(d)3 Citywide Pavement Conditions,
Funding and Maintenance Program
Delivery Strategy Status Report
Frank Farshidi
Division Manager, DOT
John Ristow
Director, DOT
Jennifer Seguin
Deputy Director, DOT
Transportation and Environment Committee
February 9, 2026
Pavement Condition Index (PCI) Overview
Total PCI
Change Street Network Miles 2025 PCI 2026 PCI
Major 967 76 71 -5
Local/Neighborhood 1,552 73 74 +1
Combined 2,519 74 73 -1
2 Local Streets
(1552 miles; overall PCI 74)
“Grading” San Jose Street Conditions
A, B 79%
Good to Excellent
C 12%
At Risk to Fair
D, F 9%
Poor or Failed
Percentage of streets in network with Grades A – F (based on 2026 PCI Ratings) A, B 75%
Good to Excellent
C 21%
At Risk to Fair
D, F 4%
Poor to Failed
Major Streets
(967 miles; overall PCI 71)
3 Local Streets
(0-49 PCI)
(210 Miles, 31 PCI)
Backlog $190.4M
Potholes
& Program
MGMT
Major Streets
(967 Miles, 71 PCI)
Local Streets
(50-100 PCI)
(1,342 Miles, 81 PCI)
Backlog $32.0M
Overall Network
• 2,519 Miles
• PCI 73
• $66.3M Annual Need*
• $370M Backlog
*Including Pothole &
Project Management costs
Major Streets
• 967 Miles (Carries Over
85% of Traffic) • PCI 71
• $32.2M Annual Need
• $147.6M Backlog
Local Streets
• 1,552 Miles
• PCI 74
• $23.9M Annual Need
• $222.4M Backlog
Pavement Needs and Funding
4 Pavement Condition Index (PCI) History
5 10-Year Funding Status
6 Cost to Recover
Based on Current Funding Level
7 Pavement Production History/Planned
8 2026 Pipeline – 20 Projects!
Major Streets Award Date Project Miles
October 7, 2025 2026 ADA Curb Ramps Concrete
November 25, 2025 2023-2024 Caltrans ADA Curb Ramps
March 10, 2026 2026 MS R&R Project
May 19, 2026 2026 MS Sealing 26
April 2026 – June 2026 2026 MS Resurfacing #1-2 19
March 3, 2026 OBAG2 – Cherry Av 2
Total Major Streets 47
Local Streets Award Date Project Miles
2026 Minor ADA Curb Ramps #1-4 August 2025 –
September 2025
December 2025 2026 LS ADA Curb Ramps #1-2
2025 Local Streets Sealing – Winter Suspension 33
October 21, 2025 2025 Local Streets Resurfacing West Pavement - Winter Suspension 27 December 1, 2025 2025-2027 Local Streets Resurfacing Pavement (Option Term 1) 33 May 12, 2026 2026 Local Streets Resurfacing South Pavement 12 April 7, 2026 2026 Local Streets Remove and Replace
June 9, 2026 2026 Local Streets Sealing Pavement 40
June 2, 2026 2026 Local Streets Cape Seal Pavement 9
Total Local & Neighborhood Streets 154
Total Combined Major + Local Streets 201
4 Minor Contracts on Local Streets
9 135 Pavement Maintenance Zones
Geographically contiguous
Efficient planning and
delivery of paving projects
Maximize work completed in
a neighborhood area
Provide geographic
spread across the City
Considers Equity Priority
Community as a tool in
planning phase
Local & Neighborhood Streets
10 Local & Neighborhood Streets
2025 Before and After
Avalani Ave
2025 Sealing
Berrywood Dr
2025 Resurfacing
Before
Before After
After
11 Local & Neighborhood Streets
2026 Projects
8 major construction projects (3 preparation,
2 sealing, 3 resurfacing)
4 minor construction projects (preparation)
Maintaining about 156 miles (including winter
suspension sealing streets)
Total estimated contract amount: $50 million
Focused on maintenance zones “poor to
failed” to maximize cost-effective treatment
Approximately 1,234 miles expected to
be maintained from 2019-2026 (80% of
network)
12 Innovation
Sustainable & Green Infrastructure
Low Carbon Concrete
Reduced carbon footprint up to 40% from baseline
for 6,000+ ADA curb ramps constructed since 2021
Permeable Interlocking Concrete Pavement (PICP)
Reconstructed failed concrete street with PICP
Permeable paver surface built on top of opengraded aggregate-filled openings Reduces stormwater runoff and pollutants while
providing a strong pavement and longer service life
Cape Seal Pavement
A multi-layer preventative maintenance treatment
Designed to seal present cracks, increase skid
resistance and improve color contrast for pavement
markings
Reduced life cycle cost compared to HMA overlays
and Mill & Fills
13 2025 Ribbon-Cutting on Katherine Ct
Application of Cape Seal Treatment
Public Right-of-Way Accessibility Guidelines
DOT is taking into consideration impacts of future
PROWAG adoption
New requirements
Dual directional ramps
Crosswalk grade (2% or 5%)
No pedestrian crossing signs
14 Budget implications for LS, MS
and ADA ramp request programs
Conclusion
Investments have yielded results
Major Street Network and Local &
Neighborhood Street Network both continue
to be rated as "Good”
Local streets PCI continued to improve from
60 to 74 since 2018
2027 maintenance backlog decreased by
about $721 million since 2017 projections
Future pavement funding is expected to
Decrease by 32% in 2028
With uncertainty in gas tax with electrification
And pavement condition WILL decline
DOT ready to
Deliver 201 miles of street pavement projects
in 2026
Build capacity to plan, procure and deliver in
2027 and beyond
Jackson Av, Post-Sealing 2025
White Rd, Post-Resurfacing 2025
15
Presentation
Transportation and Environment Committee (t&e)
February 9, 2026
- Document
- Presentation
- Meeting
- February 9, 2026
- Body
- Transportation and Environment Committee (t&e)
- Original file
- 7.3 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.