Cities Index.
Att I - Prelininary Sea Level Rise Exhibit

San Leandro City Council
June 21, 2022

Document
Att I - Prelininary Sea Level Rise Exhibit
Meeting
June 21, 2022
Body
San Leandro City Council
Original file
3.8 MB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

T
T
T
T T T

MULTI-FAMILY

FINISH FLOOR
FF 11.50 (NGVD29) FF 14.17 (NAVD88)
HOTEL FINISH FLOOR FF 15.25 (NGVD29) FF 17.92 (NAVD88)
RESTAURANT FINISH FLOOR FF 14.25 (NGVD29) FF 16.92 (NAVD88) FINISH FLOOR MARKET FF 11.50 (NGVD29) FF 14.17 (NAVD88) SHORELINE PROPOSED MINIMUM ELEVATIONS 11.83 (NGVD29) 14.50 (NAVD88) 2070 BASE FLOOD ELEVATION - 14.50 (NAVD88) 2050 BASE FLOOD ELEVATION - 12.90 (NAVD88) SHORELINE PROPOSED MINIMUM ELEVATIONS 13.83 (NGVD29) 16.50 (NAVD88) 2070 BASE FLOOD ELEVATION - 16.50 (NAVD 88) 2050 BASE FLOOD ELEVATION - 14.90 (NAVD 88) SHORELINE PROPOSED MINIMUM ELEVATIONS 12.83 (NGVD29) 15.50 (NAVD88) 2070 BASE FLOOD ELEVATION - 15.50 (NAVD88) 2050 BASE FLOOD ELEVATION - 13.90 (NAVD88) SHORELINE PROPOSED MINIMUM ELEVATIONS 11.13 (NGVD29) 13.80 (NAVD88) 2070 BASE FLOOD ELEVATION - 13.50 (NAVD88) 2050 BASE FLOOD ELEVATION - 11.90 (NAVD88) SHORELINE FRONTING EXISTING HOTEL AND RESTAURANT TO REMAIN AS EXISTING 3 3 1 1 2 2

1. DEVELOPMENT TO PROVIDE FUTURE

MITIGATION MEASURES TO BE
RESILIENT TO 2100 SEA LEVEL RISE.

2. MAJORITY OF DEVELOPMENT IS TO BE
PROTECTED TO 2070 SEA LEVEL RISE
PROJECTIONS.

3. THE ELEVATIONS IN THIS EXHIBIT ARE
PRESENTED IN 2 WAYS, EACH
REPRESENTING 2 DIFFERENT DATUMS:

3.1. NGVD29: WHICH REPRESENTS THE

DATUM USED BY CITY OF SAN

LEANDRO

3.2. NAVD88: WHICH REPRESENTS THE

DATUM USED BY FEMA AND BCDC

4. THE PROPOSED MINIMUM ELEVATIONS

WERE DETERMINED BY USING THE

CURRENT FEMA BASE FLOOD
ELEVATIONS AND ADDING THE 2070

PROJECTED SEA LEVEL RISE FOR HIGH

EMISSIONS BASED ON THE STATE OF

CALIFORNIA SEA-LEVEL RISE GUIDANCE
REFERENCE.

5. DESIGN CRITERIA FOR FINISH FLOORS
AND SHORELINE FINISH ELEVATION:

5.1. MINIMUM SHORELINE ELEVATION &
BUILDING FINISH FLOOR: FEMA
BASE FLOOD ELEVATION + 3.5' (2070

MED-HIGH RISK AVERSION, HIGH

EMISSIONS)