P H A S E 1
F A C I L I T Y C O N D I T I O N A S S E S S M E N T
T E R M I N A L B U I L D I N G S A N D
CENTRAL UTILITY PLANT
Asset
Management Study
Table of Contents
Introduction............................................................................................................................... 2 Executive Summary ........................................................................................................................................................................................ 5 Assessment Methodology ........................................................................................................................................................................... 7 Key Findings ...................................................................................................................................................................................................... 9 How to Use this Report and Supporting Files .................................................................................................................................... 11 Terminal A+ ............................................................................................................................... 12 Building Details................................................................................................................................................................................................. 13 Deficiency Summary ....................................................................................................................................................................................... 14 Life Cycle Summary ......................................................................................................................................................................................... 15 Terminal A ..................................................................................................................................20 Building Details ................................................................................................................................................................................................ 21 Deficiency Summary....................................................................................................................................................................................... 22 Life Cycle Summary ........................................................................................................................................................................................ 25 Terminal FIS ...............................................................................................................................35 Building Details ................................................................................................................................................................................................ 36 Deficiency Summary....................................................................................................................................................................................... 37 Life Cycle Summary ........................................................................................................................................................................................ 38 Terminal B ..................................................................................................................................41 Building Details ................................................................................................................................................................................................ 42 Deficiency Summary....................................................................................................................................................................................... 43 Life Cycle Summary ........................................................................................................................................................................................ 44 Interim Terminal B .....................................................................................................................59 Building Details ................................................................................................................................................................................................ 60 Deficiency Summary....................................................................................................................................................................................... 61 Life Cycle Summary ........................................................................................................................................................................................ 62 Central Utility Plant ...................................................................................................................64 Building Details ................................................................................................................................................................................................ 65 Deficiency Summary....................................................................................................................................................................................... 66 Life Cycle Summary ........................................................................................................................................................................................ 67 Discovery Findings .....................................................................................................................70 CUP ...................................................................................................................................................................................................................... 71 Energy .................................................................................................................................................................................................................. 73 Technology ........................................................................................................................................................................................................ 77 Underground Utilities .................................................................................................................................................................................... 79 Strategic Asset Management ..................................................................................................................................................................... 80 Appendix A – SJC Provided Information..................................................................................83
ASSET MANAGEMENT - STRATEGIC FRAMEWORK
Client Name San Jose Mineta International Airport
Project Name SJC Facility Condition Assessment
Project Number R5W80502 Project Manager Jennifer Mims
Version 2.0 Task Lead Joey Garcia
Date December 20, 2024
File Name SJC Facilities FCA Report Draft 12-20-2024
Version Date Description Authors Checked
Client Approved
Name/Date
01 November 18, 2024 Draft Joey Garcia Jennifer Mims
02 December 20, 2024 Final Joey Garcia Ben Lopez
Row Buffer
Blank
Blank
Blank
Blank
Blank
Blank
Blank
Blank
Blank
Blank
Blank
Blank
Blank
Blank
Blank
Jacobs Engineering Inc.
T +1.404.356.2040
www.jacobs.com
4 Embarcadero Ctr
Suite 3800
San Francisco, CA 94105
United States
Copyright Jacobs Engineering Inc. © 2024.
All rights reserved. The concepts and information contained in this document are the property of the Jacobs group of companies (“Jacobs Group”). Use or copying of this document in whole or in part without the written permission of Jacobs Group constitutes an infringement of copyright. Jacobs, the Jacobs logo, and all other Jacobs Group trademarks are the property of Jacobs Group.
NOTICE: This document has been prepared exclusively for the use and benefit of Jacobs Group client. Jacobs Group accepts no liability or responsibility for any use or reliance upon this document by any third party.
Introduction
P H A S E 1
F A C I L I T Y C O N D I T I O N A S S E S S M E N T
T E R M I N A L B U I L D I N G S A N D
CENTRAL UTILITY PLANT
Executive Summary
San José Mineta International Airport (SJC) is focused on asset preservation of Terminals A and B and has engaged the Jacobs team to explore ways to enhance its asset conditions, elevate the passenger experience, and modernize operations. The work is divided into two phases, which will result in a comprehensive investment plan providing good, better, and best options, as follows:
Plan A (Good): This plan focuses on resilience and asset preservation of core infrastructure that require repair to work normally and keep the airport operating smoothly. Plan B (Better): This plan includes cosmetic enhancements (for example, paint, lighting) and upgrades to more efficient systems and infrastructure.
Plan C (Best): This plan will include design recommendations from a passenger experience perspective, incorporating the latest and most advanced features available.
Phase 1: This first phase assessed the current state of terminal facilities (Table 1), forecasted remaining useful life (RSL), and identified key short-term investments for continuous operation of airport services. A Facility Condition Assessment (FCA) confirmed existing assets through field assessments, documentation review (including the existing capital projects list and maintenance schedules), and staff interviews. Resulting recommendations focus on core infrastructure system repairs or replacements required to maintain operations (Plan A). The report will provide the full details of the FCA, including current facility deficiencies and immediate capital renewal needs.
Building Size (in Square Feet)
Terminal A+ (Gates 1 to 8) 74,700 ft2
Terminal A (Gates 9 to 14) 261,518 ft2
Terminal FIS (Gates 15 to 16) 94,735 ft2
Terminal B (17 to 30) 552,674 ft2
Interim TB (Gates 31 to 36) 44,436 ft2
Central Utility Plant (CUP) 6,129 ft2
Total 1,034,192 ft2
Table 1. FCA Building List
Phase 1 also includes a high-level evaluation of five focus areas that may be incorporated into the Phase 2 investment planning options.
High-Level Evaluation Focus Areas
Energy
CUP
Underground Utilities
Technology
Strategic Asset Management
Phase 2: A second phase will be addressed in a future service order and will explore further investment opportunities to enhance operational performance and the passenger experience, incorporating Planning Levels B and C.
Facility Condition Assessment
Purpose
This FCA provides current facility deficiency investment needs based on condition and remaining useful life (RSL) and forecasted capital renewal needs over the next 1 to 3 years, along with both 5- and 10-year plans. The forecast can be used to provide the basis of planned capital improvement and investment plan across SJC's facilities.
The FCA approach included a visual inspection and analysis of detailed infrastructure information identified by SJC. Data was collected during the FCA using a Jacobs software tool and asset management database called MAPPS™. The results were documented in the FCA Report and Asset Detail Report along with a Life Cycle and Deficiency Excel grid file.
System Condition Index
For planning purposes, the current deficiency costs and the first 3 years of needs identified in the FCA were used to calculate a System Condition Index (SCI) score per system. An SCI score provides insight into the current needs of a facility and is calculated by dividing the total current and 3-year need by the total system replacement cost. The SCI scale shown on Figure 1 categorizes systems from “Good” to “Replacement” candidates, which are nearing the end of useful life. This is a high‑level metric for the systems based on asset data.
Figure 1. System Condition Assessment SCI Scoring Range Assessment Findings
For the SJC facilities, $3.1 million in current deficiencies were identified. In addition, projected capital renewal forecast needs over the next 10 years totals $169.0 million.
Combining current deficiencies with the next 10 years of forecasted capital renewal needs, SJC can anticipate $172.1 million in facility related needs. Figure 2 details the cost of need currently and over the next 10 years.
Figure 2. Current Plus 10-Year Cost of Repairs
Assessment Methodology
Figure 3. FCA Four Key Steps
The assessment and development of the financial forecast are based on four key steps, which are depicted in Figure 3 and described in detail in the following sections.
It is important to note that asset criticality, risk of failure, and consequence of failure (COF) were not used for developing investment needs. The process of building these out will be handled on a future task order.
Step 1: Facility Condition Assessment
The FCA process was comprised of two primary
components: (1) field assessment and (2) information
analysis. The assessment process began with deploying a team of mechanical and electrical building professionals to visually observe conditions at the facilities. Conditions were evaluated from a visual observation that did not include intrusive measures, destructive investigations, or testing.
Additionally, input provided by the facilities and
maintenance staff was incorporated where applicable. The team evaluated each building's overall condition, including its mechanical, electrical, plumbing, and fire protection systems. Assets were assigned a rating based on
definitions in Table 2. SJC provided documents as outlined in Appendix A, which were analyzed and incorporated into the results.
Score Rating Rating Definition
1 - Good Green (+)
New, slight or no serviceability or reliability reduction overall to the component section or sample. Some, but not all, minor (non-critical) subcomponents may suffer from minor degradation, or more than one major.
2 - Fair Amber (+)
Component section or sample serviceability or reliability is degraded but adequate. A very few major (critical) subcomponents may suffer from moderate deterioration, with perhaps a few minor (non-critical). 3 - Marginal Amber (-)
Component-section or sample has significant serviceability or reliability loss. Most subcomponents may suffer from moderate degradation, or a few major (critical) subcomponents may suffer from severe degradation. 4 - Failed Red
Severe or total serviceability or reliability reduction to the componentsection or sample such that is barely able to perform. Most subcomponents are severely degraded.
Table 2. Condition Rating
Life Cycle
Step 2: Deficiency Cost (Immediate Need)
Following the FCA, the team entered the data into the MAPPS™ assessment and capital planning database.
Cost estimates were derived from 2024 RSMeans (construction cost-estimating software) and enhanced with local cost estimating expertise and relevance to the San Jose, California region. All costs were based on a replace-in-kind approach.
For planning and budgeting purposes, the team added a soft cost multiplier onto deficiency repair cost estimates. For this effort, the soft costs represents a 38% markup to the regionally adjusted raw costs. This soft cost multiplier accounts for costs typically incurred when contracting for renovation and construction services. Soft costs typically include construction cost factors, such as labor and material inflation, professional fees, and administrative costs. All stated costs in the assessment report include soft costs for planning and budgeting purposes. These are not exhaustive estimates, and cost will vary at the time of construction. There is an inflationary index applied for all projected costs beyond the first year of 8%.
Replacement cost models for each facility type were developed based on RSMeans data for similar facility types and adjusted for local city cost factors and soft costs. These values are applied to the actual square footage of the facility to estimate a theoretical replacement cost.
Facility deficiency costs are associated with bringing current systems and components back to a functional state but do not account for additional funds required to adapt facilities to new construction standards or address capacity. This approach aligns with the City’s cost estimating procedure dated 7/10/2006.
Step 3: Life Cycle Cost
The 1 to 3, 5, and 10-year life cycle costs are calculated through a combination of replacement costs and stored estimated service lives for each asset. The replacement cost is projected into a year when the service life is expected to expire. Life cycle data predicts future facility costs based on the expected remaining life of individual building systems (for example, roofing, and exterior). Although a particular building component may not require immediate replacement, it is possible it will reach the end of its useful life before or during the commencement of a planned capital construction project. This results in additional costs, which must be accounted for in the planning process.
Step 4: Combined 10-year Need
Combining the immediate need costs with the 10-year life cycle renewal forecast provides the total need for the facilities. These figures exclude any cost for facility expansion, building additions, or new construction for additional growth. Also excluded are costs for programmatic changes, modernization, and replacements. These items should be determined as part of different scenarios developed during planning.
The facility deficiency cost and the life cycle forecast are combined to total the cost of facility need.
Key Findings
Tables 3 through 8 show key findings, defined as safety-related and repair needs greater than $10,000 that should be addressed within the first year. Red text indicates a safety‑related deficiency. Refer to both the Deficiency Summary and Life Cycle Summary within each building section of this report for a full list of findings for the 10-year timeframe.
Terminal A+ (Gates 1 to 8)
Item Correction Description Deficiency Note Location Cost 1 Create required clearance around
panels
General: The entirety of
A2112 was a safety hazard.
There is ladder against
conduit/the lighting control
panel, and large boxes in the
room, so there is almost no
clearance for each panel.
A2112 $0
2 Replace 5000 CFM Exterior Air
Handler (X2)
End of Life Roof $131,654
3 Replace 5 Ton Packaged RTU (X3) Corroded, end of life Roof $126,732 4 Passenger Boarding Bridge - Water
Cabinet
Leaks, Under jet bridge Gate 5 $51,572
5 Replace Package DX Unit (20 Ton) Past/Near end of service life Roof $35,109 6 Replace Passenger Boarding
Bridge - Hoist
Broken Gate 1 $13,753
Table 3. Terminal A+ (Gates 1 to 8) Key Findings
Terminal A (Gates 9 to 14)
Item Correction Description Deficiency Note Location Cost 1 Remove FACP FACP abandoned in place A2808 $9,145
2 Replace 15000 CFM Air Handler End of Life, excessive failures A3801 $151,613 3 Replace Automatic Transfer Switch
(Each)
Operationally impaired,
abandoned in place
A1984 $96,117
4 Replace Panelboard - 120/208
400A
Corroded, past service life A1824 $32,869
5 Replace Condenser - Outside Air
Cooled (5 Tons)
Unit scheduled for removal
and no replacement
A3821 $13,280
6 Replace Transformer (75 KVA) Corroded, past service life A1824 $13,194 Table 4. Terminal A (Gates 9 to 13) Key Findings
Terminal FIS (Gates 15 to 16)
Item Correction Description Deficiency Note Location Cost 1 No Key Items Identified
Table 5. Terminal FIS (Gates 14 to 16) Key Findings
Terminal B (17 to 30)
Item Correction Description Deficiency Note Location Replacement Cost 1 Repair fire suppression piping Corroded B1910 $1K
2 Replace Elevator Non-operational L1 $131,483
3 Replace Passenger Boarding
Bridge - Water Cabinet
Past useful life, leaking Gate 17 $51,572
Table 6. Terminal B (17 to 30) Key Findings
Interim TB (Gates 31 to 36)
Item Correction Description Deficiency Note Location Replacement Cost 1 No Key Items Identified
Table 7. Interim Facility (Gates 31 to 36) Key Findings Central Utility Plant (CUP)
Item Correction Description Deficiency Note Location Replacement Cost 1 No Key Items Identified
Table 8. Central Utility Plant (CUP) Key Findings
How to Use this Report and Supporting Files
FCA Report
This FCA Report provides a high-level summary of information for all SJC facility buildings followed by detailed information for each. The details for each building are described in the following three main sections:
Building Details – Provides a building specific summary, listing the 10-year work plan by system, to identify which system requires funding and in which year it falls. It also provides a roll up of costs by year with the SCI metric overlayed.
Deficiency Summary – Provides more detailed building-level data related to the identified deferred maintenance items organized by system. These are findings that are recommended to address immediately and are found in the current year of the workplan.
Life Cycle Summary – Provides more detailed building-level data related to the future ten-year outlook tied to expiring systems. These are findings that are recommended to address in future years and are found in the 2024 to 2033 workplan.
Separate Files in Support of FCA Report
In addition to the FCA Report, there are two separate files that support SJC in performing more detailed capital planning and equipment review. These files include detailed asset attribute information about all assessed assets, not just those reflected in the 10-year horizon as shown in the FCA Report. The separate files include the following:
SJC - Grid - Life Cycle and Deficiency (Excel):
o Provides deficiency related data for all buildings at the asset level. These are findings that are recommended to address immediately and are found in the current year of the workplan. The data can be sorted multiple ways, including by building, system, or cost. The data can be pulled into other tables, graphs, and charts as needed.
o Provides all life cycle related data for all buildings at the asset level. These are findings that are recommended to address in future years and are found in the 2024-2033 workplan. The data can be sorted multiple ways, including by building, system, cost, replacement year, or RSL. The data can be pulled into other tables, graphs, and charts as needed.
o Provides the equipment and attribute related data for all buildings at the asset level. This equipment data contains plate information that will eventually be uploaded into the Cityworks Enterprise Asset Management system and feed into SJC’s asset registry. The data can be sorted multiple ways, including by building, system, install year, capacity, or manufacturer. The data can be pulled into other tables, graphs, and charts as needed. Asset Details (PDF) – Provides detailed information on the MEP equipment including photos along with asset attributes such as make, model, and serial and other information.
Terminal A+
P H A S E 1
F A C I L I T Y C O N D I T I O N A S S E S S M E N T
T E R M I N A L B U I L D I N G S A N D
CENTRAL UTILITY PLANT
BUILDING DETAILS
Building Details
Terminal A+ (Gates 1 to 8), San Jose, CA 95110
Building Address
$587,980
Current Deficiencies
$77,165,104
Replacement Cost
$7,286,199
Current + 5-Year Costs
$24,414,714
Current + 10-Year Trend
1990
Const Year
74,700
Area
Current + 3-Year Costs
$2,570,898
Terminal A+ (Gates 1 to 8)
Building Condition Assessment Score
(3-Year SCI)
Good
Ten-year Work-plan by System
Current + 10-Years
System Current 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Mechanical $372,862 $0 $761,948 $0 $254,508 $911,398 $0 $144,798 $1,628,368 $263,178 $352,578 $4,689,638 Electrical $46,649 $0 $0 $12,224 $95,746 $154,082 $0 $12,595 $3,602,274 $0 $1,862,234 $5,785,804 Plumbing $0 $0 $0 $0 $0 $154,164 $567,268 $0 $135,781 $0 $7,483,459 $8,340,672 Fire & Life Safety $0 $0 $1,208,746 $0 $0 $0 $0 $0 $292,342 $0 $0 $1,501,088 Technology $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Conveyances $168,469 $0 $0 $0 $187,102 $2,958,301 $0 $0 $486,732 $0 $296,908 $4,097,512 Security $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total: $587,980 $0 $1,970,694 $12,224 $537,356 $4,177,945 $567,268 $157,393 $6,145,497 $263,178 $9,995,179 $24,414,714 Current + 10-Year Cost of Repairs / SCI
Building: T-A+ - Terminal A+ (Gates 1 to 8)
Mechanical
Deficiency Rating Qty UoM Repair Cost ID
Exterior Air Handler Replacement Amber (-) 1 Ea. $65,827 18 Note: Past/Near end of service life
Location: Roof
Exterior Air Handler Replacement Amber (-) 1 Ea. $65,827 19 Note: Past/Near end of service life
Location: Entire unit
Package DX Unit Replacement Amber (-) 1 Ea. $35,109 17
Note: Past/Near end of service life, Belt needs adjustment. Filter fallen out. Unit is scheduled for replacement Location: Roof
Package Roof Top Unit Replacement Amber (-) 1 Ea. $21,185 10 Note: Corroded, The packaged unit has moderate corrosion throughout the unit.
Location: Roof
Package Roof Top Unit Replacement Amber (-) 1 Ea. $42,244 11 Note: Corroded
Location: There is minor corrosion on the packaged unit case.
Package Roof Top Unit Replacement Amber (-) 1 Ea. $42,244 12 Note: Corroded
Location: There is minor corrosion on the packaged unit case.
Package Roof Top Unit Replacement Amber (-) 1 Ea. $42,244 13 Note: Corroded
Location: The packaged unit has minor corrosion on the casing.
Computer Room A/C Replacement Amber (-) 1 Ea. $58,182 22 Note: Corroded
Location: The condenser has moderate corrosion.
Sub Total for System 8 items $372,862
Electrical
Deficiency Rating Qty UoM Repair Cost ID
Distribution Panel Replacement Amber (-) 1 Ea. $22,511 21 Note: Deteriorated
Location: Exterior of panel
Electrical Transformer Replacement Amber (-) 1 Ea. $7,882 23 Note: Deteriorated
Location: Exterior
Electrical Transformer Replacement Amber (-) 1 Ea. $7,349 24 Note: Stained/Dirty
Location: The transformer has minor staining on the top of the case.
Panelboard Replacement Amber (-) 1 Ea. $8,907 20
Note: Past/Near end of useful service life but functioning properly and Stained/Dirty Location: Cover
Sub Total for System 4 items $46,649
Conveyances
Deficiency Rating Qty UoM Repair Cost ID
Passenger Boarding Bridge - Hoist Red 1 Ea. $13,753 84
Note: Jetbridge, Hoist Cable Broken
Location: Gate-1
Passenger Boarding Bridge - Water Cabinet Amber (-) 1 Ea. $51,572 44 Note: Water cabinet Leaks
Location: Gate-4
Passenger Boarding Bridge - Water Cabinet Amber (-) 1 Ea. $51,572 45 Note: Leaks, Under jetbridge
Location: Gate-5
Passenger Boarding Bridge - Water Cabinet Amber (-) 1 Ea. $51,572 76 Note: Past/Near end of service life
Location: Gate-6
Sub Total for System 4 items $168,469
Sub Total for Building T-A+ - Terminal A+ (Gates 1 to 8) 16 items $587,980
LIFE CYCLE SUMMARY
Building: T-A+ - Terminal A+ (Gates 1 to 8)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (-) 2007 1 Ea. $190,487 2 Note: Past/Near end of useful service life but functioning properly. R-22 refrigerant is outdated and has been phased out.
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (-) 2008 1 Ea. $190,487 2 Note: Past/Near end of useful service life but functioning properly. R-22 refrigerant is outdated and has been phased out.
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (-) 1990 1 Ea. $190,487 2 Note: Past/Near end of useful service life but functioning properly. R-22 refrigerant is outdated and has been phased out.
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (-) 2007 1 Ea. $190,487 2 Note: Past/Near end of useful service life but functioning properly. R-22 refrigerant is outdated and has been phased out.
HVAC Air Distribution Roof Top Unit - DX Gas (20 Ton) Amber (-) 2013 1 Ea. $84,836 4 Note: There is minor corrosion on the packaged unit casing.
HVAC Air Distribution Roof Top Unit - DX Gas (20 Ton) Amber (-) 2013 1 Ea. $84,836 4 Note: There is minor corrosion on the packaged unit casing.
HVAC Air Distribution Roof Top Unit - DX Gas (20 Ton) Amber (-) 2013 1 Ea. $84,836 4 Note: There is minor corrosion on the packaged unit casing.
Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Decentralized Cooling Ductless Split System (2 Ton) Amber (+) 2002 1 Ea. $9,288 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 1990 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 1990 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 1990 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 1990 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 1990 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 1990 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 1990 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 1990 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2023 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2023 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2023 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2023 1 Ea. $96,721 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2008 1 Ea. $96,721 5 Building: T-A+ - Terminal A+ (Gates 1 to 8)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $96,721 5 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $96,721 5 Note: Unit is closed off and inaccessible
Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Decentralized Cooling Condenser - Outside Air Cooled (5 Tons) Amber (+) 2010 1 Ea. $19,513 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Exhaust Air Interior Ceiling Exhaust Fan Amber (+) 1990 1 Ea. $952 5 Air Distribution Pre-Conditioned Air Unit - 45 Ton Green 2022 1 Ea. $239,959 5 HVAC Air Distribution Roof Top Unit - DX Gas (15 Ton) Amber (+) 2016 1 Ea. $72,399 7 HVAC Air Distribution Roof Top Unit - DX Gas (15 Ton) Amber (+) 2016 1 Ea. $72,399 7 Exhaust Air Roof Exhaust Fan - Large Amber (+) 1990 1 Ea. $19,807 8 HVAC Air Distribution Roof Top Unit - DX Gas (20 Ton) Amber (+) 2013 1 Ea. $115,418 8 Exhaust Air Roof Exhaust Fan - Large Amber (+) 1990 1 Ea. $19,807 8 Decentralized Cooling Ductless Split System (2 Ton) Amber (+) 2012 1 Ea. $11,700 8 HVAC Air Distribution Ductwork (Bldg.SF) Amber (+) 1990 74,700 SF $1,456,805 8 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $4,831 8 Note: Inaccessible Exhaust Fan located above the Jet Bridge HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 HVAC Air Distribution AHU 5,000 CFM Outdoor Amber (+) 2013 1 Ea. $131,589 9 Air Distribution Pre-Conditioned Air Unit - 45 Ton Green 2019 1 Ea. $352,578 10 Sub Total for System 89 items $9,157,373
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Service Transformer (75 KVA) Amber (-) 1990 1 Ea. $12,224 3 Note: Past/Near end of useful service life but functioning properly Electrical Service Transformer (75 KVA) Amber (-) 1990 1 Ea. $12,224 3 Note: Past/Near end of useful service life but functioning properly Electrical Service Transformer (75 KVA) Amber (-) 1990 1 Ea. $12,224 3 Note: Past/Near end of useful service life but functioning properly Electrical Service Transformer (75 KVA) Amber (-) 1990 1 Ea. $12,224 3 Note: Past/Near end of useful service life but functioning properly Power Distribution Distribution Panels (800 Amps) Amber (-) 1990 1 Ea. $33,631 4 Power Distribution Panelboard - 120/208 225A Amber (-) 1990 1 Ea. $9,963 4 Power Distribution Panelboard - 120/208 225A Amber (-) 1991 1 Ea. $9,963 4 Note: General: Panel is deteriorated & stained/rusty on the cover.
Power Distribution Panelboard - 120/208 100A Amber (-) 1990 1 Ea. $5,041 4 Building: T-A+ - Terminal A+ (Gates 1 to 8)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Power Distribution Panelboard - 277/480 400A Amber (-) 1990 1 Ea. $25,165 4 Note: General: Cover is stained/corroded
Electrical Service Transformer (30 KVA) Amber (-) 1990 1 Ea. $9,998 4 Electrical Service Transformer (30 KVA) Amber (-) 1990 1 Ea. $9,998 4 Wiring Devices Electrical Disconnect Amber (-) 1990 1 Ea. $1,985 4 Power Distribution Panelboard - 277/480 125A Amber (+) 1990 1 Ea. $13,087 5 Power Distribution Panelboard - 120/208 150A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 277/480 125A Amber (+) 1990 1 Ea. $13,087 5 Power Distribution Panelboard - 120/208 225A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 277/480 225A Amber (+) 1990 1 Ea. $18,337 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Power Distribution Panelboard - 277/480 400A Amber (+) 1990 1 Ea. $27,178 5 Power Distribution Panelboard - 120/208 225A Amber (+) 1990 1 Ea. $10,760 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Power Distribution Panelboard - 120/208 125A Amber (+) 1990 1 Ea. $2,855 5 Power Distribution Panelboard - 120/208 125A Amber (+) 1990 1 Ea. $2,855 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Power Distribution Panelboard - 120/208 125A Amber (+) 1990 1 Ea. $2,855 5 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $5,444 5 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $2,144 5 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $2,144 5 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $2,144 5 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $2,144 5 Electrical Service Transformer (30 KVA) Amber (+) 2001 1 Ea. $12,595 7 Electrical Service Transformer (30 KVA) Amber (+) 2001 1 Ea. $12,595 7 Power Distribution Power Wiring Amber (+) 1990 74,700 SF $218,671 8 Power Distribution Panelboard - 120/208 125A Amber (+) 1990 1 Ea. $3,596 8 Power Distribution Panelboard - 120/208 125A Amber (+) 1990 1 Ea. $3,596 8 Lighting Fixtures Light Fixtures (Bldg SF) Amber (+) 1990 74,700 SF $3,376,411 8 Fixed Ground Power Unit Amber (+) 2008 1 Ea. $222,680 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Fixed Ground Power Unit Amber (+) 2008 1 Ea. $222,680 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Fixed Ground Power Unit Amber (+) 2008 1 Ea. $222,680 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Fixed Ground Power Unit Amber (+) 2009 1 Ea. $222,680 10 Fixed Ground Power Unit Amber (+) 2008 1 Ea. $222,680 10 Power Distribution Panelboard - 120/240 100A Amber (+) 1990 1 Ea. $12,176 10 Note: General: The entirety of A2112 was a safety hazard. There is ladder against conduit/the lighting control panel, and large boxes in the room, so there is almost no clearance for each panel.
Fixed Ground Power Unit Amber (+) 2008 1 Ea. $222,680 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Building: T-A+ - Terminal A+ (Gates 1 to 8)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Fixed Ground Power Unit Amber (+) 2008 1 Ea. $222,680 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Fixed Ground Power Unit Amber (+) 2008 1 Ea. $222,680 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Sub Total for System 78 items $5,974,968
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Plumbing Fixtures Toilets Amber (+) 1990 6 Ea. $59,395 5 Plumbing Fixtures Urinals Amber (+) 1990 4 Ea. $10,598 5 Plumbing Fixtures Toilets Amber (+) 1990 3 Ea. $29,698 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 1990 4 Ea. $6,228 5 Plumbing Fixtures Urinals Amber (+) 1990 3 Ea. $7,949 5 Plumbing Fixtures Toilets Amber (+) 1990 3 Ea. $29,698 5 Plumbing Fixtures Urinals Amber (+) 1990 4 Ea. $10,598 5 Domestic Water Piping Domestic Water Piping System (Bldg.SF) Amber (+) 1990 74,700 SF $567,268 6 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2015 2 Ea. $10,856 8 Plumbing Fixtures Toilets Amber (+) 2010 7 Ea. $87,290 8 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2015 2 Ea. $10,856 8 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 4 Ea. $26,779 8 Plumbing Fixtures Lavatory Amber (+) 2010 5 Ea. $36,864 10 Domestic Water Equipment Gas Piping System (BldgSF) Amber (+) 1990 74,700 SF $7,446,595 10 Sub Total for System 14 items $8,340,672
Fire and Life Safety
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Water-Based Fire-Suppression Fire Sprinkler System (Bldg.SF) Amber (+) 1990 74,700 SF $1,208,746 2 Note: Past/Near end of useful service life but functioning properly, However the system piping is rusted Fire Detection and Alarm Fire Alarm Amber (+) 1990 74,700 SF $292,342 8 Sub Total for System 2 items $1,501,088
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (-) 1990 1 Ea. $93,551 4 Note: Cables, underside, and frame are rusty.
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (-) 1990 1 Ea. $93,551 4 Note: Cables, underside, and frame are rusty.
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (-) 1990 1 Ea. $93,551 4 Note: Cables, underside, and frame are rusty.
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (-) 1990 1 Ea. $93,551 4 Note: Cables, underside, and frame are rusty.
Escalators Escalators Amber (+) 1990 2 Ea. $1,067,436 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 1 Ea. $20,208 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 1 Ea. $20,208 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Building: T-A+ - Terminal A+ (Gates 1 to 8)
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 1 Ea. $20,208 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 1990 1 Ea. $17,680 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 1990 1 Ea. $17,680 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 1 Ea. $20,208 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 1990 1 Ea. $17,680 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 1990 1 Ea. $17,680 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 1990 1 Ea. $17,680 5 Escalators Escalators Amber (+) 1990 2 Ea. $1,067,436 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 1990 1 Ea. $17,680 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 1990 1 Ea. $101,035 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 1990 1 Ea. $17,680 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 1990 1 Ea. $17,680 5 Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $243,366 8 Note: General: 60 AMP switch along with elevator.
Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $243,366 8 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 1990 1 Ea. $148,454 10 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 1990 1 Ea. $148,454 10 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 1990 1 Ea. $148,454 10 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 1990 1 Ea. $148,454 10 Sub Total for System 41 items $4,913,175
Sub Total for Building T-A+ - Terminal A+ (Gates 1 to 8) 224 items $29,887,276 Terminal A
P H A S E 1
F A C I L I T Y C O N D I T I O N A S S E S S M E N T
T E R M I N A L B U I L D I N G S A N D
CENTRAL UTILITY PLANT
BUILDING DETAILS
Building Details
Terminal A (Gates 9 to 14), San Jose, CA 95110
Building Address
$1,689,077
Current Deficiencies
$14,477,637
Replacement Cost
$8,850,546
Current + 5-Year Costs
$74,443,224
Current + 10-Year Trend
1990
Const Year
261,518
Area
Current + 3-Year Costs
$2,335,112
Terminal A (Gates 9 to 14)
Building Condition Assessment Score
(3-Year SCI)
Average
Ten-year Work-plan by System
Current + 10-Years
System Current 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Mechanical $1,118,707 $0 $190,487 $121,211 $18,926 $1,028,427 $4,464,876 $0 $306,347 $25,583 $352,578 $7,627,142 Electrical $170,572 $0 $0 $0 $98,984 $1,828,502 $63,621 $21,389 $13,352,444 $1,256,497 $6,373,473 $23,165,482 Plumbing $13,273 $0 $0 $0 $0 $448,719 $2,082,173 $0 $159,357 $26,935 $26,161,261 $28,891,718 Fire & Life Safety $9,145 $0 $0 $0 $0 $68,515 $0 $0 $1,023,709 $0 $7,974,321 $9,075,690 Technology $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Conveyances $377,380 $0 $0 $334,337 $175,406 $2,847,955 $0 $0 $1,831,394 $0 $116,720 $5,683,192 Security $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total: $1,689,077 $0 $190,487 $455,548 $293,316 $6,222,118 $6,610,670 $21,389 $16,673,251 $1,309,015 $40,978,353 $74,443,224 Current + 10-Year Cost of Repairs / SCI
Building: T-A - Terminal A (Gates 9 to 14)
Mechanical
Deficiency Rating Qty UoM Repair Cost ID
Air Cooled Condenser Replacement Red 1 Ea. $13,280 56
Note: Deteriorated, Unit scheduled for removal
Location: Mechanical Room - A3821 (Outside)
Air Cooled Condenser Replacement Red 1 Ea. $13,280 57
Note: Deteriorated, Unit is rusted and not running.
Location: Roof - Outside Shut Room
Air Handler HVAC Component Replacement Amber (-) 1 Ea. $114,464 48 Note: Past/Near end of service life
Location: Duct work on supply side has access hatch open and is leaking air volume and pressure Air Handler HVAC Component Replacement Amber (-) 1 Ea. $114,464 49 Note: Deteriorated, Most major components are severely deteriorated. Insulation breaking down Motors constantly breaking down
Shaft damaged
Motor mount isolation springs completely worn out
Unit requires constant maintenance.
Unit scheduled to be replaced
Location: Mechanical Room - A3801
Air Handler HVAC Component Replacement Amber (-) 1 Ea. $114,464 50 Note: Deteriorated
Location: Requires constant maintenance, Most internal parts are deteriorated Air Handler HVAC Component Replacement Amber (-) 1 Ea. $114,464 51 Note: Deteriorated
Location: Requires constant maintenance, Most internal parts are deteriorated Air Handler HVAC Component Replacement Amber (-) 1 Ea. $151,613 52 Note: Deteriorated
Location: Motor damaged
Air Handler HVAC Component Replacement Amber (-) 1 Ea. $151,613 53 Note: Past/Near end of service life
Location: Entire unit
Air Handler HVAC Component Replacement Amber (-) 1 Ea. $151,613 54 Note: Past/Near end of service life
Location: Entire unit
Air Handler HVAC Component Replacement Amber (-) 1 Ea. $151,613 55 Note: Past/Near end of service life
Location: Entire unit
Ductless Split System AC Replacement Amber (-) 1 Ea. $4,000 64 Note: Stained/Dirty, The outdoor split system is dirty throughout the case.
Location: Mechanical Room - A3761
Ductless Split System AC Replacement Red 1 Ea. $6,321 65 Note: Operationally impaired, The indoor unit of the split system is non operational.
Location: IT Room - A1181
Ductless Split System AC Replacement Amber (-) 1 Ea. $6,321 66 Note: Stained/Dirty, The indoor split system is stained and dirty throughout the vents.
Location: IT Room - A1439
Ductless Split System AC Replacement Amber (-) 1 Ea. $6,321 67 Note: Missing, The indoor split system is missing a cover.
Location: IT Room - A1431
Remove Abandoned Equipment 1 Ea. $4,358 68
Note: Operationally impaired
Location: The computer room AC is abandoned in place.
Duct Grill Replacement 1 Ea. $518 62
Note: Corroded
Location: In bathroom ceiling
Sub Total for System 16 items $1,118,707
DEFICIENCY SUMMARY
Electrical
Deficiency Rating Qty UoM Repair Cost ID
Electrical Disconnect Replacement Amber (-) 1 Ea. $2,013 79 Note: Deteriorated, The switch has minor deterioration on the case and Past/Near end of useful service life but functioning properly Location: Electrical Room - A1007
Electrical Transformer Replacement Amber (-) 1 Ea. $13,194 70 Note: Corroded
Location: Top of transformer
Electrical Transformer Replacement Amber (-) 1 Ea. $7,882 78 Note: Stained/Dirty
Location: The transformer has minor staining.
Panelboard Replacement Amber (-) 2 Ea. $32,869 58
Note: Moisture/Debris/Contaminated
Location: Electrical Room - A1824
Panelboard Replacement Amber (-) 1 Ea. $18,497 59
Note: Damaged
Location: There is a missing blank on the panel
Transfer Switch Replacement Amber (-) 1 Ea. $96,117 69
Note: Operationally impaired
Location: The transfer switch is abandoned in place
Sub Total for System 6 items $170,572
Plumbing
Deficiency Rating Qty UoM Repair Cost ID
Custodial Mop Or Service Sink Replacement Amber (-) 1 Ea. $1,060 42 Note: Leaks
Location: Leaking from pipe
Non-Refrigerated Drinking Fountain Replacement Amber (-) 1 Ea. $3,174 40 Note: Corroded
Location: On nozzle
Non-Refrigerated Drinking Fountain Replacement Amber (-) 1 Ea. $3,174 41 Note: Corroded
Location: Supply nozzle is corroded
Refrigerated Water Cooler Replacement Red 2 Ea. $5,865 43 Note: Operationally impaired
Location: The water fountains are out of service.
Sub Total for System 4 items $13,273
Fire and Life Safety
Deficiency Rating Qty UoM Repair Cost ID
Fire Alarm Panel Replacement Red 1 Ea. $9,145 39
Note: Capability/Capacity deficient
Location: Fire alarm panel is abandoned in place
Sub Total for System 1 items $9,145
Conveyances
Deficiency Rating Qty UoM Repair Cost ID
Elevator Cab And/Or Controls Repair Amber (-) 1 Ea. $33,565 61 Note: Leaks
Location: Room - A1515
Passenger Boarding Bridge - Bag Lift Amber (-) 1 Ea. $68,763 71 Note: Corroded, cables at bag lift
Location: Gate-7
Passenger Boarding Bridge - Bag Lift Amber (-) 1 Ea. $68,763 72 Note: Corroded, Exterior and cables are very rusty; underside of bag lift is corroded Location: Gate-9
Passenger Boarding Bridge - Bag Lift Amber (-) 1 Ea. $68,763 73 Note: Corroded, Exterior and cables are very rusty; underside of bag lift is corroded Location: Gate-11
Passenger Boarding Bridge - Bag Lift Amber (-) 1 Ea. $68,763 74 Note: Corroded, Underside and cables are rusty
Location: Gate-16
Conveyances
Deficiency Rating Qty UoM Repair Cost ID
Passenger Boarding Bridge - Bag Lift Amber (-) 1 Ea. $68,763 75 Note: Corroded, Frame, cables, and underside are very rusty Location: Gate-22
Sub Total for System 6 items $377,380
Sub Total for Building T-A - Terminal A (Gates 9 to 14) 33 items $1,689,077
LIFE CYCLE SUMMARY
Building: T-A - Terminal A (Gates 9 to 14)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (-) 2009 1 Ea. $190,487 2 Note: R-22 refrigerant is outdated and has been phased out.
Other HVAC Distribution Systems VFD (10 HP) Amber (-) 2010 2 Ea. $19,148 3 Note: Past/Near end of useful service life but functioning properly and Motor mount springs are deterioted Other HVAC Distribution Systems VFD (7.5 HP) Amber (-) 2010 2 Ea. $17,524 3 Note: Motor mount springs are deterioted
Other HVAC Distribution Systems VFD (7.5 HP) Amber (-) 2010 1 Ea. $8,761 3 Note: Past/Near end of useful service life but functioning properly Other HVAC Distribution Systems VFD (7.5 HP) Amber (-) 2010 1 Ea. $8,761 3 Note: Past/Near end of useful service life but functioning properly Other HVAC Distribution Systems VFD (10 HP) Amber (-) 2010 1 Ea. $9,574 3 Note: Past/Near end of useful service life but functioning properly Other HVAC Distribution Systems VFD (10 HP) Amber (-) 2010 1 Ea. $9,574 3 Note: Past/Near end of useful service life but functioning properly and Cover is missing Other HVAC Distribution Systems VFD (10 HP) Amber (-) 2010 1 Ea. $9,574 3 Note: Past/Near end of useful service life but functioning properly and Cover is missing Other HVAC Distribution Systems VFD (10 HP) Amber (-) 2010 4 Ea. $38,295 3 Note: Past/Near end of useful service life but functioning properly and Covers are missing Other HVAC Distribution Systems VFD (7.5 HP) Amber (-) 2012 2 Ea. $18,926 4 Note: Motor mount springs are deterioted
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 1990 1 Ea. $6,962 5 Other HVAC Distribution Systems VFD (5 HP) Amber (+) 1990 1 Ea. $8,596 5 Exhaust Air Ventilator/Relief Vent (4'x8') Amber (+) 1990 1 Ea. $19,464 5 Other HVAC Distribution Systems VFD (15 HP) Amber (+) 2023 1 Ea. $14,789 5 Note: Cover is missing
Other HVAC Distribution Systems VFD (5 HP) Amber (+) 2019 1 Ea. $8,596 5 Note: Cover is missing
Other HVAC Distribution Systems VFD (5 HP) Amber (+) 2011 1 Ea. $8,596 5 Other HVAC Distribution Systems VFD (20 HP) Amber (+) 2012 1 Ea. $17,251 5 Exhaust Air Ventilator/Relief Vent (4'x6') Amber (+) 1990 1 Ea. $14,918 5 Facility Hydronic Distribution Pump - 5HP Amber (+) 2015 1 Ea. $13,402 5 Fan System, Centrifugal In-Line 500 CFM Amber (+) 1990 1 Ea. $18,804 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Facility Hydronic Distribution Pump - 5HP Amber (+) 2015 1 Ea. $13,402 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 1990 1 Ea. $7,580 5 Exhaust Fan Amber (+) 1990 1 Ea. $6,365 5
Decentralized Cooling Fan Coil - DX cool w/Electric Heat (5 Ton) Amber (+) 1990 1 Ea. $6,948 5 Note: The fan coil unit seems to be in working condition, but is not turned on.
Decentralized Cooling AHU 50,000 CFM Interior Amber (+) 1990 1 Ea. $347,468 5 Air Distribution Make-up Air Unit Amber (+) 1990 1 Ea. $17,391 5 Air Distribution Make-up Air Unit Amber (+) 1990 1 Ea. $17,391 5 Pollution Control Unit Amber (+) 2012 1 Ea. $101,685 5
Exhaust Air Kitchen Exhaust Hoods Amber (+) 1990 1 Ea. $21,897 5 Note: Concession exhaust
Decentralized Cooling AHU 50,000 CFM Interior Amber (+) 1990 1 Ea. $347,468 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 1990 1 Ea. $3,835 5 Decentralized Cooling Computer Room A/C (3 ton) Amber (+) 2015 1 Ea. $92,328 6 HVAC Air Distribution Ductwork (Bldg.SF) Amber (+) 1990 261,518 SF $4,372,548 6 Note: Building Wide
Exhaust Fan Amber (+) 2009 1 Ea. $8,018 8
Building: T-A - Terminal A (Gates 9 to 14)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Exhaust Fan Amber (+) 2009 1 Ea. $8,018 8
Decentralized Cooling Fan Coil - Water Cool/Water Heat ( 3 Ton) Amber (+) 2000 1 Ea. $8,355 8 Decentralized Cooling Package DX Unit ( 5 Ton) Amber (+) 2009 1 Ea. $28,027 8 Decentralized Cooling Fan Coil - Water Cool/Water Heat (15 Ton) Amber (+) 1990 12 Ea. $230,241 8 Note: There are 12 fan coil units throughout A1701. Fan coils are hard to get up close to due to baggage conveyer belts.
Fan System, Centrifugal In-Line 500 CFM Amber (+) 1990 1 Ea. $23,688 8 Fan System, Centrifugal In-Line 500 CFM Amber (+) 1990 1 Ea. $23,688 8 Fan System, Centrifugal In-Line 500 CFM Amber (+) 2008 1 Ea. $25,583 9 Fan System, Centrifugal In-Line 500 CFM Amber (+) 2008 1 Ea. $25,583 9 Air Distribution Pre-Conditioned Air Unit - 45 Ton Green 2019 1 Ea. $352,578 10 Sub Total for System 49 items $6,575,097
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Power Distribution Panelboard - 120/208 200A Amber (-) 1990 1 Ea. $9,963 4 Note: General: Rust around panel cover. No label.
Power Distribution Panelboard - 120/208 200A Amber (-) 1990 1 Ea. $9,963 4 Note: General: Rust around panel cover. No label.
Power Distribution Motor Controller (Loads) Amber (-) 1990 1 Ea. $3,328 4 Note: General: 100A disconnect. Some deterioration.
Power Distribution Panelboard - 277/480 600A Amber (-) 1990 1 Ea. $33,012 4 Power Distribution Panelboard - 277/480 600A Amber (-) 1996 1 Ea. $33,012 4 Electrical Service Transformer (15 KVA) Amber (-) 1990 1 Ea. $9,706 4 Note: General: Transformer is deteriorated
Power Distribution Panelboard - 120/208 225A Amber (-) 1990 1 Ea. $9,963 4 Note: General: Panel exterior is stained
Electrical Service Transformer (30 KVA) Amber (+) 2001 1 Ea. $10,798 5 Note: General: Nameplate indicates that transformer is from 2001 or more recent Electrical Service Transformer (30 KVA) Amber (+) 2001 1 Ea. $10,798 5 Note: General: Nameplate indicates that transformer is from 2001 or more recent Electrical Service Transformer (30 KVA) Amber (+) 2001 1 Ea. $10,798 5 Note: General: Nameplate indicates that transformer is from 2001 or more recent Electrical Service Transformer (30 KVA) Amber (+) 2001 1 Ea. $10,798 5 Note: General: Nameplate indicates that transformer is from 2001 or more recent Power Distribution Panelboard - 120/208 225A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $5,444 5 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $5,444 5 Power Distribution Panelboard - 120/208 150A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 120/208 200A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 277/480 150A Amber (+) 1990 1 Ea. $18,337 5 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $5,444 5 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $5,444 5 Power Distribution Panelboard - 277/480 100A Amber (+) 1990 1 Ea. $13,087 5 Power Distribution Panelboard - 120/208 225A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 277/480 200A Amber (+) 1990 1 Ea. $18,337 5 Power Distribution Panelboard - 120/208 225A Amber (+) 1990 1 Ea. $10,760 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Note: Transformer T-2LP3 is on a rack near the ceiling, above a light fixture Battery Equipment UPS (15 KVA) Amber (+) 1990 1 Ea. $71,023 5 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $2,144 5 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $5,444 5 Power Distribution Distribution Panel (1600 Amps) Amber (+) 1990 1 Ea. $49,258 5 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 1990 1 Ea. $141,227 5 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 1990 1 Ea. $141,227 5 Note: General: 1200A
Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 1990 1 Ea. $141,227 5 Note: General: 1200A
Electrical Service Switchgear - Main Dist Panel (4000 Amps) Amber (+) 1990 1 Ea. $165,912 5 Note: General: Switchboard
Power Distribution Panelboard - 120/208 225A Amber (+) 1990 1 Ea. $10,760 5 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $2,144 5 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $2,144 5 Building: T-A - Terminal A (Gates 9 to 14)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $14,258 5 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $14,258 5 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $14,258 5 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $14,258 5 Power Distribution Panelboard - 120/208 150A Amber (+) 1990 1 Ea. $10,760 5 Lighting Control Lighting Control Panel Amber (+) 1990 1 Ea. $5,664 5 Lighting Control Lighting Control Panel Amber (+) 1990 1 Ea. $5,664 5 Power Distribution Panelboard - 120/208 125A Amber (+) 1990 1 Ea. $2,855 5 Power Distribution Panelboard - 120/208 225A Amber (+) 1990 1 Ea. $10,760 5 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $14,258 5 Note: In the ceiling, transformer one on the right is Westinghouse, T-1LE3 and T-1LP3 (left to right) Power Distribution Panelboard - 120/208 225A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 277/480 125A Amber (+) 1990 1 Ea. $13,087 5 Power Distribution Panelboard - 277/480 225A Amber (+) 1990 1 Ea. $18,337 5 Power Distribution Panelboard - 277/480 400A Amber (+) 1990 1 Ea. $27,178 5 Electrical Service Switchgear - Main Dist Panel (3000 Amps) Amber (+) 1990 1 Ea. $133,101 5 Note: General: 3 sections
Power Distribution Panelboard - 277/480 225A Amber (+) 1990 1 Ea. $18,337 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Note: General: No label. Transformer is quite dirty.
Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Note: General: No label. Transformer is quite dirty.
Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Power Distribution Panelboard - 120/208 125A Amber (+) 1990 1 Ea. $2,855 5 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $14,258 5 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $14,258 5 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $14,258 5 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $14,258 5 Miscellaneous Electrical Systems
Supplementary Components
Electrical - Other Amber (+) 1990 1 Ea. $0 5
Note: 1500KW, tied to backup generator
Miscellaneous Electrical Systems
Supplementary Components
Electrical - Other Amber (+) 1990 1 Ea. $0 5
Note: 1500KW, tied to backup generator
Power Distribution Panelboard - 120/208 200A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 120/208 225A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 277/480 150A Amber (+) 1990 1 Ea. $18,337 5 Power Distribution Panelboard - 120/208 200A Amber (+) 1990 1 Ea. $10,760 5 Power Distribution Panelboard - 277/480 100A Amber (+) 1990 1 Ea. $13,087 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Circuit Breakers Amber (+) 1990 1 Ea. $2,958 5
Note: Service disconnect, enclosed circuit breaker.
Circuit Breakers Amber (+) 1990 1 Ea. $2,958 5
Note: Service disconnect, enclosed circuit breaker.
Power Distribution Distribution Panels (600 Amps) Amber (+) 1990 1 Ea. $34,832 5 Power Distribution Distribution Panels (600 Amps) Amber (+) 1990 1 Ea. $34,832 5 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $5,444 5 Power Distribution Panelboard - 277/480 100A Amber (+) 1990 1 Ea. $13,087 5 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $5,444 5 Power Distribution Panelboard - 277/480 125A Amber (+) 1990 1 Ea. $13,087 5 Power Distribution Distribution Panels (800 Amps) Amber (+) 1990 1 Ea. $36,322 5 Power Distribution Distribution Panels (800 Amps) Amber (+) 1990 1 Ea. $36,322 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $11,581 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Power Distribution Panelboard - 277/480 100A Amber (+) 1990 1 Ea. $13,087 5 Power Distribution Panelboard - 120/208 125A Amber (+) 1990 1 Ea. $2,855 5 Power Distribution Panelboard - 277/480 100A Amber (+) 1990 1 Ea. $13,087 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Building: T-A - Terminal A (Gates 9 to 14)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $5,444 5 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Note: The transformer T-2LE3 is hung above light fixture.
Power Distribution Motor Controller (Loads) Green 1990 1 Ea. $3,594 5 Power Distribution Motor Controller (Loads) Green 1990 1 Ea. $3,594 5 Power Distribution Motor Controller (Loads) Green 1990 1 Ea. $3,594 5 Power Distribution Panelboard - 277/480 400A Amber (+) 2001 1 Ea. $27,178 5 Power Distribution Panelboard - 277/480 225A Amber (+) 1990 1 Ea. $18,337 5 Power Distribution Panelboard - 277/480 225A Amber (+) 1990 1 Ea. $18,337 5 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $3,594 5 Power Distribution Panelboard - 277/480 400A Amber (+) 1990 1 Ea. $27,178 5 Power Distribution Panelboard - 277/480 400A Amber (+) 1990 1 Ea. $27,178 5 Fixed Ground Power Unit Amber (+) 2009 1 Ea. $151,552 5 Power Distribution Panelboard - 277/480 225A Amber (+) 1990 1 Ea. $19,804 6 Power Distribution Panelboard - 120/208 225A Amber (+) 2002 1 Ea. $11,621 6 Lighting Control Lighting Control Panel Amber (+) 1990 1 Ea. $6,117 6 Power Distribution Panelboard - 120/208 400A Amber (+) 2000 1 Ea. $26,079 6 Power Distribution Panelboard - 277/480 225A Amber (+) 1999 1 Ea. $21,389 7 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Motor Controller (Loads) Amber (+) 1990 1 Ea. $4,527 8 Power Distribution Distribution Panels (100 Amps) Amber (+) 2010 1 Ea. $41,189 8 Power Distribution Distribution Panels (100 Amps) Amber (+) 2010 1 Ea. $41,189 8 Electrical Service Exterior Liquid Filled Transformer (750 KVA) Amber (+) 1990 1 Ea. $117,125 8 Power Distribution Distribution Panels (400 Amps) Amber (+) 1990 1 Ea. $41,666 8 Electrical Service Transformer (75 KVA) Amber (+) 2002 1 Ea. $17,961 8 Electrical Service Transformer (30 KVA) Amber (+) 2000 1 Ea. $13,602 8 Power Distribution Panelboard - 120/208 225A Amber (+) 2009 1 Ea. $13,554 8 Power Distribution Panelboard - 120/208 225A Amber (+) 2009 1 Ea. $13,554 8 Power Distribution Panelboard - 120/208 225A Amber (+) 2008 1 Ea. $13,554 8 Lighting Fixtures Light Fixtures (Bldg SF) Amber (+) 1990 261,581 SF $11,823,357 8 Note: Building Wide
Power Distribution Distribution Panels (100 Amps) Amber (+) 1990 1 Ea. $41,189 8 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $6,858 8 Power Distribution Panelboard - 120/208 200A Amber (+) 1990 1 Ea. $13,554 8 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $17,961 8 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $17,961 8 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $17,961 8 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $17,961 8 Lighting Control Lighting Control Panel Amber (+) 2007 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2007 1 Ea. $7,135 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Building: T-A - Terminal A (Gates 9 to 14)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Power Distribution Power Wiring Amber (+) 1990 261,518 SF $765,549 8 Note: Building Wide
Power Distribution Panelboard - 120/208 100A Amber (+) 2005 1 Ea. $6,858 8 Power Distribution Panelboard - 120/208 100A Amber (+) 1999 1 Ea. $6,858 8 Power Distribution Panelboard - 120/208 100A Amber (+) 2009 1 Ea. $6,858 8 Note: General: Enclosed circuit breaker.
Power Distribution Panelboard - 120/208 225A Amber (+) 2009 1 Ea. $13,554 8 Power Distribution Panelboard - 120/208 225A Amber (+) 2009 1 Ea. $13,554 8 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $6,858 8 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $13,602 8 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $13,602 8 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $13,602 8 Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $13,602 8 Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $6,858 8 Power Distribution Distribution Panels (800 Amps) Amber (+) 1990 2 Ea. $91,510 8 Electrical Service Transformer (15 KVA) Amber (+) 1990 1 Ea. $13,205 8 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $17,961 8 Electrical Service Transformer (75 KVA) Amber (+) 1990 1 Ea. $17,961 8 Power Distribution Panelboard - 277/480 225A Amber (+) 1990 1 Ea. $23,100 8 Power Distribution Panelboard - 277/480 225A Amber (+) 2008 1 Ea. $23,100 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Electrical Service Transformer (45 KVA) Amber (+) 2007 1 Ea. $14,589 8 Power Distribution Panelboard - 120/208 225A Amber (+) 2008 1 Ea. $14,639 9 Power Distribution Panelboard - 120/208 225A Amber (+) 2008 1 Ea. $14,639 9 Electrical Service Switchgear - Main Dist Panel (4000 Amps) Amber (+) 2009 1 Ea. $225,722 9 Note: General: Four section switchboard.
Electrical Service Switchgear - Main Dist Panel (1200 Amps) Amber (+) 2009 1 Ea. $102,183 9 Note: Switchboard.
Electrical Service Switchgear - Main Dist Panel (2000 Amps) Amber (+) 2009 1 Ea. $174,295 9 Power Distribution Panelboard - 120/208 225A Amber (+) 2008 1 Ea. $14,639 9 Power Distribution Panelboard - 120/208 225A Amber (+) 2009 1 Ea. $14,639 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (112.5 KVA) Amber (+) 2009 1 Ea. $26,375 9 Electrical Service Transformer (112.5 KVA) Amber (+) 2009 1 Ea. $26,375 9 Electrical Service Transformer (112.5 KVA) Amber (+) 2009 1 Ea. $26,375 9 Electrical Service Transformer (112.5 KVA) Amber (+) 2009 1 Ea. $26,375 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Switchgear - Main Dist Panel (1200 Amps) Amber (+) 2009 1 Ea. $102,183 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Electrical Service Transformer (75 KVA) Amber (+) 2009 1 Ea. $19,398 9 Power Distribution Panelboard - 120/208 400A Amber (+) 2009 1 Ea. $32,852 9 Power Distribution Panelboard - 120/208 400A Amber (+) 2009 2 Ea. $65,705 9 Note: General: Two section panel.
Battery Equipment UPS (40 KVA) Amber (+) 2009 1 Ea. $205,216 9 Battery Equipment UPS (40 KVA) Amber (+) 2009 1 Ea. $205,216 9 Fixed Ground Power Unit Amber (+) 2008 1 Ea. $222,680 10 Note: General: 480-115V, 400A, Other Asset: Power Supply Building: T-A - Terminal A (Gates 9 to 14)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Fixed Ground Power Unit Amber (+) 1990 1 Ea. $222,680 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Fixed Ground Power Unit Amber (+) 2009 1 Ea. $222,680 10 Note: General: 480-115V, 400A, Other Asset: Power Supply Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Battery Equipment UPS (80 KVA) Amber (+) 1990 1 Ea. $282,871 10 Branch Wiring for Lighting Branch Wiring for Lighting Amber (+) 1990 261,518 SF $1,353,236 10 Note: Building Wide
Electrical Service Transformer (112.5 KVA) Amber (+) 1990 1 Ea. $28,485 10 Electrical Service Transformer (112.5 KVA) Amber (+) 1990 1 Ea. $28,485 10 Electrical Service Transformer (112.5 KVA) Amber (+) 1990 1 Ea. $28,485 10 Electrical Service Transformer (112.5 KVA) Amber (+) 1990 1 Ea. $28,485 10 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $17,017 10 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $17,017 10 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $17,017 10 Electrical Service Transformer (45 KVA) Amber (+) 1990 1 Ea. $17,017 10 Electrical Service Switchgear - Main Dist Panel (1600 Amps) Amber (+) 1990 1 Ea. $160,758 10 Note: Labeled as a normal distribution panel, 2 sections Electrical Service Switchgear - Main Dist Panel (4000 Amps) Amber (+) 1990 1 Ea. $243,779 10 Note: General: 3 sections
Electrical Service Switchgear - Main Dist Panel (3000 Amps) Amber (+) 1990 1 Ea. $195,568 10 Electrical Service Transformer (112.5 KVA) Amber (+) 1990 1 Ea. $28,485 10 Note: General: Top of transformer is stained from moisture.
Electrical Service Transformer (112.5 KVA) Amber (+) 1990 1 Ea. $28,485 10 Note: General: Top of transformer is stained from moisture.
Electrical Service Transformer (112.5 KVA) Amber (+) 1990 1 Ea. $28,485 10 Note: General: Top of transformer is stained from moisture.
Electrical Service Transformer (112.5 KVA) Amber (+) 1990 1 Ea. $28,485 10 Note: General: Top of transformer is stained from moisture.
Lighting Control Lighting Control Panel Amber (+) 1990 1 Ea. $8,323 10 Lighting Control Lighting Control Panel Amber (+) 1990 1 Ea. $8,323 10 Lighting Control Lighting Control Panel Amber (+) 1990 1 Ea. $8,323 10 Lighting Control Lighting Control Panel Amber (+) 1990 1 Ea. $8,323 10 Circuit Breakers Amber (+) 1990 1 Ea. $4,346 10
Circuit Breakers Amber (+) 1990 1 Ea. $4,346 10
Power Distribution Panelboard - 277/480 150A Amber (+) 1990 1 Ea. $26,943 10 Power Distribution Panelboard - 277/480 150A Amber (+) 1990 1 Ea. $26,943 10 Power Distribution Motor Controller (Loads) Green 1990 1 Ea. $5,281 10 Power Distribution Motor Controller (Loads) Green 1990 1 Ea. $5,281 10 Power Distribution Motor Controller (Loads) Green 1990 1 Ea. $5,281 10 Power Distribution Distribution Panels (400 Amps) Green 1990 1 Ea. $48,600 10 Power Distribution Distribution Panel (3000 Amps) Green 1990 1 Ea. $78,458 10 Electrical Service Transformer (45 KVA) Green 1990 1 Ea. $17,017 10 Battery Equipment UPS (40 KVA) Amber (+) 1990 1 Ea. $221,633 10 Battery Equipment UPS (40 KVA) Amber (+) 1990 1 Ea. $221,633 10 Lighting Fixtures Building Mounted Fixtures (Ea.) Amber (+) 1990 11 Ea. $28,515 10 Note: General: Recessed can lights, likely fluorescent
Lighting Fixtures Building Mounted Fixtures (Ea.) Amber (+) 1990 1 Ea. $2,593 10 Note: General: Recessed can lights, likely fluorescent
Power Distribution Panelboard - 120/208 100A Amber (+) 1990 1 Ea. $7,999 10 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 1990 1 Ea. $207,509 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Building: T-A - Terminal A (Gates 9 to 14)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Fixed Ground Power Unit Amber (+) 2009 1 Ea. $222,680 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 1990 1 Ea. $7,396 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $3,150 10 Electrical Service Exterior Dry Type Transformer (225 KVA) Amber (+) 1990 1 Ea. $57,730 10 Note: Rusty exterior
Load Bank Amber (+) 1990 1 Ea. $245,612 10
Packaged Generator Assemblies Emergency Generator (1200 KW) Amber (+) 1990 1 Ea. $914,914 10 Note: General: Includes disconnects #1 and #2 SDB, and protected secondary containment generator base tank. Diesel fuel. 12.47KV, 3P/3W, 2000KW/2500KVA Electrical Service Exterior Dry Type Transformer (225 KVA) Amber (+) 1990 1 Ea. $57,730 10 Packaged Generator Assemblies Emergency Generator (1200 KW) Amber (+) 1990 1 Ea. $914,914 10 Sub Total for System 277 items $24,108,173
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Air Dryer Amber (+) 1990 1 Ea. $4,658 5
Air Dryer Amber (+) 1990 1 Ea. $4,658 5
Air Dryer Amber (+) 1990 1 Ea. $4,658 5
Air Dryer Amber (+) 1990 1 Ea. $4,658 5
Air Dryer Amber (+) 1990 1 Ea. $4,658 5
Air Dryer Amber (+) 1990 1 Ea. $4,658 5
Air Dryer Amber (+) 1990 1 Ea. $4,658 5
Air Dryer Amber (+) 1990 1 Ea. $4,658 5
Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 1990 2 Ea. $8,618 5 Plumbing Fixtures Lavatory Amber (+) 1990 2 Ea. $10,036 5 Plumbing Fixtures Toilets Amber (+) 1990 1 Ea. $9,899 5 Plumbing Fixtures Urinals Amber (+) 1990 2 Ea. $5,300 5 Plumbing Fixtures Lavatory Amber (+) 1990 1 Ea. $5,018 5 Plumbing Fixtures Toilets Amber (+) 1990 1 Ea. $9,899 5 Plumbing Fixtures Urinals Amber (+) 1990 2 Ea. $5,300 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 1990 1 Ea. $4,310 5 Note: Rust present
Domestic Water Equipment Backflow Preventers - 6 in. (Ea) Green 1990 1 Ea. $18,762 5 Domestic Water Equipment Backflow Preventers - 4 in. (Ea.) Amber (+) 1990 1 Ea. $15,037 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2019 2 Ea. $8,618 5 Facility Potable-Water Storage Tanks Water Heater Storage Tank - 100 Gallons Amber (+) 1990 1 Ea. $11,954 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 1990 2 Ea. $8,618 5 Plumbing Fixtures Toilets Amber (+) 2010 9 Ea. $89,093 5 Plumbing Fixtures Urinals Amber (+) 1990 6 Ea. $15,898 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 1990 4 Ea. $6,228 5 Plumbing Fixtures Toilets Amber (+) 1990 5 Ea. $49,496 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 1990 2 Ea. $8,618 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 1990 4 Ea. $6,228 5 Plumbing Fixtures Urinals Amber (+) 1990 8 Ea. $21,197 5 Plumbing Fixtures Toilets Amber (+) 1990 5 Ea. $49,496 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 1990 2 Ea. $3,115 5 Plumbing Fixtures Urinals Amber (+) 1990 3 Ea. $7,949 5 Plumbing Fixtures Toilets Amber (+) 1990 3 Ea. $29,698 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 1990 1 Ea. $5,251 5 Compressed-Air Systems Air Compressor (5 hp) Amber (+) 1990 1 Ea. $11,045 5 Building: T-A - Terminal A (Gates 9 to 14)
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Compressed-Air Systems Air Compressor (5 hp) Amber (+) 1990 1 Ea. $11,045 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 1990 1 Ea. $5,251 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 1990 2 Ea. $3,115 5 Plumbing Fixtures Urinals Amber (+) 1990 1 Ea. $2,649 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 1990 1 Ea. $1,557 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 1990 1 Ea. $1,557 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2015 1 Ea. $5,251 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2015 1 Ea. $5,251 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2015 1 Ea. $5,251 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2015 1 Ea. $5,251 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2015 1 Ea. $5,251 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2015 1 Ea. $5,251 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2015 1 Ea. $5,251 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2015 1 Ea. $5,251 5 Plumbing Fixtures Toilets Amber (+) 2010 9 Ea. $96,220 6 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 4 Ea. $26,779 8 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 4 Ea. $26,779 8 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 1990 2 Ea. $10,856 8 Plumbing Fixtures Restroom Lavatory Amber (+) 1990 2 Ea. $13,390 8 Plumbing Fixtures Toilets Amber (+) 1990 4 Ea. $49,881 8 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 1990 2 Ea. $10,856 8 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 1990 2 Ea. $10,856 8 Domestic Water Equipment Water Heater - Electric - 66 gallon Amber (+) 2011 1 Ea. $9,960 8 Domestic Water Equipment Water Heater - Electric - 66 gallon Amber (+) 2011 1 Ea. $9,960 8 Domestic Water Equipment Water Heater - Electric - 66 gallon Amber (+) 2011 1 Ea. $9,960 8 Domestic Water Equipment Water Heater - Electric - 66 gallon Amber (+) 2011 1 Ea. $9,960 8 Domestic Water Equipment Water Heater - Electric - 66 gallon Amber (+) 2011 1 Ea. $9,960 8 Domestic Water Equipment Water Heater - Electric - 66 gallon Amber (+) 2011 1 Ea. $9,960 8 Domestic Water Equipment Water Heater - Electric - 66 gallon Amber (+) 2011 1 Ea. $9,960 8 Domestic Water Equipment Water Heater - Electric - 66 gallon Amber (+) 2011 1 Ea. $9,960 8 Plumbing Fixtures Toilets Amber (+) 2019 2 Ea. $26,935 9 Plumbing Fixtures Non-Refrigerated Drinking Fountain Amber (-) 1990 1 Ea. $6,852 10 Note: Fountain works but fixture has signs of rust in the bowl and supply nozzle is corroded Plumbing Fixtures Non-Refrigerated Drinking Fountain Amber (-) 1990 1 Ea. $6,852 10 Plumbing Fixtures Toilets Amber (+) 1990 3 Ea. $43,636 10 Plumbing Fixtures Restroom Lavatory Amber (+) 1990 2 Ea. $15,618 10 Domestic Water Equipment Gas Piping System (BldgSF) Amber (+) 1990 261,518 SF $26,069,865 10 Note: Building Wide
Domestic Water Piping Domestic Water Piping System (Bldg.SF) Amber (+) 1990 261,518 SF $2,701,868 10 Note: Building Wide
Plumbing Fixtures Toilets Green 1990 1 Ea. $14,545 10
Plumbing Fixtures Urinals Green 1990 1 Ea. $3,893 10
Sub Total for System 73 items $29,744,488
Fire and Life Safety
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Fire Pump Controller Amber (+) 1990 1 Ea. $68,515 5
Note: Deterioration to the cabinet due to age
Fire Pump Controller Amber (+) 1990 1 Ea. $68,515 5
Note: Deterioration to the cabinet due to age
Fire Pump Controller Amber (+) 1990 1 Ea. $68,515 5
Note: Deterioration to the cabinet due to age
Fire Pump Controller Amber (+) 1990 1 Ea. $68,515 5
Note: Deterioration to the cabinet due to age
Fire Pump Controller Amber (+) 1990 1 Ea. $68,515 5
Note: Deterioration to the cabinet due to age
Fire Pump Controller Amber (+) 1990 1 Ea. $68,515 5
Note: Deterioration to the cabinet due to age
Fire Pump Controller Amber (+) 1990 1 Ea. $68,515 5
Note: Deterioration to the cabinet due to age
Fire Pump Controller Amber (+) 1990 1 Ea. $68,515 5
Note: Deterioration to the cabinet due to age
Building: T-A - Terminal A (Gates 9 to 14)
Fire and Life Safety
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Fire Detection and Alarm Fire Alarm Green 1990 261,581 SF $1,023,709 8 Note: Building Wide
Water-Based Fire-Suppression Fire Pump Green 1990 1 Ea. $141,714 10 Note: Pump repacked 2 weeks ago
Water-Based Fire-Suppression Fire Sprinkler System (Bldg.SF) Amber (+) 1990 261,518 SF $7,832,607 10 Note: Building Wide
Sub Total for System 11 items $9,546,150
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 1990 1 Ea. $86,622 3 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 1990 1 Ea. $86,622 3 Elevators Hydraulic (Freight Elev) Amber (-) 1990 1 Ea. $247,715 3 Note: Hydraulic fluid is leaking
Elevators Hydraulic (Freight Elev) Amber (-) 1990 1 Ea. $247,715 3 Note: Hydraulic fluid is leaking
Elevators Hydraulic (Freight Elev) Amber (-) 1990 1 Ea. $247,715 3 Note: Hydraulic fluid is leaking
Elevators Hydraulic (Freight Elev) Amber (-) 1990 1 Ea. $247,715 3 Note: Hydraulic fluid is leaking
Elevators Hydraulic (Freight Elev) Amber (-) 1990 1 Ea. $247,715 3 Note: Hydraulic fluid is leaking
Elevators Hydraulic (Freight Elev) Amber (-) 1990 1 Ea. $247,715 3 Note: Hydraulic fluid is leaking
Elevators Hydraulic (Freight Elev) Amber (-) 1990 1 Ea. $247,715 3 Note: Hydraulic fluid is leaking
Elevators Hydraulic (Freight Elev) Amber (-) 1990 1 Ea. $247,715 3 Note: Hydraulic fluid is leaking
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (-) 1990 1 Ea. $16,371 4 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (-) 1990 1 Ea. $16,371 4 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (-) 1990 1 Ea. $16,371 4 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (-) 1990 1 Ea. $16,371 4 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (-) 1990 1 Ea. $16,371 4 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (-) 1990 1 Ea. $93,551 4 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (-) 1990 1 Ea. $93,551 4 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Elevators Hydraulic (Passenger Elev) Amber (+) 2013 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 2013 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $193,192 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 1990 1 Ea. $101,035 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 2 Ea. $40,414 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 1 Ea. $20,208 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 1 Ea. $20,208 5 Note: Jetbridge, lift plate on one hoist is not present Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 1990 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 1990 1 Ea. $20,208 5 Escalators Escalators Amber (+) 1990 2 Ea. $1,067,436 5 Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $193,192 5 Building: T-A - Terminal A (Gates 9 to 14)
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $243,366 8 Elevators Hydraulic (Passenger Elev) Amber (+) 1990 1 Ea. $243,366 8 Escalators Escalators Amber (+) 1990 2 Ea. $1,344,662 8 Wheelchair Lift Amber (+) 1990 1 Ea. $35,350 10
Wheelchair Lift Amber (+) 1990 1 Ea. $35,350 10
Hydraulic - Lift Amber (+) 1990 1 Ea. $46,020 10
Sub Total for System 50 items $8,066,082
Sub Total for Building T-A - Terminal A (Gates 9 to 14) 460 items $78,039,990 Terminal FIS
P H A S E 1
F A C I L I T Y C O N D I T I O N A S S E S S M E N T
T E R M I N A L B U I L D I N G S A N D
CENTRAL UTILITY PLANT
BUILDING DETAILS
Building Details
Terminal FIS (Gates 15 to 16), San Jose, CA 95110
Building Address
$438,323
Current Deficiencies
$97,861,256
Replacement Cost
$3,537,127
Current + 5-Year Costs
$16,914,045
Current + 10-Year Trend
2002
Const Year
94,735
Area
Current + 3-Year Costs
$630,512
Terminal FIS (Gates 15 to 16)
Building Condition Assessment Score
(3-Year SCI)
Good
Ten-year Work-plan by System
Current + 10-Years
System Current 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Mechanical $406,761 $0 $190,487 $0 $0 $1,060,042 $0 $0 $2,227,812 $0 $0 $3,885,102 Electrical $9,704 $0 $1,702 $0 $407,629 $299,594 $317,367 $817,153 $4,731,258 $0 $1,096,568 $7,680,975 Plumbing $0 $0 $0 $0 $0 $310,939 $719,413 $0 $94,378 $0 $0 $1,124,730 Fire & Life Safety $0 $0 $0 $0 $0 $0 $317,859 $0 $2,432,582 $0 $0 $2,750,441 Technology $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Conveyances $21,858 $0 $0 $0 $0 $828,411 $0 $622,528 $0 $0 $0 $1,472,797 Security $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total: $438,323 $0 $192,189 $0 $407,629 $2,498,986 $1,354,639 $1,439,681 $9,486,030 $0 $1,096,568 $16,914,045 Current + 10-Year Cost of Repairs / SCI
Building: T-FIS - Terminal FIS (Gates 15 to 16)
Mechanical
Deficiency Rating Qty UoM Repair Cost ID
Air Handler HVAC Component Replacement Amber (-) 1 Ea. $236,481 27 Note: Operationally Impaired, Return path ducts are sealed into the room. Air return for AHU is coming through under doorway. Room is negative pressure Location: Mechanical Room - F3061
Small Diameter Exhausts/Hoods Replacement Amber (-) 1 Ea. $2,610 25 Note: Broken: The Exhaust Fan is on, but the belt seems broken. Potential club exhaust Location: Roof
Pre-Conditioned Air Unit Amber (-) 1 Ea. $163,312 60
Note: Deteriorated, Unit is dented all over. R-22 refrigerant is outdated and has been phased out.
Location: Gate-14
Remove Abandoned Equipment 1 Ea. $4,358 85
Note: The control panel is not in service. Room used to be used for three heating and cooling water pumps, but have been removed and relocated to the CUP.
Location: Mechanical Room - F1460
Sub Total for System 4 items $406,761
Electrical
Deficiency Rating Qty UoM Repair Cost ID
Electrical Transformer Replacement Amber (-) 1 Ea. $9,704 28 Note: The transformer is corroded and dented.
Location: Electrical Room - F3140
Sub Total for System 1 items $9,704
Conveyances
Deficiency Rating Qty UoM Repair Cost ID
Loading Dock Lift Amber (-) 1 Ea. $21,858 29
Note: Corroded, There is corrosion throughout the entire lift.
Location: Exterior - Near Room F1001
Sub Total for System 1 items $21,858
Sub Total for Building T-FIS - Terminal FIS (Gates 15 to 16) 6 items $438,323
DEFICIENCY SUMMARY
LIFE CYCLE SUMMARY
Building: T-FIS - Terminal FIS (Gates 15 to 16)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (-) 2009 1 Ea. $190,487 2 Note: R-22 refrigerant is outdated and has been phased out.
Decentralized Cooling AHU 50,000 CFM Interior Amber (+) 2002 1 Ea. $347,468 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2002 2 Ea. $99,140 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2002 2 Ea. $99,140 5 Exhaust Air Roof Exhaust Fan - Large Amber (+) 2002 1 Ea. $15,723 5 Note: Unable to verify if the Exhaust Fan is functioning correctly. However, the POC indicated that the Exhaust Fan has not been used for the last 5+ years.
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2002 1 Ea. $3,835 5 Note: Unable to verify if the Exhaust Fan is functioning correctly. However, the POC indicated that the Exhaust Fan has not been used for the last 5+ years.
Exhaust Air Roof Exhaust Fan - Large Amber (+) 2002 2 Ea. $31,447 5 HVAC Air Distribution AHU 20,000 CFM Outdoor Amber (+) 2002 1 Ea. $389,454 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2002 1 Ea. $7,580 5 Exhaust Air Roof Exhaust Fan - Large Amber (+) 2002 1 Ea. $15,723 5 Exhaust Air Roof Exhaust Fan - Large Amber (+) 2002 2 Ea. $31,447 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2002 1 Ea. $7,580 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2002 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 2002 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Exhaust Air Roof Exhaust Fan - Small Amber (+) 2002 1 Ea. $3,835 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Facility Hydronic Distribution Pump - 1HP or Less (Ea.) Amber (+) 2002 1 Ea. $10,630 8 HVAC Air Distribution Ductwork (Bldg.SF) Amber (+) 2002 94,735 SF $1,847,527 8 Note: Building Wide
Decentralized Cooling Fan Coil - Water Cool/Water Heat ( 3 Ton) Amber (+) 2002 1 Ea. $8,355 8 Heating System Supplementary Components Controls - Electronic (Bldg.SF) Amber (+) 2002 94,735 SF $361,300 8 Note: Building Wide
Sub Total for System 19 items $3,478,341
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Wiring Devices Electrical Disconnect Amber (-) 2002 1 Ea. $1,702 2 Note: Switch is corroded, Past/Near end of useful service life but functioning properly Wiring Devices Electrical Disconnect Amber (-) 2002 1 Ea. $1,702 2 Note: Switch is corroded, Past/Near end of useful service life but functioning properly Wiring Devices Electrical Disconnect Amber (-) 2002 1 Ea. $1,702 2 Note: Switch is corroded, Past/Near end of useful service life but functioning properly Wiring Devices Electrical Disconnect Amber (-) 2002 1 Ea. $1,702 2 Note: Switch is corroded, Past/Near end of useful service life but functioning properly Electrical Service Switchgear - Main Dist Panel (3000 Amps) Amber (-) 2002 1 Ea. $123,241 4 Note: Very dirty, may be rusted in some areas
Electrical Service Switchgear - Main Dist Panel (4000 Amps) Amber (-) 2007 1 Ea. $153,622 4 Note: 5 sections, one breaker under repair, looks deteriorated from age, includes ATS Transfer Switches Automatic Transfer Switch (Amps) Amber (-) 2002 1 Ea. $130,766 4 Note: Not Operational, unable to verify if this equipment is abandoned in place or will be used in the future.
Power Distribution Panelboard - 277/480 400A Amber (+) 2002 1 Ea. $27,178 5 Power Distribution Panelboard - 277/480 400A Amber (+) 2002 1 Ea. $27,178 5 Power Distribution Panelboard - 400+ Amps Amber (+) 2002 1 Ea. $27,178 5 Power Distribution Panelboard - 277/480 125A Amber (+) 2002 1 Ea. $13,087 5 Power Distribution Panelboard - 400+ Amps Amber (+) 2002 1 Ea. $27,178 5 Wiring Devices Electrical Disconnect Green 2002 1 Ea. $2,144 5 Wiring Devices Electrical Disconnect Amber (+) 2002 1 Ea. $2,144 5 Power Distribution Panelboard - 120/208 225A Amber (+) 2002 1 Ea. $10,760 5 Power Distribution Panelboard - 120/208 225A Amber (+) 2002 1 Ea. $10,760 5 Power Distribution Panelboard - 120/208 225A Amber (+) 2002 1 Ea. $10,760 5 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2002 1 Ea. $141,227 5 Electrical Service Transformer (225 KVA) Amber (+) 2002 1 Ea. $38,545 6 Electrical Service Switchgear - Main Dist Panel (800 Amps) Amber (+) 2002 1 Ea. $28,835 6 Electrical Service Transformer (75 KVA) Amber (+) 2002 1 Ea. $15,399 6 Power Distribution Distribution Panels (400 Amps) Amber (+) 2002 1 Ea. $35,722 6 Building: T-FIS - Terminal FIS (Gates 15 to 16)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Power Distribution Motor Controller (Loads) Amber (+) 2002 13 Ea. $50,464 6 Power Distribution Distribution Panel (1600 Amps) Amber (+) 2002 1 Ea. $53,198 6 Electrical Service Transformer (112.5 KVA) Amber (+) 2002 1 Ea. $20,937 6 Power Distribution Distribution Panels (400 Amps) Amber (+) 2002 1 Ea. $35,722 6 Electrical Service Transformer (225 KVA) Amber (+) 2002 1 Ea. $38,545 6 Packaged Generator Assemblies Emergency Generator (1200 KW) Amber (+) 2002 1 Ea. $726,288 7 Power Distribution Panelboard - 120/208 225A Amber (+) 2002 1 Ea. $12,550 7 Power Distribution Panelboard - 120/208 225A Amber (+) 2002 1 Ea. $12,550 7 Power Distribution Panelboard - 120/208 100A Amber (+) 2002 1 Ea. $6,350 7 Power Distribution Panelboard - 120/208 100A Amber (+) 2002 1 Ea. $6,350 7 Power Distribution Panelboard - 120/208 225A Amber (+) 2002 1 Ea. $12,550 7 Power Distribution Panelboard - 120/208 100A Amber (+) 2002 1 Ea. $6,350 7 Power Distribution Panelboard - 277/480 125A Amber (+) 2002 1 Ea. $15,265 7 Power Distribution Panelboard - 120/208 225A Amber (+) 2002 1 Ea. $12,550 7 Power Distribution Panelboard - 120/208 100A Amber (+) 2002 1 Ea. $6,350 7 Power Distribution Power Wiring Amber (+) 2002 94,735 SF $277,321 8 Note: Building Wide
Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2007 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2007 1 Ea. $7,135 8 Metering Equipment Amber (+) 2002 1 Ea. $12,018 8
Lighting Fixtures Light Fixtures (Bldg SF) Amber (+) 2002 94,735 SF $4,281,984 8 Note: Building Wide
Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Lighting Control Lighting Control Panel Amber (+) 2002 1 Ea. $7,135 8 Electrical Service Exterior Liquid Filled Transformer (750 KVA) Amber (+) 2002 1 Ea. $117,125 8 Power Distribution Panelboard - 277/480 400A Amber (+) 2002 1 Ea. $39,934 10 Power Distribution Panelboard - 277/480 400A Amber (+) 2002 1 Ea. $39,934 10 Electrical Disconnect - 200A Amber (+) 2002 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 2002 1 Ea. $7,396 10 Fixed Ground Power Unit Amber (+) 2017 1 Ea. $222,680 10 Power Distribution Panelboard - 277/480 225A Amber (+) 2002 1 Ea. $26,943 10 Fixed Ground Power Unit Amber (+) 2009 1 Ea. $222,680 10 Wiring Devices Electrical Disconnect Amber (+) 2002 1 Ea. $3,150 10 Electrical Disconnect - 200A Amber (+) 2002 1 Ea. $7,396 10 Electrical Disconnect - 200A Amber (+) 2002 1 Ea. $7,396 10 Fixed Ground Power Unit Amber (+) 2012 1 Ea. $222,680 10 Electrical Service Switchgear - Main Dist Panel (800 Amps) Amber (+) 2002 1 Ea. $39,230 10 Power Distribution Panelboard - 277/480 225A Amber (+) 2002 1 Ea. $26,943 10 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2002 1 Ea. $207,509 10 Wiring Devices Electrical Disconnect Amber (+) 2002 1 Ea. $3,150 10 Power Distribution Panelboard - 277/480 225A Amber (+) 2002 1 Ea. $26,943 10 Sub Total for System 69 items $7,733,979
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Domestic Water Equipment Water Heater - Gas - 100 Gallon Amber (+) 2002 1 Ea. $12,491 5 Plumbing Fixtures Non-Refrigerated Drinking Fountain Amber (+) 2002 2 Ea. $9,329 5 Plumbing Fixtures Urinals Amber (+) 2002 1 Ea. $2,649 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2002 4 Ea. $21,258 5 Plumbing Fixtures Toilets Amber (+) 2002 3 Ea. $29,698 5 Plumbing Fixtures Toilets Amber (+) 2002 2 Ea. $19,798 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2002 2 Ea. $3,115 5 Plumbing Fixtures Urinals Amber (+) 2002 1 Ea. $2,649 5 Domestic Water Equipment Water Heater - Gas - 60 gallon Amber (+) 2002 2 Ea. $13,534 5 Building: T-FIS - Terminal FIS (Gates 15 to 16)
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Plumbing Fixtures Toilets Amber (+) 2010 7 Ea. $69,294 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 3 Ea. $15,944 5 Plumbing Fixtures Toilets Amber (+) 2010 4 Ea. $39,597 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2015 1 Ea. $4,310 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2002 1 Ea. $1,557 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2002 2 Ea. $8,618 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2002 3 Ea. $15,944 5 Plumbing Fixtures Toilets Amber (+) 2002 4 Ea. $39,597 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2002 1 Ea. $1,557 5 Domestic Water Piping Domestic Water Piping System (Bldg.SF) Amber (+) 2002 94,735 SF $719,413 6 Note: Building Wide
Plumbing Fixtures Restroom Lavatory Amber (+) 2002 3 Ea. $20,084 8 Domestic Water Equipment Water Heater - Electric - 30 gallon Amber (+) 2017 1 Ea. $5,262 8 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2002 1 Ea. $1,962 8 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2002 1 Ea. $1,962 8 Plumbing Fixtures Restroom Lavatory Amber (+) 2002 1 Ea. $6,695 8 Plumbing Fixtures Toilets Amber (+) 2002 2 Ea. $24,939 8 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 5 Ea. $33,474 8 Sub Total for System 26 items $1,124,730
Fire and Life Safety
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Fire Detection and Alarm Fire Alarm Amber (+) 2002 94,735 SF $317,859 6 Note: Building Wide
Water-Based Fire-Suppression Fire Sprinkler System (Bldg.SF) Amber (+) 2002 94,735 SF $2,432,582 8 Note: Building Wide
Sub Total for System 2 items $2,750,441
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2002 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2002 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2002 1 Ea. $20,208 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2002 1 Ea. $17,680 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2002 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2002 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2002 1 Ea. $20,208 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2002 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2002 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2002 1 Ea. $20,208 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2002 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2002 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2002 1 Ea. $17,680 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2002 1 Ea. $17,680 5 Elevators Hydraulic (Passenger Elev) Amber (+) 2002 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 2002 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 2002 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 2002 1 Ea. $193,192 5 Elevators Hydraulic (Passenger Elev) Amber (+) 2002 1 Ea. $193,192 5 Escalators Escalators Amber (+) 2002 1 Ea. $622,528 7
Note: Escalator recently repaired/serviced.
Sub Total for System 20 items $2,358,878
Sub Total for Building T-FIS - Terminal FIS (Gates 15 to 16) 136 items $17,446,369 Terminal B
P H A S E 1
F A C I L I T Y C O N D I T I O N A S S E S S M E N T
T E R M I N A L B U I L D I N G S A N D
CENTRAL UTILITY PLANT
BUILDING DETAILS
Building Details
Terminal B (Gates 17 to 30), San Jose, CA 95110
Building Address
$243,404
Current Deficiencies
$570,912,256
Replacement Cost
$8,919,096
Current + 5-Year Costs
$43,912,657
Current + 10-Year Trend
2010
Const Year
552,674
Area
Current + 3-Year Costs
$814,865
Terminal B (Gates 17 to 30)
Building Condition Assessment Score
(3-Year SCI)
Good
Ten-year Work-plan by System
Current + 10-Years
System Current 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Mechanical $0 $0 $571,461 $0 $0 $2,989,349 $193,010 $416,711 $12,359,987 $385,558 $768,531 $17,684,607 Electrical $0 $0 $0 $0 $0 $301,241 $2,642,246 $0 $1,763,717 $0 $8,105,591 $12,812,795 Plumbing $8,046 $0 $0 $0 $0 $1,495,800 $0 $0 $10,565 $0 $5,811,852 $7,326,263 Fire & Life Safety $731 $0 $0 $0 $0 $96,448 $1,854,352 $0 $0 $0 $100,671 $2,052,202 Technology $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Conveyances $234,627 $0 $0 $0 $0 $3,221,393 $0 $0 $0 $0 $580,770 $4,036,790 Security $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total: $243,404 $0 $571,461 $0 $0 $8,104,231 $4,689,608 $416,711 $14,134,269 $385,558 $15,367,415 $43,912,657 Current + 10-Year Cost of Repairs / SCI
Building: T-B - Terminal B (Gates 17 to 30)
Plumbing
Deficiency Rating Qty UoM Repair Cost ID
Domestic Water Piping Repair 3 LF $1,278 33
Note: Leaks
Location: Overhead AHU-2
Gas Water Heater Replacement Amber (-) 1 Ea. $4,648 34
Note: Damaged
Location: TPRV valve is failed
Custodial Mop Or Service Sink Replacement Amber (-) 1 Ea. $1,060 31 Note: Stained/Dirty
Location: The mop sink has major staining.
Custodial Mop Or Service Sink Replacement Amber (-) 1 Ea. $1,060 32 Note: Stained/Dirty
Location: The mop sink has moderate staining.
Sub Total for System 4 items $8,046
Fire and Life Safety
Deficiency Rating Qty UoM Repair Cost ID
Fire Sprinklers Piping Repair 5 LF $731 36
Note: Corroded
Location: Bottom of starwell
Sub Total for System 1 items $731
Conveyances
Deficiency Rating Qty UoM Repair Cost ID
Elevator Cab Replacement Amber (-) 1 Ea. $131,483 38
Note: L1 - Broken, At the time of inspection, it seemed like this elevator was not functioning Location: Mechanical Room - B3920
Passenger Boarding Bridge - Water Cabinet Amber (-) 1 Ea. $51,572 46 Note: Water cabinet Leaks
Location: Gate-26
Passenger Boarding Bridge - Water Cabinet Amber (-) 1 Ea. $51,572 77 Note: Past/Near end of service life, Hoses under jet bridge leaking heavily while use Location: Gate-17
Sub Total for System 3 items $234,627
Sub Total for Building T-B - Terminal B (Gates 17 to 30) 8 items $243,404
DEFICIENCY SUMMARY
LIFE CYCLE SUMMARY
Building: T-B - Terminal B (Gates 17 to 30)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (-) 2010 1 Ea. $190,487 2 Note: R-22 refrigerant is outdated and has been phased out.
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (-) 2010 1 Ea. $190,487 2 Note: R-22 refrigerant is outdated and has been phased out.
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (-) 2010 1 Ea. $190,487 2 Note: Out of order tag number on unit and R-22 refrigerant is outdated and has been phased out.
Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (+) 2010 1 Ea. $239,959 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Note: Above Jet Bridge
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 HVAC Air Distribution AHU 20,000 CFM Interior Amber (+) 2010 1 Ea. $283,782 5 HVAC Air Distribution AHU 20,000 CFM Interior Amber (+) 2010 1 Ea. $283,782 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 HVAC Air Distribution AHU 20,000 CFM Interior Amber (+) 2010 1 Ea. $283,782 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Note: General: Basement
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Note: General: Basement
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Note: General: Basement
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Note: General: Basement
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Note: General: Basments
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Note: General: Basement
Building: T-B - Terminal B (Gates 17 to 30)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Other HVAC Distribution Systems VFD (7.5 HP) Amber (+) 2010 1 Ea. $10,219 5 Decentralized Cooling Fan Coil - Water Cool/Water Heat ( 3 Ton) Amber (+) 2010 1 Ea. $6,633 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: On (H-03-AHU-6)
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: On (H-03-AHU-5)
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: On (H-03-AHU-4)
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: On (H-03-AHU-3)
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: On (H-03-AHU-2)
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: On (H-03-AHU-1)
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Decentralized Cooling Fan Coil - DX Cool w/Electric Heat (3 Ton) Amber (+) 2010 1 Ea. $3,854 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: On (J-03-AHU-4)
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: On (J-03-AHU-2)
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: On (J-03-AHU-3)
Other HVAC Distribution Systems VFD (20 HP) Amber (+) 2010 1 Ea. $17,251 5 Note: General: FED FROM J-00-SDPH-A
CIRCUIT 5
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (20 HP) Amber (+) 2010 1 Ea. $17,251 5 Note: General: FED FROM H-00-SDPH-A
CIRCUIT 6
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $49,571 5 Note: General: VFDs are planned to be replaced with ABBs Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Building: T-B - Terminal B (Gates 17 to 30)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 2 Ea. $99,140 5 Note: General: Supply and exhaust On AHU #4.
VFDs are currently getting replaced as they fail
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Other HVAC Distribution Systems VFD (40 HP) Amber (+) 2010 1 Ea. $27,266 5 Note: General: VFDs are planned to be replaced with ABBs.
Supply VFD
FED FROM L -03-SDPH-A
Other HVAC Distribution Systems VFD (15 HP) Green 2010 1 Ea. $14,789 5 Note: General: Return VFD on ahu 2
VFDs are planned to be replaced with ABBs.
FED FROM L -03-SDPH-A
Other HVAC Distribution Systems VFD (40 HP) Amber (+) 2010 1 Ea. $27,266 5 Note: General:
Supply VFD on AHU-1
FED FROM L -03-SDPH-A
Other HVAC Distribution Systems VFD (15 HP) Green 2010 1 Ea. $14,789 5 Note: General: Return VFD on ahu 1
VFDs are planned to be replaced with ABBs.
FED FROM L -03-SDPH-A
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Other HVAC Distribution Systems VFD (40 HP) Amber (+) 2010 1 Ea. $27,266 5 Note: General: VFDs are planned to be replaced with ABBs.
Supply VFD
Other HVAC Distribution Systems VFD (15 HP) Green 2023 1 Ea. $14,789 5 Note: General: Return VFD on ahu 3
Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Condenser - Outside Air Cooled (5 Tons) Amber (+) 2010 1 Ea. $19,513 5 Note: General: Great American bagel condensing unit
Exhaust Air Supply Fan Amber (+) 2010 1 Ea. $15,723 5
Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 3 Ea. $22,738 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $6,962 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 HVAC Air Distribution VAV Boxes / Terminal Device Amber (+) 2010 1 Ea. $7,580 5 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $9,061 5 HVAC Air Distribution AHU 2,000 CFM Interior Amber (+) 2010 1 Ea. $56,769 5 Note: General: Maintenance had to repaired broken 1 month ago HVAC Air Distribution AHU 30,000 CFM Interior Amber (+) 2010 1 Ea. $338,088 5 Decentralized Cooling Fan Coil - Water Cool/Water Heat (15 Ton) Amber (+) 2010 1 Ea. $15,231 5 Exhaust Air Supply Fan Amber (+) 2010 1 Ea. $16,981 6
Note: General: Centrifugal fan.
Building: T-B - Terminal B (Gates 17 to 30)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Supply Fan Amber (+) 2010 1 Ea. $16,981 6
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Supply Fan Amber (+) 2010 1 Ea. $16,981 6
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Note: General: Pollution control unit
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Note: General: Concession exhaust
Exhaust Air Supply Fan Amber (+) 2010 1 Ea. $16,981 6
Note: General: Kitchen concession makeup air
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Note: General: Kitchen exhaust
Exhaust Air Supply Fan Amber (+) 2010 1 Ea. $16,981 6
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Note: General: C-25,27
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Note: General: C-29,31
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,142 6 Note: General: C-29,31
Exhaust Air Supply Fan Amber (+) 2010 1 Ea. $16,981 6
Note: General: Centrifugal duct fan.
Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,473 7 HVAC Air Distribution AHU 30,000 CFM Interior Amber (+) 2010 1 Ea. $394,346 7 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,473 7 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,473 7 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,473 7 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $4,473 7 Note: General: Concession dish exhaust
HVAC Air Distribution AHU 20,000 CFM Outdoor Amber (+) 2010 1 Ea. $490,600 8 HVAC Air Distribution AHU 20,000 CFM Interior Amber (+) 2010 1 Ea. $357,483 8 HVAC Air Distribution AHU 15,000 CFM Outdoor Amber (+) 2010 1 Ea. $355,232 8 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2019 1 Ea. $62,445 8 Note: General: Recently replaced
HVAC Air Distribution AHU 20,000 CFM Interior Amber (+) 2010 1 Ea. $357,483 8 HVAC Air Distribution AHU 20,000 CFM Interior Amber (+) 2010 1 Ea. $357,483 8 Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2019 1 Ea. $62,445 8 Note: General: Recently replaced. On AHU #5
Other HVAC Distribution Systems VFD (75 HP) Amber (+) 2010 1 Ea. $62,445 8 Note: General: Recently replaced. On AHU #5
HVAC Air Distribution AHU 15,000 CFM Interior Amber (+) 2010 1 Ea. $280,625 8 HVAC Air Distribution AHU 20,000 CFM Outdoor Amber (+) 2010 1 Ea. $490,600 8 HVAC Air Distribution AHU 30,000 CFM Interior Amber (+) 2010 1 Ea. $425,894 8 Facility Hydronic Distribution Pump - 1HP or Less (Ea.) Amber (+) 2010 1 Ea. $10,630 8 Facility Hydronic Distribution Pump - 1HP or Less (Ea.) Amber (+) 2010 1 Ea. $10,630 8 HVAC Air Distribution AHU 30,000 CFM Interior Amber (+) 2010 1 Ea. $425,894 8 Note: General: Basement
HVAC Air Distribution AHU 15,000 CFM Interior Amber (+) 2010 1 Ea. $280,625 8 Note: General: Basement
Building: T-B - Terminal B (Gates 17 to 30)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
HVAC Air Distribution AHU 30,000 CFM Interior Amber (+) 2010 1 Ea. $425,894 8 Note: General: Basement
HVAC Air Distribution AHU 30,000 CFM Interior Amber (+) 2010 1 Ea. $425,894 8 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 6 Ea. $68,490 8 Decentralized Cooling Fan Coil - DX cool w/Electric Heat (5 Ton) Amber (+) 2010 1 Ea. $8,753 8 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 4 Ea. $45,661 8 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 6 Ea. $68,490 8 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 3 Ea. $34,244 8 HVAC Air Distribution AHU 20,000 CFM Outdoor Amber (+) 2010 1 Ea. $490,600 8 HVAC Air Distribution AHU 20,000 CFM Outdoor Amber (+) 2010 1 Ea. $490,600 8 HVAC Air Distribution AHU 15,000 CFM Outdoor Amber (+) 2010 1 Ea. $355,232 8 HVAC Air Distribution AHU 20,000 CFM Outdoor Amber (+) 2010 1 Ea. $490,600 8 HVAC Air Distribution AHU 30,000 CFM Outdoor Amber (+) 2010 1 Ea. $565,805 8 Heating System Supplementary Components Controls - Electronic (Bldg.SF) Amber (+) 2010 552,674 SF $2,107,788 8 Note: Building Wide
HVAC Air Distribution AHU 20,000 CFM Outdoor Amber (+) 2010 1 Ea. $490,600 8 HVAC Air Distribution AHU 20,000 CFM Outdoor Amber (+) 2010 1 Ea. $490,600 8 HVAC Air Distribution AHU 20,000 CFM Outdoor Amber (+) 2010 1 Ea. $490,600 8 Exhaust Air Supply Fan Amber (+) 2010 1 Ea. $19,807 8
Facility Hydronic Distribution Pump- 10HP (Ea.) Amber (+) 2014 1 Ea. $28,493 8 Note: General: Recycled water pump.
Facility Hydronic Distribution Pump- 10HP (Ea.) Amber (+) 2014 1 Ea. $28,493 8 Note: General: Recycled water pump.
Exhaust Air Supply Fan Amber (+) 2010 1 Ea. $19,807 8
HVAC Air Distribution AHU 30,000 CFM Interior Amber (+) 2010 1 Ea. $425,894 8 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $8,770 8 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $8,770 8 Heating System Supplementary Components Controls - Electronic Amber (+) 2010 1 Ea. $11,415 8 HVAC Air Distribution AHU 30,000 CFM Interior Amber (+) 2010 1 Ea. $425,894 8 Air Distribution Pre-Conditioned Air Unit - 45 Ton Green 2017 1 Ea. $302,279 8 Decentralized Cooling Unit Ventilator - Chilled Water (Ea.) Amber (+) 2010 1 Ea. $9,471 9 Note: Outside b3920
Decentralized Cooling Fan Coil - D/X only ( 5 Ton) Amber (+) 2019 1 Ea. $6,967 9 Exhaust Air Wall Exhaust Fan Amber (+) 2010 1 Ea. $12,594 9 Note: K-03-EF-1
Exhaust Air Interior Ceiling Exhaust Fan Amber (+) 2010 1 Ea. $1,295 9 Thermal Cooling Storage Ice Amber (+) 2010 1 Ea. $23,264 9 Note: Locked storage
Air Distribution Pre-Conditioned Air Unit - 45 Ton Green 2019 1 Ea. $326,462 9 Note: General: Jet bridge hosing is heavily leaking
Decentralized Cooling Fan Coil - D/X Only (3 Ton) Green 2010 1 Ea. $5,505 9 Note: General: Interim gate
Air Distribution Pre-Conditioned Air Unit - 45 Ton Green 2020 1 Ea. $352,578 10 HVAC Air Distribution AHU 5,000 CFM Interior Amber (+) 2010 1 Ea. $124,089 10 Note: General: Leakage discharge around side of intake close to transfer grille in wall HVAC Air Distribution AHU 5,000 CFM Interior Amber (+) 2010 1 Ea. $124,089 10 HVAC Air Distribution AHU 5,000 CFM Interior Amber (+) 2010 1 Ea. $124,089 10 Other HVAC Distribution Systems VFD (7.5 HP) Amber (+) 2014 1 Ea. $15,015 10 Decentralized Cooling Condenser - Outside Air Cooled (5 Tons) Amber (+) 2019 1 Ea. $28,671 10 Note: General: Concession condensing unit
Sub Total for System 212 items $17,684,607
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Power Distribution Panelboard - 277/480 600A Amber (+) 2010 1 Ea. $35,653 5 Power Distribution Panelboard - 277/480 250A Amber (+) 2010 1 Ea. $18,337 5 Power Distribution Panelboard - 120/208 100A Green 2010 1 Ea. $5,444 5 Electrical Service Transformer (30 KVA) Green 2010 1 Ea. $10,798 5 Power Distribution Panelboard - 120/208 225A Amber (+) 2010 1 Ea. $10,760 5 Electrical Service Transformer (30 KVA) Green 2010 1 Ea. $10,798 5 Motor Starter Disconnect Amber (+) 2010 1 Ea. $6,934 5
Note: General: 208/120V, Other Asset: Motor controller
Building: T-B - Terminal B (Gates 17 to 30)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Motor Starter Disconnect Amber (+) 2010 1 Ea. $6,934 5
Note: General: 208/120V, Other Asset: Motor controller
Motor Starter Disconnect Amber (+) 2010 1 Ea. $6,934 5
Note: General: 208/120V, Other Asset: Motor controller
Motor Starter Disconnect Amber (+) 2010 1 Ea. $6,934 5
Note: General: 208/120V, Other Asset: Motor controller
Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2010 1 Ea. $141,227 5 Note: General: 400A
Motor Starter Disconnect Amber (+) 2010 1 Ea. $6,934 5
Note: General: FED FROM
K-00-SLP-B 22-24,
Motor Starter Disconnect Amber (+) 2010 1 Ea. $6,934 5
Note: General: FED FROM
K-00-SLP-B 22-24,
Motor Starter Disconnect Amber (+) 2010 1 Ea. $6,934 5
Note: General: FED FROM
K-00-SLP-B 22-24,
Motor Starter Disconnect Amber (+) 2010 1 Ea. $6,934 5
Note: General: FED FROM
K-00-SLP-B 22-24,
Power Distribution Panelboard - 277/480 400A Amber (+) 2010 2 Ea. $54,356 5 Note: General: Rust along perimeter of panel cover
Battery Equipment UPS (40 KVA) Amber (+) 2010 4 Ea. $651,631 6 Note: General: Paired with Battery UPS—CTX-5
Battery Equipment UPS (40 KVA) Amber (+) 2010 4 Ea. $651,631 6 Note: General: Paired with Battery UPS—CTX-5
Battery Equipment UPS (40 KVA) Green 2010 4 Ea. $651,631 6 Note: General: Paired with BATTERY-UPS-CTX-7
Battery Equipment UPS (40 KVA) Green 2010 4 Ea. $651,631 6 Note: General: Paired with BATTERY-UPS-CTX-8
Power Distribution Distribution Panels (400 Amps) Amber (+) 2010 1 Ea. $35,722 6 Note: General: 208/120, from transformer ET1
Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2010 1 Ea. $177,906 8 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2010 1 Ea. $177,906 8 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $2,701 8 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $2,701 8 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2010 1 Ea. $177,906 8 Motor Starter Disconnect Green 2010 1 Ea. $8,735 8
Note: General: FED FROM J-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $8,735 8
Note: General: FED FROM J-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $8,735 8
Note: General: FED FROM J-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $8,735 8
Note: General: FED FROM J-00-PH-A
Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2010 1 Ea. $177,906 8 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2010 1 Ea. $177,906 8 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2010 1 Ea. $177,906 8 Transfer Switches Automatic Transfer Switch (Amps) Amber (+) 2010 1 Ea. $177,906 8 Electrical Service Switchgear - Main Dist Panel (1600 Amps) Amber (+) 2010 1 Ea. $137,824 8 Note: General: Switchboard.
Electrical Service Switchgear - Main Dist Panel (4000 Amps) Amber (+) 2010 1 Ea. $209,002 8 Note: General: Six sections.
Electrical Service Switchgear - Main Dist Panel (1600 Amps) Amber (+) 2010 1 Ea. $137,824 8 Note: General: Two sections, switchboard.
Power Distribution Panelboard - 120/208 225A Amber (+) 2010 1 Ea. $13,554 8 Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: Ground power unit
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Power Distribution Panelboard - 277/480 400A Amber (+) 2010 2 Ea. $79,867 10 Note: General: Rust around panel cover perimeter
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 400A
Building: T-B - Terminal B (Gates 17 to 30)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480/277V
Electrical Service Switchgear - Main Dist Panel (800 Amps) Amber (+) 2010 1 Ea. $39,230 10 Note: General: Switchboard.
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Green 2010 1 Ea. $10,188 10
Note: General: Fed from K-00-PH-A
Motor Starter Disconnect Amber (+) 2010 1 Ea. $10,188 10 Note: General: 120/208V, Other Asset: Motor controller
Motor Starter Disconnect Amber (+) 2010 1 Ea. $10,188 10 Note: General: 120/208V, Other Asset: Motor controller
Motor Starter Disconnect Amber (+) 2010 1 Ea. $10,188 10 Note: General: 120/208V, Other Asset: Motor controller
Motor Starter Disconnect Amber (+) 2010 1 Ea. $10,188 10 Note: General: 120/208V, Other Asset: Motor controller
Packaged Generator Assemblies Emergency Generator (1200 KW) Amber (+) 2010 1 Ea. $914,914 10 Note: General: Terminal B - H Core generator
Packaged Generator Assemblies Emergency Generator (1200 KW) Amber (+) 2010 1 Ea. $914,914 10 Note: General: Diesel
Packaged Generator Assemblies Emergency Generator (1200 KW) Amber (+) 2010 1 Ea. $914,914 10 Note: General: Diesel
Packaged Generator Assemblies Emergency Generator (1200 KW) Amber (+) 2010 1 Ea. $914,914 10 Note: General: Diesel
Fixed Ground Power Unit Amber (+) 2012 1 Ea. $222,680 10 Note: Other Asset: 480-115V Power Supply
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Building: T-B - Terminal B (Gates 17 to 30)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Power Distribution Distribution Panels (400 Amps) Amber (+) 2010 1 Ea. $48,600 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 400A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: 480-115V Power Supply
Power Distribution Distribution Panels (400 Amps) Amber (+) 2010 1 Ea. $48,600 10 Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 400A, 600V
Power Distribution Distribution Panels (400 Amps) Amber (+) 2010 1 Ea. $48,600 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 400A, 600V
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 400A, 600V
Power Distribution Panelboard - 277/480 400A Amber (+) 2010 2 Ea. $79,867 10 Note: General: Rust around the perimeter of panel covers Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Power Distribution Distribution Panels (400 Amps) Amber (+) 2010 1 Ea. $48,600 10 Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 400A, 600V
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Power Distribution Panelboard - 277/480 400A Amber (+) 2010 2 Ea. $79,867 10 Note: General: Rust around the perimeter of panel covers Power Distribution Distribution Panels (400 Amps) Amber (+) 2010 1 Ea. $48,600 10 Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Building: T-B - Terminal B (Gates 17 to 30)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 400A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A, 600V
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 400A, 600V
Power Distribution Distribution Panels (400 Amps) Amber (+) 2010 1 Ea. $48,600 10 Power Distribution Panelboard - 277/480 400A Amber (+) 2010 2 Ea. $79,867 10 Note: General: Rust around the perimeter of panel covers Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Fixed Ground Power Unit Amber (+) 2017 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480-277V, 100A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480-277V, 100A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480-277V, 100A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480-277V, 100A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480-277V, 400A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480-277V, 100A, 3P/4W
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480-277V, 100A, 3P/4W
Fixed Ground Power Unit Amber (+) 2017 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480, 100A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480, 100A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480, 400A
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480, 100A
Building: T-B - Terminal B (Gates 17 to 30)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480, 100A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480, 400A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480/277V, 600VAC
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480/277V, 600VAC
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480/277V, 600VAC
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480/277V, 600VAC
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: Power Supply
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480/277V, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480/277V, 200A
Power Distribution Distribution Panels (400 Amps) Amber (+) 2010 1 Ea. $48,600 10 Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480, 200A
Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Note: General: 480/277V, 600VAC
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480/277V, 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480/277V, 200A
Power Distribution Panelboard - 277/480 400A Amber (+) 2010 2 Ea. $79,867 10 Note: General: Rust around the perimeter of panel covers Power Distribution Distribution Panels (400 Amps) Amber (+) 2010 1 Ea. $48,600 10 Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 200A
Fixed Ground Power Unit Amber (+) 2010 1 Ea. $222,680 10 Note: Other Asset: ground power unit
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480V, 60+200+175A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480V, 60+200+175A
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480V, 60+200+175A
Building: T-B - Terminal B (Gates 17 to 30)
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Disconnect - 200A Amber (+) 2010 1 Ea. $7,396 10 Note: General: 480V, 60+200+175A
Sub Total for System 170 items $13,286,586
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Plumbing Fixtures Restroom Lavatory Amber (+) 2010 3 Ea. $15,944 5 Plumbing Fixtures Toilets Amber (+) 2010 4 Ea. $39,597 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 3 Ea. $15,944 5 Plumbing Fixtures Toilets Amber (+) 2010 4 Ea. $39,597 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 6 Ea. $31,887 5 Plumbing Fixtures Toilets Amber (+) 2010 9 Ea. $89,093 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 1 Ea. $5,315 5 Plumbing Fixtures Toilets Amber (+) 2010 1 Ea. $9,899 5 Plumbing Fixtures Showers Amber (+) 2010 1 Ea. $2,557 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 4 Ea. $21,258 5 Plumbing Fixtures Toilets Amber (+) 2010 6 Ea. $59,395 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2010 2 Ea. $8,618 5 Plumbing Fixtures Lavatory Amber (+) 2010 4 Ea. $20,071 5 Plumbing Fixtures Toilets Amber (+) 2010 6 Ea. $59,395 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 1 Ea. $1,557 5 Plumbing Fixtures Toilets Amber (+) 2010 1 Ea. $9,899 5 Plumbing Fixtures Toilets Amber (+) 2010 2 Ea. $19,798 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 5 Ea. $7,786 5 Plumbing Fixtures Urinals Amber (+) 2010 4 Ea. $10,598 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 1 Ea. $1,557 5 Plumbing Fixtures Urinals Amber (+) 2010 4 Ea. $10,598 5 Plumbing Fixtures Toilets Amber (+) 2010 3 Ea. $29,698 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 5 Ea. $7,786 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2010 2 Ea. $8,618 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 5 Ea. $7,786 5 Plumbing Fixtures Toilets Amber (+) 2010 3 Ea. $29,698 5 Plumbing Fixtures Urinals Amber (+) 2010 4 Ea. $10,598 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 1 Ea. $1,557 5 Plumbing Fixtures Toilets Amber (+) 2010 1 Ea. $9,899 5 Plumbing Fixtures Urinals Amber (+) 2010 4 Ea. $10,598 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 5 Ea. $7,786 5 Plumbing Fixtures Toilets Amber (+) 2010 3 Ea. $29,698 5 Plumbing Fixtures Toilets Amber (+) 2010 3 Ea. $29,698 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 3 Ea. $4,671 5 Plumbing Fixtures Urinals Amber (+) 2010 1 Ea. $2,649 5 Plumbing Fixtures Urinals Amber (+) 2010 1 Ea. $2,649 5 Plumbing Fixtures Toilets Amber (+) 2010 3 Ea. $29,698 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 2 Ea. $3,115 5 Plumbing Fixtures Toilets Amber (+) 2010 3 Ea. $29,698 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 4 Ea. $6,228 5 Plumbing Fixtures Urinals Amber (+) 2010 4 Ea. $10,598 5 Plumbing Fixtures Non-Refrigerated Drinking Fountain Amber (+) 2010 2 Ea. $9,329 5 Plumbing Fixtures Showers Amber (+) 2010 1 Ea. $2,557 5 Plumbing Fixtures Urinals Amber (+) 2010 3 Ea. $7,949 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 4 Ea. $6,228 5 Plumbing Fixtures Toilets Amber (+) 2010 3 Ea. $29,698 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2010 1 Ea. $5,251 5 Plumbing Fixtures Urinals Amber (+) 2010 3 Ea. $7,949 5 Plumbing Fixtures Toilets Amber (+) 2010 3 Ea. $29,698 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 4 Ea. $6,228 5 Domestic Water Equipment Water Heater - Electric - 52 gallon Amber (+) 2010 1 Ea. $5,251 5 Plumbing Fixtures Non-Refrigerated Drinking Fountain Amber (+) 2010 2 Ea. $9,329 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2010 2 Ea. $8,618 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 6 Ea. $31,887 5 Plumbing Fixtures Toilets Amber (+) 2010 11 Ea. $108,890 5 Building: T-B - Terminal B (Gates 17 to 30)
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Plumbing Fixtures Lavatory Amber (+) 2010 1 Ea. $5,018 5 Note: General: Nursing room.
Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2010 1 Ea. $4,310 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 6 Ea. $31,887 5 Plumbing Fixtures Toilets Amber (+) 2010 11 Ea. $108,890 5 Plumbing Fixtures Lavatory Amber (+) 2010 1 Ea. $5,018 5 Note: General: Nursing room
Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2010 2 Ea. $8,618 5 Plumbing Fixtures Toilets Amber (+) 2010 1 Ea. $9,899 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 1 Ea. $5,315 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 5 Ea. $26,573 5 Plumbing Fixtures Toilets Amber (+) 2010 11 Ea. $108,890 5 Plumbing Fixtures Lavatory Amber (+) 2010 1 Ea. $5,018 5 Plumbing Fixtures Refrigerated Drinking Fountain Amber (+) 2010 2 Ea. $8,618 5 Plumbing Fixtures Restroom Lavatory Amber (+) 2010 6 Ea. $31,887 5 Plumbing Fixtures Toilets Amber (+) 2010 11 Ea. $108,890 5 Plumbing Fixtures Lavatory Amber (+) 2010 1 Ea. $5,018 5 Domestic Water Equipment Water Heater - Gas - 50 gallon Amber (+) 2018 1 Ea. $8,603 8 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 2010 1 Ea. $1,962 8 Note: Looks in poor condition
Building Support Plumbing System
Supplementary Components
Sump Pump Amber (+) 2010 1 Ea. $1,632 10
Building Support Plumbing System
Supplementary Components
Sump Pump Amber (+) 2010 2 Ea. $3,262 10
Facility Potable-Water Storage Tanks Water Storage Tank - 750 Gallon Amber (+) 2010 1 Ea. $79,608 10 Note: General: Recycled water expansion tank.
Domestic Water Equipment Water Heater - Gas - 40 gallon Amber (-) 2010 1 Ea. $10,035 10 Note: Past/Near end of useful service life but functioning properly Plumbing Fixtures Lavatory Amber (+) 2010 1 Ea. $7,373 10 Sub Total for System 77 items $1,608,275
Fire and Life Safety
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Water-Based Fire-Suppression Fire Pump Amber (+) 2010 1 Ea. $96,448 5 Fire Detection and Alarm Fire Alarm Amber (+) 2010 552,674 SF $1,854,352 6 Note: Building Wide
Fire Pump Controller Green 2010 1 Ea. $100,671 10
Note: General: Good condition, last tested in August 2015, Other Asset: Fire pump control cabinet with electrical fire pump controller & fire pump ATS Fire Pump Controller Green 2010 1 Ea. $100,671 10
Note: General: Good condition, last tested in August 2015, Other Asset: Fire pump control cabinet with electrical fire pump controller & fire pump ATS Fire Pump Controller Green 2010 1 Ea. $100,671 10
Note: General: Good condition, last tested in August 2015, Other Asset: Fire pump control cabinet with electrical fire pump controller & fire pump ATS Fire Pump Controller Green 2010 1 Ea. $100,671 10
Note: General: Good condition, last tested in August 2015, Other Asset: Fire pump control cabinet with electrical fire pump controller & fire pump ATS Fire Pump Controller Green 2010 1 Ea. $100,671 10
Note: General: Good condition, last tested in August 2015, Other Asset: Fire pump control cabinet with electrical fire pump controller & fire pump ATS Fire Pump Controller Green 2010 1 Ea. $100,671 10
Note: General: Good condition, last tested in August 2015, Other Asset: Fire pump control cabinet with electrical fire pump controller & fire pump ATS Fire Pump Controller Green 2010 1 Ea. $100,671 10
Note: General: Good condition, last tested in August 2015, Other Asset: Fire pump control cabinet with electrical fire pump controller & fire pump ATS Fire Pump Controller Green 2010 1 Ea. $100,671 10
Note: General: Good condition, last tested in August 2015, Other Asset: Fire pump control cabinet with electrical fire pump controller & fire pump ATS Sub Total for System 10 items $2,756,168
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Elevators Hydraulic (Freight Elev) Amber (+) 2010 1 Ea. $288,935 5 Note: Other Asset: Hydraulic Lift
Elevators Hydraulic (Freight Elev) Amber (+) 2010 1 Ea. $288,935 5 Note: Other Asset: Hydraulic Lift
Elevators Hydraulic (Freight Elev) Amber (+) 2010 1 Ea. $288,935 5 Note: Other Asset: Hydraulic Lift
Building: T-B - Terminal B (Gates 17 to 30)
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Elevators Hydraulic (Freight Elev) Amber (+) 2010 1 Ea. $288,935 5 Note: Other Asset: Hydraulic Lift
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jetbridge
, Other Asset: Hoist
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Elevators Hydraulic (Passenger Elev) Amber (+) 2010 1 Ea. $193,192 5 Note: Other Asset: Hydraulic machine for elevator
Elevators Hydraulic (Passenger Elev) Amber (+) 2010 1 Ea. $193,192 5 Note: Other Asset: Hydraulic machine for elevator
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jet bridge, Other Asset: Hoist
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Autolevel is next to the passenger gates to the outside, next to yellow gates , Other Asset: Autolevel Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jetbridge, Other Asset: Hoist
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jetbridge, Other Asset: Hoist
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Building: T-B - Terminal B (Gates 17 to 30)
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Note: Jetbridge, Other Asset: Hoist
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jet bridge, Other Asset: Hoist
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jet bridge, Other Asset: Hoist
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jet bridge, Other Asset: Hoist
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jet bridge, Other Asset: Hoist
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Elevators Hydraulic (Passenger Elev) Amber (+) 2010 1 Ea. $193,192 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jet bridge, Other Asset: Hoist
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 1 Ea. $20,208 5 Note: Jetbridge, Other Asset: Hoist
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Building: T-B - Terminal B (Gates 17 to 30)
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Autolevel is next to the passenger gates to the outside, next to yellow gates , Other Asset: Autolevel Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 2 Ea. $40,414 5 Note: Other Asset: Jet bridge Hoist
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 2 Ea. $40,414 5 Note: Other Asset: Jet bridge Hoist
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Jet Bridge, Other Asset: Jet bridge Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2010 1 Ea. $75,776 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 2 Ea. $40,414 5 Note: Other Asset: Jet bridge Hoist
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Hoist Amber (+) 2010 2 Ea. $40,414 5 Note: Other Asset: Jet bridge Hoist
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2010 1 Ea. $17,680 5 Note: Jet Bridge, Other Asset: Jet bridge Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $148,454 10 Note: Cables, underside, and frame are rusty.
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $148,454 10 Note: Cables, underside, and frame are rusty.
Elevators Hydraulic (Passenger Elev) Amber (+) 2015 1 Ea. $283,862 10 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $148,454 10 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2010 1 Ea. $148,454 10 Sub Total for System 97 items $7,412,134
Sub Total for Building T-B - Terminal B (Gates 17 to 30) 566 items $42,747,770 Interim
Facility
P H A S E 1
F A C I L I T Y C O N D I T I O N A S S E S S M E N T
T E R M I N A L B U I L D I N G S A N D
CENTRAL UTILITY PLANT Interim
Terminal B
BUILDING DETAILS
Building Details
Interim TB (Gates 31 to 36), San Jose, CA 95110
Building Address
$0
Current Deficiencies
$45,902,388
Replacement Cost
$3,635,494
Current + 5-Year Costs
$3,931,744
Current + 10-Year Trend
2019
Const Year
44,436
Area
Current + 3-Year Costs
$0
Interim TB (Gates 31 to 36)
Building Condition Assessment Score
(3-Year SCI)
Good
Ten-year Work-plan by System
Current + 10-Years
System Current 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Mechanical $0 $0 $0 $0 $0 $1,606,249 $0 $0 $0 $0 $22,283 $1,628,532 Electrical $0 $0 $0 $0 $0 $11,581 $0 $0 $0 $0 $0 $11,581 Plumbing $0 $0 $0 $0 $0 $108,316 $0 $0 $20,085 $0 $253,882 $382,283 Fire & Life Safety $0 $0 $0 $0 $0 $919,213 $0 $0 $0 $0 $0 $919,213 Technology $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Conveyances $0 $0 $0 $0 $0 $990,135 $0 $0 $0 $0 $0 $990,135 Security $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total: $0 $0 $0 $0 $0 $3,635,494 $0 $0 $20,085 $0 $276,165 $3,931,744 Current + 10-Year Cost of Repairs / SCI
No deficiencies for this building.
DEFICIENCY SUMMARY
LIFE CYCLE SUMMARY
Building: T-I - Interim TB (Gates 31 to 36)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Decentralized Cooling Package DX Unit (10 Ton) Amber (+) 2019 1 Ea. $33,299 5 Decentralized Cooling Package DX Unit (10 Ton) Amber (+) 2019 1 Ea. $33,299 5 Decentralized Cooling Package DX Unit (10 Ton) Amber (+) 2019 1 Ea. $33,299 5 Decentralized Cooling Package DX Unit (10 Ton) Amber (+) 2019 1 Ea. $33,299 5 Decentralized Cooling Package DX Unit (10 Ton) Amber (+) 2019 1 Ea. $33,299 5 Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (+) 2019 1 Ea. $239,959 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (+) 2019 1 Ea. $239,959 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (+) 2019 1 Ea. $239,959 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (+) 2019 1 Ea. $239,959 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (+) 2019 1 Ea. $239,959 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Air Distribution Pre-Conditioned Air Unit - 45 Ton Amber (+) 2019 1 Ea. $239,959 5 Note: Inaccessible Exhaust Fan located above the Jet Bridge Decentralized Cooling Ductless Split System (1 Ton) Green 2019 1 Ea. $8,636 10 Decentralized Cooling Ductless Split System (2 Ton) Green 2019 1 Ea. $13,647 10 Sub Total for System 13 items $1,628,532
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Service Transformer (45 KVA) Amber (+) 2019 1 Ea. $11,581 5 Sub Total for System 1 items $11,581
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Plumbing Fixtures Toilets Amber (+) 2019 1 Ea. $9,899 5 Domestic Water Equipment Water Heater - Gas - 30 gallon Amber (+) 2019 1 Ea. $7,145 5 Plumbing Fixtures Toilets Amber (+) 2019 3 Ea. $29,698 5 Plumbing Fixtures Sink - Service / Mop Sink Green 2019 2 Ea. $3,115 5 Plumbing Fixtures Urinals Green 2019 2 Ea. $5,300 5
Plumbing Fixtures Toilets Amber (+) 2019 2 Ea. $19,798 5 Plumbing Fixtures Sink - Service / Mop Sink Green 2019 3 Ea. $4,671 5 Domestic Water Equipment Water Heater - Gas - 30 gallon Amber (+) 2019 1 Ea. $7,145 5 Plumbing Fixtures Refrigerated Drinking Fountain Green 2019 3 Ea. $12,927 5 Plumbing Fixtures Refrigerated Drinking Fountain Green 2019 2 Ea. $8,618 5 Domestic Water Piping Domestic Water Piping System (Bldg.SF) Amber (+) 2019 44,436 SF $312,448 5 Plumbing Fixtures Restroom Lavatory Green 2019 1 Ea. $6,695 8 Plumbing Fixtures Restroom Lavatory Green 2019 2 Ea. $13,390 8 Plumbing Fixtures Toilets Green 2019 4 Ea. $58,181 10
Plumbing Fixtures Toilets Green 2019 1 Ea. $14,545 10
Plumbing Fixtures Group Wash Fountain Amber (+) 2019 1 Ea. $26,332 10 Plumbing Fixtures Toilets Amber (+) 2019 4 Ea. $58,181 10 Plumbing Fixtures Urinals Amber (+) 2019 5 Ea. $19,467 10 Plumbing Fixtures Toilets Amber (+) 2019 2 Ea. $29,089 10 Plumbing Fixtures Group Wash Fountain Amber (+) 2019 1 Ea. $26,332 10 Plumbing Fixtures Urinals Amber (+) 2019 2 Ea. $7,787 10 Plumbing Fixtures Sink - Service / Mop Sink Green 2019 1 Ea. $2,288 10 Plumbing Fixtures Urinals Green 2019 1 Ea. $3,893 10
Plumbing Fixtures Urinals Green 2019 2 Ea. $7,787 10
Sub Total for System 24 items $694,731
Fire and Life Safety
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Fire Detection and Alarm Fire Alarm Panel Green 2019 1 Ea. $13,437 5 Water-Based Fire-Suppression Fire Sprinkler System (Bldg.SF) Amber (+) 2019 44,436 SF $905,776 5 Sub Total for System 2 items $919,213
Building: T-I - Interim TB (Gates 31 to 36)
Conveyances
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Jet Bridge, Other Asset: Jet bridge Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Leveler Amber (+) 2019 1 Ea. $17,680 5 Note: Other Asset: Auto leveler
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Domestic Water Equipment Passenger Boarding Bridge - Water Cabinet Amber (+) 2019 1 Ea. $75,776 5 Note: Other Asset: Jet bridge Water cabinet
Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Interior Pedestrian Control Equipment Passenger Boarding Bridge - Bag Lift Amber (+) 2019 1 Ea. $101,035 5 Sub Total for System 31 items $1,962,590
Sub Total for Building T-I - Interim TB (Gates 31 to 36) 71 items $5,216,647 Central
Utility Plant
P H A S E 1
F A C I L I T Y C O N D I T I O N A S S E S S M E N T
T E R M I N A L B U I L D I N G S A N D
CENTRAL UTILITY PLANT
BUILDING DETAILS
Building Details
CUP (Central Utility Plant), San Jose, CA 95110
Building Address
$92,793
Current Deficiencies
$6,331,257
Replacement Cost
$5,263,796
Current + 5-Year Costs
$8,448,630
Current + 10-Year Trend
1990
Const Year
6,129
Area
Current + 3-Year Costs
$1,097,699
CUP
Building Condition Assessment Score
(3-Year SCI)
Average
Ten-year Work-plan by System
Current + 10-Years
System Current 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Mechanical $81,499 $0 $0 $995,648 $0 $4,074,539 $351,031 $0 $675,450 $951,634 $52,665 $7,182,466 Electrical $0 $0 $0 $9,258 $0 $10,798 $0 $0 $131,409 $0 $341,974 $493,439 Plumbing $11,294 $0 $0 $0 $1,442 $79,318 $46,543 $0 $8,603 $0 $625,525 $772,725 Fire & Life Safety $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Technology $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Conveyances $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Security $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total: $92,793 $0 $0 $1,004,906 $1,442 $4,164,655 $397,574 $0 $815,462 $951,634 $1,020,164 $8,448,630 Current + 10-Year Cost of Repairs / SCI
Building: CUP - CUP
Mechanical
Deficiency Rating Qty UoM Repair Cost ID
Chiller Repair Amber (-) 1 Ea. $8,595 2
Note: Deteriorated, There is minor deterioration on the casing of the chiller.
Location: Mechanical Room: CP-11
Steam/HW Unit Heater Replacement Amber (-) 1 Ea. $1,979 5 Note: Corroded, There is minor corrosion on the unit heater.
Location: Mechanical Room: CP-11
Steam/HW Unit Heater Replacement Amber (-) 1 Ea. $1,979 6 Note: Corroded, There is minor corrosion on the unit heater.
Location: Mechanical Room: CP-11
Fan Coil (Chilled Water) HVAC Component Replacement Amber (-) 1 Ea. $4,514 3 Note: Deteriorated, The casing on the fan coil unit is deteriorating. - Past/Near end of useful service life but functioning properly Location: Mechanical Room: CP-11
Fan Coil (Chilled Water) HVAC Component Replacement Amber (-) 1 Ea. $4,514 4 Note: Deteriorated, The casing on the fan coil unit is deteriorating. - Past/Near end of useful service life but functioning properly Location: Mechanical Room: CP-11
Remove Abandoned Equipment 1 Ea. $4,358 8
Note: Operationally impaired, Abandoned in place
Location: Mechanical Room: CP-11
Chemical Feed System Amber (-) 1 Ea. $3,988 9
Note: Deteriorated, There is deterioration all over the chemical feeder case.
Location: Mechanical Room: CP-11
Clean Cooling Tower Amber (+) 1 Ea. $12,893 80
Note: Clean Cooling Tower, Scaling on front and back
Location: Exterior: Mechanical Yard
Clean Cooling Tower Amber (+) 1 Ea. $12,893 81
Note: Clean Cooling Tower, Scaling on front and back
Location: Exterior: Mechanical Yard
Clean Cooling Tower Amber (+) 1 Ea. $12,893 82
Note: Clean Cooling Tower, Scaling on front and back
Location: Exterior: Mechanical Yard
Clean Cooling Tower Amber (+) 1 Ea. $12,893 83
Note: Clean Cooling Tower, Scaling on front and back
Location: Exterior: Mechanical Yard
Sub Total for System 11 items $81,499
Plumbing
Deficiency Rating Qty UoM Repair Cost ID
Backflow Preventer Replacement Amber (-) 1 Ea. $10,234 7 Note: Corroded, The backflow preventer has moderate corrosion.
Location: Mechanical Room: CP-11
Custodial Mop Or Service Sink Replacement Amber (-) 1 Ea. $1,060 1 Note: Stained/Dirty - Past/Near end of useful service life but functioning properly Location: Mechanical Room: CP-10
Sub Total for System 2 items $11,294
Sub Total for Building CUP - CUP (Central Utility Plant) 13 items $92,793
DEFICIENCY SUMMARY
LIFE CYCLE SUMMARY
Building: CUP - CUP (Central Utility Plant)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Chiller - Indoor Water Cooled (1100 Tons) Amber (-) 2007 1 Ea. $995,648 3 Facility Hydronic Distribution Pump - 50HP - (Ea.) Amber (+) 2010 1 Ea. $112,906 5 Facility Hydronic Distribution Pump - 50HP - (Ea.) Amber (+) 2010 1 Ea. $112,906 5 Decentralized Cooling Condenser - Outside Air Cooled (3 Tons) Amber (+) 2010 1 Ea. $12,566 5 Decentralized Cooling Condenser - Outside Air Cooled (3 Tons) Amber (+) 2010 1 Ea. $12,566 5 Exhaust Air Roof Exhaust Fan - Small Amber (+) 2010 1 Ea. $3,835 5 Decentralized Cooling Condensing Unit (3 Ton) Amber (+) 2010 1 Ea. $9,030 5 Decentralized Cooling Condensing Unit (3 Ton) Amber (+) 2010 1 Ea. $9,030 5 Other HVAC Distribution Systems VFD (125 HP) Amber (+) 2010 1 Ea. $63,463 5 Facility Hydronic Distribution Pump - 100 Hp and greater Amber (+) 2010 1 Ea. $207,879 5 Note: Rebuilt within the last ten years
Chiller - Indoor Water Cooled (650 Tons) Amber (+) 2009 1 Ea. $850,349 5 Chiller - Indoor Water Cooled (650 Tons) Amber (+) 2009 1 Ea. $850,349 5 Heat Generation Boiler - Steel Tube (8375 MBH) Amber (+) 2011 1 Ea. $545,400 5 Heating Systems Air Separator Amber (+) 2008 1 Ea. $18,186 5 Chemical Feed System Amber (+) 2008 1 Ea. $5,860 5
Heat Generation Boiler - Cast Iron - Water (4488 MBH) Amber (+) 2010 1 Ea. $175,738 5 Heating System Supplementary Components Controls - Electronic (Bldg.SF) Amber (+) 2010 6,129 SF $18,556 5 Central Cooling Cooling Tower - Metal (750 Tons) Amber (+) 2009 1 Ea. $206,238 5 Central Cooling Cooling Tower - Metal (750 Tons) Amber (+) 2009 1 Ea. $206,238 5 Central Cooling Cooling Tower - Metal (750 Tons) Amber (+) 2007 1 Ea. $206,238 5 Central Cooling Cooling Tower - Metal (750 Tons) Amber (+) 2007 1 Ea. $206,238 5 Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Pump - 30HP (Ea.) Amber (+) 2010 1 Ea. $60,242 5
Other HVAC Distribution Systems VFD (20 HP) Amber (+) 2007 1 Ea. $18,631 6 Other HVAC Distribution Systems VFD (20 HP) Amber (+) 2007 1 Ea. $18,631 6 Other HVAC Distribution Systems VFD (40 HP) Amber (+) 2007 1 Ea. $29,448 6 Other HVAC Distribution Systems VFD (40 HP) Amber (+) 2007 1 Ea. $29,448 6 Other HVAC Distribution Systems VFD (40 HP) Amber (+) 2007 1 Ea. $29,448 6 Other HVAC Distribution Systems VFD (40 HP) Amber (+) 2007 1 Ea. $29,448 6 Other HVAC Distribution Systems VFD (125 HP) Amber (+) 2010 1 Ea. $68,540 6 Other HVAC Distribution Systems VFD (125 HP) Amber (+) 2010 1 Ea. $68,540 6 Other HVAC Distribution Systems VFD (40 HP) Amber (+) 2010 2 Ea. $58,897 6 Other HVAC Distribution Systems VFD (40 HP) Green 2023 1 Ea. $34,348 8 Decentralized Cooling Fan Coil - DX Cool w/Electric Heat (3 Ton) Amber (+) 2010 1 Ea. $4,855 8 Expansion Tank - 305 GAL Amber (+) 2002 1 Ea. $43,815 8 Other HVAC Distribution Systems VFD (40 HP) Green 2023 1 Ea. $34,348 8 Other HVAC Distribution Systems VFD (40 HP) Green 2023 1 Ea. $34,348 8 Facility Hydronic Distribution Pump - 100 Hp and greater Green 2022 1 Ea. $261,868 8 Facility Hydronic Distribution Pump - 100 Hp and greater Green 2022 1 Ea. $261,868 8 Facility Hydronic Distribution Pump - 5HP Green 2023 1 Ea. $18,233 9 Facility Hydronic Distribution Pump - 50HP - (Ea.) Green 2023 1 Ea. $153,608 9 Heat Generation Boiler - Steel Tube (8375 MBH) Green 2007 1 Ea. $742,011 9 Note: Firetube boiler. Old data plate, SME said boiler was replaced in 2023.
Exhaust Air Wall Exhaust Fan Amber (+) 2011 1 Ea. $12,594 9 Building: CUP - CUP (Central Utility Plant)
Mechanical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Exhaust Air Wall Exhaust Fan Amber (+) 2010 1 Ea. $12,594 9 Exhaust Air Wall Exhaust Fan Amber (+) 2009 1 Ea. $12,594 9 Expansion Tank - 100 GAL Amber (+) 2009 1 Ea. $30,415 10 Expansion Tank - 60 GAL Amber (+) 2010 1 Ea. $22,250 10 Sub Total for System 61 items $7,823,871
Electrical
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Electrical Service Transformer (30 KVA) Amber (-) 2001 1 Ea. $9,258 3 Note: Past/Near end of useful service life but functioning properly Electrical Service Transformer (30 KVA) Amber (+) 1990 1 Ea. $10,798 5 Safety Switch Disconnect Amber (+) 2009 1 Ea. $5,357 8
Safety Switch Disconnect Amber (+) 2009 1 Ea. $5,357 8
Power Distribution Power Wiring Amber (+) 2010 6,129 SF $17,941 8 Power Distribution Distribution Panels (100 Amps) Amber (+) 2001 1 Ea. $41,189 8 Power Distribution Panelboard - 120/208 125A Amber (+) 2001 1 Ea. $3,596 8 Electrical Service Transformer (30 KVA) Amber (+) 2001 1 Ea. $13,602 8 Power Distribution Distribution Panels (400 Amps) Amber (+) 2001 1 Ea. $41,666 8 Wiring Devices Electrical Disconnect Amber (+) 1990 1 Ea. $2,701 8 Safety Switch Disconnect Amber (+) 2010 1 Ea. $5,357 8
Safety Switch Disconnect Amber (+) 2010 1 Ea. $5,357 8
Safety Switch Disconnect Amber (+) 2010 1 Ea. $5,357 8
Safety Switch Disconnect Amber (+) 2010 1 Ea. $5,357 8
Lighting Fixtures Light Fixtures (Bldg SF) Amber (+) 2010 6,129 SF $323,126 10 Safety Switch Disconnect Amber (+) 2015 1 Ea. $6,248 10 Safety Switch Disconnect Amber (+) 2015 1 Ea. $6,248 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Wiring Devices Electrical Disconnect Amber (+) 2010 1 Ea. $3,150 10 Sub Total for System 33 items $558,915
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Plumbing Fixtures Sink - Service / Mop Sink Amber (-) 2010 1 Ea. $1,442 4 Note: The sink works, but it’s corroded.
Plumbing Fixtures Non-Refrigerated Drinking Fountain Amber (+) 2010 1 Ea. $4,664 5 Note: Stained & filter needs changing
Plumbing Fixtures Restroom Lavatory Amber (+) 2010 1 Ea. $5,315 5 Plumbing Fixtures Showers Amber (+) 2010 1 Ea. $2,557 5 Facility Potable-Water Storage Tanks Water Storage Tank - 750 Gallon Amber (+) 2010 1 Ea. $54,180 5 Plumbing Fixtures Sink - Service / Mop Sink Amber (+) 1990 1 Ea. $1,557 5 Compressed-Air Systems Air Compressor (5 hp) Amber (+) 2010 1 Ea. $11,045 5 Compressed-Air Systems Air Compressor (5 hp) Amber (+) 2010 1 Ea. $11,045 5 Compressed-Air Systems Air Compressor (5 hp) Amber (+) 2010 1 Ea. $11,045 5 Compressed-Air Systems Air Compressor (5 hp) Amber (+) 2010 1 Ea. $11,045 5 Compressed-Air Systems Air Compressor (5 hp) Amber (+) 2010 1 Ea. $11,045 5 Compressed-Air Systems Air Compressor (5 hp) Amber (+) 2010 1 Ea. $11,045 5 Compressed-Air Systems Air Compressor (5 hp) Amber (+) 2010 1 Ea. $11,045 5 Compressed-Air Systems Air Compressor (5 hp) Amber (+) 2010 1 Ea. $11,045 5 Building: CUP - CUP (Central Utility Plant)
Plumbing
Uniformat Description LC Type Description Rating
Install
Date Qty UoM Repair Cost
Remaining
Life
Domestic Water Equipment Water Heater - Gas - 50 gallon Amber (+) 2015 1 Ea. $8,603 8 Plumbing Fixtures Toilets Amber (+) 2010 1 Ea. $14,545 10 Domestic Water Equipment Gas Piping System (BldgSF) Amber (+) 2010 6,129 SF $610,980 10 Sub Total for System 17 items $792,203
Sub Total for Building CUP - CUP (Central Utility Plant) 111 items $9,174,989 Section 1 – Interviews and Engagement with SJC Staff
CUP Interview were conducted with the following SJC staff members:
• Kris Quilindrino, Heating, Ventilation, and Air Conditioning (HVAC) Supervisor • Ron Padilla, Maintenance Supervisor
• Gene Frazier, Deputy Director, Facilities and Engineering • Fai Ali, Deputy Director, Planning and Development
• Ryan Sheelen, Planner IV
The following documentation was prepared:
• CUP Study of 2019 (attached)
• As-Built Drawings
• Facility Condition Assessment (FCA, performed by Jacobs) • SCJ Energy and Sustainability Documentation
Section 2 – Key Finding from Interviews and Document Review The existing CUP sits between Terminals A and B, to the north of the Administration offices. It is a single-story concrete structure, with cooling towers located on grade to the north of the building. • Chilled water and condenser water:
◦ Chillers:
▪ Two 650-ton York electric centrifugal variable-frequency drive (VFD) chillers (YKGQEVPG-CTG) • 1040 gallons per minute (gpm), 57/42F evap.
• 1393 gpm, 80/93F cond.
• 0.585 kilowatts per ton (kW/ton) FL, 0.403 NPLV
• 380 kilowatts (kW), 542 FLA, 460 volts (V) / three-phase (3ph) • Installed 2009
▪ One 1100-ton Carrier electric centrifugal VFD chiller (19XR7272564E, 2000) • 1760 gpm, 57/42F evap.
• 2200 gpm, 80/94F cond.
• 0.585 kW/ton FL, 0.396 NPLV
Discovery Findings
Central Utility Plant
Discovery
Findings
P H A S E 1
F A C I L I T Y C O N D I T I O N A S S E S S M E N T
T E R M I N A L B U I L D I N G S A N D
CENTRAL UTILITY PLANT
Discovery Findings
Subject matter experts from Jacobs performed a high-level evaluation in five focus areas to investigate opportunities for additional consideration in phase 2 of a future service order. The process included interviews with key SJC staff, and review of various studies and other documents pertinent to this process. The following five focus areas:
High-Level Evaluation Focus Areas
Central Utility Plant
Energy
Technology
Underground Utilities
Strategic Asset Management
Central Utility Plant
Section 1 – Interviews and Engagement with SJC Staff and Document Review Table 9 summarizes Jacobs’ CUP interviews with SJC staff.
Date SJC Staff Name Title Division
09/30/2024 Kris Quilindrino,
Ron Padilla
AC Supervisor,
Maintenance Supervisor
Facilities and Engineering
Facilities and Engineering
10/01/2024 Fai Ali
Gene Frazier
Chris Fernandez
Deputy Director
Deputy Director
CMMS/Program Manager
Planning and Development
Facilities and Engineering
Facilities and Engineering
10/02/2024 Ryan Sheelen Planner IV Planning and Development Table 9. CUP DISCOVERY STAFF INTERVIEWS
Section 2 – Key Findings
The existing CUP is between Terminals A and B, to the north of the administration offices. It is a single-story concrete structure with cooling towers located on grade to the north of the building.
Following are the main observations collected through the above interviews and documentation reviews:
Chilled water and condenser water:
o One 1100-ton Carrier chiller was installed in 2007. Two 650-ton York chillers were installed in 2009. o Four 650-ton Marley cooling towers were installed, two in 2007, and two in 2009. o Three chilled water pumps (CHWPs) were installed in 2009. o Four condenser water pumps (CWPs) were installed, two in 2007, and two in 2009. o Summer cooling loads approach 1,200 tons. Winter loads vary from 250 to 600 tons. Supply temperature is 46 degrees Fahrenheit (°F), with a 10°F delta T. Summer demands appear to tax the distribution system hydraulics, such that additional chillers must run to satisfy demands. o Space exists for the installation of one additional chiller. o The chiller plant does not have enough firm capacity. The Carrier chiller is at the end of its life, and it is not capable of handling loads over 50%. York chillers are not adequate to meet airport cooling demand. Manual setpoint override is needed in the summer to manage cooling demands.
Space is available for one additional chiller.
o Some replacements have been made, such as chiller motors. A Lakos cooling tower basin sweeping system is to be installed in the next couple of years to mitigate scale build-up. However, no mid- to long-term plan exists to perform major replacements or upgrades.
o Resilience is a concern because the emergency generator’s ability to carry the CUP loads has never been verified, and it would have insufficient capacity during a full-load scenario. Sustainability of operations needs to be confirmed with a study of critical cooling loads such as IT and communications. Lack of resilience in cooling systems would impact passenger experience even if operations can be sustained. Heating water:
o Two Cleaver-Brooks packaged flexible watertube hot water boilers, natural gas-fired, 7 MMBtu/h each, were installed within 2008-2011. One Cleaver-Brooks water-back firetube hot water boiler, natural gas-fired,
5.2MMBtu/h, was installed in 2007.
o Hot water (HW) supply is 180°F, with reset down to 170°F. HW return is 140°F. Lower supply temperatures have been shown to create instability in boiler system control. o No space exists for an additional boiler.
o Some replacements have been made, such as boiler burners. However, no mid- to long-term plan exists to perform major replacements or upgrades. SCJ reported they are currently assessing feasibility of electrifying the boilers or installing heat pumps or a combination of both. Utilities and future planning:
o Two sets of distribution legs leave the plant off a common header. One set of 12-inch CHW and 8-inch HW pipes serve Terminal A, and another set serves Terminal B and auxiliary spaces. HW distribution main is 8 inches (including flow for both terminals). Total peak boiler flow is estimated less than 1,000 gpm; pipe size is acceptable.
Gates 1 through 8 in Terminal A are self-contained and not served from the CUP. Auxiliary terminal gates and consolidated rental car facility (ConRAC) on the south end are selfcontained also. Distribution piping routes across the roof to the individual loads (air handlers). The entire system is controlled through two-way valves on the HVAC system.
o As reported by SJC staff, no current utility master plan exists, but SJC staff are interested in developing one. An airport-wide electrical study is currently underway. Previous utility master planning efforts were done under TAIP and included the Terminal B Phase 2 program.
o No additional renewable energy is planned (solar photovoltaic already exists on top of the parking garage).
SJC has had conversations on fuel cell storage and battery storage. A study would be considered, and there are plans to revise the Sustainability Management Plan during the first half of 2025. o Some carbon-neutrality and sustainability goals have been identified, but criteria for project prioritizing have not been established.
o Real estate is a major constraint as there is no land for these utility expansion projects. However, some possible options exist such as the land west of the airfield, as reported by SJC staff. o A new CUP would potentially be integrated with a parking garage located in the area where Parking Lot 4 currently stands. This project would be in conjunction with the new Terminal C project. Resilience:
o Pacific Gas and Electricity (PG&E) poses resilience concerns. o An emergency generator exists that is indicated to be capable of supporting operation of a chiller, but it has never been tested with that load imposed.
o San Jose Power (new city department) is proposing the development of a downtown west microgrid to possibly include the airport.
The following documentation was provided:
CUP Study of 2019 by Jacobs
As-Built Drawings
Facility Condition Assessment (FCA, performed by Jacobs) SJC Energy and Sustainability Documentation
Section 3 – Recommendations
The following recommendations have been prioritized according to urgency:
Consolidating CUP firm capacity with the addition of a new chiller to the existing CUP (existing space available), as well as replacing the existing Carrier chiller.
Create a Utility Master Plan as a tool to address several concerns, including CUP capacity, resilience, and renewable and sustainable energy addition.
A Microgrid Study would follow the recommendations of a Utility Master Plan in coordination with San Jose Power’s smart-grid plan and address the following:
o On-site electricity generation opportunities
o Renewable energy opportunities
o Emergency generator capability expansion
o CUP capability expansion and efficient operation
o Other: Energy storage, heat recovery, combined heat and power opportunities. A new CUP is proposed to be integrated with a parking garage located in the area where Parking Lot 4 currently stands. This project would be in conjunction with the new Terminal C project. A new CUP could provide additional load support and resilience if interconnected with the existing one.
Energy
Section 1 – Interviews and Engagement with SJC Staff and Document Review Table 10 summarizes Jacobs’ energy interviews with SJC staff.
Date SJC Staff Name Title Division
09/25/2024 Patrick Hansen
Uyen Mai
Environmental Program
Manager
Environmental Services
Specialist
Environmental
Environmental
09/30/2024 Kris Quilindrino
Ron Padilla
AC Supervisor
Maintenance Supervisor
Facilities and Engineering
Facilities and Engineering
10/01/2024 Fai Ali Deputy Director Planning and Development Date SJC Staff Name Title Division
Gene Frazier
Chris Fernandez
Deputy Director
CMMS/Program Manager
Facilities and Engineering
Facilities and Engineering
10/02/2024 Ryan Sheelen Planner IV Planning and Development 10/03/2024 Kevin Spinks
Susan Frazier
Senior Engineer
Building Management
Administrator
Facilities and Engineering
Facilities and Engineering
Table 10. ENERGY DISCOVERY STAFF INTERVIEWS
AC = Air-Conditioning
CMMS = Computerized Maintenance & Monitoring Systems
Section 2 – Key Findings
Following are the main observations collected through the above interviews as well as review of spreadsheets & documents shared by SJC staff
Energy performance overview:
o SJC’s energy metrics are updated every 2 years, and the most current metric available indicates an annual energy use of 123,135 gigajoules (GJ), which is a reduction of 5% from 2018 baseline energy usage. o The electric energy use intensity (EUI) at 26 kilowatt hours (kWh) per SF per year has also had a 30% reduction from its original 2018 baseline.
o However, other passenger-related key performance indicator metrics have had significant increases; both energy and water use per passenger traffic has seen an increasing trend. Energy cost performance overview:
o SJC uses the year 2010 to 2011 as baseline year for long-term tracking purposes. o Although the annual electric kWh usage has dropped by 8.4% year ending 2023, the annual electric utility cost has escalated by 78% during the same period. This is largely contributed by cumulative increase in rate tariff by 94%.
o A similar pattern is observed with natural gas usage performance. Although the actual gas therms usage dropped by 2%, the annual natural gas utility cost increased by 159% compared to the baseline year. o Another area of concern that was mentioned by SJC is the escalating electric tariffs. The electric rate paid to PG&E/San Jose Clean Energy has been escalating at the rate of 6% annually. Energy-related sustainability overview:
o SJC pointed out the airport’s sustainability initiatives to-date, as follows:
SJC has a campaign in progress to switch out conventional lighting, with efficient and energy-saving light-emitting diode (LED) lighting throughout the terminals. SJC designs and builds all new construction to meet the U.S. Green Building Leadership in Energy and Environmental Design (LEED) Silver Certification, with a goal to meet LEED Gold Certification. SJC utilizes "smart" technologies, such as Building Management Systems (BMS’s) to control lighting and HVAC, which allows SJC to track usage in real time. By adjusting lighting and HVAC to meet the real-time needs using the BMS, SJC manages its energy consumption. In addition to reducing energy usage at the airport, SJC installed a 3.4-acre solar PV farm with a capacity to generate 1.1 megawatts (MW) of electricity. SJC also made the switch to San Jose Clean Energy subsequently upgrading to Total Green service which started supplying electric power in July 2022 from 100% renewable sources.. San Jose Power is proposing a smart-grid project for part of the San Jose downtown area. This could be an opportunity for an active partnership by creating an airport microgrid. HVAC equipment:
o A large number of air-handling units (AHUs), variable air volume (VAV) systems, and terminal boxes located at various mechanical rooms, rooftop areas, and some IT rooms appear to be beyond useful life per FCA survey and potentially under deferred maintenance.
o About a dozen outdoor air-cooled condensing units (ACCUs) are past useful life. o Similarly, a large number of pumps, fan coil units (FCUs), exhaust fans, packaged units, split systems, and unit vents are in fair to good working condition but well past useful life per FCA survey o SJC tried to tie in about 16 packaged rooftop units to the building automation system (BAS) but are currently individually controlled and standalone. Gates 31 through 36 served by these temporary/standalone RTUs are not connected to central BAS.
o SJC is considering replacing natural gas-fired Cleaver-Brooks boilers with electric boilers as part of electrification initiatives.
o A former federal-owned zone is under significant positive pressure because of return air vents blocked off for unknown reason.
o Seven Terminal A AHUs served by CUP and built in 1980s are slated to be replaced. Two of these AHUs are to be replaced in 2024, followed by one AHU replacement per year to resolve long-standing mechanical issues. Like-for-like replacements with new Plenum central fans instead of existing belt drives. Building (energy) automation system (BAS):
o HVAC systems in Terminals A and B and the Interim Facility area are served by Delta BAS. o The BAS serving Terminals B, FIS, and some portions of Terminal A are outdated. o A large portion of controls hardware in these terminals appear to be outdated as well. o SJC staff seem satisfied with the existing system’s performance. Airport lighting:
o More than 85% of airfield lighting and 65% of terminal lighting has been converted to LED lighting. o There is still a significant amount of old, non-LED lighting infrastructure, especially exteriors, including metal halides (MHs).
o The ramps use MHs, and they do not adequately throw light onto aircraft tails. SJC had to install supplemental LED high-intensity discharge (HID) lighting bolted onto jet bridges as part of an interim measure. o Interior lighting upgrades seem to be done in a somewhat ad hoc way involving many simple changeouts of old bulbs with LED without necessarily considering wiring strategies to maximize efficiency & improve lighting efficacy through fixture replacements.
o A large number of non-LED “Exit” signs are pending upgrade. o The interior architectural layouts are such that glare from windows interferes with lighting. The Transportation Security Administration (TSA) area frequently receives low foot-candle complaints from TSA staff.
Section 3 – Recommendations
First and foremost, it is critical to conduct a comprehensive onsite energy assessment to better understand energy performance needs of all major HVAC equipment, HVAC airside and waterside systems, BAS control strategies, the building envelope, and lighting systems. This will help in identifying, qualifying, and quantifying details to perform a cost-benefit analysis in a risk-adjusted manner.
The following recommendations are conceptual in nature based on virtual interviews and an exploratory review of SJC’s energy consuming infrastructure:
BAS improvement potential:
o Because significant portions of various terminals served by BAS and associated controls hardware are not current, upgrading to the latest platform will help maximize advanced control strategies, including static pressure reset, optimal stop, fan-pressure optimization, equipment sequencing to reduce peak demands, and Time of Day (TOD) scheduling.
o Perform terminal-level HVAC load analysis to better coordinate CUP plant-level efficiency strategies such as chilled/condenser water resets and chiller-tower optimization. o Optimize sensors, as improperly calibrated sensors can drive up energy usage. ASHRAE 55-2004 can serve as a guideline to establish and optimize temperature and other setpoints to partly overcome the challenges of maintaining comfort conditions specifically in an airport setting. o Upgrading BAS equipment can detect fluctuations in equipment performance and degrading components and send alerts to perform maintenance earlier.
HVAC improvement potential:
o As part of replacing 1980s-era AHUs in Terminal A, consider installing VFDs on supply and return air with premium efficiency motors as part of this replacement project. o Elsewhere, upgrading fans and pumps to VFDs can significantly reduce energy and demand by adjusting to real-time load conditions at SJC terminals.
o Consider replacing with greater efficiency models the remaining AHUs, VAVs, and terminal boxes serviced by various mechanical rooms, rooftop areas, and some IT rooms that are currently beyond useful life and potentially under deferred maintenance. This should include ACCUs, as noted previously, as well as pumps, FCUs, exhaust fans, packaged units, split systems, and unit vents that are in fair to good working condition but well past useful life.
o Develop a strategy to network about 16 packaged rooftop units to central BAS (including those serving Gates 31-36) to take advantage of efficient control strategies. o While replacing maintenance-prone legacy AHUs, packaged units, and split systems, consider heat pump systems to reduce the load on CUP, staging equipment to reduce burden on electrical demand capacity, and overall reduction in energy use. However, conversion to heat pumps may need to be carefully evaluated to avoid driving up already stretched electric demand capacity at SJC. o Because an airport uses significant energy for domestic HW, heat recovery from exhaust air should be explored using plate-frame/air-air heat exchangers.
o Newer packaged systems should be evaluated for retrofitting with economizers, conversion to VAVs, and full replacements with high Energy Efficiency Ratio (EER) systems. Conversion to heat pumps may need to be carefully evaluated to avoid driving up already stretched electric demand at SJC. Fully converting to LED lighting along with other load reductions through efficiency gains should help partially offset the need for greater electric demand by heat pumps.
High-bay areas and hangars:
o Interlocking OH doors to AHUs can yield significant savings. This avoids having most of the conditioned air escaping outdoors when OH doors need to left up for an extended period of time. This can be a short-term measure with short payback potential.
o Using infrared radiant heating (electric or gas fired) in high-bay areas can result in large savings during the heating season by reducing load on the central boiler plant and by avoiding unnecessary heating of air that easily escapes through high-bay doors. This typically can be implemented in short timeframe with short payback potential.
Lighting improvement potential:
o A full lighting audit is recommended to maximize LED conversions, maximize daylight harvesting, and add multilevel switching fully integrated with BAS.
o HID LED could benefit from occupancy sensors where permissible. o Retrofit Type-C lighting fixtures to tie into unitary HVAC units for automated occupancy-based control. o Full replacements using Type-C fixtures should be evaluated to maximize energy efficiency and would be the most efficient and reliable method to resolve conflicts with daylighting glare and shadows in TSA areas. This can be a medium-term measure with slightly longer payback potential compared to replacing only bulbs with LED.
Airport plug load improvement potential:
o Airport interior visual information displays: Manual or automatic shutdown of these in offices and some public areas when not in use or times of very low occupancy o Baggage conveyors, escalators, and moving walks: Use newer advanced controls that adjust to load demand while extending motor life. During preventive maintenance and renewals, include lower-friction belt drives balanced with torque changes to optimize motor energy demand. Airport building envelope improvement potential:
o SJC’s façades are potentially the largest surface area between airport’s internal and external environment where a great amount of heat loss can occur. Thermal insulation of the external walls from the outside is an additional way of protecting against thermal energy transfer. Evaluate retrofitting with reflective exterior insulation and finish system (EIFS) finish coating materials to reduce heat gain for reduced electric cooling demand.
o Evaluate retrofitting windows with lower solar heat gain coefficient window films to reduce heat gain and electric cooling demand (wherever window films are permissible). This is typically a short timeframe measure with short payback potential.
Technology
Section 1 – Interviews and Engagement with SJC Staff and Document Review Table 11 summarizes Jacobs’ technology interviews with SJC staff.
Date Name Title Division
09/13/2024 Matthew Kazmierczak
Peter Zaura
Division Manager
ATS Lead
Director’s Office
Director’s Office
10/01/2024 Gene Frazier
Fai Ali
Deputy Director
Deputy Director
Facilities and Engineering
Planning and Development
10/02/2024 Ryan Sheelen Planner IV Planning and Development 10/02/2024 Mookie Patel Director of Aviation N/A
Table 11. TECHNOLOGY DISCOVERY STAFF INTERVIEWS
Section 2 – Key Findings
Following are the main observations collected through the above interviews. IT organization and structure: The City of San Jose (the City) owns (governs) and operates all business applications (for example, Outlook, SharePoint) and infrastructure (for example, computers). SJC runs on an integrated network that supports all applications (business and operations) and that is operated and maintained by SJC’s IT department.
The department supports the following:
o Internal technology: All critical systems related to SJC operations; systems are heavily siloed (that is, not integrated) and are essential to the operation of SJC.
o External technology: All common use systems, including passenger experience from check-in/ticket counter all the way to the gate.
o Security systems
IT governance: Governance is split between the City and SJC. Many systems are run by the City, and SJC is aware which those are. However, no clear delineation of ownership exists, including who can make which decisions and what the differences or similarities are between operations and procedures. IT and technology upgrades and maintenance:
o Technology stack selection is done by SJC’s IT department but always requires City approval. o Major network maintenance requires a staggered calendar that is not fully aligned with other technology upgrades and maintenance requirements. Dependency on the City for any purchasing and procurement needs means additional approvals, longer lead times, etc.
IT and technology improvement projects:
o There appears to be no standard and/or documented process for improvement projects to be added to a project portfolio. The Division Directors propose projects to leadership based on a capped budget. However, no established prioritization process has been defined and communicated. A Division Director and the former Assistant Director of Aviation created a project scoring matrix; however, this has not been socialized or implemented.
o IT strategy and long-term leadership goals have not been formally established and communicated. Both IT and the Division Directors have a list of future projects and capital improvement investments that should go through a risk and opportunity assessment and prioritization exercise. o Historically, IT and technology projects have not been prioritized, and the IT “voice” did not hold much power.
With changing passenger expectation, regulatory pressure, and compliance, the focus is slowly pivoting toward specific issues such as passenger satisfaction and cybersecurity. o The lack of a formally established and socialized IT strategy creates long-term risk. SJC should focus on the most critical items by first identifying these while defining clear aspirations and goals that will guide the prioritization.
o Messaging around the focus on being “digital forward” to match their neighbors in the Bay Area while also cutting budgets and selecting the lowest service and material providers is conflicting. o The biggest challenge for IT in the future is integration with existing systems. Finding a bridge between legacy systems and upcoming upgrades and requirements while having to choose the lowest bid limits the options SJC can select from.
Overall, SJC’s IT-related strategy and priorities are unclear. These would tend to change quickly in the past. Division leads are looking for a clearer path and a “north star.” Section 3 – Recommendations
The following recommendations have been prioritized according to urgency, impact, and level of effort:
Define a medium-term strategy and goals (through an IT Master Plan), including priorities and guiding principles, in alignment with SJC’s enterprise strategic plan. Through workshops with Division Directors and Managers, socialize the strategy/master plan to incorporate feedback and confirm alignment. Finally, publish the strategy/master plan across SJC.
Define and implement an SJC-wide project prioritization process and tool or mechanism. This process requires an end-to-end view of SJC needs (avoiding a “one-topic” focus) and inclusion of all divisions and their goals. The scoring criteria should align to the strategy/master plan defined and incorporate the City’s strategic intent and goals. It should also reflect ownership cost, resources required, risk mitigation plan, and score, among other factors. This approach promotes an informed and transparent process.
Develop a comprehensive map of the current IT landscape at SJC that identifies external versus internal technology, hardware and software, critical data paths, and storage, among other aspects. Identify any gaps and what the risks of those gaps are (such as aging technology, changing regulatory requirements [for example, new cybersecurity plan required by TSA], a new policy, integration needed.).
Based on the strategy/master Plan and the current IT landscape, define a future state IT landscape, and develop a 3- to 5-year roadmap that addresses identified gaps, considers scheduled maintenance and upgrades required, and provides a view on capacity and available timeframes to schedule projects. Publish the IT roadmap and calendar proactively so division leads and teams have visibility. Build out an IT governance and operating model with clear roles, rules, catalogs, governing policy, strategy, and controls that align with SJC and City objectives. IT governance requires a governing strategy that communicates a future state, allows priorities to be managed, and initiates change. Some of these elements might already exist in various forms, but without it, the opportunity for confusion, inefficiency, lack of future proofing and planning, and operational risk increases.
Underground Utilities
Section 1 – Interviews and Engagement with SJC Staff and Document Review Table 12 summarizes Jacobs’ underground utility interviews with SJC staff.
Date SJC Staff Name Title Division
10/01/2024
Fai Ali,
Gene Frazier
Chris Fernandez
Deputy Director
Deputy Director
CMMS/Program Manager
Planning and Development
Facilities and Engineering
Facilities and Engineering
10/03/2024
Kevin Spinks
Susan Frazier
Senior Engineer
Building Management
Administrator
Facilities and Engineering
Facilities and Engineering
Table 12. UNDERGOUND UTILITIES DISCOVERY STAFF INTERVIEWS Section 2 – Key Findings
Potable water is supplied to the SJC airport from the City’s municipal water system. SJC is not responsible for the distribution system that provides potable water to the airport and only manages system piping within the service area of the airport. Issues with the repair or replacement of potable water-related assets downstream of the City’s connection are the responsibility of SJC or its tenants. This work is typically performed by airport facilities maintenance personnel or by a contractor if needed.
Wastewater collected from the SJC airport is conveyed to the City’s Santa Clara Regional Wastewater Facility. It was discussed during the October 1 call that SJC’s responsibilities begin at their lateral connection to the City’s collection system. Issues with the repair or replacement of wastewater related assets upstream of the lateral connection are the responsibility of SJC or its vendors. This work is typically performed by airport facilities maintenance personnel or by a contractor if needed.
Stormwater discharges associated with SJC are regulated by the Stormwater Industrial General Permit, Number CAS 000001, California Regional Water Quality Board Order Number 2014-0057-DWQ (Tab 1), a mechanism of the National Pollutant Discharge Elimination System (NPDES) program. The 2022 Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the operating requirements of the permit. The SWPPP addresses issues of stormwater discharges associated with the industrial activities at the airport, identifies pollutant sources, describes implemented best management practices, and provides tenants with guidance for the reduction, control, and management of these pollutants (SWPPP 2022).
Recycled water is provided to SJC from the South Bay Regional Water Recycling utility. This water is used by the airport for toilet flushing and landscaping.
A GIS file containing “Plumbing Mains” was provided with a list of pipe segments. However, this data provided limited information.
Section 3 – Recommendations
For this assessment, underground utilities were focused on linear (pipe) water, wastewater, and stormwater assets. These utility services are delivered, collected, and managed by the City. SJC and its vendors are responsible for lateral connections and assets after the utility service connection. During the interviews, utility management as it pertains to water and wastewater was not indicated as an issue.
The GIS information that was provided was named “Plumbing Mains.” The information in this file was limited and appeared to be transferred from computer-aided design (CAD) files, not mapped from the field, and was missing helpful attributes. The GIS information should be updated to accurately represent the locations of buried assets for utilities coming onto the SJC property. SJC has reported there are more specific files showing the Stormwater, Sanitary Sewer and Recycled and Potable water systems. This was not available for analysis for this report. GIS information that reflects an accurate list of water, gas, and electrical conduits systems offers significant benefits in maintaining buried infrastructure. Some of these benefits include the following:
Accurate Asset Mapping: Provides precise geospatial mapping of buried assets, reducing the risk of damage while increasing maintainability by knowing the asset’s location. Efficient Data Management: GIS integrates various data into one system allowing for more efficient infrastructure management. Recommended information for buried infrastructure follow:
o Pipe type
o Pipe material
o Pipe length
o Pipe diameter
o Ownership
o Installation date
Risk Management: Improves through the identification of aging, vulnerable, poor condition assets. Also allows for the modeling of new construction on impacts to existing infrastructure.
Strategic Asset Management
Section 1 – Interviews and Engagement with SJC Staff and Document Review Table 13 summarizes Jacobs’ strategic asset management interviews with SJC staff. Table 11.
Date SJC Staff Name Title Division
10/01/2024 Chris Fernandez CMMS/Program Manager Facilities and Engineering
10/02/2024 Mookie Patel Director of Aviation N/A
Table 13 STRATEGIC ASSET MANAGEMENT STAFF INTERVIEWS
Section 2 – Observations
As SJC continues to reinvest into existing infrastructure, establishing a robust strategic asset management program will help ensure that all assets—whether infrastructure, equipment, or facilities—are managed effectively to enhance performance and customer experience, reduce costs over the entire life of the asset, and improve SJC safety. By implementing a strategic approach to managing assets SJC can accomplish the following:
Optimize asset lifecycles: Extend the lifespan of SJC assets through proactive maintenance and timely upgrades. Enhance operational efficiency: Streamline processes and reduce downtime, leading to better service for passengers and airlines.
Support compliance and safety: Confirm that operations meet regulatory requirements, minimizing risks and enhancing safety protocols.
Improve financial planning: Facilitate better budgeting and investment decisions, confirm both capital expenditure and operation expenditure funds are allocated effectively. Enhance passenger satisfaction: Improve the overall passenger experience with shorter wait times and an overall smoother travel experience through reliable assets and operational efficiency.
SJC uses Hexagon as the airport’s Enterprise Asset Management Systems (EAMS). This system is primarily used as a work order management system, with two types of work orders being issued: (1) preventive maintenance and (2) corrective maintenance.
An asset registry has also been developed in Hexagon and work orders are issued against individual assets, which is building historical information that can potentially be used for analysis and future investment decisions. Although SJC does not have a formal strategic asset management program in place, the commitment to leveraging Hexagon as EAMS reflects a strong focus on preventive and corrective maintenance activities, as does tracking maintenance activities against individual assets in the registry, which is a key element of an asset management program.
Currently there are no standards on what assets should be added to the Hexagon asset registry other than a general rule of thumb of “if the asset requires inspection and/or preventive maintenance it goes into the registry” (Chris Fernandez). In addition, there are no documented requirements on the data to be recorded in the registry for each asset, such as location, manufacturer, and install date. Without standards and a systematic approach to collecting asset data, it becomes difficult to track asset performance, hindering informed decision making and the ability to use the system for long-term renewal and replacement planning of assets.
The organization’s focus on using Hexagon for asset management is commendable and provides a strong foundation for effective maintenance activities, however the absence of a strategic asset management program is a notable gap at SJC. Taking a more structured approach to asset management with strong leadership support will position SJC to better align asset management with broader organizational goals and will position SJC to fully capitalize on Hexagon’s capabilities, such as reporting and analytics and integrating with other key systems such as GIS and Internet of things devices.
SJC is also looking to determine the needs of the passenger boarding bridges to decide whether they should be replaced at the component level or at the system level. While the FCA will help with this decision, it may not provide a complete picture SJC needs given the importance of this asset, and Asset Management Plan for these assets may be called for.
Section 3 – Recommendations
Short-term recommendation (within next 12 to 18 months) follows:
Have key staff involved with asset management attend an Institute of Asset Management (IAM) training course to become familiar with best practices and standards (16 hours). Perform an Asset Management Maturity Assessment and develop an improvement roadmap. Develop an Asset Management Policy endorsed by leadership. Establish asset management goals and objectives.
Develop an Asset Data Improvement Plan for having more comprehensive information in Hexagon to improve performance tracking and asset renewal forecasting.
Develop an asset management plan (AMP) for passenger loading bridges to maximize their value and performance over time, providing a clear picture of the financial requirements for asset maintenance and investment, aiding in budgeting and financial planning.
Appendix A - SJC-Provided Information
Table 14 lists the information provided by SJC that was incorporated into the FCA results. Jacobs looked for excessive trends for the same equipment and adjusted rating and RSLs when possible.
Item Document Title Facility
Systems
Impacted Type of Information
1 Terminal Layout All N/A Graphical terminal layout
2 Escort email and phone listing All All Contacts for field team 3 As-Builts All All Detailed as-builts for all facilities, including others not part of this
study
4 Evacuation Maps All N/A Fire plans for all buildings
5 Floor Plans All MEP/FP/IT Floor plans including room numbers and MEP/FP/IT rooms
6 Utility Line GIS Data All Plumbing Utility line layout GIS drawings 7 Photos All N/A Facility photographs
8 2025-2029 Capital Proposal Workbook All All Upcoming capital projects 9 Building History All All Contains construction and latest renovation dates for the facilities
10 Organizational Chart All N/A SJC organizational chart, including names and positions
11 Schedule_Weekly_Bank_Structure_Report_38900 All N/A Flight schedules 12 SJ Airport Capital Planning (Elevator& Escalators) All N/A Schindler Equipment suggested annual upgrades
13 SJC ACIP FY2025-2031 v2 All N/A Airport Improvement Program and Airport Infrastructure Grant
14 SJC CUP notes All N/A Conditions, constraints, and
challenges that need to be
addressed as part of the airport’s
upgrades and development plans
15 Updated JACOBS ASSET EXPORT 9-5-2024 All N/A Assets listed by location and room number
16 12kV System - Past Studies All N/A Detailed studies and reports for distributed generation, electrical
distribution, substation meter
approval, and utility master plan
17 SJC CUP - Past Studies & Analyses All N/A Central Plant Study and TB HVAZ analysis
18 SJC Energy & Sustainability Requirements &
Goals
All N/A Detailed Masterplans and Reports
regarding Energy and Sustainability
19 Airport CIP FFY23-FFY29 - Exhibit A All N/A Ramp, Apron, SMS, Electric Vehicle Chargers, ARFF Vehicle Replacement
estimated project values
20 Airport CIP FFY23-FFY29 - Exhibit B All N/A Locations of future master plan projects and to-be-completed
projects in the airport master plan
Item Document Title Facility
Systems
Impacted Type of Information
21 Airport CIP FFY23-FFY29 - Exhibit C All N/A Airport-Owned Active Metered Electric Accounts
22 FY 22-23 Electricity Usage Charts All N/A Airport Wide Annual Electrical Usage 23 FY 22-23 Gas Usage Charts All N/A Annual Gas Usage
24 FY 22-23 Water Usage Charts All N/A Campus Total Potable Water Usage 25 San Jose Power_Skyline -
Interconnection_Feasibility_Study_Report DRAFT
(6-13-24)
All N/A Review of the proposed
interconnection design and required
interconnection facilities for the
interconnection request
26 2020-2029 Capital Proposal Workbooks All All Historic and planned Capital Improvement Plans
27 Aqualine All All Historic work orders
28 Matrix Task Orders All All Historic work orders
29 Mesa TO2 TB Plumbing Repairs
30 Peterson CAT Load Bank Repair Term Mods Exterior Loadbank Replacement 31 TO 2A - SJCOn-call mech 10333_20240326 TB Plumbing Repairs 32 TO 7-SJC On Call Mech_20240313 CUP Chiller Repair
33 HxGN Work Order Export All All Historic repairs and PMs Table 14. SJC-provided Information
FY = fiscal year; GIS = geographic information system; IT = information technology; kV = kilovolt(s); N/A = not applicable
JOEY GARCIA, PMP, IAM
Jacobs | Project Manager
O:1.720.286.6164
M:1.303.589.8466
[email protected]
717 17th Street Suite 2750
Denver, CO 80202 | US