Cities Index.
Attachments, rev. 4/10/26

San Jose City Council
March 24, 2026

Document
Attachments, rev. 4/10/26
Meeting
March 24, 2026
Body
San Jose City Council
Pages
69
Original file
3.9 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

1 of 3
ATTACHMENT A – Costar Building Class & Star Ratings Definitions Costar Multi-family Class Definitions
Class A: In general, a class A building is an extremely desirable investment-grade property with the highest quality construction and workmanship, materials and systems, significant architectural features, the highest quality/expensive finish and trim, abundant amenities, first rate maintenance and management; usually occupied by prestigious tenants with above average rental rates and in an excellent location with exceptional accessibility.

It may have been built within the last 5-10 years, but if it is older, it has been renovated to maintain its status and provide it many amenities.

Class B: In general, a class B building offers more utilitarian space without special attractions. It will typically have ordinary architectural design and structural features, with average interior finish, systems, and floor plans, adequate systems and overall condition. It will typically not have the abundant amenities and location that a class A building will have.

Class C: In general, a class C building is a no-frills, older building that offers basic space. The property has below-average maintenance and management, a mixed or low tenant prestige, and inferior elevators and mechanical/electrical systems.

Class F: A functionally or economically obsolete building is one that does not offer a viable alternative for space and does not "compete" with others of similar type for occupancy by businesses seeking a location for operations. These buildings will usually have externally visible physical or structural features as well as internal ones that render it undesirable to be leased and therefore not competitive with any other properties in the market. The property may even be tagged as "Condemned" by the local authorities.

ATTACHMENT A – Costar Building Class & Star Ratings Definitions 2 of 3
Costar Multi-family Star Rating Definitions

RATING GROUP DEFINITION


A 5-Star building represents the luxury end of multi-family buildings defined by finishes, amenities, the overall interior/exterior design and the highest level of specifications for its style (garden, low-rise, mid-rise, or high-rise).

Architectural
Design
Exterior Materials/Façade
High-quality durable materials – natural stone, glass, well detailed and constructed metal panel, wood veneer, or
terracotta cladding; accentuating lighting.

Fenestration/Glazing/Views Large windows, abundant natural day lighting, generally available exterior views, high efficient glazing specification.

Overall Aesthetics
Representing current trends and standards in design and/or of a timeless, perhaps a historic quality. Aesthetically exceptional arrangement of forms, massing and materials. Possibly
designed by a notable or signature architect.

Structure/Systems High ceilings; modern energy-efficient, central HVAC, individually controlled systems, high- speed elevators, likely new or newly renovated.

Amenities
Unit Amenities/Design
Requires numerous high quality finishes such as hardwood floors, granite countertops, stainless steel appliances, bay window(s), crown molding, a balcony/patio and in-unit
washer/dryers. Also typically has an open floor plan and high/vaulted ceilings of 9’+
Site Amenities
Requires plentiful on-site shared facilities including a clubhouse/party room, fitness center, business center, pool, concierge, etc.

Site/Landscaping Continually maintained landscaping where applicable; exterior gathering spaces, roof terrace or courtyard.

Certifications Possibly a certified/labeled green and energy efficient building. 
4-Star buildings are constructed with higher end finishes and specifications, providing desirable amenities to residents and designed/built to competitive and contemporary standards.

Architectural
Design
Exterior Materials/Façade
Durable materials, well-detailed and constructed metal panel, wood veneer or terracotta cladding; possibly exhibiting minor signs of weathering and wear.

Fenestration/Glazing/Views Large windows, great natural day lighting and views.

Overall Aesthetics Representing recent trends and standards in design and/or of a timeless, perhaps an historic quality.

Structure/Systems Likely to have some 5 Star qualities, or of a prior generation of buildings.

Amenities
Unit Amenities/Design
Includes some high quality finishes such as hardwood floors, granite countertops, stainless steel appliances, bay window(s), crown molding, a balcony/patio and in-unit washer/dryers. Also may have an open floor plan and high/vaulted ceilings.

Site Amenities Several on-site shared facilities such as a Clubhouse/Party Room, Fitness Center, Business Center, Pool, Concierge, etc.

Site/Landscaping Well maintained landscaping where applicable; likely to have exterior gathering spaces, roof terrace or courtyard.

Certifications Possibly a certified/labeled green and energy efficient building. 
Architectural
Design
Exterior Materials/Façade Brick, stucco, EIFS, precast concrete, vinyl or fiber cement siding, possibly 4 Star materials with signs of age.

Fenestration/Glazing/Views Punched windows, fair mix of glazed and opaque surfaces that provide adequate natural light.

Overall Aesthetics Average with respect to background buildings, contextually appropriate.

Structure/Systems Likely smaller and older with less energy-efficient and controllable systems.

Amenities Unit Amenities/Design Average quality finishes, layout conducive to compact lifestyle ATTACHMENT A – Costar Building Class & Star Ratings Definitions 3 of 3

RATING GROUP DEFINITION
but not necessarily an open floor plan.

Site Amenities
A few on-site shared facilities and spaces such as a
Clubhouse/Party Room, Fitness Center, Business Center, Pool, Laundry Facilities, etc.

Site/Landscaping Modest landscaping and likely small or no exterior spaces.

Certifications Possibly a certified/labeled green and energy efficient building. 
Architectural
Design
Exterior Materials/Façade Brick, stucco, EIFS, precast concrete, siding with noticeable aging.

Fenestration/Glazing/Views Small, seemingly inadequate windows.

Overall Aesthetics Average, functional.

Structure/Systems Purely functional.

Amenities Unit Amenities/Design Below average finishes, inefficient use of space.

Site Amenities Likely only one or no on-site shared facilities.

Site/Landscaping Minimal or no landscaping, no exterior spaces.

Certifications Unlikely a certified/labeled green and energy efficient building.  Practically uncompetitive with respect to typical multi-family investors, may require significant renovation, possibly functionally obsolete.

Jurisdiction San Jose ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning
Period 6th Cycle 01/31/2023 - 01/31/2031
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Historic Sites Application
Status Project Type Notes
2 3 4 6 7 8 9 10 12 13 14
Prior APN+ Current APN Street Address Project Name+
Local
Jurisdiction
Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date
Application
Submitted
(see
instructions)
Acutely Low-
Income Deed
Restricted
Acutely Low-
Income Non
Deed
Restricted
Extremely Low-
Income Deed
Restricted
Extremely Low-
Income Non
Deed
Restricted
Very Low-
Income
Deed
Restricted
Very Low-
Income
Non Deed
Restricted
Low-
Income
Deed
Restricted
Low-Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed
Restricted
Above
Moderate-
Income
Total

PROPOSED
Units by
Project
Total

APPROVED
Units by
project
Total

DISAPPROVE
D Units by
Project
Please select
state
streamlining
provision/s the
application was
submitted
pursuant to.

Is this project
located on a
site with an
associated
historical
designation as
outlined in
Government
Code Section
65400(a)(2)(N)
and reported on
Table L?
Did the
housing
development
application
seek
incentives or
concessions
pursuant to
Government
Code section
65915?
Were
incentives or
concessions
requested
pursuant to
Government
Code section
65915
approved?
Please
indicate the
status of the
application.

Is the project
considered a
ministerial
project or
discretionary
project?
Notes+
Summary Row: Start Data Entry Below 0 0 27 0 105 0 354 0 104 0 3596 4186 1166 0 47236017 0 Herald Ave H24-063 5+ R 1/22/2025 12 12 NONE No Yes Yes Pending Discretionary 24947025 445 N 6th St H25-005 2 to 4 R 2/19/2025 4 4 4 NONE Yes - Local No N/A Approved Discretionary 24947025 445 N 6th St H25-005 SFD O 2/19/2025 2 2 2 NONE Yes - Local No N/A Approved Discretionary N/A 488 Doma Dr,
San Jose, CA H25-003 SFA O
2/19/2025
2 2 NONE No No N/A Pending Discretionary
30325060 3896 Stevens
Creek
Boulevard
MP25-003
5+ R
2/20/2025
27 513 540 540 NONE No Yes Yes Approved Ministerial
Local ministerial permit
419-04-034 1803 Bradford
Way H25-006 5+ R
3/12/2025
4 12 16 16 NONE No Yes Yes Approved Ministerial
264-38-068 906 Vine St,
San Jose H25-002 SFD O
3/20/2025
1 1 NONE Yes - Local No N/A Pending Discretionary
26110065 752 Laurel St H25-009 SFA O 3/28/2025 2 2 NONE No No N/A Pending Discretionary 25924041 323 Terraine St PD25-011 5+ R
4/9/2025
345 345 NONE No No N/A Pending Discretionary
49717015 200 Southside
Dr, H25-010 2 to 4 O
4/16/2025
6 6 NONE No No N/A Pending Discretionary
24103025 1655 Berryessa
Rd PD25-008 5+ R
4/23/2025
26 130 101 3 260 260 NONE No Yes Yes Approved Discretionary 30348020 479 Boynton
Ave H25-011 SFA O
5/5/2025
8 8 NONE No No N/A Pending Discretionary
64923001 2079 S White
Rd PD25-007 5+ R
5/5/2025
64 64 NONE No No N/A Pending Discretionary
N/A 620 N 6th St PDA15-055-02 5+ R
5/27/2025
11 11 NONE No No No Pending Discretionary
43413042 1325 Lick Ave,
San Jose, CA
95110
PD25-009
5+ R
6/3/2025
65 65 65 NONE No No No Approved Discretionary
43411011 1274 Vine
Street H25-013 SFA O
6/10/2025
2 2 NONE No No N/A Pending Discretionary
43407012 147 Goodyear
Street H25-014 SFA O
6/12/2025
2 2 NONE No No No Pending Discretionary
26438053 905 Almaden
Avenue H25-017 5+ O
6/23/2025
5 5 NONE Yes - Local Yes Yes Pending Discretionary
27720034, -035 326 South
Willard Avenue H25-018 5+ O
6/24/2025
11 202 213 NONE No Yes Yes Pending Discretionary
46737030 374 S 21st St,
San Jose 95116 H25-024
SFA O
7/9/2025
2 2 2 NONE No No N/A Approved Discretionary
N/A 415 East
Empire Street H25-016 5+ R
7/9/2025
1 5 6 NONE No Yes Yes Pending Discretionary
43906042 1295 Curtner
Avenue H25-021 5+ O
7/10/2025
12 12 NONE No No No Pending Discretionary
27719034, -035 529 Page Street H25-026 5+ R
8/11/2025
3 18 21 NONE No Yes N/A Pending Discretionary
25942085 180 Park
Avenue PD25-015 5+ R
8/12/2025
391 391 NONE Yes - Local No N/A Pending Discretionary
46733035 1239 East San
Fernando Street H25-028
SFA O
9/15/2025
2 2 NONE No No N/A Pending Discretionary
26420133 323 Gifford
Avenue H25-039 5+ R
10/29/2025
14 262 276 NONE No Yes Yes Pending Discretionary
42937003 1425 Cherry
Avenue H25-040 SFD O
10/29/2025
2 2 NONE No Yes N/A Pending Discretionary
42937003 1425 Cherry
Avenue H25-040 2 to 4 O
10/29/2025
4 4 NONE No Yes N/A Pending Discretionary
26112084 0 Emory St H26-006 SFA O 11/7/2025 18 18 NONE No Discretionary 23042014 1030 McKendrie
St H25-043 5+ O
11/24/2025
12 12 NONE No Yes N/A Pending Discretionary
46720079 147 E Santa
Clara St H25-041 5+ R
12/3/2025
415 415 NONE No Yes N/A Pending Discretionary
N/A 860 W San
Carlos St H25-045 5+ R
12/22/2025
27 27 215 3 272 NONE No Yes N/A Pending Discretionary
28211029 1099 S Bascom
Ave H25-044 5+ R
12/23/2025
476 476 NONE No Yes N/A Pending Discretionary
26446077 515 Coe Ave SF25-010 SFD O 4/25/2025 1 1 NONE Yes - Local No N/A Pending Discretionary 30723023 4173 Moreland
Way
2024 117449
000 00 RS
SFD O
2/3/2025
1 1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Approved Ministerial
46405019 4812
Birmingham Dr
2025 095837
000 00 RS
SFD O
2/19/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
68432139 320 Battle
Dance Dr
2025 099873
000 00 RS
SFD O
5/7/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
49465046 3281 Lantern
Way
2025 108026
000 00 RS
SFD O
5/15/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
67916002 4793 Whitetail
Lane
2024 117901
000 00 RS
SFD O
5/30/2025
0 0 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
N/A
1148 Palm St 2025 107609
000 00 RS
SFD O
6/13/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
48120005 117 Scharff
Avenue
2025 119589
000 00 RS
SFD O
7/21/2025
2 2 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
0 Table A
Cells in grey contain auto-calculation formulas
51 Project Identifier Unit Types Density Bonus Law
Applications
11 Housing Development Applications Submitted
Proposed Units - Affordability by Household Incomes
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 1 ends

N/A
1212 Brace Ave 2025 121209
000 00 RS
SFD O
10/10/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
N/A 2703 Gilham
Way
2025 132595
000 00 RS
SFD O
10/21/2025
1 1 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
42906092 0 Minnesota
Avenue
2025 105399
000 00 RS
SFD O
12/5/2025
2 2 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
43932064 2265 Mazzaglia
Ave, San Jose,
CA 95125
2025 094896
000 00 RS
SFD O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
Prefab
41919077 1772 Barcelona
Ave, San Jose,
CA
2025 098065
000 00 RS
SFD O
3/6/2025
1 1 1 NONE No No N/A Approved Ministerial
Prefab
42949082 1544 De Anza
Way, San Jose,
CA 95125
2025 108134
000 00 RS
SFD O
5/2/2025
1 1 1 NONE No No N/A Approved Ministerial
Prefab
43951015 929 Pascoe
Ave, San Jose,
CA
2025 108345
000 00 RS
SFD O
5/13/2025
1 1 1 NONE No No N/A Approved Ministerial
Prefab
61235039 10330 Clayton
Rd, San Jose,
CA
3-11805
SFD O
1/13/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
66006008 2922
Meadowlands
Ln, San Jose,
CA
3-18712
SFD O
1/15/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
66002061 7010 San Felipe
Rd, San Jose,
CA 95135
3-16390
SFD O
1/27/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
N/A 1581 Minnesota
Ave, San Jose,
CA
3-02701
SFD O
2/14/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
49709011 13014 Pfeifle
Ave, San Jose,
CA 95111
3-27312
SFD O
3/19/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
29915027 4180 Williams
Rd, San Jose,
CA
3-08679
SFD O
3/25/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
48423016 2797

FLORENCE
AVENUE San
José, CA
3-27326
SFD O
4/8/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
45609010 2132 CANOAS
GARDEN

AVENUE SAN

JOSE, CA,
95125
3-27325
SFD O
4/10/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
66002060 7008 SAN

FELIPE ROAD
San José, CA
95135
3-16390
SFD O
4/21/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
65207010 2890 Klein Rd,
San Jose, CA
95148
3-07022
SFD O
5/8/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
30723014 1303 Flora Ave,
San Jose, CA
95130
3-27344
SFD O
5/19/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
27459032 2540 Bailey
Ave, San Jose,
CA 95128
3-27360
SFD O
6/9/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
68003024 2352 Glen
Creek Ct, San
Jose, CA 95138
3-27374
SFD O
6/23/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
59207062 652 N Capitol
Ave, San Jose,
CA 95133
3-19620
SFD O
6/27/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
58143017 6803 Leyland
Park Dr, San
Jose, CA
3-27058
SFD O
7/1/2025
0 0 1 SB 9 (2021) -
Residential Lot
Split
No No N/A Approved Ministerial
60115083 145 Fleming
Avenue, San
Jose, CA 95127
3-27333
SFD O
7/29/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
59217021 2971 Bell
Avenue, San
Jose, CA 95133
3-27286
SFD O
7/29/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
48147035 1658 E San
Antonio St, San
Jose, CA 95116
3-27438
SFD O
10/2/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
42906092 0 Minnesota
Ave, San Jose,
CA 95125
3-27446
SFD O
10/8/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
49735125 2738 Cramer
Circle, San
Jose, CA 95111
3-27449
SFD O
10/15/2025
0 0 SB 9 (2021) -
Residential Lot
Split
No No N/A Pending Ministerial
65450082 2818
Brightwood Dr
2024 108147
000 00 RS
SFD O
2/3/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1585 Minnesota
Ave
2025 093436
000 00 RS
SFD O
2/18/2025
1 1 1 NONE No No N/A Approved Ministerial
47230049 551 S 15th St 2025 096574
000 00 RS
SFD O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
65207016 3535 Norwood
Ave
2025 097895
000 00 RS
SFD O
3/4/2025
1 1 1 NONE No No N/A Approved Ministerial
57754014 5827 Brasilia
Way
2025 098415
000 00 RS
SFD O
3/4/2025
1 1 1 NONE No No N/A Approved Ministerial
57754012 5831 Brasilia
Hill Ct
2025 101364
000 00 RS
SFD O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
57754012 5835 Brasilia
Hill Ct
2025 101371
000 00 RS
SFD O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
57754012 5839 Brasilia
Hill Ct
2025 101380
000 00 RS
SFD O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
57754012 5843 Brasilia
Hill Ct
2025 101384
000 00 RS
SFD O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
57713085 6138 Mancuso
St
2025 098535
000 00 RS
SFD O
3/27/2025
1 1 NONE No No N/A Pending Ministerial
N/A 2174 Old
Piedmont Rd
2025 098497
000 00 RS
SFA O
4/24/2025
2 2 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 2 ends

42927137 1111 Pine Ave 2025 104751
000 00 RS
SFD O
5/5/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 697 Altino Blvd 2025 110550
000 00 RS
SFD O
5/17/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 703 Altino Blvd 2025 110554
000 00 RS
SFD O
5/17/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 709 Altino Blvd 2025 110556
000 00 RS
SFD O
5/17/2025
1 1 1 NONE No No N/A Approved Ministerial
23042060 931 McKendrie
St
2025 102789
000 00 RS
SFA O
5/19/2025
2 2 SB 9 (2021) -
Duplex in SF
Zone
No No N/A Pending Ministerial
65214014 0 Ruby Ave 2024 074753
000 00 RS
SFD O
6/2/2025
1 1 NONE No No N/A Pending Ministerial
47205010 1307 Peach Ct 2025 105838
000 00 RS
SFD O
6/3/2025
1 1 NONE No No N/A Pending Ministerial
59527027 819 Boulder Dr 2025 107066
000 00 RS
SFD O
6/6/2025
1 1 NONE No No N/A Pending Ministerial
43917010 911 Franquette
Ave
2025 105906
000 00 RS
SFD O
7/1/2025
1 1 NONE No No N/A Pending Ministerial
59120033 1028 Wilsham
Dr
2025 111493
000 00 RS
SFD O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
N/A 3543 Kettman
Rd
2025 114735
000 00 RS
SFD O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
N/A 3543 Kettman
Rd
2025 114728
000 00 RS
SFD O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
N/A 3543 Kettman
Rd
2025 116871
000 00 RS
SFD O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
23021042 1079 Myrtle St 2025 106385
000 00 RS
SFA O
7/24/2025
2 2 NONE No No N/A Pending Ministerial
N/A 16 Silver Elm Ct 2025 122660
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 18 Silver Elm Ct 2025 122664
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 20 Silver Elm Ct 2025 122665
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 22 Silver Elm Ct 2025 122668
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 24 Silver Elm Ct 2025 122670
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 42 Still Water Ct 2025 122672
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 40 Still Water Ct 2025 122673
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 38 Still Water Ct 2025 122675
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 36 Still Water Ct 2025 122687
000 00 RS
SFD O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 35 Silver Elm Ct 2025 122993
000 00 RS
SFD O
8/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 33 Silver Elm Ct 2025 122994
000 00 RS
SFD O
8/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 31 Silver Elm Ct 2025 122999
000 00 RS
SFD O
8/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 29 Silver Elm Ct 2025 123001
000 00 RS
SFD O
8/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 10 Silver Elm Ct 2025 123662
000 00 RS
SFD O
8/7/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 27 Silver Elm Ct 2025 123667
000 00 RS
SFD O
8/7/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 25 Silver Elm Ct 2025 123673
000 00 RS
SFD O
8/7/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 3543 Kettmann
Rd
2025 104705
000 00 RS
SFD O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
46737030 374 S 21st St 2025 117532
000 00 RS
SFA O
8/11/2025
2 2 NONE No No N/A Pending Ministerial
N/A 3543 Kettmann
Rd
2025 114879
000 00 RS
SFD O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
69503049 0 Rolling Glen
Ct
2025 122288
000 00 RS
SFD O
8/21/2025
1 1 NONE No No N/A Pending Ministerial
N/A 5863 Brasilia
Hill Ct
2025 126860
000 00 RS
SFD O
8/26/2025
1 1 1 NONE No No N/A Approved Ministerial
57713086 6146 Mancuso
St
2025 097536
000 00 RS
SFD O
8/26/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5859 Brasilia
Hill Ct
2025 127033
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5855 Brasilia
Hill Ct
2025 127044
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5851 Brasilia
Hill Ct
2025 127050
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5847 Brasilia
Hill Ct
2025 127052
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 12 Silver Elm Ct 2025 122593
000 00 RS
SFD O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 715 Altino Blvd 2025 128319
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 721 Altino Blvd 2025 128385
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 727 Altino Blvd 2025 128405
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 733 Altino Blvd 2025 128415
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 739 Altino Blvd 2025 128420
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 745 Altino Blvd 2025 128425
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 751 Altino Blvd 2025 128430
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 757 Altino Blvd 2025 128439
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 763 Altino Blvd 2025 128443
000 00 RS
SFD O
9/4/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 14 Silver Elm Ct 2025 122594
000 00 RS
SFD O
9/8/2025
1 1 1 NONE No No N/A Approved Ministerial
69511045 808 Colleen Dr 2025 130805
000 00 RS
SFD O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
37321047 6757
Devonshire Dr
2025 124064
000 00 RS
SFD O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
38131056 1489 Saratoga
Ave
2025 136541
000 00 RS
SFD O
11/3/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1199 Piedmont
Rd
2025 140615
000 00 RS
SFD O
11/14/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 1201 Piedmont
Rd
2025 140633
000 00 RS
SFD O
11/14/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 1203 Piedmont
Rd
2025 140642
000 00 RS
SFD O
11/14/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 0 Del Norte Dr 2025 140649
000 00 RS
SFD O
11/14/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 3 ends

23016025 1194 Sherwood
Ave
2025 132399
000 00 RS
SFD O
11/20/2025
1 1 NONE No No N/A Pending Ministerial
41934004 15385 Warwick
Rd
2025 140513
000 00 RS
SFA O
12/2/2025
2 2 NONE No No N/A Pending Ministerial
49711043 13080 Haga Dr,
San Jose, CA
2024 115257
000 00 RS
ADU O
1/2/2025
1 1 1 NONE No No N/A Approved Ministerial
41902036 4412 JAN WY,

SAN JOSE, CA
95124
2024 116610
000 00 RS
ADU O
1/2/2025
1 1 1 NONE No No N/A Approved Ministerial
59916030 840 Selby Ln,
San Jose, CA
2024 115868
000 00 RS
ADU O
1/6/2025
1 1 1 NONE No No N/A Approved Ministerial
44730028 4196 PALADIN

DR, SAN JOSE,
CA 95124
2024 103757
000 00 RS
ADU O
1/6/2025
1 1 1 NONE No No N/A Approved Ministerial
29928073 828 Onyx Ct,
San Jose, CA
2024 112372
000 00 RS
ADU O
1/6/2025
1 1 NONE No No N/A Pending Ministerial
28222016 650 PAMLAR

AV, SAN JOSE,
CA 95128
2024 115685
000 00 RS
ADU O
1/6/2025
1 1 1 NONE No No N/A Approved Ministerial
43427050 1686 Mackey
Ave, San Jose,
CA
2024 116788
000 00 RS
ADU O
1/7/2025
1 1 1 NONE No No N/A Approved Ministerial
67657062 1559 Yerba
Buena Rd, San
Jose, CA
2024 114597
000 00 RS
ADU O
1/7/2025
1 1 1 NONE No No N/A Approved Ministerial
59904074 3148 TRISTIAN

AV, SAN JOSE,
CA 95127
2024 095117
000 00 RS
ADU O
1/8/2025
1 1 1 NONE No No N/A Approved Ministerial
67821080 7236 Clear
Vista Ct, San
Jose, CA
2024 094968
000 00 RS
ADU O
1/9/2025
1 1 NONE No No N/A Pending Ministerial
48443080 2591 SIERRA

GRANDE WY,

SAN JOSE, CA
95116
2024 101205
000 00 RS
ADU O
1/9/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 1253 SETTLE

AV, SAN JOSE,
CA 95125
2024 117433
000 00 RS
ADU O
1/9/2025
1 1 NONE No No N/A Approved Ministerial
37803005 1033

HUNTINGDON

DR, SAN JOSE,
CA 95129
2024 116780
000 00 RS
ADU O
1/10/2025
1 1 1 NONE No No N/A Approved Ministerial
65934015 2851 Riedel Rd,
San Jose, CA
2024 108407
000 00 RS
ADU O
1/13/2025
1 1 1 NONE No No N/A Approved Ministerial
26438032 829 Vine St,
San Jose, CA
2024 117280
000 00 RS
ADU O
1/13/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
48121040 2203 Lausett
Ave, San Jose,
CA
2024 111905
000 00 RS
ADU O
1/13/2025
1 1 NONE No No N/A Pending Ministerial
N/A 203 N 5th St
Unit 4, San
Jose, CA
2025 090816
000 00 RS
ADU O
1/13/2025
1 1 1 NONE No No N/A Approved Ministerial
27426006 1825

UNIVERSITY

WY, SAN

JOSE, CA
95126
2024 107376
000 00 RS
ADU O
1/13/2025
1 1 1 NONE No No N/A Approved Ministerial
64701031 10141

TORRANCE

AV, SAN JOSE,
CA 95127
2024 075074
000 00 RS
ADU O
1/21/2025
1 1 1 NONE No No N/A Approved Ministerial
44714014 3440 Manda Dr,
San Jose, CA
2024 109072
000 00 RS
ADU O
1/22/2025
1 1 1 NONE No No N/A Approved Ministerial
56712094 5511 Camden
Ave, San Jose,
CA
2024 117617
000 00 RS
ADU O
1/23/2025
1 1 1 NONE No No N/A Approved Ministerial
59218014 2942 Edison Dr,
San Jose, CA
2024 112980
000 00 RS
ADU O
1/23/2025
1 1 NONE No No N/A Pending Ministerial
48416072 108 Birch Ln,
San Jose, CA
2024 110746
000 00 RS
ADU O
1/23/2025
1 1 1 NONE No No N/A Approved Ministerial
44245033 1722 DON AV,

SAN JOSE, CA
95124
2024 113645
000 00 RS
ADU O
1/23/2025
1 1 1 NONE No No N/A Approved Ministerial
56947051 5376

GREENBANK

CT, SAN JOSE,
CA 95118
2024 118992
000 00 RS
ADU O
1/24/2025
1 1 1 NONE No No N/A Approved Ministerial
47743098 1408 TAPER

CT, SAN JOSE,
CA 95122
2024 114276
000 00 RS
ADU O
1/24/2025
1 1 1 NONE No No N/A Approved Ministerial
26460051 1067 CAMINO

PABLO, SAN

JOSE, CA
95125
2024 111958
000 00 RS
ADU O
1/27/2025
1 1 1 NONE No No N/A Approved Ministerial
66040050 3333
Meadowlands
Ln, San Jose,
CA
2024 107484
000 00 RS
ADU O
1/27/2025
1 1 NONE No No N/A Pending Ministerial
68057018 5356 Laurel
Canyon Dr, San
Jose, CA
2024 118200
000 00 RS
ADU O
1/28/2025
1 1 NONE No No N/A Pending Ministerial
26403005 1271

FRUITDALE

AV, SAN JOSE,
CA 95126
2024 105474
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
67606061 3282 MAPLE

LEAF CT, SAN

JOSE, CA
95121
2024 119191
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
45123046 4168 EL

CORAL WY,

SAN JOSE, CA
95118
2024 113355
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
65915027 2982 Castleton
Dr, San Jose,
CA
2024 117645
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 4 ends

24923039 577 N 22nd St,
San Jose, CA
2024 117708
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
42940013 1460

GLENWOOD

AV, SAN JOSE,
CA 95125
2024 117757
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
38141072 5088

WILLIAMS RD,

SAN JOSE, CA
95129
2024 117995
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
61257007 15159 Rosemar
Ave, San Jose,
CA
2024 092633
000 00 RS
ADU O
1/30/2025
1 1 NONE No No N/A Pending Ministerial
44614048 1534

ALTAMONT AV,

SAN JOSE, CA
95125
2024 118014
000 00 RS
ADU O
1/30/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 11751
Southwood Dr
Unit 2, San
Jose, CA
2025 093108
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
41413051 2047 Foxworthy
Ave, San Jose,
CA
2025 089402
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
64927058 3284

FLINTMONT

DR, SAN JOSE,
CA 95148
2024 110305
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
49103138 2698 Tagart Dr,
San Jose, CA
2024 117533
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
65450082 2818
Brightwood Dr,
San Jose, CA
2024 103148
000 00 RS
ADU O
2/3/2025
1 1 NONE No No N/A Pending Ministerial
68435095 392 Indian
Broom Dr, San
Jose, CA
2024 116848
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
42119079 4960 Bel Escou
Dr, San Jose,
CA
2025 092810
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
58904003 1891 Camargo
Dr, San Jose,
CA
2024 118577
000 00 RS
ADU O
2/3/2025
1 1 1 NONE No No N/A Approved Ministerial
67010031 1624

SARALYNN

DR, SAN JOSE,
CA 95121
2024 118302
000 00 RS
ADU O
2/4/2025
1 1 1 NONE No No N/A Approved Ministerial
24917008 761 N 19th St,
San Jose, CA
2024 117875
000 00 RS
ADU O
2/4/2025
1 1 1 NONE No No N/A Approved Ministerial
59912010 3356 San
Mardo Ave, San
Jose, CA
2024 114927
000 00 RS
ADU O
2/5/2025
1 1 1 NONE No No N/A Approved Ministerial
67612033 4561 Pacific
Rim Way, San
Jose, CA
2025 090176
000 00 RS
ADU O
2/5/2025
1 1 NONE No No N/A Pending Ministerial
24959029 449 N 18TH ST,

SAN JOSE, CA
95112
2024 117986
000 00 RS
ADU O
2/5/2025
1 1 1 NONE No No N/A Approved Ministerial
24959028 451 N 18th St,
San Jose, CA
2024 117989
000 00 RS
ADU O
2/5/2025
1 1 1 NONE No No N/A Approved Ministerial
43424046 1526 Sanborn
Ave, San Jose,
CA
2024 116895
000 00 RS
ADU O
2/5/2025
1 1 NONE No No N/A Pending Ministerial
68065011 2362 Bentley
Ridge Dr, San
Jose, CA
2024 087560
000 00 RS
ADU O
2/7/2025
1 1 NONE No No N/A Pending Ministerial
26453028 1033 Ramona
Ave, San Jose,
CA
2024 107440
000 00 RS
ADU O
2/10/2025
1 1 NONE No No N/A Pending Ministerial
68513066 78 Park Sharon
Dr, San Jose,
CA
2024 119160
000 00 RS
ADU O
2/10/2025
1 1 NONE No No N/A Pending Ministerial
67604058 2102 Chisin Ct,
San Jose, CA
2024 116558
000 00 RS
ADU O
2/11/2025
1 1 NONE No No N/A Pending Ministerial
37714018 6074 Alcante
Dr, San Jose,
CA 95129
2025 095127
000 00 RS
ADU O
2/10/2025
1 1 NONE No No N/A Pending Ministerial
67604058 2102 Chisin Ct,
San jose, CA
2024 116558
000 00 RS
ADU O
2/11/2025
1 1 NONE No No N/A Pending Ministerial
37814015 1203 Lynbrook
Way, San Jose,
CA
2024 117436
000 00 RS
ADU O
2/11/2025
1 1 NONE No No N/A Pending Ministerial
N/A 996 Faris Dr,
San Jose, CA
95111
2025 094898
000 00 RS
ADU O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 2873 Sweetleaf
Ct Unit 2, San
Jose, CA
2025 094900
000 00 RS
ADU O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 931 McKendrie
St Unit 2, San
Jose, CA
2025 094895
000 00 RS
ADU O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
41941036 5143 Leigh Ave,
San Jose, CA
2025 091842
000 00 RS
ADU O
2/11/2025
1 1 1 NONE No No N/A Approved Ministerial
26105022 846 HARDING

AV, SAN JOSE,
CA 95126
2024 119155
000 00 RS
ADU O
2/11/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
42941023 1471
Cherrydale Dr,
San Jose, CA
2024 105159
000 00 RS
ADU O
2/13/2025
1 1 NONE No No N/A Pending Ministerial
49461019 4345
Houndsbrook
Way, San Jose,
CA
2024 101412
000 00 RS
ADU O
2/13/2025
1 1 NONE No No N/A Pending Ministerial
43920084 1763 Jonathon
Ave, San Jose,
CA
2024 119237
000 00 RS
ADU O
2/13/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 5 ends

37210017 7123 GALLI DR,

SAN JOSE, CA
95129
2025 091242
000 00 RS
ADU O
2/14/2025
1 1 1 NONE No No N/A Approved Ministerial
45603039 1661
Guadalupe Ave,
San Jose, CA
2025 091372
000 00 RS
ADU O
2/14/2025
1 1 1 NONE No No N/A Approved Ministerial
64702062 10221 Griffith St
Unit 2, San
Jose, CA
2024 118579
000 00 RS
ADU O
2/14/2025
1 1 1 NONE No No N/A Approved Ministerial
68030019 2188 Shadow
Ridge Way, San
Jose, CA
2024 117759
000 00 RS
ADU O
2/14/2025
1 1 1 NONE No No N/A Approved Ministerial
24958039 387 N 17th St,
San Jose, CA
2024 117402
000 00 RS
ADU O
2/18/2025
1 1 NONE No No N/A Pending Ministerial
24922041 1049 Calumet
Ct, San Jose,
CA
2025 091776
000 00 RS
ADU O
2/18/2025
1 1 1 NONE No No N/A Approved Ministerial
61248012 1002 Juliet Ave,
San Jose, CA
2025 091246
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
56930028 1380 Luning Dr,
San Jose, CA
2025 090848
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
66045035 6224

DOVETAIL CT,

SAN JOSE, CA
95135
2024 117804
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
30724013 4056 Moreland
Way, San Jose,
CA
2024 110423
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
46737043 224 S 21st St,
San Jose, CA
2024 119163
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
41222029 680 ELDEN DR,

SAN JOSE, CA
95008
2025 092105
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
64904016 3202 MARTEN

AV, SAN JOSE,
CA 95148
2025 092107
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
46440010 5073 NEW

ENGLAND CT,

SAN JOSE, CA
95136
2025 092937
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
26110089 801 W Taylor
St, San Jose,
CA
2025 092106
000 00 RS
ADU O
2/19/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 1067 Noble Ln,
San Jose, CA
2025 091321
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
27424004 1666 University
Way, San Jose,
CA
2024 114317
000 00 RS
ADU O
2/19/2025
1 1 NONE No No N/A Pending Ministerial
64703024 10251 Murtha
Dr, San Jose,
CA
2024 103966
000 00 RS
ADU O
2/20/2025
1 1 NONE No No N/A Pending Ministerial
1505136 1346 Grand
Blvd, San Jose,
CA
2024 097703
000 00 RS
ADU O
2/21/2025
1 1 NONE No No N/A Pending Ministerial
70614022 7402 Pegasus
Way, San Jose,
CA
2025 092559
000 00 RS
ADU O
2/21/2025
1 1 NONE No No N/A Pending Ministerial
48423036 184 S Capitol
Ave, San Jose,
CA
2025 093158
000 00 RS
ADU O
2/21/2025
1 1 NONE No No N/A Pending Ministerial
68524040 125 Red River
Way, San Jose,
CA
2025 092461
000 00 RS
ADU O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
40329033 5248 Bobbie
Ave, San Jose,
CA
2025 092183
000 00 RS
ADU O
2/21/2025
1 1 NONE No No N/A Pending Ministerial
24914112 726 VESTAL

ST, SAN JOSE,
CA 95112
2024 117718
000 00 RS
ADU O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
43952061 1747 Cottle
Ave, San Jose,
CA
2024 118713
000 00 RS
ADU O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
43918068 2085 ELLEN

AV, SAN JOSE,
CA 95125
2024 117036
000 00 RS
ADU O
2/21/2025
1 1 1 NONE No No N/A Approved Ministerial
68501006 35 SHENADO

PL, SAN JOSE,
CA 95136
2025 093660
000 00 RS
ADU O
2/24/2025
1 1 1 NONE No No N/A Approved Ministerial
47744001 902 Thelma
Way, San Jose,
CA
2024 118001
000 00 RS
ADU O
2/24/2025
1 1 NONE No No N/A Pending Ministerial
65225027 2514 Flint Ave,
San Jose, CA
2025 094217
000 00 RS
ADU O
2/25/2025
1 1 1 NONE No No N/A Approved Ministerial
67849099 5914 SILVER

LEAF RD, SAN

JOSE, CA
95138
2025 092161
000 00 RS
ADU O
2/25/2025
1 1 1 NONE No No N/A Approved Ministerial
9214014 1924

CAMARGO DR,

SAN JOSE, CA
95132
2025 093730
000 00 RS
ADU O
2/25/2025
1 1 1 NONE No No N/A Approved Ministerial
67683018 2145 Terrena
Valley Dr, San
Jose, CA
2025 094442
000 00 RS
ADU O
2/25/2025
1 1 NONE No No N/A Pending Ministerial
45122015 1165 Rodney
Dr, San Jose,
CA
2025 090118
000 00 RS
ADU O
2/26/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1108 Pine Ave,
San Jose, CA
2025 094227
000 00 RS
ADU O
2/26/2025
1 1 NONE No No N/A Pending Ministerial
65918033 2880 Haughton
Dr, San Jose,
CA
2024 118282
000 00 RS
ADU O
2/26/2025
1 1 1 NONE No No N/A Approved Ministerial
65449037 3086 WOODS

WY, SAN

JOSE, CA
95148
2024 109076
000 00 RS
ADU O
2/26/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 6 ends

37720077 1207

JOHNSON AV,

SAN JOSE, CA
95129
2025 092974
000 00 RS
ADU O
2/26/2025
1 1 1 NONE No No N/A Approved Ministerial
46737030 374 S 21st St,
San Jose, CA
2025 094008
000 00 RS
ADU O
2/27/2025
1 1 1 NONE No No N/A Approved Ministerial
43422082 1555 Pomona
Ave, San Jose,
CA
2024 118378
000 00 RS
ADU O
2/28/2025
1 1 1 NONE No No N/A Approved Ministerial
27450019 2480 Woodland
Ave, San Jose,
CA
2025 094848
000 00 RS
ADU O
2/28/2025
1 1 1 NONE No No N/A Approved Ministerial
57740020 1446 KEW

GARDENS CT,

SAN JOSE, CA
95120
2025 093155
000 00 RS
ADU O
2/28/2025
1 1 1 NONE No No N/A Approved Ministerial
49905030 2838 Aetna
Way, San Jose,
CA
2025 094462
000 00 RS
ADU O
2/28/2025
1 1 NONE No No N/A Pending Ministerial
48613002 1726 S King Rd,
San Jose, CA
2024 116458
000 00 RS
ADU O
3/3/2025
1 1 NONE No No N/A Pending Ministerial
26123053 1289 Shasta
Ave, San Jose,
CA
2025 090926
000 00 RS
ADU O
3/3/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
27455060 2382 Newhall
St, San Jose,
CA
2024 116989
000 00 RS
ADU O
3/3/2025
1 1 NONE No No N/A Pending Ministerial
48435047 2376 Sleepy
Hollow Ln, San
Jose, CA 95116
2024 098194
000 00 RS
ADU O
3/3/2025
1 1 NONE No No N/A Pending Ministerial
65445029 3307 Ingersoll
Ct, San Jose,
CA
2025 089280
000 00 RS
ADU O
3/3/2025
1 1 NONE No No N/A Pending Ministerial
48142009 1914 LAVONNE

AV, SAN JOSE,
CA 95116
2025 098196
000 00 RS
ADU O
3/3/2025
1 1 1 NONE No No N/A Approved Ministerial
27457026 2490 BAILEY

AV, SAN JOSE,
CA 95128
2025 093748
000 00 RS
ADU O
3/3/2025
1 1 1 NONE No No N/A Approved Ministerial
49441009
815 HIAWATHA

DR, SAN JOSE,
CA 95111
2024 106784
000 00 RS
ADU O
3/4/2025
1 1 1 NONE No No N/A Approved Ministerial
49747046 662 Oldham
Way, San Jose,
CA
2024 085966
000 00 RS
ADU O
3/5/2025
1 1 NONE No No N/A Pending Ministerial
56752016 1141 Carlsbad
Dr, San Jose,
CA
2025 093674
000 00 RS
ADU O
3/6/2025
1 1 NONE No No N/A Pending Ministerial
48621059 1217 Edith St,
San Jose, CA
2024 087100
000 00 RS
ADU O
3/6/2025
1 1 NONE No No N/A Pending Ministerial
49707003 13099 Pfeifle
Ave, San Jose,
CA
2024 083130
000 00 RS
ADU O
3/6/2025
1 1 1 NONE No No N/A Approved Ministerial
43942062 2970 Lansford
Ave, San Jose,
CA
2024 113043
000 00 RS
ADU O
3/6/2025
1 1 NONE No No N/A Pending Ministerial
24901008 745 N 2nd St,
San Jose, CA
2024 115895
000 00 RS
ADU O
3/7/2025
1 1 NONE No No N/A Pending Ministerial
24941020 612 N 4th St,
San Jose, CA
2024 114415
000 00 RS
ADU O
3/7/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
24941021 618 N 4th St,
San Jose, CA
2024 114429
000 00 RS
ADU O
3/7/2025
1 1 NONE No No N/A Pending Ministerial
67306035 2810 Burdick
Way, San Jose,
CA
2025 096584
000 00 RS
ADU O
3/7/2025
1 1 1 NONE No No N/A Approved Ministerial
59208075 2787 Rainview
Dr, San Jose,
CA
2024 109084
000 00 RS
ADU O
3/7/2025
1 1 NONE No No N/A Pending Ministerial
68460030 5022 Impatiens
Dr, San Jose,
CA
2025 094375
000 00 RS
ADU O
3/7/2025
1 1 NONE No No N/A Pending Ministerial
27413005 1580

HANCHETT AV,

SAN JOSE, CA
95126
2025 092282
000 00 RS
ADU O
3/7/2025
1 1 1 NONE No No N/A Approved Ministerial
43410028 1366 Mastic St,
San Jose, CA
2025 095568
000 00 RS
ADU O
3/10/2025
1 1 NONE No No N/A Pending Ministerial
58907064 2946 TOBIN

DR, SAN JOSE,
CA 95132
2025 096947
000 00 RS
ADU O
3/10/2025
1 1 1 NONE No No N/A Approved Ministerial
48811081 1570

BERKSFORD

WY, SAN

JOSE, CA
95127
2025 095522
000 00 RS
ADU O
3/10/2025
1 1 1 NONE No No N/A Approved Ministerial
26451026 465 Snyder
Ave, San Jose,
CA
2025 093081
000 00 RS
ADU O
3/11/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
27435025 2112
Cherrystone Dr,
San Jose, CA
2025 093092
000 00 RS
ADU O
3/11/2025
1 1 1 NONE No No N/A Approved Ministerial
68923018 6056 Cotton Ct,
San Jose, CA
2025 097216
000 00 RS
ADU O
3/11/2025
1 1 NONE No No N/A Pending Ministerial
30704081 11870 Vallejo
Dr, San Jose,
CA
2025 097467
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
48429038 10261

SHOREHAM

CT, SAN JOSE,
CA 95127
2025 095040
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
44207034 1906 Shulman
Ave, San Jose,
CA
2025 089652
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 7 ends

68959045 6187 Ellerbrook
Way, San Jose,
CA
2025 096091
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
26105059 810 Schiele
Ave, San Jose,
CA
2025 095814
000 00 RS
ADU O
3/12/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
25432023 710 Webster Dr,
San Jose, CA
2024 118380
000 00 RS
ADU O
3/12/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 5640
Comanche Ct,
San Jose, CA
2025 100093
000 00 RS
ADU O
3/13/2025
1 1 1 NONE No No N/A Approved Ministerial
61235072 1281 City View
Pl, San Jose,
CA
2024 106902
000 00 RS
ADU O
3/13/2025
1 1 NONE No No N/A Pending Ministerial
24957044 440 N 16TH ST,

SAN JOSE, CA
95112
2025 096447
000 00 RS
ADU O
3/13/2025
1 1 1 NONE No No N/A Approved Ministerial
67674005 3933 Baronet
Ct, San Jose,
CA
2025 096558
000 00 RS
ADU O
3/17/2025
1 1 NONE No No N/A Pending Ministerial
9205052 2537 Northwood
Dr, San Jose,
CA
2025 090304
000 00 RS
ADU O
3/17/2025
1 1 NONE No No N/A Pending Ministerial
66039056 3279

CHARMES CT,

SAN JOSE, CA
95135
2025 092088
000 00 RS
ADU O
3/17/2025
1 1 1 NONE No No N/A Approved Ministerial
26117044 1260 Randol
Ave, San Jose,
CA
2025 094383
000 00 RS
ADU O
3/17/2025
1 1 NONE No No N/A Pending Ministerial
44703029 1542 SANTA

MONICA AV,

SAN JOSE, CA
95118
2025 098099
000 00 RS
ADU O
3/17/2025
1 1 1 NONE No No N/A Approved Ministerial
67034015 1568 Staghorn
Ln, San Jose,
CA
2024 103758
000 00 RS
ADU O
3/17/2025
1 1 1 NONE No No N/A Approved Ministerial
28830019 2231 Dry Creek
Rd, San Jose,
CA
2025 096197
000 00 RS
ADU O
3/18/2025
1 1 NONE No No N/A Pending Ministerial
9211058 2908

FALLWOOD

LN, SAN JOSE,
CA 95132
2025 093276
000 00 RS
ADU O
3/18/2025
1 1 1 NONE No No N/A Approved Ministerial
59952020 774 Shetland
Ct, San Jose,
CA
2025 098697
000 00 RS
ADU O
3/18/2025
1 1 1 NONE No No N/A Approved Ministerial
43927065 1520 Curtner
Ave, San Jose,
CA
2025 098134
000 00 RS
ADU O
3/18/2025
1 1 1 NONE No No N/A Approved Ministerial
48144004 1687 Virginia Pl,
San Jose, CA
2024 119368
000 00 RS
ADU O
3/20/2025
1 1 NONE No No N/A Pending Ministerial
40331076 2038 Colusa
Way, San Jose,
CA
2025 098991
000 00 RS
ADU O
3/20/2025
1 1 NONE No No N/A Pending Ministerial
24905021 777 N 6th St,
San Jose, CA
2025 089979
000 00 RS
ADU O
3/20/2025
1 1 NONE No No N/A Pending Ministerial
44249033 1794 VALLA

DR, SAN JOSE,
CA 95124
2025 098360
000 00 RS
ADU O
3/21/2025
1 1 1 NONE No No N/A Approved Ministerial
65422052 3508

COLUMBINE

DR, SAN JOSE,
CA 95127
2025 090841
000 00 RS
ADU O
3/24/2025
1 1 1 NONE No No N/A Approved Ministerial
49912032 2702 Eulalie Dr,
San Jose, CA
2025 097320
000 00 RS
ADU O
3/24/2025
1 1 1 NONE No No N/A Approved Ministerial
43422014 1483 LITTLE

ORCHARD ST,

SAN JOSE, CA
95110
2025 100068
000 00 RS
ADU O
3/24/2025
1 1 1 NONE No No N/A Approved Ministerial
27453043 2498 Sunny
Vista Dr, San
Jose, CA
2025 095904
000 00 RS
ADU O
3/25/2025
1 1 1 NONE No No N/A Approved Ministerial
67828110 524 Broderick
Dr, San Jose,
CA
2024 112948
000 00 RS
ADU O
3/25/2025
1 1 1 NONE No No N/A Approved Ministerial
43931035 2412

WESTGATE

AV, SAN JOSE,
CA 95125
2025 096193
000 00 RS
ADU O
3/25/2025
1 1 1 NONE No No N/A Approved Ministerial
67611033 1920 BAGPIPE

WY, SAN

JOSE, CA
95121
2025 096722
000 00 RS
ADU O
3/25/2025
1 1 1 NONE No No N/A Approved Ministerial
46739054 229 S 16TH ST,

SAN JOSE, CA
95112
2025 100585
000 00 RS
ADU O
3/25/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
9210030 2981 Postwood
Dr, San Jose,
CA
2025 099548
000 00 RS
ADU O
3/26/2025
1 1 1 NONE No No N/A Approved Ministerial
65439018 3624 Satinwood
Dr, San Jose,
CA
2025 090715
000 00 RS
ADU O
3/26/2025
1 1 1 NONE No No N/A Approved Ministerial
26449021 954 Spencer
Ave, San Jose,
CA
2025 097409
000 00 RS
ADU O
3/26/2025
1 1 NONE No No N/A Pending Ministerial
27455062 2372 Newhall
St, San Jose,
CA
2025 101324
000 00 RS
ADU O
3/26/2025
1 1 1 NONE No No N/A Approved Ministerial
48614006 1800 SEAVIEW

DR, SAN JOSE,
CA 95122
2025 099256
000 00 RS
ADU O
3/26/2025
1 1 1 NONE No No N/A Approved Ministerial
67842025 88 Limewell Ct,
San Jose, CA
2024 088301
000 00 RS
ADU O
3/27/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 8 ends

47745067 1118 Algiers
Ave, San Jose,
CA
2024 117528
000 00 RS
ADU O
3/27/2025
1 1 1 NONE No No N/A Approved Ministerial
41222017 2693 Hocking
Way, San Jose,
CA
2024 073861
000 00 RS
ADU O
3/28/2025
1 1 NONE No No N/A Pending Ministerial
49108084 2142 JAMAICA

WY, SAN

JOSE, CA
95122
2025 101325
000 00 RS
ADU O
3/28/2025
1 1 1 NONE No No N/A Approved Ministerial
41944086 1832 Rosswood
Dr, San Jose,
CA
2025 100803
000 00 RS
ADU O
3/28/2025
1 1 1 NONE No No N/A Approved Ministerial
30342028 341 Maplewood
Ave, San Jose,
CA
2025 095093
000 00 RS
ADU O
3/28/2025
1 1 NONE No No N/A Pending Ministerial
29908090 3790

WOODBARK

CT SAN JOSE
95117-3438
2024 118719
000 00 RS
ADU O
4/1/2025
1 1 1 NONE No No N/A Approved Ministerial
27725012 559 MENKER

AV, SAN JOSE,
CA 95128
2025 097269
000 00 RS
ADU O
4/1/2025
1 1 1 NONE No No N/A Approved Ministerial
66006022 3166

MEADOWLAND

S LN SAN
JOSE 95135-
1621
2025 098115
000 00 RS
ADU O
4/1/2025
1 1 NONE No No N/A Pending Ministerial
24914112 726 VESTAL

ST SAN JOSE
95112-1563
2025 099442
000 00 RS
ADU O
4/1/2025
1 1 1 NONE No No N/A Approved Ministerial
67828042 489

HASSINGER

RD SAN JOSE
95111-1830
2025 089793
000 00 RS
ADU O
4/2/2025
1 1 NONE No No N/A Pending Ministerial
48810003 3081

MARKINGDON

AV SAN JOSE
95127-4627
2025 093334
000 00 RS
ADU O
4/2/2025
1 1 NONE No No N/A Pending Ministerial
66009024 2919 QUEENS

ESTATES CT

SAN JOSE
95135-1217
2025 097681
000 00 RS
ADU O
4/2/2025
1 1 1 NONE No No N/A Approved Ministerial
43902054 1224 LAURIE

AV SAN JOSE
95125-3443
2025 100664
000 00 RS
ADU O
4/2/2025
1 1 NONE No No N/A Pending Ministerial
47716017 1165

PANOCHE AV

SAN JOSE
95122-2621
2024 119189
000 00 RS
ADU O
4/3/2025
1 1 NONE No No N/A Pending Ministerial
47716017 1165

PANOCHE AV

SAN JOSE
95122-2621
2025 094111
000 00 RS
ADU O
4/3/2025
1 1 NONE No No N/A Pending Ministerial
70442021 191 BURNING

TREE DR SAN
JOSE 95119-
1822
2025 094443
000 00 RS
ADU O
4/3/2025
1 1 NONE No No N/A Pending Ministerial
47206095 1440 KELLY

CT, SAN JOSE,
CA 95116
2025 098923
000 00 RS
ADU O
4/3/2025
1 1 1 NONE No No N/A Approved Ministerial
47206095 1446 KELLY

CT, SAN JOSE,
CA 95116
2025 098946
000 00 RS
ADU O
4/3/2025
1 1 1 NONE No No N/A Approved Ministerial
49722012 3070 WATER

ST, SAN JOSE,
CA 95111
2025 100564
000 00 RS
ADU O
4/4/2025
1 1 1 NONE No No N/A Approved Ministerial
68455035 4983

HOUNDSHAVE

N WY SAN
JOSE 95111-
3808
2024 115081
000 00 RS
ADU O
4/7/2025
1 1 NONE No No N/A Pending Ministerial
46740047 371 S 14TH ST,

SAN JOSE, CA
95112
2025 098442
000 00 RS
ADU O
4/7/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
48127002 1875

KAMMERER

AV SAN JOSE
95116-3014
2025 103682
000 00 RS
ADU O
4/7/2025
1 1 NONE No No N/A Pending Ministerial
41937013 4840 ANNA DR,

SAN JOSE, CA
95124
2025 099088
000 00 RS
ADU O
4/8/2025
1 1 1 NONE No No N/A Approved Ministerial
28826031 1759

WILLOWHURS

T AV SAN
JOSE
2025 103079
000 00 RS
ADU O
4/8/2025
1 1 1 NONE No No N/A Approved Ministerial
49408032 3923 ARDEN

FARMS PL

SAN JOSE
95111-2401
2024 115372
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
1505038 1313

MICHIGAN AV

SAN JOSE
95002-0000
2025 094675
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
25410038 1672 MELODY

LN SAN JOSE
95133-1653
2025 098554
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
48116014 148 33RD ST,

SAN JOSE, CA
95116
2025 098801
000 00 RS
ADU O
4/11/2025
1 1 1 NONE No No N/A Approved Ministerial
68945034 6258 ROYAL

OAK CT SAN
JOSE 95123-
4944
2025 099707
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
67301052 2727 SAND

POINT DR,

SAN JOSE, CA
95148
2025 103069
000 00 RS
ADU O
4/11/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 9 ends

66024069 4100 BEEBE

CL SAN JOSE
95135-0000
2025 103279
000 00 RS
ADU O
4/11/2025
1 1 NONE No No N/A Pending Ministerial
N/A 182 W
Rosemary St,
San Jose, CA
95110
2025 093758
000 00 RS
ADU O
4/15/2025
1 1 1 NONE No No N/A Approved Ministerial
42922031 823 WILLOW

GLEN WY SAN
JOSE 95125-
3342
2025 096477
000 00 RS
ADU O
4/15/2025
1 1 NONE No No N/A Pending Ministerial
27438063 791

MCALISTER

DR SAN JOSE
95128-1443
2025 099448
000 00 RS
ADU O
4/15/2025
1 1 NONE No No N/A Pending Ministerial
48614025 1759 CATHAY

DR SAN JOSE
95122-2023
2025 094974
000 00 RS
ADU O
4/17/2025
1 1 1 NONE No No N/A Approved Ministerial
65469015 3670 SHADY

HOLLOW CT

SAN JOSE
95148-3207
2024 108486
000 00 RS
ADU O
4/18/2025
1 1 NONE No No N/A Pending Ministerial
66040074 6427 SPRING

MEADOW CT

SAN JOSE
95135-1635
2025 097205
000 00 RS
ADU O
4/18/2025
1 1 NONE No No N/A Pending Ministerial
48809045 1485

FARRINGDON

DR SAN JOSE
95127-4615
2025 095346
000 00 RS
ADU O
4/21/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1712 ISABEL

DR, SAN JOSE,
CA 95125
2025 103977
000 00 RS
ADU O
4/22/2025
1 1 1 NONE No No N/A Approved Ministerial
45102031 1445 REVERE

AV SAN JOSE
95118-1147
2025 105379
000 00 RS
ADU O
4/22/2025
1 1 1 NONE No No N/A Approved Ministerial
44734044 4304

BLOOMFIELD

DR SAN JOSE
95124-4742
2025 097903
000 00 RS
ADU O
4/23/2025
1 1 1 NONE No No N/A Approved Ministerial
59213029 3016

NASHVILLE DR

SAN JOSE
95133-2059
2025 102661
000 00 RS
ADU O
4/23/2025
1 1 NONE No No N/A Pending Ministerial
68409075 4432

CONCERTO

WY SAN JOSE
95111-2509
2024 086589
000 00 RS
ADU O
4/25/2025
1 1 NONE No No N/A Pending Ministerial
9222192 3288 LANDESS

AV SAN JOSE
95132-1230
2025 096416
000 00 RS
ADU O
4/25/2025
1 1 1 NONE No No N/A Approved Ministerial
44248007 2915 MANDA

DR SAN JOSE
95124-1835
2025 103105
000 00 RS
ADU O
4/25/2025
1 1 NONE No No N/A Pending Ministerial
64926001 1965 FERNISH

DR SAN JOSE
95148-1301
2025 104577
000 00 RS
ADU O
4/25/2025
1 1 NONE No No N/A Pending Ministerial
65422082 3630

EASTRIDGE

DR SAN JOSE
95148-1406
2025 100404
000 00 RS
ADU O
4/28/2025
1 1 NONE No No N/A Pending Ministerial
26446095 570 ATLANTA

AV, SAN JOSE,
CA 95125
2024 073803
000 00 RS
ADU O
5/2/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
67032068 2864

LONGACRE

CT, SAN JOSE,
CA 95121
2024 103083
000 00 RS
ADU O
5/2/2025
1 1 NONE No No N/A Pending Ministerial
43904057 1206 LENNON

WY, SAN

JOSE, CA
95125
2025 096661
000 00 RS
ADU O
5/2/2025
1 1 NONE No No N/A Pending Ministerial
44224042 2443 RALEIGH

DR, SAN JOSE,
CA 95124
2025 102129
000 00 RS
ADU O
5/2/2025
1 1 1 NONE No No N/A Approved Ministerial
45123013 1423 GAUCHO

CT, SAN JOSE,
CA 95118
2025 100170
000 00 RS
ADU O
5/5/2025
1 1 1 NONE No No N/A Approved Ministerial
37730027 1591

TARTARIAN

WY, SAN

JOSE, CA
95129
2025 103692
000 00 RS
ADU O
5/5/2025
1 1 1 NONE No No N/A Approved Ministerial
49458014 1332

ISENGARD CT,

SAN JOSE, CA
95121
2025 105034
000 00 RS
ADU O
5/5/2025
1 1 1 NONE No No N/A Approved Ministerial
48116023 1634 E SAN

FERNANDO

ST, SAN JOSE,
CA 95116
2025 093342
000 00 RS
ADU O
5/7/2025
1 1 NONE No No N/A Pending Ministerial
24504049 1286 OLD

MANOR PL,

SAN JOSE, CA
95132
2024 108900
000 00 RS
ADU O
5/8/2025
1 1 NONE No No N/A Pending Ministerial
69428011 751 PRONTO

DR, SAN JOSE,
CA 95123
2025 092162
000 00 RS
ADU O
5/8/2025
1 1 1 NONE No No N/A Approved Ministerial
56920027 1598

STAPLETON

CT, SAN JOSE,
CA 95118
2025 098131
000 00 RS
ADU O
5/8/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 10 ends

56920027 1598

STAPLETON

CT, SAN JOSE,
CA 95118
2025 100418
000 00 RS
ADU O
5/8/2025
1 1 NONE No No N/A Pending Ministerial
44735069 4009

RONDEAU DR,

SAN JOSE, CA
95124
2025 103504
000 00 RS
ADU O
5/8/2025
1 1 NONE No No N/A Pending Ministerial
46741060 333 S 12TH ST,

SAN JOSE, CA
95112
2025 106316
000 00 RS
ADU O
5/8/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
56703035 4959 RAFTON

DR, SAN JOSE,
CA 95124
2025 100414
000 00 RS
ADU O
5/12/2025
1 1 NONE No No N/A Pending Ministerial
26449102 633 WILLOW

ST, SAN JOSE,
CA 95125
2024 108744
000 00 RS
ADU O
5/13/2025
1 1 NONE No No N/A Pending Ministerial
59208041 597 ROUGH

AND READY

RD, SAN JOSE,
CA 95133
2025 092308
000 00 RS
ADU O
5/13/2025
1 1 NONE No No N/A Pending Ministerial
65458062 3152 BIMBER

CT, SAN JOSE,
CA 95148
2025 105807
000 00 RS
ADU O
5/13/2025
1 1 1 NONE No No N/A Approved Ministerial
46211039 4365 INDIGO

DR, SAN JOSE,
CA 95136
2025 107274
000 00 RS
ADU O
5/13/2025
1 1 1 NONE No No N/A Approved Ministerial
N/A 3244 Riddle Rd,
San Jose, CA
95117
2025 107223
000 00 RS
ADU O
5/13/2025
1 1 1 NONE No No N/A Approved Ministerial
57521036 1451 CORTE

DE ROSA, SAN

JOSE, CA
95120
2025 107233
000 00 RS
ADU O
5/14/2025
1 1 NONE No No N/A Pending Ministerial
48112075 44 N 34TH ST,

SAN JOSE, CA
95116
2025 097383
000 00 RS
ADU O
5/15/2025
1 1 1 NONE No No N/A Approved Ministerial
49465046 3281 LANTERN

WY, SAN

JOSE, CA
95111
2025 103492
000 00 RS
ADU O
5/15/2025
1 1 NONE No No N/A Pending Ministerial
68454006 4595

THORNHAVEN

WY, SAN

JOSE, CA
95111
2025 107167
000 00 RS
ADU O
5/15/2025
1 1 1 NONE No No N/A Approved Ministerial
59951082 3171 MABURY

RD, SAN JOSE,
CA 95127
2025 104958
000 00 RS
ADU O
5/19/2025
1 1 NONE No No N/A Pending Ministerial
26132060 33 SUNOL ST,

SAN JOSE, CA
95126
2025 107979
000 00 RS
ADU O
5/19/2025
1 1 1 NONE No No N/A Approved Ministerial
26446008 441 ATLANTA

AV, SAN JOSE,
CA 95125
2025 105506
000 00 RS
ADU O
5/20/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
65932030 3230 FALLEN

OAK CT, SAN

JOSE, CA
95148
2025 107246
000 00 RS
ADU O
5/20/2025
1 1 NONE No No N/A Pending Ministerial
57521036 1451 CORTE

DE ROSA, SAN

JOSE, CA
95120
2025 107362
000 00 RS
ADU O
5/20/2025
1 1 NONE No No N/A Pending Ministerial
70844053 7203 SHEA CT,

SAN JOSE, CA
95139
2025 102660
000 00 RS
ADU O
5/22/2025
1 1 NONE No No N/A Pending Ministerial
59526034 3491

GROSSMONT

DR, SAN JOSE,
CA 95132
2025 107001
000 00 RS
ADU O
5/22/2025
1 1 NONE No No N/A Pending Ministerial
67612031 4549 PACIFIC

RIM WY, SAN

JOSE, CA
95121
2025 107365
000 00 RS
ADU O
5/22/2025
1 1 NONE No No N/A Pending Ministerial
29908148 3778

CARAVELLA

DR, SAN JOSE,
CA 95117
2025 106333
000 00 RS
ADU O
5/23/2025
1 1 NONE No No N/A Pending Ministerial
9241080 2629

AUTUMNVALE

DR, SAN JOSE,
CA 95132
2025 107162
000 00 RS
ADU O
5/23/2025
1 1 NONE No No N/A Pending Ministerial
40304222 4575

NORWICH WY,

SAN JOSE, CA
95130
2024 106818
000 00 RS
ADU O
5/27/2025
1 1 1 NONE No No N/A Approved Ministerial
44616026 1563 WAWONA

DR, SAN JOSE,
CA 95125
2025 096794
000 00 RS
ADU O
5/28/2025
1 1 1 NONE No No N/A Approved Ministerial
49456028 1239

CLAYBURN LN,

SAN JOSE, CA
95121
2023 126020
000 00 RS
ADU O
5/29/2025
1 1 NONE No No N/A Pending Ministerial
66040150 3426 ROYAL

MEADOW LN,

SAN JOSE, CA
95135
2025 105624
000 00 RS
ADU O
5/30/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 11 ends

48811111 1460

BERKSFORD

WY, SAN

JOSE, CA
95127
2025 108825
000 00 RS
ADU O
5/30/2025
1 1 1 NONE No No N/A Approved Ministerial
68508037 5137 POSTON

DR, SAN JOSE,
CA 95136
2025 106068
000 00 RS
ADU O
6/2/2025
1 1 1 NONE No No N/A Approved Ministerial
43917161 1060

FRANQUETTE

AV, SAN JOSE,
CA 95125
2025 108906
000 00 RS
ADU O
6/2/2025
1 1 1 NONE No No N/A Approved Ministerial
24952005 373 N 10TH ST,

SAN JOSE, CA
95112
2024 090405
000 00 RS
ADU O
6/3/2025
1 1 1 NONE No No N/A Approved Ministerial
58103065 6453 LITTLE

FALLS DR,

SAN JOSE, CA
95120
2025 105002
000 00 RS
ADU O
6/3/2025
1 1 1 NONE No No N/A Approved Ministerial
68431145 67 AZUCAR

AV, SAN JOSE,
CA 95111
2025 106951
000 00 RS
ADU O
6/3/2025
1 1 1 NONE No No N/A Approved Ministerial
28412039 1837

BLACKFORD

LN, SAN JOSE,
CA 95125
2025 108859
000 00 RS
ADU O
6/3/2025
1 1 1 NONE No No N/A Approved Ministerial
49710028 12986 WOOL

AV, SAN JOSE,
CA 95111
2025 109304
000 00 RS
ADU O
6/4/2025
1 1 NONE No No N/A Pending Ministerial
47754020 878 LE

COMPTE PL,

SAN JOSE, CA
95122
2025 109673
000 00 RS
ADU O
6/4/2025
1 1 1 NONE No No N/A Approved Ministerial
43954051 1747 CHERRY

AV, SAN JOSE,
CA 95125
2025 109963
000 00 RS
ADU O
6/4/2025
1 1 1 NONE No No N/A Approved Ministerial
49710028 12986 WOOL

AV, SAN JOSE,
CA 95111
2025 112292
000 00 RS
ADU O
6/4/2025
1 1 NONE No No N/A Pending Ministerial
49710028 12986 WOOL

AV, SAN JOSE,
CA 95111
2025 112294
000 00 RS
ADU O
6/4/2025
1 1 NONE No No N/A Pending Ministerial
24409027 1701

CORALTREE

PL, SAN JOSE,
CA 95131
2025 105877
000 00 RS
ADU O
6/5/2025
1 1 NONE No No N/A Pending Ministerial
N/A 577 DUNCAN

ST, SAN JOSE,
CA 95127
2025 113630
000 00 RS
ADU O
6/5/2025
1 1 1 NONE No No N/A Approved Ministerial
46407008 329 AVENIDA

PINOS, SAN

JOSE, CA
95123
2025 104619
000 00 RS
ADU O
6/6/2025
1 1 NONE No No N/A Pending Ministerial
44626033 1430

CALLECITA ST,

SAN JOSE, CA
95125
2025 107216
000 00 RS
ADU O
6/9/2025
1 1 1 NONE No No N/A Approved Ministerial
49926041 1149 MALOTT

DR, SAN JOSE,
CA 95121
2024 114067
000 00 RS
ADU O
6/11/2025
1 1 1 NONE No No N/A Approved Ministerial
42125078 2194 BARRETT

AV, SAN JOSE,
CA 95124
2025 106713
000 00 RS
ADU O
6/11/2025
1 1 NONE No No N/A Pending Ministerial
30723026 4179

MORELAND

WY, SAN

JOSE, CA
95130
2025 114676
000 00 RS
ADU O
6/11/2025
1 1 1 NONE No No N/A Approved Ministerial
66040151 3428 ROYAL

MEADOW LN,

SAN JOSE, CA
95135
2025 105498
000 00 RS
ADU O
6/13/2025
1 1 NONE No No N/A Pending Ministerial
26432038 76 PIERCE AV,

SAN JOSE, CA
95110
2025 105682
000 00 RS
ADU O
6/13/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
27437042 2111 W

HEDDING ST,

SAN JOSE, CA
95128
2025 107419
000 00 RS
ADU O
6/13/2025
1 1 1 NONE No No N/A Approved Ministerial
44701040 1523

HILLSDALE AV,

SAN JOSE, CA
95118
2025 108596
000 00 RS
ADU O
6/13/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1148 PALM ST,

SAN JOSE, CA
95110
2025 113468
000 00 RS
ADU O
6/13/2025
1 1 NONE No No N/A Pending Ministerial
67615031 3255 HEBRON

CT, SAN JOSE,
CA 95121
2025 114784
000 00 RS
ADU O
6/13/2025
1 1 1 NONE No No N/A Approved Ministerial
45603038 1653

GUADALUPE

AV, SAN JOSE,
CA 95125
2025 099437
000 00 RS
ADU O
6/16/2025
1 1 NONE No No N/A Pending Ministerial
69225021 5661 ENNING

AV, SAN JOSE,
CA 95123
2025 110846
000 00 RS
ADU O
6/16/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 12 ends

N/A 4629 Mia Cir,
San Jose, CA
95136
2025 114637
000 00 RS
ADU O
6/16/2025
1 1 1 NONE No No N/A Approved Ministerial
46207034 4024 LUNETA

DR, SAN JOSE,
CA 95136
2025 109756
000 00 RS
ADU O
6/17/2025
1 1 NONE No No N/A Pending Ministerial
67632035 4023

LOGANBERRY

DR, SAN JOSE,
CA 95121
2025 090521
000 00 RS
ADU O
6/20/2025
1 1 NONE No No N/A Pending Ministerial
43935042 1148 HUSTED

AV, SAN JOSE,
CA 95125
2025 110712
000 00 RS
ADU O
6/20/2025
1 1 1 NONE No No N/A Approved Ministerial
42902070 1264 CURTISS

AV, SAN JOSE,
CA 95125
2025 111176
000 00 RS
ADU O
6/20/2025
1 1 1 NONE No No N/A Approved Ministerial
37815034 5663 GLEN

HAVEN CT,

SAN JOSE, CA
95129
2025 110146
000 00 RS
ADU O
6/23/2025
1 1 NONE No No N/A Pending Ministerial
26120068 1375

MAGNOLIA AV,

SAN JOSE, CA
95126
2025 090173
000 00 RS
ADU O
6/24/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
42908031 1117

COOLIDGE AV,

SAN JOSE, CA
95125
2025 112128
000 00 RS
ADU O
6/24/2025
1 1 1 NONE No No N/A Approved Ministerial
26107054 850 VILLA AV,

SAN JOSE, CA
95126
2025 115804
000 00 RS
ADU O
6/24/2025
1 1 1 NONE No No N/A Approved Ministerial
68938015 473

MCCAMISH

AV, SAN JOSE,
CA 95123
2025 090079
000 00 RS
ADU O
6/26/2025
1 1 NONE No No N/A Pending Ministerial
65450052 3133

BRIGHTWOOD

CT, SAN JOSE,
CA 95148
2025 101208
000 00 RS
ADU O
6/26/2025
1 1 1 NONE No No N/A Approved Ministerial
66005080 2612

MEADOWLEAF

CT, SAN JOSE,
CA 95135
2025 103750
000 00 RS
ADU O
6/26/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1148 PALM ST,

SAN JOSE, CA
95110
2025 107613
000 00 RS
ADU O
6/30/2025
1 1 NONE No No N/A Pending Ministerial
44628001 2106

MARQUES AV,

SAN JOSE, CA
95125
2025 111456
000 00 RS
ADU O
6/30/2025
1 1 1 NONE No No N/A Approved Ministerial
48115067 1681

SHORTRIDGE

AV, SAN JOSE,
CA 95116
2025 116108
000 00 RS
ADU O
6/30/2025
1 1 1 NONE No No N/A Approved Ministerial
43917010 911 Franquette
Ave, San Jose,
CA 95125
2025 099342
000 00 RS
ADU O
7/1/2025
1 1 NONE No No N/A Pending Ministerial
24547045 1536 Gordy Dr,
San Jose, CA
95131
2025 104815
000 00 RS
ADU O
7/1/2025
1 1 1 NONE No No N/A Approved Ministerial
70844074 7218 Alder
Spring Wy, San
Jose, CA 95139
2025 111877
000 00 RS
ADU O
7/1/2025
1 1 NONE No No N/A Pending Ministerial
N/A 4456 Poinsettia
Ct, San Jose,
CA 95136
2025 116472
000 00 RS
ADU O
7/1/2025
1 1 1 NONE No No N/A Approved Ministerial
67620050 3405 Woodside
Ct, San Jose,
CA 95121
2025 110519
000 00 RS
ADU O
7/2/2025
1 1 NONE No No N/A Pending Ministerial
47731053 1520

MCLAUGHLIN

AV, SAN JOSE,
CA 95122
2025 111694
000 00 RS
ADU O
7/7/2025
1 1 1 NONE No No N/A Approved Ministerial
42108085 15062 Brewster
Ave, San Jose,
CA 95124
2025 111778
000 00 RS
ADU O
7/7/2025
1 1 1 NONE No No N/A Approved Ministerial
69007035 164 Sun
Blossom Dr,
San Jose, CA
95123
2025 098748
000 00 RS
ADU O
7/10/2025
1 1 NONE No No N/A Pending Ministerial
70618025 7246 Pittsfield
Wy, San Jose,
CA 95139
2025 107571
000 00 RS
ADU O
7/10/2025
1 1 NONE No No N/A Pending Ministerial
24958007 432 N 15th St,
San Jose, CA
95112
2025 102940
000 00 RS
ADU O
7/11/2025
1 1 NONE No No N/A Pending Ministerial
43951005 916 Curtner
Ave, San Jose,
CA 95125
2025 105508
000 00 RS
ADU O
7/11/2025
1 1 1 NONE No No N/A Approved Ministerial
59501001 15287
Penitencia
Creek Rd, San
Jose, CA 95132
2025 110599
000 00 RS
ADU O
7/11/2025
1 1 NONE No No N/A Pending Ministerial
69215056 5872 Paddon
Cir, San Jose,
CA 95123
2025 111645
000 00 RS
ADU O
7/11/2025
1 1 1 NONE No No N/A Approved Ministerial
49427029 863 Jana Ln,
San Jose, CA
95111
2025 111739
000 00 RS
ADU O
7/11/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 13 ends

67620073 3404 Woodtree
Ct, San Jose,
CA 95121
2025 109803
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
69215014 5821 Paddon
Cir, San Jose,
CA 95123
2025 109968
000 00 RS
ADU O
7/15/2025
1 1 1 NONE No No N/A Approved Ministerial
49121091 2075 Tampa
Way, San Jose,
CA 95122
2025 111062
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
24136030 1436 Leaftree
Cir, San Jose,
CA 95131
2025 112785
000 00 RS
ADU O
7/15/2025
1 1 1 NONE No No N/A Approved Ministerial
47203075 1163 Spiro Dr,
San Jose, CA
95116
2025 113717
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
25430039 688 Anvil Ct,
San Jose, CA
95133
2025 114572
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
23515035 928 N 7th St,
San Jose,CA
95112
2025 115027
000 00 RS
ADU O
7/15/2025
1 1 1 NONE No No N/A Approved Ministerial
47731008 1625 Pearson
Ct, San Jose,
CA 95122
2025 115696
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
N/A 6932 Serenity
Wy, San Jose,
CA 95120
2025 116662
000 00 RS
ADU O
7/15/2025
1 1 NONE No No N/A Pending Ministerial
N/A 590 Minnesota
Ave, San Jose,
CA 95125
2025 116992
000 00 RS
ADU O
7/15/2025
1 1 1 NONE No No N/A Approved Ministerial
38141106 5189 Doyle Rd,
San Jose, CA
95129
2025 092358
000 00 RS
ADU O
7/16/2025
1 1 NONE No No N/A Pending Ministerial
48802033 1199 Sundown
Ln, San Jose,
CA 95127
2025 108380
000 00 RS
ADU O
7/16/2025
1 1 NONE No No N/A Pending Ministerial
46716058 199 N 12th St,
San Jose, CA
95112
2025 115146
000 00 RS
ADU O
7/16/2025
1 1 1 NONE No No N/A Approved Ministerial
42933026 1655 Cottle
Ave, San Jose,
CA 95125
2025 112058
000 00 RS
ADU O
7/17/2025
1 1 1 NONE No No N/A Approved Ministerial
29935048 963 Orchid Wy,
San Jose, CA
95117
2025 114015
000 00 RS
ADU O
7/17/2025
1 1 1 NONE No No N/A Approved Ministerial
48120005 117 Scharff
Ave, San Jose,
CA 95116
2025 112981
000 00 RS
ADU O
7/18/2025
1 1 NONE No No N/A Pending Ministerial
24412011 2032
Autumntree Ct,
San Jose, CA
95131
2025 115404
000 00 RS
ADU O
7/18/2025
1 1 1 NONE No No N/A Approved Ministerial
65919029 3046 Lynview
Dr, San Jose,
CA 95148
2025 115547
000 00 RS
ADU O
7/18/2025
1 1 NONE No No N/A Pending Ministerial
52735036 5491 Mary Jo
Wy, San Jose
CA 95124
2025 109386
000 00 RS
ADU O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
59120033 1028 Wilsham
Dr, San Jose,
CA 95132
2025 111485
000 00 RS
ADU O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
24407034 1688 Ridgetree
Wy, San Jose,
CA 95131
2025 113384
000 00 RS
ADU O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
67850137 40 Southcreek
Ct, San Jose,
CA 95138
2025 115294
000 00 RS
ADU O
7/21/2025
1 1 1 NONE No No N/A Approved Ministerial
42919029 909 California
Ave, San Jose,
CA 95125
2025 115954
000 00 RS
ADU O
7/21/2025
1 1 1 NONE No No N/A Approved Ministerial
48120025 117 Scharff
Ave, San Jose,
CA 95116
2025 119592
000 00 RS
ADU O
7/21/2025
1 1 NONE No No N/A Pending Ministerial
46404052 4928 Barron
Park Dr, San
Jose, CA 95136
2025 111906
000 00 RS
ADU O
7/22/2025
1 1 NONE No No N/A Pending Ministerial
48603036 1748 Tampa
Wy, San Jose,
CA 95122
2025 114597
000 00 RS
ADU O
7/22/2025
1 1 NONE No No N/A Pending Ministerial
28827049 1710 Marina
Wy, San Jose,
CA 95125
2025 114829
000 00 RS
ADU O
7/22/2025
1 1 NONE No No N/A Pending Ministerial
41420038 2969 Vivian Ln,
San Jose, CA
95124
2025 105999
000 00 RS
ADU O
7/23/2025
1 1 1 NONE No No N/A Approved Ministerial
70616001 15 Kent Ct, San
Jose, CA 95139
2025 111335
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
38125037 5089 Amondo
Dr, San Jose,
CA 95129
2025 114019
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
27422073 1803 Cleveland
Ave, San Jose,
CA 95126
2025 114881
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
49108074 2167 Jamaica
Wy, San Jose,
CA 95122
2025 116194
000 00 RS
ADU O
7/23/2025
1 1 1 NONE No No N/A Approved Ministerial
70616001 15 Kent Ct, San
Jose, CA 95139
2025 120716
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1644 Tartarian
Way, San Jose,
CA 95129
2025 112136
000 00 RS
ADU O
7/23/2025
1 1 NONE No No N/A Pending Ministerial
38129016 4622 Clarendon
Dr, San Jose,
CA 95129
2025 115103
000 00 RS
ADU O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
67616020 3543 Kettman
Rd, San Jose,
CA 95121
2025 119091
000 00 RS
ADU O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 14 ends

67616020 3543 Kettman
Rd, San Jose,
CA 95121
2025 119106
000 00 RS
ADU O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
67616020 3543 Kettman
Rd, San Jose,
CA 95121
2025 119395
000 00 RS
ADU O
7/24/2025
1 1 NONE No No N/A Pending Ministerial
45106002 1218 Foxworthy
Ave, San Jose,
CA 95118
2025 110416
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
43922044 1961 Johnston
Ave, San Jose,
CA 95125
2025 111407
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1676 Mackey
Ave, San Jose,
CA 95125
2025 117397
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
56937101 5139 Sutcliff
Ave, San Jose,
CA 95118
2025 117491
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
57525042 1544
Guadalajara Dr,
San Jose, CA
95120
2025 117752
000 00 RS
ADU O
7/25/2025
1 1 1 NONE No No N/A Approved Ministerial
65919029 3046 Lynview
Dr, San Jose,
CA 95148
2025 121013
000 00 RS
ADU O
7/25/2025
1 1 NONE No No N/A Pending Ministerial
49905025 1319 Sylvia Dr,
San Jose, CA
95121
2025 111876
000 00 RS
ADU O
7/28/2025
1 1 1 NONE No No N/A Approved Ministerial
67614063 2560 Aborn Rd,
San Jose, CA
95121
2025 118491
000 00 RS
ADU O
7/28/2025
1 1 1 NONE No No N/A Approved Ministerial
65987008 3740 Darshan
Ct, San Jose,
CA 95148
2024 113200
000 00 RS
ADU O
7/29/2025
1 1 NONE No No N/A Pending Ministerial
67855021 7384 Prindiville
Dr, San Jose
95138
2025 106812
000 00 RS
ADU O
7/29/2025
1 1 NONE No No N/A Pending Ministerial
60102093 3137 Barletta
Ln, San Jose,
CA 95127
2025 116226
000 00 RS
ADU O
7/29/2025
1 1 NONE No No N/A Pending Ministerial
49724009 2925 Garden
Ave, San Jose,
CA 95111
2025 117929
000 00 RS
ADU O
7/29/2025
1 1 NONE No No N/A Pending Ministerial
48140011 939 Tennyson
Ln, San Jose,
CA 95116
2025 118003
000 00 RS
ADU O
7/29/2025
1 1 1 NONE No No N/A Approved Ministerial
24912055 871 N 15th St,
San Jose, CA
95112
2025 118055
000 00 RS
ADU O
7/29/2025
1 1 1 NONE No No N/A Approved Ministerial
37215068
1378 Longfellow
Way, San Jose,
CA 95129
2025 112653
000 00 RS
ADU O
7/31/2025
1 1 NONE No No N/A Pending Ministerial
49726099 3085 Senter Rd,
San Jose, CA
95111
2025 117612
000 00 RS
ADU O
7/31/2025
1 1 NONE No No N/A Pending Ministerial
24914090 771 E Hedding
St, San Jose,
CA 95112
2025 118210
000 00 RS
ADU O
7/31/2025
1 1 NONE No No N/A Pending Ministerial
70627040 113 AVENIDA

ESPANA , SAN

JOSE, CA
95139
2025 098814
000 00 RS
ADU O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
24540033 1884 SEVILLE

WY, SAN

JOSE, CA
95131
2025 103255
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
37316038 1274 DAPHNE

DR, SAN JOSE,
CA 95129
2025 109577
000 00 RS
ADU O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
43417029 1510 CARMEL

DR, SAN JOSE,
CA 95125
2025 111508
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
42902065
1310 CURTISS

AV, SAN JOSE,
CA 95125
2025 117014
000 00 RS
ADU O
8/1/2025
1 1 1 NONE No No N/A Approved Ministerial
48116087 1670 WHITTON

AV, SAN JOSE,
CA 95116
2025 117474
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
46730045 45 S 20TH ST,

SAN JOSE, CA
95116
2025 118884
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
70633063 7042 AVENIDA

ROTELLA, SAN

JOSE, CA
95139
2025 119067
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Approved Ministerial
28420021 1549 ST

FRANCIS DR,

SAN JOSE, CA
95125
2025 119981
000 00 RS
ADU O
8/1/2025
1 1 NONE No No N/A Pending Ministerial
46727046 75 S 14TH ST,

SAN JOSE, CA
95112
2025 119827
000 00 RS
ADU O
8/4/2025
1 1 1 NONE Yes - Local No N/A Approved Ministerial
24916045 899 N 19TH ST,

SAN JOSE, CA
95112
2025 120076
000 00 RS
ADU O
8/5/2025
1 1 1 NONE No No N/A Approved Ministerial
68501017 5280

WATERFALL

CT, SAN JOSE,
CA 95136
2025 120266
000 00 RS
ADU O
8/5/2025
1 1 NONE No No N/A Pending Ministerial
67619026 3489

HILLSBOROUG

H WY, SAN

JOSE, CA
95121
2025 120500
000 00 RS
ADU O
8/5/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 15 ends

38131034 1510

TERESITA DR,

SAN JOSE, CA
95129
2025 114263
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Pending Ministerial
48134027 996 DIADEM

DR, SAN JOSE,
CA 95116
2025 120400
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Approved Ministerial
41917031 4794 SALLY

DR, SAN JOSE,
CA 95124
2025 120886
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Pending Ministerial
30705038 17930 LOS

OLIVOS DR,

SAN JOSE, CA
95130
2025 120926
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Pending Ministerial
69632024 1073

CROSSWIND

CT, SAN JOSE,
CA 95120
2025 121982
000 00 RS
ADU O
8/6/2025
1 1 NONE No No N/A Pending Ministerial
26437090 157 WILLOW

ST, SAN JOSE,
CA 95110
2025 117628
000 00 RS
ADU O
8/7/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
49722011 3080 WATER

ST, SAN JOSE,
CA 95111
2025 120006
000 00 RS
ADU O
8/7/2025
1 1 NONE No No N/A Pending Ministerial
24116014 1216

BRIARCREEK

CT, SAN JOSE,
CA 95131
2025 117936
000 00 RS
ADU O
8/8/2025
1 1 NONE No No N/A Pending Ministerial
46735074 166 S 24TH ST,

SAN JOSE, CA
95116
2025 116738
000 00 RS
ADU O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
60102083 3177

BARLETTA LN,

SAN JOSE, CA
95127
2025 118005
000 00 RS
ADU O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
24956039 397 15TH ST,

SAN JOSE, CA
95112
2025 121307
000 00 RS
ADU O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
67616020 3543

KETTMANN

RD, SAN JOSE,
CA 95121
2025 123778
000 00 RS
ADU O
8/11/2025
1 1 NONE No No N/A Pending Ministerial
40358023 2415

VERWOOD DR,

SAN JOSE, CA
95130
2025 104717
000 00 RS
ADU O
8/12/2025
1 1 NONE No No N/A Pending Ministerial
23716058 824 CREEK

DR, SAN JOSE,
CA 95125
2025 116130
000 00 RS
ADU O
8/12/2025
1 1 1 NONE No No N/A Approved Ministerial
9752037 338 BATTLE

DANCE DR,

SAN JOSE, CA
95111
2025 119947
000 00 RS
ADU O
8/12/2025
1 1 NONE No No N/A Pending Ministerial
48107009 60 JOSE

FIGUERES AV,

SAN JOSE, CA
95116
2025 105629
000 00 RS
ADU O
8/13/2025
1 1 NONE No No N/A Pending Ministerial
27413072 1438 MARTIN

AV, SAN JOSE,
CA 95126
2025 122145
000 00 RS
ADU O
8/13/2025
1 1 NONE No No N/A Pending Ministerial
24931044 631 JACKSON

STREET SAN

JOSE, CA
95112
2025 123739
000 00 RS
ADU O
8/13/2025
1 1 1 NONE No No N/A Approved Ministerial
26103048 1318 THE

ALAMEDA,

SAN JOSE, CA
95126
2025 111326
000 00 RS
ADU O
8/14/2025
1 1 1 NONE No No N/A Approved Ministerial
26103048 1318 THE

ALAMEDA ,

SAN JOSE, CA
95126
2025 111327
000 00 RS
ADU O
8/14/2025
1 1 1 NONE No No N/A Approved Ministerial
38101059 971 RIVIERA

CT, SAN JOSE,
CA 95129
2025 114736
000 00 RS
ADU O
8/14/2025
1 1 NONE No No N/A Pending Ministerial
67031033 1822 TUSTIN

DR, SAN JOSE,
CA 95122
2025 115842
000 00 RS
ADU O
8/14/2025
1 1 1 NONE No No N/A Approved Ministerial
45123014 1429 GAUCHO

CT, SAN JOSE,
CA 95118
2025 116950
000 00 RS
ADU O
8/14/2025
1 1 NONE No No N/A Pending Ministerial
65424042 3574 CLAYTON

RD, SAN JOSE,
CA 95127
2025 122044
000 00 RS
ADU O
8/14/2025
1 1 NONE No No N/A Pending Ministerial
45128099 4001 RIVOIR

DR, SAN JOSE,
CA 95118
2025 115105
000 00 RS
ADU O
8/15/2025
1 1 NONE No No N/A Pending Ministerial
58342061 1118 QUAIL

CREEK CL,

SAN JOSE, CA
95120
2025 110111
000 00 RS
ADU O
8/18/2025
1 1 NONE No No N/A Pending Ministerial
48618042 1944

MANDARIN

WY, SAN

JOSE, CA
95122
2025 116980
000 00 RS
ADU O
8/18/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 16 ends

42937018 1525 CHERRY

AV, SAN JOSE,
CA 95125
2025 118103
000 00 RS
ADU O
8/18/2025
1 1 NONE No No N/A Pending Ministerial
49707003 13099 PFEIFLE

AV, SAN JOSE,
CA 95111
2025 105204
000 00 RS
ADU O
8/20/2025
1 1 NONE No No N/A Pending Ministerial
44708009 3117 JULIO AV,

SAN JOSE, CA
95124
2025 112043
000 00 RS
ADU O
8/20/2025
1 1 NONE No No N/A Pending Ministerial
44239040 2901 La Jolla
Ave, San Jose,
CA 95124
2025 113749
000 00 RS
ADU O
8/20/2025
1 1 1 NONE No No N/A Approved Ministerial
49707003 13099 PFEIFLE

AV, SAN JOSE,
CA 95111
2025 125612
000 00 RS
ADU O
8/20/2025
1 1 NONE No No N/A Pending Ministerial
49463063 821

ROYALBROOK

CT, SAN JOSE,
CA 95111
2025 116419
000 00 RS
ADU O
8/21/2025
1 1 1 NONE No No N/A Approved Ministerial
58921055 1208

LODESTONE

DR, SAN JOSE,
CA 95132
2025 121610
000 00 RS
ADU O
8/21/2025
1 1 NONE No No N/A Pending Ministerial
24411043 1708

GOLDENTREE

DR, SAN JOSE,
CA 95131
2025 126093
000 00 RS
ADU O
8/21/2025
1 1 NONE No No N/A Pending Ministerial
N/A 539 AVALANI

AV, SAN JOSE,
CA 95133
2025 126237
000 00 RS
ADU O
8/21/2025
1 1 1 NONE No No N/A Approved Ministerial
58708023 1451 OLD

PIEDMONT RD,

SAN JOSE, CA
95132
2025 097890
000 00 RS
ADU O
8/22/2025
1 1 NONE No No N/A Pending Ministerial
30701004 1103 LOCUST

ST, SAN JOSE,
CA 95110
2025 105952
000 00 RS
ADU O
8/25/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
67011066 1662 ALDRICH

WY, SAN

JOSE, CA
95121
2025 114892
000 00 RS
ADU O
8/25/2025
1 1 1 NONE No No N/A Approved Ministerial
44727060 1639

GLENROY DR,

SAN JOSE, CA
95124
2025 116921
000 00 RS
ADU O
8/25/2025
1 1 NONE No No N/A Pending Ministerial
43408054 1125

SHERMAN ST,

SAN JOSE, CA
95110
2025 121987
000 00 RS
ADU O
8/25/2025
1 1 NONE No No N/A Pending Ministerial
48820072 1786

HILLMONT AV,

SAN JOSE, CA
95127
2025 121727
000 00 RS
ADU O
8/26/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1620 Lucretia
Ct, San Jose,
CA 95122
2025 122038
000 00 RS
ADU O
8/26/2025
1 1 1 NONE No No N/A Approved Ministerial
44623004 1672

LAURELWOOD

DR, SAN JOSE,
CA 95125
2025 123098
000 00 RS
ADU O
8/26/2025
1 1 1 NONE No No N/A Approved Ministerial
49451055 818

SYLVANDALE

AV, SAN JOSE,
CA 95111
2025 117454
000 00 RS
ADU O
8/27/2025
1 1 NONE No No N/A Pending Ministerial
65919005 3037

REMINGTON

WY, SAN

JOSE, CA
95148
2025 118918
000 00 RS
ADU O
8/27/2025
1 1 NONE No No N/A Pending Ministerial
37320039 6538

CANTERBURY

CT, SAN JOSE,
CA 95129
2025 121761
000 00 RS
ADU O
8/27/2025
1 1 NONE No No N/A Pending Ministerial
48817049 2781 TWIN

OAKS LN, SAN

JOSE, CA
95127
2025 123557
000 00 RS
ADU O
8/27/2025
1 1 1 NONE No No N/A Approved Ministerial
37801009 1025

WUNDERLICH

DR, SAN JOSE,
CA 95129
2025 119979
000 00 RS
ADU O
8/28/2025
1 1 NONE No No N/A Pending Ministerial
23516042 1019 12TH ST,

SAN JOSE, CA
95112
2025 125097
000 00 RS
ADU O
8/28/2025
1 1 NONE No No N/A Approved Ministerial
37304045 6471

CANTERBURY

CT, SAN JOSE,
CA 95129
2025 127057
000 00 RS
ADU O
8/28/2025
1 1 NONE No No N/A Pending Ministerial
46702042 279 E ST

JAMES ST,

SAN JOSE, CA
95112
2025 115403
000 00 RS
ADU O
9/2/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
27430045 2275 TULIP RD,

SAN JOSE, CA
95128
2025 116006
000 00 RS
ADU O
9/2/2025
1 1 NONE No No N/A Pending Ministerial
70432015
291 VINEYARD

DR, SAN JOSE,
CA 95119
2025 121821
000 00 RS
ADU O
9/2/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 17 ends

46731047 51 S 22ND ST,

SAN JOSE, CA
95116
2025 089193
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
46727056 175 S 14TH ST,

SAN JOSE, CA
95112
2025 109849
000 00 RS
ADU O
9/3/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
61247005 3675 WARNER

DR, SAN JOSE,
CA 95127
2025 121611
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
24929043 626 N 15TH ST,

SAN JOSE, CA
95112
2025 122105
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
26423059 752 DELMAS

AV, SAN JOSE,
CA 95126
2025 123847
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
42901033 1267 CRISTINA

AV, SAN JOSE,
CA 95125
2025 124202
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
68435083 5180

DISCOVERY

AV, SAN JOSE,
CA 95111
2025 126134
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
41421046 3101

BROWNING

AV, SAN JOSE,
CA 95124
2025 127598
000 00 RS
ADU O
9/3/2025
1 1 NONE No No N/A Pending Ministerial
23516052 517 MADERA

AV, SAN JOSE,
CA 95112
2025 119401
000 00 RS
ADU O
9/4/2025
1 1 NONE No No N/A Pending Ministerial
52738059 5520 LEIGH

AV, SAN JOSE,
CA 95124
2025 107003
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
47227002 512 S 3RD ST,

SAN JOSE, CA
95112
2025 117693
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
40349005 4950

KINGSTON

WY, SAN

JOSE, CA
95130
2025 122921
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
49133021 2001

SUPREME DR,

SAN JOSE, CA
95148
2025 123505
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
67659031 1417 MEADOW

GLEN WY, SAN

JOSE, CA
95121
2025 123936
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
27413007 1564

HANCHETT AV,

SAN JOSE, CA
95126
2025 124333
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
24904060 870 N 5TH ST,

SAN JOSE, CA
95112
2025 124589
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
37327029 1094

BELVEDERE

LN, SAN JOSE,
CA 95129
2025 127669
000 00 RS
ADU O
9/5/2025
1 1 NONE No No N/A Pending Ministerial
49447034 634

ELMBROOK

WY, SAN

JOSE, CA
95111
2025 128571
000 00 RS
ADU O
9/5/2025
1 1 1 NONE No No N/A Approved Ministerial
48619014 1960 STORY

RD, SAN JOSE,
CA 95122
2025 116855
000 00 RS
ADU O
9/8/2025
1 1 NONE No No N/A Pending Ministerial
60112116 3403

VIEWMONT

CT, SAN JOSE,
CA 95127
2025 122298
000 00 RS
ADU O
9/8/2025
1 1 NONE No No N/A Pending Ministerial
44617018 1606

GLENFIELD

DR, SAN JOSE,
CA 95125
2025 123722
000 00 RS
ADU O
9/8/2025
1 1 NONE No No N/A Pending Ministerial
43947006 2911

ALMADEN RD,

SAN JOSE, CA
95125
2025 118184
000 00 RS
ADU O
9/9/2025
1 1 NONE No No N/A Pending Ministerial
27737012 481 S

GENEVIEVE

LN, SAN JOSE,
CA 95128
2025 118294
000 00 RS
ADU O
9/9/2025
1 1 1 NONE No No N/A Approved Ministerial
59924054 986 ROCK

CANYON CL,

SAN JOSE, CA
95127
2025 121768
000 00 RS
ADU O
9/9/2025
1 1 NONE No No N/A Pending Ministerial
48807117 1363 SUFFOLK

DR, SAN JOSE,
CA 95127
2025 122641
000 00 RS
ADU O
9/9/2025
1 1 NONE No No N/A Pending Ministerial
29940005 633 COAKLEY

DR, SAN JOSE,
CA 95117
2025 125199
000 00 RS
ADU O
9/9/2025
1 1 NONE No No N/A Pending Ministerial
9225011 2044 CONIFER

LN, SAN JOSE,
CA 95132
2025 098504
000 00 RS
ADU O
9/10/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 18 ends

48130075 2017 LAVONNE

AV, SAN JOSE,
CA 95116
2025 119649
000 00 RS
ADU O
9/10/2025
1 1 NONE No No N/A Pending Ministerial
43423058 1407 FORD AV,

SAN JOSE, CA
95110
2025 107393
000 00 RS
ADU O
9/12/2025
1 1 NONE No No N/A Pending Ministerial
49143002 2545 GLEN

HAIG WY, SAN

JOSE, CA
95148
2025 111689
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
42950030 1568

MINNESOTA

AV, SAN JOSE,
CA 95125
2025 121573
000 00 RS
ADU O
9/15/2025
1 1 1 NONE No No N/A Approved Ministerial
49722006 3081 WALL ST,

SAN JOSE, CA
95111
2025 122435
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
59959008 360 TITLEIST

CT, SAN JOSE,
CA 95127
2025 125046
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
27725020 558

RICHMOND

AV, SAN JOSE,
CA 95128
2025 126229
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
30724003 4168

MORELAND

WY, SAN

JOSE, CA
95130
2025 129178
000 00 RS
ADU O
9/15/2025
1 1 NONE No No N/A Pending Ministerial
49912044 2699 LOOMIS

DR, SAN JOSE,
CA 95121
2025 125966
000 00 RS
ADU O
9/16/2025
1 1 NONE No No N/A Pending Ministerial
45112084 3226 CHERRY

AV, SAN JOSE,
CA 95118
2025 126802
000 00 RS
ADU O
9/16/2025
1 1 NONE No No N/A Pending Ministerial
46711018 29 N 24TH ST,

SAN JOSE, CA
95116
2025 116114
000 00 RS
ADU O
9/17/2025
1 1 NONE No No N/A Pending Ministerial
43913051 1067 LAURIE

AV, SAN JOSE,
CA 95125
2025 128109
000 00 RS
ADU O
9/17/2025
1 1 NONE No No N/A Pending Ministerial
48416113 147 CEDAR

LN, SAN JOSE,
CA 95127
2025 129140
000 00 RS
ADU O
9/17/2025
1 1 1 NONE No No N/A Approved Ministerial
49111065 2068

INTERBAY DR,

SAN JOSE, CA
95122
2025 123267
000 00 RS
ADU O
9/18/2025
1 1 NONE No No N/A Pending Ministerial
49915068 1211

SIMONSON

WY, SAN

JOSE, CA
95121
2025 109358
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
68454036 4590

HOUNDSHAVE

N WY, SAN

JOSE, CA
95111
2025 122998
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
60122109 3139

FLORENCE CT,

SAN JOSE, CA
95127
2025 123951
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
68432110 5149

DISCOVERY

AV, SAN JOSE,
CA 95111
2025 125752
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
49140016 2744 BRITT CT,

SAN JOSE, CA
95148
2025 125855
000 00 RS
ADU O
9/22/2025
1 1 1 NONE No No N/A Approved Ministerial
70423020 6117

ESCONDIDO

CT, SAN JOSE,
CA 95119
2025 128504
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
30734025 3673 KENDRA

WY, SAN

JOSE, CA
95130
2025 128511
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
48807047 2708

COVENTRY

DR, SAN JOSE,
CA 95127
2025 128719
000 00 RS
ADU O
9/22/2025
1 1 NONE No No N/A Pending Ministerial
46255029 4614 SIDLAW

CT, SAN JOSE,
CA 95136
2024 093005
000 00 RS
ADU O
9/24/2025
1 1 NONE No No N/A Pending Ministerial
24511012 1344 TOFTS

DR, SAN JOSE,
CA 95131
2025 130218
000 00 RS
ADU O
9/24/2025
1 1 NONE No No N/A Pending Ministerial
44715084 3462 GAVOTA

AV, SAN JOSE,
CA 95124
2025 120934
000 00 RS
ADU O
9/25/2025
1 1 NONE No No N/A Pending Ministerial
29926051 948 EDEN AV,

SAN JOSE, CA
95117
2025 124691
000 00 RS
ADU O
9/25/2025
1 1 NONE No No N/A Pending Ministerial
67621013 3438

WOODSIDE

LN, SAN JOSE,
CA 95121
2025 102430
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 19 ends

48424087 13541 EMILIE

DR, SAN JOSE,
CA 95127
2025 110122
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
42926053 1034 LOUISE

AV, SAN JOSE,
CA 95125
2025 118913
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
46710025 173 N 25TH ST,

SAN JOSE, CA
95116
2025 125499
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
67837085 1110 COYOTE

RD, SAN JOSE,
CA 95111
2025 127205
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
27917030 1247

REDOAKS DR,

SAN JOSE, CA
95128
2025 127375
000 00 RS
ADU O
9/29/2025
1 1 NONE No No N/A Pending Ministerial
48817050 2777 TWIN

OAKS LN, SAN

JOSE, CA
95127
2025 115239
000 00 RS
ADU O
9/30/2025
1 1 NONE No No N/A Pending Ministerial
37321047 6757

DEVONSHIRE

DR, SAN JOSE,
CA 95129
2025 132247
000 00 RS
ADU O
10/1/2025
1 1 NONE No No N/A Pending Ministerial
49730009 2896 GARDEN

AV, SAN JOSE,
CA 95111
2025 112737
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
43928067 1465 HUSTED

AV, SAN JOSE,
CA 95125
2025 125711
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
48416113 147 CEDAR LN,

SAN JOSE, CA
95127
2025 126598
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
65458013 3274

PINKERTON

DR, SAN JOSE,
CA 95148
2025 127960
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
48613066 1593

BERMUDA WY,

SAN JOSE, CA
95122
2025 128337
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
65441092 3092

ALLENWOOD

DR, SAN JOSE,
CA 95148
2025 130149
000 00 RS
ADU O
10/3/2025
1 1 NONE No No N/A Pending Ministerial
42117064 15180

COOPER AV,

SAN JOSE, CA
95124
2025 121584
000 00 RS
ADU O
10/6/2025
1 1 NONE No No N/A Pending Ministerial
49142033 2914 GLEN

DARBY CT,

SAN JOSE, CA
95148
2025 129496
000 00 RS
ADU O
10/6/2025
1 1 NONE No No N/A Pending Ministerial
28415035 1772 ISABEL

DR, SAN JOSE,
CA 95125
2025 130229
000 00 RS
ADU O
10/6/2025
1 1 1 NONE No No N/A Approved Ministerial
24510025 1280 TURRETT

DR, SAN JOSE,
CA 95131
2025 133642
000 00 RS
ADU O
10/6/2025
1 1 NONE No No N/A Pending Ministerial
43950018 2281

CELESTINE

AV, SAN JOSE,
CA 95125
2025 125805
000 00 RS
ADU O
10/7/2025
1 1 NONE No No N/A Pending Ministerial
70444020 6958 DEL RIO

DR, SAN JOSE,
CA 95119
2025 127875
000 00 RS
ADU O
10/7/2025
1 1 NONE No No N/A Pending Ministerial
49725061 3012

SUNBURST

DR, SAN JOSE,
CA 95111
2025 132513
000 00 RS
ADU O
10/7/2025
1 1 1 NONE No No N/A Approved Ministerial
49128057 2303 PALMIRA

WY, SAN

JOSE, CA
95122
2025 127196
000 00 RS
ADU O
10/8/2025
1 1 NONE No No N/A Pending Ministerial
N/A

MASTER FILE ,

SAN JOSE, CA
2025 134333
000 00 RS
ADU O
10/9/2025
1 1 NONE No N/A Pending Ministerial
64722002 1582 MT

FRAZIER DR,

SAN JOSE, CA
95127
2025 105095
000 00 RS
ADU O
10/10/2025
1 1 NONE No No N/A Pending Ministerial
56711069 5526 FERN DR,

SAN JOSE, CA
95124
2025 123210
000 00 RS
ADU O
10/10/2025
1 1 NONE No No N/A Pending Ministerial
64722002 1582 MT

FRAZIER DR,

SAN JOSE, CA
95127
2025 129464
000 00 RS
ADU O
10/10/2025
1 1 NONE No No N/A Pending Ministerial
66006009 2942

MEADOWLAND

S LN, SAN

JOSE, CA
95135
2025 129371
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
49420067
699 SWALLOW

DR, SAN JOSE,
CA 95111
2025 130331
000 00 RS
ADU O
10/14/2025
1 1 1 NONE No No N/A Approved Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 20 ends

40332050 1944 SERGE

AV, SAN JOSE,
CA 95130
2025 130849
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
68515060 27 PARK

WARREN PL,

SAN JOSE, CA
95136
2025 131059
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
49130025 2681 PIXANNE

CT, SAN JOSE,
CA 95148
2025 131652
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
68523010 38 PARK

FLETCHER PL,

SAN JOSE, CA
95136
2025 132511
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
37804060 1004

HUNTINGDON

DR, SAN JOSE,
CA 95129
2025 132630
000 00 RS
ADU O
10/14/2025
1 1 NONE No No N/A Pending Ministerial
58913010 2760

LONGFORD

DR, SAN JOSE,
CA 95132
2025 116374
000 00 RS
ADU O
10/15/2025
1 1 NONE No No N/A Pending Ministerial
48125052 1980 E San
Antonio St, San
Jose, CA 95116
2025 136035
000 00 RS
ADU O
10/17/2025
1 1 NONE No No N/A Pending Ministerial
24503038 1340 OLD

ROSE PL, SAN

JOSE, CA
95132
2025 106162
000 00 RS
ADU O
10/20/2025
1 1 NONE No No N/A Pending Ministerial
49925011 2687 KIMBALL

DR, SAN JOSE,
CA 95121
2025 133034
000 00 RS
ADU O
10/20/2025
1 1 NONE No No N/A Pending Ministerial
44702035 1514 SAN

JOAQUIN AV,

SAN JOSE, CA
95118
2025 135166
000 00 RS
ADU O
10/20/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1174 SIERRA

AV, SAN JOSE,
CA 95126
2025 105636
000 00 RS
ADU O
10/21/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
45116039 1441

WILLOWMONT

AV, SAN JOSE,
CA 95118
2025 136160
000 00 RS
ADU O
10/22/2025
1 1 NONE No No N/A Pending Ministerial
58920012 2480 AMARYL

DR, SAN JOSE,
CA 95132
2025 111457
000 00 RS
ADU O
10/23/2025
1 1 NONE No No N/A Pending Ministerial
43930040 2334

LANSFORD AV,

SAN JOSE, CA
95125
2025 129607
000 00 RS
ADU O
10/23/2025
1 1 NONE No No N/A Pending Ministerial
42938053 1493

BROOKDALE

DR, SAN JOSE,
CA 95125
2025 132134
000 00 RS
ADU O
10/24/2025
1 1 NONE No No N/A Pending Ministerial
26108007 801 VILLA AV,

SAN JOSE, CA
95126
2025 127671
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
46229058 4629 MIA CL,

SAN JOSE, CA
95136
2025 129183
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
58119031 1194 OLIVE

BRANCH LN,

SAN JOSE, CA
95120
2025 132329
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
23033022 1221 SANTA

PAULA AV,

SAN JOSE, CA
95110
2025 134484
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
45116039 1681

PARKSIDE AV,

SAN JOSE, CA
95125
2025 136996
000 00 RS
ADU O
10/27/2025
1 1 NONE No No N/A Pending Ministerial
47743089 2029

KILCHOAN WY,

SAN JOSE, CA
95122
2025 129104
000 00 RS
ADU O
10/28/2025
1 1 NONE No No N/A Pending Ministerial
26108007 803 VILLA AV,

SAN JOSE, CA
95126
2025 130767
000 00 RS
ADU O
10/29/2025
1 1 NONE No No N/A Pending Ministerial
49137075 2679 SAND

POINT DR,

SAN JOSE, CA
95148
2025 132559
000 00 RS
ADU O
10/29/2025
1 1 NONE No No N/A Pending Ministerial
67630039 2648

PEARTREE LN,

SAN JOSE, CA
95121
2025 133286
000 00 RS
ADU O
10/30/2025
1 1 NONE No No N/A Pending Ministerial
66061021 2721 Clover
Meadow Ct,
San Jose, CA
2025 113716
000 00 RS
ADU O
11/3/2025
1 1 NONE No No N/A Pending Ministerial
49418057 3850 Kauai Dr,
San Jose, CA
95111
2025 132482
000 00 RS
ADU O
11/3/2025
1 1 NONE No No N/A Pending Ministerial
24960026 368 N 17th St,
San Jose, CA
95112
2025 132484
000 00 RS
ADU O
11/3/2025
1 1 NONE No No N/A Pending Ministerial
46432034 684 Tarrytown
Ct, San Jose,
CA 95136
2025 118231
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
30337013 402 S Henry
Ave, San Jose,
CA 95117
2025 128786
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 21 ends

68015026
5611 Algonquin
Way, San Jose,
CA 95138
2025 129938
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
46704030 249 N 15th St,
San Jose, CA
95112
2025 134551
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
48135142 2024 Cinderella
Ln, San Jose,
CA 95116
2025 136115
000 00 RS
ADU O
11/4/2025
1 1 NONE No No N/A Pending Ministerial
49108033 2107 Orlando
Dr, San Jose,
CA 95122
2025 133575
000 00 RS
ADU O
11/5/2025
1 1 NONE No No N/A Pending Ministerial
49451010 3935 Sark Way,
San Jose 95111
2025 133754
000 00 RS
ADU O
11/5/2025
1 1 NONE No No N/A Pending Ministerial
23508006 58 E Younger
Ave, San Jose,
CA 95112
2025 136174
000 00 RS
ADU O
11/5/2025
1 1 NONE No No N/A Pending Ministerial
37317039 1391 Bretmoor
Way, San Jose,
CA 95129
2025 120222
000 00 RS
ADU O
11/6/2025
1 1 NONE No No N/A Pending Ministerial
48160015 1709 Arroyo de
Oro, San Jose,
CA 95116
2025 133917
000 00 RS
ADU O
11/6/2025
1 1 NONE No No N/A Pending Ministerial
24409079 1667 Four Oaks
Rd, San Jose,
CA 95131
2024 087520
000 00 RS
ADU O
11/10/2025
1 1 NONE No No N/A Pending Ministerial
49712003 10511 Potts
Way, San Jose,
CA 95111
2025 124804
000 00 RS
ADU O
11/10/2025
1 1 NONE No No N/A Pending Ministerial
30722064 1421 Vallejo Dr,
San Jose, CA
95130
2025 138450
000 00 RS
ADU O
11/10/2025
1 1 NONE No No N/A Pending Ministerial
47227019 503 S 5th St,
San Jose, CA
95112
2025 139715
000 00 RS
ADU O
11/10/2025
1 1 NONE Yes - Local No N/A Pending Ministerial
69214076 5821 Chris Dr,
San Jose, CA
95123
2025 139962
000 00 RS
ADU O
11/11/2025
1 1 NONE No No N/A Pending Ministerial
48618072 1933 Everglade
Ave, San Jose,
CA 95122
2025 134472
000 00 RS
ADU O
11/12/2025
1 1 NONE No No N/A Pending Ministerial
46737106 965 E Williams
St, San Jose,
CA 95116
2025 135630
000 00 RS
ADU O
11/12/2025
1 1 NONE No No N/A Pending Ministerial
9231047 3588 Behler Dr,
San Jose, CA
95132
2025 136396
000 00 RS
ADU O
11/12/2025
1 1 NONE No No N/A Pending Ministerial
57737030 5986 Colorview
Ct, San Jose,
CA 95120
2025 135635
000 00 RS
ADU O
11/13/2025
1 1 NONE No No N/A Pending Ministerial
45110007 1143
Pembridge Dr,
San Jose, CA
95118
2025 131976
000 00 RS
ADU O
11/17/2025
1 1 NONE No No N/A Pending Ministerial
30337032 373 Rosewood
Ave, San Jose,
CA 95117
2025 115482
000 00 RS
ADU O
11/18/2025
1 1 NONE No No N/A Pending Ministerial
40330071 4833 Grimsby
Dr, San Jose,
CA 95130
2025 139067
000 00 RS
ADU O
11/18/2025
1 1 NONE No No N/A Pending Ministerial
49750007 692 Santee
River Ct, San
Jose, CA 95111
2025 114928
000 00 RS
ADU O
11/20/2025
1 1 NONE No No N/A Pending Ministerial
48121095 61 Scharff Ave,
San Jose, CA
95116
2025 137614
000 00 RS
ADU O
11/20/2025
1 1 NONE No No N/A Pending Ministerial
23016025 1194 Sherwood
Ave, San Jose,
CA 95126
2025 141055
000 00 RS
ADU O
11/20/2025
1 1 NONE No No N/A Pending Ministerial
56709074 5411 Drysdale
Dr, San Jose,
CA 95124
2025 136013
000 00 RS
ADU O
11/21/2025
1 1 NONE No No N/A Pending Ministerial
70623017 73 Avenida
Espana, San
Jose, CA 95139
2025 136536
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
49727040 444 Pocatello
Dr, San Jose,
CA 95111
2025 137201
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
67855034 107 Felice Ct,
San Jose, CA
95138
2025 137519
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
49724036 2936 Garden
Ave, San Jose,
CA 95111
2025 138437
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
42908011 1195 Britton
Ave, San Jose,
CA 95125
2025 138465
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
42908011 1195 Britton
Ave, San Jose,
CA 95125
2025 138467
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
65951022 3154 Cortona
Dr, San Jose,
CA 95135
2025 139904
000 00 RS
ADU O
11/24/2025
1 1 NONE No No N/A Pending Ministerial
48142061 914 McCreery
Ave, San Jose,
CA 95116
2025 133195
000 00 RS
ADU O
11/26/2025
1 1 NONE No No N/A Pending Ministerial
27409009 1526 McDaniel
Ave, San Jose,
CA 95126
2025 136658
000 00 RS
ADU O
11/26/2025
1 1 NONE No No N/A Pending Ministerial
N/A 5290 Garwood
Dr, San Jose,
CA 95118
2025 142600
000 00 RS
ADU O
11/26/2025
1 1 1 NONE No No N/A Approved Ministerial
48142061 914 McCreery
Ave, San Jose,
CA 95116
2025 140331
000 00 RS
ADU O
11/26/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 22 ends

27454034 2357 Sunny
Vista Dr, San
Jose, CA 95128
2025 142769
000 00 RS
ADU O
11/30/2025
1 1 NONE No No N/A Pending Ministerial
24920021
769 N Bayshore
West, San
Jose, CA 95112
2025 128347
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
44215057 1767 Curtner
Ave, San Jose,
CA 95124
2025 131785
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
68715003 759 Calero Ave,
San Jose, CA
95123
2025 135316
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
49922033 2507 Sherlock
Dr, San Jose,
CA 95121
2025 138060
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
42108085 15062 Brewster
Ave, San Jose,
CA 95124
2025 142571
000 00 RS
ADU O
12/1/2025
1 1 NONE No No N/A Pending Ministerial
56717047 1708 ZINNIA

LN, SAN JOSE,
CA 95124
2025 103962
000 00 RS
ADU O
12/3/2025
1 1 NONE No No N/A Pending Ministerial
24951029 409 N 10th St,
San Jose, CA
95112
2025 128054
000 00 RS
ADU O
12/3/2025
1 1 NONE No No N/A Pending Ministerial
56717047 1708 ZINNIA

LN, SAN JOSE,
CA 95124
2025 136882
000 00 RS
ADU O
12/3/2025
1 1 NONE No No N/A Pending Ministerial
65904019 3203 Foxboro
Pl, San Jose,
CA 95135
2024 067775
000 00 RS
ADU O
12/4/2025
1 1 NONE No No N/A Pending Ministerial
44249023 1799 Foxworthy
Ave, San Jose,
CA 95124
2025 132283
000 00 RS
ADU O
12/4/2025
1 1 NONE No No N/A Pending Ministerial
67665013
3850 Glengrove
Way, San Jose,
CA 95121
2025 141032
000 00 RS
ADU O
12/4/2025
1 1 NONE No No N/A Pending Ministerial
61228037 3756 Marchant
Dr, San Jose,
CA 95127
2025 130632
000 00 RS
ADU O
12/5/2025
1 1 NONE No No N/A Pending Ministerial
69504003 917 Maclay Dr,
San Jose, CA
95123
2025 143863
000 00 RS
ADU O
12/5/2025
1 1 NONE No No N/A Pending Ministerial
47742092 2045 Malden
Ave, San Jose,
CA 95122
2025 140264
000 00 RS
ADU O
12/5/2025
1 1 NONE No No N/A Pending Ministerial
N/A 3202 Marten
Ave, San Jose,
CA 95148
2025 142586
000 00 RS
ADU O
12/5/2025
1 1 1 NONE No No N/A Approved Ministerial
49712061 458 Stroud Pl,
San Jose, CA
95111
2025 115080
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
59531011 1039 Noble
Ave, San Jose,
CA 95132
2025 138055
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
67686015 4574 Terra Pl,
San Jose, CA
95121
2025 140028
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
45819016 5288 Fell Ave,
San Jose, CA
95136
2025 140754
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
47229058 578 S 11th St,
San Jose, CA
95112
2025 141631
000 00 RS
ADU O
12/8/2025
1 1 NONE No No N/A Pending Ministerial
27420075 1830 Cleveland
Ave, San Jose,
CA 95126
2024 099377
000 00 RS
ADU O
12/10/2025
1 1 NONE No No N/A Pending Ministerial
43909031 1173 Malone
Rd, San Jose,
CA 95125
2025 122534
000 00 RS
ADU O
12/10/2025
1 1 NONE No No N/A Pending Ministerial
56735014 5568 Dartmouth
Dr, San Jose,
CA 95118
2025 140268
000 00 RS
ADU O
12/10/2025
1 1 NONE No No N/A Pending Ministerial
46259009 4458 ILLSLEY

CT, SAN JOSE,
CA 95136
2025 133994
000 00 RS
ADU O
12/11/2025
1 1 NONE No No N/A Pending Ministerial
43939039 2557 Cottle
Ave, San Jose,
CA 95125
2025 142516
000 00 RS
ADU O
12/11/2025
1 1 NONE No No N/A Pending Ministerial
67312041 2804
Westbranch Dr,
San Jose, CA
2025 132628
000 00 RS
ADU O
12/12/2025
1 1 NONE No No N/A Pending Ministerial
58112002 3551 Crown
Blvd, San Jose,
CA 95120
2025 134091
000 00 RS
ADU O
12/15/2025
1 1 NONE No No N/A Pending Ministerial
56930065 1400 Bouret Dr,
San Jose, CA
95118
2025 143386
000 00 RS
ADU O
12/15/2025
1 1 NONE No No N/A Pending Ministerial
56930065 1400 Bouret Dr,
San Jose, CA
95118
2025 143452
000 00 RS
ADU O
12/15/2025
1 1 NONE No No N/A Pending Ministerial
N/A 1800 Shady
Grove Ct, San
Jose, CA
2025 115128
000 00 RS
ADU O
12/16/2025
1 1 NONE No No N/A Pending Ministerial
42923040 1002 California
Ave, San Jose,
CA 95125
2025 144690
000 00 RS
ADU O
12/16/2025
1 1 NONE No No N/A Pending Ministerial
23510005 947 N 7th St,
San Jose, CA
95112
2025 142363
000 00 RS
ADU O
12/22/2025
1 1 NONE No No N/A Pending Ministerial
69414009 890
Summerbrook
Ln, San Jose,
CA 95123
2025 119152
000 00 RS
ADU O
12/23/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 23 ends

37801025 1017 Whiteoak
Dr, San Jose,
CA 95129
2025 133999
000 00 RS
ADU O
12/26/2025
1 1 NONE No No N/A Pending Ministerial
65919066 3068 Quimby
Rd, San Jose,
CA
2025 142682
000 00 RS
ADU O
12/26/2025
1 1 NONE No No N/A Pending Ministerial
70427036 211 Pemba Ct,
San Jose, CA
95119
2025 111636
000 00 RS
ADU O
12/29/2025
1 1 NONE No No N/A Pending Ministerial
67309078 2967

ROSSMORE

LN, SAN JOSE,
CA 95148
2025 134206
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
48123123 258 Duffy Ct,
San Jose, CA
95116
2025 138790
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
46702090 271 N 9th St,
San Jose, CA
95112
2025 141077
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
66041021 3253 Charmat
Ct, San Jose,
CA 95135
2025 142884
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
45136062 4450 Silva Ave,
San Jose, CA
95118
2025 146910
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
69431024 5870 Cabral
Ave, San Jose,
CA 95123
2025 146918
000 00 RS
ADU O
12/30/2025
1 1 NONE No No N/A Pending Ministerial
27452019 2327 Kenwood
Ave, San Jose,
CA 95128
2025 143705
000 00 RS
ADU O
12/31/2025
1 1 NONE No No N/A Pending Ministerial
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 24 ends

Jurisdiction San Jose ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2025 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
1 Projection
Period 3 4
RHNA Allocation
by Income Level
Projection
Period -
06/30/2022-
01/30/2023
2023 2024 2025 2026 2027 2028 2029 2030 2031
Total Units to
Date (all
years)
Total Remaining
RHNA by
Income Level
Deed Restricted - - - - - - - - - - Non-Deed Restricted - - - - - - - - - - Deed Restricted 13 387 213 258 - - - - - - Non-Deed Restricted - - - - - - - - - - Deed Restricted 181 180 273 317 - - - - - - Non-Deed Restricted - - 167 150 - - - - - - Deed Restricted 184 259 904 394 - - - - - - Non-Deed Restricted - - 167 150 - - - - - - Deed Restricted 51 114 132 44 - - - - - - Non-Deed Restricted - 768 167 1,066 - - - - - - Above Moderate 27,714 322 1,220 195 250 - - - - - - 1, 987 25,727 62,200
751 2,928 2,218 2,629 - - - - - - 8,526 53,674 Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact HCD staff at [email protected].

Acutely Low - -
*For years prior to 2025, data on deed-restricted vs. non-deed restricted Extremely Low-Income units is approximated from whether the projects reported any deed-restricted Very Low-Income Units. If you wish to edit this historical data for accuracy or have any questions about the data, you may login to HCD's online APR system, or contact HCD staff at [email protected].

Total Units
*For jurisdictions that received RHNA determinations for the current cycle prior to the passage of AB 3093 (September 19, 2024):
- You were not allocated Acutely Low-Income and Extremely Low-Income RHNA targets, therefore the allocations in Field 1 are listed as "0" - If you wish to set your own targets in these income categories for informational purposes, contact HCD staff at [email protected]. - All Acutely Low-Income and Extremely Low-Income units reported during the cycle are counted towards Very-Low Income RHNA progress 8,369
Total RHNA
-
6,629 Low
*For years prior to 2025, Acutely Low-Income units are reported within the Extremely Low-Income category Please Note: Table B does not currently contain data from Table F or Table F2 for prior years. You may login to the APR system to see Table B that contains this data.

Extremely Low -
2,342 Moderate
15,088
8,687
10,711
2,
058
2,139
Income Level
Very Low
871 -
This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs.

Please contact HCD if your data is different than the material supplied here 2 Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
12,949
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 25 ends

Jurisdiction San Jose ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Date of
Rezone Rezone Type
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of
Rezone
Very Low-
Income Low-Income Moder ate-
Income
Above
Moderate-
Income
Rezone Type Parcel S ize
(Acres)
General Plan
Designation Zoning
Minimum
D ensity
Allowed
Maximum
Density
Allowed
Realistic
Capacity Vacant/Nonvacant Desc ription of
Existing Uses
Note: "+" indicates an optional field
Cells
in grey contain auto-calculation formulas
Summary Row: Start Data Entry Below
83 Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 26 ends

Jurisdiction San Jose
Reporting Year 2025 (Jan. 1 - Dec. 31)
1 2 345 6 7 8 9
Name of Program Objective
Projected Completion
Date in Housing
Element
Applicable Cycle Status of Program
Implementation Program Implementation Details Quantified Outcomes:

Category
Quantified Outcomes:

Count Supporting Documents
P -1 Align Zoning with the
General Plan Council approval of zoning changes 4/1/2024 6th Cycle Compl eted This program was completed in 2024. Other 1 None P-2 Subsidize Extremely
Low-Income Housing
Including Permanent
Supportive Housing for
Homeless
Dec 2031: 45% of City capital subsidies
spent on ELI and PSH 12/31/2031 6th Cycle Continuous
Staff released the April 2025 Rolling Request for
Proposals (RFP) and the June 2025 Notice of
Funding Availability (NOFA) as an addendum to the
RFP, offering $50M in funding for extremely low- to
moderate-income housing. Of the funding
committed in CY 2025, 41% of the City subsidy was
allocated to ELI households, and 12% was allocated
to PSH units. Apartments housing 121 ELI
households, 45 PSH households, and 25 HUD-
VASH voucher recipient households began
construction during CY 2025.

Other 53 None
P-2 Subsidize Extremely
Low-Income Housing
Including Permanent
Supportive Housing for
Homeless
Dec 2031: 1,200 ELI affordable homes
created 12/31/2031 6th Cycle Continuous
Staff released the April 2025 Rolling Request for
Proposals (RFP) and the June 2025 Notice of
Funding Availability (NOFA) as an addendum to the
RFP, offering $50M in funding for extremely low- to
moderate-income housing. Of the funding
committed in CY 2025, 41% of the City subsidy was
allocated to ELI households, and 12% was allocated
to PSH units. Apartments housing 121 ELI
households, 45 PSH households, and 25 HUD-
VASH voucher recipient households began
construction during CY 2025.

Units 589 None
P-2 Subsidize Extremely
Low-Income Housing
Including Permanent
Supportive Housing for
Homeless
Dec 2031: Pursue and apply for a
minimum of 3 funding opportunities during
the planning period
12/31/2031 6th Cycle Continuous
The City served as a co-applicant for the Berryessa
Transit-Oriented development, seeking state and
federal funding through the California Debt Limit
Allocation Committee (CDLAC) to support the
creation of 50 ELI units. During the calendar year,
the City also approved the outside issuance of
bonds for 10 developments that will create or
preserve 277 ELI units. In addition, the City
supported transit improvements for two AHSC-
awarded transit-oriented developments, producing
107 ELI units. The City Council also approved the
commitment of recycled BEGIN funds to provide
downpayment assistance for 14 ELI households.

Other 0 None
P-3 North San José
Affordable Housing
Overlay Zones
Dec 2023: Council approval of General
Plan and Zoning Code Amendments 12/31/2023 6th Cycle Completed Staff completed the work necessary to create the
new zoning overlays and rezone sites in North San
José, as described in the December 2023 and
January 2024 Council memos that defined the
strategy. In 2025, staff continued analyzing
additional sites for inclusion in the North San José
General Plan and zoning overlay. We'll continue
work on this strategy as staff capacity and time
allow.

Other 1 None

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element.

Table D
Program Implementation Status pursuant to GC Section 65583 P-3 North San José
Affordable Housing
Overlay Zones
Dec 2024: Identification of additional
TERO sites for application of an affordable
or mixed income overlay consideration of
amendments by Council
12/31/2024 6th Cycle Completed
Following an evaluation of existing sites for the
addition of either an Affordable Housing Overlay
(AHO) or Mixed Income Housing Overlay (MIHO)
within the Transit Employment Residential Overlay
(TERO) District, which does not include an
affordability requirement, staff concluded that the
proposed change is unlikely to affect project
feasibility or accelerate development activity at this
time. As a result, no additional sites are currently
being considered for inclusion in the AHO or MIHO.

Other 0 None
P-3 North San José
Affordable Housing
Overlay Zones
Dec 2024: Council consideration of
previously identified sites for a TERO
overlay
12/31/2024 6th Cycle Completed
Staff had identified a single site for the TERO
District in North San Jose that wasn't included in the
list of sites. After further evaluation of the site, staff concluded that the site is not suitable for housing
development and will not be included in the TERO
District.

Other 1 None
P-4 Affordable Housing
Tools for North San José
2024: Study created analyzing potential
NSJ Density Bonus or other tools to create
affordable units 12/31/2024 6th Cycle Completed
Staff reviewed current state Density Bonus law, the
2025 Cost of Development study, and recent project
applications in North San José. Given the high
possible densities in NSJ (min. of 75 DU/AC
required), generous state law Density Bonus
provisions, and current superior financial feasibility
of lower density product types compared to higher
density, staff concluded that an additional density
bonus is unlikely at this time to be helpful to further development in NSJ; and, hiring a consultant to
confirm those findings is not necessary or fiscally
prudent at this time.

Housing and Planning staff have assessed that
feasible options for driving development to NSJ
continue to be 1) awarding geographic priority in
annual City Notices of Funding Availability for
affordable housing (per P-5), 2) successful
conveyance to an affordable housing developer of
the large City-owned Vista Montana site, which
process is planned to occur in 2026; and 3) active
implementation of the Multifamily Housing Incentive
Program to generate moderate-income and above-
moderate new housing units for projects in NSJ and
other areas of San José. For these reasons, a
formal Implementation Plan is unlikely to add
additional value; therefore, staff is closing out this
item
Other 0
See the Cost of Development Study Session
(report is the Attachment):
https://sanJosé.legistar.com/View.ashx?M=
A&ID=1315729&GUID=3C17B03F-B014-
43D5-B8DF-44024CDE065B
P-4 Affordable Housing
Tools for North San José
2024: Creation of Implementation Plan to
identify an estimate of number of
affordable homes achieved through each
approach
12/31/2024 6th Cycle Not yet started See description above for P-4. Other 0 None P-4 Affordable Housing
Tools for North San José
2024-25: Creation of draft tools / code
amendments and outreach, if study shows
it is feasible 12/31/2025 6th Cycle Not yet started See description above for P-4. Other 0 None P-4 Affordable Housing
Tools for North San José
Dec 2025: Council consideration of tools if
approval needed (e.g., ordinance change
re
quired)
12/31/2025 6th Cycle Not yet started See description above for P-4; not applicable. Other 0 None P-5 Affordable Housing
Investments in North San
José
800 restricted affordable homes in North
San José 1/31/2031 6th Cycle Continuous
In April 2025, the City released a New Construction
and Preservation Request for Proposals (RFP).

This RFP incentivized development in North San
José by awarding 10 points to projects in this key
growth area. In December 2025, the Housing
Department released a Request for Proposals for
City-Owned Sites, including one site in North San
José.

Units 0
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/developers/notice-of-funding-
availability
P-5 Affordable Housing
Investments in North San
José
2 sites acquired with RFP awards &
ground leases to affordable developers 1/31/2031 6th Cycle Continuous In 2025, the City released a Request for Proposals
for 71 Vista Montana, a site located within the North
San José Area. The site is 4.2 acres and could
produce 1,000+ units.

Other 0 None
P-6 Regular Coordination
Meetings for Affordable
Housing
Housing Navigator budgeted annually 1/31/2031 6th Cycle Completed The City continues to hold regular
monthly meetings involving Planning, Housing, and
other departments as needed to coordinate permit
processing for affordable
housing projects. The Housing Development
Facilitation Officer position, which supports City
departments and affordable housing developers
through the permitting process, was filled in January
2026.

Other 1 None
P-6 Regular Coordination
Meetings for Affordable
Housing
# affordable housing developments
assisted 1/31/2031 6th Cycle Continuous
In 2025, 16 100% affordable housing projects with a
total of 2,490 units were assisted in the building
permit application process. Building permits were
issued for 970 of those units.

Other 16 None
P-7 City Infill Housing
Ministerial Approval
Ordinance
Dec 2024: Council approval of Ordinance 12/31/2024 6th Cycle Completed The City ordinance providing a ministerial approval
pathway for infill housing development projects
went into effect in February 2025. One 540-
unit project that includes 27 units for very low-
income households has been approved using the
ministerial process, and a 100%
affordable project with 272 units is was submitted in
2025 and is currentl
y under review.

Other 1
https://sanjose.legistar.com/LegislationDetail
.aspx?ID=7039998&GUID=732C1720-428F-
443A-A575-B3453982001B
P-7 City Infill Housing
Ministerial Approval
Ordinance
Jan 2025: Outreach to developers 1/31/2025 6th Cycle Continuous Staff continues to engage with developers on an
ongoing basis to gather feedback on permit
processing, including through the monthly
Develo
pers' Roundtable.

Other 0 None
P-7 City Infill Housing
Ministerial Approval
Ordinance
June 2025: Complete first evaluation of
land use and permit processes
improvements, and implement identified
modifications. Ongoing evaluation,
reporting, and implementation will continue
through Housing Catalyst Work Plan.
6/30/2025 6th Cycle In Progress
Based on City Council direction and staff's
evaluation, the City will look to expand the
ministerial processing ordinance to the Downtown
core. In January 2026 staff has initiated the
environmental review necessary to complete this
ordinance with a goal of completing by the end of
2026.

Other 1 None
P-7 City Infill Housing
Ministerial Approval
Ordinance
Entitlement of 200 units per year using the
new streamlined process during first years
after adoption.
12/31/2024 6th Cycle Continuous One project with 540 units was entitled in 2025. Units 540 None P-7 City Infill Housing
Ministerial Approval
Ordinance
Average 25% reduction in the length of
time from application to planning permit
issuance
12/31/2024 6th Cycle Continuous
The first ministerial permit was approved in 8
months, while discretionary approvals can take 22
months or more, although timelines vary widely.

Factors that influence the timeline include site
location and characteristics, environmental
conditions, and the length of time for revisions to be
submitted to the City in response to review
comments.

Other 1 None
P-9 Diridon Affordable
Housing Production Goal
By the later of Diridon Station Area Plan
buildout or 2040: 25% of homes in Station
Area as restricted affordable 12/31/2040 6th Cycle Continuous In April 2025, a New Construction and Preservation
Request for Proposals was released. This RFP
incentivized development in the Diridon Station
Area by awarding 10 points to projects within 0.5
miles of this key multimodal transit hub.

Unfortunately, the Google downtown west project,
which would have brought significant investment
and housing development to the area, has been put
on an indefinite hold for the foreseeable future.

D
evelopment in this area is less than anticipated.

Other 0
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/developers/notice-of-funding-
availability
P-9 Diridon Affordable
Housing Production Goal
Annual goal: Fund an average of 61 new
affordable homes 1/31/2031 6th Cycle Continuous
In April 2025, a New Construction and Preservation
Request for Proposals was released. This RFP
incentivized development in the Diridon Station
Area by awarding 10 points to projects within 0.5
miles of this key multimodal transit hub.

Unfortunately, the Google downtown west project,
which would have brought significant investment
and housing development to the area, has been put
on an indefinite hold for the foreseeable future.

D
evelopment in this area is less than anticipated.

Units 0 None
P-9 Diridon Affordable
Housing Production Goal
By 2031: 350 affordable homes funded by
City 1/31/2031 6th Cycle Continuous
In April 2025, a New Construction and Preservation
Request for Proposals was released. This RFP
incentivized development in the Diridon Station
Area by awarding 10 points to projects within 0.5
miles of this key multimodal transit hub.

Unfortunately, the Google downtown west project,
which would have brought significant investment
and housing development to the area, has been put
on an indefinite hold for the foreseeable future.

D
evelopment in this area is less than anticipated.

Units 0 None
P- 10 Standardize and
Streamline Permitting,
Fees, Applications
Apr 2024: Fees webpage updated 4/1/2024 6th Cycle Continuous Staff will continue to refine and update fee
webpages as appropriate to be consistent with state
law.

Other 0
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/developers/developer-fees-
char
ges
P- 10 Standardize and
Streamline Permitting,
Fees, Applications
Dec 2025: Council adoption of ordinance
to amend municipal code 12/31/2025 6th Cycle Not yet started Refinement and adoption of an ordinance would
follow adoption of the City Council Policy described
further below. Implementing changes to the
municipal code would come as a second phase to
creation of a new Council Polic
y.

Other 0 None
P- 10 Standardize and
Streamline Permitting,
Fees, Applications
Dec 2025: Council approval of Policy on
Development Fee Framework 12/31/2025 6th Cycle In Progress The work to-date on this item is comprised of the
formation of an internal working group of city
departments with existing impact fee programs. The
first phase of the work was the creation of a new
City Council Policy that would define and
memorialize the Development Fee Framework.

Staff in the working group had developed a first
draft of the Council Policy that will require more
internal review and revisions. However, work on this
item has been slowed to prioritize the General Plan
Four-Year Review and implementation of state laws
such as SB 79. Additionally, the environment
around fees has evolved through the passage of SB
937 that went into effect last year and allows for
impact fee deferral for most residential projects until certificate of occupancy. Recently, a memorandum
authored by Councilmembers Ortiz, Cohen,
Mulcahy, and Casey was submitted to the Rules
and Open Government Committee on January 15,
2026. The memorandum focused on many of the
important areas of work contemplated in the
Development Fee Framework. Staff is currently
assessing how it can continue to move forward this
work and what, if any, additional resources might be
necessary. The first steps would involve
continuation of work on development of the City
Council Policy
Other 0 None
P-11 Allow “SB 9” Type
Housing on Additional
Properties
Jun 2024: Council approval of zoning code
amendment and design standards 6/30/2024 6th Cycle Completed In January 2026, City Council approved an update
to Title 20 of the Municipal Code. This included the
addition of Chapter 20.30 Part 9 to allow two
primary dwellings by-right on a single lot within the
R-2 Zoning District, and to allow lot splits of R-2
properties through a ministerial small-lot subdivision
process. The changes went into effect in early
March 2026.

Other 1
Ordinance:
https://sanjose.legistar.com/View.ashx?M=F
&ID=15037949&GUID=AA394D62-1526-
4B5A-9AAC-6E3822D313ED
P-12 Cost of Residential
Development Study
Update
Council presentation made 1/31/2031 6th Cycle Continuous The fifth Cost of Residential Development Study for
San Jose was completed in 2025. Key findings
include an average development cost of $676,000
per affordable housing unit. The cost per square
foot in San Jose is comparable to the Bay Area as a
whole, and most higher-density project types are
not financially feasible in today’s market. The study
and its findings were presented to community
members, stakeholder groups, City Council, and
Planning Commission in study sessions in
December 2025 and January 2026.

Other 1
The Cost of Development study can be
found here:
https://sanjose.legistar.com/View.ashx?M=F
&ID=15007144&GUID=BA1D08BC-AD4D-
4FE3-8740-F473655EA988
P-12 Cost of Residential
Development Study
Update
Program or fee changes identified and
made per updated analysis 1/31/2031 6th Cycle Continuous Based on the
findings of the Cost of Development
study regarding the effect of impact fees and to
address the slowdown in residential construction, in
January 2026 the City Council will consider an
extension and expansion of the Multifamily Housing
Incentive Program (MHIP), which reduces taxes
and fees for new multifamily construction, and
expanded the Downtown Residential Incentive
Program (previously the Downtown Residential
High-Rise Incentive Program), which waives and
reduces taxes and fees for residential projects in
the Downtown Planned Growth Area.

Other 1
MHIP resolution and ordinance changes:
https://sanjose.legistar.com/LegislationDetail
.aspx?ID=7802090&GUID=AA80E1E8-2027-
49FB-B866-9BADBD03EB3E. DRIP
resolutions and ordinance changes:
https://sanjose.legistar.com/LegislationDetail
.aspx?ID=7802088&GUID=CFEF9802-C3E1
-
495D-871E-56B81648D258.

P-13 Replacement of
Existing Affordable
Housing Units
2024: Council approval of Policy for
inventory required by state law 12/31/2024 6th Cycle In Progress Following the 2024 Housing Department
collaboration with a consultant to develop draft
procedures for replacement housing units pursuant
to Senate Bill 330, continued analysis has been
performed. During this process, the City Attorney’s
Office also consulted with the California Department
of Housing and Community Development (HCD) to
clarify statutory requirements regarding the tenure
of replacement units. Additional time was needed to
ensure the procedures fully align with state
guidance and legal interpretation. Also, the lead
staff person for this item was on long-term leave for
much of the year, and staff capacity was limited,
making it difficult to reassign this project. Final
procedures are anticipated to be completed and
posted for use by the development community in
2026
Other 0 None
P-13 Replacement of
Existing Affordable
Housing Units Website amended 12/31/2028 6th Cycle In Progress The Housing Department updated its website to
include an explanation of the Ellis Act to improve
public understanding of applicable housing laws,
particularly regarding the replacement of affordable
housing units. Additionally, policy staff were
unavailable during this time due to approved leave,
which impacted overall staffing resources. The
Department also initiated plans to hire a third public
information staff member at the end of 2025 to
strengthen outreach and communications capacity.

Anticipated hire date Q1 2026.

Other 0 None
P-13 Replacement of
Existing Affordable
Housing Units
2027: Proposal created if SB 330 12/31/28
sunset has not yet been removed 12/31/2027 6th Cycle In Progress Staff will continue to monitor this, as the sunset for SB 330 has been extended to January 2030. Other 0 None
P-13 Replacement of
Existing Affordable
Housing Units
2028: Council consideration of permanent
City program proposal 12/31/2028 6th Cycle In Progress
Will move metric in accordance with the state
extension of SB 330 to January 2030. This metric
will be moved to 2030 to consider a permanent City
program proposal.

Other 0 None
P-13 Replacement of
Existing Affordable
Housing Units Developer guidance created/ improved 12/31/2028 6th Cycle Not yet started Upon completion of legal analysis, guidance for
developers will be drafted. Staff will collect feedback from developers to finalize the guidance and then
publish it.

Other 0 None
P-14 Housing in Business
Corridors
Nov 2024: Council approval of zoning
code amendment 11/30/2024 6th Cycle Completed City Council approved the Zoning Code amendment in 2024. Other 1 None
P-15 Moderate-income
Housing Strategy Council approval of strategy 12/31/2024 6th Cycle Completed On May 19, 2025, City Council's Community and
Economic Development Committee approved the
City's Moderate-Income Housing Strategy. The five
recommendations approved were to: 1) Update the
Inclusionary Housing Ordinance Guidelines to
Maximize Housing Outcomes; 2) Foster ADU
Ownership; 3) Consider a Moderate-Income
Housing Density Bonus in Small Multifamily
Housing Developments; 4) Support Construction
Defect Liability Reform for Condominiums; and 5)
Facilitate Missing Middle Housing for the
Workforce.

Other 1
Moderate-income Housing Strategy memo:
https://sanJosé.legistar.com/LegislationDetai
l.aspx?ID=7357012&GUID=9BB00548-
CABC-47ED-981A-8AE9D37BE23E
P-15 Moderate-income
Housing Strategy
Mar 2024: Initiate identification and
inclusion of additional moderate-income
sites.
3/31/2024 6th Cycle Completed Staff initiated identification of additional sites in the spring and summer of 2025. Other 1 None
P-15 Moderate-income
Housing Strategy
Mar 2025: Report on additional moderate-
income sites in the 2025 Housing Element
APR.
3/31/2025 6th Cycle Completed
Staff conducted analysis in the spring and summer
of 2025 to identify additional moderate-income sites,
but were unable to find suitable candidates. Staff
will continue to look for opportunities for additional
moderate-income housing sites as part of the Four-
Year Review of the General Plan in 2026.

Other 0 None
P-16 Ground Leases for
Affordable Housing # existing deal land purchases 1/31/2031 6th Cycle Continuous 100% of developments closed in 2025 have City or
County ground leases. Arcade and 525 N Capitol
have City ground leases. 5885 Santa Teresa has a
County ground lease. Totaling 395 affordable
homes.

Other 0
The Fielden ground breaking:
https://news.santaclaracounty.gov/county-
and-partners-break-ground-affordable-
housing-project-east-san-José
Arcade ground breaking:
https://www.facebook.com/county.of.santa.cl
ara/posts/1254588323369513/#:~:text=The
%20County%20and%20partners%20celebra
ted,%F3%B3%84%AB
5885 Santa Teresa ground breaking:

Upcoming and scheduled for Feb 11, 2026.

P-16 Ground Leases for
Affordable Housing
# and % affordable developments that
closed construction with public ground
leases each year
1/31/2031 6th Cycle Continuous
100% of developments closed in 2025 have City or
County ground leases. Arcade and 525 N Capitol
have City ground leases. 5885 Santa Teresa has a
County ground lease. Totaling 395 affordable
homes in CY 2025, and 1,081 units across this
cycle.

Units 1081
The Fielden ground breaking:
https://news.santaclaracounty.gov/county-
and-partners-break-ground-affordable-
housing-project-east-san-José
Arcade ground breaking:
https://www.facebook.com/county.of.santa.cl
ara/posts/1254588323369513/#:~:text=The
%20County%20and%20partners%20celebra
ted,%F3%B3%84%AB
5885 Santa Teresa ground breaking:

Upcoming and scheduled for Feb 11, 2026.

P-16 Ground Leases for
Affordable Housing
% of all funded restricted affordable
properties with city or other public ground
leases
1/31/2031 6th Cycle Continuous
100% of developments closed in 2025 have City or
county ground leases. Arcade and 525 N Capitol
have City ground leases. 5885 Santa Teresa has a
Count
y ground lease.

Other 100 None
P-16 Ground Leases for
Affordable Housing # affordable units permanently preserved 1/31/2031 6th Cycle Continuous The City's limited funding has been focused on
expanding new affordable units rather than
purchasing land where opportunities exist to extend
affordabilit
y for long-term scenarios.

Units 0 None
P-17 Affordable Housing
Siting Policy Combined with N-5 6th Cycle None
P-18 Loans for Affordable
Housing NOFAs issued 1/31/2031 6th Cycle Continuous
In 2025, the Housing Department awarded $48.3M
in commitments for two new construction affordable
housing developments and closed on $68M in
financing on three new construction affordable
housing developments, two with City ground leases
and one with a County ground lease. These
properties will produce 806 new affordable homes.

The Department plans on releasing a new second
NOFA addendum to the rolling RFP in Q2 2026 and
all waitlisted applications will be refreshed and
updated as the department continues to manage
the active new construction funding pipeline.

Other 4
Gateway memo (218 affordable units):
https://sanJosé.legistar.com/gateway.aspx?
m=l&id=/matter.aspx?key=15361
Berryessa TOD memo (193):
https://sanJosé.legistar.com/gateway.aspx?
m=l&id=/matter.aspx?key=14565
The Fielden ground breaking (160):
https://news.santaclaracounty.gov/county-
and-partners-break-ground-affordable-
housing-project-east-san-José
Arcade ground breaking (189):
https://www.facebook.com/county.of.santa.cl
ara/posts/the-county-and-partners-
celebrated-the-groundbreaking-friday-for-
arcade-a-new-
af/1254588323369513/#:~:text=The%20Cou
nty%20and%20partners%20celebrated,Nov
%2014%2C%202025%F3%B0%9E%8B%F3
%B1%9F%A0
5885 Santa Teresa permit ready letter (48):
https://sanJoséca.sharepoint.com/:b:/r/sites/
Housing_ResidentialDevelopment_Productio
nandPreservation/Projects/PROJECTS/Sant
a%20Teresa%20(Charities)/Construction/61
25%20Snell%20Ave%20-
%20Permit%20Ready%20Letter.pdf?csf=1&
web=1&e=udM2P8
P-18 Loans for Affordable
Housing Funds committed 1/31/2031 6th Cycle Continuous
During Calendar Year 2025, the City Council
approved the funding for two affordable housing
developments, Berryessa TOD ($9,898,877) and
Gatewa
y Tower ($38,440,000)
Other 72200000 None
P-18 Loans for Affordable
Housing # Affordable homes created 1/31/2031 6th Cycle Continuous During Calendar Year 2025, the City Council
approved the funding for two affordable housing
developments, Berryessa TOD (195 units) and
Gatewa
y Tower (220 units)
Units 718 None
P-18 Loans for Affordable
Housing # Affordable homes preserved 1/31/2031 6th Cycle Continuous The Department has awarded, through its NOFA
process, and the project is pending Council
approval for the rehabilitation of the Comfort Suites
Inn, which will convert the hotel into 58 units of
permanent affordable housing.

Units 58 None
P-19 Expanded City
Density Bonus program Study completed 12/31/2027 6th Cycle Not yet started Significant work on this item has not
yet commenced. Staff is currently working on the
evaluation and implementation of SB 79 and its
impacts, which will, to some extent, determine the
parameters of an expansion of the City’s Density
Bonus
program.

Other 0 None
P-19 Expanded City
Density Bonus program Council approval of Ordinance changes 12/31/2027 6th Cycle Not yet started Significant work on this item has not yet commenced. Other 0 None
P-19 Expanded City
Density Bonus program
# of affordable units created through City
Density Bonus 12/31/2027 6th Cycle Not yet started Significant work on this item has not yet commenced. Units 0 None
P-19 Expanded City
Density Bonus program Number of units by AMI category 12/31/2027 6th Cycle Not yet started Significant work on this item has not yet commenced. Units 0 None
P-20 Mixed-income
Housing
# of housing developments with market-
rate or moderate-income units and ELI,
VLI and/or LI units
1/31/2031 6th Cycle Continuous
To foster mixed-income housing that is 100% deed-
restricted affordable across a range of income
levels, the City is actively promoting the use of the
California Housing Finance Agency’s Mixed-Income
Program (MIP) for new construction projects.

Gateway Tower exemplifies this strategy: in April
2025, CalHFA awarded the project MIP funding,
followed by a successful CDLAC application under
the MIP set-aside. The City of San José further
advanced this effort by committing $5 million in
predevelopment funding and $38,440,000 in
construction-permanent (CP) loan financing.

Together, these investments supported the project’s
award of approximately $10.8 million in state equity
and City approval of a 100% affordable downtown
high-rise development delivering 220 deed-
restricted units, including 100 workforce units and
120 units serving extremely low-income
households. Additionally, during the calendar year,
CMFA awarded grant funding to three
developments creating affordable housing units:

LINQ Apartments, located at 1700 Newbury Park
Drive (Ethos Real Estate and Pacific Housing), with
230 affordable units (AR recorded August 26,
2025); Fountain Park, located at 1026 S. De Anza
Boulevard, with 66 affordable units (AR recorded
August 29, 2025); and Park Kiely, located at 355
Kiely Boulevard, with 474 affordable units (AR
recorded August 21, 2025).

Other 1
Link to Actions Related to the Reallocation of
Acquisition Funding to the Construction-
Permanent Loan for the Gateway Tower
Affordable Housing Development:
https://sanJosé.legistar.com/LegislationDetai
l.aspx?ID=7769260&GUID=A6707EA8-
33CA-4C5F-96E9-
B158697201E0&Options=&Search
Link to Approval of a Multifamily Housing
Incentive Program Residential Tax and Fee
Waiver for 905 North Capitol Avenue:
https://sanJosé.legistar.com/View.ashx?M=F
&ID=13916572&GUID=C5F24BA8-FEB5-
406C-B1C9-28EFECC2A803
Link to Approval of a Multifamily Housing
Incentive Program Residential Tax and Fee
Waiver for the 0 Seely Building A
Development Located at 0 Seely Avenue:
https://sanJosé.legistar.com/View.ashx?M=F
&ID=14272794&GUID=E448BD5A-B063-
4774-9323-FA0CB8B2B07B
Actions Related to the Reallocation of
Acquisition Funding to the
Construction-Permanent Loan for the
Gateway Tower Affordable
Housing Development:
https://sanJosé.legistar.com/LegislationDetai
l.aspx?ID=7769260&GUID=A6707EA8-
33CA-4C5F-96E9-
P-21 Special Needs
Housing NOFA NOFAs issued 1/31/2031 6th Cycle Continuous In April 2025, staff released a New Construction and
Preservation Request for Proposals. This RFP
includes a points structure that incentivizes the
creation of homes for lower-income residents with
special needs, including disabilities, increased
access for disabled people, and participation in
desi
gn meetings with the disabled community.

Other 2 None
P-21 Special Needs
Housing NOFA Council commitments 1/31/2031 6th Cycle Continuous The City Council approved $9.9M for the
development of Berryessa TOD, which will provide
49 units of housing for individuals experiencing
homelessness, and $38.2M for the development of
Gateway Tower, which will offer 55 units of housing
for individuals ex
periencing homelessness.

Other 2 None
P-21 Special Needs
Housing NOFA
Goal of 15% of permanent units funded
during 6th cycle occupied by special needs
populations
1/31/2031 6th Cycle Continuous 25% of developments awarded during calendar year 2025 serve special needs populations. Other 25 None P-22 Transit-oriented
Affordable Housing near
Diridon Station
NOFAs prioritizing area 1/31/2031 6th Cycle Continuous
In April 2025, staff released a New Construction and
Preservation Request for Proposals. This RFP
includes a points structure that incentivizes the
creation of affordable housing within 0.5 miles of the
Diridon Station.

Other 1 None
P-23 Pursue AHSC
Funding near Diridon
Station
By Dec 2031: At least 2 AHSC
applications submitted for affordable
housing near Diridon
12/31/2031 6th Cycle Not yet started
There were no AHSC or NOFA applications in 2025
for improvements in this area. However, the
Housing Department will continue to support any
developments near the Diridon station that desire to
apply for AHSC. The 2025 New Construction and
Preservation Request for Proposals incentivizes
developments that secure additional funding
sources, such as HCD's AHSC, by prioritizing the
review and award process for AHSC-awarded
projects.

Other 0 None
P-23 Pursue AHSC
Funding near Diridon
Station
5 total funding applications awarded for
various initiatives, including affordable
housing
12/31/2031 6th Cycle Not yet started
Unfortunately, the Google downtown west project,
which would have brought significant investment
and housing development to the area, has been put
on an indefinite hold for the foreseeable future.

Develo
pment in this area is less than anticipated.

Other 0 None
P-23 Pursue AHSC
Funding near Diridon
Station
$20 million leveraged for planning
initiatives and affordable homes near
Diridon
12/31/2031 6th Cycle Not yet started
Unfortunately, the Google downtown west project,
which would have brought significant investment
and housing development to the area, has been put
on an indefinite hold for the foreseeable future.

Develo
pment in this area is less than anticipated.

Other 0 None
P-24 Housing on
Public/Quasi Public Lands
Dec 2024: Council approval of General
Plan amendments 12/31/2024 6th Cycle Completed This item was completed in 2024. Other 1 None P-25 Updated Inclusionary
Housing Program Fees By Jan 2028: Fees study produced 1/31/2028 6th Cycle Continuous At this time, limited progress has been made on the
Inclusionary Housing Ordinance (IHO) feasibility fee
study, as both the IHO and its accompanying
guidelines are currently undergoing updates. The
City anticipates being able to report more
comprehensive findings once the revised ordinance
and guidelines are adopted by the City Council,
anticipated on January 27, 2026. The forthcoming
study will be critical to ensuring that the IHO
program remains financially feasible and does not
create unintended barriers to housing construction.

In the interim, the City has pursued alternative
approaches to support project feasibility, including
the development of the Multifamily Housing
Incentive Program (MHIP), which reduces
construction-related taxes and sets the IHO in-lieu
fee at $0 for projects that provide at least 5% of
units affordable to households earning no more than
100% of Area Median Income (AMI)
Other 0
The Cose of Residential Development in
San José:
https://sanJosé.legistar.com/MeetingDetail.a
spx?ID=1315729&GUID=3C17B03F-B014-
43D5-B8DF-44024CDE065B&Search=
Multifamily Housing Incentive Program and
North San José Parks Fee Realignment.:
https://sanJosé.legistar.com/View.ashx?M=F
&ID=13583575&GUID=F101D3D4-D65C-
407D-9B6C-234BDE8EB26A
P-26 Accessory Dwelling
Unit (ADU) Amnesty
Program
Jul 2024: Program release 7/31/2024 6th Cycle In Progress As of July 2025, all initial inspections for the ADU
Amnesty Program had been completed. Staff
worked to complete the inspection reports and issue
them to the property owner/applicants. Of the
approximately 150 original participants in the
program, 114 remain, 19 opted out, and the
remainder ended participation for other reasons
(never responded, sold the property, etc.). By
December 2025, nearly all reports had been issued
to the property owner/applicants. The next step in
the process is for the property owner/applicants to
hire a licensed professional to draft plans and
submit a permit application to legalize the ADU.

Legalization can include reverting the structure to its originally permitted use, demolishing it, or legalizing it as a permitted ADU. If electing to legalize the unit as a permitted ADU, the unit will be held to the code
in effect at the time the structure was built, except
for life/safety requirements. Staff has retained the
third-party inspector to conduct the permit
inspections, providing consistency and continued
support to the applicants.

Units 1 None
P-26 Accessory Dwelling
Unit (ADU) Amnesty
Program
Dec 2031: Approximately 150 ADUs in
compliance by 2031 12/31/2031 6th Cycle In Progress
As of July 2025, all initial inspections for the ADU
Amnesty Program had been completed. Staff
worked to complete the inspection reports and issue
them to the property owner/applicants. Of the
approximately 150 original participants in the
program, 114 remain, 19 opted out, and the
remainder ended participation for other reasons
(never responded, sold the property, etc.). By
December 2025, nearly all reports had been issued
to the property owner/applicants. The next step in
the process is for the property owner/applicants to
hire a licensed professional to draft plans and
submit a permit application to legalize the ADU.

Legalization can include reverting the structure to its originally permitted use, demolishing it, or legalizing it as a permitted ADU. If electing to legalize the unit as a permitted ADU, the unit will be held to the code
in effect at the time the structure was built, except
for life/safety requirements. Staff has retained the
third-party inspector to conduct the permit
inspections, providing consistency and continued
support to the applicants.

Units 114 None
P-27 Accessory Dwelling
Unit (ADU) Affordability Dec 2026: Feasibility analysis completed 12/31/2026 6th Cycle In Progress In 2025, the
City lacked sufficient funding and staff
capacity to study an ADU subsidy program.

However, the Planning staff implemented the City
Council-approved ordinance 31095 from 2024,
which allows a limited number of ADUs to be sold
separately from the main housing units. This new
law should promote lower-cost, for-sale small
homes. In 2026, staff plans to begin an evaluation
of the San Diego ADU bonus program's applicability
to San José, which was approved by the Council
through the Moderate-income Housing Strategy (P-
15).

Other 0
Council committee memo for the Moderate-
Income Housing Strategy:
https://sanjoseca.govnita.com/workspaces/O
rdinances?query=31095
P-28 Predevelopment
Loans 5 predevelopment loans made 1/31/2031 6th Cycle Not yet started No predevelopment loans for developers of City-
owned sites were made in 2025. The City will
continue to support City-owned site development for
predevelopment loans in the upcoming year.

Other 0 None
P-28 Predevelopment
Loans 1,500 affordable units assisted 1/31/2031 6th Cycle Not yet started No predevelopment loans for developers of City-
owned sites were made in 2025. The City will
continue to support City-owned site development for
predevelopment loans in the upcoming year.

Units 0 None
P-29 Fair Housing Equity
Analysis for Specific
Plans
Combined with S-9 6th Cycle None
P-30 Updated Feasibility
Study for Commercial
Linkage Fee
Dec 2024: Feasibility study update 12/31/2024 6th Cycle Continuous As part of the City’s ongoing implementation of the
Commercial Linkage Fee (CLF), staff provided an
update to the Affordable Housing Impact Fee and
Commercial Linkage Fee report to support the
collection of funding for affordable housing. The
report was posted to the City’s website on
December 1, 2025, for public comment and then
brought to City Council on December 16, 2025,
where it was approved in compliance with the
California Mitigation Fee Act. The report discusses
current market conditions and key considerations
related to the CLF and helps guide how the fee is
applied. Following Council approval, the CLF will
continue to be implemented and included in
development agreements, as appropriate.

Other 1
Affordable Housing Impact Fee and
Commercial Linkage Fee
Fiscal Year 2024-2025 Annual Report
Posted 12/1/2025:
https://www.sanjoseca.gov/home/showpublis
heddocument/126919/639001785842670000
P-30 Updated Feasibility
Study for Commercial
Linkage Fee
Jun 2026: Council approval of updated
fees 6/30/2026 6th Cycle Continuous
To help address rising development costs, CLF fee
rates were maintained at Fiscal Year 2024–2025
levels.

Other 0
Adopted Schedule of Fees:
https://www.sanjoseca.gov/home/showpublis
heddocument/123189/638869640690970000
P-30 Updated Feasibility
Study for Commercial
Linkage Fee
$20M CLF revenues collected 1/31/2031 6th Cycle Continuous The Commercial Linkage Fee (CLF) account
balance was $5,885,613.96 as of July 1, 2024, and
increased to $6,112,740.16 by June 30, 2025.

During Fiscal Year 2024–2025, the Department
received $227,126.20 in CLF revenue.

Other 6
Affordable Housing Impact Fee and
Commercial Linkage Fee
Fiscal Year 2024-2025 Annual Report
Posted 12/1/2025:
https://www.sanjoseca.gov/home/showpublis
heddocument/126919/639001785842670000
P-30 Updated Feasibility
Study for Commercial
Linkage Fee
By Jan 2031: 60 affordable units
subsidized with CLF revenues 1/31/2031 6th Cycle Continuous No Commercial Linkage Fee (CLF) funds were
disbursed for new affordable housing development,
and no projects received CLF funding for
acquisition, financing, construction, or development.

Units 0
Silicon Valley real estate development
lowest since 2013:
https://sanJoséspotlight.com/silicon-valley-
real-estate-development-lowest-since-2013/
P-31 Land Acquisition for
Affordable Housing in
Target Locations
2 parcels acquired in target areas 1/31/2031 6th Cycle Not yet started No new requests to acquire land for affordable
housing development in areas close to transit and
higher-opportunity neighborhoods were made in
2025. The City will continue to support City land
acquisitions in these areas to the extent funding and
sites are available.

Units 0 None
P-31 Land Acquisition for
Affordable Housing in
Target Locations
200 affordable units developed on
acquired parcels 1/31/2031 6th Cycle Continuous
The Housing Department closed two land
acquisitions in CY 2025 for the 525 N Capitol (The
Fielden) and 1371 Kooser (Arcade) developments.

Both developments started construction in CY 2025
and will produce 347 new affordable homes.

Units 347
The Fielden ground breaking (160):
https://news.santaclaracounty.gov/county-
and-partners-break-ground-affordable-
housing-project-east-san-José
Arcade ground breaking (189):
https://www.facebook.com/county.of.santa.cl
ara/posts/the-county-and-partners-
celebrated-the-groundbreaking-friday-for-
arcade-a-new-
af/1254588323369513/#:~:text=The%20Cou
nty%20and%20partners%20celebrated,Nov
%2014%2C%202025%F3%B0%9E%8B%F3
%B1%9F%A0
P-32 Higher Subsidies per
Unit
Ongoing adjustments to NOFA/program
guidelines as needed 1/31/2031 6th Cycle Continuous
Current New Construction/Preservation Requests
for Proposals allow for funding commitments of up
to $325,000 per unit for the construction of new
housin
g.

Other 0 None
P-33 Complete and
implement new “Yes in
God’s Backyard” (YIGBY)
ordinance
Combined with P-24 6th Cycle
5885 Santa Teresa permit ready letter (48):
https://sanjoseca.sharepoint.com/:b:/r/sites/
Housing_ResidentialDevelopment_Productio
nandPreservation/Projects/PROJECTS/Sant
a%20Teresa%20(Charities)/Construction/61
25%20Snell%20Ave%20-
%20Permit%20Ready%20Letter.pdf?csf=1&
web=1&e=udM2P8
P-34 Affordable Housing
Funding Advocacy Support letters issued 1/31/2031 6th Cycle Continuous This year, Housing staff continued to work closely
with the City's Intergovernmental Relations (IGR)
team to advance the City’s homelessness and
housing priorities with the Governor’s Office and in
the State Legislature. This included supporting the
passage of SB 158 to expedite HHAP Round 7
funding, as well as ongoing engagement to fully
restore cuts made to the HHAP program during last
year’s appropriations process. IGR continues to
work closely with the Mayor’s Office and the Big
City Mayors coalition to advocate for a sustained
state commitment to address the crisis of
unsheltered homelessness, including advocating for
the inclusion of flexible funding in the State
Affordable Housing Bond Act of 2026. IGR and the
Housing Department’s policy team continue to work
collaboratively to advance the City’s housing and
homelessness legislative priorities, including
advocating for legislation to support housing
production and the City’s homelessness response
efforts during ongoing state budget negotiations
Other 11 None
P-34 Affordable Housing
Funding Advocacy Participation in working groups 1/31/2031 6th Cycle Continuous In 2025, Housing staff worked with other cities on
advocacy for the state Permanent Local Housing
Allocation to preserve jurisdictions' ability to fully
determine which of PLHA's eligible uses is most
needed. San José currently uses all of its PLHA to
pay for interim housing operations.

Other None
P-35 Small Multifamily
Housing Dec 2025: Feasibility analysis done 12/31/2025 6th Cycle In Progress As part of the General Plan Four-Year Review
process that began in October 2025, staff is
evaluating approaches to expanding areas
where small multifamily housing (4 to 10 units) may
be permitted by right. Staff will
present preliminary proposals to the Four-Year
Review Task Force and the community in March
and April 2026. Based on feedback received, the
proposal will be refined and presented to the
Planning Commission and City Council for approval
in late summer 2026. That will be followed by an
environmental review. Implementation of zoning
changes is anticipated for late 2027.

Other 0
Link to the General Plan Four-Year Review
webpage: https://www.sanjoseca.gov/your-
government/departments-offices/planning-
building-code-enforcement/planning-
division/citywide-planning/envision-san-jos-
2040-general-plan/gp-4-year-review
P-35 Small Multifamily
Housin
g Jul 2026: Possible incentives identified 7/31/2026 6th Cycle In Progress Staff will consider this in the context of the larger work described further above. Other 0 None
P-35 Small Multifamily
Housing Oct 2026: Design standards created 10/31/2026 6th Cycle In Progress Design standards are being considered broadly as
part of the initial work on Small Multifamily Housing
and will be developed later once an approach has
been refined.

Other 0 None
P-35 Small Multifamily
Housin
g
Council approval of land use changes,
design standards 6th Cycle Not yet started Approval will occur after the standards are developed. Other 0 None
P-35 Small Multifamily
Housing Jun 2027: Publish financing Information 6/30/2027 6th Cycle Not yet started This information will come later, after the approach is developed and standards are adopted. Other 0 None
P-35 Small Multifamily
Housing
At least 350 units permitted annually in the
third year post- adoption 6th Cycle Not yet started Staff cannot measure this until the program is adopted. Units 0 None
P-35 Small Multifamily
Housing
At least 20,000 units of net new capacity
added citywide 6th Cycle In Progress Capacity will be measured once the approach is finalized. Units 0 None
P-36 Alum Rock East
Urban Village Plan
Outreach conducted Plan drafted 8/31/2025 6th Cycle In Progress City staff have started work on Phase 2 of 3 of the
Urban Village Planning process, with an anticipated
project completion date of June 2026. The first
round of community meetings (in-person and
virtual) was held in September and October 2025;
the second round will be held in January and
Februar
y 2026.

Other 1
Link to Alum Rock Urban Village Plan
webpage: https://www.sanjoseca.gov/your-
government/departments-offices/planning-
building-code-enforcement/planning-
division/citywide-planning/urban-
villages/eastside-alum-rock-urban-village-
plan-update
P-36 Alum Rock East
Urban Village Plan Aug 2025: Council approval of Plan 8/31/2025 6th Cycle In Progress The anticipated project completion date is June 2026. Other 0 See above.

P-37 CEQA Analysis for
Urban Villages
Dec 2027: City Council approval of CEQA
study 12/31/2027 6th Cycle Not yet started Significant work on this item has not yet commenced, as it is a medium-term goal. Other 0 None P-38 Adequate Sites for
Lower-Income
Households on Non-
vacant & Vacant Sites
Identified in Previous
Housin
g Element Cycles
By Jan 31, 2024: City Council approval of
zoning changes 1/31/2024 6th Cycle Completed Completed in 2024 Other 1 None P-39 Replacement Unit
Program for Selected
Sites
Combined with P-13 6th Cycle None
P-40 Evaluate Urban
Village Planning Process
by 2025: Present findings to CED
Committee and City Council 12/31/2025 6th Cycle In Progress The Urban Village planning process has been
evaluated as part of the General Plan Four-Year
Review process, which began in the fall of 2025. In
November 2025, staff presented proposals to
streamline urban village planning to the General
Plan Four-Year Review Task Force. The proposals
include consolidating multiple urban villages along
transit corridors into a single plan; implementing
targeted land use and zoning changes for
small urban villages (Neighborhood Urban Villages);
and simplifying urban village plan documents. The
changes are aimed at reducing the number of
outstanding urban village plans from 42 to 15 and
reducing the time spent on plan preparation. The
Task Force expressed support for the changes,
which will be refined and presented to the
community, along with General Plan text
amendments, at outreach events in March and
April. Staff expects to present the proposed General
Plan amendments to the Planning Commission and
City Council in late summer 2026.

Other 0
Link to the General Plan Four-Year Review
webpage: https://www.sanjoseca.gov/your-
government/departments-offices/planning-
building-code-enforcement/planning-
division/citywide-planning/envision-san-jos-
2040-general-plan/gp-4-year-review
P-40 Evaluate Urban
Village Planning Process
by 2031: A minimum of two grants secured
for unplanned Urban Villages 1/31/2031 6th Cycle In Progress One grant was secured for the Alum Rock East
Urban Village planning process, which is currently
underwa
y.

Other 0 See link above
P-41 Review and Revise
Planning Permit
Conditions
Dec 2025: Council approval of ordinance 12/31/2025 6th Cycle In Progress In 2025, staff prepared the draft ordinance changes
to permit findings. However, due to staffing changes
and the prioritization of implementing stage
legislative changes and the General Plan Four-Year
Review, this strategy was not completed in 2025 as
anticipated. This strategy has been assigned to a
new team, which will continue the work in 2026, with
Council approval of the ordinance expected in the
summer or fall of 2026.

Other 0 See link above
P-42 Group Homes for
Seven or More Persons Dec 2024: Council approval of ordinance 12/31/2024 6th Cycle Completed As part of the update to the Zoning Ordinance that
was approved by City Council on January 13,
2026, the City changed its code to make it
consistent with state and federal laws regarding fair
housing. These changes removed
additional requirements for group homes serving
seven or more individuals in all residential zoning
districts, including single-family zoning. These
actions com
plete the work on item P-42.

Other 1
Link to Zoning Ordinance update:
https://sanjose.legistar.com/View.ashx?M=F
&ID=15037949&GUID=AA394D62-1526-
4B5A-9AAC-6E3822D313ED
P-43 Update City Density
Bonus
Dec 2024: Council approval of ordinance
amendments 12/31/2024 6th Cycle Completed
As part of the update to the Zoning Ordinance
approved by the City Council on January 13, 2026,
the City revised its code to align its ordinance with
the current State Density Bonus Law. These actions
com
plete the work on item P-43.

Other 1
Link to Zoning Ordinance update:
https://sanjose.legistar.com/View.ashx?M=F
&ID=15037949&GUID=AA394D62-1526-
4B5A-9AAC-6E3822D313ED
P-44 Urban Villages
Improvements Completion of evaluation 12/31/2027 6th Cycle Completed As noted in the status update for Strategy P-40, the
Urban Village planning process was evaluated as
part of the General Plan Four-Year Review, which
began in Fall 2025. In November 2025, staff
presented the Four-Year Review Task Force with
proposed changes aimed at reducing the number of
outstanding urban village plans from 42 to 15 and
reducing the time spent on plan preparation. Staff is
currently refining the proposals and will present
them to the community in March and April 2025,
with presentation to the Planning Commission and
City Council expected in late summer 2026.

Other 1
Link to the General Plan Four-Year Review
webpage: https://www.sanjoseca.gov/your-
government/departments-offices/planning-
building-code-enforcement/planning-
division/citywide-planning/envision-san-jos-
2040-general-plan/gp-4-year-review
P-45 Pipeline Projects
Evaluation
Present findings during Housing Element
APR every two years 1/31/2031 6th Cycle In Progress
In the 6th cycle Housing Element inventory, the City
had approximately 30,000 units in the pipeline, but
counted only 20,488 units (67%) towards the RHNA
residential capacity. The City assumed that
approximately 10,000 units in the pipeline
residential capacity would not commence the post-
entitlement permit stage.

By the end of 2025, 1,865 units in the pipeline had
expired without commencing the post-entitlement
permit stage, and 12,175 units had begun the post-
entitlement permit stage. Therefore, the City has
approximately 8,100 units remaining in its buffer for
pipeline projects.

Other 0 None
P-46 Rezoning Program
for Shortfall, Low-income
Sites
Council approval of rezoning ordinance
changes 12/31/2024 6th Cycle Completed This item was completed in 2024. Other 1 None P-47 Accessory Dwelling
Unit (ADU) Monitoring and
Ordinance Compliance
Monitor ADUs and their affordability levels 6/30/2024 6th Cycle Continuous Staff continues to collect ADU survey responses for
affordability levels from building permit applicants.

As of January 2026, 90 survey responses have
been received. ADU production was projected to be
361 ADUs per year during the 6th Cycle.

Residential building permits were issued for 558
ADUs in 2024 and 502 ADUs in 2025, above the
projected annual amount.

Other 1 None
P-47 Accessory Dwelling
Unit (ADU) Monitoring and
Ordinance Compliance
Jun 2024: Council consideration of
amended ADU Ordinance 6/30/2024 6th Cycle Completed The City's ADU ordinance was updated in January 2026 and is aligned with current state law. Other 1 https://sanjoseca.govnita.com/api/workspace /Ordinances/files/2124256338433/view
P-48 Surplus Land Act
(SLA) Implementation
SLA Activities Completed for 5 City-owned
parcels in sites inventory 12/31/2023 6th Cycle Continuous - Vermont House Sale (1072 & 1082 Vermont St.,
San Jose 95110, APNs: 230-42-078, 230-42-077 -
declaration of exempt surplus land for sale of the
property to Santa Clara County for use as Veteran
Housing.
- Silicon Valley Mechanical parcel sale, APN# 244-
22-001, declaration of exempt surplus land pending,
f
or sale to the adjacent property owner.

Other 1
Vermont House: Vesting Deed available via
County Records.

Silicon Valley Mechanical: Vesting Deed will
be available via County Records once
transaction closes.

P-48 Surplus Land Act
(SLA) Implementation
# Public Hearings and Notices of
Availability issued for future City- owned
sites to be desi
gnated surplus
1/31/2031 6th Cycle In Progress Two notices as listed in P-48, 1 for Vermont House and Silicon Valley Mechanical parcels Other 0 None
R-1 Monitor At-risk
Affordable Units
2024, 2026, 2028, 2030: Creation of risk-
based reports 12/31/2030 6th Cycle Continuous
The Housing Department continues to work with
property owners to identify opportunities to preserve
affordability by extending new 55-year terms as
properties approach affordability-restriction
expirations, loan maturities, or resyndication events.

Other 0 None
R-1 Monitor At-risk
Affordable Units 10 meetings held 1/31/2031 6th Cycle Continuous Maintaining regular communication with property
owners and negotiating affordability-restriction
extensions. In 2025, Housing initiated
communication with the following properties
regarding AR extensions expected in 2026 due to
upcoming expirations: Baker Park (98), Bridgeport
(28), Grove (40), Meadows (41), Paseo Senter II
(101), and Vista Park II (82).

Meetings 8 None
R-1 Monitor At-risk
Affordable Units
By 2031: 600 existing at-risk units
preserved 1/31/2031 6th Cycle Continuous
The City has 22 projects totaling 925 units with City-
initiated affordability restrictions that are scheduled to expire by December 31, 2031. Staff will work with
property owners to preserve these affordability
restrictions.

Units 0 None
R-2 Establish a
Preservation NOFA Jun 2024: Program guidelines completed 6/30/2024 6th Cycle Completed In 2025, Housing Department staff completed a
feasibility assessment of a $5.7M preservation loan
for a property being rehabilitated by the Santa Clara
County Housing Authority. The loan will help to
preserve 58 low-cost units and turn them into
restricted affordable homes.

Other 1 None
R-2 Establish a
Preservation NOFA
by Dec 2024: First NOFA issued at least
every other year (i.e., at least 4 NOFAs
during the Sixth Cycle compliance period)
1/31/2031 6th Cycle Continuous
The Department released a joint New
Construction/Preservation RFP in April 2025, which
has been supported by a $50M commitment of
available funds.

Other 2 None
R-2 Establish a
Preservation NOFA $5M average available per year per NOFA 1/31/2031 6th Cycle Continuous 1510 N 1st street is recommended to be awarded
from the results of the NOFA, this development will
see the rehabilitation of 85 hotel units into
permanent affordable housing. The department will
continue to publish NOFA that also provide funding
o
pportunity for preservation projects
Other 5 None
R-2 Establish a
Preservation NOFA
By 2031: At least 110 units of newly-
restricted affordable housing acquired by
nonprofits and rehabilitated through City
and external funding
1/31/2031 6th Cycle Continuous
In 2024, funding was awarded to preserve 18 units
at the Virginian apartments. The Department's 2025
RFP recommended awarding funding to an 85-unit
development. The Department anticipates seeking
a
pproval from the City Council in 2026.

Units 0 None
R-3 Diridon Preservation
Pilot Jan 2025: Pilot creation 1/31/2025 6th Cycle Not yet started Given that the 2024 Bay Area housing bond did not
proceed, the scarcity of funding for new
development and preservation, and the delay in the
Downtown West development proposal, work on
this Preservation Pilot creation will now move to the
latter part of the planning period. However, in 2025,
the Housing Department issued a Notice of Funding
Availability that allowed preservation as an eligible
use and included a geographic priority for affordable
h
ousing proposed in the Diridon area.

Other 0 None
R-3 Diridon Preservation
Pilot City Council approval of pilot 1/31/2031 6th Cycle Not yet started See description above for R-3. Other 0 None R-3 Diridon Preservation
Pilot By Dec 2025: NOFAs issued 12/31/2025 6th Cycle Not yet started See description above for R-3. Other 0 None R-3 Diridon Preservation
Pilot
By Aug 2026: Council approval of funding
commitments 8/31/2026 6th Cycle Not yet started See description above for R-3. Other 0 None R-3 Diridon Preservation
Pilot
55 homes preserved through acq/rehab in
defined area around Diridon Station Area 1/31/2031 6th Cycle Continuous See description above for R-3. Units 0 None R-4 Implement the
Community Opportunity
to Purchase Pro
gram
City Council rejected - NA 6th Cycle None
R-5 Acquisition Loan Fund
Request for Proposals issued for partner
lender(s) if needed 12/31/2026 6th Cycle Not yet started State funding for acquisition/rehabilitation
preservation was minimal in 2025. Because the
2024 regional affordable housing bond did not
proceed, City and County funds for
acquisition/rehabilitation are also minimal at this
time. If or when funding becomes available in state
or regional preservation-oriented funding programs,
and the availability of City funds for
acquisition/rehabilitation becomes more predictable,
the City would issue a Request for Proposals to
complete this item.

Other 0 None
R-5 Acquisition Loan Fund Loan product defined and rolled out 12/31/2026 6th Cycle Not yet started See description above for R-5. Other 0 None R-5 Acquisition Loan Fund # units acquired with Loan Fund(s) 12/31/2026 6th Cycle Not yet started See description above for R-5. Units 0 None R-6 Mobilehome Park
General Plan Designation
for Remaining 56
Mobilehome Parks
2024: Council approval of General Plan
Amendments and rezonings; 13
mobilehome parks with new land use
designation by Jan 2024; remainder by
June 2024
6/30/2024 6th Cycle Completed This item was completed in 2024. Other 1 None R-7 Extension of
Affordable Housing
Restrictions
By 2031: preserve affordability for at least
900 units in the middle of their affordability
terms (average of 112 units per year)
1/31/2031 6th Cycle Completed
In 2025, the affordability restrictions for three
properties comprising 251 units were extended to a
55-year term, with the new expiration date set for
2080.

Units 979
Affordablity Restrictions were recorded on
title to reflect a 2080 exipration date;
Hillsdale Townhomes, Paseo Senter,
Fairwa
ys at San Antonio.

R-8 Work with the Bay
Area Housing Finance
Authority (BAHFA) on
Moderate-income
Financing Strategy
2027: If product is defined and feasible,
request Council approval for structure 12/31/2027 6th Cycle Continuous In 2023, BAHFA rolled out its Welfare Tax
Exemption loan product to support lower- and
moderate-income housing. The product was used
for a San José development in 2024. In 2025, staff
met with BAHFA consultants to discuss other
products and strategies to support workforce
housing. Staff will continue to work with BAHFA to
determine whether a regional JPA-issued bond
structure is feasible and likel
y impactful.

Other 0 None
R-8 Work with the Bay
Area Housing Finance
Authority (BAHFA) on
Moderate-income
Financin
g Strategy
By 2031: Complete at least 2 transactions
if feasible 1/31/2031 6th Cycle Not yet started See description above for R-8. Other 0 None R-8 Work with the Bay
Area Housing Finance
Authority (BAHFA) on
Moderate-income
Financin
g Strategy
# newly-affordable homes at each income
level 1/31/2031 6th Cycle Not yet started See description above for R-8. Units 0 None R-9 Creation of a
Preservation Policy 2024: Criteria for FIHPP established 12/31/2024 6th Cycle In Progress In 2025, staff from the City and County did not
pursue a definition for FIHPP properties, as that
state program was not funded and was dormant. In
2025, staff posted a list of affordable housing
developers with experience doing
ac
quisition/rehabilitation.

Other 0
Housing's Preservation web page:
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/developers/affordable-
housing-plans-policies/housing-preservation
R-9 Creation of a
Preservation Policy 2024: List of affordable housing providers published 12/31/2024 6th Cycle Completed See description above for R-9. Other 1 None R-9 Creation of a
Preservation Policy By 2026: Council approval of Policy 12/31/2026 6th Cycle Not yet started See description above for R-9. Other 0 None R-10 Mobilehome Park
Local Ins
pections Strategy removed 6th Cycle None
R-11 Owner-occupied
Home Preservation 1,600 low-income households assisted 1/31/2031 6th Cycle Continuous The City's home repair programs are usually funded
by federal Community Development Block Grant
funds. However, these contracts had to be paused
in the second half of 2025 due to uncertainties in
federal funding for FY 2025–2026. All of the city's
federally funded projects were temporarily paused
pending execution of HUD grant agreements and
receipt of federal entitlement funds. Staff informed
agencies that services could be initiated starting in
July 2025 at their own risk, pending HUD’s
disbursement of federal funds. Agencies may have
continued to deliver services to San José residents
during this period and may be eligible for
reimbursement for eligible costs, provided all
federal funding requirements are met. Grant
agreements were executed, and funds disbursed in
January 2026, and contract negotiations are
expected to begin by February 2026. As a result, 99
households were aided in 2025, representing a
lower average than in prior years.

Households 366 None
R-12 Revised Citywide
Residential Ant
Displacement Strategy
2025: Best practices researched 12/31/2025 6th Cycle In Progress In 2025, Housing and Planning staff participated in
the Santa Clara County Planning Collaborative. One
of the Collaborative's focus areas for 2025 was anti-
displacement plans and programs. Through
participation in the Collaborative, staff continued to
learn best practices from other communities.

Housing staff also attended multi-city GARE
(Government Alliance on Race and Equity) Land
Use meetings to learn about anti-displacement
efforts from other cities across the country. In
concrete actions to help lower-income renters avoid
displacement, in 2025, the City also worked actively
to help place residents whose apartments burned
into available interim housing units.

Other 0
Planning Collaborative website for anti-
displacement:
https://citiesassociation.org/anti-
displacement-tenant-and-landlord-support/
R-12 Revised Citywide
Residential Ant
Dis
placement Strategy
2025: Outreach conducted 12/31/2025 6th Cycle Not yet started See description above for R-12. Other 0 None R-12 Revised Citywide
Residential Ant
Dis
placement Strategy
2026: Revised Strategy drafted 12/31/2026 6th Cycle Not yet started See description above for R-12. Other 0 None R-12 Revised Citywide
Residential Ant
Dis
placement Strategy
2026: Council approval of revised Strategy 12/31/2026 6th Cycl e Not yet started See description above for R-12. Other 0 None R-13 Soft Story Program 2023: Outreach conducted 12/31/2023 6th Cycle Completed This task was completed in 2023. Other 1 None R-13 Soft Story Program 2024: Ordinance and program drafted 12/31/2024 6th Cycle Completed This task was completed in 2023. Other 1 None R-13 Soft Story Program 2024: Council approval of Ordinance and program 12/31/2024 6th Cycle Completed This task was completed in 2024. Other 1 None R-13 Soft Story Program 2024: Rebate program launched 12/31/2024 6th Cycle In Progress In 2025, significant cuts to the Federal Emergency
Management Agency and its Building Resilient
Infrastructure and Communities (BRIC) program
affected the City’s anticipated $25M in funding for
the soft-story rebate program. The state Office of
Emergency Services (CalOES) is working to
determine how and when funds will be received,
given court injunctions related to BRIC. Given this
uncertainty, the City Council adopted an
amendment to the City’s soft-story ordinance in
March 2025 to extend compliance deadlines for
required retrofit work. Following that action, staff
proposed a smaller, voluntary pilot rebate and loan
financing program to maintain compliance with the
initial $4M FEMA grant, which will be taken to the
Council in January 2026
Other 0 None
R-13 Soft Story Program # buildings receiving retrofits 1/31/2031 6th Cycle Not yet started Pending approval from voluntary pilot program as described in R-13 (4). Other 0 None
R-13 Soft Story Program $4M funded for rebates by 2031 1/31/2031 6th Cycle In Progress Staff submitted a federal earmark for $2 million for
soft story rebates, award announcement expected
in earl
y 2026.

Other 0 None
H-1 Interim Homeless
Housing Construction
2025: Units completed 12/31/2025 6th Cycle Completed
During CY 2025, the City made significant progress
toward expanding interim housing and shelter
capacity to address unsheltered homelessness.

The Housing Department opened four new modular
interim housing communities: Branham Lane EIH
(168 units / 216 beds) in February, Via Del Oro EIH
(135 units / 150 beds) in April, the Rue Ferrari
Expansion (108 units / 144 beds) in October, and
Cherry Avenue EIH (128 units / 136 beds) in
December. Collectively, these sites added 539 units
and 606 beds, providing dignified, non-congregate
shelter and moving people off the streets. By the
end of CY 2025, San José managed a portfolio of
963 modular interim housing units (1,207 beds).

In 2025, the City also expanded its strategy of
utilizing underused hotels and motels as interim
housing. By acquiring a five-property master-leased
motel portfolio, the City rapidly added 251 shelter
units. This brought San José’s total motel-based
interim housing inventory—including conversions
and master-leased properties—to 494 units (560
beds).

The City further increased capacity for residents
living in oversized vehicles by opening the
Berryessa Safe Parking Program, which added 86
new spaces, bringing the total number of Safe
Parking slots citywide to 128. In addition, San José
launched its first tent-based supportive outdoor
sleeping site, creating 56 additional interim shelter
units.

Across all interim housing and shelter types, San
José mana
ged a total portfolio of 1,641 units by the
Units 1641
Progress on shelter and interim housing
expansion (including Goal 1.1 site openings
and capacity additions referenced in this
update) is tracked publicly through the City’s
Reducing Unsheltered Homelessness Focus
Area Scorecard / Performance Dashboard,
which includes quarterly updates, visuals
summarizing shelter system capacity, and
narrative reporting on new and expanded
sites brought online:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-
the-city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness
. Internally, site-by-site delivery and ramp-up
(e.g., modular EIH openings/expansions,
motel portfolio activation, safe parking, and
the supportive outdoor sleeping site) is
documented in the Shelter System
Production Summary tracking table used for
program reporting (units/beds/spaces by site
and month opened) and aligns to the totals
reported in the CY 2025 update.

H-1 Interim Homeless
Housing Construction Funds obtained for operations & services 1/31/2031 6th Cycle Completed During CY 2025, the Housing Department
successfully obtained future rent support for two
interim housing properties. The City instituted
subsidy layering at Pacific Motor Inn, enabling all
occupants of the 72 units to receive a federal
subsidy payment for each eligible participant. An
additional federal subsidy agreement with the Santa
Clara County Housing Authority was also approved
for the Arena Hotel, with subsidy support beginning
CY 2026.

Other 1
The City is developing a standardized
approach to track and report progress on
securing and stabilizing funding for shelter
and interim housing operations and services
at the portfolio/enterprise level (versus by
individual site). This work will align with the
City’s Reducing Unsheltered Homelessness
Focus Area Scorecard / Performance
Dashboard, including the related
performance indicator around achieving up
to a 20% reduction in per-unit operating
costs across the shelter portfolio. As the
reporting approach is finalized, summary
updates will be incorporated into the Focus
Area Scorecard’s quarterly public updates
and performance reporting:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-
the-city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness
. In the interim, Housing maintains internal
budget and contract tracking tools (e.g.,
operating budgets, subsidy-layering
agreements, grants/funding source tracking,
and cost-per-unit monitoring) that will be
used to support enterprise-level reporting
once the standardized framework is fully
implementedH-2 Interim Housing for
People Experiencing
Homelessness in Hotels/
Motels and Other Existing
Buildin
gs
At least one property newly acquired 1/31/2031 6th Cycle Completed As reported in the 2024 APR, this metric is considered completed. Other 1 None
H-2 Interim Housing for
People Experiencing
Homelessness in Hotels/
Motels and Other Existing
Buildings
At least five properties operated 1/31/2031 6th Cycle Continuous During CY2025, various City of San José
departments, led by the Housing Department,
developed a Master Leasing Program that master-
leased five underutilized motels to address
unsheltered homelessness. In total, approximately
250 units of non-congregate interim housing/shelter
were brought online and are at full capacity. The
City continued to operate its previous HomeKey
hotel conversion projects and other hotel-based
shelter strategies throughout 2025.

Other 1
Progress on shelter and interim housing
expansion (including Goal 1.1 site openings
and capacity additions referenced in this
update) is tracked publicly through the City’s
Reducing Unsheltered Homelessness Focus
Area Scorecard / Performance Dashboard,
which includes quarterly updates, visuals
summarizing shelter system capacity, and
narrative reporting on new and expanded
sites brought online:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-
the-city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness
. Internally, site-by-site delivery and ramp-up
(e.g., modular EIH openings/expansions,
motel portfolio activation, safe parking, and
the supportive outdoor sleeping site) is
documented in the Shelter System
Production Summary tracking table used for
program reporting (units/beds/spaces by site
and month opened) and aligns to the totals
reported in the CY 2025 update.

H-2 Interim Housing for
People Experiencing
Homelessness in Hotels/
Motels and Other Existing
Buildin
gs
At least $19M of new Homekey awards
accepted for acquisition/ rehabilitation 1/31/2031 6th Cycle Completed As reported in the 2024 APR, this metric is
considered completed. Homekey funding was
accepted for Pacific Motor Inn and Pavilion Inn.

Other 1 None
H-2 Interim Housing for
People Experiencing
Homelessness in Hotels/
Motels and Other Existing
Buildings
At least 280 residents housed 1/31/2031 6th Cycle Completed There have been substantive changes to the City's
motel-based strategies since the 2024 report, which
impact the 2025 metrics. First, the Surestay Hotel --
which served 76 households in 2024 -- is in the
process of transitioning to ownership by Santa
Clara County Housing Authority, which has already
taken over operations. In addition, the Temporary
Housing and Assistance Program, which served
102 individuals in 2024, was sunset due to funding
constraints. However, the City has more than
replaced those units through the master leasing
program mentioned above, which added 251 units
of non-congregate shelter and has temporarily
sheltered 278 individuals to date. In addition, the
City has maintained all other motel-based
programs, including the Motel Voucher Program (97
family units), the Arena Hotel (89 single/couples
units), Pacific Motor Inn (72 single units), and the
Plaza Hotel (42 single units). All of these sites have
operated at or above 92% throughout 2025.

Persons 1
Progress on shelter and interim housing
expansion (including Goal 1.1 site openings
and capacity additions referenced in this
update) is tracked publicly through the City’s
Reducing Unsheltered Homelessness Focus
Area Scorecard / Performance Dashboard,
which includes quarterly updates, visuals
summarizing shelter system capacity, and
narrative reporting on new and expanded
sites brought online:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-
the-city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness
. Internally, site-by-site delivery and ramp-up
(e.g., modular EIH openings/expansions,
motel portfolio activation, safe parking, and
the supportive outdoor sleeping site) is
documented in the Shelter System
Production Summary tracking table used for
program reporting (units/beds/spaces by site
and month opened) and aligns to the totals
reported in the CY 2025 update.

H-3 Conversion of
Hotels/Motels for
Homeless Housin
g
Combined with H14 6th Cycle None
H-4 Shelters Streamlining
Throughout the City Combined with H14 6th Cycle None
H-5 Low-cost Permanent
Housing Solutions
Removed 6th Cycle None
H-6 Housing with
Integrated Health Care
By 2031: At least one new development
with on-site health services 1/31/2031 6th Cycle In Progress During CY 2025, the City advanced early
implementation planning for integrated health and
behavioral health services within interim housing by
engaging Santa Clara County Behavioral Health on
a coordinated approach for on-site services and
exploring how CalAIM can help support delivery and
reduce City-funded staffing costs. Near the end of
CY 2025, teams began scoping a pilot set of sites
and potential CalAIM-covered service components
(including Enhanced Care Management and
Community Supports), and began planning to
embed behavioral health resources at select
locations. This work is intended to support the City’s
broader strategy to improve outcomes while
reducing operating costs across the shelter
portfolio; implementation planning will continue into
CY 2026
Other 0
Progress was documented through internal
project tracking tools and the City’s OKR
framework (Objectives measured by Key
Results), including a key result focused on
reducing operating costs and leveraging
CalAIM and County-delivered services to
offset City-funded staffing where feasible. As
the pilot design and implementation
approach is finalized in CY 2026, the City
plans to roll up and report portfolio-level
progress through the Reducing Unsheltered
Homelessness Focus Area Scorecard /
Performance Dashboard:
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-
the-city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness
H-7 Safe/Supportive
Parking Programs
At least 45 safe parking opportunities
created for RVs and cars 1/31/2031 6th Cycle Continuous In 2025, the City of San José invested in leasing,
developing, and operating its second Safe Parking
for RVs program. The Berryessa Safe Parking for
RVs program first opened in March 2025 and
operates 24 hours a day, 7 days a week. Located
on privately owned land leased by the City, the
program provides safe parking along with case
management, showers, laundry, meals, and other
supportive services. Operated by WeHOPE, the
Berryessa site includes 86 parking spaces and
serves unhoused residents who were previously
living in oversized vehicles throughout the city.

The site removes several common barriers to entry
that limit access to other safe parking programs,
including vehicle operability and registration
requirements, and offers free assistance to tow into
the site. Once participants are on site, WeHOPE
works with them to register their vehicles. The
addition of Berryessa increased San José’s
capacity to compassionately relocate oversized
vehicles from public streets from 42 spaces in 2024
to 128 spaces in 2025. In FY 24-25, 47% (16/34) of
exits were to positive housing destinations, 15%
were family reunification exits, and the program
maintained utilization over 95%
Units 128
Safe Parking program progress is tracked
and reported alongside broader shelter
system capacity in the City’s Reducing
Unsheltered Homelessness Focus Area
Scorecard / Performance Dashboard, which
provides quarterly public updates and
portfolio-level reporting on shelter and safe
parking capacity changes (including new
sites brought online):
https://www.sanjoseca.gov/your-
government/departments-offices/office-of-
the-city-manager/city-council-focus-
areas/reducing-unsheltered-homelessness.

In addition, program implementation and
performance are monitored through internal
portfolio tracking tools and executive
briefings (including the Reducing
Unsheltered Homelessness executive brief)
that consolidate site-level operating updates,
and service delivery information into
enterprise-level status reporting.

H-7 Safe/Supportive
Parking Programs
At least $1.7M spent on safe parking site
preparation 1/31/2031 6th Cycle Completed
In 2025, the City of San José invested in leasing,
developing, and operating its second Safe Parking
for RVs program. The Berryessa Safe Parking for
RVs program. This site first opened in March 2025
and is located on privately owned land leased by
the City. The program offers spaces for 86 RVs and
operates 24 hours a day, 7 days a week.

Approximately $7.6 million was spent on site
preparation of the Santa Teresa and Beryessa safe
parking sites.

Other 1
Program spending and service delivery for
Safe/Supportive Parking is documented
through Housing Department internal
financial and contract management tools
(e.g., budget and expenditure tracking by
site/program, vendor invoices and payment
records, and agreement/amendment files for
leasing, operations, and services). Program
teams also maintain internal implementation
trackers and periodic performance/budget
check-ins to validate that reported amounts
reflect actual costs incurred for site
preparation, ongoing operations, and
supportive services.

H-7 Safe/Supportive
Parking Programs
At least $1.2M spent per year on safe
parking operations and services 1/31/2031 6th Cycle Continuous The City continues to fund the Safe Parking for RVs
programs at the Santa Teresa VTA Lot and on
Berryessa Road. Both programs operate 24 hours a
day, 7 days a week. Santa Teresa Safe Parking can
accommodate 42 RVs, and Berryessa Safe Parking
can accommodate 86 RVs. Both programs provide
designated, secure parking, along with case
management, showers, laundry, meals, waste
management, and other on-site supportive services.

At the Berryessa Safe Parking program, 47%
(16/34) of exits were to positive housing
destinations, 15% were family reunification exits,
and the program maintained over 95% utilization
during FY 24-25. At the Santa Teresa Safe
program, 61% (11/18) of exits were to positive
housing destinations, 16% were family reunification
exits, and the program maintained over 95%
utilization during FY 24-25. As of FY 2025-26, about
$7.9 million has been spent on operations and
services over the past 3 years for the Santa Teresa
and Beryessa safe parking sites
Other 0
Program spending and service delivery for
Safe/Supportive Parking is documented
through Housing Department internal
financial and contract management tools
(e.g., budget and expenditure tracking by
site/program, vendor invoices and payment
records, and agreement/amendment files for
leasing, operations, and services). Program
teams also maintain internal implementation
trackers and periodic performance/budget
check-ins to validate that reported amounts
reflect actual costs incurred for site
preparation, ongoing operations, and
supportive services.

H-8 Nonprofit-provided
Homeless Support
Services
Funding to nonprofit service providers 1/31/2031 6th Cycle Continuous In FY 2024-2025, agreements for homeless
response services totaled $97.5M. Contracts with
nonprofit providers have maintained 2 street
outreach programs, 3 Rapid Re-housing programs,
1 laundry and shower services program for
homeless populations at encampments, 7
Emergency Interim Housing (EIH) shelters, a Motel
voucher-based program, 3 Project Homekey interim
housing programs, and 2 service-based programs
for Transitional Aged Youth at-risk of or currently
experiencing homelessness. New programs in
Calendar Year 2025 include 5 motel interim shelter
programs, a temporary tent-based shelter and
services program, and 2 additional EIHs.

Below are selected summaries of nonprofit service
providers and their metrics. In 2025, HomeFirst
managed day-to-day operations and property
maintenance and provided programming services at
six Emergency Interim Housing sites: Monterey
Bernal, Rue Ferrari, Mabury, Felipe, Via del Oro
(opened April 2025), and Cherry (opened December
2025). Combined, HomeFirst provided shelter and
services to 630 participants. 33 participants exited
to a positive housing destination. Evans Lane EIH,
a family-serving interim shelter managed by PATH,
served 224 participants, with 71 exiting to a positive
housing destination. LifeMoves served 129
participants in 2025 at their Guadalupe emergency
interim housing location, 15 of whom exited to a
positive housing destination. LifeMoves also
provided short-term motel stays for families
ex
periencing homelessness through the Motel
Other 246
Funds distributed to nonprofit service
providers are appropriated through City
Council, after which contracts are executed.

A description of all fund amounts, program
narratives, and service providers can be
found in the associated City Council
memoranda on the City website. All
pertaining grant agreements can be found on
the City’s Government Information Library
Electronic System (GILES).

H-8 Nonprofit-provided
Homeless Support
Services
# people assisted 1/31/2031 6th Cycle Continuous
In FY 2024-2025, agreements for homeless
response services totaled $97.5M. Contracts with
nonprofit providers have maintained 2 street
outreach programs, 3 Rapid Re-housing programs,
1 laundry and shower services program for
homeless populations at encampments, 7
Emergency Interim Housing (EIH) shelters, a Motel
voucher-based program, 3 Project Homekey interim
housing programs, and 2 service-based programs
for Transitional Aged Youth at-risk of or currently
experiencing homelessness. New programs in
Calendar Year 2025 include 5 motel interim shelter
programs, a temporary tent-based shelter and
services program, and 2 additional EIHs.

Below are selected summaries of nonprofit service
providers and their metrics. In 2025, HomeFirst
managed day-to-day operations and property
maintenance and provided programming services at
six Emergency Interim Housing sites: Monterey
Bernal, Rue Ferrari, Mabury, Felipe, Via del Oro
(opened April 2025), and Cherry (opened December
2025). Combined, HomeFirst provided shelter and
services to 630 participants. 33 participants exited
to a positive housing destination. Evans Lane EIH,
a family-serving interim shelter managed by PATH,
served 224 participants, with 71 exiting to a positive
housing destination. LifeMoves served 129
participants in 2025 at their Guadalupe emergency
interim housing location, 15 of whom exited to a
positive housing destination. LifeMoves also
provided short-term motel stays for families
ex
periencing homelessness through the Motel
Persons 6802
Program persons served and performance
outcomes are documented through Housing
Departemnt internal contract management
tools, including quarterly reports capturing
persons served and progress made toward
contractual program outcomes and data
reported to HMIS.

H-9 Street-based Services
for Unhoused Residents
Funds budgeted 1/31/2031 6th Cycle Continuous
In 2025, the Housing Department continued to
strengthen and expand street-based services for
unsheltered residents, building on prior years while
advancing the targeted outreach engagement
program (TOEP). As with CSJ programs, TOEP is
an outcomes-driven approach. As a result, street-
based services remained a critical component of
the City’s homelessness response, including
outreach, hygiene services, behavioral health
supports, transportation assistance, and harm
reduction interventions designed to meet people
where they are.

In 2025, the City successfully acquired and began
distributing Naloxone (Narcan) through outreach
teams, increasing the availability of life-saving
overdose-prevention tools in the field. Outreach
staff were equipped to respond to overdoses and to
provide education and referrals related to substance
use and behavioral health services, strengthening
the City’s harm reduction framework and supporting
safer engagement with unsheltered residents.

The City also successfully implemented the
Targeted Outreach Engagement Program (TOEP)
as a core strategy for delivering street-based
services in alignment with housing and shelter
opportunities. This targeted approach allowed
outreach teams to focus on intensive case
management and service coordination on specific
encampments, resulting in measurable outcomes.

Through TOEP, the City successfully cleared
Columbus Park, supported residents through
coordinated outreach
, provided assistance such as
Other 0
Funding for street-based services is tracked
through Housing Department internal budget
management tools and standard financial
reporting (e.g., program budgets,
expenditures, and contract/invoice
documentation for outreach and service
delivery).

H-9 Street-based Services
for Unhoused Residents
Services provided 1/31/2031 6th Cycle Continuous
In 2025, the Housing Department continued to
strengthen and expand street-based services for
unsheltered residents, building on prior years while
advancing the targeted outreach engagement
program (TOEP). As with CSJ programs, TOEP is
an outcomes-driven approach. As a result, street-
based services remained a critical component of
the City’s homelessness response, including
outreach, hygiene services, behavioral health
supports, transportation assistance, and harm
reduction interventions designed to meet people
where they are.

In 2025, the City successfully acquired and began
distributing Naloxone (Narcan) through outreach
teams, increasing the availability of life-saving
overdose-prevention tools in the field. Outreach
staff were equipped to respond to overdoses and to
provide education and referrals related to substance
use and behavioral health services, strengthening
the City’s harm reduction framework and supporting
safer engagement with unsheltered residents.

The City also successfully implemented the
Targeted Outreach Engagement Program (TOEP)
as a core strategy for delivering street-based
services in alignment with housing and shelter
opportunities. This targeted approach allowed
outreach teams to focus on intensive case
management and service coordination on specific
encampments, resulting in measurable outcomes.

Throu
gh TOEP, the City successfully cleared
Other 1
Services provided through the City’s street-
based programs are primarily documented in
the Homelessness Management Information
System (HMIS), where program staff can run
custom reports to monitor service delivery
and outputs by City teams and contracted
providers (e.g., outreach contacts, services
provided, and related program activities
captured in HMIS). For activities or data
elements not currently captured in HMIS, the
City also uses internal geospatial and
operational tracking tools to document
service delivery locations and field activity,
and to supplement HMIS reporting for
performance monitoring and program
management.

H-9 Street-based Services
for Unhoused Residents # of clients served 1/31/2031 6th Cycle Continuous In 2025, the Housing Department continued to
strengthen and expand street-based services for
unsheltered residents, building on prior years while
moving toward solidifying the targeted outreach
engagement program (TOEP). As is the case with
CSJ programs, TOEP is an outcomes-driven
approach. Through this, street-based services
remained a critical component of the City’s
homelessness response, including outreach,
hygiene services, behavioral health supports,
transportation assistance, and harm reduction
interventions designed to meet people where they
are.

During 2025, the City successfully acquired and
began distributing Naloxone (Narcan) through
outreach teams, increasing the availability of life-
saving overdose prevention tools in the field.

Outreach staff were equipped to respond to
overdoses and to provide education and referrals
related to substance use and behavioral health
services, strengthening the City’s harm reduction
framework and supporting safer engagement with
unsheltered residents.

The City also successfully implemented the
Targeted Outreach Engagement Program (TOEP)
as a core strategy for delivering street-based
services in alignment with housing and shelter
opportunities. This targeted approach allowed
outreach teams to focus intensive case
mana
gement and service coordination on specific
Persons 4921
The number of clients served is primarily
tracked through the Homelessness
Management Information System (HMIS),
which captures client-level records and
allows program staff to run custom reports
on people served and services delivered by
City teams and contracted providers. For
field activities or services rendered that are
not tied to an individual (i.e., non-client-
identifying activity), the City also uses
internal geospatial and operational tracking
tools to document locations and service
delivery activity; these GIS-based tools
supplement HMIS reporting where the work
is not connected to a client name/record.

H-10 Racial and Other
Bias of Protected Classes
in Homeless Shelter and
Supportive Housing
Systems
Dec 2023: Meet with County, service
providers and property management staff
on accessing data 12/31/2023 6th Cycle Continuous
The Homelessness Response Division (HRD),
within the Housing Department, continues to pull
monthly racial equity data from the County of Santa
Clara on the racial/ethnic makeup of clients in
programs across six (6) program areas (Outreach,
RRH, PSH, Interim Housing, Temporary Housing,
and Supportive Parking). HRD pulls quarterly data
on the ethnic/racial makeup of unhoused
individuals, and we compare these datasets.

Annual census-related data is part of the regular
data access and data analysis procedure that HRD
uses to evaluate its programs. So far, through the
third quarter of CY2025, no significant demographic
disparities in program access have been observed
across any program area. Reports on racial equity
progress are provided to HRD leadership at least
quarterly. Also, HRD continues to hold monthly and
other events that increase our cultural humility and
support racial and social equity. Equity
performance measures are published in the
Housing Department's annual report.

Other 0
Progress is documented through routine
reporting. The data team runs recurring
reports and extracts from relevant datasets
(e.g., program and system data sources
used for shelter/supportive housing access
and demographics), compiles summary
outputs, and shares them with program
teams for review and equity analysis. These
recurring report files and supporting datasets
serve as the primary records used to monitor
trends, assess potential disparities, and
inform any follow-up actions.

H-10 Racial and Other
Bias of Protected Classes
in Homeless Shelter and
Supportive Housing
Systems
2024, 2027, 2030: Collect and analyze
data 12/31/2030 6th Cycle Continuous
Since the fall of 2024, CSJ has been collecting and
analyzing racial/ethnic and demographic data
monthly, quarterly, and annually, in partnership with
the County of Santa Clara. As of the 3rd quarter of
CY 2025, we have not found any significant (10% or
greater) demographic disparities in housing
program access, especially for the ethnic/racial
groups disproportionately represented among the
unhoused in San José: the Native American,
African American, and Pacific Islander
communities.

Other 0
Progress is documented through routine
reporting. The data team runs recurring
reports and extracts from relevant datasets
(e.g., program and system data sources
used for shelter/supportive housing access
and demographics), compiles summary
outputs, and shares them with program
teams for review and equity analysis. These
recurring report files and supporting datasets
serve as the primary records used to monitor
trends, assess potential disparities, and
inform any follow-up actions.

H-10 Racial and Other
Bias of Protected Classes
in Homeless Shelter and
Supportive Housing
Systems
Within 12 months following each analysis
completion: Work with partners annually to
provide technical assistance sessions as
needed to ensure the City is meeting its
AFFH obligations
1/31/2031 6th Cycle Continuous
The City has an ongoing process of analyzing
demographic and housing-related data to identify
areas where housing discrimination may occur.

Our ongoing analysis of demographic and housing
data has revealed no significant demographic
disparities in program enrollment, as noted above in
Y159. San José stands ready to support any partner
in addressing significant demographic disparities
(10% or more) to ensure fair housing choice and
equal opportunity for all protected groups.

Other 0
Progress is documented through routine
reporting. The data team runs recurring
reports and extracts from relevant datasets
(e.g., program and system data sources
used for shelter/supportive housing access
and demographics), compiles summary
outputs, and shares them with program
teams for review and equity analysis. These
recurring report files and supporting datasets
serve as the primary records used to monitor
trends, assess potential disparities, and
inform any follow-up actions.

H-11 Feedback from
Those with Lived
Experience in
Homelessness in Decision
Making
2023-2031: Staff to attend meetings of
LEAB or other lived experience groups at
least once a year to ask for feedback on
program priorities
1/31/2031 6th Cycle Continuous

In CY 2025, the Housing Department implemented
Participant Advisory Committees (PAC). Service
providers at interim shelters were expected to
develop a formal structure comprising people
residing at the site. Providers coordinated and
facilitated PAC meetings, developed meeting
materials, and maintained an infrastructure through
which PAC feedback would be implemented into
program design and service delivery. Furthermore,
the Department has continued its informal
partnership with the LEAB, as reflected in CY 2023
and CY 2024. The Department’s Youth-serving
programs maintain close coordination with the
jurisdiction’s Youth Action Board.

Meetings 1 None
H-11 Feedback from
Those with Lived
Experience in
Homelessness in Decision
Making
Jul 2024: Identify universe of applicable
contracts and timeline for renewals 7/31/2024 6th Cycle Continuous In CY 2024, the Housing Department had
implemented metrics specific to feedback loop
infrastructures across grant agreements with interim
shelter and homeless service providers. Emergency
Interim Housing (EIH) contracts included metrics
that held agencies accountable for holding
Participant Advisory Committees (PACs). Service-
based program contracts (for example, Youth
Housing and Support program) included outcome
measures and required staff to submit recurring
Program Operation Manuals that incorporated
feedback from participants and youth with lived
experience. Service providers at interim shelters
were expected to continue developing a formal
structure comprising the people residing at the site.

Providers coordinated and facilitated PAC
meetings, developed meeting materials, and
maintained an infrastructure through which PAC
feedback would be implemented into program
design and service delivery. Furthermore, the
Department has continued its informal partnership
with the LEAB, as reflected in CY 2023 and CY
2024. The Department’s Youth-serving programs
maintain close coordination with the jurisdiction’s
Youth Action Board.

In CY25, 2 members of the City's HCDC are active
commission members and have lived experience
and continued engagement as detailed in previous
reporting years
Other 1 None
H-11 Feedback from
Those with Lived
Experience in
Homelessness in Decision
Making
Jun 2025: Contracts renewed amended to
include consultative language, and include
in newly awarded contracts
6/30/2025 6th Cycle Continuous
In CY 2024, the Housing Department had
implemented metrics specific to feedback loop
infrastructures across grant agreements with interim
shelter and homeless service providers. Emergency
Interim Housing (EIH) contracts included metrics
that held agencies accountable for holding
Participant Advisory Committees (PACs). Service-
based program contracts (for example, Youth
Housing and Support program) included outcome
measures and required staff to submit recurring
Program Operation Manuals that incorporated
feedback from participants and youth with lived
experience. Service providers at interim shelters
were expected to continue developing a formal
structure comprising the people residing at the site.

Providers coordinated and facilitated PAC
meetings, developed meeting materials, and
maintained an infrastructure through which PAC
feedback would be implemented into program
design and service delivery. Furthermore, the
Department has continued its informal partnership
with the LEAB, as reflected in CY 2023 and CY
2024. The Department’s Youth-serving programs
maintain close coordination with the jurisdiction’s
Youth Action Board
Other 0 None
H-11 Feedback from
Those with Lived
Experience in
Homelessness in Decision
Making
By Dec 2025: Goal of 90% of
homelessness contracts with amended
language requiring lived experience
consultations
12/31/2025 6th Cycle Continuous
In CY 2024, the Housing Department had
implemented metrics specific to feedback loop
infrastructures across grant agreements with interim
shelter and homeless service providers. Emergency
Interim Housing (EIH) contracts included metrics
that held agencies accountable for holding
Participant Advisory Committees (PACs). Service-
based program contracts (for example, Youth
Housing and Support program) included outcome
measures and required staff to submit recurring
Program Operation Manuals that incorporated
feedback from participants and youth with lived
experience. Service providers at interim shelters
were expected to continue developing a formal
structure comprising the people residing at the site.

Providers coordinated and facilitated PAC
meetings, developed meeting materials, and
maintained an infrastructure through which PAC
feedback would be implemented into program
design and service delivery. Furthermore, the
Department has continued its informal partnership
with the LEAB, as reflected in CY 2023 and CY
2024. The Department’s Youth-serving programs
maintain close coordination with the jurisdiction’s
Youth Action Board
Other 0 None
H-12 Neighborhood
outreach and education
on homeless housing and
other housing topics
Materials prepared 1/31/2031 6th Cycle Continuous
The Housing Department developed a new
Homeless Resource Guide and a new Housing
Department Brochure, both of which are being
translated into Spanish and Vietnamese. Staff also
created the Homeless Resource Guide available on
the Housin
g Department website.

Other 7 None
H-12 Neighborhood
outreach and education
on homeless housing and
other housing topics
CBOs under contract 1/31/2031 6th Cycle Continuous
The City has an existing partnership program with
nonprofit and community-based organizations to
support project-based outreach and engagement
efforts around the project sites. Selected partners
are now on call to work with staff across City
de
partments on future projects, as needs arise.

Other 0 None
H-12 Neighborhood
outreach and education
on homeless housing and
other housin
g topics
Funding allocated 1/31/2031 6th Cycle Continuous
Funding is allocated on an as-needed basis to
CBOs that the City engages for outreach and
education.

Other 0 None
H-12 Neighborhood
outreach and education
on homeless housing and
other housin
g topics
Households outreached to 1/31/2031 6th Cycle Continuous We sent mailers to approximately 10,000
households, notifying them about potential changes
to the Mobilehome Rent Ordinance and explaining
how they can provide input to the City Council.

Households 0 None
H-12 Neighborhood
outreach and education
on homeless housing and
other housing topics
Feedback sessions held 1/31/2031 6th Cycle Continuous
We initiated and hosted 11 meetings in the
Community Engagement Series on many different
topics. Invitations go out to approximately 12,000
people each month. We also hosted four
community meetings to educate the public about
the City's plan to convert hotels into interim housing
for formerl
y homeless individuals.

Meetings 0 None
H-13 Regional Homeless
Response Coordination
and Planning
2024: Council adoption of City’s
implementation plan 12/31/2024 6th Cycle In Progress
The city, in collaboration with the county, is currently developing the 2025-2030 community plan to end
homelessness. The plan will be presented to the
city council in 2026.

Other 0
Progress is documented through the County-
led planning process, including meeting
materials, working drafts, and planning
documents developed and maintained by the
County in collaboration with City staff and
other partners. These shared materials
(agendas, notes, draft chapters/sections,
and review/comment logs) serve as the
primary records of coordination and ongoing
development of the regional plan.

H-14 Emergency Shelters Jun 2024: Council adoption of necessary zoning code amendments 6/30/2024 6th Cycle Complet ed This item was completed in 2024. Other 1 Ord No. 31149:
https://records.sanjoseca.gov/Ordinances/O
RD31149.pdf . Ordinance No. 31097:
https://records.sanjoseca.gov/Ordinances/O
RD31097.
pdf
H-14 Emergency Shelters Dec 2024: Outreach conducted on further process changes 12/31/2024 6th Cycle Completed This item was completed in 2024. Other 1 None S-1 Tenant / Landlord
Resource Centers and
Code Violations Reporting
By 2025: At least 3 Tenant Resource
Centers with Code assistance 12/31/2025 6th Cycle Not yet started The Rent Stabilization team continues its outreach
efforts targeting areas with more vulnerable renter
populations and areas where the Program receives
a high number of inquiries about code issues or
renter protections. Unfortunately, the Google
Downtown West project, which would have brought
significant investment and housing development to
the Diridon area, including funding for Tenant
Resource Centers, is on an indefinite hold for the
foreseeable future. In Fiscal Year 2026-27, the Rent
Stabilization Program intends to hold periodic "pop-
up" resource clinics at community centers. These
clinics will be held at different locations in areas that show a higher need for services and education,
based on data collected by the Rent Stabilization
Program. The services will be multi-lingual and will
include assistance with code issues, filing petitions,
and referrals to mediation and legal aid services.

Other 0 None
S-1 Tenant / Landlord
Resource Centers and
Code Violations Reporting
Target of 3 locations regularly served each
year 1/31/2031 6th Cycle Not yet started See response to S-1(1) above. Other 0 None S-1 Tenant / Landlord
Resource Centers and
Code Violations Reporting
At least 400 tenants and landlords
assisted per year 1/31/2031 6th Cycle Not yet started See response to S-1(1) above. Persons 0 None S-1 Tenant / Landlord
Resource Centers and
Code Violations Reporting
4 Housing/Code meetings held per year
starting in 2024 1/31/2031 6th Cycle Continuous
The Rent Stabilization Program and Code
Enforcement met 3 times during 2025. Staffing
vacancies in the leadership of the Code
Enforcement Inspection program and key Rent
Stabilization Staff on leave have delayed efforts for
regular coordination. The Rent Stabilization
Program staff and Code inspectors maintain
channels of communication regarding Code issues
that arise in units or properties covered by the
Apartment Rent Ordinance and/or Tenant
Protection Ordinance.

Meetings 5 None
S-2 Rental Property
Registry Improvement
2025: Implement new Code information
system with improved addresses 12/31/2025 6th Cycle In Progress Significant work on this item has not yet
commenced due to staff capacity and competing
priorities.

Other 0 None
S-2 Rental Property
Registry Improvement % of City's rental units registered 12/31/2025 6th Cycle In Progress Significant work on this item has not yet
commenced due to staff capacity and competing
priorities.

Other 0 None
S-3 Proactive Code
Enforcement in Identified
Project Hope Place-based
Nei
ghborhoods
Annually through 2031: At least 3
neighborhoods covered with enhanced
multifamily inspections 1/31/2031 6th Cycle Continuous
Code inspectors conducted Enhanced Multiple
Housing inspections in the 8 Project Hope
designated areas.

Other 17 None
S-3 Proactive Code
Enforcement in Identified
Project Hope Place-based
Nei
ghborhoods
Annually through 2031: Average 200 units
inspected per neighborhood per year (total
600 units per year)
1/31/2031 6th Cycle Continuous
In 2025, a total of 656 units were inspected. Each
inspector inspects one to a few neighborhoods,
averaging 82 units per neighborhood.

Other 82 None
S-3 Proactive Code
Enforcement in Identified
Project Hope Place-based
Nei
ghborhoods
Goal of 2,000 violations resolved within
150 days each year (includes mostly
housing violations and some blight) by
2031
1/31/2031 6th Cycle Continuous
A total of 728 violations were resolved in 2025, with
579 resolved within 150 days. The average violation
duration for housing and blight violations was 107
days.

Other 2495 None
S-4 Updated Relocation
Assistance Analysis complete 12/31/2025 6th Cycle Completed In 2025, Housing staff reviewed relocation
assistance mandated under several City ordinances
and SB 330 regarding new developments that
displace existing lower-income renters. Staff
determined that existing ordinances had consistent
escalators; therefore, rather than seeking Council
approval of changes, clearer communication and
consistent administration would be sufficient to
benefit both renters and developers. Housing staff
researched different methodologies in 2025 and
plans to update its webpages in spring 2026.

Changes to the municipal code are not necessary,
and this item is being implemented administratively.

Other 1 None
S-4 Updated Relocation
Assistance
Stakeholder outreach on cost escalators
and proposed changes 1/31/2031 6th Cycle In Progress See description above of S-4. Other 0 None S-4 Updated Relocation
Assistance Council approval of code updates 1/31/2031 6th Cycle In Progress See description above of S-4. Other 0 None S-5 Code Enforcement
Improved Case
Management
Jan 2026: Phase 1 - New case
management system implemented and
violation tracking system in place
1/31/2026 6th Cycle In Progress
In 2025, after meeting all requirements and
reviewing the data, it was determined that a new
project timeline was needed. Therefore,
implementation was scoped into 2 phases, and the
timeline was extended to a Go Live of July 2027 for
Phase 1. We are in the process of renegotiating the
contract with Infinite Solutions for the extended
timeline and 1 new scope item. We hope to have a
new contract in place by mid-February of 2026. We
have completed detailed requirements and
development of 28% of all features. Further, we
have secured an ITD resource that has completed
all data integrity fixes and will begin 1st round of
data cleanup in January 2026. We have also
formulated our first retention schedule and are 40%
complete with the analysis
Other 0 None
S-5 Code Enforcement
Improved Case
Management
Jan 2028: Phase 2 - Analysis of building
performance complete 1/31/2028 6th Cycle Not yet started In 2025, after meeting all requirements and
reviewing the data, it was determined that a new
project timeline was needed. Therefore,
implementation was scoped into 2 phases, and the
timeline was extended to a Go Live of July 2027 for
Phase 1. We are in the process of renegotiating the
contract with Infinite Solutions for the extended
timeline and 1 new scope item. We hope to have a
new contract in place by mid-February of 2026. We
have completed detailed requirements and
development of 28% of all features. Further, we
have secured an ITD resource that has completed
all data integrity fixes and will begin 1st round of
data cleanup in January 2026. We have also
formulated our first retention schedule and are 40%
complete with the analysis
Other 0 None
S-5 Code Enforcement
Improved Case
Management
Jan 2029: Phase 3 - Stakeholder outreach
on cost escalators and proposed changes 1/31/2029 6th Cycle Not yet started In 2025, after meeting all requirements and
reviewing the data, it was determined that a new
project timeline was needed. Therefore,
implementation was scoped into 2 phases, and the
timeline was extended to a Go Live of July 2027 for
Phase 1. We are in the process of renegotiating the
contract with Infinite Solutions for the extended
timeline and 1 new scope item. We hope to have a
new contract in place by mid-February of 2026. We
have completed detailed requirements and
development of 28% of all features. Further, we
have secured an ITD resource that has completed
all data integrity fixes and will begin 1st round of
data cleanup in January 2026. We have also
formulated our first retention schedule and are 40%
complete with the analysis
Other 0 None
S-5 Code Enforcement
Improved Case
Management
Council approval of code updates (if any) 1/31/2029 6th Cycle Not yet started In 2025, after meeting all requirements and
reviewing the data, it was determined that a new
project timeline was needed. Therefore,
implementation was scoped into 2 phases, and the
timeline was extended to a Go Live of July 2027 for
Phase 1. We are in the process of renegotiating the
contract with Infinite Solutions for the extended
timeline and 1 new scope item. We hope to have a
new contract in place by mid-February of 2026. We
have completed detailed requirements and
development of 28% of all features. Further, we
have secured an ITD resource that has completed
all data integrity fixes and will begin 1st round of
data cleanup in January 2026. We have also
formulated our first retention schedule and are 40%
complete with the analysis
Other 0 None
S-5 Code Enforcement
Improved Case
Management
Jan 2030: Phase 4 - Implementation
complete 1/31/2030 6th Cycle Not yet started
In 2025, after meeting all requirements and
reviewing the data, it was determined that a new
project timeline was needed. Therefore,
implementation was scoped into 2 phases, and the
timeline was extended to a Go Live of July 2027 for
Phase 1. We are in the process of renegotiating the
contract with Infinite Solutions for the extended
timeline and 1 new scope item. We hope to have a
new contract in place by mid-February of 2026. We
have completed detailed requirements and
development of 28% of all features. Further, we
have secured an ITD resource that has completed
all data integrity fixes and will begin 1st round of
data cleanup in January 2026. We have also
formulated our first retention schedule and are 40%
complete with the analysis
Other 0 None
S-6 Proactive Code
Enforcement for More
Rented Residences
June 2025: Complete study 6/30/2025 6th Cycle Not yet started Significant work on this item has not yet
commenced due to staff capacity and competing
priorities.

Other 0 None
S-6 Proactive Code
Enforcement for More
Rented Residences
Dec 2025: Recommendation to City
Council if feasible 12/31/2025 6th Cycle Not yet started Significant work on this item has not yet
commenced due to staff capacity and competing
priorities.

Other 0 None
S-7 Financial Literacy
Programs for Potential
Homebuyers
Services provided 1/31/2031 6th Cycle Continuous
Staff continues to explore funding opportunities to
build financial literacy and educate potential
homebuyers. In 2025, staff continued to monitor
upcoming grant opportunities from local, state, and
federal funding sources that could be used for this
purpose. If and when funding can be identified, staff
will apply, and a budget will be allocated if
successful.

Other 0 None
S-7 Financial Literacy
Programs for Potential
Homebu
yers
Budget allocated 1/31/2031 6th Cycle Conti nuous See description above of S-7. Other 0 None S-7 Financial Literacy
Programs for Potential
Homebu
yers
# buyers assisted 1/31/2031 6th Cycle Not yet started See description above of S-7. Persons 0 None S-8 Homebuyer Program
Redesign
2026: Feasibility analysis and plan created 12/31/2026 6th Cycle In Progress In March 2025, the City began redesigning its
homeownership programs by reducing the equity
share requirement in the First-Time Homebuyer
Loan Program from 30% to 15%. This change is
intended to reduce financial barriers for low- and
moderate-income households and support long-
term housing stability and wealth-building, while
preserving deed-restricted affordability. The action
reflects an equity-focused review of existing
programs and informs future efforts to expand
access, strengthen outreach to underserved
communities, and evaluate program impacts over
time.

The City continues to lack sufficient funding and
staffing to sustain an ongoing homeownership
program. Last year, staff instead focused on
expediting the reuse of old loan repayments
dedicated to homeownership by partnering with the
County of Santa Clara. In October 2025, the City
Council approved transferring $9M in homebuyer
loan repayments from previous commitments under
the state's CalHome BEGIN program to the County,
which runs its own homebuyer program. The funds
will be used to provide homebuyer downpayment
assistance for two 100% affordable-for-sale
developments.

In addition, in early 2025, the Housing Department
worked with the nonprofit HouseKeys to ensure that
4 new single-family homes on Rose Avenue, built
b
y Robson Homes, were sold to low-income
Other 0
First-Time Homebuyer Loan Program Equity
Share Reduction:
http://sanJosé.legistar.com/View.ashx?M=F
&ID=13983534&GUID=F26A4F67-02D6-
4F5D-9BC7-77A0B22CA004
Council memo for transfer of BEGIN funds:
https://sanJosé.legistar.com/LegislationDetai
l.aspx?ID=7693692&GUID=62F9C821-0BC7
-
44FB-B0DC-CDF21525EA72
HouseKeys website for San José:
https://www.housekeys27.com/
S-8 Homebuyer Program
Redesign 2027: Council approval of program 12/31/2027 6th Cycle In Progress See description above for S-8.1. Other 0 None S-8 Homebuyer Program
Redesign By 2031: Assist 100 households 1/31/2031 6th Cycle In Progress See description above for S-8.1. Households 0 None S-9 Fair Housing Equity
Analysis and Ant
Displacement for Specific
Plans
2024: Consultant identifies anti-
displacement features for Five Wounds
UV Plan 12/31/2024 6th Cycle In Progress
In 2025, staff continued working with the consultant
but did not identify new anti-displacement strategies
for Urban Village Plans. The Five Wounds UV plan
is currently in the environmental review phase, with
completion estimated for mid-2026.

Other 0 None
S-9 Fair Housing Equity
Analysis and Ant
Displacement for Specific
Plans
# of other UV Plans incorporating features 12/31/2024 6th Cycle Not yet started Anti-displacement features will be considered in future plans. Other 0 None
S-9 Fair Housing Equity
Analysis and Ant
Displacement for Specific
Plans
By 2026: Fair Housing Equity Analysis
method defined 12/31/2026 6th Cycle Not yet started Staff will continue to define a method in 2026. Other 0 None S-9 Fair Housing Equity
Analysis and Ant
Displacement for Specific
Plans
Ongoing: Plans with fair housing analysis
and anti- displacement features integrated 1/31/2031 6th Cycle Not yet started Anti-displa cement features will be considered. Other 0 None S-10 Study on Rent
Increases and Burden in
Affordable Housing
2024: Research conducted 12/31/2024 6th Cycle In Progress In 2025, the data system for affordable apartment
rent rolls was under review and revision. Staffing
constraints and core function process
improvements also limited the staff resources
available for this effort in 2025. Following
completion of the data system review in 2026, data
updates, and redaction of personally identifiable
information, staff intend to leverage AI to assist with rent burden analysis. Once the data analysis is
complete, the findings will be incorporated into one
or more City Council reports as appropriate.

Other 0 None
S-10 Study on Rent
Increases and Burden in
Affordable Housin
g
By June 2025: Findings presented to the
City Council 6/30/2025 6th Cycle In Progress See description above of S-10. Other 0 None S-11 Alternative
Documentation for Non-
Citizens
Jul 2024: Council approval 7/31/2024 6th Cycle Completed In 2025, with guidance from the City’s Attorney’s
office, Housing staff developed administrative
guidelines that include requiring owners of
properties subject to the Tenant Preferences
Program to Help Fight Displacement to accept
alternative forms of documentation identified by the
City and/or the State of California. The alternative
documents can be used to verify both program
eligibility and income eligibility, to the extent allowed by the State’s Tax Credit Allocation Committee
regulations. In addition, marketing materials for
subject properties must also advertise that
alternative documents are accepted.

Housing staff will continue to require acceptance of
alternative documents in affordable housing
properties subject to the Tenant Preferences
Program, but have been advised by the City
Attorney’s office to pause work on expanding to
different types of affordable homes due to the
current federal political climate
Other 1
Tenant Preferences Program to help Fight
Displacement web page:
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/resource-library/housing-
policy-plans-and-reports/tenant-preferences
S-11 Alternative
Documentation for Non-
Citizens
Jul 2025: Workplan complete 7/31/2025 6th Cycle In Progress See description above of S-11. Other 0 None S-11 Alternative
Documentation for Non-
Citizens
# properties implemented 12/31/2026 6th Cycle Continuous As of the end of 2025, two affordable housing
properties are employing alternative documentation
requirements through the Tenant Preference
program.

Other 2 None
S-12 Eviction Prevention By 2025: At least 50 workshops held 12/31/2025 6th Cycle Completed During 2025, 50 weekly courthouse workshops
were conducted on Wednesdays and the Superior
Court. In total, 142 weekly courthouse workshops
were held between 2023 and 2025.

Meetings 50 None
S-12 Eviction Prevention By 2025: At least 275 households kept stably housed 12/31/2025 6th Cycle Completed
Since 2023, 335 tenant households have been kept
stably housed through the court-focused Eviction
Diversion and Settlement Pro
gram.

Households 335 None
S-12 Eviction Prevention
By 2025: At least 5,000 households
assisted via calls to Eviction Helpline, walk-
ins and emails
12/31/2025 6th Cycle Completed
From 2023 through 2025, over 10,000 tenants and
property owners have been assisted through the
Eviction Helpline by phone, email, or in person at
City Hall. In calendar year 2025, 273 tenants and
landlords involved in eviction court actions were
assisted with resources at the Eviction Prevention
(UD) Weekly Court Clinic and during the eviction
court calendar
, 2-3 days a week.

Households 10000 None
S-12 Eviction Prevention By 2026: At least $3M in funding secured 12/31/2026 6th Cycle Completed In addition to a $2M State earmark received in
2024, the City has continued to fund eviction
prevention staffing and the eviction diversion
program through a portion of the Measure E
revenue allocation for prevention, with $650K
allocated for prevention staffing for FY 2025-26.

Additional Measure E funds for Eviction Prevention
were awarded in 2023 and 2024, totaling more than
$2M.

Other 5 None
S-12 Eviction Prevention By 2031: Seek at least $3M in additional funding 1/31/2031 6th Cycle Not yet started Staff continues to monitor for any funding opportunities to support this metric. Other 0 None
S-13 Affordable Housing
Renter Portal Access 2023: Top 4 languages available 12/31/2023 6th Cycle Completed The City of San José Doorway portal remains
available in English, Spanish, Chinese, and
Vietnamese.

Additionally, the Doorway portal uses the Web
Content Accessibility Guidelines (WCAG) to make
content "more accessible to a wider range of people
with disabilities, including accommodations for
blindness
, low vision, and deafness".

Other 1
City of San José Doorway Portal:
https://housing.sanjoseca.gov
WCAG Guidelines:
https://www.w3.org/TR/WCAG21/
S-13 Affordable Housing
Renter Portal Access
# applicants using non-English versions
(to the extent data is available) 12/31/2023 6th Cycle Continuous Across CY 2025, a total of 6,766 non-English-
speaking users accessed the City of San José
Doorway portal. The breakdown was as follows:
4,259 Spanish-speaking users, 1,485 Chinese-
speaking users, and 1,022 Vietnamese-speaking
users.

Regarding outreach, the Doorway portal is
promoted in multiple ways:
- Promoted via the monthly Housing Department
newsletter (10,000+ recipients)
- Accessible via the homepage of the Housing
Department website
- Included in Housing Department flyers as a QR
code available to attendees at community events.

Events include the City of San José Career Expo
(October 2, 2025) and Disability Awareness Day
(October 30 2025)
Persons 6766 City of San José Doorway Portal analytics
via Exygys
S-13 Affordable Housing
Renter Portal Access
90% of funded affordable properties listing
on Doorway by 2028 12/31/2028 6th Cycle Continuous
As of December 31, 2025, a total of 89 properties
were listed on the City of San José Doorway portal.

Of these 89 properties, 48 had active City funding.

There are a total of 102 properties with active City
funding and affordability restrictions, which brings
the current percentage of properties posted on
Doorway to 47% (48/102). All newly funded
affordable housing properties are required to list on
Doorwa
y.

Other 47
City of San José Doorway Portal analytics
via Exygys, City of San José loan and
affordablity restriction records
S-14 Advocacy for Tenant-
Based Vouchers
Legislation passage 12/31/2026 6th Cycle Continuous
In 2025, the City continued to advocate for the use
of Tenant-Based Vouchers and worked with the
Santa Clara County Housing Authority's staff to
explore TBVs for residents in interim housing. Staff
continues to meet regularly with SCCHA to discuss
maximizing voucher utilization and housing
placements.

Other 0
Council memo for the City Housing
Authority's approval of the Moving to Work
FY 2026 Plan, which contains direction on
exploring use of vouchers for interim
housing:
https://sanJosé.legistar.com/LegislationDetai
l.aspx?ID=7272340&GUID=AFC73EB9-
510E-4D64-9DB9-CFEAC96964CE
S-14 Advocacy for Tenant-
Based Vouchers Support letters and meetings on vouchers 12/31/2026 6th Cycle Continuous See description above for S-14. Other 0 None S-15 Tenant preferences
in VTA station areas
By 2031: At least 2 sets of affordability
restrictions recorded requiring tenant
preferences 1/31/2031 6th Cycle Continuous
As of 2025, affordable housing developments in
station areas have regularly sought City funds and
are therefore subject to the City's Tenant
Preference program (except for developments
using state or direct federal funding). No additional
approval is needed to implement Tenant
Preferences in VTA station areas. The Tenant
Preference program, as approved by Council in
March 2024, applies to all city-owned sites and to
those with City development agreements. Staff will
continue to monitor City-funded VTA station area
deals and report units subject to Tenant
Preferences under Program S-20. This work item is
considered complete. For example, there are 2 VTA
projects - Tamien and Berryessa where our TPP
policy will be implemented. City is currently working
on a prospective project called VTA capitol as well.
the city has RFP'ed 4 publicly owned sites (71
Vista, Arena, West Comm Center, 101 S Jackson)
for development, if these sites are awarded and
developed, the TPP policy will be implemented.

Other 0 None
S-15 Tenant preferences
in VTA station areas
70 restricted affordable units subject to
preferences in station areas 1/31/2031 6th Cycle Continuous See description above for S-15. Units 0 None S-16 Affirmative marketing
languages and best
practices for affordable
housing
2027: Requirement rolled out 12/31/2027 6th Cycle In Progress Staff continues to operate Doorway, the City's
online tenant portal in San José's top four
languages. The multilingual feature is well used;
according to Exygy, the consultant who created the
portal, almost 6,800 users viewed almost 106,000
pages on Doorway in Spanish, Vietnamese, and
Chinese languages in 2025.

Staff plans to initiate development of an
administrative affirmative marketing policy
requirement in 2026.

Other 0
Doorway portal:
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/tenants/apply-for-affordable-
housing
S-16 Affirmative marketing
languages and best
practices for affordable
housin
g
Data collected for compliance 12/31/2027 6th Cycle In Progress See description above for S-16. Other 0 None S-16 Affirmative marketing
languages and best
practices for affordable
housin
g
2027: Library created & made available 12/31/2027 6th Cycle Not yet started Work was not yet started on this item in 2025 as it is a medium-term priority. Other 0 None
S-17 Local Fair Chance /
"Ban the Box" ordinance
Report completed 12/31/2028 6th Cycle Not yet started Work was not yet started on this item in 2025 as it is a medium-term priority. Other 0 None
S-17 Local Fair Chance /
"Ban the Box" ordinance Council presentation made 12/31/2028 6th Cycle Not yet started Work was not yet started on this item in 2025 as it is a medium-term priority. Other 0 None
S-17 Local Fair Chance /
"Ban the Box" ordinance Outreach done Ordinance drafted 12/31/2028 6th Cycle Not yet started Work was not yet started on this item in 2025 as it is a medium-term priority. Other 0 None
S-17 Local Fair Chance /
"Ban the Box" ordinance Program proposal created 12/31/2028 6th Cycle Not yet started Work was not yet started on this item in 2025 as it is a medium-term priority. Other 0 None
S-17 Local Fair Chance /
"Ban the Box" ordinance Council consideration 12/31/2028 6th Cycle Not yet started Work was not yet started on this item in 2025 as it is a medium-term priority. Other 0 None
S-18 Review Data on City-
Monitored Properties to
Identify Fair Housing
Issues
Dec 2025: First data collection on
residents and applicants, then 2027, 2029,
2031
1/31/2031 6th Cycle In Progress
Rent data from affordable housing developments,
subject to the City's oversight, is captured on "Rent
Rolls". In 2025, this data system underwent a
system-wide review. Following completion of the
system review in 2026, data updates and redaction
of personally identifiable information, staff intend to leverage AI to assist with this fair housing analysis,
subject to budgetary constraints and higher-priority
initiatives. Once analysis is conducted and outliers
are identified, staff will meet with property managers
to review affirmative marketing and lease-up
practices to identify and address any potential fair
housing issues.

Other 0 None
S-18 Review Data on City-
Monitored Properties to
Identify Fair Housing
Issues
Aug 2026: Outliers analysis 8/31/2026 6th Cycle Not yet started See description above for S-18. Other 0 None S-18 Review Data on City-
Monitored Properties to
Identify Fair Housing
Issues
Mar 2027: Meet with 100% of outlier
properties 3/31/2027 6th Cycle Not yet started See description above for S-18. Other 0 None S-18 Review Data on City-
Monitored Properties to
Identify Fair Housing
Issues
Technical assistance given 3/31/2027 6th Cycle Not yet started See description above for S-18. Other 0 None S-19 Certificate of
Preference Program
Jan 2025: Research and legal analysis
conducted 12/31/2025 6th Cycle Not yet started
In 2025, given the delay in development in the
Diridon Station Area and the need for the
Partnership for the Bay's Future Policy Fellow to
seek funding for healthcare services for the
homeless, this work was deprioritized and moved to
later in the
planning period.

Other 0 None
S-19 Certificate of
Preference Program Jun 2027: Findings presented to Council 6/30/2027 6th Cycle Not yet started See description above for S-19. Other 0 None S-19 Certificate of
Preference Program
If Council directed, program developed in
2027 12/31/2027 6th Cycle Not yet started See description above for S-19. Other 0 None S-20 Tenant Preferences
that Help Fight
Displacement
Dec 2023: Complete disparate impact
analysis for 2 proposed preferences and
submit to HCD for review
12/31/2023 6th Cycle In Progress
The Tenant Preferences Program to Help Fight
Displacement was approved by Council in 2024,
and staff implemented it throughout 2025. Last year,
staff developed draft administrative guidelines that
were circulated among Housing staff, community
stakeholders, and affordable housing developers.

Staff anticipates completion of the administrative
guidelines in 2026. As of late 2025, two
developments were actively implementing the
Tenant Preference Program. Staff expect that over
the next four years, as many as 300 affordable
housing units will be set aside under the Program
for eligible applicants.

In 2025, staff monitored upcoming subject
properties, anticipating state funding to determine
whether a new disparate impact analysis was
needed for HCD review.

In 2025, the City also deprioritized development of a
Displaced Person preference, as a new preference
would significantly reduce the effectiveness and
impact of the existing Tenant Preferences Program,
given that the overall 35% set-aside of units would
be divided among all preference programs. As the
Tenant Preferences Program to Help Fight
Displacement reaches a larger cohort of City
residents, administering the current program has
been deemed the most efficient use of limited staff
resources
Other 0
Web page for Tenant Preferences Program:
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/resource-library/housing-
policy-plans-and-reports/tenant-preferences
S-20 Tenant Preferences
that Help Fight
Dis
placement
Mar 2024: Draft program presented to City
commission and Council committee 3/31/2024 6th Cycle Completed See description above for S-20. Other 1 None S-20 Tenant Preferences
that Help Fight
Dis
placement
Apr 2024: Council approval of ordinance 4/30/2024 6th Cy cle Completed See description above for S-20. Other 1 None S-20 Tenant Preferences
that Help Fight
Displacement
Jun 2024: Initiate development of
Displaced Tenant Preference, including
research, analysis, and community
en
gagement
6/30/2024 6th Cycle Not yet started See description above for S-20. Other 0 None S-20 Tenant Preferences
that Help Fight
Dis
placement
Mar 2025: Draft program presented to City
commission and Council committee 3/31/2025 6th Cycle Not yet started See description above for S-20. Other 0 None S-20 Tenant Preferences
that Help Fight
Dis
placement
June 2025: Council approval of ordinance 6/30/2025 6th Cycle Not yet started See description above for S-20. Other 0 None S-21 Facilitation of Equal
Access to Housing
Jul 2024 Metrics developed by
collaboration with and feedback from at
least 3 fair housing grantees
7/31/2024 6th Cycle Continuous
The
City will continue to fund the Fair Housing
Program, which is identified in the 2025–2030
Consolidated Plan and the FY 2025–2026 Annual
Action Plan as a priority area under the Increasing
Housing Affordability goal. Due to federal funding
uncertainties in FY 2025–2026, federally funded
projects were temporarily paused pending
execution of HUD grant agreements and receipt of
federal entitlement funds. Grant agreements were
executed, and funds are anticipated to be disbursed
in January 2026. Contract negotiations are
expected to begin by February 2026.

Other 0
An update on progress for the remainder of
FY 2025–2026 will be provided at the end of
the fiscal year. Agencies were informed that
services could be initiated at the beginning of
the fiscal year in July at their own risk,
pending HUD’s disbursement of federal
funds. Agencies may have continued to
deliver services to San José residents during
this period and may be eligible for
reimbursement for eligible costs, provided all
federal funding requirements are met.

S-21 Facilitation of Equal
Access to Housing Funding to nonprofit fair housing providers 1/31/2031 6th Cycle Continuous In FY 2025–2026, a total of $400,000 in federal
funds (CDBG and HOME) was awarded to the Law
Foundation for the Fair Housing Program,
consistent with
prior-year funding levels.

Other 1611484 FY 25-26 Annual Action Plan
S-21 Facilitation of Equal
Access to Housing # people assisted 1/31/2031 6th Cycle Continuous No quantified outcomes are reported for Q1 and Q2
due to federal funding uncertainties in FY
2025–2026. Federally funded projects were
temporarily paused pending execution of HUD grant
agreements and receipt of federal entitlement funds.

Grant agreements were executed, and funds
disbursed in January 2026, and contract
negotiations are expected to begin by February
2026.

Persons 512
An update on progress for the remainder of
FY 2025–2026 will be provided at the end of
the fiscal year. Agencies were informed that
services could be initiated at the beginning of
the fiscal year in July at their own risk,
pending HUD’s disbursement of federal
funds. Agencies may have continued to
deliver services to San José residents during
this period and may be eligible for
reimbursement for eligible costs, provided all
federal funding requirements are met.

S-22 Fair Housing
Services and Support
Annual meetings held 1/31/2031 6th Cycle Continuous
Two meetings were convened between the City and
its consortium of grantees that provide fair housing
testing, outreach and education, and legal
re
presentation services.

Meetings 3 None
S-22 Fair Housing
Services and Support Priorities established jointly 1/31/2031 6th Cycle Continuous Monthly meetings Law Foundation, Project Sentinel,
Senior Adult Legal Services, and Asian Law
Alliance (Fair Housing Consortium)across the first
half of CY2025. With the Federal Government's
pause on community funding and staff on approved
medical leave, these meetings did not reconvene
before the end of the calendar year. Staff
anticipates reviving these meetings with the
execution of a new contract and the return of staff to
l
ead this effort.

Other 0 None
S-23 Know Your Rights
Materials Jul 2024: Outreach Strategy developed 7/31/2024 6th Cycle Completed As indicated in the 2024 APR, this metric is considered complete. Other 1 None
S-23 Know Your Rights
Materials Jan 2025: funding source identified 1/31/2025 6th Cycle Continuous Funds from City protection ordinance fees and other
Housing Department funds are sufficient to support
this on
going work.

Other 1 None
S-23 Know Your Rights
Materials # of communications pieces released 12/31/2025 6th Cycle Continuous The communications team has continued to
maintain the "Renting Has Its Rights" website;
brochures, social posts, and related materials are
distributed by Housing staff at tabling events; and
content related to renters' rights is included in the
Housing Department's monthly newsletter, which is
distributed electronically to approximately 10,000
subscribers.

Other 35 None
S-23 Know Your Rights
Materials # of recipients of communications 12/31/2025 6th Cycle Continuous See S-2(3) above Persons 10000 None S-23 Know Your Rights
Materials
at least 2 partner organizations identified
to assist in outreach 12/31/2025 6th Cycle Completed
A grantee, Project Sentinel, conducts outreach and
education to tenants and property owners regarding
rental housing rights and obligations. The contract
was originally awarded in 2024 with multi-year
options to continue services. Another grantee,
Legal Link, provides training programs for
employees of community and social service
agencies in San José on Housing Rights, using a
"train the trainers" approach. The strategy is to train individuals who regularly interact with renters on the
basics of San José's rental housing laws and on
how to access resources when they need
assistance resolving problems. The contract was
originally awarded in 2024 with multi-year options to
continue services.

Other 1 None
S-24 Targeted Fair
Housing Outreach and
Enforcement
Dec 2024: Data obtained from nonprofit
legal organizations on locations of
complaints
12/31/2024 6th Cycle In Progress
With the Federal Government's pause on
community funding and staff on approved medical
leave, this data collection has progressed on a
slower-than-expected timeline. Staff anticipates
continuing these efforts as funding is restored in
2026.

Other 0 None
S-24 Targeted Fair
Housing Outreach and
Enforcement
15% increase in outreach in targeted
neighborhoods identified 1/31/2031 6th Cycle In Progress See S-24(1) above Other 0 None S-24 Targeted Fair
Housing Outreach and
Enforcement
May 2025: Capacity assessed of legal
assistance partners to do new outreach
with community partners
5/31/2025 6th Cycle In Progress See S-24(1) above Other 0 None S-24 Targeted Fair
Housing Outreach and
Enforcement
Jun 2025: Funding identified 6 /30/2025 6th Cycle In Progress See S-24(1) above Other 0 None S-24 Targeted Fair
Housing Outreach and
Enforcement
Jan 2026: Contracts executed 1/31/2026 6th Cycl e Not yet started See S-24(1) above Other 0 None S-24 Targeted Fair
Housing Outreach and
Enforcement
# people assisted 1/31/2031 6th Cycle In Progress See S-24(1) above Persons 0 None S-24 Targeted Fair
Housing Outreach and
Enforcement
# services delivered 1/31/2031 6th Cycle In Progress See S-24(1) above Other 0 None S-25 Tenant-based
Vouchers in Higher-
resource Areas
by Dec 2023: Meet with SCCHA to
develop alignment of policies and
measures
12/31/2023 6th Cycle In Progress
In 2025, staff met regularly with SCCHA staff to
discuss affordable housing transactions. Policy
discussions and the City's approval of SCCHA's
Moving to Work Plan focused on the use of
vouchers for interim housing units and the most
vulnerable populations as a higher priority. If staffing is adequate in 2026, staff will continue discussions
about the locations of vouchers used in San José.

Other 0 None
S-25 Tenant-based
Vouchers in Higher-
resource Areas
by Dec 2024: Seek Council approval to
direct SCCHA to capture relevant
performance measures, if necessary
12/31/2024 6th Cycle Not yet started See description above for S-25. Other 0 None S-25 Tenant-based
Vouchers in Higher-
resource Areas
by Jul 2026: Identify possible program
improvements 7/31/2026 6th Cycle Not yet started See description above for S-25. Other 0 None S-25 Tenant-based
Vouchers in Higher-
resource Areas
7% increase of vouchers used in higher-
resource areas 12/31/2026 6th Cycle Continuous See description above for S-25. Other 0 None S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
Dec 2025: Launch hotline 12/31/2025 6th Cycle Completed Beginning in August 2024, through a Grantee,
Project Sentinel, a dedicated phone number and
email were established for the propose of providing
education, guidance, and dispute resolution
services to all residential tenants and landlords in
the City of San Jose with the purpose of preventing
and resolve rental housing conflicts. An amendment
to the initial Grant is in effect and Project Sentinel
continued to operate the hotline as of December 31,
2 025.

Other 1 None
S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
Funds budgeted annually for tenant and
landlord outreach and education 1/31/2031 6th Cycle Continuous The City continues to fund Grants through June 30,
2026 to Grantees Project Sentinel and LegalLink to
contine education and outreach on tenant-landlord
issues utilizing CDBG funding.

Other 1 None
S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
Difference in average funding per year for
tenant and landlord outreach and
education from 2023 to 2031
1/31/2031 6th Cycle Not yet started This item cannot yet be reported, as the program's first year of funding completed in 2025. Other 0 None
S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
Services provided 1/31/2031 6th Cycle Continuous
Project Sentinel provides neutral tenant-landlord
counseling and dispute resolution. The purpose of
the services are that tenants and landlords alike
understand their rights and responsibilities, while
offering practicalsupport to address issues such as
terminations, evictions,habitability, privacy,
deposits, and rent increases. Services apply to all
housing types, including apartments, single-family
homes, mobilehomes, and properties governed by
homeowners associations. Legal Link trains and
supports groups of housing workers who frequently
interact with tenants and works with established
partner organizations to address housing-related
legal issues at an early stage.

Other 1 None
S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
# Calls supported 1/31/2031 6th Cycle Continuous 800 Other 800 This is from the contract goals. Project
Sentinel typically recevies calls exceeding
this target. We do not have full reporting
from CY 2025 yet.

S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
# Clients served 1/31/2031 6th Cycle Continuous 800 Persons 800 This is from the contract goals. Project
Sentinel typically meets or exceeds this
target. We do not have full reporting from CY
2025 yet.

S-26 Increased Support
for Nonprofits to do
Tenant and Landlord
Outreach and Education
Jul 2025: funds identified for hotline 7/ 31/2025 6th Cycle Completed Funds were i dentified in 2024 for the hotline. Other 1 None S-27 Tenant/Landlord
Education Centers Combined with S-1 6th Cycle None
S-28 Right to Counsel or
Alternative
2023-24: Collaborate with Bay Area
Housing Finance Authority on protections
policy event including right to counsel and
alternatives
12/31/2024 6th Cycle In Progress
In 2024, the Housing Department contracted with
HR&A Advisors to complete a County-wide study
on Eviction Court Alternatives. The study examines
various eviction court interventions and analyzes
the feasibility of those alternatives, including the
Housing Department’s current efforts that began
during the pandemic. The goal of the study is to
identify efforts the City can continue or initiate to
prevent families from falling into homelessness after
a court action and to reach residents and housing
providers further upstream during the eviction
process. The study should also highlight gaps in the
existing eviction court process ecosystem regarding
how the Court, community service providers, legal
aid, landlord bar, mediators, and the City coordinate
efforts to resolve eviction cases and efficiently
utilize safety net programs. The majority of the
study's work was completed by the consultant in
2025, and the Housing Department is working to
refine the recommendations, aiming to release the
report in 2026.

Other 0 None
S-28 Right to Counsel or
Alternative 2023: RFP Issued 12/31/2023 6th Cycle Completed See description above for S-28. Other 1 None S-28 Right to Counsel or
Alternative 2024: Consultant hired 12/31/2024 6th Cycle Com pleted See description above for S-28. Other 1 None S-28 Right to Counsel or
Alternative
2025: Consultant report completed and
program proposed to Council for approval 12/31/2025 6th Cycle In Progress Staff is currently working with consultants to review
the report and will return to Council with
recommendations.

Other 0 None
S-28 Right to Counsel or
Alternative
If approved, start program creation within
12 months of approval 12/31/2026 6th Cycle Not yet started See description above for S-28 (4). Other 0 None S-29 Rent Stabilization
Program Strategic Plan
and Program Assessment
2024: Outreach, program assessment,
and Strategic Plan completed with
consultant
12/31/2024 6th Cycle Completed This task was completed in 2024. Other 1 None S-29 Rent Stabilization
Program Strategic Plan
and Program Assessment
By 2026: Data collected as recommended 12/31/2026 6th Cycle In Progress Work to improve and enhance the Rent Stabilization
Program's Salesforce database to collect data
aligned with the Strategic Plan began in 2025 and is
ex
pected to be finalized in 2026.

Other 0 None
S-29 Rent Stabilization
Program Strategic Plan
and Pro
gram Assessment
Dec 2026: 80% of short-term activities
implemented 12/31/2026 6th Cycle Completed
More than 80% of the short-term Rent Stabilization
Program Strategic Plan activities have been
completed.

Other 1 None
S-29 Rent Stabilization
Program Strategic Plan
and Program Assessment
2028: Amendments presented to Council,
if any, during next three- year Strategic
Plan cycle
12/31/2028 6th Cycle In Progress
Proposed Amendments to the Mobilehome Rent
Ordinance will be brought to the City Council in
2026, and possible amendments to the Apartment
Rent Ordinance will be developed and brought to
the Cit
y Council in 2026 or 2027.

Other 0 None
S-30 Just Cause Eviction
Protection Amendment
2027: Analysis of issue 12/31/2027 6th Cycle Not yet started Significant work on this item did not commence in 2025 as it is a medium-term priority. Other 0 None
S-30 Just Cause Eviction
Protection Amendment
2027: Revised Ordinance presented to
Council 12/31/2027 6th Cycle Not yet started Significant work on this item did not commence in 2025 as it is a medium-term priority. Other 0 None
S-31 Tenant Protection
Ordinance Amendment for
Affordable Apartments
2027: Presentation to Council and Council
consideration of amended Ordinance 12/31/2027 6th Cycle Not yet started This item has not yet started. Other 0 None S-31 Tenant Protection
Ordinance Amendment for
Affordable Apartments
2025: Analysis of issue 12/31/2025 6th Cycle In Progress Housing Department has been working on an
analysis of all Restricted Affordable Units to
determine an accurate inventory of what units are
exempt from the Tenant Protection Ordinance
under the Ordinance's definition of "Affordable".

With an accurate assessment of which units are
exempt from the TPO, the HOusing Department
can better analyze where there may be gaps in
protection and what actions the city may want to
consider.

Other 0 None
S-31 Tenant Protection
Ordinance Amendment for
Affordable Apartments
2026: Ordinance amendment 12/31/2026 6th Cycle Not yet started This item has not yet started. Other 0 None S-32 Local Enforcement of
State Tenant Protections State determined pathway 12/ 31/2026 6th Cycle Completed The metric is considered complete with the passage of SB 567. Other 1 None
S-32 Local Enforcement of
State Tenant Protections
Advocate for existing bills that could
incorporate local right to enforce 12/31/2026 6th Cycle Completed The metric is considered complete with the passage of SB 567. Other 1 None
S-32 Local Enforcement of
State Tenant Protections Sponsored state bill if needed 12/31/2026 6th Cycle Completed The metric is considered complete with the passage of SB 567. Other 1 None
S-32 Local Enforcement of
State Tenant Protections
Work with coalition of rent stabilization
cities 12/31/2026 6th Cycle Continuous
The Rent Stabilization Program continues to
participate in the California Rent Stabilization
Network and attends quarterly meetings where best
practices are shared and updates on State
legislation or activities related to rent stabilization are shared.

Other 1 None
S-32 Local Enforcement of
State Tenant Protections Legislation passage 12/31/2026 6th Cycle Completed The metric is considered complete with the passage of SB 567. Other 1 None
S-33 Job Training with
Housing Subsidies
# housing-subsidized participants in job
training programs 1/31/2031 6th Cycle Not yet started No programs offering job training combined with housing subsidies were implemented in 2025. Persons 0 None S-33 Job Training with
Housin
g Subsidies
Support letters and meetings for legislation
/ budget requests 1/31/2031 6th Cycle Not yet started No programs offering job training combined with housing subsidies were implemented in 2025. Other 0 None S-34 Economic
Opportunity Strategies
Strategies created 1/31/2031 6th Cycle Continuous
In FY 2024–2025, the Housing Department finalized
an agreement with WeeCare, Inc., dba Upwards
(Upwards), awarding $1,048,394 in CDBG funds to
support the Business Operation and Optimization
Support Tools (BOOST) Program and will continue
to fund the program through FY 2025-2026.

Other 0 FY 25-26 Annual Action Plan
S-34 Economic
O
pportunity Strategies
Strategies implemented 1/31/2031 6th Cycle Continuous Consistent with prior-year funding levels, WeeCare was awarded the same amount of funding. Other 0 None
S-34 Economic
Opportunity Strategies Programs funded 1/31/2031 6th Cycle Continuous Services were provided to 168 low- and moderate- income (LMI) childcare service providers. Persons 168 Quarterly Reports N-1 Equitable
Neighborhoods-based
Investment Strategies
Dec 2023:Neighborhood engagement
strategy created 12/31/2023 6th Cycle In Progress
In June 2025, the City Council approved the 2025-
2030 Consolidated Plan for HUD funds, including
Community Development Block Grant funds for
several capital projects in low- and moderate-
income (LMI) neighborhoods. For the existing
Annual Action Plan, eligible uses included $150,000
for sidewalk repairs, $500,000 to support pedestrian
and traffic safety through multi-sensory pedestrian
signal enhancements that are accessible for
disabled residents in six LMI census tracts;
$260,000 for street light improvements, and up to
$1.8 million in improvements in two affordable
housing properties. In addition, $3,000,000 will
support the La Placita Facility Improvement Project
at the School of Arts and Culture at the Mexican
Heritage Plaza, expanding cultural programming,
food access, and job opportunities for residents in
LMI areas. The identified low- and moderate-income
neighborhoods tend to have higher concentrations
of residents by race/ethnicity.

The City's ability to identify race and ethnicity in the use of federal funding was not generally restricted;
however, in 2025, HUD imposed new funding
conditions tied to immigration status verification and
related executive policy directives that would have
affected eligibility for certain federal grants. In
response, the City joined a coalition of jurisdictions
in King County v. Turner, challenging these
conditions as unlawful and beyond the authority of
federal agencies.

Other 0
Council approval of the 2025-2030
Consolidated Plan, including use of CDBG
funds for Community Development
Investments:
https://sanJosé.legistar.com/LegislationDetai
l.aspx?ID=7406217&GUID=2EBB456E-
8B29-4A9B-9A0B-DD81BC4B3801
N-1 Equitable
Neighborhoods-based
Investment Strate
gies
By Mar 2024: Neighborhood engagement
launched 3/31/2024 6th Cycle In Progress See description above for item N-1. Other 0 None N-1 Equitable
Neighborhoods-based
Investment Strate
gies
Aug 2025: Council approves
Neighborhood investment priorities
created in draft Consolidated Plan
8/31/2025 6th Cycle In Progress See description above for item N-1. Other 0 None N-1 Equitable
Neighborhoods-based
Investment Strate
gies
At least 5 place- based improvements to
low-to-moderate resource neighborhoods
during the planning period
1/31/2031 6th Cycle Completed See description above for item N-1. Other 1 None N-1 Equitable
Neighborhoods-based
Investment Strate
gies
$5M in additional funding sought to
support neighborhood investments and
anti- displacement strategies by 2031
1/31/2031 6th Cycle Continuous See description above for item N-1. Other 0 None N-2 Urban Village Plans
with Ant Displacement
Features
2024: Consultant- identified anti-
displacement features for Five Wounds
UV Plan 12/31/2024 6th Cycle In Progress
In 2025, staff continued working with the consultant
but did not identify new anti-displacement strategies
for Urban Village Plans. The Five Wounds UV plan
is currently in the environmental review phase, with
completion estimated for mid-2026.

Other 0 None
N-2 Urban Village Plans
with Ant Displacement
Features
Other UV Plans ongoing beginning in 2025 1/31/2031 6th Cycle In Progress Two urban village plans are currently in
development, and staff will consider inclusion of
strategies to help prevent the displacement of small
businesses and residents.

Other 0 None
N-3 Vacant and Neglected
Buildings and Storefront
Program
# buildings monitored 1/31/2031 6th Cycle Continuous
The Vacant and Neglected Building and Storefronts
program is currently supported by one full-time
inspector and one Limited-Dated (LD) inspector
position. The LD position focuses on enhanced
enforcement efforts within the downtown to address
the most chronically vacant and blighted buildings,
as well as other occupied, blighted, and nuisance
properties. Staff also launched the
interdepartmental Downtown Vacant Building and
Storefront Working Group to coordinate strategies
to improve prevention, intervention, and resolution
outcomes.

In CY 2025, 214 vacant properties and/or
storefronts are being monitored. 62 vacant
properties/storefronts are being monitored by the
LD inspector. 152 vacant properties/storefronts are
being monitored by the full-time citywide inspector.

Other 214 None
N-3 Vacant and Neglected
Buildings and Storefront
Program
# buildings cited 1/31/2031 6th Cycle Continuous
The Vacant and Neglected Building and Storefronts
program is currently supported by one full-time
inspector and one Limited-Dated (LD) inspector
position. The LD position focuses on enhanced
enforcement efforts within the downtown to address
the most chronically vacant and blighted buildings,
as well as other occupied, blighted, and nuisance
properties. Staff also launched the
interdepartmental Downtown Vacant Building and
Storefront Working Group to coordinate strategies
to improve prevention, intervention, and resolution
outcomes.

In CY 2025, a total of 129 citations were issued. 94
citations were issued by the full-time inspector, and
another 35 by the LD enhanced inspector.

Other 129 None
N-3 Vacant and Neglected
Buildings and Storefront
Program
# cases resolved 1/31/2031 6th Cycle Continuous
The Vacant and Neglected Building and Storefronts
program is currently supported by one full-time
inspector and one Limited-Dated (LD) inspector
position. The LD position focuses on enhanced
enforcement efforts within the downtown to address
the most chronically vacant and blighted buildings,
as well as other occupied, blighted, and nuisance
properties. Staff also launched the
interdepartmental Downtown Vacant Building and
Storefront Working Group to coordinate strategies
to improve prevention, intervention, and resolution
outcomes.

The LD enhanced inspector resolved 63 cases, and
the full-time inspector resolved 57 cases city-wide;
for a total of 120 cases resolved in CY 2025.

Other 120 None
N-4 Preservation and
Community Development
Capacity Building
By Dec 2024: $1M total in capacity-
building grants awarded to 3 or 4
organizations
12/31/2024 6th Cycle Continuous
The Housing Department entered into agreements
with 4 nonprofit service providers from July and
August 2024 through 2026 to deliver capacity-
building support focused on strengthening housing
preservation activities. The service providers
include South Bay Community Land Trust, Sacred
Heart Community Service, SOMOS Mayfair, Inc.,
and the School of Arts and Culture at Mexican
Heritage Plaza (SOAC).

These activities are funded by one-time Community
Benefits Agreement funds from Google’s Downtown
West development. As part of the agreements, 3 of
the 4 organizations included activities and outcome
measures to assess the feasibility of becoming a
Community Development Corporation (CDC), and
all 4 established goals to develop housing
strategies aligned with the City’s Housing
Preservation Workplan.

In 2025, Sacred Heart Community Service and
SOAC presented feasibility reports to City staff
evaluating their potential transition to CDC status.

SOAC intends to advance the La Placita project
through a three-phase development approach, with
Phase 3 focused on creating affordable housing for
low- and moderate-income households. Sacred
Heart Community Service, in partnership with Alta
Housing, implemented a CDC capacity-building
initiative that included community outreach, staff
and resident trainings on affordable housing and
CDC models
, and research and evaluation of
Other 1255000 Unable to post links. Grants team can
provide presentations, if needed.

N-5 Increase Affordable
Housing Production in
Higher-resource Areas
Jul 2026: 35% of funds for new
construction of affordable housing
awarded in high-opportunity areas within
the 5-year period starting July 2021
7/31/2026 6th Cycle Continuous
In 2025, a New Construction and Preservation
Request for Proposals was released. This RFP
incorporates the City's Siting Policy by awarding
additional points for developments located within
Affordable Housing Expansion Areas.

Other 9
https://sanJoséca.sharepoint.com/:b:/r/sites/
Housing_ResidentialDevelopment_Productio
nandPreservation/Production/NOFAs/Over%
20the%20Counter%20NOFA/Documents%2
0for%20Publication/Rolling%20RFP%20Fina
l%20Clean%20v2.pdf?csf=1&web=1&e=NuT
5T
q
N-5 Increase Affordable
Housing Production in
Hi
gher-resource Areas
Dec 2027: Complete evaluation of Siting
Policy and present to City Council 12/31/2027 6th Cycle Not yet started An update to the Siting Policy is forthcoming and will add new data to the City's Siting Policy map. Other 0 https://belonging.berkeley.edu/sjc-siting- policy-map
N-5 Increase Affordable
Housing Production in
Hi
gher-resource Areas
# residents in # affordable units in higher-
opportunity areas 12/31/2027 6th Cycle Continuous
Dry Creek Crossing, located in an Affordable
Housing Expansion Area, began leasing up its 64
homes in 2025.

Households 64 None
N-6 Reduced Transit
Fares for Lower-Income
Residents
Advocacy meetings and letters 1/31/2031 6th Cycle Continuous The City is a member of a regional transit task force
that is implementing region-wide passes and
rationalizing fare structures. Furthermore, the City
continues to work with the Valley Transportation
Authority (VTA) to implement its discount dates
program for those who already receive public
assistance. Staff will work with the Office of
Intergovernmental Relations will explore any future
possible avenues of funding that can subsidize
these reduced transit fares.

Other 0 None
N-6 Reduced Transit
Fares for Lower-Income
Residents
federal funds obtained for fare reductions 1/31/2031 6th Cy cle Continuous See description above for item N-6. Other 0 None N-7 External Infrastructure
Funding to Create
Complete, High-quality
Living Environments
Jun 2024: Implement pilot project funded
by at least $2M in CDBG for prioritizing
R/ECAPs and other historically disinvested
neighborhoods
6/30/2024 6th Cycle Continuous
In fiscal year 2025–2026, the Housing Department
funded 4 new Community Development Investment
(CDI) construction projects for City departments
using CDBG funds, including the Department of
Transportation and Public Works. In addition, 3
infrastructure improvement projects funded in fiscal
year 2023–2024 remain ongoing. The FY
2025–2026 CDBG-funded transportation projects
prioritize pedestrian safety, accessibility, and
neighborhood infrastructure in low- and moderate-
income areas through improvements such as
accessible pedestrian signal installations, curb
extensions and reconfigured crossings, targeted
street lighting upgrades, and sidewalk repairs.

Collectively, these investments enhance mobility
and safety while advancing equitable infrastructure
improvements in historically underserved
neighborhoods. Environmental (NEPA) clearance
has been approved for most projects, with the
remaining clearances currently in progress. MOUs
are established between Housing and the
department for each project, including the scope of
work construction timelines and budget
Other 0 MOUs can be provided by the Grants team,
if needed
N-7 External Infrastructure
Funding to Create
Complete, High-quality
Living Environments
Dec 2024: Plan with goals/metrics and
timeline developed in 2024 12/31/2024 6th Cycle Continuous In fiscal year 2025–2026, the Housing Department
funded 4 new Community Development Investment
(CDI) construction projects for City departments
using CDBG funds, including the Department of
Transportation and Public Works. In addition, 3
infrastructure improvement projects funded in fiscal
year 2023–2024 remain ongoing. The FY
2025–2026 CDBG-funded transportation projects
prioritize pedestrian safety, accessibility, and
neighborhood infrastructure in low- and moderate-
income areas through improvements such as
accessible pedestrian signal installations, curb
extensions and reconfigured crossings, targeted
street lighting upgrades, and sidewalk repairs.

Collectively, these investments enhance mobility
and safety while advancing equitable infrastructure
improvements in historically underserved
neighborhoods. Environmental (NEPA) clearance
has been approved for most projects, with the
remaining clearances currently in progress. MOUs
are established between Housing and the
department for each project, including the scope of
work construction timelines and budget
Other 7 MOUs can be provided by the Grants team,
if needed
N-8 Outside Bond Issuers Analysis done 12/31/2025 6th Cycle Completed The department ran an analysis over time from a
number of outside bond issuance projects. The City
has assessed the restrictions on outside issuers,
like CMFA's regulatory agreements vs the City's
affordability restrictions. in 2025, our bond poilicy
was amended to allow outside bond issuances for
tax credit projects, without getting a council
approval, i.e. an exception to the policy. We added
a requirement that the City will require to be a co-
adminintrator on such regulatory agreement in order
to have city monitoring rights on these affordable
housing properties. This has resulted in improved
staff capacity and workload. We also studied the
bond issuance and monitoring fees with CMFA vs
the City. Another bond policy revision will be taken
to Council 2nd quarter of 2026.

Other 1 None
N-8 Outside Bond Issuers Council request for change to policy (if warranted) 12/31/2025 6th Cycle Completed
In April 2025, the City Council, jointly with the
Finance Department, approved a modification to the
City's Bond Policy that allows outside bond issuers.

Other 1 None
N-9 Affordable Transit-
oriented Development
8 parcels purchased 1/31/2031 6th Cycle Continuous
In 2025, the Housing Department awarded $9.9M in
commitments to one new construction affordable
housing development that received an HCD AHSC
funding commitment. The development will provide
193 new affordable homes located near the
Berryessa BART Station and is projected to start
construction earl
y Summer 2026.

Other 0 https://sanJosé.legistar.com/gateway.aspx?
m=l&id=/matter.aspx?key=14565
N-9 Affordable Transit-
oriented Development 1,200 projected affordable units assisted 1/31/2031 6th Cycle Continuous In 2025, the Housing Department awarded $9.9M in
commitments to one new construction affordable
housing development that received an HCD AHSC
funding commitment. The development will provide
195 new affordable homes located near the
Berryessa BART Station and is projected to start
construction earl
y Summer 2026.

Units 329 https://sanJosé.legistar.com/gateway.aspx?
m=l&id=/matter.aspx?key=14565
I-1 Persons with
Disabilities Partnership
and Priorities
# Meetings held 1/31/2031 6th Cycle In Progress
In 2025, two key staff members were on leave and
unavailable to convene meetings with disability
partners; however, the City's 2025 competitive
NOFA awarded points for units with disability
access. Staff plans to reconnect with partners in
2026 and to consider using The Kelsey's resources
as best practices.

Meetings 0
The Kelsey's Learn Center:
https://thekelsey.org/learn-center/
The Kelsey's citation by the Urban Land
Institute for its trauma-informed best
practices:
https://www.urban.org/apps/trauma-informed
-
housing/kelsey
2025 Rolling RFP/NOFA under the link
below: (will need to register in Biddingo to
access document)
https://www.sanjoseca.gov/your-
government/departments-
offices/housing/developers/notice-of-funding-
availability
I-1 Persons with
Disabilities Partnership
and Priorities
2025: Tours conducted 12/31/2025 6th Cycle In Progres s See description above for item I-1. Other 0 None I-1 Persons with
Disabilities Partnership
and Priorities
Changes to NOFAs' affordable housing
development requirements 1/31/2031 6th Cycle In Progress See description above for item I-1. Other 0 None I-1 Persons with
Disabilities Partnership
and Priorities
2026: Release lessons learned publication
and incorporate some or all of the
strategies recommended from the report
durin
g the planning period.
12/31/2026 6th Cycle In Progress See description above for item I-1. Other 0 None I-2 Affirmative Marketing
to Persons with
Disabilities
Annually 2023-2031: measure review of
affirmative marketing plans 1/31/2031 6th Cycle In Progress Progress on this item has been on hold since the
key staff member who led work on this strategy has
been on extended leave. They are expected to
return in S
pring 2026 to continue the work.

Other 0 None
I-2 Affirmative Marketing
to Persons with
Disabilities
Sep 2024: Gather best practices 9/30/2024 6th Cycle In Progress See description above for item I-2. Other 0 None I-2 Affirmative Marketing
to Persons with
Disabilities
Jul 2025: Implement changes on
affirmative marketing plan requirements &
reasonable accommodation request forms
7/31/2025 6th Cycle In Progress See description above for item I-2. Other 0 None I-2 Affirmative Marketing
to Persons with
Disabilities
Goal: 95% compliance by 3 years after
rollout 7/31/2028 6th Cycle In Progress See description above for item I-2. Other 0 None I-2 Affirmative Marketing
to Persons with
Disabilities
Sep 2025: Hold stakeholder meetings 9/30/2025 6th Cycle In Progress See description above for item I-2. Meetings 0 None I-2 Affirmative Marketing
to Persons with
Disabilities
Sep 2026: Issue best practices / create a
library of materials 9/30/2026 6th Cycle In Progress See description above for item I-2. Other 0 None I-3 Farmworker Housing Council approval of zoning code update 12/31/2024 6th Cycle C ompleted This item was completed in 2023. Other 1 None I-4 Create a Housing
Balance Report
By Dec 2025: First report presented to City
Council 12/31/2025 6th Cycle Completed
On May 19, 2025, the City Council's Community
and Economic Development Committee approved
the City's first Housing Balance Report. The Report
analyzed market-rate, rent-stabilized, and restricted
affordable multifamily rental housing stock,
identified the housing's characteristics (location and
depth of affordability), and noted the importance of
preserving existing affordable housing.

Other 1 None
I-5 Accessibility Plans and
Guidance
Plan set created and posted 12/31/2027 6th Cycle Not yet started Significant work on this item has not yet commenced, as it is a medium-term goal. Other 0 none
I-5 Accessibility Plans and
Guidance Pathways guidelines created and released 12/31/2027 6th Cycle Not yet started Significant work on this item has not yet commenced, as it is a medium-term goal. Other 0 none
I-6 Universal Design and
ADA Upgrades
By 2031: At least 50% of annual NOFAs
issued incentivize units for residents with
disabilities 1/31/2031 6th Cycle Continuous
In 2025, sta
ff released a New Construction and
Preservation Request for Proposals. This RFP
includes a points structure that incentivizes special
needs housing, including individuals with
disabilities, and awards additional points for
developments that provide increased access for
people with disabilities, and participate in design
meetings with the disabled community. Four of the
six conditionally awarded applicants from the 2025
rolling RFP received additional bonus points for
providing inclusive design workshop plans and/or
other increased access.

Other 0
https://sanJoséca.sharepoint.com/:b:/r/sites/
Housing_ResidentialDevelopment_Productio
nandPreservation/Production/NOFAs/Over%
20the%20Counter%20NOFA/Documents%2
0for%20Publication/Rolling%20RFP%20Fina
l%20Clean%20v2.pdf?csf=1&web=1&e=NuT
5Tq
I-6 Universal Design and
ADA Upgrades
By 2031: City funds committed to 150 units
with enhanced accessibility per TCAC
guidelines
1/31/2031 6th Cycle Continuous
Through the 2025 New Construction and
Preservation RFP, awarded projects that committed
to and scored points for increased access for
people with disabilities and inclusive design include
6 projects and 688 units in total, totaling 680
affordable units.

Trillium Seniors (64 aff + 1 mgr units)
Berryessa TOD (193+2 units)
East Santa Clara Seniors (67+1 units)
501 Almaden (98+1 units)
VTA Capitol Station (201+2 units)
1510 N 1st St rehab (57+1 units)
Through the 2023 New Construction NOFA,
awarded projects that committed to and scored
points for increased access for people with
disabilities and inclusive design include 2 projects
and 152 units total, or 149 affordable units.

Hawthorn Senior Apartments (101 aff +2 mgr units)
Santa Teresa Multifamily (48+1 units)
Other 840 None
I-7 Inclusive and Equitable
Community Engagement Community engagement strategies drafted 12/31/2026 6th Cycle In Progress Staff began initial work in early 2025 to update
Council Policy 6-30, its public outreach policy. Staff
anticipates reengaging in this work beginning in
Summer 2026.

Other 0 None
I-7 Inclusive and Equitable
Community Engagement
City Auditor's recommendations on
outreach closed 12/31/2026 6th Cycle In Progress See description above for item I-7. Other 0 None I-7 Inclusive and Equitable
Community Engagement
Amended outreach policy drafted and
adopted by Council 12/31/2026 6th Cycle In Progress See description above for item I-7. Other 0 None I-7 Inclusive and Equitable
Community Engagement
Revised Language Access plan for
Housing 12/31/2026 6th Cycle In Progress See description above for item I-7. Other 0 None I-7 Inclusive and Equitable
Community Engagement Revised outreach procedures for PBCE 12/31/2026 6th Cycle In Progress See description above for item I-7. Other 0 None I-7 Inclusive and Equitable
Community Engagement
Budget for CBO- based outreach
increased 12/31/2026 6th Cycle In Progress See description above for item I-7. Other 0 None I-8 Promotores-based
outreach # promotores contracts per year 1/31/2031 6th Cycle Completed Unfortunately, the City Council was unable to
include funding for a citywide Promotores contract
in the 2025-2026 budget to assist City staff in
conductin
g equitable outreach.

Other 0 None
I-8 Promotores-based
outreach # community engagements 1/31/2031 6th Cycle Completed See description above for item I-8. Other 0 None I-8 Promotores-based
outreach Budget spent per year 1/31/2031 6th Cycle Complet ed See description above for item I-8. Other 0 None I-8 Promotores-based
outreach # residents reached in priority areas 1/31/2031 6th Cycle Completed See description above for item I-8. Persons 0 None I-9 Equitable
Representation of
Historically
Underrepresented
Communities on City
Bodies
2026: Guidelines developed 12/31/2026 6th Cycle In Progress The Housing and Community Development
Commission continues to have several seats for
representatives of historically underrepresented
populations: those with lived experience in
homelessness (a commissioner and an alternate);
at least two commissioners identify within the
LGBTQIA+ community, at least one rent-stabilized
apartment renter; at least one mobilehome park
resident; and a total of at least 5 members who
represent lower-income households. In addition,
stipends paid to lower-income commissioners on all
commissions are available. Broader work regarding
analyzing memberships on other commissions or
developing guidelines has not yet started.

Other 0
SJ Municipal Code on HCDC membership
requirements:
https://library.municode.com/ca/san_José/co
des/code_of_ordinances?nodeId=TIT2AD_C
H2.08BOBUCO_PT28HOCODECO_2.08.28
20SPELRE
I-9 Equitable
Representation of
Historically
Underrepresented
Communities on City
Bodies
2027: Council approval of municipal code
updates 12/31/2027 6th Cycle Not yet started See description above for item I-9. Other 0 None I-9 Equitable
Representation of
Historically
Underrepresented
Communities on City
Bodies
# of protected class members and those
with lived experience of housing insecurity
added to commissions and/or advisory
boards
12/31/2028 6th Cycle In Progress See description above for item I-9. Persons 5 None I-10 Lived Experience with
Homelessness Seat on
Commission
Feb 2023: Seats filled 2/ 28/2023 6th Cycle Completed
The work item was completed in 2023 and reported
in the City's Consolidated Annual Homelessness
Report and the Annual Implementation Plan
Update. Staff continues to provide training and
support as necessary. Regular check-ins are held
with the Lived Experience Commissioner and
Alternate. Both lived experience commissioners
continue to actively participate in the commission.

Other 1 None
I-10 Lived Experience with
Homelessness Seat on
Commission
Feb 2023: Orientation and training
provided, compensation provided 2/28/2023 6th Cycle Continuous See description above for I-10. Other 1 None I-10 Lived Experience with
Homelessness Seat on
Commission
Feb 2024: Evaluation conducted 2/29/2024 6th Cycle C ompleted See description above for I-10. Other 1 None I-10 Lived Experience with
Homelessness Seat on
Commission
Jul 2025 to Jul 2026: Additional
improvements made, as appropriate 7/31/2026 6th Cycle Completed See description above for I-10. Other 1 None I-11 Representation of and
priority for protected
class members on City
bodies
Combined with I-9 6th Cycle None
I-12 Resident-identified
Priorities Jul 2025: Survey designed & released 7/31/2025 6th Cycle In Progress Due to staff vacancies, City Council's direction to
focus staff activities on their identified Focus Areas, and the discontinuation of the City's Open House
meetings, the citywide resident survey was
deprioritized for 2025 and moved to a later stage of
the
planning period.

Other 0 None
I-12 Resident-identified
Priorities
Jul 2025: Work with Open House and
other stakeholders to increase survey
res
ponse rate
7/31/2025 6th Cycle In Progress See description above for I-12. Other 0 None I-12 Resident-identified
Priorities
Jul 2025 to Jul 2026: Survey responses
analyzed 7/31/2026 6th Cycle In Progress See description above for I-12. Other 0 None I-12 Resident-identified
Priorities
Jul 2026: Resulting changes proposed to
City programs and efforts; release
Information Memo
7/31/2026 6th Cycle In Progress See description above for I-12. Other 0 None I-13 Equity-focused
Metrics Strategy removed 6th Cycle None
I-14 Assessment of Fair
Housing Plan Sep 2024: Completion of draft Plan 9/30/2024 6th Cycle Completed Production of a final Assessment of Fair Housing
was deemed complete in 2024 through the
incorporation of a fair housing assessment and
strategies into the Housing Element. HUD's
proposed AFH framework from the Biden
administration was never codified and did not move
forward under the current federal administration.

Other 1 None
I-14 Assessment of Fair
Housin
g Plan Oct 2024: Adoption by Council 10/30/2024 6th Cycle C ompleted See description above for I-14. Other 1 None I-14 Assessment of Fair
Housing Plan Oct 2024: Submission to HUD 10/30/2024 6th Cycle Completed See description above for I-14. Other 1 None I-15 Housing Catalyst
Team Work Plan
Fall 2023: First workplan brought to council
for approval. 11/30/2023 6th Cycle Completed
On February 25, 2025, staff presented the most
recent Housing Catalyst Work Plan report to the
Community and Economic Development
Committee, and then to the City Council on March
18, 2025, concurrent with the Housing
Element Annual Pro
gress Report.

Other 1
https://sanjose.legistar.com/View.ashx?M=F
&ID=13903147&GUID=6C7DC747-9F6D-
43D0-BF6E-2E55E91E9CC2
I-15 Housing Catalyst
Team Work Plan
Spring 2024 and annually: Progress
update to Council 5/31/2024 6th Cycle Continuous
On February 25, 2025, staff presented the most
recent Housing Catalyst Work Plan report to the
Community and Economic Development
Committee, and then to the City Council on March
18, 2025, concurrent with the Housing Element
Annual Progress Report.

Other 1
https://sanjose.legistar.com/View.ashx?M=F
&ID=13903147&GUID=6C7DC747-9F6D-
43D0-BF6E-2E55E91E9CC2
I-15 Housing Catalyst
Team Work Plan Jun 2024: Webpage created 6/30/2024 6th Cycle Continuous The Housing Catalyst webpage is a hub for links to
the City's latest housing data (Housing Data
Dashboard) and information on permitting and
incentives.

Other 1
Housing Catalyst webpage URL:
https://www.sanjoseca.gov/your-
government/departments-offices/planning-
building-code-enforcement/planning-
division/cit
ywide-planning/housing-catalyst
I-16 Advocacy to Close the
Racial Homeownership
Gap
Support letters issued 1/31/2031 6th Cycle Continuous
In 2025, staff followed news from the state and
federal governments on racially conscious
programs. The federal government's strict stance
on this issue indicates this strategy is highly unlikely to proceed at the federal level. The Governor
vetoed 2025 state legislation on reparations funding
but signed other state legislation to create
organizational and knowledge infrastructure for
future reparations work. Staff and the City
Attorney's Office will continue to track progress that
could support future work to close racial
homeownership gaps in San José and will seek
advocacy opportunities as appropriate.

Other 0 None
I-16 Advocacy to Close the
Racial Homeownership
Ga
p
Advocacy meetings held 1/31/2031 6th Cycle Continuous See description above for I-16. Meetings 0 None I-17 Collaborative
Solutions to Address
Housing Needs
Collaborative initiatives 1/31/2031 6th Cycle Continuous For 2025, Housing and Planning staff continued to
regularly attend meetings with the outlined
stakeholders multiple times over the year, including,
but not limited to, the Big 3 Cities housing groups,
ABAG/MTC working groups, the Santa Clara
County Planning Collaborative, California Housing
Consortium Statewide Policy Committee, NPH
Legislative Working Group, and CDBG
Coordinators county-wide group. IGR staff regularly
meet with the League of California Cities, the Big
City Mayors Coalition, the U.S. Conference of
Mayors, the National League of Cities, and the
Countywide Legislators Coalition to advance the
City's housing priorities.

Other 1 None
I-18 Advocacy on Public
Policies and Programs to
Facilitate Production,
Preservation, Protection,
and Neighborhood
Investments
Support letters 1/31/2031 6th Cycle Continuous
Five letters in support of bills that encourage the
City's Housing Goals were submitted to the State
legislature.

Other 1 None
I-18 Advocacy on Public
Policies and Programs to
Facilitate Production,
Preservation, Protection,
and Neighborhood
Investments
Working group participation 1/31/2031 6th Cycle Continuous For 2025, Housing and Planning staff continued to
regularly attend meetings with the outlined
stakeholders multiple times over the year, including,
but not limited to, the Big 3 Cities housing groups,
ABAG/MTC working groups, the Santa Clara
County Planning Collaborative, California Housing
Consortium Statewide Policy Committee, NPH
Legislative Working Group, and CDBG
Coordinators county-wide group. IGR staff regularly
meet with the League of California Cities, the Big
City Mayors Coalition, the U.S. Conference of
Mayors, the National League of Cities, and the
Countywide Legislators Coalition to advance the
City's housing priorities.

Other 1 None
I-19 Reasonable
Accommodation
Council approval of ordinance. 12/31/2025 6th Cycle In Progress In 2025, Citywide Planning staff, in consultation with
the City Attorney's Office, refined the draft revisions to the City’s Reasonable Accommodation Request
ordinance to align it with the state’s model
ordinance. Among the changes are simplifying the
required findings and reducing the application fee by
a significant amount. Two public outreach events
are being planned for spring 2026, including a focus
group with organizations representing individuals
with disabilities. The target date for City Council
approval is 2026.

Other 0 None
I-19 Reasonable
Accommodation 2 outreach meetings conducted 12/31/2025 6th Cycle In Progress The two outreach meetings will take place in spring 2026. Meetings 0 None

Jurisdiction San Jose ANNUAL ELEMENT PROGRESS REPORT
Reporting
Period 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning 6th Cycle 01/31/2023 - 01/31/2031
Description of
Commercial
Development Bonus
Commercial Development Bonus
Date Approved
3 4
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Very Low
Income
Low
Income
Moderate
Income
Above Moderate
Income
Description of
Commercial
Development Bonus
Commercial Development Bonus
Date Approved
Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7 Table E
Note: "+" indicates an optional field
Project Identifier
1 2
Cells in grey contain auto-calculation
formulas
(CCR Title 25 §6202)
Annual Progress Report January 2020
ATTACHMENT B: San José Housing Element Annual Progress Report for CY 2025 (Tables A-J)

Page 64 ends
← All documents from this meeting