San Leandro Bicycle and
Pedestrian Master Plan
Update
Facilities & Transportation Committee
October 2, 2024
About the Plan
Draft Plan Summary
Next Steps and Discussion
1 2
3 Presentation Outline
About the Plan
What is the Bicycle and Pedestrian
Master Plan Update?
The Bicycle and Pedestrian Master Plan is a focused update to the 2018 Plan that creates a 5-year work plan of projects and programs to support bicycling and walking in San Leandro.

What is a “focused update?”
The focused update reviews and updates the 2018 network with new prioritization and implementation strategies.

The community outreach and technical tasks are designed to build off existing work and finalize the update on a shorter schedule.

San Leandro adopted a Vision Zero policy and
Local Roadway Safety Plan in 2021.

Vision Zero aims to eliminate all traffic fatalities and severe injuries.

The focused update incorporates new
best practice guidelines.

NACTO’s Contextual Guidance for
Selecting all Ages and Abilities
Bikeways
The Plan was developed over the last year,
with engagement during each stage.

Needs
Assessment
Network
Recommendations
Prioritization &
Implementation Final Plan
FALL 2023 WINTER 2023 Phase 1 SPRING 2024 SUMMER 2024 FALL 2024 WINTER 2024 Engagement
Phase 2
Engagement
Phase 3
Engagement
Project
Initiation
Draft Plan
We talked with San Leandrans at the Tree
Lighting and Cherry Festival events.
12/1/23: Tree Lighting Event Pop-Up 6/1/24: Cherry Festival Event Pop-Up ~170
People Engaged
In Person
We also received input online about current
conditions and the draft network recommendations.
355
Web Map Comments
1,823
Website Visitors to Date
91 Surveys Completed
Draft Plan Summary
The Plan consists of:

1. Introduction

2. Vision and Goals

3. Existing Conditions

4. Pedestrian and Bicycle
Recommendations Update

6. Implementation

7. Appendices
- Design Guidelines
- Project List
- Comprehensive
Community Feedback

5. Support Programs
The vision statement was developed with
input from the BPAC.

San Leandro will be a connected community where walking and biking are fully integrated into daily life as safe, equitable, and enjoyable transportation options for people of all ages and abilities.

The BPMP has four goals with associated
policies.

Safe Systems Community
Support Programs
A Comprehensive,
Comfortable, and
Connected System
Fund and Implement
Active Transportation
Projects and Programs
Bikeways are recommended by four
main types.

Shared Use Path
Separated Bike Lane Bike Lane
Bike Boulevard
The proposed bikeway network will provide
access for all ages and abilities.

Pedestrian priority areas focus on schools,
business districts, and transit.

These are some of the typical project types within
pedestrian priority areas.

Pedestrian Scramble Pedestrian Hybrid Beacon
Rectangular Rapid Flashing Beacon Wide and Smooth Sidewalks Project locations have been scored and
prioritized based on five criteria:

Safety Need Community Input
Community Destinations Equity
Growth
The plan includes priority corridors, several of
which have projects underway.

Corridor Lead Agency Status
San Leandro Creek
Trail City of San Leandro Study complete
150th Avenue City of San Leandro Recommended
Davis Street Caltrans Partially complete
East 14th Street
Alameda
CTC/Caltrans/
City of San Leandro
In progress
Parrott Street City of San Leandro Recommended
West Juana Avenue City of San Leandro Recommended
Alvarado Street City of San Leandro Recommended
Bancroft Avenue City of San Leandro Crosstown Corridors Study complete
Estudillo Avenue City of San Leandro In progress
Hesperian Boulevard City of San Leandro In progress
The Plan outlines existing and proposed
active transportation support programs for
the City and its partners.

Bike Parking Education
Traffic Calming Safe Routes to School Wayfinding
Sidewalk and Bikeway
Maintenance
The Design Guide is underway and will be
included as an appendix to the Plan.

Street
Design Principles
Safe System Approach
Speed Management
Travel Lane Widths
Bicycle
Design Guidelines
Pedestrian
Design Guidelines
Bicycle Facility Selection
Bikeway Dimensions
Intersections and Rail Crossings
Bus Stops
Bike Parking
Sidewalk Design
Crosswalk Policy
Safety Enhancements
Next Steps and
Discussion
Next Steps
Phase 3 online outreach October-November 2024
City Council approval of the final plan in December 2024 Discussion and Questions
• Do you have questions or comments on the contents
of the draft Bicycle and Pedestrian Master Plan
update?