TO: HONORABLE MAYOR

AND CITY COUNCIL
FROM: Matt Loesch

SUBJECT: See Below DATE: July 20, 2026

Approved

Date:
7/30/26

COUNCIL DISTRICT: 10

SUBJECT: Franchise Agreement with Tokay Energy Storage 1, LLC for Electric Services for Public Rights-of-Way

RECOMMENDATION

Adopt a resolution:

(a) Setting a public hearing for August 25, 2026, at 1:30 p.m., to hear any objections to the granting of the franchise to Tokay Energy Storage 1, LLC for the purpose of transmitting electric services in the City's public rights-of-way; and

(b) Directing the City Clerk to publish notice of the public hearing.

SUMMARY AND OUTCOME

Adoption of this resolution will enable the City Council to conduct a public hearing to consider objections to the City's intent to grant a franchise to Tokay Energy Storage 1, LLC (Tokay), a subsidiary of New Leaf Energy, Inc., for the installation and construction of electric interconnection and transmission facilities and appurtenances within the City's public rights-of-way on Santa Teresa Boulevard and Martinvale Lane, connecting Tokay's approximately 100-megawatt (MW) battery energy storage facility located at 6150 San Ignacio Avenue to the existing Pacific Gas & Electric Santa Teresa Substation (see Attachment A – Project Map).

The proposed franchise agreement maintains the City's historical franchise structure while incorporating objective market benchmarks and securing community benefits associated with a modern battery energy storage facility. In addition to franchise fee compensation, the project includes a Community Benefit Agreement (CBA) requiring a $100,000 contribution to San José Fire Department's Emergency Response Equipment Fund and a covenant to maximize local sales tax revenue. Together, these elements COUNCIL AGENDA: 8/11/26
FILE: 26-829
ITEM: 2.21

HONORABLE MAYOR AND CITY COUNCIL
July 20, 2026
Subject: Franchise Agreement with Tokay Energy Storage 1, LLC for Electric Services for Public Rights-of-Way

Page 2 ends

provide considerable community benefit and greater predictability for future battery energy storage developers to select San José for their next project.

BACKGROUND

Electric battery storage systems are a critical component of California's transition to clean energy. As the State of California accelerates renewable energy integration, large-scale battery storage facilities provide the grid flexibility necessary to balance variable generation sources and maintain reliability across the broader Bay Area electric system.

The Tokay Energy Storage project will construct an approximately 100 MW battery energy storage facility on a 5.5-acre site at 6150 San Ignacio Avenue in south San José. The project includes the installation of four 8-inch and two 4-inch underground electric interconnection conduits running approximately 1.3 miles (6,864 linear feet) along Santa Teresa Boulevard and Martinvale Lane connecting the facility to the existing Pacific Gas & Electric Santa Teresa Substation. The conduits will be installed underground within the public rights-of-way, consistent with the City's requirements for below-grade utility infrastructure.

The City has previously granted a franchise in 2022 for a similar battery energy storage interconnection to Hummingbird Energy Storage, LLC for a project along Monterey Road to the Pacific Gas & Electric Metcalf Substation. The Tokay franchise builds directly on that precedent, while updating the compensation structure to reflect current market conditions and incorporating an Infrastructure Capacity Adjustment and community benefits not included in the previously granted franchise.

ANALYSIS

As required by Chapter 15.32.030 of the San José Municipal Code, Tokay submitted an application for franchise on June 30, 2026.

Under Article XIII of the San José City Charter, the City Council is empowered to grant a franchise by ordinance for the purpose of furnishing the City or its inhabitants with water, light, heat, and gas, etc., or any other public utility or service using or proposing to use any public street, way, alley, or place in the City. Subject to the provisions of Article XIII of the San José City Charter, the City Council may grant a franchise pursuant to procedures prescribed by ordinance or by state law.

Chapter 15.32 of the San José Municipal Code establishes the City’s exclusive procedures for granting gas and electric franchises, including the procedure by which

HONORABLE MAYOR AND CITY COUNCIL
July 20, 2026
Subject: Franchise Agreement with Tokay Energy Storage 1, LLC for Electric Services for Public Rights-of-Way

Page 3 ends

the City may grant a franchise to construct or use poles, wires, conduits, and appurtenances for the transmission and distribution of electricity.

As outlined in Chapter 15.32.040 of the San José Municipal Code, the City Council may pass a resolution declaring its intention to grant the proposed franchise. The City Council must then consider any objections to the granting of the franchise at a public hearing, which shall be set for a fixed time not less than 10 days or more than 25 days after the date of the adoption of said resolution.

If the City Council adopts the resolution as part of this memorandum, declaring its intention to grant the proposed franchise ordinance, the ordinance will be scheduled for public hearing and the City Council’s final consideration on August 25, 2026.

Staff recommend a franchise term of 10 years, consistent with the City’s prior battery energy storage franchise. The proposed franchise sets forth various requirements for construction, operation and maintenance of Tokay's project, including insurance, bonds, and indemnification requirements. The franchise will not become effective until Tokay executes a CBA with the City. In addition, a Memorandum of Understanding will outline a shared commitment between Tokay and the City to partner on innovative or pilot project opportunities that may arise during the franchise term, including climate action technologies and climate resiliency options.

Staff's analysis of the proposed franchise is organized around four key findings:

Finding 1: Continuity With Existing Franchise Practice

The proposed franchise maintains the City's established approach of compensating the public for the use of public rights-of-way through a linear-footage occupancy model, consistent with prior battery energy storage franchise agreement, while updating the linear-footage rates to better reflect today’s market conditions. To verify that the new rates are reasonable, staff benchmarked them against the rates from three comparable franchise examples: the County of Los Angeles, the City of Carson, and the City's own prior battery energy storage franchise with Hummingbird Energy Storage, LLC along the Monterey Road corridor.

The linear-footage component of the proposed franchise for the approximately 1.3 miles of underground conduit along Santa Teresa Boulevard and Martinvale Lane totals $29,927. This amount falls squarely within the range established by the comparable jurisdictions, above the outdated prior franchise rate and consistent with current regional market practice. A detailed calculation breakdown, including conduit dimensions, cross- sectional areas, and fee calculations for each comparable, is provided in Attachment B - Franchise Fee Comparable Analysis.

HONORABLE MAYOR AND CITY COUNCIL
July 20, 2026
Subject: Franchise Agreement with Tokay Energy Storage 1, LLC for Electric Services for Public Rights-of-Way

Page 4 ends

Finding 2: Modernization Through Infrastructure Capacity Adjustment

Battery energy storage facilities provide a fundamentally different type of infrastructure value than traditional pipeline occupancy. The capacity they provide to the electric grid, measured in megawatts (MW) available for resource adequacy, represents a form of public benefit that is distinct from, and not captured by, simple physical occupancy. The ability to store and dispatch up to 100 MW of electricity on demand has real, measurable value to the reliability of the regional electric grid.

To reflect this distinction, the proposed franchise introduces an Infrastructure Capacity Adjustment, a new annual fee component calculated using the California Public Utilities Commission Local Resource Adequacy Market Price Benchmark for Pacific Gas & Electric, published each October by the California Public Utilities Commission. This independently established benchmark reflects the market value of electric capacity available to support grid reliability. The Infrastructure Capacity Adjustment is not based on project revenues, profitability, electricity sales, or customer rates. Instead, it provides an objective, transparent adjustment reflecting the scale of infrastructure enabled by the franchise. This framework is scalable and can be applied consistently to future battery energy storage projects in San José, providing developers clear and predictable expectations when evaluating the City as a project location.

The Infrastructure Capacity Adjustment solely based on Tokay's scale of grid capacity that the project makes available, in this case, 100 MW, applied at modest percentage rates structured across two tiers. The tiered structure applies a lower rate (0.1%) to the project's baseline capacity (0-50 MW) and a higher rate (0.25%) to the upper range of its footprint (50-100 MW), consistent with the principle that larger facilities providing greater grid benefit should contribute proportionally more. Using the 2025 California Public Utilities Commission benchmark values, the combined Infrastructure Capacity Adjustment is projected to be $25,662 annually. Detailed calculations are provided in Attachment C - Infrastructure Capacity Adjustment Calculations.

Finding 3: Community Benefit Commitments

In addition to franchise fee compensation, the franchise includes a commitment by Tokay to execute a CBA. Execution of the CBA between Tokay and the City is a condition precedent of the franchise taking effect.

The CBA includes the following commitments:
• Sales Tax Covenant: During the term of the CBA (15 years from project approval), Tokay will use commercially reasonable efforts to maximize the total amount of local sales and use tax revenue received by the City from construction and development of the project, including purchases made by third-party contractors. Battery energy storage projects involve significant procurement of equipment and materials. A meaningful share of those purchases can generate

HONORABLE MAYOR AND CITY COUNCIL
July 20, 2026
Subject: Franchise Agreement with Tokay Energy Storage 1, LLC for Electric Services for Public Rights-of-Way

Page 5 ends

local sales tax receipts for the City's General Fund, but only if the developer structures its procurement accordingly. This covenant ensures Tokay is actively working to direct that benefit to San José rather than allowing it to accrue elsewhere by default.
• Emergency Response Equipment Fund: Within 90 days of the project receiving all permits necessary for commencement of operation, Tokay will make a one- time $100,000 contribution to the City Fire Department's Emergency Response Equipment Fund for specialized equipment related to battery storage emergency response.

This contribution addresses a real and specific public safety need. Lithium-ion battery fires behave fundamentally differently from conventional electrical fires. They can reignite hours or days after initial suppression, require far greater volumes of water, and may release toxic gases that demand specialized protective equipment. Standard fire department readiness protocols are not designed for these scenarios. The $100,000 contribution will help ensure that San José firefighters have the equipment and training necessary to respond effectively should an incident occur at this facility or at future battery storage sites in the City.

Finding 4: Full Public Benefit Package

Individually, each component of this franchise (the linear-footage fee, the Infrastructure Capacity Adjustment, and the CBA) represents a meaningful improvement over prior battery energy storage franchise agreements. Together, they provide considerable community value and build a framework of predictability that encourages future battery storage developments in San José.

The total estimated annual franchise compensation of $55,589 better reflects the modern grid market reality. The $100,000 Fire Department contribution addresses an equipment and training gap that will only grow as more battery storage facilities come online in San José. The sales tax covenant ensures the City captures construction- phase tax revenue that might otherwise be lost. In addition, the property tax growth associated with Tokay's improvements to the project site will provide additional ongoing benefit to the City's tax base.

Taken together:
• $55,589 estimated annual franchise compensation, combining the linear-footage fee and the Infrastructure Capacity Adjustment, both updated and indexed to objective published benchmarks;
• $100,000 one-time Fire Department contribution for battery storage emergency response preparedness;
• A binding sales tax covenant ensuring commercially reasonable efforts to maximize San José's share of construction-phase sales and use tax receipts; • Anticipated property tax growth from improvements to the project site.

HONORABLE MAYOR AND CITY COUNCIL
July 20, 2026
Subject: Franchise Agreement with Tokay Energy Storage 1, LLC for Electric Services for Public Rights-of-Way

Page 6 ends

The proposed franchise agreement maintains the City's historical franchise structure while incorporating objective market benchmarks and securing community benefits associated with a modern battery energy storage facility. The findings above provide considerable community benefit and establishes greater predictability for future battery energy storage developers to select San José for their next project, making clear that the City has a fair, transparent, and well-reasoned framework in place for projects of this type.

EVALUATION AND FOLLOW-UP

The City Council will conduct a public hearing at the August 25, 2026 City Council meeting to hear any objections to the City's intent to grant the franchise. Any interested person may make a written protest stating objections against the granting of the franchise. All protests shall be signed by the protestor and be mailed or delivered to the City Clerk at 200 E. Santa Clara Street, 14th floor, San José, CA 95113, no later than 12 p.m. on August 25, 2026. At the time set for the hearing, the City Council shall hear all objections and pass upon all protests made, and its decision shall be final and conclusive.

Staff will continue to coordinate with the Fire Department regarding the Emergency Response Equipment Fund contribution and any ongoing costs needed to support Fire Department operations to adequately address the challenges of battery fires. They will report to the City Council if any material changes to the CBA terms result from those discussions.

FISCAL IMPACTS

Tokay will pay the City an annual franchise fee consisting of two components: (1) a linear-footage component of $29,927 based on the per-lineal-foot rate schedule in the proposed franchise ordinance; and (2) a tiered Infrastructure Capacity Adjustment of $25,662 annually. The tiered structure applies a modest rate to baseline capacity while capturing greater value from the upper range of the facility's 100 MW footprint.

Combined, the estimated total annual franchise compensation is $55,589.

In addition, Tokay's one-time $100,000 Emergency Response Equipment Fund contribution will support the San José Fire Department’s readiness for battery storage emergencies. Sales and use tax revenue generated during construction is not estimated at this time but is expected to provide meaningful benefit to the City’s General Fund, subject to Tokay's commercially reasonable efforts covenant in the CBA.

Under the franchise agreement, Tokay will remit payments within 60 days after the end of each calendar year. Substantial franchise fee revenue is not expected to be received

HONORABLE MAYOR AND CITY COUNCIL
July 20, 2026
Subject: Franchise Agreement with Tokay Energy Storage 1, LLC for Electric Services for Public Rights-of-Way

Page 7 ends

until the project becomes operational. Construction is expected to begin in late 2027 with project operation tentatively anticipated by 2029. Franchise fee revenue will be deposited in the City’s General Fund.

COORDINATION

This memorandum was coordinated with the City Attorney’s Office, City Manager’s Budget Office, City Manager’s Office of Economic Development and Cultural Affairs, Energy Department, Environmental Services Department, Fire Department, and the Planning, Building, and Code Enforcement Department.

PUBLIC OUTREACH

This memorandum will be posted on the City Council Agenda website for the August 11, 2026 City Council meeting. The City Clerk will also be directed to publish notice of the public hearing for August 25, 2026.

BOARD, COMMISSION, COMMITTEE RECOMMENDATION AND INPUT

No commission recommendation or input is associated with this action.

CEQA

Community Plan Exemption, File No. CP24-015, CEQA Guidelines Section 15183, Projects Consistent with a Community Plan or Zoning.

PUBLIC SUBSIDY REPORTING

This item does not include a public subsidy as defined in section 53083 or 53083.1 of the California Government Code or the City’s Open Government Resolution.

/s/

MATT LOESCH
Director of Public Works

HONORABLE MAYOR AND CITY COUNCIL
July 20, 2026
Subject: Franchise Agreement with Tokay Energy Storage 1, LLC for Electric Services for Public Rights-of-Way

Page 8 ends

For questions, please contact J. Guevara, Deputy Director of Public Works, Public Works Department at [email protected] or (408) 535-8300.

ATTACHMENTS:

Attachment A – Project Map
Attachment B – Franchise Fee Comparable Analysis
Attachment C – Infrastructure Capacity Adjustment Calculations

I

SITE OVERVIEW
SCALE: 1" = 500' C=::J
o 250· 500' 1000· A
���� i
Attachment A - Project Map
Key Site
Proposed Underground Conduit
Conduit Conduit Quantity Diameter Cross-Sectional Area (each) sq ft Combined Area sq ft Power conduits 4 8 inches 0.349 1.396
Signal/comm conduits 2 2 inches 0.022 0.044
Total 1.44
Gen-tie length: approximately 1.3 miles (6,864 linear feet) Jurisdiction Rate Source Calculation Annual Fee Additional Notes County of Los Angeles $2.10 per cubic foot (annually)
LA County E&B Natural Resource
Management Corportation Franchise
Agreement

1.44 sq ft × 6,864 LF × $2.10/cu ft $20,757 $10,000 (one-time upfront granting fee) City of Carson $3.29/LF (2018 rate $2.56 CPI-
adjusted) Carson City Municipal Code 1.44 sq ft × 6,864 LF × $3.29/cu ft $32,529 $9,674 (one-time upfront granting fee) City of San José
$0.228/ LF of 8" Conduit
$0.114/ LF of 4" Conduit City of San José Hummingbird Energy Storage, LLC Franchise
(6,864 LF × $0.228/ LF 8" × 4 conduits) +
(6,864 LF × $0.114/ LF 4" ×2 conduits) $7,825
Legacy pipeline-style per-LF schedule; The rate for 4"
diameter conduits is the smallest diameter provided
and was used as a proxy to calculate the 2" diameter
conduit fee.

Conduit Quantity Rate ($/LF) Length (LF) Annual Fee Calculation Annual Fee Total 8-inch conduits 4 $0.92 6,864 4 × $0.918 × 6,864 $25,204.61 4-inch conduits (proxy for 2-
inch conduits) 2 $0.34 6,864 2 × $0.344 × 6,864 $4,722.43 Total $29,927.04
Jurisdiction Annual LF Fee
Prior San José BESS
Franchise $7,825.00
Los Angeles County $20,757.00
City of Carson (CPI-
adjusted) $32,529.00
Tokay (Proposed) $2,927.04
Attachment B: Franchise Fee Comparable Analysis
Summary Comparison
Project Conduit Configuration
Franchise Fee Comparable Analysis
Proposed Tokay Linear Footage Fee
Formula:CPUC Market Price Benchmark for PG&E Local Resource Adequacy × Tier MW × 1,000 kW/MW × 12 months × Tier Adjustment Percentage 2025 Benchmark Value:

Tier Capacity Range Adjustment % Calculation Annual Amount Tier 1 0 – 50 MW 0.10% $12.22 × 50MW × 1,000 kW/MW × 12 × 0.001 $7,332 Tier 2 51 – 100 MW 0.25% $12.22 × 50MW × 1,000 kW/MW × 12 × 0.025 $18,330 Total $25,662
Attachment C - Infrastructure Capacity Adjustment Calculations $12.22/kW-month (Published October 2025; updated annually each October by CPUC)