Cities Index.
Attachments

San Jose City Council
March 24, 2026

Document
Attachments
Meeting
March 24, 2026
Body
San Jose City Council
Pages
69
Original file
5.2 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

1 of 3
ATTACHMENT A – Costar Building Class & Star Ratings Definitions Costar Multi-family Class Definitions
Class A: In general, a class A building is an extremely desirable investment-grade property with the highest quality construction and workmanship, materials and systems, significant architectural features, the highest quality/expensive finish and trim, abundant amenities, first rate maintenance and management; usually occupied by prestigious tenants with above average rental rates and in an excellent location with exceptional accessibility.

It may have been built within the last 5-10 years, but if it is older, it has been renovated to maintain its status and provide it many amenities.

Class B: In general, a class B building offers more utilitarian space without special attractions. It will typically have ordinary architectural design and structural features, with average interior finish, systems, and floor plans, adequate systems and overall condition. It will typically not have the abundant amenities and location that a class A building will have.

Class C: In general, a class C building is a no-frills, older building that offers basic space. The property has below-average maintenance and management, a mixed or low tenant prestige, and inferior elevators and mechanical/electrical systems.

Class F: A functionally or economically obsolete building is one that does not offer a viable alternative for space and does not "compete" with others of similar type for occupancy by businesses seeking a location for operations. These buildings will usually have externally visible physical or structural features as well as internal ones that render it undesirable to be leased and therefore not competitive with any other properties in the market. The property may even be tagged as "Condemned" by the local authorities.

ATTACHMENT A – Costar Building Class & Star Ratings Definitions 2 of 3
Costar Multi-family Star Rating Definitions

RATING GROUP DEFINITION


A 5-Star building represents the luxury end of multi-family buildings defined by finishes, amenities, the overall interior/exterior design and the highest level of specifications for its style (garden, low-rise, mid-rise, or high-rise).

Architectural
Design
Exterior Materials/Façade
High-quality durable materials – natural stone, glass, well detailed and constructed metal panel, wood veneer, or
terracotta cladding; accentuating lighting.

Fenestration/Glazing/Views Large windows, abundant natural day lighting, generally available exterior views, high efficient glazing specification.

Overall Aesthetics
Representing current trends and standards in design and/or of a timeless, perhaps a historic quality. Aesthetically exceptional arrangement of forms, massing and materials. Possibly
designed by a notable or signature architect.

Structure/Systems High ceilings; modern energy-efficient, central HVAC, individually controlled systems, high- speed elevators, likely new or newly renovated.

Amenities
Unit Amenities/Design
Requires numerous high quality finishes such as hardwood floors, granite countertops, stainless steel appliances, bay window(s), crown molding, a balcony/patio and in-unit
washer/dryers. Also typically has an open floor plan and high/vaulted ceilings of 9’+
Site Amenities
Requires plentiful on-site shared facilities including a clubhouse/party room, fitness center, business center, pool, concierge, etc.

Site/Landscaping Continually maintained landscaping where applicable; exterior gathering spaces, roof terrace or courtyard.

Certifications Possibly a certified/labeled green and energy efficient building. 
4-Star buildings are constructed with higher end finishes and specifications, providing desirable amenities to residents and designed/built to competitive and contemporary standards.

Architectural
Design
Exterior Materials/Façade
Durable materials, well-detailed and constructed metal panel, wood veneer or terracotta cladding; possibly exhibiting minor signs of weathering and wear.

Fenestration/Glazing/Views Large windows, great natural day lighting and views.

Overall Aesthetics Representing recent trends and standards in design and/or of a timeless, perhaps an historic quality.

Structure/Systems Likely to have some 5 Star qualities, or of a prior generation of buildings.

Amenities
Unit Amenities/Design
Includes some high quality finishes such as hardwood floors, granite countertops, stainless steel appliances, bay window(s), crown molding, a balcony/patio and in-unit washer/dryers. Also may have an open floor plan and high/vaulted ceilings.

Site Amenities Several on-site shared facilities such as a Clubhouse/Party Room, Fitness Center, Business Center, Pool, Concierge, etc.

Site/Landscaping Well maintained landscaping where applicable; likely to have exterior gathering spaces, roof terrace or courtyard.

Certifications Possibly a certified/labeled green and energy efficient building. 
Architectural
Design
Exterior Materials/Façade Brick, stucco, EIFS, precast concrete, vinyl or fiber cement siding, possibly 4 Star materials with signs of age.

Fenestration/Glazing/Views Punched windows, fair mix of glazed and opaque surfaces that provide adequate natural light.

Overall Aesthetics Average with respect to background buildings, contextually appropriate.

Structure/Systems Likely smaller and older with less energy-efficient and controllable systems.

Amenities Unit Amenities/Design Average quality finishes, layout conducive to compact lifestyle ATTACHMENT A – Costar Building Class & Star Ratings Definitions 3 of 3

RATING GROUP DEFINITION
but not necessarily an open floor plan.

Site Amenities
A few on-site shared facilities and spaces such as a
Clubhouse/Party Room, Fitness Center, Business Center, Pool, Laundry Facilities, etc.

Site/Landscaping Modest landscaping and likely small or no exterior spaces.

Certifications Possibly a certified/labeled green and energy efficient building. 
Architectural
Design
Exterior Materials/Façade Brick, stucco, EIFS, precast concrete, siding with noticeable aging.

Fenestration/Glazing/Views Small, seemingly inadequate windows.

Overall Aesthetics Average, functional.

Structure/Systems Purely functional.

Amenities Unit Amenities/Design Below average finishes, inefficient use of space.

Site Amenities Likely only one or no on-site shared facilities.

Site/Landscaping Minimal or no landscaping, no exterior spaces.

Certifications Unlikely a certified/labeled green and energy efficient building.  Practically uncompetitive with respect to typical multi-family investors, may require significant renovation, possibly functionally obsolete.

Jurisdiction San Jose ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning
Period 6th Cycle 01/31/2023 - 01/31/2031
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Historic Sites Application
Status Project Type Notes
2 3 4 6 7 8 9 10 12 13 14
Prior APN+ Current APN Street Address Project Name+
Local
Jurisdiction
Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date
Application
Submitted
(see
instructions)
Acutely Low-
Income Deed
Restricted
Acutely Low-
Income Non
Deed
Restricted
Extremely Low-
Income Deed
Restricted
Extremely Low-
Income Non
Deed
Restricted
Very Low-
Income
Deed
Restricted
Very Low-
Income
Non Deed
Restricted
Low-
Income
Deed
Restricted
Low-Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed
Restricted
Above
Moderate-
Income
Total

PROPOSED
Units by
Project
Total

APPROVED
Units by
project
Total

DISAPPROVE
D Units by
Project
Please select
state
streamlining
provision/s the
application was
submitted
pursuant to.

Is this project
located on a
site with an
associated
historical
designation as
outlined in
Government
Code Section
65400(a)(2)(N)
and reported on
Table L?
Did the
housing
development
application
seek
incentives or
concessions
pursuant to
Government
Code section
65915?
Were
incentives or
concessions
requested
pursuant to
Government
Code section
65915
approved?
Please
indicate the
status of the
application.

Is the project
considered a
ministerial
project or
discretionary
project?
Notes+
Summary Row: Start Data Entry Below 0 0 27 0 105 0 354 0 104 0 3596 4186 1166 0 47236017 0 Herald Ave H24-063 5+ R 1/22/2025 12 12 NONE No Yes Yes Pending Discretionary 24947025 445 N 6th St H25-005 2 to 4 R 2/19/2025 4 4 4 NONE Yes - Local No N/A Approved Discretionary 24947025 445 N 6th St H25-005 SFD O 2/19/2025 2 2 2 NONE Yes - Local No N/A Approved Discretionary N/A 488 Doma Dr,
San Jose, CA H25-003 SFA O
2/19/2025
2 2 NONE No No N/A Pending Discretionary
30325060 3896 Stevens
Creek
Boulevard
MP25-003
5+ R
2/20/2025
27 513 540 540 NONE No Yes Yes Approved Ministerial
Local ministerial permit
419-04-034 1803 Bradford
Way H25-006 5+ R
3/12/2025
4 12 16 16 NONE No Yes Yes Approved Ministerial
264-38-068 906 Vine St,
San Jose H25-002 SFD O
3/20/2025
1 1 NONE Yes - Local No N/A Pending Discretionary
26110065 752 Laurel St H25-009 SFA O 3/28/2025 2 2 NONE No No N/A Pending Discretionary 25924041 323 Terraine St PD25-011 5+ R
4/9/2025
345 345 NONE No No N/A Pending Discretionary
49717015 200 Southside
Dr, H25-010 2 to 4 O
4/16/2025
6 6 NONE No No N/A Pending Discretionary
24103025 1655 Berryessa
Rd PD25-008 5+ R
4/23/2025
26 130 101 3 260 260 NONE No Yes Yes Approved Discretionary 30348020 479 Boynton
Ave H25-011 SFA O
5/5/2025
8 8 NONE No No N/A Pending Discretionary
64923001 2079 S White
Rd PD25-007 5+ R
5/5/2025
64 64 NONE No No N/A Pending Discretionary
N/A 620 N 6th St PDA15-055-02 5+ R
5/27/2025
11 11 NONE No No No Pending Discretionary
43413042 1325 Lick Ave,
San Jose, CA
95110
PD25-009
5+ R
6/3/2025
65 65 65 NONE No No No Approved Discretionary
43411011 1274 Vine
Street H25-013 SFA O
6/10/2025
2 2 NONE No No N/A Pending Discretionary
43407012 147 Goodyear
Street H25-014 SFA O
6/12/2025
2 2 NONE No No No Pending Discretionary
26438053 905 Almaden
Avenue H25-017 5+ O
6/23/2025
5 5 NONE Yes - Local Yes Yes Pending Discretionary
27720034, -035 326 South
Willard Avenue H25-018 5+ O
6/24/2025
11 202 213 NONE No Yes Yes Pending Discretionary
46737030 374 S 21st St,
San Jose 95116 H25-024
SFA O
7/9/2025
2 2 2 NONE No No N/A Approved Discretionary
N/A 415 East
Empire Street H25-016 5+ R
7/9/2025
1 5 6 NONE No Yes Yes Pending Discretionary
43906042 1295 Curtner
Avenue H25-021 5+ O
7/10/2025
12 12 NONE No No No Pending Discretionary
27719034, -035 529 Page Street H25-026 5+ R
8/11/2025
3 18 21 NONE No Yes N/A Pending Discretionary
25942085 180 Park
Avenue PD25-015 5+ R
8/12/2025
391 391 NONE Yes - Local No N/A Pending Discretionary
46733035 1239 East San
Fernando Street H25-028
SFA O
9/15/2025
2 2 NONE No No N/A Pending Discretionary
26420133 323 Gifford
Avenue H25-039 5+ R
10/29/2025
14 262 276 NONE No Yes Yes Pending Discretionary
42937003 1425 Cherry
Avenue H25-040 SFD O
10/29/2025
2 2 NONE No Yes N/A Pending Discretionary
42937003 1425 Cherry
Avenue H25-040 2 to 4 O
10/29/2025
4 4 NONE No Yes N/A Pending Discretionary
26112084 0 Emory St H26-006 SFA O 11/7/2025 18 18 NONE No Discretionary 23042014 1030 McKendrie
St H25-043 5+ O
11/24/2025
12 12 NONE No Yes N/A Pending Discretionary
46720079 147 E Santa
Clara St H25-041 5+ R
12/3/2025
415 415 NONE No Yes N/A Pending Discretionary
N/A 860 W San
Carlos St H25-045 5+ R
12/22/2025
27 27 215 3 272 NONE No Yes N/A Pending Discretionary
28211029 1099 S Bascom
Ave H25-044 5+ R
12/23/2025
476 476 NONE No Yes N/A Pending Discretionary
26446077 515 Coe Ave SF25-010 SFD O 4/25/2025 1 1 NONE Yes - Local No N/A Pending Discretionary 30723023 4173 Moreland
Way
2024 117449
000 00 RS
SFD O
2/3/2025
1 1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Approved Ministerial
46405019 4812
Birmingham Dr
2025 095837
000 00 RS
SFD O
2/19/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
68432139 320 Battle
Dance Dr
2025 099873
000 00 RS
SFD O
5/7/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
49465046 3281 Lantern
Way
2025 108026
000 00 RS
SFD O
5/15/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
67916002 4793 Whitetail
Lane
2024 117901
000 00 RS
SFD O
5/30/2025
0 0 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
N/A
1148 Palm St 2025 107609
000 00 RS
SFD O
6/13/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
48120005 117 Scharff
Avenue
2025 119589
000 00 RS
SFD O
7/21/2025
2 2 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
0 Table A
Cells in grey contain auto-calculation formulas
51 Project Identifier Unit Types Density Bonus Law
Applications
11 Housing Development Applications Submitted
Proposed Units - Affordability by Household Incomes
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 1 ends

N/A
1212 Brace Ave 2025 121209
000 00 RS
SFD O
10/10/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
N/A 2703 Gilham
Way
2025 132595
000 00 RS
SFD O
10/21/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
42906092 0 Minnesota
Avenue
2025 105399
000 00 RS
SFD O
12/5/2025
2 2 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
43932064 2265 Mazzaglia
Ave, San Jose,
CA 95125
2025 094896
000 00 RS
SFD O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
Prefab
41919077 1772 Barcelona
Ave, San Jose,
CA
2025 098065
000 00 RS
SFD O
3/6/2025
1 1 1 NONE No No N/A Approved Ministerial
Prefab
42949082 1544 De Anza
Way, San Jose,
CA 95125
2025 108134
000 00 RS
SFD O
5/2/2025
1 1 1 NONE No No N/A Approved Ministerial
Prefab
43951015 929 Pascoe
Ave, San Jose,
CA
2025 108345
000 00 RS
SFD O
5/13/2025
1 1 1 NONE No No N/A Approved Ministerial
Prefab
61235039 10330 Clayton
Rd, San Jose,
CA
3-11805
SFD O
1/13/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
66006008 2922
Meadowlands
Ln, San Jose,
CA
3-18712
SFD O
1/15/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
66002061 7010 San Felipe
Rd, San Jose,
CA 95135
3-16390
SFD O
1/27/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
N/A 1581 Minnesota
Ave, San Jose,
CA
3-02701
SFD O
2/14/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
49709011 13014 Pfeifle
Ave, San Jose,
CA 95111
3-27312
SFD O
3/19/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
29915027 4180 Williams
Rd, San Jose,
CA
3-08679
SFD O
3/25/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
48423016 2797

FLORENCE
AVENUE San
José, CA
3-27326
SFD O
4/8/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
45609010 2132 CANOAS
GARDEN

AVENUE SAN

JOSE, CA,
95125
3-27325
SFD O
4/10/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
66002060 7008 SAN

FELIPE ROAD
San José, CA
95135
3-16390
SFD O
4/21/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
65207010 2890 Klein Rd,
San Jose, CA
95148
3-07022
SFD O
5/8/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
30723014 1303 Flora Ave,
San Jose, CA
95130
3-27344
SFD O
5/19/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
27459032 2540 Bailey
Ave, San Jose,
CA 95128
3-27360
SFD O
6/9/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
68003024 2352 Glen
Creek Ct, San
Jose, CA 95138
3-27374
SFD O
6/23/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
59207062 652 N Capitol
Ave, San Jose,
CA 95133
3-19620
SFD O
6/27/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
58143017 6803 Leyland
Park Dr, San
Jose, CA
3-27058
SFD O
7/1/2025
0 0 1 SB 9 (2021) -
Residential Lot
Split
No No N/A Approved Ministerial
60115083 145 Fleming
Avenue, San
Jose, CA 95127
3-27333
SFD O
7/29/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
59217021 2971 Bell
Avenue, San
Jose, CA 95133
3-27286
SFD O
7/29/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
48147035 1658 E San
Antonio St, San
Jose, CA 95116
3-27438
SFD O
10/2/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
42906092 0 Minnesota
Ave, San Jose,
CA 95125
3-27446
SFD O
10/8/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
49735125 2738 Cramer
Circle, San
Jose, CA 95111
3-27449
SFD O
10/15/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
65450082 2818
Brightwood Dr
2024 108147
000 00 RS
SFD O
2/3/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1585 Minnesota
Ave
2025 093436
000 00 RS
SFD O
2/18/2025
1 1 1 NONE No No N/A Approved Ministerial
47230049 551 S 15th St 2025 096574
000 00 RS
SFD O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
65207016 3535 Norwood
Ave
2025 097895
000 00 RS
SFD O
3/4/2025
1 1 1 NONE No No N/A Approved Ministerial
57754014 5827 Brasilia
Way
2025 098415
000 00 RS
SFD O
3/4/2025
1 1 1 NONE No No N/A Approved Ministerial
57754012 5831 Brasilia
Hill Ct
2025 101364
000 00 RS
SFD O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
57754012 5835 Brasilia
Hill Ct
2025 101371
000 00 RS
SFD O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
57754012 5839 Brasilia
Hill Ct
2025 101380
000 00 RS
SFD O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
57754012 5843 Brasilia
Hill Ct
2025 101384
000 00 RS
SFD O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
57713085 6138 Mancuso
St
2025 098535
000 00 RS
SFD O
3/27/2025
1 1 NONE No No N/A Pending Ministerial
N/A 2174 Old
Piedmont Rd
2025 098497
000 00 RS
SFA O
4/24/2025
2 2 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 2 ends

42927137 1111 Pine Ave 2025 104751
000 00 RS
SFD O
5/5/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 697 Altino Blvd 2025 110550
000 00 RS
SFD O
5/17/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 703 Altino Blvd 2025 110554
000 00 RS
SFD O
5/17/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 709 Altino Blvd 2025 110556
000 00 RS
SFD O
5/17/2025
1 1 1 NONE No No N/A Approved Ministerial
23042060 931 McKendrie
St
2025 102789
000 00 RS
SFA O
5/19/2025
2 2 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
65214014 0 Ruby Ave 2024 074753
000 00 RS
SFD O
6/2/2025
1 1 NONE No No N/A Pending Ministerial
47205010 1307 Peach Ct 2025 105838
000 00 RS
SFD O
6/3/2025
1 1 NONE No No N/A Pending Ministerial
59527027 819 Boulder Dr 2025 107066
000 00 RS
SFD O
6/6/2025
1 1 NONE No No N/A Pending Ministerial
43917010 911 Franquette
Ave
2025 105906
000 00 RS
SFD O
7/1/2025
1 1 NONE No No N/A Pending Ministerial
59120033 1028 Wilsham
Dr
2025 111493
000 00 RS
SFD O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
N/A 3543 Kettman
Rd
2025 114735
000 00 RS
SFD O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
N/A 3543 Kettman
Rd
2025 114728
000 00 RS
SFD O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
N/A 3543 Kettman
Rd
2025 116871
000 00 RS
SFD O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
23021042 1079 Myrtle St 2025 106385
000 00 RS
SFA O
7/24/2025
2 2 NONE No No N/A Pending Ministerial
N/A 16 Silver Elm Ct 2025 122660
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 18 Silver Elm Ct 2025 122664
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 20 Silver Elm Ct 2025 122665
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 22 Silver Elm Ct 2025 122668
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 24 Silver Elm Ct 2025 122670
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 42 Still Water Ct 2025 122672
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 40 Still Water Ct 2025 122673
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 38 Still Water Ct 2025 122675
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 36 Still Water Ct 2025 122687
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 35 Silver Elm Ct 2025 122993
000 00 RS
SFD O
8/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 33 Silver Elm Ct 2025 122994
000 00 RS
SFD O
8/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 31 Silver Elm Ct 2025 122999
000 00 RS
SFD O
8/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 29 Silver Elm Ct 2025 123001
000 00 RS
SFD O
8/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 10 Silver Elm Ct 2025 123662
000 00 RS
SFD O
8/7/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 27 Silver Elm Ct 2025 123667
000 00 RS
SFD O
8/7/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 25 Silver Elm Ct 2025 123673
000 00 RS
SFD O
8/7/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 3543 Kettmann
Rd
2025 104705
000 00 RS
SFD O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
46737030 374 S 21st St 2025 117532
000 00 RS
SFA O
8/11/2025
2 2 NONE No No N/A Pending Ministerial
N/A 3543 Kettmann
Rd
2025 114879
000 00 RS
SFD O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
69503049 0 Rolling Glen
Ct
2025 122288
000 00 RS
SFD O
8/21/2025
1 1 NONE No No N/A Pending Ministerial
N/A 5863 Brasilia
Hill Ct
2025 126860
000 00 RS
SFD O
8/26/2025
1 1 1 NONE No No N/A Approved Ministerial
57713086 6146 Mancuso
St
2025 097536
000 00 RS
SFD O
8/26/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5859 Brasilia
Hill Ct
2025 127033
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5855 Brasilia
Hill Ct
2025 127044
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5851 Brasilia
Hill Ct
2025 127050
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5847 Brasilia
Hill Ct
2025 127052
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 12 Silver Elm Ct 2025 122593
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 715 Altino Blvd 2025 128319
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 721 Altino Blvd 2025 128385
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 727 Altino Blvd 2025 128405
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 733 Altino Blvd 2025 128415
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 739 Altino Blvd 2025 128420
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 745 Altino Blvd 2025 128425
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 751 Altino Blvd 2025 128430
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 757 Altino Blvd 2025 128439
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 763 Altino Blvd 2025 128443
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 14 Silver Elm Ct 2025 122594
000 00 RS
SFD O
9/8/2025
1 1 1 NONE No No N/A Approved Ministerial
69511045 808 Colleen Dr 2025 130805
000 00 RS
SFD O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
37321047 6757
Devonshire Dr
2025 124064
000 00 RS
SFD O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
38131056 1489 Saratoga
Ave
2025 136541
000 00 RS
SFD O
11/3/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1199 Piedmont
Rd
2025 140615
000 00 RS
SFD O
11/14/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 1201 Piedmont
Rd
2025 140633
000 00 RS
SFD O
11/14/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 1203 Piedmont
Rd
2025 140642
000 00 RS
SFD O
11/14/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 0 Del Norte Dr 2025 140649
000 00 RS
SFD O
11/14/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 3 ends

23016025 1194 Sherwood
Ave
2025 132399
000 00 RS
SFD O
11/20/2025
1 1 NONE No No N/A Pending Ministerial
41934004 15385 Warwick
Rd
2025 140513
000 00 RS
SFA O
12/2/2025
2 2 NONE No No N/A Pending Ministerial
49711043 13080 Haga Dr,
San Jose, CA
2024 115257
000 00 RS
ADU O
1/2/2025
1 1 1 NONE No No N/A Approved Ministerial
41902036 4412 JAN WY,

SAN JOSE, CA
95124
2024 116610
000 00 RS
ADU O
1/2/2025
1 1 1 NONE No No N/A Approved Ministerial
59916030 840 Selby Ln,
San Jose, CA
2024 115868
000 00 RS
ADU O
1/6/2025
1 1 1 NONE No No N/A Approved Ministerial
44730028 4196 PALADIN

DR, SAN JOSE,
CA 95124
2024 103757
000 00 RS
ADU O
1/6/2025
1 1 1 NONE No No N/A Approved Ministerial
29928073 828 Onyx Ct,
San Jose, CA
2024 112372
000 00 RS
ADU O
1/6/2025
1 1 NONE No No N/A Pending Ministerial
28222016 650 PAMLAR

AV, SAN JOSE,
CA 95128
2024 115685
000 00 RS
ADU O
1/6/2025
1 1 1 NONE No No N/A Approved Ministerial
43427050 1686 Mackey
Ave, San Jose,
CA
2024 116788
000 00 RS
ADU O
1/7/2025
1 1 1 NONE No No N/A Approved Ministerial
67657062 1559 Yerba
Buena Rd, San
Jose, CA
2024 114597
000 00 RS
ADU O
1/7/2025
1 1 1 NONE No No N/A Approved Ministerial
59904074 3148 TRISTIAN

AV, SAN JOSE,
CA 95127
2024 095117
000 00 RS
ADU O
1/8/2025
1 1 1 NONE No No N/A Approved Ministerial
67821080 7236 Clear
Vista Ct, San
Jose, CA
2024 094968
000 00 RS
ADU O
1/9/2025
1 1 NONE No No N/A Pending Ministerial
48443080 2591 SIERRA

GRANDE WY,

SAN JOSE, CA
95116
2024 101205
000 00 RS
ADU O
1/9/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 1253 SETTLE

AV, SAN JOSE,
CA 95125
2024 117433
000 00 RS
ADU O
1/9/2025
1 1 NONE No No N/A Approved Ministerial
37803005 1033

HUNTINGDON

DR, SAN JOSE,
CA 95129
2024 116780
000 00 RS
ADU O
1/10/2025
1 1 1 NONE No No N/A Approved Ministerial
65934015 2851 Riedel Rd,
San Jose, CA
2024 108407
000 00 RS
ADU O
1/13/2025
1 1 1 NONE No No N/A Approved Ministerial
26438032 829 Vine St,
San Jose, CA
2024 117280
000 00 RS
ADU O
1/13/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
48121040 2203 Lausett
Ave, San Jose,
CA
2024 111905
000 00 RS
ADU O
1/13/2025
1 1 NONE No No N/A Pending Ministerial
N/A 203 N 5th St
Unit 4, San
Jose, CA
2025 090816
000 00 RS
ADU O
1/13/2025
1 1 1 NONE No No N/A Approved Ministerial
27426006 1825

UNIVERSITY

WY, SAN

JOSE, CA
95126
2024 107376
000 00 RS
ADU O
1/13/2025
1 1 1 NONE No No N/A Approved Ministerial
64701031 10141

TORRANCE

AV, SAN JOSE,
CA 95127
2024 075074
000 00 RS
ADU O
1/21/2025
1 1 1 NONE No No N/A Approved Ministerial
44714014 3440 Manda Dr,
San Jose, CA
2024 109072
000 00 RS
ADU O
1/22/2025
1 1 1 NONE No No N/A Approved Ministerial
56712094 5511 Camden
Ave, San Jose,
CA
2024 117617
000 00 RS
ADU O
1/23/2025
1 1 1 NONE No No N/A Approved Ministerial
59218014 2942 Edison Dr,
San Jose, CA
2024 112980
000 00 RS
ADU O
1/23/2025
1 1 NONE No No N/A Pending Ministerial
48416072 108 Birch Ln,
San Jose, CA
2024 110746
000 00 RS
ADU O
1/23/2025
1 1 1 NONE No No N/A Approved Ministerial
44245033 1722 DON AV,

SAN JOSE, CA
95124
2024 113645
000 00 RS
ADU O
1/23/2025
1 1 1 NONE No No N/A Approved Ministerial
56947051 5376

GREENBANK

CT, SAN JOSE,
CA 95118
2024 118992
000 00 RS
ADU O
1/24/2025
1 1 1 NONE No No N/A Approved Ministerial
47743098 1408 TAPER

CT, SAN JOSE,
CA 95122
2024 114276
000 00 RS
ADU O
1/24/2025
1 1 1 NONE No No N/A Approved Ministerial
26460051 1067 CAMINO

PABLO, SAN

JOSE, CA
95125
2024 111958
000 00 RS
ADU O
1/27/2025
1 1 1 NONE No No N/A Approved Ministerial
66040050 3333
Meadowlands
Ln, San Jose,
CA
2024 107484
000 00 RS
ADU O
1/27/2025
1 1 NONE No No N/A Pending Ministerial
68057018 5356 Laurel
Canyon Dr, San
Jose, CA
2024 118200
000 00 RS
ADU O
1/28/2025
1 1 NONE No No N/A Pending Ministerial
26403005 1271

FRUITDALE

AV, SAN JOSE,
CA 95126
2024 105474
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
67606061 3282 MAPLE

LEAF CT, SAN

JOSE, CA
95121
2024 119191
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
45123046 4168 EL

CORAL WY,

SAN JOSE, CA
95118
2024 113355
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
65915027 2982 Castleton
Dr, San Jose,
CA
2024 117645
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 4 ends

24923039 577 N 22nd St,
San Jose, CA
2024 117708
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
42940013 1460

GLENWOOD

AV, SAN JOSE,
CA 95125
2024 117757
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
38141072 5088

WILLIAMS RD,

SAN JOSE, CA
95129
2024 117995
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
61257007 15159 Rosemar
Ave, San Jose,
CA
2024 092633
000 00 RS
ADU O
1/30/2025
1 1 NONE No No N/A Pending Ministerial
44614048 1534

ALTAMONT AV,

SAN JOSE, CA
95125
2024 118014
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 11751
Southwood Dr
Unit 2, San
Jose, CA
2025 093108
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
41413051 2047 Foxworthy
Ave, San Jose,
CA
2025 089402
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
64927058 3284

FLINTMONT

DR, SAN JOSE,
CA 95148
2024 110305
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
49103138 2698 Tagart Dr,
San Jose, CA
2024 117533
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
65450082 2818
Brightwood Dr,
San Jose, CA
2024 103148
000 00 RS
ADU O
2/3/2025
1 1 NONE No No N/A Pending Ministerial
68435095 392 Indian
Broom Dr, San
Jose, CA
2024 116848
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
42119079 4960 Bel Escou
Dr, San Jose,
CA
2025 092810
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
58904003 1891 Camargo
Dr, San Jose,
CA
2024 118577
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
67010031 1624

SARALYNN

DR, SAN JOSE,
CA 95121
2024 118302
000 00 RS
ADU O
2/4/2025
1 1 1 NONE No No N/A Approved Ministerial
24917008 761 N 19th St,
San Jose, CA
2024 117875
000 00 RS
ADU O
2/4/2025
1 1 1 NONE No No N/A Approved Ministerial
59912010 3356 San
Mardo Ave, San
Jose, CA
2024 114927
000 00 RS
ADU O
2/5/2025
1 1 1 NONE No No N/A Approved Ministerial
67612033 4561 Pacific
Rim Way, San
Jose, CA
2025 090176
000 00 RS
ADU O
2/5/2025
1 1 NONE No No N/A Pending Ministerial
24959029 449 N 18TH ST,

SAN JOSE, CA
95112
2024 117986
000 00 RS
ADU O
2/5/2025
1 1 1 NONE No No N/A Approved Ministerial
24959028 451 N 18th St,
San Jose, CA
2024 117989
000 00 RS
ADU O
2/5/2025
1 1 1 NONE No No N/A Approved Ministerial
43424046 1526 Sanborn
Ave, San Jose,
CA
2024 116895
000 00 RS
ADU O
2/5/2025
1 1 NONE No No N/A Pending Ministerial
68065011 2362 Bentley
Ridge Dr, San
Jose, CA
2024 087560
000 00 RS
ADU O
2/7/2025
1 1 NONE No No N/A Pending Ministerial
26453028 1033 Ramona
Ave, San Jose,
CA
2024 107440
000 00 RS
ADU O
2/10/2025
1 1 NONE No No N/A Pending Ministerial
68513066 78 Park Sharon
Dr, San Jose,
CA
2024 119160
000 00 RS
ADU O
2/10/2025
1 1 NONE No No N/A Pending Ministerial
67604058 2102 Chisin Ct,
San Jose, CA
2024 116558
000 00 RS
ADU O
2/11/2025
1 1 NONE No No N/A Pending Ministerial
37714018 6074 Alcante
Dr, San Jose,
CA 95129
2025 095127
000 00 RS
ADU O
2/10/2025
1 1 NONE No No N/A Pending Ministerial
67604058 2102 Chisin Ct,
San jose, CA
2024 116558
000 00 RS
ADU O
2/11/2025
1 1 NONE No No N/A Pending Ministerial
37814015 1203 Lynbrook
Way, San Jose,
CA
2024 117436
000 00 RS
ADU O
2/11/2025
1 1 NONE No No N/A Pending Ministerial
N/A 996 Faris Dr,
San Jose, CA
95111
2025 094898
000 00 RS
ADU O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 2873 Sweetleaf
Ct Unit 2, San
Jose, CA
2025 094900
000 00 RS
ADU O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 931 McKendrie
St Unit 2, San
Jose, CA
2025 094895
000 00 RS
ADU O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
41941036 5143 Leigh Ave,
San Jose, CA
2025 091842
000 00 RS
ADU O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
26105022 846 HARDING

AV, SAN JOSE,
CA 95126
2024 119155
000 00 RS
ADU O
2/11/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
42941023 1471
Cherrydale Dr,
San Jose, CA
2024 105159
000 00 RS
ADU O
2/13/2025
1 1 NONE No No N/A Pending Ministerial
49461019 4345
Houndsbrook
Way, San Jose,
CA
2024 101412
000 00 RS
ADU O
2/13/2025
1 1 NONE No No N/A Pending Ministerial
43920084 1763 Jonathon
Ave, San Jose,
CA
2024 119237
000 00 RS
ADU O
2/13/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 5 ends

37210017 7123 GALLI DR,

SAN JOSE, CA
95129
2025 091242
000 00 RS
ADU O
2/14/2025
1 1 1 NONE No No N/A Approved Ministerial
45603039 1661
Guadalupe Ave,
San Jose, CA
2025 091372
000 00 RS
ADU O
2/14/2025
1 1 1 NONE No No N/A Approved Ministerial
64702062 10221 Griffith St
Unit 2, San
Jose, CA
2024 118579
000 00 RS
ADU O
2/14/2025
1 1 1 NONE No No N/A Approved Ministerial
68030019 2188 Shadow
Ridge Way, San
Jose, CA
2024 117759
000 00 RS
ADU O
2/14/2025
1 1 1 NONE No No N/A Approved Ministerial
24958039 387 N 17th St,
San Jose, CA
2024 117402
000 00 RS
ADU O
2/18/2025
1 1 NONE No No N/A Pending Ministerial
24922041 1049 Calumet
Ct, San Jose,
CA
2025 091776
000 00 RS
ADU O
2/18/2025
1 1 1 NONE No No N/A Approved Ministerial
61248012 1002 Juliet Ave,
San Jose, CA
2025 091246
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
56930028 1380 Luning Dr,
San Jose, CA
2025 090848
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
66045035 6224

DOVETAIL CT,

SAN JOSE, CA
95135
2024 117804
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
30724013 4056 Moreland
Way, San Jose,
CA
2024 110423
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
46737043 224 S 21st St,
San Jose, CA
2024 119163
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
41222029 680 ELDEN DR,

SAN JOSE, CA
95008
2025 092105
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
64904016 3202 MARTEN

AV, SAN JOSE,
CA 95148
2025 092107
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
46440010 5073 NEW

ENGLAND CT,

SAN JOSE, CA
95136
2025 092937
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
26110089 801 W Taylor
St, San Jose,
CA
2025 092106
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 1067 Noble Ln,
San Jose, CA
2025 091321
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
27424004 1666 University
Way, San Jose,
CA
2024 114317
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
64703024 10251 Murtha
Dr, San Jose,
CA
2024 103966
000 00 RS
ADU O
2/20/2025
1 1 NONE No No N/A Pending Ministerial
1505136 1346 Grand
Blvd, San Jose,
CA
2024 097703
000 00 RS
ADU O
2/21/2025
1 1 NONE No No N/A Pending Ministerial
70614022 7402 Pegasus
Way, San Jose,
CA
2025 092559
000 00 RS
ADU O
2/21/2025
1 1 NONE No No N/A Pending Ministerial
48423036 184 S Capitol
Ave, San Jose,
CA
2025 093158
000 00 RS
ADU O
2/21/2025
1 1 NONE No No N/A Pending Ministerial
68524040 125 Red River
Way, San Jose,
CA
2025 092461
000 00 RS
ADU O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
40329033 5248 Bobbie
Ave, San Jose,
CA
2025 092183
000 00 RS
ADU O
2/21/2025
1 1 NONE No No N/A Pending Ministerial
24914112 726 VESTAL

ST, SAN JOSE,
CA 95112
2024 117718
000 00 RS
ADU O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
43952061 1747 Cottle
Ave, San Jose,
CA
2024 118713
000 00 RS
ADU O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
43918068 2085 ELLEN

AV, SAN JOSE,
CA 95125
2024 117036
000 00 RS
ADU O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
68501006 35 SHENADO

PL, SAN JOSE,
CA 95136
2025 093660
000 00 RS
ADU O
2/24/2025
1 1 1 NONE No No N/A Approved Ministerial
47744001 902 Thelma
Way, San Jose,
CA
2024 118001
000 00 RS
ADU O
2/24/2025
1 1 NONE No No N/A Pending Ministerial
65225027 2514 Flint Ave,
San Jose, CA
2025 094217
000 00 RS
ADU O
2/25/2025
1 1 1 NONE No No N/A Approved Ministerial
67849099 5914 SILVER

LEAF RD, SAN

JOSE, CA
95138
2025 092161
000 00 RS
ADU O
2/25/2025
1 1 1 NONE No No N/A Approved Ministerial
9214014 1924

CAMARGO DR,

SAN JOSE, CA
95132
2025 093730
000 00 RS
ADU O
2/25/2025
1 1 1 NONE No No N/A Approved Ministerial
67683018 2145 Terrena
Valley Dr, San
Jose, CA
2025 094442
000 00 RS
ADU O
2/25/2025
1 1 NONE No No N/A Pending Ministerial
45122015 1165 Rodney
Dr, San Jose,
CA
2025 090118
000 00 RS
ADU O
2/26/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1108 Pine Ave,
San Jose, CA
2025 094227
000 00 RS
ADU O
2/26/2025
1 1 NONE No No N/A Pending Ministerial
65918033 2880 Haughton
Dr, San Jose,
CA
2024 118282
000 00 RS
ADU O
2/26/2025
1 1 1 NONE No No N/A Approved Ministerial
65449037 3086 WOODS

WY, SAN

JOSE, CA
95148
2024 109076
000 00 RS
ADU O
2/26/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 6 ends

37720077 1207

JOHNSON AV,

SAN JOSE, CA
95129
2025 092974
000 00 RS
ADU O
2/26/2025
1 1 1 NONE No No N/A Approved Ministerial
46737030 374 S 21st St,
San Jose, CA
2025 094008
000 00 RS
ADU O
2/27/2025
1 1 1 NONE No No N/A Approved Ministerial
43422082 1555 Pomona
Ave, San Jose,
CA
2024 118378
000 00 RS
ADU O
2/28/2025
1 1 1 NONE No No N/A Approved Ministerial
27450019 2480 Woodland
Ave, San Jose,
CA
2025 094848
000 00 RS
ADU O
2/28/2025
1 1 1 NONE No No N/A Approved Ministerial
57740020 1446 KEW

GARDENS CT,

SAN JOSE, CA
95120
2025 093155
000 00 RS
ADU O
2/28/2025
1 1 1 NONE No No N/A Approved Ministerial
49905030 2838 Aetna
Way, San Jose,
CA
2025 094462
000 00 RS
ADU O
2/28/2025
1 1 NONE No No N/A Pending Ministerial
48613002 1726 S King Rd,
San Jose, CA
2024 116458
000 00 RS
ADU O
3/3/2025
1 1 NONE No No N/A Pending Ministerial
26123053 1289 Shasta
Ave, San Jose,
CA
2025 090926
000 00 RS
ADU O
3/3/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
27455060 2382 Newhall
St, San Jose,
CA
2024 116989
000 00 RS
ADU O
3/3/2025
1 1 NONE No No N/A Pending Ministerial
48435047 2376 Sleepy
Hollow Ln, San
Jose, CA 95116
2024 098194
000 00 RS
ADU O
3/3/2025
1 1 NONE No No N/A Pending Ministerial
65445029 3307 Ingersoll
Ct, San Jose,
CA
2025 089280
000 00 RS
ADU O
3/3/2025
1 1 NONE No No N/A Pending Ministerial
48142009 1914 LAVONNE

AV, SAN JOSE,
CA 95116
2025 098196
000 00 RS
ADU O
3/3/2025
1 1 1 NONE No No N/A Approved Ministerial
27457026 2490 BAILEY

AV, SAN JOSE,
CA 95128
2025 093748
000 00 RS
ADU O
3/3/2025
1 1 1 NONE No No N/A Approved Ministerial
49441009
815 HIAWATHA

DR, SAN JOSE,
CA 95111
2024 106784
000 00 RS
ADU O
3/4/2025
1 1 1 NONE No No N/A Approved Ministerial
49747046 662 Oldham
Way, San Jose,
CA
2024 085966
000 00 RS
ADU O
3/5/2025
1 1 NONE No No N/A Pending Ministerial
56752016 1141 Carlsbad
Dr, San Jose,
CA
2025 093674
000 00 RS
ADU O
3/6/2025
1 1 NONE No No N/A Pending Ministerial
48621059 1217 Edith St,
San Jose, CA
2024 087100
000 00 RS
ADU O
3/6/2025
1 1 NONE No No N/A Pending Ministerial
49707003 13099 Pfeifle
Ave, San Jose,
CA
2024 083130
000 00 RS
ADU O
3/6/2025
1 1 1 NONE No No N/A Approved Ministerial
43942062 2970 Lansford
Ave, San Jose,
CA
2024 113043
000 00 RS
ADU O
3/6/2025
1 1 NONE No No N/A Pending Ministerial
24901008 745 N 2nd St,
San Jose, CA
2024 115895
000 00 RS
ADU O
3/7/2025
1 1 NONE No No N/A Pending Ministerial
24941020 612 N 4th St,
San Jose, CA
2024 114415
000 00 RS
ADU O
3/7/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
24941021 618 N 4th St,
San Jose, CA
2024 114429
000 00 RS
ADU O
3/7/2025
1 1 NONE No No N/A Pending Ministerial
67306035 2810 Burdick
Way, San Jose,
CA
2025 096584
000 00 RS
ADU O
3/7/2025
1 1 1 NONE No No N/A Approved Ministerial
59208075 2787 Rainview
Dr, San Jose,
CA
2024 109084
000 00 RS
ADU O
3/7/2025
1 1 NONE No No N/A Pending Ministerial
68460030 5022 Impatiens
Dr, San Jose,
CA
2025 094375
000 00 RS
ADU O
3/7/2025
1 1 NONE No No N/A Pending Ministerial
27413005 1580

HANCHETT AV,

SAN JOSE, CA
95126
2025 092282
000 00 RS
ADU O
3/7/2025
1 1 1 NONE No No N/A Approved Ministerial
43410028 1366 Mastic St,
San Jose, CA
2025 095568
000 00 RS
ADU O
3/10/2025
1 1 NONE No No N/A Pending Ministerial
58907064 2946 TOBIN

DR, SAN JOSE,
CA 95132
2025 096947
000 00 RS
ADU O
3/10/2025
1 1 1 NONE No No N/A Approved Ministerial
48811081 1570

BERKSFORD

WY, SAN

JOSE, CA
95127
2025 095522
000 00 RS
ADU O
3/10/2025
1 1 1 NONE No No N/A Approved Ministerial
26451026 465 Snyder
Ave, San Jose,
CA
2025 093081
000 00 RS
ADU O
3/11/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
27435025 2112
Cherrystone Dr,
San Jose, CA
2025 093092
000 00 RS
ADU O
3/11/2025
1 1 1 NONE No No N/A Approved Ministerial
68923018 6056 Cotton Ct,
San Jose, CA
2025 097216
000 00 RS
ADU O
3/11/2025
1 1 NONE No No N/A Pending Ministerial
30704081 11870 Vallejo
Dr, San Jose,
CA
2025 097467
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
48429038 10261

SHOREHAM

CT, SAN JOSE,
CA 95127
2025 095040
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
44207034 1906 Shulman
Ave, San Jose,
CA
2025 089652
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 7 ends

68959045 6187 Ellerbrook
Way, San Jose,
CA
2025 096091
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
26105059 810 Schiele
Ave, San Jose,
CA
2025 095814
000 00 RS
ADU O
3/12/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
25432023 710 Webster Dr,
San Jose, CA
2024 118380
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5640
Comanche Ct,
San Jose, CA
2025 100093
000 00 RS
ADU O
3/13/2025
1 1 1 NONE No No N/A Approved Ministerial
61235072 1281 City View
Pl, San Jose,
CA
2024 106902
000 00 RS
ADU O
3/13/2025
1 1 NONE No No N/A Pending Ministerial
24957044 440 N 16TH ST,

SAN JOSE, CA
95112
2025 096447
000 00 RS
ADU O
3/13/2025
1 1 1 NONE No No N/A Approved Ministerial
67674005 3933 Baronet
Ct, San Jose,
CA
2025 096558
000 00 RS
ADU O
3/17/2025
1 1 NONE No No N/A Pending Ministerial
9205052 2537 Northwood
Dr, San Jose,
CA
2025 090304
000 00 RS
ADU O
3/17/2025
1 1 NONE No No N/A Pending Ministerial
66039056 3279

CHARMES CT,

SAN JOSE, CA
95135
2025 092088
000 00 RS
ADU O
3/17/2025
1 1 1 NONE No No N/A Approved Ministerial
26117044 1260 Randol
Ave, San Jose,
CA
2025 094383
000 00 RS
ADU O
3/17/2025
1 1 NONE No No N/A Pending Ministerial
44703029 1542 SANTA

MONICA AV,

SAN JOSE, CA
95118
2025 098099
000 00 RS
ADU O
3/17/2025
1 1 1 NONE No No N/A Approved Ministerial
67034015 1568 Staghorn
Ln, San Jose,
CA
2024 103758
000 00 RS
ADU O
3/17/2025
1 1 1 NONE No No N/A Approved Ministerial
28830019 2231 Dry Creek
Rd, San Jose,
CA
2025 096197
000 00 RS
ADU O
3/18/2025
1 1 NONE No No N/A Pending Ministerial
9211058 2908

FALLWOOD

LN, SAN JOSE,
CA 95132
2025 093276
000 00 RS
ADU O
3/18/2025
1 1 1 NONE No No N/A Approved Ministerial
59952020 774 Shetland
Ct, San Jose,
CA
2025 098697
000 00 RS
ADU O
3/18/2025
1 1 1 NONE No No N/A Approved Ministerial
43927065 1520 Curtner
Ave, San Jose,
CA
2025 098134
000 00 RS
ADU O
3/18/2025
1 1 1 NONE No No N/A Approved Ministerial
48144004 1687 Virginia Pl,
San Jose, CA
2024 119368
000 00 RS
ADU O
3/20/2025
1 1 NONE No No N/A Pending Ministerial
40331076 2038 Colusa
Way, San Jose,
CA
2025 098991
000 00 RS
ADU O
3/20/2025
1 1 NONE No No N/A Pending Ministerial
24905021 777 N 6th St,
San Jose, CA
2025 089979
000 00 RS
ADU O
3/20/2025
1 1 NONE No No N/A Pending Ministerial
44249033 1794 VALLA

DR, SAN JOSE,
CA 95124
2025 098360
000 00 RS
ADU O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
65422052 3508

COLUMBINE

DR, SAN JOSE,
CA 95127
2025 090841
000 00 RS
ADU O
3/24/2025
1 1 1 NONE No No N/A Approved Ministerial
49912032 2702 Eulalie Dr,
San Jose, CA
2025 097320
000 00 RS
ADU O
3/24/2025
1 1 1 NONE No No N/A Approved Ministerial
43422014 1483 LITTLE

ORCHARD ST,

SAN JOSE, CA
95110
2025 100068
000 00 RS
ADU O
3/24/2025
1 1 1 NONE No No N/A Approved Ministerial
27453043 2498 Sunny
Vista Dr, San
Jose, CA
2025 095904
000 00 RS
ADU O
3/25/2025
1 1 1 NONE No No N/A Approved Ministerial
67828110 524 Broderick
Dr, San Jose,
CA
2024 112948
000 00 RS
ADU O
3/25/2025
1 1 1 NONE No No N/A Approved Ministerial
43931035 2412

WESTGATE

AV, SAN JOSE,
CA 95125
2025 096193
000 00 RS
ADU O
3/25/2025
1 1 1 NONE No No N/A Approved Ministerial
67611033 1920 BAGPIPE

WY, SAN

JOSE, CA
95121
2025 096722
000 00 RS
ADU O
3/25/2025
1 1 1 NONE No No N/A Approved Ministerial
46739054 229 S 16TH ST,

SAN JOSE, CA
95112
2025 100585
000 00 RS
ADU O
3/25/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
9210030 2981 Postwood
Dr, San Jose,
CA
2025 099548
000 00 RS
ADU O
3/26/2025
1 1 1 NONE No No N/A Approved Ministerial
65439018 3624 Satinwood
Dr, San Jose,
CA
2025 090715
000 00 RS
ADU O
3/26/2025
1 1 1 NONE No No N/A Approved Ministerial
26449021 954 Spencer
Ave, San Jose,
CA
2025 097409
000 00 RS
ADU O
3/26/2025
1 1 NONE No No N/A Pending Ministerial
27455062 2372 Newhall
St, San Jose,
CA
2025 101324
000 00 RS
ADU O
3/26/2025
1 1 1 NONE No No N/A Approved Ministerial
48614006 1800 SEAVIEW

DR, SAN JOSE,
CA 95122
2025 099256
000 00 RS
ADU O
3/26/2025
1 1 1 NONE No No N/A Approved Ministerial
67842025 88 Limewell Ct,
San Jose, CA
2024 088301
000 00 RS
ADU O
3/27/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 8 ends

47745067 1118 Algiers
Ave, San Jose,
CA
2024 117528
000 00 RS
ADU O
3/27/2025
1 1 1 NONE No No N/A Approved Ministerial
41222017 2693 Hocking
Way, San Jose,
CA
2024 073861
000 00 RS
ADU O
3/28/2025
1 1 NONE No No N/A Pending Ministerial
49108084 2142 JAMAICA

WY, SAN

JOSE, CA
95122
2025 101325
000 00 RS
ADU O
3/28/2025
1 1 1 NONE No No N/A Approved Ministerial
41944086 1832 Rosswood
Dr, San Jose,
CA
2025 100803
000 00 RS
ADU O
3/28/2025
1 1 1 NONE No No N/A Approved Ministerial
30342028 341 Maplewood
Ave, San Jose,
CA
2025 095093
000 00 RS
ADU O
3/28/2025
1 1 NONE No No N/A Pending Ministerial
29908090 3790

WOODBARK

CT SAN JOSE
95117-3438
2024 118719
000 00 RS
ADU O
4/1/2025
1 1 1 NONE No No N/A Approved Ministerial
27725012 559 MENKER

AV, SAN JOSE,
CA 95128
2025 097269
000 00 RS
ADU O
4/1/2025
1 1 1 NONE No No N/A Approved Ministerial
66006022 3166

MEADOWLAND

S LN SAN
JOSE 95135-
1621
2025 098115
000 00 RS
ADU O
4/1/2025
1 1 NONE No No N/A Pending Ministerial
24914112 726 VESTAL

ST SAN JOSE
95112-1563
2025 099442
000 00 RS
ADU O
4/1/2025
1 1 1 NONE No No N/A Approved Ministerial
67828042 489

HASSINGER

RD SAN JOSE
95111-1830
2025 089793
000 00 RS
ADU O
4/2/2025
1 1 NONE No No N/A Pending Ministerial
48810003 3081

MARKINGDON

AV SAN JOSE
95127-4627
2025 093334
000 00 RS
ADU O
4/2/2025
1 1 NONE No No N/A Pending Ministerial
66009024 2919 QUEENS

ESTATES CT

SAN JOSE
95135-1217
2025 097681
000 00 RS
ADU O
4/2/2025
1 1 1 NONE No No N/A Approved Ministerial
43902054 1224 LAURIE

AV SAN JOSE
95125-3443
2025 100664
000 00 RS
ADU O
4/2/2025
1 1 NONE No No N/A Pending Ministerial
47716017 1165

PANOCHE AV

SAN JOSE
95122-2621
2024 119189
000 00 RS
ADU O
4/3/2025
1 1 NONE No No N/A Pending Ministerial
47716017 1165

PANOCHE AV

SAN JOSE
95122-2621
2025 094111
000 00 RS
ADU O
4/3/2025
1 1 NONE No No N/A Pending Ministerial
70442021 191 BURNING

TREE DR SAN
JOSE 95119-
1822
2025 094443
000 00 RS
ADU O
4/3/2025
1 1 NONE No No N/A Pending Ministerial
47206095 1440 KELLY

CT, SAN JOSE,
CA 95116
2025 098923
000 00 RS
ADU O
4/3/2025
1 1 1 NONE No No N/A Approved Ministerial
47206095 1446 KELLY

CT, SAN JOSE,
CA 95116
2025 098946
000 00 RS
ADU O
4/3/2025
1 1 1 NONE No No N/A Approved Ministerial
49722012 3070 WATER

ST, SAN JOSE,
CA 95111
2025 100564
000 00 RS
ADU O
4/4/2025
1 1 1 NONE No No N/A Approved Ministerial
68455035 4983

HOUNDSHAVE

N WY SAN
JOSE 95111-
3808
2024 115081
000 00 RS
ADU O
4/7/2025
1 1 NONE No No N/A Pending Ministerial
46740047 371 S 14TH ST,

SAN JOSE, CA
95112
2025 098442
000 00 RS
ADU O
4/7/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
48127002 1875

KAMMERER

AV SAN JOSE
95116-3014
2025 103682
000 00 RS
ADU O
4/7/2025
1 1 NONE No No N/A Pending Ministerial
41937013 4840 ANNA DR,

SAN JOSE, CA
95124
2025 099088
000 00 RS
ADU O
4/8/2025
1 1 1 NONE No No N/A Approved Ministerial
28826031 1759

WILLOWHURS

T AV SAN
JOSE
2025 103079
000 00 RS
ADU O
4/8/2025
1 1 1 NONE No No N/A Approved Ministerial
49408032 3923 ARDEN

FARMS PL

SAN JOSE
95111-2401
2024 115372
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
1505038 1313

MICHIGAN AV

SAN JOSE
95002-0000
2025 094675
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
25410038 1672 MELODY

LN SAN JOSE
95133-1653
2025 098554
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
48116014 148 33RD ST,

SAN JOSE, CA
95116
2025 098801
000 00 RS
ADU O
4/11/2025
1 1 1 NONE No No N/A Approved Ministerial
68945034 6258 ROYAL

OAK CT SAN
JOSE 95123-
4944
2025 099707
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
67301052 2727 SAND

POINT DR,

SAN JOSE, CA
95148
2025 103069
000 00 RS
ADU O
4/11/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 9 ends

66024069 4100 BEEBE

CL SAN JOSE
95135-0000
2025 103279
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
N/A 182 W
Rosemary St,
San Jose, CA
95110
2025 093758
000 00 RS
ADU O
4/15/2025
1 1 1 NONE No No N/A Approved Ministerial
42922031 823 WILLOW

GLEN WY SAN
JOSE 95125-
3342
2025 096477
000 00 RS
ADU O
4/15/2025
1 1 NONE No No N/A Pending Ministerial
27438063 791

MCALISTER

DR SAN JOSE
95128-1443
2025 099448
000 00 RS
ADU O
4/15/2025
1 1 NONE No No N/A Pending Ministerial
48614025 1759 CATHAY

DR SAN JOSE
95122-2023
2025 094974
000 00 RS
ADU O
4/17/2025
1 1 1 NONE No No N/A Approved Ministerial
65469015 3670 SHADY

HOLLOW CT

SAN JOSE
95148-3207
2024 108486
000 00 RS
ADU O
4/18/2025
1 1 NONE No No N/A Pending Ministerial
66040074 6427 SPRING

MEADOW CT

SAN JOSE
95135-1635
2025 097205
000 00 RS
ADU O
4/18/2025
1 1 NONE No No N/A Pending Ministerial
48809045 1485

FARRINGDON

DR SAN JOSE
95127-4615
2025 095346
000 00 RS
ADU O
4/21/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1712 ISABEL

DR, SAN JOSE,
CA 95125
2025 103977
000 00 RS
ADU O
4/22/2025
1 1 1 NONE No No N/A Approved Ministerial
45102031 1445 REVERE

AV SAN JOSE
95118-1147
2025 105379
000 00 RS
ADU O
4/22/2025
1 1 1 NONE No No N/A Approved Ministerial
44734044 4304

BLOOMFIELD

DR SAN JOSE
95124-4742
2025 097903
000 00 RS
ADU O
4/23/2025
1 1 1 NONE No No N/A Approved Ministerial
59213029 3016

NASHVILLE DR

SAN JOSE
95133-2059
2025 102661
000 00 RS
ADU O
4/23/2025
1 1 NONE No No N/A Pending Ministerial
68409075 4432

CONCERTO

WY SAN JOSE
95111-2509
2024 086589
000 00 RS
ADU O
4/25/2025
1 1 NONE No No N/A Pending Ministerial
9222192 3288 LANDESS

AV SAN JOSE
95132-1230
2025 096416
000 00 RS
ADU O
4/25/2025
1 1 1 NONE No No N/A Approved Ministerial
44248007 2915 MANDA

DR SAN JOSE
95124-1835
2025 103105
000 00 RS
ADU O
4/25/2025
1 1 NONE No No N/A Pending Ministerial
64926001 1965 FERNISH

DR SAN JOSE
95148-1301
2025 104577
000 00 RS
ADU O
4/25/2025
1 1 NONE No No N/A Pending Ministerial
65422082 3630

EASTRIDGE

DR SAN JOSE
95148-1406
2025 100404
000 00 RS
ADU O
4/28/2025
1 1 NONE No No N/A Pending Ministerial
26446095 570 ATLANTA

AV, SAN JOSE,
CA 95125
2024 073803
000 00 RS
ADU O
5/2/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
67032068 2864

LONGACRE

CT, SAN JOSE,
CA 95121
2024 103083
000 00 RS
ADU O
5/2/2025
1 1 NONE No No N/A Pending Ministerial
43904057 1206 LENNON

WY, SAN

JOSE, CA
95125
2025 096661
000 00 RS
ADU O
5/2/2025
1 1 NONE No No N/A Pending Ministerial
44224042 2443 RALEIGH

DR, SAN JOSE,
CA 95124
2025 102129
000 00 RS
ADU O
5/2/2025
1 1 1 NONE No No N/A Approved Ministerial
45123013 1423 GAUCHO

CT, SAN JOSE,
CA 95118
2025 100170
000 00 RS
ADU O
5/5/2025
1 1 1 NONE No No N/A Approved Ministerial
37730027 1591

TARTARIAN

WY, SAN

JOSE, CA
95129
2025 103692
000 00 RS
ADU O
5/5/2025
1 1 1 NONE No No N/A Approved Ministerial
49458014 1332

ISENGARD CT,

SAN JOSE, CA
95121
2025 105034
000 00 RS
ADU O
5/5/2025
1 1 1 NONE No No N/A Approved Ministerial
48116023 1634 E SAN

FERNANDO

ST, SAN JOSE,
CA 95116
2025 093342
000 00 RS
ADU O
5/7/2025
1 1 NONE No No N/A Pending Ministerial
24504049 1286 OLD

MANOR PL,

SAN JOSE, CA
95132
2024 108900
000 00 RS
ADU O
5/8/2025
1 1 NONE No No N/A Pending Ministerial
69428011 751 PRONTO

DR, SAN JOSE,
CA 95123
2025 092162
000 00 RS
ADU O
5/8/2025
1 1 1 NONE No No N/A Approved Ministerial
56920027 1598

STAPLETON

CT, SAN JOSE,
CA 95118
2025 098131
000 00 RS
ADU O
5/8/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 10 ends

56920027 1598

STAPLETON

CT, SAN JOSE,
CA 95118
2025 100418
000 00 RS
ADU O
5/8/2025
1 1 NONE No No N/A Pending Ministerial
44735069 4009

RONDEAU DR,

SAN JOSE, CA
95124
2025 103504
000 00 RS
ADU O
5/8/2025
1 1 NONE No No N/A Pending Ministerial
46741060 333 S 12TH ST,

SAN JOSE, CA
95112
2025 106316
000 00 RS
ADU O
5/8/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
56703035 4959 RAFTON

DR, SAN JOSE,
CA 95124
2025 100414
000 00 RS
ADU O
5/12/2025
1 1 NONE No No N/A Pending Ministerial
26449102 633 WILLOW

ST, SAN JOSE,
CA 95125
2024 108744
000 00 RS
ADU O
5/13/2025
1 1 NONE No No N/A Pending Ministerial
59208041 597 ROUGH

AND READY

RD, SAN JOSE,
CA 95133
2025 092308
000 00 RS
ADU O
5/13/2025
1 1 NONE No No N/A Pending Ministerial
65458062 3152 BIMBER

CT, SAN JOSE,
CA 95148
2025 105807
000 00 RS
ADU O
5/13/2025
1 1 1 NONE No No N/A Approved Ministerial
46211039 4365 INDIGO

DR, SAN JOSE,
CA 95136
2025 107274
000 00 RS
ADU O
5/13/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 3244 Riddle Rd,
San Jose, CA
95117
2025 107223
000 00 RS
ADU O
5/13/2025
1 1 1 NONE No No N/A Approved Ministerial
57521036 1451 CORTE

DE ROSA, SAN

JOSE, CA
95120
2025 107233
000 00 RS
ADU O
5/14/2025
1 1 NONE No No N/A Pending Ministerial
48112075 44 N 34TH ST,

SAN JOSE, CA
95116
2025 097383
000 00 RS
ADU O
5/15/2025
1 1 1 NONE No No N/A Approved Ministerial
49465046 3281 LANTERN

WY, SAN

JOSE, CA
95111
2025 103492
000 00 RS
ADU O
5/15/2025
1 1 NONE No No N/A Pending Ministerial
68454006 4595

THORNHAVEN

WY, SAN

JOSE, CA
95111
2025 107167
000 00 RS
ADU O
5/15/2025
1 1 1 NONE No No N/A Approved Ministerial
59951082 3171 MABURY

RD, SAN JOSE,
CA 95127
2025 104958
000 00 RS
ADU O
5/19/2025
1 1 NONE No No N/A Pending Ministerial
26132060 33 SUNOL ST,

SAN JOSE, CA
95126
2025 107979
000 00 RS
ADU O
5/19/2025
1 1 1 NONE No No N/A Approved Ministerial
26446008 441 ATLANTA

AV, SAN JOSE,
CA 95125
2025 105506
000 00 RS
ADU O
5/20/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
65932030 3230 FALLEN

OAK CT, SAN

JOSE, CA
95148
2025 107246
000 00 RS
ADU O
5/20/2025
1 1 NONE No No N/A Pending Ministerial
57521036 1451 CORTE

DE ROSA, SAN

JOSE, CA
95120
2025 107362
000 00 RS
ADU O
5/20/2025
1 1 NONE No No N/A Pending Ministerial
70844053 7203 SHEA CT,

SAN JOSE, CA
95139
2025 102660
000 00 RS
ADU O
5/22/2025
1 1 NONE No No N/A Pending Ministerial
59526034 3491

GROSSMONT

DR, SAN JOSE,
CA 95132
2025 107001
000 00 RS
ADU O
5/22/2025
1 1 NONE No No N/A Pending Ministerial
67612031 4549 PACIFIC

RIM WY, SAN

JOSE, CA
95121
2025 107365
000 00 RS
ADU O
5/22/2025
1 1 NONE No No N/A Pending Ministerial
29908148 3778

CARAVELLA

DR, SAN JOSE,
CA 95117
2025 106333
000 00 RS
ADU O
5/23/2025
1 1 NONE No No N/A Pending Ministerial
9241080 2629

AUTUMNVALE

DR, SAN JOSE,
CA 95132
2025 107162
000 00 RS
ADU O
5/23/2025
1 1 NONE No No N/A Pending Ministerial
40304222 4575

NORWICH WY,

SAN JOSE, CA
95130
2024 106818
000 00 RS
ADU O
5/27/2025
1 1 1 NONE No No N/A Approved Ministerial
44616026 1563 WAWONA

DR, SAN JOSE,
CA 95125
2025 096794
000 00 RS
ADU O
5/28/2025
1 1 1 NONE No No N/A Approved Ministerial
49456028 1239

CLAYBURN LN,

SAN JOSE, CA
95121
2023 126020
000 00 RS
ADU O
5/29/2025
1 1 NONE No No N/A Pending Ministerial
66040150 3426 ROYAL

MEADOW LN,

SAN JOSE, CA
95135
2025 105624
000 00 RS
ADU O
5/30/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 11 ends

48811111 1460

BERKSFORD

WY, SAN

JOSE, CA
95127
2025 108825
000 00 RS
ADU O
5/30/2025
1 1 1 NONE No No N/A Approved Ministerial
68508037 5137 POSTON

DR, SAN JOSE,
CA 95136
2025 106068
000 00 RS
ADU O
6/2/2025
1 1 1 NONE No No N/A Approved Ministerial
43917161 1060

FRANQUETTE

AV, SAN JOSE,
CA 95125
2025 108906
000 00 RS
ADU O
6/2/2025
1 1 1 NONE No No N/A Approved Ministerial
24952005 373 N 10TH ST,

SAN JOSE, CA
95112
2024 090405
000 00 RS
ADU O
6/3/2025
1 1 1 NONE No No N/A Approved Ministerial
58103065 6453 LITTLE

FALLS DR,

SAN JOSE, CA
95120
2025 105002
000 00 RS
ADU O
6/3/2025
1 1 1 NONE No No N/A Approved Ministerial
68431145 67 AZUCAR

AV, SAN JOSE,
CA 95111
2025 106951
000 00 RS
ADU O
6/3/2025
1 1 1 NONE No No N/A Approved Ministerial
28412039 1837

BLACKFORD

LN, SAN JOSE,
CA 95125
2025 108859
000 00 RS
ADU O
6/3/2025
1 1 1 NONE No No N/A Approved Ministerial
49710028 12986 WOOL

AV, SAN JOSE,
CA 95111
2025 109304
000 00 RS
ADU O
6/4/2025
1 1 NONE No No N/A Pending Ministerial
47754020 878 LE

COMPTE PL,

SAN JOSE, CA
95122
2025 109673
000 00 RS
ADU O
6/4/2025
1 1 1 NONE No No N/A Approved Ministerial
43954051 1747 CHERRY

AV, SAN JOSE,
CA 95125
2025 109963
000 00 RS
ADU O
6/4/2025
1 1 1 NONE No No N/A Approved Ministerial
49710028 12986 WOOL

AV, SAN JOSE,
CA 95111
2025 112292
000 00 RS
ADU O
6/4/2025
1 1 NONE No No N/A Pending Ministerial
49710028 12986 WOOL

AV, SAN JOSE,
CA 95111
2025 112294
000 00 RS
ADU O
6/4/2025
1 1 NONE No No N/A Pending Ministerial
24409027 1701

CORALTREE

PL, SAN JOSE,
CA 95131
2025 105877
000 00 RS
ADU O
6/5/2025
1 1 NONE No No N/A Pending Ministerial
N/A 577 DUNCAN

ST, SAN JOSE,
CA 95127
2025 113630
000 00 RS
ADU O
6/5/2025
1 1 1 NONE No No N/A Approved Ministerial
46407008 329 AVENIDA

PINOS, SAN

JOSE, CA
95123
2025 104619
000 00 RS
ADU O
6/6/2025
1 1 NONE No No N/A Pending Ministerial
44626033 1430

CALLECITA ST,

SAN JOSE, CA
95125
2025 107216
000 00 RS
ADU O
6/9/2025
1 1 1 NONE No No N/A Approved Ministerial
49926041 1149 MALOTT

DR, SAN JOSE,
CA 95121
2024 114067
000 00 RS
ADU O
6/11/2025
1 1 1 NONE No No N/A Approved Ministerial
42125078 2194 BARRETT

AV, SAN JOSE,
CA 95124
2025 106713
000 00 RS
ADU O
6/11/2025
1 1 NONE No No N/A Pending Ministerial
30723026 4179

MORELAND

WY, SAN

JOSE, CA
95130
2025 114676
000 00 RS
ADU O
6/11/2025
1 1 1 NONE No No N/A Approved Ministerial
66040151 3428 ROYAL

MEADOW LN,

SAN JOSE, CA
95135
2025 105498
000 00 RS
ADU O
6/13/2025
1 1 NONE No No N/A Pending Ministerial
26432038 76 PIERCE AV,

SAN JOSE, CA
95110
2025 105682
000 00 RS
ADU O
6/13/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
27437042 2111 W

HEDDING ST,

SAN JOSE, CA
95128
2025 107419
000 00 RS
ADU O
6/13/2025
1 1 1 NONE No No N/A Approved Ministerial
44701040 1523

HILLSDALE AV,

SAN JOSE, CA
95118
2025 108596
000 00 RS
ADU O
6/13/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1148 PALM ST,

SAN JOSE, CA
95110
2025 113468
000 00 RS
ADU O
6/13/2025
1 1 NONE No No N/A Pending Ministerial
67615031 3255 HEBRON

CT, SAN JOSE,
CA 95121
2025 114784
000 00 RS
ADU O
6/13/2025
1 1 1 NONE No No N/A Approved Ministerial
45603038 1653

GUADALUPE

AV, SAN JOSE,
CA 95125
2025 099437
000 00 RS
ADU O
6/16/2025
1 1 NONE No No N/A Pending Ministerial
69225021 5661 ENNING

AV, SAN JOSE,
CA 95123
2025 110846
000 00 RS
ADU O
6/16/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 12 ends

N/A 4629 Mia Cir,
San Jose, CA
95136
2025 114637
000 00 RS
ADU O
6/16/2025
1 1 1 NONE No No N/A Approved Ministerial
46207034 4024 LUNETA

DR, SAN JOSE,
CA 95136
2025 109756
000 00 RS
ADU O
6/17/2025
1 1 NONE No No N/A Pending Ministerial
67632035 4023

LOGANBERRY

DR, SAN JOSE,
CA 95121
2025 090521
000 00 RS
ADU O
6/20/2025
1 1 NONE No No N/A Pending Ministerial
43935042 1148 HUSTED

AV, SAN JOSE,
CA 95125
2025 110712
000 00 RS
ADU O
6/20/2025
1 1 1 NONE No No N/A Approved Ministerial
42902070 1264 CURTISS

AV, SAN JOSE,
CA 95125
2025 111176
000 00 RS
ADU O
6/20/2025
1 1 1 NONE No No N/A Approved Ministerial
37815034 5663 GLEN

HAVEN CT,

SAN JOSE, CA
95129
2025 110146
000 00 RS
ADU O
6/23/2025
1 1 NONE No No N/A Pending Ministerial
26120068 1375

MAGNOLIA AV,

SAN JOSE, CA
95126
2025 090173
000 00 RS
ADU O
6/24/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
42908031 1117

COOLIDGE AV,

SAN JOSE, CA
95125
2025 112128
000 00 RS
ADU O
6/24/2025
1 1 1 NONE No No N/A Approved Ministerial
26107054 850 VILLA AV,

SAN JOSE, CA
95126
2025 115804
000 00 RS
ADU O
6/24/2025
1 1 1 NONE No No N/A Approved Ministerial
68938015 473

MCCAMISH

AV, SAN JOSE,
CA 95123
2025 090079
000 00 RS
ADU O
6/26/2025
1 1 NONE No No N/A Pending Ministerial
65450052 3133

BRIGHTWOOD

CT, SAN JOSE,
CA 95148
2025 101208
000 00 RS
ADU O
6/26/2025
1 1 1 NONE No No N/A Approved Ministerial
66005080 2612

MEADOWLEAF

CT, SAN JOSE,
CA 95135
2025 103750
000 00 RS
ADU O
6/26/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1148 PALM ST,

SAN JOSE, CA
95110
2025 107613
000 00 RS
ADU O
6/30/2025
1 1 NONE No No N/A Pending Ministerial
44628001 2106

MARQUES AV,

SAN JOSE, CA
95125
2025 111456
000 00 RS
ADU O
6/30/2025
1 1 1 NONE No No N/A Approved Ministerial
48115067 1681

SHORTRIDGE

AV, SAN JOSE,
CA 95116
2025 116108
000 00 RS
ADU O
6/30/2025
1 1 1 NONE No No N/A Approved Ministerial
43917010 911 Franquette
Ave, San Jose,
CA 95125
2025 099342
000 00 RS
ADU O
7/1/2025
1 1 NONE No No N/A Pending Ministerial
24547045 1536 Gordy Dr,
San Jose, CA
95131
2025 104815
000 00 RS
ADU O
7/1/2025
1 1 1 NONE No No N/A Approved Ministerial
70844074 7218 Alder
Spring Wy, San
Jose, CA 95139
2025 111877
000 00 RS
ADU O
7/1/2025
1 1 NONE No No N/A Pending Ministerial
N/A 4456 Poinsettia
Ct, San Jose,
CA 95136
2025 116472
000 00 RS
ADU O
7/1/2025
1 1 1 NONE No No N/A Approved Ministerial
67620050 3405 Woodside
Ct, San Jose,
CA 95121
2025 110519
000 00 RS
ADU O
7/2/2025
1 1 NONE No No N/A Pending Ministerial
47731053 1520

MCLAUGHLIN

AV, SAN JOSE,
CA 95122
2025 111694
000 00 RS
ADU O
7/7/2025
1 1 1 NONE No No N/A Approved Ministerial
42108085 15062 Brewster
Ave, San Jose,
CA 95124
2025 111778
000 00 RS
ADU O
7/7/2025
1 1 1 NONE No No N/A Approved Ministerial
69007035 164 Sun
Blossom Dr,
San Jose, CA
95123
2025 098748
000 00 RS
ADU O
7/10/2025
1 1 NONE No No N/A Pending Ministerial
70618025 7246 Pittsfield
Wy, San Jose,
CA 95139
2025 107571
000 00 RS
ADU O
7/10/2025
1 1 NONE No No N/A Pending Ministerial
24958007 432 N 15th St,
San Jose, CA
95112
2025 102940
000 00 RS
ADU O
7/11/2025
1 1 NONE No No N/A Pending Ministerial
43951005 916 Curtner
Ave, San Jose,
CA 95125
2025 105508
000 00 RS
ADU O
7/11/2025
1 1 1 NONE No No N/A Approved Ministerial
59501001 15287
Penitencia
Creek Rd, San
Jose, CA 95132
2025 110599
000 00 RS
ADU O
7/11/2025
1 1 NONE No No N/A Pending Ministerial
69215056 5872 Paddon
Cir, San Jose,
CA 95123
2025 111645
000 00 RS
ADU O
7/11/2025
1 1 1 NONE No No N/A Approved Ministerial
49427029 863 Jana Ln,
San Jose, CA
95111
2025 111739
000 00 RS
ADU O
7/11/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 13 ends

67620073 3404 Woodtree
Ct, San Jose,
CA 95121
2025 109803
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
69215014 5821 Paddon
Cir, San Jose,
CA 95123
2025 109968
000 00 RS
ADU O
7/15/2025
1 1 1 NONE No No N/A Approved Ministerial
49121091 2075 Tampa
Way, San Jose,
CA 95122
2025 111062
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
24136030 1436 Leaftree
Cir, San Jose,
CA 95131
2025 112785
000 00 RS
ADU O
7/15/2025
1 1 1 NONE No No N/A Approved Ministerial
47203075 1163 Spiro Dr,
San Jose, CA
95116
2025 113717
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
25430039 688 Anvil Ct,
San Jose, CA
95133
2025 114572
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
23515035 928 N 7th St,
San Jose,CA
95112
2025 115027
000 00 RS
ADU O
7/15/2025
1 1 1 NONE No No N/A Approved Ministerial
47731008 1625 Pearson
Ct, San Jose,
CA 95122
2025 115696
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
N/A 6932 Serenity
Wy, San Jose,
CA 95120
2025 116662
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
N/A 590 Minnesota
Ave, San Jose,
CA 95125
2025 116992
000 00 RS
ADU O
7/15/2025
1 1 1 NONE No No N/A Approved Ministerial
38141106 5189 Doyle Rd,
San Jose, CA
95129
2025 092358
000 00 RS
ADU O
7/16/2025
1 1 NONE No No N/A Pending Ministerial
48802033 1199 Sundown
Ln, San Jose,
CA 95127
2025 108380
000 00 RS
ADU O
7/16/2025
1 1 NONE No No N/A Pending Ministerial
46716058 199 N 12th St,
San Jose, CA
95112
2025 115146
000 00 RS
ADU O
7/16/2025
1 1 1 NONE No No N/A Approved Ministerial
42933026 1655 Cottle
Ave, San Jose,
CA 95125
2025 112058
000 00 RS
ADU O
7/17/2025
1 1 1 NONE No No N/A Approved Ministerial
29935048 963 Orchid Wy,
San Jose, CA
95117
2025 114015
000 00 RS
ADU O
7/17/2025
1 1 1 NONE No No N/A Approved Ministerial
48120005 117 Scharff
Ave, San Jose,
CA 95116
2025 112981
000 00 RS
ADU O
7/18/2025
1 1 NONE No No N/A Pending Ministerial
24412011 2032
Autumntree Ct,
San Jose, CA
95131
2025 115404
000 00 RS
ADU O
7/18/2025
1 1 1 NONE No No N/A Approved Ministerial
65919029 3046 Lynview
Dr, San Jose,
CA 95148
2025 115547
000 00 RS
ADU O
7/18/2025
1 1 NONE No No N/A Pending Ministerial
52735036 5491 Mary Jo
Wy, San Jose
CA 95124
2025 109386
000 00 RS
ADU O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
59120033 1028 Wilsham
Dr, San Jose,
CA 95132
2025 111485
000 00 RS
ADU O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
24407034 1688 Ridgetree
Wy, San Jose,
CA 95131
2025 113384
000 00 RS
ADU O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
67850137 40 Southcreek
Ct, San Jose,
CA 95138
2025 115294
000 00 RS
ADU O
7/21/2025
1 1 1 NONE No No N/A Approved Ministerial
42919029 909 California
Ave, San Jose,
CA 95125
2025 115954
000 00 RS
ADU O
7/21/2025
1 1 1 NONE No No N/A Approved Ministerial
48120025 117 Scharff
Ave, San Jose,
CA 95116
2025 119592
000 00 RS
ADU O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
46404052 4928 Barron
Park Dr, San
Jose, CA 95136
2025 111906
000 00 RS
ADU O
7/22/2025
1 1 NONE No No N/A Pending Ministerial
48603036 1748 Tampa
Wy, San Jose,
CA 95122
2025 114597
000 00 RS
ADU O
7/22/2025
1 1 NONE No No N/A Pending Ministerial
28827049 1710 Marina
Wy, San Jose,
CA 95125
2025 114829
000 00 RS
ADU O
7/22/2025
1 1 NONE No No N/A Pending Ministerial
41420038 2969 Vivian Ln,
San Jose, CA
95124
2025 105999
000 00 RS
ADU O
7/23/2025
1 1 1 NONE No No N/A Approved Ministerial
70616001 15 Kent Ct, San
Jose, CA 95139
2025 111335
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
38125037 5089 Amondo
Dr, San Jose,
CA 95129
2025 114019
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
27422073 1803 Cleveland
Ave, San Jose,
CA 95126
2025 114881
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
49108074 2167 Jamaica
Wy, San Jose,
CA 95122
2025 116194
000 00 RS
ADU O
7/23/2025
1 1 1 NONE No No N/A Approved Ministerial
70616001 15 Kent Ct, San
Jose, CA 95139
2025 120716
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1644 Tartarian
Way, San Jose,
CA 95129
2025 112136
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
38129016 4622 Clarendon
Dr, San Jose,
CA 95129
2025 115103
000 00 RS
ADU O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
67616020 3543 Kettman
Rd, San Jose,
CA 95121
2025 119091
000 00 RS
ADU O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 14 ends

67616020 3543 Kettman
Rd, San Jose,
CA 95121
2025 119106
000 00 RS
ADU O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
67616020 3543 Kettman
Rd, San Jose,
CA 95121
2025 119395
000 00 RS
ADU O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
45106002 1218 Foxworthy
Ave, San Jose,
CA 95118
2025 110416
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
43922044 1961 Johnston
Ave, San Jose,
CA 95125
2025 111407
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1676 Mackey
Ave, San Jose,
CA 95125
2025 117397
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
56937101 5139 Sutcliff
Ave, San Jose,
CA 95118
2025 117491
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
57525042 1544
Guadalajara Dr,
San Jose, CA
95120
2025 117752
000 00 RS
ADU O
7/25/2025
1 1 1 NONE No No N/A Approved Ministerial
65919029 3046 Lynview
Dr, San Jose,
CA 95148
2025 121013
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
49905025 1319 Sylvia Dr,
San Jose, CA
95121
2025 111876
000 00 RS
ADU O
7/28/2025
1 1 1 NONE No No N/A Approved Ministerial
67614063 2560 Aborn Rd,
San Jose, CA
95121
2025 118491
000 00 RS
ADU O
7/28/2025
1 1 1 NONE No No N/A Approved Ministerial
65987008 3740 Darshan
Ct, San Jose,
CA 95148
2024 113200
000 00 RS
ADU O
7/29/2025
1 1 NONE No No N/A Pending Ministerial
67855021 7384 Prindiville
Dr, San Jose
95138
2025 106812
000 00 RS
ADU O
7/29/2025
1 1 NONE No No N/A Pending Ministerial
60102093 3137 Barletta
Ln, San Jose,
CA 95127
2025 116226
000 00 RS
ADU O
7/29/2025
1 1 NONE No No N/A Pending Ministerial
49724009 2925 Garden
Ave, San Jose,
CA 95111
2025 117929
000 00 RS
ADU O
7/29/2025
1 1 NONE No No N/A Pending Ministerial
48140011 939 Tennyson
Ln, San Jose,
CA 95116
2025 118003
000 00 RS
ADU O
7/29/2025
1 1 1 NONE No No N/A Approved Ministerial
24912055 871 N 15th St,
San Jose, CA
95112
2025 118055
000 00 RS
ADU O
7/29/2025
1 1 1 NONE No No N/A Approved Ministerial
37215068
1378 Longfellow
Way, San Jose,
CA 95129
2025 112653
000 00 RS
ADU O
7/31/2025
1 1 NONE No No N/A Pending Ministerial
49726099 3085 Senter Rd,
San Jose, CA
95111
2025 117612
000 00 RS
ADU O
7/31/2025
1 1 NONE No No N/A Pending Ministerial
24914090 771 E Hedding
St, San Jose,
CA 95112
2025 118210
000 00 RS
ADU O
7/31/2025
1 1 NONE No No N/A Pending Ministerial
70627040 113 AVENIDA

ESPANA , SAN

JOSE, CA
95139
2025 098814
000 00 RS
ADU O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
24540033 1884 SEVILLE

WY, SAN

JOSE, CA
95131
2025 103255
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
37316038 1274 DAPHNE

DR, SAN JOSE,
CA 95129
2025 109577
000 00 RS
ADU O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
43417029 1510 CARMEL

DR, SAN JOSE,
CA 95125
2025 111508
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
42902065
1310 CURTISS

AV, SAN JOSE,
CA 95125
2025 117014
000 00 RS
ADU O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
48116087 1670 WHITTON

AV, SAN JOSE,
CA 95116
2025 117474
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
46730045 45 S 20TH ST,

SAN JOSE, CA
95116
2025 118884
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
70633063 7042 AVENIDA

ROTELLA, SAN

JOSE, CA
95139
2025 119067
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Approved Ministerial
28420021 1549 ST

FRANCIS DR,

SAN JOSE, CA
95125
2025 119981
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
46727046 75 S 14TH ST,

SAN JOSE, CA
95112
2025 119827
000 00 RS
ADU O
8/4/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
24916045 899 N 19TH ST,

SAN JOSE, CA
95112
2025 120076
000 00 RS
ADU O
8/5/2025
1 1 1 NONE No No N/A Approved Ministerial
68501017 5280

WATERFALL

CT, SAN JOSE,
CA 95136
2025 120266
000 00 RS
ADU O
8/5/2025
1 1 NONE No No N/A Pending Ministerial
67619026 3489

HILLSBOROUG

H WY, SAN

JOSE, CA
95121
2025 120500
000 00 RS
ADU O
8/5/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 15 ends

38131034 1510

TERESITA DR,

SAN JOSE, CA
95129
2025 114263
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Pending Ministerial
48134027 996 DIADEM

DR, SAN JOSE,
CA 95116
2025 120400
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Approved Ministerial
41917031 4794 SALLY

DR, SAN JOSE,
CA 95124
2025 120886
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Pending Ministerial
30705038 17930 LOS

OLIVOS DR,

SAN JOSE, CA
95130
2025 120926
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Pending Ministerial
69632024 1073

CROSSWIND

CT, SAN JOSE,
CA 95120
2025 121982
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Pending Ministerial
26437090 157 WILLOW

ST, SAN JOSE,
CA 95110
2025 117628
000 00 RS
ADU O
8/7/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
49722011 3080 WATER

ST, SAN JOSE,
CA 95111
2025 120006
000 00 RS
ADU O
8/7/2025
1 1 NONE No No N/A Pending Ministerial
24116014 1216

BRIARCREEK

CT, SAN JOSE,
CA 95131
2025 117936
000 00 RS
ADU O
8/8/2025
1 1 NONE No No N/A Pending Ministerial
46735074 166 S 24TH ST,

SAN JOSE, CA
95116
2025 116738
000 00 RS
ADU O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
60102083 3177

BARLETTA LN,

SAN JOSE, CA
95127
2025 118005
000 00 RS
ADU O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
24956039 397 15TH ST,

SAN JOSE, CA
95112
2025 121307
000 00 RS
ADU O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
67616020 3543

KETTMANN

RD, SAN JOSE,
CA 95121
2025 123778
000 00 RS
ADU O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
40358023 2415

VERWOOD DR,

SAN JOSE, CA
95130
2025 104717
000 00 RS
ADU O
8/12/2025
1 1 NONE No No N/A Pending Ministerial
23716058 824 CREEK

DR, SAN JOSE,
CA 95125
2025 116130
000 00 RS
ADU O
8/12/2025
1 1 1 NONE No No N/A Approved Ministerial
9752037 338 BATTLE

DANCE DR,

SAN JOSE, CA
95111
2025 119947
000 00 RS
ADU O
8/12/2025
1 1 NONE No No N/A Pending Ministerial
48107009 60 JOSE

FIGUERES AV,

SAN JOSE, CA
95116
2025 105629
000 00 RS
ADU O
8/13/2025
1 1 NONE No No N/A Pending Ministerial
27413072 1438 MARTIN

AV, SAN JOSE,
CA 95126
2025 122145
000 00 RS
ADU O
8/13/2025
1 1 NONE No No N/A Pending Ministerial
24931044 631 JACKSON

STREET SAN

JOSE, CA
95112
2025 123739
000 00 RS
ADU O
8/13/2025
1 1 1 NONE No No N/A Approved Ministerial
26103048 1318 THE

ALAMEDA,

SAN JOSE, CA
95126
2025 111326
000 00 RS
ADU O
8/14/2025
1 1 1 NONE No No N/A Approved Ministerial
26103048 1318 THE

ALAMEDA ,

SAN JOSE, CA
95126
2025 111327
000 00 RS
ADU O
8/14/2025
1 1 1 NONE No No N/A Approved Ministerial
38101059 971 RIVIERA

CT, SAN JOSE,
CA 95129
2025 114736
000 00 RS
ADU O
8/14/2025
1 1 NONE No No N/A Pending Ministerial
67031033 1822 TUSTIN

DR, SAN JOSE,
CA 95122
2025 115842
000 00 RS
ADU O
8/14/2025
1 1 1 NONE No No N/A Approved Ministerial
45123014 1429 GAUCHO

CT, SAN JOSE,
CA 95118
2025 116950
000 00 RS
ADU O
8/14/2025
1 1 NONE No No N/A Pending Ministerial
65424042 3574 CLAYTON

RD, SAN JOSE,
CA 95127
2025 122044
000 00 RS
ADU O
8/14/2025
1 1 NONE No No N/A Pending Ministerial
45128099 4001 RIVOIR

DR, SAN JOSE,
CA 95118
2025 115105
000 00 RS
ADU O
8/15/2025
1 1 NONE No No N/A Pending Ministerial
58342061 1118 QUAIL

CREEK CL,

SAN JOSE, CA
95120
2025 110111
000 00 RS
ADU O
8/18/2025
1 1 NONE No No N/A Pending Ministerial
48618042 1944

MANDARIN

WY, SAN

JOSE, CA
95122
2025 116980
000 00 RS
ADU O
8/18/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 16 ends

42937018 1525 CHERRY

AV, SAN JOSE,
CA 95125
2025 118103
000 00 RS
ADU O
8/18/2025
1 1 NONE No No N/A Pending Ministerial
49707003 13099 PFEIFLE

AV, SAN JOSE,
CA 95111
2025 105204
000 00 RS
ADU O
8/20/2025
1 1 NONE No No N/A Pending Ministerial
44708009 3117 JULIO AV,

SAN JOSE, CA
95124
2025 112043
000 00 RS
ADU O
8/20/2025
1 1 NONE No No N/A Pending Ministerial
44239040 2901 La Jolla
Ave, San Jose,
CA 95124
2025 113749
000 00 RS
ADU O
8/20/2025
1 1 1 NONE No No N/A Approved Ministerial
49707003 13099 PFEIFLE

AV, SAN JOSE,
CA 95111
2025 125612
000 00 RS
ADU O
8/20/2025
1 1 NONE No No N/A Pending Ministerial
49463063 821

ROYALBROOK

CT, SAN JOSE,
CA 95111
2025 116419
000 00 RS
ADU O
8/21/2025
1 1 1 NONE No No N/A Approved Ministerial
58921055 1208

LODESTONE

DR, SAN JOSE,
CA 95132
2025 121610
000 00 RS
ADU O
8/21/2025
1 1 NONE No No N/A Pending Ministerial
24411043 1708

GOLDENTREE

DR, SAN JOSE,
CA 95131
2025 126093
000 00 RS
ADU O
8/21/2025
1 1 NONE No No N/A Pending Ministerial
N/A 539 AVALANI

AV, SAN JOSE,
CA 95133
2025 126237
000 00 RS
ADU O
8/21/2025
1 1 1 NONE No No N/A Approved Ministerial
58708023 1451 OLD

PIEDMONT RD,

SAN JOSE, CA
95132
2025 097890
000 00 RS
ADU O
8/22/2025
1 1 NONE No No N/A Pending Ministerial
30701004 1103 LOCUST

ST, SAN JOSE,
CA 95110
2025 105952
000 00 RS
ADU O
8/25/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
67011066 1662 ALDRICH

WY, SAN

JOSE, CA
95121
2025 114892
000 00 RS
ADU O
8/25/2025
1 1 1 NONE No No N/A Approved Ministerial
44727060 1639

GLENROY DR,

SAN JOSE, CA
95124
2025 116921
000 00 RS
ADU O
8/25/2025
1 1 NONE No No N/A Pending Ministerial
43408054 1125

SHERMAN ST,

SAN JOSE, CA
95110
2025 121987
000 00 RS
ADU O
8/25/2025
1 1 NONE No No N/A Pending Ministerial
48820072 1786

HILLMONT AV,

SAN JOSE, CA
95127
2025 121727
000 00 RS
ADU O
8/26/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1620 Lucretia
Ct, San Jose,
CA 95122
2025 122038
000 00 RS
ADU O
8/26/2025
1 1 1 NONE No No N/A Approved Ministerial
44623004 1672

LAURELWOOD

DR, SAN JOSE,
CA 95125
2025 123098
000 00 RS
ADU O
8/26/2025
1 1 1 NONE No No N/A Approved Ministerial
49451055 818

SYLVANDALE

AV, SAN JOSE,
CA 95111
2025 117454
000 00 RS
ADU O
8/27/2025
1 1 NONE No No N/A Pending Ministerial
65919005 3037

REMINGTON

WY, SAN

JOSE, CA
95148
2025 118918
000 00 RS
ADU O
8/27/2025
1 1 NONE No No N/A Pending Ministerial
37320039 6538

CANTERBURY

CT, SAN JOSE,
CA 95129
2025 121761
000 00 RS
ADU O
8/27/2025
1 1 NONE No No N/A Pending Ministerial
48817049 2781 TWIN

OAKS LN, SAN

JOSE, CA
95127
2025 123557
000 00 RS
ADU O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
37801009 1025

WUNDERLICH

DR, SAN JOSE,
CA 95129
2025 119979
000 00 RS
ADU O
8/28/2025
1 1 NONE No No N/A Pending Ministerial
23516042 1019 12TH ST,

SAN JOSE, CA
95112
2025 125097
000 00 RS
ADU O
8/28/2025
1 1 NONE No No N/A Approved Ministerial
37304045 6471

CANTERBURY

CT, SAN JOSE,
CA 95129
2025 127057
000 00 RS
ADU O
8/28/2025
1 1 NONE No No N/A Pending Ministerial
46702042 279 E ST

JAMES ST,

SAN JOSE, CA
95112
2025 115403
000 00 RS
ADU O
9/2/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
27430045 2275 TULIP RD,

SAN JOSE, CA
95128
2025 116006
000 00 RS
ADU O
9/2/2025
1 1 NONE No No N/A Pending Ministerial
70432015
291 VINEYARD

DR, SAN JOSE,
CA 95119
2025 121821
000 00 RS
ADU O
9/2/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 17 ends

46731047 51 S 22ND ST,

SAN JOSE, CA
95116
2025 089193
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
46727056 175 S 14TH ST,

SAN JOSE, CA
95112
2025 109849
000 00 RS
ADU O
9/3/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
61247005 3675 WARNER

DR, SAN JOSE,
CA 95127
2025 121611
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
24929043 626 N 15TH ST,

SAN JOSE, CA
95112
2025 122105
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
26423059 752 DELMAS

AV, SAN JOSE,
CA 95126
2025 123847
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
42901033 1267 CRISTINA

AV, SAN JOSE,
CA 95125
2025 124202
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
68435083 5180

DISCOVERY

AV, SAN JOSE,
CA 95111
2025 126134
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
41421046 3101

BROWNING

AV, SAN JOSE,
CA 95124
2025 127598
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
23516052 517 MADERA

AV, SAN JOSE,
CA 95112
2025 119401
000 00 RS
ADU O
9/4/2025
1 1 NONE No No N/A Pending Ministerial
52738059 5520 LEIGH

AV, SAN JOSE,
CA 95124
2025 107003
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
47227002 512 S 3RD ST,

SAN JOSE, CA
95112
2025 117693
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
40349005 4950

KINGSTON

WY, SAN

JOSE, CA
95130
2025 122921
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
49133021 2001

SUPREME DR,

SAN JOSE, CA
95148
2025 123505
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
67659031 1417 MEADOW

GLEN WY, SAN

JOSE, CA
95121
2025 123936
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
27413007 1564

HANCHETT AV,

SAN JOSE, CA
95126
2025 124333
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
24904060 870 N 5TH ST,

SAN JOSE, CA
95112
2025 124589
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
37327029 1094

BELVEDERE

LN, SAN JOSE,
CA 95129
2025 127669
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
49447034 634

ELMBROOK

WY, SAN

JOSE, CA
95111
2025 128571
000 00 RS
ADU O
9/5/2025
1 1 1 NONE No No N/A Approved Ministerial
48619014 1960 STORY

RD, SAN JOSE,
CA 95122
2025 116855
000 00 RS
ADU O
9/8/2025
1 1 NONE No No N/A Pending Ministerial
60112116 3403

VIEWMONT

CT, SAN JOSE,
CA 95127
2025 122298
000 00 RS
ADU O
9/8/2025
1 1 NONE No No N/A Pending Ministerial
44617018 1606

GLENFIELD

DR, SAN JOSE,
CA 95125
2025 123722
000 00 RS
ADU O
9/8/2025
1 1 NONE No No N/A Pending Ministerial
43947006 2911

ALMADEN RD,

SAN JOSE, CA
95125
2025 118184
000 00 RS
ADU O
9/9/2025
1 1 NONE No No N/A Pending Ministerial
27737012 481 S

GENEVIEVE

LN, SAN JOSE,
CA 95128
2025 118294
000 00 RS
ADU O
9/9/2025
1 1 1 NONE No No N/A Approved Ministerial
59924054 986 ROCK

CANYON CL,

SAN JOSE, CA
95127
2025 121768
000 00 RS
ADU O
9/9/2025
1 1 NONE No No N/A Pending Ministerial
48807117 1363 SUFFOLK

DR, SAN JOSE,
CA 95127
2025 122641
000 00 RS
ADU O
9/9/2025
1 1 NONE No No N/A Pending Ministerial
29940005 633 COAKLEY

DR, SAN JOSE,
CA 95117
2025 125199
000 00 RS
ADU O
9/9/2025
1 1 NONE No No N/A Pending Ministerial
9225011 2044 CONIFER

LN, SAN JOSE,
CA 95132
2025 098504
000 00 RS
ADU O
9/10/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 18 ends

48130075 2017 LAVONNE

AV, SAN JOSE,
CA 95116
2025 119649
000 00 RS
ADU O
9/10/2025
1 1 NONE No No N/A Pending Ministerial
43423058 1407 FORD AV,

SAN JOSE, CA
95110
2025 107393
000 00 RS
ADU O
9/12/2025
1 1 NONE No No N/A Pending Ministerial
49143002 2545 GLEN

HAIG WY, SAN

JOSE, CA
95148
2025 111689
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
42950030 1568

MINNESOTA

AV, SAN JOSE,
CA 95125
2025 121573
000 00 RS
ADU O
9/15/2025
1 1 1 NONE No No N/A Approved Ministerial
49722006 3081 WALL ST,

SAN JOSE, CA
95111
2025 122435
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
59959008 360 TITLEIST

CT, SAN JOSE,
CA 95127
2025 125046
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
27725020 558

RICHMOND

AV, SAN JOSE,
CA 95128
2025 126229
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
30724003 4168

MORELAND

WY, SAN

JOSE, CA
95130
2025 129178
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
49912044 2699 LOOMIS

DR, SAN JOSE,
CA 95121
2025 125966
000 00 RS
ADU O
9/16/2025
1 1 NONE No No N/A Pending Ministerial
45112084 3226 CHERRY

AV, SAN JOSE,
CA 95118
2025 126802
000 00 RS
ADU O
9/16/2025
1 1 NONE No No N/A Pending Ministerial
46711018 29 N 24TH ST,

SAN JOSE, CA
95116
2025 116114
000 00 RS
ADU O
9/17/2025
1 1 NONE No No N/A Pending Ministerial
43913051 1067 LAURIE

AV, SAN JOSE,
CA 95125
2025 128109
000 00 RS
ADU O
9/17/2025
1 1 NONE No No N/A Pending Ministerial
48416113 147 CEDAR

LN, SAN JOSE,
CA 95127
2025 129140
000 00 RS
ADU O
9/17/2025
1 1 1 NONE No No N/A Approved Ministerial
49111065 2068

INTERBAY DR,

SAN JOSE, CA
95122
2025 123267
000 00 RS
ADU O
9/18/2025
1 1 NONE No No N/A Pending Ministerial
49915068 1211

SIMONSON

WY, SAN

JOSE, CA
95121
2025 109358
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
68454036 4590

HOUNDSHAVE

N WY, SAN

JOSE, CA
95111
2025 122998
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
60122109 3139

FLORENCE CT,

SAN JOSE, CA
95127
2025 123951
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
68432110 5149

DISCOVERY

AV, SAN JOSE,
CA 95111
2025 125752
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
49140016 2744 BRITT CT,

SAN JOSE, CA
95148
2025 125855
000 00 RS
ADU O
9/22/2025
1 1 1 NONE No No N/A Approved Ministerial
70423020 6117

ESCONDIDO

CT, SAN JOSE,
CA 95119
2025 128504
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
30734025 3673 KENDRA

WY, SAN

JOSE, CA
95130
2025 128511
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
48807047 2708

COVENTRY

DR, SAN JOSE,
CA 95127
2025 128719
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
46255029 4614 SIDLAW

CT, SAN JOSE,
CA 95136
2024 093005
000 00 RS
ADU O
9/24/2025
1 1 NONE No No N/A Pending Ministerial
24511012 1344 TOFTS

DR, SAN JOSE,
CA 95131
2025 130218
000 00 RS
ADU O
9/24/2025
1 1 NONE No No N/A Pending Ministerial
44715084 3462 GAVOTA

AV, SAN JOSE,
CA 95124
2025 120934
000 00 RS
ADU O
9/25/2025
1 1 NONE No No N/A Pending Ministerial
29926051 948 EDEN AV,

SAN JOSE, CA
95117
2025 124691
000 00 RS
ADU O
9/25/2025
1 1 NONE No No N/A Pending Ministerial
67621013 3438

WOODSIDE

LN, SAN JOSE,
CA 95121
2025 102430
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 19 ends

48424087 13541 EMILIE

DR, SAN JOSE,
CA 95127
2025 110122
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
42926053 1034 LOUISE

AV, SAN JOSE,
CA 95125
2025 118913
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
46710025 173 N 25TH ST,

SAN JOSE, CA
95116
2025 125499
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
67837085 1110 COYOTE

RD, SAN JOSE,
CA 95111
2025 127205
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
27917030 1247

REDOAKS DR,

SAN JOSE, CA
95128
2025 127375
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
48817050 2777 TWIN

OAKS LN, SAN

JOSE, CA
95127
2025 115239
000 00 RS
ADU O
9/30/2025
1 1 NONE No No N/A Pending Ministerial
37321047 6757

DEVONSHIRE

DR, SAN JOSE,
CA 95129
2025 132247
000 00 RS
ADU O
10/1/2025
1 1 NONE No No N/A Pending Ministerial
49730009 2896 GARDEN

AV, SAN JOSE,
CA 95111
2025 112737
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
43928067 1465 HUSTED

AV, SAN JOSE,
CA 95125
2025 125711
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
48416113 147 CEDAR LN,

SAN JOSE, CA
95127
2025 126598
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
65458013 3274

PINKERTON

DR, SAN JOSE,
CA 95148
2025 127960
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
48613066 1593

BERMUDA WY,

SAN JOSE, CA
95122
2025 128337
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
65441092 3092

ALLENWOOD

DR, SAN JOSE,
CA 95148
2025 130149
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
42117064 15180

COOPER AV,

SAN JOSE, CA
95124
2025 121584
000 00 RS
ADU O
10/6/2025
1 1 NONE No No N/A Pending Ministerial
49142033 2914 GLEN

DARBY CT,

SAN JOSE, CA
95148
2025 129496
000 00 RS
ADU O
10/6/2025
1 1 NONE No No N/A Pending Ministerial
28415035 1772 ISABEL

DR, SAN JOSE,
CA 95125
2025 130229
000 00 RS
ADU O
10/6/2025
1 1 1 NONE No No N/A Approved Ministerial
24510025 1280 TURRETT

DR, SAN JOSE,
CA 95131
2025 133642
000 00 RS
ADU O
10/6/2025
1 1 NONE No No N/A Pending Ministerial
43950018 2281

CELESTINE

AV, SAN JOSE,
CA 95125
2025 125805
000 00 RS
ADU O
10/7/2025
1 1 NONE No No N/A Pending Ministerial
70444020 6958 DEL RIO

DR, SAN JOSE,
CA 95119
2025 127875
000 00 RS
ADU O
10/7/2025
1 1 NONE No No N/A Pending Ministerial
49725061 3012

SUNBURST

DR, SAN JOSE,
CA 95111
2025 132513
000 00 RS
ADU O
10/7/2025
1 1 1 NONE No No N/A Approved Ministerial
49128057 2303 PALMIRA

WY, SAN

JOSE, CA
95122
2025 127196
000 00 RS
ADU O
10/8/2025
1 1 NONE No No N/A Pending Ministerial
N/A

MASTER FILE ,

SAN JOSE, CA
2025 134333
000 00 RS
ADU O
10/9/2025
1 1 NONE No N/A Pending Ministerial
64722002 1582 MT

FRAZIER DR,

SAN JOSE, CA
95127
2025 105095
000 00 RS
ADU O
10/10/2025
1 1 NONE No No N/A Pending Ministerial
56711069 5526 FERN DR,

SAN JOSE, CA
95124
2025 123210
000 00 RS
ADU O
10/10/2025
1 1 NONE No No N/A Pending Ministerial
64722002 1582 MT

FRAZIER DR,

SAN JOSE, CA
95127
2025 129464
000 00 RS
ADU O
10/10/2025
1 1 NONE No No N/A Pending Ministerial
66006009 2942

MEADOWLAND

S LN, SAN

JOSE, CA
95135
2025 129371
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
49420067
699 SWALLOW

DR, SAN JOSE,
CA 95111
2025 130331
000 00 RS
ADU O
10/14/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 20 ends

40332050 1944 SERGE

AV, SAN JOSE,
CA 95130
2025 130849
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
68515060 27 PARK

WARREN PL,

SAN JOSE, CA
95136
2025 131059
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
49130025 2681 PIXANNE

CT, SAN JOSE,
CA 95148
2025 131652
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
68523010 38 PARK

FLETCHER PL,

SAN JOSE, CA
95136
2025 132511
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
37804060 1004

HUNTINGDON

DR, SAN JOSE,
CA 95129
2025 132630
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
58913010 2760

LONGFORD

DR, SAN JOSE,
CA 95132
2025 116374
000 00 RS
ADU O
10/15/2025
1 1 NONE No No N/A Pending Ministerial
48125052 1980 E San
Antonio St, San
Jose, CA 95116
2025 136035
000 00 RS
ADU O
10/17/2025
1 1 NONE No No N/A Pending Ministerial
24503038 1340 OLD

ROSE PL, SAN

JOSE, CA
95132
2025 106162
000 00 RS
ADU O
10/20/2025
1 1 NONE No No N/A Pending Ministerial
49925011 2687 KIMBALL

DR, SAN JOSE,
CA 95121
2025 133034
000 00 RS
ADU O
10/20/2025
1 1 NONE No No N/A Pending Ministerial
44702035 1514 SAN

JOAQUIN AV,

SAN JOSE, CA
95118
2025 135166
000 00 RS
ADU O
10/20/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1174 SIERRA

AV, SAN JOSE,
CA 95126
2025 105636
000 00 RS
ADU O
10/21/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
45116039 1441

WILLOWMONT

AV, SAN JOSE,
CA 95118
2025 136160
000 00 RS
ADU O
10/22/2025
1 1 NONE No No N/A Pending Ministerial
58920012 2480 AMARYL

DR, SAN JOSE,
CA 95132
2025 111457
000 00 RS
ADU O
10/23/2025
1 1 NONE No No N/A Pending Ministerial
43930040 2334

LANSFORD AV,

SAN JOSE, CA
95125
2025 129607
000 00 RS
ADU O
10/23/2025
1 1 NONE No No N/A Pending Ministerial
42938053 1493

BROOKDALE

DR, SAN JOSE,
CA 95125
2025 132134
000 00 RS
ADU O
10/24/2025
1 1 NONE No No N/A Pending Ministerial
26108007 801 VILLA AV,

SAN JOSE, CA
95126
2025 127671
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
46229058 4629 MIA CL,

SAN JOSE, CA
95136
2025 129183
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
58119031 1194 OLIVE

BRANCH LN,

SAN JOSE, CA
95120
2025 132329
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
23033022 1221 SANTA

PAULA AV,

SAN JOSE, CA
95110
2025 134484
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
45116039 1681

PARKSIDE AV,

SAN JOSE, CA
95125
2025 136996
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
47743089 2029

KILCHOAN WY,

SAN JOSE, CA
95122
2025 129104
000 00 RS
ADU O
10/28/2025
1 1 NONE No No N/A Pending Ministerial
26108007 803 VILLA AV,

SAN JOSE, CA
95126
2025 130767
000 00 RS
ADU O
10/29/2025
1 1 NONE No No N/A Pending Ministerial
49137075 2679 SAND

POINT DR,

SAN JOSE, CA
95148
2025 132559
000 00 RS
ADU O
10/29/2025
1 1 NONE No No N/A Pending Ministerial
67630039 2648

PEARTREE LN,

SAN JOSE, CA
95121
2025 133286
000 00 RS
ADU O
10/30/2025
1 1 NONE No No N/A Pending Ministerial
66061021 2721 Clover
Meadow Ct,
San Jose, CA
2025 113716
000 00 RS
ADU O
11/3/2025
1 1 NONE No No N/A Pending Ministerial
49418057 3850 Kauai Dr,
San Jose, CA
95111
2025 132482
000 00 RS
ADU O
11/3/2025
1 1 NONE No No N/A Pending Ministerial
24960026 368 N 17th St,
San Jose, CA
95112
2025 132484
000 00 RS
ADU O
11/3/2025
1 1 NONE No No N/A Pending Ministerial
46432034 684 Tarrytown
Ct, San Jose,
CA 95136
2025 118231
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
30337013 402 S Henry
Ave, San Jose,
CA 95117
2025 128786
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 21 ends

68015026
5611 Algonquin
Way, San Jose,
CA 95138
2025 129938
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
46704030 249 N 15th St,
San Jose, CA
95112
2025 134551
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
48135142 2024 Cinderella
Ln, San Jose,
CA 95116
2025 136115
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
49108033 2107 Orlando
Dr, San Jose,
CA 95122
2025 133575
000 00 RS
ADU O
11/5/2025
1 1 NONE No No N/A Pending Ministerial
49451010 3935 Sark Way,
San Jose 95111
2025 133754
000 00 RS
ADU O
11/5/2025
1 1 NONE No No N/A Pending Ministerial
23508006 58 E Younger
Ave, San Jose,
CA 95112
2025 136174
000 00 RS
ADU O
11/5/2025
1 1 NONE No No N/A Pending Ministerial
37317039 1391 Bretmoor
Way, San Jose,
CA 95129
2025 120222
000 00 RS
ADU O
11/6/2025
1 1 NONE No No N/A Pending Ministerial
48160015 1709 Arroyo de
Oro, San Jose,
CA 95116
2025 133917
000 00 RS
ADU O
11/6/2025
1 1 NONE No No N/A Pending Ministerial
24409079 1667 Four Oaks
Rd, San Jose,
CA 95131
2024 087520
000 00 RS
ADU O
11/10/2025
1 1 NONE No No N/A Pending Ministerial
49712003 10511 Potts
Way, San Jose,
CA 95111
2025 124804
000 00 RS
ADU O
11/10/2025
1 1 NONE No No N/A Pending Ministerial
30722064 1421 Vallejo Dr,
San Jose, CA
95130
2025 138450
000 00 RS
ADU O
11/10/2025
1 1 NONE No No N/A Pending Ministerial
47227019 503 S 5th St,
San Jose, CA
95112
2025 139715
000 00 RS
ADU O
11/10/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
69214076 5821 Chris Dr,
San Jose, CA
95123
2025 139962
000 00 RS
ADU O
11/11/2025
1 1 NONE No No N/A Pending Ministerial
48618072 1933 Everglade
Ave, San Jose,
CA 95122
2025 134472
000 00 RS
ADU O
11/12/2025
1 1 NONE No No N/A Pending Ministerial
46737106 965 E Williams
St, San Jose,
CA 95116
2025 135630
000 00 RS
ADU O
11/12/2025
1 1 NONE No No N/A Pending Ministerial
9231047 3588 Behler Dr,
San Jose, CA
95132
2025 136396
000 00 RS
ADU O
11/12/2025
1 1 NONE No No N/A Pending Ministerial
57737030 5986 Colorview
Ct, San Jose,
CA 95120
2025 135635
000 00 RS
ADU O
11/13/2025
1 1 NONE No No N/A Pending Ministerial
45110007 1143
Pembridge Dr,
San Jose, CA
95118
2025 131976
000 00 RS
ADU O
11/17/2025
1 1 NONE No No N/A Pending Ministerial
30337032 373 Rosewood
Ave, San Jose,
CA 95117
2025 115482
000 00 RS
ADU O
11/18/2025
1 1 NONE No No N/A Pending Ministerial
40330071 4833 Grimsby
Dr, San Jose,
CA 95130
2025 139067
000 00 RS
ADU O
11/18/2025
1 1 NONE No No N/A Pending Ministerial
49750007 692 Santee
River Ct, San
Jose, CA 95111
2025 114928
000 00 RS
ADU O
11/20/2025
1 1 NONE No No N/A Pending Ministerial
48121095 61 Scharff Ave,
San Jose, CA
95116
2025 137614
000 00 RS
ADU O
11/20/2025
1 1 NONE No No N/A Pending Ministerial
23016025 1194 Sherwood
Ave, San Jose,
CA 95126
2025 141055
000 00 RS
ADU O
11/20/2025
1 1 NONE No No N/A Pending Ministerial
56709074 5411 Drysdale
Dr, San Jose,
CA 95124
2025 136013
000 00 RS
ADU O
11/21/2025
1 1 NONE No No N/A Pending Ministerial
70623017 73 Avenida
Espana, San
Jose, CA 95139
2025 136536
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
49727040 444 Pocatello
Dr, San Jose,
CA 95111
2025 137201
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
67855034 107 Felice Ct,
San Jose, CA
95138
2025 137519
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
49724036 2936 Garden
Ave, San Jose,
CA 95111
2025 138437
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
42908011 1195 Britton
Ave, San Jose,
CA 95125
2025 138465
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
42908011 1195 Britton
Ave, San Jose,
CA 95125
2025 138467
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
65951022 3154 Cortona
Dr, San Jose,
CA 95135
2025 139904
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
48142061 914 McCreery
Ave, San Jose,
CA 95116
2025 133195
000 00 RS
ADU O
11/26/2025
1 1 NONE No No N/A Pending Ministerial
27409009 1526 McDaniel
Ave, San Jose,
CA 95126
2025 136658
000 00 RS
ADU O
11/26/2025
1 1 NONE No No N/A Pending Ministerial
N/A 5290 Garwood
Dr, San Jose,
CA 95118
2025 142600
000 00 RS
ADU O
11/26/2025
1 1 1 NONE No No N/A Approved Ministerial
48142061 914 McCreery
Ave, San Jose,
CA 95116
2025 140331
000 00 RS
ADU O
11/26/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 22 ends

27454034 2357 Sunny
Vista Dr, San
Jose, CA 95128
2025 142769
000 00 RS
ADU O
11/30/2025
1 1 NONE No No N/A Pending Ministerial
24920021
769 N Bayshore
West, San
Jose, CA 95112
2025 128347
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
44215057 1767 Curtner
Ave, San Jose,
CA 95124
2025 131785
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
68715003 759 Calero Ave,
San Jose, CA
95123
2025 135316
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
49922033 2507 Sherlock
Dr, San Jose,
CA 95121
2025 138060
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
42108085 15062 Brewster
Ave, San Jose,
CA 95124
2025 142571
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
56717047 1708 ZINNIA

LN, SAN JOSE,
CA 95124
2025 103962
000 00 RS
ADU O
12/3/2025
1 1 NONE No No N/A Pending Ministerial
24951029 409 N 10th St,
San Jose, CA
95112
2025 128054
000 00 RS
ADU O
12/3/2025
1 1 NONE No No N/A Pending Ministerial
56717047 1708 ZINNIA

LN, SAN JOSE,
CA 95124
2025 136882
000 00 RS
ADU O
12/3/2025
1 1 NONE No No N/A Pending Ministerial
65904019 3203 Foxboro
Pl, San Jose,
CA 95135
2024 067775
000 00 RS
ADU O
12/4/2025
1 1 NONE No No N/A Pending Ministerial
44249023 1799 Foxworthy
Ave, San Jose,
CA 95124
2025 132283
000 00 RS
ADU O
12/4/2025
1 1 NONE No No N/A Pending Ministerial
67665013
3850 Glengrove
Way, San Jose,
CA 95121
2025 141032
000 00 RS
ADU O
12/4/2025
1 1 NONE No No N/A Pending Ministerial
61228037 3756 Marchant
Dr, San Jose,
CA 95127
2025 130632
000 00 RS
ADU O
12/5/2025
1 1 NONE No No N/A Pending Ministerial
69504003 917 Maclay Dr,
San Jose, CA
95123
2025 143863
000 00 RS
ADU O
12/5/2025
1 1 NONE No No N/A Pending Ministerial
47742092 2045 Malden
Ave, San Jose,
CA 95122
2025 140264
000 00 RS
ADU O
12/5/2025
1 1 NONE No No N/A Pending Ministerial
N/A 3202 Marten
Ave, San Jose,
CA 95148
2025 142586
000 00 RS
ADU O
12/5/2025
1 1 1 NONE No No N/A Approved Ministerial
49712061 458 Stroud Pl,
San Jose, CA
95111
2025 115080
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
59531011 1039 Noble
Ave, San Jose,
CA 95132
2025 138055
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
67686015 4574 Terra Pl,
San Jose, CA
95121
2025 140028
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
45819016 5288 Fell Ave,
San Jose, CA
95136
2025 140754
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
47229058 578 S 11th St,
San Jose, CA
95112
2025 141631
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
27420075 1830 Cleveland
Ave, San Jose,
CA 95126
2024 099377
000 00 RS
ADU O
12/10/2025
1 1 NONE No No N/A Pending Ministerial
43909031 1173 Malone
Rd, San Jose,
CA 95125
2025 122534
000 00 RS
ADU O
12/10/2025
1 1 NONE No No N/A Pending Ministerial
56735014 5568 Dartmouth
Dr, San Jose,
CA 95118
2025 140268
000 00 RS
ADU O
12/10/2025
1 1 NONE No No N/A Pending Ministerial
46259009 4458 ILLSLEY

CT, SAN JOSE,
CA 95136
2025 133994
000 00 RS
ADU O
12/11/2025
1 1 NONE No No N/A Pending Ministerial
43939039 2557 Cottle
Ave, San Jose,
CA 95125
2025 142516
000 00 RS
ADU O
12/11/2025
1 1 NONE No No N/A Pending Ministerial
67312041 2804
Westbranch Dr,
San Jose, CA
2025 132628
000 00 RS
ADU O
12/12/2025
1 1 NONE No No N/A Pending Ministerial
58112002 3551 Crown
Blvd, San Jose,
CA 95120
2025 134091
000 00 RS
ADU O
12/15/2025
1 1 NONE No No N/A Pending Ministerial
56930065 1400 Bouret Dr,
San Jose, CA
95118
2025 143386
000 00 RS
ADU O
12/15/2025
1 1 NONE No No N/A Pending Ministerial
56930065 1400 Bouret Dr,
San Jose, CA
95118
2025 143452
000 00 RS
ADU O
12/15/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1800 Shady
Grove Ct, San
Jose, CA
2025 115128
000 00 RS
ADU O
12/16/2025
1 1 NONE No No N/A Pending Ministerial
42923040 1002 California
Ave, San Jose,
CA 95125
2025 144690
000 00 RS
ADU O
12/16/2025
1 1 NONE No No N/A Pending Ministerial
23510005 947 N 7th St,
San Jose, CA
95112
2025 142363
000 00 RS
ADU O
12/22/2025
1 1 NONE No No N/A Pending Ministerial
69414009 890
Summerbrook
Ln, San Jose,
CA 95123
2025 119152
000 00 RS
ADU O
12/23/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 23 ends

37801025 1017 Whiteoak
Dr, San Jose,
CA 95129
2025 133999
000 00 RS
ADU O
12/26/2025
1 1 NONE No No N/A Pending Ministerial
65919066 3068 Quimby
Rd, San Jose,
CA
2025 142682
000 00 RS
ADU O
12/26/2025
1 1 NONE No No N/A Pending Ministerial
70427036 211 Pemba Ct,
San Jose, CA
95119
2025 111636
000 00 RS
ADU O
12/29/2025
1 1 NONE No No N/A Pending Ministerial
67309078 2967

ROSSMORE

LN, SAN JOSE,
CA 95148
2025 134206
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
48123123 258 Duffy Ct,
San Jose, CA
95116
2025 138790
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
46702090 271 N 9th St,
San Jose, CA
95112
2025 141077
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
66041021 3253 Charmat
Ct, San Jose,
CA 95135
2025 142884
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
45136062 4450 Silva Ave,
San Jose, CA
95118
2025 146910
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
69431024 5870 Cabral
Ave, San Jose,
CA 95123
2025 146918
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
27452019 2327 Kenwood
Ave, San Jose,
CA 95128
2025 143705
000 00 RS
ADU O
12/31/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 24 ends

Jurisdiction San Jose ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2025 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
1 Projection
Period 3 4
RHNA Allocation
by Income Level
Projection
Period -
06/30/2022-
01/30/2023
2023 2024 2025 2026 2027 2028 2029 2030 2031
Total Units to
Date (all
years)
Total Remaining
RHNA by
Income Level
Deed Restricted - - - - - - - - - - Non-Deed Restricted - - - - - - - - - - Deed Restricted 13 387 213 258 - - - - - - Non-Deed Restricted - - - - - - - - - - Deed Restricted 181 180 273 317 - - - - - - Non-Deed Restricted - - 167 150 - - - - - - Deed Restricted 184 259 904 394 - - - - - - Non-Deed Restricted - - 167 150 - - - - - - Deed Restricted 51 114 132 44 - - - - - - Non-Deed Restricted - 768 167 1,066 - - - - - - Above Moderate 27,714 322 1,220 195 250 - - - - - - 1, 987 25,727 62,200
751 2,928 2,218 2,629 - - - - - - 8,526 53,674 Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact HCD staff at [email protected].

Acutely Low - -
*For years prior to 2025, data on deed-restricted vs. non-deed restricted Extremely Low-Income units is approximated from whether the projects reported any deed-restricted Very Low-Income Units. If you wish to edit this historical data for accuracy or have any questions about the data, you may login to HCD's online APR system, or contact HCD staff at [email protected].

Total Units
*For jurisdictions that received RHNA determinations for the current cycle prior to the passage of AB 3093 (September 19, 2024):
- You were not allocated Acutely Low-Income and Extremely Low-Income RHNA targets, therefore the allocations in Field 1 are listed as "0" - If you wish to set your own targets in these income categories for informational purposes, contact HCD staff at [email protected]. - All Acutely Low-Income and Extremely Low-Income units reported during the cycle are counted towards Very-Low Income RHNA progress 8,369
Total RHNA
-
6,629 Low
*For years prior to 2025, Acutely Low-Income units are reported within the Extremely Low-Income category Please Note: Table B does not currently contain data from Table F or Table F2 for prior years. You may login to the APR system to see Table B that contains this data.

Extremely Low -
2,342 Moderate
15,088
8,687
10,711
2,
058
2,139
Income Level
Very Low
871 -
This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs.

Please contact HCD if your data is different than the material supplied here 2 Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
12,949
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 25 ends

Jurisdiction San Jose ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Date of
Rezone Rezone Type
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of
Rezone
Very Low-
Income Low-Income Moder ate-
Income
Above
Moderate-
Income
Rezone Type Parcel S ize
(Acres)
General Plan
Designation Zoning
Minimum
D ensity
Allowed
Maximum
Density
Allowed
Realistic
Capacity Vacant/Nonvacant Desc ription of
Existing Uses
Note: "+" indicates an optional field
Cells
in grey contain auto-calculation formulas
Summary Row: Start Data Entry Below
83 Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 26 ends

Jurisdiction San Jose
Reporting Year 2025 (Jan. 1 - Dec. 31)
1 2 3 4 5 6 7 8 9
Name of Program Objective
Projected Completion
Date in Housing
Element
Applicable
Cycle
Status of Program
Implementation Program Implementation Details Quantif ied Outcomes:

Category
Quantified Outcomes:

Count Supporting Documents
P -1 Align Zoning with the
General Plan
Council approval of zoning changes 4/1/2024 6th Cycle Completed T his program was completed in 2024. Other 1 None P-2 Subsidize Extremely
Low-Income Housing
Including Permanent
Supportiv
e Housing for
Homeless
Dec 2031: 45% of City capital subsidies
spent on ELI and PSH
12/31/2031 6th Cycle Continuous
Staff released the April 2025 Rolling Request for Proposals (RFP) and the June 2025 Notice of Funding Availability (NOFA) as an addendum to the RFP, offering $50M in funding for extremely low- to moderate-income housing. Of the funding committed in CY 2025, 41% of the City subsidy was allocated to ELI households, and 12% was allocated to PSH units. Apartments housing 121 ELI households, 45 PSH households, and 25 HUD-VASH voucher recipient households began construction during CY 2025.

Other 53 None
P-2 Subsidize Extremely
Low-Income Housing
Including Permanent
Supportiv
e Housing for
Homeless
Dec 2031: 1,200 ELI affordable homes
created
12/31/2031 6th Cycle Continuous
Staff released the April 2025 Rolling Request for Proposals (RFP) and the June 2025 Notice of Funding Availability (NOFA) as an addendum to the RFP, offering $50M in funding for extremely low- to moderate-income housing. Of the funding committed in CY 2025, 41% of the City subsidy was allocated to ELI households, and 12% was allocated to PSH units. Apartments housing 121 ELI households, 45 PSH households, and 25 HUD-VASH voucher recipient households began construction during CY 2025.

Units 589 None
P-2 Subsidize Extremely
Low-Income Housing
Including Permanent
Supportiv
e Housing for
Homeless
Dec 2031: Pursue and apply for a
minimum of 3 funding opportunities during
the planning period
12/31/2031 6th Cycle Continuous
The City served as a co-applicant for the Berryessa Transit-Oriented development, seeking state and federal funding through the California Debt Limit Allocation Committee (CDLAC) to support the creation of 50 ELI units.

During the c
alendar year, the City also approved the outside issuance of bonds for 10 developments that will create or preserve 277 ELI units. In addition, the City supported transit improvements for two AHSC-awarded transit-oriented developments, producing 107 ELI units. The City Council also approved the commitment of recycled BEGIN funds to provide downpayment assistance for 14 ELI households.

Other None
P-3 North San José
Affordable Housing
Overlay Zones
Dec 2023: Council approval of General
Plan and Zoning Code Amendments
12/31/2023 6th Cycle Completed
Staff completed the work necessary to create the new zoning overlays and rezone sites in North San José, as described in the December 2023 and January 2024 Council memos that defined the strategy. In 2025, staff continued analy
zing additional sites for inclusion in the North San José General Plan and zoning overlay. We'll continue work on this strategy as staff capacity and time allow.

Other 1 None
P-3 North San José
Affordable Housing
Overlay Zones
Dec 2024: Identification of additional
TERO sites for application of an affordable
or mixed income overlay consideration of
amendments by Council
12/31/2024 6th Cycle Completed
Following an evaluation of existing sites for the addition of either an Affordable Housing Overlay (AHO) or Mixed Income Housing Overlay (MIHO) within the Transit Employment Residential Overlay (TERO) District, which does not include an aff
ordability requirement, staff concluded that the proposed change is unlikely to affect project feasibility or accelerate development activity at this time. As a result, no additional sites are currently being considered for inclusion in the AHO or MIHO.

Other None
P-3 North San José
Affordable Housing
Overlay Zones
Dec 2024: Council consideration of
previously identified sites for a TERO
overlay
12/31/2024 6th Cycle Completed
Staff had identified a single site for the TERO District in North San Jose that wasn't included in the list of sites. After further evaluation of the site, staff concluded that the site is not suitable for housing development and will not be included in the TERO District.

Other 1 None

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element.

Table D
Program Implementation Status pursuant to GC Section 65583 ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 27 ends

P-4 Affordable Housing
Tools for North San José
2024: Study created analyzing potential
NSJ Density Bonus or other tools to create
affordable units
12/31/2024 6th Cycle Completed
Staff reviewed current state Density Bonus law, the 2025 Cost of Development study, and recent project applications in North San José. Given the high possible densities in NSJ (min. of 75 DU/AC required), generous state law
Density Bonus provisions, and current superior financial feasibility of lower density product types compared to higher density, staff concluded that an additional density bonus is unlikely at this time to be helpful to further development in NSJ; and, hiring a consultant to confirm those findings is not necessary or fiscally prudent at this time.

Housing and Planning staff have assessed that feasible options for driving development to NSJ continue to be 1) awarding geographic priority in annual City Notices of Funding Availability for affordable housing (per P-5), 2) successful conveyance to an affordable housing developer of the large City- owned Vista Montana site, which process is planned to occur in 2026; and 3) active implementation of the Multifamily Housing Incentive Program to generate moderate-income and above-moderate new housing units for projects in NSJ and other areas of San José. For these reasons, a formal Implementation Plan is unlikely to add additional value; therefore, staff is closing out this item.

Other
See the Cost
of Development Study Session
(report is the Attachment):
https://sanJosé.legistar.com/View.ashx?M=A
&ID=1315729&
GUID=3C17B03F-B014-
43D5-B8DF-44024CDE065B
P-4 Affordable Housing
Tools for North San José
2024: Creation of Implementation Plan to
identify an estimate of number of
affordable homes achieved through each
approach
12/31/2024 6th Cycle Not yet started See descri ption above for P-4. Other None P-4 Affordable Housing
Tools for North San José
2024-25: Creation of draft tools / code
amendments and outreach, if study shows
it is feasible
12/31/2025 6th Cycle Not yet started See descri ption above for P-4. Other None P-4 Affordable Housing
Tools for North San José
Dec 2025: Council consideration of tools if
approval needed (e.g., ordinance change
required)
12/31/2025 6th Cycle Not yet started See descri ption above for P-4; not applicable. Other None P-5 Affordable Housing
Investments in North San
José
800 restricted affordable homes in North
San José
1/31/2031 6th Cycle Continuous
In April 2025, the City released a New Construction and Preservation Request for Proposals (RFP). This RFP incentivized development in North San José by awarding 10 points to projects in this key growth area. In December 2025, the Housing Department released a Request for Proposals for City-Owned Sites, including one site in North San José.

Units
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/developers/notice-of-funding-
availab
ility
P-5 Affordable Housing
Investments in North San
José
2 sites acquired with RFP awards &
ground leases to affordable developers 1/31/2031 6th Cycle Continuous In 2025, the City released a Request for Proposals for 71 Vista Montana, a site located within the North San José Area. The site is 4.2 acres and could produce 1,000+ units.

Other None
P-6 Regular Coordination
Meetings for Affordable
Housing
Housing Navigator budgeted annually
1/31/2031 6th Cycle Completed
The City continues to hold regular m onthly meetings involv ing Planning, Housing, and other departments as needed to coordinate permit processing for affordable housing project s. The Housing D evelopment Facilitation Officer positi
on, which supports City departments and affordable housing developers through the permitting process, was fi
lled in January 2026.

Other 1 None
P-6 Regular Coordination
Meetings for Affordable
Housing
# affordable housing developments
assisted 1/31/2031 6th Cycle Continuous
In 2025, 16 100% affordable housing projects with a total of 2,490 units were assisted in the building permit application process. Buildi ng permits were issued for 970 of those units.

Other 16 None
P-7 City Infill Housing
Ministerial Approval
Ordinance
Dec 2024: Council approval of Ordinance
12/31/2024 6th Cycle Completed
The City ordinance providing a ministerial approval pathway for infill housing development projects went into effect in February 2025. One 540- unit project that inc ludes 27 units for very l ow-income households has been approved us
ing the ministerial process, and a 100% affor
dable project with
272 uni
ts is was submitted in 2025 and is currently under review.

Other 1
https://sanjose.legistar.com/LegislationDetail.
aspx?ID=7039998&GUID=732C1720-428F-
443A-A575-B3453982001B
P-7 City Infill Housing
Ministerial Approval
Ordinance
Jan 2025: Outreach to developers
1/31/2025 6th Cycle Continuous
Staff continues to engage with developers on an ongoing basis to gather feedback on permit processing, including through the monthly Developers' Roundtable.

Other None
P-7 City Infill Housing
Ministerial Approval
Ordinance
June 2025: Complete first evaluation of
land use and permit processes
improvements, and implement identified
modific
ations. Ongoing evaluation,
reporting, and implementation will continue
through Housing Catalyst Work Plan.
6/30/2025 6th Cycle In Progress
Based on City Council direction and staff's evaluation, the City will look to expand the ministerial processing ordinance to the Downtown core. In January 2026 staff has initiated the environmental review necessary to complete this ordinance with a goal of completing by the end of 2026.

Other 1 None
P-7 City Infill Housing
Ministerial Approval
Ordinance
Entitlement of 200 units per year using the
new streamlined process during first years
after adoption.
12/31/2024 6th Cycle Continuous One project with 540 units was entitled in 2025. Units 540 None ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 28 ends

P-7 City Infill Housing
Ministerial Approval
Ordinance
Average 25% reduction in the length of
time from application to planning permit
issuance
12/31/2024 6th Cycle Continuous
The first ministerial permit was approved in 8 months, while discretionary approvals can take 22 months or more, although timelines vary widely.

Factors that influence the timeline include site location and characteristics, environment
al conditions, and the length of time for revisions to be submitted to the City in response to review comments.

Other 1 None
P-9 Diridon Affordable
Housing Production Goal
By the later of Diridon Station Area Plan
buildout or 2040: 25% of homes in Station
Area as restricted affordable
12/31/2040 6th Cycle Continuous
In April 2025, a New Construction and Preservation Request for Proposals was released. This RFP incentivized development in the Diridon Station Area by awarding 10 points to projects within 0.5 miles of this key multimodal transit hub. Unfort
unately, the Google downtown west project, which would have brought significant investment and housing development to the area, has been put on an indefinite hold for the foreseeable future. Development in this area is less than anticipated.

Other
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/developers/notice-of-funding-
availab
ility
P-9 Diridon Affordable
Housing Production Goal
Annual goal: Fund an average of 61 new
affordable homes
1/31/2031 6th Cycle Continuous
In April 2025, a New Construction and Preservation Request for Proposals was released. This RFP incentivized development in the Diridon Station Area by awarding 10 points to projects within 0.5 miles of this key multimodal transit hub. Unfort
unately, the Google downtown west project, which would have brought significant investment and housing development to the area, has been put on an indefinite hold for the foreseeable future. Development in this area is less than anticipated.

Units None
P-9 Diridon Affordable
Housing Production Goal
By 2031: 350 affordable homes funded by
City
1/31/2031 6th Cycle Continuous
In April 2025, a New Construction and Preservation Request for Proposals was released. This RFP incentivized development in the Diridon Station Area by awarding 10 points to projects within 0.5 miles of this key multimodal transit hub. Unfort
unately, the Google downtown west project, which would have brought significant investment and housing development to the area, has been put on an indefinite hold for the foreseeable future. Development in this area is less than anticipated.

Units None
P- 10 Standardize and
Streamline Permitting,
Fees, Applications
Apr 2024: Fees webpage updated
4/1/2024 6th Cycle Continuous St aff will continue to refine and update fee webpages as appropriate to be consistent with state law. Other
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/developers/developer-fees-
charges
P- 10 Standardize and
Streamline Permitting,
Fees, Applications
Dec 2025: Council adoption of ordinance
to amend municipal code 12/31/2025 6th Cycle Not yet started Refinement and adoption of an ordinance would follow adoption of the City Council Policy described further below. Implementing changes to the municipal code would come as a second phase to creation of a new Council Policy.

Other None
P- 10 Standardize and
Streamline Permitting,
Fees, Applications
Dec 2025: Council approval of Policy on
Development Fee Framework
12/31/2025 6th Cycle In Progress
The work to-date on this item is comprised of the formation of an internal working group of city departments with existing impact fee programs. The first phase of the work was the creation of a new City Council Policy that would define and memor
ialize the Development Fee Framework. Staff in the working group had developed a first draft of the Council Policy that will require more internal review and revisions. However, work on this item has been slowed to prioritize the General Plan Four-Year Review and implementation of state laws such as SB 79. Additionally, the environment around fees has evolved through the passage of SB 937 that went into effect last year and allows for impact fee deferral for most residential projects until certificate of occupancy.

Recently, a memorandum authored by Councilmembers Ortiz, Cohen, Mulcahy, and Casey was submitted to the Rules and Open Government Committee on January 15, 2026. The memorandum focused on many of the important areas of work contemplated in the Development Fee Framework.

Staff is currently assessing how it can continue to move forward this work and what, if any, additional resources might be necessary. The first steps would involve continuation of work on development of the City Council Policy.

Other None
P-11 Allow “SB 9” Type
Housing on Additional
Properties
Jun 2024: Council approval of zoning code
amendment and design standards
6/30/2024 6th Cycle Completed
In January 2026, City Council approved an update to Title 20 of the Municipal Code. This included the addition of Chapter 20.30 Part 9 to allow two pri mary dwellings by-ri ght on a single l ot within the R-2 Zoning District, and to allow lot splits of R-2 properties through a minis
terial small-lot subdivision
process. The changes went
into effect in early March 2026.

Other 1
Ordinance:
https://sanjose.legistar.com/View.ashx?M=F
&ID=15037949&GUID=AA394D62-1526-
4B5A-9AA
C-6E3822D313ED
P-12 Cost of Residential
Development Study
Update
Council presentation made
1/31/2031 6th Cycle Continuous
The fifth Cost of Residential Development Study for San Jose was completed in 2025. Key findings include an average development cost of $676,000 per affordable housing unit. The cost per square f oot in San Jos e is comparabl
e to the Bay Area as a whole, and most higher-density project types are not financi
ally feasibl
e in today’
s market. The study
and its findings
were presented to community members, stakeholder groups, City Council, and Planning Commission in study sessions in December 2025 and January 2026.

Other
The Cost of Development study can be
found here:
https://sanjose.legistar.com/View.ashx?M=F
&ID=15007144&
GUID=BA1D08BC-AD4D-
4FE3-8740-F473655EA988
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 29 ends

P-12 Cost of Residential
Development Study
Update
Program or fee changes identified and
made per updated analysis
1/31/2031 6th Cycle Continuous
Based on the findings of the Cost of Development study regarding the effect of impact fees and to address the slowdown in residential construction, in January 2026 the City Council will consider an extension and expansion of the Multif
amily Housing Incentive Program (MHIP), which reduces taxes and fees for new multifamily construction, and expanded the Downtown Residential Incentive Program (previously the Downtown Residential High-Rise Incentive Program), which waives and reduces taxes and fees for residential projects in the Downtown Planned Growth Area.

Other 1
MHIP resolution and ordinance changes:
https://sanjose.legistar.com/LegislationDetail.
aspx?ID=7802090&GUID=AA80E1E8-2027-
49FB-B866-
9BADBD03EB3E. DRIP
resolutions and ordinance changes:
https://sanjose.legistar.com/LegislationDetail.
aspx?ID=7802088&GUID=CFEF9802-C3E1-
495D-871E-56B81648D258.

P-13 Replacement of
Existing Affordable
Housing Units
2024: Council approval of Policy for
inventory required by state law
12/31/2024 6th Cycle In Progress
Following the 2024 Housing Department collaboration with a consultant to develop draft procedures for replacement housing units pursuant to Senate Bill 330, continued analysis has been performed. During this process, the City Attorney
’s Office also consulted with the California Department of Housing and Community Development (HCD) to clarify statutory requirements regarding the tenure of replacement units. Additional time was needed to ensure the procedures fully align with state guidance and legal interpretation.

Also, the lead staff person for this item was on long-term leave for much of the year, and staff capacity was limited, making it difficult to reassign this project.

Final procedures are anticipated to be completed and posted for use by the development community in 2026.

Other None
P-13 Replacement of
Existing Affordable
Housing Units
Website amended
12/31/2028 6th Cycle In Progres s
The Housing Department updated its website to include an explanation of the Ellis Act to improve public understanding of applicable housing laws, particularly regarding the replacement of affordable housing units. Additionally, policy staff were unavailable during this time due to approved leave, which impacted overall staffing resources. The Department also initiated plans to hire a third public information staff member at the end of 2025 to strengthen outreach and communications capacity. Anticipated hire date Q1 2026.

Other None
P-13 Replacement of
Existing Affordable
Housing Units
2027: Proposal created if SB 330 12/31/28
sunset has not yet been removed 12/31/2027 6th Cycle In Progress Staff will continue to monitor this, as the sunset for SB 330 has been extended to January 2030. Other None
P-13 Replacement of
Existing Affordable
Housing Units
2028: Council consideration of permanent
City program proposal 12/31/2028 6th Cycle In Progress
Will move metric in accordance with the state extension of SB 330 to January 2030. This metric will be moved to 2030 to consider a permanent City program proposal.

Other None
P-13 Replacement of
Existing Affordable
Housing Units
Developer guidance created/ improved
12/31/2028 6th Cycle Not yet s tarted
Upon completion of legal analysis, guidance for developers will be drafted.

Staff will collect feedback from developers to finalize the guidance and then publish it.

Other None
P-14 Housing in Business
Corridors
Nov 2024: Council approval of zoning
code amendment
11/30/2024 6th Cycle Completed City C ouncil approved the Zoning Code amendment in 2024. Other 1 None P-15 Moderate-income
Housing Strategy
Council approval of strategy
6th Cycle Completed
On May 19, 2025, City Council's Community and Economic Development Committee approved the City's Moderate-Income Housing Strategy. The five recommendations approved were to: 1) Update the Inclusionary Housing Ordinance G
uidelines to Maximize Housing Outcomes; 2) Foster ADU
Ownership; 3) Consider a Moderate-Income Housing Density Bonus in Small Multifamily Housing Developments; 4) Support Construction Defect Liability Reform for Condominiums; and 5) Facilitate Missing Middle Housing for the Workforce.

Other 1
Moderate-income Housing Strategy memo:
https://sanJosé.legistar.com/LegislationDetail
.aspx?ID=7357012&GUID=9BB00548-CABC-
47ED-981A-8AE9D37BE23E
P-15 Moderate-income
Housing Strategy
Mar 2024: Initiate identification and
inclusion of additional moderate-income
sites.
3/31/2024 6th Cycle Completed Staff initiated identification of additional sites in the spring and summer of 2025. Other 1 None
P-15 Moderate-income
Housing Strategy
Mar 2025: Report on additional moderate-
income sites in the 2025 Housing Element
APR.
3/31/2025 6th Cycle Completed
Staff conducted analysis in the spring and summer of 2025 to identify additional moderate-income sites, but were unable to find suitable candidates.

Staff will continue to look for opportunities for additional moderate-income housing sit
es as part of the Four-Year Review of the General Plan in 2026.

Other None
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 30 ends

P-16 Ground Leases for
Affordable Housing
# existing deal land purchases
1/31/2031 6th Cycle Continuous
100%
of developments closed in 2025 have City or County ground leases.

Arcade and 525 N Capitol have City ground leases. 5885 Santa Teresa has a County ground lease. Totaling 395 affordable homes.

Other
The Fiel
den ground breaking:
https://news.santaclaracounty.gov/county-
and-partners-break-ground-affordable-
housing-pr
oject-east-san-José
Arcade ground breaking:
https://www.facebook.com/county.of.santa.cl
ara/posts/1254588323369513/#:~:text=The
%20County%20and%20partners%20celebra
ted,%F3%B3%84%AB
5885 Santa Teresa ground breaking:

Upcoming and scheduled for Feb 11, 2026.

P-16 Ground Leases for
Affordable Housing
# and % affordable developments that
closed construction with public ground
leases each year
1/31/2031 6th Cycle Continuous
100% of developments closed in 2025 have City or County ground leases.

Arcade and 525 N Capitol have City ground leases. 5885 Santa Teresa has a County ground lease. Totaling 395 affordable homes in CY 2025, and 1,081 unit
s across this cycle.

Units 1081
The Fielden ground breaking:
https://news.santaclaracounty.gov/county-
and-partners-break-ground-affordable-
housing-pr
oject-east-san-José
Arcade ground breaking:
https://www.facebook.com/county.of.santa.cl
ara/posts/1254588323369513/#:~:text=The
%20County%20and%20partners%20celebra
ted,%F3%B3%84%AB
5885 Santa Teresa ground breaking:

Upcoming and scheduled for Feb 11, 2026.

P-16 Ground Leases for
Affordable Housing
% of all funded restricted affordable
properties with city or other public ground
leases
1/31/2031 6th Cycle Continuous
100% of developments closed in 2025 have City or county ground leases.

Arcade and 525 N Capitol have City ground leases. 5885 Santa Teresa has a County ground lease.

Other 100 None
P-16 Ground Leases for
Affordable Housing
# affordable units permanently preserved
1/31/2031 6th Cycle Continuous
The City's limited funding has been focused on expanding new affordable units rather than purchasing land where opportunities exist to extend affordability for long-term scenarios.

Units None
P-17 Affordable Housing
Siting Policy
Combined with N-5 6th Cycle None
P-18 Loans for Affordable
Housing
NOFAs issued
1/31/2031 6th Cycle Continuous
In 2025, the Housing Department awarded $48.3M in commitments for two new construction affordable housing developments and closed on $68M in financing on three new construction affordable housing developments, two with City ground leases and one with a County ground lease. These properties will produce 806 new affordable homes. The Department plans on releasing a new second NOFA addendum to the rolling RFP in Q2 2026 and all waitlisted applications will be refreshed and updated as the department continues to manage the active new construction funding pipeline.

Other 4
Gateway memo (218 affordable units):
https://sanJosé.legistar.com/gateway.aspx?
m=l&id=/matter.aspx?key=15361
Berry
essa TOD memo (193):
https://sanJosé.legistar.com/gateway.aspx?
m=l&id=/matter.aspx?key=14565
The Fielden ground breaking (160):
https://news.santaclaracounty.gov/county-
and-partners-break-ground-affordable-
housing-project-east-san-José
Arcade ground breaking (189):
https://www.facebook.com/county.of.santa.cl
ara/posts/the-county-and-partners-
celebrated-the-groundbreaking-friday-for-
arcade-a-new-
af/1254588323369513/#:~:text=The%20Cou
nty%20and%20partners%20celebrated,Nov
%2014%2C%202025%F3%B0%9E%8B%F
3%B1%9F%A0
5885 Santa Teresa permit ready letter (48):
https://sanJoséca.sharepoint.com/:b:/r/sites/
Housing_ResidentialDevelopment_Productio
nandPreservation/Projects/PROJECTS/Sant
a%20Teresa%20(Charities)/Construction/61
25%20Snell%20Ave%20-
%20Permit%20Ready%20Letter.pdf?csf=1&
web=1&e=udM2P8
P-18 Loans for Affordable
Housing
Funds committed
1/31/2031 6th Cycle Continuous
During Calendar Year 2025, the City Council approved the funding for two affordable housing developments, Berryessa TOD ($9,898,877) and Gateway Tower ($38,440,000)
Other 72200000 None
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 31 ends

P-18 Loans for Affordable
Housing
# Affordable homes created
1/31/2031 6th Cycle Continuous
During Calendar Year 2025, the City Council approved the funding for two affordable housing developments, Berryessa TOD (195 units) and Gateway Tower (220 units)
Units 718 None
P-18 Loans for Affordable
Housing
# Affordable homes preserved
1/31/2031 6th Cycle Continuous
The D
epartment has awarded, through its NOFA process, and the project is pending Council approval for the rehabilitation of the Comfort Suites Inn, which will convert the hotel into 58 units of permanent affordable housing.

Units 58 None
P-19 Expanded City
Density Bonus program
Study completed
12/31/2027 6th Cycle Not yet s tarted
Significant work on this item has not yet commenced. Staff is currently working on the evaluation and implementation of SB 79 and its impacts, which w
ill, to some extent, determine the parameters of an expansion of the City’s Density Bonus program.

Other None
P-19 Expanded City
Density Bonus program
Council approval of Ordinance changes 12/31/2027 6th Cycle Not yet s tarted Significant work on this item has not yet commenced. Other None P-19 Expanded City
Density Bonus program
# of affordable units created through City
Density Bonus
12/31/2027 6th Cycle Not yet started Signifi cant work on this item has not yet commenced. Units None P-19 Expanded City
Density Bonus program
Number of units by AMI category 12/31/2027 6th Cycle Not yet s tarted Significant work on this item has not yet commenced. Units None P-20 Mixed-income
Housing
# of housing developments with market-
rate or moderate-income units and ELI,
VLI and/or LI units
1/31/2031 6th Cycle Continuous
To foster mixed-income housing that is 100% deed-restricted affordable across a range of income levels, the City is actively promoting the use of the California Housing Finance Agency’s Mixed-Income Program (MIP) for new construc
tion projects. Gateway Tower exemplifies this strategy: in April 2025, CalHFA awarded the project MIP funding, followed by a successful CDLAC application under the MIP set-aside. The City of San José further advanced this effort by committing $5 million in predevelopment funding and $38,440,000 in construction-permanent (CP) loan financing. Together, these investments supported the project’s award of approximately $10.8 million in state equity and City approval of a 100% affordable downtown high-rise development delivering 220 deed-restricted units, including 100 workforce units and 120 units serving extremely low-income households. Additionally, during the calendar year, CMFA awarded grant funding to three developments creating affordable housing units: LINQ Apartments, located at 1700 Newbury Park Drive (Ethos Real Estate and Pacific Housing), with 230 affordable units (AR recorded August 26, 2025); Fountain Park, located at 1026 S. De Anza Boulevard, with 66 affordable units (AR recorded August 29, 2025); and Park Kiely, located at 355 Kiely Boulevard, with 474 affordable units (AR recorded August 21, 2025).

Other 1
Link to Actions Related to the Reallocation of
Acquisition Funding to the Construction-
Permanent Loan for the Gateway Tower
Affordabl
e Housing Development:
https://sanJosé.legistar.com/LegislationDetail
.aspx?ID=7769260&GUID=A6707EA8-33CA-
4C5F-96E9-
B158697201E0&Options=&Search
Link to Approval of a Multifamily Housing
Incentive Program Residential Tax and Fee
Waiver for 905 North Capitol Avenue:
https://sanJosé.legistar.com/View.ashx?M=F
&ID=13916572&GUID=C5F24BA8-FEB5-
406C-B1C9-28EFECC2A803
Link to Approval of a Multifamily Housing
Incentive Program Residential Tax and Fee
Waiver for the 0 Seely Building A
Development Located at 0 Seely Avenue:
https://sanJosé.legistar.com/View.ashx?M=F
&ID=14272794&GUID=E448BD5A-B063-
4774-9323-FA0CB8B2B07B
Actions Related to the Reallocation of
Acquisition Funding to the
Construction-Permanent Loan for the
Gateway Tower Affordable
Housing Development:
https://sanJosé.legistar.com/LegislationDetail
.aspx?ID=7769260&GUID=A6707EA8-33CA-
4C5F-96E9-
B158697201E0&Options=&Search=
P-21 Special Needs
Housing NOFA
NOFAs issued
1/31/2031 6th Cycle Continuous
In April 2025, staff released a New Construction and Preservation Request for Proposals. This RFP includes a points structure that incentivizes the creation of homes for lower-income residents with special needs, including disabilities, increased ac
cess for disabled people, and participation in design meetings with the disabled community.

Other 2 None
P-21 Special Needs
Housing NOFA
Council commitments
1/31/2031 6th Cycle Continuous
The C
ity Council approved $9.9M for the development of Berryessa TOD, which will provide 49 units of housing for individuals experiencing homelessness, and $38.2M for the development of Gateway Tower, which will offer 55 unit
s of housing for individuals experiencing homelessness.

Other 2 None
P-21 Special Needs
Housing NOFA
Goal of 15% of permanent units funded
during 6th cycle occupied by special needs
populations
1/31/2031 6th Cycle Continuous 25% of developments awarded during calendar year 2025 serve special needs populations. Other 25 None
P-22 Transit-oriented
Affordable Housing near
Diridon Station
NOFAs prioritizing area
1/31/2031 6th Cycle Continuous
In April 2025, staff released a New Construction and Preservation Request for Proposals. This RFP includes a points structure that incentivizes the creation of affordable housing within 0.5 miles of the Diridon Station.

Other 1 None
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 32 ends

P-23 Pursue AHSC
Funding near Diridon
Station
By Dec 2031: At least 2 AHSC
applications submitted for affordable
housing near Diridon
12/31/2031 6th Cycle Not yet started
There were no AHSC or NOFA applications in 2025 for improvements in this area. However, the Housing Department will continue to support any developments near the Diridon station that desire to apply for AHSC. The 2025 New Cons
truction and Preservation Request for Proposals incentivizes developments that secure additional funding sources, such as HCD's AHSC, by prioritizing the review and award process for AHSC-awarded projects.

Other None
P-23 Pursue AHSC
Funding near Diridon
Station
5 total funding applications awarded for
various initiatives, including affordable
housing
12/31/2031 6th Cycle Not yet started
Unfortunately, the Google downtown west project, which would have brought significant investment and housing development to the area, has been put on an indefinite hold for the foreseeable future. Development in this area is less than anticipated.

Other None
P-23 Pursue AHSC
Funding near Diridon
Station
$20 million leveraged for planning
initiatives and affordable homes near
Diridon
12/31/2031 6th Cycle Not yet started
Unfortunately, the Google downtown west project, which would have brought significant investment and housing development to the area, has been put on an indefinite hold for the foreseeable future. Development in this area is less than anticipated.

Other None
P-24 Housing on
Public/Quasi Public
Lands
Dec 2024: Council approval of General
Plan amendments 12/31/2024 6th Cycle Completed This i tem was completed in 2024. Other 1 None P-25 Updated Inclusionary
Housing Program Fees
By Jan 2028: Fees study produced
1/31/2028 6th Cycle Continuous
At this time, limited progress has been made on the Inclusionary Housing Ordinance (IHO) feasibility fee study, as both the IHO and its accompanying guidelines are currently undergoing updates. The City anticipates being able to report more comprehensive findings once the revised ordinance and guidelines are adopted by the City Council, anticipated on January 27, 2026.

The forthcoming study will be critical to ensuring that the IHO program remains financially feasible and does not create unintended barriers to housing construction. In the interim, the City has pursued alternative approaches to support project feasibility, including the development of the Multifamily Housing Incentive Program (MHIP), which reduces construction- related taxes and sets the IHO in-lieu fee at $0 for projects that provide at least 5% of units affordable to households earning no more than 100% of Area Median Income (AMI)
Other
The Cose of Residential Development in San
José:
https://sanJosé.legistar.com/MeetingDetail.a
spx?ID
=1315729&GUID=3C17B03F-B014-
43D5-B8DF-44024CDE065B&Search=
Multifamily Housing Incentive Program and
North San José Parks Fee Realignment.:
https://sanJosé.legistar.com/View.ashx?M=F
&ID=13583575&GUID=F101D3D4-D65C-
407D-9B6C-234BDE8EB26A
P-26 Accessory Dwelling
Unit (ADU) Amnesty
Program
Jul 2024: Program release
7/31/2024 6th Cycle In Progr ess
As of July 2025, all initial inspections for the ADU Amnesty Program had been completed. Staff worked to complete the inspection reports and issue them to the property owner/applicants. Of the approximately 150 original participants in the program, 114 remain, 19 opted out, and the remainder ended participation for other reasons (never responded, sold the property, etc.). By December 2025, nearly all reports had been issued to the property owner/applicants. The next step in the process is for the property owner/applicants to hire a licensed professional to draft plans and submit a permit application to legalize the ADU.

Legalization can include reverting the structure to its originally permitted use, demolishing it, or legalizing it as a permitted ADU. If electing to legalize the unit as a permitted ADU, the unit will be held to the code in effect at the time the structure was built, except for life/safety requirements. Staff has retained the third-party inspector to conduct the permit inspections, providing consistency and continued support to the applicants.

Units 1 None
P-26 Accessory Dwelling
Unit (ADU) Amnesty
Program
Dec 2031: Approximately 150 ADUs in
compliance by 2031
12/31/2031 6th Cycle In Progress
As of July 2025, all initial inspections for the ADU Amnesty Program had been completed. Staff worked to complete the inspection reports and issue them to the property owner/applicants. Of the approximately 150 original participants in the program, 114 remain, 19 opted out, and the remainder ended participation for other reasons (never responded, sold the property, etc.). By December 2025, nearly all reports had been issued to the property owner/applicants. The next step in the process is for the property owner/applicants to hire a licensed professional to draft plans and submit a permit application to legalize the ADU.

Legalization can include reverting the structure to its originally permitted use, demolishing it, or legalizing it as a permitted ADU. If electing to legalize the unit as a permitted ADU, the unit will be held to the code in effect at the time the structure was built, except for life/safety requirements. Staff has retained the third-party inspector to conduct the permit inspections, providing consistency and continued support to the applicants.

Units 114 None
P-27 Accessory Dwelling
Unit (ADU) Affordability
Dec 2026: Feasibility analysis completed
12/31/2026 6th Cycle In Progr ess
In 2025, the City lacked sufficient funding and staff capacity to study an ADU subsidy program. However, the Planning staff implemented the City Council- approved ordinance 31095 from 2024, which allows a limited number of ADUs to be sold s
eparately from the main housing units. This new law should promote lower-cost, for-sale small homes. In 2026, staff plans to begin an evaluation of the San Diego ADU bonus program's applicability to San José, which was approved by the Council through the Moderate-income Housing Strategy (P-15).

Other
Council committee memo for the Moderate-
Income Housing Strategy:
https://sanjoseca.govnita.com/workspaces/O
rdinances
?query=31095
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 33 ends

P-28 Predevelopment
Loans
5 predevelopment loans made
1/31/2031 6th Cycle Not yet s tarted
No predevelopment loans for developers of City-owned sites were made in 2025. The City will continue to support City-owned site development for predevelopment loans in the upcoming year.

Other None
P-28 Predevelopment
Loans
1,500 affordable units assisted
1/31/2031 6th Cycle Not yet s tarted
No predevelopment loans for developers of City-owned sites were made in 2025. The City will continue to support City-owned site development for predevelopment loans in the upcoming year.

Units None
P-29 Fair Housing Equity
Analysis for Specific
Plans
Combined with S-9
6th Cycle None
P-30 Updated Feasibility
Study for Commercial
Linkage Fee
Dec 2024: Feasibility study update
12/31/2024 6th Cycle Continuous
As
part of the City’s ongoing implementation of the Commercial Linkage Fee (CLF), staff provided an update to the Affordable Housing Impact Fee and Commercial Linkage Fee report to support the collection of funding for affordable hous
ing. The report was posted to the City’s website on December 1, 2025, for public comment and then brought to City Council on December 16, 2025, where it was approved in compliance with the California Mitigation Fee Act. The report discusses current market conditions and key considerations related to the CLF and helps guide how the fee is applied.

Following Council approval, the CLF will continue to be implemented and included in development agreements, as appropriate.

Other 1
Affordable Housing Impact Fee and
Commercial Linkage Fee
Fiscal Year 2024-2025 Annual Report
Posted 12/1/
2025:
https://www.sanjoseca.gov/home/showpublis
heddocument/126919/639001785842670000
P-30 Updated Feasibility
Study for Commercial
Linkage Fee
Jun 2026: Council approval of updated
fees 6/30/2026 6th Cycle Continuous To help address rising development costs, CLF fee rates were maintained at Fiscal Year 2024–2025 levels. Other
Adopted Schedul
e of Fees:
https://www.sanjoseca.gov/home/showpublis
heddocument/123189/638869640690970000
P-30 Updated Feasibility
Study for Commercial
Linkage Fee
$20M CLF revenues collected
1/31/2031 6th Cycle Continuous
The C
ommercial Linkage Fee (CLF) account balance was $5,885,613.96 as of July 1, 2024, and increased to $6,112,740.16 by June 30, 2025. During Fiscal Year 2024–2025, the Department received $227,126.20 in CLF revenue.

Other 6
A
ffordable Housing Impact Fee and
Commercial Linkage Fee
Fiscal Year 2024-2025 Annual Report
Posted 12/1/
2025:
https://www.sanjoseca.gov/home/showpublis
heddocument/126919/639001785842670000
P-30 Updated Feasibility
Study for Commercial
Linkage Fee
By Jan 2031: 60 affordable units
subsidized with CLF revenues
1/31/2031 6th Cycle Continuous
No Commercial Linkage Fee (CLF) funds were disbursed for new affordable housing development, and no projects received CLF funding for acquisition, financing, construction, or development.

Units
Silicon Valley real estate development lowest
since 2013:
https://sanJoséspotlight.com/silicon-valley-
real-est
ate-development-lowest-since-2013/
P-31 Land Acquisition for
Affordable Housing in
Target Locations
2 parcels acquired in target areas
1/31/2031 6th Cycle Not yet s tarted
No new requests to acquire land for affordable housing development in areas close to transit and higher-opportunity neighborhoods were made in 2025. The City will continue to support City land acquisitions in these areas to the extent funding and sites are available.

Units None
P-31 Land Acquisition for
Affordable Housing in
Target Locations
200 affordable units developed on
acquired parcels
1/31/2031 6th Cycle Continuous
The Housing Department closed two land acquisitions in CY 2025 for the 525 N Capitol (The Fielden) and 1371 Kooser (Arcade) developments. Both developments started construction in CY 2025 and will produce 347 new affordable hom
es.

Units 347
The Fielden ground breaking (160):
https://news.santaclaracounty.gov/county-
and-partners-break-ground-affordable-
housing-proj
ect-east-san-José
Arcade ground breaking (189):
https://www.facebook.com/county.of.santa.cl
ara/posts/the-county-and-partners-
celebrated-the-groundbreaking-friday-for-
arcade-a-new-
af/1254588323369513/#:~:text=The%20Cou
nty%20and%20partners%20celebrated,Nov
%2014%2C%202025%F3%B0%9E%8B%F
3%B1%9F%A0
P-32 Higher Subsidies per
Unit
Ongoing adjustments to NOFA/program
guidelines as needed 1/31/2031 6th Cycle Continuous
Current New Construction/Preservation Requests for Proposals allow for funding commitments of up to $325,000 per unit for the construction of new housing.

Other None
P-33 Complete and
implement new “Yes in
God’s Backyard” (YIGBY)
ordinance
Combined with P-24
6th Cycle
5885 Santa Teresa permit ready letter (48):
https://sanjoseca.sharepoint.com/:b:/r/sites/
Housing_ResidentialDevelopment_Productio
nandPreserv
ation/Projects/PROJECTS/Sant
a%20Teresa%20(Charities)/Construction/61
25%20Snell%20Ave%20-
%20Permit%20Ready%20Letter.pdf?csf=1&
web=1&e=udM2P8
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 34 ends

P-34 Affordable Housing
Funding Advocacy
Support letters issued
1/31/2031 6th Cycle Continuous
Thi
s year, Housing staff continued to work closely with the City's Intergovernmental Relations (IGR) team to advance the City’s homelessness and housing priorities with the Governor’s Office and in the State Legislature.

This inc
luded supporting the passage of SB 158 to expedite HHAP Round 7 funding, as well as ongoing engagement to fully restore cuts made to the HHAP program during last year’s appropriations process. IGR continues to work closely with the Mayor’s Office and the Big City Mayors coalition to advocate for a sustained state commitment to address the crisis of unsheltered homelessness, including advocating for the inclusion of flexible funding in the State Affordable Housing Bond Act of 2026. IGR and the Housing Department’s policy team continue to work collaboratively to advance the City’s housing and homelessness legislative priorities, including advocating for legislation to support housing production and the City’s homelessness response efforts during ongoing state budget negotiations.

Other 11 None
P-34 Affordable Housing
Funding Advocacy
Participation in working groups
1/31/2031 6th Cycle Continuous
In 2025, Housing staff worked with other cities on advocacy for the state Permanent Local Housing Allocation to preserve jurisdictions' ability to fully determine which of PLHA's eligible uses is most needed. San José currently uses all of its PLHA to pay for interim housing operations.

Other None
P-35 Small Multifamily
Housing
Dec 2025: Feasibility analysis done
12/31/2025 6th Cycle In Progres s
As part of the General Plan Four-Year Review process that began in October 2025, staff is evaluating approaches to expanding areas where small multifamily housing (4 to 10 units) may be permit ted by right . Staff will present prelim
inary proposals
to the Four-Year Review Task
Force and the communi
ty in March and April 2026. Based on f
eedback
received, the proposal
will be refined and presented t
o the Planning
Commission and City Council for approval i
n late summer 2026. That wi
ll be
followed by an environmental review. Implementation of zoning changes is anticipated for late 2027.

Other
Link to the General Plan Four-Year Review
webpage: https://www.sanjoseca.gov/your-
government/departments-offices/planning-
building-c
ode-enforcement/planning-
division/citywide-planning/envision-san-jos-
2040-general-plan/gp-4-year-review
P-35 Small Multifamily
Housing
Jul 2026: Possible incentives identified 7/31/2026 6th Cycle In Progres s Staff will consider this in the context of the larger work described further above.

Other None
P-35 Small Multifamily
Housing
Oct 2026: Design standards created
10/31/2026 6th Cycle In Progres s
Design standards are being considered broadly as part of the initial work on Small Multifamily Housing and will be developed later once an approach has been refined.

Other None
P-35 Small Multifamily
Housing
Council approval of land use changes,
design standards
6th Cycle Not yet started Approval will occur after the standards are developed. Other None P-35 Small Multifamily
Housing
Jun 2027: Publish financing Information 6/30/2027 6th Cycle Not yet s tarted This information will come later, after the approach is developed and standards are adopted.

Other None
P-35 Small Multifamily
Housing
At least 350 units permitted annually in the
third year post- adoption
6th Cycle Not yet started Staff cannot measure this until the program is adopted. Units None P-35 Small Multifamily
Housing
At least 20,000 units of net new capacity
added citywide
6th Cycle In Progress Capacity will be measured once the approach is finalized. Units None P
-36 Alum Rock East
Urban Village Plan
Outreach conducted Plan drafted
8/31/2025 6th Cycle In Progres s
City staff have started work on Phase 2 of 3 of the Urban Village Planning process, with an anticipated project completion date of June 2026. The first round of community meetings (in-person and virtual) was held in September and October 2025;
the second round will be held in January and February
2026.

Other 1
Link to Alum Rock Urban Village Plan
webpage: https://www.sanjoseca.gov/your-
government/departments-offices/planning-
building-c
ode-enforcement/planning-
division/citywide-planning/urban-
villages/eastside-alum-rock-urban-village-
plan-update
P-36 Alum Rock East
Urban Village Plan
Aug 2025: Council approval of Plan 8/31/2025 6th Cycle In Progres s The anticipated project completion date is June 2026. Other See above.

P-37 CEQA Analysis for
Urban Villages
Dec 2027: City Council approval of CEQA
study
12/31/2027 6th Cycle Not yet started Significant work on this item has not yet commenced, as it is a medium-term goal. Other None
P-38 Adequate Sites for
Lower-Income
Households on Non-
vacant & Vacan
t Sites
Identified in Previous
Housing Element Cycles
By Jan 31, 2024: City Council approval of
zoning changes
1/31/2024 6th Cycle Completed Completed i n 2024 Other 1 None P-39 Replacement Unit
Program for Selected
Sites
Combined with P-13
6th Cycle None
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 35 ends

P-40 Evaluate Urban
Village Planning Process
by 2025: Present findings to CED
Committee and City Council
12/31/2025 6th Cycle In Progress
The Urban Village planning process has been evaluated as part of the General Plan Four-Year Review process, which began in the fall of 2025. In November 2025, staff presented proposals to streamline
urban village
planning to t
he General
Plan Four-
Year Review Task
Force. The proposals
include consolidating multiple urban villages along transit corridors into a singl
e plan; impl
ementing targeted land use and zoning changes for
s
mall urban vil
lages (Neighborhood Urban Villages); and sim
plifying urban
vi
llage plan documents. The changes are aim
ed at reducing the number of

outstanding urban village plans from 42 to 15 and reduci ng the time spent on
plan preparation. The Tas
k Force expressed support for the changes, which
will be refined and present
ed to the community, along with General Plan text

amendments, at outr
each events in March and April. Staf
f expect
s to present
the proposed General Plan amendments to the Planni
ng Commission and
City Counci
l in lat
e summer 2026.

Other
Link to the General Plan Four-Year Review
webpage: https://www.sanjoseca.gov/your-
government/departments-offices/planning-
building-
code-enforcement/planning-
division/citywide-planning/envision-san-jos-
2040-general-plan/gp-4-year-review
P-40 Evaluate Urban
Village Planning Process
by 2031: A minimum of two grants secured
for unplanned Urban Villages 1/31/2031 6th Cycle In Progress One grant was secured for the Alum Rock East Urban Village planning process, which is currently underway. Other See link above P-41 Review and Revise
Planning Permit
Conditions
Dec 2025: Council approval of ordinance
12/31/2025 6th Cycle In Progr ess
In 2025, staff prepared the draft ordinance changes to permit findings.

However, due to staffing changes and the prioritization of implementing stage legislative changes and the General Plan Four-Year Review, this strategy was not compl
eted in 2025 as anticipated. This strategy has been assigned to a new team, which will continue the work in 2026, with Council approval of the ordinance expected in the summer or fall of 2026.

Other See link above
P-42 Group Homes for
Seven or More Persons
Dec 2024: Council approval of ordinance
12/31/2024 6th Cycle Complet ed
As part of the update to the Zoning Ordinance that was approved by City Council on January 13, 2026, the Cit y changed it s code to mak e it consistent with state and federal laws regardi ng fair housing. These changes removed additional requir
ements for group homes
serving seven or more individuals in
all
residential zoning districts, including single-family zoning. These actions complete the work on item P-42.

Other 1
Link to Zoning Ordinance update:
https://sanjose.legistar.com/View.ashx?M=F
&ID=15037949&GUID=AA394D62-1526-
4B5A-9A
AC-6E3822D313ED
P-43 Update City Density
Bonus
Dec 2024: Council approval of ordinance
amendments 12/31/2024 6th Cycle Completed
As part of the update to the Zoning Ordinance approved by the City Council on January 13, 2026, the City revised its code to align its ordinance with the current State Density Bonus Law. These actions complete the work on item P-

43. Other 1
Link to Zoning Ordinance update:
https://sanjose.legistar.com/View.ashx?M=F
&ID=15037949&GUID=AA394D62-1526-
4B5A-9AAC-6E3822D313ED
P-44 Urban Villages
Improvements
Completion of evaluation
12/31/2027 6th Cycle Complet ed
As noted in the status update for Strategy P-40, the Urban Village planning process was evaluated as part of the General Plan Four-Year Review, which began in Fall 2025. In November 2025, staff presented the Four-Year Review Task F
orce with proposed changes aimed at reducing the number of

outstanding urban village plans from 42 to 15 and reduci ng the time spent on
plan preparation. Staf
f is currently refining the proposals and will present them to the community in March and April 2025, with presentation to the Planning Commission and City
Counci
l expect
ed in late summer 2026.

Other 1
Link to the General Plan Four-Year Review
webpage: https://www.sanjoseca.gov/your-
government/departments-offices/planning-
building-
code-enforcement/planning-
division/citywide-planning/envision-san-jos-
2040-general-plan/gp-4-year-review
P-45 Pipeline Projects
Evaluation
Present findings during Housing Element
APR every two years
1/31/2031 6th Cycle In Progress
In the 6th cycle Housing Element inventory, the City had approximately 30,000 units in the pipeline, but counted only 20,488 units (67%) towards the RHNA residential capacity. The City assumed that approximately 10,000 units in the pipeline r
esidential capacity would not commence the post-entitlement permit stage.

By the end of 2025, 1,865 units in the pipeline had expired without commencing the post-entitlement permit stage, and 12,175 units had begun the post-entitlement permit stage. Therefore, the City has approximately 8,100 units remaining in its buffer for pipeline projects.

Other None
P-46 Rezoning Program
for Shortfall, Low-income
Sites
Council approval of rezoning ordinance
changes 12/31/2024 6th Cycle Completed This i tem was completed in 2024. Other 1 None P-47 Accessory Dwelling
Unit (ADU) Monitoring and
Ordinance Compliance
Monitor ADUs and their affordability levels
6/30/2024 6th Cycle Continuous
Staff continues to collect ADU survey responses for affordability levels from building permit applicants. As of January 2026, 90 survey responses have been received. ADU production was projected to be 361 ADUs per year during the 6th Cycle. Residential building permits were issued for 558 ADUs in 2024 and 502 ADUs in 2025, above the projected annual amount.

Other 1 None
P-47 Accessory Dwelling
Unit (ADU) Monitoring and
Ordinance Compliance
Jun 2024: Council consideration of
amended ADU Ordinance 6/30/2024 6th Cycle Completed The City's ADU ordinance was updated in January 2026 and is aligned with current state law. Other 1 https://sanjoseca.govnita.com/api/workspace /Ordinances/files/2124256338433/view
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 36 ends

P-48 Surplus Land Act
(SLA) Implementation
SLA Activities Completed for 5 City-owned
parcels in sites inventory
12/31/2023 6th Cycle Continuous
- Vermont House Sale (1072 & 1082 Vermont St., San Jose 95110, APNs:
230-42-078, 230-42-077 - declaration of exempt surplus land for sale of the property to Santa Clara County for use as Veteran Housing. - Sili
con Valley Mechanical parcel sale, APN# 244-22-001, declaration of exempt surplus land pending, for sale to the adjacent property owner.

Other 1
Vermont House: Vesting Deed available via
County Records.

Silicon Valley Mechanical: Vesting Deed will
be available v
ia County Records once
transaction closes.

P-48 Surplus Land Act
(SLA) Implementation
# Public Hearings and Notices of
Availability issued for future City- owned
sites to be designated surplus
1/31/2031 6th Cycle In Progress Two notices as listed in P-48, 1 for Vermont House and Silicon Valley Mechanical parcels Other None
R-1 Monitor At-risk
Affordable Units
2024, 2026, 2028, 2030: Creation of risk-
based reports 12/31/2030 6th Cycle Continuous
The Housing Department continues to work with property owners to identify opportunities to preserve affordability by extending new 55-year terms as properties approach affordability-restriction expirations, loan maturities, or resyndication events.

Other None
R-1 Monitor At-risk
Affordable Units
10 meetings held
1/31/2031 6th Cycle Continuous
Mai
ntaining regular communication with property owners and negotiating affordability-restriction extensions. In 2025, Housing initiated communication with the following properties regarding AR extensions expected in 2026 due to upcoming expi
rations: Baker Park (98), Bridgeport (28), Grove (40), Meadows (41), Paseo Senter II (101), and Vista Park II (82).

Meetings 8 None
R-1 Monitor At-risk
Affordable Units
By 2031: 600 existing at-risk units
preserved 1/31/2031 6th Cycle Continuous
The City has 22 projects totaling 925 units with City-initiated affordability restrictions that are scheduled to expire by December 31, 2031. Staff will work with property owners to preserve these affordability restrictions.

Units None
R-2 Establish a
Preservation NOFA
Jun 2024: Program guidelines completed
6/30/2024 6th Cycle Completed
In 2025, Housing Department staff completed a feasibility assessment of a $5.7M preservation loan for a property being rehabilitated by the Santa Clara County Housing Authority. The loan will help to preserve 58 low-cost units and turn them into restricted affordable homes.

Other 1 None
R-2 Establish a
Preservation NOFA
by Dec 2024: First NOFA issued at least
every other year (i.e., at least 4 NOFAs
during the Sixth Cycle compliance period)
1/31/2031 6th Cycle Continuous The Department released a joint New Construction/Preservation RFP in April 2025, which has been supported by a $50M commitment of available funds. Other 2 None R-2 Establish a
Preservation NOFA
$5M average available per year per NOFA
1/31/2031 6th Cycle Continuous
1510 N 1st street is recommended to be awarded from the results of the NOFA, this development will see the rehabilitation of 85 hotel units into permanent affordable housing. The department will continue to publish NOFA that also provide funding opportunity for preservation projects Other 5.35 None
R-2 Establish a
Preservation NOFA
By 2031: At least 110 units of newly-
restricted affordable housing acquired by
nonprofits and rehabilitated through City
and external funding
1/31/2031 6th Cycle Continuous
In 2024, funding was awarded to preserve 18 units at the Virginian apartments. The Department's 2025 RFP recommended awarding funding to an 85-unit development. The Department anticipates seeking approval from the City Council in 2026.

Units None
R-3 Diridon Preservation
Pilot
Jan 2025: Pilot creation
1/31/2025 6th Cycle Not yet s tarted
Given that the 2024 Bay Area housing bond did not proceed, the scarcity of funding for new development and preservation, and the delay in the Downtown West development proposal, work on this Preservation Pilot creation w
ill now move to the latter part of the planning period. However, in 2025, the Housing Department issued a Notice of Funding Availability that allowed preservation as an eligible use and included a geographic priority for affordable housing proposed in the Diridon area.

Other None
R-3 Diridon Preservation
Pilot
City Council approval of pilot 6th Cycle Not yet started See descri ption above for R-3. Other None R-3 Diridon Preservation
Pilot
By Dec 2025: NOFAs issued 12/31/2025 6th Cycle Not yet s tarted See description above for R-3. Other None R-3 Diridon Preservation
Pilot
By Aug 2026: Council approval of funding
commitments
8/31/2026 6th Cycle Not yet started See descri ption above for R-3. Other None R-3 Diridon Preservation
Pilot
55 homes preserved through acq/rehab in
defined area around Diridon Station Area 6th Cycle Continuous See description above for R-3. Units None R-4 Implement the
Community Opportunity
to Purchase Program
City Council rejected - NA
6th Cycle None
R-5 Acquisition Loan
Fund
Request for Proposals issued for partner
lender(s) if needed
12/31/2026 6th Cycle Not yet started
State funding for acquisition/rehabilitation preservation was minimal in 2025.

Because the 2024 regional affordable housing bond did not proceed, City and County funds for acquisition/rehabilitation are also minimal at this time. If or when funding becom
es available in state or regional preservation-oriented funding programs, and the availability of City funds for acquisition/rehabilitation becomes more predictable, the City would issue a Request for Proposals to complete this item.

Other None
R-5 Acquisition Loan
Fund
Loan product defined and rolled out 12/31/2026 6th Cycle Not yet s tarted See description above for R-5. Other None R-5 Acquisition Loan
Fund
# units acquired with Loan Fund(s) 12/31/2026 6th Cycle Not yet s tarted See description above for R-5. Units None ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 37 ends

R-6 Mobilehome Park
General Plan Designation
for Remaining 56
Mobi
lehome Parks
2024: Council approval of General Plan
Amendments and rezonings; 13
mobilehome parks with new land use
designati
on by Jan 2024; remainder by
June 2024
6/30/2024 6th Cycle Completed This i tem was completed in 2024. Other 1 None R-7 Extension of
Affordable Housing
Restrictions
By 2031: preserve affordability for at least
900 units in the middle of their affordability
terms (average of 112 units per year)
1/31/2031 6th Cycle Completed In 2025, the affordability restrictions for three properties comprising 251 units were extended to a 55-year term, with the new expiration date set for 2080. Units 979 Affordablity Restrictions were recorded on
title to reflect a 2080 exipration date;
Hillsdale Townhomes, Paseo Senter,
Fairways at San Antonio.

R-8 Work with the Bay
Area Housing Finance
Authority (BAHFA) on
Moder
ate-income
Financing Strategy
2027: If product is defined and feasible,
request Council approval for structure
12/31/2027 6th Cycle Continuous
In 2023, BAHFA rolled out its Welfare Tax Exemption loan product to support lower- and moderate-income housing. The product was used for a San José development in 2024. In 2025, staff met with BAHFA consultants to discuss other produc
ts and strategies to support workforce housing. Staff will continue to work with BAHFA to determine whether a regional JPA-issued bond structure is feasible and likely impactful.

Other None
R-8 Work with the Bay
Area Housing Finance
Authority (BAHFA) on
Moder
ate-income
Financing Strategy
By 2031: Complete at least 2 transactions
if feasible
1/31/2031 6th Cycle Not yet started See descr iption above for R-8. Other None R-8 Work with the Bay
Area Housing Finance
Authority (BAHFA) on
Moder
ate-income
Financing Strategy
# newly-affordable homes at each income
level
1/31/2031 6th Cycle Not yet started See descr iption above for R-8. Units None R-9 Creation of a
Preservation Policy
2024: Criteria for FIHPP established
12/31/2024 6th Cycle In Progr ess
In 2025, staff from the City and County did not pursue a definition for FIHPP properties, as that state program was not funded and was dormant. In 2025, staff posted a list of affordable housing developers with experience doing acquisi
tion/rehabilitation.

Other
Housing'
s Preservation web page:
https://www.sanjoseca.gov/your-
government/departments-
offic
es/housing/developers/affordable-
housing-plans-policies/housing-preservation
R-9 Creation of a
Preservation Policy
2024: List of affordable housing providers
published 12/31/2024 6th Cycle Completed See descr iption above for R-9. Other 1 None R-9 Creation of a
Preservation Policy
By 2026: Council approval of Policy
12/31/2026 6th Cycle Not yet started See description above for R-9. Other None R-10 Mobilehome Park
Local Inspections
Strategy removed 6th Cycle None
R-11 Owner-occupied
Home Preservation
1,600 low-income households assisted
1/31/2031 6th Cycle Continuous
The City's home repair programs are usually funded by federal Community Development Block Grant funds. However, these contracts had to be paused in the second half of 2025 due to uncertainties in federal funding for FY 2025–2026. All
of the city's federally funded projects were temporarily paused pending execution of HUD grant agreements and receipt of federal entitlement funds. Staff informed agencies that services could be initiated starting in July 2025 at their own risk, pending HUD’s disbursement of federal funds.

Agencies may have continued to deliver services to San José residents during this period and may be eligible for reimbursement for eligible costs, provided all federal funding requirements are met. Grant agreements were executed, and funds disbursed in January 2026, and contract negotiations are expected to begin by February 2026. As a result, 99 households were aided in 2025, representing a lower average than in prior years.

Households 366 None
R-12 Revised Citywide
Residential Ant
Displacement Strategy
2025: Best practices researched
12/31/2025 6th Cycle In Progr ess
In 2025, Housing and Planning staff participated in the Santa Clara County Planning Collaborative. One of the Collaborative's focus areas for 2025 was anti-displacement plans and programs. Through participation in the Collabor
ative, staff continued to learn best practices from other communities.

Housing staff also attended multi-city GARE (Government Alliance on Race and Equity) Land Use meetings to learn about anti-displacement efforts from other cities across the country. In concrete actions to help lower-income renters avoid displacement, in 2025, the City also worked actively to help place residents whose apartments burned into available interim housing units.

Other
Planning C
ollaborative website for anti-
displacement:
https://citiesassociation.org/anti-
displac
ement-tenant-and-landlord-support/
R-12 Revised Citywide
Residential Ant
Displacement Strategy
2025: Outreach conducted
12/31/2025 6th Cycle Not yet started See description above for R-12. Other None ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 38 ends

R-12 Revised Citywide
Residential Ant
Displacement Strategy
2026: Revised Strategy drafted
12/31/2026 6th Cycle Not yet s tarted See description above for R-12. Other None R-12 Revised Citywide
Residential Ant
Displacement Strategy
2026: Council approval of revised Strategy
12/31/2026 6th Cycle Not yet s tarted See description above for R-12. Other None R-13 Soft Story Program 2023: Outreach conducted 12/31/2023 6th Cycle Completed Other 1 None R-13 Soft Story Program 2024: Ordinance and program drafted 12/31/2024 6th Cycle Completed Other 1 None R-13 Soft Story Program 2024: Council approval of Ordinance and program 12/31/2024 6th Cycle Completed Other 1 None
R-
13 Soft Story Program
2024: Rebate program launched
12/31/2024 6th Cycle In Progress
In 2025, significant cuts to the Federal Emergency Management Agency and its Building Resilient Infrastructure and Communities (BRIC) program affected the City’s anticipated $25M in funding for the soft-story rebate program. The state Of
fice of Emergency Services (CalOES) is working to determine how and when funds will be received, given court injunctions related to BRIC.

Given this uncertainty, the City Council adopted an amendment to the City’s soft-story ordinance in March 2025 to extend compliance deadlines for required retrofit work. Following that action, staff proposed a smaller, voluntary pilot rebate and loan financing program to maintain compliance with the initial $4M FEMA grant, which will be taken to the Council in January 2026 Other None
R-13 Soft Story Program # buildings receiving retrofits 1/31/2031 6th Cycle Not yet started Pending approval from voluntary pilot program as described in R-13 (4). Other None R-13 Soft Story Program $4M funded for rebates by 2031 1/31/2031 6th Cycle In Progress Staff submitted a federal earmark for $2 million for soft story rebates, award announcement expected in early 2026.

Other None
H-1 Interim Homeless
Housing Construction
2025: Units completed
12/31/2025 6th Cycle Completed
During CY 2025, the City made significant progress toward expanding interim housing and shelter capacity to address unsheltered homelessness. The Housing Department opened four new modular interim housing communities:

Branham Lane EI
H (168 units / 216 beds) in February, Via Del Oro EIH (135 units / 150 beds) in April, the Rue Ferrari Expansion (108 units / 144 beds) in October, and Cherry Avenue EIH (128 units / 136 beds) in December.

Collectively, these sites added 539 units and 606 beds, providing dignified, non-congregate shelter and moving people off the streets. By the end of CY 2025, San José managed a portfolio of 963 modular interim housing units (1,207 beds).

In 2025, the City also expanded its strategy of utilizing underused hotels and motels as interim housing. By acquiring a five-property master-leased motel portfolio, the City rapidly added 251 shelter units. This brought San José’s total motel-based interim housing inventory—including conversions and master-leased properties—to 494 units (560 beds).

The City further increased capacity for residents living in oversized vehicles by opening the Berryessa Safe Parking Program, which added 86 new spaces, bringing the total number of Safe Parking slots citywide to 128. In addition, San José launched its first tent-based supportive outdoor sleeping site, creating 56 additional interim shelter units.

Across all interim housing and shelter types, San José managed a total portfolio of 1,641 units by the end of CY 2025, with 932 units developed or brought online during the year. Nearly all new sites were delivered through coordinated, cross-departmental efforts involving the Housing Department, Public Works, Planning, the City Manager’s Office, and multiple other City departments. Two of the four new modular interim housing communities were developed through land-use agreements with Caltrans and the Valley Water District, and another was made possible through a philanthropic partnership with the Sobrato Foundation. Also of note, the City entered into a partnership with the Housing Authority to establish an interim housing subsidy layering at the Pacific Motor Inn to streamline eligible voucher holders into permanent Units 1641
Progress on shelter and interim housing
expansion (including Goal 1.1 site openings
and capacity additions referenced in this
update) is t
racked publicly through the City’s
Reducing Unsheltered Homelessness Focus
Area Scorecard / Performance Dashboard,
which includes quarterly updates, visuals
summarizing shelter system capacity, and
narrative reporting on new and expanded
sites brought online:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-the-
city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness
. Internally, site-by-site delivery and ramp-up
(e.g., modular EIH openings/expansions,
motel portfolio activation, safe parking, and
the supportive outdoor sleeping site) is
documented in the Shelter System
Production Summary tracking table used for
program reporting (units/beds/spaces by site
and month opened) and aligns to the totals
reported in the CY 2025 update.

ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 39 ends

H-1 Interim Homeless
Housing Construction
Funds obtained for operations & services
6th Cycle Completed
During CY 2025, the Housing Department successfully obtained future rent support for two interim housing properties. The City instituted subsidy layering at Pacific Motor Inn, enabling all occupants of the 72 units to receive a federal subsidy pay
ment for each eligible participant. An additional federal subsidy agreement with the Santa Clara County Housing Authority was also approved for the Arena Hotel, with subsidy support beginning CY 2026.

Other 1
The City is developing a standardized
approach to track and report progress on
securing and stabilizing funding for shelter
and interim
housing operations and services
at the portfolio/enterprise level (versus by
individual site). This work will align with the
City’s Reducing Unsheltered Homelessness
Focus Area Scorecard / Performance
Dashboard, including the related
performance indicator around achieving up to
a 20% reduction in per-unit operating costs
across the shelter portfolio. As the reporting
approach is finalized, summary updates will
be incorporated into the Focus Area
Scorecard’s quarterly public updates and
performance reporting:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-the-
city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness
. In the interim, Housing maintains internal
budget and contract tracking tools (e.g.,
operating budgets, subsidy-layering
agreements, grants/funding source tracking,
and cost-per-unit monitoring) that will be
used to support enterprise-level reporting
once the standardized framework is fully
implemented.

H-2 Interim Housing for
People Experiencing
Homelessness in Hotels/
Motels and Other Existing
Buildings
At least one property newly acquired
1/31/2031 6th Cycle Completed A s reported in the 2024 APR, this metric is considered completed. Other 1 None H-2 Interim Housing for
People Experiencing
Homelessness in Hotels/
Motels and Other Existing
Buildings
At least five properties operated
1/31/2031 6th Cycle Continuous
Dur
ing CY2025, various City of San José departments, led by the Housing Department, developed a Master Leasing Program that master-leased five underutilized motels to address unsheltered homelessness. In total, approximat
ely 250 units of non-congregate interim housing/shelter were brought online and are at full capacity. The City continued to operate its previous HomeKey hotel conversion projects and other hotel-based shelter strategies throughout 2025.

Other 1
Progress on shelter and interim housing
expansion (including Goal 1.1 site openings
and capacity additions referenced in this
update) is t
racked publicly through the City’s
Reducing Unsheltered Homelessness Focus
Area Scorecard / Performance Dashboard,
which includes quarterly updates, visuals
summarizing shelter system capacity, and
narrative reporting on new and expanded
sites brought online:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-the-
city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness
. Internally, site-by-site delivery and ramp-up
(e.g., modular EIH openings/expansions,
motel portfolio activation, safe parking, and
the supportive outdoor sleeping site) is
documented in the Shelter System
Production Summary tracking table used for
program reporting (units/beds/spaces by site
and month opened) and aligns to the totals
reported in the CY 2025 update.

H-2 Interim Housing for
People Experiencing
Homelessness in Hotels/
Motels and Other Existing
Buildings
At least $19M of new Homekey awards
accepted for acquisition/ rehabilitation
1/31/2031 6th Cycle Completed As reported in the 2024 APR, this metric is considered completed. Homekey funding was accepted for Pacific Motor Inn and Pavilion Inn. Other 1 None ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 40 ends

H-2 Interim Housing for
People Experiencing
Homelessness in Hotels/
Motels and Other Existing
Buildings
At least 280 residents housed
1/31/2031 6th Cycle Completed
T
here have been substantive changes to the City's motel-based strategies since the 2024 report, which impact the 2025 metrics. First, the Surestay Hotel -- which served 76 households in 2024 -- is in the process of transit
ioning to ownership by Santa Clara County Housing Authority, which has already taken over operations. In addition, the Temporary Housing and Assistance Program, which served 102 individuals in 2024, was sunset due to funding constraints. However, the City has more than replaced those units through the master leasing program mentioned above, which added 251 units of non-congregate shelter and has temporarily sheltered 278 individuals to date. In addition, the City has maintained all other motel-based programs, including the Motel Voucher Program (97 family units), the Arena Hotel (89 single/couples units), Pacific Motor Inn (72 single units), and the Plaza Hotel (42 single units). All of these sites have operated at or above 92% throughout 2025.

Persons 1
Progress on shelter and interim housing
expansion (including Goal 1.1 site openings
and capacity additions referenced in this
update) is t
racked publicly through the City’s
Reducing Unsheltered Homelessness Focus
Area Scorecard / Performance Dashboard,
which includes quarterly updates, visuals
summarizing shelter system capacity, and
narrative reporting on new and expanded
sites brought online:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-the-
city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness
. Internally, site-by-site delivery and ramp-up
(e.g., modular EIH openings/expansions,
motel portfolio activation, safe parking, and
the supportive outdoor sleeping site) is
documented in the Shelter System
Production Summary tracking table used for
program reporting (units/beds/spaces by site
and month opened) and aligns to the totals
reported in the CY 2025 update.

H-3 Conversion of
Hotels/Motels for
Homeless Housing
Combined with H14
6th Cycle None
H-4 Shelters Streamlining
Throughout the City
Combined with H14
6th Cycle None
H-5 Low-cost Permanent
Housing Solutions
Removed 6th Cycle None
H-6 Housing with
Integrated Health Care
By 2031: At least one new development
with on-site health services
1/31/2031 6th Cycle In Progress
During CY 2025, the City advanced early implementation planning for integrated health and behavioral health services within interim housing by engaging Santa Clara County Behavioral Health on a coordinated approach for on-si
te services and exploring how CalAIM can help support delivery and reduce City-funded staffing costs. Near the end of CY 2025, teams began scoping a pilot set of sites and potential CalAIM-covered service components (including Enhanced Care Management and Community Supports), and began planning to embed behavioral health resources at select locations. This work is intended to support the City’s broader strategy to improve outcomes while reducing operating costs across the shelter portfolio; implementation planning will continue into CY 2026.

Other
Progress was documented through internal
project tracking tools and the City’s OKR
framework (Objectives measured by Key
Results
), including a key result focused on
reducing operating costs and leveraging
CalAIM and County-delivered services to
offset City-funded staffing where feasible. As
the pilot design and implementation
approach is finalized in CY 2026, the City
plans to roll up and report portfolio-level
progress through the Reducing Unsheltered
Homelessness Focus Area Scorecard /
Performance Dashboard:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-the-
city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness.

ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 41 ends

H-7 Safe/Supportive
Parking Programs
At least 45 safe parking opportunities
created for RVs and cars
1/31/2031 6th Cycle Continuous
In 2025, the City of San José invested in leasing, developing, and operating its second Safe Parking for RVs program. The Berryessa Safe Parking for RVs program first opened in March 2025 and operates 24 hours a day, 7 days a week. Located on privately owned land leased by the City, the program provides safe parking along with case management, showers, laundry, meals, and other supportive services. Operated by WeHOPE, the Berryessa site includes 86 parking spaces and serves unhoused residents who were previously living in oversized vehicles throughout the city.

The site removes several common barriers to entry that limit access to other safe parking programs, including vehicle operability and registration requirements, and offers free assistance to tow into the site. Once participants are on site, WeHOPE works with them to register their vehicles. The addition of Berryessa increased San José’s capacity to compassionately relocate oversized vehicles from public streets from 42 spaces in 2024 to 128 spaces in 2025. In FY 24-25, 47% (16/34) of exits were to positive housing destinations, 15% were family reunification exits, and the program maintained utilization over 95%.

Units 128
Safe Parking program progress is tracked
and reported alongside broader shelter
system capacity in the City’s Reducing
Unshelter
ed Homelessness Focus Area
Scorecard / Performance Dashboard, which
provides quarterly public updates and
portfolio-level reporting on shelter and safe
parking capacity changes (including new
sites brought online):
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-the-
city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness.

In addition, program implementation and
performance are monitored through internal
portfolio tracking tools and executive
briefings (including the Reducing
Unsheltered Homelessness executive brief)
that consolidate site-level operating updates,
and service delivery information into
enterprise-level status reporting.

H-7 Safe/Supportive
Parking Programs
At least $1.7M spent on safe parking site
preparation
1/31/2031 6th Cycle Completed
In 2025, the City of San José invested in leasing, developing, and operating its second Safe Parking for RVs program. The Berryessa Safe Parking for RVs program. This site first opened in March 2025 and is located on privately owned land leased by
the City. The program offers spaces for 86 RVs and
operates 24 hours a day, 7 days a week.

Other
Program s
pending and service delivery for
Safe/Supportive Parking is documented
through Housing Department internal
financial
and contract management tools
(e.g., budget and expenditure tracking by
site/program, vendor invoices and payment
records, and agreement/amendment files for
leasing, operations, and services). Program
teams also maintain internal implementation
trackers and periodic performance/budget
check-ins to validate that reported amounts
reflect actual costs incurred for site
preparation, ongoing operations, and
supportive services.

H-7 Safe/Supportive
Parking Programs
At least $1.2M spent per year on safe
parking operations and services
1/31/2031 6th Cycle Continuous
The City continues to fund the Safe Parking for RVs programs at the Santa Teresa VTA Lot and on Berryessa Road. Both programs operate 24 hours a day, 7 days a week. Santa Teresa Safe Parking can accommodate 42 RVs, and Berryes
sa Safe Parking can accommodate 86 RVs. Both programs
provide designated, secure parking, along with case management, showers, laundry, meals, waste management, and other on-site supportive services. At the Berryessa Safe Parking program, 47% (16/34) of exits were to positive housing destinations, 15% were family reunification exits, and the program maintained over 95% utilization during FY 24-25. At the Santa Teresa Safe program, 61% (11/18) of exits were to positive housing destinations, 16% were family reunification exits, and the program maintained over 95% utilization during FY 24-25.

Other
Program s
pending and service delivery for
Safe/Supportive Parking is documented
through Housing Department internal
financial
and contract management tools
(e.g., budget and expenditure tracking by
site/program, vendor invoices and payment
records, and agreement/amendment files for
leasing, operations, and services). Program
teams also maintain internal implementation
trackers and periodic performance/budget
check-ins to validate that reported amounts
reflect actual costs incurred for site
preparation, ongoing operations, and
supportive services.

ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 42 ends

H-8 Nonprofit-provided
Homeless Support
Services
Funding to nonprofit service providers
1/31/2031 6th Cycle Continuous
In F
Y 2024-2025, agreements for homeless response services totaled $97.5M. Contracts with nonprofit providers have maintained 2 street outreach programs, 3 Rapid Re-housing programs, 1 laundry and shower services program for
homeless populations at encampments, 7 Emergency Interim Housing (EIH) shelters, a Motel voucher-based program, 3 Project Homekey interim housing programs, and 2 service-based programs for Transitional Aged Youth at-risk of or currently experiencing homelessness. New programs in Calendar Year 2025 include 5 motel interim shelter programs, a temporary tent-based shelter and services program, and 2 additional EIHs.

Below are selected summaries of nonprofit service providers and their metrics. In 2025, HomeFirst managed day-to-day operations and property maintenance and provided programming services at six Emergency Interim Housing sites: Monterey Bernal, Rue Ferrari, Mabury, Felipe, Via del Oro (opened April 2025), and Cherry (opened December 2025). Combined, HomeFirst provided shelter and services to 630 participants. 33 participants exited to a positive housing destination. Evans Lane EIH, a family-serving interim shelter managed by PATH, served 224 participants, with 71 exiting to a positive housing destination. LifeMoves served 129 participants in 2025 at their Guadalupe emergency interim housing location, 15 of whom exited to a positive housing destination. LifeMoves also provided short-term motel stays for families experiencing homelessness through the Motel Voucher for Vulnerable Populations Program. In total, the program served 156 households, including 459 individuals. Additionally, in 2025, the Housing Department added five master-leased, underutilized motels to its interim shelter portfolio, increasing interim shelter capacity by 249 units. The Department also completed two pilot programs serving at-risk and currently homeless Transitional Aged Youth. The programs, operated by service providers Bill Wilson Center and Unity Care, served a total of 106 youth, 94 of whom exited to positive housing destinations at the conclusion of the program in December 2025.

Other 245.6
Funds distributed to nonprofit service
providers are appropriated through City
Council, after which contracts are executed.

A descri
ption of all fund amounts, program
narratives, and service providers can be
found in the associated City Council
memoranda on the City website. All
pertaining grant agreements can be found on
the City’s Government Information Library
Electronic System (GILES).

H-8 Nonprofit-provided
Homeless Support
Services
# people assisted
1/31/2031 6th Cycle Continuous
In F
Y 2024-2025, agreements for homeless response services totaled $97.5M. Contracts with nonprofit providers have maintained 2 street outreach programs, 3 Rapid Re-housing programs, 1 laundry and shower services program for
homeless populations at encampments, 7 Emergency Interim Housing (EIH) shelters, a Motel voucher-based program, 3 Project Homekey interim housing programs, and 2 service-based programs for Transitional Aged Youth at-risk of or currently experiencing homelessness. New programs in Calendar Year 2025 include 5 motel interim shelter programs, a temporary tent-based shelter and services program, and 2 additional EIHs.

Below are selected summaries of nonprofit service providers and their metrics. In 2025, HomeFirst managed day-to-day operations and property maintenance and provided programming services at six Emergency Interim Housing sites: Monterey Bernal, Rue Ferrari, Mabury, Felipe, Via del Oro (opened April 2025), and Cherry (opened December 2025). Combined, HomeFirst provided shelter and services to 630 participants. 33 participants exited to a positive housing destination. Evans Lane EIH, a family-serving interim shelter managed by PATH, served 224 participants, with 71 exiting to a positive housing destination. LifeMoves served 129 participants in 2025 at their Guadalupe emergency interim housing location, 15 of whom exited to a positive housing destination. LifeMoves also provided short-term motel stays for families experiencing homelessness through the Motel Voucher for Vulnerable Populations Program. In total, the program served 156 households, including 459 individuals. Additionally, in 2025, the Housing Department added five master-leased, underutilized motels to its interim shelter portfolio, increasing interim shelter capacity by 249 units. The Department also completed two pilot programs serving at-risk and currently homeless Transitional Aged Youth. The programs, operated by service providers Bill Wilson Center and Unity Care, served a total of 106 youth, 94 of whom exited to positive housing destinations at the conclusion of the program in December 2025.

Persons 6802
Program persons served and performance
outcomes are documented through Housing
Departemnt internal contract management
tools, i
ncluding quarterly reports capturing
persons served and progress made toward
contractual program outcomes and data
reported to HMIS.

ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 43 ends

H-9 Street-based Services
for Unhoused Residents
Funds budgeted
1/31/2031 6th Cycle Continuous
In 2025, the Housing Department continued to strengthen and expand street- based services for unsheltered residents, building on prior years while advancing the targeted outreach engagement program (TOEP). As with CSJ programs
, TOEP is an outcomes-driven approach. As a result, street-based services remained a critical component of the City’s homelessness response, including outreach, hygiene services, behavioral health supports, transportation assistance, and harm reduction interventions designed to meet people where they are.

In 2025, the City successfully acquired and began distributing Naloxone (Narcan) through outreach teams, increasing the availability of life-saving overdose-prevention tools in the field. Outreach staff were equipped to respond to overdoses and to provide education and referrals related to substance use and behavioral health services, strengthening the City’s harm reduction framework and supporting safer engagement with unsheltered residents.

The City also successfully implemented the Targeted Outreach Engagement Program (TOEP) as a core strategy for delivering street-based services in alignment with housing and shelter opportunities. This targeted approach allowed outreach teams to focus on intensive case management and service coordination on specific encampments, resulting in measurable outcomes.

Through TOEP, the City successfully cleared Columbus Park, supported residents through coordinated outreach, provided assistance such as RV buyback services, and helped place multiple individuals into shelter. The TOEP model demonstrated the effectiveness of pairing sustained outreach with clear housing pathways and coordinated abatements, reinforcing its role as a central component of the City’s outreach strategy.

To further support and scale street-based outreach, the City continued building out the Encampment Resource Coordination System (ERCS) in 2025.

Other
Funding for street-based services is tracked
through Housing Department internal budget
management tools and standard financial
reporti
ng (e.g., program budgets,
expenditures, and contract/invoice
documentation for outreach and service
delivery).

H-9 Street-based Services
for Unhoused Residents
Services provided
1/31/2031 6th Cycle Continuous
In 2025, the Housing Department continued to strengthen and expand street- based services for unsheltered residents, building on prior years while advancing the targeted outreach engagement program (TOEP). As with CSJ programs
, TOEP is an outcomes-driven approach. As a result, street-based services remained a critical component of the City’s homelessness response, including outreach, hygiene services, behavioral health supports, transportation assistance, and harm reduction interventions designed to meet people where they are.

In 2025, the City successfully acquired and began distributing Naloxone (Narcan) through outreach teams, increasing the availability of life-saving overdose-prevention tools in the field. Outreach staff were equipped to respond to overdoses and to provide education and referrals related to substance use and behavioral health services, strengthening the City’s harm reduction framework and supporting safer engagement with unsheltered residents.

The City also successfully implemented the Targeted Outreach Engagement Program (TOEP) as a core strategy for delivering street-based services in alignment with housing and shelter opportunities. This targeted approach allowed outreach teams to focus on intensive case management and service coordination on specific encampments, resulting in measurable outcomes.

Through TOEP, the City successfully cleared Columbus Park, supported residents through coordinated outreach, provided assistance such as RV buyback services, and helped place multiple individuals into shelter. The TOEP model demonstrated the effectiveness of pairing sustained outreach with clear housing pathways and coordinated abatements, reinforcing its role as a central component of the City’s outreach strategy.

To further support and scale street-based outreach, the City continued building out the Encampment Resource Coordination System (ERCS) in 2025.

Other 1
Services provided through the City’s street-
based programs are primarily documented in
the Homelessness Management Information
System (HMIS), where program staff can run
custom reports to monitor service delivery
and outputs by City teams and contracted
providers (e.g., outreach contacts, services
provided, and related program activities
captured in HMIS). For activities or data
elements not currently captured in HMIS, the
City also uses internal geospatial and
operational tracking tools to document
service delivery locations and field activity,
and to supplement HMIS reporting for
performance monitoring and program
management.

ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 44 ends

H-9 Street-based Services
for Unhoused Residents
# of clients served
1/31/2031 6th Cycle Continuous
In 2025, the Housing Department continued to strengthen and expand street- based services for unsheltered residents, building on prior years while moving toward solidifying the targeted outreach engagement program (TOEP). As is the case wi
th CSJ programs, TOEP is an outcomes-driven approach.

Through this, street-based services remained a critical component of the City’s homelessness response, including outreach, hygiene services, behavioral health supports, transportation assistance, and harm reduction interventions designed to meet people where they are.

During 2025, the City successfully acquired and began distributing Naloxone (Narcan) through outreach teams, increasing the availability of life-saving overdose prevention tools in the field. Outreach staff were equipped to respond to overdoses and to provide education and referrals related to substance use and behavioral health services, strengthening the City’s harm reduction framework and supporting safer engagement with unsheltered residents.

The City also successfully implemented the Targeted Outreach Engagement Program (TOEP) as a core strategy for delivering street-based services in alignment with housing and shelter opportunities. This targeted approach allowed outreach teams to focus intensive case management and service coordination on specific encampments, resulting in measurable outcomes.

Through TOEP, the City was able to successfully clear Columbus Park, support residents through coordinated outreach, provide assistance such as RV buyback services, and help place multiple individuals into shelter. The TOEP model demonstrated the effectiveness of pairing sustained outreach with clear housing pathways and coordinated abatements, reinforcing its role as a central component of the City’s outreach strategy.

To further support and scale street-based outreach, the City continued building out the Encampment Resource Coordination System (ERCS) in 2025.

Persons 4921
The number of clients served is primarily
tracked through the Homelessness
Management Information System (HMIS),
which capt
ures client-level records and
allows program staff to run custom reports
on people served and services delivered by
City teams and contracted providers. For
field activities or services rendered that are
not tied to an individual (i.e., non-client-
identifying activity), the City also uses
internal geospatial and operational tracking
tools to document locations and service
delivery activity; these GIS-based tools
supplement HMIS reporting where the work
is not connected to a client name/record.

H-10 Racial and Other
Bias of Protected Classes
in Homeless Shelter and
Supportiv
e Housing
Systems
Dec 2023: Meet with County, service
providers and property management staff
on accessing data
12/31/2023 6th Cycle Continuous
The Homelessness Response Division (HRD), within the Housing Department, continues to pull monthly racial equity data from the County of Santa Clara on the racial/ethnic makeup of clients in programs across six (6) program areas
(Outreach, RRH, PSH, Interim Housing, Temporary Housing, and Supportive Parking). HRD pulls quarterly data on the ethnic/racial makeup of unhoused individuals, and we compare these datasets. Annual census-related data is part of the regular data access and data analysis procedure that HRD uses to evaluate its programs. So far, through the third quarter of CY2025, no significant demographic disparities in program access have been observed across any program area. Reports on racial equity progress are provided to HRD leadership at least quarterly. Also, HRD continues to hold monthly and other events that increase our cultural humility and support racial and social equity. Equity performance measures are published in the Housing Department's annual report.

Other
Progress is documented through routine
reporting. The data team runs recurring
reports and extracts from relevant datasets
(e.g., pr
ogram and system data sources
used for shelter/supportive housing access
and demographics), compiles summary
outputs, and shares them with program
teams for review and equity analysis. These
recurring report files and supporting datasets
serve as the primary records used to monitor
trends, assess potential disparities, and
inform any follow-up actions.

H-10 Racial and Other
Bias of Protected Classes
in Homeless Shelter and
Supportiv
e Housing
Systems
2024, 2027, 2030: Collect and analyze
data
12/31/2030 6th Cycle Continuous
Since the fall of 2024, CSJ has been collecting and analyzing racial/ethnic and demographic data monthly, quarterly, and annually, in partnership with the County of Santa Clara. As of the 3rd quarter of CY 2025, we have not found any signif
icant (10% or greater) demographic disparities in housing program access, especially for the ethnic/racial groups disproportionately represented among the unhoused in San José: the Native American, African American, and Pacific Islander communities.

Other
Progress is documented through routine
reporting. The data team runs recurring
reports and extracts from relevant datasets
(e.g., pr
ogram and system data sources
used for shelter/supportive housing access
and demographics), compiles summary
outputs, and shares them with program
teams for review and equity analysis. These
recurring report files and supporting datasets
serve as the primary records used to monitor
trends, assess potential disparities, and
inform any follow-up actions.

ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 45 ends

H-10 Racial and Other
Bias of Protected Classes
in Homeless Shelter and
Supporti
ve Housing
Systems
Within 12 months following each analysis
completion: Work with partners annually to
provide technical assistance sessions as
needed to ensure the City is meeting its
AFFH obligations
1/31/2031 6th Cycle Continuous
The City has an ongoing process of analyzing demographic and housing- related data to identify areas where housing discrimination may occur. Our ongoing analysis of demographic and housing data has revealed no significant demographic disparities in program enrollment, as noted above in Y159. San José stands ready to support any partner in addressing significant demographic disparities (10% or more) to ensure fair housing choice and equal opportunity for all protected groups.

Other
Progress is documented through routine
reporting. The data team runs recurring
reports and extracts from relevant datasets
(e.g.,
program and system data sources
used for shelter/supportive housing access
and demographics), compiles summary
outputs, and shares them with program
teams for review and equity analysis. These
recurring report files and supporting datasets
serve as the primary records used to monitor
trends, assess potential disparities, and
inform any follow-up actions.

H-11 Feedback from
Those with Lived
Experience in
Homel
essness in
Decision Making
2023-2031: Staff to attend meetings of
LEAB or other lived experience groups at
least once a year to ask for feedback on
program pr
iorities
1/31/2031 6th Cycle Continuous
In CY 2025, the Housing Department implemented Participant Advisory Committees (PAC). Service providers at interim shelters were expected to develop a formal structure comprising people residing at the site. Providers coordinat
ed and facilitated PAC meetings, developed meeting materials, and maintained an infrastructure through which PAC feedback would be implemented into program design and service delivery. Furthermore, the Department has continued its informal partnership with the LEAB, as reflected in CY 2023 and CY 2024. The Department’s Youth-serving programs maintain close coordination with the jurisdiction’s Youth Action Board.

Meetings 1 None
H-11 Feedback from
Those with Lived
Experience in
Homel
essness in
Decision Making
Jul 2024: Identify universe of applicable
contracts and timeline for renewals
7/31/2024 6th Cycle Continuous
In CY 2024, the Housing Department had implemented metrics specific to feedback loop infrastructures across grant agreements with interim shelter and homeless service providers. Emergency Interim Housing (EIH) contracts included m
etrics that held agencies accountable for holding Participant Advisory Committees (PACs). Service-based program contracts (for example, Youth Housing and Support program) included outcome measures and required staff to submit recurring Program Operation Manuals that incorporated feedback from participants and youth with lived experience.

Service providers at interim shelters were expected to continue developing a formal structure comprising the people residing at the site. Providers coordinated and facilitated PAC meetings, developed meeting materials, and maintained an infrastructure through which PAC feedback would be implemented into program design and service delivery. Furthermore, the Department has continued its informal partnership with the LEAB, as reflected in CY 2023 and CY 2024. The Department’s Youth-serving programs maintain close coordination with the jurisdiction’s Youth Action Board.

In CY25, 2 members of the City's HCDC are active commission members and have lived experience and continued engagement as detailed in previous reporting years.

Other 1 None
H-11 Feedback from
Those with Lived
Experience in
Homel
essness in
Decision Making
Jun 2025: Contracts renewed amended to
include consultative language, and include
in newly awarded contracts
6/30/2025 6th Cycle Continuous
In CY 2024, the Housing Department had implemented metrics specific to feedback loop infrastructures across grant agreements with interim shelter and homeless service providers. Emergency Interim Housing (EIH) contracts included m
etrics that held agencies accountable for holding Participant Advisory Committees (PACs). Service-based program contracts (for example, Youth Housing and Support program) included outcome measures and required staff to submit recurring Program Operation Manuals that incorporated feedback from participants and youth with lived experience.

Service providers at interim shelters were expected to continue developing a formal structure comprising the people residing at the site. Providers coordinated and facilitated PAC meetings, developed meeting materials, and maintained an infrastructure through which PAC feedback would be implemented into program design and service delivery. Furthermore, the Department has continued its informal partnership with the LEAB, as reflected in CY 2023 and CY 2024. The Department’s Youth-serving programs maintain close coordination with the jurisdiction’s Youth Action Board.

Other None
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 46 ends

H-11 Feedback from
Those with Lived
Experience in
Homelessn
ess in
Decision Making
By Dec 2025: Goal of 90% of
homelessness contracts with amended
language requiring lived experience
consultat
ions
12/31/2025 6th Cycle Continuous
In CY 2024, the Housing Department had implemented metrics specific to feedback loop infrastructures across grant agreements with interim shelter and homeless service providers. Emergency Interim Housing (EIH) contracts included met
rics that held agencies accountable for holding Participant Advisory Committees (PACs). Service-based program contracts (for example, Youth Housing and Support program) included outcome measures and required staff to submit recurring Program Operation Manuals that incorporated feedback from participants and youth with lived experience.

Service providers at interim shelters were expected to continue developing a formal structure comprising the people residing at the site. Providers coordinated and facilitated PAC meetings, developed meeting materials, and maintained an infrastructure through which PAC feedback would be implemented into program design and service delivery. Furthermore, the Department has continued its informal partnership with the LEAB, as reflected in CY 2023 and CY 2024. The Department’s Youth-serving programs maintain close coordination with the jurisdiction’s Youth Action Board.

Other None
H-12 Neighborhood
outreach and education
on homeless housing and
other housing topics
Materials prepared
1/31/2031 6th Cycle Continuous
The H
ousing Department developed a new Homeless Resource Guide and a new Housing Department Brochure, both of which are being translated into Spanish and Vietnamese. Staff also created the Homeless Resource Guide available on t
he Housing Department website.

Other 7 None
H-12 Neighborhood
outreach and education
on homeless housing and
other housing topics
CBOs under contract
1/31/2031 6th Cycle Continuous
The C
ity has an existing partnership program with nonprofit and community- based organizations to support project-based outreach and engagement efforts around the project sites. Selected partners are now on call to work with staff ac
ross City departments on future projects, as needs arise.

Other None
H-12 Neighborhood
outreach and education
on homeless housing and
other housing topics
Funding allocated
1/31/2031 6th Cycle Continuous Funding is allocated on an as-needed basis to CBOs that the City engages for outreach and education. Other None
H-12 Neighborhood
outreach and education
on homeless housing and
other housing topics
Households outreached to
1/31/2031 6th Cycle Continuous
We sent mailers to approximately 10,000 households, notifying them about potential changes to the Mobilehome Rent Ordinance and explaining how they can provide input to the City Council.

Households None
H-12 Neighborhood
outreach and education
on homeless housing and
other housing topics
Feedback sessions held
1/31/2031 6th Cycle Continuous
We initiated and hosted 11 meetings in the Community Engagement Series on many different topics. Invitations go out to approximately 12,000 people each month. We also hosted four community meetings to educate the public about the City
's plan to convert hotels into interim housing for formerly homeless individuals.

Meetings None
H-13 Regional Homeless
Response Coordination
and Planning
2024: Council adoption of City’s
implementation plan
12/31/2024 6th Cycle In Progress
The city, in collaboration with the county, is currently developing the 2025- 2030 community plan to end homelessness. The plan will be presented to the city council in 2026.

Other
Progress is documented through the County-
led planning process, including meeting
materials, working drafts, and planning
documents developed and maintained by the
County in collaboration with City staff and
other partners. These shared materials
(agendas, notes, draft chapters/sections,
and review/comment logs) serve as the
primary records of coordination and ongoing
development of the regional plan.

H-14 Emergency Shelters
Jun 2024: Council adoption of necessary
zoning code amendments
6/30/2024 6th Cycle Completed This it em was completed in 2024. Other 1 Ord No. 31149:
https://records.sanjoseca.gov/Ordinances/O
RD31149.pdf . Ordinance No. 31097:
https:/
/records.sanjoseca.gov/Ordinances/O
RD31097.pdf
H-14 Emergency Shelters Dec 2024: Outreach conducted on further process changes 12/31/2024 6th Cycle Completed This it em was completed in 2024. Other 1 None ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 47 ends

S-1 Tenant / Landlord
Resource Centers and
Code Violations
Report
ing
By 2025: At least 3 Tenant Resource
Centers with Code assistance
12/31/2025 6th Cycle Not yet started
The Rent Stabilization team continues its outreach efforts targeting areas with more vulnerable renter populations and areas where the Program receives a high number of inquiries about code issues or renter protections.

Unfort
unately, the Google Downtown West project, which would have brought significant investment and housing development to the Diridon area, including funding for Tenant Resource Centers, is on an indefinite hold for the foreseeable future. In Fiscal Year 2026-27, the Rent Stabilization Program intends to hold periodic "pop-up" resource clinics at community centers. These clinics will be held at different locations in areas that show a higher need for services and education, based on data collected by the Rent Stabilization Program. The services will be multi-lingual and will include assistance with code issues, filing petitions, and referrals to mediation and legal aid services.

Other None
S-1 Tenant / Landlord
Resource Centers and
Code Violations
Reporting
Target of 3 locations regularly served each
year 1/31/2031 6th Cycle Not yet started See respons e to S-1(1) above. Other None S-1 Tenant / Landlord
Resource Centers and
Code Violations
Reporting
At least 400 tenants and landlords
assisted per year 1/31/2031 6th Cycle Not yet started See respons e to S-1(1) above. Persons None S-1 Tenant / Landlord
Resource Centers and
Code Violations
Report
ing
4 Housing/Code meetings held per year
starting in 2024
1/31/2031 6th Cycle Continuous
The Rent Stabilization Program and Code Enforcement met 3 times during 2025. Staffing vacancies in the leadership of the Code Enforcement Inspection program and key Rent Stabilization Staff on leave have delayed effort
s for regular coordination. The Rent Stabilization Program staff and Code inspectors maintain channels of communication regarding Code issues that arise in units or properties covered by the Apartment Rent Ordinance and/or Tenant Protection Ordinance.

Meetings 5 None
S-2 Rental Property
Registry Improvement
2025: Implement new Code information
system with improved addresses 12/31/2025 6th Cycle In Progress Significant work on this item has not yet commenced due to staff capacity and competing priorities. Other None
S-2 Rental Property
Registry Improvement
% of City's rental units registered 12/31/2025 6th Cycle In Progr ess Significant work on this item has not yet commenced due to staff capacity and competing priorities.

Other None
S-3 Proactive Code
Enforcement in Identified
Project Hope Place-based
Neighbor
hoods
Annually through 2031: At least 3
neighborhoods covered with enhanced
multifamily inspections
1/31/2031 6th Cycle Continuous Code inspectors conducted Enhanced Multiple Housing inspections in the 8 Project Hope designated areas. Other 17 None
S-3 Proactive Code
Enforcement in Identified
Project Hope Place-based
Neighbor
hoods
Annually through 2031: Average 200 units
inspected per neighborhood per year (total
600 units per year) 1/31/2031 6th Cycle Continuous In 2025, a total of 656 units were inspected. Each inspector inspects one to a few neighborhoods, averaging 82 units per neighborhood. Other 82 None S-3 Proactive Code
Enforcement in Identified
Project Hope Place-based
Neighbor
hoods
Goal of 2,000 violations resolved within
150 days each year (includes mostly
housing violations and some blight) by
2031
1/31/2031 6th Cycle Continuous
A total of 728 violations were resolved in 2025, with 579 resolved within 150 days. The average violation duration for housing and blight violations was 107 days.

Other 2495 None
S-4 Updated Relocation
Assistance
Analysis complete
12/31/2025 6th Cycle Complet ed
In 2025, Housing staff reviewed relocation assistance mandated under several City ordinances and SB 330 regarding new developments that displace existing lower-income renters. Staff determined that existing ordinances
had consistent escalators; therefore, rather than seeking Council approval of changes, clearer communication and consistent administration would be sufficient to benefit both renters and developers. Housing staff researched different methodologies in 2025 and plans to update its webpages in spring 2026. Changes to the municipal code are not necessary, and this item is being implemented administratively.

Other 1 None
S-4 Updated Relocation
Assistance
Stakeholder outreach on cost escalators
and proposed changes
6th Cycle In Progress See description above of S-4. Other None S-4 Updated Relocation
Assistance
Council approval of code updates 6th Cycle In Progress See descr iption above of S-4. Other None ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 48 ends

S-5 Code Enforcement
Improved Case
Management
Jan 2026: Phase 1 - New case
management system implemented and
violation tracking system in place
1/31/2026 6th Cycle In Progress
In 2025, after meeting all requirements and reviewing the data, it was determined that a new project timeline was needed. Therefore, implementation was scoped into 2 phases, and the timeline was extended to a Go Live of July 2027 for Phase 1. We are in the process of renegotiating the contract with Infinite Solutions for the extended timeline and 1 new scope item. We hope to have a new contract in place by mid-February of 2026. We have completed detailed requirements and development of 28% of all features. Further, we have secured an ITD resource that has completed all data integrity fixes and will begin 1st round of data cleanup in January 2026.

We have also formulated our first retention schedule and are 40% complete with the analysis.

Other None
S-5 Code Enforcement
Improved Case
Management
Jan 2028: Phase 2 - Analysis of building
performance complete
1/31/2028 6th Cycle Not yet started
In 2025, after meeting all requirements and reviewing the data, it was determined that a new project timeline was needed. Therefore, implementation was scoped into 2 phases, and the timeline was extended to a Go Live of July 2027 for Phase 1. We are in the process of renegotiating the contract with Infinite Solutions for the extended timeline and 1 new scope item. We hope to have a new contract in place by mid-February of 2026. We have completed detailed requirements and development of 28% of all features. Further, we have secured an ITD resource that has completed all data integrity fixes and will begin 1st round of data cleanup in January 2026.

We have also formulated our first retention schedule and are 40% complete with the analysis.

Other None
S-5 Code Enforcement
Improved Case
Management
Jan 2029: Phase 3 - Stakeholder outreach
on cost escalators and proposed changes
1/31/2029 6th Cycle Not yet started
In 2025, after meeting all requirements and reviewing the data, it was determined that a new project timeline was needed. Therefore, implementation was scoped into 2 phases, and the timeline was extended to a Go Live of July 2027 for Phase 1. We are in the process of renegotiating the contract with Infinite Solutions for the extended timeline and 1 new scope item. We hope to have a new contract in place by mid-February of 2026. We have completed detailed requirements and development of 28% of all features. Further, we have secured an ITD resource that has completed all data integrity fixes and will begin 1st round of data cleanup in January 2026.

We have also formulated our first retention schedule and are 40% complete with the analysis.

Other None
S-5 Code Enforcement
Improved Case
Management
Council approval of code updates (if any)
1/31/2029 6th Cycle Not yet s tarted
In 2025, after meeting all requirements and reviewing the data, it was determined that a new project timeline was needed. Therefore, implementation was scoped into 2 phases, and the timeline was extended to a Go Live of July 2027 for Phase 1. We are in the process of renegotiating the contract with Infinite Solutions for the extended timeline and 1 new scope item. We hope to have a new contract in place by mid-February of 2026. We have completed detailed requirements and development of 28% of all features. Further, we have secured an ITD resource that has completed all data integrity fixes and will begin 1st round of data cleanup in January 2026.

We have also formulated our first retention schedule and are 40% complete with the analysis.

Other None
S-5 Code Enforcement
Improved Case
Management
Jan 2030: Phase 4 - Implementation
complete
1/31/2030 6th Cycle Not yet started
In 2025, after meeting all requirements and reviewing the data, it was determined that a new project timeline was needed. Therefore, implementation was scoped into 2 phases, and the timeline was extended to a Go Live of July 2027 for Phase 1. We are in the process of renegotiating the contract with Infinite Solutions for the extended timeline and 1 new scope item. We hope to have a new contract in place by mid-February of 2026. We have completed detailed requirements and development of 28% of all features. Further, we have secured an ITD resource that has completed all data integrity fixes and will begin 1st round of data cleanup in January 2026.

We have also formulated our first retention schedule and are 40% complete with the analysis.

Other None
S-6 Proactive Code
Enforcement for More
Rented Residences
June 2025: Complete study
6/30/2025 6th Cycle Not yet s tarted Significant work on this item has not yet commenced due to staff capacity and competing priorities. Other None
S-6 Proactive Code
Enforcement for More
Rented Residences
Dec 2025: Recommendation to City
Council if feasible 12/31/2025 6th Cycle Not yet started Significant work on this item has not yet commenced due to staff capacity and competing priorities. Other None
S-7 Financial Literacy
Programs for Potential
Homebuyers
Services provided
1/31/2031 6th Cycle Continuous
Staff continues to explore funding opportunities to build financial literacy and educate potential homebuyers. In 2025, staff continued to monitor upcoming grant opportunities from local, state, and federal funding sources that could be used for this purpose. If and when funding can be identified, staff will apply, and a budget will be allocated if successful.

Other None
S-7 Financial Literacy
Programs for Potential
Homebuyers
Budget allocated
1/31/2031 6th Cycle Continuous See des cription above of S-7. Other None ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 49 ends

S-7 Financial Literacy
Programs for Potential
Homebuyers
# buyers assisted
1/31/2031 6th Cycle Not yet s tarted See description above of S-7. Persons None S-8 Homebuyer Program
Redesign
2026: Feasibility analysis and plan created
12/31/2026 6th Cycle In Progress
In March 2025, the City began redesigning its homeownership programs by reducing the equity share requirement in the First-Time Homebuyer Loan Program from 30% to 15%. This change is intended to reduce financial barriers
for low- and moderate-income households and support long-term housing stability and wealth-building, while preserving deed-restricted affordability. The action reflects an equity-focused review of existing programs and informs future efforts to expand access, strengthen outreach to underserved communities, and evaluate program impacts over time.

The City continues to lack sufficient funding and staffing to sustain an ongoing homeownership program. Last year, staff instead focused on expediting the reuse of old loan repayments dedicated to homeownership by partnering with the County of Santa Clara. In October 2025, the City Council approved transferring $9M in homebuyer loan repayments from previous commitments under the state's CalHome BEGIN program to the County, which runs its own homebuyer program. The funds will be used to provide homebuyer downpayment assistance for two 100% affordable-for-sale developments.

In addition, in early 2025, the Housing Department worked with the nonprofit HouseKeys to ensure that 4 new single-family homes on Rose Avenue, built by Robson Homes, were sold to low-income households through the City's Inclusionary Housing Program.

Other
First
-Time Homebuyer Loan Program Equity
Share Reduction:
http://sanJosé.legistar.com/View.ashx?M=F
&ID=13983534&
GUID=F26A4F67-02D6-
4F5D-9BC7-77A0B22CA004
Council memo for transfer of BEGIN funds:
https://sanJosé.legistar.com/LegislationDetail
.aspx?ID=7693692&GUID=62F9C821-0BC7-
44FB-B0DC-CDF21525EA72
HouseKeys website for San José:
https://www.housekeys27.com/
S-8 Homebuyer Program
Redesign
2027: Council approval of program 12/31/2027 6th Cycle In Progres s See description above for S-8.1. Other None S-8 Homebuyer Program
Redesign
By 2031: Assist 100 households 1/31/2031 6th Cycle In Progres s See description above for S-8.1. Households None S-9 Fair Housing Equity
Analysis and Ant
Displacement for Specific
Plans
2024: Consultant identifies anti-
displacement features for Five Wounds
UV Plan
12/31/2024 6th Cycle In Progress
In 2025, staff continued working with the consultant but did not identify new anti-displacement strategies for Urban Village Plans. The Five Wounds UV plan is currently in the environmental review phase, with completion estimated for mid-2026.

Other None
S-9 Fair Housing Equity
Analysis and Ant
Displacement for Specific
Plans
# of other UV Plans incorporating features 12/31/2024 6th Cycle Not yet s tarted Anti-displacement features will be considered in future plans. Other None S-9 Fair Housing Equity
Analysis and Ant
Displacement for Specific
Plans
By 2026: Fair Housing Equity Analysis
method defined 12/31/2026 6th Cycle Not yet started Staff w ill continue to define a method in 2026. Other None
S-9 Fair Housing Equity
Analysis and Ant
Displacement for Specific
Plans
Ongoing: Plans with fair housing analysis
and anti- displacement features integrated 1/31/2031 6th Cycle Not yet started Anti-di splacement features will be considered. Other None
S-10 Study on Rent
Increases and Burden in
Affordable Housing
2024: Research conducted 12/31/2024 6th Cycle In Progres s
In 2025, the data system for affordable apartment rent rolls was under review and revision. Staffing constraints and core function process improvements also limited the staff resources available for this effort in 2025. Following completi
on of the data system review in 2026, data updates, and redaction of personally identifiable information, staff intend to leverage AI to assist with rent burden analysis. Once the data analysis is complete, the findings will be incorporated into one or more City Council reports as appropriate.

Other None
S-10 Study on Rent
Increases and Burden in
Affordable Housing
By June 2025: Findings presented to the
City Council 6/30/2025 6th Cycle In Progress See descri ption above of S-10. Other None
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 50 ends

S-11 Alternative
Documentation for Non-
Citizens
Jul 2024: Council approval 7/31/2024 6th Cycle Completed In 2025, with guidance from the City’s Attorney’s office, Housing staff developed administrative guidelines that include requiring owners of properties subject to the Tenant Preferences Program to Help Fight Displacement to accept alternative forms of documentation identified by the City and/or the State of California. The alternative documents can be used to verify both program eligibility and income eligibility, to the extent allowed by the State’s Tax Credit Allocation Committee regulations. In addition, marketing materials for subject properties must also advertise that alternative documents are accepted.

Housing staff will continue to require acceptance of alternative documents in affordable housing properties subject to the Tenant Preferences Program, but have been advised by the City Attorney’s office to pause work on expanding to different types of affordable homes due to the current federal political climate
Other 1
Tenant Preferences Program to help Fight
Displacement web page:
https://www.sanjoseca.gov/your-
government/
departments-
offices/housing/resource-library/housing-
policy-plans-and-reports/tenant-preferences
S-11 Alternative
Documentation for Non-
Citizens
Jul 2025: Workplan complete
7/31/2025 6th Cycle In Progres s See description above of S-11. Other None S-11 Alternative
Documentation for Non-
Citizens
# properties implemented
12/31/2026 6th Cycle Continuous
As of the end of 2025, two affordable housing properties are employing alternative documentation requirements through the Tenant Preference program.

Other 2 None
S-12 Eviction Prevention
By 2025: At least 50 workshops held
12/31/2025 6th Cycle Completed
During 2025, 50 weekly courthouse workshops were conducted on Wednesdays and the Superior Court. In total, 142 weekly courthouse workshops were held between 2023 and 2025.

Meetings 50 None
S-12 Eviction Prevention By 2025: At least 275 households kept stably housed
12/31/2025 6th Cycle Completed Since 2023, 335 tenant households have been kept stably housed through the court-focused Eviction Diversion and Settlement Program.

Households 335 None
S-12 Eviction Prevention
By 2025: At least 5,000 households
assisted via calls to Eviction Helpline, walk-
ins and emails
12/31/2025 6th Cycle Completed
From 2023 through 2025, over 10,000 tenants and property owners have been assisted through the Eviction Helpline by phone, email, or in person at City Hall. In calendar year 2025, 273 tenants and landlords involved in eviction court actions were assisted with resources at the Eviction Prevention (UD) Weekly Court Clinic and during the eviction court calendar, 2-3 days a week.

Households 10000
None
S-12 Eviction Prevention By 2026: At least $3M in funding secured 12/31/2026 6th Cycl e Completed In addition to a $2M State earmark received in 2024, the City has continued to fund eviction prevention staffing and the eviction diversion program through a portion of the Measure E revenue allocation for prevention, with $650K allocated f
or prevention staffing for FY 2025-26. Additional Measure E funds for Eviction Prevention were awarded in 2023 and 2024, totaling more than $2M.

Other 4.6 None
S-12 Eviction Prevention By 2031: Seek at least $3M in additional funding
1/31/2031 6th Cycle Not yet started Staff c ontinues to monitor for any funding opportunities to support this metric. Other None S-13 Affordable Housing
Renter Portal Access 2023: Top 4 languages available 12/31/2023 6th Cycle Completed The City of San José Doorway portal remains available in English, Spanish, Chinese, and Vietnamese.

Additionally, the Doorway portal uses the Web Content Accessibility Guidelines
(WCAG) to make content "more accessible to a wider range of people with disabilities, including accommodations for blindness, low vision, and deafness".

Other 1
City of San José Doorway Portal:
https://housing.sanjoseca.gov
WCAG Guidelines:
https://ww
w.w3.org/TR/WCAG21/
S-13 Affordable Housing
Renter Portal Access
# applicants using non-English versions (to
the extent data is available) 12/31/2023 6th Cycle Continuous Across CY 2025, a total of 6,766 non-English-speaking users accessed the City of San José Doorway portal. The breakdown was as follows: 4,259 Spanish-speaking users, 1,485 Chinese-speaking users, and 1,022 Vietnames
e-speaking users.

Regarding outreach, the Doorway portal is promoted in multiple ways:
- Promoted via the monthly Housing Department newsletter (10,000+ recipients)
- Accessible via the homepage of the Housing Department website - Included in Housing Department flyers as a QR code available to attendees at community events. Events include the City of San José Career Expo (October 2, 2025) and Disability Awareness Day (October 30, 2025).

Persons 6766 City of San José Doorway Portal analytics
via Exygys
S-13 Affordable Housing
Renter Portal Access
90% of funded affordable properties listing
on Doorway by 2028 12/31/2028 6th Cycle Continuous
As of December 31, 2025, a total of 89 properties were listed on the City of San José Doorway portal. Of these 89 properties, 48 had active City funding.

There are a total of 102 properties with active City funding and affordability restri
ctions, which brings the current percentage of properties posted on Doorway to 47% (48/102). All newly funded affordable housing properties are required to list on Doorway.

Other 47
City of San José Doorway Portal analytics
via Exygys, City of San José loan and
affordablity restriction records
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 51 ends

S-14 Advocacy for Tenant-
Based Vouchers
Legislation passage 12/31/2026 6th Cycle Continuous
In 2025, the City continued to advocate for the use of Tenant-Based Vouchers and worked with the Santa Clara County Housing Authority's staff to explore TBVs for residents in interim housing. Staff continues to meet regularly with SCCHA
to discuss maximizing voucher utilization and housing placements.

Other
Council memo for the City Housing
Authority's approval of the Moving to Work
FY 2026 Plan, which contains direction on
exploring us
e of vouchers for interim
housing:
https://sanJosé.legistar.com/LegislationDetail
.aspx?ID=7272340&GUID=AFC73EB9-510E-
4D64-9DB9-CFEAC96964CE
S-14 Advocacy for Tenant-
Based Vouchers
Support letters and meetings on vouchers 12/31/2026 6th Cycle Continuous See des cription above for S-14. Other None S-15 Tenant preferences
in VTA station areas
By 2031: At least 2 sets of affordability
restrictions recorded requiring tenant
preferences 1/31/2031 6th Cycle Continuous
As of 2025, affordable housing developments in station areas have regularly sought City funds and are therefore subject to the City's Tenant Preference program (except for developments using state or direct federal funding). No additional approval is needed to implement Tenant Preferences in VTA station areas. The Tenant Preference program, as approved by Council in March 2024, applies to all city-owned sites and to those with City development agreements. Staff will continue to monitor City-funded VTA station area deals and report units subject to Tenant Preferences under Program S-20. This work item is considered complete. For example, there are 2 VTA projects - Tamien and Berryessa where our TPP policy will be implemented. City is currently working on a prospective project called VTA capitol as well. the city has RFP'ed 4 publicly owned sites (71 Vista, Arena, West Comm Center, 101 S Jackson) for development, if these sites are awarded and developed, the TPP policy will be implemented.

Other None
S-15 Tenant preferences
in VTA station areas
70 restricted affordable units subject to
preferences in station areas
1/31/2031 6th Cycle Continuous See descri ption above for S-15. Units None S-16 Affirmative
marketing languages and
best practices for
afforda
ble housing
2027: Requirement rolled out 12/31/2027 6th Cycle In Progres s Staff continues to operate Doorway, the City's online tenant portal in San José's top four languages. The multilingual feature is well used; according to Exygy, the consultant who created the portal, almost 6,800 users viewed almost 106,
000 pages on Doorway in Spanish, Vietnamese, and Chinese languages in 2025.

Staff plans to initiate development of an administrative affirmative marketing policy requirement in 2026.

Other
Doorway portal:
https://www.sanjoseca.gov/your-
government/departments-
offices
/housing/tenants/apply-for-affordable-
housing
S-16 Affirmative
marketing languages and
best practices for
affordable housing
Data collected for compliance 12/31/2027 6th Cycle In Progres s See description above for S-16. Other None S-16 Affirmative
marketing languages and
best practices for
affordable housing
2027: Library created & made available 12/31/2027 6th Cycle Not yet s tarted Work was not yet started on this item in 2025 as it is a medium-term priority. Other None S-17 Local Fair Chance /
"Ban the Box" ordinance
Report completed 12/31/2028 6th Cycle Not yet s
tarted Work was not yet started on this item in 2025 as it is a medium-term priority. Other None S-17 Local Fair Chance /
"Ban the Box" ordinance Council presentation made 12/31/2028 6th Cycle Not yet s tarted Work was not yet started on this item in 2025 as it is a medium-term priority. Other None S-17 Local Fair Chance /
"Ban the Box" ordinance Outreach done Ordinance drafted 12/31/2028 6th Cycle Not yet s tarted Work was not yet started on this item in 2025 as it is a medium-term priority. Other None S-17 Local Fair Chance /
"Ban the Box" ordinance Program proposal created 12/31/2028 6th Cycle Not yet s tarted Work was not yet started on this item in 2025 as it is a medium-term priority. Other None S-17 Local Fair Chance /
"Ban the Box" ordinance Council consideration 12/31/2028 6th Cycle Not yet s tarted Work was not yet started on this item in 2025 as it is a medium-term priority. Other None S-18 Review Data on City-
Monitored Properties to
Identify Fair Housing
Issues
Dec 2025: First data collection on
residents and applicants, then 2027, 2029,
2031
1/31/2031 6th Cycle In Progress
Rent data from affordable housing developments, subject to the City's oversight, is captured on "Rent Rolls". In 2025, this data system underwent a system-wide review. Following completion of the system review in 2026, data updates and redact
ion of personally identifiable information, staff intend to leverage AI to assist with this fair housing analysis, subject to budgetary constraints and higher-priority initiatives. Once analysis is conducted and outliers are identified, staff will meet with property managers to review affirmative marketing and lease-up practices to identify and address any potential fair housing issues.

Other None
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 52 ends

S-18 Review Data on City-
Monitored Properties to
Identify Fair Housing
Issues
Aug 2026: Outliers analysis 8/31/2026 6th Cycle Not yet s tarted See description above for S-18. Other None S-18 Review Data on City-
Monitored Properties to
Identify Fair Housing
Issues
Mar 2027: Meet with 100% of outlier
properties 3/31/2027 6th Cycle Not yet started See descri ption above for S-18. Other None
S-18 Review Data on City-
Monitored Properties to
Identify Fair Housing
Issues
Technical assistance given 3/31/2027 6th Cycle Not yet s tarted See description above for S-18. Other None S-19 Certificate of
Preference Program
Jan 2025: Research and legal analysis
conducted 12/31/2025 6th Cycle Not yet started
In 2025, given the delay in development in the Diridon Station Area and the need for the Partnership for the Bay's Future Policy Fellow to seek funding for healthcare services for the homeless, this work was deprioritized and moved to later in the planning period.

Other None
S-19 Certificate of
Preference Program
Jun 2027: Findings presented to Council 6/30/2027 6th Cycle Not yet s tarted See description above for S-19. Other None S-19 Certificate of
Preference Program
If Council directed, program developed in
2027
12/31/2027 6th Cycle Not yet started See descri ption above for S-19. Other None S-20 Tenant Preferences
that Help Fight
Displacement
Dec 2023: Complete disparate impact
analysis for 2 proposed preferences and
submit to HCD for review
12/31/2023 6th Cycle In Progress
The Tenant Preferences Program to Help Fight Displacement was approved by Council in 2024, and staff implemented it throughout 2025. Last year, staff developed draft administrative guidelines that were circulated among Housing staff,
community stakeholders, and affordable housing developers. Staff anticipates completion of the administrative guidelines in 2026. As of late 2025, two developments were actively implementing the Tenant Preference Program. Staff expect that over the next four years, as many as 300 affordable housing units will be set aside under the Program for eligible applicants.

In 2025, staff monitored upcoming subject properties, anticipating state funding to determine whether a new disparate impact analysis was needed for HCD review.

In 2025, the City also deprioritized development of a Displaced Person preference, as a new preference would significantly reduce the effectiveness and impact of the existing Tenant Preferences Program, given that the overall 35% set-aside of units would be divided among all preference programs. As the Tenant Preferences Program to Help Fight Displacement reaches a larger cohort of City residents, administering the current program has been deemed the most efficient use of limited staff resources.

Other
Web page for Tenant Preferences Program:
https://www.sanjoseca.gov/your-
government/departments-
offices
/housing/resource-library/housing-
policy-plans-and-reports/tenant-preferences
S-20 Tenant Preferences
that Help Fight
Displacement
Mar 2024: Draft program presented to City
commission and Council committee 3/31/2024 6th Cycle Completed See descri ption above for S-20. Other 1 None S-20 Tenant Preferences
that Help Fight
Displacement
Apr 2024: Council approval of ordinance 4/30/2024 6th Cycle Completed S ee description above for S-20. Other 1 None S-20 Tenant Preferences
that Help Fight
Displacement
Jun 2024: Initiate development of
Displaced Tenant Preference, including
research, analysis, and community
engagement
6/30/2024 6th Cycle Not yet started See descri ption above for S-20. Other None S-20 Tenant Preferences
that Help Fight
Displacement
Mar 2025: Draft program presented to City
commission and Council committee 3/31/2025 6th Cycle Not yet started See descri ption above for S-20. Other None S-20 Tenant Preferences
that Help Fight
Displacement
June 2025: Council approval of ordinance 6/30/2025 6th Cycle Not yet s tarted See description above for S-20. Other None S-21 Facilitation of Equal
Access to Housing
Jul 2024 Metrics developed by
collaboration with and feedback from at
least 3 fair housing grantees
7/31/2024 6th Cycle Continuous
The City will continue to fund the Fair Housing Program, which is identified in the 2025–2030 Consolidated Plan and the FY 2025–2026 Annual Action Plan as a priority area under the Increasing Housing Affordability goal. Due to federal fundi
ng uncertainties in FY 2025–2026, federally funded projects were temporarily paused pending execution of HUD grant agreements and receipt of federal entitlement funds. Grant agreements were executed, and funds are anticipated to be disbursed in January 2026. Contract negotiations are expected to begin by February 2026.

Other
An update on progress for the remainder of
FY 2025–2026 will be provided at the end of
the fiscal year. Agencies were informed that
services could be initiated at the beginning of
the fiscal year in July at their own risk,
pending HUD’s disbursement of federal
funds. Agencies may have continued to
deliver services to San José residents during
this period and may be eligible for
reimbursement for eligible costs, provided all
federal funding requirements are met.

ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 53 ends

S-21 Facilitation of Equal
Access to Housing Funding to nonprofit fair housing providers 6th Cycle Continuous In FY 2025–2026, a total of $400,000 in federal funds (CDBG and HOME) was awarded to the Law Foundation for the Fair Housing Program, consistent with prior-year funding levels.

Other 1611484
FY 25-26 Annual Action Plan
S-21 Facilitation of Equal
Access to Housing # people assisted 6th Cycle Continuous No quantified outcomes are reported for Q1 and Q2 due to federal funding uncertainties in FY 2025–2026. Federally funded projects were temporarily paused pending execution of HUD grant agreements and receipt of federal entitlem
ent funds. Grant agreements were executed, and funds disbursed in January 2026, and contract negotiations are expected to begin by February 2026.

Persons 512
An update on progress for the remainder of
FY 2025–2026 will be provided at the end of
the fiscal year. Agencies were informed that
services could be initiated at the beginning of
the fiscal year in July at their own risk,
pending HUD’s disbursement of federal
funds. Agencies may have continued to
deliver services to San José residents during
this period and may be eligible for
reimbursement for eligible costs, provided all
federal funding requirements are met.

S-22 Fair Housing
Services and Support
Annual meetings held 1/31/2031 6th Cycle Continuous
Two meetings were convened between the City and its consortium of grantees that provide fair housing testing, outreach and education, and legal representation services.

Meetings 3 None
S-22 Fair Housing
Services and Support Priorities established jointly 1/31/2031 6th Cycle Continuous Mont
hly meetings Law Foundation, Project Sentinel, Senior Adult Legal Services, and Asian Law Alliance (Fair Housing Consortium)across the first half of CY2025. With the Federal Government's pause on community funding and staff on appr
oved medical leave, these meetings did not reconvene
before the end of the calendar year. Staff anticipates reviving these meetings with the execution of a new contract and the return of staff to lead this effort.

Other None
S-23 Know Your Rights
Materials
Jul 2024: Outreach Strategy developed 7/31/2024 6th Cycle Completed A s indicated in the 2024 APR, this metric is considered complete. Other 1 None S-23 Know Your Rights
Materials
Jan 2025: funding source identified 1/31/2025 6th Cycle Continuous Funds from City protection ordinance fees and other Housing Department funds are sufficient to support this ongoing work.

Other 1 None
S-23 Know Your Rights
Materials # of communications pieces released 12/31/2025 6th Cycle Continuous The c
ommunications team has continued to maintain the "Renting Has Its Rights" website; brochures, social posts, and related materials are distributed by Housing staff at tabling events; and content related to renters' rights is included in t
he Housing Department's monthly newsletter, which is distributed electronically to approximately 10,000 subscribers.

Other 35 None
S-23 Know Your Rights
Materials
# of recipients of communications 12/31/2025 6th Cycle Continuous See S -2(3) above Persons 10000 None S-23 Know Your Rights
Materials
at least 2 partner organizations identified
to assist in outreach 12/31/2025 6th Cycle Completed
A grantee, Project Sentinel, conducts outreach and education to tenants and property owners regarding rental housing rights and obligations. The contract was originally awarded in 2024 with multi-year options to continue services.

Another grant
ee, Legal Link, provides training programs for employees of community and social service agencies in San José on Housing Rights, using a "train the trainers" approach. The strategy is to train individuals who regularly interact with renters on the basics of San José's rental housing laws and on how to access resources when they need assistance resolving problems. The contract was originally awarded in 2024 with multi-year options to continue services.

Other 1 None
S-24 Targeted Fair
Housing Outreach and
Enforcement
Dec 2024: Data obtained from nonprofit
legal organizations on locations of
complaints
12/31/2024 6th Cycle In Progress
With the Federal Government's pause on community funding and staff on approved medical leave, this data collection has progressed on a slower-than- expected timeline. Staff anticipates continuing these efforts as funding is restored in 2026.

Other None
S-24 Targeted Fair
Housing Outreach and
Enforcement
15% increase in outreach in targeted
neighborhoods identified 1/31/2031 6th Cycle In Progress See S-24(1) above Other None
S-24 Targeted Fair
Housing Outreach and
Enforcement
May 2025: Capacity assessed of legal
assistance partners to do new outreach
with community partners
5/31/2025 6th Cycle In Progress See S-24(1) above Other None S-24 Targeted Fair
Housing Outreach and
Enforcement
Jun 2025: Funding identified 6/30/2025 6th Cycle In Progres s See S-24(1) above Other None S-24 Targeted Fair
Housing Outreach and
Enforcement
Jan 2026: Contracts executed 1/31/2026 6th Cycle Not yet s tarted See S-24(1) above Other None S-24 Targeted Fair
Housing Outreach and
Enforcement
# people assisted 1/31/2031 6th Cycle In Progres s See S-24(1) above Persons None S-24 Targeted Fair
Housing Outreach and
Enforcement
# services delivered 1/31/2031 6th Cycle In Progres s See S-24(1) above Other None ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 54 ends

S-25 Tenant-based
Vouchers in Higher-
resource Areas
by Dec 2023: Meet with SCCHA to
develop alignment of policies and
measures
12/31/2023 6th Cycle In Progress
In 2025, staff met regularly with SCCHA staff to discuss affordable housing transactions. Policy discussions and the City's approval of SCCHA's Moving to Work Plan focused on the use of vouchers for interim housing units and the most vulnerable populations as a higher priority. If staffing is adequate in 2026, staff will continue discussions about the locations of vouchers used in San José.

Other None
S-25 Tenant-based
Vouchers in Higher-
resource Areas
by Dec 2024: Seek Council approval to
direct SCCHA to capture relevant
performance measures, if necessary
12/31/2024 6th Cycle Not yet started See descri ption above for S-25. Other None S-25 Tenant-based
Vouchers in Higher-
resource Areas
by Jul 2026: Identify possible program
improvements 7/31/2026 6th Cycle Not yet started See descri ption above for S-25. Other None
S-25 Tenant-based
Vouchers in Higher-
resource Areas
7% increase of vouchers used in higher-
resource areas 12/31/2026 6th Cycle Continuous See descri ption above for S-25. Other None
S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Out
rea
ch and Education
Dec 2025: Launch hotline 12/31/2025 6th Cycle Completed Beginning in August 2024, through a Grantee, Project Sentinel, a dedicated phone number and email were established for the propose of providing education, guidance, and dispute resolution services to all residential tenants and landlords i
n the City of San Jose with the purpose of preventing and resolve rental housing conflicts. An amendment to the initial Grant is in effect and Project Sentinel continued to operate the hotline as of December 31, 2025.

Other 1 None
S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
Funds budgeted annually for tenant and
landlord outreach and education 1/31/2031 6th Cycle Continuous The City continues to fund Grants through June 30, 2026 to Grantees Project Sentinel and LegalLink to contine education and outreach on tenant-landlord issues utilizing CDBG funding.

Other 1 None
S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
Difference in average funding per year for
tenant and landlord outreach and
education from 2023 to 2031
1/31/2031 6th Cycle Not yet started This item cannot yet be reported, as the program's first year of funding completed in 2025. Other None
S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Out
rea
ch and Education
Services provided 1/31/2031 6th Cycle Continuous
Pr
oject Sentinel provides neutral tenant-landlord counseling and dispute resolution. The purpose of the services are that tenants and landlords alike understand their rights and responsibilities, while offering practicalsupport to address is
sues such as terminations, evictions,habitability, privacy, deposits, and rent increases. Services apply to all housing types, including apartments, single-family homes, mobilehomes, and properties governed by homeowners associations. Legal Link trains and supports groups of housing workers who frequently interact with tenants and works with established partner organizations to address housing-related legal issues at an early stage.

Other 1 None
S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
# Calls supported 1/31/2031 6th Cycle Continuous 800 Ot her 800 This is from the contract goals. Project
Sentinel typically recevies calls exceeding
this target. We do not have full reporting
from CY 2025 yet.

S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
# Clients served 1/31/2031 6th Cycle Continuous 800 Per sons 800 This is from the contract goals. Project
Sentinel typically meets or exceeds this
target. We do not have full reporting from CY
2025 yet.

S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
Jul 2025: funds identified for hotline 7/31/2025 6th Cycle Completed F unds were identified in 2024 for the hotline. Other 1 None S-27 Tenant/Landlord
Education Centers
Combined with S-1 6th Cycle None
S-28 Right to Counsel or
Alternative
2023-24: Collaborate with Bay Area
Housing Finance Authority on protections
policy event including right to counsel and
alternati
ves
12/31/2024 6th Cycle In Progress
In 2024, the Housing Department contracted with HR&A Advisors to complete a County-wide study on Eviction Court Alternatives. The study examines various eviction court interventions and analyzes the feasibility of those alternati
ves, including the Housing Department’s current efforts that began during the pandemic. The goal of the study is to identify efforts the City can continue or initiate to prevent families from falling into homelessness after a court action and to reach residents and housing providers further upstream during the eviction process. The study should also highlight gaps in the existing eviction court process ecosystem regarding how the Court, community service providers, legal aid, landlord bar, mediators, and the City coordinate efforts to resolve eviction cases and efficiently utilize safety net programs. The majority of the study's work was completed by the consultant in 2025, and the Housing Department is working to refine the recommendations, aiming to release the report in 2026.

Other None
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 55 ends

S-28 Right to Counsel or
Alternative 2023: RFP Issued 12/31/2023 6th Cycle Complet ed See description above for S-28. Other None S-28 Right to Counsel or
Alternative 2024: Consultant hired 12/31/2024 6th Cycle Complet ed See description above for S-28. Other 1 None S-28 Right to Counsel or
Alternative
2025: Consultant report completed and
program proposed to Council for approval 12/31/2025 6th Cycle In Progress Staff is currently working with consultants to review the report and will return to Council with recommendations. Other None
S-28 Right to Counsel or
Alternative
If approved, start program creation within
12 months of approval
12/31/2026 6th Cycle Not yet started See descr iption above for S-28 (4). Other None S-29 Rent Stabilization
Program Strategic Plan
and Program Assessment
2024: Outreach, program assessment,
and Strategic Plan completed with
consultant
12/31/2024 6th Cycle Completed Other 1 None
S
-29 Rent Stabilization
Program Strategic Plan
and Program Assessment
By 2026: Data collected as recommended 12/31/2026 6th Cycle In Progr ess
Work to improve and enhance the Rent Stabilization Program's Salesforce database to collect data aligned with the Strategic Plan began in 2025 and is expected to be finalized in 2026.

Other None
S-29 Rent Stabilization
Program Strategic Plan
and Program Assessment
Dec 2026: 80% of short-term activities
implemented 12/31/2026 6th Cycle Completed More than 80% of the short-term Rent Stabilization Program Strategic Plan activities have been completed. Other 1 None
S-29 Rent Stabilization
Program Strategic Plan
and Program Assessment
2028: Amendments presented to Council,
if any, during next three- year Strategic
Plan cycle
12/31/2028 6th Cycle In Progress
Proposed Amendments to the Mobilehome Rent Ordinance will be brought to the City Council in 2026, and possible amendments to the Apartment Rent Ordinance will be developed and brought to the City Council in 2026 or 2027.

Other None
S-30 Just Cause Eviction
Protection Amendment
2027: Analysis of issue 12/31/2027 6th Cycle Not yet started Significant work on this item did not commence in 2025 as it is a medium-term priority.

Other None
S-30 Just Cause Eviction
Protection Amendment
2027: Revised Ordinance presented to
Council
12/31/2027 6th Cycle Not yet started Significant work on this item did not commence in 2025 as it is a medium-term priority.

Other None
S-31 Tenant Protection
Ordinance Amendment
for Affordable Apartments
2027: Presentation to Council and Council
consideration of amended Ordinance 12/31/2027 6th Cycle Not yet started Other None S
-31 Tenant Protection
Ordinance Amendment
for Affordable Apartments
2025: Analysis of issue 12/31/2025 6th Cycle In Progr
ess
Housing Department has been working on an analysis of all Restricted Affordable Units to determine an accurate inventory of what units are exempt from the Tenant Protection Ordinance under the Ordinance's definition of "Affordable". With an accurate assessment of which units are exempt from the TPO, the HOusing Department can better analyze where there may be gaps in protection and what actions the city may want to consider.

Other None
S-31 Tenant Protection
Ordinance Amendment
for Affordable Apartments
2026: Ordinance amendment 12/31/2026 6th Cycle Not yet
started Other None
S-32 Local Enforcement
of State Tenant
Protections
State determined pathway 12/31/2026 6th Cycle Complet ed The metric is considered complete with the passage of SB 567. Other 1 None S-32 Local Enforcement
of State Tenant
Protections
Advocate for existing bills that could
incorporate local right to enforce 12/31/2026 6th Cycle Completed The metr ic is considered complete with the passage of SB 567. Other 1 None S-32 Local Enforcement
of State Tenant
Protections
Sponsored state bill if needed 12/31/2026 6th Cycle Complet ed The metric is considered complete with the passage of SB 567. Other 1 None S-32 Local Enforcement
of State Tenant
Protections
Work with coalition of rent stabilization
cities 12/31/2026 6th Cycle Continuous
The Rent Stabilization Program continues to participate in the California Rent Stabilization Network and attends quarterly meetings where best practices are shared and updates on State legislation or activities related to rent stabilization are shared.

Other 1 None
S-32 Local Enforcement
of State Tenant
Protections
Legislation passage 12/31/2026 6th Cycle Complet ed The metric is considered complete with the passage of SB 567. Other 1 None S-33 Job Training with
Housing Subsidies
# housing-subsidized participants in job
training programs 1/31/2031 6th Cycle Not yet started No programs offering job training combined with housing subsidies were implemented in 2025. Persons None
S-33 Job Training with
Housing Subsidies
Support letters and meetings for legislation
/ budget requests
1/31/2031 6th Cycle Not yet started No programs offering job training combined with housing subsidies were implemented in 2025.

Other None
S-34 Economic
Opportunity Strategies
Strategies created 1/31/2031 6th Cycle Continuous
In FY 2024–2025, the Housing Department finalized an agreement with WeeCare, Inc., dba Upwards (Upwards), awarding $1,048,394 in CDBG funds to support the Business Operation and Optimization Support Tools (BOOST) Program and will continue to fund the program through FY 2025-2026.

Other FY 25-26 Annual Action Plan
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 56 ends

S-34 Economic
Opportunity Strategies
Strategies implemented 1/31/2031 6th Cycle Continuous Consistent with prior-year funding levels, WeeCare was awarded the same amount of funding. Other None
S-34 Economic
Opportunity Strategies Programs funded 1/31/2031 6th Cycle Continuous Services were provided to 168 low- and moderate-income (LMI) childcare service providers. Persons 168 Quarterly Reports
N-1 Equitable
Neighborhoods-based
Investment Strategies
Dec 2023:Neighborhood engagement
strategy created 12/31/2023 6th Cycle In Progress
In June 2025, the City Council approved the 2025-2030 Consolidated Plan for HUD funds, including Community Development Block Grant funds for several capital projects in low- and moderate-income (LMI) neighborhoods. For the existi
ng Annual Action Plan, eligible uses included $150,000 for sidewalk repairs, $500,000 to support pedestrian and traffic safety through multi- sensory pedestrian signal enhancements that are accessible for disabled residents in six LMI census tracts; $260,000 for street light improvements, and up to $1.8 million in improvements in two affordable housing properties. In addition, $3,000,000 will support the La Placita Facility Improvement Project at the School of Arts and Culture at the Mexican Heritage Plaza, expanding cultural programming, food access, and job opportunities for residents in LMI areas. The identified low- and moderate-income neighborhoods tend to have higher concentrations of residents by race/ethnicity.

The City's ability to identify race and ethnicity in the use of federal funding was not generally restricted; however, in 2025, HUD imposed new funding conditions tied to immigration status verification and related executive policy directives that would have affected eligibility for certain federal grants. In response, the City joined a coalition of jurisdictions in King County v. Turner, challenging these conditions as unlawful and beyond the authority of federal agencies.

In June and August 2025, the U.S. District Court for the Western District of Washington issued preliminary injunctions preventing HUD and other agencies from enforcing these requirements against plaintiffs, including jurisdictions that redlined the contested provisions. The court extended these protections in January 2026, and the injunction will be reconsidered in February 2026.

Housing staff also continued to search in 2025 for additional funding sources to implement neighborhood investments and anti-displacement priorities.

Other
Council approval of the 2025-2030
Consolidated Plan, including use of CDBG
funds for Community Development
Investm
ents:
https://sanJosé.legistar.com/LegislationDetail
.aspx?ID=7406217&GUID=2EBB456E-8B29-
4A9B-9A0B-DD81BC4B3801
N-1 Equitable
Neighborhoods-based
Investment Strategies
By Mar 2024: Neighborhood engagement
launched 3/31/2024 6th Cycle In Progress See descri
ption above for item N-1. Other None
N-1 Equitable
Neighborhoods-based
Investment Strategies
Aug 2025: Council approves
Neighborhood investment priorities created
in draft Consolidated Plan
8/31/2025 6th Cycle In Progress See descri ption above for item N-1. Other None N-1 Equitable
Neighborhoods-based
Investment Strategies
At least 5 place- based improvements to
low-to-moderate resource neighborhoods
during the planning period
1/31/2031 6th Cycle Completed See descri
ption above for item N-1. Other 1 None
N-1 Equitable
Neighborhoods-based
Investment Strategies
$5M in additional funding sought to
support neighborhood investments and
anti- displacement strategies by 2031
1/31/2031 6th Cycle Continuous See descri ption above for item N-1. Other None N-2 Urban Village Plans
with Ant Displacement
Features
2024: Consultant- identified anti-
displacement features for Five Wounds
UV Plan
12/31/2024 6th Cycle In Progress
In 2025, staff continued working with the consultant but did not identify new anti-displacement strategies for Urban Village Plans. The Five Wounds UV plan is currently in the environmental review phase, with completion estimated for mid-2026.

Other None
N-2 Urban Village Plans
with Ant Displacement
Features
Other UV Plans ongoing beginning in 2025 1/31/2031 6th Cycle In Progres s Two urban village plans are currently in development, and staff will consider inclusion of strategies to help prevent the displacement of small businesses and residents.

Other None
N-3 Vacant and Neglected
Buildings and Storefront
Program
# buildings monitored 1/31/2031 6th Cycle Continuous
The Vacant and Neglected Building and Storefronts program is currently supported by one full-time inspector and one Limited-Dated (LD) inspector position. The LD position focuses on enhanced enforcement efforts within the downtown to addr
ess the most chronically vacant and blighted buildings, as well as other occupied, blighted, and nuisance properties. Staff also launched the interdepartmental Downtown Vacant Building and Storefront Working Group to coordinate strategies to improve prevention, intervention, and resolution outcomes.

In CY 2025, 214 vacant properties and/or storefronts are being monitored. 62 vacant properties/storefronts are being monitored by the LD inspector. 152 vacant properties/storefronts are being monitored by the full-time citywide inspector.

Other 214 None
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 57 ends
← All documents from this meeting