PROJECT
UPDATES
by District
FACILITIES AND TRANSPORTATION COMMITTEE
OCTOBER 4, 2023
1 District 1
2 Council District 1 Projects
3 Name Location/Limits Status Total Project
Cost (est.)
Completion
Date (est.)
Annual Street Overlay/Rehab. 19-21
Phases 1& 2 Citywide Construction $13.5M Fall 2024
Annual Street Paving 21-23 Citywide Construction $20.3M Fall 2024 Annual Street Sealing 21-23 Maintenance Area 3 & 4 Construction $6.7M Fall 2024 Annual Street Sealing 24 Maintenance Area 1 Design $900,000 Fall 2024 Fire Station Feasibility Study
(Station No. 9, 12, 13) 476 Estudillo Avenue Pre-design $1M TBD Lake Chabot Road Stabilization Chabot Terrace to Astor
Drive Design TBD Spring 2024
Washington Avenue Reconstruction W. Juana Avenue to Castro Street Construction $2.8M Winter 2024
Caltrans Paving/Concrete Project E14th Street (SR 185)
Davis Street (SR114) Construction n/a June 2024
Pavement Maintenance
4 District 2
5 Council District 2 Projects
6 Name Location/Limits Status Total Project
Cost (est.)
Completion
Date (est.)
E.14th Street Undergrounding Bancroft Avenue to
Thornton Street
On-hold per
PG&E $12M TBD
Hesperian Boulevard Bike Lanes Fairmont Drive to
Springlake Drive Design
Fire Station Feasibility Study (Station
Nos. 9, 12, 13) 143rd Avenue Pre-design TBD TBD
Washington Avenue Railroad
Pedestrian Improvements At UPRR tracks Construction $1.1M Jan. 2024 Annual Street Overlay/Rehab. 19-21
Phases 1& 2 Citywide Construction $13.5M Fall 2024
Annual Street Paving 21-23 Citywide Construction $20.3M Fall 2024 Annual Street Sealing 21-23 Maintenance Area 3&4 Construction $6.7M Fall 2024 Poppy Lane Development 2824 Halcyon Drive Construction n/a TBD Caltrans Paving / Concrete Project E14th Street (SR185) Davis Street (SR114) Construction n/a June 2024
UPRR Track Replacement Washington, Halcyon, Hesperian Completed n/a Sept 2023 Pavement
Maintenance
7 PROJECT
UPDATES
by District
FACILITIES AND TRANSPORTATION COMMITTEE
OCTOBER 4, 2023
8