CITY OF SAN LEANDRO
MASTER FEE SCHEDULE
FY 2026-2027
5/6/2026
Department Page #
City Manager's Office ….............................................. 3-4 Parking Fees ….............................................. 5-7 Wastewater Discharge Fees ….............................................. 8-9 City Clerk ….............................................. 10 Finance ….............................................. 11-14 Environmental Services ….............................................. 15-18 Community Development
Planning ….............................................. 19-25 Building ….............................................. 26-34 Code Enforcement ….............................................. 35 Economic Development ….............................................. 36 Housing ….............................................. 37 Development Impact Fees ….............................................. 38-41 Davis-Doolittle Traffic Impact ….............................................. 42 Fire ….............................................. 43-46 Public Works
Engineering and Transportation 47-54
Maintenance …..............................................
Maintenance Equipment ….............................................. 55-56
57 Police .................................................. 58-63 Police - Fines ….............................................. 64-68 Library ….............................................. 69-71 Library - Rentals Rates ….............................................. 72-74 Recreation ….............................................. 75-77 Recreation - Rental Rates ….............................................. 78-83 Golf Course Fees ….............................................. 84-87 Other Fees and Taxes
Business License Fees ….............................................. Attachment A EMS (Emergency Medical Services) Tax ….............................................. Attachment B Emergency Communication Systems Access Tax ….............................................. Attachment C Table of Contents
City of San Leandro
Master Fee Schedule
Adopted Table of Contents
CITY MANAGER'S OFFICE
Justification
1 Reproduction Work [1]
A. Public Records, General
Per Page per page $ 0.10 $0.10 Fee limited by statute;
B. Audio Recordings per meeting
Available Online;
any other format
Actual Cost
Actual cost
2 Filming Project Fees:
A. Application Fee - No Right Of Way Encroachment or Private Property 15 - 21 Day Prior Notification each 191 $ $ 196 CPI7-14 Day Prior Notification each 191 $ $ 196 CPI0-6 Day Prior Notification each 191 $ $ 196 CPI B. Application Fee - Involves Right of Way Encroachment or Private Property 15 - 21 Day Prior Notification each 1,694 $ $ 1,745 CPI 7-14 Day Prior Notification each 1,694 $ $ 1,745 CPI
0-6 Day Prior Notification each 1,694 $ $ 1,745 CPI
C. Encroachment Fee each
See Public Works -
Engineering Fee
Schedule
See Public Works -
Engineering Fee
Schedule
D. Personnel Fee:
-- Police per hour (4 hr min) [2] Current OT Hourly Rate Current OT Hourly Rate -- Other City staff: per hour [3] Current Hourly Rate Current Hourly Rate FY 26 Adopted Fee No. Fee Name Fee Unit Type
Notes FY 27 Proposed
City of San LeandroMaster Fee ScheduleAdopted
City Manager
3 of 90
CITY MANAGER'S OFFICE
FY 26 Adopted Justification Fee No. Fee Name Fee Unit Type Notes FY 27 Proposed
3 Subpoena Fees [4]
A. Records each 15 $ $ 15 Set by statute; cannot escalate B. Personal appearance of City employees per day 275 $ $ 275 Set by statute; cannot escalateC. Personal appearance of police officers per day 275 $ $ 275 Set by statute; cannot escalate 4 Legal Services Cost Recovery Fee [5] [6]
Community Development Department applications and other Cost Recovery eligible legal services performed by the City Attorney's office will be charged the following rates:
Attorney Time per hour Actual Cost Actual cost
Paralegal Time per hour Actual Cost Actual cost
5 Parking Meter Rates: See Parking Fees Schedule See Parking Fees Schedule 6 Service fee for credit card transactions processed by the City each [6] Max of 2.5% of total cc amount Max of 2.5% of total cc amount 7 Hourly Services and/or Services not Otherwise Listed per hour 212 $ Actual Cost Align to cost recovery Notes
[1] Set by State.[2] Minimum 4 hours per officer.
[3]
[4] Subpoena fees set by GC 68096.1 and Evidence Code 1563(6). [5]
[6] Fee is a pass through of costs to City.
Community Development Department applications and other Cost Recovery eligible legal services performed by the City Attorney's office will be charged at actual cost.For services within normal working hours. Overtime rate charged for services provided outside normal operational hours.
City of San LeandroMaster Fee ScheduleAdopted
City Manager
4 of 90
PARKING FEES
Justification
1 Parking Meter Rates
A. Three Hour Meters (Zone 1)15 minutes $ 0.50 N/A Restructured 30 minutes $ 1.00 N/A Restructured45 minutes $ 1.50 N/A Restructured60 minutes $ 2.00 N/A Restructured N/A Restructured
B. Three Hour Meters (Zone 2) N/A Restructured15 minutes $ 0.25 N/A Restructured30 minutes $ 0.50 N/A Restructured45 minutes $ 0.75 N/A Restructured60 minutes $ 1.00 N/AC. 30 Minute Meters 8 minutes $ 0.25 N/A Restructured
15 minutes $ 0.50 N/A Restructured23 minutes $ 0.75 N/A Restructured30 minutes $ 1.00 N/A Restructured 1 Paid Parking Rates Zones 1 & 2 replaced by smaller areas Bancroft/Dutton - 3 hour maximum hourly N/A $ 2.00
Best Building Lot - 3 hour maximum hourly N/A $ 1.00 Reduction based on utilization data Downtown Core - 3 hour maximum hourly N/A $ 1.50 Reduction based on utilization data Downtown Core - 20-minute maximum 20-minutes N/A $ 0.50 Reduction based on utilization data Downtown North - 3 hour maximum hourly N/A $ 1.00 Downtown South - 3 hour maximum hourly N/A $ 1.00
Estudillo Garage - 3 hour maximum hourly N/A $ 1.00
Estudillo Garage - all day daily N/A $ 4.00
Pelton Plaza - 2 hour maximum hourly N/A $ 2.00
Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed
City of San LeandroMaster Fee ScheduleAdopted
Ex. Parking Fees
5 of 90
PARKING FEES
Justification Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed
2 D. Electric Vehicle Charging Station (EVCS)
First 4 hours hourly $ 1.00 $ Aligned with market rate 1.00 For fifth (5th) and successive hours during the hours of 6:00 a.m. to 4:00 p.m., Monday through Friday, except for holidays hourly $ 5.00 $ Aligned with market rate 5.00
For fifth (5th) and successive hours on weekends and holidays and during the hours of 4:00 p.m. to 6:00 a.m. Monday through Friday hourly $ 1.00 $ Aligned with market rate 1.00
2 Residential Parking Permit Program Program eliminated A. Permit each [1] $ 240.00 N/A Restructured
B. Visitor Permits each [2] $ 50.00 N/A Restructured
3 Parking Permits Space Rental Rates reorganized for simplification A. Estudillo Garage Permit-- Unrestricted Parking monthly $ 45.00 N/A Restructured -- Low Income Parking (Employees ONLY) monthly [3] $ 20.00 N/A Restructured-- Daily Parking daily $ 4.00 N/A Restructured-- Reserved Parking annual $ 960.00 N/A RestructuredB. Plaza Lot monthly N/A RestructuredC. Safeway and Regency Employees ONLY monthly $ 20.00 N/A RestructuredD. Hayes Street Permit N/A Restructured-- Permit Parking monthly $ 45.00 N/A Restructured-- Low Income Parking (Employees ONLY) monthly [3] $ 20.00 N/A RestructuredD. Alvarado Street Permit monthly $ 20.00 N/A RestructuredAlvarado Street Permit monthly N/A $ Restructured 20.00 Downtown Permit monthly N/A $ Restructured 45.00
Low Income Permit monthly (2) N/A $ Restructured 20.00
Reserved Parking Estudillo Garage annual N/A $ Restructured 960.00Safeway/Regency Employee Permit monthly N/A $ Restructured 20.00 City of San LeandroMaster Fee ScheduleAdopted
Ex. Parking Fees
6 of 90
PARKING FEES
Justification Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed
Notes
[1] Fees are annual and are to be charged on a calendar year basis and shall not be prorated.[2] Good for 14-days [2] Low income is defined as California fast food wage or less City of San LeandroMaster Fee ScheduleAdopted
Ex. Parking Fees
7 of 90
WASTEWATER DISCHARGE FEES
1 A. For Classification A Users (Residential): [1]
Single-Family Each Unit Per Month each 57.12 $ $ Council Approved Reso 2025-041 62.26 Multiple-Family Each Unit Per Month each 42.19 $ $ Council Approved Reso 2025-041 45.99 Accessory Dwelling Each Unit Per Month each 42.19 $ $ Council Approved Reso 2025-041 45.99 B. For Classification B Users (Commercial & Institutional):Low Strength 100 c.f. 5.42 $ $ Council Approved Reso 2025-041 5.91 Medium Strength 100 c.f. 6.17 $ $ Council Approved Reso 2025-041 6.73High Strength 100 c.f. 11.41 $ $ Council Approved Reso 2025-041 12.44 C. For Classification C Users (Industrial & Other Large Users):Loading Charge – based on the total discharge volumes for the billing period.
Volume, per million gallons million
gallons $ 5,305 $ Council Approved Reso 2025-041 5,782
BOD (Biochemical oxygen demand), per thousand pounds thousand gallons $ 736 $ 802
SS (Suspended solids), per thousand pounds thousand
gallons $ 1,263 $ Council Approved Reso 2025-041 1,377
Classification B & C Monthly Fixed Rate Per Connection Council Approved Reso 2025-041Class B & C Connections each 10.71 $ $ Council Approved Reso 2025-041 12 Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed Justification
City of San LeandroMaster Fee Schedule WasteWater Discharge Fees 8 of 90
WASTEWATER DISCHARGE FEES
Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed Justification
2 Connection Fees
Dwelling units:Single-Family, Each Unit each 4,802 $ $ 4,936 Increase based on Construction Cost Index Increase Multiple-Family, Each Unit each 4,008 $ $ 4,120 Increase based on Construction Cost Index Increase Accessory Dwelling, Each Unit (maximum) each 4,008 $ $ 4,120 Increase based on Construction Cost Index Increase Converting an existing apartment building to condominium units unit 179 $ $ 184 Increase based on Construction Cost Index Increase Non-residential users shall be assessed connection fees based on the estimated average day of their peak month discharge according to the unit cost schedule below:
Volume, gallons per day gallons/day 26.90 $ $ 28 Increase based on Construction Cost Index Increase BOD (Biochemical oxygen demand), pounds per day pounds/day 1,148 $ $ 1,180 Increase based on Construction Cost Index Increase SS (Suspended solids), pounds per day pounds/day 1,215 $ $ 1,249 Increase based on Construction Cost Index Increase Notes
[1]
A connection fee adjustment may be made at the end of one year of service for all non-residential users to reflect the actual wastewater discharge based on monitored wastewater discharged or metered water usage adjusted for volume not discharged to the sanitary sewer system. If the estimated wastewater discharge is low, an additional connection fee shall be assessed. If the estimated wastewater discharge is high, the City shall issue a refund to the user.
City of San LeandroMaster Fee Schedule WasteWater Discharge Fees 9 of 90
CITY CLERK
Justification
1 Fire and Closing Out Sales Application Fees each [1] 168 $ $ CPI 173 2 Appeals Fee
A. Non-refundable appeal processing fee for administrative decisions each 224 $ $ CPI 230B. Non-refundable appeal processing fee for Board of Zoning Adjustments, or Planning Commission. This fee is in addition to the Appeal Fees in the Community Development Department which cover the costs associated with the review and processing of the appeal. each 112 $ $ CPI 115
C. Appeal of Notice of Violation or Citation each 224 $ $ CPI 230 3 Fee for the processing of an initiative petition for any municipal measure.
each [2] 200 $ $ Set by statute 200
4 Proof of Life / Proof of Residency Letter each [1] 37 $ $ CPI 38 5 Hourly Services and/or Services not Otherwise Listed per hour 112 $ Actual Cost Align to cost recovery Notes
[1] Good for 60 days.[2]
FY 26
Adopted
Fee set by State not to exceed $200. Refundable if, within one year of the date of filing the Notice of Intent, the Clerk certifies the sufficiency of the petition. CA Elections Code §9202(b) Fee
No.
Fee Name
Fee Unit
Type
NotesFY 27 Proposed
City of San LeandroMaster Fee ScheduleAdopted
City Clerk
10 of 90
FINANCE
Justification
1 Business License Related Fees:
A. Administrative Fee for Business License Changes each $ 87 $ 90 CPI 2 Permits:
A. Marina Shoreline Peddlers (Ice Cream Vendors Only)
-- New and Renewal annual $ 268 $ 276 CPI
B. Peddler/Solicitor:
-- New each $ 220 $ 227 CPI-- Renewal each $ 220 $ 227 CPI C. Itinerant Merchant
-- New each $ 220 $ 227 CPI-- Renewal each $ 220 $ 227 CPI D. Used Vehicle Dealers each $ 349 $ 359 CPIE. Amusement Device Machines per machine business license base fee business license base fee F. Bingo Not-for-Profit - New and Renewals each business license base fee business license base fee G. Cannabis Dispensary Permit annual $ 35,000 $ 36,050 CPI 3 Taxicab
A. Application - Taxicab Business Permit Application
-- Initial each $ 348 $ 358 CPI-- Renewal each $ 348 $ 358 CPI B. Additional Vehicles - Permit Amendment each $ 174 $ 180 CPI Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed
City of San LeandroMaster Fee ScheduleAdopted
Finance
11 of 90
FINANCE
Justification Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed
4 Animal Permits
A. Animal Permit (New-Includes changes to permit) per permit 174 $ $ 180 CPI B. Animal Permit (Renewal) per permit 87 $ $ 90 CPIC. Beekeeping Permit (New) per permit 174 $ $ 180 CPID. Beekeeping Permit (Renewal) per permit 174 $ $ 180 CPI 5 Dog License [3] [4]
A. Unspayed/unneutered, 1 yr. each $ 44 $ 45 CPI
B. Unspayed/unneutered, 3 yr. (1) each $ 87 $ 90 CPI C. Spayed/neutered, 1 yr. (2) each $ 10 $ 10 CPI D. Spayed/neutered, 3 yr. (1) (2) each $ 21 $ 22 CPI E. Penalty:
-- Unspayed/unneutered each $ 10 $ 10 CPI
-- Spayed/neutered each $ 10 $ 10 CPI
F. City/County within California: Seeing-eye dog or certified hearing dog for physically disabled each No fee No fee G. Duplicate tag each $ 6 $ 6.20 CPI 6 Pot-Bellied Pig License - spayed/neutered, 1 year each $ 87 $ 90 CPI7 Payroll Related Fees A. Garnishment implementation fee each [5] $ 1.5 $ 1.50 Capped by State at $1.50 for child support garnishment B. Duplicate W-2’s
-- Electronic Copies each No Charge No Charge
-- Printed Copies each Actual Cost Actual Cost
City of San LeandroMaster Fee ScheduleAdopted
Finance
12 of 90
FINANCE
Justification Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed
8 Late Payment Charges monthly
.75% of
outstanding
balance
.75% of
outstanding
balance
9 Purchase of Paid or Cancelled Bonds each Actual Cost Actual Cost 10 Bond Issue each Actual Cost Actual Cost 11 Returned Check Service Charge A. For 1st occurrence each [1] $ 25 $ 25 Set by StateB. For Each Additional Occurrence each [1] $ 35 $ 35 Set by State 12 Copy of Adopted/Adopted Budget each
Available OnLine or See
Copy Fee
Available OnLine or See
Copy Fee
13 Copy of Annual Comprehensive Financial Report (ACFR) each Available OnLine or See
Copy Fee
Available OnLine or See
Copy Fee
City of San LeandroMaster Fee ScheduleAdopted
Finance
13 of 90
FINANCE
Justification Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed
14 Administrative Fee to Place Delinquent Accounts on Tax Bills each [2] Per County Fee Schedule Per County Fee Schedule 15 Stop Payment Service Charge each Actual Cost of Bank Charge Actual Cost of Bank Charge Wire Transfer Service Charge
16 each Actual Cost of Bank Charge Actual Cost of Bank Charge 17 Hourly Services and/or Services not Otherwise Listed per hour 174 $ Actual Cost Align to cost recovery Notes
[1][2] County charges the City a 1% admin fee that will be passed through.[3][4][5] Garnishment Administrative Fee as Set by State of California.
Fee set by California Civil Code Ch. 522 Section 1719. Additional charges may apply if not paid within 30 days of receipt of written demand for payment letter.3 year pet licenses are purchased by pet owners at a reduced fee and, therefore, are not refundable in whole or in part nor will credit be allowed toward licenses for other owned pets.Pet owners presenting a receipt from a Veterinarian Clinic or Pet Hospital for prepayment of a spayed or neutered operation for their pet will be allowed to license their pet at the spay/neuter rate.
City of San LeandroMaster Fee ScheduleAdopted
Finance
14 of 90
ENVIRONMENTAL SERVICES
Justification
1 Hazardous Materials Handling
A. Annual fees for handling of combustible liquids, corrosives, flammable gases, flammable liquids, flammable solids, nonflammable gases, organic peroxides, other regulated materials, oxidizers, poisonous gasses, poisonous materials [1]
Quantity Range 1 per year $ 200 $ 206 CPIQuantity Range 2 per year $ 250 $ 258 CPIQuantity Range 3 per year $ 300 $ 309 CPIQuantity Range 4 per year $ 400 $ 412 CPIQuantity Range 5 per year $ 500 $ 515 CPIB. Annual Fees for Radioactives per year $ 200 $ 206 CPIC. Aboveground Tank Installation Permit per tank [2] $ 1,601 $ 1,649 CPID. APSA Facility Annual FeeQualified Facility (Tier I/Tier II) per year $ 800 $ 824 CPINon-Qualified Facility (full SPCC) per year $ 900 $ 927 CPI 2 Accidental Release Program:
Annual Fee:Program 1 per year $ 2,001 $ 2,061 CPI
Program 2 per year $ 5,002 $ 5,152 CPIProgram 3 per year $ 6,002 $ 6,182 CPIProgram 4 per hour $ 200 $ 206 CPI FY 27
Proposed
Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted
City of San LeandroMaster Fee ScheduleAdopted
Environmental Services
15 of 90
ENVIRONMENTAL SERVICES
Justification FY 27
Proposed
Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted
3 Underground Hazardous Materials Storage
A. Annual Operating Permit: Each Tank per tank $ 2,001 $ 2,061 CPIB. New Tank Installation [2]· Each Tank per tank $ 5,002 $ 5,152 CPIC. Tank Removal, Repair, Alterations [2]· Each Tank per tank $ 4,002 $ 4,122 CPID. Minor Repairs and Alterations Hourly Rate per hour $ 200 $ 206 CPI 4 Hazardous Waste On-site Treatment:
Annual Fees:Permit-by-Rule per year $ 1,601 $ 1,649 CPIConditional Authorization per year $ 800 $ 824 CPIConditional Exempt per year $ 400 $ 412 CPI 5 Additional Review
A. City Staff per hour $ 200 $ 206 CPI
B. Third Party per review [5] Direct Cost + 10% Direct Cost + 10% 6 Hazardous Waste Generators
A. Annual Fees for Generators of Hazardous Waste [3]VSQG per year $ 250 $ 258 CPISQG per year $ 450 $ 464 CPILQG per year $ 800 $ 824 CPIUWG per year $ 250 $ 258 CPI 7 CalEPA CUPA Surcharge Fee each [4]
As required
by State of
California
As required
by State of
California
City of San LeandroMaster Fee ScheduleAdopted
Environmental Services
16 of 90
ENVIRONMENTAL SERVICES
Justification FY 27
Proposed
Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted
8 Plan Review :
A. City Staff per hour $ 200 $ 206 CPIB. Third Party per review [5] Direct Cost + 10% Direct Cost + 10% 9 Pretreatment:
A. All UsersMonthly Service Charge – based on activity frequency-- Weekly Activity per month $ 2,201 $ 2,267 CPI -- Semi-Monthly Activity per month $ 1,200 $ 1,236 CPI-- Monthly Activity per month $ 600 $ 618 CPI-- Bi-Monthly Activity per month $ 300 $ 309 CPI-- Quarterly Activity per month $ 200 $ 206 CPI-- Semi-Annual Activity per month $ 150 $ 155 CPI-- Annual Activity per month $ 100 $ 103 CPIB. Sample Collection-- Composite Samples per sample event $ 1,401 $ 1,443 CPI-- Grab Samples per sample event $ 1,000 $ 1,030 CPI-- Laboratory Analyses per request [5] Direct Cost + 10% Direct Cost + 10% C. Violation Follow-Up:-- Composite Samples per sample event $ 2,001 $ 2,061 CPI-- Grab Samples per sample event $ 1,601 $ 1,649 CPI-- Laboratory Analyses Per Sample Event [5] Direct Cost + 10% Direct Cost + 10% D. Pretreatment Permit per permit $ 2,001 $ 2,061 CPIE. Special Discharge Permit per permit $ 2,001 $ 2,061 CPI City of San LeandroMaster Fee ScheduleAdopted
Environmental Services
17 of 90
ENVIRONMENTAL SERVICES
Justification FY 27
Proposed
Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted
10 Miscellaneous Services :
A. Site Visit per hour $ 200 $ 206 CPIB. Compliance schedule for violation correction per violation $ 800 $ 824 CPI 11 Hourly Services and/or Services not Otherwise Listed per hour $ 200 Actual Cost Align to Cost Recovery Notes
[1] Quantity Range 1 Less than or equal to 500 pounds, 55 gallons, or 2,000 cubic feet at STP.
Quantity Range 5 Greater than 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP. [2][3]
UWG – Universal Waste Generator
[4] CA Health & Safety Code; Title 27[5] 10% fee added to third party cost.
Includes plan review, field inspections, and permit processing. Additional time will be charged at the current hourly rate.CESQG – Conditionally Exempt Small Quantity Generator – less than 100 kilograms of hazardous waste per month.SQG – Small Quantity Generator – more than or equal to 100 kilograms but less than 1,000 kilograms of hazardous waste per month.LQG – Large Quantity Generator – more than or equal to 1,000 kilograms of hazardous waste per monthQuantity Range 2 Greater than 500 pounds, 55 gallons, or 2,000 cubic feet at STP, but less than or equal to 5,000 pounds, 550 gallons or 20,000 cubic feet at STP, respectively.Quantity Range 3 Greater than 5,000 pounds, 550 gallons, or 20,000 cubic feet at STP, but less than or equal to 50,000 pounds, 5,500 gallons or 200,000 cubic feet at STP, respectively.Quantity Range 4 Greater than 50,000 pounds, 5,500 gallons, or 200,000 cubic feet at STP, but less than or equal to 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP, respectively.
City of San LeandroMaster Fee ScheduleAdopted
Environmental Services
18 of 90
PLANNING
1 Annexation deposit [3] $ 88,864 $ CPI 91,530
2 Appeal
A. Appeal by Applicant to Official/Commission Other than City Council deposit [3] $ 5,901 $ CPI 6,078B. Appeal by Applicant to City Council (Add 'l City Clerk Filing Fees Apply) deposit [3] $ 5,901 $ CPI 6,078 C. Appeal to Official/Commission Other than City Council fixed fee $ 5,945 $ CPI 6,124 D. Appeal to City Council (Add 'l City Clerk Filing Fees Apply) fixed fee $ 6,078 $ CPI 6,260 3 Conditional Use Permit deposit [3] $ 4,000 $ CPI 4,120 4 Variance deposit [3] $ 7,728 $ CPI 7,9605 Development Plan Review deposit [3] $ 25,000 $ CPI 25,7506 Development Agreement deposit [3] $ 25,000 $ CPI 25,750 7 Administrative Exceptions
A. Residential deposit [3] $ 2,986 $ CPI 3,075
B. Non-Residential deposit [3] $ 2,490 $ CPI 2,565
8 Administrative Review
A. Residential Administrative Review fixed fee $ 3,000 $ CPI 3,090 B. Non-Residential Administrative Review fixed fee $ 3,000 $ CPI 3,090 C. Outdoor Facilities Permits fixed fee $ 2,500 $ CPI 2,575 D. Mobile Food Vending fixed fee $ 240 $ CPI 247
E. Wireless Telecommunication Facilityi.) Monopoles fixed fee $ 8,226 $ CPI 8,473 ii.) Antennas fixed fee $ 7,280 $ CPI 7,498
FY 26 Adopted FY 27 Proposed Justification Fee No. Fee Name Fee Unit / Type Notes
City of San LeandroMaster Fee ScheduleAdopted
Planning
19 of 90
PLANNING
FY 26 Adopted FY 27 Proposed Justification Fee No. Fee Name Fee Unit / Type Notes
9 Administrative Review Requiring Hearing
A. Non-Residential fixed fee $ 7,656 $ CPI 7,885
B. Residential fixed fee $ 8,492 $ CPI 8,747
10 Site Plan Review
A. Minor Site Plan Review fixed fee $ 5,024 $ CPI 5,175 B. Major Site Plan Review deposit [3] $ 10,230 $ CPI 10,537 C. Administrative Site Plan Review (Standard) deposit [3][6] $ 30,268 $ CPI 31,177 Administrative Site Plan Review (Minor Alterations) deposit [3][6] N/A $ 7,500 NEW - A variety of development projects trigger Administrative Site Plan Review, which require varying levels of effort to review. A lower deposit reduces the initial financial burden on applicants for minor site alterations.
D. Non-Residential Façade Change fixed fee [3] $ 1,411 $ CPI 1,453 E. Major Site Plan Review in RS-VP Zoning District fixed fee [3] $ 7,205 $ CPI 7,421 City of San LeandroMaster Fee ScheduleAdopted
Planning
20 of 90
PLANNING
FY 26 Adopted FY 27 Proposed Justification Fee No. Fee Name Fee Unit / Type Notes
11 Environmental Review
A. Exemption Without Checklist / Initial Study (Categorical) fixed fee [5] $ 770 $ CPI 793 B. Exemption with Checklist / Initial Study / Technical Reports deposit [3][4] [5] $ 7,113 $ CPI 7,326 C. Initial Study / Negative Declaration / Mitigated Negative Declaration / EIR deposit [3][4] [5] $ 9,806 $ CPI 10,100 12 Fence Modification
A. Single Family and Duplex fixed fee $ 3,932 $ CPI 4,050 B. Multi-Family and Non-Residential fixed fee $ 4,184 $ CPI 4,309 C. RS-VP Zoning District - View Preservation fixed fee $ 5,967 $ CPI 6,146 13 Historical Landmark Designation deposit $ 9,365 $ CPI 9,646 14 Planned Unit Development deposit $ 25,000 $ CPI 25,750 15 Pre-Application
A. First Meeting fixed fee $ 2,591 $ CPI 2,669
B. Each Additional meeting fixed fee $ 2,228 $ CPI 2,295 C. SB 330 Preliminary Application fixed fee $ 7,081 $ CPI 7,293 16 Public Convenience and Necessity Determination fixed fee $ 1,814 $ CPI 1,869 17 Signs
A. Temporary Sign Permit fixed fee $ 250 $ CPI 258B. Standard Sign Permit fixed fee $ 500 $ CPI 515 C. Master Sign Program and Sign Exceptions (for modifications to Master Sign Program, see Other Fees) deposit $ 5,967 $ CPI 6,146 City of San LeandroMaster Fee ScheduleAdopted
Planning
21 of 90
PLANNING
FY 26 Adopted FY 27 Proposed Justification Fee No. Fee Name Fee Unit / Type Notes
18 Temporary Use Permit (TUP)
A. TUP - Holiday, Parking Lot Sale, Car Wash, or Fundraiser fixed fee $ 250 258 CPIB. TUP - All Others fixed fee $ 500 515 CPI 19 Tentative Map / Subdivision / Condominium
A. Tentative Tract Map deposit [3] $ 20,180 $ CPI 20,786 B. Parcel Map deposit [3] $ 4,710 $ CPI 4,851
C. Lot Line Adjustment deposit [3] $ 2,144 $ CPI 2,209
D. Conversion of Residential Apartment Buildings to Condominiums deposit [3] $ 14,854 $ CPI 15,299 E. Conversion of Non-Residential Complexes to Individual Unit or Condominium Ownership deposit [3] $ 15,163 $ CPI 15,618 20 Conversion of Residential Apartment Buildings to Condominiums (per unit) fixed fee $ 5,617 $ CPI 5,786 21 Zoning Map Amendment / Specific Plans / General Plan Amendments A. Zoning Map Amendment deposit [3] $ 25,000 $ CPI 25,750 B. Zoning Code Amendment deposit [3] $ 25,000 $ CPI 25,750 C. General Plan Amendment deposit [3] $ 25,000 $ CPI 25,750 D. Specific Plan deposit [3] $ 86,038 $ CPI 88,619
E. Specific Plan Amendment deposit [3] $ 10,072 $ CPI 10,374 22 Zoning Verification Letter (per parcel) fixed fee $ 1,026 $ CPI 1,057 23 Zoning Approval for Business License
A. New Business License Zoning (per review) fixed fee $ 257 $ CPI 264B. Home Occupation - Application fixed fee $ 205 $ CPI 211 City of San LeandroMaster Fee ScheduleAdopted
Planning
22 of 90
PLANNING
FY 26 Adopted FY 27 Proposed Justification Fee No. Fee Name Fee Unit / Type Notes
24 Other Fees
A. Planning Inspection fixed fee $ 1,026 $ CPI 1,057
B. Time Extension of Approved Entitlement / Map fixed fee $ 1,283 $ CPI 1,321 C. Plan Check for Building [1]i.) Alterations/Additions/Accessory Buildings - Residential per hour $ 257 $ CPI 264ii.) New Construction - Single Family Residential per hour $ 257 $ CPI 264iii.) New Construction - Multi-Family Residential per hour $ 257 $ CPI 264iv.) New Construction - Non-Residential per hour $ 257 $ CPI 264v.) Alterations/Additions - Non-Residential per hour $ 257 $ CPI 264vi.) Alterations/Additions/New Construction - Accessory Dwelling Unit(s) per hour $ 257 $ CPI 264 D. Public Notice Sign Deposit (fully refundable if sign returned) deposit $ 100 Fee not applicable E. Community Planning Fee (applies to all building permits) deposit [2] 10.84% 10.84%F. Modifications of Approved Projectsi.) Minor (Review by Staff or Zoning Enforcement Official) deposit [3] $ 2,440 $ CPI 2,513 ii.) Major (Review by Board of Zoning Adjustments, Planning Commission, and/or City Council) deposit [3] $ 6,465 $ CPI 6,659 G. Technology Fee: applies to all fees except Zoning Verification Letter (22), Zoning Approval for Business License (23) and Modification to an Approved Project in "Other Fees" (24) fixed fee 6.92% 6.92%
H. Legal Review deposit [3] $ 2,500 $ CPI 2,575
City of San LeandroMaster Fee ScheduleAdopted
Planning
23 of 90
PLANNING
FY 26 Adopted FY 27 Proposed Justification Fee No. Fee Name Fee Unit / Type Notes
25 City Staff Rates for Hourly Services and/or Services not Otherwise Listed Administrative Assistant per hour $ 198 Actual Cost Align to Cost RecoveryAssistant Community Development Director per hour $ 405 Actual Cost Align to Cost RecoveryAssistant Planner per hour $ 253 Actual Cost Align to Cost RecoveryAssociate Planner per hour $ 268 Actual Cost Align to Cost RecoveryPlanning Manager per hour $ 358 Actual Cost Align to Cost RecoverySenior Planner per hour $ 283 Actual Cost Align to Cost RecoveryPlanning Staff - Blended/Average per hour $ 257 Actual Cost Align to Cost Recovery City of San LeandroMaster Fee ScheduleAdopted
Planning
24 of 90
PLANNING
FY 26 Adopted FY 27 Proposed Justification Fee No. Fee Name Fee Unit / Type Notes
Notes
[1][2][3][4][5][6]
DEPOSITS AND DEPOSIT REPLENISHMENT: Applicants for applications requiring initial deposits shall pay for all City staff time at adopted hourly rates listed in the Master Fee Schedule, legal costs, as well as any costs for consultants required to process the application. An agreement for Payment of Fees for Application Processing shall be submitted with the project application. Initial deposits, as shown on the fee schedule, will be collected, and held by the City in a deposit account at the time the application is submitted. The cost of City staff time, legal costs, and consultant costs as applicable will be drawn from the deposit account. A positive account balance shall be maintained at all times during the application review process. No work will be performed on a project with a negative fund balance. If the deposit is reduced below 20% of the initial deposit amount, the applicant will be notified and required to supplement the deposit account with an additional amount no less than 50% of the original amount. When more than one application requiring a deposit is submitted, the sum total of the initial deposit amount can be reduced by 20%. Projects outside the scope of this fee schedule will be subject to a full cost reimbursement agreement with an initial deposit based on cost estimates for both City staff time, legal, and consultant services on a defined scope of work. Funds expended for staff time shall not be dependent upon the City's approval or disapproval of the application request. The deposit account will be held open for 90 days after project approval for the City to complete any miscellaneous clean-up items and to account for all project-related costs. Any deposit amounts As may be required by the Community Development Department for project evaluation or environmental review, all payment for consultant work shall be the responsibility of the applicant and must be paid in advance.Note: For minor alterations that trigger Administrative Site Plan Review, the Community Development Director may, at his/her discretion, collect the Minor Alterations Deposit.Note: For small tenant improvements to existing buildings and ADUs, the Chief Building Official and/or the Community Development Director may waive the Community Planning Fee at his/her discretion.Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements.
Note for all fees: In addition to City of San Leandro fees, applicant is responsible for any applicable fees imposed by other agencies, such as county filing fees, LAFCO fees, Department of Fish and Wildlife Fees, etc.
City of San LeandroMaster Fee ScheduleAdopted
Planning
25 of 90
BUILDING
Justification
1 Building Permit Fees
A. Filing and Issuance Fee per permit $ 212 $ CPI 219
Re-filing Fee upon 2nd resubmittal for plan check on same project. per occurrence $ 212 $ CPI 219
Re-filing Fee for each revision after issued permit issuance per occurrence $ 319 $ CPI 328
B. Permit Fee [1][2]
Refunds per permit [14] 80% of fees
paid
80% of fees
paid
Permit Extension (Requested before permit expires) per permit $ 106 $ CPI 109 Reopen Permit (Requested after permit has expired) per permit $ 637 $ CPI 656 i) New Buildings, Additions, Tenant Improvements, Residential Remodels, and Combined Mechanical, Electrical and/or Plumbing Permits, and Deferred Submittal
$1 - $5,000 per permit $ 531 $ CPI 547
$ 5,001 base fee @
$5,001 $ 531 $ CPI 547
each additional $1000 or fraction thereof each add'l
$1000 $ 21.24 $ CPI 21.88
$ 10,001 base fee @
10,001 $ 637 $ CPI 656
each additional $1000 or fraction thereof each add'l
$1,000 $ 14.60 $ CPI 15.0
$ 50,001 base fee @
$50,001 $ 1,221 $ CPI 1,258
each additional $1000 or fraction thereof each add'l
$1,000 $ 21.24 $ CPI 21.90
$ 100,001 base fee @
$100,001 $ 2,283 $ CPI 2,352
each additional $1000 or fraction thereof each add'l
$1,000 $ 10.75 $ CPI 11.10
$ 500,001 base fee @
$500,001 $ 6,585 $ CPI 6,782
each additional $1000 or fraction thereof each add'l
$1,000 $ 2.34 $ CPI 2.40
$ 1,000,001 base fee @
$1,000,001 $ 7,753 $ CPI 7,986
each additional $1000 or fraction thereof each add'l
$1,000 $ 1.62 $ CPI 1.70
$ 5,000,001 base fee @
$5,000,001 $ 14,231 $ CPI 14,658
each additional $1000 or fraction thereof each add'l
$1,000 $ 5.78 $ CPI 5.95
$ 10,000,001 base fee @
$10,000,001 $ 43,119 $ CPI 44,413
each additional $1000 or fraction thereof each add'l
$1,000 $ 1.63 $ CPI 1.70
$ 50,000,001 base fee @
$50,000,001 $ 108,329 $ CPI 111,579
each additional $1000 or fraction thereof each add'l
$1,000 $ 2.17 $ CPI 2.25
FY 27
Proposed
Fee
No.
Fee Name Fee Unit /
Type
Notes
FY 26
Adopted
City of San Leandro
Master Fee Schedule
Adopted
Building
26 of 90
BUILDING
Justification FY 27
Proposed
Fee
No.
Fee Name Fee Unit /
Type
Notes
FY 26
Adopted
ii) Stand-Alone Plumbing Permit
Up to $2,000 per permit $ 425 $ CPI 438
$2,001 - $5,000 per permit $ 425 $ CPI 438
$ 5,001 base fee @
5,001 $ 956 $ CPI 985
each additional $1000 or fraction thereof each add'l
$1,000 $ 63.72 $ CPI 66
$ 10,001 base fee @
$10,001 $ 1,274 $ CPI 1,313
each additional $1000 or fraction thereof each add'l
$1,000 $ 6.64 $ CPI 6.85
$ 50,001 base fee @
$50,001 $ 1,540 $ CPI 1,586
each additional $1000 or fraction thereof each add'l
$1,000 $ 18.05 $ CPI 19
$ 100,001 base fee @
$100,001 $ 2,443 $ CPI 2,516
each additional $1000 or fraction thereof each add'l
$1,000 $ 3.05 $ CPI 3.15
$ 500,001 base fee @
$500,001 $ 3,664 $ CPI 3,774
each additional $1000 or fraction thereof each add'l
$1,000 $ 7.33 $ CPI 7.55
iii) Stand-Alone Electrical Permit
Up to $2,000 base fee @
$2,000 $ 425 $ CPI 438
$2,001 - $5,000 base fee @
$2,001 $ 425 $ CPI 438
$ 5,001 base fee @
5,001 $ 956 $ CPI 985
each additional $1000 or fraction thereof each add'l
$1,000 $ 74.34 $ CPI 77
$ 10,001 base fee @
$10,001 $ 1,328 $ CPI 1,367
each additional $1000 or fraction thereof each add'l
$1,000 $ 9.29 $ CPI 9.55
$ 50,001 base fee @
$50,001 $ 1,699 $ CPI 1,750
each additional $1000 or fraction thereof each add'l
$1,000 $ 21.24 $ CPI 22
$ 100,001 base fee @
$100,001 $ 2,761 $ CPI 2,844
each additional $1000 or fraction thereof each add'l
$1,000 $ 3.32 $ CPI 3.45
$ 500,001 base fee @
$500,001 $ 4,089 $ CPI 4,212
each additional $1000 or fraction thereof each add'l
$1,000 $ 8.18 $ CPI 8.40
City of San Leandro
Master Fee Schedule
Adopted
Building
27 of 90
BUILDING
Justification FY 27
Proposed
Fee
No.
Fee Name Fee Unit /
Type
Notes
FY 26
Adopted
iv) Stand-Alone Mechanical Permit
$ 2,000 base fee @
$2,000 $ 425 $ CPI 438
$ 2,001 base fee @
$2,001 $ 425 $ CPI 438
$ 5,001 base fee @
5,001 $ 956 $ CPI 985
each additional $1000 or fraction thereof each add'l
$1,000 $ 74.34 $ CPI 77
$ 10,001 base fee @
$10,001 $ 1,328 $ CPI 1,367
each additional $1000 or fraction thereof each add'l
$1,000 $ 6.64 $ CPI 6.85
$ 50,001 base fee @
$50,001 $ 1,593 $ CPI 1,641
each additional $1000 or fraction thereof each add'l
$1,000 $ 23.37 $ CPI 24.07
$ 100,001 base fee @
$100,001 $ 2,761 $ CPI 2,844
each additional $1000 or fraction thereof each add'l
$1,000 $ 3.19 $ CPI 3.30
$ 500,001 base fee @
$500,001 $ 4,036 $ CPI 4,157
each additional $1000 or fraction thereof each add'l
$1,000 $ 8.07 $ CPI 8.30
City of San Leandro
Master Fee Schedule
Adopted
Building
28 of 90
BUILDING
Justification FY 27
Proposed
Fee
No.
Fee Name Fee Unit /
Type
Notes
FY 26
Adopted
v) Residential 1 and 2 Family Re-roof
a) Main dwelling roof per permit $ 637 $ CPI 656
b) Detached garages and accessory structures on same property as main dwelling and done at the same time as the main dwelling roof.
per permit $ 319 $ CPI 328
vi) Inspection of the installation of an earthquake gas shutoff valve per permit $ 150 $ CPI 155 vii) Residential Seismic Retrofit projects using "Plan set A" (for one and two family residences) per permit $ 81 $ CPI 83
viii) Electric Vehicle Charger at 1 or 2 Family Residences per permit $ 319 $ CPI 328 ix) Photovoltaic Systems [3]
a) Residential
i) Up to 15kW per permit $ 450 $ CPI 464
ii) each additional kW over 15kW per permit $ 15 $ CPI 15.45 b) Commercial
i) Up to 25kW per permit $ 956 $ CPI 985
ii) 26kW - 50kW per permit $ 956 $ CPI 985
iii) each additional kW (51kW - 250kW) per permit $ 7 $ CPI 7.20 iv) each additional kW over 250kW per permit $ 5 $ CPI 5.15 x) Signs [4]
a) 1st New sign attached to building. (Energized or Not) per permit $ 478 $ CPI 492 b) each additional sign thereafter: per permit $ 212 $ CPI 219 c) Pylon sign, energized or not, each: (Height -5'1'' and Taller) per permit $ 1,274 $ CPI 1,313 d) Monument sign, energized or not, each (5ft and Under) per permit $ 1,168 $ CPI 1,203 e) Relocation or alteration of any sign electronically or mechanically, but not including replacement of tubing,
transformers and such parts subject to failure; or shop inspection by the local inspection department in lieu of a UL label (a local electrical inspection department label of approval shall be required), each
per permit $ 850 $ CPI 875
xi) Demolition
a) Commercial/Residential Demolition up to 3,000SF base fee @ 3,000SF $ 850 $ CPI 875
b) Each Additional 10,000SF each add'l
10,000SF $ 637 $ CPI 656
xii) Addressing Fee
a) First 10 Addresses per permit $ 319 $ CPI 328
b) Each Additional (Over 10) per permit $ 11 $ CPI 11.00 City of San Leandro
Master Fee Schedule
Adopted
Building
29 of 90
BUILDING
Justification FY 27
Proposed
Fee
No.
Fee Name Fee Unit /
Type
Notes
FY 26
Adopted
C. Plan Check Fee [5]
$1 - $5,000 per permit $ 212 $ CPI 219
$ 5,001 base fee @
$5,001 $ 266 $ CPI 273
each additional $1000 or fraction thereof each add'l
$1000 $ 10.62 $ CPI 10.95
$ 10,001 base fee @
10,001 $ 319 $ CPI 328
each additional $1000 or fraction thereof each add'l
$1,000 $ 9.29 $ CPI 9.60
$ 50,001 base fee @
$50,001 $ 690 $ CPI 711
each additional $1000 or fraction thereof each add'l
$1,000 $ 4.25 $ CPI 4.40
$ 100,001 base fee @
$100,001 $ 903 $ CPI 930
each additional $1000 or fraction thereof each add'l
$1,000 $ 1.33 $ CPI 1.40
$ 500,001 base fee @
$500,001 $ 1,434 $ CPI 1,477
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.74 $ CPI 0.80
$ 1,000,001 base fee @
$1,000,001 $ 1,805 $ CPI 1,860
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.45 $ CPI 0.50
$ 5,000,001 base fee @
$5,000,001 $ 3,611 $ CPI 3,719
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.68 $ CPI 0.70
$ 10,000,001 base fee @
$10,000,001 $ 7,010 $ CPI 7,220
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.51 $ CPI 0.55
$ 50,000,001 base fee @
$50,000,001 $ 27,454 $ CPI 28,278
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.55 $ CPI 0.60
City of San Leandro
Master Fee Schedule
Adopted
Building
30 of 90
BUILDING
Justification FY 27
Proposed
Fee
No.
Fee Name Fee Unit /
Type
Notes
FY 26
Adopted
ii) For Master Plans (i.e. identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time)
Master Plan when more than one building will be built each Full Plan
Check Fee
Applies
Full Plan
Check Fee
Applies
Each production phase building at time of application each $ 584 $ CPI 602 iii. OTC plan checks for Minor Residential Remodels per permit $ 767 $ CPI 790 iv) Changes, revisions, or additions to plans previously approved and issued
per hour, 1
hour min [6] $ 212 $ CPI 219
v) Additional plan review after the first re-check per hour, 1 hour min [6] $ 212 $ CPI 219
vi) Alternate Methods and Materials
Under $10M in construction valuation per request [6] $ 531 $ CPI 547 Over $10M in construction valuation per request [6] $ 1,062 $ CPI 1,094 vii) Energy Conservation - for all buildings and projects subject to the California Energy Commission’s conservation regulations $1 - $5,000 per permit $ 319 $ CPI 328
$ 5,001 base fee @
$5,001 $ 319 $ CPI 328
each additional $1000 or fraction thereof each add'l
$1000 $ 31.86 $ CPI 32.80
$ 10,001 base fee @
10,001 $ 478 $ CPI 492
each additional $1000 or fraction thereof each add'l
$1,000 $ -
$ 50,001 base fee @
$50,001 $ 478 $ CPI 492
each additional $1000 or fraction thereof each add'l
$1,000 $ 1.06 $ CPI 1.10
$ 100,001 base fee @
$100,001 $ 531 $ CPI 547
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.93 $ CPI 0.95
$ 500,001 base fee @
$500,001 $ 903 $ CPI 930
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.32 $ CPI 0.35
$ 1,000,001 base fee @
$1,000,001 $ 1,062 $ CPI 1,094
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.13 $ CPI 0.15
$ 5,000,000 base fee @
$5,000,001 $ 1,593 $ CPI 1,641
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.13 $ CPI 0.15
$ 10,000,000 base fee @
$10,000,001 $ 2,230 $ CPI 2,297
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.10 $ CPI 0.15
$ 50,000,000 base fee @
$50,000,001 $ 6,266 $ CPI 6,454
each additional $1000 or fraction thereof each add'l
$1,000 $ 0.13 $ CPI 0.15
City of San Leandro
Master Fee Schedule
Adopted
Building
31 of 90
BUILDING
Justification FY 27
Proposed
Fee
No.
Fee Name Fee Unit /
Type
Notes
FY 26
Adopted
vii) Truss Calculation - Deferred Submittal per hour, 1 hour min [6] $ 212 $ CPI 219
viii) 3rd Party additional plan review fee, after 2nd review a) City Processing Fee per review $ 106 $ CPI 109
b) 3rd Party Consultant per review Actual Cost Actual Cost D. Miscellaneous Fees
i) Miscellaneous Inspections
a) Fees for Inspection not otherwise set forth herein per hour, 1 hour min [6] $ 319 $ CPI 328
b) Fees for inspection conducted outside of normal business hours - 2 hour minimum
per hour, 2
hour min [7] $ 606 $ CPI 624
ii) Investigation Fees [8]
a) Investigation fee for work commenced without first obtaining permits as required by the San Leandro Municipal Code, whether or not a permit is subsequently issued
See
Administrativ
e Citations
Schedule
See
Administrative
Citations
Schedule
b) Investigation fee for conditions that are not in compliance with the San Leandro Zoning and/or Municipal Codes -
per hour, 1
hour min $ 212 $ CPI 219
City of San Leandro
Master Fee Schedule
Adopted
Building
32 of 90
BUILDING
Justification FY 27
Proposed
Fee
No.
Fee Name Fee Unit /
Type
Notes
FY 26
Adopted
E. Other Fees and Charges
(i) Technology Fee per permit [11] 6.92% 6.92% CPI
(ii) Community Planning Fee (for commercial, industrial & residential projects) per permit [9,10] 10.84% 10.84% CPI (iii) Strong Motion Impact Fee: State mandated tax for the Seismic Safety Commission for seismic monitoring.
Set by State Set by State
Residential
.00013 per
$1.00
Valuation or
fraction
thereof with
a $0.50
.00013 per
$1.00
Valuation or
fraction
thereof with a
$0.50
Set by state
Commercial/Industrial
.00028 per
$1.00
Valuation or
fraction
thereof with
a $0.50
.00028 per
$1.00
Valuation or
fraction
thereof with a
$0.50
Set by state
(iv) Building Standards Commission (SB1473) Fee: State Mandated tax for Green Building Standards collected for the State by the City. hourly Set by State Set by State (v) Exception to Noise Ordinance per permit $ 106 $ CPI 109 (vi) Certificate of Occupancy per hour, 1
hour min [6] $ 212 $ CPI 219
(vii) Temporary Certificate of Occupancy per 30 days per hour, 1 hour min [6] $ 212 $ CPI 219
(viii) Certificate of Compliance per hour, 1
hour min [6] $ 212 $ CPI 219
(ix) House Moving permit per hour, 1
hour min [6] $ 212 $ CPI 219
(x) Microfilm Copies per sheet [13] $ 1.20 $ CPI 1.25
- Microfilm Copies that require an affidavit per request $ 425 $ CPI 438 (xi) Photocopies per page [13] $ 0.10 $ CPI 0.15
(xii) Reproduce lost permit (plan sets, supporting documents and job card) per request $ 531 $ CPI 547
(xiii) Failed C&D Debris per request $ 212 $ CPI 219
(xiv) Appeals each Actual Cost Actual Cost
(xv) Soft Story Seismic Report Review each Actual Cost Actual Cost F. Building Code Violation [12]
First Violation each $ 130 $ CPI 134
Second Violation each $ 700 $ CPI 721
Third Violation each $ 1,300 $ CPI 1,339
Each additional violation of the same ordinance withing two years of the first violation each $ 2,500 $ CPI 2,575
2 Hourly Services and/or Services not Otherwise Listed per hour $ 212 Actual Cost Align to Cost Recovery
City of San Leandro
Master Fee Schedule
Adopted
Building
33 of 90
BUILDING
Justification FY 27
Proposed
Fee
No.
Fee Name Fee Unit /
Type
Notes
FY 26
Adopted
Notes
[1]
[2]
[3]
[4] Sign permit fees are based on all signs being on the same property and on the same permit. [5]
[6] 1 hour minimum.
[7] 2 hour minimum.
[8]
[9]
[10]
[11] Fee charged as a percentage of permit fee.
[12] CA Gov't Code 36900
[13] Set by State
[14] 80% of fees paid less Technology Fee and Credit Card fee Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to the building permit fee.
Note: Payment of any investigation fees does not exempt any person from compliance with all other provisions of applicable codes in the execution of the work nor from any other penalties prescribed by law.
Note: For small tenant improvements to existing buildings and ADUs, the Chief Building Official and/or the Community Development Director may waive the Community Planning Fee at his/her discretion.
Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements.
Determination of Valuation for Fee-Setting Purposes: Valuation shall be based on total value of all construction work, as determined by the Building Official, including all finish work, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment). For new construction project valuations which the Building Official believes are understated at submittal, valuation may be determined using the most current International Code Council (ICC) valuation table modified to account for a regional construction cost modifier of 16% or the most currently available regional construction cost modifier (i.e. construction value in ICC Table *
1.16). For tenant improvement, residential remodels, or other projects that do not involve new square footage project valuations which the Building Official believes are understated at submittal, valuation may be determined using, up to 50% of, the most current International Code Council (ICC) valuation table modified to account for a regional construction cost modifier of 16% or the most currently available regional construction cost modifier (i.e. up to 50% of construction value in ICC Table * 1.16.)
Note: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community Planning Fees, and other mandated fees shall not exceed amounts authorized via Government Code Section 66015.
Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this fee schedule.
City of San Leandro
Master Fee Schedule
Adopted
Building
34 of 90
COMMUNITY DEVELOPMENT - CODE ENFORCEMENT
1 Administrative Citations
Municipal Code Violation [1]
[2]
1st Violation $ 100 $ 100 Set by statute; cannot escalate by CPI2nd Violation $ 200 $ 200 Set by statute; cannot escalate by CPI3rd Violation $ 500 $ 500 Set by statute; cannot escalate by CPICap on penalty accruing on same violation for single-family residential parcels during one calendar year $ 5,000 $ 5,000 Capped at $5,000 2 Re-Inspection Fee per hour $ 209 $ 215.27 CPI
Notes
[1] CA Gov't Code 36900.[2] Cap set by Ord 2020-011.
Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed Justification
City of San LeandroMaster Fee ScheduleAdopted
CD Code Enforcement
35 of 90
COMMUNITY DEVELOPMENT - ECONOMIC DEVELOPMENT
1 Agreements and Leases per hour [1] $ 257 $ CPI 264
Notes
[1] Legal costs will be charged separately from Economic Development staff time and will be billed at actual cost.
Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed Justification
City of San LeandroMaster Fee ScheduleAdopted
CD Economic Development
36 of 90
HOUSING
1 Below Market Ownership Units - Transaction Fee per unit [1] Actual Cost Actual Cost 2 Annual Below Market Rate Rental Monitoring Fee Review of Income, Rents, Certifications per development [2] 1,000 $ $ CPI 1,030 Inspection of Property per development [2]20 units or less $ 399 $ CPI 411 21-100 units $ 1,408 $ CPI 1,451
101+ units $ 3,320 $ CPI 3,420
3 First Time Homebuyer Loan Program - Administrative Fee each [3] Actual Cost Actual Cost 4 Mobile Home Rent Stabilization Annual Rent Stabilization Administration Fee per space 8 $ $ CPI 8 Fair Return Rent Increase Fee Filing per case 1,749 $ $ CPI 1,801Appeal of Rent Review Officer Decision per case 6,457 $ $ CPI 6,651Temp Rent Increase CIP/Capital Replacement Filing per case 1,166 $ $ CPI 1,201Appeal of Rent Review Officer Decision per case 3,874 $ $ CPI 3,991Rent Reduction Request Filing per case 874 $ $ CPI 901 Appeal of Rent Review Officer Decision per case 2,791 $ $ CPI 2,875 5 Hourly Services and/or Services not Otherwise Listed per hour 291 $ Actual Cost Align to Cost Recovery Notes
[1]
[2] Rental developments with Inclusionary units / per development with restricted rent [3] Administrative charge for review and approval of first time home buyer loan and eligibility documentation / per loan approved.Administration of “For Sale” Inclusionary units / per unit per change in ownership – Including initial sale and resale; services are provided by third party and charged at actual cost FY 26 Adopted Fee No. Fee Name Fee Unit / Type
Notes FY 27 Proposed Justification
City of San LeandroMaster Fee ScheduleAdopted
Housing
37 of 90
DEVELOPMENT IMPACT FEES
1 Park Facilities Development Impact Fees [1]
Park Land Acquisition Fee: [5][7] [9][10] CPI
Unit Size <550 SF Unit $1,558
Unit Size 550-750 SF Unit $1,947 Unit Size 751-1,150 SF Unit $2,987 Unit Size 1,151-1,650 SF Unit $4,156 Unit Size 1,651-1,950 SF Unit $5,325 Unit Size >1,950 SF Unit $6,623 Accessory Dwelling Unit Unit [2] $0 Park Improvement Fee: [6][8] [9][10] CCI Unit Size <550 SF Unit $4,670
Unit Size 550-750 SF Unit $5,838 Unit Size 751-1,150 SF Unit $8,952 Unit Size 1,151-1,650 SF Unit $12,456 Unit Size 1,651-1,950 SF Unit $15,958 Unit Size >1,950 SF Unit $19,851 Accessory Dwelling Unit [2] $0 Total Acquisition and Improvement Fee:
[5][6][7][8]
[9][10]
Acquisiton: CPI
Improvement: CCI
Unit Size <550 SF Unit $ 6,228 Unit Size 550-750 SF Unit $ 7,785 Unit Size 751-1,150 SF Unit $ 11,939 Unit Size 1,151-1,650 SF Unit $ 16,612 Unit Size 1,651-1,950 SF Unit $ 21,283 Unit Size >1,950 SF Unit $ 26,474 Accessory Dwelling Unit [2] $ - FY 2027 Proposed Justification
$ 20,679$ 16,140$ 11,600
$ 7,565
$ 25,723$ -
$ 6,052$ 1,513$ 1,891$ 2,900
$ -
$ 4,035$ 5,170$ 6,431$ 4,539$ 5,674$ 8,700
Fee
No.
Fee Name
Notes Fee Unit/Type FY 26 Adopted
$ -$ 12,105$ 15,509$ 19,292
City of San LeandroMaster Fee ScheduleAdopted
Impact Fees
38 of 90
DEVELOPMENT IMPACT FEES
FY 2027 Proposed Justification Fee No. Fee Name
Notes Fee Unit/Type FY 26 Adopted
2 Development Fees for Street Improvements (DFSI) [3] CCI A. Residential:General residential $1,760Senior housing $878Accessory Dwelling Unit [2] $ - B. Commercial:General Office gross bldg. sq. ft. (No fee when <360 sq. ft.) $ 4.90Medical Office /gross bldg. sq. ft.
(No fee when <257
sq ft )
$ 6.85
C. Retail:General Retail gross bldg. sq. ft. (No fee when <322 sq. ft.) $ 5.45Personal Services gross bldg. sq. ft. (No fee when <601 sq. ft.) $ 2.95D. RestaurantsQuality Restaurants gross bldg. sq. ft. (No fee when <449 sq. ft.) $ 3.90All Other Restaurants gross bldg. sq. ft. (No fee when <111 sq. ft.) $ 15.85 E. Financial Services gross bldg. sq. ft. (No fee when <120 sq. ft.) $ 14.65 F. Hotel/Motel per room 1,192
G. Industrial:General gross bldg. sq. ft. (No fee when <1,119 sq. $ 1.55Mini-warehouse gross bldg. sq. ft. (No fee when <3,566 sq. $ 0.50Service Station station 12,508 $ 1,711.57
$ 854.07
$ -
$ 4.75 $ 6.65 $ 5.32 $ 2.85
3.81 15.40 14.25
1,159
$ 1.53 $ 0.48
12,165
City of San LeandroMaster Fee ScheduleAdopted
Impact Fees
39 of 90
DEVELOPMENT IMPACT FEES
FY 2027 Proposed Justification Fee No. Fee Name
Notes Fee Unit/Type FY 26 Adopted
3 Oversized vehicles, objects, buildings:
A. Red-tipping Driveway N/A Not applicable
A. Public Service Directional Sign $ 67 CPIB. Other Services 4 Davis-Doolittle Traffic Impact Fee
See Davis-Doolittle
Traffic Impact Fee
Schedule
CCI
5 Marina / Interstate 880 Traffic Impact Fee [4] CCI
A. Residential:General residential $ 885Senior housing $ 299Accessory Dwelling Unit [2] $ - B. Commercial:General Office gross bldg. sq. ft. (No fee when <475 sq. ft.) $ 1.85Medical Office gross bldg. sq. ft. (No fee when <253 sq. ft.) $ 3.50C. Retail:General Retail gross bldg. sq. ft. (No fee when <411 sq. ft.) $ 2.15Personal Services gross bldg. sq. ft. (No fee when <295 sq. ft.) $ 3.00D. RestaurantsQuality Restaurants gross bldg. sq. ft. (No fee when <218 sq. ft.) $ 4.05All Other Restaurants gross bldg. sq. ft. (No fee when <128 sq. ft.) $ 6.90E. Financial Services gross bldg. sq. ft. (No fee when <57 sq. ft.) $ 15.40 F. Hotel/Motel room $ 794
$ 3.95 $ 6.72 $ 3.40
$65.00 plus $6.50/ft for
additional red-tipping > 10'
$65
Direct Costs (1)
See Davis-Doolittle Traffic
Impact Fee Schedule
$ 860.89$ 290.92
$ -
$ 1.81 $ 2.10 $ 2.91
$ 14.98
$ 772
City of San LeandroMaster Fee ScheduleAdopted
Impact Fees
40 of 90
DEVELOPMENT IMPACT FEES
FY 2027 Proposed Justification Fee No. Fee Name
Notes Fee Unit/Type FY 26 Adopted
G. Industrial:General gross bldg. sq. ft. (No fee when <765 sq. ft.) $ 1.15Mini-warehouse gross bldg. sq. ft. (No fee when <3,328 sq. $ 0.30 Service Station station $ 3,178 Notes
[1] Park Development Fees created with Reso. 2000-64, and amended with Reso. 2005-069, Reso. 2019-074 and Reso. 2025-106.[2][3][4][5][6][7][8][9] [10]
A residential development is exempt from payment of the Park Land Acquisition and Park Improvement Fee if it satisfies both of the following conditions: i) one hundred percent (100%) of the units in the development, excluding any manager’s units, are affordable units; and ii) the project applicant is an entity, or is controlled by an entity, exempt from taxation pursuant to section 501(c)(3) of the Internal Revenue Code. $ 1.12 $ 0.25
$ 3,091
Accessory Dwelling Units exempted from Park Land Acquisition Fee, Park Improvement Fee and Development Fees for Street Improvements by Reso. 2025-106 and Reso. 2025-107.This fee is reviewed in February of each year to determine if adjustment is required based on changes in the Construction Cost Index as shown in the “Engineering News Record.”The amount of the Park Land Acquisition and Park Improvement Fees for any affordable unit, other than those units subject to the conditions noted above in Note [9], shall be fifty percent (50%) of the otherwise applicable rate.Marina/ Interstate 880 Impact Fees pertain to a certain zone in the City - Please contact Public Works Department for a complete map.The Park Land Acquisition Fee shall be imposed only on non-subdivided residential development. The Park Improvement Fee shall be imposed on both subdivided and non-subdivided residential development. Annually, on July 1, the City Manager shall adjust the amount of the Park Improvements Fee by the annual percentage change in the Engineering News-Record San Francisco Building Cost Index.Annually, on July 1, the City Manager shall adjust the amount of the Park Land Acquisition Fee based on the annual percentage change in the Consumer Price Index for All Urban Consumers for the San Francisco Bay Area.
City of San LeandroMaster Fee ScheduleAdopted
Impact Fees
41 of 90
DAVIS-DOOLITTLE TRAFFIC IMPACT FEE SCHEDULE
4 Davis-Doolittle Traffic Impact Fee CCI
TAZ (rates are per sq. ft.) 1 2 34568 1234568
General Residential $0.14 $6.52 $0.32 $0.23 $0.07 $0.08 $0.87 $0.14 $6.52 $0.32 $0.23 $0.08 $0.09 $0.88Senior Housing $0.07 $3.70 $0.17 $0.12 $0.04 $0.04 $0.48 $0.08 $3.70 $0.18 $0.13 $0.05 $0.05 $0.48Accessory Dwelling Unit [2] $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00General Office $0.24 $10.96 $0.55 $0.38 $0.11 $0.15 $1.47 $0.24 $10.96 $0.55 $0.38 $0.12 $0.16 $1.47Medical Office $0.33 $15.74 $0.77 $0.57 $0.17 $0.22 $2.08 $0.33 $15.74 $0.77 $0.57 $0.18 $0.22 $2.08General Retail $0.28 $12.59 $0.62 $0.43 $0.12 $0.17 $1.68 $0.28 $12.59 $0.62 $0.43 $0.13 $0.18 $1.68Personal Services $0.14 $6.74 $0.33 $0.23 $0.07 $0.08 $0.90 $0.14 $6.74 $0.33 $0.23 $0.08 $0.09 $0.90Financial Services $0.73 $33.72 $1.67 $1.19 $0.36 $0.46 $4.49 $0.73 $33.72 $1.67 $1.19 $0.36 $0.46 $4.49Hotel/Motel $0.11 $5.40 $0.26 $0.19 $0.06 $0.07 $0.72 $0.12 $5.40 $0.26 $0.19 $0.07 $0.08 $0.72General Industrial $0.07 $3.59 $0.17 $0.12 $0.04 $0.04 $0.46 $0.08 $3.59 $0.18 $0.13 $0.05 $0.05 $0.46Mini-Warehouse $0.03 $1.12 $0.06 $0.04 $0.01 $0.01 $0.14 $0.04 $1.12 $0.07 $0.05 $0.02 $0.02 $0.15Service Station $0.98 $44.94 $2.19 $1.59 $0.50 $0.62 $5.98 $0.98 $44.94 $2.19 $1.59 $0.50 $0.62 $5.98 Notes
[2]
Justification Fee No. Fee Name
Notes FY 26 Adopted FY 2027 Proposed
Accessory Dwelling Units exempted from Park Land Acquisition Fee, Park Improvement Fee and Development Fees for Street Improvements by Reso. 2025-106 and Reso. 2025-107.
City of San LeandroMaster Fee ScheduleAdopted
Davis Doolittle Traffic Impact
42 of 90
FIRE
1 Fire Prevention Fees
A. Fire Permit Filing and Issuance Fee per permit See Building Fee Schedule See Building Fee Schedule B. Fire Permit Re-inspection Processing Fee per permit See Building Fee Schedule See Building Fee Schedule 2 Permits
A. Fire Code Permit Fees - Operational (CFC 105.5) per permit 38 $ $ CPI 40 B. Fire Code Permit Fees - Construction Related (CFC 105.6) per project 512 $ $ CPI 527 $ -
3 Sprinkler Fees: $ -
A. Underground/Private Service Fire Main (includes plan review, Pre-pour Inspection, Hydrostatic Test, Flush, & Inspections <2) per
underground $ 959 $ CPI 988
B.1 Sprinkler System Commercial (New) (system = 1 riser) (Includes Plan Review, Weld, Hydrostatic Test, Bell Test, & Inspections <2) $ -
-- Less than 20 heads per project 1,023 $ $ 1,054
-- Greater than or equal to 20 heads per project 1,023 $ $ CPI 1,054 B.2 Sprinkler System Commercial (Tenant Improvement) (system = 1 riser) (Includes Plan Review, Weld, Hydrostatic Test, Bell Test, & Inspections <2) $ -
-- Less than 20 heads per project 384 $ $ CPI 395 -- Greater than or equal to 20 heads per project 895 $ $ CPI 922C. Additional inspection required for extraordinary situations, beyond first 2 inspections per hour 256 $ $ CPI 263 Fee
No. Fee Name Fee Unit Type
Notes FY 26 Adopted FY 27 Proposed Justification
City of San LeandroMaster Fee ScheduleAdopted
Fire
43 of 90
FIRE
Fee
No. Fee Name Fee Unit Type
Notes FY 26 Adopted FY 27 Proposed Justification
D.1 Automatic Sprinkler System Residential (New) (Includes Plan Review, Hydrostatic Test, & Inspection <2) $ - -- NFPA 13 D System- Master Plan check per unit 1,023 $ $ CPI 1,054 -- Additional permit for already approved master plan per unit 806 $ $ CPI 830 -- NFPA 13R System - (per unit per building) per system 1,279 $ $ CPI 1,317 -- NFPA 13 System - (per unit per building) per system 1,279 $ $ CPI 1,317 D.2 Automatic Sprinkler System Residential (Alteration) (Includes Plan Review, Hydrostatic Test, & Inspection <2) $ - -- NFPA 13 D System- Master Plan check per unit 1,023 $ $ CPI 1,054 -- Additional permit for already approved master plan per unit 806 $ $ CPI 830 -- NFPA 13 System - (per unit per building) per system 1,023 $ $ CPI 1,054 -- NFPA 13 System - (per unit per building) per system 1,023 $ $ CPI 1,054 $ -
4 Fixed Fire Protection System $ -
A. Hood Duct System per system $ 384 $ CPI 395B. Halon or Clean Agent, pre action, etc. per system 640 $ $ CPI 659C. Spray Booth per booth 384 $ $ CPI 395 $ -
5 Fire Alarms & Monitoring System (New or Tenant Improvement) $ - A. Fire Alarm System <=50 devices (Includes, Plan Review, and Test) per project 448 $ $ CPI 461 B. Fire Alarm System >50 devices (Includes, Plan Review, and Test) per project 767 $ $ CPI 790 $ -
City of San LeandroMaster Fee ScheduleAdopted
Fire
44 of 90
FIRE
Fee
No. Fee Name Fee Unit Type
Notes FY 26 Adopted FY 27 Proposed Justification
6 Hazardous Materials Response and Other Incident Fees - $ A. Engine or Truck Company per hour $ 341 $ CPI 351B. Chief Officer per hour $ 114 $ CPI 117 $ -
7 All State Mandated Inspections [1] $ -
A. E: Public Schools per hour 256 $ $ CPI 263
B. E: Private Schools per hour 256 $ $ CPI 263C. R-1 Hotel/Motel per hour 256 $ $ CPI 263D. R-2 Apartments per hour 256 $ $ CPI 263E. 850 Licensing Clearance per request 512 $ $ CPI 527 $ -
8 Miscellaneous $ -
A. Plan Review and Inspection of Building and Safety projects $ -New Construction up to 5,000 sq. ft. per application $ 1,535 $ CPI 1,581New Construction 5,001 sq. ft. to 45,000 sq. ft. per application $ 2,558 $ CPI 2,635New Construction > 45,000 sq. ft. per application $ 3,070 $ CPI 3,162T.I. up to 5,000 sq. ft. per application $ 2,046 $ CPI 2,108T.I. 5,001 sq. ft. to 45,000 sq. ft. per application $ 2,046 $ CPI 2,108T.I. > 45,000 sq. ft. per application $ 2,558 $ CPI 2,635Custom Single Family Residence per application $ 1,535 $ CPI 1,581 $ -
B. Other Fire Prevention Services (includes any miscellaneous fire protection related activities not otherwise categorized in this fee schedule) per hour, 1
hour min [2] 256 $ $ CPI 263
C. Excessive Plan Review and/or Inspections per hour, 1 hour min $ 256 $ CPI 263D. Any retest, re-inspection, or additional inspection per hour, 1 hour min $ 256 $ CPI 263 City of San LeandroMaster Fee ScheduleAdopted
Fire
45 of 90
FIRE
Fee
No. Fee Name Fee Unit Type
Notes FY 26 Adopted FY 27 Proposed Justification
$ -
9 Hourly Services and/or Services not Otherwise Listed per hour 256 $ Actual Cost Align to Cost Recovery Notes
[1] 1 hour minimum
[2] The City Manager and/or Fire Chief may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this fee schedule.
City of San LeandroMaster Fee ScheduleAdopted
Fire
46 of 90
PUBLIC WORKS - ENGINEERING
1.0 General Encroachment
A. Permit Processing Fee per permit 498 $ $ CPI 513B. Permit for Amendment/Revision Fee (Changes to an Issued Permit) per permit 249 $ $ CPI 257C. Expedited Review Fee per hour (4 hr min) City Overtime
Rates Apply
and/or
Applicable
Consultant Costs
City Staff and
Overtime Rates
Below and/or
Applicable
Consultant Costs
D. Additional Insurance Review Fee (Major Encroachment Permits) per permit 374 $ $ CPI 385 E. No Permit Penalty Fee penalty
Double
Inspection &
Permit fee
Double
Inspection &
Permit fee
F. Overtime Fee per hour (4 hr min) See Staff Rates Below See Staff Rates Below G. Compliance Inspection Fee (Investigation Fee / Work Without a Permit, Insurance Expiration Notification, Notice of Violation § 1-12-140) per hour
(1 hr min) $ 249 $ CPI 257
H. Refund - Permit Withdrawal per permit N/A 80% of fees paid New Fee
No.
Fee Name Fee Unit /
Type
Notes FY 26 Adopted FY 2027 Proposed Justification
City of San LeandroMaster Fee ScheduleAdopted
PW - Engineering
47 of 90
PUBLIC WORKS - ENGINEERING
Fee
No.
Fee Name Fee Unit /
Type
Notes FY 26 Adopted FY 2027 Proposed Justification
1.1 Plan Review Fee (includes up to 3 reviews) [4]
A. Minor Plan Check (For work at a single location) per permit 373 $ $ CPI 384B. Major Plan Check (For work involving more than one single location and more than one connection) deposit 3,738 $ $ CPI 3,850 C. Minor Traffic Control Plan Review (When traffic control plan review is minor and at a single location i.e. Using MUTCD standards) per permit 249 $ $ CPI 257D. Major Traffic Control Plan Review (When traffic control plan review is site specific or at multiple locations) deposit 1,495 $ $ CPI 1,540
1.2 Inspection Fees by Type of Work Performed [5]
A. Utility Pothole Inspection FeesUp to 10 potholes flat fee 498 $ $ CPI 513> 10 potholes > 40 potholes flat fee 1,993 $ $ CPI 2,053>40 potholes deposit 3,987 $ $ CPI 4,107B. Trenching / Road Cuts - Base transverse and longitudinal trenches1 - 100 sq. ft base fee per permit $ 872 $ CPI 898 >100 sq. ft., additional fee per sq. ft. 5 $ $ CPI 5.15 C. Concrete Sidewalk1 - 50 sq. ft. base fee per permit $ 498 $ CPI 513 >50 sq. ft., additional fee per sq. ft. $ 5.0 $ 5.15 CPI D. Concrete DrivewayResidential per permit $ 623 $ 642 CPI Commercial per permit $ 997 $ 1,027 CPI
E. Curb, and Gutter:1 - 25 sq. ft. base fee per permit $ 748 $ CPI 770 >25 sq. ft., additional fee per sq. ft. 37 $ $ CPI 38F. Miscellaneous Structures includes manholes, storm water inlets, storm water outlets per
connection $ 997 $ CPI 1,027
G. Street Resurfacing deposit $ 1,240 $ 1,277 CPI
H. Access Only Inspection Fee (e.g. crane, tree removal/trimming, Utility access to manholes, well monitoring, no excavation)Up to 5 days flat fee $ 498 $ 513 CPI 5+ days deposit $ 5,980 $ 6,159 CPI I. Warranty Inspections (1-year) for Encroachments/ Permit Closeout flat fee 249 $ $ CPI 257 City of San Leandro Master Fee ScheduleAdopted
PW - Engineering
48 of 90
PUBLIC WORKS - ENGINEERING
Fee
No.
Fee Name Fee Unit /
Type
Notes FY 26 Adopted FY 2027 Proposed Justification
2.0 Miscellaneous Permits2.1 Annual Permit Fee flat fee $ 872 $ 898 CPI
2.2 Parklet Program
A. Application Fee each $ 374 $ 385 CPI
B. Design Review Deposit deposit As determined by engineer As determined by engineer C. Restoration Deposit deposit
2.3 POD, Containers, Dumpsters Permit Fee flat fee $ 622 $ 641 CPI 2.4 Sewer Lateral Permit Fee (non-subdivision) flat fee A. Residential flat fee $ 1,494 $ 1,539 CPI
B. Commercial/Industrial flat fee $ 1,744 $ 1,796 CPI
2.5 Storm Drain Permit Fee (non-subdivision) flat fee $ 1,744 $ 1,796 CPI
2.6 Monitoring Well installation and abandonment Fee per permit $ 1,993 $ 2,053 CPI City of San LeandroMaster Fee ScheduleAdopted
PW - Engineering
49 of 90
PUBLIC WORKS - ENGINEERING
Fee
No.
Fee Name Fee Unit /
Type
Notes FY 26 Adopted FY 2027 Proposed Justification
2.7 News rack Permit
A. Permit Issuance and Inspection per permit $ 498 $ 513 CPI B. Maintenance Deposit deposit $100 + $5 per news rack $100 + $5 per news rack
3.0 Bonding Requirements for Restoration
See
separate
document
from PW
Engineering
Division
As determined
by City Engineer
As determined
by City Engineer
4.0 General Land Development Permit Fees
A. Permit Processing Fee (Applies to item 4.2) per permit $ 374 $ 385 CPI B. Project Submittal Intake Fee per permit $ 498 $ 513 CPI
4.1 Subdivision:
A. Parcel Map Waiver/Lot Line Adjustment/or Certificate of Compliance/Easement Dedication, Right of Way Dedication Review deposit 5,980 $ $ CPI 6,159 B. Subdivision Map Review CPI B.1 Parcel Map deposit $ 14,768 $ 15,211 CPI B.2 Tract Map deposit $ 22,536 $ 23,212 CPI
B.2.a Additional Tract Map Review Fee Per Lot deposit per lot $ 249 $ CPI 257 C. Tentative Subdivision Map Review deposit 12,458 $ $ CPI 12,832D. Subdivision Grading/Improvement Plan/Review and Inspection deposit 3% of
estimated cost
of
improvements
(5000 min
$100K max)
3% of estimated
cost of
improvements
(5000 min $100K
max)
E. Amended Map or Certificate of Correction deposit $ 8,970 $ 9,239 CPI F. Street Vacations/Abandonment, Right of Way Dedication Review deposit 12,458 $ $ CPI 12,832 City of San LeandroMaster Fee ScheduleAdopted
PW - Engineering
50 of 90
PUBLIC WORKS - ENGINEERING
Fee
No.
Fee Name Fee Unit /
Type
Notes FY 26 Adopted FY 2027 Proposed Justification
4.2 Grading Permits (not a subdivision):
A. Plan ReviewResidential deposit $ 7,475 $ 7,699 CPI Non-Residential deposit $ 14,950 $ 15,399 CPI B. InspectionResidential deposit $ 4,983 $ 5,133 CPI
Non-Residential deposit $ 18,688 $ 19,248 CPI
C. Performance Bond per permit As determined by City Engineer As determined by City Engineer D. Erosion and Sediment Control Bond per permit As determined by City Engineer As determined by City Engineer
5.0 Building Permits (includes up to 3 reviews) [4]
A. Residential per project $ 748 $ 770 CPI
B. Non-Residential per project $ 1,993 $ 2,053 CPI
C. Traffic Plan Review Fee per project $ 872 $ 898 CPI
D. Demolition Permit Erosion Control Inspectionup to 10 days Demo flat $ 997 $ 1,027 CPI 10 + days deposit $ 4,983 $ 5,132 CPI E. 4th and subsequent review fee T&M T&M T&M
6.0 Overhead Utility Conversion
A. Residential DevelopmentLesser of: SLMC §5-3-325
i) Actual cost per linear foot of property frontage, or Underground Utility District Master Planii) $1,861.59 per dwelling unit, or per DU 1,862 $ $ 1,963
5.4% increase based on Engineering News Records Construction Cost Index for two years
iii) $465.82/LF of property frontage per LF 466 $ $ 491
5.4% increase based on Engineering News Records Construction Cost Index for two years
B. Non-Residential DevelopmentLesser of: SLMC §5-3-325 i) Actual cost per linear foot of property frontage, or Underground Utility District Master Planii) $465.82/LF of property frontage per LF 466 $ $ 491
5.4% increase based on Engineering News Records Construction Cost Index City of San LeandroMaster Fee ScheduleAdopted
PW - Engineering
51 of 90
PUBLIC WORKS - ENGINEERING
Fee
No.
Fee Name Fee Unit /
Type
Notes FY 26 Adopted FY 2027 Proposed Justification
7.0 Impact Fees
A. Park Facilities Development Impact Fees (MOVED to Impact Fee Schedule) [1]&[2] Per Impact Fee Schedule N/A MOVED to Impact Fee Schedule B. Overhead Utility Conversion (MOVED from Impact Fees to 6.0) Per Impact Fee Schedule N/A MOVED from Impact Fees to 6.0 AC. Development Fees for Street Improvements (DFSI) [2] Per Impact Fee Schedule Per Impact Fee Schedule BE. Davis-Doolittle Traffic Impact Fee Per Impact Fee Schedule Per Impact Fee Schedule CF. Marina /Interstate 880 Traffic Impact fee Per Impact Fee Schedule Per Impact Fee Schedule
8.0 Technology Fee each [3] 6.92% 6.92%
9.0 Research Fee (first 1/2 hour free) per 1/2 hour 125 $ $ CPI 128
10.0 Credit Card Transaction Fee flat fee
See City
Manager Fee
Schedule
See City
Manager Fee
Schedule
11.0 Agreement Preparation and Review deposit $ 3,738 $ 3,850 CPI City of San LeandroMaster Fee ScheduleAdopted
PW - Engineering
52 of 90
PUBLIC WORKS - ENGINEERING
Fee
No.
Fee Name Fee Unit /
Type
Notes FY 26 Adopted FY 2027 Proposed Justification
12.0 City Staff Rates for Hourly Services and/or Services not Otherwise Listed Regular Business HoursAdmin Services Manager per hour $ 253 Actual Cost Administrative Assistant per hour $ 166 Actual CostAssociate Engineer per hour $ 263 Actual CostCity Engineer per hour $ 345 Actual CostEngineering & Transportation Director Public Works Director per hour $ 412 Actual Cost Change in position title Engineering Inspector per hour $ 229 Actual CostPrincipal Engineer/Engineering Manager per hour $ 336 Actual CostSenior Engineer per hour $ 321 Actual CostSenior Engineering Aide Engineering Technician per hour $ 200 Actual Cost Change in position title Supervising Engineering Inspector per hour $ 245 Actual CostTraffic Operations Manager per hour $ 274 Actual CostEngineering/Transportation Staff Blended/Average per hour $ 249 N/A No longer applicable Overtime / After Regular Business HoursAdmin Services Manager per hour $ 289 Actual CostAdministrative Assistant per hour $ 190 Actual CostAssociate Engineer per hour $ 301 Actual CostCity Engineer per hour $ 345 Actual CostEngineering & Transportation Director Public Works Director per hour $ 412 Actual Cost Change in position title Engineering Inspector per hour $ 262 Actual CostSenior Engineering Aide Engineering Technician per hour $ 228 Actual Cost Change in position title Principal Engineer/Engineering Manager per hour $ 336 Actual CostSenior Engineer per hour $ 321 Actual CostSupervising Engineering Inspector per hour $ 280 Actual CostTraffic Operations Manager per hour $ 274 Actual CostEngineering/Transportation Staff Blended/Average per hour $ 285 Actual Cost No longer applicable
TRAFFIC DIVISION
1 Vertical Curb Striping Costs
A. Driveway Approach Red Tipping up to 10' each $ 498 $ 513 CPI ea. additional > 10' per ft. $ 37 $ 38 CPI
2 No Parking Signs per pc. $ 2 $ 2.10 CPI
3 Special Study Review (Oversize and overload route review, Traffic Management Plan review) deposit 4,983 $ $ CPI 5,132 City of San LeandroMaster Fee ScheduleAdopted
PW - Engineering
53 of 90
PUBLIC WORKS - ENGINEERING
Fee
No.
Fee Name Fee Unit /
Type
Notes FY 26 Adopted FY 2027 Proposed Justification
ADMINISTRATIVE CITATIONS
Adding citation fees associated with public right of way to align with citations for private property Municipal Code Violation (Public Works) [6] [7]1st Violation per citation N/A $ 100 2nd Violation per citation N/A $ 200
3rd Violation per citation N/A $ 500
Cap on penalty accruing on same violation for single-family residential parcels during one calendar year per citation N/A $ 5,000 Notes
[1][2][3][4][5][6] CA Gov't Code 36900[7] Cap set by Ord 2020-011 The applicable project inspection fee shall be the total permit inspection fee of all work performed under the permit. No City Impact Fees: The City Council officially waived Park and DFSI fees (Resolutions 2025-106 and 2025-107) to support ADU development. Impact fee for ADUs 750 sq. ft. or larger shall be charged Technology Fee does not apply to the following fees: (2.21.C) Parklet Program, (2.7 1.I) News Rack Permits, (5.03) Building Permit review costs by Engineering staff, (4) Large Format Copies, (4.2 C & D)(6.E) & (6.F) Grading Permit Performance and Erosion Control Bonds,(1) Park Facilities Development Impact Fees, and (6.0) Overhead Utility Conversion Fees.Includes 3 reviews. Additional reviews will be charged time and materials and the balance will be collected prior to permit issuance. Park Development Fees created with Reso. 2000-64, and amended with Reso. 2005-069, Reso. 2019-074 and Reso. 2025-106.
City of San LeandroMaster Fee ScheduleAdopted
PW - Engineering
54 of 90
PUBLIC WORKS - MAINTENANCE
1 Equipment Rental:
Set by City; Varies
by type of
equipment
Set by City; Varies
by type of equipment
2 Emergency Call-Out: per hour Actual Cost Actual Cost
3 Barricades:
Block Party Deposit up to 8 each $ 100 N/A
Program revised and folded under Block Party Permit application process each additional each $ 34 N/A
Program revised and folded under Block Party Permit application process Block Party Drop-off and Pickup Services each $ 100 N/A Program revised and folded under Block Party Permit application process Unreturned Barricades each $ 34 N/A
Program revised and folded under Block Party Permit application process 4 C.3 Inspections and Report Reviews
Tier 1: Sites that are responsible and able to provide requested reporting data in a timely manner per property Actual Cost per Vendor Agreement Actual Cost per Vendor Agreement Tier 2: Sites that require additional administrative work to track down/contact owners, or provide additional support in gathering reporting data. per property Actual Cost per Vendor Agreement Actual Cost per Vendor Agreement Tier 3: Sites that are non-responsive and/or on-site field work (inspection) is required to gather information per property Actual Cost per Vendor Agreement Actual Cost per Vendor Agreement FY 26 Adopted Fee No. Fee Name Fee Unit Type
Notes FY 27 Proposed Justification
City of San LeandroMaster Fee ScheduleAdopted
Public Works - Maintenance
55 of 90
PUBLIC WORKS - MAINTENANCE
FY 26 Adopted Fee No. Fee Name Fee Unit Type
Notes FY 27 Proposed Justification
5 Solid Waste & Recycling:
Diversion Plan (formerly Waste Management Plan) Waste
Management Plan (WMP) Review each $ 143 $ 147 CPIPlan Review each $ 143 $ 147 CPILandfill Penalty per ton N/A $ 100 CPIReceptacles:Receptacle Deposit for Community Events first 15 $ 300 $ 300 CPIeach additional each $ 60 $ 77 CPIUnreturned Receptacles each $ 60 $ 77 CPIReceptacle Cleaning each $ 278 Delete No longer applicable 6 SB 1383 Edible Food Recovery Inspections each Actual cost charged by ACDEH* Actual cost charged by ACDEH* 7 Hourly Services and/or Services not Otherwise Listed per hour $ 139 Actual Cost Align to Cost Recovery Notes
*Alameda County Department of Environmental Health
City of San LeandroMaster Fee ScheduleAdopted
Public Works - Maintenance
56 of 90
PUBLIC WORKS - MAINTENANCE EQUIPMENT
1 Equipment [1]
See Caltrans "Labor
Surcharge and
Equipment Rental
Rates"
See Caltrans "Labor Surcharge
and Equipment Rental Rates"
Notes
[1] Rates based on most recent Caltrans "Labor Surcharge and Equipment Rental Rates" publication https://dot.ca.gov/programs/construction/equipment-rental-rates-andlabor-surcharge Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed Justification
City of San LeandroMaster Fee ScheduleAdopted
PW Equipment
57 of 90
POLICE
Justification
1 Fingerprint (Live Scan) Fee [5]
A. Resident each 117 $ $ 121 CPI
B. Non-Resident each 117 $ $ 121 CPI
2 Massage/Acupuncture Permits:
A. New Establishment per permit [1] [4] $ 254 $ 263 CPI B. Renewal Establishment per permit 124 $ $ 128 CPIC. Masseur/Masseuse/Acupuncturist Permit Permit Fee per permit 73 $ $ 76 CPIFingerprint (Live scan) & Background Check per permit See Separate Fingerprint Fee See Separate Fingerprint Fee Police Dept. Administrative Fee. per permit 124 $ $ 128 CPI 3 Secondhand Dealers/Junk Dealers/Pawnbrokers:
A. New per permit [1] [4] $ 220 $ 227 CPI
B. Renewal per permit 220 $ $ 227 CPI
4 Fortunetelling:
A. New per permit [4] 268 $ $ 277 CPI
B. Renewal per permit [4] 268 $ $ 277 CPI
FY 26 Adopted Fee No. Fee Name Fee Unit Type
Notes FY 27 Proposed
City of San LeandroMaster Fee ScheduleAdopted
Police
58 of 90
POLICE
FY 26 Adopted Justification Fee No. Fee Name Fee Unit Type Notes FY 27 Proposed
5 Taxicab:
A. Owner Fingerprint & Background Check each 151 $ $ 156 CPI Police Dept. Administrative Fee. per permit 124 $ $ 128 CPIB. Driver Permit Application, Annual per permit [2] [3] $ 370 $ 382 CPIFingerprint (Live scan) & Background Check per permit See Separate Fingerprint Fee See Separate Fingerprint Fee Police Dept. Administrative Fee. per permit 124 $ $ 128 CPI C. Driver Permit Re-issuance (within 6 mos.) per permit 30 $ $ 31 CPI 6 Tobacco Retailer's Annual Permit Fee per permit 151 $ $ 156 CPI7 Police Reports:
A. Letter of clearance, verification, lost property, etc. each 37 $ $ 38 CPI B. Accident Reports (first 10 pages) each 10 $ $ 11 CPIC. Police Reports/Arrest Reports (first 10 pages) each 10 $ $ 11 CPI 8 Animal Service Fees:
A. Animal pickup per pickup 147 $ $ 151 CPI
9 Video recordings of telephone and/or radio communications - incident related records for public release each 73 $ $ 76 CPI City of San LeandroMaster Fee ScheduleAdopted
Police
59 of 90
POLICE
FY 26 Adopted Justification Fee No. Fee Name Fee Unit Type Notes FY 27 Proposed
10 Intoxicated Driver: [7]
A. Property Damage each Actual Costs Actual Costs B. Emergency Response per hour 302 $ Actual Costs Align to Cost Recovery 11 Vehicle Release each 37 $ $ 38 CPI12 Vehicle Repossession each 37 $ $ 38 CPI14 Photographs:
Duplication of CD’s & DVD’s each 73 $ $ 76 CPI
15 Parade Permits (Special Events):
A. Permit per permit 220 $ $ 227 CPI
B. City service support (i.e. personnel assistance, barricade services or special refuse services), excluding City sponsored civic functions. per event
Direct Costs in
Excess of $500
per event
Direct Costs in
Excess of $500
per event
16 Carnival Permit per permit 270 $ $ 279 CPI
17 Block Party Permit per permit 125 $ 125
Maintain current fee to avoid overpricing relative to neighboring agencies & preserve community participation 18 Vehicle Registration Violation - Correction Verifications At City Hall each 50 $ $ 50
Fees consistent with those of neigbhoring agencies.
City of San LeandroMaster Fee ScheduleAdopted
Police
60 of 90
POLICE
FY 26 Adopted Justification Fee No. Fee Name Fee Unit Type Notes FY 27 Proposed
19 Parking Citation Fines each Fines Set by Code/City Fines Set by Code/City 20 Traffic Control:
Driving over or across newly laid pavement, surfacing, painting eachDriving over any street barrier, sign, marker for closed street eachUnauthorized placement of barrier or sign eachUnlawful riding of skateboard, roller-skates, coasters, toy vehicles or similar device on undesignated City Property each Unlawful for operator to drive across property not intended for use as a public right of way as means of effecting shortened route each Refusal or failure to comply with Police Officer/Parking Aide's traffic control instructions eachFailure to remove ignition key from unattended vehicle each 21 Commercial Enforcement: [6]
A. Transportation Permit Violation - No Permit each Fines Set by Code/City Fines Set by Code/City B. Transportation Permit - Annual each 90 $ Fee set by the State C. Transportation Permit - Repetitive each 90 $ Fee set by the State D. Transportation Permit - Single Trip Only each 16 $ Fee set by the State E. Overweight Vehicle Permit Violation - No Permit each Fines Set by Code/City Fines Set by Code/City 22 Special Event/Oversized Loads requiring Police special services per event Direct Costs Direct Costs Fines Set by
Code/City
Fines Set by
Code/City
City of San LeandroMaster Fee ScheduleAdopted
Police
61 of 90
POLICE
FY 26 Adopted Justification Fee No. Fee Name Fee Unit Type Notes FY 27 Proposed
23 Municipal Code Violations:
A. 1st Violation eachB. 2nd Violation eachC. 3rd Violation (treated as a misdemeanor) each 24 Curfew Violations:
A. 1st Violation eachB. 2nd Violation within 12months of first violation eachC. 3rd Violation and additional offenses within 12 months of the 2nd violation each 25 Concealed Carry Weapon License Fees
Initial LicenseA. Standard (2 years) $ 424 $ 437 CPIB. Judicial (3 years) $ 453 $ 467 CPIC. Reserve (4 years) $ 470 $ 485 CPID. Employment (90 days) $ 369 $ 381 CPIRenewalA. Standard (2 years) $ 383 $ 395 CPIB. Judicial (3 years) $ 405 $ 418 CPIC. Reserve (4 years) $ 416 $ 429 CPID. Employment (90 days) $ 402 $ 415 CPIDuplicate License $ 15 $ 16 CPIModification $ 35 $ 37 CPI 26 Hourly Services and/or Services not Otherwise Listed A. SwornDuring normal business hours hourly 302 $ Actual Cost After business hours hourly 353 $ Actual Cost B. Non-SwornDuring normal business hours hourly 147 $ Actual Cost After business hours hourly 174 $ Actual Cost Fines Set by
Code/City
Fines Set by
Code/City
Fines Set by
Code/City
Fines Set by
Code/City
City of San LeandroMaster Fee ScheduleAdopted
Police
62 of 90
POLICE
FY 26 Adopted Justification Fee No. Fee Name Fee Unit Type Notes FY 27 Proposed
Notes
[1][2][3]
[4] Plus State Fee[5] Department of Justice fees charged separately [6]
[7] GC 53155 maximum is $12k per incident.
“Single trip permit or rider.$16.00” Cal. Code Regs. tit. 21 § 1411.3 / “Annual permit.$90.00” Cal. Code Regs. tit. 21 § 1411.3As part of the application process, applicants must undergo a psychological evaluation at a cost of $150, which shall be borne by the applicant.
As part of the application process, applicants must submit proof of a current drug test showing negative results and two identical and current passport size color photographs.As part of the Police Department's inspection of taxi cabs, verification of the City Council approved (5/2/11) flag drop rate of $3.00, $2.60 mileage rate and $26.00 wait fee/hour will be conducted to ensure compliance with SLMC 6-6-400, effective June 1, 2011.
City of San LeandroMaster Fee ScheduleAdopted
Police
63 of 90
POLICE - FINES
Justification
1 Parking Citation Fees
CPO Parking Violation each SLMC 3.1.200(h) 68 $ $ 68 Set by municipal or State code Parking on Street for Repairs each SLMC 6.1.270 94 $ $ 94 Set by municipal or State code Posted Private Property each SLMC 6.1.400 47 $ $ 47 Set by municipal or State code Not Curbing Wheels on Hill each SLMC 6.1.425 42 $ $ 42 Set by municipal or State code Oversize Vehicle (Commercial in Residential) each SLMC 6.1.430(d) 156 $ $ 156 Set by municipal or State code Off-Street Oversize Vehicle each SLMC 6.1.430(b) 156 $ $ 156 Set by municipal or State code Non-Motorized Vehicle each SLMC 6.1.430(c) 78 $ $ 78 Set by municipal or State code Parking Within Designated Stall each SLMC 6.1.435 47 $ $ 47 Set by municipal or State code No Parking Area each SLMC 6.1.500(a) 68 $ $ 68 Set by municipal or State code Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed
City of San LeandroMaster Fee ScheduleAdopted
PD - Fines
64 of 90
POLICE - FINES
Justification Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed
Designated Street or Park by Time or Day each SLMC 6.1.500(b) 68 $ $ 68 Set by municipal or State code Parking Limitations/Restrictions each SLMC 6.1.500(c) 47 $ $ 47 Set by municipal or State code Curb Markings/Red-A/Yel-B/Whi-C/Grn-D each SLMC 6.1.505 68 $ $ 68 Set by municipal or State code Handicapped Stall each SLMC 6.1.505(e) 365 $ $ 365 Set by municipal or State code Truck-No Parking each SLMC 6.1.600 78 $ $ 78 Set by municipal or State code Truck-No Parking Truck Route each SLMC 6.1.605 78 $ $ 78 Set by municipal or State code Truck Parking Prohibited each SLMC 6.1.610 78 $ $ 78 Set by municipal or State code Truck Over 25 Tons Prohibited each SLMC 6.1.615 78 $ $ 78 Set by municipal or State code Municipal Parking Lots-Restrictions each SLMC 6.1.800 47 $ $ 47 Set by municipal or State code Designated Reserved Parking Spaces each SLMC 6.1.805 47 $ $ 47 Set by municipal or State code Obstructing Enf.-Removing Chalk Marks each SLMC 6.1.810(a) 47 $ $ 47 Set by municipal or State code Obstructing Enf.-Moving Vehicle to Evade each SLMC 6.1.810(b) 47 $ $ 47 Set by municipal or State code City of San LeandroMaster Fee ScheduleAdopted
PD - Fines
65 of 90
POLICE - FINES
Justification Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed
Parking in Excess of 72 Hours each SLMC 6.1.820 94 $ $ 94 Set by municipal or State code Passenger Loading Zone each SLMC 6.1.835 47 $ $ 47 Set by municipal or State code Parking Limitations/Golf Course each SLMC 6.1.850 38 $ $ 38 Set by municipal or State code Meter Expired each SLMC 6.2.115 47 $ $ 47 Set by municipal or State code Meter Zone Time Limit each SLMC 6.2.120 47 $ $ 47 Set by municipal or State code Private Property Storage each SLMC 6.4.400 121 $ $ 121 Set by municipal or State code Failure to Abate from Private Property each SLMC 6.4.405 121 $ $ 121 Set by municipal or State code Truck Route Violation for parked and moving trucks each SLMC 6.7.210 156 $ $ 156 Set by municipal or State code Parking on or blocking a Crosswalk each CVC 22500(b) 63 $ $ 63 Set by municipal or State code Parking in front of a driveway each CVC 22500(e) 63 $ $ 63 Set by municipal or State code Parking on a sidewalk each CVC 22500(f) 63 $ $ 63 Set by municipal or State code Parking within 20 feet of a marked or unmarked crosswalk each CVC 22500 (n) 63 $ $ 63 Set by municipal or State code Double Parking each CVC 22500(h) 63 $ $ 63 Set by municipal or State code Parking over 18" from curb each CVC 22502(a) 78 $ $ 78 Set by municipal or State code Parking within 15 feet of fire hydrant each CVC 22514 63 $ $ 63 Set by municipal or State code Parking within 7-1/2 feet of railroad track each CVC 22521 63 $ $ 63 Set by municipal or State code Abandoned vehicle each CVC 22523(a) 313 $ $ 313 Set by municipal or State code Electric Vehicle Charging Station (EVCS) Parking Stall each SLMC 6.2.405 47 $ $ 47 Set by municipal or State code City of San LeandroMaster Fee ScheduleAdopted
PD - Fines
66 of 90
POLICE - FINES
Justification Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed
2 Traffic Control
Driving over or across newly laid pavement, surfacing, painting each SLMC 6.1.240 78 $ $ 78 Set by municipal or State code Driving over any street barrier, sign, marker for closed street each SLMC 6.1.245 78 $ $ 78 Set by municipal or State code Unauthorized placement of barrier or sign each SLMC 6.1.255 52 $ $ 52 Set by municipal or State code Unlawful riding of skateboard, roller-skates, coasters, toy vehicles or similar device on undesignated City Property each SLMC 6.1.265 52 $ $ 52 Set by municipal or State code Unlawful for operator to drive across property not intended for use as a public right of way as means of effecting shortened route each SLMC 6.1.285 52 $ $ 52 Set by municipal or State code Refusal or failure to comply with Police Officer/Parking Aide's traffic control instructions each SLMC 6.1.300 104 $ $ 104 Set by municipal or State code Failure to remove ignition key from unattended vehicle each SLMC 6.1.830 52 $ $ 52 Set by municipal or State code City of San LeandroMaster Fee ScheduleAdopted
PD - Fines
67 of 90
POLICE - FINES
Justification Fee
No.
Fee Name
Fee Unit
Type
Notes FY 26 Adopted FY 27 Proposed
3 Municipal Code Violations SLMC 1-12-200 ( c)
A. 1st Violation each 104 $ $ 104 Set by municipal or State code B. 2nd Violation each 208 $ $ 208 Set by municipal or State code C. 3rd Violation (treated as a misdemeanor) each 1,042 $ $ 1,042 Set by municipal or State code 4 Curfew Violations
SLMC 1.12.140,
4.1.305, 4.1.310,
4.1.320
A. 1st Violation each 52 $ $ 52 Set by municipal or State code B. 2nd Violation within 12months of first violation each 104 $ $ 104 Set by municipal or State code C. 3rd Violation and additional offenses within 12 months of the 2nd violation each 208 $ $ 208 Set by municipal or State code City of San LeandroMaster Fee ScheduleAdopted
PD - Fines
68 of 90
LIBRARY SERVICES
1 Fines and Penalties
A. Lost or damaged book or media item (DVD/Blu-ray/CD) each Item list price Item list price B. Lost or damaged Tech2Go kit or Library of Things item/kit each Item list price or
itemized cost of
part
Item list price or
itemized cost of
part
C. Lost or damaged Magazine each $ 6 $ 6
No change; minimal use of physical magazines
2 Special Services
A. Inter-Library Loan - Replacement Fee each 115 $ $ 115 No Change - Set fee by LINK+ B. Proctor Exam Fee per hour 51 $ $ CPI 53
3 Meeting Facility Fees (SPECIFIC ROOMS FEES MOVED TO LIBRARY RENTAL RATE TAB) [1]
[2]
See San Leandro
Public Library
Meeting Room
Policy
See San Leandro
Public Library
Meeting Room
Policy
FY 26 Adopted Fee No. Fee Name Fee Unit Type
Notes FY 27 Proposed Justification
City of San LeandroMaster Fee ScheduleAdopted
Library
69 of 90
LIBRARY SERVICES
FY 26 Adopted Fee No. Fee Name Fee Unit Type
Notes FY 27 Proposed Justification
4 OTHER FEES:
-- Attendant on Duty per hour 167 $ $ 167.00
No change needed; in line with market
-- Liability Insurance per use
Determined
Separately Per
Use, Per City's
Facility Use
Guidelines and
Risk
Management's
Guidance
Determined
Separately Per
Use, Per City's
Facility Use
Guidelines and
Risk
Management's
Guidance
-- San Leandro Police Dept. Security per hour Per Police Rate Schedule Per Police Rate Schedule -- Private Vendor Security per hour Actual Cost Actual Cost -- Meeting Room Damage Deposit flat $50 - $250,
depending upon
room size
$150-$750
depending on
room size
Change to be consistent with Rec & Parks
Equipment Rental flat
See San Leandro
Public Library
Meeting Room
Policy
See San Leandro
Public Library
Meeting Room
Policy
5 CANCELLATION PENALTY: (Rooms)
If cancelled more than 61+ days prior to event: flat
Full refund of
deposit and fees,
minus admin fee.
See San Leandro
Public Library
Meeting Room
Policy
If cancelled between 60 days and 31 days prior to event: flat Forfeit full damage deposit.
See San Leandro
Public Library
Meeting Room
Policy
If cancelled between 30 days and 10 days prior to event: flat Forfeit full
damage deposit
and one half
(1/2) of all fees
collected.
See San Leandro
Public Library
Meeting Room
Policy
If cancelled less than 10 days prior to event: flat
Forfeit all
deposits and fees
collected.
See San Leandro
Public Library
Meeting Room
Policy
City of San LeandroMaster Fee ScheduleAdopted
Library
70 of 90
LIBRARY SERVICES
FY 26 Adopted Fee No. Fee Name Fee Unit Type
Notes FY 27 Proposed Justification
6 Change/Amendment/No Show Fee flat
[3] $25 admin fee,
per Amendment
/ Cancelation
Form
$30 admin fee,
per Amendment
/ Cancelation
Form
Change to be consistent with Rec & Parks
7 Hourly Services and/or Services not Otherwise Listed
During normal business hours per hour 167 $ $ 167 No change needed; in line with market After business hours per hour 188 $ $ 188 No change needed; in line with market Notes
[1]
Group Eligibility A: Programs administered by or for the City of San Leandro.
Group Eligibility B: Public Agencies and San Leandro Non-Profits Group Eligibility C: San Leandro Resident Individual or Group Group Eligibility D: San Leandro Non-Resident Individual or GroupGroup Eligibility E: Business or Commercial Group [2] RENTAL FEES are determined by group eligibility and facility used. [3] Changes to reservations (date/time/location) including "no shows" made within 30 days of the rental date will be charged a $30 administrative fee.USERS are classified into the following groups for the purpose of determining applicable fees and charges.
City of San LeandroMaster Fee ScheduleAdopted
Library
71 of 90
LIBRARY - RENTAL RATES
Justification
1 Library [1, 2]
Main Library A B C D E A B C D E
Trustees Room, Mary Brown Room; Conference B
or Conference C - Meeting Rooms (2 Hour Minimum)
hourly N/A N/A $ 50 $ 75 $ 85 N/A $ 50 $ 70 $ 90 $ 120 Fees updated to align with Rereation facility rentals Meeting Room - Damage Deposit (Refundable) flat N/A N/A N/A N/A N/A N/A $150 $150 $150 $150 Fees updated to align with Rereation facility rentals Lecture Hall, Estudillo Room, Karp Room or Senior
Facility Multi-Purpose Rooms (2 Hour Minimum) hourly N/A N/A $ 100 $ 120 $ 140 N/A $ 70 $ 100 $ 130 $ 170 Fees updated to align with Rereation facility rentals Multi-Purpose Room - Damage Deposit (Refundable)
flat NEW N/A $ 300 $ 300 $ 300 $ 300 Fees updated to align with Rereation facility rentals Estudillo Kitchen (Flat Rate) - only to be used in conjunction with Estudillo or the combined Estudillo/ Karp Room. flat N/A N/A $ 75 $ 85 $ 110 N/A $ 50 $ 70 $ 90 $ 120 Fees updated to align with Rereation facility rentals Kitchen - Deposit (Refundable) flat NEW N/A $ 150 $ 150 $ 150 $ 150 Fees updated to align with Rereation facility rentals Karp/Estudillo combination, Library Plaza, Library Parking Lot - Event Spaces (4 Hour Minimum) hourly N/A N/A $ 150 $ 200 $ 250 N/A $ 160 $ 225 $ 295 $ 385 Newly Added: Library Plaza, Library Parking Lot. Fees updated to align with Rereation facility rentals Event Space - Damage Deposit (Refundable) flat NEW N/A $ 750 $ 750 $ 750 $ 750 Fees updated to align with Rereation facility rentals FY 27 Proposed Fee No. Fee Name Fee Unit Type
Notes FY 26 Adopted
City of San LeandroMaster Fee ScheduleAdopted
Library Rental Rates
72 of 90
LIBRARY - RENTAL RATES
FY 27 Proposed Justification Fee No. Fee Name Fee Unit Type Notes FY 26 Adopted
Manor Branch Library Newly AddedProgram Room - Meeting Room (2 Hour Minimum) hourly N/A N/A N/A N/A N/A NEW N/A $ 50 $ 70 $ 90 $ 120 Fees updated to align with Rereation facility rentals Meeting Room-Damage Deposit (Refundable)
flat
N/A N/A N/A N/A N/A NEW N/A $150 $150 $150 $150 Fees updated to align with Rereation facility rentals History MuseumMuseum Auditorium - Multi-purpose room (2 Hour Minimum) hourly N/A $ 70 $ 100 $ 130 $ 170 N/A $ 70 $ 100 $ 130 $ 170 Fees updated to align with Rereation facility rentals Multi-Purpose Room-Deposit (Refundable) flat N/A $ 300 $ 300 $ 300 $ 300 N/A $ 300 $ 300 $ 300 $ 300 Fees updated to align with Rereation facility rentals Casa Peralta Grounds
Kitchen (Flat Rate) hourly N/A N/A $ 80 $ 100 $ 120 N/A N/A $ 80 $ 100 $ 120 Removed; facility not available for rental Casa Peralta Grounds - Event Space (4 Hour Minimum) hourly N/A $ 160 $ 225 $ 295 $ 385 N/A $ 160 $ 225 $ 295 $ 385 Newly added to reflect correct rental spaces. Fees updated to align with Rereation facility rentals Event Spaces-Deposit (Refundable) flat N/A $ 750 $ 750 $ 750 $ 750 N/A $ 750 $ 750 $ 750 $ 750 Fees updated to align with Rereation facility rentals City of San LeandroMaster Fee ScheduleAdopted
Library Rental Rates
73 of 90
LIBRARY - RENTAL RATES
FY 27 Proposed Justification Fee No. Fee Name Fee Unit Type Notes FY 26 Adopted
Notes[1]
USERS are classified into the following groups for the purpose of determining applicable fees and charges.Group Eligibility A: Programs administered by or for the City of San Leandro.Group Eligibility B: Public Agencies and San Leandro Non-Profits Group Eligibility C: San Leandro Resident Individual or Group Group Eligibility D: San Leandro Non-Resident Individual or GroupGroup Eligibility E: Business or Commercial Group [2]
RENTAL FEES are determined by group eligibility and facility used. Operations costs, liability insurance, and security fees may also be applicable. Minimum rental is two hours. Hourly rates are not prorated for parts of an hour.
City of San LeandroMaster Fee ScheduleAdopted
Library Rental Rates
74 of 90
Justification
1 Facilities
Rental rates for Marina Community Center, Senior community Center, Surlene Grant Community Room hourly per rental See Recreation Rental Rates See Recreation Rental Rates Additional Fees for Facility Rentals (Fees are the same for all categories):
Liability Insurance per rental Fees Determined for Each Use Fees Determined for Each Use San Leandro Police Dept. Security per hour See Police Fee Schedule See Police Fee Schedule Private Vendor Security per rental Fees Determined for Each Use Fees Determined for Each Use Meeting Room Damage Deposit per rental See Recreation Rental Rates See Recreation Rental Rates Rental Overtime Fee per hour 2x Hourly Rental Rate 2x Hourly Rental Rate Change/Amendment Fee per change 30 $ $ 30 Aligns with market rate and cost recovery
Cancellation Policy for Facilities:If cancelled more than 61 days prior to event: per rental Full refund of deposit minus admin fee Full refund of deposit minus admin fee If cancelled between 60 days and 31 days prior to event: per rental Forfeit full damage deposit Forfeit full damage deposit If cancelled between 30 days and 10 days prior to event: per rental Forfeit full damage deposit & 1/2 of all fees collected Forfeit full damage deposit & 1/2 of all fees collected If cancelled less than 10 days prior to event: per rental Forfeit all deposits and fees collected Forfeit all deposits and fees collected
RECREATION & PARKS
FY 26 Adopted FY 27 Proposed Fee No. Fee Name Fee Unit Type Notes
City of San LeandroMaster Fee ScheduleAdopted
Recreation
75 of 90
Justification
RECREATION & PARKS
FY 26 Adopted FY 27 Proposed Fee No. Fee Name Fee Unit Type Notes
2 Parks
Daily rental fees for all locations/capacities per rental See Recreation Rental Rates See Recreation Rental Rates Additional Fees for Parks:Park Restoration Special Event Fee (Groups 350+) per event 500 $ $ 250 Aligns with market rate Inflatable Fee per event 30 $ $ 30 Aligns with market rate Cancellation Fee: A non-refundable fee will be charged for changes or cancellations within 30 days. per request 30 $ $ 30 Aligns with market rate and cost recovery
3 Pools
Damage Deposit: per rental See Recreation Rental Rates See Recreation Rental Rates Pool Rentals/Buy Outs per rental See Recreation Rental Rates See Recreation Rental Rates 4 Field/Facility Rentals
Damage Deposit: per season See Recreation Rental Rates See Recreation Rental Rates Field Rental all types/locations per rental See Recreation Rental Rates See Recreation Rental Rates Field Lights hourly See Recreation Rental Rates See Recreation Rental Rates Add field preparation, with bases (additional to field rental fee) per day See Recreation Rental Rates See Recreation Rental Rates Scorebooth / Kitchen per day See Recreation Rental Rates See Recreation Rental Rates City of San LeandroMaster Fee ScheduleAdopted
Recreation
76 of 90
Justification
RECREATION & PARKS
FY 26 Adopted FY 27 Proposed Fee No. Fee Name Fee Unit Type Notes
6 Tree Planting:
New Tree each $ 210 $ 216 CPI
Concrete Cutout (up to 4' x 4') each $ 200 $ 513
Mirror encroachment permit fee.
7 Overhead Banner Installation and Removal per banner $ 280 $ 320 Cost recovery total 8 Hourly Services and/or Services not Otherwise Listed After business hours (full-time) per hour 275 $ $ 285
The per-hour cost is adjusted by 3.75% adopted agreement.
B. Part-Time
During normal business hours per hour $ 70.00 N/A Deleted - no longer applicable After business hours (part-time) per hour 75 $ $ 78
The per-hour cost is adjusted by 3.75% adopted agreement.
City of San LeandroMaster Fee ScheduleAdopted
Recreation
77 of 90
RECREATION RENTAL RATES
1 Facilities [1] [2]
Marina Community Center ABCDE ABCDEMeeting Room (2-hour minimum ) hourly N/A $50 $70 $90 $120 N/A $50 $70 $90 $120 Aligns with market rate Meeting Room-Deposit (Refundable) flat N/A $150 $150 $150 $150 N/A $150 $150 $150 $150 Aligns with market rate Multi-Purpose Room (2-hour minimum) hourly N/A N/A N/A N/A N/A N/A $70 $100 $130 $170 Aligns with market rate and larger capacity then meeting room rate Multi-Purpose-Deposit (Refundable) flat N/A N/A N/A N/A N/A N/A $300 $300 $300 $300 Aligns with market rate and larger capacity then meeting room rate Main Hall A or B (4-hours minimum) hourly N/A $70 $100 $130 $170 N/A N/A N/A N/A N/A Restructured Main Hall A or B-Deposit flat N/A $650 $650 $650 $650 N/A N/A N/A N/A N/A RestructuredEvent Hall with kitchen(4-hour minimum) hourly N/A $130 $190 $245 $320 N/A $160 $225 $295 $385 Aligns with market rate and includes kitchen in rate Event Hall-Security Deposit (Refundable) flat N/A $650 $650 $650 $650 $750 $750 $750 $750 $750 Aligns with market rate and includes kitchen in rate Kitchen (Flat Rate) - coincides with
duration of room rental flat N/A $75 $110 $140 $185 N/A N/A N/A N/A N/A Restructured Kitchen (Hourly Rate) hourly N/A $50 $70 $90 $120 N/A $50 $70 $90 $120 Aligns with market rate Fee No. Fee Name FY 26 Adopted FY 27 Proposed Fee Unit Type Notes Justification City of San LeandroMaster Fee ScheduleAdopted
Recreation Rental Rates
78 of 90
RECREATION RENTAL RATES
Fee No. Fee Name FY 26 Adopted FY 27 Proposed Fee Unit Type Notes Justification Senior Community Center ABCDE ABCDEMeeting Room (2-hour minimum ) hourly N/A $50 $70 $90 $120 N/A $50 $70 $90 $120 Aligns with market rate Meeting Room-Deposit (Refundable) flat N/A $150 $150 $150 $150 N/A $150 $150 $150 $150 Aligns with market rate Multi-Purpose Room (2-hour minimum) hourly N/A N/A N/A N/A N/A N/A $70 $100 $130 $170 Aligns with market rate and larger capacity then meeting room rate Multi-Purpose-Deposit (Refundable) flat N/A N/A N/A N/A N/A N/A $300 $300 $300 $300 Aligns with market rate and larger capacity then meeting room rate Main Hall A or B (4-hours minimum) hourly N/A $70 $100 $130 $170 N/A N/A N/A N/A N/A Restructured Main Hall A or B-Deposit flat N/A $650 $650 $650 $650 N/A N/A N/A N/A N/A RestructuredEvent Hall with kitchen(4-hour minimum) hourly N/A $130 $190 $245 $320 N/A $160 $225 $295 $385 Aligns with market rate and includes kitchen in rate Event Hall-Deposit (Refundable) flat N/A $650 $650 $650 $650 $750 $750 $750 $750 $750 Aligns with market rate and includes kitchen in rate Kitchen (Flat Rate) - coincides with
duration of room rental flat N/A $75 $110 $140 $185 N/A N/A N/A N/A N/A Kitchen (Hourly Rate) hourly N/A $50 $70 $90 $120 N/A $50 $70 $90 $120 Aligns with market rate Kitchen-Deposit (Refundable) N/A N/A N/A N/A N/A $150 $150 $150 $150 $150 New - Aligns with market rate Surlene Grant Community Room: ABCDE ABCDEMulti-Purpose Room (2-hour minimum) hourly N/A $70 $100 $130 $170 N/A $70 $100 $130 $170 Aligns with market rate Kitchen (Flat Rate) - coincides with duration of room rental flat N/A $55 $80 $105 $135 N/A $50 $70 $90 $120 Aligns with the kitchen rate at other facilities Multi-Purpose-Security Deposit (Refundable) N/A $150 $150 $150 $150 N/A $300 $300 $300 $300 Aligns with market rate City of San LeandroMaster Fee ScheduleAdopted
Recreation Rental Rates
79 of 90
RECREATION RENTAL RATES
Fee No. Fee Name FY 26 Adopted FY 27 Proposed Fee Unit Type Notes Justification 2 Parks [1] [2]
Rental Fees per Table ABCDE ABCDE
per table/daily rate
N/A N/A N/A N/A N/A N/A $21 $30 $40 $50
Alignment with the market rate and overall decrease to fees for picninc area Bonaire Park - Area 5 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A Restructured Cherry Grove Park - Areas 1, 4, 5, 10, 11, and 12 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A Restructured Cherry Grove Park - Areas 3, 4, 5, 6, 7,
8, 9, 10, 11, and 12 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A Restructured Tony B. Santos Park - Areas 1 and 2 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredHalcyon Park - Areas 2, 3, daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredHalcyon Park - Areas 4 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredMarina Park - Areas 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, and 18 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A Restructured Mulford Point Areas 1, 2, 3, and 4 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredMemorial Park - Area 2* daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredRoot Park daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredSiempre Verde Park, Areas 1 and 2 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredStenzel Park - Areas 1 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredStenzel Park - Areas 2, 3 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredWashington Manor Park - Areas 7 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A RestructuredWashington Manor Park - Areas 2, 3, 4, 5, 6, 8 daily N/A $45 $65 $85 $110 N/A N/A N/A N/A N/A Restructured Capacity 40-75 A B C D E A B C D E
Bonaire Park - Pods 1 & 2* and Pods 3 & 4* daily N/A $105 $150 $195 $255 N/A N/A N/A N/A N/A Restructured Cherry Grove Park - Area 2 daily N/A $105 $150 $195 $255 N/A N/A N/A N/A N/A RestructuredFloresta Park - Areas 1* and 2* daily N/A $105 $150 $195 $255 N/A N/A N/A N/A N/A RestructuredHalcyon Park - Areas 1 daily N/A $105 $150 $195 $255 N/A N/A N/A N/A N/A RestructuredHalcyon Park - Areas 5 daily N/A $105 $150 $195 $255 N/A N/A N/A N/A N/A RestructuredMarina Park - Heron Area, Mallard Area daily N/A $105 $150 $195 $255 N/A N/A N/A N/A N/A RestructuredMemorial Park - Area 1* daily N/A $105 $150 $195 $255 N/A N/A N/A N/A N/A RestructuredThrasher Park* daily N/A $105 $150 $195 $255 N/A N/A N/A N/A N/A RestructuredToyon Park* daily N/A $105 $150 $195 $255 N/A N/A N/A N/A N/A Restructured Restructured
Capacity 75-100 A B C D E A B C D E Restructured
Marina - Otter daily N/A $145 $205 $265 $345 N/A N/A N/A N/A N/A Restructured Bonaire Park - Pods 1 & 2* and Pods 3
& 4* daily N/A $145 $205 $265 $345 N/A N/A N/A N/A N/A Restructured Cherry Grove Park - Area 2 daily N/A $145 $205 $265 $345 N/A N/A N/A N/A N/A RestructuredFloresta Park - Areas 1* and 2* daily N/A $145 $205 $265 $345 N/A N/A N/A N/A N/A RestructuredHalcyon Park - Areas 1* and 5* daily N/A $145 $205 $265 $345 N/A N/A N/A N/A N/A Restructured City of San LeandroMaster Fee ScheduleAdopted
Recreation Rental Rates
80 of 90
RECREATION RENTAL RATES
Fee No. Fee Name FY 26 Adopted FY 27 Proposed Fee Unit Type Notes Justification Capacity 150+ A B C D E A B C D EMarina Park - Seagull Area* daily N/A $185 $264 $343 $446 N/A N/A N/A N/A N/A Restructured City of San LeandroMaster Fee ScheduleAdopted
Recreation Rental Rates
81 of 90
RECREATION RENTAL RATES
Fee No. Fee Name FY 26 Adopted FY 27 Proposed Fee Unit Type Notes Justification 3 Pools [1] [2]
San Leandro Boys & Girls Club Pool: ABCDE ABCDEBuy Outs- Capacity 150 (2-hour minimum) hourly N/A $210 $300 $390 $507 N/A $210 $300 $390 $507 Aligns with market rate Security Deposit (Refundable) N/A $250 $250 $250 $250 N/A $500 $500 $500 $500 Aligns with market rate Farrelly Pool : ABCDE ABCDEOutdoor Party Package - Capacity 24 3 4 hours N/A $220 $315 $410 $530 N/A $265 $375 $490 $635 Aligns with market rate and includes passes
Outdoor Party Package-Security Deposit (Refundable) flat N/A $250 $250 $250 $250 N/A $250 $250 $250 $250 Aligns with market rate Buy Outs- Capacity 150 (2-hour minimum) hourly N/A $340 $485 $630 $820 N/A $340 $485 $630 $820 Aligns with market rate Buy-Out Security Deposit (Refundable) flat N/A $500 $500 $500 $500 Aligns with market rate San Leandro Family Aquatic Center: ABCDE ABCDEIndoor Party Package - Capacity 40 3 4 hours N/A $400 $575 $750 $970 N/A $560 $800 $1,040 $1,350 Aligns with market rate and includes passes
Indoor Party Package - Security Deposit (Refundable) flat N/A $250 $250 $250 $250 N/A $250 $250 $250 $250 Aligns with market rate Outdoor Party Package - Capacity 24 3 4 hours N/A $330 $475 $620 $800 N/A $330 $475 $620 $800 Aligns with market rate Outdoor Party Package - Security Deposit (Refundable) flat N/A $250 $250 $250 $250 N/A $250 $250 $250 $250 Aligns with market rate Buy Outs- Capacity 250 (2-hour minimum) hourly N/A $385 $550 $715 $930 N/A $385 $550 $715 $930 Aligns with market rate Buy-Out Security Deposit (Refundable) flat N/A $500 $500 $500 $500 N/A $500 $500 $500 $500 Aligns with market rate 4 Field/Facility Rentals [1] [2] A B C D E ABCDE
Floresta, Stenzel, Washington Manor Middle, Thrasher Park Washington Manor Park Deposit (Refundable) season N/A $325 $325 $325 $325 N/A $325 $325 $325 $325 Aligns with market rate T-Ball Field-Youth N/A $6 $8 $10 $15 Aligns with market rate Field Rental-Youth hourly N/A $6 $8 $10 $15 N/A $7 $10 $10 $15 Aligns with market rate Field Rental-Adult hourly N/A $15 $20 $25 $35 N/A $15 $20 $25 $35 Aligns with market rate Add field preparation daily N/A $40 $60 $80 $100 N/A $40 $60 $80 $100 Aligns with market rate Add lights (additional to field rental fee) daily N/A $15 $15 $15 $15 N/A $15 $15 $15 $15 Aligns with market rate Add score booth (additional to field rental fee) daily N/A $15 $20 $25 $35 N/A $15 $20 $25 $35 Aligns with market rate Banner N/A $75 N/A N/A N/A N/A $75 N/A N/A N/A Aligns with market rate City of San LeandroMaster Fee ScheduleAdopted
Recreation Rental Rates
82 of 90
RECREATION RENTAL RATES
Fee No. Fee Name FY 26 Adopted FY 27 Proposed Fee Unit Type Notes Justification San Leandro Ball Park ABCDE ABCDEDeposit season N/A $525 $525 $525 $525 N/A $525 $525 $525 $525 Aligns with market rate Field rental hourly N/A $40 $60 $80 $100 N/A $40 $60 $80 $100 Aligns with market rate Add field preparation daily N/A $30 $60 $80 $100 N/A $40 $60 $80 $100 Alignment with other fields Add lights (additional to field rental fee) daily N/A $15 $15 $15 $15 N/A $15 $15 $15 $15 Aligns with market rate Kitchen Fee (additional to field rental, prep and bases) daily N/A $60 $60 $60 $60 N/A N/A N/A N/A N/A Aligns with market rate Banner N/A $75 N/A N/A N/A N/A $75 N/A N/A N/A Aligns with market rate Tennis and Pickleball Court ABCDE ABCDERental fee per court hourly N/A N/A N/A N/A N/A N/A $10 $10 $15 $20 New fee and aligns with market rate Gymnasium ABCDE ABCDERental fee hourly N/A N/A N/A N/A N/A N/A N/A $100 $130 $170 New fee and aligns with market rate Gym Deposit (Refundable) flat N/A N/A N/A N/A N/A N/A $500 $500 $500 $500 New fee and aligns with market rate Equipment Stage rental fee daily N/A N/A N/A N/A N/A N/A $1,000 $1,300 $1,700 $2,200 New fee aligns with market rate and cost recovery [1][2] All facility rentals and pool buy-outs, must provide proof of insurance or purchase Notes
USERS are classified into the following groups for the purpose of determining applicable Group Eligibility A: Programs administered by or for the City of San Leandro.Group Eligibility B: Public Agencies and San Leandro Non-Profits FOR ALL OTHER RECREATION AND HUMAN SERVICES FEES AND PROGRAMS, SEE THE CURRENT RECREATION PROGRAM GUIDE.
Group Eligibility C: San Leandro Resident Individual or Group Group Eligibility D: San Leandro Non-Resident Individual or GroupGroup Eligibility E: Business or Commercial Group City of San LeandroMaster Fee ScheduleAdopted
Recreation Rental Rates
83 of 90
RECREATION & PARKS - GOLF COURSE
Justification
San Leandro Resident Green Fees
1 Lema Course Weekday Rate (18-Holes)
Adult 40 $ $ Aligns with market rate 40
Senior 30 $ $ Aligns with market rate 30
Junior 10 $ $ Aligns with market rate 10
Twilight (five hours before sunset) 27 $ $ Aligns with market rate 27 Super Twilight (three hours before sunset) 20 $ $ Aligns with market rate 20 Back Nine (first two hours after sunrise) 20 $ $ Aligns with market rate 20 2 Lema Course Weekend Rate (18-Holes)
Adult 55 $ $ Aligns with market rate 55
Junior 10 $ $ 10
Twilight (five hours before sunset) 33 $ $ Aligns with market rate 33 Super Twilight (three hours before sunset) 25 $ $ Aligns with market rate 25 Back Nine (first two hours after sunrise) 33 $ $ Aligns with market rate 33 3 Marina Course Weekday Rate (9-Holes)
Adult 15 $ $ Aligns with market rate 19
Junior 5 $ $ Aligns with market rate 5
Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed
City of San LeandroMaster Fee ScheduleAdopted
REC Golf Course
84 of 90
RECREATION & PARKS - GOLF COURSE
Justification Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed
4 Marina Course Weekend Rate (9-Holes)
Adult 18 $ $ Aligns with market rate 25
Junior 10 $ $ Aligns with market rate 10
San Leandro Non-Resident Green Fees
5 Lema Course Weekday Rate (18-Holes)
Adult 46 $ $ Aligns with market rate 46
Senior 38 $ $ Aligns with market rate 38
Junior 10 $ $ Aligns with market rate 10
Twilight (five hours before sunset) 36 $ $ Aligns with market rate 36 Super Twilight (three hours before sunset) 25 $ $ Aligns with market rate 25 Back Nine (first two hours after sunrise) 25 $ $ Aligns with market rate 25 City of San LeandroMaster Fee ScheduleAdopted
REC Golf Course
85 of 90
RECREATION & PARKS - GOLF COURSE
Justification Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed
6 Lema Course Weekend Rate (18-Holes)
Adult (sunrise-11am) 81 $ $ Aligns with market rate 81
Adult (11am-Twilight) 75 $ $ Aligns with market rate 75 Junior 10 $ $ Aligns with market rate 10
Twilight (five hours before sunset) 45 $ $ Aligns with market rate 45 Super Twilight (three hours before sunset) 35 $ $ Aligns with market rate 35 Back Nine (first two hours after sunrise) 35 $ $ Aligns with market rate 35 7 Marina Course Weekday Rate (9-Holes)
Adult 15 $ $ Aligns with market rate 19
Junior 5 $ $ Aligns with market rate 5
8 Marina Course Weekend Rate (9-Holes)
Adult 18 $ $ Aligns with market rate 25
Junior 10 $ $ Aligns with market rate 10
City of San LeandroMaster Fee ScheduleAdopted
REC Golf Course
86 of 90
RECREATION & PARKS - GOLF COURSE
Justification Fee
No.
Fee Name
Fee Unit
Type
NotesFY 26 Adopted FY 27 Proposed
9 Electric Cart (per rider)
Adult 18-holes (dual riders) $ 18 $ Aligns with market rate 20 Adult 18-holes (single rider) $ 25 $ Aligns with market rate 27 Senior 18-holes $ 12 $ Aligns with market rate 14
9-holes $ 12 $ Aligns with market rate 14
Twilight $ 12 $ Aligns with market rate 14
Super Twilight $ 10 $ Aligns with market rate 12
10 Range
Small $ 8 $ Aligns with market rate 10
Medium $ 14 $ Aligns with market rate 16
Large $ 18 $ Aligns with market rate 20
Players Card (1 bucket per day) $ 55 $ Aligns with market rate 55 City of San LeandroMaster Fee ScheduleAdopted
REC Golf Course
87 of 90
Business Classification Annual
Base Fee
Unit Fee Annual Unit Fee Unit Fee Basis
Automobile Wrecking $ 856.90 $ - $ 882.61 Flat/Annual
Bingo $ 171.00 $ - $ 176.13 Flat/Annual
Carnival $ 171.00 $ 316.20 $ 176.13 $ 325.69 Flat/Daily Christmas Trees/Pumpkin Patch $ 856.90 $ - $ 882.61 Flat/Annual Coin Operated Device $ 171.00 $ 1.70 $ 176.13 $ 1.75 Per $1,000 of gross receipts Commercial Advertising $ 856.90 $ - $ 882.61 Flat/Annual Contractor $ 171.00 $ 105.60 $ 176.13 $ 108.77 Per each owner and each employee Dance Hall $ 856.90 $ - $ 882.61 Flat/Annual
Firearms Dealer $ 171.00 $ 5.20 $ 176.13 $ 5.36
Per $100 of Gross Receipts attributable to the sales of firearms capable of being concealed upon the person and ammunition for such firearms, excluding sales to public agencies
Fortune Telling $ 856.90 $ - $ 882.61 Flat/Annual
Itinerant Merchant $ 171.00 $ 54.50 $ 176.13 $ 56.14 Flat/Weekly Manufacturing $ 171.00 $ 52.70 $ 176.13 $ 54.28 Per each owner and each employee Miscellaneous $ 171.00 $ 52.70 $ 176.13 $ 54.28 Per each owner and each employee Mobile Food Vendors $ 171.00 $ - $ 176.13 Flat/Annual
Nonresidential Property Rental $ 171.00 $ 26.30 $ 176.13 $ 27.09 Per 1,000 square feet Residential Property Rental $ 171.00 $ 15.80 $ 176.13 $ 16.27 Per each unit or space Parking Lot $ 171.00 $ 118.00 $ 176.13 $ 121.54 Per $1,000 of gross receipts Pawnbroker $ 856.90 $ - $ 882.61 Flat/Annual
Peddler/Solicitor $ 171.00 $ 52.70 $ 176.13 $ 54.28 Per each owner and each employee Professional $ 171.00 $ 132.00 $ 176.13 $ 135.96 Per each owner and each employee Public Utilities $ 171.00 $ 52.70 $ 176.13 $ 54.28 Per each owner and each employee Recreation and Entertainment $ 171.00 $ 105.60 $ 176.13 $ 108.77 Per each owner and each employee Retail $ 171.00 $ 52.70 $ 176.13 $ 54.28 Per each owner and each employee Secondhand Dealer $ 856.90 $ - $ 882.61 Flat/Annual
Service $ 171.00 $ 105.60 $ 176.13 $ 108.77 Per each owner and each employee Towing $ 171.00 $ 1.70 $ 176.13 $ 1.75 Per $1,000 of gross receipts Warehouse/Storage $ 171.00 $ 137.00 $ 176.13 $ 141.11 Per 1,000 square feet Waste Disposal Site $ 171.00 $ 2.40 $ 176.13 $ 2.47 Per ton Wholesale/Distribution - General $ 171.00 $ 137.00 $ 176.13 $ 141.11 Per 1,000 square feet Wholesale/Distribution - Large local $ 171.00 $ 52.70 $ 176.13 $ 54.28 Per each owner and each employee, if sales tax revenue to the City is ≥ $50,000 based on prior fiscal year
CITY OF SAN LEANDRO
FINAL BUSINESS LICENSE FEE SCHEDULE
EFFECTIVE JULY 1, 2026 - JUNE 30, 2027
FY 26 Adopted FY 2027 Proposed Fee
Attachment A (BL tax)
88 of 90
July 1, 2026 - June 30, 2027
Property Use BU
FY 26
Adopted
Rate
FY 27
Proposed
Rate
Property Use BU
FY 26
Adopted
Rate
FY 27
Proposed
Rate
One Living Unit 1 $ 22.60 $ 23.28 Schools 5 $ 113.00 $ 116.39 Two to Five living units 3 $ 67.80 $ 69.83 Churches 4 $ 90.40 $ 93.11 Six or more living units 1 BU per
unit $ 22.60 $ 23.28 Other institutions 3 $ 67.80 $ 69.83 One-story stores 2 $ 45.20 $ 46.56 Lodge halls 7 $ 158.20 $ 162.95 Store first floor w/office/ apartments 4 $ 90.40 $ 93.11 Clubhouses 4 $ 90.40 $ 93.11 Miscellaneous commercial 2 $ 45.20 $ 46.56 Car washes 2 $ 45.20 $ 46.56 Department stores 5 $ 113.00 $ 116.39 Commercial garage/auto 2 $ 45.20 $ 46.56 Discount houses 5 $ 113.00 $ 116.39 Service stations 2 $ 45.20 $ 46.56 Restaurants 4 $ 90.40 $ 93.11 Funeral homes 2 $ 45.20 $ 46.56 Shopping centers 7 $ 158.20 $ 162.95 Nursing/boarding homes 6 $ 135.60 $ 139.67 Supermarkets 4 $ 90.40 $ 93.11 Hospitals 5 $ 113.00 $ 116.39 Commercial/industrial condominiums 4 $ 90.40 $ 93.11 Hotels 5 $ - Warehouses 2 $ 45.20 $ 46.56 Motels 5 $ 113.00 $ 116.39 Light industry 4 $ 90.40 $ 93.11 Mobile home parks 5 $ 113.00 $ 116.39 Heavy industry 6 $ 135.60 $ 139.67 Banks 4 $ 90.40 $ 93.11 Miscellaneous industrial 2 $ 45.20 $ 46.56 Medical/dental offices 4 $ 90.40 $ 93.11 Nurseries 2 $ 45.20 $ 46.56 1 to 3 story offices 4 $ 90.40 $ 93.11 Quarries 2 $ 45.20 $ 46.56 Over 3 story offices 7 $ 158.20 $ 162.95 Wrecking yards 2 $ 45.20 $ 46.56 Bowling alleys 4 $ 90.40 $ 93.11 Terminals, trucking 2 $ 45.20 $ 46.56 Theaters, walk-in 4 $ 90.40 $ 93.11 Improved government-owned property 2 $ 45.20 $ 46.56 Theaters, drive-in 4 $ 90.40 $ 93.11 Golf courses 2 $ 45.20 $ 46.56 Other recreational 4 $ 90.40 $ 93.11
CITY OF SAN LEANDRO
Emergency Medical Services Tax
Section 2-13-140 of Chapter 2-13 of the City of San Leandro Municipal Code Ordinance The tax per "Benefit Unit" (BU) per year shall be the amount of Twenty Three Dollars and Twenty-Eight Cents ($23.28) based on the Consumer Price Index (CPI) of 3% increase from the current rate of Twenty Two dollars and Sixty Cents. The number of benefit units shall be determined by the use to which the owner or occupant has put the property, as follows:
Attachment B (EMS)
89 of 90
Description FY 26 Adopted Rate FY 27 Proposed
Single Access Line $ 3.22 $ 3.32
Trunk Line (7½ times the capacity of a Single Access Line) $ 22.24 $ 22.91 Super Trunk Line (capacity of at least 24 channels over a high capacity service line) $ 78.00 $ 80.34
Cap Threshold $ 15,471.58 $ 15,935.73
CITY OF SAN LEANDRO
Emergency Communication System Access Tax
July 1, 2026 - June 30, 2027
Section 2-18-210 of Chapter 2-18 of the City of San Leandro Municipal Code Ordinance "The amount of tax imposed by this section shall be established by this ordinance as set forth below and shall be paid on a per-line basis". The described tax rates and the cap of $10,000 annually shall be adjusted annually by the City Council, by the percentage increase in the Consumer Price Index (CPI) of 3% as follows:
Attachment C (911 Access)
90 of 90