CAPITAL

IMPROVEMENTS

JOINT COUNCIL MEETING

AARON KERRIGAN, BOND DIRECTOR
SEPTEMBER 25, 2023
A bond measure passed in 2016 to fund facility
upgrades and improvements for SLUSD schools.

Funds improved learning environments, integrated
21st-century technology, and enhanced facilities for
students and staff.

MEASUREJ 1

OVERVIEW
10 4 74 .8 %
Million Approved

HEATING,

VENTILATION, AND

AIRCONDITIONING
Major Projects for J1 Bond
• HVAC units installed in all district schools
• HVAC units improve comfort during extreme
weather conditions
• HVAC units also enhance air quality
• High-efficiency air filters contribute to better
classroom air quality

LIBRARIES
FOR THE 21ST

CENTURY
Major Projects forJ1 Bond
• Elementary and middle school library makeovers • Fresh paint, new flooring, and modern furniture • Improved layouts for enhanced learning • Focus on promoting exploration and collaboration • Adaptation to the evolving educational environment • Accommodating modern tools and technology • Positive impact on student learning and engagement CAMPUS

UPGRADES
Major Projects for J1 Bond
• District-wide school repairs and renovations
• Focus on enhancing the teaching and
learning environment
• Resulted in cleaner and safer schools
• Upgrades included electrical improvements
• Installation of new furniture, flooring, and
fresh paint
• Modernization of classrooms for improved
functionality

MODULAR

CLASSSROOMS
Major Projects for J1 Bond
• Replaced portable classrooms at
multiple schools
• Installed new permanent modular
buildings
• Enhanced energy efficiency of
classrooms
• Improved the educational environment
for all students
• Directly supported teaching and
learning initiatives

TECHNOLOGY

UPGRADES
Major Projects for J1 Bond
• Interactive 70-inch touch panel Promethean
Boards in every classroom districtwide
• Chromebooks available for every student at
home and school
• New MacBook laptops for all teachers,
support staff, and administrators

SAFETY&SECURITY

UPGRADES
Major Projects for J1 Bond
• Enhanced safety and security
measures implemented district-wide
• Fencing around schools
• Upgraded security systems
• Improved safety features inside and
outside campus perimeters
• Ensuring a safe and secure
environment for students, staff, and
the community

ELECTRICAL, LIGHTING
& ROOFING UPGRADES
Major Projects for J1 Bond
• Installation of high-quality, weather-resistant
roofing materials
• Improved insulation for energy efficiency
• Modernization of outdated electrical systems
• Installation of energy-efficient lighting
solutions
• Reduced maintenance costs and increased
reliability
Funds to improve school facilities with new
construction projects and essential renovation. Helps
SLUSD continue addressing needs identified in the
Facilities Master Plan and complete facility upgrade
projects already in progress through previous bond
measures.

MEASUREN

OVERVIEW
19 8 64%
Million Approved
Major Projects for N Bond SANLEANDROHIGHGYMNASIUM

SANLEANDROHIGH

GYMNASIUM
Major Projects for N Bond
• New gymnasium, locker rooms, weight
room, and practice facility
• Electrical upgrade
• New school entrance and enhanced parking
Fall 2024
$ 6 7,0 0 0 ,0 0 0
Projected Budget
• New campus next to the SLUSD Adult
School
• New classrooms and multipurpose room • New athletic and outdoor learning spaces • New marquee

LINCOLNHIGH
CAMPUS
Major Projects forN Bond
Fall 2023
$ 26 ,0 0 0 ,0 0 0
Projected Budget

BANCROFTMIDDLE
SCHOOL
Major Projects for N Bond
• Portable replacement
• New safety drop off area
• Field and track replacement
• New blacktop surface
• New shade structure
• New landscaping
• Redesign of school entry
• New security fencing
$ 14 ,0 0 0 ,0 0 0
Budget Total

MCKINLEYELEMENTARY

DROP OFF&ENTRY
Major Projects for N Bond
• New safety pick up and drop off area
• Additional parking area
• Redesigned school entryway
• New security fencing
$ 2,50 0 ,0 0 0
Budget Total
SHADE

STRUCTURES
Major Projects for N Bond
New shaded outdoor seating areas at all schools:
• Garfield Elementary
• Halkin Elementary
• Jefferson Elementary
• Madison Elementary
• McKinley Elementary
• Monroe Elementary
• Roosevelt Elementary
• Washington Elementary
• Bancroft Middle School
• John Muir Middle School
• San Leandro High School
$ 5,0 0 0 ,0 0 0
Budget Total
SOLAR

PROJ ECT
Major Projects for N Bond
SLUSD partners with SitelogIQ for 1.6MW solar systems
at ten schools, saving $30M over 30 years, reducing
emissions, and promoting renewable energy education.
• Garfield Elementary
• Halkin Elementary
• Jefferson Elementary
• Madison Elementary
• McKinley Elementary
• Monroe Elementary
• Roosevelt Elementary
• Washington Elementary
• Bancroft Middle School
• San Leandro High School
$ 10 ,0 0 0 ,0 0 0
Budget Total

ELECTRONIC

MARQUEES
Major Projects for N Bond
Installation of electronic marquees at the
following schools:
• Garfield Elementary
• Halkin Elementary
• Jefferson Elementary
• Madison Elementary
• Monroe Elementary
• Roosevelt Elementary
• Washington Elementary
• Bancroft Middle School
• John Muir Middle School
• San Leandro High School
$ 8 0 0 ,0 0 0
Budget Total
CAMPUS

UPGRADES
Major Projects for N Bond
San Leandro High School Quad
• New landscaping and hardscaping
• Increased seating and shade areas
• Energy saving irrigation
• Shade Structures
Electric vehicle charging stations provide a convenient and eco-friendly solution for powering electric cars,
reducing reliance on fossil fuels.
• McKinley Elementary School
• Bancroft Middle School
• San Leandro High School
• Madison Elementary School

CAPITAL

IMPROVEMENTS
Joint Council Meeting

THANK YOU