BID SUMMARY
BID OPENING Instuform Technologies, LLC Valentine Corporation Mitchell Engineering DATE: December 7, 2021 Date Approved: 11/5/2021 17988 Edison Avenue 111 Pelican Way 1395 Evans Avenue TIME: 3:00 pm Prepared by: J. Ababa Chesterfield, MO 63005 San Rafael, CA 94901 San Francisco, CA 94124 LOCATION: City Clerk's Office Phone: (636) 530-8000 Phone: (415) 453-3732 Phone: (415) 227-1040 Fax: (636) 530-8701 Fax: (415) 457-5820 Fax: (415) 227-1046 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST 1 All work shown on plans or
specifications (except for Bid item 2)
1 LS $575,600.00 $575,600.00 $766,485.00 $766,485.00 $1,077,369.00 $1,077,369.00 $1,155,000.00 $1,155,000.00 2 Sheeting, Shoring, and Bracing 1 LS $29,400.00 $29,400.00 $40,570.00 $40,570.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 TOTAL BASE BID:

REQUIRED DOCUMENTATION:

Agreement to be Bound
*
SUBCONTRACTORS:

JMB Construction, Inc. Mission City Rebar Rain for RentSunbelt Rentals Murphy Industrial Coatings Tap Master, Inc.Ransome Company
NOTES:

Date:

Jerome Ababa, Project Manager
Date:

Austine Osakwe, Senior EngineerEffluent Line Rehabilitation This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information.

NO NO

YES YES
NO NO
$1,197,369.00 $1,205,000.00

YES YES
NO NO
Yes NO
Insituform Technologies, LLC
PROJECT TITLE:

PROJECT NO.:

BID NO.:

QUANTITY
Water Pollution Control Plant 36" Secondary
$807,055.00
Calstate Pipeline, Inc.
2018.600020-21.007
YES
NO

NONONONO
Bid Bond

ITEM COST ITEM COST
$605,000.00

ENGINEER'S ESTIMATE

ITEM COST
Reviewed by:Reviewed by:

Insituform
Addendum No. 4 not received
San Leandro Local BusinessAddenda #1-425 % ParticipationGood Faith Effort WPCP SE Line Rehabilitation Page 1 of 1 Printed 12/8/2021 @ 4:04 PM 12/9/21