SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 1
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

RESOLUTION NO. ______________

A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN

JOSE APPROVING A MAJOR AMENDMENT TO THE

AIRPORT MASTER PLAN FOR THE SAN JOSE MINETA

INTERNATIONAL AIRPORT TO UPDATE AVIATION

DEMAND FORECASTS AND FACILITY REQUIREMENTS,

REVISE AND REFINE THE PHASED DEVELOPMENT

PROGRAM, AND INCORPORATE RELATED TECHNICAL

AND POLICY UPDATES

WHEREAS, the City of San José owns and operates the San José Mineta International Airport (“Airport”); and

WHEREAS, by Resolution No. 67380 on June 10, 1997, the City Council adopted certain findings of overriding considerations in accordance with the requirements of the California Environmental Quality Act (CEQA) for the Airport Master Plan; and

WHEREAS, by Resolution 67381 on June 10, 1997, the City Council adopted the Airport Master Plan, which has been amended over time as conditions and activity trends have changed; and

WHEREAS, by Resolution 79498 on April 28, 2020, the City Council adopted a major amendment to the Airport Master Plan for the San José Mineta International Airport to extend the Plan Horizon Year, update the projected aviation demand and facility requirements, and modify the list of specific project components of the long- term development program, including incorporation of the safety-related airfield improvements recommended in the airport runway incursion mitigation/design standards analysis study; and

SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 2
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

WHEREAS, by Resolution 79497 on April 28, 2020, the City Council certifi ed a Final Environmental Impact Report (“FEIR”) for the major amendment to the Airport Master Plan for the San José Mineta International Airport; and

WHEREAS, approval of the Master Plan Amendment constitutes a “project” under the provisions of the California Environmental Quality Act of 1970, together with related state and local implementation guidelines and policies promulgated thereunder, all as amended to date (collectively, CEQA”); and

WHEREAS, to comply with CEQA, City prepared an Addendum to the FEIR to evaluate the potential environmental impacts of the proposed Master Plan Amendment; and

WHEREAS, the California Public Utilities Commission mandates the proposed Master Plan Amendment be referred to the Santa Clara County Airport Land Use Commission (“ALUC”); and

WHEREAS, on March 25, 2 026, ALUC found the proposed M aster Plan Amendment consistent with the Airport Land Use Compatibility Plan (“ ALUCP”) for the San Jose Mineta International Airport and directed staff to prepare an amendment to the ALUCP ; and

WHEREAS, the proposed Master Plan Amendment revisions alter development goals/objectives or allow for increased activity levels, design capacity, or noise impacts beyond the levels currently projected in the plan and therefore constitute a “major” amendment to the Airport Master Plan; and

WHEREAS, the San José Municipal Code (“SJMC”) Section 25.02.200 requires review of proposed major amendments to the Airport Master Plan by both the City’s Airport and Planning Commissions; and
SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 3
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

WHEREAS, on February 9, 2026, the Airport Commission discussed the Master Plan Amendment; and

WHEREAS, on April 22, 2026, the City’s Planning Commission recommended City Council approval of the Addendum to the FEIR and the Master Plan Amendment; and

WHEREAS, concurrent with the date of this meeting, by resolution the City Council certified the Master Plan Amendment FEIR; and

WHEREAS, SJMC 25.02.320 provides that the City Council may, in its discretion, approve a major amendment to the Airport Master Plan if it makes a finding that the proposed revisions or modifications to the Airport Master Plan are in the public interest ; and

WHEREAS, City Council desires to approve the proposed major Airport Master Plan Amendment; and

WHEREAS, the City Clerk has given notice of the time and place of this City Council hearing by one publication in a newspaper of general circulation in the City at least twenty (20) days before the date of this hearing;

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SAN JOSE THAT:

Section 1. Description of Proposed Major Airport Master Plan Amendment.

The proposed major Airport Master Plan Amendment consists of the following specific changes to the Demand Projections and designated Projects in the Airport Master Plan:

SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 4
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

Summary of New Airport Master Plan Demand Projections

Existing and Forecasted Activity Levels at the Airport

Existing
(Year 2024)
Currently
Adopted
Forecast
(Year 2037)
New Forecast
Proposed for
Adoption
(Year 2037)
Annual Air Passengers (millions) 11.4 22.5 16.75
Annual Air Cargo (tons) 30,837 100,200 40,698
General Aviation (based aircraft) 154 164 183
Annual Aircraft Operations
Air Passenger
Air Cargo
Air Taxi “Commuter”
General Aviation
Military
Total

106,245
1,202
24,217
31,946
125
163,735

183,920
1,960
22,168
29,412
250
237,710

147,071
1,729
33,052
40,073
125
222,150

//

//

//

//

//

//
SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 5
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 6
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

Proposed Amended Airport Master Plan Project List
(* denotes modified or new project)

# Description Status
Airfield Improvement Projects
A-1. Reconstruct/extend Runway 12L-30R to 11,000 feet. Complete A-2. Extend parallel Taxiway Y from Taxiway L to new
Taxiway N and from Taxiway B to new Taxiway A. Complete A-3. Extend/widen parallel Taxiway Z from Taxiway K to
Taxiway L. Complete
A-4. Construct new cross Taxiway A at south end, east of extended Taxiway Y to west of extended Runway 12L-
30R.

Complete
A-5. Construct new cross Taxiway N at north end, from
extended Taxiway Y to west of extended Runway 12L-
30R.

Complete
A-6. Strengthen cross Taxiway C east and west of Runway 12L-30R. Complete
A-7. Extend cross Taxiway D west of Runway 12L-30R and
strengthen east of 12L-30R. Complete
A-8. Strengthen cross Taxiway E east of Runway 12L-30R. Complete A-9. Strengthen cross Taxiway F east and west of Runway 12L-30R Complete
A-10. Strengthen cross Taxiway H east and west of Runway 12L-30R. Complete
A-11. Strengthen cross Taxiway J east and west of
extended Runway 12L-30R. Complete
A-12. Strengthen cross Taxiway K east and west of
extended Runway 12L-30R. Complete
A-13. Strengthen cross Taxiway L from extended Taxiway Z to west of extended Runway 12L-30R. Complete
A-14. Reconstruct/extend Runway 12R-30L to 11,000 feet. Complete SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 7
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.
# Description Status
A-15. Extend new cross Taxiway A west of extended
Runway 12L-30R to Runway 12R-30L. Complete
A-16. Extend new cross Taxiway N west of extended
Runway 12L-30R to extended Runway 12R-30L. Complete
A-17. Extend/widen parallel Taxiway W south from Taxiway C to Runway 12R-30L (for ADG-IV aircraft between
Taxiway C & Taxiway B, and for ADG-III aircraft
between Taxiway B and Runway 12R-30L).

Part Complete
(Taxiway
C→Taxiway B)
A-18. Strengthen cross Taxiway C west of Runway 12L-30R to west of Runway 12R-30L and widen at 12R-30L for
higher-speed arrivals exit to east
Complete
A-19. Extend cross Taxiway D west of Runway 12L-30R to
west of Runway 12R-30L and widen at 12R-30L for
higher-speed arrivals exit to east.

Complete
A-20. Strengthen cross Taxiway F west of Runway 12L-30R to Runway 12R-30L. Complete
A-21. Widen/strengthen cross Taxiway G west of Runway
12R-30L (for ADG-IV aircraft). Complete
A-22. Strengthen cross Taxiway H west of Runway 12L-30R to Runway 12R-30L. Complete
A-23. Strengthen cross Taxiway J west of extended Runway 12L-30R to west of Runway 12R-30L and widen at
12R-30L for higher-speed arrivals exit to west.

Part Complete
(strengthening)
A-24. Strengthen cross Taxiway K west of extended
Runway 12L-30R to Runway 12R-30L and widen at
12R-30L for higher-speed arrivals exit to east.

Complete
A-25. Strengthen cross Taxiway L west of extended
Runway 12L-30R to Runway 12R-30L. Complete
A-26.* Convert former Runway 11-29 to a new parallel
Taxiway V (for ADG-III aircraft) and extend south to
Taxiway C and north to a new cross Taxiway V6.

Part Complete
(Phase 1 and 2)
A-27.* Construct new cross Taxiway V6 (for ADG-III aircraft) from north end of new Taxiway V to Taxiway W. Complete
SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 8
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.
# Description Status
A-28. Extend parallel Taxiway Z from Taxiway B to Taxiway A, and realign north of Taxiway G to match alignment
south of Taxiway G.

Complete
A-29. Rehabilitate parallel Taxiway Y between Taxiway B and Taxiway L and strengthen at cross taxiways. Complete A-30. Construct parallel Taxiway W between Taxiway C and Taxiway L (for ADG-IV aircraft). Complete
A-31. Strengthen cross Taxiway C from west of Runway
12R-30L to Taxiway W. Complete
A-32. Extend cross Taxiway D west of Runway 12R-30L to
Runway 11-29 (for ADG-IV aircraft east of Taxiway W
and for ADG-III aircraft west of Taxiway W).

Complete
A-33. Widen/strengthen cross Taxiway G west of Runway
12R-30L to Taxiway V (for ADG-IV aircraft). Complete
A-34. Widen/strengthen cross Taxiway J west of Runway
12R-30L to Taxiway V (for ADG-IV aircraft). Complete
A-35. Rehabilitate terminal apron pavement east of Taxiway Z between Taxiway D and Taxiway G. Complete
A-36. Rehabilitate Taxiway C between Taxiway V and
Taxiway W. Complete
A-37. Close existing Taxiway V and replace with a parallel apron-edge taxilane (for ADG-III aircraft).

Part Complete
(Close Taxiway V)
A-38.* Construct up to six new taxiway connectors (V1–V6) between the expanded west side apron (Project G-9)
and new Taxiway V (for ADG-III aircraft).

Part Complete
(Taxiways V3 →
V6)
A-39. Mitigate direct access from west side apron to
Taxiways B, C, & D through pavement
marking/painting or removal.

Future
A-40. Create up to three new taxiway connectors (W1–W3) between the southwest apron and Taxiway W (for
ADG-III aircraft) through pavement marking/painting or
removal.

Future
A-41. Relocate existing general aviation run-up pad to
southwest apron area. Future
SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 9
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.
# Description Status
A-42. Relocate Runway 12R-30L aircraft hold positions on all cross taxiways to current ADG-V aircraft standard. Future A-43. Widen Runway 12L-30R blast pads, and lengthen
blast pad at Runway 12L end, to current ADG-V
standard.

Future
A-44. Realign existing cross Taxiways B-F, H, J, & L
between Taxiways Y and Z to mitigate direct access
from east side apron to Runway 12L-30R and rename
realigned segments as Taxiways Z1–Z8 & Z10.

Future
A-45. Close existing segments of cross Taxiways B-F, H, J, & L between Taxiways Y and Z through pavement
marking/painting or removal (upon completion of
Project A-44).

Future
A-46.* Narrow segment of existing cross Taxiway B between Taxiway Z and Runway 12L-30R through pavement
removal.

Future
A-47.* Narrow segment of existing cross Taxiway L between Taxiway Y and Runway 12R-30L through pavement
removal.

Future
A-48.* Close existing segments of cross Taxiways F and H between Runway 12R-30L and Runway 12L-30R
through pavement removal.

Future
A-49. Add pavement markings to existing parallel Taxiway W and Taxiway Y between adjacent runway displaced
thresholds and taxiway end, to visually denote their
use as taxiways.

Complete
A-50.* Close existing segment of cross Taxiways E, F, and H between Runway 12L/30R and Taxiway Y through
pavement removal.

Future
Terminal Projects
T-1. Construct interim long-term public and employee
parking lot (up to 7,400 spaces) on vacant 55-acre
site on west side (north and south of Air Traffic Control Tower).

Complete
SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 10
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.
# Description Status
T-2. Remove Long-Term Parking “Yellow” and “Green” lots, temporarily consolidating long-term public and
employee parking on west side (upon completion of
Project T-1).

Complete
T-3. Relocate Hourly Parking “Red” lot and existing parking operations facilities to interim sites during construction of Project T-4).

Complete
T-4. Construct new Public Short-Term Parking Garage
(up to 5,000 spaces) and associated roadway
improvements south of existing Rental Car Garage
and opposite new Terminal B South Concourse
(Project T-13)
Future
T-5. Construct new “North Concourse” (part of new
Terminal B) between existing Terminals A and C,
consisting of up to 400,000 sq.ft. and 9 air carrier
gates, with passenger processing facilities.

Complete
T-6. Remove former temporary FIS facility from ramp south of Terminal C and remove City office structures at
1311 Airport Blvd.

Part Complete (FIS
removed)
T-7. Relocate/expand employee parking (up to 2,600
spaces) to terminal area parking facilities or to former FMC site on west side of Coleman Ave.

Complete
(Terminal A
Garage)
T-8. Construct new Public Long-Term Parking Garage (up
to approx. 6,000 spaces) on former interim rental car
ready/return parking lot site, including interim surface parking at site prior to garage construction, second 2- lane bridge accessing site from Airport Blvd. and (upon completion) removal of public parking from interim
west side lot.

Part Complete
(interim surface
parking, removal of
west side lot, and
garage Phase 1
complete)
T-9. Expand/remodel Terminal A by approx. 50,000 sq.ft. (total of 400,000 sq.ft.) to provide additional passenger processing, concession, and support space.

Complete
T-10. Install temporary Terminal C passenger processing facility (approx. 25,000 sq.ft.) east of existing south wing for during demolition of other Terminal C wings
(displaced by Projects T-11 and T-15).

Complete
SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 11
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.
# Description Status
T-11. Expand North Concourse/Terminal B by up to
200,000 ft2 and 4 air carrier gates to south on site of demolished north wing of Terminal C (upon completion
of Project T-10).

Complete
T-12. Demolish remainder of Terminal C and temporary
passenger processing facility (upon completion of
Project T-11 and relocation of airline functions to
Terminal A and North Concourse/Terminal B).

Complete
T-13. Expand Terminal B (South Concourse) to south,
including up to an additional 14 air carrier gates and
750,000 sq.ft. of building space and associated
passenger processing facilities (ultimate terminal
complex total of up to 42 gates and 1.80 million ft2).

Part Complete
(Interim Facility
Gates 31-36)
T-14. Construct new Rental Car Garage (up to 6,000
spaces, including 2,000 ready/return spaces and
vehicle servicing facilities) opposite new Terminal B.

Upon completion, remove existing interim rental car
ready/return, servicing, and storage facilities.

Complete
T-15. Construct terminal area roadway improvements
including realigned/ widened Terminal Dr., Airport
Blvd./Terminal Dr. connection south of Terminal A,
dedicated shuttle lane between Terminal A and new
rental car parking garage opposite new Terminal B,
reconfigured Terminal Dr./Airport Blvd. south
intersection, and associated parking lot modifications.

Complete
T-16. Construct new multi-story business hotel south
of/adjacent to new public short-term parking garage
(Project T-4), up to 300,000 ft2 in size including up to 330 guest rooms and 300 parking spaces.

Future
Air Cargo Projects
C-1. Construct interim expansion of east side cargo airline area ramp to the south (up to 162,000 ft2 of new
ramp).

Complete
C-2. Construct new cargo airline facilities at or adjacent to existing east side cargo airline areas, including up to 500,000 ft2 of ramp, building, and vehicle
parking/movement space.

Future
SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 12
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.
# Description Status
C-3. Relocate belly-freight facilities to new site(s) on east side of Airport, including up to 150,000 ft2 of ramp,
building and vehicle parking/movement space.

Future
C-4. Remove existing Air Freight Building and vehicle
parking/movement area (displaced by Projects T-13
and T-15).

Future
General Aviation Projects
G-1. Remove south end tiedowns, shelters, and General
Aviation Terminal facilities (displaced by Projects A-1, A-2, A-4).

Complete
G-2. Remove southeast t-hangar facilities (displaced by Project A-28). Complete
G-3. Remove “94th Aero Squadron” restaurant facility on west side and convert site to general aviation use. Complete G-4. Remove east side ACM facilities (FBO) upon lease
expiration by 2009 (displaced by Project S-8). Complete G-5. Remove San José State University facilities at
southwest side upon lease expiration in 2010 and
convert site to aviation support or general aviation
facility use.

Complete
G-6. Establish new FBO leaseholds on west side for
reconfiguration of general aviation facilities.

Part Complete
(AvBase, ACM
FBOs)
G-7. Construct general aviation facilities on vacant parcel between San José Jet Center FBO leasehold and Air
Traffic Control Tower.

Complete
G-8. Expand general aviation facilities onto northwest side of Airport (44 acres, upon phased implementation of
Project T-7 and T-8).

Part Complete
(Signature FBO)
G-9. Expand west side general aviation apron out to edge of new parallel taxilane (Project A-37) Future
G-10. Reconfigure southwest apron tiedown storage facilities (to accommodate Projects A-40, A-41, and G-5). Future
SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 13
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.
# Description Status
G-11.* Identify vertiport(s) and associated support facilities and at various existing facilities or new sites on the
east or west sides of the Airport.

Future
Aviation Support Projects
S-1. Construct approx. 7-acre fuel storage facility (up to 8 tanks, 4.0 million gallons capacity) on vacant parcel
north of Hwy. 101, two-acre fuel dispensing facility
between Terminal A and north end of airfield, and
pipeline connecting storage and dispensing.

Part Complete
(3 tanks with 2.0
million gallons)
S-2. Remove existing fuel storage and dispensing
facilities on southeast side of Airport and clean-up
site (upon completion of Project S-1).

Complete
S-3. Relocate/expand airport maintenance facilities at
existing or new sites on east or west sides of Airport. Complete S-4. Expand flight kitchen facilities at existing or new sites on east side of Airport or relocate/expand off-
airport.

Future
S-5. Relocate/expand airline maintenance/storage
facilities at various or new sites on east side of
Airport.

Future
S-6. Remove, relocate, or upgrade existing aviation support facilities on southeast side of Airport (1239-1311
Airport Blvd.) at various existing or new sites on east or west sides the Airport.

Future
S-7. Relocate/upgrade/expand Aircraft Rescue & Fire
Fighting (ARFF) facility at new site on west side of
Airport, potentially including a consolidated Airport
Response Center facility.

Complete
S-8. Convert existing east side ACM leasehold to aviation support uses (upon completion of Project G-4), such
as airline provisioning/security clearance facility,
roadway expansion, and aircraft remote parking.

Complete
S-9. Reuse former FMC site on west side of Coleman Ave. for interim or long-term uses to be determined over
time to facilitate on-Airport development or operation, Complete (interim
construction
staging only)
SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 14
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.
# Description Status
such as project construction staging, rental car
storage, public or employee parking, support facilities, and compatible non-aviation leaseholds.

S-10.* Demolish existing air traffic control tower (ATCT) and remote transmitter/receiver (RTR) and construct
replacement ATCT and RTR adjacent to existing
ATCT location on the west side of the Airport.

Future

Section 2. Finding.

The City Council hereby finds and determines with regard to the proposed major Master Plan Amendment to the Airport Master Plan that:

1. Based on the forecasted growth in annual air taxi (commuter) operations and general aviation activity, retaining the Airport Master Plan’s horizon year of 2037 provides an appropriate framework to calibrate long-range development needs before extending the planning horizon.

2. The proposed adjustments and modifications to the components, sizing and locations of various air carrier, air cargo, general aviation, and support facilities described in Proposed Amended Airport Master Plan Project List set forth in Section 1 would adequately serve demand through 2037.

3. The proposed changes in Section 1 to airfield configurations would improve safety of aircraft operations and conformance with the latest FAA airfield design standards and adequately serve demand through 2037.

Section 3. Approval.

The proposed major Master Plan Amendment to the Airport Master Plan as described in Section 1 above is hereby approved.

SAW:JAC:DJF
3/17/2026

T-37690.002 / 2299574 15
Council Agenda: 05-12-2026
Item No.: 5.1(b)
DRAFT--Contact the Office of the City Clerk at (408)535-1260 or [email protected] for final document.

ADOPTED this _____ day of ___________, 2026, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

MATT MAHAN
Mayor
ATTEST:

TONI J. TABER, MMC
City Clerk