Childcare Facility Preliminary Assessment
of

Feasibility

Edenvale Community Center 330 Branham Lane East, San Jose, CA 95111

Prepared by Matthew Tinsley, SCCOE, September 2025 This childcare feasibility assessment report was prepared by the Santa Clara County Office

of

Education

with

funding

from

the

Silicon

Valley

Community

Foundation.

2 1. Summary This report provides the findings of a site visit by Santa Clara County Office of Education

(SCCOE)

staff

to

the

Edenvale

Community

Center

at

330

Branham

Lane

East,

San

Jose,

CA

95111.

The

facility

is

approximately

20,200

square

feet

in

size

and

has

fire

sprinklers

throughout,

meeting

new

fire

safety

requirements

to

serve

infants

and

toddlers.

The

visit

focused

on

two

existing

classrooms

(approximately

900

square

feet

each),

currently

used

for

teen

afterschool

programs,

and

a

community

room

(approximately

1,800

square

feet)

immediately

across

a

hallway

from

the

existing

classrooms.

The

purpose

of

the

site

was

to

make

a

preliminary

assessment

of

the

feasibility

of

retrofitting

these

existing

spaces

to

serve

as

a

licensed

childcare

facility.

The

intended

outcome

of

the

visit

was

to

assess

the

space,

highlight

opportunities

and

challenges

associated

with

developing

it

as

a

childcare

facility,

and

determine

a

list

of

next

steps

required

to

complete

the

feasibility

assessment.

The proposed childcare spaces can be accessed via a side door to the center that is separate

from

the

main

entrance.

The

other

end

of

this

hallway

leads

into

the

main

entrance;

a

door

at

this

point

would

separate

the

childcare

spaces

from

the

rest

of

the

building,

providing

access

control.

The

existing

classrooms

are

completely

built

out

and

include

all

the

necessary

fixtures

to

serve

as

childcare

space.

Each

already

has

a

restroom

with

a

toddler

height

sink

and

toilet.

There

is

existing

millwork

with

storage

cupboards,

“cubbies”

by

the

entrance,

and

an

adult

and

toddler

height

sink

in

the

main

classroom

area.

These

rooms

also

have

doors

to

the

main

hallway

and

a

separate

door

to

a

small,

enclosed,

outdoor

space

with

direct

access

to

an

existing

parking

lot.

This

could

be

used

as

an

emergency

exit

or

as

an

entrance

to

a

play

area

that

would

replace

part

of

the

current

parking

lot

(please

see

below).

Both

interior

and

exterior

doors

in

these

rooms

are

glass,

allowing

ample

natural

light

into

the

space.

The community room, across the hallway from these classrooms has a row of glass windows

looking

onto

the

hallway

and

two

exterior

doors

to

the

front

landscaped

area

of

the

building.

This

allows

the

required

two

exits

for

safety.

The

room

has

a

partition

system

that

allows

it

to

be

temporarily

divided

into

two.

There

is

a

lofted

ceiling

and

exterior

clerestory

windows

allowing

ample

natural

light

into

the

space.

There

is

no

existing

plumbing

in

this

room,

so

conversion

of

this

space

into

childcare

space

would

require

trenching

through

the

existing

foundation.

The building has a 50+ spaces dedicated parking lot and is owned by the City of San Jose.

It

neighbors

a

Boys

and

Girls

Club

afterschool

center

and

Davis

Intermediate

School,

part

of

Oak

Grove

School

District.

Please

see

Appendix

A

for

site

visit

photographs

with

annotations.

Prepared by the Santa Clara County Office of Education 3 Opportunities : The existing classrooms require little to no renovation to serve as childcare

space,

there

is

sufficient

parking

for

staff,

the

building

meets

new

fire

code

requirements

for

serving

infants

and

toddlers,

and

allows

for

a

simple

and

secure

access

to

the

childcare

space

for

families.

Challenges : There is currently less than 500 square feet of outdoor space, between the two

existing

classrooms,

that

could

serve

as

a

play

area.

This

is

insufficient

and

so

additional

outdoor

space

would

need

to

be

created.

The

most

likely

option

is

to

turn

part

of

the

existing

parking

lot

into

an

outdoor

play

area

(please

see

below).

The

community

room

would

need

significant

renovation,

including

trenching

and

installation

of

new

water

and

sewer

lines,

to

be

converted

into

either

two

classrooms

or

one

classroom

and

non-classroom

accessory

space.

Existing

restrooms

in

the

community

center

could

be

used

by

staff

but

are

outside

the

proposed

childcare

space.

Recommendation : Based on the findings of the initial assessment, should the decision be

made

to

continue

evaluating

this

space,

we

recommend

the

following

steps.

First,

assessment

by

an

architecture

and

engineering

team

of

the

feasibility

of

using

a

portion

of

the

existing

parking

lot

to

create

an

outdoor

play

area.

Second,

evaluation

of

the

best

use

of

the

community

room

as

either

(i)

two

classrooms,

or

(ii)

one

classroom

and

accessory

space

and

the

associated

costs

of

each.

This

evaluation

may

require

outreach

to

childcare

operators

about

their

interest

in

operating

a

licensed

program

at

a

site

with

either

three

classrooms

or

extremely

limited

non-classroom

and

accessory

space.

Alternative

uses

include

the

site

operating

as

satellite

space

for

an

existing

provider

with

a

nearby

center

or

as

an

unlicensed

childcare

center

(e.g.

a

parent

co-op

program).

However,

both

of

these

uses

would

still

require

the

development

of

outdoor

play

space.

2. Local Childcare Need Data from the Local Early Education Planning Council (LPC) 2023 Childcare Needs Assessment
1 (published

in

March

2025)

shows

that

in

the

City

of

San

Jose

there

are

approximately

19,242

children

ages

0-2

years

for

whom

there

is

no

child

care

slot.

For

preschool

age

children

(ages

3-4

years),

supply

exceeds

the

demand

by

3,600

slots.

Within

zip

code

95111,

the

LPC

ZIP

Code

Priorities

Report

(2024)
2 shows

there

are

over

1,500

preschool

age

children,

that

almost

800

are

eligible

for

subsidized

childcare,

and

that

81%

of

eligible

children

are

currently

unserved

by

a

subsidized

program.

Similarly,

there

are

almost

2,000

infants

and

toddlers

in

this

zip

code,

almost

900

are

eligible

for

subsidized

childcare,

and

that

97%

of

eligible

infants

and

toddlers

are

currently

2 https://www.sccoe.org/supoffice/lpc/Documents/Reports/Santa-Clara-County-LPC-ZIP-Code-Priorities-R eport_2024-CSPP.pdf

1 https://www.sccoe.org/supoffice/lpc/Documents/Reports/2023_LPC-Needs-Assessment.pdf Prepared by the Santa Clara County Office of Education 4 unserved by a subsidized program
3 . Based on these data, this zip code is classified as Priority

One,

meaning

that

providers

seeking

to

serve

subsidy-eligible

children

in

this

zip

code

will

receive

preferential

access

to

new

subsidized

childcare

contracts

from

the

state

in

any

upcoming

expansion.

Data from the SCCOE Resource and Referral Agency Childcare Portal (www.childcarescc.org) indicates that there are 51 licensed private childcare providers in zip code 95111 with a combined capacity of 812, less than 25% of the population of children

ages

0-5

in

the

area.

Of

those

45 are

family

childcare

homes

(FCCH)

and

six

are

centers.

Twenty

three

of

the

FCCH

and

one

of

the

centers

accept

childcare

subsidy

vouchers,

the

remainder

are

private

pay

only.

Together

these

data

suggest

(i)

there

is

unmet

need

for

childcare

in

this

zip

code,

(ii)

there

is

substantial

unmet

need

for

subsidized

care

in

this

zip

code,

especially

for

infant

and

toddler

care,

and

(iii)

any

childcare

center

at

this

site

should

be

designed

to

support

infant

and

toddler

care.

3. Site & Facility Assessment In order for a space to support a high quality early childhood program it should provide (i)

ample

classroom

space

with

direct

connections

to

outdoor

play

areas,

(ii)

non-classroom

space

to

support

teacher

work,

administration,

and

family

support

activities,

(iii)

accessory

space

for

food

and

janitorial

services,

(iv)

outdoor

space

that

supports

a

variety

of

play

activities

and

gross

motor

development,

with

appropriate

separation

between

age

groups,

(v)

safe

and

efficient

access

for

child

drop-off

and

services,

and

(vi)

staff

parking

and

efficient

traffic

circulation.

Indoor classroom space:

Childcare licensing requires a minimum of 35 square feet of unencumbered classroom space

per

child.

Current

best

practice

recommends

classrooms

be

1,000

to

1,300

square

feet.

The

existing

two

classrooms

are

approximately

900

square

feet

each.

The

licensed

capacity

of

these

classrooms

will

depend

on

exact

furniture

layout

and

other

constraints

but

a

typical

classroom

enrollment

of

12 toddlers

(18-36

months)

is

possible

in

this

space.

Given

that

these

rooms

already

have

toddler

height

sinks

and

toilets,

and

all

the

necessary

cabinetry,

our

recommendation

is

that

they

be

used

for

toddler

care

(i.e.

18-36

month

old

children)

as

infant

care

would

require

additional

space

for

cribs.

One

classroom

could

be

used

for

younger

toddlers

and

the

second

for

older

children

to

allow

for

developmentally

consistent

grouping.

The existing, 1,800 square foot community room could be converted into ECE learning space.

However,

this

will

require

significant

investment.

There

is

currently

no

plumbing

and

so

installing

toilets,

sinks,

dishwashers

etc.

will

require

connecting

to

existing

utility

3 https://www.sccoe.org/supoffice/lpc/Documents/Reports/Santa-Clara-County-LPC-ZIP-Code-Priorities-R eport_2024-CCTR.pdf

Prepared by the Santa Clara County Office of Education 5 lines, which may require trenching through the existing concrete slab. This space could be

converted

into

a

single,

large,

classroom

with

low

walls

or

furniture

dividers

to

designate

different

learning

spaces.

Alternatively,

a

full

height

wall

could

be

built

to

divide

the

space

into

two,

small,

classrooms

or

to

one

classroom

and

non-classroom

accessory

space.

This

room

does

have

direct

outside

access,

meeting

emergency

exit

requirements

but

does

not

have

direct

access

to

appropriate

outdoor

space

for

play.

Non-classroom and accessory space:

A childcare facility requires a variety of spaces in addition to classrooms. These include separate

offices

for

administration,

assessment,

and

parent

conferences;

teacher

work

spaces;

rooms

for

food

service,

laundry,

and

janitorial

storage

that

are

separate

from

childcare

areas;

adult

restrooms,

a

reception

area

with

access

control,

and

circulation.

There is currently no non-classroom or accessory space associated with the existing classrooms.

Existing

restrooms

in

the

community

center

could

be

used

by

staff

but

are

outside

the

proposed

childcare

space.

The

only

opportunity

to

build

non-classroom

space

within

the

proposed

childcare

footprint

would

be

to

include

it

in

the

renovation

of

the

community

room,

sacrificing

the

possibility

of

a

fourth

classroom.

This

creates

a

potential

barrier

to

recruit

a

provider

to

offer

childcare

services

by

reducing

the

number

of

children

who

can

be

served

in

the

space,

affecting

fiscal

sustainability.

Alternatively,

if

the

site

does

not

include

accessory

spaces,

this

creates

substantial

difficulties

in

program

operations.

This

is

a

significant

barrier

to

the

feasibility

of

this

site

supporting

a

stand-alone,

licensed

childcare

center.

Other

alternative

uses,

such

as

an

unlicensed

program

(e.g.

parent

co-op

program)

or

as

a

satellite

site

for

a

nearby

early

learning

program,

are

possible

but

depend

on

factors

outside

the

scope

of

this

study.

Outdoor play space:

There is currently no licensable outdoor play space at the site. There is an enclosed courtyard

of

approximately

500

square

feet

between

the

two

existing

classrooms.

After

renovations,

this

could

serve

as

outdoor

space

for

six

children

at

a

time.

This

is

insufficient

and

so

additional

space

needs

to

be

found

for

the

site

to

be

feasible.

Given

the

existing

layout,

the

only

possibility

is

to

take

some

of

the

existing

parking

lot

behind

the

community

center

and

convert

it

to

outdoor

play

space,

with

the

enclosed

courtyard

being

used

as

access

to

this

area.

The site has a parking lot with 50+ spaces alongside and behind the center, bounded by the

Boys

and

Girls

Club

on

one

side

and

Davis

Intermediate

School

on

the

other.

During

the

time

of

the

visit,

a

mid-week

morning,

a

majority

of

the

spaces

were

empty.

This

suggests

that

a

portion

of

the

lot

might

be

able

to

be

used

as

outdoor

play

space.

Depending

on

the

classroom

configuration,

scheduling,

and

enrollment,

the

outdoor

Prepared by the Santa Clara County Office of Education 6 space would need to be approximately 2,000 to 5,000 square feet. This could be achieved

by

taking

the

space

behind

the

center

and

using

it

as

outdoor

space

while

maintaining

existing

parking

alongside

the

center,

adjacent

to

Branham

Lane

East.

This

configuration

preserves

parking

access

and

circulation,

while

giving

shelter

and

privacy

to

the

play

area.

It

would

also

allow

access

to

the

childcare

space

from

an

existing

door

and

to

the

outdoor

space

from

the

existing

classrooms

and

community

room

via

the

enclosed

courtyard.

SCCOE staff had a number of concerns about this plan to create an outdoor space.

Most

importantly,

this

area

of

the

parking

lot

is

also

a

fire

lane.

Determining

which

parts

of

the

site

are

served

by

this

fire

access,

and

whether

this

area

can

be

repurposed

as

outdoor

play

space,

will

determine

whether

childcare

is

a

feasible

use

of

this

site.

Additionally,

determining

the

parking

demand

on

site

-

and

whether

there

are

existing

agreements

with

neighboring

sites

about

use

of

the

lot

-

is

necessary.

This

analysis

requires

contracting

with

an

architect,

landscape

designer,

and

utilities

engineer

and

may

also

require

discussion

with

the

San

Jose

Fire

Department.

There

is

also

a

significant

grade

immediately

beyond

the

existing

lot

that

runs

down

onto

the

school

site.

Use

of

the

space

as

a

play

area

may

affect

drainage

and

runoff

and

will

need

to

be

understood.

This

renovation

will

also

result

in

a

significant

capital

expense.

Safe child drop off:

The side entrance to the community center, adjacent to the parking lot, opens into the proposed

childcare

space

and

could

serve

as

a

dedicated

childcare

entrance

into

a

reception

area.

Nearby

parking

spaces

could

be

reserved

for

short

term

parking

(e.g.

10 minutes)

to

allow

safe

and

efficient

childcare

drop-off

and

pickup.

SCCOE

staff

noted

that

drop

off

and

pick

up

for

a

program

that

includes

infants

and

toddlers

is

complicated

because

parents

need

to

leave

their

cars

and

accompany

children

to

the

classrooms.

SCCOE

staff

had

no

significant

concerns

about

developing

a

safe

child

drop-off

area

for

this

space.

Services access:

The side entrance to the community center, described above, could also serve as services

access

to

the

proposed

childcare

space.

This

would

support

food

service

deliveries

from

an

off-site

kitchen

and

other

services.

SCCOE

staff

did

not

have

concerns

about

services

access

to

this

space.

Staff parking:

Using the site as a childcare center will create demand for 12-15 staff parking spaces, depending

on

the

number

of

classrooms,

the

ages

of

the

children

served,

and

other

Prepared by the Santa Clara County Office of Education 7 operating features. There is likely sufficient parking to meet staff’s needs, contingent on existing

parking

demand

and

the

extent

of

the

parking

lot

renovated

into

outdoor

play

space.

General comments:

While there are two existing classrooms that are “turnkey” spaces for childcare with bathrooms,

toddler

height

fixtures,

and

millwork,

these

spaces

are

small.

Modifying

the

community

room

to

support

either

two

small

classrooms,

one

large

classroom,

or

a

classroom

and

accessory

space,

will

be

complex

and

expensive

due

to

the

lack

of

existing

plumbing

access.

The

lack

of

additional

space

for

non-classroom

uses

creates

a

difficult

trade

off

for

any

potential

operator

between

having

enough

classrooms

for

a

fiscally

sustainable

program

and

having

other

areas

necessary

for

program

operations.

Access to outdoor space is another major concern. There is currently no sufficient outdoor

space

and

the

best

option

for

creating

this

space

may

not

be

feasible

due

to

the

need

for

fire

access

to

the

site

and,

potentially,

neighboring

facilities.

Determining

whether

a

portion

of

the

parking

lot

can

be

repurposed

into

an

outdoor

play

area

is

the

key

to

the

feasibility

of

using

the

site

as

childcare

space.

If

it

is

possible

to

repurpose

part

of

the

parking

lot,

it

will

require

significant

capital

investment.

There appear to be no concerns with access control, services accessibility, and staff parking.

4. Operational Considerations
General recommendations for fiscally sustainable childcare operations are that (i) a new center

should

support

a

minimum

of

four

classrooms

to

allow

for

efficiencies

of

scale,

administrative

oversight,

and

robust

operations,

(ii)

the

site

should

provide

care

for

infants,

toddlers,

and

preschool

age

children

to

allow

families

to

enroll

at

the

site

for

as

long

as

possible,

(iii)

the

program

should

provide

full-day

care,

(iv)

the

site

should

have

space

for

a

warming

kitchen

to

allow

central

food

service,

and

(v)

programs

serving

infants

and

toddlers

should

have

on-site

laundry

facilities.

As discussed above, the proposed space will require significant trade offs between these

competing

uses.

The

existing

classrooms

are

best

suited

to

provide

toddler

care

as

they

are

too

small

to

accommodate

the

increased

class

size

of

a

preschool

room

and

are

also

too

small

to

meet

infant

room’s

requirements

for

crib

space.

Converting

the

community

room

into

two

classrooms

may

allow

sufficient

enrollment

for

a

fiscally

sustainable

program,

but

does

not

provide

space

for

non-classroom

uses.

Converting

it

to

one

classroom

and

accessory

space

does

not

allow

the

center

to

serve

the

full

infant

to

preschool

age

range,

as

these

two

ages

must

be

physically

separated.

All

of

these

Prepared by the Santa Clara County Office of Education 8 constraints make it less likely that a provider would be interested in the space - although they

do

not

rule

it

out

completely.

For

example,

a

provider

with

a

nearby

preschool

center

may

be

interested

in

using

the

space

for

a

satellite

infant

and

toddler

program.

Examining

these

possibilities

is

outside

of

the

scope

of

this

assessment.

Additional operational considerations include the cost of rent, utilities, janitorial, and landscape

services,

that

have

a

significant

impact

on

the

program

operations

budget

and

could

determine

whether

the

site

is

attractive

to

childcare

providers.

Most

childcare

providers

operate

with

very

thin

margins

and

so

it

would

be

important

to

determine

what

terms

might

be

available

from

the

City

of

San

Jose

before

reaching

out

to

potential

operators.

5. ROM Capital Costs Estimate
Based on prior experience and recent childcare construction projects, SCCOE staff estimates

the

cost

of

transitioning

the

site

from

its

current

state

to

a

licensed

childcare

facility

to

be

on

the

order

of

$2.5-3

million.

These

estimates

assume

a

cost

of:
● $800,000 thousand in soft costs (architect, permitting etc.) and contingency, ● $500 sqft to retrofit the community room, ● $300 sqft to renovate a portion of the parking lot into playground spaces. These estimates are approximations only and do not take into account construction cost inflation or unforeseen delays. They are provided to give a sense of the scale of the capital

costs

and

funding

required

to

develop

the

existing

space

into

a

childcare

facility.

6. Conclusion & Next Steps This site is challenging to convert into a stand alone licensed childcare facility due to the lack

of

classroom

space,

non-classroom

and

accessory

space,

and

outdoor

play

areas.

Conversion

of

the

community

room

and

a

portion

of

the

parking

lot

to

new

uses

will

require

substantial

funds.

Additionally,

converting

a

portion

of

the

parking

lot

into

play

space

may

not

be

possible

given

its

current

use

as

fire

access.

If

that

is

the

case,

this

site

may

not

be

a

feasible

location

for

childcare.

There

are

three

recommended

next

steps.

First, determining the viability of converting a section of the parking lot into outdoor play space.

This

includes

assessing

the

need

for

fire

access,

alternatives

to

the

current

design,

and

the

cost

of

conversion

if

alternatives

do

exist.

It

also

includes

understanding

any

constraints

on

what

can

be

done

with

the

existing

parking

lot,

e.g.

current

use

demands,

any

use

by

neighboring

facilities,

and

any

imposed

by

regulatory

or

funding

requirements.

Second, the development of a preliminary indoor and outdoor space plan by an architect

experienced

in

designing

childcare

centers.

This

could

resolve

space

use

Prepared by the Santa Clara County Office of Education 9 questions (e.g. the best use of the community room) and would provide additional information

on

design

requirements

for

the

outdoor

space.

Finally, discussion with the City of San Jose, the building owner, about (i) use of the space

for

childcare

and

how

it

would

interact

with

the

ongoing

use

of

the

rest

of

the

building

as

a

community

center,

(ii)

the

conversion

of

part

of

the

parking

lot

into

outdoor

play

space,

and

(iii)

their

expectations

for

rent

and

other

operational

costs

for

potential

childcare

providers

on

site.

Any

ability

to

reduce

these

costs

could

have

a

significant

impact

on

the

attractiveness

of

the

site

to

a

potential

childcare

tenant.

Appendices
- Appendix A: Site visit photographs with annotations

Prepared by the Santa Clara County Office of Education 10 Appendix A : Site visit photographs with annotations View from the community center entrance to
the

hallway

of

the

proposed

childcare

space.

To

the

right

is

the

community

room.

The

end

of

the

hallway

is

the

proposed

childcare

entrance.

The

doorways

to

the

front

left

are

the

center

restrooms

that

could

be

used

by

childcare

staff.

Existing classroom with bathroom in back left
corner

(including

toddler

height

toilet

and

sink),

counters

and

cabinetry

(including

toddler

height

sink

in

back

middle

and

storage

along

the

left

wall).

Bathroom in existing classrooms with the
toddler

height

sink,

mirror,

and

toilet

installed.

View of enclosed courtyard between the two
existing

classrooms

showing

direct

access

to

the

outdoor

space.

Prepared by the Santa Clara County Office of Education

11 Community room. Note the lowered ceiling
halfway

down

to

accommodate

the

existing

partition

system,

the

glass

wall

between

the

room

and

interior

hallway,

and

the

exit

door

to

the

front

exterior

of

the

community

center

providing

emergency

egress.

View of the existing parking lot behind the
center

proposed

to

be

renovated

into

an

outdoor

play

area.

Note

the

red

curbing

indicating

fire

lane

access.

Additional view of the parking lot behind the
center

showing

proximity

of

the

lot

to

the

building.

The

horizontal

panelled

section

of

the

building

in

the

center

of

the

photo

is

the

wall

between

the

lot

and

the

enclosed

courtyard,

illustrating

the

potential

path

of

travel

to

the

proposed

outdoor

space.

Prepared by the Santa Clara County Office of Education

← All documents from this meeting