San Leandro Crosstown
Corridors Study
Alternatives Engagement Summary
June 2022
Project Timeline
Currently
Beginning
Phase 3
We took the Bancroft Avenue and Williams
Street concepts to the community.
2 Open Houses
617
Website Visitors
122
Survey Responses
3 Committee and
Advisory Group
Meetings
Crosswalk enhancements, speed
management, and separated bike lanes are
very important to the community.
0 20
40 60
80 100
120
140
Crosswalk
Enhancements
Speed
Management
Bus Stop
Enhancements
Separated Bike
Lanes
On-Street Parking
and Loading
School Zone PickUp and Drop-Off
Are these design considerations important to you?
Not Very Important Somewhat Important Very Important
They shared additional thoughts on the
baseline improvements for both corridors.
“Fully concrete-separated
bike lanes are an absolute
must. Crosswalk
improvements should be at
as many intersections as
possible.”
“Bike lanes must be safe enough that
parents are comfortable with their kids
using them alone.”
“Speed management
throughout San Leandro is
important to me. I would
encourage the city to
invest in tree-lined streets
to discourage speeding.”
“Pedestrian safety should
be number one.”
“California
native plant
landscaping is
important.”
Bancroft Option 1 – Two-Way
Separated Bike Lanes
Two-Way Separated
Bike Lanes
Crosswalk Safety
Enhancements Speed Management
80% of respondents said
they would feel comfortable
with Option 1.

Bancroft Option 2 – One-Way
Separated Bike Lanes
One-Way
Separated Bike Lanes
Crosswalk
Enhancements Speed Management
75% of respondents said
they would feel comfortable
with Option 2.

Williams Option 1 – Two-Way
Separated Bike Lanes
One-Way Separated Bike Lanes Pick-Up/Drop-Off Crosswalk Enhancements 71% of respondents said
they would feel comfortable
with Option 1.

Williams Option 2 – One-Way
Separated Bike Lanes
One-Way Separated Bike Lanes Pick-Up/Drop-Off Crosswalk Enhancements 62% of respondents said
they would feel comfortable
with Option 2.

On both corridors, feedback for Option 1
was enthusiastic, with some concerns
about intersection design and conflicts.
“Looks good from safety and access
standpoint. Needs native plant
landscaping to complete aesthetics
and ecological responsibility.”
“I'd be curious to see what the
intersection treatment is for a
two-way separated bike lane, as
I'm not familiar with best practices
with regard to that type of facility.”
“I would be concerned about drivers
[exiting side streets] not looking
right as I’m commuting home.”
“Hopefully slower speeds means
less car noise to make the local
businesses more enjoyable.”
Feedback for Option 2 was also positive,
but with significant concerns about
parking and space constraints.
“It does not have room for landscaping
which is a key component for shaping the
neighborhood.”
“Would be my preferred design but not
at the sacrifice of street parking
south of the high school. That's a lot to
ask.”
“Smaller buffers make me
feel less safe.”
“This would make cross town
rides much easier and safer.”
For Bancroft, more respondents preferred
Option 1, the two-way bikeway.

Option 1: Two-Way
Bikeway, 58%
Option 2: One-Way
Bikeways, 36%
Option 1: Two-Way Bikeway Option 2: One-Way Bikeways Neither Either One On Williams, Option 1, the two-way
bikeway, was also preferred.

Option 1: Two-Way
Bikeway, 63%
Option 2: One-Way
Bikeways, 37%
Option 1: Two-Way Bikeway Option 2: One-Way Bikeways
Staff recommend Option 1, a two-way
separated bikeway, on both corridors.

Wider Buffers
Robust Bus Stops
More Landscape Opportunity
More Parking Retention
Focus on School Access
Community Support
For both corridors, community input has
identified our focus areas for the full
concept design.
Intersection Design
School Zone Passenger Loading
Trees and Planting Opportunities
Bikeway Separation Design
Driveway Access
Parking Configuration
Next, the project team will prepare
concepts for phase 3 outreach.
Full Concepts with Block-by Block Concept Design
Student Ambassadors Start June 27 for Summer Outreach
Tactical Urbanism Demonstration Project in August 2022 Final Concept by End of 2022