BID SUMMARY
BID OPENING D'Arcy & Harty Construction, Inc. Kerex Engineering, Inc. Koios Engineering Inc. DPI Inc.

DATE: February 28, 2023 1300 Carroll Avenue 4941 Pacheco Blvd. PO Box 320217 5942 Las Positas Rd.TIME: 3:00 p.m. San Francisco, CA 94124 Martinez, CA 94553 San Francisco, CA 94132 Livermore, CA 94551LOCATION: City Clerk's Office Phone: (415) 822-5200 Phone: (925) 387-8913 Phone: (650) 826-7632 Phone: (925) 800-3100 Fax: (415) 822-0747 Fax: (925) 387-0853 Fax: (415) 449-3454 Fax: (925) 800-3104 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST UNIT COST 1 Mobilization, Staging &
Stockpiling per Sections 7-8.4 & 9-

3.4 1 LS $50,000.00 $50,000.00 $100,000.00 $100,000.00 $70,000.00 $70,000.00 $55,000.00 $55,000.00 $170,537.00 $170,537.00 2 Temporary Traffic Control – Level
1, per Section 600
44 EA $600.00 $26,400.00 $500.00 $22,000.00 $1,500.00 $66,000.00 $3,500.00 $154,000.00 $1,660.00 $73,040.00 3 Temporary Traffic Control – Level
2, per Section 600
5 EA $800.00 $4,000.00 $1,000.00 $5,000.00 $5,000.00 $25,000.00 $3,500.00 $17,500.00 $1,930.00 $9,650.00 4 Temporary Traffic Control – Level
3, per Section 600
6 EA $1,000.00 $6,000.00 $1,500.00 $9,000.00 $7,500.00 $45,000.00 $3,500.00 $21,000.00 $2,097.00 $12,582.00 5 Pipe Cleaning & CCTV Inspection
, per section 500-1.1
27,391 LF $3.00 $82,173.00 $5.00 $136,955.00 $3.90 $106,824.90 $2.00 $54,782.00 $3.17 $86,829.47 6 Trench Excavation & Backfill, 0’-5’
Depth, per sections 306-3, 306-5, 306-6 & 306-12
54 LF $600.00 $32,400.00 $750.00 $40,500.00 $600.00 $32,400.00 $200.00 $10,800.00 $1,292.00 $69,768.00 7 Trench Excavation & Backfill, 5’-8’
Depth, per sections 306-3, 306-5, 306-6 & 306-12
340 LF $700.00 $238,000.00 $850.00 $289,000.00 $600.00 $204,000.00 $200.00 $68,000.00 $1,550.00 $527,000.00 8 Trench Excavation & Backfill, 8’-
11’ Depth, per sections 306-3, 306-5, 306-6 & 306-12
22 LF $800.00 $17,600.00 $1,000.00 $22,000.00 $900.00 $19,800.00 $200.00 $4,400.00 $2,067.00 $45,474.00 9 Point Repair, 6-inch Pipeline
Replacement, per section 306-7
294 LF $145.00 $42,630.00 $30.00 $8,820.00 $100.00 $29,400.00 $500.00 $147,000.00 $652.33 $191,785.02 10 Point Repair, 8-inch Pipeline
Replacement, per section 306-7
72 LF $150.00 $10,800.00 $40.00 $2,880.00 $200.00 $14,400.00 $500.00 $36,000.00 $500.00 $36,000.00 11 Point Repair, 10-inch Pipeline
Replacement, per section 306-7
30 LF $160.00 $4,800.00 $100.00 $3,000.00 $300.00 $9,000.00 $500.00 $15,000.00 $623.00 $18,690.00 Prepared by: R. MagnoDate Approved:1/30/23
This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information.

ITEM COST
PROJECT TITLE:

PROJECT NO.:

BID NO.:

QUANTITY
Sanitary Sewer Point Repairs 20222022.012022-23.008

ITEM COST ITEM COST

ENGINEER'S ESTIMATE

ITEM COST
Sanitary Sewer Point Repairs 2022_Bid Summary.xlsx Page 1 of 3 Printed 3/7/2023 @ 9:20 AM

BID SUMMARY
BID OPENING D'Arcy & Harty Construction, Inc. Kerex Engineering, Inc. Koios Engineering Inc. DPI Inc.

DATE: February 28, 2023 1300 Carroll Avenue 4941 Pacheco Blvd. PO Box 320217 5942 Las Positas Rd.TIME: 3:00 p.m. San Francisco, CA 94124 Martinez, CA 94553 San Francisco, CA 94132 Livermore, CA 94551LOCATION: City Clerk's Office Phone: (415) 822-5200 Phone: (925) 387-8913 Phone: (650) 826-7632 Phone: (925) 800-3100 Fax: (415) 822-0747 Fax: (925) 387-0853 Fax: (415) 449-3454 Fax: (925) 800-3104 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST UNIT COST Prepared by: R. MagnoDate Approved:1/30/23
This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information.

ITEM COST
PROJECT TITLE:

PROJECT NO.:

BID NO.:

QUANTITY
Sanitary Sewer Point Repairs 20222022.012022-23.008

ITEM COST ITEM COST

ENGINEER'S ESTIMATE

ITEM COST
12 Point Repair, 12-inch Pipeline
Replacement, per section 306-7
18 LF $170.00 $3,060.00 $140.00 $2,520.00 $500.00 $9,000.00 $500.00 $9,000.00 $727.00 $13,086.00 13 Reconnect Service Lateral to 6-
inch Main Pipeline, per section 306-7
29 EA $200.00 $5,800.00 $200.00 $5,800.00 $2,500.00 $72,500.00 $500.00 $14,500.00 $509.00 $14,761.00 14 Install New Type A-2 Manhole, 0’-
5’ Depth, per section 306-7
23 EA $8,000.00 $184,000.00 $7,000.00 $161,000.00 $10,000.00 $230,000.00 $15,750.00 $362,250.00 $12,361.00 $284,303.00 15 Install New Type A-2 Manhole, 5’-
10’ Depth, per section 306-7
10 EA $10,000.00 $100,000.00 $8,500.00 $85,000.00 $15,000.00 $150,000.00 $16,000.00 $160,000.00 $17,662.00 $176,620.00 16 Repair/Rehabilitate Manhole
Bench and Channel, per section 500-5.2
4 EA $1,000.00 $4,000.00 $1,500.00 $6,000.00 $6,800.00 $27,200.00 $7,000.00 $28,000.00 $6,270.00 $25,080.00 17 Expose and Raise Manhole
Frame & Cover to Grade, per section 300-1.6
1 EA $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 $1,500.00 $1,500.00 $5,191.00 $5,191.00 18 Sheeting, Shoring & Bracing, per
section 306-4
1 LS $50,000.00 $50,000.00 $84,000.00 $84,000.00 $60,000.00 $60,000.00 $50,000.00 $50,000.00 $20,123.00 $20,123.00 19 AC Pavement Restoration 6-inch
Depth, per section 302-5
6,700 SF $22.00 $147,400.00 $14.00 $93,800.00 $9.00 $60,300.00 $6.00 $40,200.00 $46.00 $308,200.00 20 Work Site Safety, per Section 7-

10.4.1 1 LS $25,000.00 $25,000.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $20,000.00 $20,000.00 $777.00 $777.00 TOTAL BASE BID:

REQUIRED DOCUMENTATION:

Agreement to be Bound25 % Participation NO NO NOGood Faith Effort NO NO NO $1,243,324.90 $1,268,932.00

YES YES YES

NO NO NO

YES YES YES
$1,084,275.00 $2,089,496.49
YES
NONONO
YES
Bid BondSan Leandro Local Business
$1,036,063.00
Sanitary Sewer Point Repairs 2022_Bid Summary.xlsx Page 2 of 3 Printed 3/7/2023 @ 9:20 AM

BID SUMMARY
BID OPENING D'Arcy & Harty Construction, Inc. Kerex Engineering, Inc. Koios Engineering Inc. DPI Inc.

DATE: February 28, 2023 1300 Carroll Avenue 4941 Pacheco Blvd. PO Box 320217 5942 Las Positas Rd.

TIME: 3:00 p.m. San Francisco, CA 94124 Martinez, CA 94553 San Francisco, CA 94132 Livermore, CA 94551 LOCATION: City Clerk's Office Phone: (415) 822-5200 Phone: (925) 387-8913 Phone: (650) 826-7632 Phone: (925) 800-3100 Fax: (415) 822-0747 Fax: (925) 387-0853 Fax: (415) 449-3454 Fax: (925) 800-3104 ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST UNIT COST Prepared by: R. MagnoDate Approved:1/30/23
This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information.

ITEM COST
PROJECT TITLE:

PROJECT NO.:

BID NO.:

QUANTITY
Sanitary Sewer Point Repairs 20222022.012022-23.008

ITEM COST ITEM COST

ENGINEER'S ESTIMATE

ITEM COST
SUBCONTRACTORS: L Showmee Home Solutions
H&R Plumbing Compass Engineering Presidio Systems Inc.

NOTES:

Date:

Robert Magno, Project Manager
Date:

Austine Osakwe, Senior Engineer
NONE H&R Plumbing
Reviewed by:Reviewed by:

H&R Plumbing
Sanitary Sewer Point Repairs 2022_Bid Summary.xlsx Page 3 of 3 Printed 3/7/2023 @ 9:20 AM 3/7/23