Attachment B – MNS Amendment 1 Scope of Work

Page 1 of 2 ends

Attachment B
Amendment 1 to CSA with MNS Engineers
Scope of Work
The following is a summary of the revised ‘Scope of Work’ that will be included in the Contract Services Agreement Amendment Number 1 with MNS Engineers for the Cary Haas Pedestrian Bridge, Project No.2024.1010:

1. Section 2 of the Agreement entitled “Compensation” is hereby amended to pay Consultant a sum not to exceed 513,337.00; and

2. Exhibit A of the Agreement entitled “Scope of Services” is hereby amended to read:

Added the following additional services to tasks listed in the Scope of Work:
_________________________________________________________________________________ Task 2 – Environmental
As a result of the altered bridge alignment, new abutments will be placed within the top-of-bank limits delineated by MNS subconsultant EMC Planning. EMC Planning will need to update their Wetland Delineation Report. MNS will need to update the CEQA Categorical Exemption Project Description. MNS will also need to submit an application to the California Department of Fish and Wildlife (CDFW) for a 1602 Streambed Alteration Agreement (SAA) permit.

Task 3 – Survey and Mapping
A Right-of-Way Base Map was listed as optional in the contract. This was requested by the City and provided by MNS in the 35% PS&E deliverable.

Task 5 – Geotechnical Engineering
Subtask 5.3 – Geotechnical Engineering Analyses
• MNS Subconsultant Earth Mechanics, Inc. will need to provide recommendations for pile type and pile length to support the new abutment design.

Task 6 – Hydrology & Hydraulics
Subtask 6.1 – Location Hydraulic Study (LHS) Technical Memorandum • The FEMA Technical Memorandum may need updated based on the new bridge profile • and alignment.

Task 7 – Civil Engineering
Approach walkways and surface drainage will need updated to fit the new bridge alignment.

Attachment B – MNS Amendment 1 Scope of Work

Page 2 of 2 ends

Task 8 – Structural Engineering
Two (2) bridge abutments will need designed as we are no longer using the existing abutments.

Existing 35% Plan sheets will require revision, and new sheets will be required, including Abutment Layouts and Details, and Drainage and Approach Slab Layouts and Details. New abutments will also require design, modeling, and calculations.
____________________________________________________________________________________ End of Additional Services