Hesperian Boulevard
Bike Lane Gap
Closure Project
Facilities & Transportation Committee, February 12, 2026 Introductions
Iman M. Fawzy Cade Luongo, W-Trans
Meron Shiferaw, DKS
Facilities & Transportation Committee, February 12, 2026 2 Project Scope
1 AGENDA
Bike Network
3 Budget Analysis
5 Schedule & Next
Steps
6 Guiding Policies
2 Traffic Impacts
Study
4 3
Facilities & Transportation Committee, February 12, 2026 3 Project Scope
Facilities & Transportation Committee, February 12, 2026 • 0.4 mile Segment: 150th
Ave to Bayfair Dr
• Lane reconfiguration &
Class IV bike lane
• Accessible Curb Ramps,
Pedestrian Hybrid
Beacon & Pedestrian
Improvements
• Signal and striping
improvements
4 San-Leandro-Local-RoadwaySafety-Plan-LRSP
2024-Bicycle-and-PedestrianMaster-Plan-PDF
Guiding Policies
Vision Zero Policy statement:
• In 2022 a goal was adopted to eliminate fatalities and serious injuries by making travel safer for all modes of transportation and people of all ages and abilities Local Road Safety Plan (LRSP)
• Adopted in 2022, it outlines goals and policies, and identifies 7 priority corridors for safety improvements.

Bicycle and Pedestrian Master Plan
• Adopted in 2024 Expands on LRSP and sets plan to guide infrastructure projects and programs to support bicycling and walking as safe, enjoyable, and practical transportation options.

Facilities & Transportation Committee, February 12, 2026 5 Project
Benefits
•Enhance safety and comfort for
pedestrians and bicyclists of all
ages and abilities
• Enhance connectivity to the
existing and planned Class IV
bikeways
Facilities & Transportation Committee, February 12, 2026 6 Related Bike
Network
Projects

THIS PROJECT
(150th to Bayfair)
Hesperian Class IV Bikeways
Project
Crosstown Corridors
Start of Design – Spring 2026
East Bay Greenway
Start of Construction
Winter 2026
Fairmont Bike Lanes
Completed in 2022
150th Avenue (End)
Bayfair Drive (Begin)
Facilities & Transportation Committee, February 12, 2026 7 Hesperian Boulevard (Fairmont to Grace) Cross Section
Existing
Proposed
Facilities & Transportation Committee, February 12, 2026 8 Hesperian Blvd & Fairmont Dr
Alternative 1 Rendering
Facilities & Transportation Committee, February 12, 2026 9 Hesperian Blvd & Fairmont Dr
Alternative 2 Rendering
Facilities & Transportation Committee, February 12, 2026 10 Hesperian Boulevard (Grace to 150th
) Cross Section
Existing
Proposed
Facilities & Transportation Committee, February 12, 2026 11 Hesperian Blvd & Grace St
Rendering
Facilities & Transportation Committee, February 12, 2026 12 Bicycle Treatments Under
Consideration
Raised, Sidewalk-Level Bike Lane at Intersection
Facilities & Transportation Committee, February 12, 2026 13 Bicycle Treatments
Under Consideration
Dashed Green Conflict Zone Striping Marked Bicycle Crossing with Two-Stage Turn Box Green Thermoplastic Pavement Markings
Facilities & Transportation Committee, February 12, 2026 14 Alternative#
1 Pg_ ________ Meeting Date _____ Facilities & Transportation Committee, February 12, 2026 15 Bicycle Treatments Under Consideration
Raised Bike Buffer Islands Facilities & Transportation Committee, February 12, 2026 16 Facilities & Transportation Committee, February 12, 2026 17 Traffic Impacts Study
• Delay and LOS along Hesperian fall within acceptable limits in the proposed project condition Facilities & Transportation Committee, February 12, 2026 18 Traffic Impacts Study
• With proposed project mitigations, arterial level of service improves from LOS F to E Facilities & Transportation Committee, February 12, 2026 19 Budget
Analysis
Project Cost
• Pre-Design Costs: $ 60,000
• Design Cost: $789,249
• Total Design Costs: $849,249
Available Funding (Design only)
• City Funds: $524,249
• ACTC Grant: $225,000
• MTC Grant: $100,000
• Total Funding: $849,249
• Estimated Construction Costs $5,200,000
Facilities & Transportation Committee, February 12, 2026 20 Project Schedule and Next Steps
Facilities &
Transportation
Committee meeting
February 12, 2026
Bicycle & Pedestrian
Advisory Committee
Meeting
March 2026
Design Development
March – October 2026
Final Design
December 2026
Design Bid & Award
Mar – Dec 2026
Pre-Design Start Construction
Complete
Facilities & Transportation Committee, February 12, 2026 21 Questions