4 Name Location/Limits Status Total Project
Cost (est.)
Completion
Date (est.)
Annual Street Overlay/Rehab. 19-21
Phase 1 and 2 Citywide Complete (Ph. 1)Design (Ph. 2) $13.5M Fall 2024 Annual Street Paving 21-23 Citywide Construction $20.3M Fall 2024 Annual Street Sealing 21-23 Maintenance Areas 3 & 4 Construction $6.7M Fall 2024 Wicks/Manor Traffic Signal Improvements Wicks Blvd at Manor Blvd Construction $920,000 Spring 2024 Adaptive Signal Marina Marina Blvd Construction $645,000 Spring 2024 Shoreline Fiber Optics Marina-Monarch BayFarrallon-Wicks Design $700,000 Fall 2023 UPRR Track Replacement Marina Blvd Permitting n/a Early 2024 Prologis Project Rough Grading /
Demolition 1919 Williams St Permitting n/a TBD
Caltrans Bridge Railing Project along
Washington Ave at I-880 Highway
Washington Ave Constructionn/a2024
District 4
5 Council District 4 Projects
6 Name Location/Limits Status Total Project
Cost (est.)
Completion
Date (est.)
Annual Street Overlay/Rehab. 19-21
Phase 1 and 2 Citywide Complete (Ph. 1)Design (Ph. 2) $13.5M Fall 2024 Annual Street Paving 21-23 Citywide Construction $20.3M Fall 2024 Long Beach Restoration Studies Roberts Landing Shoreline Design $541,500 Fall 2024 Washington Manor Park Pool
Renovation 14900 Zelma Street Design $2.5M Summer 2024
Washington Manor Park Well 14900 Zelma Street Construction $530,000 Spring 2024 Wicks/Manor Traffic Signal
Improvements Wicks Blvd at Manor Blvd Construction $920,000 Spring 2024 Bandwidth IG, Conduit Boring Install Monarch Bay, Lewelling & Wicks Construction N/A Ongoing
Monarch Bay Golf Course Grading 13800 Monarch Drive Construction N/A Ongoing Pavement
Maintenance