Joint City Council/SLUSD/SLZUSD Meeting
September 25, 2023
Sheila Marquises, Engineering Director
Infrastructure Enhancements
Around Schools
Purpose

UNDERSTANDING AWARENESS SUPPORT
2 Infrastructure Goals
Safety
Multimodally connected
communities
Health and socioeconomic
benefits
3 4
Aurora Drive
Refreshed crosswalk
Yield triangle markings
Rapid rectangular flashing beacons
Directional curb ramps
Before After
5 Juniper Street
Refreshed crosswalk
Yield triangle markings
Before After
6 Monterey Boulevard
Refreshed crosswalk
Yield triangle markings
Rapid rectangular flashing beacons
Directional curb ramps
Before After
7 Dowling Boulevard
Speed humps
Before After
Before
8 Dowling Boulevard
Future speed humps (2024)
Farrelly Pool
9 Corvallis Street
Realigned crosswalk
Yield triangle markings
Solar rapid rectangular flashing beacons
Directional curb ramps
Curb extensions
Before After
10 Dayton Avenue
Refreshed crosswalk
Yield triangle markings
Before After
11 Fargo Avenue
Refreshed crosswalk
Bike “sharrow” pavement markings
Narrower lane widths
Before After
12 Williams Street
Refreshed crosswalk
Yield triangle markings
Rapid rectangular flashing beacons
Directional curb ramps
Before After
13 Bancroft Avenue
Exclusive pedestrian walk phase
14 Bancroft Avenue/Blossom Way
Refreshed crosswalk
“Tuffcurb” extensions
Updated curb ramp
Narrower lane widths
Before After
15 In Design –
Mulford Marina
Branch
Project Cost = $9.5M
Completion Date = Spring 2026
16 Fairway Drive/Aurora Drive
Existing
Future Rendering
Under Construction – Memorial Park
Bancroft Avenue/Callan Avenue
Project Cost = $5.5M
Completion Date = Summer 2025
17 In Design (2024)
Crosstown Corridor Project
18 Existing Future Rendering
Existing Future Rendering
19 20
Bancroft Avenue
Williams Street
21 Joint City Council/SLUSD/SLZUSD Meeting
September 25, 2023
Sheila Marquises, Engineering Director
Infrastructure Enhancements
Around Schools