Cities Index.
Resolution

San Jose City Council
April 28, 2026

Document
Resolution
Meeting
April 28, 2026
Body
San Jose City Council
Original file
142 KB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

NVF:MDT:JMD
4/16/2026

T-52029 / 2301742 1
Council Agenda: 4-28-2026
Item No.: 2.12
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

RESOLUTION NO. ______________

A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN

JOSE APPROVING A LIST OF PAVEMENT
MAINTENANCE PROJECTS ELIGIBLE FOR SAN JOSE’S
2026-2027 ALLOCATION OF THE ROAD MAINTENANCE

AND REHABILITATION ACCOUNT FUNDING, WHICH

WAS MADE AVAILABLE BY THE APPROVAL OF SENATE
BILL NO. 1, OTHERWISE KNOWN AS THE ROAD REPAIR
AND ACCOUNTABILITY ACT OF 2017

WHEREAS, on April 28th, 2017, Governor Brown signed Senate Bill No. 1 (“SB-1”), which created the Road Maintenance and Rehabilitation Account (“RMRA”) to address deferred maintenance on the state highway and local streets and roads systems; and

WHEREAS, SB-1 requires the City of San José (“City”) to meet specific reporting and accountability requirements established by the California Transportation Commission (“CTC”); and

WHEREAS, to receive the Fiscal Year 2026-2027 RMRA funds, the City must submit a City Council-approved list of projects (streets) to the CTC by July 1, 2026; and

WHEREAS, in October 2025, the Department of Transportation (DOT) released its three-year Pavement Maintenance Plan (2026-2028) to preserve and rehabilitate streets Citywide; and

WHEREAS, the City is projected to receive approximately $28 million in RMRA funds that will serve as one of the several funding sources making up the estimated $89 million of pavement maintenance funding in Fiscal Year 2026-2027. This total level of funding will allow for maintenance on both the Major Street Network and the Local and Neighborhood Street Network in 2027; however, it may change if unforeseen circumstances arise or new information regarding other street-related projects becomes NVF:MDT:JMD
4/16/2026

T-52029 / 2301742 2
Council Agenda: 4-28-2026
Item No.: 2.12
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.
available, which is acceptable per the CTC guidelines, as the actual projects completed may differ from the original list submitted; and

WHEREAS, the City desires to use the funding to preventatively maintain or resurface selected streets throughout the City, improving their condition and extending their useful life before more costly treatments, repairs or reconstruction is necessary;

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SAN JOSE THAT:

The list of pavement maintenance projects eligible for San Jose’s Fiscal Year 2026- 2027 allocation of the Road Maintenance and Rehabilitation Account funding, which was made available by the approval of Senate Bill No. 1 (SB-1), otherwise known as the Road Repair and Accountability Act of 2017, as shown in Attachment A, is hereby approved.

//

//

//

//

//

//

//
NVF:MDT:JMD
4/16/2026

T-52029 / 2301742 3
Council Agenda: 4-28-2026
Item No.: 2.12
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

ADOPTED this _____ day of ___________, 2026, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

MATT MAHAN
Mayor
ATTEST:

TONI J. TABER, MMC
City Clerk
NVF:MDT:JMD
4/16/2026

T-52029 / 2301742 A-1
Council Agenda: 4-28-2026
Item No.: 2.12
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

ATTACHMENT A
List of Pavement Maintenance Projects Eligible for SB-1 Funding

CD STREET NAME BEGIN LOCATION END LOCATION SCHEDULE DESCRIPTION OF

PROJECT

PREDICTED

USEFUL LIFE
1 MILLER AV BOLLINGER RD RAINBOW DR SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
1 PROSPECT RD WB LAWRENCE EXPY CITY LIMIT SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
1 PROSPECT RD WB DE ANZA BL S BLANEY AV SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
1 WILLIAMS RD SARATOGA AV WINCHESTER BL SUMMER/FALL 2027 STREET SEALING 7 YEARS 2, 9,
10 HILLSDALE AV FOXWORTHY AV COMMUNICATIONS HILL SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
2 MCKEAN RD N CITY LIMIT BAILEY AV SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
2 NARVAEZ AV FAYE PARK DR BRANHAM LN SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
2 SILICON VALLEY BL HWY 101 BASKING RIDGE AV SUMMER/FALL 2027 STREET SEALING 7 YEARS 2 SILVER CREEK
VALLEY RD HWY 101 SILVER CREEK VALLEY
PL SUMMER/FALL 2027 STREET SEALING 7 YEARS
3 GRAHAM AV GOODYEAR ST WILLOW ST SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
3 GOODYEAR ST 1ST ST S GRAHAM AV SUMMER/FALL 2027 STREET

RESURFACING
20 YEARS
3 HEDDING ST E HWY 101 N 13TH ST SUMMER/FALL 2027 STREET

RESURFACING
20 YEARS
3, 5 KING RD N MCKEE RD STORY RD SUMMER/FALL 2027 STREET SEALING 7 YEARS 3 ST. JAMES ST E MARKET ST 19TH ST SUMMER/FALL 2027 STREET

RESURFACING
20 YEARS
NVF:MDT:JMD
4/16/2026

T-52029 / 2301742 A-2
Council Agenda: 4-28-2026
Item No.: 2.12
DRAFT – Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CD STREET NAME BEGIN LOCATION END LOCATION SCHEDULE DESCRIPTION OF

PROJECT

PREDICTED

USEFUL LIFE
3, 6 WILLOW ST LELONG ST 1ST ST SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
4 CHARCOT AV ZANKER RD ORCHARD PKWY SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
4 TASMAN DR E 680’ E/O CISCO WY 583’ W/O RENAISSANCE
DR SUMMER/FALL 2027 STREET SEALING 7 YEARS
6 JULIAN ST W N MONTGOMERY ST THE ALAMEDA SUMMER/FALL 2027 STREET SEALING 7 YEARS 6, 9 LEIGH AV CAMDEN AV MCBAIN AV SUMMER/FALL 2027 STREET SEALING 7 YEARS 6, 9 LINCOLN AV CURTNER AV DELYNN WY SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
7 STORY RD SENTER RD MCLAUGHLIN AV SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
7 UMBARGER RD MONTEREY RD CRAMER CIR SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
6 TAYLOR ST STOCKTON AV SAN PEDRO ST SUMMER/FALL 2027 STREET RESURFACING 20 YEARS
8 SAN FELIPE RD YERBA BUENA RD THE VILLAGES PKWY SUMMER/FALL 2027 STREET SEALING 7 YEARS 8 YERBA BUENA RD VILLA VISTA RD ALTIA AV SUMMER/FALL 2027 STREET SEALING 7 YEARS

← All documents from this meeting