City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 26 - 4 GROUNDING AND BONDING
1. Connect the neutral to ground only at one point within the enclosure of the first disconnecting means on the load side of the service transformer.
J. Ground connections:
1. All connections to the ground grid system, the duct bank grounding system, equipment, ground rods, etc., shall be made using compression type grounding connectors as indicated on the Drawings, UL listed, and labeled for the application.
2. Make ground connections in accordance with the manufacturer's instructions.
3. Do not conceal or cover any ground connections until the Engineer or authorized representative has established and provided written confirmation that every grounding connection is as indicated on the Drawings and specified in the Specifications.
K. Grounding electrode system:
1. Ground ring:
a. Provide all trenching and materials necessary to install the ground ring as indicated on the Drawings.
b. Ground ring conductor shall be in direct contact with the earth, or where embedded, concrete, of the size as indicated on the Drawings.
c. Minimum burial depth 36 inches or as indicated on the Drawings. d. Re-compact disturbed soils to original density in 6-inch lifts.
2. Ground rods:
a. Locations as indicated on the Drawings.
b. Length of rods forming an individual ground array shall be equal in length. c. Drive ground rods and install grounding conductors before construction of concrete slabs and duct banks.
d. Pre-crimp all ground rods, as recommended by the manufacturer, before crimping connector to ground rod.
3. Metal underground water pipe:
a. Bond metal underground domestic water pipe to grounding electrode system.
4. Metal frame of building or structure:
a. Bond metal frame of building or structure to grounding electrode system.
5. Extend grounding conductors through concrete to accessible points for grounding equipment and electrical enclosures.
6. Where grounding conductors are not concrete-encased or direct buried, install in Schedule 40 PVC conduit for protection.
7. Install grounding system at each structure where switchgear, motor control centers, switchboards, panelboards, panels, or other electrical equipment are installed.
L. Shield grounding:
1. Shielded instrumentation cable shall have its shield grounded at one end only unless shop drawings indicate otherwise:
a. The grounding point shall be at the control panel or at the power source end of the signal carried by the cable.
2. Terminate the shield drain wire on a dedicated terminal block.
3. Use manufacturer’s terminal block jumpers to interconnect ground terminals.
4. Connection to the panel main ground bus shall be via a green No. 12 conductor to the main ground bus for the panel.
M. Antenna ground:
1. Install individual ground rod or ground system for communication system antenna:
a. Install a dedicated grounding electrode conductor from the antenna ground to the grounding electrode system.
b. Do not connect any other grounds to the antenna grounding electrode conductor.
2. Install ground rod or ground system in accordance with the radio manufacturer's requirements.
N. Where indicated on the Drawings, install ground rods in precast ground wells.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 26 - 5 GROUNDING AND BONDING O. Ground all gates, fences, and handrails, even if not shown on Drawings. Grounding conductor from ground grid to gates, fences and handrails shall be #2 AWG minimum.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 TESTING
A. As specified in Section 26 08 50.
3.08 FIELD QUALITY CONTROL
A. As specified in Section 26 05 00.
B. Measure grounding electrode system resistance to ground in accordance with IEEE 81.
3.09 ADJUSTING
A. Under the direction of the Engineer, add additional parallel connected ground rods and/or deeper driven rods until the ground resistance measurement meets the specified resistance requirements:
1. Use of salts, water, or compounds to attain the specified ground resistance is not acceptable.
3.10 CLEANING (NOT USED)
3.11 PROTECTION
A. As specified in Section 26 05 00.
3.12 SCHEDULES (NOT USED)
END OF SECTION 26 05 26
This page intentionally left blank
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 29 - 1 HANGERS AND SUPPORTS SECTION 26 05 29
HANGERS AND SUPPORTS
PART 1GENERAL
1.01 SUMMARY
A. Section includes:
1. Mounting and supporting electrical equipment and components.
B. Related sections:
1. Section 01 33 00 - Submittal Procedures.
2. Section 26 05 00 - Common Work Results for Electrical.
1.02 REFERENCES
A. As specified in Section 26 05 00.
B. ASTM International (ASTM):
1. A123 - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products.
2. A153 - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware.
3. A240 - Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications.
1.03 DEFINITIONS
A. As specified in Section 26 05 00.
1.04 SYSTEM DESCRIPTION
A. Design requirements:
1. Conform to the requirements of the Building Code.
2. Demonstrate the following using generally accepted engineering methods:
a. That the anchors to the structure are adequate to resist the loads generated in accordance with the Building Code and equipment requirements. b. That the required load capacity of the anchors can be fully developed in the structural materials to which they are attached.
3. Design loading and anchoring requirements:
a. As indicated in the Building Code unless otherwise specified. b. Seismic loading requirements:
1) Freestanding, suspended, or wall-hung equipment shall be anchored in place by methods that will satisfy the requirements for the seismic design specified in Section 26 05 00.
c. Wind loading requirements:
1) All exterior equipment shall be anchored in place by methods that will satisfy the requirements for wind design specified in Section 26 05 00. d. Minimum safety factor against overturning: 1.5.
e. The foundation and structures to which hangers and supports are attached shall be capable of withstanding all anchor loads.
B. Performance requirements:
1. Hangers and supports individually and as a system shall resist all weights and coderequired forces without deflections and deformations that would damage the supporting elements, the equipment supported, or the surrounding construction.
1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01 33 00 and 26 05 00.
B. Product data:
1. Supports:
a. Materials.
b. Geometry.
c. Manufacturer.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 29 - 2 HANGERS AND SUPPORTS
2. Hardware:
a. Materials.
b. Manufacturer.
C. Shop drawings:
1. Complete dimensioned and scalable shop drawings of all supporting structures, trapezes, wall supports, etc.
2. Complete anchoring details for equipment, lighting and raceway, supporting structures, trapezes, wall supports for all equipment in excess of 200 pounds, and all freestanding supports:
a. Stamped by a professional engineer licensed in the state where the Project is being constructed.
b. Said submittals, by virtue of the fact that they bear the stamp of a registered engineer, will be reviewed for general consistency with the requirements specified in the Contract Documents, but not for context, accuracy, or method of calculation.
3. Include data on attachment hardware and construction methods that will satisfy the design loading and anchoring criteria.
D. Installation instructions:
1. Furnish anchorage instructions and requirements based on the seismic and wind conditions of the Site:
a. Stamped by a professional engineer licensed in the state where the Project is being constructed.
1.06 QUALITY ASSURANCE
A. As specified in Section 26 05 00.
1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26 05 00.
1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 26 05 00.
1.09 SEQUENCING (NOT USED)
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 26 05 00.
1.12 SYSTEM STARTUP
A. As specified in Section 26 05 00.
1.13 OWNER'S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED)
PART 2PRODUCTS
2.01 MANUFACTURERS
A. One of the following or equal:
1. Thomas & Betts.
2. Power-Strut.
3. Unistrut.
4. Cooper B-Line.
5. Robroy.
6. Aickinstrut.
2.02 EXISTING PRODUCTS (NOT USED)
2.03 MATERIALS
A. Use materials appropriate for the area as specified in Section 26 05 00.
B. Hot dip galvanized steel:
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 29 - 3 HANGERS AND SUPPORTS
1. Supports:
a. In accordance with ASTM A123 or A153.
b. Minimum zinc coating thickness of 2.5 mils.
2. Hardware:
a. Electro-galvanized.
b. In accordance with ASTM A153.
C. Stainless steel:
1. Supports:
a. In accordance with ASTM A240.
b. ANSI Type 316 material.
2. Hardware:
a. ANSI Type 316 material.
2.04 MANUFACTURED UNITS (NOT USED)
2.05 EQUIPMENT (NOT USED)
2.06 COMPONENTS (NOT USED)
2.07 ACCESSORIES
A. Anchor bolts:
1. Indoor, Dry Locations: Anchor bolts shall be ASTM A307 galvanized steel.
2. Outdoor, Wet or Corrosive Areas: Anchor bolts shall be Type 316 ASTM A276 stainless steel.
2.08 MIXES (NOT USED)
2.09 FABRICATION (NOT USED)
2.10 FINISHES
A. Paint and finish all supporting structures per Owner’s requirements.
2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. As specified in Section 26 05 00.
B. Mount all raceways, cabinets, boxes, fixtures, instruments, and devices on Contractorfabricated racks unless otherwise indicated on the Drawings.
1. Provide the necessary sway bracing to keep trapeze type structures from swaying under seismic events or wind loading.
C. Brace and anchor freestanding equipment supports using methods that provide structural support based on the seismic loads and wind loads:
1. Lateral deflection at top of supports not to exceed support height divided by 240 unless otherwise approved by the Engineer.
D. Provide fabricated steel support pedestals for wall mounted panels that weigh more than 200 pounds:
1. Fabricate pedestals out of welded angle, tube sections, or preformed channel.
2. If the supported equipment is a panel or cabinet, match the supported equipment in physical appearance and dimensions.
3. Provide auxiliary floor supports for transformers hung from stud walls and weighing more than 200 pounds.
4. Mount all equipment, cabinets, boxes, instruments, and devices in damp or wet locations on minimum of 7/8-inch preformed mounting channel.
a. Mount channel vertically along the length of the device so that water or moisture may run freely behind the device.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 29 - 4 HANGERS AND SUPPORTS E. Corrosion protection:
1. Isolate dissimilar metals, except where required for electrical continuity. a. Use neoprene washers, 9-mil polyethylene tape, or gaskets for isolation.
F. Raceway:
1. Furnish all racks and trapeze structures needed to support the raceway from the structure. a. Group raceway and position on racks to minimize crossovers. b. Provide the necessary bracing to keep trapeze type structures from swaying under loads from cable installation, seismic forces, or wind forces.
G. Anchoring methods:
1. Solid concrete: Anchor bolts, anchor rods, or post-installed anchors as specified herein.
2. Metal surfaces: Machine screws or bolts.
3. Hollow masonry units: Post-installed anchors as specified on drawings.
H. Recoat or seal all drilled holes, cut or scratched surfaces or with products recommended by the manufacturer.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 FIELD QUALITY CONTROL
A. As specified in Section 26 05 00.
3.08 ADJUSTING (NOT USED)
3.09 CLEANING (NOT USED)
3.10 PROTECTION
A. As specified in Section 26 05 00.
3.11 SCHEDULES (NOT USED)
END OF SECTION 26 05 29
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 1 CONDUITS SECTION 26 05 33
CONDUITS
PART 1GENERAL
1.01 SUMMARY
A. Section includes:
1. Metallic conduits.
2. Nonmetallic conduits.
3. Conduit bodies.
4. Conduit fittings and accessories.
5. Conduit installation.
B. Related sections:
1. Section 01 33 00 - Submittal Procedures.
2. Section 26 05 00 - Common Work Results for Electrical.
3. Section 26 05 29 - Hangers and Supports.
4. Section 26 05 53 - Identification for Electrical Systems.
1.02 REFERENCES
A. As specified in Section 26 05 00.
B. American National Standards Institute (ANSI):
1. C80.1 - Electrical Rigid Steel Conduit.
2. C80.3 - Steel Electrical Metallic Tubing.
3. C80.5 - Electrical Rigid Aluminum Conduit.
4. C80.6 - Electrical Intermediate Metal Conduit.
C. National Electrical Manufacturer’s Association (NEMA):
1. RN-1 - Polyvinyl Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Steel Conduit.
2. TC2 - Electrical Polyvinyl Chloride (PVC) Conduit.
3. TC3 - Polyvinyl Chloride (PVC) Fittings for Use with Rigid PVC Conduit and Tubing.
4. TC7 - Smooth-Wall Coilable Electrical Polyethylene Conduit.
5. TC13 - Electrical Nonmetallic Tubing.
6. TC14 - Reinforced Thermosetting Resin Conduit (RTRC) and Fittings.
D. Underwriters Laboratories (UL):
1. 1 - Standard for Flexible Metal Conduit.
2. 6 - Standard for Electrical Rigid Metal Conduit - Steel.
3. 6A - Standard for Electrical Rigid Metal Conduit - Aluminum, Red Brass, and Stainless Steel.
4. 360 - Standard for Liquidtight Flexible Steel Conduit.
5. 651 - Standard for Schedule 40 and 80 Rigid PVC Conduit and Fittings.
6. 651B - Standard for Continuous Length HDPE Conduit.
7. 797 - Standard for Electrical Metallic Tubing - Steel.
8. 1242 - Standard for Electrical Intermediate Metal Conduit - Steel.
9. 1653 - Standard for Electrical Nonmetallic Tubing.
10. 1660 - Standard for Liquidtight Flexible Nonmetallic Conduit.
11. 1684 - Standard for Reinforced Thermosetting Resin Conduit (RTRC) and Fittings.
1.03 DEFINITIONS
A. As specified in Section 26 05 00.
B. Specific definitions and abbreviations:
1. Conduit bodies: A separate portion of a conduit system that provides access through a removable cover to the interior of the system at a junction of 2 or more conduit sections.
Includes, but not limited to, Shapes C, E, LB, T, X, etc.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 2 CONDUITS
2. Conduit fitting: An accessory that primarily serves a mechanical purpose. Includes, but not limited to, bushings, locknuts, hubs, couplings, reducers, etc.
3. GRC: Galvanized rigid steel conduit.
4. PCS: Polyvinyl chloride (PVC) coated rigid steel conduit.
5. PVC: Polyvinyl chloride rigid nonmetallic conduit.
6. SLT: Sealtight-liquidtight flexible conduit.
7. NPT: National pipe thread.
1.04 SYSTEM DESCRIPTION
A. Provide conduits, conduit bodies, fittings, junction boxes, and all necessary components, whether or not indicated on the Drawings, as required, to install a complete electrical raceway system.
1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01 33 00 and 26 05 00.
B. Product data:
1. Furnish complete manufacturer’s catalog sheets for every type and size of conduit, fitting, conduit body, and accessories to be used on the Project.
2. Furnish complete manufacturer’s recommended special tools to be used for installation if required.
3. Certified test results for PVC-coated metallic conduit showing the adhesive bond is stronger than the tensile strength of the PVC.
C. Certifications:
1. Furnish PVC-coated conduit manufacturer’s certification for each installer.
D. Record Documents:
1. Incorporate all changes in conduit routing on electrical plan drawings.
2. Dimension underground and concealed conduits from building lines.
1.06 QUALITY ASSURANCE
A. As specified in Section 26 05 00.
B. All conduits, conduit bodies, and fittings shall be UL listed and labeled.
C. Every installer of PVC-coated metallic conduit shall be certified by the manufacturer for installation of the conduit.
1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26 05 00.
B. Do not expose nonmetallic to direct sunlight.
C. Do not store conduit in direct contact with the ground.
1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 26 05 00.
1.09 SEQUENCING
A. Before installing any conduit or locating any device box:
1. Examine the complete set of Drawings and Specifications, and all applicable shop drawings.
2. Verify all dimensions and space requirements and make any minor adjustments to the conduit system as required to avoid conflicts with the building structure, other equipment, or the work of other trades.
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 26 05 00.
1.12 SYSTEM START-UP
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 3 CONDUITS A. As specified in Section 26 05 00.
1.13 OWNER’S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED)
PART 2PRODUCTS
2.01 MANUFACTURERS
A. Galvanized rigid steel conduit:
1. One of the following or equal:
a. Western Tube and Conduit.
b. Allied Tube and Conduit.
c. Wheatland Tube Co.
B. PVC-coated rigid steel conduit:
1. One of the following or equal:
a. Robroy Industries.
b. Ocal, Inc.
c. Calbond.
C. Sealtight-liquidtight flexible conduit:
1. One of the following or equal:
a. Southwire.
b. AFC Cable Systems.
c. Electri-Flex Company.
d. Anaconda.
D. Conduit bodies:
1. One of the following or equal:
a. Crouse-Hinds.
b. Appleton.
c. O-Z/Gedney.
d. Ocal, Inc..
e. Robroy Industries.
f. Calbond.
g. Carlon.
E. Joint compound:
1. Thomas and Betts.
F. Galvanized rigid steel conduit expansion fittings:
1. One of the following or equal:
a. Crouse-Hinds.
b. Appleton.
c. O-Z/Gedney.
G. Conduit hangers and supports:
1. As specified in Section 26 05 29.
2.02 EXISTING PRODUCTS (NOT USED)
2.03 MATERIALS (NOT USED)
2.04 MANUFACTURED UNITS (NOT USED)
2.05 EQUIPMENT (NOT USED)
2.06 COMPONENTS
A. GRC:
1. All threads: NPT standard conduit threads with a 3/4-inch taper per foot:
a. Running conduit threads are not acceptable.
2. Hot-dip galvanized inside and out:
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 4 CONDUITS a. Ensures complete coverage and heats the zinc and steel to a temperature that ensures the zinc alloys with the steel over the entire surface. b. Electro-galvanizing is not acceptable.
3. Manufactured in accordance with:
a. UL-6.
b. ANSI C80.1.
B. PCS:
1. The steel conduit, before PVC coating, shall be new, unused, hot-dip galvanized material, conforming to the requirements for Type GRC.
2. Coated conduit NEMA Standard RN-1:
a. The galvanized coating may not be disturbed or reduced in thickness during the cleaning and preparatory process.
3. Factory-bonded PVC jacket:
a. The exterior galvanized surfaces shall be coated with primer before PVC coating to ensure a bond between the zinc substrate and the PVC coating. b. Nominal thickness of the exterior PVC coating shall be 0.040 inch except where part configuration or application of the piece dictates otherwise. c. PVC coating on conduits and associated fittings shall have no sags, blisters, lumps, or other surface defects and shall be free of holes and holidays. d. The PVC adhesive bond on conduits and fittings shall be greater than the tensile strength of the PVC plastic coating:
1) Confirm bond with certified test results.
4. A urethane coating shall be uniformly and consistently applied to the interior of all conduits and fittings:
a. Nominal thickness of 0.002 inch.
b. Conduits having areas with thin or no coating are not acceptable. c. All threads shall be coated with urethane.
5. The PVC exterior and urethane interior coatings applied to the conduits shall afford sufficient flexibility to permit field bending without cracking or flaking at temperature above 30 degrees Fahrenheit (-1 degree Celsius).
6. PCS conduit bodies and fittings:
a. Malleable iron.
b. The conduit body, before PVC coating, shall be new, unused material and shall conform to appropriate UL standards.
c. The PVC coating on the outside of conduit bodies shall be 0.040-inch thick and have a series of longitudinal ribs to protect the coating from tool damage during installation. d. 0.002-inch interior urethane coating.
e. Utilize the PVC coating as an integral part of the gasket design. f. Stainless steel cover screw heads shall be encapsulated with plastic to ensure corrosion protection.
g. A PVC sleeve extending 1 conduit diameter or 2 inches, whichever is less, shall be formed at each female conduit opening.
1) The inside diameter of the sleeve shall be the same as the outside diameter of the conduit to be used.
2) The sleeve shall provide a vapor- and moisture-tight seal at every connection.
C. SLT:
1. Temperature rated for use in the ambient temperature at the installed location but not less than the following:
a. General purpose:
1) Temperature range: -20 degrees Celsius to +80 degrees Celsius. b. Oil-resistant:
1) Temperature range: -20 degrees Celsius to +60 degrees Celsius.
2. Sunlight-resistant, weatherproof, and watertight.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 5 CONDUITS
3. Manufactured from single strip steel, hot-dip galvanized on all 4 sides before conduit fabrication.
4. Strip steel spiral wound resulting in an interior that is smooth and clean for easy wire pulling.
5. Overall PVC jacket.
6. With integral copper ground wire, built in the core, in conduit trade sizes 1/2 inch through 1-1/4 inch.
D. PVC:
1. Extruded from virgin PVC compound:
a. Schedule 40 unless otherwise specified.
b. Schedule 80 extra-heavy wall where specified.
2. Rated for 90 degrees Celsius conductors or cable.
3. Rated for use in direct sunlight.
E. Conduit bodies:
1. Material consistent with conduit type:
a. Malleable iron bodies and covers when used with Type GRC. b. PVC-coated malleable iron bodies and covers when used with Type PCS.
2. Conduit bodies to conform to Form 8, Mark 9, or Mogul design:
a. Mogul design conforming to NEC requirements for bending space for large conductors for conduit trade sizes of 1 inch and larger with conductors #4 AWG and larger, or where required for wire-bending space.
3. Gasketed covers attached to bodies with stainless steel screws secured to threaded holes in conduit body.
2.07 ACCESSORIES
A. Connectors and fittings:
1. Manufactured with compatible materials to the corresponding conduit.
B. Insulated throat metallic bushings:
1. Construction:
a. Malleable iron or zinc-plated steel when used with steel conduit. b. Positive metallic conduit end stop.
c. Integrally molded non-combustible phenolic-insulated surfaces rated at 150 degrees Celsius.
d. Use fully insulated bushings on nonmetallic conduit system made of high-impact 150 degrees Celsius rated non-combustible thermosetting phenolic.
C. Insulated grounding bushings:
1. Construction:
a. Malleable iron or steel, zinc-plated, with a positive metallic end stop. b. Integrally molded non-combustible phenolic-insulated surfaces rated at 150 degrees Celsius.
c. Tin-plated copper grounding saddle for use with copper or aluminum conductors.
D. Electrical unions (Erickson Couplings):
1. Construction:
a. Malleable iron for use with steel conduit.
b. Concrete tight, 3-piece construction.
c. Rated for Class I Division 1 Group D in hazardous areas.
E. SLT fittings:
1. Construction:
a. Malleable iron.
b. Furnished with locknut and sealing ring.
c. Liquidtight, rain-tight, oil-tight.
d. Insulated throat.
e. Furnish as straight, 45-degree elbows, and 90-degree elbows.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 6 CONDUITS f. Designed to prevent sleeving:
1) Verify complete bonding of the raceway jacket to the plastic gasket seal. g. Equipped with grounding device to provide ground continuity irrespective of raceway core construction. Grounding device, if inserted into raceway and directly in contact with conductors, shall have rolled-over edges for sizes under 5 inches. h. Where terminated into a threadless opening using a threaded hub fitting, a suitable moisture-resistant/oil-resistant synthetic rubber gasket shall be provided between the outside of the box or enclosure and the fitting shoulder. Gasket shall be adequately protected by and permanently bonded to a metallic retainer.
2. Corrosion-resistant and outdoor SLT fittings:
a. Construction:
1) PVC-coated liquidtight fittings with a bonded 0.040-inch thick PVC coating on the metal connector to form a seal around the SLT conduit. 2) Insulated throat and an integral sealing ring.
F. Hubs for threaded attachment of steel conduit to sheet metal enclosures:
1. Construction:
a. Insulated throat.
b. PVC-coated when used in corrosive areas.
c. Bonding locknut.
d. Recessed neoprene O-ring to ensure watertight and dust-tight connector. e. One half (1/2)-inch through 1-1/4-inch steel zinc electroplated. f. One and one half (1-1/2)-inch through 6-inch malleable iron zinc plated.
2. Usage:
a. All conduits in damp, wet, outdoor, and corrosive areas shall use threaded hubs for connections to sheet metal enclosures.
G. PVC fittings:
1. Materials:
a. All devices shall be made of PVC, using the same materials as used for Type PVC conduit.
b. All metal hardware shall be stainless steel.
H. Expansion/deflection couplings:
1. Use to compensate for movement in any directions between 2 conduit ends where they connect.
2. Shall allow movement of 3/4 inch from the normal in all directions.
3. Shall allow angular movement for a deflection of 30 degrees from normal in any direction.
4. Constructed to maintain electrical continuity of the conduit system.
5. Materials:
6. End couplings: Bronze or galvanized ductile iron.
a. Sleeve: Neoprene.
b. Bands: Stainless steel.
c. Bonding jumper: Tinned copper braid.
I. Expansion couplings:
1. Shall allow for expansion and contraction of conduit:
a. Permitting 8-inch movement, 4 inches in either direction.
2. Constructed to maintain electrical continuity of the conduit system.
3. Materials:
a. Head: Malleable or ductile iron.
b. Sleeve: Steel.
c. Insulating bushing: Phenolic.
d. Finish: Hot-dip galvanized.
J. Conduit markers:
1. As specified in Section 26 05 53.
2.08 MIXES (NOT USED)
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 7 CONDUITS
2.09 FABRICATION (NOT USED)
2.10 FINISHES (NOT USED)
2.11 SOURCE QUALITY CONTROL
A. As specified in Section 26 05 00.
PART 3EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. As specified in Section 26 05 00.
B. General:
1. Conduit routing:
a. The electrical drawings are diagrammatic in nature:
1) Install conduit runs as specified with schematic representation indicated on the Drawings and as specified.
2) Modify conduit runs to suit field conditions, as accepted by the Engineer:
(a) Make changes in conduit locations that are consistent with the design intent but are dimensionally different, or routing to bypass obstructions. (b) Make changes in conduit routing due to the relocation of equipment. 3) The electrical drawings do not indicate all required junction boxes and pull boxes:
(a) Provide junction boxes and pull boxes to facilitate wire pulling as required:
(1) To meet cable manufacturer’s pulling tension requirements. (2) To limit total conduit bends between pull locations. (b) Install junction boxes and pull boxes at locations acceptable to the Engineer.
b. The Contractor is responsible for any deviations in general location, conduit size, routing, or changes to the conduit schedule without the express written approval or direction by the Engineer:
1) The Engineer is the sole source in determining whether the change is constituted as a deviation:
2) Perform any changes resulting in additional conduits, or extra work from such deviations.
3) Incorporate any deviations on the Record Documents.
2. Use only tools recommended by the conduit manufacturer for assembling the conduit system.
3. Provide adequate clearances from high-temperature surfaces for all conduit runs.
4. Do not install 1-inch or larger conduits in or through structural members unless approved by the Engineer.
5. Run conduits exposed to view parallel with or at right angles to structural members, walls, or lines of the building:
a. Install straight and true conduit runs with uniform and symmetrical elbows, offsets, and bends.
b. Make changes in direction with long radius bends or with conduit bodies.
6. Install conduits with total conduit bends between pull locations less than or equal to 270 degrees.
7. Route all exposed conduits to preserve headroom, access space and work space, and to prevent tripping hazards and clearance problems:
a. Install conduit runs so that runs do not interfere with proper and safe operation of equipment and do not block or interfere with ingress or egress, including equipmentremoval hatches. b. Route conduits to avoid drains or other gravity lines. Where conflicts occur, relocate the conduit as required.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 8 CONDUITS
8. When installing conduits through existing slabs or walls, make provisions for locating any possible conflicting items where the conduit is to penetrate. Use tone signal or X-ray methods to make certain that no penetrations will be made into the existing conduits, piping, cables, post-tensioning cables, etc.
9. Plug conduits brought into pull boxes, manholes, handholes, and other openings until used to prevent entrance of moisture.
10. For 2-inch and larger conduit runs, snake conduits with a conduit cleaner equipped with a cylindrical mandrel of a diameter not less than 85 percent of nominal diameter of the conduit:
a. Remove and replace conduits through which mandrel will not pass.
11. Provide all sleeves and openings required for the passage of electrical raceways or cables even when these openings or sleeves are not specifically indicated on the Drawings.
12. Install complete conduit systems before conductors are installed.
13. Provide metallic conduits terminating in transformer, switchgear, motor control center, or other equipment conduit windows with grounding bushings and ground with a minimum No. 6 AWG ground wire.
14. Underground conduits:
a. Install underground conduits, including conduit runs below slabs-on-grade in concrete-reinforced duct bank construction per plan.
b. Make underground conduit size transitions at handholes and manholes. c. Install spare conduits in underground duct banks towards top center of runs to allow for ease of installation of future cables as conduits enter underground manholes and handholes.
d. Seal around conduit penetrations of below grade walls with a mechanical seal.
C. Lighting and receptacle conduits:
1. Provide conduit runs for lighting and receptacle circuits, whether or not indicated on the Drawings:
2. Install conduits in accordance with the requirements of this Section unless otherwise indicated.
3. Minimum conduit size:
a. 3/4-inch for exposed conduits.
b. 1-inch for underground or in-slab conduits.
4. Provide conduit materials for the installed location as specified in Section 26 05 00.
D. Conduit usage:
1. Exposed conduits:
a. Rigid conduit:
1) Install the rigid conduit type for each location as specified in Section 26 05 00. 2) Minimum size: 3/4-inch.
b. Flexible conduit:
1) Use flexible conduit for final connections between rigid conduit and motors, vibrating equipment, instruments, control equipment, or where required for equipment servicing:
(a) Use Type SLT with rigid metallic conduit.
2) Minimum size: 3/4-inch:
(a) 1/2 when required for connection to instruments.
3) Maximum length:
(a) Fixed equipment:
Conduit Trade Size Flexible Conduit Length
(inch)
3/4 18
1 18
1-1/4 18
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 9 CONDUITS 1-1/2 18
2 36
2-1/2 36
3 36
3-1/2 38
4 40
(b) Removable instruments or hinged equipment:
(1) As required to allow complete removal or full movement without disconnecting or stressing the conduit.
2. Concrete-encased and embedded conduits:
a. Type PVC Schedule 40 and PVC-coated rigid metallic conduit as specified below:
1) Use Type PCS in underground and embedded installation as follows:
(a) Stub-up and risers to grade floor or equipment from nonmetallic conduits. (b) Entering and exiting underground or embedded conduit runs a minimum 12 inches above and below grade of finished floor.
(c) For any and all bends where the total deflection is greater than 45 degrees. b. Minimum size:
1) 2-inch in duct banks unless otherwise indicated on the Drawings. 2) 1-inch for in-slab conduits unless otherwise indicated on the Drawings.
3. Direct-buried and sand-bedded duct bank conduits:
a. Type PVC Schedule 40.
b. Minimum size: 1-inch.
4. PVC-coated rigid metallic conduit:
a. Use specifically manufactured or machined threading dies to manufacturer’s specifications to accommodate the PVC jacket.
5. GRC:
a. Conduit shall be cut square and reamed before threading.
6. PVC:
a. Conduit terminations shall be via threaded adapters into threaded hubs on the junction boxes or conduit bodies.
b. Conduit terminations into boxes without threaded hubs shall utilize a threaded adapter and a flat neoprene washer on the outside of the box. 1) Use a locknut on the inside of the box to tighten the adapter to the box. c. Route conduit to afford it the maximum physical protection. 1) If necessary, cover conduit to afford additional protection when it cannot be shielded by the structure or machinery frames.
(a) Use Schedule 80 where exposed runs may be subject to physical damage.
E. Conduit joints and bends:
1. General:
a. Where conduit is underground, under slabs on grade, exposed to the weather, or in NEMA Type 4 or NEMA Type 4X locations, make joints liquidtight. b. Keep bends and offsets in conduit runs to an absolute minimum. c. All bends shall be symmetrical.
d. The following conduit systems shall use large-radius sweep elbows:
1) Underground conduits.
2) Conduits containing shielded cables.
e. Provide large-radius factory-made bends for 1-1/4-inch trade size or larger. f. Make field bends with a radius of not less than the requirements found in the NEC:
1) The minimum bending radius of the cable must be less than the radius of the conduit bend.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 10 CONDUITS 2) Make all field bends with power bending equipment or manual benders specifically intended for the purpose:
(a) Make bends so that the conduit is not damaged and the internal diameter is not effectively reduced.
(b) For the serving utilities, make bends to meet their requirements. g. Replace all deformed, flattened, or kinked conduit.
2. Threaded conduit:
a. Cut threads on rigid metallic conduit with a standard conduit-cutting die that provides a 3/4-inch per foot taper and to a length such that all bare metal exposed by the threading operation is completely covered by the couplings or fittings used. In addition, cut the lengths of the thread such that all joints become secure and wrenchtight just preceding the point where the conduit ends would butt together in couplings or where conduit ends would butt into the ends or shoulders of other fittings. b. Thoroughly ream conduit after threads have been cut to remove burrs. c. Use bushings or conduit fittings at conduit terminations. d. On exposed conduits, repair scratches and other defects with galvanizing repair stick, Enterprise Galvanizing “Galvabar,” or CRC “Zinc It.”
e. Coat conduit threads with an approved electrically conductive sealant and corrosion inhibitor that is not harmful to the conductor insulation:
1) Apply to the male threads and tighten joints securely. 2) Clean excess sealant from exposed threads after assembly. f. Securely tighten all threaded connections.
g. Any exposed threaded surfaces must be cleaned and coated with a galvanizing solution so that all exposed surfaces have a galvanized protective coating.
3. PVC:
a. Use approved solvent-weld cement specifically manufactured for the purpose. Spraytype cement is not allowed. b. Apply heat for bends so that conduit does not distort or discolor. Use a spring mandrel as required to ensure full inside diameter at all bends:
1) Utilize a heater specifically for PVC conduit as recommended by the conduit manufacturer.
F. Conduit sealing and drainage:
1. Conduit drainage and sealing:
a. Provide sealing and drainage in vertical drops of long (in excess of 20 feet), exterior, above-grade conduit runs at the points at which the conduit enters buildings, switchgear, control panels, lighting panelboards, and other similar enclosures. b. Provide seal fittings with drains in vertical drops directly above grade for exterior and above-grade conduit runs that are extended below grade. c. Provide conduit seals with drains in areas of high humidity and rapidly changing temperatures:
1) Where portions of an interior raceway pass through walls, ceilings, or floors that separate adjacent areas having widely different temperatures.
G. Conduit supports:
1. General:
a. Provide appropriate hangers, supports, fasteners, and seismic restraints to suit applications:
1) As specified in Section 26 05 29.
2) Provide support materials consistent with the type of conduit being installed as specified in Section 26 05 00.
b. Support conduit at the intervals required by the NEC. c. Perforated strap and plumbers tape are not acceptable for conduit supports.
2. Conduit on concrete or masonry:
a. Use 1-hole malleable iron straps with metallic or plastic expansion anchors and screws or support from preset inserts.
b. Use preset inserts in concrete when possible.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 33 - 11 CONDUITS c. Use pipe spacers (clamp backs) in wet locations.
d. On plaster or stucco, use 1-hole malleable iron straps with toggle bolts.
3. Conduit on metal decking:
a. Use 1-hole malleable iron straps with 1-inch long cadmium-plated Type A panhead sheet-metal screws. Fully or partially hammer-driven screws are not acceptable.
4. Suspended conduit:
a. Use malleable-iron factory-made split-hinged pipe rings with threaded suspension rods sized for the weight to be carried (minimum 3/8-inch diameter), Kindorf, or equal. b. For grouped conduits, construct racks with threaded rods and tiered angle iron or preformed channel cross members. Clamp each conduit individually to a cross member. Where rods are more than 2-feet long, provide rigid sway bracing.
5. Supports at structural steel members:
a. Use beam clamps.
b. Drilling or welding may be used only as specified or with approval of the Engineer.
6. PVC-coated rigid metal systems:
a. Provide right-angle beam clamps and “U” bolts specially formed and sized to snugly fit the outside diameter of the coated conduit. Provide "U" bolts with PVCencapsulated nuts that cover the exposed portions of the threads. b. Securely fasten exposed conduits with Type 316 stainless steel clamps or straps.
H. Expansion or expansion/deflection fittings:
1. General:
a. Align expansion coupling with the conduit run to prevent binding. b. Follow manufacturer’s instructions to set the piston opening. c. Install expansion fittings across concrete expansion joints and at other locations where necessary to compensate for thermal or mechanical expansion and contraction.
d. Furnish fittings of the same material as the conduit system.
I. Empty conduits:
1. Provide a polyethylene rope rated at 250 pounds tensile strength in each empty conduit more than 10 feet in length.
2. Seal ends of all conduits with approved, manufactured conduit seals, caps, or plugs immediately after installation:
a. Keep ends sealed until immediately before pulling conductors.
J. Miscellaneous:
1. Provide electrical unions at all points of union between ends of rigid conduit systems that cannot otherwise be coupled:
a. Running threads and threadless couplings are not allowed.
2. Replace any conduits installed that the Engineer determines do not meet the requirements of this Specification.
3.04 ERECTION, INSTALLATION, APPLICATIONS, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 FIELD QUALITY CONTROL
A. As specified in Section 26 05 00.
3.08 ADJUSTING (NOT USED)
3.09 CLEANING (NOT USED)
3.10 PROTECTION
A. As specified in Section 26 05 00.
3.11 SCHEDULES (NOT USED)
END OF SECTION 26 05 33
This page intentionally left blank
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 34 - 1 BOXES
SECTION 26 05 34
BOXES
PART 1GENERAL
1.01 SUMMARY
A. Section includes:
1. Device boxes.
2. Raceway system boxes.
B. Related sections:
1. Section 01 33 00 - Submittal Procedures.
2. Section 26 05 00 - Common Work Results for Electrical.
1.02 REFERENCES
A. As specified in Section 26 05 00.
B. ASTM International (ASTM):
1. A47 - Standard Specification for Ferritic Malleable Iron Castings.
2. D149 - Standard Test Method for Dielectric Breakdown Voltage and Dielectric Strength of Solid Electrical Insulating Materials at Commercial Power Frequencies.
3. D495 - Standard Test Method for High-Voltage, Low-Current, Dry Arc Resistance of Solid Electrical Insulation.
4. D570 - Standard Test Method for Water Absorption of Plastics.
5. D648 - Standard Test Method for Deflection Temperature of Plastics Under Flexural Load in the Edgewise Position.
6. D790 - Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials.
7. D792 - Standard Test Methods for Density and Specific Gravity (Relative Density) of Plastics by Displacement.
C. Joint Industry Conference (JIC).
D. Underwriters Laboratories, Inc. (UL):
1. 94 - Standard for Tests for Flammability of Plastic Materials for Parts in Devices and Appliances.
1.03 DEFINITIONS
A. As specified in Section 26 05 00.
B. Specific definitions:
1. Raceway system boxes: Boxes that are used for wire and cable pullboxes, conduit junction boxes, or terminal boxes.
1.04 SYSTEM DESCRIPTION
A. Provide outlet boxes for devices such as switches, receptacles, telephone and computer jacks, security systems, junction, and pullboxes for use in the raceway systems, etc.
B. Provide boxes as indicated on the Drawings or as needed to complete the raceway installation.
1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01 33 00 and 26 05 00.
B. Product data:
1. Manufacturer.
2. Materials.
3. Dimensions:
a. Height.
b. Width.
c. Depth.
d. Weight.
e. NEMA rating.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 34 - 2 BOXES
4. Conduit entry locations.
5. Catalog cut sheets.
6. Installation instructions.
C. Shop drawings:
1. Include identification and sizes of pull boxes.
1.06 QUALITY ASSURANCE
A. As specified in Section 26 05 00.
B. Regulatory requirements:
1. Outlet boxes shall comply with all applicable standards of:
a. JIC.
b. NEC.
c. NEMA.
d. UL.
1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26 05 00.
1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 26 05 00.
1.09 SEQUENCING
A. As specified in Section 26 05 00.
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 26 05 00.
1.12 SYSTEM START-UP
A. As specified in Section 26 05 00.
1.13 OWNER’S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED)
PART 2PRODUCTS
2.01 MANUFACTURERS
A. One of the following or equal:
1. Plastic coated boxes:
a. Rob Roy.
b. OCAL.
2. Cast device boxes:
a. Appleton.
b. Crouse - Hinds.
c. OZ/Gedney.
3. Formed steel enclosures:
a. Hoffman.
b. Thomas and Betts.
c. Stahlin.
d. Rittal.
4. Stainless steel enclosures:
a. Hoffman.
b. Stahlin.
c. Rittal.
2.02 EXISTING PRODUCTS (NOT USED)
2.03 MATERIALS (NOT USED)
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 34 - 3 BOXES
2.04 MANUFACTURED UNITS
A. Cast device boxes:
1. Construction:
a. With internal green ground screw.
b. Furnished with a suitable gasketed cover.
c. With integral cast mounting lugs when surface mounted. d. Conduit sizes range from 3/4 inch to 1 inch.
e. Tapered threaded hubs with integral bushing.
2. Malleable iron boxes:
a. Conforming to ASTM A47 Grade 32510.
B. Plastic coated cast device boxes:
1. Construction:
a. With internal green ground screw.
b. Furnished with a suitable gasketed cover.
c. With integral cast mounting lugs when surface mounted. d. Conduit sizes range from 3/4 inch to 1 inch.
e. Double coated with a nominal 0.002-inch (2 mil) urethane on both the interior and exterior before application of PVC coating.
f. With a minimum 0.040-inch (40 mil) PVC coating bonded to exterior. g. With pressure sealing sleeve to protect the connection with conduit.
C. Formed steel enclosures:
1. Steel:
a. NEMA Type 12.
b. Fabricated from 14-gauge steel, minimum.
c. All seams continuously welded ground smooth.
d. Door:
1) Rolled lip around 3 sides.
2) Attached to enclosure by means of a continuous stainless steel hinge and pin. e. Neoprene door gasket to provide a watertight, dusttight, oiltight seal:
1) Attached with an adhesive.
2) Retained by a retaining strip.
f. Fabricate all external removable hardware for clamping the door to the enclosure body from zinc-plated heavy gauge steel:
1) With a hasp and staple for padlocking.
g. Provide large enclosures with door and body stiffeners for extra rigidity. h. No holes or knockouts.
i. Finish:
1) ANSI-61 gray electrostatically applied polyester powder inside and out over cleaned and primed surfaces.
2) White electrostatically applied polyester powder mounting plate. j. Heavy gauge steel external mounting brackets when surface mounted.
2. Stainless steel:
a. NEMA Type 4X:
1) Boxes in locations subject to flooding or temporary submersion:
(a) NEMA Type 6.
b. Fabricated from 14-gauge Type 316 stainless steel.
c. All seams continuously welded.
d. Door:
1) Rolled lip around 3 sides.
2) Attached to enclosure by means of a continuous stainless steel hinge and pin. e. Neoprene door gasket to provide a watertight seal:
1) Attached with an adhesive.
2) Retained by a retaining strip.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 34 - 4 BOXES
f. Fabricate all external removable hardware for clamping the door to the enclosure body from heavy gauge stainless steel:
1) With a hasp and staple for padlocking.
g. Provide large enclosures with door and body stiffeners for extra rigidity. h. No holes or knockouts.
i. Finish:
1) Brushed.
j. Stainless steel external mounting brackets when surface mounted.
2.05 EQUIPMENT (NOT USED)
2.06 COMPONENTS (NOT USED)
2.07 ACCESSORIES
A. Fasteners:
1. Electroplated or stainless steel in boxes with wiring devices.
2. Screws, nuts, bolts, and other threaded fasteners:
a. Stainless steel.
B. Provide breather and drain fittings where appropriate.
2.08 MIXES (NOT USED)
2.09 FABRICATION (NOT USED)
2.10 FINISHES (NOT USED)
2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. As specified in Section 26 05 00.
B. General:
1. Provide materials and construction suitable for environmental conditions at the location of the box as specified in Section 26 05 00.
2. Provide outlet box materials to match the conduit system:
a. GRC - Cast ferrous boxes.
b. PCS - PVC coated cast ferrous boxes.
3. Solid type gang boxes:
a. For more than 2 devices.
b. For barriered outlets.
4. Support all wall mounted NEMA Type 4 or NEMA Type 4X boxes to maintain a minimum of 7/8-inch free air space between the back of the enclosure and the wall:
a. Use machined spacers to maintain air space; built-up washers are not acceptable. b. Use stainless steel or nylon materials for spacers.
5. Use cast malleable iron boxes when box must support other devices.
6. Boxes serving luminaires or devices:
a. Use as pull boxes wherever possible.
7. Size boxes in accordance with NEC requirements and to provide sufficient room for the future components and cables indicated on the Drawings.
8. For fire-rated construction, provide materials and installation for use in accordance with the listing requirements of the classified construction.
C. Outlet boxes:
1. Locate outlet boxes as indicated on the Drawings:
a. Adjust locations so as not to conflict with structural requirements or other trades.
2. Use deep threaded-hub malleable iron boxes:
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 34 - 5 BOXES
a. To act as a pull box for conductors in a conduit system. b. Accommodate wiring devices.
3. Use deep threaded-hub plastic coated malleable iron boxes in corrosive and NEMA Type 4X area and when the conduit system is PVC coated steel.
4. Outlet boxes may be used as junction boxes wherever possible.
D. Pull boxes and junction boxes:
1. Size pull boxes in accordance with NEC requirements and to provide sufficient room for any future conduits and cables as indicated on the Drawings.
2. Install pull boxes such that access to them is not restricted.
E. For boxes not indicated:
1. Provide types and mountings as required to suit the equipment and that will be consistent with the conduit system and environmental conditions as indicated in Section 26 05 00.
2. Outlet, switch, and junction boxes where surface mounted in exposed locations:
a. Cast ferrous boxes with mounting lugs, zinc, or cadmium plating finish.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 REINSTALLATION (NOT USED)
3.07 FIELD QUALITY CONTROL
A. As specified in Section 26 05 00.
3.08 ADJUSTING (NOT USED)
3.09 CLEANING
A. As specified in Section 26 05 00.
3.10 PROTECTION
A. As specified in Section 26 05 00.
3.11 SCHEDULES (NOT USED)
END OF SECTION 26 05 34
This page intentionally left blank
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 53 - 1
IDENTIFICATION FOR
ELECTRICAL SYSTEMS
SECTION 26 05 53
IDENTIFICATION FOR ELECTRICAL SYSTEMS
PART 1GENERAL
1.01 SUMMARY
A. Section includes:
1. Identification of electrical equipment, devices, and components.
2. Material, manufacturing, and installation requirements for identification devices.
B. Related sections:
1. Section 01 33 00 - Submittal Procedures.
2. Section 01 75 17 - Commissioning.
3. Section 26 05 00 - Common Work Results for Electrical.
4. Section 26 05 33 - Conduits.
1.02 REFERENCES
A. As specified in Section 26 05 00.
B. Occupational Safety and Health Administration (OSHA).
1.03 DEFINITIONS
A. As specified in Section 26 05 00.
1.04 SYSTEM DESCRIPTION
A. Nameplates:
1. Provide a nameplate for each piece of electrical equipment and devices, control panel and control panel components.
2. Provide all nameplates of identical style, color, and material throughout the facility.
3. Device nameplates information:
a. Designations as indicated on the Drawings and identified on the Process and Instrumentation Drawings.
B. Wire numbers:
1. Coordinate the wire numbering system with all vendors of equipment so that every field wire has a unique number associated with it for the entire system:
a. Wire numbers shall correspond to the wire numbers on the control drawings or the panel and circuit numbers for receptacles and lighting. b. Wire numbers shall correspond to the terminal block number to which they are attached in the control panel.
c. Internal panel wires on a common terminal shall have the same wire number. d. Multi-conductor cables shall be assigned a cable number that shall be attached to the cable at intermediate pull boxes and stub-up locations beneath freestanding equipment. All multi-conductor and instrumentation cables shall be identified at pull points as described above:
1) Label armored multi-conductor cable using the conduit number as indicated on the Drawings, following the requirements for conduit markers in Section 26 05
33. 2. Provide the following wiring numbering schemes throughout the project for field wires between process control module, (PCM), vendor control panels, (VCP), motor control centers, (MCC), field starters, field instruments, etc.
Where:
ORIGIN LOC.= Designation for originating panel or device ORIGIN TERM. = Terminal designation at originating panel or device DEST. LOC. = Designation for destination panel or device
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 53 - 2
IDENTIFICATION FOR
ELECTRICAL SYSTEMS
DEST. TERM. = Terminal designation at destination panel or device or PLC I/O address at destination panel:
3. Identify equipment and field instruments as the origin.
4. PCMs are always identified as the destination.
5. Location is the panel designation for VCP, LCP, or PCM. For connections to MCCs, location is the specific starter tag and loop number. Location is the tag and loop number for motor starters, field instruments and equipment. Any hyphen in the panel designation or tag and loop number shall be omitted.
6. Terminal designation is the actual number on the terminal block where the conductor terminates at field devices and vendor control panels. For multi- conductor cables, all terminal numbers shall be shown, separated by commas.
7. Terminal designations at motor leads shall be the motor manufacturer’s standard terminal designation (e.g. T1, T2, T3, etc.).
8. Terminal designations at PCMs where the field conductor connects to field terminal blocks for a PLC input or output shall be the PLC address (Note: the following PLC I/O numbering scheme is typical for Allen-Bradley, the numbering scheme should be modified to match that of the actual PLC manufacturer used for the project):
a. Discrete Point:
W:X:Y/Z Analog
Point: W:X:Y.Z
Where:
W = I for input, O for output, X = PLC number (1, 2, 3…) Y = Slot number (01, 02, 03…)
Z = Terminal number (00, 01, 02…) for a discrete point or a word number for an analog point (1, 2, 3…)
9. Terminal designations at PCMs where the conductor does not connect to a PLC I/O point shall be the terminal number with a “C” prefix (e.g. C0010). For common power after a fuse or neutrals after a switch, the subsequent points shall have and capital letter suffix starting with “A” (e.g. C0010A).
C. Case 1: Vendor control panel (VCP) to process control module (PCM): Field wire number/label: A-B/C-D
A = Vendor control panel number without hyphen (VCP#)
B = Terminal number within VCP (manufacturer’s or vendor’s standard terminal number) C = Process control module number without hyphen (PCM#) D = Either the PLC address if the field terminal is connected directly to a PLC input or output point or the terminal number with a “C” prefix if not connected directly to a PLC I/O point (C0010)
Examples: VCP#-10/PCM#-I:1:01/01
VCP#-10/PCM#-
O:1:10/07
VCP#-
10/PCM#-C0100
D. Case 2: Field instrument to process control module
(PCM): Field wire number/label: E-F/C-D
C = Process control module number without hyphen (PCM#) D = Either the PLC address if the field terminal is connected directly to a PLC input or output point or the terminal number with a “C” prefix if not connected directly to a PLC I/O point (C0010)
E = Field mounted instrument tag and loop numbers without hyphen (EDV#) F = Manufacturer’s standard terminal number within instrument. Use both terminal numbers for analog points separated by a comma
Examples: TIT#-2,3/PCM#-I:1:01.1
TSH#-1/PCM#-I:2:01/00
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 53 - 3
IDENTIFICATION FOR
ELECTRICAL SYSTEMS
E. Case 3: Motor control center (MCC) to process control module (PCM): Field wire number/label: G-B/C-D
B = Terminal number within Motor Control Center (manufacturer’s or vendor’s standard terminal number)
C = Process control module without hyphen (PCM#)
D = Either the PLC address if the field terminal is connected directly to a PLC input or output point or the terminal number with a “C” prefix if not connected directly to a PLC I/O point (C0010)
G = Actual starter designation in the motor control center without hyphen (MMS#) Examples: MMS#-10/PCM#-I:1:01/01
MMS#-10/PCM#-
O:1:10/07
MMS#-
10/PCM#-C0100
F. Case 4: Motor control center (MCC) to vendor control panel (VCP): Field wire number/label: G-B/A-B
A = Vendor control panel number without hyphen (VCP#)
B = Terminal number within motor control center or vendor control panel (manufacturer’s or vendors standard terminal number)
G = Actual starter designation in the motor control center without hyphen (MMS#) Example: MMS#-X2/VCP#-10
G. Case 5: Motor leads to a motor control center
(MCC): Field wire number/label: H-I/G-B
B = Terminal number within motor control center (manufacturer’s standard terminal number)
G = Actual starter designation in the motor control center without hyphen (MMS#) H = Equipment tag and loop number without hyphen (PMP#) I = Motor manufacturer’s standard motor lead identification (e.g. T1, T2, T3, etc.) Example: PMP-#-T3/MMS#-T3
H. Case 6: Remote or separately mounted starter or variable frequency drive (VFD) to process control module (PCM):
Field wire number/label: J-B/C-D
B = Terminal number within starter or variable frequency drive (manufacturer’s standard terminal number)
C = Process control module number without hyphen (VCP#) D = Either the PLC address if the field terminal is connected directly to a PLC input or output point or the terminal number with a “C” prefix if not connected directly to a PLC I/O point (C0010)
J = Starter or variable frequency drive tag and loop number without hyphen (MMS#) Examples: MMS#-10/PCM#-I:1:01/01
MMS#-10/PCM#-
O:2:10/07
MMS#-
10/PCM#-C0010
I. Identify all spare conductors as required for other field wires with an “S” prefix: Example: S MMS#-10/PCM#-C011
1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01 33 00 and 26 05 00.
B. Product data:
1. Nameplates:
a. Color.
b. Size:
1) Outside dimensions.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 53 - 4
IDENTIFICATION FOR
ELECTRICAL SYSTEMS
2) Lettering.
c. Material.
d. Mounting means.
2. Nameplate schedule:
a. Show exact wording for each nameplate.
b. Include nameplate and letter sizes.
3. Wire numbers:
a. Manufacturer’s catalog data for wire labels and label printer.
C. Record documents:
1. Update the conduit schedule to reflect the exact quantity of wire numbers including spares and destination points for all wires.
1.06 QUALITY ASSURANCE (NOT USED)
1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26 05 00.
1.08 PROJECT SITE CONDITIONS (NOT USED)
1.09 SEQUENCING (NOT USED)
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 26 05 00.
1.12 SYSTEM START-UP
A. As specified in Section 26 05 00.
1.13 OWNER’S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED)
PART 2PRODUCTS
2.01 MANUFACTURERS
A. Nameplates and signs:
1. One of the following or equal:
a. Brady.
b. Seton.
B. Conductor and cable markers:
1. Heat-shrinkable tubing:
a. One of the following or equal:
1) Raychem.
2) Brady.
3) Thomas & Betts.
4) Kroy.
C. Conduit and raceway markers:
1. One of the following or equal:
a. Almetek: Mini Tags.
b. Lapp Group: Maxi System.
2.02 EXISTING PRODUCTS (NOT USED)
2.03 MATERIALS
A. Nameplates:
1. Fabricated from white-center and red face or black-center, white face laminated plastic engraving stock:
a. 3/32-inch thick material.
b. Two-ply.
c. With chamfered edges.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 53 - 5
IDENTIFICATION FOR
ELECTRICAL SYSTEMS
d. Block style engraved characters of adequate size to be read easily from a distance of 6 feet:
1) No characters smaller than 1/8-inch in height.
B. Signs:
1. Automatic equipment and high voltage signs:
a. Suitable for exterior use.
b. In accordance with OSHA regulations.
C. Conductor and cable markers:
1. Machine printed black characters on white tubing.
2. Ten point type or larger.
D. Conduit and raceway markers:
1. Non-metallic:
a. UV resistant holder and letters
b. Black letters on yellow background.
c. Minimum letter height: 1/2-inch.
d. Adhesive labels are not acceptable.
2.04 MANUFACTURED UNITS (NOT USED)
2.05 EQUIPMENT (NOT USED)
2.06 COMPONENTS (NOT USED)
2.07 ACCESSORIES (NOT USED)
2.08 MIXES (NOT USED)
2.09 FABRICATION (NOT USED)
2.10 FINISHES (NOT USED)
2.11 SOURCE QUALITY CONTROL
A. Nameplates:
1. Provide all nameplates for control panel operator devices (e.g. pushbuttons, selector switches, pilot lights, etc.):
a. Same material and same color and appearance as the device nameplates, in order to achieve an aesthetically consistent and coordinated system.
PART 3EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. As specified in Section 26 05 00.
B. Nameplates:
1. Attach nameplates to equipment with rivets, bolts or sheet metal screws, approved waterproof epoxy-based cement or install in metal holders welded to the equipment.
2. On NEMA Type 4, NEMA Type 4X, enclosures, use epoxy-based cement to attach nameplates.
3. Nameplates shall be aligned and level or plumb to within 1/64 inch over the entire length:
a. Misaligned or crooked nameplates shall be remounted, or provide new enclosures at the discretion of the Engineer.
C. Conductor and cable markers:
1. Apply all conductor and cable markers before termination.
2. Heat-shrinkable tubing:
a. Tubing shall be shrunk using a heat gun that produces low temperature heated air. b. Tubing shall be tight on the wire after it has been heated. c. Characters shall face the open panel and shall read from left to right or top to bottom. d. Marker shall start within 1/32 inch of the end of the stripped insulation point.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 05 53 - 6
IDENTIFICATION FOR
ELECTRICAL SYSTEMS
D. Conduit markers:
1. Furnish and install conduit markers for every conduit in the electrical system that is identified in the conduit schedule or part of the process system.
2. Mark conduits at the following locations:
a. Each end of conduits that are greater than 10 feet in length. b. Where the conduit penetrates a wall or structure.
c. Where the conduit emerges from the ground, slab, etc. d. The middle of conduits that are 10 feet or less in length.
3. Mark conduits after the conduits have been fully painted.
4. Position conduit markers so that they are easily read from the floor.
5. Attach non-metallic conduit markers with nylon cable ties:
a. Provide ultraviolet resistant cable ties for conduit markers exposed to direct sunlight.
6. Mark conduits before construction review by Engineer for punch list purposes.
7. Label intrinsically safe conduits in accordance with the requirements of the NEC.
E. Signs and labeling:
1. Furnish and install warning signs on equipment that has more than one source of power. a. Warning signs to identify every panel and circuit number of the disconnecting means of all external power sources.
2. Place warning signs on equipment that has 120 VAC control voltage source used for interlocking.
a. Identify panel and circuit number or conductor tag for control voltage source disconnecting means.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 COMMISSIONING
A. As specified in Section 01 75 17.
3.08 FIELD QUALITY CONTROL
A. Replace any nameplates, signs, conductor markers, cable markers or raceway labels that in the sole opinion of the Engineer do not meet the Engineer’s aesthetic requirements.
3.09 ADJUSTING (NOT USED)
3.10 CLEANING (NOT USED)
3.11 PROTECTION (NOT USED)
3.12 SCHEDULES (NOT USED)
END OF SECTION 26 05 53
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 08 50 - 1
FIELD ELECTRICAL
ACCEPTANCE TESTS
SECTION 26 08 50
FIELD ELECTRICAL ACCEPTANCE TESTS
PART 1GENERAL
1.01 SUMMARY
A. Section includes:
1. Responsibilities for testing the electrical installation.
2. Adjusting and calibration.
3. Acceptance tests.
B. Related sections:
1. Section 01 33 00 - Submittal Procedures.
2. Section 26 05 00 - Common Work Results for Electrical.
3. Section 26 05 26 - Grounding and Bonding.
C. Copyright information:
1. Some portions of this Section are copyrighted by the InterNational Electrical Testing Association, Inc (NETA). See NETA publication ATS for details.
1.02 REFERENCES
A. As specified in Section 26 05 00.
B. American National Standards Institute (ANSI).
C. Institute of Electrical and Electronics Engineers (IEEE):
1. 43 - IEEE Recommended Practice for Testing Insulation Resistance of Rotating Machinery.
2. 81 - IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System.
3. 95 - IEEE Recommended Practice for Insulation Testing of AC Electric Machinery (2300 V and Above) With High Direct Voltage.
4. 421.3 - IEEE Standard for High-Potential Test Requirement for Excitation Systems for Synchronous Machines.
5. 450 - IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications.
6. 1106 - IEEE Recommended Practice for Installation, Maintenance, Testing, and Replacement of Vented Nickel-Cadmium Batteries for Stationary Applications.
7. 1188 - IEEE Recommended Practice for Maintenance, Testing, and Replacement of Valve-Regulated Lead-Acid (VRLA) Batteries for Stationary Applications.
8. C57.13 - IEEE Standard Requirements for Instrument Transformers.
9. C57.13.1 – IEEE Guide for Field Testing of Relaying Current Transformers.
10. C57.13.3 - IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases.
11. C57.104 - IEEE Guide for the Interpretation of Gases Generated in Oil- Immersed Transformers.
D. Insulated Cable Engineer’s Association (ICEA).
E. InterNational Electrical Testing Association (NETA).
1. ATS-2009 Standard for Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems.
F. International Electrotechnical Commission (IEC).
G. Manufacturer’s testing recommendations and instruction manuals.
H. National Fire Protection Association (NFPA):
1. 70 – National Electrical Code (NEC).
2. 110 - Standard for Emergency and Standby Power Systems.
I. National Institute of Standards and Technology (NIST).
J. Specification sections for the electrical equipment being tested.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 08 50 - 2
FIELD ELECTRICAL
ACCEPTANCE TESTS
K. Shop drawings.
1.03 DEFINITIONS
A. As specified in Section 26 05 00.
B. Specific definitions:
1. Testing laboratory: The organization performing acceptance tests.
1.04 SYSTEM DESCRIPTION
A. Testing of all electrical equipment installed under this Contract in accordance with the manufacturer’s requirements and as specified in this Section. All the NETA standard electrical acceptance testing shall be performed by third party testing agency.
B. Conduct all tests in the presence of the Engineer or the Engineer’s representative:
1. Engineer will witness all visual, mechanical and electrical tests, and inspections.
C. The testing and inspections shall verify that the equipment is operational within the tolerances required and expected by the manufacturer, and these Specifications.
D. Responsibilities:
1. Contractor responsibilities:
a. Ensure that all resources are made available for testing, and that all testing requirements are met.
2. Electrical subcontractor responsibilities:
a. Perform routine tests during installation.
b. Demonstrate operation of electrical equipment.
c. Commission the electrical installation.
d. Provide the necessary services during testing, and provide these services to the testing laboratory, Contractor, and other subcontractors, including but not limited to:
1) Providing electrical power as required.
2) Operating of electrical equipment in conjunction with testing of other equipment. 3) Activating and shutting down electrical circuits.
4) Making and recording electrical measurements.
5) Replacing blown fuses.
6) Installing temporary jumpers.
3. Testing laboratory responsibilities:
a. Perform all acceptance tests specified in this Section. b. Provide all required equipment, materials, labor, and technical support during acceptance tests.
E. Upon completion of testing or calibration, attach a label to all serviced devices:
1. The label shall indicate the date serviced and the company that performed the service.
1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01 33 00 and 26 05 00.
B. Manufacturers’ testing procedures:
1. Submit manufacturers’ recommended testing procedures and acceptable test results for review by the Engineer.
C. Test report:
1. Test reports shall be based on NETA’s latest Acceptance Testing Specifications having a sign-off, pass/fail data filed for each line item covered by NETA’s Acceptance Testing Specifications latest edition.
2. Include the following:
a. Summary of Project.
b. Description of equipment tested.
c. Description of tests performed.
d. Test results.
e. Conclusions and recommendations.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 08 50 - 3
FIELD ELECTRICAL
ACCEPTANCE TESTS
f. Completed test forms.
g. List of test equipment used and calibration dates.
D. Testing laboratory qualifications:
1. Submit a complete resume and statement of qualifications from the proposed testing laboratory detailing their experiences in performing the tests specified:
2. Testing organization shall be corporately and financially independent of the supplier, producer and installer of the equipment, who has been regularly engaged in the testing of equipment for a period of at least 10 years. All testing shall be conducted under the direct supervision of an electrical engineer, registered in the State of California. This registered electrical engineer will prepare and sign test reports with values, recommendations, and comments.
3. Testing equipment required to conduct the specified tests shall be furnished by the testing organization. Testing equipment shall be in good working condition and comply with the requirements of this Specification and applicable industry standards.
4. Testing shall be done in accordance with the manufacturer's instructions, these Specifications, and applicable NETA Acceptance Testing Specifications, NEMA, ANSI, NFPA, and ASTM Standards. Forms shall include space for ENGINEER sign off at time of test. Testing organization shall meet Federal OSHA criteria for accreditation of testing laboratories, Title 29, Part 1907, 1910 and 1936. Membership in the InterNational Electrical Testing Association constitutes proof of meeting such criteria.
5. The testing organization shall cooperate with any manufacturer's representative that may be retained by the CONTRACTOR. Testing organization shall be Cutler Hammer; Electro test; Power Systems; General Electric; or equal NETA approved testing company.
E. Division of responsibilities:
1. Submit a list identifying who is responsible for performing each portion of the testing.
1.06 QUALITY ASSURANCE
A. As specified in Section 26 05 00.
B. Testing laboratory qualifications:
1. The testing laboratory shall be an independent testing company.
2. Selection of the testing laboratory and testing personnel is subject to approval by the Engineer based on testing experience and certifications of the individuals and testing capabilities of the organization.
1.07 DELIVERY, STORAGE, AND PROTECTION (NOT USED)
1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 26 05 00.
1.09 SEQUENCING
A. At least 30 days before commencement of the acceptance tests, submit the manufacturer’s complete field testing procedures to the Engineer and to the testing laboratory, complete with expected test results and tolerances for all equipment to be tested.
B. Perform testing in the following sequence:
1. Perform routine tests as the equipment is installed including:
a. Insulation-resistance tests.
b. Continuity tests.
c. Rotational tests.
2. Adjusting and preliminary calibration.
3. Acceptance tests.
4. Demonstration.
5. Commissioning and plant start-up.
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 26 05 00 and 01 78 36.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 08 50 - 4
FIELD ELECTRICAL
ACCEPTANCE TESTS
1.12 SYSTEM START-UP (NOT USED)
1.13 OWNER'S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED) PART 2
1.15 PRODUCTS (NOT USED)
PART 2EXECUTION
2.01 EXAMINATION (NOT USED)
2.02 PREPARATION
A. Test instrument calibration:
1. Utilize a testing laboratory with a calibration program which maintains all applicable test instrumentation within rated accuracy.
2. The accuracy shall be traceable to the NIST in an unbroken chain.
3. Calibrate instruments in accordance with the following frequency schedule:
a. Field instruments: 6 months maximum.
b. Laboratory instruments: 12 months maximum.
c. Leased specialty equipment where the accuracy is guaranteed by the lessor (such as Doble): 12 months maximum.
4. Dated calibration labels shall be visible on all test equipment.
5. Maintain an up-to-date instrument calibration record for each test instrument:
a. The records shall show the date and results of each calibration or test.
6. Maintain an up-to-date instrument calibration instruction and procedure for each test instrument.
B. Do not begin testing until the following conditions have been met:
1. All instruments required are available and in proper operating condition.
2. All required dispensable materials such as solvents, rags, and brushes are available.
3. All equipment handling devices such as cranes, vehicles, chain falls and other lifting equipment are available or scheduled.
4. All instruction books, calibration curves, or other printed material to cover the electrical devices are available.
5. Data sheets to record all test results are available.
C. Engine generator tests:
1. The following individuals must be present and remain at the site during the entire field testing of the engine generator:
a. Manufacturer’s field engineer for the voltage regulator. b. Manufacturer’s field engineer for the governor and governor controller. c. Manufacturer’s field engineer for the switchgear.
d. Load bank operator.
e. Electrical contractor.
f. Electric utility’s field engineer.
2.03 INSTALLATION (NOT USED)
2.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
2.05 REPAIR/RESTORATION (NOT USED)
2.06 RE-INSTALLATION (NOT USED)
2.07 FIELD QUALITY CONTROL
A. Dry type transformers:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, and grounding.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 08 50 - 5
FIELD ELECTRICAL
ACCEPTANCE TESTS
d. Verify that resilient mounts are free and that any shipping brackets have been removed.
e. Inspect equipment for cleanliness.
f. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
(a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
g. Verify that as-left tap connections are as specified.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low- resistance ohmmeter.
b. Perform insulation-resistance tests winding-to-winding and each winding- to-ground:
1) Apply voltage in accordance with manufacturer’s published data. (a) Refer to NETA ATS tables in the absence of manufacturer’s published data. c. Calculate dielectric absorption ration or polarization index. d. Perform turns ratio tests at all tap positions.
e. Verify correct secondary voltage, phase-to-phase and phase-to-neutral after energization and before loading.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data. c. Tap connections are left as found unless otherwise specified. d. Minimum insulation-resistance values of transformer insulation shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data. 2) Investigate insulation values less than the allowable minimum. e. The dielectric absorption ratio or polarization index shall not be less than 1.0. f. Turns-ratio results should not deviate more than 1/2 percent from either the adjacent coils or calculated ratio.
g. Phase-to-phase and phase-to-neutral secondary voltages shall be in agreement with nameplate data.
B. Low voltage cables, 600 volt maximum:
1. Visual and mechanical inspection:
a. Compare cable data with the Drawings and Specifications. b. Inspect exposed sections of cable for physical damage and correct connection as indicated on the Drawings.
c. Inspect bolted electrical connections for high resistance by 1 of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
(a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Inspect compression applied connectors for correct cable match and indentation. e. Inspect for correct identification and arrangement.
f. Inspect cable jacket insulation and condition.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low- resistance ohmmeter.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 08 50 - 6
FIELD ELECTRICAL
ACCEPTANCE TESTS
b. Perform insulation resistance test on each conductor with respect to ground and adjacent conductors:
1) Applied potential shall be 500 volts dc for 300 volt rated cable and 1,000 volts dc for 600 volt rated cable.
2) Test duration shall be 1 minute.
c. Perform continuity tests to insure correct cable connection. d. Verify uniform resistance of parallel conductors.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
b. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data. 2) Investigate values of insulation-resistance less than the allowable minimum. 3) Investigate values of insulation-resistance where there is a great deviation between of values between conductors.
c. Cable shall exhibit continuity.
d. Investigate deviations in resistance between parallel conductors.
C. Low voltage molded case and insulated case circuit breakers:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage and alignment.
d. Verify that all maintenance devices are available for servicing and operating the breaker.
e. Verify the unit is clean.
f. Verify the arc chutes are intact.
g. Inspect moving and stationary contacts for condition and alignment. h. Verify that primary and secondary contact wipe and other dimensions vital to satisfactory operation of the breaker are correct.
i. Perform all mechanical operator and contact alignment tests on both the breaker and its operating mechanism in accordance with manufacturers published data. j. Operate circuit breaker to ensure smooth operation.
k. Inspect bolted electrical connections for high resistance by one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
(a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
l. Inspect operating mechanism, contacts, and arc chutes in unsealed units. m. Verify cell fit and element alignment.
n. Verify racking mechanism operation.
o. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
p. Perform adjustments for final protective device settings in accordance with the coordination study.
q. Record as-found and as-left operation counter readings.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low- resistance ohmmeter.
b. Perform insulation-resistance tests for 1 minute on each pole, phase-to- phase and phase-to-ground with the circuit breaker closed and across each open pole:
1) Apply voltage in accordance with manufacturer’s published data.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 08 50 - 7
FIELD ELECTRICAL
ACCEPTANCE TESTS
2) Refer to NETA ATS tables in the absence of manufacturer’s published data. c. Perform a contact/pole-resistance test.
d. Determine long-time pickup and delay by primary current injection. e. Determine short-time pickup and delay by primary current injection. f. Determine ground-fault pickup and delay by primary current injection. g. Determine instantaneous pickup value by primary current injection. h. Perform minimum pickup voltage tests on shunt trip and close coils in accordance with manufacturer’s published data.
i. Verify correct operation of any auxiliary features such as trip and pickup indicators, zone interlocking, electrical close and trip operation, trip-free, anti-pump function and trip unit battery condition:
1) Reset all trip logs and indicators.
j. Verify operation of charging mechanism.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data. c. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data. 2) Investigate values of insulation-resistance less than the allowable minimum. d. Microhm or dc millivolt drop values shall not exceed the high levels of the normal range as indicated in the manufacturer’s published data:
1) If manufacturer’s data is not available, investigate any values which deviate from adjacent poles or similar breakers by more than 50 percent of the lowest value. e. Insulation-resistance values of control wiring shall not be less than 2 megohms. 1) Long-time pickup values shall be as specified, and the trip characteristic shall not exceed manufacturer’s published time-current characteristic tolerance band including adjustment factors:If manufacturer’s curves are not available, trip times shall not exceed the value shown in NETA ATS tables.
f. Short-time pickup values shall be as specified, and the trip characteristic shall not exceed manufacturer’s published time-current tolerance band. g. Ground fault pickup values shall be as specified, and the trip characteristic shall not exceed manufacturer’s published time-current tolerance band. h. Instantaneous pickup values shall be as specified and within manufacturer’s published tolerances:
i. Refer to NETA ATS tables in the absence of manufacturer’s published data. j. Pickup values and trip characteristics shall be within manufacturer’s published tolerances.
k. Minimum pickup voltage of the shunt trip and close coils shall conform to the manufacturer’s published data:
l. Refer to NETA ATS tables in the absence of manufacturer’s published data. m. Breaker open, close, trip, trip-free, anti-pump, and auxiliary features shall function as designed.
n. The charging mechanism shall operate in accordance with manufacturer’s published data.
D. Grounding systems:
1. Visual and mechanical inspection:
a. Inspect ground system for compliance with that indicated on the Drawings, specified in Specifications, and in the NEC.
b. Inspect physical and mechanical condition.
c. Inspect bolted electrical connections for high resistance using one of the following methods:
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 08 50 - 8
FIELD ELECTRICAL
ACCEPTANCE TESTS
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
(a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Inspect anchorage.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low- resistance ohmmeter.
b. Perform fall of potential test or alternative test in accordance with IEEE 81 on the main grounding electrode or system.
c. Perform point-to-point tests to determine the resistance between the main grounding system and all major electrical equipment frames, the system neutral and any derived neutral points.
3. Test values:
a. Grounding system electrical and mechanical connections shall be free of corrosion. b. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
c. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data. d. The resistance between the main grounding electrode and ground shall be as specified in Section 26 05 26. Investigate point-to-point resistance values that exceed
0.5 ohm.
2.08 ADJUSTING (NOT USED)
2.09 CLEANING
A. As specified in Section 26 05 00.
B. After the acceptance tests have been completed, dispose of all testing expendables, vacuum all cabinets, and sweep clean all surrounding areas.
2.10 PROTECTION
A. As specified in Section 26 05 00.
2.11 SCHEDULES (NOT USED)
END OF SECTION 26 08 50
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 24 13 - 1 SWITCHBOARDS SECTION 26 24 13
SWITCHBOARDS
PART 1GENERAL
1.01 SUMMARY
A. Section includes:
1. Switchboards
2. Switchboard accessories.
B. Related sections:
1. Section 01 33 00 - Submittal Procedures.
2. Section 26 05 00 - Common Work Results for Electrical.
3. Section 26 05 53 - Identification for Electrical Systems.
4. Section 26 08 50 - Field Electrical Acceptance Tests.
5. Section 26 28 01 - Low Voltage Molded Case Circuit Breakers.
6. Section 26 43 14 - Surge Protective Devices.
1.02 REFERENCES
A. As specified in Section 26 05 00.
B. Institute of Electrical and Electronic Engineers (IEEE).
1. C57.13 - IEEE Standard Requirements for Instrument Transformers.
C. National Electrical Manufacturers' Association (NEMA):
1. PB 2 - Deadfront Distribution Switchboards.
D. Underwriters' Laboratories, Inc. (UL):
1. 891 - Switchboards.
1.03 DEFINITIONS
A. As specified in Section 26 05 00.
1.04 SYSTEM DESCRIPTION
A. Factory assembled, wired, and tested switchboards, with major components being products of a single manufacturer, including circuit breakers, and other equipment specified in this Section and indicated on the Drawings.
1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01 33 00 and 26 05 00.
B. Product data:
1. Manufacturer of switchboard.
2. Manufacturer of all component parts of switchboard.
3. Dimensions:
4. Nameplate schedule.
a. Width.
b. Length.
c. Height.
d. Weight.
5. Bill of material.
6. Description of operation:
7. Ratings:
a. Voltage.
b. Phase.
c. Current.
d. Interrupting rating (circuit breakers and fuses).
8. List of recommended spare parts.
9. Name of dealer’s repair facility and parts stocking agreement with the factory:
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 24 13 - 2 SWITCHBOARDS a. Agreement shall outline in detail the manufacturer's parts stocking requirements and the method by which the manufacturer's representative verifies that the stock is at an acceptable level.
b. Agreement should also outline the method by which the manufacturer's representative determines that the service personnel meet factory standards. c. A toll-free or local phone number with 24/7 emergency monitoring/call back is required.
10. Furnish circuit breaker submittals as specified in:
a. Section 26 28 01.
b. Section 26 24 13.
11. For equipment installed in structures designated as seismic design category C, D, E, or F submit the following as specified in Section 26 05 00:
a. Manufacturer’s statement of seismic qualification with substantiating test data.
12. Manufacturer’s special seismic certification with substantiating test data.
C. Shop Drawings:
1. Complete, detailed, and scaled switchboard layout:
a. Front panel.
b. Sub-panels.
c. Interior panels.
d. Top and bottom conduit windows.
2. Complete electrical wiring diagrams:
a. Point-to-point connections.
b. Internal compartment-to-compartment interconnection wiring diagrams. c. Wiring identification and terminal numbers.
3. Complete 3-line diagrams for each switchboard lineup. These drawings shall indicate devices comprising the switchboard assembly including, but not limited to, circuit breakers, control power and instrument transformers, meters, and control devices. Clearly, indicate electrical ratings of devices on Drawings.
4. Complete interface and connection diagrams for metering system.
5. Complete bill of material list and equipment data sheets identifying appropriate information specific to the switchboard being supplied.
6. Nameplate schedule.
7. Before fabrication, submit Switchboard Shop Drawings for approval to Developer’s dry utility consultant and SCE.
D. Installation instructions:
1. Detail the complete installation of the equipment including rigging, moving, and setting into place.
2. For equipment installed in structures designated as seismic design category A or B:
a. Provide manufacturer’s installation instructions and anchoring details for connecting equipment to supports and structures.
3. For equipment installed in structures designated as seismic design category C, D, E, or F:
a. Provide project-specific installation instructions and anchoring details based on support conditions and requirements to resist seismic and wind loads as specified in Section 26 05 00.
b. Submit anchoring drawings with supporting calculations.
E. Drawings and calculations shall be stamped by a professional engineer registered in the state where the Project is being constructed.
F. Test forms and reports:
1. Submit complete factory acceptance test procedures and all forms used during the test.
2. Manufacturer to furnish a certified report after the shop tests.
3. Manufacturer's start-up representative to furnish a written report after the start-up:
a. Report must state that the installation is complete and satisfactory, or list items requiring additional attention and a proposal for the actions.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 24 13 - 3 SWITCHBOARDS b. If any items require attention after the initial start-up, a final report is required stating that the installation is complete and satisfactory.
G. Installation instructions:
1. The written instructions must detail the complete installation of the switchboard including rigging, moving and setting into place.
2. Provide anchorage instructions and requirements for the switchboard based on the seismic conditions of the site as specified in Section 26 05 00. a. Stamped by a professional engineer licensed in the state where the Project is being constructed.
1.06 QUALITY ASSURANCE
A. As specified in Section 26 05 00.
B. The switchboard and all components shall be UL listed and labeled.
C. Equipment shall be designed and constructed in accordance with the following standards and requirements:
1. NEMA PB 2.
2. UL 891.
1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26 05 00.
B. Ship switchboards to the site in dedicated air ride vans that will allow the Contractor to utilize on site off loading equipment.
C. Furnish temporary equipment heaters within the switchboard to prevent condensation from forming.
1.08 PROJECT/SITE CONDITIONS
A. As specified in Section 26 05 00
1.09 SEQUENCING
A. Conduct the initial fault current study and submit results for Engineer’s review.
B. After successful review of the initial fault current study, submit complete equipment submittal.
C. Conduct factory acceptance test and submit certified test results for Engineer’s review.
D. Ship equipment to the Project Site after successful completion of factory acceptance test.
E. Assemble equipment in the field.
F. Conduct field acceptance test and submit results for Engineer’s review.
G. Submit manufacturer’s certification that the equipment has been properly installed and is fully functional for Engineer’s review.
H. Conduct Owner’s training sessions.
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 26 05 00 and 01 78 36.
1.12 SYSTEM START-UP
A. As specified in Section 26 05 00.
1.13 OWNER’S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED)
PART 2PRODUCTS
2.01 MANUFACTURERS
A. Switchboards:
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 24 13 - 4 SWITCHBOARDS
1. As manufactured by:
a. Eaton or approved equal
2.02 EXISTING PRODUCTS (NOT USED)
2.03 MATERIALS (NOT USED)
2.04 MANUFACTURED UNITS (NOT USED)
2.05 EQUIPMENT
A. Switchboard
1. Complete assembly, including steel framing and covers, bus system, and breaker mounting, shall satisfy applicable provisions of UL 891 and NEMA PB-2 and the California Electrical Code for low-voltage distribution switchboards. Switchboards shall be furnished with UL labels.
2. Short Circuit Current Rating: Switchboards shall be rated with a minimum short circuit current rating of 65,000 rms symmetrical amperes at 480 VAC maximum.
3. Switchboards shall be floor standing, dead front, dead rear, line bussed, front operated and connected, circuit-breaker type, unless otherwise indicated and shall contain equipment indicated and specified. Switchboard shall be complete with pull, service, and distribution sections as required.
4. Required equipment shall be enclosed in fully interchangeable die formed steel sectional cabinets will be absolutely rigid welded construction, plumb and uniform in size. Each cabinet shall be a separate and independent unit with assembly holes die-stamped or jig drilled; openings for interconnections shall be so placed that cabinet can be located in any position in assembly without drilling or cutting holes on job. Deliver switchboard to Project site in completely assembled sections and provide required assembly bolts and blanking plates. Front plates and doors shall be of not less than 12 gage furniture steel, completely removable, secured to cabinet with machine screws, with cup washers uniformly and symmetrically spaced. Provide hinged wire gutter covers for distribution sections.
Equipment shall meet NEMA and UL standards.
5. Circuit breakers shall be as follows (protective device shall be as shown on drawings):
a. See Section 26 28 01
b. Main circuit breakers shall be automatic, one-piece molded-case, trip-free, common trip, quick-make, quick-break, thermal-magnetic with solid state trips, bolted to bus with frame size and trip ratings as indicated on drawings. Voltage, amperage ratings and number of poles shall be as indicated on breakers. Main breaker shall provide a minimum short-circuit interrupting capacity as determined by utility company. Provide shunt-trip and integral ground fault devices, as indicated on drawings. Breakers shall be furnished with lockout provisions.
c. Feeder circuit breakers shall be automatic, one-piece molded-case, trip-free, common trip, quick-make, quick-break, thermal-magnetic or solid state type bolted to bus, with handles clearly indicating tripped position.
d. Breakers shall be furnished with a single handle with no tie-bar. Voltage, amperage, and number of poles shall be as indicated on Drawings. Breaker ratings shall be on handle or label. Breakers shall be furnished with lockout provisions approved by the State of California for padlocking and shall provide a minimum symmetrical shortcircuit interrupting rating, as indicated on Drawings. Series rated circuit breaker combinations are not acceptable.
6. Utility metering provisions shall meet requirements of serving utility and shall be furnished with necessary fittings.
7. Provide switchboard silver-plated copper bus bars of same capacity as main breaker, or as indicated on Drawings, between current transformer and main section and distribution sections; also, full height of breaker space in distribution portions. Copper bus shall have current density of 1000A per square inch of cross section. Bus structure shall be freefitted, and shall have sufficient strength to withstand short-circuit as indicated on drawings.
Connections shall be securely bolted together with corrosion-resistant plated carbon steel, minimum grade five machine screws secured with constant pressure-type locking devices. Bus bar bracing shall be designed to withstand maximum available short-circuit
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 24 13 - 5 SWITCHBOARDS current. Connections for cables to circuit breakers, switches and motor control devices shall be heavy-duty mechanical pressure type terminal lugs. Provide service cable lugs as required by utility company. Cables and internal wiring shall be supported with suitable cleats.
8. Switchboard distribution sections shall be furnished with full height bussing. Unused spaces shall be provided with blank covers. Switchboards, as complete units, shall be given single short-circuit current ratings by manufacturer. Such ratings shall be established by actual tests by manufacturer, in accordance with UL specifications, on equipment constructed similarly to the furnished switchboard.
9. Provide a large nameplate identifying switchboard, indicating service voltage, originating power source, function and current rating. Nameplate shall be furnished with 3/16 inch engraved black letters on white background. Name plate shall be mechanically fastened to switchboard.
10. Provide labels for circuit breakers, disconnect switches, and or other disconnecting means in switchboards. Label shall indicate name of load served, name or room number and if in different building, name of building. If equipment is installed in same room as source, label should indicate source name and “in this room”.
a. Labels shall be as specified in Section 26 05 53.
11. Paint cabinets, framework and plates inside and out with one coat of rust-resistant metal primer and one coat of enamel, baked on, or lacquer sprayed on.
12. Manufacture boards according to reviewed Shop Drawings. Switchboard shall meet requirements of legally constituted authorities having jurisdiction, and respective serving utility.
13. Switchboards installed outdoors shall be weatherproof NEMA Type 3R enclosure.
Enclosure construction shall be formed of code gage galvanized steel with enamel finish.
Heavy-duty, three-point latching, vault type door handles with padlocking provisions shall be furnished on doors. Padlocks shall be furnished keyed to Corbin No. 60 keys.
Switchboards installed outdoors shall be specifically required to maintain service during extreme outdoor ambient temperatures of a minimum of 150 degrees Fahrenheit in NEMA Type 3R enclosures.
14. For grounded wye electrical service switchboards rated more than 150 volts, to ground and 1,000 amperes or more, provide ground fault protection for main protective device.
Ground fault protection shall be UL listed, with ground sensor encircling phase conductors and neutral conductors integral with the main protective device. Provide testing of ground fault protection system by an independent recognized testing laboratory.
Testing lab shall provide necessary testing equipment at the Project site and perform a certified test on ground protection system in presence of the Project Inspector. The ground fault setting shall be selected to coordinate with downstream circuit protective devices.
Verify that the system neutral is grounded at the service entrance switchboard only, except neutrals of step down distribution transformers. For branch circuit protective devices, rated 800 amps or more, provide ground fault protection where shown on the drawings, or as described above, for main protective device. Coordinate settings with main protective device ground fault protection.
15. Connections to bussing shall be securely bolted together with corrosion-resistant plated carbon steel, minimum grade five machine screws secured with constant pressure-type locking devices.
16. Arc Flash Reduction Maintenance Switch: The Arcflash Reduction Maintenance System shall allow the operator to enable a maintenance mode using a 5 position switch which enables a preset accelerated instantaneous override trip to reduce arc flash energy. A blue LED on the trip unit shall indicate the trip unit is in the maintenance mode.
B. ACCESSORIES
1. Power monitor:
a. As specified on Drawings.
2. Surge protective devices:
a. As specified in Section 26 43 14.
2.06 MIXES (NOT USED)
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 24 13 - 6 SWITCHBOARDS
2.07 FABRICATION (NOT USED)
2.08 FINISHES
A. Chemically clean all steel surfaces before painting.
B. Color per City of Tulare
2.09 SOURCE QUALITY CONTROL (NOT USED)
PART 3EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. As specified in Section 26 05 00.
B. Install the equipment in accordance with the accepted installation instructions and anchorage details to meet the seismic and wind load requirements at the Project site.
C. General:
1. Furnish cables, conduit, lugs, bolts, expansion anchors, sealants, and other accessories needed to complete the installation of the switchboard.
2. Physically assemble and install the switchboard in the location and layout indicated on the Drawings.
3. Make bus splice connections.
4. Perform work in accordance with manufacturer’s instructions and shop drawings.
5. Furnish components and equipment as required to complete the installation.
6. Replace hardware lost or damaged during the installation or handling to provide a complete installation.
7. Weld and/or bolt switchboard frame to leveling channels embedded in the concrete housekeeping pad:
a. Provide structural leveling channels in accordance with manufacturer's recommendations to provide proper alignment of the units. b. The installation shall meet the seismic requirements of the site.
D. Provide the services of a qualified manufacturer’s representative to:
1. Inspect, verify, and certify that the mechanical installation meets the manufacturer’s requirements.
2. Make control connections across the shipping splits.
3. Install and align all circuit breakers.
4. Perform field tests.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 COMMISSIONING
A. Factory tests:
1. The Owner and Engineer will witness the factory acceptance test as specified in Section 26 05 00 and and latest edition of NETA ATS standard.
2. Test the complete switchgear at the manufacturer’s establishment. a. Completely assemble, wire and test the switchboard:
1) Detailed inspections before and after assembly to assure correctness of design and workmanship.
2) Provide groups of wires leaving the shipping-assembled equipment with terminal blocks with suitable numbering strips.
B. Owner training:
1. As specified in Section 26 05 00.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 24 13 - 7 SWITCHBOARDS
3.08 FIELD QUALITY CONTROL
A. As specified in Section 26 05 00.
B. Provide manufacturer’s services for the following:
1. Make all bus splice connections.
2. Make all control connections across shipping splits.
3. Ensure that all items furnished are in proper operating condition:
a. Technician must be completely knowledgeable in the operation, maintenance, and start-up of the electrical system.
4. Furnish a written report after start-up signed by the manufacturer’s authorized representative:
a. Report must state that the installation is complete and meets all of the manufacturer’s requirements.
b. List any items requiring additional attention.
3.09 ADJUSTING
A. Make all adjustments as necessary and recommended by the manufacturer, Engineer, or testing firm.
3.10 CLEANING
A. As specified in Section 26 05 00.
3.11 PROTECTION
A. As specified in Section 26 05 00.
3.12 SCHEDULES (NOT USED)
END OF SECTION 26 24 13
This page intentionally left blank
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 28 01 - 1
LOW VOLTAGE MOLDED CASE
CIRCUIT BREAKERS
SECTION 26 28 01
LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS
PART 1GENERAL
1.01 SUMMARY
A. Section includes:
1. Low voltage molded case circuit breakers.
B. Related sections:
1. Section 01 33 00 - Submittal Procedures.
2. Section 26 05 00 - Common Work Results for Electrical.
3. Section 26 05 74 - Electrical System Studies.
1.02 REFERENCES
A. As specified in Section 26 05 00.
B. National Electrical Manufacturers Association (NEMA):
1. AB 3. - Molded Case Circuit Breakers and Their Application.
C. Underwriter’s Laboratories (UL):
1. 489 - Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit- Breaker Enclosures.
2. 943 - Ground Fault Circuit Interrupters.
1.03 DEFINITIONS
A. As specified in Section 26 05 00.
B. In accordance with UL 489.
1.04 SYSTEM DESCRIPTION
A. Molded case thermal magnetic or motor circuit protector type circuit breakers as indicated on the Drawings and connected to form a completed system.
1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01 33 00 and 26 05 00.
B. Product data:
1. Catalog cut sheets.
2. Manufacturer’s time-current curves for all molded case circuit breakers furnished.
1.06 QUALITY ASSURANCE
A. As specified in Section 26 05 00.
B. Low voltage molded case circuit breakers shall be UL listed and labeled.
1.07 DELIVERY, STORAGE AND HANDLING
A. As specified in Section 26 05 00.
1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 26 05 00.
1.09 SEQUENCING (NOT USED)
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 26 05 00 and 01 78 36.
1.12 SYSTEM START-UP
A. As specified in Section 26 05 00.
1.13 OWNER’S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED)
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 28 01 - 2
LOW VOLTAGE MOLDED CASE
CIRCUIT BREAKERS
PART 2PRODUCTS
2.01 MANUFACTURERS
A. One of the following or equal:
1. Eaton/Cutler-Hammer.
2. General Electric Company.
3. Schneider Electric/Square D Company.
4. ABB.
2.02 EXISTING PRODUCTS (NOT USED)
2.03 MATERIALS (NOT USED)
2.04 MANUFACTURED UNITS
A. General:
1. Conforming to UL 489.
2. Operating mechanism:
a. Quick-make, quick-break, non-welding silver alloy contacts. b. Common Trip, Open and Close for multi-pole breakers such that all poles open and close simultaneously.
c. Mechanically trip free from the handle.
d. Trip indicating handle - automatically assumes a position midway between the manual ON and OFF positions to clearly indicate the circuit breaker has tripped. e. Lockable in the "OFF" position.
3. Arc extinction:
a. In arc chutes.
4. Voltage and current ratings:
a. Minimum ratings as indicated on the Drawings.
b. Minimum frame size 100A.
5. Interrupting ratings:
a. Minimum ratings as indicated on the Drawings.
b. Not less than the rating of the assembly (panelboard, switchboard, motor control center, etc.)
B. Motor circuit protectors:
1. Instantaneous only circuit breaker as part of a listed combination motor controller.
2. Each pole continuously adjustable in a linear scale with ‘LO’ and ‘HI’ settings factory calibrated.
2.05 EQUIPMENT (NOT USED)
2.06 COMPONENTS
A. Terminals:
1. Line and load terminals suitable for the conductor type, size, and number of conductors in accordance with UL 489.
B. Case:
1. Molded polyester glass reinforced.
2. Ratings clearly marked.
C. Trip units:
1. Provide thermal magnetic or solid-state trip units as indicated on the Drawings.
2. Thermal magnetic:
a. Instantaneous short circuit protection.
b. Inverse time delay overload.
c. Ambient or enclosure compensated by means of a bimetallic element.
3. Solid state:
a. With the following settings as indicated on the Drawings.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 28 01 - 3
LOW VOLTAGE MOLDED CASE
CIRCUIT BREAKERS
1) Adjustable long time current setting.
2) Adjustable long time delay.
3) Adjustable short time pickup.
4) Adjustable short time delay.
5) Adjustable instantaneous pickup.
6) Adjustable ground fault pickup as indicated on the Drawings. 7) Adjustable ground fault delay as indicated on the Drawings.
D. Molded case circuit breakers for use in panelboards:
1. Bolt-on type.
a. Plug-in type breakers are not acceptable.
2. Ground fault trip devices as indicated on the Drawings.
2.07 ACCESSORIES (NOT USED)
2.08 MIXES (NOT USED)
2.09 FABRICATION (NOT USED)
2.10 FINISHES (NOT USED)
2.11 SOURCE QUALITY CONTROL
A. Test breakers in accordance with:
1. UL 489.
2. Manufacturer’s standard testing procedures.
PART 3EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. Install breakers to correspond to the accepted shop drawings.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 FIELD QUALITY CONTROL
A. As specified in Section 26 05 00.
3.08 ADJUSTING
A. Adjust trip settings in accordance with Protective Device Coordination Study as accepted by the Engineer and in accordance with manufacturer’s recommendations.
B. Adjust motor circuit protectors in accordance with NEC and the manufacturer’s recommendation based on the nameplate values of the installed motor.
3.09 CLEANING (NOT USED)
3.10 PROTECTION
A. As specified in Section 26 05 00.
3.11 SCHEDULES (NOT USED)
END OF SECTION 26 28 01
This page intentionally left blank
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 43 14 - 1 SURGE PROTECTIVE DEVICES SECTION 26 43 14
SURGE PROTECTIVE DEVICES
PART 1GENERAL
1.01 SUMMARY
A. Section includes:
1. High-energy surge protective devices.
B. Related sections:
1. Section 01 33 00 - Submittal Procedures.
2. Section 01 75 17 - Commissioning.
3. Section 26 05 00 - Common Work Results for Electrical.
4. Section 26 08 50 - Field Electrical Acceptance Tests.
1.02 REFERENCES
A. As specified in Section 26 05 00.
B. Institute of Electrical and Electronics Engineers (IEEE):
1. C62.41 – Recommended Practice on Surge Voltages in Low Voltage AC Power Circuits.
2. C62.45 –Guide on Surge Testing for Equipment Connected to Low-Voltage (1000 V and Less) AC Power Circuits.
3. C62.62- Standard Test Specifications for Surge Protective Devices for Low Voltage AC Power Circuits.
C. Underwriters Laboratory:
1. 1449, 4th Edition, Standard for Surge Protective Devices.
1.03 DEFINITIONS
A. As specified in Section 26 05 00.
B. Specific definitions:
1. SPD: Surge protective device.
2. SAD: Silicon avalanche diode.
3. MOV: Metal oxide varistor.
4. MCOV: Maximum continuous operating voltage.
5. In: Nominal discharge current.
6. VPR: Voltage protection rating.
7. SCCR: Short circuit current rating.
1.04 SYSTEM DESCRIPTION
A. Surge protective devices as an integral component of the electrical equipment or externally mounted as indicated on the Drawings.
1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01 33 00 and 26 05 00.
B. Product data:
1. Furnish complete product data confirming detailed compliance or exception statements to all provisions of this Section.
2. Manufacturer’s catalog cut sheets indicating:
a. Manufacturer and model numbers.
b. Ratings of each SPD including but not limited to:
1) Short circuit current rating.
2) Nominal discharge current.
3) Maximum continuous operating voltage.
4) Voltage protection rating.
5) System voltage.
6) System frequency.
7) Surge current capacity.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 43 14 - 2 SURGE PROTECTIVE DEVICES
3. Submit independent test data from a nationally recognized testing laboratory verifying the following:
a. Overcurrent protection.
b. UL 1449.
C. Shop drawings:
1. Provide electrical and mechanical drawings by the manufacturer that detail:
a. Unit dimensions.
b. Weights.
c. Components.
d. Field connection locations.
e. Mounting provisions.
f. Connection details.
g. Wiring diagram.
D. Operation and maintenance manuals:
1. Provide the manufacturer’s manual with installation, start-up, spare parts lists, and operating instructions for the specified system.
1.06 QUALITY ASSURANCE
A. As specified in Section 26 05 00.
B. Provide SPD units that are designed, manufactured, tested and installed in compliance with the following codes and standards:
1. Institute of Electrical and Electronics Engineers (IEEE C62.41, C62.45, C62.62).
2. Federal Information Processing Standards Publication 94 (FIBS PUB 94).
3. National Electrical Manufacturer Association.
4. National Fire Protection Association (NFPA 20, 75 and 780).
5. National Electric Code (NFPA 70).
6. Underwriters Laboratories (UL 1449 4th Edition and UL 1283).
7. International Electrotechnical Commission (IEC 801).
1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26 05 00.
1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 26 05 00.
1.09 SEQUENCING
A. Coordinate with and provide SPD equipment to the electrical equipment manufacturer before final assembly and factory testing.
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 26 05 00 and 01 78 36.
B. Extended warranty:
1. Furnish a manufacturer’s full 5-year parts and labor warranty from date of shipment against any part failure when installed in compliance with manufacturer's written instructions, UL listing requirements, and any applicable national, state, or local electrical codes.
2. Warranty shall include:
a. Direct, factory trained employees must be available within 48 hours for assessment of the problem.
b. A 24-hour toll-free 800-number for warranty support.
1.12 SYSTEM START-UP
A. As specified in Section 26 05 00.
1.13 OWNER'S INSTRUCTIONS (NOT USED)
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 43 14 - 3 SURGE PROTECTIVE DEVICES
1.14 MAINTENANCE (NOT USED)
PART 2PRODUCTS
2.01 MANUFACTURERS
A. One of the following or equal:
1. Liebert.
2. Eaton/Cutler-Hammer.
3. Schneider Electric/Square D.
4. General Electric.
2.02 EXISTING PRODUCTS (NOT USED)
2.03 MATERIALS (NOT USED)
2.04 MANUFACTURED UNITS
A. Provide Type 1 or Type 2 SPD units as required for the locations indicated on the Drawings.
B. Electrical requirements:
1. SPD ratings are to be consistent with the nominal system operating voltage, phase, and configuration as indicated on the Drawings.
2. MCOV:
a. For the SPD and all components in the suppression path (including all MOVs, SADs, and selenium cells): Greater than 115 percent of the nominal system operating voltage.
3. Operating frequency:
a. 47 to 63 hertz.
4. SCCR:
a. 65 kAIC minimum, but not less than the equipment it is connected to as indicated on the Drawings.
b. The SCCR shall be marked on the SPD in accordance with UL 1449 and the NEC.
5. Nominal discharge current In:
a. 20 kA.
6. Maximum VPR:
Modes 240/120 208Y/120 480Y/277
L-N, L-G, N-G 900 900 1,500
L-L 1,200 1,200 2000
7. Peak surge current:
a. Service entrance locations:
1) 240 kA per phase minimum.
2) 120 kA per mode minimum.
b. Branch locations:
1) 120 kA per phase, minimum.
2) 60 kA per mode minimum.
C. Protection modes:
1. Provide SPD protection modes as follows:
a. Line to Neutral (L-N) where applicable.
b. Line to Ground (L-G).
c. Neutral to Ground (N-G), where applicable.
D. Environmental requirements:
1. Storage temperature:
a. -40 degrees to +50 degrees Celsius.
2. Operating temperature:
a. -0 degrees to +60 Celsius.
3. Relative humidity:
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 43 14 - 4 SURGE PROTECTIVE DEVICES a. 5 percent to 95 percent.
4. Audible noise:
a. Less than 45 dBa at 5 feet (1.5 m).
5. Operating altitude:
a. Zero to 12,000 feet above sea level.
E. Provide surge protective devices that are suitable for application in IEEE C62.41 Category A, B and C3 environments, as tested to IEEE C62.45.
2.05 EQUIPMENT (NOT USED)
2.06 COMPONENTS
A. Enclosure:
1. Located in electrical equipment as or in an external NEMA 12 enclosure indicated on the Drawings.
a. NEMA Type 12 enclosure:
1) No ventilation openings.
b. Hinged cover requiring a tool for internal access.
c. Internal drawing pocket.
d. All monitoring indications must be visible without opening the door.
B. Internal connections:
1. Provide low impedance copper plates for intra-unit connections:
a. Attach surge modules using bolted connections to the plates for low impedance connections.
2. Size all connections, conductors, and terminals for the specified surge current capacity.
C. Surge diversion modules:
1. MOV:
a. Where multiple MOVs are used in parallel, utilize computer matched MOVs to within 1 volt variance and tested for manufacturer's defects.
D. Overcurrent protection:
1. Individually fuse all components, including suppression, filtering, and monitoring components:
a. Rated to allow maximum specified nominal discharge current capacity. b. Overcurrent protection that limits specified surge currents is not acceptable.
E. Connections:
1. Provide terminals to accommodate wire sizes up to #2 AWG.
2.07 ACCESSORIES
A. Unit status indicators:
1. Provide red and green solid-state indicators, with printed labels, on the front cover to redundantly indicate on-line unit status:
a. The absence of the green light and the presence of the red light indicate that surge protection is reduced and service is needed to restore full operation. b. Indicates the status of protection on each mode or phase.
B. Dry contacts for remote monitoring:
1. Electrically isolated Form C dry contacts (1 A/125 VAC) for remote monitoring of system integrity, and indication of under voltage, phase and/or power loss.
C. Provide an audible alarm which activates under any fault condition.
1. Provide an alarm On/Off switch to silence the alarm.
2. A visible LED will confirm whether alarm is On or Disabled.
3. Locate both switches and the audible alarm on the unit’s front cover.
D. Provide transient counter to count transient voltage surges:
1. LCD readout located on the unit’s front cover.
2. Counter to utilize batteries with a 10-year nominal life or non-volitile memory to maintain accurate counts in the event of power loss.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 26 43 14 - 5 SURGE PROTECTIVE DEVICES
2.08 MIXES (NOT USED)
2.09 FABRICATION (NOT USED)
2.10 FINISHES (NOT USED)
2.11 SOURCE QUALITY CONTROL
A. Permanently affix surge rating to the SPD.
B. Perform manufacturer’s standard factory test.
1. Perform testing in accordance with UL 1449.
PART 3EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. As specified in Section 26 05 00.
B. Follow the manufacturer's recommended installation practices and comply with all applicable codes.
C. Special techniques:
1. Install the SPD with as short and straight conductors including ground conductor as practically possible:
a. Twist the input conductors together to reduce input conductor inductance.
2. Do not subject SPD to insulation resistance testing.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 COMMISSIONING
A. As specified in Section 01 75 17.
3.08 FIELD QUALITY CONTROL
A. As specified in Section 26 08 50.
3.09 ADJUSTING (NOT USED)
3.10 CLEANING (NOT USED)
3.11 PROTECTION
A. As specified in Section 26 05 00.
3.12 SCHEDULES (NOT USED)
END OF SECTION 26 43 14
This page intentionally left blank
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 31 23 16.13 - 1
TRENCHING, EXCAVATION,
BACKFILLING, AND
COMPACTING
SECTION 31 23 16.13
TRENCHING, EXCAVATION, BACKFILLING, AND COMPACTING
PART 1 – GENERAL
1.01 DESCRIPTION
A. This section includes materials, testing, and installation for trench excavation, backfill, and compaction of piping, conduit, and catch basins.
1.02 REFERENCE STANDARDS
A. The publications listed below form part of this specification to the extent referenced and are referred to in the text by the basic designation only. Reference shall be made to the latest edition of said standards unless otherwise called for.
B. ASTM C 131 Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
C. ASTM C 150 Portland Cement
D. ASTM D 75 Practice for Sampling Aggregates
E. ASTM 1556 Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone method
F. ASTM D 1557 Test Method for Moisture-Density Relations of Soils Using a Modified Effort
G. ASTM D 2419 Test Method for Sand Equivalent Values of Soil and Fine Aggregate H. ASTM D 3017 Test Method for Water Content of Soil and Rock in Place by Nuclear Methods
I. ASTM D 3776Test Method for Mass Per Unit Area (Weight) of Woven Fabric J. ASTM D 4253Test Methods for Maximum Index Density and Unit Weight of Soils Using a Vibratory Plate
K. ASTM D 4254Test Methods for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density
L. ASTM D 4632Test Method for Grab Breaking Load and Elongation of Geotextiles M. ASTM D 4751Test Method for Determining the Apparent Opening Size of a Geotextile N. CAL-OSHA Title 8 General Industry Safety Orders
1.03 RELATED SECTIONS
A. Section 33 05 05 - General Piping System and Appurtenances B. Section 33 05 19 – Ductile Iron Pipe and Fittings
C. Section 33 42 11 - Drainage Systems
1.04 GEOTECHNICAL TESTING
A. The Contractor shall engage the services of a geotechnical engineering firm or individual licensed in the State of California to monitor soil conditions during earthwork, trenching, bedding, backfill, and compaction operations. Sampling and testing procedures shall be performed in accordance with the Reference Standards and as follows:
B. The soils technician shall be present at the site during all backfill and compaction operations.
Failure to have the soils technician present will subject such operations to rejection.
C. Density and optimum moisture content of soil shall be determined by the use of the sand cone method, ASTM D 1556, or nuclear density gauge method, ASTM D 2922 & D 3017. Since the composition of the pipe and the walls of the trench have an effect on the nuclear density gauge output, a minimum of 25% of the density and optimum moisture tests shall be made using the sand cone method.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 31 23 16.13 - 2
TRENCHING, EXCAVATION,
BACKFILLING, AND
COMPACTING
D. Determine laboratory moisture-density relations of existing soil by ASTM D 1557, Method C and/or D.
E. Determine the relative density of cohesion less soils by ASTM D 1557, Method C and/or D.
F. Sample backfill material by ASTM D 75.
G. Express “relative compaction” as a percentage of the ratio of the in-place dry density to the laboratory maximum dry density.
H. A report of all soils tests performed shall be stamped and signed by the soils firm or individual and shall be submitted by the Contractor prior to the filling of the Notice of Completion by the City. The report shall document the sampling and testing of materials, the location and results of all tests performed, and shall certify that materials and work are in compliance with this specification.
1.05 PIPE ZONE (PIPE BEDDING)
A. The pipe zone includes the full-width of the trench from 6-inches below the bottom of the pipe to 12-inches above the top of the pipe and extends into manhole or catch basin excavations to the point of connection to or penetration of such structure.
1.06 TRENCH ZONE
A. The trench zone includes the portion of the trench from the top of the pipe zone (pipe bedding) to the bottom of the pavement zone in paved areas, or to the existing surface in unpaved areas, and extends into manhole or catch basin excavations above the pipe zone.
1.07 PAVEMENT ZONE
A. The pavement zone includes the concrete or asphalt concrete pavement and aggregate base section placed over the trench zone and extends into manhole or catch basin excavations above the trench zone.
1.08 PROTECTION OF EXISTING UTILITIES AND FACILITIES
A. The Contractor shall be responsible for the care and protection of all existing utilities, facilities, and structures that may be encountered in or near the area of the work.
1.09 PROTECTION OF EXISTING LANDSCAPING
A. The Contractor shall be responsible for the protection of all the trees, shrubs, fences, and other landscape items adjacent to or within the work area.
1.10 ACCESS
A. The Contractor shall provide continuous, unobstructed access to all driveways, water valves, hydrants, or other property or facilities within or adjacent to the work areas.
1.11 SAFETY
A. Protection of workers within trenches shall be as required by the California Labor Code.
B. All excavations shall be performed in a safe manner and shall be protected and supported in accordance with CAL-OSHA regulations.
C. Barriers and traffic delineators shall be placed in accordance with the requirements of the agency having jurisdiction.
1.12 BLASTING
A. Blasting for excavation shall not be performed without the written permission of the City Procedures and methods of blasting shall conform to all Federal, State, and local laws and ordinances.
1.13 PIPE JACKING (NOT USED)
1.14 EXCESS EXCAVATED MATERIAL
A. The Contractor shall remove and legally dispose of all excess excavated material and demolition debris.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 31 23 16.13 - 3
TRENCHING, EXCAVATION,
BACKFILLING, AND
COMPACTING
B. It is the intent of these specifications that all surplus material shall be legally disposed of by the Contractor. Before acceptance of the work by City, the Contractor shall provide the City with written releases signed by all property owners with whom the Contractor has entered into agreements for disposing of excess excavated material, absolving the City from any liability connected therewith.
C. The certified quantities shall be reported to the City.
1.15 CHANGES IN LINE AND GRADE
A. In the event obstructions not shown on the plans are encountered during the progress of the work, and which will require alterations to the plans, the Engineer shall have the authority to change the plans and order the necessary deviation from the line and grade. The Contractor shall not deviate from the specified line and grade without prior written approval by the City.
1.16 HYDROSTATIC TESTING
A. Pre-testing of the piping system may be performed for the Contractor’s convenience at any time. However, the final disinfection and hydrostatic pressure tests, as described in Sections 33 01 10.58 and 33 05 05.31, shall be performed following the completion of all backfilling and trench zone compaction with a minimum of 3-feet of material over the pipe.
PART 2 – MATERIALS
2.01 GENERAL
A. The Contractor shall furnish backfill material as specified below. All materials used in and above the pipe zone shall be capable of attaining the required relative density.
2.02 IMPORTED SAND – PIPE ZONE
A. Imported sand shall be used within the Pipe Zone for installations of DIP, PVC, Corrugated HDPE Drain Pipe, Cement-Mortar Coated and Lined Welded Steel Pipe, Tape-Wrapped Steel Pipe, and Paint- Coated Pipe.
B. Imported sand shall be free from clay balls, organic matter, and other deleterious substances and shall have a coefficient of permeability greater than 0.014 measured in accordance with ASTM D2434 or a sand equivalent of greater than 30 per ASTM D2419.
C. Resistivity for imported sand shall be not less than 2,000 ohm-cm when maximum chloride concentration of 200 mg/I when measured in accordance with California Test Method 422 and a maximum sulfate concentration of 500mg/I when measures in accordance with California Test Method 417.
D. Imported Sand shall conform to the following gradation:
Sieve Size Percent Passing by Weight
½ inch 100
No. 4 75-100
No. 16 35-75
No. 50 10-40
No. 200 0-10
2.03 TRENCH PLUGS
A. Trench plugs consisting of compacted Imported Granular Material or sand cement slurry shall be installed on piping systems that are backfilled with crushed rock.
2.04 EARTH BACKFILL MATERIAL - TRENCH ZONE
A. Earth backfill is defined as materials removed from the required excavations and used as backfill of earth fill. Earth backfill that meets the requirements specified herein may be used for all backfill or fill, except where imported materials are shown on the Plans or specified herein.
Do not use stockpiled topsoil for backfill or fill.
B. Earth backfill shall be excavated material that is free from organic matter, roots, debris, and rocks larger than 3 inches in the greatest dimension.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 31 23 16.13 - 4
TRENCHING, EXCAVATION,
BACKFILLING, AND
COMPACTING
C. Earth backfill used in the trench zone shall be native granular materials free from roots, debris, and organic matter with less than 50 percent passing the No. 200 sieve and more than 40 percent passing the No. 4 sieve and rock particles with a maximum dimension no greater than 4 inches, unless otherwise recommended by the Geotechnical Engineer.
D. Where the onsite materials are determined by the Engineer to be unsuitable, imported fill shall be provide by the Contractor.
2.05 SAND-CEMENT SLURRY
A. Sand-cement slurry shall consist of 1sack (94 pounds) of Portland cement per cubic yard of sand and sufficient moisture for workability. City approval is required for use of slurry as a backfill material.
2.06 FILTER FABRIC
A. Filter fabric shall be manufactured from polyester, nylon, or polypropylene. Material shall be of non-woven construction and shall meet the following requirements:
B. Grab tensile strength (ASTM D 4632): 100 lbs. minimum for a 1-inch raveled strip
C. Weight (ASTM D 3776): 4.5 oz./yd^2
D. Apparent opening size (ASTM D 4751): 0.006-inch
PART 3 – EXECUTION
3.01 CLEARING AND GRUBBING
A. Areas where work is to be performed shall be cleared of all trees, shrubs, rubbish, and other objectionable material of any kind, which, if left in place, would interfere with the proper performance or completion of the completed work, would impair its subsequent use, or would form obstructions therein.
B. Organic material from clearing and grubbing operations will not be incorporated in the trench backfill and shall be removed from the project site or retained and incorporated into the topsoil.
3.02 PAVEMENT, CURB, AND SIDEWALK REMOVAL
A. Bituminous or concrete pavements, curbs, and sidewalks shall be removed and replaced in accordance with the requirements of the agency having jurisdiction.
3.03 DEWATERING
A. The Contractor shall provide and maintain at all times during construction ample means and devices to promptly remove and dispose of all water from any source entering excavations or other parts of the work. Dewatering shall be performed by methods that will ensure a dry excavation and preservation of the final lines and grades of the bottoms of excavations.
Dewatering methods may include well points, sump points, suitable rock or gravel placed as pipe bedding for drainage and pumping, temporary pipelines, or other means, all subject to the approval of the City. The cost of all dewatering activities shall be borne by the Developer or Contractor.
B. Sewer systems shall not be used as drains for dewatering trenches or excavations, nor for disposal of collected or accumulated groundcover, without the approval of the agency of jurisdiction.
C. Concrete shall not be poured in water, nor shall water be allowed to rise around concrete or mortar until it has set at least four hours.
D. The Contractor is responsible for meeting all Federal, State, and local laws, rules, and regulations regarding the treatment and disposal of water from dewatering operations at the construction site.
3.04 SHORING AND SHIELDING
A. The Contractor’s design and installation of shoring shall be consistent with the rules, orders, and regulations of CAL-OSHA.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 31 23 16.13 - 5
TRENCHING, EXCAVATION,
BACKFILLING, AND
COMPACTING
B. Excavations shall be shored, sheeted, and supported such that the walls of the excavation will not slide or settle and all existing improvements of any kind, either on public or private property, will be fully protected from damage.
C. The sheeting and shoring shall be arranged so as not to place any stress on portions of the completed work until the general construction has proceeded far enough to provide ample strength.
D. Care shall be exercised in the moving or removal of trench shields, sheeting, and shoring to prevent the caving or collapse of the excavation faces being supported.
3.05 CORRECTION OF OVEREXCAVATION
A. Over-excavations shall be corrected by backfilling with approved imported granular material or crushed rock, compacted to 90% relative compaction, as directed by the City.
3.06 FOUNDATION STABILIZATION
A. When unsuitable soil materials are encountered, the unsuitable material shall be removed to the depth determined necessary in the field by the Soils Technician, and as acceptable to the City. The sub-grade shall be restored with compacted Imported Granular Material or crushed rock as recommended by the Soils Technician. Place the appropriate bedding or base material on this restored foundation.
B. When rock encroachment is encountered, the rock shall be removed to a point below the intended trench or excavation sub-grade as determined necessary in the field by the Soils Technician, and as acceptable to the City. The sub-grade shall be restored with compacted Imported Granular Material as recommended by the Soils Technician. Place the appropriate bedding or base material on this restored foundation.
C. When excessively wet, soft, spongy, or similarly unstable material is encountered at the surface upon which the bedding or base material is to be placed, the unsuitable material shall be removed to the depth determined necessary in the field by the Soils Technician, and as acceptable to the City. Restore the trench with crushed rock enclosed in filter fabric as directed by the Engineer. Larger size rocks, up to 3-inches, with appropriate gradation, may be used if recommended by the Soils Technician. Place the appropriate bedding or base material on this restored foundation.
3.07 TRENCH EXCAVATION AND PLACEMENT OF BEDDING
A. Excavate the trench to the lines and grades shown on the drawings with allowance for 6-inches of pipe bedding material. The trench section shall be as shown on the Standard Drawings.
B. The maximum length of open trench shall be 500-feet except by permission of the City. The distance is the collective length at any location, including open excavation and pipe laying, which has not been backfilled to the elevation of the surrounding gate.
C. Trench walls shall be sloped or shored per the requirements of CAL-OSHA.
D. The trench bottom shall be graded to provide a smooth, firm, and stable foundation that is free from rocks and other obstructions.
E. Place the specified thickness of bedding material over the full width of the trench. Grade the top of the pipe base ahead of the pipe laying to provide a firm, uniform support along the full length of pipe.
F. Excavate bell holes at each joint to permit proper assembly and inspection of the entire joint.
G. Trenches for main pipelines and all appurtenances shall be backfilled with the materials and methods as specified for the Pipe Zone, Trench Zone, and Pavement Zone.
H. Trench widths shall be in accordance with the Standard Drawings.
I. Trench depth shall be as required to install pipelines in accordance with the Approved Plans and these Standard Specifications. Unless shown otherwise in the Approved Plans, the minimum cover for pipelines shall be as follows:
Pipeline Application Minimum Cover Required
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 31 23 16.13 - 6
TRENCHING, EXCAVATION,
BACKFILLING, AND
COMPACTING
Potable Water 36-inches
Storm Drain 24-inches
Recycled Water 48-inches
Sewer 60-inches
3.08 MANHOLES, VAULTS, AND CATCH BASINS
A. The Contractor shall prepare an excavation large enough to accommodate the structure and permit grouting of openings and backfilling operations. The walls of the excavation shall be sloped or shored per the requirements of CAL-OSHA.
B. Manholes, vaults, and catch basins excavation shall be placed at the location and elevation shown on the plans, on undisturbed soil with 6-inches of compacted crushed rock base.
C. Manholes, vaults, and catch basins excavations shall be backfilled with the materials and methods as specified for the Pipe Zone, Trench Zone, and Pavement Zone.
3.09 COMPACTION REQUIREMENTS
A. Compaction shall be accomplished by mechanical means. Consolidation by water settling methods such as jetting or flooding is prohibited.
B. If the backfill fails to meet the specified relative compaction requirements, the backfill shall be reworked until the requirements are met. All necessary excavations for density tests shall be made as directed by the Soils Technician, and as acceptable to the Engineer. The requirements of the Agency having jurisdiction shall prevail on all public roads.
C. Compaction tests shall be performed at random depths, and at random intervals not to exceed 150-feet, as directed by the Soils Technician or City.
D. Relative compaction shall be determined by the impact or field compaction test made in accordance with ASTM D 1557 Procedure C.
E. Unless otherwise shown on the plans, standard drawings or otherwise described in the specifications for the particular type of pipe installed, relative compaction in pipe trenches shall be as follows:
1. Pipe zone – 90% relative compaction.
2. Trench zone – 90% relative compaction.
3. Structural section in paved areas (upper twelve inches of trench zone underlying pavements) – per agency requirements, 95% minimum.
4. Imported Granular Material for over excavation or foundation stabilization – 90% relative density.
F. F. All excavations are subject to compaction tests.
3.10 TRENCH PLUGS
A. Trench plugs shall be installed at 200-foot intervals along the entire length of piping systems.
Trench plugs shall be 10-feet in length and shall encompass the entire pipe zone. Additional trench plugs may be required as directed by the Engineer.
3.11 PIPE ZONE BACKFILL
A. Care shall be taken in placing the imported granular backfill material simultaneously around the main pipeline and appurtenance pipes so that the pipe barrel is completely supported and that no voids or uncompacted areas are left beneath the pipe or on the sides of the pipe. Care shall be taken to place material simultaneously on both sides of the pipe to prevent lateral movement. This area shall be mechanically compacted to attain 90% relative density. Care shall be taken when compacting appurtenance laterals 2-inches and smaller to prevent the crushing or denting of the copper lateral. Additional lifts of 12-inches or less thickness may be required on 16-inch or larger diameter pipe to attain complete support of the haunch area. Soils tests may be taken on this layer or backfill.
B. After the spring line backfill has been approved by the Soils Technician, backfill of the remainder of the Pipe Zone may proceed. Do not drop sharp, heavy pieces of material directly onto the pipe or the tamped material around the pipe.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 31 23 16.13 - 7
TRENCHING, EXCAVATION,
BACKFILLING, AND
COMPACTING
C. Place and compact the imported granular material at a maximum of 12-inch lifts. Compact all material placed in the Pipe Zone by mechanical methods. Nuclear tests shall be taken on this layer of backfill.
D. The use of a backhoe mounted compaction wheel is prohibited within the pipe zone to 12- inches above the top of the pipe.
E. Under no circumstances shall consolidation by water settling or water-setting methods (i.e., jetting, diking, etc.) be permitted.
3.12 TRENCH ZONE BACKFILL
A. After the Pipe Zone material has been placed, compacted, approved by the Soil Technician, and accepted by the City, backfill in the Trench Zone may proceed.
B. Compaction using vibratory equipment, tamping rollers, pneumatic tire rollers, or other mechanical tampers shall be performed with the type and size of equipment necessary to accomplish the work. The backfill shall be placed in horizontal layers of such depths as are considered proper for the type of compacting equipment being used in relation to the backfill material being placed. Each layer shall be evenly spread, properly moistened, and compacted to the specified relative density. The Contractor shall repair or replace any pipe, fitting, manhole, or structure damaged by the installation operations as directed by the City.
3.13 PAVEMENT ZONE BACKFILL AND RESTORATION
A. After the Trench Zone material has been placed, compacted, approved by the Geotechnical Engineer, and accepted by the City, backfill in the Pavement Zone may proceed as necessary in accordance with the requirements of the agency having jurisdiction.
B. Replace bituminous and concrete pavement, curbs, and sidewalks removed or damaged during construction in accordance with the requirements of the agency having jurisdiction.
END OF SECTION 31 23 16.13
This page intentionally left blank
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 11 23 - 1 Aggregate Base Courses SECTION 32 11 23
AGGREGATE BASE COURSES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Aggregate base course.
B. Paving aggregates.
1.02 RELATED REQUIREMENTS
A. Section 31 23 16.13 - Trenching: Compacted fill over utility trenches under base course.
B. Section 31 23 23 - Fill: Compacted fill under base course.
C. Section 32 12 16 - Asphalt Paving: Finish and binder asphalt courses.
D. Section 32 13 13 - Concrete Paving: Finish concrete surface course.
1.03 PRICE AND PAYMENT PROCEDURES
A. See Section 01 22 00 - Unit Prices for general requirements applicable to unit prices for earthwork.
B. Coarse Aggregate Type [____]: By the cubic yard. Includes supplying aggregate material, stockpiling, scarifying substrate surface, placing, and compacting.
1.04 REFERENCE STANDARDS
1.05 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements for submittal procedures.
PART 2 PRODUCTS
2.01 MATERIALS
A. Coarse Aggregate Type [____]: Coarse aggregate, complying with State of [________] Highway Department standard.
2.02 SOURCE QUALITY CONTROL
A. See Section 01 40 00 - Quality Requirements for general requirements for testing and analysis of aggregate materials.
PART 3 EXECUTION
3.01 INSTALLATION
A. Under Bituminous Concrete Paving:
1. Place coarse aggregate to a total compacted thickness of [____] inches.
2. Compact to [____] lb/cu ft dry density.
3. Compact to 95 percent of maximum dry density.
B. Under Portland Cement Concrete Paving:
1. Place coarse aggregate to a total compacted thickness of [____] inches.
2. Compact to [____] lb/cu ft dry density.
3. Compact to 95 percent of maximum dry density.
C. Place aggregate in maximum 4 inch layers and roller compact to specified density.
D. Level and contour surfaces to elevations and gradients indicated.
E. Add small quantities of fine aggregate to coarse aggregate as appropriate to assist compaction.
F. Add water to assist compaction. If excess water is apparent, remove aggregate and aerate to reduce moisture content.
G. Use mechanical tamping equipment in areas inaccessible to compaction equipment.
3.02 FIELD QUALITY CONTROL
A. See Section 01 40 00 - Quality Requirements for general requirements for field inspection and testing.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 11 23 - 2 Aggregate Base Courses END OF SECTION 32 11 23
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 12 16 - 1 Asphalt Paving SECTION 32 12 16
ASPHALT PAVING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Aggregate base course.
B. Single course bituminous concrete paving.
C. Double course bituminous concrete paving.
1.02 RELATED REQUIREMENTS
A. Section 31 22 00 - Grading: Preparation of site for paving and base.
B. Section 31 23 23 - Fill: Compacted subgrade for paving.
C. Section 32 17 23 - Pavement Markings.
1.03 PRICE AND PAYMENT PROCEDURES
A. See Section 01 22 00 - Unit Prices for requirements applicable to this section. Measurement and payment will be as follows:
B. Asphalt Pavement Mix (Base Course): By the SF. Includes preparing base, tack coating surfaces, placing, compacting and rolling, testing. Includes mix design, supplying to site, testing.
C. Asphalt Pavement Mix (Binder Course): By the ton. Includes preparing base, tack coating surfaces, placing, compacting and rolling, testing. Includes mix design, supplying to site, testing.
D. Asphalt Pavement Mix (Wearing Course): By the ton. Includes preparing base, tack coating surfaces, placing, compacting and rolling, testing. Includes mix design, supplying to site, testing.
1.04 REFERENCE STANDARDS
A. AI MS-2 - Asphalt Mix Design Methods 2015.
B. ASTM D946 - Standard Specification for Penetration-Graded Asphalt Cement for Use in Pavement Construction 2009a.
1.05 QUALITY ASSURANCE
A. Perform Work in accordance with State of [________] Highways standard.
B. Mixing Plant: Complying with State of [________] Highways standard.
C. Obtain materials from same source throughout.
1.06 FIELD CONDITIONS
A. Do not place asphalt when ambient air or base surface temperature is less than 40 degrees F, or surface is wet or frozen.
PART 2 PRODUCTS
2.01 REGULATORY REQUIREMENTS
A. Comply with applicable code for paving work on public property.
2.02 MATERIALS
A. Asphalt Cement: ASTM D946.
B. Aggregate for Base Course: In accordance with State of [________] Highways standards.
C. Aggregate for Binder Course: In accordance with State of [________] Highways standards.
D. Aggregate for Wearing Course: In accordance with State of [________] Highways standards.
E. Tack Coat: Homogeneous, medium curing, liquid asphalt.
2.03 ASPHALT PAVING MIXES AND MIX DESIGN
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 12 16 - 2 Asphalt Paving A. Asphalt Base Course: 3.0 to 6 percent of asphalt cement by weight in mixture in accordance with AI MS-2.
B. Asphalt Binder Course: 4.5 to 6 percent of asphalt cement by weight in mixture in accordance with AI [____].
C. Asphalt Wearing Course: 5 to 7 percent of asphalt cement by weight in mixture in accordance with AI MS-2.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that compacted subgrade is dry and ready to support paving and imposed loads.
B. Verify gradients and elevations of base are correct.
3.02 AGGREGATE BASE COURSE
A. Place and compact aggregate base course.
3.03 PREPARATION - TACK COAT
A. Apply tack coat in accordance with manufacturer's instructions.
B. Apply tack coat on asphalt or concrete surfaces over subgrade surface at uniform rate of 1/3 gal/sq yd.
C. Coat surfaces of manhole frames with oil to prevent bond with asphalt pavement. Do not tack coat these surfaces.
3.04 PLACING ASPHALT PAVEMENT - SINGLE COURSE
A. Install Work in accordance with State of [________] Highways standards.
B. Place asphalt within 24 hours of applying primer or tack coat.
C. Compact pavement by rolling to specified density. Do not displace or extrude pavement from position. Hand compact in areas inaccessible to rolling equipment.
D. Perform rolling with consecutive passes to achieve even and smooth finish without roller marks.
3.05 PLACING ASPHALT PAVEMENT - DOUBLE COURSE
A. Place asphalt binder course within 24 hours of applying primer or tack coat.
B. Place asphalt wearing course within two hours of placing and compacting binder course.
C. Compact pavement by rolling to specified density. Do not displace or extrude pavement from position. Hand compact in areas inaccessible to rolling equipment.
D. Perform rolling with consecutive passes to achieve even and smooth finish, without roller marks.
3.06 SCHEDULE
A. Pavement at Parking Areas: Two courses; binder course of 2-1/2 inch compacted thickness and wearing course of 1 inch compacted thickness, fog seal coat.
END OF SECTION 32 12 16
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 13 13 - 1 Concrete Paving SECTION 32 13 13
CONCRETE PAVING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Concrete parking areas.
1.02 RELATED REQUIREMENTS
A. Section 03 10 00 - Concrete Forming and Accessories.
B. Section 03 20 00 - Concrete Reinforcing.
C. Section 03 30 00 - Cast-in-Place Concrete.
D. Section 07 92 00 - Joint Sealants: Sealing joints.
E. Section 09 91 13 - Exterior Painting: Pavement markings.
F. Section 31 22 00 - Grading: Preparation of site for paving and base.
G. Section 31 23 23 - Fill: Compacted subbase for paving.
H. Section 32 11 23 - Aggregate Base Courses: Class II base course.
1.03 PRICE AND PAYMENT PROCEDURES
A. Provide concrete paving by the unit price method.
B. See Section 01 22 00 - Unit Prices, for additional unit price requirements.
C. Concrete Placed: Measurement by the square yard per inch thickness. Includes preparing base, placing, floating and finishing, testing.
1.04 REFERENCE STANDARDS
A. ACI 211.1 - Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete 1991 (Reapproved 2009).
B. ACI 301 - Specifications for Concrete Construction 2020.
C. ACI 304R - Guide for Measuring, Mixing, Transporting, and Placing Concrete 2000 (Reapproved 2009).
D. ASTM A615/A615M - Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement 2020.
E. ASTM A1064/A1064M - Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete 2018a.
F. ASTM C33/C33M - Standard Specification for Concrete Aggregates 2018.
G. ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens 2021.
H. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete 2021b.
I. ASTM C173/C173M - Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method 2016.
J. ASTM C309 - Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete 2019.
K. ASTM D1751 - Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types) 2018.
L. ASTM D1752 - Standard Specification for Preformed Sponge Rubber, Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction 2018.
1.05 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data on joint filler, admixtures, and curing compound.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 13 13 - 2 Concrete Paving C. Design Data: Indicate pavement thickness, designed concrete strength, reinforcement, and typical details.
PART 2 PRODUCTS
2.01 PAVING ASSEMBLIES
A. Comply with applicable requirements of the Caltrans 2018 Standard Specifications .
B. Parking Area Pavement: 4,000 psi 28 day concrete, 8 inches thick, #4 @ 24" o.c. both ways reinforcement, wood float finish.
2.02 FORM MATERIALS
A. Form Materials: As specified in Section 03 10 00.
B. Joint Filler: Preformed; non-extruding bituminous type (ASTM D1751) or sponge rubber or cork (ASTM D1752).
2.03 REINFORCEMENT
A. Reinforcing Steel and Welded Wire Reinforcement: Types specified in Section 03 20 00.
B. Dowels: ASTM A615/A615M, Grade 40 - 40,000 psi yield strength; deformed billet steel bars; unfinished finish.
2.04 CONCRETE MATERIALS
A. Obtain cementitious materials from same source throughout.
B. Concrete Materials: As specified in Section 03 30 00.
2.05 ACCESSORIES
A. Curing Compound: ASTM C309, Type 1, Class A.
2.06 CONCRETE MIX DESIGN
A. Proportioning Normal Weight Concrete: Comply with ACI 211.1 recommendations.
B. Concrete Properties:
1. Compressive strength, when tested in accordance with ASTM C39/C39M at 28 days; 4,000 psi.
2. Cement Content: Minimum [___] lb per cubic yard.
3. Water-Cement Ratio: Maximum 40 percent by weight.
4. Total Air Content: 4 percent, determined in accordance with ASTM C173/C173M.
5. Maximum Slump: 3 inches.
6. Maximum Aggregate Size: [__] inch.
2.07 MIXING
A. Transit Mixers: Comply with ASTM C94/C94M.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify compacted subgrade is acceptable and ready to support paving and imposed loads.
B. Verify gradients and elevations of base are correct.
3.02 SUBBASE
A. See Section 32 11 23 for construction of base course for work of this Section.
3.03 PREPARATION
A. Moisten base to minimize absorption of water from fresh concrete.
B. Notify Engineer minimum 24 hours prior to commencement of concreting operations.
3.04 FORMING
A. Place and secure forms to correct location, dimension, profile, and gradient.
B. Assemble formwork to permit easy stripping and dismantling without damaging concrete.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 13 13 - 3 Concrete Paving C. Place joint filler vertical in position, in straight lines. Secure to formwork during concrete placement.
3.05 REINFORCEMENT
A. Place reinforcement at top of slabs-on-grade.
B. Interrupt reinforcement at contraction joints.
C. Provide doweled joints [____] inch on center at transverse joints.
3.06 PLACING CONCRETE
A. Place concrete as specified in Section 03 30 00.
B. Do not place concrete when base surface is wet.
C. Place concrete using the slip form technique.
D. Ensure reinforcement, inserts, embedded parts, formed joints are not disturbed during concrete placement.
E. Place concrete continuously over the full width of the panel and between predetermined construction joints. Do not break or interrupt successive pours such that cold joints occur.
3.07 JOINTS
A. Place 3/8 inch wide expansion joints at 20 foot intervals and to separate paving from vertical surfaces and other components.
1. Form joints with joint filler extending from bottom of pavement to within 1/2 inch of finished surface.
2. Secure to resist movement by wet concrete.
B. Saw cut contraction joints 3/16 inch wide at an optimum time after finishing. Cut 1/3 into depth of slab.
3.08 FINISHING
A. Area Paving: Light broom, texture perpendicular to pavement direction.
B. Place curing compound on exposed concrete surfaces immediately after finishing. Apply in accordance with manufacturer's instructions.
3.09 FIELD QUALITY CONTROL
A. An independent testing agency will perform field quality control tests, as specified in Section 01 40 00 - Quality Requirements.
1. Provide free access to concrete operations at project site and cooperate with appointed firm.
2. Submit proposed mix design of each class of concrete to inspection and testing firm for review prior to commencement of concrete operations.
3. Tests of concrete and concrete materials may be performed at any time to ensure compliance with specified requirements.
B. Compressive Strength Tests: ASTM C39/C39M; for each test, mold and cure three concrete test cylinders. Obtain test samples for every 100 cu yd or less of each class of concrete placed.
1. Perform one slump test for each set of test cylinders taken.
C. Maintain records of placed concrete items. Record date, location of pour, quantity, air temperature, and test samples taken.
3.10 PROTECTION
A. Immediately after placement, protect pavement from premature drying, excessive hot or cold temperatures, and mechanical injury.
END OF SECTION 32 13 13
This page intentionally left blank
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 17 23.13 - 1 Painted Pavement Markings SECTION 32 17 23.13
PAINTED PAVEMENT MARKINGS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Parking lot markings, including parking bays and arrows.
1.02 RELATED REQUIREMENTS
A. Section 32 12 16 - Asphalt Paving.
B. Section 32 13 13 - Concrete Paving.
1.03 PRICE AND PAYMENT PROCEDURES
A. See Section 01 21 00 - Allowances, for cash allowances affecting this section.
B. See Section 01 22 00 - Unit Prices, for additional unit price requirements.
1.04 REFERENCE STANDARDS
A. MPI (APL) - Master Painters Institute Approved Products List; Master Painters and Decorators Association Current Edition.
B. FHWA MUTCD - Manual on Uniform Traffic Control Devices 2010, with Errata.
PART 2 PRODUCTS
2.01 MATERIALS
A. Line and Zone Marking Paint: MPI (APL) No. 97 Latex Traffic Marking Paint; color(s) as indicated.
1. Parking Lots: Yellow.
2. Handicapped Symbols: Blue.
B. Temporary Marking Tape: Preformed, reflective, pressure sensitive adhesive tape in color(s) required; Contractor is responsible for selection of material of sufficient durability as to perform satisfactorily during period for which its use is required.
PART 3 EXECUTION
3.01 PREPARATION
A. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
B. Clean surfaces thoroughly prior to installation.
1. Remove dust, dirt, and other granular surface deposits by sweeping, blowing with compressed air, rinsing with water, or a combination of these methods.
C. Where oil or grease are present, scrub affected areas with several applications of trisodium phosphate solution or other approved detergent or degreaser, and rinse thoroughly after each application; after cleaning, seal oil-soaked areas with cut shellac to prevent bleeding through the new paint.
D. Establish survey control points to determine locations and dimensions of markings; provide templates to control paint application by type and color at necessary intervals.
E. Temporary Pavement Markings: When required or directed by Engineer, apply temporary markings of the color(s), width(s) and length(s) as indicated or directed.
1. After temporary marking has served its purpose, remove temporary marking by carefully controlled sandblasting, approved grinding equipment, or other approved method so that surface to which the marking was applied will not be damaged.
2. At Contractor's option, temporary marking tape may be used in lieu of temporary painted marking; remove unsatisfactory tape and replace with painted markings at no additional cost to City.
3.02 INSTALLATION
A. Begin pavement marking as soon as practicable after surface has been cleaned and dried.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 17 23.13 - 2 Painted Pavement Markings B. Do not apply paint if temperature of surface to be painted or the atmosphere is less than 50 degrees F or more than 95 degrees F.
C. Apply in accordance with manufacturer's instructions using an experienced technician that is thoroughly familiar with equipment, materials, and marking layouts.
D. Comply with FHWA MUTCD manual (http://mutcd.fhwa.dot.gov) for details not shown.
E. Apply markings in locations determined by measurement from survey control points; preserve control points until after markings have been accepted.
F. Apply uniformly painted markings of color(s), lengths, and widths as indicated on drawings true, sharp edges and ends.
1. Apply paint in one coat only.
2. Wet Film Thickness: 0.015 inch, minimum.
3. Width Tolerance: Plus or minus 1/8 inch.
G. Parking Lots: Apply parking space lines, entrance and exit arrows, painted curbs, and other markings indicated on drawings.
1. Mark the International Handicapped Symbol at indicated parking spaces.
2. Hand application by pneumatic spray is acceptable.
H. Symbols: Use a suitable template that will provide a pavement marking with true, sharp edges and ends, of the design and size indicated.
END OF SECTION 32 17 23.13
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 31 13 - 1 Chain Link Fences and Gates SECTION 32 31 13
CHAIN LINK FENCES AND GATES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Posts, rails, and frames.
B. Wire fabric.
C. Concrete.
1.02 RELATED REQUIREMENTS
A. Section 03 30 00 - Cast-in-Place Concrete: Concrete anchorage for posts.
1.03 PRICE AND PAYMENT PROCEDURES
A. Allowances: See Section 01 21 00 - Allowances, for cash allowances affecting this section.
B. Unit Prices: See Section 01 22 00 - Unit Prices, for additional unit price requirements.
1. Fencing: Measurement and payment by the linear foot, to the fence height specified, based on the specified post spacing. Includes posts, rails, tension wire, fabric, accessories, attachments.
1.04 REFERENCE STANDARDS
A. ASTM F567 - Standard Practice for Installation of Chain-Link Fence 2014a (Reapproved 2019).
B. FS RR-F-191/1D - Fencing, Wire and Post Metal (Chain-Link Fence Fabric) 1990.
1.05 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Chain Link Fences and Gates:
1. [______].
2.02 COMPONENTS
A. Line Posts: 1.9 inch diameter.
B. Corner and Terminal Posts: 2.38 inch diameter.
C. Fabric: 2 inch diamond mesh interwoven wire, 6 gauge, 0.1920 inch thick, top selvage knuckle end closed, bottom selvage twisted tight.
D. Tension Wire: 6 gauge, 0.1920 inch thick steel, single strand.
E. Tie Wire: Aluminum alloy steel wire.
2.03 MATERIALS
A. Posts, Rails, and Frames: [______]:
1. Line Posts: Type I round in accordance with FS RR-F-191/1D.
2. Terminal, Corner, Rail, Brace, and Gate Posts: Type I round in accordance with FS RRF-191/1D.
B. Wire Fabric: [______]:
C. Concrete: [______]:
1. Type specified in Section 03 30 00.
PART 3 EXECUTION
3.01 PREPARATION
A. Removal: Obstructions or debris.
3.02 INSTALLATION
A. Install framework, fabric, accessories and gates in accordance with ASTM F567.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 32 31 13 - 2 Chain Link Fences and Gates
3.03 CLEANING
A. Clean jobsite of excess materials; scatter excess material from post hole excavations uniformly away from posts. Remove excess material if required.
B. Clean fence with mild household detergent and clean water rinse well.
END OF SECTION 32 31 13
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 33 31 13 - 1
Site Sanitary Sewerage Gravity
Piping
SECTION 33 31 13
SITE SANITARY SEWERAGE GRAVITY PIPING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Sanitary sewerage drainage piping, fittings, and accessories.
B. Connection of building sanitary drainage system to municipal sewers.
1.02 RELATED REQUIREMENTS
A. Section 31 23 16.13 - Trenching: Excavating, bedding, and backfilling.
1.03 PRICE AND PAYMENT PROCEDURES
A. See Section 01 22 00 - Unit Prices, for additional unit price requirements.
B. Pipe and Fittings:
1. Basis of Measurement: By the linear foot.
1.04 REFERENCE STANDARDS
A. ASTM D2321 - Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications 2020.
B. ASTM D3034 - Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings 2016.
1.05 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data indicating pipe, pipe accessories, and [________].
C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
D. Manufacturer's Installation Instructions: Indicate special procedures required to install Products specified.
PART 2 PRODUCTS
2.01 SEWER PIPE MATERIALS
A. Plastic Pipe: ASTM D3034, Type PSM, Poly(Vinyl Chloride) (PVC) material; inside nominal diameter of [____] inches, bell and spigot style solvent sealed joint end.
B. Fittings: Same material as pipe molded or formed to suit pipe size and end design, in required tee, bends, elbows, cleanouts, reducers, traps and other configurations required.
2.02 PIPE ACCESSORIES
A. Trace Wire: Magnetic detectable conductor, clear plastic covering, imprinted with "Sewer Service" in large letters.
2.03 BEDDING AND COVER MATERIALS
A. Pipe Bedding Material: As specified in Section 31 23 23.
B. Pipe Cover Material: As specified in Section 31 23 23.
PART 3 EXECUTION
3.01 TRENCHING
A. See Section 31 23 16.13 for additional requirements.
B. Backfill around sides and to top of pipe with cover fill, tamp in place and compact, then complete backfilling.
3.02 INSTALLATION - PIPE
A. Install pipe, fittings, and accessories in accordance with manufacturer's instructions. Seal watertight.
1. Plastic Pipe: Also comply with ASTM D2321.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 33 31 13 - 2
Site Sanitary Sewerage Gravity
Piping
B. Lay pipe to slope gradients noted on layout drawings; with maximum variation from true slope of 1/8 inch in 10 feet.
C. Connect to building sanitary sewer outlet and municipal sewer system , through installed sleeves.
D. Install trace wire 6 inches above top of pipe; coordinate with Section 31 23 16.13.
END OF SECTION 33 31 13
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 33 42 30 - 1 Stormwater Drains SECTION 33 42 30
STORMWATER DRAINS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Precast concrete catch basins.
B. Prefabricated drop inlets.
C. Frames and grates.
1.02 PRICE AND PAYMENT PROCEDURES
A. See Section 01 22 00 - Unit Prices for additional unit price requirements.
B. Catch Basins and Drop Inlets:
1. Basis of Measurement: By the unit for a nominal depth of [____] feet.
1.03 REFERENCE STANDARDS
A. AASHTO HB - Standard Specifications for Highway Bridges 2005, with Errata.
B. ASTM C478/C478M - Standard Specification for Circular Precast Reinforced Concrete Manhole Sections 2020.
C. ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants 2009 (Reapproved 2019).
D. ASTM C1634 - Standard Specification for Concrete Facing Brick and Other Concrete Masonry Facing Units 2020.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements for submittal procedures.
B. Shop Drawings: Indicate stack assembly, invert elevations, opening sizes, and pipe angles.
C. Manufacturer's Installation Instructions: Indicate special procedures for assembly.
D. Manufacturer's qualification statement.
PART 2 PRODUCTS
2.01 CATCH BASINS
A. Weight Rating: H 10 according to AASHTO HB.
B. Precast Concrete Catch Basins: Comply with ASTM C478/C478M, reinforced.
1. Wall Thickness: 6 inches (152 mm).
2. Base Thickness: 12 inches (305 mm).
3. Reinforcement: Formed steel wire, galvanized finish, wire diameter as indicated on drawings.
4. Joint Sealant: Comply with ASTM C990.
C. Grade Adjustments:
1. Concrete Bricks: ASTM C1634 or ASTM C55 Grade N, cored, normal weight; [___] by [___] by [___] inches.
D. Frames and Grates: Steel, checkerboard pattern, [___] by [___] inch.
2.02 CATCH BASIN, TRENCH DRAIN, CLEANOUT, AND AREA DRAIN COMPONENTS A. Lids and Drain Covers: Cast iron, hinged to cast iron frame.
1. Catch Basin:
a. Lid Design: Linear grill.
b. Nominal Lid and Frame Size: [___] by [___] inch.
PART 3 EXECUTION
3.01 EXCAVATION AND FILL
A. Hand trim excavation for accurate placement to indicated elevations.
City of San Luis Obispo Transit
Facility EV Charging Infrastructure 33 42 30 - 2 Stormwater Drains B. Backfill with cover fill, tamp in place and compact, then complete backfilling.
3.02 INSTALLATION
A. Establish elevations and pipe inverts for inlets and outlets as indicated in drawings.
B. Precast Concrete Catch Basins:
1. Place base section plumb and level.
2. Install joint sealant uniformly around section lip.
C. Grade Adjustments:
1. Lay brick or masonry units uniformly on mortar bed with full head joints, running bond.
Top with mortar, plumb and level.
2. Place adjacent materials tight and smooth following design grades.
D. Frames and Grates:
1. Place frame plumb and level.
2. Place grate in frame securely.
END OF SECTION 33 42 30
City of San Luis Obispo Sole Source Justification Form
ChargePoint
It is the policy of the City of San Luis Obispo to solicit quotations or bids for purchases of commodities or services for specified dollar amounts and to select vendors on a competitive basis (See City of San Luis Obispo Financial Management Manual, Section 201, Exhibit 201‐B).
Pursuant to San Luis Obispo Municipal Code Chapter 3.24.060, certain acquisitions in which the products or services may only be obtained from a single source may be purchased without engaging in bidding procedures. Such Sole Source acquisitions must be justified in sufficient detail to explain the basis for suspending the usual competitive procurement process and approved by the approving authority before such a purchase is made.
1. What product or service is being requested? Why is it necessary? City staff is requesting to purchase two ChargePoint Express 250 charger stations directly from ChargePoint. These chargers are necessary to charge the new electric buses being purchased by the City.
2. Is this “brand” of product or services offered the only one that meets the City’s requirements? If yes, what is unique about the product/services?
This brand of charger is being used throughout the City on various other electric vehicle charging stations. The product is also UL Rated and approved by PG&E for their EV Supply Equipment rebate.
This product is compliant with the Federal Transportation Authority (FTA) and Federal Highway Administration (FHWA) Buy America Options. This project is using federal dollars and must comply with federal procurement requirements. Referring to FTA Circular 42220.1F, sole source procurement is acceptable if one or more conditions are satisfied:
i. Unique Capability or Availability
ii. Unique or Innovative Concept
iii. Patents or Restricted Data Rights
iv. Substantial Duplication Costs
v. Unacceptable Delay.
In this case, the following conditions exist:
Unique Capability or availability. The charge units from ChargePoint meets the power and charging requirements for the City ZEBs. ChargePoint is the only US firm with available unit within delivery timeframe for this project.
Unacceptable Delay. The other firms are from outside the US and delivery delays would cause unacceptable delays to the completion of the project.
3. Is the product or service proprietary or is it available from various dealers? Have you verified this?
City of San Luis Obispo Sole Source Justification Form
This specific product is distributed by other vendors, but the City is requesting to purchase the chargers directly from the manufacturer in order to avoid third party markups.
4. Have other products/vendors been considered? If yes, which products/vendors have been considered and how did they fail to meet the City’s requirements? No other products have been considered because this product meets all the City’s requirements for this project.
5. Is the purchase an upgrade or addition to an existing system or brand of products adopted citywide? If so, will purchase of this product avoid other costs as opposed to purchasing another product or service (e.g., additional training required; data conversion; implementation of a new system; etc.)? This purchase is an expansion of the City’s Electric Vehicle charging infrastructure and continuing with the brand of infrastructure installed at the Marsh Street Parking Structure and the City Hall Parking Lot. ChargePoint also integrates with the City’s existing asset management software and has a local partner that is able to service and troubleshoot the equipment.
6. Is this a request for services by a contractor with necessary, unique and critical knowledge of established City systems or programs? If so, will using the contractor’s services avoid other costs (e.g.: significant staff time in compiling information, data transfers, etc.)? This request is not for services by a contractor with necessary, unique and critical knowledge of established City systems or programs.
7. What is the quoted price for the product or services and is it reasonable (based on other products or services in the same field or based on historical pricing for the City for similar products or services)?
The quoted price for the products to purchase is $126,066 and the fee is reasonable for the products provided.
Approved:
Daniel Clancy /s/ //2022
Daniel Clancy Date
Purchasing Analyst
Item 5d
Department: Public Works
Cost Center: 5201 (Transit)
For Agenda of: 3/1/2022
Placement: Consent
Estimated Time: N/A
FROM: Matt Horn, Public Works Director
Prepared By: Austin O’Dell, Transit Manager
SUBJECT: AUTHORIZATION TO SUBMIT 2020-21 LOW CARBON TRANSIT
OPERATIONS PROGRAM (LCTOP) GRANT APPLICATIONS, ELECTRIC
VEHICLE (EV) INFRASTRUCTURE
RECOMMENDATION
Adopt a Resolution entitled, “A Resolution of the City Council of the City of San Luis Obispo, California, authorizing the City Manager or their Designee, to file, execute and fulfill any related Low Carbon Transportation Operations Program Grant Applications, Certifications, Assurances, Forms, Agreements, and Associated Documents on behalf of the City.”
DISCUSSION
Background Information on California’s LCTOP
The LCTOP is one of several programs that are part of the Transit, Affordable Housing, and Sustainable Communities Program established by the California Legislature in 2014 by Senate Bill 862. The California Legislature created LCTOP to provide operating and capital assistance for transit agencies to reduce greenhouse gas emissions and improve mobility, with a priority on serving disadvantaged communities. Approved projects in LCTOP support new or expanded bus or rail services, expand intermodal transit facilities, and may include equipment acquisition, fueling, maintenance, and other costs to operate those services or facilities, with each project reducing greenhouse gas emissions (GHG). Since 2015-16, Senate Bill 862 continuously appropriates five percent of the annual auction proceeds in the Greenhouse Gas Reduction Fund (Fund) for LCTOP.
The LCTOP is administered by California Department of Transportation (Caltrans) in coordination with the California Air Resource Board (ARB) and the State Controller’s Office (SCO). Caltrans is responsible for ensuring that the statutory requirements of the LCTOP are met in terms of project eligibility, greenhouse reduction, disadvantaged community benefit, and other requirements of the law.
Per Public Resource Code § 75230(f)(1)(3) funds shall be expended to provide transit operating or capital assistance that meets any of the following three criteria:
Item 5d
1. New and Expanded. Expenditures that directly enhance or expand transit service by supporting new or expanded bus or rail services, new or expanded water-borne transit, or expanded intermodal facilities, and may include equipment acquisition, fueling, and maintenance, and other costs to operate those services or facilities.
2. Increased Modality. Operational expenditures that increase transit mode share.
3. Zero-Emissions. Expenditures related to the purchase of zero-emission buses, including electric buses, and the installation of the necessary equipment and infrastructure to operate and support zero-emission buses.
Relevancy of LCTOP to the City
The City of San Luis Obispo may seek a portion of
LCTOP funds annually. Each transit operator is
entitled to funds based on a statewide formula. The
City’s currently identified allocation is $5,899; this
amount may change slightly based upon revised
State numbers.
Regionally, a discretionary amount of $285,233
available to all local transit agencies to apply for is also projected. These specific and regional LCTOP
funds require an annual grant application. This grant
application requires City Council approval. SLOCOG determines the grant awards based on one of following criteria:
Expenditures that directly enhance or expand transit service by supporting new or expanded bus or rail services, new or expanded water-borne transit, or expanded intermodal facilities, and may include equipment acquisition, fueling, and maintenance, and other costs to operate those services or facilities. Operational expenditures that increase transit mode share. Expenditures related to the purchase of zero-emission buses, including electric buses, and the installation of the necessary equipment and infrastructure to operate and support zero-emission buses.
City LCTOP Grant Application for Supporting EV Infrastructure Staff is recommending that this year’s 2021-22 LCTOP grant application be made toward supporting the infrastructure costs related to the purchase and installation of electric bus charging units.
Item 5d
The State of California’s Air Resource Board has manded that transit agencies convert to zero emission vehicles by 2040. The City of San Luis Obispo’s Climate Action Plan also has the ambitious goal for City services to be carbon neutral by 2030. In support of this, City Council has previously approved the purchase of two (2) electric transit vehicles on July 7, 2020, to replace two aged diesel transit buses. These electric transit vehicles are expected to be delivered in early 2022.
These two new vehicles will therefore need to be supported with appropriate EV infrastructure and charging units. The design for this EV infrastructure and charging units is in progress. Funding to support the construction phase of this work will come from both an Air Pollution Control District and PG&E grants. Supplemental funding from LCTOP meets the intended purpose of the funds by supporting reduction in GHG emission.
Policy Context
Financial Management Manual Policy 740 requires that the City Council approve grant applications equal to or greater than $5,000. The application will request $291,132 combined with the City allocated and discretionary LCTOP funds.
Further, this project is consistent with the City’s adopted 2019 Major City Goals Financial Plan, Climate Action Plan, 2017-22 Short Range Transit Plan, the regions SLO Regional Zero Emission Bus Plan and the state’s Innovative Clean Transit Rule.
Public Engagement
This is an administrative item, so no outside public engagement was completed. Public comment can be provided to the City Council through written correspondence prior to the meeting and through public testimony at the meeting.
CONCURRENCE
This proposed project has been reviewed by the San Luis Obispo Council of Governments (SLOCOG) before submission to the City Council. SLOCOG board, Transportation Technical Advisory Committee, and Social Services Technical Advisory Committee are recommending funding for the City’s project.
ENVIRONMENTAL REVIEW
The California Environmental Quality Act does not apply to the recommended action in this report, because the action does not constitute a “Project” under CEQA Guidelines Sec. 15378.
Item 5d
FISCAL IMPACT
Budgeted: Yes – Grant Funding Budget Year: 2021-22
Funding Identified: Yes
Fiscal Analysis:
Funding Sources
Total
Budget
Available
Current
Funding
Request
Remaining
Balance
Annual
Ongoing
Cost
Transit Fund $ $
State – LCTOP
Discretionary
$285,233
State – LCTOP Direct $5,899
Other: APCD
Other: PG&E
Total $291,132 $ $
There is no impact on the City’s General Fund as a result of applying or receiving these grant funds. Rather, securement of these funds will assist and supplement the Transit Enterprise fund in achieving its capital project goals.
ALTERNATIVES
Deny authorization request for the grant application. This is not recommended as this will leave the transit program without another funding source to pursue this vital project.
ATTACHMENTS
A - Draft Resolution authorizing submission of LCTOP grant applications
Item 5f
Department: Community Development
Cost Center: 4003
For Agenda of: 3/15/2022
Placement: Consent
Estimated Time: N/A
FROM: Michael Codron, Community Development Director
Prepared By: Walter Oetzell, Assistant Planner
SUBJECT: REQUEST TO REMOVE THE PROPERTY AT 540 BUCHON STREET FROM THE CONTRIBUTING PROPERTIES LIST OF THE CITY’S
INVENTORY OF HISTORIC RESOURCES
RECOMMENDATION
As recommended by the Cultural Heritage Committee, adopt a resolution entitled “A Resolution of the City Council of the City of San Luis Obispo, California, removing the property at 540 Buchon Street from the Inventory of Historic Resources (HIST-0727- 2021).”
DISCUSSION
The owner of the property at 540 Buchon
Street has requested that the property be
removed from the City’s Inventory of Historic
Resources, as provided in Listing
Procedures for Historic Resources, set out in
Section 14.01.060 (C) of the City’ s Historic
Preservation Ordinance. An evaluation of
the property and its eligibility for historic
listing has been prepared by James Papp,
PhD (Historicities LLC) to inform
consideration of this request (see
Attachment B).
Site and Setting
The property is a residential parcel on the north side of Buchon Street, about 100 feet east of Beach Street, within the Old Town Historic District, one of the City’s oldest residential neighborhoods, built up historically around the turn of the 20th Century, with older structures dating back to the 1880s.
Figure 1: 540 Buchon Street
Item 5f
The site is developed with a single-family dwelling and detached garage (see Figure 1).
As described in the applicant’s Historic Resource Evaluation (Attachment B), a dwelling is depicted on the site in a 1891 Sanborn Map, the first to include this block of Buchon, and subsequent maps show a rear stable structure in 1905, later replaced by a shed and garage with composition roof by 1926 (Papp, pg. 5 & 9). Evidence suggests that the residence likely embodied a Gothic Revival style (Papp pg. 8), however the dwelling does not currently retain the characteristic form or features of the style. It was extensively remodeled in 1957, with the front section of the building having apparently been demolished and replaced (Papp, pg. 10).
Historic Listing
Historic preservation policies are set out in the Conservation and Open Space Element (COSE) of the City’s General Plan and the Historic Preservation Ordinance (SLOMC Ch. 14.01) implements these policies.
Property may be designated as a Contributing List resource where a building on it maintains its historic and architectural character, and contributes, by itself or in conjunction with other structures, to the unique or historic character of a neighborhood, district, or to the City as a whole, and satisfies at least one of the historic significance criteria listed in § 14.01.070. The subject property first appears as a “Contributing Property” in the listing of properties attached (as “Exhibit C”) to Resolution 6424 adopted in April 1988, establishing a comprehensive listing of historic properties within the City.
EVALUATION
Criteria for Historic Resource Listing
The applicant’s Historic Resource Evaluation evaluates the property against the Criteria for Historic Resource Listing provided in § 14.01.070 of the City’s Historic Preservation Ordinance, and concludes that the property is not eligible for historical listing in the City’s Inventory of Historic Resources, as the primary dwelling on the property has, since its 1957 alteration, lacked the integrity to communicate its original architectural character and the remodeled and refinished building did not later attain its own historical significance (Papp, pg. 1). In addition, the evaluation did not result in identification of any association with important historical persons or events which would otherwise make the property eligible for listing.
In order to be eligible for designation, a resource must exhibit a high level of historic integrity and satisfy at least one of the evaluation criteria listed in § 14.01.070 of the City’s Historic Preservation Ordinance. The Ordinance also provides that, while it is the general intent that property not be removed from historic listing, property may be removed if the structure on it is found to no longer meet eligibility (historic significance) criteria for listing (§ 14.01.060 (C)).
Item 5f
Architectural Criteria (§ 14.01.070 (A)). The residence on this property does not exhibit the form or characteristic features of the original dwelling constructed on the site, having been lost through extensive modifications in 1957, leaving any remaining portions without “anything to relate to” (Papp, pg. 10). Its architect is not known, though the present building as modified would no longer faithfully reflect the architect’s work.
Historic Criteria (§ 14.01.070 (B)). The Evaluation notes that the property is not associated with persons or events of historical significance that would qualify the property for historical designation (Papp pg. 10). There is no evidence that the property was associated with any famous or “first-of-its-kind” event and its construction is not considered to be a notably important, unique, or distinctly interesting contribution to the City. The home could be associated with the earliest residential development of the City, but no longer possesses the integrity to communicate this association.
Integrity. The applicant’s Evaluation describes the major modifications to the dwelling in 1957, including demolition and replacement of the front portion the building in 1957 which have resulted in the loss of the building’s original architectural character and materials, such that it would be unrecognizable in comparison with its pre-1957 form (Papp, pg. 10) Previous Council or Advisory Body Action
The Cultural Heritage Committee reviewed this Historical Preservation application (HIST0727-2021), requesting removal of the property from the City’s Inventory of Historic Resources, at a public hearing on January 24, 2022 and by a vote of 5-0 (with one Committee Member absent and one Vacancy) recommended that the Council remove the property from the Contributing Properties List, finding that the original dwelling has lost integrity due to previous alterations to the property, such that it is no longer eligible for listing as a Contributing List Resource.
Policy Context
The recommended action on this item is supported by historical preservation policies in section 3.0 of the Conservation and Open Space Element of the City’ s General Plan, and with procedures and standards for listing of historic resources of The City’ s Historic Preservation Ordinance SLOMC Sections 14.01.060 & 14.01.070. The Historic Preservation Ordinance states that in order to qualify as a resource, a high degree of integrity must be maintained and that at least one of the historic significance criteria is satisfied.
Public Engagement
Public notice of this hearing has been provided to owners and occupants of property near the subject site, and published in a widely circulated local newspaper, and hearing agendas for this meeting have been posted at City Hall, consistent with adopted notification procedures for development projects.
Item 5f
ENVIRONMENTAL REVIEW
Consideration of continued eligibility of this property for historic listing is exempt from the provisions of the California Environmental Quality Act (CEQA), as it is does not have the potential for causing a significant effect on the environment, and so is covered by the general rule described in CEQA Guidelines § 15061(b)(3). The determination of continued eligibility for historic listing is limited to review of whether the subject site remains eligible for historic resource listing according to the criteria set forth in the City’ s Historic Preservation Ordinance.
FISCAL IMPACT
Budgeted: No Budget Year: 2022
Funding Identified: No
Fiscal Analysis:
Funding
Sources
Total Budget
Available
Current
Funding
Request
Remaining
Balance
Annual
Ongoing
Cost
General Fund $N/A $ $ $
State
Federal
Fees
Other:
Total $ $0 $ $0
The removal of the property from the contributing properties’ list has no fiscal impact since the property is not currently eligible for historic preservation benefits (i.e. Mills Act) and the historic designation of the property has no bearing on City fiscal resources.
ALTERNATIVES
1. Maintain 540 Buchon Street on the City’ s Inventory of Historic Resources, based on findings that the property continues to satisfy the criteria for Historic Resource Listing of the City’s Historic Preservation Ordinance. This alternative is not recommended because the Historic Resources Evaluation prepared for this property indicates that the property is not eligible for listing as an historical resource.
2. Continue consideration of the request to a future date for additional information or discussion.
Item 5f
ATTACHMENTS
A - Draft Resolution removing 540 Buchon from Inventory of Historic Resources B - Historical Resource Evaluation (James Papp, PhD)
C - Evaluation Criteria for Historic Resource Listing
R ______
RESOLUTION NO. _____ (2022 SERIES)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, REMOVING THE PROPERTY AT 540 BUCHON STREET FROM THE INVENTORY OF HISTORIC RESOURCES (HIST0727-2021) WHEREAS, the applicant, Ashley Ludaescher, submitted on October 19, 2021 an application to remove the property located at 540 Buchon Street (“the Property”) from the Contributing Properties List of Historic Resources (HIST-0727-2021); and WHEREAS, the Cultural Heritage Committee of the City of San Luis Obispo conducted a public hearing via teleconference from the City of San Luis Obispo, California on January 24, 2022 to consider the application, and recommended that the City Council remove the Property from the Contributing Properties List of Historic Resources; and WHEREAS, the City Council of the City of San Luis Obispo conducted a public hearing in the Council Chamber of City Hall, 990 Palm Street, San Luis Obispo, California on March 15, 2022 for the purpose of considering removal of the Property from the Contributing Properties List of Historic Resources; and WHEREAS, notices of said public hearing and meeting were made at the time and in the manner required by law; and
WHEREAS, the City Council has duly considered all evidence, including the record of the Cultural Heritage Committee hearing and recommendation, testimony of the applicant and interested parties, and the evaluation and recommendations by staff presented at said hearing.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo as follows:
SECTION 1. Findings. Based upon all the evidence, the Council makes the following findings:
a) The property is not historically significant under the Integrity Criteria set out in § 14.01.070 (C) of the City’s Historic Preservation Ordinance. The primary dwelling on the property no longer has the integrity to qualify as a Contributing Historic Resource due to previous alteration.
Resolution No. _____ (2022 Series) Page 2
R _____
b) The removal of the property from the City’s Contributing Properties List of Historic Resources is consistent with the Historic Preservation Ordinance because the buildings on the property lack significance within the historical contexts addressed by the Evaluation Criteria for Historic Resource Listing set out in § 14.01.070 of the City’s Historic Preservation Ordinance. The eligibility of the property for inclusion in the City’s Inventory of Historic Resources has been evaluated by an architectural historian. As summarized in the applicant’s statement submitted with application HIST-0727-2021, that evaluation concluded that the primary structure on the property no longer has the integrity to qualify as a Contributing Historic Resource due to previous alteration, and that the property is not a candidate for inclusion on the City’s Inventory.
SECTION 2. Environmental Review. Consideration of continuing eligibility of this property for historic listing is exempt from the provisions of the California Environmental Quality Act (CEQA). The determination of continued eligibility for historic listing is limited to review of whether the subject site remains eligible for historic resource listing according to the criteria set forth in the City’s Historic Preservation Ordinance. A determination that the property is not eligible for historic listing will cause the removal of the property from the City's Inventory of Historic Resources, but will have no direct physical effect on the environment, as the determination does not approve any physical site development. As such, it is does not have the potential for causing a significant effect on the environment and is covered by the general rule described in CEQA Guidelines §15061(b)(3).
Resolution No. _____ (2022 Series) Page 3
R _____
SECTION 3. Action. The City Council of the City of San Luis Obispo does hereby determine that the structures located on the Property do not meet eligibility criteria for listing as Historic Resources and removes the Property from the Contributing Properties List of Historic Resources, subject to the following condition:
Upon motion of Council Member ___________, seconded by Council Member _______________, and on the following roll call vote:
AYES:
NOES:
ABSENT:
The foregoing resolution was adopted this ____ day of _________ 2022. __________________________
Mayor Erica A. Stewart
ATTEST:
________________________
Teresa Purrington
City Clerk
APPROVED AS TO FORM:
_________________________
J. Christine Dietrick
City Attorney
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, on ______________________. __________________________
Teresa Purrington
City Clerk
12 Zoning, or remove the property from historic listing if the structure on the property no longer meets eligibility criteria for listing, following the process for listing set forth herein.
14.01.070. Evaluation Criteria for Historic Resource Listing When determining if a property should be designated as a listed Historic or Cultural Resource, the CHC and City Council shall consider this ordinance and State Historic Preservation Office (“SHPO”) standards. In order to be eligible for designation, the resource shall exhibit a high level of historic integrity, be at least fifty (50) years old (less than 50 if it can be demonstrated that enough time has passed to understand its historical importance) and satisfy at least one of the following criteria:
A. Architectural Criteria: Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of a master, or possesses high artistic values. (1) Style: Describes the form of a building, such as size, structural shape and details within that form (e.g. arrangement of windows and doors, ornamentation, etc.). Building style will be evaluated as a measure of:
a. The relative purity of a traditional style;
b. Rarity of existence at any time in the locale; and/or current rarity although the structure reflects a once popular style;
c. Traditional, vernacular and/or eclectic influences that represent a particular social milieu and period of the community; and/or the uniqueness of hybrid styles and how these styles are put together.
(2) Design: Describes the architectural concept of a structure and the quality of artistic merit and craftsmanship of the individual parts. Reflects how well a particular style or combination of styles are expressed through compatibility and detailing of elements.
Also, suggests degree to which the designer (e.g., carpenter-builder) accurately interpreted and conveyed the style(s). Building design will be evaluated as a measure of:
a. Notable attractiveness with aesthetic appeal because of its artistic merit, details and craftsmanship (even if not necessarily unique);
b. An expression of interesting details and eclecticism among carpenter-builders, although the craftsmanship and artistic quality may not be superior. (3) Architect: Describes the professional (an individual or firm) directly responsible for the building design and plans of the structure. The architect will be evaluated as a reference to:
13 a. A notable architect (e.g., Wright, Morgan), including architects who made significant contributions to the state or region, or an architect whose work influenced development of the city, state or nation.
b. An architect who, in terms of craftsmanship, made significant contributions to San Luis Obispo (e.g., Abrahams who, according to local sources, designed the house at 810 Osos - Frank Avila's father's home - built between 1927 – 30).
B. Historic Criteria
(1) History – Person: Associated with the lives of persons important to local, California, or national history. Historic person will be evaluated as a measure of the degree to which a person or group was:
a. Significant to the community as a public leader (e.g., mayor, congress member, etc.) or for his or her fame and outstanding recognition - locally, regionally, or nationally.
b. Significant to the community as a public servant or person who made early, unique, or outstanding contributions to the community, important local affairs or institutions (e.g., council members, educators, medical professionals, clergymen, railroad officials).
(2) History – Event: Associated with events that have made a significant contribution to the broad patterns of local or regional history or the cultural heritage of California or the United States. Historic event will be evaluated as a measure of:
(i) A landmark, famous, or first-of-its-kind event for the city - regardless of whether the impact of the event spread beyond the city.
(ii) A relatively unique, important or interesting contribution to the city (e.g., the Ah Louis Store as the center for Chinese-American cultural activities in early San Luis Obispo history).
(3) History-Context: Associated with and also a prime illustration of predominant patterns of political, social, economic, cultural, medical, educational, governmental, military, industrial, or religious history. Historic context will be evaluated as a measure of the degree to which it reflects:
a. Early, first, or major patterns of local history, regardless of whether the historic effects go beyond the city level, that are intimately connected with the building (e.g., County Museum).
b. Secondary patterns of local history, but closely associated with the building (e.g., Park Hotel).
14 C. Integrity: Authenticity of an historical resource’s physical identity evidenced by the survival of characteristics that existed during the resource’s period of significance. Integrity will be evaluated by a measure of:
(1) Whether or not a structure occupies its original site and/or whether or not the original foundation has been changed, if known.
(2) The degree to which the structure has maintained enough of its historic character or appearance to be recognizable as an historic resource and to convey the reason(s) for its significance.
(3) The degree to which the resource has retained its design, setting, materials, workmanship, feeling and association.
14.01.080 Historic District Designation, Purpose and Application A. Historic (H) District designation. All properties within historic districts shall be designated by an “H” zoning. Properties zoned “H” shall be subject to the provisions and standards as provided in Ordinance 17.54 (Zoning) of the Municipal Code.
B. Purposes of Historic Districts. The purposes of historic districts and H zone designation are to:
(1) Implement cultural resource preservation policies of the General Plan, the preservation provisions of adopted area plans, the Historic Preservation and Archaeological Resource Preservation Program Guidelines, and (2) Identify and preserve definable, unified geographical entities that possess a significant concentration, linkage, or continuity of sites, buildings, structures, or objects united historically or aesthetically by plan or physical development; (3) Implement historic preservation provisions of adopted area and neighborhood improvement plans;
(4) Enhance and preserve the setting of historic resources so that surrounding land uses and structures do not detract from the historic or architectural integrity of designated historic resources and districts; and
(5) Promote the public understanding and appreciation of historic resources.
C. Eligibility for incentives. Properties zoned as Historic Preservation (H) shall be eligible for preservation incentive and benefit programs as established herein, in the Guidelines and other local, state and federal programs.
Item 5g
Department: Public Works
Cost Center: 6102
For Agenda of: 3/15/2022
Placement: Consent
Estimated Time: N/A
FROM: Matt Horn, Public Works Director
Prepared By: Hai Nguyen, Engineer III
SUBJECT: AUTHORIZATION TO ADVERTISE VERDE/LUNETA/RAMONA/BROAD SEWER PIPE REPLACEMENT, SPECIFICATION NO. 1000091
RECOMMENDATION
1. Approve the project plans and specifications for Verde/Luneta/Ramona/Broad Sewer Pipe Replacement, Specification Number 1000091; and
2. Authorize staff to advertise for bids; and
3. Authorize the City Manager, or their designee to award the Construction Contract pursuant to Section 3.24.190 of the Municipal Code for the bid total, if the lowest responsible bid is within the publicly disclosed funding amount of $1,156,000; and
4. Authorize the City Engineer to approve Contract Change Orders up to the available project budget.
DISCUSSION
Background
Replacement and rehabilitation of wastewater collection (sewer) pipes is part of an ongoing program to maintain aging and deteriorating infrastructure. This program has several objectives: 1) ensure reliable removal of wastewater; 2) reduce the need for emergency repairs; 3) reduce the need for preventive maintenance; and 4) ensure uninterrupted wastewater flow without health or environmental hazard from wastewater leakage. This project will accomplish these objectives for part of the City’s wastewater collection system.
The Project
The Verde/Luneta/Ramona/Broad Sewer Pipe Replacement Project (Project) proposes replacement of approximately 2,347 lineal feet of sewer main on Verde, Luneta, Ramona and Broad (Attachment C). The existing sewer pipes planned for replacement work have been video inspected and confirmed to have reached the end of their useful life.
Item 5g
This Project also includes an additive alternate bid item. This Project’s additive alternate bid items include four lateral connections and abandonment of 500 lineal feet of sewer main. With the additive alternate bid items, the contractors bidding the project provide the cost of the additive items of work and staff will make the determination whether to award this portion of the work if the cost is within available budget. If it is not within the available budget to award the additive alternative, the work to abandon 500 lineal feet of sewer main will have to be deferred and the existing sewer main will have to remain active.
Previous Council or Advisory Body Action
This Project was identified in the 2019-21 and 2021-23 Financial Plans that were approved by Council.
Policy Context
The City Council approved the Wastewater Collection System Infrastructure Renewal Strategy in January 2016. The plan identified a strategy for prioritizing pipeline replacement in the wastewater collection system to serve existing customers and future development in the City.
Additionally, consistent with the October 2018 Purchasing Policy Update to the July 2015 Financial Management Manual, Council approval must be obtained before proceeding with this project, as approval is required for Public Projects that cost over $175,000.
Public Engagement
Public engagement was conducted during the initial identification of this Project to be included in the 2019-21 and 2021-23 Financial Plans.
CONCURRENCE
This project has the concurrence of the Utilities Department.
ENVIRONMENTAL REVIEW
A portion of the Project is located within a potentially archeologically sensitive zone of influence (within 200 feet of Old Garden Creek). Mitigation measures approved through Mitigated Negative Declaration ER10-07 are included in the Project’s specifications and will be followed by the City’s contractor, as applicable, consistent with the requirements of the California Environmental Quality Act (CEQA).
Item 5g
FISCAL IMPACT
Budgeted: Yes Budget Year: 2019-21 & 2021-23
Funding Identified: Yes
Fiscal Analysis:
Funding
Sources
Total Budget
Available
Current
Funding
Request
Remaining
Balance
Annual
Ongoing
Cost
General Fund $ $ $ $
State
Federal
Fees
Sewer Fund: $1,372,434 $1,371,500 $934 N/A
Total $1,372,434 $1,371,500 $934 N/A
602 Sewer Fund
Base Bid Estimate $1,040,000
Add Alt A Estimate $116,000
Contingencies $200,000
Total for Construction $1,356,000
Materials Testing $5,000
Archaeological Monintoring $10,000
Printing $500
Total Project Cost $1,371,500
Current Project Balance: $1,372,434
Remaining Balance: $934
Verde/Luneta/Ramona/Broad Sewer Replacement
Specification No. 1000091
Project Account
(1000091)
The project is structured with a Base Bid and one Additive Alternative to maximize the scope of work within available funding. The strategy is to award the contract with the Base Bid and Additive Alternative A as funding will allow, up to the Publicly Disclosed Funding amount of $1,156,000 in compliance with Public Contract Code Section 20103.8(c).
Sewerline improvements identified in this project are described in the 2019-21 and 2021- 23 Financial Plan, Capital Improvement Program (page 388). Funding for this project is available in the Project Account (1000091) which has a current balance $1,372,434.
Item 5g
ALTERNATIVES
Deny or defer approval to advertise. The City Council may choose to deny or defer the approval to advertise this project. Staff does not recommend this option, as the sewer mains included in this project continue to deteriorate and pose a high risk of catastrophic failure, requiring expensive repairs.
ATTACHMENTS
A - Project Plans (1000091)
B - Project Specifications (1000091)
C - Project Vicinity Map (1000091)
Project Locations
index to plans
sheet no. description
san luis obispo county, california
SPECIFICATION NO. DATE SHEET
1000091 FILE NO./LOCATION
1 2
3 4
56 7
COVER SHEET
LUNETA DRIVE
VERDE DRIVEVERDE DRIVE & RAMONA DRIVE
RAMONA DRIVERAMONA DRIVE
BROAD STREET
1 of
7 VERDE/LUNETA/RAMONA/BROAD
SEWER REPLACEMENT
FEBRUARY 2022
SEWER MANHOLE FLOW DIAGRAM SCHEMATIC.
TROUGH VARIES WITH PIPE LAYOUT. ARROWS
INDICATE FLOW DIRECTION.
DEAD OR UNUSED SEWER LATERAL, VERIFY
CONDITION. ABANDON IN PLACE IF DEAD,
UNUSED, OR CAPPED.
CONNECT SEWER LATERALS AND MARK TOP OFCURB WITH THE LETTER "S" PER ENG. STD. 6810.CONNECT SEWER LATERALS AND MARK TOP OFCURB WITH THE LETTER "S" PER ENG. STD. 6810. (BID ALTERNATIVE A)(E) STORM DRAIN(E) SEWER(E) WATER(E) GAS(E) OIL(E) TELEPHONE(E) FIBER OPTIC
ABANDONED SEWERABANDONED WATER
(E) SURVEY MONUMENT - PROTECT IN PLACE(E) SURVEY MONUMENT - REPLACE IF DAMAGED OR DESTROYED. SEE GENERAL NOTE 4.
DS DS
SS SS
SD SD
SS SS
W W
G GO O
T T
FO FO
AS AS
AW AW
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT "UNDERGROUND SERVICE ALERT U.S.A." TOLL FREE AT 1-800-227-2600 FORTY-EIGHT (48)
HOURS PRIOR TO START OF CONSTRUCTION, FOR LOCATION OF POWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR OR PERMITEE SHALL ALSO CONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V., WATER, SEWER, DRAINAGE OR UNDERGROUND FACILITIES.
2. THE CONTRACTOR SHALL POSSESS A CLASS "A" OR "C-34" LICENSE AT THE TIME OF BID OPENING.
3. CONTRACTOR SHALL VERIFY DEPTH AND LOCATION OF ALL CROSSINGS PRIOR TO LAYING PIPE SO THAT PIPE ALIGNMENT AND GRADE CAN BE ADJUSTED AS NEEDED.
4. TIE OUT CENTERLINE MONUMENTS BEFORE WORK AND REPLACE IF DISTURBED IN ACCORDANCE WITH THE LAND SURVEYORS ACT, AND SECTION 5-1.36E, REPLACE MONUMENT AND WELL PER ENG. STD. 9020.
5. THE CONTRACTOR MUST REPLACE ALL PAVEMENT STRIPES, MARKINGS, AND MARKERS DISTURBED DURING CONSTRUCTION. ALL PAVEMENT STRIPES AND MARKINGS WITHIN 5 FEET OF THE DISTURBED AREA MUST BE REPLACED. ALL STRIPING IS PER STATE STANDARD PLANS AND PER PER ENGINEERING STANDARD SPECIFICATION 84-1.01A.
6. SEWER MAIN WITH LESS THAN 1% SLOPE MUST BE INSTALLED WITH FLOAT ROCK AS BEDDING AND INITIAL BACKFILL. SEE ENG. STD. 6020, NOTE 10 FOR ADDITIONALREQUIREMENTS.
7. CONNECT EXISTING VCP SEWER MAIN TO NEW MANHOLE WITH 3 FOOT PVC STUB AND
STRONG BACK RC COUPLINGS
8. CONNECT EXISTING HDPE SEWER MAIN TO NEW MANHOLE WITH 3 FOOT HDPE STUB AND FUSED COUPLINGS OR BUTT FUSION.
9. CONNECT EXISTING PVC SEWER MAIN TO NEW MANHOLE WITH 3 FOOT PVC STUB AND PVC COUPLINGS.
10. ALL PIPE LENGTHS ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL PIPE LENGTHS.
11. APPROXIMATE LOCATION OF LATERALS ARE SHOWN ON PLANS. LOCATING LATERALS IS
THE RESPONSIBILITY OF THE CONTRACTOR AND ANY DAMAGE TO A LATERAL MUST BE REPAIRED IMMEDIATELY AND AT NO COST TO THE CITY.
12. ALL NEW MANHOLE MUST BE COATED PER SECTION 77-3.03D OF THE PROJECT SPECIAL PROVISIONS. DO NOT COAT EXISTING SSMH I06-48 AT RAMONA AND PALOMAR.
13. ALL WORK ON BROAD AND RAMONA (SHEET 6 & 7) MUST BE COMPLETED AS THE FIRST PRIORITY OF WORK. ROCK EXCAVATION IS EXPECTED ON THESE STREETS (REFER TO SECTION 19-1.03E AND GEOTECHNICAL REPORTS FOR MORE INFORMATION).
14. NOT ALL IMPROVEMENTS WITHIN PRIVATE PROPERTIES ARE SHOWN. UPON COMPLETION
OF WORK WITHIN PRIVATE PROPERTIES, THE CONTRACTOR MUST RESTORE PRIVATE
PROPERTY IMPROVEMENTS TO THE SAME CONDITION BEFORE THE START OF CONSTRUCTION.
Reference Documents:
City Standard Specifications - 2020 EditionCity Engineering Standards - 2020 Edition
APPROVED BY
Brian A. Nelson, City Engineer R.C.E. C79870 Approved Date No. C 79870
BRIAN A. NELSON
C I V I L
SIZE & INV
SIZE
ELEV OUT
SS SS
285
290
295
300
305
310
315
320
325
330
285290295
300305310315320325330
66+50 66+75 67+00 67+25 67+50 67+75 68+00 68+25 68+50 68+75 69+00 69+25 69+50 69+75 70+00 70+25 STA. 66+57.05
(N) SSCO I07-8
RIM = 319.06'
8" OUT 315.00' (E)
(N) 347' - 8" HDPE SEWER, S = 7.83% BY OPEN TRENCHING & REMOVE EXISTING 6" VCP SEWER STA. 70+06.04 (N) SSMH I07-7 RIM = 293.58' 8" IN 287.80' (W)6" IN 287.80' (S)8" OUT 287.70' (N)
(E) GRADE
REMOVE (E) SSMH I07-9
(E) 2" GAS
(E) 6" AC WATER
W
W
W
W
W
W
W
W
W
W
GG
GGG
GGG
GG
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
W
W
W
W
W
W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G SS
SS
SS
SS
SS SS SS
SS SS SS
SS SS SS
SS SS SS
SS SS SS
SS SS
SS SS
SS
GGG
GGG
GG
G
GG
GGG
GGG
G
WW
WW
W
W
W
(E) 6" AC WATER
(E) 6" AC WATER
(E) 8" CI WATER
(E) 8" AC WATER
(E) 8" CI WATER
(E) 2" GAS
(E) 2" GAS
(E) 2" GAS
67 + 00 68 + 00 69 + 00
70 + 00
STA 66+57.05
(N) SSCO I07-8
RIM = 319.06'
STA 70+06.04
(N) SSMH I07-7
RIM = 293.58'
(N) 174' - 6" HDPE SEWER (N) 113' - 8" HDPE SEWER LUNETA DR.
8.6' 15.4'
38'
8' 6'
REMOVE AND REPLACE
SSCO I07-8
PER ENG. STD. 6710
6" OUT 315.00
REMOVE AND REPLACE
SSMH I07-7
PER ENG. STD. 6610
8" IN 287.80
8" OUT 287.70
6" IN 287.80
VERDE DR
(N) 195' - 8" HDPE SEWER REMOVE (E) SSMH I07-9
(N) 50' - 8" HDPE SEWER
R1000.0' (N) 102' - 8" HDPE SEWER
14' PUBLIC UTILITY
EASEMENT
REMOVE SSMH I07-9
(E) 6" IN 299.50 (E) 6" OUT 299.20
0 SCALE IN FEET
20 40
LUNETA DRIVE
2 HORIZ 1" = 20'
VERT 1" = 5'
SEE SHEET 3
CITY SPECIFICATION NO.DATE:
PROJECT TITLE:
SHEET TITLE:
of
SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATION HN
VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT
HN
MG
BN
FEBRUARY 2022
1000019
7 APPROVED: [Mo Day, Yr]
SEE SHEET 3
STA. 81+24.32
(N) SSMH I07-2
RIM = 285.34'
8" IN 281.70' (S)8" OUT 281.60' (N)
STA. 80+09.71
(N) SSMH I07-7
RIM = 293.58'
8" IN 287.80' (W)
6" IN 287.80' (S)
8" OUT 287.70' (N)
STA. 78+34.11
(N) CO I07-15
RIM = 302.70'
6" OUT 295.00' (N)
BY PIPE BURSTING THROUGH EXISTING 6" VCP SEWER (N) 174' - 6" HDPE SEWER, S = 4.10% BY OPEN TRENCHING & REMOVE EXISTING 6" VCP SEWER (N) 113' - 8" HDPE SEWER, S = 5.23% (N) 337' - 8" HDPE SEWER, S = 10.23% BY OPEN TRENCHING & REMOVE EXISTING 6" VCP SEWER (E) GRADE
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S
S SS SS SS SS SS SS SS SS
G SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
SS SS SS
SS SS
SS SS
SS SS
SS SS
SS
SS SS
SS SS
SS SS
SS SS
SS
SS
SS
SS
G
G
G
GGG
G
GGG
G
GGG
W
W
W
W
W
W
(E) 6" AC WATER
(E) 6" AC WATER
(E) 8" CI WATER (E) 8" CI WATER (E) 2" GAS (E) 2" GAS (E) 6" AC WATER (E) 2" GAS + 70 00 +
71 STA 78+34.11(N) CO I07-15
RIM = 302.70'
(N) 174' - 6" HDPE SEWER
STA 81+24.32
(N) SSMH I07-2
RIM = 285.34'
(N) 113' - 8" HDPE SEWER
+ 00 79 + 00 80 + 00 81+ 00 82 + 00 83 + 00
VERDE DR
LUNETA DR.
STA 80+09.71
(N) SSMH I07-7
RIM = 293.58'
12' 5' 5'
34'
12'
REMOVE AND REPLACE
SSCO I07-15
PER ENG. STD. 6710
6" OUT 295.00
REMOVE AND REPLACE
SSMH I07-7
PER ENG. STD. 6610
6" IN 287.80 8" OUT 287.70
6" IN 287.80
REMOVE AND REPLACE
SSMH I07-2
PER ENG. STD. 6610
8" IN 281.70 8" OUT 281.60
(N) 102' - 8" HDPE SEWER
14' PUBLIC UTILITY
EASEMENT
12' PUBLIC UTILITY
EASEMENT
(E) 24" RCP
(N) 337' - 8" HDPE SEWER
78+25 78+50 78+75 79+00 79+25 79+50 79+75 80+00 80+25 80+50 80+75 81+00 81+25 81+50 81+75 82+00 82+25 82+50 82+75 83+00 83+25 83+50 260
265
270
275
280
285
290
295
300
305
260
265
270
275
280
285
290
295
300
305
0 SCALE IN FEET
20 40
VERDE DRIVE
3 HORIZ 1" = 20'
VERT 1" = 5'
MATCHLINE - STA. 83+50.00: SEE SHEET 4 MATCHLINE - STA. 83+50.00: SEE SHEET 4 SHEET 2 CITY SPECIFICATION NO.DATE:
PROJECT TITLE:
SHEET TITLE:
of
SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATION HN
VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT
HN
MG
BN
FEBRUARY 2022
1000019
7 APPROVED: [Mo Day, Yr]
STA. 85+73.87
(N) SSMH I06-46
RIM = 249.92'
8" IN 244.80' (S)
6" IN 243.00' (N)
8" IN 243.00' (W)
10" OUT 242.90' (E)
STA. 84+59.70
(N) SSMH I06-49
RIM = 252.64'
8" IN 247.30' (S)8" OUT 247.20' (N)
(N) 114' - 8" HDPE SEWER, S = 2.10% BY OPEN TRENCHING & REMOVE EXISTING 6" VCP SEWER (E) 6" PVC SEWER (N) 337' - 8" HDPE SEWER, S = 10.23% BY OPEN TRENCHING & REMOVE EXISTING 10" VCP SEWER (E) GRADE (E) 18" RCP
(E) 2" GAS
(E) 6" AC WATER
(E) AT&T
DUCT BANK
SD
SD
SD
SD
W
W
W
W
W
W W W W
W W W W W W W W W W W W W W W W W W W
SD SD SD SD SD
G G G G G G G G G G G G G G G G G G G G G G G G
WWW
WWWW
WWW
WWW
WWWW
W
T
TTT
TTTT
TTT
TTT
TTTT
TTT
TTT
TTT
TTTT
TTT
TT
GGGG
GGG
GGG
GGGG
GGG
G
SS SS SS SS SS SS SS SS SS SS
SS SS SS SS SS SS SS SS SS
SS SS SS SS SS SS SS SS SS SS SS SS
SS SS SS SS SS SS SS SS
SS SS
SS
SS SS
SS
SS SS SS
SS SS
W
W
G
GGG
(E) 8" VCP SEWER
(E) 6" AC WATER (E) 4" AC WATER
(E) 6" AC WATER
(E) 2" GAS (E) 18" RCP (E) 2" GAS
(E) 18" RCP
(E) 18" RCP(E) 6" PVC SEWER
(E) AT&T
(E) 2" GAS
(E) AT&T
(E) 2" GAS
(E) 6" AC WATER
STA 84+59.70
(N) SSMH I06-49
RIM = 252.64'
STA 85+73.87
(N) SSMH I06-46
RIM = 249.92'
(N) 114' - 8" HDPE SEWER
(N) 451' - 10" HDPE SEWER
00 + 90 00 84 + 00 85 +00 86 +
RAMONA DR
34'
12' 13' 4' 5'
VERDE DR
REMOVE AND REPLACE
SSMH I06-49
PER ENG. STD. 6610
8" IN 247.30 8" OUT 247.20
REMOVE AND REPLACE
SSMH I06-46
PER ENG. STD. 6610
8" IN 244.80 6" IN 243.00
8" IN 243.00
10" OUT 242.90
(E) 8" TELEPHONE
(E) TELEPHONE
(N) 337' - 8" HDPE SEWER
(E) CHARTER
SD
SD
SD
SD
W W W W
W W W W W
SS SS SS SS
SS SS
WWW
WWW
WWWW
W
W
W
W
W
W
W
SD SD SD SD SD SD SD SD SD SD SD
GG
GGGG
GGG
GGG
GGGG
GG
W W W W W W W W W W W W W W W W W W W W W W W W W W W W
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
G G G G G G G G
T T T T T T T T T T T T T T T T T T T T T T T T T T T T
G G G G G G G G G G G G G G G G G G
G
G
G
W
SS SS SS SS SS SS SS SS
SS SS
SS SS SS SS SS SS SS SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS SS
G
T T T T T T T T T T T T T T
TTTTT
(E) 4" AC WATER
(E) 2" GAS
(E) 6" AC WATER
(E) 2" GAS
(E) 18" RCP(E) 18" RCP
(E) 18" RCP
(E) 6" PVC SEWER
(E) 6" AC WATER(E) 2" GAS
(E) AT&T
(N) 114' - 8" HDPE SEWER
(N) 451' - 10" HDPE SEWER
90 + 00 91+ 00 92 + 00
14.5'
40'
STA 90+04.39
(N) SSMH I06-46
RIM = 249.92'
15.5' 10'
RAMONA DR
VERDE DR REMOVE AND REPLACE SSMH I06-46 PER ENG. STD. 6610 8" IN 243.00 10" OUT 242.90 6" IN 243.00
8" IN 244.80
REPLACE WATER WELL AND
COVER PER ENG. STD. 6340
(E) TELEPHONE
STA. 90+04.39
(N) SSMH I06-46
RIM = 249.92'
8" IN 244.80' (S)6" IN 243.00' (N)8" IN 243.00' (W)
10" OUT 242.90' (E)
(E) 8" VCP SEWER
(N) 451' - 10" HDPE SEWER, S = 1.94% BY OPEN TRENCHING & REMOVE EXISTING 10" VCP SEWER (E) 2" GAS
(E) CHARTER
CONDUIT
90+00 90+25 90+50 90+75 91+00 91+25 91+50 91+75 92+00 92+25 92+50 92+75 230
235
240
245
250
255
260
265
270
230
235
240
245
250
255
260
265
270
230
235
240
245
250
255
260
265
270
83+50 83+75 84+00 84+25 84+50 84+75 85+00 85+25 85+50 85+75
VERDE DRIVE & RAMONA DRIVE
4 HORIZ 1" = 20'
VERT 1" = 5'
SEE RIGHT
MATCHLINE - STA. 83+50.00: SEE SHEET 3 MATCHLINE - STA. 83+50.00: SEE SHEET 3
SEE LEFT
MATCHLINE - STA. 92+75.00: SEE SHEET 5 MATCHLINE - STA. 92+75.00: SEE SHEET 5 0 SCALE IN FEET
0 20 40
SCALE IN FEET
20 40
CITY SPECIFICATION NO.DATE:
PROJECT TITLE:
SHEET TITLE:
of
SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATION HN
VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT
HN
MG
BN
FEBRUARY 2022
1000019
7 APPROVED: [Mo Day, Yr]
SD
SD
SD
SD
SD
SD
SD SD
W
WW
W
W W W W W W W W W W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
T T T T T T T T T T T T T T T T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
TTT
T
G G G G G G G G G G G G G G G G G
G
G
G
G
G
G
G G
G
G
G
G
G
G
G
G
G
G G
T T T T T T T T T T T T T T T T T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T T
G
GGG
GG
GGG
WW
SS
SS
SS
SS
SS SS SS SS
SS SS SS SS SS SS
SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
G
T
T T
T T T T T T
T T T T T T T T T T T T T T T T T
TTTT
T
T
T
T
T
T
(E) 10" CI WATER(E) 2" GAS
(E) AT&T
(E) 10" CI WATER
(E) 2" GAS
(E) AT&T
(E) 2" GAS
(E) 10" CI WATER
(E) 6" VCP SEWER
(E) 18" CMP
STA 94+56.87
(N) SSMH I06-47
RIM = 244.49'
STA 96+41.48
(E) SSMH I06-48
RIM = 240.73' (N) 183' - 10" HDPE SEWER
93 + 00 94 + 00
95 + 00
+ 96 00
5' 10'
40'
5'
22.6'
9.4'
3'
40'
RAMONA DR
PALOMAR AVE
REMOVE (E) SSMH I06-47
PER ENG. STD. 6610
(E) 10" IN 238.70 (E) 10" OUT 238.60
INSTALL (N) SSMH I06-47
PER ENG. STD. 6610
10" IN 234.10 10" OUT 234.00
(E) SSMH I06-48 TO REMAIN
10" IN 228.00
6" IN 228.00
10" OUT 227.90
(E) 10" CIPP SEWER
15.5' 9.5' REMOVE
(E) SSMH
(N) 451' - 10" HDPE SEWER
(N) 451' - 10" HDPE SEWER, S = 1.94% BY OPEN TRENCHING & REMOVE EXISTING 10" VCP SEWER STA. 94+56.87
(N) SSMH I06-47
RIM = 244.49'
10" IN 234.10' (W)10" OUT 234.00' (E)
(N) 183' - 10" HDPE SEWER, S = 3.22% BY PIPE BURSTING THROUGH EXISTING STA. 96+41.48
(E) SSMH I06-48
RIM = 240.73'
10" IN 228.00' (W)
6" IN 228.00' (S)
10" OUT 227.90' (SE)
(E) GRADE
(E) 10" CIPP SEWER CONNECT TO (E) SSMH
PER ENG. STD. 6610
(E) AT&T
DUCT BANK
(E) 2" GAS
REMOVE (E)
SSMH
220
225
230
235
240
245
250
255
260
92+75 93+00 93+25 93+50 93+75 94+00 94+25 94+50 94+75 95+00 95+25 95+50 95+75 96+00 96+25 96+50 96+75 220
225
230
235
240
245
250
255
260
RAMONA DRIVE
5 HORIZ 1" = 20'
VERT 1" = 5'
MATCHLINE - STA. 92+75.00: SEE SHEET 4 MATCHLINE - STA. 92+75.00: SEE SHEET 4 0 SCALE IN FEET
20 40
CITY SPECIFICATION NO.DATE:
PROJECT TITLE:
SHEET TITLE:
of
SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATION HN
VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT
HN
MG
BN
FEBRUARY 2022
1000019
7 APPROVED: [Mo Day, Yr]
SD SD SD
SD SD
W
W
W
W
W
W
W
W
W
WW
WW
WW
WW
WW
W
WW
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
W
W
W
W
W
W
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
TTTTTT
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
GGGGGGG
T T T T T T T T T T T T T T T T T T T T T T T T T T T T TTTTTT
T
T
T
T
T
T
T
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS SS SS SS SS SS SS SS SS SS SS SS SS
SS SS SS SS
T
T
T
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T TTTTT
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
TEL
T
T
T
SS SS
SS SS
SS SS
SS
T
T
T
T
T
T
T
GG
GG
G
T
TT
T
DS DS
DS DS
101+ 00 102 + 00 103 + 00 104 + 00 104 + 24
STA 101+15.08
(N) SSMH 01
RIM = 237.50'
STA 104+21.35
(N) SSMH 02
RIM = 246.12'
ABANDON (E) 10" VCP SEWER (E) 10" VCP SEWER
(E) 10" CI WATER
(E) 20" DI WATER
(E) 10" CI WATER
*ABANDON (E) 10" VCP SEWER
(E) TELEPHONE
(E) GAS
(N) 302' - 10" HDPE SEWER
RAMONA DR
BROAD ST
(E) TELEPHONE
(E) 10" CI WATER(E) TELPHONE(E) 2" GAS
(E)TELEPHONE
(N) 326' - 10" HDPE SEWER
(E) 8" CI WATER
(E) 20" DI WATER
(E) TELEPHONE
40'
11.2' 14.3' 14.5'
(N) SSMH 01
PER ENG. STD. 6610
10" IN 226.20 10" OUT 226.15
*ABANDON (E) 10" VCP SEWER *ABANDON SSMH J06-50 RIM 234.51 INV 226.74 *ABANDON SSMH J06-58
RIM 235.15
INV 225.35
10" IN 227.00
(N) SSMH 02
PER ENG. STD. 6610
10" IN 225.05
10" OUT 225.00
(E) GAS
*ABANDON (E) 10" VCP SEWER
*ABANDON (E) SEWERLINE
PER ENG. STD. 6050
*LATERAL TIE OVER BY HDD OR
OTHER APPROVED METHOD (TYP.)
(N) 3' STUB - 10" HDPE SEWER
*LATERAL TIE OVER BY HDD OR
OTHER APPROVED METHOD (TYP.)
(E) SS LAT
(E) SS LAT (E) 10' SEWER EASEMENT
(E) TELEPHONE
(E) TELPHONE (E) TELEPHONE
(E) TELEPHONE
PROTECT
(E) WALL
PROTECT
(E) WALL
STA. 101+15.08
(N) SSMH 01
RIM = 237.50'
10" IN 226.20' (W)
10" IN 227.00' (N)
10" OUT 226.15' (E)
STA. 104+21.35
(N) SSMH 02
RIM = 246.12'
10" IN 225.05' (W)
10" OUT 225.00' (S)
(N) 302' - 10" HDPE SEWER, S = 0.36%
(N) 3' STUB BY OPEN TRENCHING
10" HDPE SEWER, S = 0.36%
BY OPEN TRENCHING
(E) TELE
DUCT BANK
220
225
230
235
240
245
250
255
260
220
225
230
235
240
245
250
255
260
100+50 100+75 101+00 101+25 101+50 101+75 102+00 102+25 102+50 102+75 103+00 103+25 103+50 103+75 104+00 104+25 104+50 104+75
RAMONA DRIVE
6 HORIZ 1" = 20'
VERT 1" = 5'
0 SCALE IN FEET
20 40
CITY SPECIFICATION NO.DATE:
PROJECT TITLE:
SHEET TITLE:
of
SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATION HN
VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT
HN
MG
BN
FEBRUARY 2022
1000019
7 APPROVED: [Mo Day, Yr]
SEE SHEET 7
*BID ALTERNATIVE "A" IS INDICATED BY ASTERISK*
220
225
230
235
240
245
250
255
260
220225230235240245250255260
109+50 109+75 110+00 110+25 110+50 110+75 111+00 111+25 111+50 111+75 112+00 112+25 112+50 112+75 113+00 113+25 113+50 113+75 114+00 STA. 110+08.76
(N) SSMH 02
RIM = 246.12'
10" IN 225.05' (W)10" OUT 225.00' (S)
(E) 10" VCP SEWER
(N) 326' - 10" HDPE SEWER, S = 0.39%
BY OPEN TRENCHING
STA. 113+38.65
(N) SSMH J07-1
RIM = 230.24'
10" IN 223.70' (N)
8" IN 224.24' (N)
10" OUT 223.70' (S) (E) FIBER DUCT BANK
2" GAS
(E) 20 DI WATER
(E) TELE
SD SD SD SD SD
W W W W W W W W W W W W W
W W W
W W W W
WW
WW
SS
SS
SS
SS
G
G
GG
G
GG
G
GG
W W W W W W W W W W
G G G G G G G G G G G G G G G G G
W
WW
WW
WW
WW
W W W W W W W W W W W W W W W W W W W W W W W W W
T
TT
TT
T
T
T T T T T T T T T T T
G
GG
GG
GG
GG
G G G
T
T T T T T T T T T T T T T T T T T T
T
T
T
T
T
T
SS SS SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS
SS
SS SS SS SS SS
SS SS SS SS SS SS SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS
T
T
T
T
TT
TT
T
T
T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
G G
W
W
W
WW
W
W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
W
W
W
TEL
W
SS SS
SS SS
SS SS
SS
SS
SS
SS
SS SS
T
G G G G G
GGG
GGG
GGG
T
T
T
T
T
T
T
G
WW
W
WW
W
WW
W
T T T T T T T T T T
SS
SS
SS
SS
SS
SS
SS SS SS SS SS
T T T T T T T T T T T T T T T T T T
(N) 326' - 10" HDPE SEWER
110 + 00 111+ 00 112 + 00 113 + 00 114 +
STA 110+08.76
(N) SSMH 02
RIM = 246.12'
RAMONA DR
BROAD ST
MEINECKE AVE
STA 113+38.65
(N) SSMH J07-1
RIM = 230.24'
(E) 10" CI WATER
(E) 20" DI WATER
(E) 20" DI WATER
(E) 8" CI WATER
(E) 6" VCP SEWER
(E) 6" CI WATER
(E) TELEPHONE
(E) 6" VCP SEWER
(E) 8" PVC SEWER
*ABANDON (E) 10" VCP SEWER
(E) 10" VCP SEWER
(E) 18" CMP
(E) 20" DI WATER
(E) 10" CI WATER
*ABANDON (E) 10" VCP SEWER
(E) GAS
(E) TELEPHONE
(E) 2" GAS
(E) 2" GAS
(E) FIBER DUCT BANK
(N) 302' - 10" HDPE SEWER
(E) GAS
(E) TELEPHONE
(N) 326' - 10" HDPE SEWER
(E) 20" DI WATER
(E) 8" CI WATER
(E) TELEPHONE
34'
6' 6' 9'
*ABANDON (E) 10" VCP SEWER
(N) SSMH 02
PER ENG. STD. 6610
10" IN 225.05
10" OUT 225.00
REMOVE AND REPLACE
SSMH J07-1
PER ENG. STD. 6610
10" IN 223.70 10" OUT 223.70
8" IN 224.24
*REMOVE (E) SSMH I06-59
AND INSTALL (N) CO PER
DETAIL B, THIS SHEETRIM 232.26INV 223.81
13' (E) GAS
*ABANDON (E) SEWERLINE
PER ENG. STD. 6050
*ABANDON SSMH J06-58
RIM 235.15INV 225.35
MAINTAIN ACCESS TO THE
VILLAGES AT ALL TIMES
(E) 6" PVC SEWER LATERAL
*LATERAL TIE OVER BY HDD OR
OTHER APPROVED METHOD (TYP.)
INV 223.95
(E) SS LAT
(E) SS LAT (E) 10' SEWER EASEMENT
(E) TELEPHONE
(E) TELEPHONE
(E) TELEPHONE
PROTECT
(E) WALL
(N) 68 LF - 6" HPDE SEWER BY
SLIPLINING PER DETAIL A, THIS SHEET (E) 10" VCP SEWER
BROAD STREET
7 HORIZ 1" = 20'
VERT 1" = 5'
SEE SHEET 6
0 SCALE IN FEET
20 40
CITY SPECIFICATION NO.DATE:
PROJECT TITLE:
SHEET TITLE:
of
SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATION HN
VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT
HN
MG
BN
FEBRUARY 2022
1000019
7 APPROVED: [Mo Day, Yr]
SEWER SLIPLINING A
NOTES:
1. BEFORE INSTALLATION OF THE PIPE LINER, THE HOST PIPE MUST BE CLEANED AND ALL ROCKS AND DEBRIS REMOVED.
2. SLIP LINER PIPE GRADE MUST BE MAINTAINED PARALLEL TO THE GRADE OF THE HOST PIPE. THE LINER PIPE MUST BE HELD AT THE INVERT OF THE HOST PIPE AND BE BRACED TO PREVENTFLOTATION OR MOTION DURING GROUTING.
3. A CONCRETE BULKHEAD MUST BE INSTALLED AT EACH OPEN END BETWEEN THE HOST PIPE AND
NEW PIPE TO PREVENT GROUT FROM FLOWING FROM THE ENDS WHILE FILLING THE ANNULAR SPACE BETWEEN THE TWO PIPE.
3. GROUT MIX FOR ANNULAR SPACE MUST CONSIST OF LOW DENSITY FOAM, CONCRETE COMPOSED OF WATER, CEMENTITIOUS MATERIAL AND OPTIONAL CHEMICAL ADMIXTURES. GROUT MUST HAVE A DENSITY OF 40-80 POUNDS PER CUBIC FOOT AND STRENGTH OF 300 PSI.
4. THE ANNULAR VOID MUST BE GROUTED SOLID BY INJECTING GROUT FROM ONE END OF THE PIPE RUN AND ALLOWING IT TO FLOW TOWARD THE OTHER END. VENTING OF THE ANNULAR VOID MUSTBE PERFORMED TO ASSURE UNIFORM FILLING OF THE VOID SPACE DURING THE GROUTINGPROCESS. PRESSURE ON THE ANNULAR VOID MUST NOT EXCEED 2 PSI TO AVOID DAMAGE TO THELINER PIPE. (E) 10" VCP SEWER
(N) 6" HPDE SEWERGROUT ANNULAR
SPACE
*BID ALTERNATIVE "A" IS INDICATED BY ASTERISK*
(E) 6" PVC LATERAL
REMOVE (E) SSMH
(N) 6" HPDE SEWER BY
SLIPLINING PER DETAIL A,
THIS SHEET
(E) 10" VCP
SEWER
(N) CLEANOUT PER
ENG.STD. 6710
(N) CLEANOUT B
NOTES:
1. ALL PVC FITTINGS MUST BE GLUED
2. PVC AND HDPE CONNECTION MUST BE MADE WITH STRONG BACK RC COUPLINGS. (N) 6" PVC (SDR 35)
PIPE AND FITTINGS
63(&,$/3529,6,216
)25
&,7<2)6$1/8,62%,632
9HUGH/XQHWD5DPRQD%URDG6HZHU5HSODFHPHQW
6SHFLILFDWLRQ1R
0DUFK
38%/,&:25.6'(3$570(17
(1*,1((5,1*',9,6,21
3DOP6WUHHW
6DQ/XLV2ELVSR&$
9HUGH/XQHWD5DPRQD%URDG6HZHU5HSODFHPHQW
6SHFLILFDWLRQ1R
$SSURYDO'DWH
0DUFK
March XX, 2022
March XX, 2022
7$%/(2)&217(176
127,&(72%,''(56, %,'68%0,66,21, %,''2&80(176,, 352-(&7,1)250$7,21,, 48$/,),&$7,216,,, $:$5'9 $&&2002'$7,219 %,')2506$ %,',7(0/,67)259(5'(/81(7$5$021$%52$'6(:(55(3/$&(0(1763(&,),&$7,21 12
$ /,672)68%&2175$&7256' 38%/,&&2175$&7&2'(6(&7,2167$7(0(17( 38%/,&&2175$&7&2'(6(&7,2148(67,211$,5(( 38%/,&&2175$&7&2'(6(&7,2167$7(0(17( /$%25&2'(6(&7,2167$7(0(176( 121&2//86,21'(&/$5$7,21* %,''(5$&.12:/('*(0(176+ 48$/,),&$7,216, $77$&+%,''(5
6%21'72$&&203$1<%,'- 63(&,$/3529,6,216 ',9,6,21,*(1(5$/3529,6,216 *(1(5$/ %,'',1* 6&23(2):25. /(*$/5(/$7,216$1'5(63216,%,/,7<727+(38%/,& 3526(&87,21$1'352*5(66 ',9,6,21,,*(1(5$/&216758&7,21 (19,5210(17$/67(:$5'6+,3 ',9,6,219,,,0,6&(//$1(286&216758&7,21 /2&$/,1)5$6758&785( ',9,6,21,;75$)),&&21752/'(9,&(6 0$5.,1*6 ',9,6,21;,,,$33(1',&(6 $33(1',;$)2502)$*5((0(17 $33(1',;%±352-(&70,7,*$7,210($685(6 $33(1',;&±*(27(&+1,&$/5(32576
127,&(72%,''(56
L
127,&(72%,''(56
%,'68%0,66,21
6HDOHG ELGV ZLOO EH UHFHLYHG E\ WKH &LW\ RI 6DQ /XLV 2ELVSR DW WKH 3XEOLF :RUNV $GPLQLVWUDWLRQ2IILFHORFDWHGDW
3DOP6WUHHW6DQ/XLV2ELVSR&DOLIRUQLD
XQWLO
DPRQ$SULO;;
DWZKLFKWLPHWKH\ZLOOEHSXEOLFO\RSHQHGDQG UHDGDORXG3XEOLFELGRSHQLQJPD\EH DFFHVVHG YLD 0LFURVRIW 7HDPV YLGHR FRQIHUHQFH DQG FRQIHUHQFH FDOO ,Q SHUVRQ DWWHQGDQFHZLOOEHSHUPLWWHG$WWHQGHHVDUHHQFRXUDJHGWRZHDUIDFHPDVNVDQGSUDFWLFH VRFLDOGLVWDQFLQJ8VHWKHIROORZLQJOLQN
KWWSV
WHDPVPLFURVRIWFRPOPHHWXS
MRLQ
DPHHWLQJB0]<1M,[=M(W1(1\1M4/:,2'$W0]9L<P,\1M9N=7$[WK UHDGY"FRQWH[W E7LGDDEG
HD
D
GFEF2LGDDDGGIDF DFGDEHFG
RUMRLQE\SKRQHZLWKWKLVQXPEHU
ZLWK&RQIHUHQFH,'
6XEPLWELGLQDVHDOHGHQYHORSHSODLQO\PDUNHG
9HUGH/XQHWD5DPRQD%URDG6HZHU5HSODFHPHQW6SHFLILFDWLRQ1R
$Q\ ELG UHFHLYHG DIWHU WKH WLPH DQG GDWH VSHFLILHG ZLOO QRW EH FRQVLGHUHG DQG ZLOO EH UHWXUQHGWRWKHELGGHUXQRSHQHG%LGVUHFHLYHGE\)D[RU(PDLOZLOOQRWEHFRQVLGHUHG %\ VXEPLVVLRQRIELG \RXDJUHHWR FRPSO\ZLWKDOOLQVWUXFWLRQDQG UHTXLUHPHQWVLQWKLV QRWLFHDQGWKHFRQWUDFWGRFXPHQWV
$OOELGVPXVWEHVXEPLWWHGRQWKH%LG,WHP/LVWIRUP
V
SURYLGHGDQGVXEPLWWHGZLWKDOO
RWKHU%LG)RUPVLQFOXGHGLQWKHVH6SHFLDO3URYLVLRQV
(DFKELGPXVWEHDFFRPSDQLHGE\HLWKHUD
FHUWLILHGFKHFN
FDVKLHU
VFKHFN
ELGGHU
VERQG
PDGHSD\DEOHWRWKH&LW\RI6DQ/XLV2ELVSRIRUDQDPRXQWHTXDOWRWHQSHUFHQWRIWKH ELGDPRXQWDVDJXDUDQW\*XDUDQW\ZLOOEHIRUIHLWHGWRWKH&LW\6DQ/XLV2ELVSRLIWKH ELGGHUWRZKRPWKHFRQWUDFWLVDZDUGHGIDLOVWRHQWHULQWRWKHFRQWUDFW 7KH&LW\RI6DQ/XLV2ELVSRUHVHUYHVWKHULJKWWRDFFHSWRUUHMHFWDQ\RUDOOELGVRUZDLYH DQ\LQIRUPDOLW\LQDELG
$OOELGVDUHWREHFRPSDUHGEDVHGRQWKH&LW\(QJLQHHU
VHVWLPDWHRIWKHTXDQWLWLHVRI
ZRUNWREHGRQHDVVKRZQRQWKH%LG,WHP/LVW
127,&(72%,''(56
127,&(72%,''(56
LL
%LGVZLOORQO\EHDFFHSWHGIURPELGGHUVWKDWDUHOLFHQVHGLQFRPSOLDQFHZLWKWKHSURYLVLRQV RI&KDSWHU
'LYLVLRQ,,,RI%XVLQHVVDQG3URIHVVLRQV&RGH
7KHDZDUGRIWKHFRQWUDFWLIDZDUGHGZLOOEHWRWKHORZHVWUHVSRQVLYHELGVXEPLWWHGE\D UHVSRQVLEOH FRQWUDFWRU ZKRVH ELG FRPSOLHV ZLWK WKH UHTXLUHPHQWV SUHVFULEHG ,I WKH FRQWUDFW LV DZDUGHG WKH FRQWUDFW ZLOO EH DZDUGHG ZLWKLQ FDOHQGDU GD\V DIWHU WKH RSHQLQJRIWKHELGV
)DLOXUHWRUDLVHGHIHFWVLQWKHQRWLFHWRELGGHUVRUELGIRUPVSULRUWRELGRSHQLQJFRQVWLWXWH DZDLYHURIWKRVHGHIHFWV
%,''2&80(176
$FRS\RIWKHSODQVDQGVSHFLDOSURYLVLRQVPD\EHGRZQORDGHGIUHHRIFKDUJHIURPWKH &LW\¶VZHEVLWHDW
ZZZVORFLW\RUJJRYHUQPHQWGHSDUWPHQWGLUHFWRU\SXEOLFZRUNVSXEOLFZRUNVELGV
SURSRVDOV
1RSULQWHGFRSLHVDUHDYDLODEOHIRUSXUFKDVHDWWKH&LW\RIILFH 6WDQGDUG6SHFLILFDWLRQVDQG(QJLQHHULQJ6WDQGDUGVUHIHUHQFHGLQWKH6SHFLDO3URYLVLRQV PD\EHGRZQORDGHGIUHHRIFKDUJHIURPWKH&LW\¶VZHEVLWHDW
ZZZVORFLW\RUJJRYHUQPHQWGHSDUWPHQWGLUHFWRU\SXEOLFZRUNVGRFXPHQWV RQOLQHFRQVWUXFWLRQGRFXPHQWV
<RXDUHUHVSRQVLEOHWRREWDLQDOOLVVXHGDGGHQGDSULRUWRELGRSHQLQJ$GGHQGDZLOOEH DYDLODEOH WR GRZQORDG DW WKH &LW\¶V ZHEVLWH OLVWHG DERYH RU DW WKH RIILFH RI WKH &LW\ (QJLQHHU
4XHVWLRQVPXVWEHVXEPLWWHGWKURXJK%LG6\QFVRWKDWLWLVDYDLODEOHWRWKHSXEOLF&RQWDFW WKHSURMHFWPDQDJHU+DL1JX\HQDWRUWKH3XEOLF:RUNV'HSDUWPHQWDW
SULRUWRELGRSHQLQJWRYHULI\WKHQXPEHURIDGGHQGDLVVXHG <RXDUHUHVSRQVLEOHWRYHULI\\RXUFRQWDFWLQIRUPDWLRQLVFRUUHFWRQWKHSODQKROGHUVOLVW ORFDWHGRQWKH&LW\¶VZHEVLWHDW
ZZZVORFLW\RUJJRYHUQPHQWGHSDUWPHQWGLUHFWRU\SXEOLFZRUNVSXEOLFZRUNVELGV SURSRVDOV
352-(&7,1)250$7,21
,Q JHQHUDO WKH SURMHFW FRQVLVWV RI WKH UHSODFHPHQW RI H[LVWLQJ VHZHUOLQHV E\ RSHQ WUHQFKLQJDQGSLSHEXUVWLQJ
127,&(72%,''(56
127,&(72%,''(56
LLL
7KHSURMHFWHVWLPDWHGFRQVWUXFWLRQFRVWDQGFRQWUDFWWLPHHVWDEOLVKHGIRUWKHSURMHFWLVD
IROORZV
%$6(%,'
ZRUNLQJGD\V
$'',7,9($/7(51$7,9(³$´ ZRUNLQJGD\V 727$/352-(&7%,'
%$6(%,'$''$/7³$´
7KH IL[HG OLTXLGDWHG GDPDJHV DPRXQW LV HVWDEOLVKHG DW SHU GD\ IRU IDLOXUH WR FRPSOHWHWKHZRUNZLWKLQWKHFRQWUDFWWLPH
,QFRPSOLDQFHZLWKVHFWLRQRIWKH/DERU&RGHWKH6WDWHRI&DOLIRUQLD'HSDUWPHQWRI ,QGXVWULDO 5HODWLRQV KDV HVWDEOLVKHG SUHYDLOLQJ KRXUO\ ZDJH UDWHV IRU HDFK W\SH RI ZRUNPDQ&XUUHQWZDJHUDWHVPD\EHREWDLQHGIURPWKH'LYLVLRQRI/DERUDW
KWWSV
ZZZGLUFDJRYRSUO'3UH:DJH'HWHUPLQDWLRQKWP
7KLVSURMHFWLVVXEMHFWWRFRPSOLDQFHPRQLWRULQJDQGHQIRUFHPHQWE\WKH'HSDUWPHQWRI ,QGXVWULDO5HODWLRQV
48$/,),&$7,216
<RXPXVW SRVVHVV D YDOLG &ODVV$ RU & &RQWUDFWRU V /LFHQVH DWWKHWLPH RIWKH ELG
RSHQLQJ
<RXDQGDQ\VXEFRQWUDFWRUVUHTXLUHG WRSD\SUHYDLOLQJZDJHPXVWEHUHJLVWHUHG ZLWKWKH'HSDUWPHQWRI,QGXVWULDO5HODWLRQVSXUVXDQWWR6HFWLRQRIWKH/DERU &RGH
3URYLGH WZR UHIHUHQFHG SURMHFWV FRPSOHWHG DV WKH SULPH FRQWUDFWRU DQG RQH UHIHUHQFHGSURMHFWFRPSOHWHGDVHLWKHUWKHSULPHRUVXEFRQWUDFWRU$OOUHIHUHQFHG SURMHFWVPXVWKDYHEHHQFRPSOHWHGZLWKLQWKHODVWILYH\HDUVIURPWKLVSURMHFW¶VELG RSHQLQJGDWH
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
127,&(72%,''(56
127,&(72%,''(56
LY
7KH&LW\UHVHUYHVWKHULJKWWRUHMHFWDUHVSRQVLYHELGEDVHGRQWKHQRQUHVSRQVLELOLW\RI WKHELGGHULIWKH'LUHFWRURI3XEOLF:RUNVRU'HVLJQHHILQGVDIWHUSURYLGLQJQRWLFHDQGD KHDULQJWRWKHELGGHUWKDWWKHELGGHUODFNVWKH
NQRZOHGJH
H[SHULHQFH
RULVRWKHUZLVHQRWUHVSRQVLEOH
DVGHILQHGLQ6HFWLRQRIWKH6DQ/XLV2ELVSR0XQLFLSDO&RGHWRFRPSOHWHWKHSURMHFW LQWKHEHVWLQWHUHVWRIWKH&LW\
5HMHFWHG ELGGHUV PD\ DSSHDO WKLV GHWHUPLQDWLRQ $SSHDO PXVW FRPSO\ ZLWK WKH UHTXLUHPHQWVLQWKLV1RWLFHWR%LGGHUV
,WLVWKH&LW\RI6DQ/XLV2ELVSR¶VLQWHQWWRDZDUGWKHFRQWUDFWWRWKHORZHVWUHVSRQVLYH ELGVXEPLWWHGE\DUHVSRQVLEOHELGGHU,ILQWKHELGGHU¶VRSLQLRQWKHFRQWUDFWKDVEHHQRU PD\EHLPSURSHUO\DZDUGHGWKHELGGHUPD\SURWHVWWKHFRQWUDFWDZDUG 3URWHVWVPXVWEHILOHGQRODWHUWKDQILYHZRUNLQJGD\VDIWHUHLWKHU
ELGRSHQLQJGDWH
QRWLILFDWLRQRIUHMHFWHGELG
3URWHVWPXVWEHLQZULWLQJDQGUHFHLYHGE\WKHSURMHFWPDQDJHUORFDWHGDW
3DOP6WUHHW
6DQ/XLV2ELVSR&$
9DOLGSURWHVWVPXVWFRQWDLQWKHIROORZLQJLQIRUPDWLRQ
WKHUHDVRQVIRUWKHSURWHVW
DQ\VXSSRUWLQJGRFXPHQWDWLRQ
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
,IWKHSURWHVWHULVQRWVDWLVILHGZLWKUXOLQJWKHSURWHVWHUPD\DSSHDOWKHUXOLQJWRWKH&LW\ &RXQFLOLQFRPSOLDQFHZLWK&KDSWHURIWKH&LW\RI6DQ/XLV2ELVSR0XQLFLSDO&RGH 3XUVXDQWWRWKH3XEOLF5HFRUGV$FW
*RYHUQPHQW&RGH HW VHT
WKH&LW\ZLOO
PDNHSXEOLFUHFRUGVDYDLODEOHXSRQUHTXHVW
127,&(72%,''(56
127,&(72%,''(56
Y
$:$5'
7KHORZHVWELGGHUZLOOEHGHWHUPLQHGLQFRPSOLDQFHZLWK3XEOLF&RQWUDFW&RGH6HFWLRQ
F
ZLWKWKH3XEOLFO\'LVFORVHG)XQGLQJ$PRXQWRIXVLQJHLWKHU
x 727$/352-(&7%,'LIELGIRU%DVH%LG$GG$OW³$´LVOHVVWKDQ RU
x %$6(%,' LI%DVH%LG LV OHVVWKDQ DQG%DVH%LG$GG$OW ³$´ LV JUHDWHUWKDQ
$VDFRQGLWLRQWRH[HFXWLQJDFRQWUDFWZLWKWKH&LW\WZRERQGVHDFKHTXDOWRRQHKXQGUHG SHUFHQWRIWKHWRWDOFRQWUDFWSULFHDUHUHTXLUHGLQFRPSOLDQFHZLWK6HFWLRQRIWKH 6WDQGDUG6SHFLILFDWLRQV
<RXPD\VXEVWLWXWHVHFXULWLHVIRUPRQH\VZLWKKHOGXQGHUWKHFRQWUDFWLQFRPSOLDQFHZLWK WKHSURYLVLRQVRIWKH3XEOLF&RQWUDFW&RGH6HFWLRQ $&&2002'$7,21
,I DQ\ DFFRPPRGDWLRQV DUH QHHGHG WR SDUWLFLSDWH LQ WKH ELG SURFHVV SOHDVH FRQWDFW $UJHOLD&KDQJDW
RUE\7HOHFRPPXQLFDWLRQV'HYLFHIRUWKH'HDIDW
5HTXHVWVVKRXOGEHPDGHDVHDUO\DVSRVVLEOHLQWKHELGGLQJSURFHVVWRDOORZ WLPHIRUDFFRPPRGDWLRQ
%,')2506
$
%,')2506
$OO ELGIRUPVPXVW EH FRPSOHWHG DQG VXEPLWWHG ZLWK \RXU ELG)DLOXUHWR VXEPLWWKHVH IRUPVDQGUHTXLUHGELGERQGLVFDXVHWRUHMHFWWKHELGDVQRQUHVSRQVLYH6WDSOHDOOELG IRUPVWRJHWKHU
7+(81'(56,*1('DJUHHVWKDWWKH\KDYHFDUHIXOO\H[DPLQHG
WKHORFDWLRQRIWKHSURSRVHGZRUN
WKHSODQVDQGVSHFLILFDWLRQV
UHDGWKHDFFRPSDQ\LQJLQVWUXFWLRQVWRELGGHUV
DQGSURSRVHWRIXUQLVKDOO
PDWHULDOV
ODERU
WRFRPSOHWHDOOWKHUHTXLUHGZRUNVDWLVIDFWRULO\LQFRPSOLDQFHZLWK SODQV
VSHFLILFDWLRQV
VSHFLDOSURYLVLRQV
IRUWKHSULFHVVHWIRUWKLQWKHELGLWHPOLVW
%,',7(0/,67)259(5'(/81(7$5$021$%52$'6(:(55(3/$&(0(17 63(&,),&$7,2112
,WHP ,WHP 8QLWRI (VWLPDWHG ,WHP3ULFH 7RWDO
1R 66
'HVFULSWLRQ 0HDVXUH 4XDQWLW\
LQILJXUHV
LQILJXUHV
ϭ ϳ dZ&&/KEdZK>W>EE
/DW>
D
Edd/KE >^ ϭ
Ϯ ϳϳ WKd,K>/E' >^ ϭ
ϯ ϴϰ Z
W>
dZ&&/^dZ/W/E'Θ
DZ<
Z^ >^ ϭ
ϰ ϳ KDW>zt/d,K^, >^ ϭ
ϱ ϭϰ
KDW>zt/d,D/d/'d/KE
D
^hZ
^E
Z,
K>K'/>
DKE/dKZ/E'W>E
>^ ϭ
ϲ ϳϳ EKE^
t
Z>/E
͕
DE,K>
^E&/>/d/
^ >^ ϭ
ϳ ϳϳ zW^^WhDW/E' >^ ϭ
ϴ ϳϳ Z
^dKZd/KEK&WZ/sd
WZKW
Zdz >^ ϭ
ϵΎ ϭϵ ZK<
ysd/KE z ϭϬϬϬ
ϭϬ ϳϳ Z
W>
td
Zt
>>E
Ks
Z
ϭ
ϭϭ ϲ͕ϭϱ DKEhD
EdZ
^dKZd/KE
ϯ
%,')2506
%,')2506
%
,WHP ,WHP 8QLWRI (VWLPDWHG ,WHP3ULFH 7RWDO
1R 66
'HVFULSWLRQ 0HDVXUH 4XDQWLW\
LQILJXUHV
LQILJXUHV
ϭϮ ϳϳ
/E^d>>E
tϲΗ,W
^
t
Z>/E
zW/W
hZ^d/E'
d,ZKh',
y/^d/E'^
t
Z>/E
>& ϭϳϰ
ϭϯ ϳϳ
Z
DKs
y/^d/E'^
t
Z>/E
E/E^d>>E
tϴΗ,W
^
t
Z>/E
zKW
E
dZ
E,/E'
>& ϵϭϭ
ϭϰ ϳϳ
Z
DKs
y/^d/E'^
t
Z>/E
E/E^d>>E
tϭϬΗ,W
^
t
Z>/E
zKW
E
d
^ddZ
E,/E'
>& ϲϯϰ
ϭϱ ϳϳ
/E^d>>E
tϭϬΗ,W
^
t
Z>/E
zKW
E
dZ
E,/E';^dd/KEϭϬϭнϬϬͲ
^dd/KEϭϭϯнϰϬͿ
>& ϲϮϴ
ϭϲ ϳϳ /E^d>>E
tDE,K>
ϴ
ϭϳ ϳϳ /E^d>>DE,K>
Kd/E'
ϴ
ϭϴ ϳϳ Z
DKs
y/^d/E'DE,K>
ϲ
ϭϵ ϳϳ Z
DKs
y/^d/E'E/E^d>>
E
t>
EKhd
ϭ
ϮϬ ϳϳ KEE
d
y/^d/E'^
t
Z
>d
Z>dK^
t
ZD/E
ϯϬ
Ϯϭ ϳϳ /E^d>>ϲΗ,W
^
t
Zz
^>/W>/E/E' >& ϲϴ
ϮϮΎ ϳϳ Z
Ͳ'Z
^
t
Z>d
Z>
zKEϱ&
d >& ϭϬ
%DVH%LG
Ϯϯ ϳ dZ&&/KEdZK>W>EE
/DW>
D
Edd/KE >^ ϭ
Ϯϰ ϳϳ WKd,K>/E' >^ ϭ
Ϯϱ ϴϰ Z
W>
dZ&&/^dZ/W/E'Θ
DZ<
Z^ >^ ϭ
Ϯϲ ϳ KDW>zt/d,K^, >^ ϭ
Ϯϳ ϭϰ
KDW>zt/d,D/d/'d/KE
D
^hZ
^E
Z,
K>K'/>
DKE/dKZ/E'W>E
>^ ϭ
Ϯϴ ϳϳ EKE^
t
Z>/E
͕
DE,K>
^E&/>/d/
^ >^ ϭ
Ϯϵ ϳϳ zW^^WhDW/E' >^ ϭ
ϯϬ ϳϳ Z
^dKZd/KEK&WZ/sd
WZKW
Zdz >^ ϭ
%,')2506
%,')2506
&
,WHP ,WHP 8QLWRI (VWLPDWHG ,WHP3ULFH 7RWDO
1R 66
'HVFULSWLRQ 0HDVXUH 4XDQWLW\
LQILJXUHV
LQILJXUHV
ϯϭ ϳϳ >d
Z>d/
Ks
Zz,
ϰ
ϯϭ ϳϳ Z
DKs
;
Ϳ^^D,E/E^d>>
;EͿ>
EKhd
ϭ
$GGLWLYH$OWHUQDWLYH$
7RWDO3URMHFW%LG
%DVH%LG$GGLWLYH$OWHUQDWLYH$
&RPSDQ\1DPH
UHIHUVWRVHFWLRQLQWKH6WDQGDUG6SHFLILFDWLRQVZLWKPRGLILFDWLRQVLQWKH6SHFLDO3URYLVLRQVWKDWGHVFULEHUHTXLUHG ZRUN
%LGLWHPH[HPSWIURP6HFWLRQ
RIWKH6WDQGDUG6SHFLILFDWLRQV7KHXQLWSULFHZLOOQRWEHDGMXVWHGUHJDUGOHVVRI WKHILQDOELGLWHPTXDQWLW\
%,')2506
%,')2506
'
/,672)68%&2175$&7256
3XUVXDQW WR 6HFWLRQ RI WKH 3XEOLF &RQWUDFWV &RGH DQG VHFWLRQ & RI WKH VWDQGDUGVSHFLILFDWLRQVWKH%LGGHULVUHTXLUHGWRIXUQLVKWKHIROORZLQJLQIRUPDWLRQIRUHDFK 6XEFRQWUDFWRUSHUIRUPLQJPRUHWKDQSHUFHQW
RIWKHWRWDOEDVHELG'RQRWOLVW
DOWHUQDWLYHVXEFRQWUDFWRUVIRUWKHVDPHZRUN6XEFRQWUDFWLQJPXVWQRWWRWDOPRUHWKDQ ILIW\SHUFHQW
RIWKHVXEPLWWHGELGH[FHSWDVDOORZHGLQVHFWLRQRIWKHVWDQGDUG VSHFLILFDWLRQV
)RU6WUHHWV +LJKZD\VSURMHFWVVXEFRQWUDFWRUVSHUIRUPLQJOHVVWKDQWHQWKRXVDQGGROODUV
ZRUWK RI ZRUN QHHG QRW EH PHQWLRQHG 6XEFRQWUDFWRUV UHTXLUHG WR SD\ SUHYDLOLQJ ZDJH PXVW EH UHJLVWHUHG ZLWK WKH 'HSDUWPHQW RI ,QGXVWULDO 5HODWLRQV SXUVXDQWWR/DERU&RGHVHFWLRQWREHOLVWHG
127(
,IWKHUHDUHQRVXEFRQWUDFWRUVZULWH³121(´DQGVXEPLWZLWKELG 1DPH8QGHU:KLFK
6XEFRQWUDFWRULV/LFHQVHG /LFHQVH1XPEHU
',53XEOLF
:RUNV
5HJLVWUDWLRQ
1XPEHU
$GGUHVVDQG3KRQH
1XPEHURI2IILFH0LOORU
6KRS
6SHFLILF
'HVFULSWLRQRI
6XEFRQWUDFW
RI
7RWDO
%DVH
%LG
$WWDFKDGGLWLRQDOVKHHWVDVQHHGHG
%,')2506
%,')2506
(
38%/,&&2175$&7&2'(6(&7,2167$7(0(17
,QFRPSOLDQFHZLWK3XEOLF&RQWUDFW&RGH6HFWLRQ &KDSWHU6WDWV
WKH
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
127(
7KHELGGHUPXVWSODFHDFKHFNPDUNDIWHUKDVRUKDVQRWLQRQHRIWKHEODQN VSDFHVSURYLGHG7KHDERYH6WDWHPHQWLVSDUWRIWKH%LG6LJQLQJWKLV%LGRQWKHVLJQDWXUH SRUWLRQFRQVWLWXWHVLJQDWXUHRIWKLV6WDWHPHQW%LGGHUVDUHFDXWLRQHGWKDWPDNLQJDIDOVH FHUWLILFDWLRQPD\VXEMHFWWKHFHUWLILHUWRFULPLQDOSURVHFXWLRQ 38%/,&&2175$&7&2'(6(&7,2148(67,211$,5(
,QFRPSOLDQFHZLWK3XEOLF&RQWUDFW&RGH6HFWLRQWKH%LGGHUPXVWFRPSOHWHXQGHU SHQDOW\RISHUMXU\WKHIROORZLQJTXHVWLRQQDLUH
+DV WKH ELGGHU DQ\ RIILFHU RI WKH ELGGHU RU DQ\ HPSOR\HH RI WKH ELGGHU ZKR KDV D SURSULHWDU\LQWHUHVWLQWKHELGGHUHYHUEHHQGLVTXDOLILHGUHPRYHGRURWKHUZLVHSUHYHQWHG IURPELGGLQJRQRUFRPSOHWLQJDIHGHUDOVWDWHRUORFDOJRYHUQPHQWSURMHFWEHFDXVHRID YLRODWLRQRIODZRUDVDIHW\UHJXODWLRQ"
<HV 1R
,IWKHDQVZHULV\HVDWWDFKDOHWWHUH[SODLQLQJWKHFLUFXPVWDQFHV 38%/,&&2175$&7&2'(6(&7,2167$7(0(17
,QFRPSOLDQFHZLWK3XEOLF&RQWUDFW&RGH6HFWLRQ\RXKHUHE\VWDWHXQGHUSHQDOW\RI SHUMXU\WKDWQRPRUHWKDQRQHILQDOXQDSSHDODEOHILQGLQJRIFRQWHPSWRIFRXUWE\DIHGHUDO FRXUW KDV EHHQ LVVXHG DJDLQVW \RX ZLWKLQ WKH LPPHGLDWHO\ SUHFHGLQJ WZR\HDU SHULRG EHFDXVHRI\RXUIDLOXUHWRFRPSO\ZLWKDQRUGHURIDIHGHUDOFRXUWZKLFKRUGHUV\RXWRFRPSO\ ZLWKDQRUGHURIWKH1DWLRQDO/DERU5HODWLRQV%RDUG
/$%25&2'(6(&7,2167$7(0(176
7KHELGGHUKDVGHOLQTXHQWOLDELOLW\WRDQHPSOR\HHRUWKHVWDWHIRUDQ\DVVHVVPHQWRIEDFN ZDJHVRU UHODWHGGDPDJHVLQWHUHVWILQHVRUSHQDOWLHVSXUVXDQWWRDQ\ILQDOMXGJPHQW RUGHURUGHWHUPLQDWLRQE\DFRXUWRUDQ\IHGHUDOVWDWHRUORFDODGPLQLVWUDWLYHDJHQF\ LQFOXGLQJ D FRQILUPHG DUELWUDWLRQ DZDUG $Q\ MXGJPHQW RUGHU RU GHWHUPLQDWLRQ WKDW LV
%,')2506
%,')2506
)
XQGHUDSSHDOLVH[FOXGHGSURYLGHGWKDWWKHFRQWUDFWRUKDVVHFXUHGWKHSD\PHQWRIDQ\ DPRXQWHYHQWXDOO\IRXQGGXHWKURXJKDERQGRURWKHUDSSURSULDWHPHDQV <HV 1R
7KHELGGHULVFXUUHQWO\GHEDUUHGXQGHU6HFWLRQRUXQGHUDQ\RWKHUIHGHUDORUVWDWH ODZSURYLGLQJIRUWKHGHEDUPHQWRIFRQWUDFWRUVIURPSXEOLFZRUNV <HV 1R
127(
7KHDERYH6WDWHPHQWVDQG4XHVWLRQQDLUHDUHSDUWRIWKH%LG6LJQLQJWKLV%LGRQ WKHVLJQDWXUHSRUWLRQFRQVWLWXWHVLJQDWXUHRIWKLV6WDWHPHQWDQG4XHVWLRQQDLUH%LGGHUVDUH FDXWLRQHGWKDWPDNLQJDIDOVHFHUWLILFDWLRQPD\VXEMHFWWKHFHUWLILHUWRFULPLQDOSURVHFXWLRQ
%,')2506
%,')2506
*
121&2//86,21'(&/$5$7,21
,GHFODUHWKDW ,DPRI WKHSDUW\PDNLQJWKHIRUHJRLQJELGWKDWWKHELGLVQRWPDGHLQWKHLQWHUHVWRIRURQEHKDOI RI DQ\ XQGLVFORVHG SHUVRQ SDUWQHUVKLS FRPSDQ\ DVVRFLDWLRQ RUJDQL]DWLRQ RU
FRUSRUDWLRQ
WKDW WKH ELG LV JHQXLQH DQG QRW FROOXVLYH RU VKDP WKDW WKH ELGGHU KDV QRW
GLUHFWO\RULQGLUHFWO\LQGXFHGRUVROLFLWHGDQ\RWKHUELGGHUWRSXWLQDIDOVHRUVKDPELGDQG KDVQRWGLUHFWO\RULQGLUHFWO\FROOXGHGFRQVSLUHGFRQQLYHGRUDJUHHGZLWKDQ\ELGGHURU DQ\RQHHOVHWRSXWLQDVKDPELGRUWKDWDQ\RQHUHIUDLQHGIURPELGGLQJ WKDWWKHELGGHUKDV
QRW LQ DQ\ PDQQHU GLUHFWO\ RU LQGLUHFWO\ VRXJKW E\ DJUHHPHQW FRPPXQLFDWLRQ RU FRQIHUHQFHZLWKDQ\RQHWRIL[WKHELGSULFHRIWKHELGGHURUDQ\RWKHUELGGHURUWRIL[DQ\ RYHUKHDGSURILWRUFRVWHOHPHQWRIWKHELGSULFHRURIWKDWRIDQ\RWKHUELGGHURUWRVHFXUH DQ\DGYDQWDJHDJDLQVWWKHSXEOLFERG\DZDUGLQJWKHFRQWUDFWRIDQ\RQHLQWHUHVWHGLQWKH SURSRVHGFRQWUDFW
WKDWDOOVWDWHPHQWVFRQWDLQHGLQWKHELGDUHWUXH
DQGIXUWKHUWKDWWKH
ELGGHUKDVQRWGLUHFWO\RULQGLUHFWO\VXEPLWWHGKLVRUKHUELGSULFHRUDQ\EUHDNGRZQWKHUHRI RUWKHFRQWHQWVWKHUHRIRUGLYXOJHGLQIRUPDWLRQRUGDWDUHODWLYHWKHUHWRRUSDLGDQGZLOOQRW SD\ DQ\ IHH WR DQ\ FRUSRUDWLRQ SDUWQHUVKLS FRPSDQ\ DVVRFLDWLRQ RUJDQL]DWLRQ ELG GHSRVLWRU\RUWRDQ\PHPEHURUDJHQWWKHUHRIWRHIIHFWXDWHDFROOXVLYHRUVKDPELG ([HFXWHGRQLQBB ,GHFODUHXQGHUSHQDOW\RISHUMXU\XQGHUWKHODZVRIWKH6WDWHRI&DOLIRUQLDWKDWWKHIRUHJRLQJ LVWUXHDQGFRUUHFW
6LJQDWXUHDQG7LWOHRI'HFODUDQW
6($/
6XEVFULEHGDQGVZRUQWREHIRUHPH
WKLVBBBBBBBGD\RIBBBBBBBBBBBBBB
1RWDU\3XEOLF
&RPSDQ\1DPH
BBBBBBBBBBBBBBBBBBBB
%,')2506
%,')2506
+
%,''(5$&.12:/('*(0(176
%\VLJQLQJEHORZWKHELGGHUDFNQRZOHGJHVDQGFRQILUPVWKDWWKLVELGLVEDVHGRQWKHLQIRUPDWLRQFRQWDLQHG LQ DOO FRQWUDFW GRFXPHQWV LQFOXGLQJ WKH QRWLFH WR ELGGHUV SODQV VSHFLILFDWLRQV VSHFLDO SURYLVLRQV DQG DGGHQGXPQXPEHU
V
1RWH
<RXDUHUHVSRQVLEOHWRYHULI\WKHQXPEHURI
DGGHQGDSULRUWRWKHELGRSHQLQJ
7KHXQGHUVLJQHGIXUWKHUDJUHHVWKDWLQ FDVHRIGHIDXOWLQH[HFXWLQJWKH UHTXLUHG FRQWUDFWZLWKQHFHVVDU\ ERQGVZLWKLQ HLJKW GD\V
QRW LQFOXGLQJ6DWXUGD\V6XQGD\V DQG OHJDO KROLGD\V DIWHU KDYLQJ UHFHLYHG D
PDLOHGQRWLFHWKDWWKHFRQWUDFWLVUHDG\IRUVLJQDWXUHWKHSURFHHGVRIWKHFKHFNRUERQGDFFRPSDQ\LQJKLV ELGZLOOEHFRPHWKHSURSHUW\RIWKH&LW\RI6DQ/XLV2ELVSR /LFHQVHGLQDFFRUGDQFHZLWKDQDFWSURYLGLQJIRUWKHUHJLVWUDWLRQRIFRQWUDFWRUV/LFHQVH1R([SLUDWLRQ 'DWH
7KHDERYHVWDWHPHQWLVPDGHXQGHUSHQDOW\RISHUMXU\DQGDQ\ELGQRWFRQWDLQLQJWKLVLQIRUPDWLRQZLOOEH FRQVLGHUHGQRQUHVSRQVLYHDQGZLOOEHUHMHFWHG´E\WKH&LW\ 6LJQDWXUHRI%LGGHU
3ULQW1DPHDQG7LWOHRI%LGGHU
',5±3XEOLF:RUNV
5HJLVWUDWLRQ1R
%XVLQHVV1DPH
'%$
2ZQHU/HJDO1DPH
,QGLFDWH2QH
6ROHSURSULHWRU
3DUWQHUVKLS
&RUSRUDWLRQ
/LVW3DUWQHUV&RUSRUDWH2IILFHUV
1DPH7LWOH
1DPH7LWOH
1DPH7LWOH
%XVLQHVV$GGUHVV
6WUHHW$GGUHVV
0DLOLQJ$GGUHVV
&LW\6WDWH=LS&RGH
3KRQH1XPEHU
)D[1XPEHU
(PDLO$GGUHVV
'DWH
%,')2506
%,')2506
,
48$/,),&$7,216
)DLOXUH WR IXUQLVK FRPSOHWH UHIHUHQFH LQIRUPDWLRQ 21 7+,6 )250 DV VSHFLILHG LQ WKLV SURMHFW¶V 1RWLFH WR %LGGHUV DQG LQGLFDWHG EHORZ LV FDXVH WR UHMHFW WKH ELG $GGLWLRQDO LQIRUPDWLRQPD\EHDWWDFKHGEXWLVQRWDVXEVWLWXWHIRUWKLVIRUP 5HIHUHQFH1XPEHU
&XVWRPHU1DPH &RQWDFW,QGLYLGXDO
7HOHSKRQH (PDLO
3URMHFW1DPH
6LWH$GGUHVV
'LGWKLVSURMHFWLQVWDOODPLQLPXPRI
/)RIVHZHUOLQHE\RSHQ
WUHQFKLQJ"
<HVƑ1RƑ
'HVFULEHWKHVHUYLFHVSURYLGHGDQGKRZWKLVSURMHFWLVVLPLODUWR WKDWZKLFKLVEHLQJELG
'DWHSURMHFWFRPSOHWHG
:DVWKLVFRQWUDFWIRUDSXEOLFDJHQF\"
<HVƑ1RƑ
5HIHUHQFH1XPEHU
&XVWRPHU1DPH &RQWDFW,QGLYLGXDO
7HOHSKRQH (PDLO
3URMHFW1DPH
6LWH$GGUHVV
'LGWKLVSURMHFWLQVWDOODPLQLPXPRI
/)RIVHZHUOLQHE\RSHQ
WUHQFKLQJ"
<HVƑ1RƑ
'HVFULEHWKHVHUYLFHVSURYLGHGDQGKRZWKLVSURMHFWLVVLPLODUWR WKDWZKLFKLVEHLQJELG
'DWHSURMHFWFRPSOHWHG
:DVWKLVFRQWUDFWIRUDSXEOLFDJHQF\"
<HVƑ1RƑ
5HIHUHQFH1XPEHU
&XVWRPHU1DPH &RQWDFW,QGLYLGXDO
7HOHSKRQH (PDLO
3URMHFW1DPH
6LWH$GGUHVV
'LGWKLVSURMHFWLQVWDOODPLQLPXPRI
/)RIVHZHUOLQHE\RSHQ
WUHQFKLQJ"
<HVƑ1RƑ
'HVFULEHWKHVHUYLFHVSURYLGHGDQGKRZWKLVSURMHFWLVVLPLODUWR WKDWZKLFKLVEHLQJELG
'DWHSURMHFWFRPSOHWHG
:DVWKLVFRQWUDFWIRUDSXEOLFDJHQF\"
<HVƑ1RƑ
%,')2506
%,')2506
-
$77$&+%,''(5
6%21'72$&&203$1<%,'
.QRZDOOPHQE\WKHVHSUHVHQWV
7KDWZHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB$635,1&,3$/DQG BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB $6 685(7< DUH KHOG DQG ILUPO\ ERXQGXQWRWKH&LW\RI6DQ/XLV2ELVSRLQWKHVXPRI
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 'ROODUV
BBBBBBBBBBBBB
WR EH SDLG WR
VDLG&LW\RULWVFHUWDLQDWWRUQH\LWVVXFFHVVRUVDQGDVVLJQV IRUZKLFKSD\PHQWZHOODQGWUXO\WREHPDGHZH
ELQGRXUVHOYHVRXUKHLUVH[HFXWRUVDQGDGPLQLVWUDWRUVVXFFHVVRUVRUDVVLJQVMRLQWO\DQGVHYHUDOO\ILUPO\E\ WKHVHSUHVHQWV
7+(&21',7,212)7+,62%/,*$7,21,668&+WKDWLIWKHFHUWDLQELGRIWKHDERYH ERXQGHQBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB WRFRQVWUXFWBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
LQVHUWQDPHRIVWUHHWDQGOLPLWVWREHLPSURYHGRUSURMHFW
GDWHGBBBBBBBBBBBBBBBBBBBBBLVDFFHSWHGE\WKH&LW\RI6DQ/XLV2ELVSRDQGLIWKHDERYH ERXQGHQ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB KLV KHLUV H[HFXWRUV DGPLQLVWUDWRUVVXFFHVVRUVDQGDVVLJQVVKDOOGXO\HQWHULQWRDQGH[HFXWHDFRQWUDFWIRUVXFKFRQVWUXFWLRQDQG VKDOOH[HFXWHDQGGHOLYHUWKHWZRERQGVGHVFULEHGZLWKLQWHQ
GD\V
QRWLQFOXGLQJ6DWXUGD\V6XQGD\VRU
OHJDOKROLGD\V
DIWHUWKHDERYHERXQGHQ
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB KDV UHFHLYHG QRWLFH E\ DQG IURP WKH VDLG&LW\RI6DQ/XLV2ELVSRWKDWVDLGFRQWUDFWLVUHDG\IRUH[HFXWLRQWKHQWKLVREOLJDWLRQVKDOOEHFRPHQXOO DQGYRLG
RWKHUZLVHLWVKDOOEHDQGUHPDLQLQIXOOIRUFHDQGYLUWXH ,1:,71(66:+(5(2)ZHKHUHXQWRVHWRXUKDQGVDQGVHDOVWKLVBBBGD\RIBBBBBBBBBB %LGGHU3ULQFLSDO
6LJQDWXUH 'DWH
7LWOH
6XUHW\
%LGGHU
VVLJQDWXUHLVQRWUHTXLUHGWREHQRWDUL]HG6XUHW\
VVLJQDWXUHPXVWEHQRWDUL]HG
(TXLYDOHQWIRUPPD\EHVXEVWLWXWHG
(Rev. 6-30-14)
63(&,$/3529,6,216
63(&,$/3529,6,216
25*$1,=$7,21
6SHFLDOSURYLVLRQVDUHXQGHUKHDGLQJVWKDWFRUUHVSRQGZLWKWKHPDLQVHFWLRQKHDGLQJRI WKH6WDQGDUG6SHFLILFDWLRQV(DFK VSHFLDO SURYLVLRQ EHJLQV ZLWK D UHYLVLRQ FODXVHWKDW GHVFULEHVRULQWURGXFHVDUHYLVLRQWRWKH6WDQGDUG6SHFLILFDWLRQV$Q\SDUDJUDSKDGGHG RUGHOHWHGE\DUHYLVLRQFODXVHGRHVQRWFKDQJHWKHSDUDJUDSKQXPEHURIWKH6WDQGDUG 6SHFLILFDWLRQVIRUDQ\RWKHUUHIHUHQFHWRDSDUDJUDSKRIWKH6WDQGDUG6SHFLILFDWLRQV ',9,6,21,*(1(5$/3529,6,216
*(1(5$/
$GGWR6HFWLRQ*(1(5$/
7KHZRUNPXVWEHGRQHLQFRPSOLDQFHZLWKWKH&LW\RI6DQ/XLV2ELVSR'HSDUWPHQWRI 3XEOLF:RUNV
9HUGH/XQHWD5DPRQD%URDG6HZHU5HSODFHPHQW6SHFLDO3URYLVLRQV &LW\ RI 6DQ /XLV 2ELVSR 6WDQGDUG 6SHFLILFDWLRQV DQG (QJLQHHULQJ 6WDQGDUGV ± HGLWLRQ
6WDWH RI &DOLIRUQLD 'HSDUWPHQW RI 7UDQVSRUWDWLRQ 6WDQGDUG 6SHFLILFDWLRQV DQG 6WDQGDUG3ODQV±HGLWLRQ
,QFDVHRIFRQIOLFWEHWZHHQGRFXPHQWVJRYHUQLQJUDQNLQJPXVWFRPSO\ZLWKVHFWLRQ RIWKH&LW\RI6DQ/XLV2ELVSR¶V6WDQGDUG6SHFLILFDWLRQV )DLOXUHWRFRPSO\ZLWKWKHSURYLVLRQVRIWKHVHVHFWLRQVLVDPDWHULDOEUHDFKRIFRQWUDFW
6HFWLRQVWKURXJKRIWKH6WDQGDUG6SHFLILFDWLRQV 6HFWLRQWKURXJKRIWKH6WDQGDUG6SHFLILFDWLRQV 6HFWLRQRIWKH6WDQGDUG6SHFLILFDWLRQV
6HFWLRQRIWKH6WDQGDUG6SHFLILFDWLRQV
DXWKRUL]HGZRUNLQJKRXUV
26+$FRPSOLDQFH
%,'',1*
5HSODFH6HFWLRQ$%,''2&80(17&203/(7,21$1'68%0,77$/*HQHUDO ZLWK
)XUQLVK ELG XVLQJ EODQNIRUPV SURYLGHG LQWKH6SHFLDO3URYLVLRQV%LGPXVW LQFOXGH DOO IRUPVDQGPXVWEHVLJQHGE\WKHELGGHU
6&23(2):25.
$GGWR6HFWLRQ:25.'(6&5,37,21
&RPSO\ZLWKWKHSURYLVLRQVRI6HFWLRQV
IRUJHQHUDOPDWHULDO
FRQVWUXFWLRQDQGSD\PHQWVSHFLILFV
63(&,$/3529,6,216
63(&,$/3529,6,216
/(*$/5(/$7,216$1'5(63216,%,/,7<727+(38%/,&
$GGWR6HFWLRQ%38%/,&&219(1,(1&(7UDIILF&RQWURO3ODQ :RUNZLWKLQSULYDWHSURSHUW\LVUHVWULFWHGWRWKHZRUNLQJKRXUVRI0RQGD\WKURXJK)ULGD\ IURP
DPWR
SP
$OORWKHUZRUNPXVWEHFRPSOHWHGGXULQJQRUPDOZRUNLQJKRXUVRI0RQGD\WKURXJK)ULGD\
DPWR
SP
1RIXOOZLGWKVWUHHWFORVXUHVZLOOEHSHUPLWWHG7UDIILFFRQWUROSODQVVKRXOGFRQVLGHUDQ\ODQH FORVXUHVEDVHGRQWKHIROORZLQJOLVWRISULRULWLHV
LQRUGHURIPRVWGHVLUHGWROHDVWGHVLUHG
RSWLRQ
5HVWULFWSDUNLQJRQRQHRUERWKVLGHVDVQHFHVVDU\LQRUGHUWRPDLQWDLQWZRZD\ WUDIILFFLUFXODWLRQZLWKPLQLPXP¶WUDYHOODQHV
7ZRZD\FLUFXODWLRQZLWKIODJJHUVDQGPLQLPXP¶WUDYHOODQH 3URYLGHWUDIILFFRQWUROSODQDQGWUDIILFFRQWURODSSOLFDWLRQDWRUEHIRUHWKHSUHFRQVWUXFWLRQ PHHWLQJ7UDIILFFRQWUROSODQPXVWEHGUDZQWRVFDOH7UDIILFFRQWURODSSOLFDWLRQPD\EH REWDLQHGRQWKH&LW\¶VZHEVLWH
ZZZVORFLW\RUJJRYHUQPHQWGHSDUWPHQWGLUHFWRU\SXEOLFZRUNVGRFXPHQWV RQOLQHFRQVWUXFWLRQGRFXPHQWV
8SRQDSSURYDORIWKHWUDIILFFRQWUROSODQWKH&LW\ZLOOLVVXHDQRIHH(QFURDFKPHQW3HUPLW 3HUPLWWHHLVUHVSRQVLEOHWRFRPSO\ZLWKDOOFRQGLWLRQVRIWKHWUDIILFFRQWUROSODQ&RPSOHWH ZRUNXVLQJGXHGLOLJHQFHWRUHVWRUHIUHHIORZLQJRIWUDIILF 3526(&87,21$1'352*5(66
5HSODFHWKHVWSDUDJUDSKLQ6HFWLRQ$6&+('8/(*HQHUDOZLWK
3URYLGHD/HYHOVFKHGXOHIRUWKLVZRUN
',9,6,21,,*(1(5$/&216758&7,21
(19,5210(17$/67(:$5'6+,3
$GGWR6HFWLRQ$$5&+$(2/2*,&$/5(6285&(6*HQHUDO $UFKDHRORJLFDOPRQLWRULQJZLOO EH UHTXLUHG GXHWR SUR[LPLW\WRDUFKDHRORJLFDO VHQVLWLYH DUHDV0RQLWRULQJZLOOEHSHUIRUPHGE\DFRQVXOWDQWKLUHGE\WKH&LW\7KHFRQWUDFWRUPXVW FRPSO\ ZLWK WKH 3URMHFW 0LWLJDWLRQ 0HDVXUHV DSSURYHG WKURXJK (5 DQG $UFKDHRORJLFDO PRQLWRULQJ SODQ
$SSHQGL[ %
,I DUFKDHRORJLFDO FXOWXUDO UHVRXUFHV DUH
LGHQWLILHG GXULQJ PRQLWRULQJ WKH PRQLWRU ZLOO EH HPSRZHUHG WR KDOW FRQVWUXFWLRQ 1R DGGLWLRQDO SD\PHQW ZLOO EH PDGH WR WKH FRQWUDFWRU IRU ULJKW RI ZD\ GHOD\V )XOO
63(&,$/3529,6,216
63(&,$/3529,6,216
FRPSHQVDWLRQIRUFRQIRUPLQJWRWKHUHTXLUHPHQWVRIWKLVVHFWLRQVKDOOEHLQFOXGHGLQWKH OXPSVXPSULFHDQGQRDGGLWLRQDOFRPSHQVDWLRQZLOOEHDOORZHGWKHUHIRUH ',9,6,219,,,0,6&(//$1(286&216758&7,21
/2&$/,1)5$6758&785(
$GGWR6HFWLRQ$
*URXQGZDWHU
*URXQGZDWHU KDV EHHQ HQFRXQWHUHG RQVLWH
6HH*HRWHFKQLFDO UHSRUWV ±$SSHQGL[ &
)ORDW URFN PD\ EH VXEVWLWXWHG IRU LQLWLDO EDFNILOO ZKHQ JURXQG ZDWHU LV SUHVHQW SHU (QJLQHHULQJ 6WDQGDUG )XOO FRPSHQVDWLRQ IRU UHPRYLQJ ZDWHU RU GHZDWHULQJ H[FDYDWLRQVDQGEDFNILOOLQJZLWKIORDWURFNLVLQFOXGHGLQWKHSD\PHQWIRURWKHUELGLWHPV XQOHVVDELGLWHPRIZRUNLVVKRZQRQWKH%LG,WHP/LVW $GGWR6HFWLRQ%
75(1&+&216758&7,21*HQHUDO
,IDWDQ\SRLQWGXULQJWKHSURMHFWDWUHQFKLVH[FDYDWHGZLWKLQIHHWRIWKHZDOORIWKHWUHQFK RIDQDFWLYHXWLOLW\VXFKDVDZDWHUOLQHRUDQ\RWKHUXWLOLW\WKDWFRXOGSRWHQWLDOO\EUHDNWKH &RQWUDFWRUPXVWSURYLGHVKRULQJDVQHFHVVDU\WRSUHYHQWPRYHPHQWRIH[LVWLQJOLQHV $GGWR6HFWLRQ'6XUIDFH5HVWRUDWLRQ
*HRWHFKQLFDO ERULQJV DQG SRWKROLQJ RI H[LVWLQJ XWLOLWLHV LQGLFDWH WKH IROORZLQJ DVSKDOW
VHFWLRQV
/XQHWD'ULYH±´$&WKURXJK´$&
9HUGH'ULYH±´$&WKURXJK´$&
5DPRQD±´$&WKURXJK´$&
%URDG±´$&WKURXJK´$&
5HSDLUWUHQFKSDYLQJRQ5DPRQDDQG%URDGDQGDWWKHLQWHUVHFWLRQRI5DPRQDDQG9HUGH PXVWEHUHSDLUHGZLWKLQFKHVRI$&
$OORWKHUVHFWLRQVRI/XQHWD'ULYHDQG9HUGH'ULYHPXVWEHUHSDLUHGZLWKLQFKHVRI$& $GGWR6HFWLRQ$
3LSH%XUVWLQJDQG5HDPLQJ
$OOSLSHEXUVWLQJRSHUDWLRQVPXVWEHGRQHE\D&RQWUDFWRUZLWKDWOHDVW\HDUVRISLSH EXUVWLQJH[SHULHQFH)XVLRQHTXLSPHQWPXVWEHRSHUDWHGRQO\E\WHFKQLFLDQVZKRKDYH EHHQ FHUWLILHG E\WKH SLSHPDQXIDFWXUHU RU VXSSOLHU 3URYLGH UHIHUHQFHG SURMHFWVIRU VHZHUOLQHUHSODFHPHQWZRUNXVLQJSQHXPDWLFSLSHEXUVWLQJLQVWDOODWLRQPHWKRGV $GGWR6HFWLRQ$
6HZHU/DWHUDO3LSH
6HZHUODWHUDOZ\HVPXVWEHIXVHG+'3(
$GGWR6HFWLRQ$
+'3(3LSH-RLQW
+'3( SLSHV MRLQWHG E\ KHDW IXVLRQ ZHOGLQJ PXVW EH LQWHUQDOO\ GHEHDGHG SULRU WR LQVWDOODWLRQ
63(&,$/3529,6,216
63(&,$/3529,6,216
$GGWR6HFWLRQ&%\SDVV3XPSLQJ
7KH&RQWUDFWRUPXVWSURYLGHIRUWKHIORZRIVHZDJHDURXQGWKHVHFWLRQRUVHFWLRQVRISLSH GHVLJQDWHGIRUUHSDLU7KHSXPS
V
DQGE\SDVVOLQH
V
PXVWEHRIDGHTXDWHFDSDFLW\WR
DFFRPPRGDWHDVHZDJHIORZRIJDOORQVSHUGD\
$GG6HFWLRQ'0DQKROH&RDWLQJ
&RDWLQJPDQKROHVVKDOOLQFOXGHWKHIROORZLQJDFWLYLWLHV
&OHDQLQJWKHPDQKROHDQGSUHSDUHWKHPDQKROHIRURQHRIWKHDSSURYHGFRDWLQJ V\VWHPV
$SSO\LQJRQHRIWKHDSSURYHGFRDWLQJV\VWHPVDVVSHFLILHGKHUHLQ 7HVWLQJWKHILQLVKHGVXUIDFHFRDWLQJDVUHTXLUHGKHUHLQ 2WKHUUHODWHGDFWLYLWLHVDVQRWHGKHUHLQ
:KHUHGHVLJQDWHGLQWKHSODQVPDQKROHVPXVWEH FRDWHGZLWKDQDSSURYHG FRUURVLRQ SURWHFWLYH FRDWLQJ DSSOLHGWRWKHLU LQWHULRU VXUIDFHV DV VSHFLILHG KHUHLQ 7KH DSSURYHG FRDWLQJV\VWHP
DVVSHFLILHGKHUHLQ
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
7KH&RQWUDFWRUVKDOOWHUPLQDWHWKHFRDWLQJDWWKHVSULQJOLQHRIWKHFKDQQHOZLWKDFXW JURRYH
0DWHULDOVVKDOOEHGHOLYHUHGWRWKHVLWHLQIDFWRU\VHDOHGDQGODEHOHGFRQWDLQHUV'DWHRI PDQXIDFWXUH VKDOO DSSHDU RQ HDFK FRQWDLQHU 0DWHULDOV VKDOO EH KDQGOHG DQG VWRUHG DFFRUGLQJWRWKH VWULFWHVW UHTXLUHPHQWV RIWKHPDQXIDFWXUHU DQGLQ DFFRUGDQFHZLWK DOO ORFDOVWDWHDQGIHGHUDOODZVDQGUHJXODWLRQV
$WHDFKPDQKROHWKH(QJLQHHUVKDOOLQVSHFWDQGDFFHSWWKHZRUNFRPSOHWHGWRGDWHDW WKHFRPSOHWLRQRIHDFKRIPLOHVWRQHVOLVWHGEHORZEHIRUHWKH&RQWUDFWRUVKDOOFRPPHUFH ZRUNRQWKHQH[WPLOHVWRQH