BID SUMMARY
BID OPENING Sposeto Engineering Kerex Engineering, Inc.

DATE: April 19, 2023 4558 Contractors Place 4941 Pacheco Boulevard TIME: 3:00 pm Livermore, CA 94551 Martinez, CA 94553
LOCATION: City Clerk's Office Phone: (925) 443-4200 Phone: (925) 387-8913 Fax: (925) 443-6800 Fax: (925) 387-0853
ITEM
NO. ITEM UNIT COST ITEM COST UNIT COST UNIT COST
1 Mobilization, Staging, and
Stockpiling per Section 7 and
Section 9
1 LS $55,000.00 $55,000.00 $27,000.00 $27,000.00 $40,000.00 $40,000.00 2 Temporary Traffic Control per
Section 600
1 LS $55,000.00 $55,000.00 $21,000.00 $21,000.00 $40,000.00 $40,000.00 3 Curb Cut Ramp Type A or B per
Section 303
47 EA $7,000.00 $329,000.00 $6,500.00 $305,500.00 $7,500.00 $352,500.00 4 Curb Cut Ramp Type C or D per
Section 303
48 EA $6,500.00 $312,000.00 $6,000.00 $288,000.00 $7,500.00 $360,000.00 5 Dome and Landing Replacement
per Section 303 (Allowance)
4 EA $3,000.00 $12,000.00 $2,500.00 $10,000.00 $1,500.00 $6,000.00 6 Retaining Curb Replacement per
Section 303 (Allowance)
4 EA $2,000.00 $8,000.00 $600.00 $2,400.00 $3,000.00 $12,000.00 7 Sidewalk per Section 303 1,500 SF $30.00 $45,000.00 $25.00 $37,500.00 $25.00 $37,500.00 8 Curb and Gutter per Section 303 400 LF $115.00 $46,000.00 $102.00 $40,800.00 $90.00 $36,000.00 9 AC Tie In per Section 303 400 SF $30.00 $12,000.00 $22.00 $8,800.00 $30.00 $12,000.00 10 Concrete Valley Gutter / Apron
per Section 303
1,500 SF $45.00 $67,500.00 $45.00 $67,500.00 $40.00 $60,000.00 11 Curb Storm Inlet Adjustment
within Ramp Flare per 303
3 EA $5,000.00 $15,000.00 $6,000.00 $18,000.00 $4,000.00 $12,000.00 12 Paint Curb Red per Section 314 50 LF $20.00 $1,000.00 $38.00 $1,900.00 $30.00 $1,500.00 13 Relocate Roadside Sign on New
Post per Section 315
10 EA $800.00 $8,000.00 $700.00 $7,000.00 $650.00 $6,500.00 14 Adjust Utility Box to Grade per
Section 301
10 EA $2,000.00 $20,000.00 $500.00 $5,000.00 $500.00 $5,000.00 15 Relocate Existing Pedestrian
Push Button to New Post per
Section 701
12 EA $5,000.00 $60,000.00 $4,000.00 $48,000.00 $4,000.00 $48,000.00 16 Install Pull Box per Section 701
(Allowance)
4 EA $1,000.00 $4,000.00 $1,000.00 $4,000.00 $1,000.00 $4,000.00 17 Install Conduit per Section 701 20 LF $100.00 $2,000.00 $50.00 $1,000.00 $50.00 $1,000.00 TOTAL BASE BID:

REQUIRED DOCUMENTATION:

Agreement to be Bound
SUBCONTRACTORS:

NOTES:

Date: 4/20/2023
Mohit Chaudhary, Project Manager
Date: -
Austine Osakwe, Senior Engineer

ITEM COST
$1,051,500.00

ENGINEER'S ESTIMATE

ITEM COST
Reviewed by:

Reviewed by:

Gremelli Industries
25 % Participation
Good Faith Effort
YES
$1,034,000.00
NO

TO BE SUBMITTED
PROJECT TITLE:

PROJECT NO.:

BID NO.:

QUANTITY
Curb Ramp Upgrades for
$893,400.00
Gremelli Industries
2022.0070
22-23.007
YES
NO
NO
YES
YES
YES
Bid Bond
San Leandro Local Business
Addendum #1
NO
YES
NO
This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information.

Annual Street Seal 2021-23
Prepared by: Mohit Chaudhary
Date Approved: 3/17/23
Curb Ramp Upgrades for Street Seal 2021-23-04.20.23 Page 1 of 1 Printed 4/20/2023 @ 1:47 PM