side of the liner will be balanced and the liner will be secure.
Table 7 - Pond Liner Options
3 Primary Contact Recreation (where ingestion of water is likely, i.e. swimming, boating) designated waters have more stringent requirements and are recommended to monitor for fecal coliforms and other harmful pathogen-indicating bacterias.
14 328 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Liner Type Pros Cons Cost Maintenance
Synthetic
(Rubber,
RPE, PVC
or HDPE)
● Flexible
● Easy to install, familiar
to contractors
● Requires little to no
maintenance if
installed under right
conditions
● Does not easily
support habitat,
difficult to place
planting material on
top of liner, especially
at 3:1 slope
● Easy for roots and
rocks to puncture
● Not aesthetically
pleasing, can degrade
in UV light
● If not weighted down,
it will float to the
surface with high
ground water level.
$ *
Puddled
Bentonite
Clay
● Easy to install, typical
type of pond liner
● Naturally-occuring
materials supports a
natural habitat
● Absorbent and swells
around cracks to fix
itself
● Can crack if dry or
uncovered. Clay liners
need to stay wet, or
have a thick soil cover
on top to prevent them
from drying and
cracking
● Cracks can lead to
channelization over
time
● Additional care
required when
installing on grades
steeper than 3:1
$$ ***
Geotextile
and Clay*
● Durable and resilient,
used in high-pressure
applications
● Can withstand dry
periods better than
regular clay liners
● Viable for all slopes
● Easier to maintain
● Supports a natural
habitat
● Not as familiar to
contractors, has
potential to be more
difficult to install
● Geotextiles are
typically made from
non-natural synthetic
materials
$$$ **
*This type of liner is made of a thin layer of processed clay (typically bentonite) either bonded to a geomembrane or fixed between two sheets of geotextile.
The recommended pond liner will depend largely on the selected approach for each of the ponds. If all three ponds are converted to amenity ponds with consistent year-round water surface levels, all of the above options are viable. Synthetic liners will be the cheapest to install, but introduce non-natural materials that go against the project’s sustainability goals and may be more difficult to repair than clay.
Puddled bentonite and geotextile clay liners would facilitate either open water amenity ponds, or vegetated treatment pond conditions with shallower, fluctuating water depths. Additional discussion and 15 329
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
recommendations for a cohesive approach for all three ponds is included in Section 4.0 - Recommendations and Next Steps.
Other Considerations:
It is also important to consider near- and long-term availability of recycled water when evaluating the sustainability of developing a program reliant on a make-up water source. Currently, there is more recycled water supply than there is demand in the City of San Jose, suggesting there is a sufficient supply to fill the ponds. However, in the long-term, there is a possibility that demand for recycled water will increase for other uses within the City (non-potable residential, commercial and industrial applications); amenity ponds may become a lower priority use for recycled water in the future as pressure on water resources grows. These dynamics should be evaluated when considering long term make-up water reliability, and a long term use contract might limit water supply risk.
Summary:
This is the only strategy evaluated that will allow the ponds to function as year-round open-water amenity features. This strategy would require investment in site infrastructure to extend recycled water supply, install impermeable liners, and potentially reconfigure connecting channels and overflow connections. . In addition to upfront infrastructure costs, ongoing costs could include purchasing recycled water to supply pond make-up water and operations and maintenance costs associated with water quality infrastructure.
2.4 STRATEGY #4 - POND REMOVAL
The intent of this strategy is to completely remove one or more of the ponds to create additional passive recreation in the former pond sites such as picnicking, trails, and increased woodland habitat. Complete removal evaluates the soil volume required to fill each pond to the surveyed water surface level as described in Section 1.2.
Table 8 - Pond Volume and Required Fill For Full Removal Pond Fill Quantity (CY)
A 13,127
B 17,632
C 21,101
Total 51,860
Given the park topography, filling the ponds to the surveyed WSL would result in large, closed depressions in the former pond locations with no overland point of release for stormwater runoff. Utilizing backfill material that will allow for percolation and infiltration of stormwater within the depressed areas, for example the sandy and loamy soils typical in and around San Jose (Natural Resources Conservation Service - Web Soil Survey), will help to minimize localized ponding in large storm events. For this scenario, further evaluation of drainage patterns would be needed, and potential modifications to existing drainage infrastructure could be required depending on the programming of the former pond sites. 16 330 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Summary:
Filling the ponds would require significant quantities of imported fill, which may have EIR implications due to truck trips and impact to local neighborhoods. Furthermore, removal of all ponds would impact migratory bird and waterfowl habitat.
The park character would be significantly changed by removing the pond features, and there may be significant resistance from the community, which has expressed a desire to maintain the open water ponds within the park. Removing the ponds would also not be without impact to recycled water demands; the park’s irrigation system (currently fed with recycled water) would likely need to be extended to support newly vegetated areas within new landscape areas that replace the ponds.
3.0 CONCLUSIONS
This technical feasibility assessment evaluates four strategies that will inform the design and programming of the ponds at Overfelt Park. Key conclusions and recommendations from the analysis of each independent strategy are summarized below and in Exhibit 6 - Evaluation Matrix.
1. Strategy 1 - Seasonal Fluctuation: Analysis indicates that direct rainfall on the ponds and stormwater runoff from the surrounding park provide minimal water supply relative to the volume and depth of the ponds. This result is generally consistent with the site observations summarized in Section 1.1, however the model predicts that the ponds would be dry for the majority of the summer, which is inconsistent with observed water levels during the site visit in August 2021 and June 2022. The higher water levels observed in the middle of summer suggests that the pond levels may be influenced by upwelling from the unconfined aquifer that lies beneath, which appears to provide a baseline amount of water year-round. Further studies outside of this scope would be required to characterize potential unconfined aquifer upwelling and the impact to seasonal water levels. In either case, the very low water levels could limit or prevent the possibility of planting in certain portions of the pond embankments for habitat creation and water quality issues (stagnant water, algae) could persist. It is recommended that RHAA further evaluate potential planting and ecological enhancement strategies given the hydrologic analysis presented above.
2. Strategy 2 - Maximize Stormwater Opportunities: The majority of the natural water supply comes from rainfall falling directly onto the pond surface. In the average rainfall year, the model only predicts a very modest increase from 642,900 to 652,200 gallons (a 1.4% increase). The cost of either regrading or rerouting runoff from the adjacent subcatchments to Pond C is high relative to the benefit of additional runoff into the pond. Furthermore, per conversations with RHAA and the City of San Jose, regrading of the park is not recommended due to potential disturbance to established vegetation, trails, and other park amenities. Implementation of this strategy is not recommended due to the minimal impact on the pond hydrology.
3. Strategy 3 - Supplement with Reclaimed Water: Conversion of the ponds to year-round water features, supplemented by recycled water, is a viable alternative but requires investment in site infrastructure and treatment systems to maintain water quality in the ponds over time. Water quality infrastructure is not due to recycled water quality, but would be necessary in any scenario that maintains standing water in the ponds. Ongoing costs associated with purchasing recycled water to supply pond make-up water and the operations and maintenance of water quality infrastructure is important to take into account. Implementation of this alternative in combination with pond removal and habitat optimization could yield results that achieve 17 331
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
the desired open-water pond aesthetic, while minimizing infrastructure and ongoing recycled water purchases.
4. Strategy 4 - Pond Removal: Filling the ponds is a viable alternative, but the park character would be significantly changed by removing the ponds. There may be significant resistance from the community, which expressed a desire to maintain the open water ponds within the park.
Furthermore, removal of all ponds would impact migratory bird and waterfowl habitat. Removing the ponds would also impact recycled water demands; the irrigation system (currently fed with recycled water) would likely need to be extended to newly vegetated areas within the landscape / recreation areas that replace the ponds. Pond removal could be considered for one of the ponds, but is not recommended for all three due to community and environmental goals.
4.0 RECOMMENDATIONS AND NEXT STEPS
Based on the conclusions, the development of an integrated approach that combines the different strategies described would allow for Overfelt Park to optimize multiple project goals simultaneously. As evident from key conclusions presented in this memorandum, each of the individual approaches evaluated has significant advantages and disadvantages with regards to aesthetics, programming goals, sustainability, cost, and ongoing operations and maintenance. In the absence of detailed programmatic goals, it is possible to present an alternative that optimizes for technical constraints and opportunities, including cost. One such integrated approach (Exhibit 7) could include the following combination of strategies:
● Pond A: Convert to a passive vegetated treatment wetland with a natural clay liner. Regrade the pond to include a series of cells that convey water from north to south and ultimately flow to the open channel connecting Pond A to Pond C. Water treated in the newly constructed wetland will be directed to the open water amenity Pond C This strategy will effectively leverage the new wetland system in Pond A to maintain water quality in Pond C by removing contaminants introduced by waterfowl and other species.
● Pond B: Fill the pond to convert to passive recreation uses. This limits water supply demand as well as infrastructure capital and O&M costs. Regrade the remaining embankment to make the side slopes less steep to address any safety issues. Update and.or address any drainage concerns.
● Pond C: Enhance as an open water amenity pond, using the recycled water connection extended to Pond A. Add a natural clay liner and reconfigure the overflow structure to connect to the City sanitary sewer. Include natural strategies, such as aquatic and emergent plants, to help maintain water quality and pond aesthetic. Retrofit and replace existing pump infrastructure to pump water from Pond C to Pond A for treatment through the new passive treatment wetland.
Combining strategies would allow for preservation of pond amenities within the park - both open water and vegetated wetlands - while reducing the long-term recycled water demand for make-up water and minimizing “gray” infrastructure (high maintenance mechanical filtration or treatment systems).
Diversification of the ponds would enhance habitat biodiversity and can provide a community education benefit. Filling one of the ponds would increase passive recreation opportunities, while reducing the O&M burden.
18 332 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
While technically sound, the suggested alternative lacks important inputs that may drive a different solution. Before further development of an integrated approach, feedback on the individual strategies and in-depth information on the park’s programming goals and key drivers should be considered.
Several data gaps and assumptions are noted throughout the memorandum that limit the depth of this technical analysis. The City has provided the 1974 as-built construction drawings and the 2005 site survey; however, additional survey work of the current pond bathymetry would allow for a more accurate understanding of the pond geometry, volume, water surface level and open-channel connections between the ponds. Additionally, the impact of groundwater on the pond hydrology is not well understood based on the background documentation provided to date. Procurement of prior studies that characterize the groundwater conditions of the ponds would augment the assessment of seasonal fluctuation as a viable option, and help to elucidate whether the use of recycled water would interact with groundwater should the pond(s) not be lined. If no prior study exists, a long-term hydrogeologic monitoring study (multiple seasons) would need to be conducted in order to characterize groundwater conditions within the park extent.
5.0 COST ESTIMATION
To support the decision making process, an engineer's opinion of probable cost (cost estimate) has been developed. To compare the four (4) pond strategies, a rough order of magnitude (ROM) cost estimate is provided in the Evaluation Matrix (Exhibit 6) which includes a qualitative cost range on a one to four scale ($ to $$$$) for both capital costs (CapEx) and ongoing operation and maintenance costs (OpEx). A more detailed quantitative cost estimate (Exhibit 8) is provided for the recommended combination of strategies discussed in Section 4. The cost for the recommended combination of strategies is $1,530,000 (see Exhibit 8 for more details).
6.0 REFERENCES:
1. City of San Jose, Department of Parks and Recreation (1974). Overfelt Gardens - First Phase of Development. Construction drawings
2. City of San Jose, Department of Parks and Recreation (2005). Overfelt Park Land Survey. Survey Drawings
3. San Jose Water Company (2018). Recycled Water Retrofit Package 19. Construction drawings
4. Sherwood Design Engineers. Overfelt Park Ponds Water Resources and Sustainability Assessment Memorandum. October 2021.
5. Natural Resources Conservation Service. Web Soil Survey. https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm. Accessed in August 2022.
6. City of San Jose, Department of Public Works. Existing Sanitary Sewer and Storm Drain Utilities. https://gis.sanjoseca.gov/maps/publicgisviewer/. Accessed in August 2022.
7. San Jose Airport (Station ID GHCND:USW00023293). 1997-2022 Precipitation Data. https://www.ncei.noaa.gov/cdo-web/. Accessed in August 2022.
8. United States Department of Agriculture. Urban Hydrology for Small Watersheds, Technical Release (TR)-55. https://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb1044171.pdf.
Accessed in August 2022.
9. City of San Jose. Recycled Water Cost.
https://www.sanjoseca.gov/your-government/environment/water-utilities/drinking-water/customerservice/recycled-water-rates. Accessed in August 2022 19 333
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Appendix A
Seasonal Fluctuation - Water Balance Model Results
Dry Year
Average Year
Wet Year
Figure A1. Pond A Seasonal Flucationation for the Wet, Dry and Average Rainfall Year 20 334 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Dry Year
Average Year
Wet Year
Figure A2. Pond B Seasonal Flucationation for the Wet, Dry and Average Rainfall Year 21 335
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
2548 MISSION STREET, SAN FRANCISCO, CA 94110
(415) 677-7300 | WWW.SHERWOODENGINEERS.COM
Appendix B
Recycled Water Make-up Demands - Seasonal Analysis
Figure B1. Water Balance - Seasonal Recycled Water Make-up for Dry, Wet and Average Year 22 336 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
EXH BI TI 1 - S at et of ht e ht ree ponds under summer drought condit oi ns, open channel rout ni g direct oi n, and ht e ol cat oi n of wt o struc ut res a ol ng Pond C s’ embankment, pho ot s at ken by She wr ood Des gi n Eng ni eers A( ugust 2021) 337
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
EXH BI TI 2 - Ex si t ni g Sani at ry Sewer and S ot mr Dra ni Utilit ei s at ht e Si et 338 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
EXH BI TI 3 - Recyc el d wa et r retrofit p al n of Over ef lt Park and po ni ts of connect oi n (2018) 339
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
EXH BI TI 4 - EX SI T NI G TOPOGRAPHY AND DRA NI AGE COND TI OI NS 340 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
EXH BI TI 5 - SCHEMAT CI RECYCLED WATER CONNECT OI N DETA LI S AND
EX SI T NI G POND C OVERFLOW NI FRASTRUCTURE
341
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
EXH BI TI 6 - Eva ul at oi n Matr xi
342 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
EXH BI TI 7 - RECOMMENDED COMB NI ED STRATEGY
343
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
EXH BI TI 8 - COST EST MI ATE
344 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
EXH BI TI 9 - SCHEMAT CI LAYOUT OF STORMDRA NI UT LI TI EI S TO OPT MI ZI E STORMWATER COLLECT OI N Shows the earthwork and grading adjustments that would be required to route adjacent catchments to Pond C. 345
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE
EXH BI TI 10 - SCHEMAT CI LAYOUT OF STORMDRA NI UT LI TI EI S TO OPT MI ZI E STORMWATER COLLECT OI N Alternative strategy to route water via new storm drain infrastructure. Surface drains would be located at localized low points to collect runoff into a storm drain pipe network that outfalls into Pond C. Energy dissipation measures are recommended for any new outfall to prevent erosion. 346 OVERFELT GARDENS PARK MASTER PLAN UPDATE
Appendix D
347
Appendix D
OVERFELT GARDENS PARK MASTER PLAN UPDATE