LAKE CHABOT ROAD

ONE-WAY

CIRCULATION

EVALUATION
February 3, 2025
February 3, 2025 City Council Meeting 1
1 Agenda
Supplemental Geotechnical Investigation
One-Way Circulation Evaluation
2 February 3, 2025 City Council Meeting 2
February 3, 2025 City Council Meeting 3

DATE LEGISLATIVE BODY ACTION/DISCUSSION TOPIC
2/20/2018 City Council Award consultant design contract for roadway stabilization 10/5/2022 Facilities & Transportation Committee Roadway Stabilization Roadway Configuration 2/1/2023 Facilities & Transportation Committee Storm Damage Assessment 5/3/2023 Facilities & Transportation Committee Damaged Roadway Interim Options 7/5/2023 Facilities & Transportation Committee Funding request for roadway storm damage repair 7/17/2023 City Council Accelerated construction award for upslope repair 4/15/2024 City Council Accept federal grant funding for emergency repair 7/15/2024 City council Award environmental consultant contract 9/9/2024 City Council Council Referral: Repair Status Update Presentation 11/6/2024 Facilities & Transportation Committee Council Follow Up: Alternating One-Way, Traffic Calming, Additional Grant Funding, Emergency access/response
12/4/2024 Facilities & Transportation Committee Committee Follow Up: Supplemental geotechnical investigation fee proposal 12/16/2024 City Council Award consultant design contract 1/14/2025 Facilities & Transportation Committee Committee Follow Up: Supplemental geotechnical investigation, one-way circulation, mitigation measures
One-Way
Circulation Evaluation
1 February 3, 2025 City Council Meeting 4
Westbound One-Way Operations
February 3, 2025 City Council Meeting 5
Challenges
 Detour of Eastbound Traffic
 Inbound access restricted to
certain residences
 Reduced Emergency Access
 Unacceptable Sight Lines
Westbound One-Way Operations
February 3, 2025 City Council Meeting 6
Challenges
• Errant eastbound vehicles
likely detour to local streets
• Restricted inbound access to
certain residences
Turn Around Route
One-Way WB Operation
Two-Way Operation
Inbound Access Restricted
Transition at Estudillo Ave
Westbound One-Way Operations
February 3, 2025 City Council Meeting 7
Challenges
 Lake Chabot Rd & Estudillo Ave intersection not
suitable for U-Turns
Delivery Truck Bus Semi Trailer Truck
Westbound One-Way Operations
February 3, 2025 City Council Meeting 8
Challenges
 Residents with restricted
inbound access increases
 Emergency access to
residents further restricted
Detour Route
One-Way WB Operation
Two-Way Operation
Inbound Access Restricted
Transition at Benedict Dr

EMERGENCY VEHICLE ACCESS
1 3
2 4
5 6
8 9
7 February 3, 2025 City Council Meeting 9
Westbound One-Way Operations
February 3, 2025 City Council Meeting 10
Challenges
 Driveway Sightlines
Construction Zone
One-Way WB Operation
Sight Triangle
Eastbound One-Way Operations
February 3, 2025 City Council Meeting 11
Challenges
 Detour of Westbound Traffic
 Reduced Emergency Access
Detour Route
One-Way EB Operation
Two-Way Operation
Supplemental
Geotechnical
Investigation
2 February 3, 2025 City Council Meeting 12

PREVIOUS GEOTECHNICAL INVESTIGATIONS
February 3, 2025 City Council Meeting 13
Nov 2011 Geological & Geotechnical Investigation Lake Chabot Stabilization Treadwell & Rollo (Langan)
Jan 2019 Materials Report Lake Chabot Road Embankment Stabilization Cal Engineering & Geology
Mar 2019 Design Alternatives Report Lake Chabot Road Embankment Stabilization Cal Engineering & Geology

PREVIOUS GEOTECHNICAL INVESTIGATIONS
November 2011
Geological & Geotechnical Investigation
Lake Chabot Stabilization
Treadwell & Rollo (Langan)
 Advanced six (6) borings
 13.3’ – 39.5’ depth
February 3, 2025 14
1 2
3 4
Pre-storm erosion
Additional erosion
#
#
Boring location
City Council Meeting

PREVIOUS GEOTECHNICAL INVESTIGATIONS
November 2011
Geological & Geotechnical Investigation Lake Chabot Stabilization Treadwell & Rollo (Langan)
Conclusions
 Observed roadway distress result of settlement of fill & fill slope creep movement  Landslides triggered by excessive precipitation or earthquake may cause displacement of road
Recommended Mitigation
 Stitch Pier Retention System
February 3, 2025 City Council Meeting 15

PREVIOUS GEOTECHNICAL INVESTIGATIONS
January – March 2019
Cal Engineering & Geology
Materials Report Lake Chabot Road
Embankment Stabilization
Design Alternatives Report Lake
Chabot Road Embankment
Stabilization
 Topographic Survey
 Seismic refraction profiles
 Seven (7) additional locations
February 3, 2025 City Council Meeting 16
2 3
4 Pre-storm erosion
Additional erosion
#
#
Boring location
1 Refraction profile

PREVIOUS GEOTECHNICAL INVESTIGATIONS
January – March 2019
Cal Engineering & Geology
Materials Report Lake Chabot Road Embankment Stabilization Design Alternatives Report Lake Chabot Road Embankment Stabilization Conclusions
 Substantiated conclusions in 2011 Treadwell & Rollo report  Identified areas of embankment failure; downslope creep; loss of lateral support Recommended Mitigation
 CIDH Piles
 Soldier Pile & Lagging Retaining Wall
 Drainage Improvements
February 3, 2025 City Council Meeting 17
1 2
3 February 3, 2025 City Council Meeting 18

PREVIOUS GEOTECHNICAL INVESTIGATIONS
Pavement failure limits
1 2
3 SUPPLEMENTAL GEOTECHNICAL INVESTIGATION
December 2024
Scope & Fee Proposal
Treadwell & Rollo (Langan)
Scope
 Topographic survey; Lidar scan
 Perform slope stability evaluation
 Geotechnical criteria for stability/safety
 Develop short-term mitigation recommendations
Schedule
 10 to 12 weeks
February 3, 2025 City Council Meeting 19

SUPPLEMENTAL GEOTECHNICAL INVESTIGATION
December 2024
Scope & Fee Proposal
Treadwell & Rollo (Langan)
Fee
 $89,500
 Not eligible for FEMA reimbursement
 Topographic survey ($40k) would have been eligible
 Current budget earmarked for construction and FEMA local match  Additional funds would need to be allocated
February 3, 2025 City Council Meeting 20

ESTIMATED COST TO REPAIR ALL SLIDES

ITEM ESTIMATED COSTS
Slide 1 and Slide 4 Repair Costs $3M
Stabilize Erosion Sites 2 and 3 $6M
Reconstruct Pavement $2M
Total $11M

LAKE CHABOT ROAD
Repair Funded by Grant
Repair Funded by Grant
Pre-storm erosion
Additional erosion
1 2 3
#
#
February 3, 2025 City Council Meeting 21

CITYWIDE ROAD

FUNDING NEEDS

0.5 mi LAKE CHABOT ROAD REPAIR COSTS AMOUNT
(est.)
Slide 1 and Slide 4 Repair Costs (estimate) $3M
Stabilize Erosion Sites 2 and 3 (estimate) $6M
Reconstruct Pavement (estimate) $2M
Total $11M

CITYWIDE ROAD REPAIR NEEDS AMOUNT
43 miles of Failed roads (red, PCI<25) $96
26 miles of Poor roads (orange, PCI<50) $51M
29 miles of Fair roads, (yellow, PCI<65) $18M
Total (98 miles) $165M
February 3, 2025 City Council Meeting 22
Lake Chabot Road PCI = 37 (poor, orange)

NEXT STEPS
Summer 2026
(earliest)
Construction
Environmental
Studies and Design
Hillside
Protection
February 3, 2025 City Council Meeting 23
December 2024
Design Contract Awarded
November 2024
Completed

OPTIONS AND STAFF RECOMMENDATION
February 3, 2025 City Council Meeting 24
 Direct staff to design one-way circulation (~$20,000) AND Award Agreement to perform Supplemental
Geotechnical Investigation ($89,500)
Select Direction: Westbound OR Eastbound
 Keep road closed to allow staff to focus on repairing slides 1 and 4

STAFF RECOMMENDATIONS

DEPARTMENT JUSTIFICATION
City Manager’s Office 1. Risks associated with unrepaired storm damage at 2 slide locations

2. Risks associated natural geological hazard and erosion/slide history Public Works Department 3. Minimizes vehicle cut-through traffic and waiting queues

4. Preserves pavement structural integrity

5. Streamlines environmental studies, design, and road/hillside inspections

6. Will allow uninterrupted road construction/repair

7. Current temporary traffic control is the lowest cost to implement and maintain Fire and Police Department 8. Allows emergency vehicle access

9. Minimizes conflict with vehicles in the event of an emergency response

10. Allows public use in emergency circumstances
February 3, 2025 City Council Meeting 25

1. KEEP LAKE CHABOT ROAD CLOSED, AS CONFIGURED

2. FOCUS ON COMPLETING ROAD REPAIRS, AS REQUIRED BY FHWA GRANT

3. EVALUATE AND IMPLEMENT APPLICABLE TRAFFIC CALMING MEASURES

← All documents from this meeting