Non-Professional Services Agreement between
City of San Leandro and T&S West Exhibit B Page 1 of 6

EXHIBIT B

COMPENSATION SCHEDULE & REIMBURSABLE EXPENSES
Bid items denoted with F are final pay. Payment equal to the total price in the Price Schedule for Final Pay items will be the total payment made for the work described in the plans and specifications, regardless of whether or not the quantity of the actual work equals the estimated quantity in the contract price schedule.

Bid
Item
CSI
Number Description Qty Units
Unit Price
with Factor Total Price
1 F
01 22 16
00-0002
Reimbursable contractor fees:
bond 2% of total 6360 EA $1.10 $6,996.00
2 F
01 22 23
00-0010 60' Boom Man Lift 3 Mo $4,660.40 $13,981.20
3 F
01 22 23
00-1036 10,000 LB Forklift w/ Operator 3 Mo $30,028.02 $90,084.07 4 F
01 22 23
00-1036 Deduct without operator 1.5 Mo ($23,891.09) ($35,836.63) 5 F
01 31 33
00-0007
Electrician minimum charge:
light removal safe off breaker 1 EA $1,138.78 $1,138.78 6 F
01 53 23
00-0002
Temporary plywood for
access: roof protection for
parapet stucco demo Install 1500 SF $2.03 $3,038.61
6 F
01 53 23
00-0002
Temporary plywood for
access: roof protection for
parapet stucco demo Removal 1500 SF $0.65 $977.45
7 F
01 54 23
00-0013 Masonry scaffolding 200
CCF x
Month $77.66 $15,531.60
8 F
01 54 23
00-0019
Heavy duty scaffolding
erection 184 CCF $109.25 $20,101.67
9 F
01 56 16
00-0004
6 Mil plastic sheeting dust
control 1000 SF $0.78 $779.13
10 F
01 56 16
00-0086
Red rosin paper floor
protection, 36" Wide 840 LF $0.45 $380.78
11 F
01 66 19
00-0051
Handling Material For Over
125' Per 12" x 24" x 48"
Container Per 125' Segment 150 EA $1.66 $248.61
12 F
01 66 19
00-0073
Transfer stucco demolition
debris from rooftop to
dumpster per CY per 125' 80 CY $8.40 $672.04
13 F
01 71 13
00-0004
Equipment
mobilization/demobilization
Aerial Lift and Long Reach
Forklift 2 EA $1,330.63 $2,661.25
14 F
01 74 19
00-0004 Steel debris chute 60 LF $74.12 $4,446.99
Non-Professional Services Agreement between
City of San Leandro and T&S West Exhibit B Page 2 of 6
15 F
01 74 19
00-0016 40 CY dumpster 2 EA $1,218.25 $2,436.50
16 F
01 74 19
00-0024
Concrete washout bin for
concrete curb construction 1 EA $1,530.54 $1,530.54
17 F
02 41 16
13-0020 Sorting debris for recycling 100 CCF $11.83 $1,182.86 18 F
02 41 16
13-0020
MOD Add for up to 500 CCF 100 CCF $3.56 $355.57
19 F
02 41 16
13-0024
Concrete foundation
demolition 20 CF $22.42 $448.50
20 F
02 41 19
13-0071 Saw cut minimum charge 1 EA $1,327.99 $1,327.99 21 F
02 41 19
13-0280
1/2" Diameter drilling in
concrete per inch of depth 24 inch $3.19 $76.50
22 F
03 21 11
00-0120
Slab On Grade, Steel
Reinforcement Bar (#4- Grade
40) 50 LF $1.23 $61.62
23 F
03 30 53
00-0007 Hand Mix And Place Concrete 20 CF $40.81 $816.24 24 F
03 35 13
00-0006
Steel Trowel Concrete Floor
Finish 20 SF $2.28 $45.61
25 F
03 35 13
00-0006
MOD Add for up to 100 SF 20 SF $4.56 $91.23
26 F
05 05 19
00-0014 Wedge Anchor Expansion Bolt 16 EA $28.39 $454.22 27 F
05 05 19
00-0014
MOD Deduct for >10 to 50 16 EA ($1.29) ($20.63)
28 F
06 11 16
00-0054
2" x 8" Pressure Treated Wood
Stud Framing 400 LF $4.42 $1,767.92
28 F
06 11 16
00-0054
DEMO Demolition of wood studs 400 LF $1.37 $549.64
29 F
06 11 16
00-0154
2" x 8" Pressure Treated Wood
Blocking 500 LF $12.17 $6,084.30
29 F
06 11 16
00-0154
DEMO Demolition of wood blocking 500 LF $4.39 $2,195.73 30 F
06 13 23
00-0038
4" x 8" Pressure Treated Heavy
Timber Beam 20 LF $14.28 $285.59
30 F
06 13 23
00-0038
DEMO Demolition of timber beam 20 LF $2.90 $58.08
31 F
06 16 33
00-0012
1/2" Interior BC Plywood Wall
Sheathing 1510 SF $3.54 $5,347.67
Non-Professional Services Agreement between
City of San Leandro and T&S West Exhibit B Page 3 of 6
31 F
06 16 33
00-0012
DEMO
Demolition of plywood
sheathing 1510 SF $1.20 $1,818.21
32 F
06 16 33
00-0012
MOD
Add for Shear Wall
Construction 1510 SF $0.48 $727.28
33 F
06 16 33
00-0012
MOD
Add for Exterior CC Grade
Plywood 1510 SF $0.17 $256.69
34 F
07 13 53
00-0024 10 Mil PVC Vapor Barrier 65 CSF $97.87 $6,361.74 35 F
07 13 53
00-0024
DEMO Demolition of vapor barrier 65 CSF $20.27 $1,317.65 35 F
07 13 53
00-0024
MOD
Add for Joint Taping (of vapor
barrier) 65 CSF $14.22 $924.47
36 07 21 16
00-0016
Fiberglass batt insulation
Install 1500 SF $3.17 $4,759.78
37 F
07 51 13
00-0178 TPO membrane roofing 7 SQ $667.64 $4,673.51
38 F
07 51 13
00-0189 TPO bonding adhesive 7 SQ $119.58 $837.03
39 F
07 62 13
00-0017
Stainless steel flashing Roof to
stucco and at steel trelllis
Install 320 SF $20.29 $6,491.43
39 F
07 62 13
00-0017 Stainless steel flashing Demo 320 SF $5.26 $1,681.79 40 F
07 62 13
00-0017
MOD
Add for wrap around window
panning (at trellis) 20 SF $10.51 $210.22
41 F
07 62 13
00-0017
MOD
Add for mechanically keyed
flashing 300 SF $3.91 $1,172.94
42 F
07 71 13
00-0006
Galvanized steel coping (new
top cap) Install 320 LF $54.03 $17,289.32
42 F
07 71 13
00-0006
Galvanized steel coping (new
top cap) Demo 320 LF $3.26 $1,042.62
43 F
07 71 19
00-0180 Fascia spillout scupper Install 2 EA $151.29 $302.59 43 F
07 71 19
00-0180 Fascia spillout scupper Demo 2 EA $4.24 $8.47
44 F
07 71 19
00-0196 Fascia spillout scupper Install 2 EA $188.12 $376.25 44 F
07 71 19
00-0196 Fascia spillout scupper Demo 2 EA $4.24 $8.47
45 F
07 71 23
00-0005
K-style aluminum gutter
(downspout) Install 50 LF $13.54 $677.13
Non-Professional Services Agreement between
City of San Leandro and T&S West Exhibit B Page 4 of 6
45 F
07 71 23
00-0005
K-style aluminum gutter
(downspout) Demo 50 LF $5.58 $279.07
46 F
07 71 23
00-0005
MOD Add for up to 100' 50 LF $2.73 $136.70
47 F
07 71 23
00-0005
MOD Add for Kynar 500 finish 50 LF $1.98 $99.16
48 F
07 92 13
00-0005
3/8" x 3/8" Joint Silicone
Sealant and Caulk around
windows doors penetrations 2 CLF $537.25 $1,074.49
49 F
07 92 13
00-0005
MOD for up to 2.5 CLF ADD 2 CLF $29.78 $59.55
50 F
07 92 13
00-0013
1/2" x 1" Joint, Silicone sealant
and caulking Install at wall cap
and batten bar 12 CLF $895.87 $10,750.46
50 F
07 92 13
00-0013
1/2" x 1" Joint, Silicone sealant
and caulking Demo 12 CLF $160.66 $1,927.88
51 F
08 12 13
13-0041
Hollow metal door frame
(demo only) 1 EA $150.22 $150.22
52 F
08 17 23
00-0130
Solid core wood door (demo
only) 1 EA $101.40 $101.40
53 F
08 71 11
00-0027 Heavy duty hinge (demo only) 1.5 EA $16.52 $24.78 54 F
08 71 11
00-2270
Surface mounted door closer
(demo only) 1 EA $43.56 $43.56
55 F NOT USED $0.00
56 F
08 71 11
00-2299
Pre-assembled lockset (demo
only) 1 EA $37.55 $37.55
57 F
09 01 60
91-0013 Chemical floor prep 56 SY $9.82 $549.75
58 F
09 05 61
13-0009 Moisture vapor control 500 SF $7.56 $3,782.32
59 09 22 36
23-0018
Expanded metal lath on solid
wall surface, Install 3100 SF $3.87 $11,988.69
59 09 22 36
23-0018
Expanded metal lath on solid
wall surface, Demo 3100 SF $0.93 $2,898.36
60 F
09 22 36
23-0018
MOD
For columns and beams > 10'
high apply to portion of wall
over 10' 1150 SF $0.27 $309.53
61 09 24 23
00-0002 Three-coat stucco Install 3100 SF $12.83 $39,786.63 61 09 24 23
00-0002 Three-coat stucco Demo 3100 SF $4.14 $12,823.06 62 F
09 24 23
00-0002
MOD For walls > 10' Add 3100 SF $1.13 $3,513.17
Non-Professional Services Agreement between
City of San Leandro and T&S West Exhibit B Page 5 of 6
63 09 29 10
00-0009 Type X gypsum board (install) 1000 SF $2.55 $2,549.88 64 F
09 29 10
00-0039
Tape/spackle/finish gypsum
board >10' high (applly to
entire wall) 1000 SF $1.26 $1,260.77
65 F
09 29 10
00-0039
MOD spray applied wall texture 740 SF $0.93 $691.87
66 F
09 29 10
00-0045 Vertical corners finishing > 10' 100 LF $2.27 $226.66 67 F
09 29 10
00-0048
Horizontal corners finishing >
10' 100 LF $2.65 $264.90
68 F
09 29 10
00-0051 Galvanized steel corner bead 100 LF $5.26 $525.56 69 F
09 65 13
13-0011
Thermoplastic rubber wall
base 120 LF $10.04 $1,205.24
70 F
09 65 19
23-0005 Solid vinyl tile (install) 500 SF $9.60 $4,802.27 70 F
09 65 19
23-0005 Solid vinyl tile (demo) 500 SF $1.64 $821.63
71 F
09 91 13
00-0059 1 coat Paint exterior plaster 3100 SF $0.71 $2,195.73 72 F
09 91 13
00-0059 Add for work above 20' 1950 SF $0.13 $248.61
73 F
09 91 13
00-0059 2500 to 5000 SF deduct for qty 3100 SF ($0.04) ($131.74) 74 F
09 91 13
00-0059 Add for epoxy Paint 3100 SF $0.10 $307.40
75 F
09 91 13
00 0060 2 coats Paint exterior plaster 3100 SF $1.13 $3,513.17 76 F
09 91 13
00 0060 Add for work above 20' 1950 SF $0.18 $359.11
77 F
09 91 13
00 0060 2500 to 5000 SF deduct for qty 3100 SF ($0.06) ($175.66) 78 F
09 91 13
00 0060 Add for epoxy Paint 3100 SF $0.17 $526.98
79 F
09 21 23
00 0067
Primer coat on interior
plaster/drywall 2500 SF $0.84 $2,089.49
80 F
09 21 23
00 0069
Two coats paint on interior
plaster/drywall 2500 SF $1.67 $4,178.97
81 F
09 91 23
00-0252
Primer coat on interior wood
door frame 65 LF $1.30 $84.71
82 F
09 91 23
00-0254
Two coats paint on interior
wood door frame 65 LF $2.85 $185.08
83 F
09 91 23
00-0275
Primer coat on interior wood
door (both faces) 3 EA $102.69 $308.07
Non-Professional Services Agreement between
City of San Leandro and T&S West Exhibit B Page 6 of 6
84 F
09 91 23
00-0277
Two coats paint on interior
wood door (both faces) 3 EA $183.76 $551.28
85 F
09 91 23
00-0297
Paint interior wood window
trim (based on window size) 50 SF $6.73 $336.44
Grand Total $318,497.56