Joint City Council/SLUSD/SLZUSD Meeting
September 25, 2023
Sheila Marquises, Engineering Director
Infrastructure Enhancements
Around Schools
Purpose
UNDERSTANDING AWARENESS SUPPORT
2 Infrastructure Goals
Safety
Multimodally connected
communities
Health and socioeconomic
benefits
3 4
Aurora Drive
Refreshed crosswalk
Yield triangle markings
Rapid rectangular flashing beacons
Directional curb ramps
Before After
5 Juniper Street
Refreshed crosswalk
Yield triangle markings
Before After
6 Monterey Boulevard
Refreshed crosswalk
Yield triangle markings
Rapid rectangular flashing beacons
Directional curb ramps
Before After
7 Dowling Boulevard
Speed humps
Before After
Before
8 Dowling Boulevard
Future speed humps (2024)
Farrelly Pool
9 Corvallis Street
Realigned crosswalk
Yield triangle markings
Solar rapid rectangular flashing beacons
Directional curb ramps
Curb extensions
Before After
10 Dayton Avenue
Refreshed crosswalk
Yield triangle markings
Before After
11 Fargo Avenue
Refreshed crosswalk
Bike “sharrow” pavement markings
Narrower lane widths
Before After
12 Williams Street
Refreshed crosswalk
Yield triangle markings
Rapid rectangular flashing beacons
Directional curb ramps
Before After
13 Bancroft Avenue
Exclusive pedestrian walk phase
14 Bancroft Avenue/Blossom Way
Refreshed crosswalk
“Tuffcurb” extensions
Updated curb ramp
Narrower lane widths
Before After
15 In Design –
Mulford Marina
Branch
Project Cost = $9.5M
Completion Date = Spring 2026
16 Fairway Drive/Aurora Drive
Existing
Future Rendering
Under Construction – Memorial Park
Bancroft Avenue/Callan Avenue
Project Cost = $5.5M
Completion Date = Summer 2025
17 In Design (2024)
Crosstown Corridor Project
18 Existing Future Rendering
Existing Future Rendering
19 20
Bancroft Avenue
Williams Street
21 Joint City Council/SLUSD/SLZUSD Meeting
September 25, 2023
Sheila Marquises, Engineering Director
Infrastructure Enhancements
Around Schools