BID SUMMARY
BID OPENING Spencon Construction Kerex Engineering, Inc. Rosas Brothers Construction DATE: November 2, 2022 3170 Crow Canyon Pl. #250 4941 Pacheco Blvd. 4731 Coliseum WayTIME: 3:00 P.M. San Ramon, CA 94583 Martinez, CA 94553 Oakland, CA 94601LOCATION: City Clerk's Office Phone: (925) 984-2581 Phone: (925) 387-8913 Phone: (510) 534-1077 Fax: (925) 984-2583 Fax: (925) 387-0853 Fax: (510) 534-5077 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST

BASE BID
1 Mobilization, Staging, and Stockpiling
per Section 7-8.4 and 9-3.4
1 LS $50,000.00 $50,000.00 $10,000.00 $10,000.00 $100,000.00 $100,000.00 $5,000.00 $5,000.00 2 Temporary Traffic Control per Section
600
1 LS $75,000.00 $75,000.00 $50,000.00 $50,000.00 $75,000.00 $75,000.00 $5,000.00 $5,000.00 3 Curb Cut Ramp Type A or B per
Section 303-5.9
96 EA $7,500.00 $720,000.00 $5,000.00 $480,000.00 $5,250.00 $504,000.00 $7,600.00 $729,600.00 4 Curb Cut Ramp Type C or D per
Section 303-5.9
187 EA $6,500.00 $1,215,500.00 $5,000.00 $935,000.00 $5,150.00 $963,050.00 $6,750.00 $1,262,250.00 5 Dome and Landing Replacement per
Section 303-5.9
60 EA $3,500.00 $210,000.00 $2,300.00 $138,000.00 $2,900.00 $174,000.00 $1,500.00 $90,000.00 6 Gutter Replacement per Section 303-

5.9 29 EA $1,200.00 $34,800.00 $2,500.00 $72,500.00 $2,750.00 $79,750.00 $1,200.00 $34,800.00 7 Retaining Curb Replacement per
Section 303-5.9
4 EA $1,000.00 $4,000.00 $1,500.00 $6,000.00 $3,000.00 $12,000.00 $3,000.00 $12,000.00 8 Sidewalk per Section 303-5.9 7500 SF $25.00 $187,500.00 $16.00 $120,000.00 $15.00 $112,500.00 $8.00 $60,000.009 Curb and Gutter per Section 303-5.9 1200 LF $115.00 $138,000.00 $95.00 $114,000.00 $100.00 $120,000.00 $50.00 $60,000.00 10 AC Tie In per Section 302 -5.9 1500 SF $40.00 $60,000.00 $15.00 $22,500.00 $25.00 $37,500.00 $20.00 $30,000.0011 Concrete Valley Gutter / Apron per Section 303-5.9
2000 SF $38.00 $76,000.00 $40.00 $80,000.00 $34.00 $68,000.00 $40.00 $80,000.00 12 Curb Storm Inlet Adjustment within
Ramp Flare per 303-1.1.1
20 EA $1,000.00 $20,000.00 $1,500.00 $30,000.00 $4,000.00 $80,000.00 $1,800.00 $36,000.00 13 Relocate roadside sign on new post per
Section 315
25 EA $750.00 $18,750.00 $450.00 $11,250.00 $450.00 $11,250.00 $500.00 $12,500.00 TOTAL BASE BID: $2,809,550.00 $2,069,250.00 $2,337,050.00 $2,417,150.00 This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information.

Prepared by: M. Goralka
Annual Street Paving 2021-23
Date Approved:November 2, 2022
PROJECT TITLE: Curb Ramp Upgrades for
PROJECT NO.:

BID NO.:

ENGINEER'S ESTIMATE
2022.005022-23.003

QUANTITY ITEM COST ITEM COST ITEM COST
MJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 1 of 6 Printed 11/3/2022 @ 5:11 PM

BID SUMMARY
BID OPENING Spencon Construction Kerex Engineering, Inc. Rosas Brothers Construction DATE: November 2, 2022 3170 Crow Canyon Pl. #250 4941 Pacheco Blvd. 4731 Coliseum WayTIME: 3:00 P.M. San Ramon, CA 94583 Martinez, CA 94553 Oakland, CA 94601LOCATION: City Clerk's Office Phone: (925) 984-2581 Phone: (925) 387-8913 Phone: (510) 534-1077 Fax: (925) 984-2583 Fax: (925) 387-0853 Fax: (510) 534-5077 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST Prepared by: M. Goralka
Annual Street Paving 2021-23
Date Approved:November 2, 2022
PROJECT TITLE: Curb Ramp Upgrades for
PROJECT NO.:

BID NO.:

ENGINEER'S ESTIMATE
2022.005022-23.003

QUANTITY ITEM COST ITEM COST ITEM COST

BID ALTERNATE A
1A. Mobilization, Staging, and Stockpiling
per Section 7-8.4 and 9-3.4
1 LS $15,000.00 $15,000.00 $4,500.00 $4,500.00 $25,000.00 $25,000.00 $5,000.00 $5,000.00 2A. Temporary Traffic Control per Section
600
1 LS $20,000.00 $20,000.00 $15,000.00 $15,000.00 $18,000.00 $18,000.00 $5,000.00 $5,000.00 3A. Curb Cut Ramp Type A or B per
Section 303-5.9
4 EA $7,500.00 $30,000.00 $5,000.00 $20,000.00 $5,250.00 $21,000.00 $8,200.00 $32,800.00 4A. Curb Cut Ramp Type C or D per
Section 303-5.9
44 EA $6,500.00 $286,000.00 $5,000.00 $220,000.00 $5,150.00 $226,600.00 $7,000.00 $308,000.00 5A. Dome and Landing Replacement per
Section 303-5.9
16 EA $3,500.00 $56,000.00 $2,300.00 $36,800.00 $3,000.00 $48,000.00 $1,700.00 $27,200.00 6A. Gutter Replacement per Section 303-

5.9 22 EA $1,200.00 $26,400.00 $2,500.00 $55,000.00 $3,000.00 $66,000.00 $1,200.00 $26,400.00 7A. Not Used -- -- -- $0.00 $0.00 $0.00 $0.008A. Sidewalk per Section 303-5.9 1100 SF $25.00 $27,500.00 $16.00 $17,600.00 $22.00 $24,200.00 $8.00 $8,800.009A. Curb and Gutter per Section 303-5.9 180 LF $115.00 $20,700.00 $95.00 $17,100.00 $100.00 $18,000.00 $60.00 $10,800.00 10A. AC Tie In per Section 302-5.9 250 SF $40.00 $10,000.00 $15.00 $3,750.00 $35.00 $8,750.00 $20.00 $5,000.0011A. Concrete Valley Gutter / Apron per Section 303-5.9
300 SF $38.00 $11,400.00 $40.00 $12,000.00 $34.00 $10,200.00 $40.00 $12,000.00 12A. Not Used -- -- -- $0.00 $0.00 $0.00 $0.0013A. Not Used -- -- -- $0.00 $0.00 $0.00 $0.00 TOTAL BID ALTERNATE A: $503,000.00 $401,750.00 $465,750.00 $441,000.00 TOTAL BASE BID:

TOTAL BASE BID + ALTERNATE BID ITEM A:
$2,069,250.00 $2,337,050.00 $2,417,150.00
$2,858,150.00
$2,809,550.00$3,312,550.00 $2,471,000.00 $2,802,800.00
MJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 2 of 6 Printed 11/3/2022 @ 5:11 PM

BID SUMMARY
BID OPENING Spencon Construction Kerex Engineering, Inc. Rosas Brothers Construction DATE: November 2, 2022 3170 Crow Canyon Pl. #250 4941 Pacheco Blvd. 4731 Coliseum Way TIME: 3:00 P.M. San Ramon, CA 94583 Martinez, CA 94553 Oakland, CA 94601LOCATION: City Clerk's Office Phone: (925) 984-2581 Phone: (925) 387-8913 Phone: (510) 534-1077 Fax: (925) 984-2583 Fax: (925) 387-0853 Fax: (510) 534-5077 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST Prepared by: M. Goralka
Annual Street Paving 2021-23
Date Approved:November 2, 2022
PROJECT TITLE: Curb Ramp Upgrades for
PROJECT NO.:

BID NO.:

ENGINEER'S ESTIMATE
2022.005022-23.003

QUANTITY ITEM COST ITEM COST ITEM COST
REQUIRED DOCUMENTATION:

SUBCONTRACTORS:NOTES:

Reviewed by: Date:

Mark Goralka, Project Manager
Reviewed by: Date:

Austine Osakwe, Senior Engineer

YES YES YES
Equal Opportunity Cert.

Agreement to be Bound YES YES YES
YES
Subcontract / 50% Self Performance per 2-3.2 YES YES YES

YES YES YES
Addendum #1-2
Bid Bond YES YES
None. None All Cities Trucking Services
MJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 3 of 6 Printed 11/3/2022 @ 5:11 PM 11/4/2022
for 11/4/2022

BID SUMMARY

BID OPENING
DATE: November 2, 2022TIME: 3:00 P.M.LOCATION: City Clerk's Office ITEM
NO. ITEM UNIT COST ITEM COST

BASE BID
1 Mobilization, Staging, and Stockpiling
per Section 7-8.4 and 9-3.4
1 LS $50,000.00 $50,000.00
2 Temporary Traffic Control per Section
600
1 LS $75,000.00 $75,000.00
3 Curb Cut Ramp Type A or B per
Section 303-5.9
96 EA $7,500.00 $720,000.00
4 Curb Cut Ramp Type C or D per
Section 303-5.9
187 EA $6,500.00 $1,215,500.00
5 Dome and Landing Replacement per
Section 303-5.9
60 EA $3,500.00 $210,000.00
6 Gutter Replacement per Section 303-

5.9 29 EA $1,200.00 $34,800.00
7 Retaining Curb Replacement per
Section 303-5.9
4 EA $1,000.00 $4,000.00
8 Sidewalk per Section 303-5.9 7500 SF $25.00 $187,500.00 9 Curb and Gutter per Section 303-5.9 1200 LF $115.00 $138,000.00 10 AC Tie In per Section 302 -5.9 1500 SF $40.00 $60,000.00 11 Concrete Valley Gutter / Apron per Section 303-5.9
2000 SF $38.00 $76,000.00
12 Curb Storm Inlet Adjustment within
Ramp Flare per 303-1.1.1
20 EA $1,000.00 $20,000.00
13 Relocate roadside sign on new post per
Section 315
25 EA $750.00 $18,750.00
TOTAL BASE BID: $2,809,550.00
Prepared by: M. Goralka
Annual Street Paving 2021-23
Date Approved:November 2, 2022
PROJECT TITLE: Curb Ramp Upgrades for
PROJECT NO.:

BID NO.:

ENGINEER'S ESTIMATE
2022.005022-23.003

QUANTITY
JJR Construction, Inc. FBD Vanguard Construction, Inc. Sposeto Engineering, Inc.1120 Ninth Avenue 550 Greenville Road 4558 Contractors PlaceSan Mateo, CA 94402 Livermore, CA 94550 Livermore, CA 94551Phone: (650) 343-6109 Phone: (925) 245-1300 Phone: (925) 443-4200Fax: (650) 343-6207 Fax: (925) 245-1007 Fax: (925) 443-6800

UNIT COST UNIT COST UNIT COST
$10,000.00 $10,000.00 $122,500.00 $122,500.00 $72,000.00 $72,000.00$30,000.00 $30,000.00 $50,000.00 $50,000.00 $45,000.00 $45,000.00 $6,842.09 $656,840.64 $7,000.00 $672,000.00 $6,400.00 $614,400.00$5,194.65 $971,399.55 $6,420.00 $1,200,540.00 $6,400.00 $1,196,800.00$3,352.76 $201,165.60 $3,500.00 $210,000.00 $3,400.00 $204,000.00$1,808.23 $52,438.67 $1,200.00 $34,800.00 $1,350.00 $39,150.00$1,425.03 $5,700.12 $800.00 $3,200.00 $1,600.00 $6,400.00 $23.84 $178,800.00 $14.00 $105,000.00 $18.00 $135,000.00 $123.79 $148,548.00 $40.00 $48,000.00 $113.00 $135,600.00 $41.88 $62,820.00 $14.00 $21,000.00 $23.00 $34,500.00$57.48 $114,960.00 $20.00 $40,000.00 $40.00 $80,000.00 ** $660.90 $13,218.00 $2,100.00 $42,000.00 $2,800.00 $56,000.00$400.00 $10,000.00 $443.00 $11,075.00 $500.00 $12,500.00 $2,455,890.58 $2,560,115.00 $2,631,350.00

ITEM COST ITEM COST ITEM COST
MJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 4 of 6 Printed 11/3/2022 @ 5:11 PM

BID SUMMARY

BID OPENING
DATE: November 2, 2022TIME: 3:00 P.M.LOCATION: City Clerk's Office ITEM
NO. ITEM UNIT COST ITEM COST
Prepared by: M. Goralka
Annual Street Paving 2021-23
Date Approved:November 2, 2022
PROJECT TITLE: Curb Ramp Upgrades for
PROJECT NO.:

BID NO.:

ENGINEER'S ESTIMATE
2022.005022-23.003

QUANTITY

BID ALTERNATE A
1A. Mobilization, Staging, and Stockpiling
per Section 7-8.4 and 9-3.4
1 LS $15,000.00 $15,000.00
2A. Temporary Traffic Control per Section
600
1 LS $20,000.00 $20,000.00
3A. Curb Cut Ramp Type A or B per
Section 303-5.9
4 EA $7,500.00 $30,000.00
4A. Curb Cut Ramp Type C or D per
Section 303-5.9
44 EA $6,500.00 $286,000.00
5A. Dome and Landing Replacement per
Section 303-5.9
16 EA $3,500.00 $56,000.00
6A. Gutter Replacement per Section 303-

5.9 22 EA $1,200.00 $26,400.00
7A. Not Used -- -- -- $0.00 8A. Sidewalk per Section 303-5.9 1100 SF $25.00 $27,500.00 9A. Curb and Gutter per Section 303-5.9 180 LF $115.00 $20,700.00 10A. AC Tie In per Section 302-5.9 250 SF $40.00 $10,000.00 11A. Concrete Valley Gutter / Apron per Section 303-5.9
300 SF $38.00 $11,400.00
12A. Not Used -- -- -- $0.00 13A. Not Used -- -- -- $0.00 TOTAL BID ALTERNATE A: $503,000.00
TOTAL BASE BID:

TOTAL BASE BID + ALTERNATE BID ITEM A:
$2,809,550.00$3,312,550.00
JJR Construction, Inc. FBD Vanguard Construction, Inc. Sposeto Engineering, Inc.1120 Ninth Avenue 550 Greenville Road 4558 Contractors PlaceSan Mateo, CA 94402 Livermore, CA 94550 Livermore, CA 94551Phone: (650) 343-6109 Phone: (925) 245-1300 Phone: (925) 443-4200Fax: (650) 343-6207 Fax: (925) 245-1007 Fax: (925) 443-6800

UNIT COST UNIT COST UNIT COST ITEM COST ITEM COST ITEM COST $4,000.00 $4,000.00 $50,000.00 $50,000.00 $14,000.00 $14,000.00$9,136.94 $9,136.94 $26,252.00 $26,252.00 $12,000.00 $12,000.00$6,842.09 $27,368.36 $9,000.00 $36,000.00 $7,000.00 $28,000.00 **$5,194.65 $228,564.60 $8,000.00 $352,000.00 $6,400.00 $281,600.00$3,352.76 $53,644.16 $5,025.00 $80,400.00 $3,400.00 $54,400.00$1,808.23 $39,781.06 $2,000.00 $44,000.00 $1,400.00 $30,800.00 $0.00 $0.00 $0.00
$23.84 $26,224.00 $14.00 $15,400.00 $18.00 $19,800.00
$123.79 $22,282.20 $40.00 $7,200.00 $113.00 $20,340.00
$41.88 $10,470.00 $35.00 $8,750.00 $23.00 $5,750.00$57.48 $17,244.00 $20.00 $6,000.00 $40.00 $12,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $438,715.32 $626,002.00 $478,690.00
$2,455,890.58 $2,560,115.00$2,894,605.90
$2,631,350.00
$3,186,117.00 $3,110,040.00
MJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 5 of 6 Printed 11/3/2022 @ 5:11 PM

BID SUMMARY

BID OPENING
DATE: November 2, 2022TIME: 3:00 P.M.LOCATION: City Clerk's Office ITEM
NO. ITEM UNIT COST ITEM COST
Prepared by: M. Goralka
Annual Street Paving 2021-23
Date Approved:November 2, 2022
PROJECT TITLE: Curb Ramp Upgrades for
PROJECT NO.:

BID NO.:

ENGINEER'S ESTIMATE
2022.005022-23.003

QUANTITY
REQUIRED DOCUMENTATION:

SUBCONTRACTORS:NOTES:

Reviewed by: Date:

Mark Goralka, Project Manager
Reviewed by: Date:

Austine Osakwe, Senior Engineer
Equal Opportunity Cert.

Agreement to be Bound
Subcontract / 50% Self Performance per 2-3.2
Addendum #1-2
Bid Bond
JJR Construction, Inc. FBD Vanguard Construction, Inc. Sposeto Engineering, Inc.1120 Ninth Avenue 550 Greenville Road 4558 Contractors Place San Mateo, CA 94402 Livermore, CA 94550 Livermore, CA 94551 Phone: (650) 343-6109 Phone: (925) 245-1300 Phone: (925) 443-4200 Fax: (650) 343-6207 Fax: (925) 245-1007 Fax: (925) 443-6800

UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST

YES YES YESYES YES YESYES YES YESYES YES YESYES YES YES ** Line item math error corrected, but summary total amount unchanged.

USA Trucking, Inc.Del Secco Diamond Core and Saw, Inc.

Farwest Safety, Inc. All Cities Trucking Services
MJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 6 of 6 Printed 11/3/2022 @ 5:11 PM 11/4/2022