BID SUMMARY
FEDERAL PROJECT NO.: STPL-5041 (048)
BID OPENING Redgwick Construction Company McGuire and Hester DeSilva Gates Construction, Inc. Ray's Electric DATE: February 28, 2023 Date Approved: 2 Feb 21, 2023 21 Hegenberger Ct. 2810 Harbor Bay Parkway 11555 Dublin Blvd. 411 Pendleton Way, Suite B TIME: 3:00 pm Oakland, CA 94621 Alameda, CA 94603 Dublin, CA 94568 Oakland, CA 94621 LOCATION: City Clerk's Office Phone: (510) 792-1727 Phone: (510) 632-7676 Phone: (925) 829-9220 Phone: (510) 577-7700 Fax: (510) 792-1728 Fax: (510) 562-5209 Fax: (925) 803-4263 Fax: (510) 577-7706 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST UNIT COST

BASE BID
1 Mobilization per Section 9-3.4 1 LS $63,000.00 $63,000.00 $72,700.00 $72,700.00 $169,153.00 $169,153.00 ** $115,000.00 $115,000.00 $214,000.00 $214,000.00 2 Construction Area Signs & Traffic
Control per Section 601
1 LS $63,000.00 $63,000.00 $73,800.00 $73,800.00 $4,400.00 $4,400.00 $115,000.00 $115,000.00 $80,000.00 $80,000.00 3 Portable Changeable Message Sign 2 EA $2,500.00 $5,000.00 $2,500.00 $5,000.00 $6,200.00 $12,400.00 $4,500.00 $9,000.00 $5,000.00 $10,000.00 4 Stormwater Pollution Control 1 LS $10,000.00 $10,000.00 $31,500.00 $31,500.00 $14,000.00 $14,000.00 $5,000.00 $5,000.00 $12,675.00 $12,675.00 5 Construction Staking 1 LS $45,000.00 $45,000.00 $14,500.00 $14,500.00 $16,500.00 $16,500.00 $6,500.00 $6,500.00 $6,500.00 $6,500.00 6 Utility Potholing 1 LS $20,000.00 $20,000.00 $42,500.00 $42,500.00 $24,000.00 $24,000.00 $25,000.00 $25,000.00 $50,000.00 $50,000.00 7 Remove Traffic Striping Pavement
Markings and Delineators
1 LS $10,000.00 $10,000.00 $9,500.00 $9,500.00 $5,900.00 $5,900.00 $5,000.00 $5,000.00 $5,500.00 $5,500.00 8 Remove Storm Drain Arch Culvert 196 LF $25.00 $4,900.00 $50.00 $9,800.00 $367.00 $71,932.00 $80.00 $15,680.00 $78.00 $15,288.00 9 Remove Storm Drain Catch Inlet 1 EA $1,500.00 $1,500.00 $2,000.00 $2,000.00 $2,600.00 $2,600.00 $2,700.00 $2,700.00 $2,675.00 $2,675.00 10 Remove Storm Drain Manhole 2 EA $1,500.00 $3,000.00 $2,200.00 $4,400.00 $4,800.00 $9,600.00 $3,500.00 $7,000.00 $3,525.00 $7,050.00 11 Adjust Storm Drain Manhole Cover to
Grade
3 EA $1,000.00 $3,000.00 $1,500.00 $4,500.00 $2,000.00 $6,000.00 $1,400.00 $4,200.00 $1,325.00 $3,975.00 12 Adjust Monument Box to Grade 5 EA $1,000.00 $5,000.00 $900.00 $4,500.00 $1,700.00 $8,500.00 $2,200.00 $11,000.00 $1,425.00 $7,125.00 13 Replace Portland Concrete Base
(Revocable)
1,400 SY $65.00 $91,000.00 $87.00 $121,800.00 $176.00 $246,400.00 $165.00 $231,000.00 $400.00 $560,000.00 14 Grind Asphalt Concrete Over Existing
Gutter Pan
415 LF $15.00 $6,225.00 $12.00 $4,980.00 $9.00 $3,735.00 $40.00 $16,600.00 $8.00 $3,320.00 15 Cold Milling (Varies up to 10.5-inch
Thick)
6,600 SY $18.00 $118,800.00 $18.00 $118,800.00 $19.00 $125,400.00 $35.00 $231,000.00 $18.10 $119,460.00 15a. Cold Milling (Varies up to 5-inch Thick) 220 SY $12.00 $2,640.00 $32.00 $7,040.00 $31.00 $6,820.00 $35.00 $7,700.00 $33.50 $7,370.00 15b. 12-Inch-Thick Full Depth Asphalt
Replacement with RHMA
2,800 SF $15.00 $42,000.00 $22.00 $61,600.00 $21.00 $58,800.00 $45.00 $126,000.00 $24.00 $67,200.00 16 Rubberized Hot Mix Asphalt (RHMA-G)
with ½-inch Aggregate
1,350 TN $150.00 $202,500.00 $245.00 $330,750.00 $279.00 $376,650.00 $280.00 $378,000.00 $264.00 $356,400.00 17 GlassGrid 8511 TF Pavement Fabric or
Approved Equal
7,131 SY $6.00 $42,786.00 $16.00 $114,096.00 $14.00 $99,834.00 $12.00 $85,572.00 $14.75 $105,182.25 18 Curb and Gutter 617 LF $150.00 $92,550.00 $112.00 $69,104.00 $106.00 $65,402.00 $100.00 $61,700.00 $120.00 $74,040.00 19 Driveway Approach (8-inch PCC) 391 SF $25.00 $9,775.00 $35.00 $13,685.00 $34.00 $13,294.00 $31.00 $12,121.00 $50.00 $19,550.00 20 Replace Curb and Gutter after Grinding
(Revocable)
240 LF $100.00 $24,000.00 $100.00 $24,000.00 $106.00 $25,440.00 $100.00 $24,000.00 $120.00 $28,800.00 21 Adjust Water Meter (Service) Box
Cover to Grade in Concrete
4 EA $600.00 $2,400.00 $450.00 $1,800.00 $1,200.00 $4,800.00 $200.00 $800.00 $425.00 $1,700.00 22 Replace Pull Box 10 EA $500.00 $5,000.00 $500.00 $5,000.00 $700.00 $7,000.00 $1,000.00 $10,000.00 $2,330.00 $23,300.00 23 Reset Street Furniture 7 EA $200.00 $1,400.00 $200.00 $1,400.00 $660.00 $4,620.00 $500.00 $3,500.00 $1,600.00 $11,200.00 24 12-inch RCP Storm Drain (including
Backfill)
214 LF $350.00 $74,900.00 $446.00 $95,444.00 $500.00 $107,000.00 $700.00 $149,800.00 $685.93 $146,789.02 25 Pipe Connection to Existing Manhole 1 LS $800.00 $800.00 $2,500.00 $2,500.00 $6,300.00 $6,300.00 $5,000.00 $5,000.00 $4,750.00 $4,750.00 26 Storm Drain Curb Inlet with Trash
Capture Device
4 EA $6,500.00 $26,000.00 $11,000.00 $44,000.00 $11,800.00 $47,200.00 $17,000.00 $68,000.00 $12,100.00 $48,400.00 27 Modified Storm Drain Curb Inlet (Bubble
Up Structure)
1 EA $12,000.00 $12,000.00 $7,500.00 $7,500.00 $13,600.00 $13,600.00 $9,000.00 $9,000.00 $3,675.00 $3,675.00 28 Storm Drain Manhole (City Standard) 2 EA $8,000.00 $16,000.00 $12,000.00 $24,000.00 $11,700.00 $23,400.00 $9,000.00 $18,000.00 $8,675.00 $17,350.00 29 Storm Drain Manhole (ACFCD Type II) 1 EA $8,500.00 $8,500.00 $31,000.00 $31,000.00 $91,400.00 $91,400.00 $21,000.00 $21,000.00 $21,500.00 $21,500.00 30 Reset or Relocate Sign Post 5 EA $500.00 $2,500.00 $300.00 $1,500.00 $300.00 $1,500.00 $500.00 $2,500.00 $300.00 $1,500.00 31 Sign and Post 4 EA $750.00 $3,000.00 $550.00 $2,200.00 $525.00 $2,100.00 $800.00 $3,200.00 $525.00 $2,100.00 32 Thermoplastic Pavement Markers
(Various Legend)
312 UNIT $5.50 $1,716.00 $8.00 $2,496.00 $8.00 $2,496.00 $15.00 $4,680.00 $8.00 $2,496.00 33 Thermoplastic Pavement Markers (MultiColored Crosswalk)624 UNIT $6.50 $4,056.00 $8.00 $4,992.00 $8.00 $4,992.00 $35.00 $21,840.00 $8.00 $4,992.00 34 Thermoplastic Pavement Stripe – 12”
Wide White Stripe
1,010 UNIT $1.50 $1,515.00 $10.00 $10,100.00 $8.00 $8,080.00 $8.00 $8,080.00 $8.00 $8,080.00 This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City.

An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information.

PROJECT TITLE: Washington Ave Reconstruction
PROJECT NO.:

BID NO.:

ENGINEER'S ESTIMATE
2018.4020
22-23.002

QUANTITY ITEM COST
Prepared by: M. Chaudhary

ITEM COST ITEM COST ITEM COST
Washington Ave Reconstruction Rev Page 1 of 3 Printed 3/2/2023 @ 10:22 AM

BID SUMMARY
FEDERAL PROJECT NO.: STPL-5041 (048)
BID OPENING Redgwick Construction Company McGuire and Hester DeSilva Gates Construction, Inc. Ray's Electric DATE: February 28, 2023 Date Approved: 2 Feb 21, 2023 21 Hegenberger Ct. 2810 Harbor Bay Parkway 11555 Dublin Blvd. 411 Pendleton Way, Suite B TIME: 3:00 pm Oakland, CA 94621 Alameda, CA 94603 Dublin, CA 94568 Oakland, CA 94621 LOCATION: City Clerk's Office Phone: (510) 792-1727 Phone: (510) 632-7676 Phone: (925) 829-9220 Phone: (510) 577-7700 Fax: (510) 792-1728 Fax: (510) 562-5209 Fax: (925) 803-4263 Fax: (510) 577-7706 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST UNIT COST PROJECT TITLE: Washington Ave Reconstruction
PROJECT NO.:

BID NO.:

ENGINEER'S ESTIMATE
2018.4020
22-23.002

QUANTITY ITEM COST
Prepared by: M. Chaudhary

ITEM COST ITEM COST ITEM COST
35 Thermoplastic Pavement Stripe –
Parking Tee
200 UNIT $2.50 $500.00 $5.00 $1,000.00 $5.00 $1,000.00 $5.00 $1,000.00 $5.00 $1,000.00 36 Thermoplastic Pavement Stripe – Detail
2 40 UNIT $1.50 $60.00 $2.50 $100.00 $2.50 $100.00 $5.00 $200.00 $2.30 $92.00 37 Thermoplastic Pavement Stripe – Detail
22 1,215 UNIT $2.00 $0.00 $6.00 $7,290.00 $4.60 $5,589.00 $5.00 $6,075.00 $4.60 $5,589.00 38 Thermoplastic Pavement Stripe - Detail
27B
38 UNIT $1.50 $57.00 $3.00 $114.00 $3.00 $114.00 $5.00 $190.00 $3.00 $114.00 39 Thermoplastic Pavement Stripe - Detail
39 70 UNIT $2.00 $140.00 $3.00 $210.00 $2.50 $175.00 $5.00 $350.00 $2.50 $175.00 40 Red Curb Paint 100 UNIT $2.00 $200.00 $5.00 $500.00 $4.00 $400.00 $5.00 $500.00 $4.00 $400.00 41 Two-Way Reflective Blue Pavement
Marker
2 UNIT $30.00 $60.00 $18.00 $36.00 $15.00 $30.00 $49.00 $98.00 $15.00 $30.00 Modification – Washington Avenue and W 42 1 UNIT $140,500.00 $140,500.00 $190,000.00 $190,000.00 $145,000.00 $145,000.00 $185,000.00 $185,000.00 $175,000.00 $175,000.00 43 Traffic Signal Modification –
Washington Avenue and Castro Street
1 UNIT $138,100.00 $138,100.00 $190,000.00 $190,000.00 $145,000.00 $145,000.00 $185,000.00 $185,000.00 $192,000.00 $192,000.00 44 Adjust ACFCD Storm Drain Manhole
Cover to Grade
2 UNIT $1,000.00 $2,000.00 $1,800.00 $3,600.00 $2,600.00 $5,200.00 $2,000.00 $4,000.00 $1,965.00 $3,930.00 TOTAL BASE BID: $1,307,080.00 $1,993,856.00 ** $2,202,586.00 $2,432,272.27

NON-PARTICIPATING BID ITEMS
45 Curb Ramp (Including Truncated Dome
and Retaining Curb)
13 EA $6,500.00 $84,500.00 $7,000.00 $91,000.00 $6,400.00 $83,200.00 $6,300.00 $81,900.00 $7,000.00 $91,000.00 46 Sidewalk (4-Inch PCC) 3073 SF $20.00 $61,460.00 $23.00 $70,679.00 $24.00 $73,752.00 $18.00 $55,314.00 $34.00 $104,482.00 47 Adjust Sanitary Sewer Manhole Cover
to Grade (CoSL)
8 EA $1,000.00 $8,000.00 $1,800.00 $14,400.00 $2,600.00 $20,800.00 $1,400.00 $11,200.00 $1,325.00 $10,600.00 48 Adjust Water Valve Cover to Grade
(EBMUD)
22 EA $600.00 $13,200.00 $700.00 $15,400.00 $1,600.00 $35,200.00 $1,000.00 $22,000.00 $985.00 $21,670.00 TOTAL NON-PARTICIPATING BID ITEMS: $167,160.00 $191,479.00 $212,952.00 ** $170,414.00 $227,752.00 TOTAL BASE BID: **
TOTAL BASE BID + NON-PARTICIPATING BID ITEMS:

REQUIRED DOCUMENTATION:

SUBCONTRACTORS:

NOTES:

Pale Horse Asphalt
Golden Bay Construction Inc.

Compass Engineering
Contractors
Addendum #1 YES YES YES
Rosas Brothers
YES
Construction Survey, Inc. Pale Horse

N/A TO BE SUBMITTED UPON

REQUEST N/A
Section 3 - Good Faith Effort RECEIVED NOT RECEIVED NOT RECEIVED RECEIVED DBE Goal- 24% Met

NOT SUBMITTED
Compass Engineering
Contractors
$2,202,586.00
$2,373,000.00
$2,432,272.27
YES
$2,660,024.27
YES
YES
$1,767,337.00
YES

YES YES
$1,307,080.00 $1,767,337.00 $1,993,856.00
DBE-Good Faith Effort
NO
$2,206,808.00
Bid Bond
NO
$1,474,240.00 $1,958,816.00
Tully consulting Group
Bay Area Lightworks
Rosas Brothers
A1 Trucking Services, Inc.

ABSL Construction
Total Traffic Control
Bay Area Lightworks
Anrak
Compass Engineering
Rosas Brothers
McGuire & Hester
Construction Survey
TDW Construction
CMC Traffic Control
Tully Consulting Group
Bay Line Cutting & Coring
Pale Horse Asphalt
Bay Area Lightworks, Inc.

Striping Graphics
TDW Construction, Inc.
** Math Error Corrected
Washington Ave Reconstruction Rev Page 2 of 3 Printed 3/2/2023 @ 10:22 AM

BID SUMMARY
FEDERAL PROJECT NO.: STPL-5041 (048)
BID OPENING Redgwick Construction Company McGuire and Hester DeSilva Gates Construction, Inc. Ray's Electric DATE: February 28, 2023 Date Approved: 2 Feb 21, 2023 21 Hegenberger Ct. 2810 Harbor Bay Parkway 11555 Dublin Blvd. 411 Pendleton Way, Suite B TIME: 3:00 pm Oakland, CA 94621 Alameda, CA 94603 Dublin, CA 94568 Oakland, CA 94621 LOCATION: City Clerk's Office Phone: (510) 792-1727 Phone: (510) 632-7676 Phone: (925) 829-9220 Phone: (510) 577-7700 Fax: (510) 792-1728 Fax: (510) 562-5209 Fax: (925) 803-4263 Fax: (510) 577-7706 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST UNIT COST PROJECT TITLE: Washington Ave Reconstruction
PROJECT NO.:

BID NO.:

ENGINEER'S ESTIMATE
2018.4020
22-23.002

QUANTITY ITEM COST
Prepared by: M. Chaudhary

ITEM COST ITEM COST ITEM COST
Reviewed by: Date: 3/1/2023
Mohit Chaudhary, Project Manager
Reviewed by: Date: 3/2/2023
Austine Osakwe, Senior Engineer
Washington Ave Reconstruction Rev Page 3 of 3 Printed 3/2/2023 @ 10:22 AM