RESOLUTION NO. _____
A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN
JOSE ADOPTING A MITIGATED NEGATIVE DECLARATION
FOR THE ELECTRONIC SIGNS ON CITY-OWNED
PROPERTY PROJECT – WEST MISSION STREET AND
MABURY ROAD SITES, FOR WHICH AN INITIAL STUDY
WAS PREPARED, AND A RELATED MITIGATION
MONITORING AND REPORTING PROGRAM ALL IN
ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL
QUALITY ACT
WHEREAS, prior to the adoption of this Resolution, the Director of Planning, Building and Code Enforcement of the City of San José prepared an Initial Study and approved for circulation a Mitigated Negative Declaration for the Electronic Signs on City-Owned Property Project – West Mission Street and Mabury Road Sites under Planning File No.
ER23-052 (the “Initial Study/Mitigated Negative Declaration”), all in accordance with the requirements of the California Environmental Quality Act of 1970, together with state and local guidelines implementing said Act, all as amended to date (collectively “CEQA”); and
WHEREAS, the Electronic Signs on City-Owned Property Project – West Mission Street and Mabury Road Sites (the “Project”) analyzed under the Initial Study/Mitigated Negative Declaration consists of the installation and operation of two double-sided programmable electronic signs on two separate City-owned parcels located at the southeast corner of Guadalupe Parkway and West Mission Street and at 1404 Mabury Road in accordance with Title 23 of the San José Municipal Code and Council Policy 6-4 in San José, California; and
WHEREAS, the Initial Study/Mitigated Negative Declaration concluded that implementation of the Project would not result in any significant effects on the environment; and
NVF:DHZ:KMF
06/04/2025
2 T-53008.002 / 2214586_2
Council Agenda: 06-17-2025
Item No.: 8.7(a)
DRAFT – Contact the Office of the City Clerk at (408) 593-1260 or [email protected] for final document.
WHEREAS, the City of San José is the lead agency on the Project, and the City Council is the decision-making body for the proposed approval to undertake the Project; and
WHEREAS, in connection with the approval of a project involving the preparation of an initial study/mitigated negative declaration that identifies one or more significant environmental effects, CEQA requires the decision-making body of the lead agency to incorporate feasible mitigation measures that would reduce those significant environmental effects to a less-than-significant level; and
WHEREAS, whenever a lead agency approves a project requiring the implementation of measures to mitigate or avoid significant effects on the environment, CEQA also requires a lead agency to adopt a mitigation monitoring and reporting program to ensure compliance with the mitigation measures during project implementation, and such a mitigation monitoring and reporting program has been prepared for the Project for consideration by the decision-maker of the City of San José as lead agency for the Project (the “Mitigation Monitoring and Reporting Program”); and
WHEREAS, the City Council has reviewed and considered the Initial Study/Mitigated Negative Declaration and related Mitigation Monitoring and Reporting Program for the Project and intends to take actions on the Project in compliance with CEQA and state and local guidelines implementing CEQA; and
WHEREAS, the Initial Study/Mitigated Negative Declaration and related Mitigation Monitoring and Reporting Program for the Project are on file in the Office of the Director of Planning, Building and Code Enforcement, located at 200 East Santa Clara Street, 3rd Floor Tower, San José, California, 95113, is available for inspection by any interested person at that location and electronically on the Department of Planning, Building and Code Enforcement webpage, and is, by this reference, incorporated into this Resolution as if fully set forth herein;
NVF:DHZ:KMF
06/04/2025
3 T-53008.002 / 2214586_2
Council Agenda: 06-17-2025
Item No.: 8.7(a)
DRAFT – Contact the Office of the City Clerk at (408) 593-1260 or [email protected] for final document.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN JOSE:
THAT THE CITY COUNCIL does hereby incorporate the foregoing recitals into this Resolution as if fully set forth herein.
THAT THE CITY COUNCIL does hereby make the following findings: (1) it has independently reviewed and analyzed the Initial Study/Mitigated Negative Declaration and other information in the record and has considered the information contained therein, prior to acting upon or approving the Project, (2) the Initial Study/Mitigated Negative Declaration prepared for the Project has been completed in compliance with CEQA and is consistent with state and local guidelines implementing CEQA, and (3) the Initial Study/Mitigated Negative Declaration represents the independent judgment and analysis of the City of San José, as lead agency for the Project. The City Council designates the Director of Planning, Building and Code Enforcement at the Director’s Office at 200 East Santa Clara Street, 3rd Floor Tower, San José, California, 95113, as the custodian of documents and records of proceedings on which this decision is based.
THAT THE CITY COUNCIL does hereby find that based upon the entire record of proceedings before it and all information received that there is no substantial evidence that the Project will have a significant effect on the environment and does hereby adopt the Mitigated Negative Declaration and related Mitigation Monitoring and Reporting Program prepared for the Project (Planning File No. ER23-052). The Mitigation Monitoring and Reporting Program for the Project, attached hereto as Exhibit “A” and fully incorporated herein. The Initial Study/Mitigated Negative Declaration is hereby incorporated by reference and is: (1) on file in the Office of the Director of Planning, Building and Code Enforcement, located at 200 East Santa Clara Street, 3rd Floor Tower, San José, California 95113, and electronically on the Department of Planning, Building NVF:DHZ:KMF
06/04/2025
4 T-53008.002 / 2214586_2
Council Agenda: 06-17-2025
Item No.: 8.7(a)
DRAFT – Contact the Office of the City Clerk at (408) 593-1260 or [email protected] for final document.
and Code Enforcement webpage and (2) available for inspection by any interested person.
ADOPTED this ____ day of ___________, 2025, by the following vote:
AYES:
NOES:
ABSENT:
DISQUALIFIED:
MATT MAHAN
Mayor
ATTEST:
TONI J. TABER, MMC
City Clerk
EXHIBIT “A”
Page | 1 File No. ER23-130
MITIGATION MONITORING AND REPORTING PROGRAM
Electronic Signs on City-owned Property Project
West Mission Street and Mabury Road Billboards Sites
Initial Study Mitigated Negative Declaration
File No. ER23-052
February 2025
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
EXHIBIT “A”
Page | 2 File No. ER23-130
PREFACE
Section 21081.6 of the California Environmental Quality Act (CEQA) requires a Lead Agency to adopt a Mitigation Monitoring and Reporting Program (MMRP) whenever it approves a project for which measures have been required to mitigate or avoid significant effects on the environment.
The purpose of the monitoring and reporting program is to ensure compliance with the mitigation measures during project implementation.
The Initial Study/Mitigated Negative Declaration (IS/MND) prepared for the proposed West Mission Street and Mabury Road Billboards Project (Project) concluded that the implementation of the Project could result in significant effects on the environment and mitigation measures were incorporated into the Project or are required as a condition of Project approval. This MMRP addresses those measures in terms of how and when they will be implemented.
This document does not discuss those subjects for which the IS/MND concluded that the impacts from implementation of the Project would be less than significant.
The mitigation measures enumerated in this document would reduce the level of impact of potential environmental effects of the proposed action. In all cases, these mitigation measures would reduce the impact of effects determined to be significant prior to mitigation to less-than-significant levels.
I, Sarah F
ishleder , the applicant, on the behalf of Clear Channel Outdoor, hereby agree to implement the mitigation measures described below which have been developed in conjunction with the preparation of an Initial Study/Mitigated Negative Declaration for the Project. I understand that these mitigation measures or substantially similar measures will be adopted as conditions of approval with my development permit request to avoid or significantly reduce potential environmental impacts to a less than significant level.
Pr
oject Applicant’s Signature _____________________________________________
Date___________________________________________________________ DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
EXHIBIT “A”
Page | 3 File No. ER23-130
Electronic Signes on City-owned Property
Project, West Mission Street and Mabury Road
Billboards Sites
ER23-052
MITIGATIONS MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
or Mitigation Action
Timing of
Compliance
Oversight
Responsibility
Actions/Reports Monitoring
Timing or
Schedule
Biological Resources
Impact BIO-1: The Project could have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special- status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service.
Impact BIO-4: The Project could have a substantial adverse effect on the movement of nesting birds and roosting bats.
Mitigation Measure BIO-1: Impacts to Nesting Birds
The proposed Project shall implement the following
measures to avoid impacts to nesting migratory birds:
• Avoidance: Ground disturbance and vegetation
removal activities shall be restricted to the
nonbreeding season for birds (September 1 to January
31, inclusive), when feasible.
Avoid construction
activities during nesting
seasons (February 1
through August 31,
inclusive).
Prior to initiation of
any ground
disturbance permits.
Director of Planning,
Building, and Code
Enforcement or the
Director’s designee.
• Nesting Bird Surveys: For ground disturbance and
vegetation removal activities occurring during the
bird nesting season (February 1 to August 31,
inclusive), general pre-construction nesting bird
surveys shall be conducted by a qualified Biologist
not more than 14 days prior to construction activities
involving ground clearing, vegetation
removal/trimming, or building demolition. The
surveys shall include the disturbance area plus a 200-
foot buffer around the site and a 500-foot buffer for
raptors.
If construction is
scheduled during nesting
bird season February 1 –
August 31 (inclusive) the
Project applicant or its
contractor shall contract a
qualified biologist to
conduct preconstruction
surveys for nesting birds.
Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
earliest).
Director of Planning,
Building, and Code
Enforcement or the
Director’s designee.
Review and approve
the preconstruction
survey report.
Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs earliest).
• Buffer Zones: If active nests are located, an
appropriate avoidance buffer shall be established
within which no work activity will be allowed that
would impact these nests. The avoidance buffer shall
If an active nest is
identified, establish no-
disturbance buffer zones
around each nest, and
During construction,
as needed.
Director of Planning,
Building, and Code
Enforcement or the
Director’s designee.
Planning, Building and Code Enforcement
CHRISTOPHER BURTON, DIRECTOR
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
EXHIBIT “A”
Page | 4 File No. ER23-130
Electronic Signes on City-owned Property
Project, West Mission Street and Mabury Road
Billboards Sites
ER23-052
MITIGATIONS MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
or Mitigation Action
Timing of
Compliance
Oversight
Responsibility
Actions/Reports Monitoring
Timing or
Schedule
be established by the qualified Biologist on a case-by- case basis based on the species and site conditions. In no case shall the buffer be smaller than 50 feet for
non-raptor bird species or smaller than 200 feet for
raptor species. Larger buffers may be required
depending on the status of the nest and the
construction activities occurring near the nest. The
buffer area(s) shall be closed to all construction
personnel and equipment until juveniles have fledged
and until the nest is inactive. The qualified Biologist shall confirm that breeding/nesting is completed and
young have fledged the nest prior to removal of the
buffer. If there are delays in on-site activities for
more than 14 days during the breeding season, an
additional survey shall be required within 14 days
prior to the start of work.
monitor construction
activities near suitable
habitat, when applicable.
• Limitation on Noise: If no nests are found,
construction may proceed within normal limits of
noise. If noises are to regularly exceed 110 decibel
(dB) (such as piledriving), additional bird surveys and a Biological Monitor should be employed during the
duration of the noise, and the Biological Monitor
shall stop construction if any protected species are
harassed by construction activities.
The Project applicant or
its contractor shall
contract a qualified
biologist to conduct
additional bird surveys.
During construction,
as needed.
Director of Planning,
Building, and Code
Enforcement or the
Director’s designee.
MM BIO-2: Protection from Potential Light Impacts
The project applicant shall implement the following
measure to avoid sources of light impacts on birds:
The Project applicant or
its contractor shall ensure
measures are
implemented and include
During construction;
immediately
following
construction
Director of Planning,
Building, and Code
Enforcement or the
Director’s designee.
Planning, Building and Code Enforcement
CHRISTOPHER BURTON, DIRECTOR
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
EXHIBIT “A”
Page | 5 File No. ER23-130
Electronic Signes on City-owned Property
Project, West Mission Street and Mabury Road
Billboards Sites
ER23-052
MITIGATIONS MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
or Mitigation Action
Timing of
Compliance
Oversight
Responsibility
Actions/Reports Monitoring
Timing or
Schedule
• Keep billboard intensity below 300 NIT from 30
minutes before sunset until midnight.
the requirement on all
construction documents.
(establishing
billboard display
setting)
Mitigation Measure BIO-3: Impacts to Roosting Bats
No more than 7 days in advance of tree and structure
removal or adaptive reuse, a qualified Biologist shall
conduct a pre-construction survey for special-status bats to characterize potential bat habitat and identify active roost sites within 100 feet of the Project site. The results of the survey and the locations of any designated buffer zones shall be submitted to the Director of Planning, Building and Code Enforcement (PBCE), or the Director’s
designee, for review and approval prior to issuance of any demolition or building permits. Should potential roosting habitat or active bat roosts be found in trees and/or
structures to be removed or renovated under the Project or within a 100-foot buffer zone from these areas, the
following measures shall be implemented:
• Removal of trees and structures with active roosts
shall occur when bats are active, approximately
between March 1 and April 15, inclusive, and
between September 1 and October 15, inclusive. To
the extent feasible, removal shall occur outside of bat maternity roosting season (approximately April 15 to
August 31, inclusive) and outside of the months of
winter torpor (approximately October 16 to February
28, inclusive).
The Project applicant or
its contractor shall
contract a qualified
biologist to conduct a
preconstruction survey for
roosting bats.
Prior to the issuance
of any demolition,
grading, and/or
building permits
(whichever occurs
earliest).
Director of Planning,
Building, and Code
Enforcement or the
Director’s designee.
Review and approve
the preconstruction
survey report.
Prior to the
issuance of any
demolition,
grading, and/or
building permits
(whichever
occurs earliest);
during
construction.
Planning, Building and Code Enforcement
CHRISTOPHER BURTON, DIRECTOR
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
EXHIBIT “A”
Page | 6 File No. ER23-130
Electronic Signes on City-owned Property
Project, West Mission Street and Mabury Road
Billboards Sites
ER23-052
MITIGATIONS MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
or Mitigation Action
Timing of
Compliance
Oversight
Responsibility
Actions/Reports Monitoring
Timing or
Schedule
• If removing trees and structures during the periods
when bats are active is not feasible and active bat
roosts being used for maternity or hibernation
purposes are found on or in the immediate vicinity of
the Project area where tree and structure removal is
planned, a no-disturbance buffer shall be established
around these roost sites, typically 100 feet or an area determined to be adequate by the qualified Biologist,
based on site conditions, construction activity,
species, number of roosting individuals, and/or noise
attenuation and frequency, along with coordination
with the California Department of Fish and Wildlife
(CDFW), if necessary, until the qualified Biologist
has determined that they are no longer active.
The qualified Biologist shall be present during
removal of trees and structures when active bat roosts
not being used for maternity or hibernation purposes
are present. Trees and structures with active roosts
shall be removed only when no rain is occurring and
rain is not forecast to occur for 3 days following
removal of the roost, and when daytime temperatures
are at least 50°F (degrees Fahrenheit).
• Removal of trees with active or potentially active
roost sites shall follow a two-step removal process:
(1) On the first day of tree removal and under the
supervision of the qualified Biologist, branches
and limbs that do not contain cavities or fissures
in which bats could roost shall be cut only using
chain saws. Removal of the canopy makes the
Planning, Building and Code Enforcement
CHRISTOPHER BURTON, DIRECTOR
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
EXHIBIT “A”
Page | 7 File No. ER23-130
Electronic Signes on City-owned Property
Project, West Mission Street and Mabury Road
Billboards Sites
ER23-052
MITIGATIONS MONITORING AND REPORTING PROGRAM
Documentation of Compliance
[Project Applicant/Proponent Responsibility]
Documentation of Compliance
[Lead Agency Responsibility]
Method of Compliance
or Mitigation Action
Timing of
Compliance
Oversight
Responsibility
Actions/Reports Monitoring
Timing or
Schedule
tree unappealing for bats to return that evening to
roost.
(2) On the following day and under the supervision
of the qualified Biologist, after confirmation that
bats have not returned, the remainder of the tree
may be removed, using either chain saws or other
equipment (e.g., excavator or backhoe).
Structures that contain or are suspected to contain active bat roosts, but that are not being used for maternity or hibernation purposes, shall be dismantled under the
supervision of the qualified Biologist in the evening, after the bats have emerged from the roost to forage. The
structures shall be partially dismantled to substantially change roost conditions, causing the bats to abandon and not return to roost.
Source: IS/MND, Willow Street Billboard Project, City of San José, February 2025.
Planning, Building and Code Enforcement
CHRISTOPHER BURTON, DIRECTOR
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
THIS PAGE INTENTIONALLY LEFT BLANK
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.