Cities Index.
C - Compensation for Median Maintenance #60668

San Leandro City Council
October 16, 2023

Document
C - Compensation for Median Maintenance #60668
Meeting
October 16, 2023
Body
San Leandro City Council
Original file
693 KB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

Location Description Special Instructions/Exceptions to Baseline. Work also includes Baseline Maintenance Services
Monthly Price* Annual Cost
L1 Benedict Dr. Trim ivy on fence from Estudillo Ave to View Dr. Keep area between fence and curb free of overgrowth and weeds on a minimum quarterly basis. No irrigation. No baseline services. $ 39.48 $473.76
L2 Benedict Dr. From San Leandro Creek south Estudillo Ave, both sides of street and Cement Island at the intersection.

Keep area between fence and curb free of overgrowth and weeds on a minimum quarterly basis. No irrigation. No baseline services. $ 39.48 $473.76
L3 Benedict Dr. From Estudillo Ave to Scenicview Dr, west side of the street along the fence line.

Keep area between fence and curb free of overgrowth and weeds on a minimum quarterly basis. No irrigation. No baseline services. $ 39.48 $473.76
L4 Benedict Dr. From Montrose Dr south city border (entrance to Hillcrest Knolls) at speed hump.

Keep area between fence and curb free of overgrowth and weeds on a minimum quarterly basis. No irrigation. No baseline services. $ 39.48 $473.76
L5 Bermuda Way Lift station and parking strip at the west end of the street. 1668 sq. ft.

Service is required quarterly at a minimum. No irrigation. No baseline services. $ 19.74 $236.88
L6 Blossom Way Trim roses and other plants, and remove weeds in median between Bancroft Avenue and E. 14th.

Service is required quarterly at a minimum. No irrigation. No baseline services. $ 39.48 $473.76
L7 Broadmoor Bl Median at southwest corner of Broadmoor Blvd at Bancroft Ave
$ 128.36 $1,540.32
L8 Broadmoor Bl Two (2) medians, one on the north side and one on the south side of the intersection of Broadmoor Blvd and Breed Ave No irrigation $ 128.36 $1,540.32
L9 Callan Ave All landscaping in parking lot behind Santos Robinson Mortuary, between 151 Callan and Parking Garage
$ 128.36 $1,540.32
L10 Davis St Medians from E. 14th Street to Maltester/Polvorosa overcrossing
Weekly Trash and Debris removal $ 128.36 $1,540.32
L11 Davis St Landscaped areas on north side of street from Douglas Dr to crosswalk at I-880 N onramp.

Weekly Trash and Debris removal $ 128.36 $1,540.32
L12 Davis St Landscaped areas south side of street from Wayne Ave to Pierce Ave; frontage road, median, landscaped area from Pierce Ave to Gilmore Ave; alley to Gardner Bl Weekly Trash and Debris removal $ 256.62 $3,079.44
L13 Davis St Trim ivy on walls on north side of street from Douglas Dr to crosswalk at I-880 N onramp, south side of street from Wayne to backflow device west of Gilmore Ave, north side of SB I-880 off ramp west to Warden Ave Service is required quarterly at a minimum $ 39.48 $473.76 L14 Davis St Costco Area: Landscaping and turf on northwest corner of Warden Ave and Davis St. “Davis West” sign to be kept clear of ivy Weekly Trash and Debris removal $ 256.62 $3,079.44
L15 Davis St Frontage road on the south side of the Maltester/Polvorosa overcrossing, including turf and landscaped areas west to Beecher St.

Weekly Trash and Debris removal $ 256.62 $3,079.44
L16 Davis St Davis Street - City Property at 2512 Davis St. 8880 Sq. Ft. Service is required quarterly at a minimum. No irrigation. No baseline services.
$ 19.74 $236.88
L17 Doolittle Dr Median from W. Ave. 135th south to Flood Control canal - no irrigation
No irrigation $ 513.19 $6,158.28

WORK LOCATIONS AND COST PROPOSAL
There are technical specifications in the RFP for the baseline maintenance requirements. In addition, there are exceptions and special instructions required in addition to the baseline maintenance services. Unless otherwise specified as an Exception, service frequency must be sufficient to meet the maintenance standards and technical specifications. *All services regardless of frequency or contractor scheduling are presented by the Contractor, and paid by the City, as a Monthly Price* Attachment C - Compensation
Location Description Special Instructions/Exceptions to Baseline. Work also includes Baseline Maintenance Services
Monthly Price* Annual Cost
L18 Doolittle Dr Landscaped areas in between sidewalk and curb on east side of street, from Davis St north to controller box at 130 Doolittle Drive (“Welcome to Oakland” sign) Weekly Trash and Debris removal $ 513.19 $6,158.28
L19 Doolittle Dr Medians from Davis St north to 260 Doolittle Drive Weekly Trash and Debris removal $ 513.19 $6,158.28L20 Dowling Bl Three (3) medians – (2 large & 1 small) at intersection across from the Breed Ave side of Washington Elementary School Service is required quarterly at a minimum $ 59.22 $710.64 L21 Dutton Bl 566 Dutton Ave - trim plants and remove weeds in two (2) red brick planters next to dry cleaners.

Service is required quarterly at a minimum. No irrigation $ 19.74 $236.88 L22 Dutton Bl Median across from the front of Washington Elementary School at Breed Ave.

Service is required monthly at a minimum. No irrigation. $ 59.22 $710.64 L23 E. 14th St. Landscaped strip from Bristol Blvd to Farrelly Dr along the frontage road. Medians from Bristol Bl to Broadmoor Blvd except for the arch Weekly Trash and Debris removal $ 513.19 $6,158.28
L24 E. 14th St. Bank entrance and entire plaza area in between buildings, including planter boxes at Wells Fargo Bank at 1298 E. 14th St. Blow out and pick up debris every Tuesday and Friday. The planter areas must be trimmed and kept weed free Twice Weekly Trash and Debris removal - Tuesday and Friday $ 513.24 $6,158.88
L25 E. 14th St. Landscaped area in front of Buffet Fortuna (1330 Washington Ave) including the lawn area between 1330 and 1371 E. 14th, and the patio area along the south side of Buffet Fortuna from E. 14th Street to Washington Ave, and area located along the south side of 1427 E14th st (runs along the building) Weekly Trash and Debris removal $ 384.93 $4,619.16
L26 E. 14th St. Two (2) planter boxes in alleyway between 1350 & 1378 E. 14th St, all planter boxes in parking lot behind 1350 & 1378 E. 14th Street, planting strip along Estudillo Ave up to 215 Estudillo Ave, along west wall of 215 Estudillo Ave, along west fence line of 176 Joaquin Ave up to Joaquin Ave (including tree), and all sidewalks around parking lot and in the alleyway - no irrigation. Blow out all areas and pick up debris every Tuesday and Friday Twice Weekly Trash and Debris removal - Tuesday and Friday $ 769.86 $9,238.32
L27 E. 14th St. All medians and landscaped areas in parking lot behind 1495 E. 14th St west to Washington Ave and north to 156 W. Juana Ave, including the planter area next to 156 W. Juana Weekly Trash and Debris removal $ 513.19 $6,158.28
L28 E. 14th St. Five medians between 136th Ave and 144th Ave Weekly Trash and Debris removal $ 513.19 $6,158.28L29 Fairway Ave Medians between Doolittle Dr and Blue Whale St Weekly Trash and Debris removal $ 513.19 $6,158.28L30 Farnsworth Ave Landscaping on northeast corner of the Burkhart Ave intersection
$ 128.36 $1,540.32
L31 Farnsworth Ave Landscaping on three (3) corners of Farnsworth Ave and Manor Bl including three (3) small islands in the parking lot in front of market at 1167 Manor Blvd and tree pits and shrubs across the street from 1167 Manor Blvd. Do not maintain the northwest corner of Farnsworth Ave and Manor Blvd Weekly Trash and Debris removal $ 256.62 $3,079.44
L33 Farnsworth Ave Shrubs and trees on both sides of Farnsworth Ave south of Manor Blvd to the end of the bank and Porter’s Market.
$ 128.36 $1,540.32
Attachment C - Compensation
Location Description Special Instructions/Exceptions to Baseline. Work also includes Baseline Maintenance Services
Monthly Price* Annual Cost
L34 Fremont Ave Trim ivy along the wall of the west side of street from Floresta Blvd north to Alvarado St.

Service is required quarterly at a minimum. No irrigation. No baseline services. $ 157.91 $1,894.92
L35 Floresta Bl Medians from Washington Ave west to Fremont Ave $ 128.36 $1,540.32L36 Floresta Bl Triangular landscaped island at the intersection of Monterey Bl (south side of street)
$ 64.16 $769.92
L37 Floresta Bl Triangular landscaped island at the intersection of Corvallis St
$ 64.16 $769.92
L38 Floresta Bl Landscaped areas from Monterey Blvd west to Corvallis St along the overcrossing, including both hillsides down to private property fence lines.

No irrigation. No baseline services. $ 256.62 $3,079.44 L39 Floresta Bl trim Ivy off of curb and back behind guardrail on north side of Street from Monterey Blvd west to incline of overcrossing Service is required three times per year at a minimum. No irrigation. No baseline services. $ 29.61 $355.32
L40 Grand Ave Remove weeds and trim back growth overhanging in backyards to twelve (12) feet high on west side of street from Sybil Ave to PG&E right-of-way; includes area between the sidewalk and the private property fence lines along 1902 - 1988 Evergreen Ave and walkway adjacent to 1962 Evergreen Ave Service is required three times per year at a minimum. No irrigation. No baseline services. $ 29.61 $355.32
L41 Grand Ave Trim back ivy along fence line from Sybil Ave to Benedict Dr. Service is required quarterly at a minimum. No irrigation. No baseline services.
$ 39.48 $473.76
L42 Halcyon Bl Medians between Olivia St and Hesperian Ave Weekly Trash and Debris removal $ 256.62 $3,079.44L43 Halcyon Bl Turf and landscaping on north side of street between railroad tracks (under BART) and Dillo St
Weekly Trash and Debris removal $ 256.62 $3,079.44
L45 Halcyon Bl Planted area on south side of street at Adason Dr between the sidewalk and street at the crosswalk.

Weekly Trash and Debris removal $ 64.16 $769.92
L46 Halcyon Bl Trim ivy on walls between Olivia and railroad tracks on a quarterly basis
Service is only required quarterly at a minimum $ 39.48 $473.76 L47 Halcyon Bl Spray and remove weeds on median hardscapes from Washington to Hesperian, dirt planting strip areas on north side of street from Olivia St. to Dillo St Service level and frequency is required to meet technical specifications of 'weed free' $ 59.21 $710.52
L48 Halcyon Bl Spray and remove weeds at frontage of railroad tracks and BART tracks (6ft) on both sides of the street including corners of fence linewas on the south side of the street Service level and frequency is required to meet technical specifications of 'weed free' $ 9.87 $118.44
L49 Hesperian Bl Medians from Grace St south to Springlake Dr - no irrigation. $ 769.81 $9,237.72 L50 Hesperian Bl From Grace St south to Springlake Dr - Spray and remove weeds in medians and adjacent to railroad crossings
Service level and frequency is required to meet technical specifications of 'weed free' $ 59.21 $710.52
L51 Hesperian Bl Trim juniper bushes at the corners of the fenced-in Triangle property at the intersections of E14th St and 150th Ave. Spray and remove weeds Service is required quarterly at a minimum. No irrigation. No baseline services. 10573 Sq. Ft. $ 29.61 $355.32
L52 Hillside Dr Planted area between 2150 and 2112 Hillside Dr from sidewalk to wrought iron fence, and median in front of 2060 Hillside Dr $ 256.62 $3,079.44
L53 Lewelling Bl Medians from Sedgeman west to Wicks Blvd Weekly Trash and Debris removal $ 1,154.74 $13,856.88L54 Lewelling Bl Spray and remove weeds in parking strips from Sedgeman St west to Wicks Bl
Service level and frequency is required to meet technical specifications of 'weed free' $ 59.22 $710.64
L55 MacArthur Bl Medians from Dutton Ave south Estudillo Ave Weekly Trash and Debris removal $ 256.62 $3,079.44 Attachment C - Compensation
Location Description Special Instructions/Exceptions to Baseline. Work also includes Baseline Maintenance Services
Monthly Price* Annual Cost
L56 MacArthur Bl Planting strip on east side of street along freeway wall from Dowling Blvd south to Estudillo Ave exit, and two (2) islands on west side located at 1045 and 1077 Macarthur Bl Weekly Trash and Debris removal $ 256.62 $3,079.44
L57 MacArthur Bl Planting strip on east side under I-580 from Dowling Blvd north
Weekly Trash and Debris removal $ 256.62 $3,079.44
L58 MacArthur Bl Spray and remove weeds in medians and in planting strips from from Dutton south to Estudillo Ave
Service level and frequency is required to meet technical specifications of 'weed free' $ 88.82 $1,065.84
L59 Marina Bl Medians from San Leandro Blvd west to Merced St Weekly Trash and Debris removal $ 769.81 $9,237.72L60 Marina Bl Spray and remove weeds in medians and along rail crossings from San Leandro Blvd west to I-880.

Service level and frequency is required to meet technical specifications of 'weed free' $ 118.43 $1,421.16
L61 Merced St Medians between Fairway and Marina including small island at SE corner of Marina Bl
Weekly Trash and Debris removal $ 128.36 $1,540.32
L61 Merced St Island with the Bonaire Neighborhood Entry sign at intersection of Wicks Blvd
$ 128.36 $1,540.32
L63 Merced St Corner lot at Wicks Blvd next to 14251 Merced St $ 256.62 $3,079.44L64 Merced St Center median on Wicks Blvd across from corner lot $ 256.62 $3,079.44L65 Parrot St Landscaping on both sides of the street between E. 14th St and Washington Ave
Weekly Trash and Debris removal $ 256.62 $3,079.44
L66 San Leandro Bl Exterior of Siempre Verde Park on west side (fence line to curb), including the Veteran’s Memorial Wall
Weekly Trash and Debris removal $ 256.62 $3,079.44
L67 San Leandro Bl Medians from Creekside Plaza south to E. 14th St. Weekly Trash and Debris removal $ 513.19 $6,158.28L68 San Leandro Bl Landscaping in planting strips (bulb-outs) from W. Estudillo to Thornton St.

Weekly Trash and Debris removal $ 256.62 $3,079.44
L69 San Leandro Bl Planted area under BART tracks from the bart station south to 2481 San Leandro Bl. Trim ivy back to curb. Spray and trim weeds including the area between the plants and the railroad tracks.

Weekly Trash and Debris removal $ 513.19 $6,158.28
L70 San Leandro Bl Planted area between private property fence line and sidewalk on south side beginning at Rose Drive and continuing east to end of fence line approximately 200 feet west of E. 14th St Weekly Trash and Debris removal $ 256.62 $3,079.44
L71 San Leandro Bl Trim Ivy along east fence line of Boys & Girls Club located at 2200 San Leandro Bl
Service is required quarterly at a minimum. No irrigation. No baseline services. $ 39.48 $473.76
L72 San Leandro Bl Spray and remove weeds in all referenced medians and landscaped areas.

Service level and frequency is required to meet technical specifications of 'weed free' $ 157.91 $1,894.92
L73 San Leandro Bl Spray and remove weeds on east side of street along fence line from Estabrook St. to Marina Bl and from the Family Services Agency to Washington Ave Service level and frequency is required to meet technical specifications of 'weed free' $ 59.21 $710.52
L74 San Leandro Bl Spray and remove weeds at empty lot at Coburn Ct Service level and frequency is required to meet technical specifications of 'weed free'
$ 19.74 $236.88
L75 School Street Raise tree’s and trim suckers along fence line at I-580 from 141st Ave to Russ Ave
No irrigation. No baseline services. $ 22.21 $266.52
L76 Springlake Dr Landscaped areas on the north side from flood control canal west to end of wall, 75 feet west of Peninsula St; and south side from flood control canal west to Washington Ave $ 384.93 $4,619.16
L77 Springlake Dr Medians from Hesperian Blvd west to Washington Ave $ 1,026.43 $12,317.16L78 Springlake Dr Trim ivy on walls from Washington Ave to flood control channel on a quarterly basis
Service is only required quarterly at a minimum. No irrigation. No baseline services. $ 78.96 $947.52
Attachment C - Compensation
Location Description Special Instructions/Exceptions to Baseline. Work also includes Baseline Maintenance Services
Monthly Price* Annual Cost
L79 Springlake Dr Spray and remove weeds in all referenced medians and landscaped areas and lot on southeast corner of Washington Ave along the wall (100 ft) Service level and frequency is required to meet technical specifications of 'weed free' $ 88.82 $1,065.84
L80 W. Joaquin Ave Alley between 129 and 145 W. Joaquin Ave including the two (2) brick planters and tree wells, and along the building and planter next to 1371-D Washington Ave Weekly Trash and Debris removal $ 256.62 $3,079.44
L81 W. Joaquin Ave Landscaped planters and pots between 129 W. Joaquin and 138 W. Juana
Weekly Trash and Debris removal $ 256.62 $3,079.44
L82 W. Joaquin Ave Landscaped areas in patio area off of E. 14th St Weekly Trash and Debris removal $ 513.19 $6,158.28L83 W. Joaquin Ave Spray and remove weeds in all referenced landscape areas Service level and frequency is required to meet technical specifications of 'weed free'
$ 29.61 $355.32
L84 W. Juana Ave Five (5) medians from Washington Ave to E. 14th Street Weekly Trash and Debris removal $ 320.78 $3,849.36L85 W. Juana Ave Spray and remove weeds in all referenced landscape areas Service level and frequency is required to meet technical specifications of 'weed free'
$ 29.61 $355.32
L86 Washington Ave Turf and landscaping at northeast corner of the Halcyon Dr intersection
Weekly Trash and Debris removal $ 513.19 $6,158.28
L87 Washington Ave Medians from I-880 to Lewelling Blvd Weekly Trash and Debris removal $ 513.19 $6,158.28L88 Westgate Pkwy Landscaped area on west side of street from Williams St to cross walk (at the back of Walmart)
Weekly Trash and Debris removal $ 513.19 $6,158.28
L89 Westgate Pkwy Landscaped area along wall on east side of street from the cross walk (at the back of Walmart) to Timothy Dr
Weekly Trash and Debris removal $ 513.19 $6,158.28
L90 Westgate Pkwy Medians at intersection of Timothy Drive and Westgate Parkway
Weekly Trash and Debris removal $ 513.19 $6,158.28
L91 Westgate Pkwy 2x a week trash pickup from Davis Street to Williams Twice Weekly Trash and Debris removal $ 769.89 $9,238.68L92 Westgate Pkwy Spray and remove weeds in all referenced medians and landscaped areas
Service level and frequency is required to meet technical specifications of 'weed free' $ 59.21 $710.52
L93 Williams St Landscaped area along fence line on south side of street from Doolittle Dr to Aurora Ave
$ 256.62 $3,079.44
L94 Williams St Spray and remove weeds along south side of street from Doolittle Dr to Neptune Dr
Service level and frequency is required to meet technical specifications of 'weed free' $ 29.61 $355.32
L95 Woodland Park Spray and remove weeds along south side of street from Doolittle Dr to Neptune Dr
Service level and frequency is required to meet technical specifications of 'weed free' $ 59.21 $710.52
TOTALS $ 22,979.33 $ 275,751.96
Year 1 = Start of Contract to June 30, 2025 [more than 12 months] Insert propsed CPI adjustment below**
Year 2 = July 1, 2025 - June 30, 2026 Proposed Contract CPI Adjustment 6.40%Year 3 = July 1, 2026 - June 30, 2027 Proposed Contract CPI Adjustment 5.00%Year 4 = July 1, 2027 - June 30, 2028 Proposed Contract CPI Adjustment 5.00%Year 5 = July 1, 2028 - June 30, 2029 Proposed Contract CPI Adjustment 5.00% Attachment C - Compensation
Price - Contractor to insert pricing here - Shown in $ or portions of a $ Weed Abatement PRICING
Citywide Medians *- Hardscape Not Adjacent to
Landscape Areas or within the same continuous median
perimeter. See Weed Abatement Areas Tab Per Linear Foot 0.01 $ Citywide Curb & Gutter* - Hardscape, No Landscaping -
Back of Sidewalk to Back of Sidewalk Per Linear Foot 0.01 $ Mowing or Equipment Trimming* - Weed areas. See
Weed Abatement Areas Tab Per Square Foot $ 0.04
Spraying Weeds in identified areas* - no landscaping, no irrigation; See Weed Abatement Areas Tab Per Square Foot $ 0.01 *Fee paid by City will be inclusive of all treatments need to remove the weeds, not a per application fee.

Deductives
Landscape Areas no longer requiring any form of
maintenance or irrigation maintenance - to be removed
from contract areas Per Square Foot 8.54 $
Labor Rates; inclusive of all wages, benefits, taxes
General Laborer (Basic Labor Tasks/Repairs) Hour $ 56.40 Irrigation Technician (General Irrigation Repairs) Hour $ 120.00 Irrigation Specialist (Technical Irrigation Repairs) Hour $ 120.00 Minimum Service Call Charge Per Call $ 240.00
Markup on material cost
Percentage above
cost $ 72.42
Markup on subcontractor cost (if necessary)
Percentage above
cost 47.06 $
Other Services
Aeration - Turf Per Square Foot $ 0.00
Fertilization - Turf Per Square Foot $ 0.00
Fertilization - Landscape Areas Per Square Foot $ 0.00
Dethatching - Turf Per Square Foot $ 0.01
Overseeding/Top Dressing - Turf Per Square Foot $ 0.03
Plant Replacement * See PLANT MATERIAL xxx

PLANT MATERIAL
One Gallon (including labor and materials installed Each $ 11.41 Five Gallon (including labor and materials installed) Each $ 41.87 Fifteen Gallon (including labor and materials installed; for trees-install city provided stake/strap) Each $ 154.79
Attachment C - Compensation
Extra Services
24" Box Tree (including labor and materials installed; for trees-install city provided stake/strap) Each $ 384.32
36" Box Tree (including labor and materials installed; for trees-install city provided stake/strap Each $ 1,006.21 Flat-Ground Cover (including labor and materials
installed) Per Flat $ 56.91
Flat-Annual Color (including labor and materials installed) Per Flat $ 56.07 Sod-Turf (including labor and materials installed; remove old) Per Square Foot $ 1.20

BULK MATERIAL
Shredded Bark (including labor and material installed) Per cubic yard $ 123.63 2x4 Cobble (including labor and material installed) Per cubic yard $ 257.57 Topsoil (including labor and material installed) Per cubic yard $ 153.07 Soil Amendment (including labor and material installed) Per cubic yard $ 137.99 Bender/Headerboard (including labor and material
installed) 2x6 Benda board Per foot $ 5.86
Boulders/Moss Rock (materials only) Per pound $ 0.10
Compost/Mulch (including delivery, labor and material
installed) Medians Per Cubic Yard $ 129.45
Compost/Mulch (including delivery, labor and material
installed) City Facilities Landscape area Per Cubic yard $ 129.45 Attachment C - Compensation
Extra Services
See Extra Services Worksheet for Pricing
RIGHT-OF WAY WEED ABATEMENT Description
W1
139th Ave @ Washington
Landscaped area on the south side of the street from
Washington Ave east to Western Pacific Railroad (WPRR).

W2
Alvarado St
From W. Estudillo Ave (South of Davis St) south to railroad tracks, six (6) feet clearance including the area on both sides of the tracks at the crossing.

W3 Alvarado St Guardrail on west side of street at Fremont Ave intersection.

W4 Alvarado St
Tree wells on east side of street from Fremont Ave to Portola Dr.

W5 Callan Ave Cement Island at Huff Ave intersection
W6 Chapman Rd
Dirt area from the corner of Chapman Rd at Washington Ave to the Service Center gate (east side of street).

W7 Chapman Rd
Dirt area along eastern fence line of the Service Center – remain 25’ away from train tracks.

W8
Dan Niemi Way
Along fence line adjacent behind gardrail to San Leandro Creek between Davis St and E. 14th St. Trim back growth to twelve (12) feet high along fence line.

W9 Davis St Service road parallel to overcrossing on the south side W10 Davis St
Dirt lot on the south side of overcrossing adjacent to the muffler shop at the Doolittle Dr intersection
W11
Doolittle Dr
Along wall and fence line on west side of street from Eden Rd south to Davis St, including corner area under Redwood trees W12
Estudillo Ave/Lake Chabot Rd
Trim back shrubs and trees behind guardrail on north side of Estudillo Ave from Parker St to Brookvale Dr. Remove litter and weeds along road down to fence line per operational standards. Keep leaves cleaned up so as not to create a fire danger.

W13
Estudillo Ave/Lake Chabot Rd
Trim ivy back two (2) feet behind white line and up
embankment so as not to create a visual driving hazard on south side from Parker St to 1337 Lake Chabot Road. Remove litter and weeds along roadside.

W14 Fairmont Dr E.14th St west to Hesperian Blvd, hardscape medians only W15 Grand Ave Cement Island at Joaquin Ave
W16 Huff Ave Cement Island at Callan Ave intersection
W17
Leonard Ave
Keep area trimmed behind curb line and up to 12 feet high, and signs clear along fence line on west side of street from 1581 Leonard Dr south to I-880 overpass. No parking signs must be kept clear.and visible.

W18 Lola Ave
Along fence line inside the perimeter of the Fire Training Center
W19 Menlo St
From Marina Blvd south to barricade at the end of street at Fairway Dr.

W20 San Leandro Bl
West side of street from 523 San Leandro Blvd North to just west of 110 San Leandro Blvd. Trim plants and trees.

W21 Timothy Dr
Ivy along wall and fence line across from 1271 Timothy Dr north to Davis St
W22 Vistagrand Dr In front of the wall between 1650 and 1750 Vistagrand Dr.

W23 Washington Ave
All four (4) sides above railroad underpass south of San Leandro Blvd
Price will be paid to contractor to meet technical specifications in Attachment A-6 Section 600. Work for weed abatement will be calculated as Per Linear Foot or Per Square Foot depending on the type of treatment needed. The contractor shall be compensated once for the service regardless of how many treatments are needed. No pricing is needed here.

City will authorize this as Extra Work. These are locations where weed abatement services will likely be requested.

Attachment C - Compensation
Weed Abatement Locations

← All documents from this meeting