TO: HONORABLE MAYOR

AND CITY COUNCIL
FROM: John Ristow
Matt Loesch
SUBJECT: See Below DATE: March 16, 2026
Approved Date:
3/17/26
CO
UNCIL DISTRICT: Citywide
S
UBJECT: Report on Bids and Award of Contract for the 10626 – 2026 Local Streets Remove and Replace Pavement Project
RE

COMMENDATION
(a
) Report on bids and award of contract for the 10626 – 2026 Local Streets Remove and Replace Pavement Project, to the lowest responsive, responsible bidder, G. Bortolotto & Company, Inc., in the amount of $2,601,480; and (b) Approve a 10% contingency in the amount of $260,148.

S

UMMARY AND OUTCOME
A
ward of the contract to G. Bortolotto & Company, Inc. enables the construction of the 10626 – 2026 Local Streets Remove and Replace Pavement Project (Project), which will provide needed asphalt concrete pavement repairs along 50 miles of the Local and Neighborhood Streets Network to be sealed in the 2026 construction season. Approval of the 10% contingency provides funding for any unanticipated work necessary for the proper completion or construction of the Project.

BACKG
ROUND
T
he Department of Transportation (DOT) will maintain approximately 201 miles of roadway during the 2026 construction season. As part of this effort, staff plans to seal 50 miles along the Local and Neighborhood Streets Network to extend pavement life and improve overall roadway conditions.

P
avement maintenance is typically performed in two separate phases: preparation and a final surface application. The preparation phase consists of the installation or upgrade of Americans with Disabilities Act-compliant (ADA) curb ramps and the removal and replacement of failed asphalt pavement. The ADA work is conducted in advance using COUNCIL AGENDA: 4/7/26
FILE: 26-346
ITEM: 2.9

HONORABLE MAYOR AND CITY COUNCIL
March 16, 2026
Subject: Report on Bids and Award of Contract for the 10626 – 2026 Local Streets Remove and Replace Pavement Project

Page 2 ends

minor contracts to provide more job opportunities for local and small businesses.

Streets to be sealed will also require the removal and replacement of any structurally failed areas of pavement prior to the final surface application phase. The final sealing application provides a thin layer of asphalt emulsion blended with rock approximately 3/8 of an inch in thickness to the pavement.

T
he City’s Local and Neighborhood Streets Network is organized into 135 geographically contiguous Pavement Maintenance Zones. The Pavement Maintenance Zones were established several decades ago to support efficient planning and delivery of paving projects, maximize the amount of paving work completed at one time within a neighborhood area, and provide geographic spread of pavement maintenance across San José.

D
OT utilizes a pavement management system to collect and store roadway condition data. This data is then used to generate a candidate list of streets to be considered for the annual pavement maintenance program. The candidate list is thoroughly analyzed by staff using the following criteria to create the final list of streets:
• F
unding availability and funding use restrictions;
• Streets on the Local Street Network;
• Streets not affected by current or future street-related projects; • Maintenance history and prescribed treatment schedules; • Streets associated with planned safety, bikeway, or other “complete streets” projects;
• Community and City Council Office feedback regarding roadway conditions and priority street segments;
• Relative location of street segments to create multiple, continuous segments, consistency within neighborhoods, and project efficiency; and • Multi-year geographic spread across the San José and street network.

D
OT staff cross-referenced the selected zones with census tracts designated by the Metropolitan Transportation Commission as “Equity Priority Communities” (EPCs), formerly known as “Communities of Concern,” to better track equity in service delivery.

Results confirmed that 256 out of 266 miles (roughly 96%) of local and neighborhood streets designated in EPC areas will be maintained by the end of the current three-year plan (2028). DOT anticipates completing pavement maintenance for nearly 91% of the local street network in this same timeframe.

D
OT has maintained a total of 228 EPC miles since 2019 and will be maintaining an additional 8.17 EPC miles in 2026, which is about 9% of the 94 miles of local and neighborhood streets selected for maintenance in 2026. This project includes 2.46 EPC miles, which is about 5% of the anticipated 50 sealing miles.

HONORABLE MAYOR AND CITY COUNCIL
March 16, 2026
Subject: Report on Bids and Award of Contract for the 10626 – 2026 Local Streets Remove and Replace Pavement Project

Page 3 ends

The attachment to this memorandum contains the list of streets to be sealed as part of this Project. The list may change if unforeseen circumstances arise or new information regarding other projects becomes available. Construction is scheduled to begin in May 2026 with a substantial completion in August 2026.

ANAL
YSIS
B
ids were opened on February 19, 2026, with the following results:

C
ontractor Bid Amount Variance
Amount
Over/(Under)
Percent
G. Bortolotto & Company, Inc.
(San Carlos) $2,601,480 -$801,520 (24%)
O'Grady Paving, Inc.
(Mountain View) $3,076,800 -$326,200 (10%)
Radius Earthwork, Inc.
(Campbell) $3,132,185 -$270,815 (8%)
Rapid Grading Services
(Hayward)
(non-responsive)
$3,147,630 -$255,370 (8%)
Wattis Construction Co., Inc.
(San José)
(non-responsive)
$3,318,140 -$84,860 (2%)
Engineer’s Estimate $3,403,000 -- --
T
he bids from Rapid Grading Services and Wattis Construction Co., Inc. were deemed non-responsive for failing to meet the City’s experience requirements.

T
he lowest bid, submitted by G. Bortolotto & Company, Inc., is 24% below the Engineer’s Estimate. The estimate is based on bids received from similar past projects and most current estimated construction prices. The bid is considered acceptable for the work involved in the Project. One potential reason bids came in lower than the Engineer’s Estimate is due to the timing of when the Project was advertised. This Project was advertised earlier in the year compared to the 2025 contract, which was advertised later in the calendar year, closer to when contractors were into their construction season. This earlier advertisement led to a higher number of bid submissions and more competitive pricing, as many contractors had not yet committed to other projects and still had available capacity.

HONORABLE MAYOR AND CITY COUNCIL
March 16, 2026
Subject: Report on Bids and Award of Contract for the 10626 – 2026 Local Streets Remove and Replace Pavement Project

Page 4 ends

G. Bortolotto & Company, Inc. has prior experience in successfully delivering multiple pavement projects for the City of San José. Most recently, G. Bortolotto & Company, Inc. performed removal of failed pavement areas on approximately 36 miles of arterial streets during the 2025 construction season on the 10507 – 2025 Major Streets Remove and Replace Project. Previously, the contractor completed similar work on approximately 48 miles of arterial streets during the 2023 construction season on the 10246 – 2023 Major Streets Remove and Replace Project.

C
ontingency
S
an José Municipal Code Section 27.04.050 provides for a standard contingency of 10% on all public works contracts except those involving the renovation of building or buildings. The standard 10% contingency is appropriate for this Project.

W
age Theft Prevention Policy Check
T
he Office of Equality Assurance reviewed bidders for compliance with the City’s Wage Theft Prevention Policy on February 19, 2026, and again on March 4, 2026. No wage theft issues were identified.

P
roject Labor Agreement Applicability
T
he City’s Project Labor Agreement is applicable to this project because the Engineer’s Estimate is over $730,000.

Loc
al and Small Business Analysis
T
he recommended contractor is not a Local Business Enterprise nor a Small Business Enterprise. No local companies were listed as subcontractors.

E

VALUATION AND FOLLOW-UP
D
OT provides an ongoing evaluation of the City’s pavement conditions and provides periodic reports on this topic to the Transportation and Environment Committee. In addition to the Project discussed in this memorandum, four additional major streets and three additional local and neighborhood streets pavement maintenance projects are scheduled for City Council action this spring.

F

ISCAL IMPACTS
T
hese projects support the Transportation and Aviation Services City Service Area’s goal to Preserve and Improve Transportation Assets and Facilities. By performing pavement maintenance, the extension of the useful life of the Project streets will delay the need for more costly reconstruction. The source of funding for these Projects is

HONORABLE MAYOR AND CITY COUNCIL
March 16, 2026
Subject: Report on Bids and Award of Contract for the 10626 – 2026 Local Streets Remove and Replace Pavement Project

Page 5 ends

through the 486 – VTA Measure B 2016 (Complete Streets - use for residential) fund.

These projects will have a net zero impact to the General Fund as the standard in- house operating and maintenance costs are already included in DOT's annual budget.

1. TOTAL COST OF PROJECT:

Programmatic Project Delivery Estimate $ 330,500
Construction 2,601,480
Contingency (10%) 260,148
TOTAL PROJECT COSTS $3,192,128

2. COST ELEMENTS OF CONTRACT AS RECOMMENDED AS PART OF THE MEMORANDUM:

Materials and Placement $2,196,130
Utility Adjustment 91,000
Pavement Striping & Markings 224,350
Other Construction Cost 90,000
TOTAL CONTRACT AMOUNT $2,601,480
BUDG

ET REFERENCE
T
he table below identifies the fund and appropriations to fund the contract recommended as part of this memorandum and remaining project costs, including project delivery, construction, and contingency costs.

Fund
#
Appn.
#
Appropriation
Name
Total
Appropriation
Amount for
Contract
2025-2027
Adopted Biennial
Capital Budget
Page
Last Budget
Action
(Date, Ord.

No.)
486 403Q
Pavement
Maintenance – VTA
2016 Measure B
$35,734,000 $2,601,480 1008 10/21/25
31252
Total Current Funding Available $35,734,000 $2,601,480
CO

ORDINATION
T
his memorandum has been coordinated with the City Attorney’s Office, the City Manager’s Budget Office, and the Planning, Building, and Code Enforcement Department.

HONORABLE MAYOR AND CITY COUNCIL
March 16, 2026
Subject: Report on Bids and Award of Contract for the 10626 – 2026 Local Streets Remove and Replace Pavement Project

Page 6 ends

PUBLIC OUTREACH
This memorandum will be posted on the City Council Agenda website for the April 7, 2026 City Cou nc il meeting.

When the Project commences, the contractor will provide advance notification regarding pr
oject working hour s, duration, a nd any appropriate schedule and lane closures to affected businesses and residents, as stated in the specifications. To inform traveling m
otorists of upcoming construction activities and potential traffic delays, changeable message signs may be used on selected streets stating the scheduled date and time for work to occur on the street.

BOARD, COMMISSION, COMMITTEE RECOMMENDATION AND INPUT
No board, commission, or committee recommendation or input is associated with this action.

CEQA
Categorically
Exempt, File No. ER24‐313, CEQA Guidelines Section 15301(c), Existing Fa
cilities.

P

UBLIC SUBSIDY REPORTING
This item does not include a public subsidy as defined in section 53083 or 53083.1 of the California Government Code or the City’s Open Government Resolution. /s/ /s/
MAT

T LOESCH JOHN RISTOW
Director of Public Works Director of Transportation For questions, please contact Jennifer Seguin, Deputy Director, Department of Transportation, at [email protected] or Katherine Brown, Assistant Director of Public Works, Public Works Department at [email protected].

ATTACHMENT: List of Streets

ATTACHMENT

Page 1 of 9 ends

List of Streets
CD Street Name Street From Street To
1 DOYLE CT DOYLE RD S END
1 BLUE RIDGE DR TERESITA DR PRISCILLA DR
1 BLUE RIDGE DR PRISCILLA DR BURKETTE DR
1 PRISCILLA DR CLARENDON DR DOYLE RD
1 RHONDA DR HAPPY VALLEY AV BRENTON AV
1 RHONDA DR BRENTON AV TERESITA DR
1 RHONDA DR TERESITA DR OLYMPUS DR
1 HAPPY VALLEY AV EILEEN DR DOYLE RD
1 BURKETTE DR CLARENDON DR DOYLE RD
1 ENGLEWOOD DR BURKETTE DR TERESITA DR
1 HOYET DR HAPPY VALLEY AV CORDELIA AV
1 HOYET DR CORDELIA AV W END
1 COUNTRY LN HAPPY VALLEY AV BRENTON AV
1 OLYMPUS DR COUNTRY LN BELA DR
1 BELA DR OLYMPUS AV TERESITA DR
1 WINDING WY DOYLE RD MARILLA AV
1 MARILLA AV WINDING WY DOYLE RD
1 CLARENDON DR PRISCILLA DR TERESITA DR
2 SOUTHOAKS CT SILVER LEAF RD E END
2 SOUTHSUN CT SILVER LEAF RD E END
2 PALMWELL WY SILVER LEAF RD MONTEREY RD
2 SOUTHPINE DR PALMWELL WY SOUTHVIEW DR
2 SOUTHVIEW DR SILVER LEAF RD TENNANT AV
2 SOUTHLAKE DR SOUTHVIEW DR MONTEREY RD
2 SOUTHMONT CT SOUTHLAKE DR S END
2 SOUTHRIDGE CT SOUTHLAKE DR E END
2 SOUTHOAKS CT SILVER LEAF RD E END
2 SOUTHSUN CT SILVER LEAF RD E END
2 SOUTHVIEW CT SILVER LEAF RD E END
2 BRADWELL CT SILVER LEAF RD E END
2 DUNWELL CT SILVER LEAF RD E END
2 SEAWELL CT SILVER LEAF RD E END
2 PARKWELL CT SILVER LEAF RD E END
2 MEADWELL CT SILVER LEAF RD E END
2 FLINTWELL CT SILVER LEAF RD E END
2 CASSWELL CT SILVER LEAF RD E END
2 CADWELL CT SILVER LEAF RD E END
2 MOSSWELL CT SILVER LEAF RD END
2 ROSEWELL WY SILVER LEAF RD GRANDWELL WY

ATTACHMENT

Page 2 of 9 ends

CD Street Name Street From Street To
2 ROSEWELL CT GRANDWELL WY E END
2 SAGEWELL WY GRANDWELL WY FLINTWELL WY
2 FOXWELL CT SAGEWELL WY W END
2 OLDWELL CT SAGEWELL WY W END
2 LIMEWELL CT SAGEWELL WY W END
2 BARNSWELL WY GRANDWELL WY SAGEWELL WY
2 DEARWELL WY KNOLLWELL WY KNOLLWELL WY
2 LINWELL CT KNOLLWELL WY S END
2 MAYLAND AV FORD RD DEMEREST LN
2 MAYLAND CT MAYLAND AV S END
2 DEMEREST LN FORD RD W END
2 GRANDWELL WY SILVER LEAF RD MONTEREY RD
2 KNOLLWELL WY FLINTWELL WY PALMWELL WY
2 FINCHWELL CT KNOLLWELL WY S END
2 MARSHWELL WY PALMWELL WY SOUTHVIEW DR
2 SOUTHMAR CT MARSHWELL WY N END
2 SOUTHPINE CT SOUTHPINE DR S END
2 TENNANT AV SILVER LEAF RD E END
2 SOUTH GARDEN CT TENNANT AV E END
2 SOUTH SURF CT TENNANT AV S END
2 SOUTH BREEZE CT TENNANT AV E END
2 SOUTHLITE CT TENNANT AV E END
2 SOUTHLAKE CT SOUTHVIEW DR E END
2 SOUTHSEA CT SILVER LEAF RD W END
2 FORDWELL CT DEARWELL WY S END
2 FORSUM RD MONTEREY HY END
2 MENARD DR MONTEREY HY FORSUM RD
2 FORSUM CT FORSUM RD END
2 PRINDIVILLE DR URSHAN WY FORSUM RD
2 PRINDIVILLE CT PRINDIVILLE DR END
2 FELICE CT PRINDIVILLE DR END
2 URSHAN CT URSHAN WY END
2 URSHAN WY MENARD DR FORSUM RD
2 YASUI CT FORSUM RD END
2 SUNSPRING CL FORD RD FORD RD
2 LARISA OAKS PL MONTEREY RD N
2 PINEWELL CT SILVER LEAF RD E END
2 FLINTWELL WY SILVER LEAF RD KNOLLWELL WY
2 FLINTWELL WY KNOLLWELL WY MONTEREY RD
2 TENNANT AV MONTEREY HY SILVER LEAF RD

ATTACHMENT

Page 3 of 9 ends

CD Street Name Street From Street To
2 FLINTWELL WY SILVER LEAF RD KNOLLWELL WY
2 FLINTWELL WY KNOLLWELL WY MONTEREY RD
2 TENNANT AV MONTEREY HY SILVER LEAF RD
3 RIDDER PARK DR S END SCHALLENBERGER RD
3 RIDDER PARK DR S END SCHALLENBERGER RD
4 ATMEL WY ORCHARD PY W END
4 CHESTERTON CR LUNDY AV CHESTERTON CR
4 CAPE ASTON CT CAPE BUFFALO DR E END
4 FANWOOD CT CAPE BUFFALO DR E END
4 CAPE MISTY DR CAPE BUFFALO DR JUNESONG WY
4 JUNESONG WY BERRYESSA RD CAPE CORAL DR
4 COMMODORE DR N JACKSON AV IVY GLEN DR
4 PORT WY N JACKSON AV IVY GLEN DR
4 IVY GLEN DR COMMODORE DR N END
4 CALLA CT IVY GLEN DR E END
4 ROCKROSE CT IVY GLEN DR E END
4 FIELDSTONE CT IVY GLEN DR E END
4 DAHLIA CT IVY GLEN DR E END
4 ESTEE CT IVY GLEN DR E END
4 ROSE ARBOR CT IVY GLEN DR E END
4 CELESTE CT IVY GLEN DR E END
4 CAPE ANITA PL PORT WY E END
4 CAPE MARY PL PORT WY E END
4 ENSIGN WY N JACKSON AV CAPE JESSUP DR
4 CAPE JESSUP DR FARRAGUT WY SEABEE PL
4 WAVE PL CAPE JESSUP DR E END
4 FARRAGUT WY BERRYESSA RD DIONNE WY
4 NAVY PL CAPE JESSUP DR E END
4 CAPE HORN DR CAPE DIAMOND DR CAPE COLONY DR
4 CAPE COLONY DR CAPE HORN DR COMMODORE DR
4 CAPE HATTERAS WY COLONY DR CAPE DIAMOND DR
4 CAPE KENNEDY DR CAPE HORN DR CAPE HATTERAS WY
4 CAPE FLATTERY PL CAPE HATTERAS WY SOUTH END
4 CAPE TOWN PL CAPE HATTERAS WY S END
4 CAPE MAY PL CAPE HATTERAS W S END
4 CAPE BRETON PL CAPE HATTERAS WY S END
4 CAPE TRINITY PL CAPE HATTERAS WY S END
4 CAPE ANN PL CAPE HATTERAS WY S END
4 MOSSDALE WY N JACKSON AV GATEVIEW DR
4 GATEVIEW DR MOSSDALE WY LAVA DR

ATTACHMENT

Page 4 of 9 ends

CD Street Name Street From Street To
4 LAVA DR GATEVIEW DR N JACKSON AV
4 GATEVIEW CT GATEVIEW DR E END
4 ANTERO CT GATEVIEW DR E END
4 MOUNTAINGATE WY GATEVIEW DR BEAVER CREEK WY
4 LAVA WY LAVA DR MABURY RD
4 SALAMONI CT KING RD N W END
5 HIGH GLEN DR MABURY RD S END
5 BETSY WY JIM DR ROUGH & READY RD
5 VERNA DR FRANCIS DR W END
5 RAINVIEW DR RAINWELL DR RAINFIELD DR
5 RAINWELL DR RAINFIELD DR RAINFIELD DR
5 RAINWELL CT RAINWELL DR W END
5 EASTON CT EASTON DR N END
5 BATON ROUGE DR EASTON DR CEDARVILLE LN
5 WILLIFORD DR GILCHRIST DR N CAPITOL AV
5 RAINWELL DR RAINFIELD DR W RAINVIEW DR
5 GIMELLI WY N CAPITOL AV EASTON DR
5 EASTON DR GIMELLI WY EASTON CT
5 BATON ROUGE DR ST CHARLES CL/CELADON CL N CAPITOL AV
5 BATON ROUGE DR ST CHARLES CL BEIGNET WY
5 BATON ROUGE DR BEIGNET WY CELADON CL
5 BATON ROUGE DR CELADON CL ST CHARLES CL
5 BATON ROUGE DR CEDARVILLE LN ST CHARLES CL
5 BELL AV FRANCIS DR W END
5 KENTRIDGE DR WHITE RD N END
5 MABURY RD N WHITE RD GRIDLEY ST
5 FRANKLIN CT MABURY RD E END
5 TIMOR CT MABURY RD E END
5 FRANKLIN CT MABURY RD E END
5 TIMOR CT MABURY RD E END
6 SUNNY VISTA DR N MONROE ST N WINCHESTER BL
6 BOXWOOD DR N MONROE ST N WINCHESTER BL
6 REDWOOD AV N BOXWOOD DR TULIP RD
6 REDWOOD AV N NEWHALL ST BOXWOOD DR
6 PEACHTREE LN 150' S/OF SUNNY VISTA DR TULIP RD
6 PEACHTREE LN TULIP RD BOXWOOD DR
6 CHERRYSTONE DR N MONROE ST SUNNY VISTA DR
6 CORY AV N MONROE ST WOODLAND AV
6 WOODLAND AV N WINCHESTER BL N MONROE ST
6 HOMEWOOD DR HEDDING ST W MONROE ST N

ATTACHMENT

Page 5 of 9 ends

CD Street Name Street From Street To
6 HOMEWOOD DR N. MONROE ST N. DANIEL WY
6 GENEVIEVE LN N DANIEL WY N HOMEWOOD DR
6 CLOVER AV N FOREST AV HOMEWOOD DR
6 REDWOOD AV N FOREST AV HOMEWOOD DR
6 BEECHWOOD AV N REDWOOD AV FOREST AV
6 WESTRIDGE DR FOREST AV PRUNERIDGE AV
6 CRESTVIEW DR FOREST AV PRUNERIDGE AV
6 TULIP RD PEACHTREE LN N MONROE ST
6 WALNUT GROVE AV MONROE ST N REDWOOD AV N
6 DANIEL WY N HEDDING ST FRONTAGE W GENEVIEVE LN
7 POCATELLO CT HUNKEN DR E END
7 POCATELLO DR HUNKEN DR DURANT AV
7 INDEPENDENCE DR DURANT AV SENTER RD
7 LOUMENA LN SENTER RD DURANT AV
7 WALL ST LEWIS RD SOUTHSIDE DR
7 HOPE ST SOUTHSIDE DR N END
7 WEBER ST WALL ST W END
7 WATER ST SOUTHSIDE N END
7 DURANT AV LEWIS RD SOUTHSIDE DR
8 APPLE GROVE CT CASTLE CANYON WY N END
8 BLUFF CT RUNNING SPRINGS RD S END
8 CARMELLA CT RACHAELLA LN E END
8 CASTLE CANYON WY HEARTLAND WY LIVERY LN
8 CLOVER MEADOW CT SCENIC MEADOW LN E END
8 CREEKVIEW MEADOW LN SCENIC MEADOW LN SCENIC MEADOW LN 8 DOVETAIL CT RUNNING SPRINGS RD W END
8 FLOWERING MEADOW CT FLOWERING MEADOW LN SW END
8 GAYLEY PL RACHELLA LN N END
8 GOLD MEADOW CT SCENIC MEADOW LN E END
8 GRAND MEADOW LN MEADOWLANDS LN MEADOWLANDS LN
8 GRAND OAK WY RUNNING SPRINGS RD HEMATITE CT
8 HAWKCREST CIR RUNNING SPRINGS RD E END
8 HEARTLAND WY SAN FELIPE RD N END
8 HECKER CT SILVER OAK ST N END
8 HEMATITE CT GRAND OAK WY E END
8 HIGH MEADOW WY MEADOWLANDS LN MEADOWLANDS LN
8 LIVERY LN RUNNING SPRINGS RD S END
8 MEADOW VISTA CT MEADOWFIELD LN N END
8 MEADOWFIELD LN SAN FELIPE RD E END
8 MEADOWLANDS LN WILD MEADOW WY VALLEY MEADOW CT

ATTACHMENT

Page 6 of 9 ends

CD Street Name Street From Street To
8 MEADOWLANDS LN VALLEY MEADOW CT SAN FELIPE RD
8 MEADOWLANDS LN SAN FELIPE RD HIGH MEADOW LN N
8 MEADOWLANDS LN HIGH MEADOW LN N WILD MEADOW WY
8 MEADOWLEAF CT SAN FELIPE RD E END
8 MOUNTAIN MEADOW CT MEADOWLANDS LN E END
8 OLD MEADOW CT ROYAL MEADOW LN S END
8 SLOPING MEADOW CT ROYAL MEADOW LN S END
8 SKY MEADOW WY ROYAL MEADOW LN MEADOWLANDS LN
8 ROYAL MEADOW LN GRAND MEADOW LN GRAND MEADOW LN
8 ROLLING MEADOW CT ROYAL MEADOW LN S END
8 SPRING MEADOW CT ROYAL MEADOW LN S END
8 WILD MEADOW WY ROYAL MEADOW LN MEADOWLANDS LN
8 PLACID CT RUNNING SPRINGS RD E END
8 PROMONTORY WY LIVERY WY HEARTLAND WY
8 RACHELLA LN GAYLEY PL SILVER OAK ST
8 RED PEAK LN RUNNING SPRINGS RD SKYWALKER WY
8 ROBIN RIDGE CT GRAND OAK WY E END
8 RUNNING SPRINGS RD E END E END
8 SKYWALKER WY RUNNING SPRINGS RD RUNNING SPRINGS RD
8 WINDROW CT RUNNING SPRINGS RD S END
8 WILDERNESS CIR HEARTLAND WY W END
8 WINDWARD CT CASTLE CANYON WY S END
8 SCENIC MEADOW LN SAN FELIPE RD MEADOWLANDS LN
8 SILVER OAK ST RACHELLA LN SAN FELIPE RD
8 VALLEY MEADOW CT MEADOWLANDS LN W END
8 EARLY MORNING LN WB RUNNING SPRINGS RD SAN FELIPE RD
8 EARLY MORNING LN EB SAN FELIPE RD RUNNING SPRINGS RD
8 Flowering Meadow Ln San Felipe Rd Flowering Meadow Ct 8 Flowering Meadow Ln Flowering Meadow Ct S END
8 Grand Oak Wy Hematite Ct N END
8 Turturici Ct Turturici Wy E END
8 Turturici Wy Turturici Ct W END
8 Turturici Wy San Felipe Rd Turturici Ct
9 Lyle Ln Curtner Av Lyle Ln
9 Lyle Ln Lyle Ln S Bascom Av
9 PRESCOTT AV CAMDEN AV CROWDER AV
9 ANDREWS AV CHARMERAN AV PRESCOTT AV
9 ANDREWS AV PRESCOTT AV ARBUCKLE DR
9 ARBUCKLE DR ANDREWS AV CHARMERAN AV
9 CROWDER AV ARBUCKLE DR ANDREWS AV

ATTACHMENT

Page 7 of 9 ends

CD Street Name Street From Street To
9 CHARMERAN AV CAMDEN AV LEIGH AV
9 LENCAR WY LINWOOD DR CAMDEN AV
9 RONIE WY GATES DR CAMDEN AV
9 TERRI WY CAMDEN AV GATES DR
9 SALLY DR GUNSTON WY WYRICK AV
9 SALLY DR WYRICK AV BRANHAM LN
9 CONRAD AV SALLY DR HARWOOD RD
9 ALBERT AV HARWOOD RD SALLY DR
9 BARCELONA AV SALLY DR HARWOOD RD
9 WYRICK AV CAMDEN AV CITY LIMIT
9 HARWOOD RD WYRICK AV BRANHAM LN
9 ROSSWOOD DR LEIGH AV UNION AV
9 TRENT DR ROSSWOOD DR N. END
9 TILDEN DR N END ROSSWOOD DR
9 Troy Park Pl Trent Dr Tilden Dr
9 SAMSON CT SAMSON WY W END
9 OAKWOOD AV ROSS AV CAMDEN AV
9 DONNA LN CAMDEN AV ROSS AV
9 NELSON WY LEIGH AV CAMDEN AV
9 GAYLE DR LENCAR WY GUNSTON WY
9 GUNSTON WY GAYLE DR LEIGH AV
9 GUNSTON WY LEIGH AV WYRICK AV
9 BERCAW LN WYRICK AV CAMDEN AV
9 LINWOOD DR GUNSTON WY NELSON WY
9 GATES DR LENCAR WY NELSON WY
9 BASSWOOD CT LITTLE BRANHAM LN S END
9 HEIMGARTNER LN UNION AV KENLAR DR
9 LITTLE BRANHAM LN HARWOOD DR LEIGH AVE
9 CAMBRIA CT CAMDEN AVE E END
9 Swain Wy Tony Av / N Swan Wy Anna Dr / N Swan Wy
9 NOREEN DR WOODFORD DR KIRK RD
9 KILO AV SILVERWOOD DR HILLSDALE AV
9 JULIO AV HILLSDALE AV SILVERWOOD DR
9 IRLANDA WY SILVERWOOD DR HILLSDALE AV
10 BANNER DR DUNN AV SANTA TERESA BL
10 BANNER CT BANNER DR E END
10 CHANNEL DR SNELL AV SUISSE DR
10 CULVERT DR SUISSE DR CURIE DR
10 MADISON DR SANTA TERESA BL LEAN AV
10 MADISON DR LEAN AV 510' S/OF SANTA TERESA BL

ATTACHMENT

Page 8 of 9 ends

CD Street Name Street From Street To
10 GLEN HARBOR DR SANTA TERESA BL MADISON DR
10 MCCAMISH AV LEAN AV MAHAN DR
10 TOVAR DR LEAN AV MAHAN DR
10 BOTHELL CR TOVAR DR TOVAR DR
10 WASKOW DR LEAN AV MAHAN DR
10 VALROY DR CURIE DR LOS PINOS WY
10 VALROY CT VALROY DR W END
10 ALLEGAN CR LEAN AV LEAN AV
10 CLISE CT BOTHELL CR E END
10 ASHBURTON DR SANTA TERESA BL MADISON DR
10 MCCAMISH CT MCCAMISH AVE N END
10 MADISON DR SANTA TERESA BL 510' S/OF SANTA TERESA BL 10 CESSNA CT GALEN DR S END
10 CONTESSA CT GALEN DR S END
10 NORTHDALE CT GALEN DR S END
10 FORBES WY GALEN DR CURIE DR
10 PANCHO CT GALEN AV S END
10 MAHAN DR MCCAMISH AV LEAN AV
10 FEVER DR MAHAN DR DUNN AV
10 ROYAL OAK CT VALROY DR N END
10 ELLERBROOK WY LOS PINOS WY ANSDELL WY
10 ANSDELL WY ELLERBROOK WY LOS PINOS WY
10 MADISON DR SANTA TERESA BL 510' S/OF SANTA TERESA BL 10 PEDRICK CT BOSE LN N END
10 HOSTA LN HYACINTH LN VISTA LOOP
10 HYDRANGEA LN BEGONIA DR 345 E/OF BEGONIA DR
10 HYDRANGEA LN 345'E/BEGONIA DR E END
10 CANNA LN BEGONIA DR 1064 E/OF BEGONIA DR
10 IXIAS CT IXIAS LN W END
10 DRYSDALE DR BLOSSOM HILL RD ALMOND BLOSSOM LN
10 ALMOND BLOSSOM LN CAMDEN AV CITY LIMIT
10 ARBOR DELL WY BLOSSOM HILL RD FLOWER GARDEN LN
10 FLOWER GARDEN LN ARBOR DELL WY CAMDEN AV
10 PRESTON DR CAMDEN AV MALPAS DR
10 MALPAS DR PRESTON DR CAMDEN AV

← All documents from this meeting