Cities Index.
Memorandum

San Jose City Council
June 16, 2026

Document
Memorandum
Meeting
June 16, 2026
Body
San Jose City Council
Pages
11
Original file
417 KB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

TO: HONORABLE MAYOR

AND CITY COUNCIL
FROM: John Ristow
Matt Loesch

SUBJECT: See Below DATE: May 26, 2026

Approved

Date:
6/4/26

COUNCIL DISTRICT: Citywide

SUBJECT: Report on Bids and Award of Contract for the 10627 – 2026 Local Streets Sealing Pavement Project

RECOMMENDATION

(a) Report on bids and award of a contract for the construction of the 10627 – 2026 Local Streets Sealing Pavement Project to the lowest responsive, responsible bidder, Pavement Coatings, Co., in the amount of $3,478,564; and

(b) Approve a 10% contingency in the amount of $347,857.

SUMMARY AND OUTCOME

Award of the contract to Pavement Coatings, Co. enables the construction of the 10627 – 2026 Local Streets Resurfacing Sealing Pavement Project (Project), which will provide required preventative pavement maintenance along 40 miles of the Local and Neighborhood Street Network. Approval of the 10% contingency provides funding for any unanticipated work necessary for the proper completion or construction of the Project.

BACKGROUND

The Department of Transportation (DOT) will maintain approximately 201 miles of roadway during the 2026 construction season. As part of this effort, the Project will seal approximately 40 miles of streets in the Local and Neighborhood Street Network, extending the pavement life and improving overall roadway conditions.

COUNCIL AGENDA: 6/16/26
FILE: 26-715
ITEM: 2.27

HONORABLE MAYOR AND CITY COUNCIL
May 25, 2026
Subject: Report on Bids and Award of Contract for the 10627 – 2026 Local Streets Sealing Pavement Project

Page 2 ends

Pavement maintenance is typically performed in two separate phases: preparation and a final surface application. The preparation phase includes Americans with Disabilities Act (ADA) compliant curb ramp installations and retrofits, and the removal and replacement of any structurally failed areas of pavement prior to the commencement of the pavement surface treatment. The final surface treatment, also known as micro- surfacing application, is applied to the entire street after preparation phases are complete.  Micro-surfacing is the application of a thin layer of asphalt emulsion blended with rock, approximately three eighths of an inch in depth, to the pavement.

To reduce the overall timeframe for completing the preparation work, DOT is managing multiple projects for the concrete and curb ramp improvements, most of which are currently in the construction phase. This Project will provide sealing of the pavement and is the final phase of the pavement treatment.

The City’s Local and Neighborhood Street Network consists of approximately 1,552 miles of streets within San José, organized into 135 geographically contiguous pavement maintenance zones. Pavement maintenance zones support efficient planning and delivery of paving projects by maximizing the amount of paving work completed at one time within a neighborhood area, and to ensure geographic spread of pavement maintenance throughout each Council District. DOT anticipates completing pavement maintenance for approximately 91% of all streets within the Local and Neighborhood Streets Network by the end of the current three-year plan (2026-2028).

DOT utilized information provided by the City’s pavement management system to generate a candidate list of streets for pavement maintenance. The candidate list was then thoroughly analyzed by staff using the following criteria to create the final list of streets:

• Funding availability and funding use restrictions;
• Streets on the Major Street Network;
• Streets not affected by current or future street-related projects; • Maintenance history and prescribed treatment schedules; • Streets associated with planned safety, bikeway, or other “complete streets” projects;
• Community and City Council Office feedback regarding roadway conditions and priority street segments;
• Relative location of street segments to create multiple, continuous segments, consistency within neighborhoods, and project efficiency; and • Multi-year geographic spread across the city and street network.

HONORABLE MAYOR AND CITY COUNCIL
May 25, 2026
Subject: Report on Bids and Award of Contract for the 10627 – 2026 Local Streets Sealing Pavement Project

Page 3 ends

DOT staff cross-referenced the zones selected for maintenance with census tracts designated by the Metropolitan Transportation Commission as “Equity Priority Communities,” formerly known as “Communities of Concern,” to better track equity in service delivery. There are approximately 266 miles of streets in the Local and Neighborhood Streets Network that are within Equity Priority Communities. It is estimated that 256 of these miles (roughly 96%) will be maintained by the end of the current three-year plan (2026-2028).

DOT has maintained a total of 228 Equity Priority Community miles since 2019 and will be maintaining an additional 8.17 Equity Priority Community miles in 2026. This is approximately 9% of the 94 miles of streets in the Local and Neighborhood Streets Network selected for maintenance in 2026. The Project will maintain 2.46 Equity Priority Community miles, which is about 6% of the anticipated 40 sealing miles in 2026.

The Attachment to this memorandum, “List of Streets,” contains the list of streets to be maintained as a part of the Project. The list may change if unforeseen circumstances arise or new information regarding other projects becomes available.

Construction is scheduled to begin August 2026 with substantial completion in November 2026.

ANALYSIS

Bids were opened on April 23, 2026, with the following results:

Contractor
Bid Amount Variance
Amount
Over/(Under)
Percent
Pavement Coatings Co.
(Sacramento) $3,478,564.00 ($456,676.00) (12)
Graham Construction, Inc.
(San José) $3,774,610.00 ($160,630.00) (4)
Union Pavement Services, Inc.
(Jurupa Valley)
(non-responsive)
$3,866,998.80 ($68,241.20) (2)
Engineer's Estimate $3,935,240.00 --

HONORABLE MAYOR AND CITY COUNCIL
May 25, 2026
Subject: Report on Bids and Award of Contract for the 10627 – 2026 Local Streets Sealing Pavement Project

Page 4 ends

The bid from Union Pavement Services, Inc. was deemed non-responsive for failing to include the California Air Resources Board Certificate of Reported Compliance for its vehicle fleet and for failing to meet the City’s experience requirements.

The low bid submitted by Pavement Coatings Co. is $3,478,564.00 and is 12% below the Engineer’s Estimate. Staff expected the price of paving-related items to increase significantly compared to previous years, but prices did not change as much as anticipated. Striping-related items were relatively low across the board, with the lowest bid being 37% below the Engineer’s Estimate for striping items. Pavement Coatings Co.’s bid is considered acceptable for the work involved in the Project.

Pavement Coatings Co. has successfully delivered multiple paving projects for the City of San José with similar project scope and size, including: 8759 - 2018 Street Sealing Project; 8711 - 2019 Local Streets Rubberized Slurry Seal Project; and 10363 - 2024 Local Streets Sealing.

Contingency

San José Municipal Code Section 27.04.050 provides for a standard contingency of 10% on all public works contracts except those involving the renovation of building or buildings. The standard 10% contingency is appropriate for the Project.

Wage Theft Prevention Policy Check

The Office of Equality Assurance reviewed bidders for compliance with the City’s Wage Theft Prevention Policy on April 30, 2026, and again on May 1, 2026. No wage theft issues were identified.

Project Labor Agreement Applicability

The City’s Project Labor Agreement is applicable to the Project because the Engineer’s Estimate is more than $730,000.

Local and Small Business Outreach

The recommended contractor, Pavement Coatings Co., is not a Local Business Enterprise nor a Small Business Enterprise. No local companies were listed as subcontractors.

HONORABLE MAYOR AND CITY COUNCIL
May 25, 2026
Subject: Report on Bids and Award of Contract for the 10627 – 2026 Local Streets Sealing Pavement Project

Page 5 ends

EVALUATION AND FOLLOW-UP

DOT provides an ongoing evaluation of the City’s pavement condition and provides periodic reports on this topic to the Transportation and Environment Committee. In addition to the Project discussed in this memorandum, two additional major street projects and one additional local and neighborhood streets pavement maintenance project are scheduled for City Council action this spring.

FISCAL IMPACTS

The Project supports the Transportation and Aviation Services City Service Area goal to preserve and improve transportation assets and facilities. The pavement maintenance performed by the Project will extend the useful life of the streets. Funding for the Project is included in the VTA Measure B 2016 Fund (Fund 486), subject to the appropriation of funds. The Project will have no net operating and maintenance costs to the General Fund.

1. TOTAL COST OF PROJECT:

Project Delivery* $409,754
Construction (if applicable) 3,478,564
Contingency (if applicable) 347,857
TOTAL PROJECT COSTS $4,236,175
Costs expended to date $18,606
TOTAL REMAINING PROJECT COSTS $4,217,569
*Project delivery includes $81,951 for design services and bidding and $327,803 for construction management and inspection services.

2. COST ELEMENTS OF CONTRACT AS RECOMMENDED AS PART OF THE MEMORANDUM:

New Paving $2,627,500
Thermoplastic Striping 745,944
Other Construction Costs 105,120
TOTAL CONTRACT AMOUNT $3,478,564

HONORABLE MAYOR AND CITY COUNCIL
May 25, 2026
Subject: Report on Bids and Award of Contract for the 10627 – 2026 Local Streets Sealing Pavement Project

Page 6 ends

BUDGET REFERENCE

The table below identifies the fund and appropriation to fund the contract recommended as part of this memorandum and remaining project costs, including project delivery, construction, and contingency costs.

Fund
#
Appn.
#
Appropriation
Name
Total
Appropriation
Amount for
Contract
2025-2027
Adopted
Biennial Capital
Budget Page
Last Budget
Action
(Date, Ord.

No.)
486 403Q Pavement
Maintenance –
VTA Measure B
2016
$35,734,000 $3,478,564 1008 10/21/25
31252

COORDINATION

This memorandum has been coordinated with the City Attorney’s Office, City Manager’s Budget Office, and the Planning, Building, and Code Enforcement Department.

PUBLIC OUTREACH

This memorandum will be posted on the City Council Agenda website for the June 16, 2026 City Council meeting.

When the Project commences, the contractor will provide advance notification regarding project working hours, duration, and any appropriate schedule and lane closures to affected businesses, schools, and residents, as stated in the specifications. To inform traveling motorists of upcoming construction activities and potential traffic delays, changeable message signs may be used on selected streets stating the scheduled date and time for work to occur on the street.

BOARD, COMMISSION, COMMITTEE RECOMMENDATION AND INPUT

No board, commission, or committee recommendation or input is associated with this action.

CEQA

Categorically Exempt, File No. ER24‐313, CEQA Guidelines Section 15301(c) Existing Facilities.

HONORABLE MAYOR AND CITY COUNCIL
May 25, 2026
Subject: Report on Bids and Award of Contract for the 10627 – 2026 Local Streets Sealing Pavement Project

Page 7 ends

PUBLIC SUBSIDY REPORTING

This item does not include a public subsidy as defined in section 53083 or 53083.1 of the California Government Code or the City’s Open Government Resolution.

/s/ /s/

JOHN RISTOW MATT LOESCH
Director of Transportation Director of Public Works

For questions, please contact Jennifer Seguin, Deputy Director, Department of Transportation, at [email protected] or Katherine Brown, Assistant Director of Public Works, at [email protected].

ATTACHMENT: List of Streets

Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 1 of 11 ends

List of Streets
CD Street Name Street From Street To
1 DOYLE CT DOYLE RD S END
1 BLUE RIDGE DR TERESITA DR PRISCILLA DR
1 BLUE RIDGE DR PRISCILLA DR BURKETTE DR
1 PRISCILLA DR CLARENDON DR DOYLE RD
1 RHONDA DR HAPPY VALLEY AV BRENTON AV
1 RHONDA DR BRENTON AV TERESITA DR
1 RHONDA DR TERESITA DR OLYMPUS DR
1 HAPPY VALLEY AV EILEEN DR DOYLE RD
1 BURKETTE DR CLARENDON DR DOYLE RD
1 ENGLEWOOD DR BURKETTE DR TERESITA DR
1 HOYET DR HAPPY VALLEY AV CORDELIA AV
1 HOYET DR CORDELIA AV W END
1 COUNTRY LN HAPPY VALLEY AV BRENTON AV
1 OLYMPUS DR COUNTRY LN BELA DR
1 BELA DR OLYMPUS AV TERESITA DR
1 WINDING WY DOYLE RD MARILLA AV
1 MARILLA AV WINDING WY DOYLE RD
1 CLARENDON DR PRISCILLA DR TERESITA DR
2 SOUTHSUN CT SILVER LEAF RD E END
2 SOUTHVIEW CT SILVER LEAF RD E END
2 BRADWELL CT SILVER LEAF RD E END
2 DUNWELL CT SILVER LEAF RD E END
2 SEAWELL CT SILVER LEAF RD E END
2 PARKWELL CT SILVER LEAF RD E END
2 MEADWELL CT SILVER LEAF RD E END
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 2 of 11 ends

CD Street Name Street From Street To
2 FLINTWELL CT SILVER LEAF RD E END
2 CASSWELL CT SILVER LEAF RD E END
2 CADWELL CT SILVER LEAF RD E END
2 MOSSWELL CT SILVER LEAF RD END
2 ROSEWELL WY SILVER LEAF RD GRANDWELL WY
2 ROSEWELL CT GRANDWELL WY E END
2 SAGEWELL WY GRANDWELL WY FLINTWELL WY
2 FOXWELL CT SAGEWELL WY W END
2 OLDWELL CT SAGEWELL WY W END
2 LIMEWELL CT SAGEWELL WY W END
2 BARNSWELL WY GRANDWELL WY SAGEWELL WY
2 DEARWELL WY KNOLLWELL WY KNOLLWELL WY
2 LINWELL CT KNOLLWELL WY S END
2 MAYLAND AV FORD RD DEMEREST LN
2 MAYLAND CT MAYLAND AV S END
2 DEMEREST LN FORD RD W END
2 GRANDWELL WY SILVER LEAF RD MONTEREY RD
2 KNOLLWELL WY FLINTWELL WY PALMWELL WY
2 FINCHWELL CT KNOLLWELL WY S END
2 MARSHWELL WY PALMWELL WY SOUTHVIEW DR
2 SOUTHMAR CT MARSHWELL WY N END
2 SOUTHPINE CT SOUTHPINE DR S END
2 TENNANT AV SILVER LEAF RD E END
2 SOUTH GARDEN CT TENNANT AV E END
2 SOUTH SURF CT TENNANT AV S END
2 SOUTH BREEZE CT TENNANT AV E END
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 3 of 11 ends

CD Street Name Street From Street To
2 SOUTHLITE CT TENNANT AV E END
2 SOUTHLAKE CT SOUTHVIEW DR E END
2 SOUTHSEA CT SILVER LEAF RD W END
2 FORDWELL CT DEARWELL WY S END
2 FORSUM RD MONTEREY HY END
2 MENARD DR MONTEREY HY FORSUM RD
2 FORSUM CT FORSUM RD END
2 PRINDIVILLE DR URSHAN WY FORSUM RD
2 PRINDIVILLE CT PRINDIVILLE DR END
2 FELICE CT PRINDIVILLE DR END
2 URSHAN CT URSHAN WY END
2 URSHAN WY MENARD DR FORSUM RD
2 YASUI CT FORSUM RD END
2 SUNSPRING CL FORD RD FORD RD
2 LARISA OAKS PL MONTEREY RD N
2 PINEWELL CT SILVER LEAF RD E END
2 FLINTWELL WY SILVER LEAF RD KNOLLWELL WY
2 FLINTWELL WY KNOLLWELL WY MONTEREY RD
2 TENNANT AV MONTEREY HY SILVER LEAF RD
3 RIDDER PARK DR S END SCHALLENBERGER RD
4 ATMEL WY ORCHARD PY W END
4 CHESTERTON CR LUNDY AV CHESTERTON CR
4 CAPE ASTON CT CAPE BUFFALO DR E END
4 FANWOOD CT CAPE BUFFALO DR E END
4 CAPE MISTY DR CAPE BUFFALO DR JUNESONG WY
4 JUNESONG WY BERRYESSA RD CAPE CORAL DR
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 4 of 11 ends

CD Street Name Street From Street To
4 COMMODORE DR N JACKSON AV IVY GLEN DR
4 PORT WY N JACKSON AV IVY GLEN DR
4 IVY GLEN DR COMMODORE DR N END
4 CALLA CT IVY GLEN DR E END
4 ROCKROSE CT IVY GLEN DR E END
4 FIELDSTONE CT IVY GLEN DR E END
4 DAHLIA CT IVY GLEN DR E END
4 ESTEE CT IVY GLEN DR E END
4 ROSE ARBOR CT IVY GLEN DR E END
4 CELESTE CT IVY GLEN DR E END
4 CAPE ANITA PL PORT WY E END
4 CAPE MARY PL PORT WY E END
4 ENSIGN WY N JACKSON AV CAPE JESSUP DR
4 CAPE JESSUP DR FARRAGUT WY SEABEE PL
4 WAVE PL CAPE JESSUP DR E END
4 FARRAGUT WY BERRYESSA RD DIONNE WY
4 NAVY PL CAPE JESSUP DR E END
4 CAPE HORN DR CAPE DIAMOND DR CAPE COLONY DR
4 CAPE COLONY DR CAPE HORN DR COMMODORE DR
4 CAPE HATTERAS WY COLONY DR CAPE DIAMOND DR
4 CAPE KENNEDY DR CAPE HORN DR CAPE HATTERAS WY
4 CAPE FLATTERY PL CAPE HATTERAS WY SOUTH END
4 CAPE TOWN PL CAPE HATTERAS WY S END
4 CAPE MAY PL CAPE HATTERAS W S END
4 CAPE BRETON PL CAPE HATTERAS WY S END
4 CAPE TRINITY PL CAPE HATTERAS WY S END
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 5 of 11 ends

CD Street Name Street From Street To
4 CAPE ANN PL CAPE HATTERAS WY S END
4 MOSSDALE WY N JACKSON AV GATEVIEW DR
4 GATEVIEW DR MOSSDALE WY LAVA DR
4 LAVA DR GATEVIEW DR N JACKSON AV
4 GATEVIEW CT GATEVIEW DR E END
4 ANTERO CT GATEVIEW DR E END
4 MOUNTAINGATE WY GATEVIEW DR BEAVER CREEK WY
4 LAVA WY LAVA DR MABURY RD
4 SALAMONI CT KING RD N W END
5 HIGH GLEN DR MABURY RD S END
5 BETSY WY JIM DR ROUGH & READY RD
5 VERNA DR FRANCIS DR W END
5 RAINVIEW DR RAINWELL DR RAINFIELD DR
5 RAINWELL DR RAINFIELD DR RAINFIELD DR
5 RAINWELL CT RAINWELL DR W END
5 EASTON CT EASTON DR N END
5 BATON ROUGE DR EASTON DR CEDARVILLE LN
5 WILLIFORD DR GILCHRIST DR N CAPITOL AV
5 RAINWELL DR RAINFIELD DR W RAINVIEW DR
5 GIMELLI WY N CAPITOL AV EASTON DR
5 EASTON DR GIMELLI WY EASTON CT
5 BATON ROUGE DR ST CHARLES CL/CELADON

CL N CAPITOL AV
5 BATON ROUGE DR ST CHARLES CL BEIGNET WY
5 BATON ROUGE DR BEIGNET WY CELADON CL
5 BATON ROUGE DR CELADON CL ST CHARLES CL
5 BATON ROUGE DR CEDARVILLE LN ST CHARLES CL
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 6 of 11 ends

CD Street Name Street From Street To
5 BELL AV FRANCIS DR W END
5 KENTRIDGE DR WHITE RD N END
5 MABURY RD N WHITE RD GRIDLEY ST
5 FRANKLIN CT MABURY RD E END
5 TIMOR CT MABURY RD E END
6 SUNNY VISTA DR N MONROE ST N WINCHESTER BL
6 BOXWOOD DR N MONROE ST N WINCHESTER BL
6 REDWOOD AV N BOXWOOD DR TULIP RD
6 REDWOOD AV N NEWHALL ST BOXWOOD DR
6 PEACHTREE LN SUNNY VISTA DR TULIP RD
6 PEACHTREE LN TULIP RD BOXWOOD DR
6 CHERRYSTONE DR N MONROE ST SUNNY VISTA DR
6 CORY AV N MONROE ST WOODLAND AV
6 WOODLAND AV N WINCHESTER BL N MONROE ST
6 HOMEWOOD DR HEDDING ST W MONROE ST N
6 HOMEWOOD DR N. MONROE ST N. DANIEL WY
6 GENEVIEVE LN N DANIEL WY N HOMEWOOD DR
6 CLOVER AV N FOREST AV HOMEWOOD DR
6 REDWOOD AV N FOREST AV HOMEWOOD DR
6 BEECHWOOD AV N REDWOOD AV FOREST AV
6 WESTRIDGE DR FOREST AV PRUNERIDGE AV
6 CRESTVIEW DR FOREST AV PRUNERIDGE AV
6 TULIP RD PEACHTREE LN N MONROE ST
6 WALNUT GROVE AV MONROE ST N REDWOOD AV N
6 DANIEL WY N HEDDING ST FRONTAGE W GENEVIEVE LN
7 POCATELLO CT HUNKEN DR E END
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 7 of 11 ends

CD Street Name Street From Street To
7 POCATELLO DR HUNKEN DR DURANT AV
7 INDEPENDENCE DR DURANT AV SENTER RD
7 LOUMENA LN SENTER RD DURANT AV
7 WALL ST LEWIS RD SOUTHSIDE DR
7 HOPE ST SOUTHSIDE DR N END
7 WEBER ST WALL ST W END
7 WATER ST SOUTHSIDE N END
7 DURANT AV LEWIS RD SOUTHSIDE DR
8 APPLE GROVE CT CASTLE CANYON WY N END
8 BLUFF CT RUNNING SPRINGS RD S END
8 CARMELLA CT RACHAELLA LN E END
8 CASTLE CANYON WY HEARTLAND WY LIVERY LN
8 CLOVER MEADOW CT SCENIC MEADOW LN E END
8 CREEKVIEW MEADOW

LN SCENIC MEADOW LN SCENIC MEADOW LN
8 DOVETAIL CT RUNNING SPRINGS RD W END
8 FLOWERING MEADOW

CT FLOWERING MEADOW LN SW END
8 GAYLEY PL RACHELLA LN N END
8 GOLD MEADOW CT SCENIC MEADOW LN E END
8 GRAND MEADOW LN MEADOWLANDS LN MEADOWLANDS LN
8 GRAND OAK WY RUNNING SPRINGS RD HEMATITE CT
8 HAWKCREST CIR RUNNING SPRINGS RD E END
8 HEARTLAND WY 1030' N/OF SAN FELIPE RD N END
8 HECKER CT SILVER OAK ST N END
8 HEMATITE CT GRAND OAK WY E END
8 HIGH MEADOW WY MEADOWLANDS LN MEADOWLANDS LN
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 8 of 11 ends

CD Street Name Street From Street To
8 LIVERY LN RUNNING SPRINGS RD S END
8 MEADOW VISTA CT MEADOWFIELD LN N END
8 MEADOWFIELD LN SAN FELIPE RD E END
8 MEADOWLANDS LN WILD MEADOW WY VALLEY MEADOW CT
8 MEADOWLANDS LN VALLEY MEADOW CT SAN FELIPE RD
8 MEADOWLANDS LN SAN FELIPE RD HIGH MEADOW LN N
8 MEADOWLANDS LN HIGH MEADOW LN N WILD MEADOW WY
8 MEADOWLEAF CT SAN FELIPE RD E END
8 MOUNTAIN MEADOW CT MEADOWLANDS LN E END
8 OLD MEADOW CT ROYAL MEADOW LN S END
8 SLOPING MEADOW CT ROYAL MEADOW LN S END
8 SKY MEADOW WY ROYAL MEADOW LN MEADOWLANDS LN
8 ROYAL MEADOW LN GRAND MEADOW LN GRAND MEADOW LN
8 ROLLING MEADOW CT ROYAL MEADOW LN S END
8 SPRING MEADOW CT ROYAL MEADOW LN S END
8 WILD MEADOW WY ROYAL MEADOW LN MEADOWLANDS LN
8 PLACID CT RUNNING SPRINGS RD E END
8 PROMONTORY WY LIVERY WY HEARTLAND WY
8 RACHELLA LN GAYLEY PL SILVER OAK ST
8 RED PEAK LN RUNNING SPRINGS RD SKYWALKER WY
8 ROBIN RIDGE CT GRAND OAK WY E END
8 RUNNING SPRINGS RD E END E END
8 SKYWALKER WY RUNNING SPRINGS RD RUNNING SPRINGS RD
8 WINDROW CT RUNNING SPRINGS RD S END
8 WILDERNESS CIR HEARTLAND WY W END
8 SCENIC MEADOW LN SAN FELIPE RD MEADOWLANDS LN
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 9 of 11 ends

CD Street Name Street From Street To
8 SILVER OAK ST RACHELLA LN SAN FELIPE RD
8 VALLEY MEADOW CT MEADOWLANDS LN W END
8 EARLY MORNING LN WB RUNNING SPRINGS RD SAN FELIPE RD
8 EARLY MORNING LN EB SAN FELIPE RD RUNNING SPRINGS RD
8 FLOWERING MEADOW

LN SAN FELIPE RD FLOWERING MEADOW CT
8 FLOWERING MEADOW

LN FLOWERING MEADOW CT S END
8 GRAND OAK WY HEMATITE CT N END
8 TURTURICI CT TURTURICI WY E END
8 TURTURICI WY TURTURICI CT W END
8 TURTURICI WY SAN FELIPE RD TURTURICI CT
9 LYLE LN CURTNER AV LYLE LN
9 LYLE LN LYLE LN S BASCOM AV
9 SAMSON CT SAMSON WY W END
9 OAKWOOD AV ROSS AV CAMDEN AV
9 DONNA LN CAMDEN AV ROSS AV
9 NELSON WY LEIGH AV CAMDEN AV
9 GAYLE DR LENCAR WY GUNSTON WY
9 GUNSTON WY GAYLE DR LEIGH AV
9 GUNSTON WY LEIGH AV WYRICK AV
9 BERCAW LN WYRICK AV CAMDEN AV
9 LINWOOD DR GUNSTON WY NELSON WY
9 GATES DR LENCAR WY NELSON WY
9 BASSWOOD CT LITTLE BRANHAM LN S END
9 HEIMGARTNER LN UNION AV KENLAR DR
9 LITTLE BRANHAM LN HARWOOD DR LEIGH AVE
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 10 of 11 ends

CD Street Name Street From Street To
9 CAMBRIA CT CAMDEN AVE E END
9 Swain Wy Tony Av / N Swan Wy Anna Dr / N Swan Wy
9 NOREEN DR WOODFORD DR KIRK RD
9 KILO AV SILVERWOOD DR HILLSDALE AV
9 JULIO AV HILLSDALE AV SILVERWOOD DR
9 IRLANDA WY SILVERWOOD DR HILLSDALE AV
10 CESSNA CT GALEN DR S END
10 CONTESSA CT GALEN DR S END
10 NORTHDALE CT GALEN DR S END
10 FORBES WY GALEN DR CURIE DR
10 PANCHO CT GALEN AV S END
10 MAHAN DR MCCAMISH AV LEAN AV
10 FEVER DR MAHAN DR DUNN AV
10 ELLERBROOK WY LOS PINOS WY ANSDELL WY
10 ANSDELL WY ELLERBROOK WY LOS PINOS WY
10 PEDRICK CT BOSE LN N END
10 HOSTA LN HYACINTH LN VISTA LOOP
10 HYDRANGEA LN BEGONIA DR 345 E/OF BEGONIA DR
10 HYDRANGEA LN 345'E/BEGONIA DR E END
10 CANNA LN BEGONIA DR 1064 E/OF BEGONIA DR
10 IXIAS CT IXIAS LN W END
10 DRYSDALE DR BLOSSOM HILL RD ALMOND BLOSSOM LN
10 ALMOND BLOSSOM LN CAMDEN AV CITY LIMIT
10 ARBOR DELL WY BLOSSOM HILL RD FLOWER GARDEN LN
10 FLOWER GARDEN LN ARBOR DELL WY CAMDEN AV
10 PRESTON DR CAMDEN AV MALPAS DR
Attachment - 10627 – 2026 Local Streets Sealing Pavement Project

Page 11 of 11 ends

CD Street Name Street From Street To
10 MALPAS DR PRESTON DR CAMDEN AV

← All documents from this meeting