Cities Index.
Agenda packet

San Luis Obispo City Council
February 7, 2023

Document
Agenda packet
Meeting
February 7, 2023
Body
San Luis Obispo City Council
Pages
493
Original file
24.7 MB
Text extracted from the city's file for reading and search. Open the original on pub-slocity.escribemeetings.com. That file is the official record.

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 00 - 3

COMMON WORK RESULTS FOR

ELECTRICAL
g. International Code Council (ICC).
1) International Code Council Evaluation Service (ICC-ES). (a) AC 156 – Acceptance Criteria for Seismic Certification by Shake Table Testing of Non-Structural Components (ICC-ES AC 156).
h. International Society of Automation (ISA).
i. National Electrical Manufacturers Association (NEMA):
1) 250 - Enclosures for Electrical Equipment (1000 V Maximum). j. National Fire Protection Association (NFPA):
1) 70 - National Electrical Code (NEC).
k. National Institute of Standards and Technology (NIST). l. Underwriters' Laboratories, Inc. (UL).

B. Compliance with laws and regulations:

1. In accordance with Owner’s front end bid documents.

1.03 DEFINITIONS
A. Definitions of terms and other electrical and instrumentation considerations as set forth by:

1. IEEE.

2. NETA.

3. IES.

4. ISA.

5. NEC.

6. NEMA.

7. NFPA.

8. NIST.

B. Specific definitions:

1. FAT: Factory acceptance test.

2. ICSC: Instrumentation and controls subcontractor.

3. LCP: Local control panel: Operator interface panel that may contain an HMI, pilot type control devices, operator interface devices, control relays, etc. and does not contain a PLC or RIO.

4. PCM: Process control module: An enclosure containing any of the following devices: PLC, RTU, or RIO.

5. PCIS: Process control and instrumentation system.

6. RTU: Remote telemetry unit: A controller typically consisting of a PLC, and a means for remote communications. The remote communications devices typically are radios, modems, etc.

7. Space: That portion of the switchgear, motor control center, panelboard, switchboard or control panel that does not physically contain a device but is capable of accepting a device with no modifications to the equipment, i.e., provide all standoffs, bus, and hardware, as part of the space.

8. Spare: That portion of the switchgear, motor control center, panelboard, switchboard or control panel that physically contains a device with no load connections to be made.

9. VCP: Vendor control panel: Control panels that are furnished with particular equipment by a vendor other than the ICSC. These panels may contain PLCs, RIO, OIT, HMI, etc.

10. Unequipped space: That portion of the switchgear, motor control center, panelboard, switchboard or control panel that does not physically contain a device, standoff, bus, hardware, or other equipment.

1.04 SYSTEM DESCRIPTION
A. General requirements:

1. The Work includes everything necessary for and incidental to executing and completing the Electrical Work indicated on the Drawings and specified in the Specifications and reasonably inferable there from:
a. The Electrical Drawings are schematic in nature; use the Structural, Architectural, Mechanical, and Civil Drawings for all dimensions and scaling purposes.

Page 262 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 00 - 4

COMMON WORK RESULTS FOR

ELECTRICAL

2. It is the intent of these Specifications that the entire electrical power, instrumentation, and control system be complete and operable. Provide all necessary material and labor for the complete system from source of power to final utilization equipment, including all connections, testing, calibration of equipment furnished by others as well as equipment furnished by the Contractor, whether or not specifically mentioned but which are necessary for successful operation.

3. Provide all Electrical Work, including conduit, field wiring, and connections by the electrical subcontractor under the provisions of the Electrical Specifications for all aspects of the Work.

4. Coordinate all aspects of the Work with the electrical subcontractor and other subcontractors before bidding in order to ensure that all costs associated with a complete installation are included. The Owner is not responsible for any change orders due to lack of coordination of the Work between the Contractor, the electrical subcontractor, the other subcontractors or suppliers.

5. Provide all trenching, forming, rebar, concrete, back filling, hard surface removal and replacement, for all items associated with the Electrical Work and installation:
a. As specified in the Contract Documents.

6. Defective work:
a. In accordance with Owner’s front end bid documents.

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01_33_00 and this Section.

B. General:

1. Instruct all equipment suppliers of submittals and operation and maintenance manuals of the requirements in this Section.

2. Furnish the submittals required by each section in the Electrical Specifications.

3. Adhere to the wiring numbering scheme specified in Section 26_05_53 throughout the Project:
a. Uniquely number each wire.
b. Wire numbers must appear on all Equipment Drawings.

4. Use equipment and instrument tags, as indicated on the Drawings, for all submittals.

C. Seismic requirements:

1. Provide electrical equipment with construction and anchorage to supporting structures designed to resist site seismic loads based on the seismic design criteria per the Manufacturer’s instructions.

2. Exemptions: A “statement of seismic qualification” and a “special seismic certification” are not required for the following equipment:
a. Temporary or moveable equipment.
b. Equipment anchored to the structure and having a total weight of 20 pounds or less. c. Distribution equipment anchored to the structure and having a total unit weight of 3 pounds per linear foot, or less.

D. Operation and maintenance manuals:

1. Furnish the Engineer with a complete set of written operation and maintenance manuals 8 weeks before Functional Acceptance Testing.

E. Material and equipment schedules:

1. Furnish a complete schedule and/or matrix of all materials, equipment, apparatus, and luminaries that are proposed for use:
a. Include sizes, names of manufacturers, catalog numbers, and such other information required to identify the items.

F. Schedule of values:

1. In addition to completing all items referred to in the schedule of values, submit per unit material and labor costs used in developing the final bid for the electrical system, for the express purpose of pricing and cost justification for any proposed change orders. In addition to the items shown on the schedule of values, provide per unit material and labor

Page 263 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 00 - 5

COMMON WORK RESULTS FOR

ELECTRICAL
costs for conduit and wire installation for specific types, sizes, and locations as indicated on the Drawings and Conduit Schedule. It is the responsibility of the electrical subcontractor to prove to the Engineer’s satisfaction that said per unit costs were used in the development of the final Bid amount.

G. Record Documents:

1. In accordance with Owner’s front end bid documents.

H. Test reports:

1. As specified in Section 01_33_00.

2. Additional requirements for field acceptance test reports are specified in Section 26_08_50.

I. Calculations:

1. Where required by specific Electrical Specifications:
a. Because these calculations are being provided by a registered professional engineer, they will be reviewed for form, format, and content but will not be reviewed for accuracy and calculation means.

1.06 QUALITY ASSURANCE
A. Furnish all equipment listed by and bearing the label of UL or of an independent testing laboratory acceptable to the Engineer and the Authority Having Jurisdiction.

1.07 DELIVERY, STORAGE, AND HANDLING
A. In accordance with Owner’s front end bid documents and per Manufacturer’s instructions.

1.08 PROJECT OR SITE CONDITIONS
A. Site conditions:

1. Provide an electrical, instrumentation and control system, including all equipment, raceways, and any other components required for a complete installation that meets the environmental conditions for the Site as specified in the General Requirements and below.

2. Altitude, temperature and humidity:
a. Provide all electrical components and equipment fully rated for continuous operation at this altitude, with no additional derating factors applied. b. Provide additional temperature conditioning equipment to maintain all equipment in non-conditioned spaces subject to these ambient temperatures, with a band of 10 degrees Fahrenheit above the minimum operating temperature and 10 degrees Fahrenheit below maximum operating temperature, as determined by the equipment manufacturer’s guidelines:
1) Provide all power conduits wiring for these devices (e.g. heaters, fans, etc.) whether indicated on the Drawings or not.

B. Provide enclosures for electrical, instrumentation and control equipment, regardless of supplier or subcontractor furnishing the equipment, that meet the requirements outlined in NEMA Standard 250 for the following types of enclosures:

1. NEMA Type 1: Intended for indoor use, primarily to provide a degree of protection from accidental contact with energized parts or equipment.

2. NEMA Type 3R: Intended for outdoor use, to provide a degree of protection against ingress of solid foreign objects (falling dirt), and from the ingress of water (rain, sleet, snow).

3. NEMA Type 4: Intended for indoor or outdoor use, primarily to protect equipment from exposure to windblown dust and rain, splashing or hose directed water, ice formation and freezing.

4. NEMA Type 4X: Made from corrosion resistant materials (fiberglass reinforced plastic, 316 stainless steel or equal) and are intended for indoor or outdoor use, primarily to protect equipment from exposure to windblown dust and rain, splashing or hose directed water, ice formation and freezing, and corrosion.

5. NEMA Type 12: Intended for indoor use, primarily to provide a degree of protection from dust, falling dirt and dripping non-corrosive liquids.

Page 264 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 00 - 6

COMMON WORK RESULTS FOR

ELECTRICAL
C. Plant area Electrical Work requirements:

1. Provide all Electrical Work in accordance with the following table, unless otherwise specifically indicated on the Drawings:

PLANT AREA
NEMA

ENCLOSURE TYPE EXPOSED

CONDUIT TYPE

ENVIRONMENT W
= WET
D = DAMP
C = CLEAN/DRY X
= CORROSIVE H =

HAZARDOUS

SUPPORT

MATERIALS

ELECTRICAL
BUILDING 1, 12 GALVANIZEDSTEEL C

GALVANIZED
STEEL
OUTDOORS 3R, 4

GALVANIZED

STEEL W STAINLESS STEEL

2. Modify exposed conduit runs as specified in Section 26_05_33.

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING
A. General:

1. As specified in accordance with the Owner’s front end bid documents.

2. Testing requirements are specified in Section 26_08_50 and other sections.

B. Pre-submittal conference:

1. Before producing any submittals, schedule a pre-submittal conference for the purposes of reviewing the entire Project, equipment, control philosophy, schedules, and submittal requirements.

1.11 WARRANTY
A. Warrant the Electrical Work as specified in in accordance with the Owner’s front end bid documents.

1. Provide additional warranty as specified in the individual Electrical Specifications.

1.12 SYSTEM START-UP
A. Replace or modify equipment, software, and materials that do not achieve design requirements after installation in order to attain compliance with the design requirements:

1. Following replacement or modification, retest the system and perform additional testing to place the complete system in satisfactory operation and obtain compliance acceptance from the Engineer.

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE
A. Before Substantial Completion, perform all maintenance activities required by any sections of the Specifications including any calibrations, final adjustments, component replacements or other routine service required before placing equipment or systems in service.

B. Furnish all spare parts as required by other sections of the Specifications.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Provide similar items of same manufacturer throughout the electrical and instrumentation portion of the Project.

B. Allowable manufacturers are specified in individual Electrical Specifications.

Page 265 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 00 - 7

COMMON WORK RESULTS FOR

ELECTRICAL

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS
A. Furnish all materials under this Contract that are new, free from defects, and standard products produced by manufacturers regularly engaged in the production of these products and that bear all approvals and labels as required by the Specifications.

B. Provide materials complying with the applicable industrial standards.

C. Stainless steel:

1. Where stainless steel is indicated or used for any portion of the Electrical Work, provide a non-magnetic, corrosion-resistant alloy, ANSI Type 316, satin finish.

2. Provide exposed screws of the same alloys.

3. Provide finished material free of any burrs or sharp edges.

4. Use only stainless steel hardware, when chemically compatible, in all areas that are or could be in contact with corrosive chemicals.

5. Use stainless steel hardware, when chemically compatible, in all chemical areas or areas requiring NEMA Type 4X construction.

6. Do not use stainless steel in any area containing chlorine, gas or solution, chlorine products or ferric chloride.

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT (NOT USED)

2.06 COMPONENTS (NOT USED)

2.07 ACCESSORIES (NOT USED)

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL
A. Provide all equipment that is new, free from defects, and standard products produced by manufacturers regularly engaged in the production of these products.

PART 3 EXECUTION

3.01 EXAMINATION
A. It is the electrical subcontractor's responsibility to be fully familiar with the existing conditions and local requirements and regulations.

B. Comply with pre-bid conference requirements as specified in in accordance with the Owner’s front end bid documents.

C. Review the site conditions and examine all shop drawings for the various items of equipment in order to determine exact routing and final terminations for all wiring and cables.

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. Equipment locations shown on Electrical Drawings may change due to variations in equipment size or minor changes made by others during construction:

1. Verify all dimensions indicated on the Drawings:
a. Actual field conditions govern all final installed locations, distances, and levels.

2. Review all Contract Documents and approved equipment shop drawings and coordinate Work as necessary to adjust to all conditions that arise due to such changes.

3. Make minor changes in location of equipment before rough in, as directed by the Owner or Engineer.

4. Provide a complete electrical system:
a. Install all extra conduits, cables, and interfaces as may be necessary to provide a complete and operating electrical system.

Page 266 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 00 - 8

COMMON WORK RESULTS FOR

ELECTRICAL
B. Install the equipment in accordance with the accepted installation instructions and anchorage details to meet the seismic and wind load requirements at the Project site.

C. Cutting and patching:

1. Perform all cutting, patching, channeling, core drilling, and fitting required for the Electrical Work, except as otherwise directed:
a. Secure the permission of the Engineer before performing any operation likely to affect the strength of a structural member such as drilling, cutting or piercing:
1) Before cutting, channeling, or core drilling any surface, ensure that no penetration of any other systems will be made:
(a) Verify that area is clear and free of conduits, cables, piping, ductwork, posttensioning cables, etc. (b) Use tone-locate system or X-ray to ensure that area is clear of obstructions. b. Review the complete Drawing set to ensure that there are no conflicts or coordination problems before cutting, channeling, or core drilling any surface.

2. Perform all patching to the same quality and appearance as the original work. Employ the proper tradesmen to secure the desired results. Seal around all conduits, wires, and cables penetrating walls, ceilings, and floors in all locations with a fire stop material, typically:
a. 3M: CP 25WB+: Caulk.
b. 3M: Fire Barrier: Putty.

3. Use the installation details indicated on the Drawings as a guide for acceptable sealing methods.

D. Install all conduits and equipment in such a manner as to avoid all obstructions and to preserve headroom and keep openings and passageways clear:

1. Install all conduits and equipment in accordance with working space requirements in accordance with the NEC.
a. This includes any panel, disconnect switch or other equipment that can be energized while open exposing live parts regardless of whether it is likely to require examination or has serviceable parts.

2. Where the Drawings do not show dimensions for locating equipment, install equipment in the approximate locations indicated on the Drawings.
a. Adjust equipment locations as necessary to avoid any obstruction or interferences.

3. Where an obstruction interferes with equipment operation or safe access, relocate the equipment.

4. Where the Drawings do not indicate the exact mounting and/or supporting method to be used, use materials and methods similar to the mounting details indicated on the Drawings.

E. Earthwork and concrete:

1. Install all trenching, shoring, concrete, backfilling, grading and resurfacing associated with the Electrical Work:
a. Requirements as specified in the Contract Documents.

F. Terminations:

1. Provide and terminate all conductors required to interconnect power, controls, instruments, panels, and all other equipment.

G. Miscellaneous installation requirements:

1. In case of interference between electrical equipment indicated on the Drawings and the other equipment, notify the Engineer.

2. Location of manholes and pullboxes indicated on the Drawings are approximate.

Coordinate exact location of manholes and pullboxes with Mechanical and Civil Work.

3. Provide additional manholes or pullboxes to those shown where they are required to make a workable installation.

H. Labeling:

1. Provide all nameplates and labels as specified in Sections 26_05_53.

Page 267 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 00 - 9

COMMON WORK RESULTS FOR

ELECTRICAL
I. Equipment tie-downs:

1. Anchor all instruments, control panels, and equipment by methods that comply with seismic and wind bracing criteria, which apply to the Site.

2. All control panels must be permanently mounted and tied down to structures in accordance with the Project seismic criteria.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 COMMISSIONING (NOT USED)

3.08 FIELD QUALITY CONTROL
A. Inspection:

1. Allow for inspection of electrical system installation as specified in this section.

2. Provide any assistance necessary to support inspection activities.

3. Engineer inspections may include, but are not limited to, the following:
a. Inspect equipment and materials for physical damage. b. Inspect installation for compliance with the Drawings and Specifications. c. Inspect installation for obstructions and adequate clearances around equipment. d. Inspect equipment installation for proper leveling, alignment, anchorage, and assembly.
e. Inspect equipment nameplate data to verify compliance with design requirements. f. Inspect raceway installation for quality workmanship and adequate support. g. Inspect cable terminations.

4. Inspection activities conducted during construction do not satisfy inspection or testing requirements specified in Section 26_08_50.

B. Field acceptance testing (Functional Testing):

1. Notify the Engineer when the Electrical Work is ready for field acceptance testing.

2. Perform the field acceptance tests as specified in Section 26_08_50.

3. Record results of the required tests along with the date of test:
a. Use conduit identification numbers to indicate portion of circuit tested.

C. Workmanship:

1. Leave wiring in panels, manholes, boxes, and other locations neat, clean, and organized:
a. Neatly coil and label spare wiring lengths.
b. Shorten, re-terminate, and re-label excessive used as well as spare wire and cable lengths, as determined by the Engineer.

3.09 ADJUSTING (NOT USED)

3.10 CLEANING
A. As specified in Section 01_77_00.

B. Remove all foreign material and restore all damaged finishes to the satisfaction of the Engineer and Owner.

C. Clean and vacuum all enclosures to remove all metal filings, surplus insulation and any visible dirt, dust or other matter before energization of the equipment or system start-up:

D. As specified in other sections of the Contract Documents.

3.11 PROTECTION
A. Protect all Work from damage or degradation until Substantial Completion.

B. Maintain all surfaces to be painted in a clean and smooth condition.

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 268 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 18 - 1
600-VOLT OR LESS WIRES AND
CABLES
SECTION 26 05 18
600-VOLT OR LESS WIRES AND CABLES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. 600 volt class or less wire and cable.

B. Related sections:

1. Section 01_33_00 - Submittal Procedures.

2. Section 26_05_00 - Common Work Results for Electrical.

3. Section 26_05_26 - Grounding and Bonding.

4. Section 26_05_53 - Identification for Electrical Systems.

1.02 REFERENCES
A. As specified in Section 26_05_00.

B. ASTM International (ASTM):

1. B3 - Standard Specification for Soft or Annealed Copper Wire.

2. B8 - Standard Specification for Concentric-Lay–Stranded Copper Conductors, Hard, Medium-Hard, or Soft.

C. CSA International (CSA).

D. Insulated Cable Engineers Association (ICEA):

1. NEMA WC 70/ICEA S-95-658-1999 - Standard for Nonshielded Power Cables Rated 2000 Volts or Less for the Distribution of Electrical Energy.

2. NEMA WC 57/ICEA S-73-532 - Standard for Control, Thermocouple Extension, and Instrumentation Cables.

E. National Fire Protection Association (NFPA):

1. 70 - National Electrical Code (NEC).

2. 72 - National Fire Alarm and Signaling Code.

3. 101 - Life Safety Code.

F. Telecommunications Industry Association/Electronics Industry Association (TIA/EIA):

1. 568-C.2 - Balanced Twisted-Pair Telecommunication Cabling and Components Standard.

G. Underwriter's Laboratories Inc., (UL):

1. 44 - Thermoset-Insulated Wires and Cables.

2. 1277 - Standard for Electrical Power and Control Tray Cables with Optional Optical-Fiber Members.

3. 1424 - Standard for Cables for Power-Limited Fire-Alarm Circuits.

4. 1569 - Standard for Metal-Clad Cables.

5. 2196 - Standard for Tests for Fire Resistive Cables.

6. 2225 - Standard for Cables and Cable-Fittings For Use in Hazardous (Classified) Locations.

1.03 DEFINITIONS
A. As specified in Section 26_05_00.

B. Definitions of terms and other electrical considerations as set forth in the:

1. ASTM.

2. ICEA.

1.04 SYSTEM DESCRIPTION
A. Furnish and install the complete wire and cable system.

1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01_33_00 and 26_05_00.

B. Product data:

Page 269 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 18 - 2
600-VOLT OR LESS WIRES AND
CABLES

1. Manufacturer of wire and cable.

2. Insulation:
a. Type.
b. Voltage class.

3. American wire gauge (AWG) size.

4. Conductor material.

5. Pulling compounds.

C. Shop drawings:

1. Show splice locations.
a. For each proposed splice location provide written justification describing why the splice is necessary.

D. Test reports:

1. Submit test reports for meg-ohm tests.

E. Calculations:

1. Submit cable pulling calculations to the Engineer for review and comment for all cables that will be installed using mechanical pulling equipment. Show that the maximum cable tension and sidewall pressure will not exceed manufacturer recommended values:
a. Provide a table showing the manufacturer’s recommended maximum cable tension and sidewall pressure for each cable type and size included in the calculations. b. Submit the calculations to the Engineer a minimum of 2 weeks before conduit installation.

1.06 QUALITY ASSURANCE
A. As specified in Section 26_05_00.

B. All wires and cables shall be UL listed and labeled.

1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26_05_00.

1.08 PROJECT OR SITE CONDITIONS (NOT USED)

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 26_05_00.

1.12 SYSTEM START-UP
A. As specified in Section 26_05_00.

1.13 OWNER`S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. 600 volt class wire and cable:
a. General Cable.
b. Okonite Company.
c. Southwire Company.

2. Instrumentation class wire and cable:
a. Alpha Wire Company.
b. Belden CDT.
c. General Cable BICC Brand.
d. Okonite Company.
e. Rockbestos Surprenant Cable Corporation.

Page 270 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 18 - 3
600-VOLT OR LESS WIRES AND
CABLES

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS
A. Conductors:

1. Copper in accordance with ASTM B3.

2.04 MANUFACTURED UNITS
A. General:

1. Provide new wires and cables manufactured within 1 year of the date of delivery to the Site.

2. Permanently mark each wire and cable with the following at 24-inch intervals:
a. AWG size.
b. Voltage rating.
c. Insulation type.
d. UL symbol.
e. Month and year of manufacture.
f. Manufacturer's name.

3. Identify and mark wire and cable as specified in Section 26_05_53:
a. Use integral color insulation for Number 2 AWG and smaller wire. b. Wrap colored tape around cable larger than Number 2 AWG.

B. 600 volt class wire and cable:

1. Provide AWG or kcmil sizes as indicated on the Drawings or in the Conduit Schedules:
a. When not indicated on the Drawings, size wire as follows:
1) In accordance with the NEC:
(a) Use 75 degree Celsius ampacity ratings.
(b) Ampacity rating after all derating factors, equal to or greater than rating of the overcurrent device.
2) Provide Number 12 AWG minimum for power conductors.
3) Provide Number 14 AWG minimum for control conductors.

2. Provide Class B stranding in accordance with ASTM B8:
a. Provide Class C stranding where extra flexibility is required.

3. Insulation:
a. XHHW-2
b. 90 degrees Celsius rating.

C. Instrumentation class cable:

1. Type TC.

2. Suitable for use in wet locations.

3. Voltage rating: 600 volts.

4. Temperature rating:
a. 90 degrees Celsius rating in dry locations.
b. 75 degrees Celsius rating in wet locations.

5. Conductors:
a. Insulation:
1) Flame-retardant PVC, 15 mils nominal thickness, with nylon jacket 4 mils nominal thickness.
b. Number 16 AWG stranded and tinned.
c. Color code:
1) Pair: Black and white.
2) Triad: Black, white and red.
3) Multiple pairs or triads:
(a) Color-coded and numbered.

6. Drain wire:
a. 18 AWG.
b. Stranded, tinned.

Page 271 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 18 - 4
600-VOLT OR LESS WIRES AND
CABLES

7. Jacket:
a. Flame retardant, moisture and sunlight resistant PVC. b. Ripcord laid longitudinally under jacket to facilitate removal.

8. Shielding:
a. Individual pair/triad:
1) Minimum 1.35-mil double-faced aluminum foil/polyester tape overlapped to provide 100 percent coverage.
b. Multiple pair or triad shielding:
1) Group shield: Minimum 1.35-mil double-faced aluminum foil/polyester tape overlapped to provide 100 percent coverage.
2) Completely isolate group shields from each other.
3) Cable shield: 2.35 mils double-faced aluminum and synthetic polymer backed tape overlapped to provide 100 percent coverage.
c. All shielding to be in contact with the drain wire.

2.05 EQUIPMENT (NOT USED)

2.06 COMPONENTS (NOT USED)

2.07 ACCESSORIES
A. Wire ties:

1. One of the following or equal:
a. T&B "Ty-Rap" cable ties.
b. Panduit cable ties.

B. Wire markers:

1. As specified in Section 26_05_53.

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL
A. Assembly and testing of cable shall comply with the applicable requirements of ICEA S-95-658-1999.

B. Test Type XHHW-2 in accordance with the requirements of UL 44.

PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. As specified in Section 26_05_00.

B. Color-coding:

1. Color-coding shall be consistent throughout the facility.

2. The following color code shall be followed for all 240/120 volt and 208/120 volt systems:
a. Phase A - Black.
b. Phase B - Red.
c. Phase C - Blue.
d. Single phase system - Black for one hot leg, red for the other. e. Neutral - White.
f. High phase or wild leg - Orange.
g. Equipment ground - Green.

3. The following color code shall be followed for all 480/277 volt systems:
a. Phase A - Brown.
b. Phase B - Orange.
c. Phase C - Yellow.

Page 272 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 18 - 5
600-VOLT OR LESS WIRES AND
CABLES
d. Neutral - Gray.
e. Equipment ground - Green.

4. The following color code shall be followed for all 120 VAC control wiring:
a. Power - Red.
b. Neutral - White.

5. The following color code shall be followed for all general purpose DC control circuits:
a. Grounded conductors - White with blue stripe.
b. Ungrounded conductors - Blue.

6. Switch legs shall be violet. Three-way switch runners shall be pink.

7. Wires in intrinsically safe circuits shall be light blue.

8. Wire colors shall be implemented in the following methods:
a. Wires manufactured of the desired color.
b. Continuously spiral wrap the first 6 inches of the wire from the termination point with colored tape:
1) Colored tape shall be wrapped to overlap 1/2 of the width of the tape.

C. Install conductors only after the conduit installation is complete, and all enclosures have been vacuumed clean, and the affected conduits have been swabbed clean and dry:

1. Install wires only in approved raceways.

2. Do not install wire:
a. In incomplete conduit runs.
b. Until after the concrete work and plastering is completed.

D. Properly coat wires and cables with pulling compound before pulling into conduits:

1. For all Number 4 AWG and larger, use an approved wire-pulling lubricant while cable is being installed in conduit:
a. Ideal Products.
b. Polywater Products.
c. 3M Products.
d. Greenlee Products.
e. Or equal as recommended by cable manufacturer.
f. Do not use oil, grease, or similar substances.

E. Cable pulling:

1. Prevent mechanical damage to conductors during installation.

2. For cables Number 1 AWG and smaller, install cables by hand.

3. For cables larger than Number 1 AWG, power pulling winches may be used if they have cable tension monitoring equipment.

4. Provide documentation that maximum cable pulling tension was no more than 75 percent of the maximum recommended level as published by the cable manufacturer. If exceeded, the Engineer may, at his discretion, require replacement of the cable.

5. Ensure cable pulling crews have all calculations and cable pulling limitations while pulling cable.

6. Add a junction box or pullbox where required to prevent cable pulling tension or sidewall pressure from exceeding 75 percent of manufacturer’s recommendation for the specified cable size:
a. Leave sufficient slack to make proper connections.

F. Use smooth-rolling sheaves and rollers when pulling cable into cable tray to keep pulling tension and bending radius within manufacturer’s recommendations.

G. Install and terminate all wire in accordance with manufacturer's recommendations.

H. Neatly arrange and lace conductors in all switchboards, panelboards, pull boxes, and terminal cabinets by means of wire ties:

1. Do not lace wires in gutter or panel channel.

2. Install all wire ties with a flush cutting wire tie installation tool:
a. Use a tool with an adjustable tension setting.

3. Do not leave sharp edges on wire ties.

Page 273 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 18 - 6
600-VOLT OR LESS WIRES AND
CABLES
I. Terminate stranded conductors on equipment box lugs such that all conductor strands are confined within the lug:

1. Use ring type lugs if box lugs are not available on the equipment.

J. Lighting circuits:

1. Each circuit shall have a dedicated neutral.

K. Apply wire markers to all wires at each end after being installed in the conduit and before megohm testing and termination.

L. Instrumentation class cable:

1. Install instrumentation class cables in separate raceway systems from power cables:
a. Install instrument cable in metallic conduit within non-dedicated manholes or pull boxes.
b. Install cable without splices between instruments or between field devices and instrument enclosures or panels.

2. Do not make intermediate terminations, except in designated terminal boxes as indicated on the Drawings.

3. Shield grounding requirements as specified in Section 26_05_26.

M. Signal cable:

1. Separate and isolate electrical signal cables from sources of electrical noise and power cables by minimum 12 inches.

N. Wiring allowances:

1. Equipment locations may vary slightly from the drawings. Include an allowance for necessary conductors and terminations for motorized equipment, electrical outlets, fixtures, communication outlets, instruments, and devices within 10 linear feet of locations indicated on the Drawings.

2. Locations for pull boxes, manholes, and duct banks may vary slightly from the drawings.

Include an allowance for necessary conductors and related materials to provide conductors to all pull boxes, manholes and duct banks within 20 linear feet of locations indicated on the Drawings.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 TESTING
A. As specified in Section 26_08_50.

3.08 FIELD QUALITY CONTROL
A. As specified in Section 26_05_00.

B. Grounding:

1. As specified in Section 26_05_26.

3.09 ADJUSTING (NOT USED)

3.10 CLEANING (NOT USED)

3.11 PROTECTION
A. As specified in Section 26_05_00.

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 274 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 21 - 1

LOW VOLTAGE WIRE

CONNECTIONS
SECTION 26 05 21

LOW VOLTAGE WIRE CONNECTIONS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Wire connecting devices.

2. Terminations.

3. Splices.

B. Related sections:

1. Section 01_33_00 - Submittal Procedures.

2. Section 26_05_00 - Common Work Results for Electrical.

3. Section 26_05_18 - 600-Volt or Less Wires and Cables.

4. Section 26_08_50 - Field Electrical Acceptance Tests.

1.02 REFERENCES
A. As specified in Section 26_05_00.

B. ASTM International (ASTM):

1. D3005 – Standard Specification for Low-Temperature Resistant Vinyl Chloride Plastic Pressure-Sensitive Electrical Insulating Tape.

C. CSA International (CSA):

1. C22.2 - No.197-M1983 (R2208) - PVC Insulating Tape.

D. Underwriters Laboratories, Inc. (UL):

1. 510 - Standard for Polyvinyl Chloride, Polyethylene, and Rubber Insulating Tape.

1.03 DEFINITIONS
A. As specified in Section 26_05_00.

1.04 SYSTEM DESCRIPTION
A. Provide a complete system of wiring connectors, terminators, fittings, etc. for a complete wiring system suitable for the cables and conductors used.

1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01_33_00 and 26_05_00.

B. Product data:

1. Catalog cut sheets.

2. Installation instructions.

1.06 QUALITY ASSURANCE
A. As specified in Section 26_05_00.

B. All materials shall be UL listed.

1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26_05_00.

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 26_05_00.

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 26_05_00.

1.12 SYSTEM START-UP
A. As specified in Section 26_05_00.

Page 275 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 21 - 2

LOW VOLTAGE WIRE

CONNECTIONS

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Manufacturers for each type of technology are specified with the equipment in this Section.

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT
A. Control connections:

1. Use insulated ring type wire terminators for connections to all screw terminals:
a. With chamfered/funneled terminal barrel entry.
b. Deep internal serrations.
c. Long barrel design to reduce electrical resistance and increased insulator-barrel surface area to ensure that the insulator remains in contact with the barrel. d. Electroplated-tin copper conductor.
e. Manufacturer: The following or equal:
1) Thomas and Betts, Sta-Kon.

2. For process equipment connections work from manufacturer's drawings.

B. Joints, taps, and connections:

1. 600-volt conductors:
a. Use solderless connectors.
b. Use only plated copper alloy connectors or lugs:
1) Aluminum connectors or lugs are not acceptable for copper conductors. c. For wire Number 10 AWG and smaller use compression splice caps, with insulating caps:
1) Manufacturer: The following or equal:
(a) Buchanan 2006S or 2011S, with 2007 or 2014 insulating caps. d. For wire Number 8 AWG and larger, use heavy duty copper compression connectors:
1) Manufacturer: One of the following or equal:
(a) Burndy.
(b) Thomas and Betts.
e. Heat shrink tubing:
1) Suitable for indoors, outdoors, overhead, direct burial or submerged applications.
2) Minimum shrink ratio: 4 to 1.
3) Continuous operating temperature: -55 degrees Celsius to 110 degrees Celsius. 4) Internally applied adhesive sealant.
5) Cross-linked polyolefin:
(a) Manufacturers, one of the following or equal:
(1) 3M ITCSN.
(2) Thomas & Betts Shrink-Kon.

C. Insulating tape:

1. General purpose insulating tape:
a. Minimum 7 mil vinyl tape.
b. Suitable for application in an ambient of -18 degrees Celsius (0 degrees Fahrenheit). c. Operating range up to 105 degrees Celsius (220 degrees Fahrenheit). d. Flame retardant, hot- and cold- weather resistant, UV resistant. e. For use as a primary insulation for wire cable splices up to 600 VAC. f. Meeting and complying with:

Page 276 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 21 - 3

LOW VOLTAGE WIRE

CONNECTIONS
1) ASTM D3005 Type I
2) UL 510.
3) CSA C22.2.
g. Manufacturer: The following or equal:
1) 3M - Scotch Number Super 33+.

2. General-purpose color-coding tape:
a. Minimum 7 mil vinyl tape.
b. Suitable for application on PVC and polyethylene jacketed cables. c. For use indoors and outdoors in weather protected enclosures. d. Available with the following colors:
1) Red.
2) Yellow.
3) Blue.
4) Brown.
5) Gray.
6) White.
7) Green.
8) Orange.
9) Violet.
e. For use as phase identification, marking, insulating, and harnessing. f. Meeting and complying with:
1) UL 510.
2) CSA C22.2.
g. Manufacturer the following or equal:
1) 3M - Scotch Number 35.

2.06 COMPONENTS (NOT USED)

2.07 ACCESSORIES (NOT USED)

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. As specified in Section 26_05_00.

B. Load connections:

1. Connect loads to the circuits as indicated. Color-code all branch circuits as specified in Section 26_05_18.

C. Zero to 600-volt systems:

1. Make all connections with the proper tool and die as specified by the device manufacturer.

2. Use only tooling and dies manufactured by the device manufacturer.

3. Insulate all connections and splices with Scotch 33+ tape and Scotchfill, or pre-molded plastic covers, or heat shrink tubing and caps.

4. Number all power and control wires before termination.

D. Motor connections (600 volts and below):

1. Terminate wires with compression type ring lugs at motors.

2. Connection at both the motor leads and the machine wires shall have ring type compression lugs.

Page 277 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 21 - 4

LOW VOLTAGE WIRE

CONNECTIONS

3. Cover bolted connectors with a heat shrinkable, cross-linked polyolefin material formed as a single opening boot:
a. In damp and wet locations, use a complete kit containing mastic that shall seal out moisture and contamination.
b. Shrink cap with low heat as recommended by manufacturer.

4. Wire markers shall be readable after boot installation.

5. Manufacturer: The following or equal:
a. Raychem MCK.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 FIELD QUALITY CONTROL
A. As specified in Section 26_05_00.

3.08 ADJUSTING (NOT USED)

3.09 CLEANING (NOT USED)

3.10 PROTECTION
A. As specified in Section 26_05_00.

3.11 SCHEDULES (NOT USED)

END OF SECTION

Page 278 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 26 - 1 GROUNDING AND BONDING
SECTION 26 05 26

GROUNDING AND BONDING
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Grounding materials and requirements.

B. Related sections:

1. Section 01_33_00 - Submittal Procedures.

2. Section 26_05_00 - Common Work Results for Electrical.

3. Section 26_08_50 - Field Electrical Acceptance Tests.

1.02 REFERENCES
A. As specified in Section 26_05_00.

B. ASTM International (ASTM):

1. B3 - Standard Specification for Soft or Annealed Copper Wire.

2. B8 - Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft.

C. Institute of Electrical and Electronics Engineers (IEEE):

1. 81 - IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System.

D. Underwriters Laboratories, Inc. (UL):

1. 467 - Ground and Bonding Equipment.

1.03 DEFINITIONS
A. As specified in Section 26_05_00.

1.04 SYSTEM DESCRIPTION
A. Ground equipment and raceway systems so that the completed installation conforms to all applicable code requirements.

B. Provide a complete electrical grounding system as indicated on the Drawings and as specified including but not limited to:

1. Grounding electrodes.

2. Bonding jumpers.

3. Ground connections.

C. Provide bonding jumpers and wire, grounding bushings, clamps and appurtenances required for complete grounding system to bond equipment and raceways to equipment grounding conductors.

D. The ground system resistance (electrode to ground) of the completed installation, as determined by tests specified in Section 26_08_50, shall be:

1. 5 ohms or less for industrial systems.

2. 1 ohm or less for electrical buildings.

1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01_33_00 and 26_05_00.

B. Product data:

1. Catalog cut sheets.

1.06 QUALITY ASSURANCE
A. As specified in Section 26_05_00.

B. All grounding components and materials shall be UL listed and labeled.

1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26_05_00.

Page 279 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 26 - 2 GROUNDING AND BONDING

1.08 PROJECT/SITE CONDITIONS (NOT USED)

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 26_05_00.

1.12 SYSTEM START-UP
A. As specified in Section 26_05_00.

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Compression connectors: One of the following or equal:

1. FCI Burndy.

2. Thomas & Betts.

B. Ground rods: One of the following or equal:

1. Erico.

2. Harger.

3. Nehring
C. Ground cable: One of the following or equal:

1. Nehring.

2. Harger.

3. Southwire.

D. Precast ground well boxes: One of the following or equal:

1. Brooks Products.

2. Christy Concrete Products.

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS
A. Ground rod:

1. Minimum: 3/4-inch diameter, 10 feet long.

2. Uniform 10 mil covering of electrolytic copper metallically bonded to a rigid steel core:
a. The copper-to-steel bond shall be corrosion resistant.

3. In accordance with UL 467.

4. Sectional type joined by threaded copper alloy couplings.

5. Fit the top of the rod with a threaded coupling and steel-driving stud.

B. Ground cable:

1. Requirements:
a. Soft drawn (annealed).
b. Concentric lay, coarse stranded in accordance with ASTM B8. c. Bare copper in accordance with ASTM B3.

2. Size is as indicated on the Drawings, but not less than required by the NEC.

C. Ground connectors:

1. Products shall be listed and labeled as grounding connectors for the materials used.

2. Above ground installations: Mechanical and/or compression type connectors.

3. Below ground installations: Exothermic and/or compression type connectors.

4. Exothermic connections:
a. Weld connections together using an exothermic fusion type process. Provide connections equal or larger in size than the conductors joined and with the same current carrying capacity as the largest conductor. Connections shall be Cadweld or

Page 280 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 26 - 3 GROUNDING AND BONDING
equivalent.

5. Compression connectors:
a. Manufactured of high copper alloy specifically for the particular grounding application. b. Suitable for direct burial in earth and concrete.
c. Identifying compression die number inscription to be impressed on compression fitting.

D. Equipment grounding conductors:

1. Conductors shall be the same type and insulation as the load circuit conductors:

2. Minimum size in accordance with the NEC.

E. Grounding electrode conductors:

1. Minimum size in accordance with the NEC.

F. Main bonding jumpers and bonding jumpers:

1. Minimum size in accordance with the NEC.

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT (NOT USED)

2.06 COMPONENTS (NOT USED)

2.07 ACCESSORIES
A. Precast ground well boxes:

1. Minimum 10 inch interior diameter.

2. Traffic-rated cast iron cover.

3. Permanent “GROUND” marking on cover.

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. As specified in Section 26_05_00.

B. Provide a separate, green insulated, grounding conductor in each raceway independent of raceway material.

1. Provide a separate grounding conductor in each individual raceway for parallel feeders.

C. Provide a separate grounding conductor for each motor and connect at motor terminal box. Do not use bolts securing motor box to frame or cover for grounding connectors:

1. When grounding motors driven by variable frequency drives (VFD) comply with the requirements of the VFD manufacturer.

D. Provide a grounding type bushing with lug for connection of grounding conductor for conduits that originate from each motor control center section, switchboard, or panelboard:

1. Individually bond these raceways to the ground bus in the equipment.

E. Provide grounding type bushings with lugs for connection of grounding conductor at both ends of metallic conduit runs. Bond ground bushings to the grounding system.

F. Provide a green insulated wire-grounding jumper from the ground screw to a box grounding screw and, for grounding type devices, to equipment grounding conductor.

G. Interconnect the secondary switchgear, switchboard, or panelboard neutral bus to the ground bus in the secondary switchgear, switchboard, or panelboard compartment, only at service entrance point or after a transformer.

Page 281 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 26 - 4 GROUNDING AND BONDING
H. Duct bank ground system:

1. Provide a bare copper grounding conductor the entire length of each duct bank, embedded in the concrete of the duct bank as indicated on the Drawings and specified in the Specifications.

2. Bond duct bank ground conductors together where duct banks join, merge, intersect, or split.

I. Grounding at service (600 V or Less):

1. Connect the neutral to ground only at one point within the enclosure of the first disconnecting means on the load side of the service transformer.

J. Ground connections:

1. All connections to the ground grid system, the duct bank grounding system, equipment, ground rods, etc., shall be made using compression type grounding connectors as indicated on the Drawings, UL listed, and labeled for the application.

2. Make ground connections in accordance with the manufacturer's instructions.

3. Do not conceal or cover any ground connections until the Engineer or authorized representative has established and provided written confirmation that every grounding connection is as indicated on the Drawings and specified in the Specifications.

K. Grounding electrode system:

1. Ground ring:
a. Provide all trenching and materials necessary to install the ground ring as indicated on the Drawings.
b. Ground ring conductor shall be in direct contact with the earth, or where embedded, concrete, of the size as indicated on the Drawings.
c. Minimum burial depth 36 inches or as indicated on the Drawings. d. Re-compact disturbed soils to original density in 6-inch lifts.

2. Ground rods:
a. Locations as indicated on the Drawings.
b. Length of rods forming an individual ground array shall be equal in length. c. Drive ground rods and install grounding conductors before construction of concrete slabs and duct banks.
d. Pre-crimp all ground rods, as recommended by the manufacturer, before crimping connector to ground rod.

3. Metal underground water pipe:
a. Bond metal underground domestic water pipe to grounding electrode system.

4. Metal frame of building or structure:
a. Bond metal frame of building or structure to grounding electrode system.

5. Extend grounding conductors through concrete to accessible points for grounding equipment and electrical enclosures.

6. Where grounding conductors are not concrete-encased or direct buried, install in Schedule 40 PVC conduit for protection.

7. Install grounding system at each structure where switchgear, motor control centers, switchboards, panelboards, panels, or other electrical equipment are installed.

L. Shield grounding:

1. Shielded instrumentation cable shall have its shield grounded at one end only unless shop drawings indicate otherwise:
a. The grounding point shall be at the control panel or at the power source end of the signal carried by the cable.

2. Terminate the shield drain wire on a dedicated terminal block.

3. Use manufacturer’s terminal block jumpers to interconnect ground terminals.

4. Connection to the panel main ground bus shall be via a green No. 12 conductor to the main ground bus for the panel.

M. Antenna ground:

1. Install individual ground rod or ground system for communication system antenna:

Page 282 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 26 - 5 GROUNDING AND BONDING
a. Install a dedicated grounding electrode conductor from the antenna ground to the grounding electrode system.
b. Do not connect any other grounds to the antenna grounding electrode conductor.

2. Install ground rod or ground system in accordance with the radio manufacturer's requirements.

N. Where indicated on the Drawings, install ground rods in precast ground wells.

O. Ground all gates, fences, and handrails, even if not shown on Drawings. Grounding conductor from ground grid to gates, fences and handrails shall be #2 AWG minimum.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 TESTING
A. As specified in Section 26_08_50.

3.08 FIELD QUALITY CONTROL
A. As specified in Section 26_05_00.

B. Measure grounding electrode system resistance to ground in accordance with IEEE 81.

3.09 ADJUSTING
A. Under the direction of the Engineer, add additional parallel connected ground rods and/or deeper driven rods until the ground resistance measurement meets the specified resistance requirements:

1. Use of salts, water, or compounds to attain the specified ground resistance is not acceptable.

3.10 CLEANING (NOT USED)

3.11 PROTECTION
A. As specified in Section 26_05_00.

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 283 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 29 - 1 HANGERS AND SUPPORTS
SECTION 26 05 29

HANGERS AND SUPPORTS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Mounting and supporting electrical equipment and components.

B. Related sections:

1. Section 01_33_00 - Submittal Procedures.

2. Section 26_05_00 - Common Work Results for Electrical.

1.02 REFERENCES
A. As specified in Section 26_05_00.

B. ASTM International (ASTM):

1. A123 - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products.

2. A153 - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware.

3. A240 - Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications.

1.03 DEFINITIONS
A. As specified in Section 26_05_00.

1.04 SYSTEM DESCRIPTION
A. Design requirements:

1. Conform to the requirements of the Building Code.

2. Demonstrate the following using generally accepted engineering methods:
a. That the anchors to the structure are adequate to resist the loads generated in accordance with the Building Code and equipment requirements. b. That the required load capacity of the anchors can be fully developed in the structural materials to which they are attached.

3. Design loading and anchoring requirements:
a. As indicated in the Building Code unless otherwise specified. b. Seismic loading requirements:
1) Freestanding, suspended, or wall-hung equipment shall be anchored in place by methods that will satisfy the requirements for the seismic design specified in Section 26_05_00.
c. Wind loading requirements:
1) All exterior equipment shall be anchored in place by methods that will satisfy the requirements for wind design specified in Section 26_05_00. d. Minimum safety factor against overturning: 1.5.
e. The foundation and structures to which hangers and supports are attached shall be capable of withstanding all anchor loads.

B. Performance requirements:

1. Hangers and supports individually and as a system shall resist all weights and coderequired forces without deflections and deformations that would damage the supporting elements, the equipment supported, or the surrounding construction.

1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01_33_00 and 26_05_00.

B. Product data:

1. Supports:
a. Materials.
b. Geometry.
c. Manufacturer.

Page 284 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 29 - 2 HANGERS AND SUPPORTS

2. Hardware:
a. Materials.
b. Manufacturer.

C. Shop drawings:

1. Complete dimensioned and scalable shop drawings of all supporting structures, trapezes, wall supports, etc.

2. Complete anchoring details for equipment, lighting and raceway, supporting structures, trapezes, wall supports for all equipment in excess of 200 pounds, and all freestanding supports:
a. Stamped by a professional engineer licensed in the state where the Project is being constructed.
b. Said submittals, by virtue of the fact that they bear the stamp of a registered engineer, will be reviewed for general consistency with the requirements specified in the Contract Documents, but not for context, accuracy, or method of calculation.

3. Include data on attachment hardware and construction methods that will satisfy the design loading and anchoring criteria.

D. Installation instructions:

1. Furnish anchorage instructions and requirements based on the seismic and wind conditions of the Site:
a. Stamped by a professional engineer licensed in the state where the Project is being constructed.

1.06 QUALITY ASSURANCE
A. As specified in Section 26_05_00.

1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26_05_00.

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 26_05_00.

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 26_05_00.

1.12 SYSTEM STARTUP
A. As specified in Section 26_05_00.

1.13 OWNER'S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. Thomas & Betts.

2. Power-Strut.

3. Unistrut.

4. Cooper B-Line.

5. Robroy.

6. Aickinstrut.

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS
A. Use materials appropriate for the area as specified in Section 26_05_00.

Page 285 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 29 - 3 HANGERS AND SUPPORTS
B. Hot dip galvanized steel:

1. Supports:
a. In accordance with ASTM A123 or A153.
b. Minimum zinc coating thickness of 2.5 mils.

2. Hardware:
a. Electro-galvanized.
b. In accordance with ASTM A153.

C. Stainless steel:

1. Supports:
a. In accordance with ASTM A240.
b. ANSI Type 316 material.

2. Hardware:
a. ANSI Type 316 material.

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT (NOT USED)

2.06 COMPONENTS (NOT USED)

2.07 ACCESSORIES
A. Anchor bolts:

1. Indoor, Dry Locations: Anchor bolts shall be ASTM A307 galvanized steel.

2. Outdoor, Wet or Corrosive Areas: Anchor bolts shall be Type 316 ASTM A276 stainless steel.

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES
A. Paint and finish all supporting structures per Owner’s requirements.

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. As specified in Section 26_05_00.

B. Mount all raceways, cabinets, boxes, fixtures, instruments, and devices on Contractorfabricated racks unless otherwise indicated on the Drawings.

1. Provide the necessary sway bracing to keep trapeze type structures from swaying under seismic events or wind loading.

C. Brace and anchor freestanding equipment supports using methods that provide structural support based on the seismic loads and wind loads:

1. Lateral deflection at top of supports not to exceed support height divided by 240 unless otherwise approved by the Engineer.

D. Provide fabricated steel support pedestals for wall mounted panels that weigh more than 200 pounds:

1. Fabricate pedestals out of welded angle, tube sections, or preformed channel.

2. If the supported equipment is a panel or cabinet, match the supported equipment in physical appearance and dimensions.

3. Provide auxiliary floor supports for transformers hung from stud walls and weighing more than 200 pounds.

4. Mount all equipment, cabinets, boxes, instruments, and devices in damp or wet locations on minimum of 7/8-inch preformed mounting channel.

Page 286 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 29 - 4 HANGERS AND SUPPORTS
a. Mount channel vertically along the length of the device so that water or moisture may run freely behind the device.

E. Corrosion protection:

1. Isolate dissimilar metals, except where required for electrical continuity. a. Use neoprene washers, 9-mil polyethylene tape, or gaskets for isolation.

F. Raceway:

1. Furnish all racks and trapeze structures needed to support the raceway from the structure. a. Group raceway and position on racks to minimize crossovers. b. Provide the necessary bracing to keep trapeze type structures from swaying under loads from cable installation, seismic forces, or wind forces.

G. Anchoring methods:

1. Solid concrete: Anchor bolts, anchor rods, or post-installed anchors as specified herein.

2. Metal surfaces: Machine screws or bolts.

3. Hollow masonry units: Post-installed anchors as specified on drawings.

H. Recoat or seal all drilled holes, cut or scratched surfaces or with products recommended by the manufacturer.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 FIELD QUALITY CONTROL
A. As specified in Section 26_05_00.

3.08 ADJUSTING (NOT USED)

3.09 CLEANING (NOT USED)

3.10 PROTECTION
A. As specified in Section 26_05_00.

3.11 SCHEDULES (NOT USED)

END OF SECTION

Page 287 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 1 CONDUITS
SECTION 26 05 33

CONDUITS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Metallic conduits.

2. Nonmetallic conduits.

3. Conduit bodies.

4. Conduit fittings and accessories.

5. Conduit installation.

B. Related sections:

1. Section 01_33_00 - Submittal Procedures.

2. Section 26_05_00 - Common Work Results for Electrical.

3. Section 26_05_29 - Hangers and Supports.

4. Section 26_05_53 - Identification for Electrical Systems.

1.02 REFERENCES
A. As specified in Section 26_05_00.

B. American National Standards Institute (ANSI):

1. C80.1 - Electrical Rigid Steel Conduit.

2. C80.3 - Steel Electrical Metallic Tubing.

3. C80.5 - Electrical Rigid Aluminum Conduit.

4. C80.6 - Electrical Intermediate Metal Conduit.

C. National Electrical Manufacturer’s Association (NEMA):

1. RN-1 - Polyvinyl Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Steel Conduit.

2. TC2 - Electrical Polyvinyl Chloride (PVC) Conduit.

3. TC3 - Polyvinyl Chloride (PVC) Fittings for Use with Rigid PVC Conduit and Tubing.

4. TC7 - Smooth-Wall Coilable Electrical Polyethylene Conduit.

5. TC13 - Electrical Nonmetallic Tubing.

6. TC14 - Reinforced Thermosetting Resin Conduit (RTRC) and Fittings.

D. Underwriters Laboratories (UL):

1. 1 - Standard for Flexible Metal Conduit.

2. 6 - Standard for Electrical Rigid Metal Conduit - Steel.

3. 6A - Standard for Electrical Rigid Metal Conduit - Aluminum, Red Brass, and Stainless Steel.

4. 360 - Standard for Liquidtight Flexible Steel Conduit.

5. 651 - Standard for Schedule 40 and 80 Rigid PVC Conduit and Fittings.

6. 651B - Standard for Continuous Length HDPE Conduit.

7. 797 - Standard for Electrical Metallic Tubing - Steel.

8. 1242 - Standard for Electrical Intermediate Metal Conduit - Steel.

9. 1653 - Standard for Electrical Nonmetallic Tubing.

10. 1660 - Standard for Liquidtight Flexible Nonmetallic Conduit.

11. 1684 - Standard for Reinforced Thermosetting Resin Conduit (RTRC) and Fittings.

1.03 DEFINITIONS
A. As specified in Section 26_05_00.

B. Specific definitions and abbreviations:

1. Conduit bodies: A separate portion of a conduit system that provides access through a removable cover to the interior of the system at a junction of 2 or more conduit sections.

Includes, but not limited to, Shapes C, E, LB, T, X, etc.

Page 288 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 2 CONDUITS

2. Conduit fitting: An accessory that primarily serves a mechanical purpose. Includes, but not limited to, bushings, locknuts, hubs, couplings, reducers, etc.

3. GRC: Galvanized rigid steel conduit.

4. PCS: Polyvinyl chloride (PVC) coated rigid steel conduit.

5. PVC: Polyvinyl chloride rigid nonmetallic conduit.

6. SLT: Sealtight-liquidtight flexible conduit.

7. NPT: National pipe thread.

1.04 SYSTEM DESCRIPTION
A. Provide conduits, conduit bodies, fittings, junction boxes, and all necessary components, whether or not indicated on the Drawings, as required, to install a complete electrical raceway system.

1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01_33_00 and 26_05_00.

B. Product data:

1. Furnish complete manufacturer’s catalog sheets for every type and size of conduit, fitting, conduit body, and accessories to be used on the Project.

2. Furnish complete manufacturer’s recommended special tools to be used for installation if required.

3. Certified test results for PVC-coated metallic conduit showing the adhesive bond is stronger than the tensile strength of the PVC.

C. Certifications:

1. Furnish PVC-coated conduit manufacturer’s certification for each installer.

D. Record Documents:

1. Incorporate all changes in conduit routing on electrical plan drawings.

2. Dimension underground and concealed conduits from building lines.

1.06 QUALITY ASSURANCE
A. As specified in Section 26_05_00.

B. All conduits, conduit bodies, and fittings shall be UL listed and labeled.

C. Every installer of PVC-coated metallic conduit shall be certified by the manufacturer for installation of the conduit.

D. DELIVERY, STORAGE, AND HANDLING
E. As specified in Section 26_05_00.

F. Do not expose nonmetallic to direct sunlight.

G. Do not store conduit in direct contact with the ground.

H. PROJECT OR SITE CONDITIONS
I. As specified in Section 26_05_00.

1.07 SEQUENCING
A. Before installing any conduit or locating any device box:

1. Examine the complete set of Drawings and Specifications, and all applicable shop drawings.

2. Verify all dimensions and space requirements and make any minor adjustments to the conduit system as required to avoid conflicts with the building structure, other equipment, or the work of other trades.

B. SCHEDULING (NOT USED)
C. WARRANTY
D. As specified in Section 26_05_00.

E. SYSTEM START-UP

Page 289 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 3 CONDUITS
F. As specified in Section 26_05_00.

G. OWNER’S INSTRUCTIONS (NOT USED)
H. MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Galvanized rigid steel conduit:

1. One of the following or equal:
a. Western Tube and Conduit.
b. Allied Tube and Conduit.
c. Wheatland Tube Co.

B. PVC-coated rigid steel conduit:

1. One of the following or equal:
a. Robroy Industries.
b. Ocal, Inc.
c. Calbond.
1) Sealtight-liquidtight flexible conduit:

2. One of the following or equal:
a. Southwire.
b. AFC Cable Systems.
c. Electri-Flex Company.
d. Anaconda.

C. Rigid nonmetallic PVC conduit:

1. One of the following or equal:
a. Carlon.
b. Cantex.
c. Triangle Conduit and Cable.

D. Conduit bodies:

1. One of the following or equal:
a. Crouse-Hinds.
b. Appleton.
c. O-Z/Gedney.
d. Ocal, Inc..
e. Robroy Industries.
f. Calbond.
g. Carlon.

E. Joint compound:

1. Thomas and Betts.

F. Galvanized rigid steel conduit expansion fittings:

1. One of the following or equal:
a. Crouse-Hinds.
b. Appleton.
c. O-Z/Gedney.

G. Conduit hangers and supports:

1. As specified in Section 26_05_29.

Page 290 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 4 CONDUITS

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT (NOT USED)

2.06 COMPONENTS
A. GRC:

1. All threads: NPT standard conduit threads with a 3/4-inch taper per foot:
a. Running conduit threads are not acceptable.

2. Hot-dip galvanized inside and out:
a. Ensures complete coverage and heats the zinc and steel to a temperature that ensures the zinc alloys with the steel over the entire surface. b. Electro-galvanizing is not acceptable.

3. Manufactured in accordance with:
a. UL-6.
b. ANSI C80.1.

B. PCS:

1. The steel conduit, before PVC coating, shall be new, unused, hot-dip galvanized material, conforming to the requirements for Type GRC.

2. Coated conduit NEMA Standard RN-1:
a. The galvanized coating may not be disturbed or reduced in thickness during the cleaning and preparatory process.

3. Factory-bonded PVC jacket:
a. The exterior galvanized surfaces shall be coated with primer before PVC coating to ensure a bond between the zinc substrate and the PVC coating. b. Nominal thickness of the exterior PVC coating shall be 0.040 inch except where part configuration or application of the piece dictates otherwise. c. PVC coating on conduits and associated fittings shall have no sags, blisters, lumps, or other surface defects and shall be free of holes and holidays. d. The PVC adhesive bond on conduits and fittings shall be greater than the tensile strength of the PVC plastic coating:
1) Confirm bond with certified test results.

4. A urethane coating shall be uniformly and consistently applied to the interior of all conduits and fittings:
a. Nominal thickness of 0.002 inch.
b. Conduits having areas with thin or no coating are not acceptable. c. All threads shall be coated with urethane.

5. The PVC exterior and urethane interior coatings applied to the conduits shall afford sufficient flexibility to permit field bending without cracking or flaking at temperature above 30 degrees Fahrenheit (-1 degree Celsius).

6. PCS conduit bodies and fittings:
a. Malleable iron.
b. The conduit body, before PVC coating, shall be new, unused material and shall conform to appropriate UL standards.
c. The PVC coating on the outside of conduit bodies shall be 0.040-inch thick and have a series of longitudinal ribs to protect the coating from tool damage during installation. d. -inch interior urethane coating.
e. Utilize the PVC coating as an integral part of the gasket design. f. Stainless steel cover screw heads shall be encapsulated with plastic to ensure corrosion protection.
g. A PVC sleeve extending 1 conduit diameter or 2 inches, whichever is less, shall be formed at each female conduit opening.
1) The inside diameter of the sleeve shall be the same as the outside diameter of the conduit to be used.

Page 291 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 5 CONDUITS
2) The sleeve shall provide a vapor- and moisture-tight seal at every connection.

C. SLT:

1. Temperature rated for use in the ambient temperature at the installed location but not less than the following:
a. General purpose:
1) Temperature range: -20 degrees Celsius to +80 degrees Celsius. b. Oil-resistant:
1) Temperature range: -20 degrees Celsius to +60 degrees Celsius.

2. Sunlight-resistant, weatherproof, and watertight.

3. Manufactured from single strip steel, hot-dip galvanized on all 4 sides before conduit fabrication.

4. Strip steel spiral wound resulting in an interior that is smooth and clean for easy wire pulling.

5. Overall PVC jacket.

6. With integral copper ground wire, built in the core, in conduit trade sizes 1/2 inch through 1-1/4 inch.

D. PVC:

1. Extruded from virgin PVC compound:
a. Schedule 40 unless otherwise specified.
b. Schedule 80 extra-heavy wall where specified.

2. Rated for 90 degrees Celsius conductors or cable.

3. Rated for use in direct sunlight.

E. Conduit bodies:

1. Material consistent with conduit type:
a. Malleable iron bodies and covers when used with Type GRC. b. PVC-coated malleable iron bodies and covers when used with Type PCS.

2. Conduit bodies to conform to Form 8, Mark 9, or Mogul design:
a. Mogul design conforming to NEC requirements for bending space for large conductors for conduit trade sizes of 1 inch and larger with conductors #4 AWG and larger, or where required for wire-bending space.

3. Gasketed covers attached to bodies with stainless steel screws secured to threaded holes in conduit body.

F. ACCESSORIES
G. Connectors and fittings:

1. Manufactured with compatible materials to the corresponding conduit.

H. Insulated throat metallic bushings:

1. Construction:
a. Malleable iron or zinc-plated steel when used with steel conduit. b. Positive metallic conduit end stop.
c. Integrally molded non-combustible phenolic-insulated surfaces rated at 150 degrees Celsius.
d. Use fully insulated bushings on nonmetallic conduit system made of high-impact 150 degrees Celsius rated non-combustible thermosetting phenolic.

I. Insulated grounding bushings:

1. Construction:
a. Malleable iron or steel, zinc-plated, with a positive metallic end stop. b. Integrally molded non-combustible phenolic-insulated surfaces rated at 150 degrees Celsius.
c. Tin-plated copper grounding saddle for use with copper or aluminum conductors.

J. Electrical unions (Erickson Couplings):

1. Construction:
a. Malleable iron for use with steel conduit.

Page 292 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 6 CONDUITS
b. Concrete tight, 3-piece construction.
c. Rated for Class I Division 1 Group D in hazardous areas.

K. SLT fittings:

1. Construction:
a. Malleable iron.
b. Furnished with locknut and sealing ring.
c. Liquidtight, rain-tight, oil-tight.
d. Insulated throat.
e. Furnish as straight, 45-degree elbows, and 90-degree elbows. f. Designed to prevent sleeving:
1) Verify complete bonding of the raceway jacket to the plastic gasket seal. g. Equipped with grounding device to provide ground continuity irrespective of raceway core construction. Grounding device, if inserted into raceway and directly in contact with conductors, shall have rolled-over edges for sizes under 5 inches. h. Where terminated into a threadless opening using a threaded hub fitting, a suitable moisture-resistant/oil-resistant synthetic rubber gasket shall be provided between the outside of the box or enclosure and the fitting shoulder. Gasket shall be adequately protected by and permanently bonded to a metallic retainer.

2. Corrosion-resistant and outdoor SLT fittings:
a. Construction:
1) PVC-coated liquidtight fittings with a bonded 0.040-inch thick PVC coating on the metal connector to form a seal around the SLT conduit. 2) Insulated throat and an integral sealing ring.

L. Hubs for threaded attachment of steel conduit to sheet metal enclosures:

1. Construction:
a. Insulated throat.
b. PVC-coated when used in corrosive areas.
c. Bonding locknut.
d. Recessed neoprene O-ring to ensure watertight and dust-tight connector. e. One half (1/2)-inch through 1-1/4-inch steel zinc electroplated. f. One and one half (1-1/2)-inch through 6-inch malleable iron zinc plated.

2. Usage:
a. All conduits in damp, wet, outdoor, and corrosive areas shall use threaded hubs for connections to sheet metal enclosures.

M. PVC fittings:

1. Materials:
a. All devices shall be made of PVC, using the same materials as used for Type PVC conduit.
b. All metal hardware shall be stainless steel.

N. Expansion/deflection couplings:

1. Use to compensate for movement in any directions between 2 conduit ends where they connect.

2. Shall allow movement of 3/4 inch from the normal in all directions.

3. Shall allow angular movement for a deflection of 30 degrees from normal in any direction.

4. Constructed to maintain electrical continuity of the conduit system.

5. Materials:

6. End couplings: Bronze or galvanized ductile iron.
a. Sleeve: Neoprene.
b. Bands: Stainless steel.
c. Bonding jumper: Tinned copper braid.

O. Expansion couplings:

1. Shall allow for expansion and contraction of conduit:
a. Permitting 8-inch movement, 4 inches in either direction.

Page 293 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 7 CONDUITS

2. Constructed to maintain electrical continuity of the conduit system.

3. Materials:
a. Head: Malleable or ductile iron.
b. Sleeve: Steel.
c. Insulating bushing: Phenolic.
d. Finish: Hot-dip galvanized.

P. Conduit markers:

1. As specified in Section 26_05_53.

2.07 MIXES (NOT USED)

2.08 FABRICATION (NOT USED)

2.09 FINISHES (NOT USED)

2.10 SOURCE QUALITY CONTROL
A. As specified in Section 26_05_00.

PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. As specified in Section 26_05_00.

B. General:

1. Conduit routing:
a. The electrical drawings are diagrammatic in nature:
1) Install conduit runs as specified with schematic representation indicated on the Drawings and as specified.
2) Modify conduit runs to suit field conditions, as accepted by the Engineer:
(a) Make changes in conduit locations that are consistent with the design intent but are dimensionally different, or routing to bypass obstructions. (b) Make changes in conduit routing due to the relocation of equipment. 3) The electrical drawings do not indicate all required junction boxes and pull boxes:
(a) Provide junction boxes and pull boxes to facilitate wire pulling as required:
(1) To meet cable manufacturer’s pulling tension requirements. (2) To limit total conduit bends between pull locations. (b) Install junction boxes and pull boxes at locations acceptable to the Engineer.
b. The Contractor is responsible for any deviations in general location, conduit size, routing, or changes to the conduit schedule without the express written approval or direction by the Engineer:
1) The Engineer is the sole source in determining whether the change is constituted as a deviation:
2) Perform any changes resulting in additional conduits, or extra work from such deviations.
3) Incorporate any deviations on the Record Documents.

2. Use only tools recommended by the conduit manufacturer for assembling the conduit system.

3. Provide adequate clearances from high-temperature surfaces for all conduit runs.

4. Do not install 1-inch or larger conduits in or through structural members unless approved by the Engineer.

5. Run conduits exposed to view parallel with or at right angles to structural members, walls, or lines of the building:
a. Install straight and true conduit runs with uniform and symmetrical elbows, offsets, and bends.

Page 294 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 8 CONDUITS
b. Make changes in direction with long radius bends or with conduit bodies.

6. Install conduits with total conduit bends between pull locations less than or equal to 270 degrees.

7. Route all exposed conduits to preserve headroom, access space and work space, and to prevent tripping hazards and clearance problems:
a. Install conduit runs so that runs do not interfere with proper and safe operation of equipment and do not block or interfere with ingress or egress, including equipmentremoval hatches. b. Route conduits to avoid drains or other gravity lines. Where conflicts occur, relocate the conduit as required.

8. When installing conduits through existing slabs or walls, make provisions for locating any possible conflicting items where the conduit is to penetrate. Use tone signal or X-ray methods to make certain that no penetrations will be made into the existing conduits, piping, cables, post-tensioning cables, etc.

9. Plug conduits brought into pull boxes, manholes, handholes, and other openings until used to prevent entrance of moisture.

10. For 2-inch and larger conduit runs, snake conduits with a conduit cleaner equipped with a cylindrical mandrel of a diameter not less than 85 percent of nominal diameter of the conduit:
a. Remove and replace conduits through which mandrel will not pass.

11. Provide all sleeves and openings required for the passage of electrical raceways or cables even when these openings or sleeves are not specifically indicated on the Drawings.

12. Install complete conduit systems before conductors are installed.

13. Provide metallic conduits terminating in transformer, switchgear, motor control center, or other equipment conduit windows with grounding bushings and ground with a minimum No. 6 AWG ground wire.

14. Underground conduits:
a. Install underground conduits, including conduit runs below slabs-on-grade in concrete-reinforced duct bank construction:
1) If noted on plans and per specifications.
b. Make underground conduit size transitions at handholes and manholes. c. Install spare conduits in underground duct banks towards top center of runs to allow for ease of installation of future cables as conduits enter underground manholes and handholes.
d. Seal around conduit penetrations of below grade walls with a mechanical seal. e. Provide 24‑inch‑minimum cover at finished grade for direct burial underground conduit. Provide 3‑inch‑minimum sand above and below conduit. f. Provide 24-inch minimum cover at finished grade above top of concrete for concreteencased duct banks. Provide 2-inch minimum separation between conduits and 3- inch minimum concrete encasement around conduits. Extend the concrete encasement under any floor slabs or equipment mounting pads to the point of raceway termination. After the concrete envelope has set, pull a bristle brush through each raceway to remove debris. Underground conduits shall be concrete encased unless shown as direct buried on the Drawings.
g. Where other utility piping systems are encountered or being installed along a raceway route, maintain a 12‑inch‑minimum vertical separation between raceways and other systems at crossings. Maintain a 12‑inch‑minimum separation between raceways and other systems in parallel runs. Do not place raceways over valves or couplings in other piping systems. Refer conflicts with these requirements to the Engineer for instructions before further work is done.
h. Thoroughly clean conduits before lying. During construction and after completion, the conduit ends shall be kept plugged to prevent water from washing mud into the manholes or pull boxes.
i. Terminate conduit in end bells in manholes and pull boxes and enter at right angles to the wall.

Page 295 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 9 CONDUITS
j. Place conduit separators every 4 feet on centers and securely anchor to prevent movement.
k. Backfill, Non‑paved Areas: Use native backfill, compacted in 6-inch layers to 90 percent relative compaction. Final backfill elevation shall match existing. l. Backfill, Paved Areas:
1) Use clean imported sand having the following gradation:

Sieve Size Percent Passing By Weight
3/8 inch 100
No. 4 75 - 100
No. 30 12 - 50
No. 100 5 - 20
No. 200 0 - 15
(a) Imported sand shall be free from organic material, trash, debris and rubbish.
2) Compact trench backfill by manual methods. Water flooding or jetting is not permitted.

C. Lighting and receptacle conduits:

1. Provide conduit runs for lighting and receptacle circuits, whether or not indicated on the Drawings:

2. Install conduits in accordance with the requirements of this Section unless otherwise indicated.

3. Minimum conduit size:
a. 3/4-inch for exposed conduits.
b. 1-inch for underground or in-slab conduits.

4. Provide conduit materials for the installed location as specified in Section 26_05_00.

D. Conduit usage:

1. Exposed conduits:
a. Rigid conduit:
1) Install the rigid conduit type for each location as specified in Section 26_05_00. 2) Minimum size: 1-inch, unless otherwise indicated on Drawings. b. Flexible conduit:
1) Use flexible conduit for final connections between rigid conduit and motors, vibrating equipment, instruments, control equipment, or where required for equipment servicing:
(a) Use Type SLT with rigid metallic conduit.
2) Minimum size: 3/4-inch:
(a) 1/2 when required for connection to instruments.
3) Maximum length:
(a) Fixed equipment:

Conduit Trade Size Flexible Conduit Length (inch)
3/4 18
1 18
1-1/4 18
1-1/2 18
2 36
2-1/2 36
3 36
3-1/2 38
4 40
(b) Removable instruments or hinged equipment:

Page 296 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 10 CONDUITS
(1) As required to allow complete removal or full movement without disconnecting or stressing the conduit.

2. Underground, concrete-encased and embedded conduits:
a. Type PVC Schedule 40 and PVC-coated rigid metallic conduit as specified below:
1) Use Type PCS in underground and embedded installation as follows:
(a) Stub-up and risers to grade floor or equipment from nonmetallic conduits. (b) Entering and exiting underground or embedded conduit runs a minimum 12 inches above and below grade of finished floor.
(c) For any and all bends where the total deflection is greater than 45 degrees. b. Minimum size:
1) 2-inch in duct banks unless otherwise indicated on the Drawings. 2) 2-inch for in-slab conduits unless otherwise indicated on the Drawings. (a) PVC-coated rigid metallic conduit:
c. Use specifically manufactured or machined threading dies to manufacturer’s specifications to accommodate the PVC jacket.

3. GRC:
a. Conduit shall be cut square and reamed before threading.

4. PVC:
a. Conduit terminations shall be via threaded adapters into threaded hubs on the junction boxes or conduit bodies.
b. Conduit terminations into boxes without threaded hubs shall utilize a threaded adapter and a flat neoprene washer on the outside of the box. 1) Use a locknut on the inside of the box to tighten the adapter to the box. c. Route conduit to afford it the maximum physical protection. 1) If necessary, cover conduit to afford additional protection when it cannot be shielded by the structure or machinery frames.
(a) Use Schedule 80 where exposed runs may be subject to physical damage.

E. Conduit joints and bends:

1. General:
a. Where conduit is underground, under slabs on grade, exposed to the weather, or in NEMA Type 4 or NEMA Type 4X locations, make joints liquidtight. b. Keep bends and offsets in conduit runs to an absolute minimum. c. All bends shall be symmetrical.
d. The following conduit systems shall use large-radius sweep elbows:
1) Underground conduits.
2) Conduits containing shielded cables.
e. Provide large-radius factory-made bends for 1-1/4-inch trade size or larger. f. Make field bends with a radius of not less than the requirements found in the NEC:
1) The minimum bending radius of the cable must be less than the radius of the conduit bend.
2) Make all field bends with power bending equipment or manual benders specifically intended for the purpose:
(a) Make bends so that the conduit is not damaged and the internal diameter is not effectively reduced.
(b) For the serving utilities, make bends to meet their requirements. g. Replace all deformed, flattened, or kinked conduit.

2. Threaded conduit:
a. Cut threads on rigid metallic conduit with a standard conduit-cutting die that provides a 3/4-inch per foot taper and to a length such that all bare metal exposed by the threading operation is completely covered by the couplings or fittings used. In addition, cut the lengths of the thread such that all joints become secure and wrenchtight just preceding the point where the conduit ends would butt together in couplings or where conduit ends would butt into the ends or shoulders of other fittings. b. Thoroughly ream conduit after threads have been cut to remove burrs.

Page 297 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 11 CONDUITS
c. Use bushings or conduit fittings at conduit terminations. d. On exposed conduits, repair scratches and other defects with galvanizing repair stick, Enterprise Galvanizing “Galvabar,” or CRC “Zinc It.”
e. Coat conduit threads with an approved electrically conductive sealant and corrosion inhibitor that is not harmful to the conductor insulation:
1) Apply to the male threads and tighten joints securely. 2) Clean excess sealant from exposed threads after assembly. f. Securely tighten all threaded connections.
g. Any exposed threaded surfaces must be cleaned and coated with a galvanizing solution so that all exposed surfaces have a galvanized protective coating.

3. PVC:
a. Use approved solvent-weld cement specifically manufactured for the purpose. Spraytype cement is not allowed. b. Apply heat for bends so that conduit does not distort or discolor. Use a spring mandrel as required to ensure full inside diameter at all bends:
1) Utilize a heater specifically for PVC conduit as recommended by the conduit manufacturer.

F. Conduit sealing and drainage:

1. Conduit drainage and sealing:
a. Provide sealing and drainage in vertical drops of long (in excess of 20 feet), exterior, above-grade conduit runs at the points at which the conduit enters buildings, switchgear, control panels, lighting panelboards, and other similar enclosures. b. Provide seal fittings with drains in vertical drops directly above grade for exterior and above-grade conduit runs that are extended below grade. c. Provide conduit seals with drains in areas of high humidity and rapidly changing temperatures:
1) Where portions of an interior raceway pass through walls, ceilings, or floors that separate adjacent areas having widely different temperatures.

G. Conduit supports:

1. General:
a. Provide appropriate hangers, supports, fasteners, and seismic restraints to suit applications:
1) As specified in Section 26_05_29.
2) Provide support materials consistent with the type of conduit being installed as specified in Section 26_05_00.
b. Support conduit at the intervals required by the NEC. c. Perforated strap and plumbers tape are not acceptable for conduit supports.

2. Conduit on concrete or masonry:
a. Use 1-hole malleable iron straps with metallic or plastic expansion anchors and screws or support from preset inserts.
b. Use preset inserts in concrete when possible.
c. Use pipe spacers (clamp backs) in wet locations.
d. On plaster or stucco, use 1-hole malleable iron straps with toggle bolts.

3. Conduit on metal decking:
a. Use 1-hole malleable iron straps with 1-inch long cadmium-plated Type A panhead sheet-metal screws. Fully or partially hammer-driven screws are not acceptable.

4. Suspended conduit:
a. Use malleable-iron factory-made split-hinged pipe rings with threaded suspension rods sized for the weight to be carried (minimum 3/8-inch diameter), Kindorf, or equal. b. For grouped conduits, construct racks with threaded rods and tiered angle iron or preformed channel cross members. Clamp each conduit individually to a cross member. Where rods are more than 2-feet long, provide rigid sway bracing.

5. Supports at structural steel members:
a. Use beam clamps.

Page 298 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 33 - 12 CONDUITS
b. Drilling or welding may be used only as specified or with approval of the Engineer.

6. PVC-coated rigid metal systems:
a. Provide right-angle beam clamps and “U” bolts specially formed and sized to snugly fit the outside diameter of the coated conduit. Provide "U" bolts with PVCencapsulated nuts that cover the exposed portions of the threads. b. Securely fasten exposed conduits with Type 316 stainless steel clamps or straps.

H. Expansion or expansion/deflection fittings:

1. General:
a. Align expansion coupling with the conduit run to prevent binding. b. Follow manufacturer’s instructions to set the piston opening. c. Install expansion fittings across concrete expansion joints and at other locations where necessary to compensate for thermal or mechanical expansion and contraction.
d. Furnish fittings of the same material as the conduit system.

I. Empty conduits:

1. Provide a polyethylene rope rated at 250 pounds tensile strength in each empty conduit more than 10 feet in length.

2. Seal ends of all conduits with approved, manufactured conduit seals, caps, or plugs immediately after installation:
a. Keep ends sealed until immediately before pulling conductors.

J. Miscellaneous:

1. Provide electrical unions at all points of union between ends of rigid conduit systems that cannot otherwise be coupled:
a. Running threads and threadless couplings are not allowed.

2. Replace any conduits installed that the Engineer determines do not meet the requirements of this Specification.

3.04 ERECTION, INSTALLATION, APPLICATIONS, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 FIELD QUALITY CONTROL
A. As specified in Section 26_05_00.

3.08 ADJUSTING (NOT USED)

3.09 CLEANING (NOT USED)

3.10 PROTECTION
A. As specified in Section 26_05_00.

3.11 SCHEDULES (NOT USED)

END OF SECTION

Page 299 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 34 - 1 BOXES
SECTION 26 05 34
BOXES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Device boxes.

2. Raceway system boxes.

B. Related sections:

1. Section 01_33_00 - Submittal Procedures.

2. Section 26_05_00 - Common Work Results for Electrical.

1.02 REFERENCES
A. As specified in Section 26_05_00.

B. ASTM International (ASTM):

1. A47 - Standard Specification for Ferritic Malleable Iron Castings.

2. D149 - Standard Test Method for Dielectric Breakdown Voltage and Dielectric Strength of Solid Electrical Insulating Materials at Commercial Power Frequencies.

3. D495 - Standard Test Method for High-Voltage, Low-Current, Dry Arc Resistance of Solid Electrical Insulation.

4. D570 - Standard Test Method for Water Absorption of Plastics.

5. D648 - Standard Test Method for Deflection Temperature of Plastics Under Flexural Load in the Edgewise Position.

6. D790 - Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials.

7. D792 - Standard Test Methods for Density and Specific Gravity (Relative Density) of Plastics by Displacement.

C. Joint Industry Conference (JIC).

D. Underwriters Laboratories, Inc. (UL):

1. 94 - Standard for Tests for Flammability of Plastic Materials for Parts in Devices and Appliances.

1.03 DEFINITIONS
A. As specified in Section 26_05_00.

B. Specific definitions:

1. Raceway system boxes: Boxes that are used for wire and cable pullboxes, conduit junction boxes, or terminal boxes.

1.04 SYSTEM DESCRIPTION
A. Provide outlet boxes for devices such as switches, receptacles, telephone and computer jacks, security systems, junction, and pullboxes for use in the raceway systems, etc.

B. Provide boxes as indicated on the Drawings or as needed to complete the raceway installation.

1.05 SUBMITTALS
A. Furnish submittals as specified in Sections 01_33_00 and 26_05_00.

B. Product data:

1. Manufacturer.

2. Materials.

3. Dimensions:
a. Height.
b. Width.
c. Depth.
d. Weight.
e. NEMA rating.

Page 300 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 34 - 2 BOXES

4. Conduit entry locations.

5. Catalog cut sheets.

6. Installation instructions.

C. Shop drawings:

1. Include identification and sizes of pull boxes.

1.06 QUALITY ASSURANCE
A. As specified in Section 26_05_00.

B. Regulatory requirements:

1. Outlet boxes shall comply with all applicable standards of:
a. JIC.
b. NEC.
c. NEMA.
d. UL.

1.07 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26_05_00.

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 26_05_00.

1.09 SEQUENCING
A. As specified in Section 26_05_00.

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 26_05_00.

1.12 SYSTEM START-UP
A. As specified in Section 26_05_00.

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. Plastic coated boxes:
a. Rob Roy.
b. OCAL.

2. Cast device boxes:
a. Appleton.
b. Crouse - Hinds.
c. OZ/Gedney.

3. Formed steel enclosures:
a. Hoffman.
b. Thomas and Betts.
c. Stahlin.
d. Rittal.

4. Stainless steel enclosures:
a. Hoffman.
b. Stahlin.
c. Rittal.

Page 301 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 34 - 3 BOXES

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

2.04 MANUFACTURED UNITS
A. Cast device boxes:

1. Construction:
a. With internal green ground screw.
b. Furnished with a suitable gasketed cover.
c. With integral cast mounting lugs when surface mounted. d. Conduit sizes range from 3/4 inch to 1 inch.
e. Tapered threaded hubs with integral bushing.

2. Malleable iron boxes:
a. Conforming to ASTM A47 Grade 32510.

B. Plastic coated cast device boxes:

1. Construction:
a. With internal green ground screw.
b. Furnished with a suitable gasketed cover.
c. With integral cast mounting lugs when surface mounted. d. Conduit sizes range from 3/4 inch to 1 inch.
e. Double coated with a nominal 0.002-inch (2 mil) urethane on both the interior and exterior before application of PVC coating.
f. With a minimum 0.040-inch (40 mil) PVC coating bonded to exterior. g. With pressure sealing sleeve to protect the connection with conduit.

C. Formed steel enclosures:

1. Steel:
a. NEMA Type 12.
b. Fabricated from 14-gauge steel, minimum.
c. All seams continuously welded ground smooth.
d. Door:
1) Rolled lip around 3 sides.
2) Attached to enclosure by means of a continuous stainless steel hinge and pin. e. Neoprene door gasket to provide a watertight, dusttight, oiltight seal:
1) Attached with an adhesive.
2) Retained by a retaining strip.
f. Fabricate all external removable hardware for clamping the door to the enclosure body from zinc-plated heavy gauge steel:
1) With a hasp and staple for padlocking.
g. Provide large enclosures with door and body stiffeners for extra rigidity. h. No holes or knockouts.
i. Finish:
1) ANSI-61 gray electrostatically applied polyester powder inside and out over cleaned and primed surfaces.
2) White electrostatically applied polyester powder mounting plate. j. Heavy gauge steel external mounting brackets when surface mounted. k. NEMA Type 3R for outdoor use, unless NEMA 4X is specified on the Drawings.

2. Stainless steel:
a. NEMA Type 4X:
1) Boxes in locations subject to flooding or temporary submersion:
(a) NEMA Type 6.
b. Fabricated from 14-gauge Type 316 stainless steel.
c. All seams continuously welded.
d. Door:
1) Rolled lip around 3 sides.

Page 302 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 34 - 4 BOXES
2) Attached to enclosure by means of a continuous stainless steel hinge and pin. e. Neoprene door gasket to provide a watertight seal:
1) Attached with an adhesive.
2) Retained by a retaining strip.
f. Fabricate all external removable hardware for clamping the door to the enclosure body from heavy gauge stainless steel:
1) With a hasp and staple for padlocking.
g. Provide large enclosures with door and body stiffeners for extra rigidity. h. No holes or knockouts.
i. Finish:
1) Brushed.
j. Stainless steel external mounting brackets when surface mounted.

2.05 EQUIPMENT (NOT USED)

2.06 COMPONENTS (NOT USED)

2.07 ACCESSORIES
A. Fasteners:

1. Electroplated or stainless steel in boxes with wiring devices.

2. Screws, nuts, bolts, and other threaded fasteners:
a. Stainless steel.

B. Provide breather and drain fittings where appropriate.

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. As specified in Section 26_05_00.

B. General:

1. Provide materials and construction suitable for environmental conditions at the location of the box as specified in Section 26_05_00.

2. Provide outlet box materials to match the conduit system:
a. GRC - Cast ferrous boxes.
b. PCS - PVC coated cast ferrous boxes.

3. Solid type gang boxes:
a. For more than 2 devices.
b. For barriered outlets.

4. Support all wall mounted NEMA Type 4 or NEMA Type 4X boxes to maintain a minimum of 7/8-inch free air space between the back of the enclosure and the wall:
a. Use machined spacers to maintain air space; built-up washers are not acceptable. b. Use stainless steel or nylon materials for spacers.

5. Use cast malleable iron boxes when box must support other devices.

6. Boxes serving luminaires or devices:
a. Use as pull boxes wherever possible.

7. Size boxes in accordance with NEC requirements and to provide sufficient room for the future components and cables indicated on the Drawings.

8. For fire-rated construction, provide materials and installation for use in accordance with the listing requirements of the classified construction.

Page 303 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 34 - 5 BOXES
C. Outlet boxes:

1. Locate outlet boxes as indicated on the Drawings:
a. Adjust locations so as not to conflict with structural requirements or other trades.

2. Use deep threaded-hub malleable iron boxes:
a. To act as a pull box for conductors in a conduit system. b. Accommodate wiring devices.

3. Use deep threaded-hub plastic coated malleable iron boxes in corrosive and NEMA Type 4X area and when the conduit system is PVC coated steel.

4. Outlet boxes may be used as junction boxes wherever possible.

D. Pull boxes and junction boxes:

1. Size pull boxes in accordance with NEC requirements and to provide sufficient room for any future conduits and cables as indicated on the Drawings.

2. Install pull boxes such that access to them is not restricted.

E. For boxes not indicated:

1. Provide types and mountings as required to suit the equipment and that will be consistent with the conduit system and environmental conditions as indicated in Section 26_05_00.

2. Outlet, switch, and junction boxes where surface mounted in exposed locations:
a. Cast ferrous boxes with mounting lugs, zinc, or cadmium plating finish.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 REINSTALLATION (NOT USED)

3.07 FIELD QUALITY CONTROL
A. As specified in Section 26_05_00.

3.08 ADJUSTING (NOT USED)

3.09 CLEANING
A. As specified in Section 26_05_00.

3.10 PROTECTION
A. As specified in Section 26_05_00.

3.11 SCHEDULES (NOT USED)

END OF SECTION

Page 304 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 53 - 1

IDENTIFICATION FOR

ELECTRICAL SYSTEMS
SECTION 26 05 53

IDENTIFICATION FOR ELECTRICAL SYSTEMS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Identification of electrical equipment, devices, and components.

2. Material, manufacturing, and installation requirements for identification devices.

B. Related sections:

1. Section 01_33_00 - Submittal Procedures.

2. Section 26_05_00 - Common Work Results for Electrical.

3. Section 26_05_33 - Conduits.

1.02 REFERENCES
A. As specified in Section 26_05_00.

B. Occupational Safety and Health Administration (OSHA).

1.03 DEFINITIONS
A. As specified in Section 26_05_00.

1.04 SYSTEM DESCRIPTION
A. Nameplates:

1. Provide a nameplate for each piece of electrical equipment and devices, control panel and control panel components.

2. Provide all nameplates of identical style, color, and material throughout the facility.

3. Device nameplates information:
a. Designations as indicated on the Drawings and identified on the Process and Instrumentation Drawings.

B. Wire numbers:

1. Coordinate the wire numbering system with all vendors of equipment so that every field wire has a unique number associated with it for the entire system:
a. Wire numbers shall correspond to the wire numbers on the control drawings or the panel and circuit numbers for receptacles and lighting. b. Wire numbers shall correspond to the terminal block number to which they are attached in the control panel.
c. Internal panel wires on a common terminal shall have the same wire number. d. Multi-conductor cables shall be assigned a cable number that shall be attached to the cable at intermediate pull boxes and stub-up locations beneath freestanding equipment. All multi-conductor and instrumentation cables shall be identified at pull points as described above:
1) Label armored multi-conductor cable using the conduit number as indicated on the Drawings, following the requirements for conduit markers in Section 26_05_33.

2. Provide the following wiring numbering schemes throughout the project for field wires between process control module, (PCM), vendor control panels, (VCP), motor control centers, (MCC), field starters, field instruments, etc.

WHERE:
= DESIGNATION FOR ORIGINATING PANEL OR DEVICE ORIGIN TERM. = TERMINAL DESIGNATION AT ORIGINATING PANEL OR DEVICE DEST. LOC. = DESIGNATION FOR

DESTINATION PANEL OR DEVICE
= TERMINAL DESIGNATION AT DESTINATION PANEL OR DEVICE OR PLC I/O ADDRESS AT DESTINATION PANEL:
a. Identify equipment and field instruments as the origin. b. PCMs are always identified as the destination.

Page 305 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 53 - 2

IDENTIFICATION FOR

ELECTRICAL SYSTEMS
c. Location is the panel designation for VCP, LCP, or PCM. For connections to MCCs, location is the specific starter tag and loop number. Location is the tag and loop number for motor starters, field instruments and equipment. Any hyphen in the panel designation or tag and loop number shall be omitted.
d. Terminal designation is the actual number on the terminal block where the conductor terminates at field devices and vendor control panels. For multi- conductor cables, all terminal numbers shall be shown, separated by commas.
e. Terminal designations at motor leads shall be the motor manufacturer’s standard terminal designation (e.g. T1, T2, T3, etc.).
f. Terminal designations at PCMs where the field conductor connects to field terminal blocks for a PLC input or output shall be the PLC address (Note: the following PLC I/O numbering scheme is typical for Allen-Bradley, the numbering scheme should be modified to match that of the actual PLC manufacturer used for the project):
1) Discrete Point: W:X:Y/Z Analog Point: W:X:Y.Z Where:
(a) W = I for input, O for output X = PLC number (1, 2, 3…) (b) Y = Slot number (01, 02, 03…)
(1) Z = Terminal number (00, 01, 02…) for a discrete point or a word number for an analog point (1, 2, 3…)
g. Terminal designations at PCMs where the conductor does not connect to a PLC I/O point shall be the terminal number with a “C” prefix (e.g. C0010). For common power after a fuse or neutrals after a switch, the subsequent points shall have and capital letter suffix starting with “A” (e.g. C0010A).

2. Case 1: Vendor control panel (VCP) to process control module (PCM): Field wire number/label: A-B/C-D
a. A = Vendor control panel number without hyphen (VCP#) b. B = Terminal number within VCP (manufacturer’s or vendor’s standard terminal number)
c. C = Process control module number without hyphen (PCM#) d. D = Either the PLC address if the field terminal is connected directly to a PLC input or output point or the terminal number with a “C” prefix if not connected directly to a PLC I/O point (C0010)
1) VCP#-10/PCM#-I:1:01/01
(a) VCP#-10/PCM#-O:1:10/07 VCP#-10/PCM#-C0100

3. Case 2: Field instrument to process control module (PCM): Field wire number/label: EF/C-D a. C = Process control module number without hyphen (PCM#) b. D = Either the PLC address if the field terminal is connected directly to a PLC input or output point or the terminal number with a “C” prefix if not connected directly to a PLC I/O point (C0010)
c. E = Field mounted instrument tag and loop numbers without hyphen (EDV#) d. F = Manufacturer’s standard terminal number within instrument. Use both terminal numbers for analog points separated by a comma
1) TIT#-2,3/PCM#-I:1:01.1
(a) TSH#-1/PCM#-I:2:01/00

4. Case 3: Motor control center (MCC) to process control module (PCM): Field wire number/label: G-B/C-D
a. B = Terminal number within Motor Control Center (manufacturer’s or vendor’s standard terminal number)
b. C = Process control module without hyphen (PCM#)
c. D = Either the PLC address if the field terminal is connected directly to a PLC input or output point or the terminal number with a “C” prefix if not connected directly to a PLC I/O point (C0010)
d. G = Actual starter designation in the motor control center without hyphen (MMS#) 1) MMS#-10/PCM#-I:1:01/01
(a) MMS#-10/PCM#-O:1:10/07 MMS#-10/PCM#-C0100

Page 306 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 53 - 3

IDENTIFICATION FOR

ELECTRICAL SYSTEMS

5. Case 4: Motor control center (MCC) to vendor control panel (VCP): Field wire number/label: G-B/A-B
a. A = Vendor control panel number without hyphen (VCP#) b. B = Terminal number within motor control center or vendor control panel (manufacturer’s or vendors standard terminal number)
c. G = Actual starter designation in the motor control center without hyphen (MMS#) d. MMS#-X2/VCP#-10

6. Case 5: Motor leads to a motor control center (MCC): Field wire number/label: H-I/G-B a. B = Terminal number within motor control center (manufacturer’s standard terminal number)
b. G = Actual starter designation in the motor control center without hyphen (MMS#) c. H = Equipment tag and loop number without hyphen (PMP#) d. Motor manufacturer’s standard motor lead identification (e.g. T1, T2, T3, etc.) e. PMP-#-T3/MMS#-T3

7. Case 6: Remote or separately mounted starter or variable frequency drive (VFD) to process control module (PCM):
a. Field wire number/label: J-B/C-D
b. B = Terminal number within starter or variable frequency drive (manufacturer’s standard terminal number)
c. C = Process control module number without hyphen (VCP#) d. D = Either the PLC address if the field terminal is connected directly to a PLC input or output point or the terminal number with a “C” prefix if not connected directly to a PLC I/O point (C0010)
e. J = Starter or variable frequency drive tag and loop number without hyphen (MMS#) f. MMS#-10/PCM#-I:1:01/01
(a) MMS#-10/PCM#-O:2:10/07 MMS#-10/PCM#-C0010

8. Identify all spare conductors as required for other field wires with an “S” prefix:
a. S MMS#-10/PCM#-C011

5.02 SUBMITTALS
A. Furnish submittals as specified in Sections 01_33_00 and 26_05_00.

B. Product data:

1. Nameplates:
a. Color.
b. Size:
1) Outside dimensions.
2) Lettering.
c. Material.
d. Mounting means.

2. Nameplate schedule:
a. Show exact wording for each nameplate.
b. Include nameplate and letter sizes.

3. Wire numbers:
a. Manufacturer’s catalog data for wire labels and label printer.

C. Record documents:

1. Update the conduit schedule to reflect the exact quantity of wire numbers including spares and destination points for all wires.

5.03 QUALITY ASSURANCE (NOT USED)

5.04 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 26_05_00.

Page 307 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 53 - 4

IDENTIFICATION FOR

ELECTRICAL SYSTEMS

5.05 PROJECT SITE CONDITIONS (NOT USED)

5.06 SEQUENCING (NOT USED)

5.07 SCHEDULING (NOT USED)

5.08 WARRANTY
A. As specified in Section 26_05_00.

5.09 SYSTEM START-UP
A. As specified in Section 26_05_00.

5.10 OWNER’S INSTRUCTIONS (NOT USED)

5.11 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

6.01 MANUFACTURERS
A. Nameplates and signs:

1. One of the following or equal:
a. Brady.
b. Seton.

B. Conductor and cable markers:

1. Heat-shrinkable tubing:
a. One of the following or equal:
1) Raychem.
2) Brady.
3) Thomas & Betts.
4) Kroy.

C. Conduit and raceway markers:

1. One of the following or equal:
a. Almetek: Mini Tags.
b. Lapp Group: Maxi System.

6.02 EXISTING PRODUCTS (NOT USED)

6.03 MATERIALS
A. Nameplates:

1. Fabricated from white-center and red face or black-center, white face laminated plastic engraving stock:
a. 3/32-inch thick material.
b. Two-ply.
c. With chamfered edges.
d. Block style engraved characters of adequate size to be read easily from a distance of 6 feet:
1) No characters smaller than 1/8-inch in height.

B. Signs:

1. Automatic equipment and high voltage signs:
a. Suitable for exterior use.
b. In accordance with OSHA regulations.

C. Conductor and cable markers:

1. Machine printed black characters on white tubing.

2. Ten point type or larger.

D. Conduit and raceway markers:

1. Non-metallic:
a. UV resistant holder and letters
b. Black letters on yellow background.

Page 308 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 53 - 5

IDENTIFICATION FOR

ELECTRICAL SYSTEMS
c. Minimum letter height: 1/2-inch.
d. Adhesive labels are not acceptable.

6.04 MANUFACTURED UNITS (NOT USED)

6.05 EQUIPMENT (NOT USED)

6.06 COMPONENTS (NOT USED)

6.07 ACCESSORIES (NOT USED)

6.08 MIXES (NOT USED)

6.09 FABRICATION (NOT USED)

6.10 FINISHES (NOT USED)

6.11 SOURCE QUALITY CONTROL
A. Nameplates:

1. Provide all nameplates for control panel operator devices (e.g. pushbuttons, selector switches, pilot lights, etc.):
a. Same material and same color and appearance as the device nameplates, in order to achieve an aesthetically consistent and coordinated system.

PART 3 EXECUTION

7.01 EXAMINATION (NOT USED)

7.02 PREPARATION (NOT USED)

7.03 INSTALLATION
A. As specified in Section 26_05_00.

B. Nameplates:

1. Attach nameplates to equipment with rivets, bolts or sheet metal screws, approved waterproof epoxy-based cement or install in metal holders welded to the equipment.

2. On NEMA Type 4, NEMA Type 4X, enclosures, use epoxy-based cement to attach nameplates.

3. Nameplates shall be aligned and level or plumb to within 1/64 inch over the entire length:
a. Misaligned or crooked nameplates shall be remounted, or provide new enclosures at the discretion of the Engineer.

C. Conductor and cable markers:

1. Apply all conductor and cable markers before termination.

2. Heat-shrinkable tubing:
a. Tubing shall be shrunk using a heat gun that produces low temperature heated air. b. Tubing shall be tight on the wire after it has been heated. c. Characters shall face the open panel and shall read from left to right or top to bottom. d. Marker shall start within 1/32 inch of the end of the stripped insulation point.

D. Conduit markers:

1. Furnish and install conduit markers for every conduit in the electrical system that is identified in the conduit schedule or part of the process system.

2. Mark conduits at the following locations:
a. Each end of conduits that are greater than 10 feet in length. b. Where the conduit penetrates a wall or structure.
c. Where the conduit emerges from the ground, slab, etc. d. The middle of conduits that are 10 feet or less in length.

3. Mark conduits after the conduits have been fully painted.

4. Position conduit markers so that they are easily read from the floor.

5. Attach non-metallic conduit markers with nylon cable ties:
a. Provide ultraviolet resistant cable ties for conduit markers exposed to direct sunlight.

6. Mark conduits before construction review by Engineer for punch list purposes.

7. Label intrinsically safe conduits in accordance with the requirements of the NEC.

Page 309 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 05 53 - 6

IDENTIFICATION FOR

ELECTRICAL SYSTEMS
E. Signs and labeling:

1. Furnish and install warning signs on equipment that has more than one source of power. a. Warning signs to identify every panel and circuit number of the disconnecting means of all external power sources.

2. Place warning signs on equipment that has 120 VAC control voltage source used for interlocking.
a. Identify panel and circuit number or conductor tag for control voltage source disconnecting means.

7.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

7.05 REPAIR/RESTORATION (NOT USED)

7.06 RE-INSTALLATION (NOT USED)

7.07 FIELD QUALITY CONTROL
A. Replace any nameplates, signs, conductor markers, cable markers or raceway labels that in the sole opinion of the Engineer do not meet the Engineer’s aesthetic requirements.

7.08 ADJUSTING (NOT USED)

7.09 CLEANING (NOT USED)

7.10 PROTECTION (NOT USED)

7.11 SCHEDULES (NOT USED)

END OF SECTION

Page 310 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 08 50 - 1

FIELD ELECTRICAL

ACCEPTANCE TESTS
SECTION 26 08 50

FIELD ELECTRICAL ACCEPTANCE TESTS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Responsibilities for testing the electrical installation.

2. Adjusting and calibration.

3. Acceptance tests.

B. Related sections:

1. Section 01_33_00 - Submittal Procedures.

2. Section 26_05_00 - Common Work Results for Electrical.

C. Copyright information:

1. Some portions of this Section are copyrighted by the InterNational Electrical Testing Association, Inc (NETA). See NETA publication ATS for details. a. REFERENCES
D. As specified in Section 26_05_00.

E. American National Standards Institute (ANSI).

F. Institute of Electrical and Electronics Engineers (IEEE):

1. 43 - IEEE Recommended Practice for Testing Insulation Resistance of Rotating Machinery.

2. 81 - IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System.

3. 95 - IEEE Recommended Practice for Insulation Testing of AC Electric Machinery (2300 V and Above) With High Direct Voltage.

4. - IEEE Standard for High-Potential Test Requirement for Excitation Systems for Synchronous Machines.

5. 450 - IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications.

6. 1106 - IEEE Recommended Practice for Installation, Maintenance, Testing, and Replacement of Vented Nickel-Cadmium Batteries for Stationary Applications.

7. 1188 - IEEE Recommended Practice for Maintenance, Testing, and Replacement of Valve-Regulated Lead-Acid (VRLA) Batteries for Stationary Applications.

8. C57.13 - IEEE Standard Requirements for Instrument Transformers.

9. C57.13.1 – IEEE Guide for Field Testing of Relaying Current Transformers.

10. C57.13.3 - IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases.

11. C57.104 - IEEE Guide for the Interpretation of Gases Generated in Oil- Immersed Transformers.

G. Insulated Cable Engineer’s Association (ICEA).

H. InterNational Electrical Testing Association (NETA).

1. ATS-2009 Standard for Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems.

I. International Electrotechnical Commission (IEC).

J. Manufacturer’s testing recommendations and instruction manuals.

K. National Fire Protection Association (NFPA):

1. 70 – National Electrical Code (NEC).

2. 110 - Standard for Emergency and Standby Power Systems.

L. National Institute of Standards and Technology (NIST).

M. Specification sections for the electrical equipment being tested.

Page 311 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 08 50 - 2

FIELD ELECTRICAL

ACCEPTANCE TESTS
N. Shop drawings.
a. DEFINITIONS
O. As specified in Section 26_05_00.

P. Specific definitions:

1. Testing laboratory: The organization performing acceptance tests. a. SYSTEM DESCRIPTION
Q. Testing of all electrical equipment installed under this Contract in accordance with the manufacturer’s requirements and as specified in this Section.

R. Conduct all tests in the presence of the Engineer or the Engineer’s representative:

1. Engineer will witness all visual, mechanical and electrical tests, and inspections.

S. The testing and inspections shall verify that the equipment is operational within the tolerances required and expected by the manufacturer, and these Specifications.

T. Responsibilities:

1. Contractor responsibilities:
a. Ensure that all resources are made available for testing, and that all testing requirements are met.

2. Electrical subcontractor responsibilities:
a. Perform routine tests during installation.
b. Demonstrate operation of electrical equipment.
c. Commission the electrical installation.
d. Provide the necessary services during testing, and provide these services to the testing laboratory, Contractor, and other subcontractors, including but not limited to:
1) Providing electrical power as required.
2) Operating of electrical equipment in conjunction with testing of other equipment. 3) Activating and shutting down electrical circuits.
4) Making and recording electrical measurements.
5) Replacing blown fuses.
6) Installing temporary jumpers.

3. Testing laboratory responsibilities:
a. Perform all acceptance tests specified in this Section. b. Provide all required equipment, materials, labor, and technical support during acceptance tests.

U. Upon completion of testing or calibration, attach a label to all serviced devices:

1. The label shall indicate the date serviced and the company that performed the service. a. SUBMITTALS
V. Furnish submittals as specified in Sections 01_33_00 and 26_05_00.

W. Manufacturers’ testing procedures:

1. Submit manufacturers’ recommended testing procedures and acceptable test results for review by the Engineer.

X. Test report:

1. Test reports shall be based on NETA’s latest Acceptance Testing Specifications having a sign-off, pass/fail data filed for each line item covered by NETA’s Acceptance Testing Specifications latest edition.

2. Include the following:
a. Summary of Project.
b. Description of equipment tested.
c. Description of tests performed.
d. Test results.
e. Conclusions and recommendations.
f. Completed test forms.
g. List of test equipment used and calibration dates.

Page 312 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 08 50 - 3

FIELD ELECTRICAL

ACCEPTANCE TESTS
Y. Testing laboratory qualifications:

1. Submit a complete resume and statement of qualifications from the proposed testing laboratory detailing their experiences in performing the tests specified:

2. Testing organization shall be corporately and financially independent of the supplier, producer and installer of the equipment, who has been regularly engaged in the testing of equipment for a period of at least 10 years. All testing shall be conducted under the direct supervision of an electrical engineer, registered in the State of California. This registered electrical engineer will prepare and sign test reports with values, recommendations, and comments.

3. Testing equipment required to conduct the specified tests shall be furnished by the testing organization. Testing equipment shall be in good working condition and comply with the requirements of this Specification and applicable industry standards.

4. Testing shall be done in accordance with the manufacturer's instructions, these Specifications, and applicable NETA Acceptance Testing Specifications, NEMA, ANSI, NFPA, and ASTM Standards. Forms shall include space for ENGINEER sign off at time of test. Testing organization shall meet Federal OSHA criteria for accreditation of testing laboratories, Title 29, Part 1907, 1910 and 1936. Membership in the InterNational Electrical Testing Association constitutes proof of meeting such criteria.

5. The testing organization shall cooperate with any manufacturer's representative that may be retained by the CONTRACTOR. Testing organization shall be ABM Electrical Power Services; Electric Power Systems; Electrical Reliability Services; or equal NETA approved testing company.

Z. Division of responsibilities:

1. Submit a list identifying who is responsible for performing each portion of the testing. a. QUALITY ASSURANCE
AA. As specified in Section 26_05_00.

BB. Testing laboratory qualifications:

1. The testing laboratory shall be an independent testing company.

2. Selection of the testing laboratory and testing personnel is subject to approval by the Engineer based on testing experience and certifications of the individuals and testing capabilities of the organization.
a. DELIVERY, STORAGE, AND PROTECTION (NOT USED)
b. PROJECT OR SITE CONDITIONS
CC. As specified in Section 26_05_00.
a. SEQUENCING
DD. At least 30 days before commencement of the acceptance tests, submit the manufacturer’s complete field testing procedures to the Engineer and to the testing laboratory, complete with expected test results and tolerances for all equipment to be tested.

EE. Perform testing in the following sequence:

1. Perform routine tests as the equipment is installed including:
a. Insulation-resistance tests.
b. Continuity tests.
c. Rotational tests.

2. Adjusting and preliminary calibration.

3. Acceptance tests.

4. Demonstration.

5. Commissioning and plant start-up.
a. SCHEDULING (NOT USED)
b. WARRANTY
FF. As specified in Section 26_05_00.
a. SYSTEM START-UP (NOT USED)
b. OWNER'S INSTRUCTIONS (NOT USED)

Page 313 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 08 50 - 4

FIELD ELECTRICAL

ACCEPTANCE TESTS

1.02 MAINTENANCE (NOT USED)
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)
a. PREPARATION
B. Test instrument calibration:

1. Utilize a testing laboratory with a calibration program which maintains all applicable test instrumentation within rated accuracy.

2. The accuracy shall be traceable to the NIST in an unbroken chain.

3. Calibrate instruments in accordance with the following frequency schedule:
a. Field instruments: 6 months maximum.
b. Laboratory instruments: 12 months maximum.
c. Leased specialty equipment where the accuracy is guaranteed by the lessor (such as Doble): 12 months maximum.

4. Dated calibration labels shall be visible on all test equipment.

5. Maintain an up-to-date instrument calibration record for each test instrument:
a. The records shall show the date and results of each calibration or test.

6. Maintain an up-to-date instrument calibration instruction and procedure for each test instrument.

C. Do not begin testing until the following conditions have been met:

1. All instruments required are available and in proper operating condition.

2. All required dispensable materials such as solvents, rags, and brushes are available.

3. All equipment handling devices such as cranes, vehicles, chain falls and other lifting equipment are available or scheduled.

4. All instruction books, calibration curves, or other printed material to cover the electrical devices are available.

5. Data sheets to record all test results are available. a. INSTALLATION (NOT USED)
b. ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED) c. REPAIR/RESTORATION (NOT USED)
d. RE-INSTALLATION (NOT USED)
e. FIELD QUALITY CONTROL
D. Low voltage cables, 600 volt maximum:

1. Visual and mechanical inspection:
a. Compare cable data with the Drawings and Specifications. b. Inspect exposed sections of cable for physical damage and correct connection as indicated on the Drawings.
c. Inspect bolted electrical connections for high resistance by 1 of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
(a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Inspect compression applied connectors for correct cable match and indentation. e. Inspect for correct identification and arrangement.
f. Inspect cable jacket insulation and condition.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low- resistance ohmmeter.
b. Perform insulation resistance test on each conductor with respect to ground and adjacent conductors:

Page 314 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 08 50 - 5

FIELD ELECTRICAL

ACCEPTANCE TESTS
1) Applied potential shall be 500 volts dc for 300 volt rated cable and 1,000 volts dc for 600 volt rated cable.
2) Test duration shall be 1 minute.
c. Perform continuity tests to insure correct cable connection. d. Verify uniform resistance of parallel conductors.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
b. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data. 2) Investigate values of insulation-resistance less than the allowable minimum. 3) Investigate values of insulation-resistance where there is a great deviation between of values between conductors.
c. Cable shall exhibit continuity.
d. Investigate deviations in resistance between parallel conductors.

E. Grounding systems:

1. Visual and mechanical inspection:
a. Inspect ground system for compliance with that indicated on the Drawings, specified in Specifications, and in the NEC.
b. Inspect physical and mechanical condition.
c. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
(a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Inspect anchorage.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low- resistance ohmmeter.
b. Perform fall of potential test or alternative test in accordance with IEEE 81 on the main grounding electrode or system.
c. Perform point-to-point tests to determine the resistance between the main grounding system and all major electrical equipment frames, the system neutral and any derived neutral points.

3. Test values:
a. Grounding system electrical and mechanical connections shall be free of corrosion. b. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
c. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data. d. The resistance between the main grounding electrode and ground shall be as specified in Section 26_05_26. Investigate point-to-point resistance values that exceed 0.5 ohm.
e. ADJUSTING (NOT USED)
f. CLEANING
F. As specified in Section 26_05_00.

G. After the acceptance tests have been completed, dispose of all testing expendables, vacuum all cabinets, and sweep clean all surrounding areas.
a. PROTECTION

Page 315 of 493 ends

APPENDIX B

APPENDIX B
N. Broad Street Neighborhood
Park
26 08 50 - 6

FIELD ELECTRICAL

ACCEPTANCE TESTS
H. As specified in Section 26_05_00.
a. SCHEDULES (NOT USED)

END OF SECTION

Page 316 of 493 ends

APPENDIX

APPENDIX
4 APPENDIX C – PG&E ELECTRICAL DESIGN

Page 317 of 493 ends

APPENDIX

APPENDIX
5 APPENDIX D – GEOTECHNICAL REPORT

Page 318 of 493 ends

GEOTECHNICAL ENGINEERING
CITY OF SAN LUIS OBISPO NORTH BROAD ST. PARK

BROAD STREET

SAN LUIS OBISPO, CALIFORNIA
October 4, 2022
Prepared for
Mr. Nathan Garcia Nava
City of San Luis Obispo Public Works
Prepared by
Earth Systems Pacific
4378 Old Santa Fe Road
San Luis Obispo, CA 93401
Copyright © 2022

Page 319 of 493 ends

ii
October 4, 2022
FILE NO.: 305559-001
Mr. Nathan Garcia Nava
City of San Luis Obispo Public Works
919 Palm Street
San Luis Obispo, CA 93401
PROJECT: CITY OF SAN LUIS OBISPO NORTH BROAD ST. PARK

BROAD STREET

SAN LUIS OBISPO, CALIFORNIA
SUBJECT: Geotechnical Engineering Report

CONTRACT
REF: Earth Systems Pacific Proposal to Provide a Geotechnical Engineering Report, North Broad Street Neighborhood Park, 533 Broad Street, San Luis Obispo, California, dated August 5, 2022, Doc. No. SLO-2208-017.PRP Dear Mr. Garcia Nava:

As per your authorization of the referenced proposal, this geotechnical engineering report has been prepared for use in the development of plans and specifications for the North Broad Street Neighborhood Park located on Broad Street, where the Broad Street community garden currently resides, in San Luis Obispo, California. Preliminary geotechnical recommendations for site preparation, grading, foundations, flatwork, drainage, and observation and testing are presented herein. One bound copy and an electronic copy of this report are furnished for your use.

We appreciate the opportunity to have provided services for this project and look forward to working with you again in the future. If there are any questions concerning this report, please do not hesitate to contact the undersigned.

Sincerely,
Earth Systems Pacific
Samuel Venable, EIT Robert Down, PE
Staff Engineer Principal Engineer
Doc. No.: 2209-067.SER/pm

Page 320 of 493 ends

iii
Table of Contents
COVER LETTER............................................................................................................. ii

1.0 INTRODUCTION AND SITE SETTING............................................................................. 1

2.0 SCOPE OF SERVICES..................................................................................................... 1

3.0 FIELD INVESTIGATION AND LABORATORY ANALYSIS................................................... 2

4.0 GENERAL SUBSURFACE ............................................................................................... 3

5.0 CONCLUSIONS ............................................................................................................. 3

6.0 GEOTECHNICAL RECOMMENDATIONS ........................................................................ 5 Site Preparation...........................................................................................................6 Grading........................................................................................................................6 Foundations ................................................................................................................8 Pedestrian Flatwork ....................................................................................................9 Drainage and Maintenance .......................................................................................10 Observation and Testing ...........................................................................................11

7.0 CLOSURE.................................................................................................................... 13 TECHNICAL REFERENCES ....................................................................................................... 14

APPENDICES
APPENDIX A Figure 1 - Site Vicinity Map
Figure 2 - Exploration Location Map
Boring Log Legend
Boring Log
APPENDIX B Laboratory Test Results

Page 321 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 1 2209-067.SER

1.0 INTRODUCTION AND SITE SETTING
The proposed project will consist of a neighborhood park to be located on Broad Street, where the Broad Street community garden currently resides, in San Luis Obispo, California (see Figure 1 – Site Vicinity Map in Appendix A). Based on the preliminary plans, the proposed neighborhood park will include new pedestrian flatwork, a new shade structure, new playground structures, decorative fencing, and miscellaneous structures such as picnic bench and table areas.

We understand the new playground and miscellaneous structures as well as the new shade and signage structures will be supported by conventional shallow foundations. We have provided separate shallow foundation recommendations for the playground/miscellaneous structures and the shade/signage structures. Dead plus live column loads were not provided for the shade and signage structures but are anticipated to be on the order of 500 psf. Site improvements will include Portland cement concrete (PCC), exterior flatwork, and landscaping. No stormwater control measures (SCMs), basements, retaining walls or subterranean structures are anticipated.

The site is currently used as a community garden with multiple raised and in-ground garden beds, and a few non-permanent picnic tables. The site is located at the approximate coordinates of latitude 35.2841N and longitude 120.6684W, which were obtained from the Google Earth Website (Google Earth 2022). The site is relatively flat. The site is surrounded by Broad Street to the northeast, residential units to the southwest, and descending slopes leading to creeks on the southeast and northwest bounds of the site.

2.0 SCOPE OF SERVICES
The authorized scope of work included a general site reconnaissance, field exploration, geotechnical analysis of the data gathered, and preparation of this report. The analysis and subsequent recommendations were based on verbal information and a general project location plan provided by the client.

This report and recommendations are intended to comply with the considerations of Sections 1803.1 through 1803.6, J104.3 and J104.4, as applicable, of the 2019 California Building Code (CBC) and common geotechnical engineering practice in this area under similar conditions at this time. The test procedures were accomplished in general conformance with the standards noted, as modified by common geotechnical engineering practice in this area under similar conditions at this time.

Page 322 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 2 2209-067.SER
Preliminary geotechnical engineering recommendations for site preparation, grading, foundations, flatwork, drainage, and observation and testing are presented to guide the development of project plans and specifications. As there may be geotechnical issues yet to be resolved, the geotechnical engineer should be retained to provide consultation as the design progresses. It may also be advantageous to retain the geotechnical engineer to review project plans as they near completion to assist in verifying that pertinent geotechnical issues have been addressed and to aid in conformance with the intent of this report.

It is our intent that this report be used exclusively by the client to form the geotechnical basis of the design of the project and in the preparation of plans and specifications. Application beyond this intent is strictly at the user’s risk.

This report does not address issues in the domain of contractors such as, but not limited to, site safety, loss of volume due to stripping of the site, shrinkage of soils during compaction, excavatability, dewatering, temporary slope angles, construction means and methods, etc.

Analyses of aerial or site geology, or of the soil for corrosivity, radioisotopes, asbestos (either naturally occurring or in man-made products), lead or mold potential, hydrocarbons, or chemical properties is beyond the scope of this report. Any ancillary features such as flag or light poles, temporary access roads, non-structural fills, and vehicular pavements are not within our scope and are also not addressed. Design and/or suitability of LID features such as retention basins, bio swales, or other improvements are also beyond our scope.

In the event that there are any changes in the nature, design, or location of improvements, or if any assumptions used in the preparation of this report prove to be incorrect, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions of this report modified or verified by the geotechnical engineer in writing. The criteria presented in this report are considered preliminary until such time as any peer review or review by any jurisdiction has been completed, conditions have been observed by the geotechnical engineer in the field during construction, and the recommendations have been verified as appropriate, or modified by the geotechnical engineer in writing.

3.0 FIELD INVESTIGATION AND LABORATORY ANALYSIS
On August 17, 2022, two exploratory boring was drilled on site to depths ranging from approximately 11.5 feet and 16.5 feet below the existing ground surface (bgs). The boring was drilled with a truck-mounted SIMCO EP200 drill rig equipped with a 4-inch outside diameter solid

Page 323 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 3 2209-067.SER
stem auger and an automatic hammer for sampling. As the boring was advanced, a soil sample was obtained using a 3-inch outside diameter ring-lined barrel sampler (ASTM D 3550-17 with shoe similar to ASTM D 2937-17). Bulk samples were also obtained from the auger cuttings. The approximate locations of the borings are shown on Figure 2 – Exploration Location Map in Appendix A.

Soils encountered in the borings were categorized and logged in general accordance with the Unified Soil Classification System and ASTM D 2488-17. Logs of the borings are presented in Appendix A, along with a Boring Log Legend. In reviewing the boring logs and legend, the reader should recognize that the legend is intended as a guideline only, and there are a number of conditions that may influence the characteristics observed during drilling. These include, but are not limited to, the presence of cobbles or boulders, cementation, variations in soil moisture, presence of groundwater, and other factors. Consequently, the logger must exercise judgment in interpreting soil and bedrock characteristics, possibly resulting in soil or bedrock descriptions that vary from the legend.

One bulk sample was tested for maximum density and optimum moisture content (ASTM D 1557- 12, modified) and expansion index (ASTM D 4829-11). Three ring samples were tested for bulk density (ASTM D 2937-17, modified for ring liners) and moisture (ASTM D 2216-10). One ring sample was tested for direct shear (ASTM D 3080/D 3080M-11) and one was tested of one dimensional consolidation (ASTM D 2435/2435M-11). The results of the laboratory tests are presented in Appendix B.

4.0 GENERAL SUBSURFACE
Similar conditions were found in both borings. Alluvium was encountered at the surface and extended to the maximum depth explored of 16.5 feet bgs. The alluvium consisted of sandy fat clay to a depth of approximately 14 feet bgs at which point sandy lean clay was encountered. The sandy fat clay had a medium stiff to very stiff consistency; the sandy lean clay was medium stiff.

The alluvium was logged as being slightly moist to very moist. Groundwater was not encountered in the borings. Please refer to the boring logs in Appendix A for a more complete description of the subsurface conditions encountered at the site.

5.0 CONCLUSIONS
In our opinion, the site is suitable, from a geotechnical engineering standpoint, for the proposed project, provided the recommendations contained herein are implemented in the design and

Page 324 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 4 2209-067.SER
construction. From a geotechnical engineering standpoint, the primary concerns at the site are the potentials for strong ground shaking and the presence of expansive surficial soils. The potential for liquefaction is also discussed below.

Potential Strong Ground Shaking
The site is in a region of high seismic activity with the potential for large seismic events that could generate strong ground shaking. The CBC requires that seismic loads be considered in structural design. A seismic analysis was undertaken to provide seismic acceleration design parameters; the results are presented in the “Foundations” section of this report for use by others in the structural design process.

The 2010 ASCE 7 method with 2013 updates available on the Structural Engineers Associate of California (SEAOC) Seismic Design Map Tool website (SEAOC, 2021) was used for the seismic analysis. The risk category for buildings and structures is assigned by others in accordance with CBC Table 1604.5; however, based on our current understanding of the project, we selected Risk Category II for our analysis. Based upon the subsurface conditions encountered during our subsurface investigation, Site Class “D,” “Stiff Soil,” was used. A general ground motion seismic analysis was performed, assuming that Exception 2 listed in Section 11.4.8 (ASCE, 2017) will apply to the project. We also provided seismic parameters if the Simplified Lateral Force Analysis Procedure from Section 12.14.8 (ASCE, 2017) will be used in structural design.

Presence of Expansive Surficial Soils
Expansion index testing performed on a bulk sample of the near surface soils resulted in a value of 158, which indicates the soils are highly expansive. Expansive soils tend to swell with seasonal increases in moisture and shrink during the dry season as subsurface moisture decreases. The volume changes that these materials undergo in this cyclical pattern can stress and damage slabs and foundations if precautionary measures are not incorporated into the design and construction procedures. Footings are typically deepened, and additional reinforcement is added. Imported non-expansive soils are recommended to be placed beneath exterior flatwork.

Liquefaction Potential
Liquefaction refers to a phenomenon that tends to occur in saturated soils of low density that have grain sizes within a certain range, usually fine- to medium-grained poorly graded sands, silty sands, and sandy silts. A sufficiently strong earthquake is also required to cause liquefaction.

Page 325 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 5 2209-067.SER
During liquefaction, the energy from the earthquake causes the water pressure within the pores of the soil to increase. The increase in water pressure decreases the friction between the soil grains, allowing the soil grains to move relative to one another. During this state, the soil will behave as a viscous liquid, temporarily losing its ability to support foundations and other improvements. As the pressure is released, the soils typically settle in a process called “liquefaction settlement.” Liquefaction settlement can cause damage to structures and other surface and subsurface improvements if their potential is not addressed. The soils encountered at the site were classified as sandy fat clay and sandy lean clay. Clay soils such as those encountered at the site are unlikely to liquefy if encountered below the groundwater.

Groundwater was not encountered at a maximum depth of 16.5 feet bgs. Although the site is mapped by the County of San Luis Obispo (2013) as being in an area of moderate liquefaction potential, it is our opinion that there is minimal potential for liquefaction at the project site due to the presence of the clay soils and to the lack of groundwater at the maximum depth explored.

6.0 GEOTECHNICAL RECOMMENDATIONS
These recommendations are applicable for the improvements as described in the “Introduction and Site Setting” Section of this report. If other improvements not previously mentioned are included, the geotechnical engineer should be contacted for revised recommendations.

Unless otherwise noted, the following definitions are used in the recommendations presented below. Where terms are not defined, definitions commonly used in the construction industry are intended.
• Foundation Areas – The areas within the footprints of all conventional shallow (individual spread) foundations.
• Pedestrian Flatwork Areas: The footprint on any PCC flatwork that will accommodate pedestrian foot traffic only.
• Grading Area – The entire area to be graded, including the foundation areas, pedestrian flatwork areas, and any other areas to be graded.
• Subgrade: The elevation of the surface upon which a sand cushion/non-expansive imported material or aggregate base will be placed for flatwork or pavement improvements.
• Scarified: Thoroughly plowed or ripped in two orthogonal directions to a depth of not less than 8 inches.

Page 326 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 6 2209-067.SER
• Moisture Conditioned: Soil moisture content adjusted to just above optimum moisture content prior to application of compactive effort.
• Compacted / Recompacted: Soils placed in level lifts not exceeding 8 inches in loose thickness and compacted to a minimum of 90 percent of maximum dry density, unless specified otherwise. The standard tests used to establish maximum dry density and field density should be ASTM D 1557-12 and ASTM D 6938-17, respectively, or other methods acceptable to the geotechnical engineer and jurisdiction.

Site Preparation

1. The ground surface in the foundation area or foundation area should be prepared for construction by removing the existing flatwork, debris, vegetation and other deleterious materials. Existing utility lines that will not remain in service should be either removed or abandoned. The appropriate method of abandonment will depend upon the type and depth of the utility. Recommendations for abandonment can be made as necessary.

2. Voids created by the removal of materials or utilities described above should be called to the attention of the geotechnical engineer. No fill should be placed unless the underlying soil has been observed by the geotechnical engineer.

Grading
Foundation Areas

1. Following site preparation, soils within the foundation areasshould be removed to a level plane at a minimum depth of the planned bottom-of-footing elevation. The exposed surfaces should then be scarified, moisture conditioned and recompacted.

Pedestrian Flatwork Areas

2. The soil in the exterior pedestrian flatwork areas should be overexcavated to a minimum depth of 2 foot below planned finished surface elevation. The soil surface exposed by overexcavation should be scarified, moisture conditioned, and recompacted. Imported non-expansive soil should then be placed in compacted lifts to subgrade elevation. Once subgrade is established and compacted, the placement, moisture conditioning, and compaction of aggregate base and any non-expansive soil can proceed. Non-expansive material is described below in paragraph 3.

Page 327 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 7 2209-067.SER

3. Non-expansive soils are defined as falling into the GP, GW, GM, GC, SM, SC, SP, or SW categories (ASTM D 2487-17) and having an expansion index of 10 or less (ASTM D 4829- 19). Imported non-expansive soils used in the flatwork areas should have strength qualities equal to or better than the site soils. All proposed imported fill should be approved by the geotechnical engineer before being transported to the site and periodically during construction.

Grading – General

4. In the remainder of the grading area, prior to placement of fill or filling excavations to grade, the existing or excavated soil surfaces should be scarified, moisture conditioned, and recompacted.

5. Voids created by dislodging rocks and/or debris during scarification should be backfilled and compacted, and the dislodged materials should be removed from the work area.

6. All materials used as fill should be cleaned of all debris and any rocks larger than 6 inches in maximum dimension. When fill material includes rocks, the rocks should be placed in a sufficient soil matrix to ensure that voids caused by nesting of the rocks will not occur and that the fill can be properly compacted.

7. If the soils become unstable, or if the recommended compaction cannot be readily achieved, drying the soil to just above optimum moisture content may be necessary.

Placement of gravel layers or geotextiles may also be necessary to help stabilize unstable soils. If such conditions are found, the geotechnical engineer should be contacted to assist the contractor in selecting appropriate measures for stabilization of unstable soils.

8. The recommended soil moisture content should be maintained during construction and throughout the life of the project. Failure to maintain the soil moisture content can result in cracks and disturbance, which are an indication of degradation of the soil compaction.

If cracks are allowed to develop, or if soils near improvements such as foundations, flatwork, pavement, curbs, etc. are otherwise disturbed, damage to those improvements may result. Soils that have been or are otherwise disturbed should be removed, moisture conditioned, and compacted.

Page 328 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 8 2209-067.SER
Foundations
Playground and Miscellaneous Structures

1. Conventional shallow continuous and spread footings may be used to support the proposed playground structures, picnic benches and tables. The footing excavations should be constructed with minimum depths of 18 inches below the lowest adjacent firm soil grade. Footing excavations should be cut neat and horizontal.

2. Continuous footings should be reinforced as required by the architect/engineer; minimum reinforcement should consist of one No. 4 rebar top and bottom. Spread footings should be reinforced in accordance with the requirements of the architect/engineer.

3. Footings bearing into native soils may be designed using maximum allowable bearing capacities of 1,000 psf for dead loads and 1,500 psf for dead plus live loads. Using these criteria, maximum settlement is expected to be less than 1 inch.

Shade, Signage, and Fencing Structures

4. Conventional shallow continuous and spread footings may be used to support the proposed shade structure, park entrance signage, and decorative fencing. The footing excavations should be constructed with minimum depths of 3 feet below the lowest adjacent firm soil grade. Footing excavations should be cut neat and horizontal.

5. Continuous footings should be reinforced as required by the architect/engineer; minimum reinforcement should consist of one No. 4 rebar top and bottom. Spread footings should be reinforced in accordance with the requirements of the architect/engineer.

6. Footings bearing into native soils may be designed using maximum allowable bearing capacities of 1,500 psf for dead loads and 2,000 psf for dead plus live loads. Using these criteria, maximum settlement and differential settlement are expected to be less than 1 inch over a horizontal distance of 25 feet.

General Foundations

7. In calculating resistance to lateral loads, a passive equivalent fluid pressure of 150 pcf in the soil may be used. Coefficient of friction for soil of 0.3 may also be utilized. Lateral capacity is based on the assumption that the soil adjacent to the foundation is undisturbed. In the case of foundations adjacent to native soils, the upper 1 foot and 2

Page 329 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 9 2209-067.SER
foot should be neglected in the design of the playground/miscellaneous structures and the shade/signage/fencing structures, respectively. Allowable bearing capacities may be increased by one-third when transient loads such as wind or seismicity are included.

8. The seismic acceleration site parameters included in the table below have been provided to the design team for use in its analyses. The 2010 ASCE 7 method with 2013 updates, available on the Structural Engineers Association of California website (SEAOC 2021), was used to obtain the parameters. The project was considered to be a “nonessential” facility from the perspective of risk category as described by the CBC. The site coordinates stated in the “Introduction and Site Setting” section were used in the analysis. Based upon the subsurface conditions encountered during our investigation, the site should be classified as Site Class D (Stiff Soil). Foundations may be designed using the following 2019 CBC seismic parameters.

SEISMIC ACCELERATION SITE PARAMETERS
Mapped Spectral
Response
Accelerations
Site Coefficients for
Site Class D
Adjusted MCE
Spectral Response
Accelerations for
Site Class D
Design Spectral
Response
Accelerations for
Site Class D
Seismic
Parameter
Value
(g)
Site
Coefficient Value
Seismic
Parameter
Value
(g)
Seismic
Parameter
Value
(g)
SS 1.056 Fa 1.08 SMS 1.138 SDS 0.759
S1 0.390 Fv 1.91 SM1 0.745 SD1 0.497
Peak Mean Ground Acceleration (PGAm) : 0.53 g
Seismic Design Category: D

9. Foundation excavations should be observed by the geotechnical engineer prior to placement of reinforcing steel. Soils in foundation excavations should be moistened to optimum moisture content, or just above, and no desiccation cracks should be present prior to concrete placement.

Exterior Pedestrian Flatwork

1. PCC pedestrian flatwork should have a minimum thickness of 4 full inches. Reinforcement size, placement, and dowels should be as directed by the architect/engineer; minimum pedestrian flatwork reinforcement should consist of No. 3 rebar placed at 24 inches oncenter each way.

Page 330 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 10 2209-067.SER

2. Where maintaining the elevation of the pedestrian flatwork is critical, the flatwork should be doweled to the perimeter of adjacent improvements, at a minimum, by No. 3 dowels lapped to the flatwork rebar. In other areas, the flatwork may be doweled to the foundation or the flatwork may be allowed to “float free,” at the discretion of the architect/engineer. Flatwork that is intended to float free should be separated from foundations or other improvements by a felt joint or other means.

3. In addition to the placement of non-expansive material in the pedestrian flatwork areas as described in the “Grading” section, another measure that can be taken to reduce the risk of movement of flatwork due to expansive soils is to provide thickened edges or grade beams around the perimeters of the flatwork. The thickened edges or grade beams could be from 12 to 27 inches deep, with the deeper edges or grade beams providing better protection. At a minimum, the thickened edge or grade beam should be reinforced by two No. 5 rebar, one at the top and one at the bottom. The use of thickened edges or grade beams is left to the discretion of the city and/or architect/engineer.

4. To reduce shrinkage cracks in concrete, the concrete aggregates should be of appropriate size and proportion, the water/cement ratio should be low, the concrete should be properly placed and finished, contraction joints should be installed, and the concrete should be properly cured. Concrete materials, placement, and curing specifications should be at the direction of the architect/engineer; ACI 302.1R-15 is suggested as a resource for the architect/engineer in preparing such specifications.

Drainage and Maintenance

1. Unpaved ground surfaces should be graded during construction and, per Section 1804.3 of the CBC, finish graded to direct surface runoff away from foundations, slopes, and other improvements at a minimum 5 percent grade for a minimum distance of 10 feet. If this is not feasible due to the terrain, property lines, or other factors, swales with improved surfaces, area drains, or other drainage features should be provided to divert drainage away from these areas.

2. All eaves of the canopy should be fitted with roof gutters. Runoff from flatwork, roof gutters, downspouts, planter drains, area drains, etc. should discharge in a nonerosive manner away from foundations and other improvements in accordance with the requirements of the governing agencies. Erosion protection should be placed at all

Page 331 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 11 2209-067.SER
discharge points unless the discharge is to an improved surface.

3. If soils are disturbed during construction, stabilization of soils by vegetation or other means, during and following construction, is essential to reduce erosion damage. Care should be taken to establish and maintain vegetation. The landscaping should be planned and installed to maintain the surface drainage recommended above. Surface drainage should also be maintained during construction.

4. Maintenance of drainage and other improvements is critical to the long-term stability of the site and the integrity of the structures. Site improvements should be maintained on a regular basis.

5. Finished flatwork surfaces should be sloped to freely drain toward appropriate drainage facilities. Water should not be allowed to stand or pond on or adjacent to exterior pedestrian flatwork, or other improvements as it could infiltrate into the sand/aggregate base or subgrade, causing premature deterioration of flatwork or other improvements.

6. All exterior drains and drain outlets should be maintained to be free-flowing. Care should be taken to establish and maintain vegetation. Vegetation and erosion matting (if utilized) should be maintained or augmented as needed. Irrigation systems should be maintained so that soils around structures are maintained at a relatively uniform year-round moisture content and are neither over-watered nor allowed to dry and desiccate.

7. To reduce the potential for disruption of drainage patterns and undermining of structures, fill areas, etc., all rodent activity should be aggressively controlled.

Observation and Testing

1. It must be recognized that the recommendations contained in this report are based on a limited number of borings and rely on continuity of the subsurface conditions encountered. Therefore, the geotechnical engineer should be retained to provide consultation during the design phase, to review plans as they near completion, to interpret this report during construction, and to provide construction monitoring in the form of testing and observation.

2. At a minimum, the geotechnical engineer should be retained to provide:
• Oversight of soil special inspection

Page 332 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 12 2209-067.SER

3. Special inspection of grading and backfill should be provided as per Section 1705.6 and Table 1705.6 of the 2019 CBC. The special inspector should be under the direction of the geotechnical engineer. It is our opinion that none of the grading construction is of a nature that should warrant continuous special inspection; periodic special inspection should suffice. Subject to approval by the Building Official, the exception to continuous special inspection is described in Section 1704.2 of the 2019 CBC and should be specified by the architect/engineer and periodic special inspection of the following items should be provided by the special inspector.
• Conventional foundation excavations

4. A program of quality assurance should be developed prior to beginning construction. At a minimum, the program should include all geotechnical items shown on the testing and inspection schedule of the approved plans. It should also include any additional inspection items required by the engineer and/or the governing jurisdiction. These items should be discussed at a preconstruction site meeting among a representative of the owner, the geotechnical engineer, special inspector, the project inspector, the engineer, and contractors. The geotechnical engineer should be notified at least 48 hours prior to beginning grading operations.

5. Locations and frequency of compaction tests should be per the recommendation of the geotechnical engineer at the time of construction. The recommended test location and frequency may be subject to modification by the geotechnical engineer, based upon soil and moisture conditions encountered, size and type of equipment used by the contractor, the general trend of the results of compaction tests, or other factors.

6. A preconstruction conference among the owner, the geotechnical engineer, the governing agency, the special inspector, the project inspector, the architect/engineer, and contractors is recommended to discuss planned construction procedures and quality control requirements.

7. The geotechnical engineer should be notified at least 48 hours prior to beginning construction operations. If Earth Systems Pacific is not retained to provide construction observation and testing services, it shall not be responsible for the interpretation of the information by others or any consequences arising therefrom.

Page 333 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 13 2209-067.SER

7.0 CLOSURE
Our intent was to perform the investigation in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in the locality of this project under similar conditions. No representation, warranty, or guarantee is either expressed or implied. This report is intended for the exclusive use by the client as discussed in the “Scope of Services” Section. Application beyond the stated intent is strictly at the user's risk.

This report is valid for conditions as they exist at this time for the type of project described herein.

The conclusions and recommendations contained in this report could be rendered invalid, either in whole or in part, due to changes in building codes, regulations, standards of geotechnical or construction practice, changes in physical conditions, or the broadening of knowledge.

If changes with respect to the project become necessary, if items not addressed in this report are incorporated into plans, or if any of the assumptions used in the preparation of this report are not correct, this firm shall be notified for modifications to this report. Any items not specifically addressed in this report should comply with the CBC of other applicable standards, and the requirements of the governing jurisdiction.

The recommendations presented in this geotechnical report are based upon the geotechnical conditions encountered at the site and may be augmented by additional requirements of the client, or by additional recommendations provided by the geotechnical engineer based on peer or jurisdiction reviews, or conditions exposed at the time of construction. If Earth Systems Pacific is not retained to provide construction observation and testing services, it shall not be responsible for the interpretation of the information by others or any consequences arising therefrom.

This document, the data, conclusions, and recommendations contained herein are the property of Earth Systems Pacific. This report shall be used in its entirety, with no individual sections reproduced or used out of context. Copies may be made only by Earth Systems Pacific, the client, and the client’s authorized agents for use exclusively on the subject project. Any other use is subject to federal copyright laws and the written approval of Earth Systems Pacific.

Thank you for this opportunity to have been of service. If you have any questions, please feel free to contact this office at your convenience.

End of Text.

Page 334 of 493 ends

City of San Luis Obispo North Broad Street Park October 4, 2022 San Luis Obispo, California
305559-001 14 2209-067.SER

TECHNICAL REFERENCES
ACI (American Concrete Institute). 2019. “Building Code Requirements for Structural Concrete.” Document 318.

ACI (American Concrete Institute). 2015. "Guide for Concrete Floor and Slab Construction." Document 302.1R.15.

ASCE (American Society of Civil Engineers). 2017. Minimum Design Loads for Buildings and other Structures, ASCE/SEI 7-16, ASCE.

California Building Code. 2019. California Code of Regulations, Title 24, Part 2.

Google Earth. 2021. Google Earth [website], retrieved from:
http://www.google.com/earth/index.html
San Luis Obispo, County of. 2021. Department of Planning and Building, Land Use View, interactive web, https://www.slocounty.ca.gov/Departments/PlanningBuilding/Information-Systems/Services/Land-Use-View.aspx.

SEAOC (Structural Engineers Association of California). 2022. “Seismic Design Map Tool.” Retrieved from: https://seismicmaps.org/

Page 335 of 493 ends

APPENDIX A
Figure 1 - Site Vicinity Map
Figure 2 - Exploration Location Map
Boring Log Legend
Boring Log

Page 336 of 493 ends

NOT TO SCALE 4378 Old Santa Fe Road, San Luis Obispo, CA 93401 www.earthsystems.com
(805) 544-3276 Fax (805) 544-1786 Date September 2022 Project No. 305559-001 Figure 1 SITE VICINITY MAP North Broad Street Park 533 Broad Street San Luis Obispo, California BASE MAP PROVIDED BY: Google Earth (2022) NOT TO SCALE SITE Page 337 of 493 NOT TO SCALE 4378 Old Santa Fe Road, San Luis Obispo, CA 93401 www.earthsystems.com
(805) 544-3276 Fax (805) 544-1786 Date September 2022 Project No. 305559-001 Figure 2 EXPLORATION LOCATION MAP North Broad Street Park 533 Broad Street San Luis Obispo, California BASE MAP PROVIDED BY: Google Earth (2022) LEGEND Boring Location (Approx.) B2 B1 B2 Page 338 of 493 drafting/masters/Boring Log Legend 062719.dwg
UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D 2487)

OBSERVED MOISTURE CONDITION

DRY SLIGHTLY MOIST MOIST VERY MOIST WET (SATURATED)

TYPICAL BEDROCK HARDNESS

TYPICAL BEDROCK WEATHERING

GRAIN SIZES

CONSISTENCY

Page 339 of 493 ends

DEPTH (feet) USCS CLASS SYMBOL INTERVAL (feet) SAMPLE TYPE DRY DENSITY (pcf) MOISTURE (%) BLOWS PER 6 IN.

SAMPLE DATA

SOIL DESCRIPTION
Earth Systems Pacific
LEGEND: Ring Sample Grab Sample Shelby Tube Sample SPT
NOTE: This log of subsurface conditions is a simplification of actual conditions encountered. It applies at the location and time of drilling.

Subsurface conditions may differ at other locations and times.

AUGER TYPE:4" Solid Stem
DRILL RIG: SIMCO EP200 with Automatic Hammer
LOGGED BY: S. Venable
SANDY FAT CLAY: light brown,medium stiff,
slightly moist, trace gravel (Alluvium)

5.0 - 6.5

10.0 - 11.5

15.0 - 16.5 3
2 5
11 6
13 8
5 9
End of Boring @ 16.5'
No subsurface water encountered
PAGE 1 OF 1
Boring No. 1
JOB NO.: 305559-001
DATE: 08/17/2022

0.0 - 5.0
North Broad Street Park
533 Broad Street
San Luis Obispo, California
CH
very dark brown, stiff, moist
dark olive brown with gray mottling
SANDY LEAN CLAY: very dark grayish brown,
medium stiff, very moist

93.3 17.2

79.9 39.1
CL

Page 340 of 493 ends

DEPTH (feet) USCS CLASS SYMBOL INTERVAL (feet) SAMPLE TYPE DRY DENSITY (pcf) MOISTURE (%) BLOWS PER 6 IN.

SAMPLE DATA

SOIL DESCRIPTION
Earth Systems Pacific
LEGEND: Ring Sample Grab Sample Shelby Tube Sample SPT
NOTE: This log of subsurface conditions is a simplification of actual conditions encountered. It applies at the location and time of drilling.

Subsurface conditions may differ at other locations and times.

AUGER TYPE:4" Solid Stem
DRILL RIG: SIMCO EP200 with Automatic Hammer
LOGGED BY: S. Venable
SANDY FAT CLAY: brown, medium stiff, slightly
moist (Alluvium)

5.0 - 6.5

10.0 - 11.5 9
6 14
14 8
20 End of Boring @ 11.5'
No subsurface water encountered
PAGE 1 OF 1
Boring No. 2
JOB NO.: 305559-001
DATE: 08/17/2022
North Broad Street Park
533 Broad Street
San Luis Obispo, California
CH
very dark brown with orange mottling, very stiff,
moist
dark olive brown, stiff
103.0 17.5

Page 341 of 493 ends

APPENDIX B
Laboratory Test Results

Page 342 of 493 ends

City of SLO 305559-001
North Broad Street Park
BULK DENSITY TEST RESULTS ASTM D 2937-17 (modified for ring liners) September 8, 2022

BORING DEPTH MOISTURE WET DRY
NO. feet CONTENT, % DENSITY, pcf DENSITY, pcf
1 6.0 - 6.5 17.2 109.4 93.3
1 16.0 - 16.5 39.1 111.1 79.9
2 6.0 - 6.5 17.5 121.1 103.0
EXPANSION INDEX TEST RESULTS ASTM D 4829-19

BORING DEPTH EXPANSION
NO. feet INDEX
1 0.0 - 5.0 158

Page 343 of 493 ends

City of SLO 305559-001
North Broad Street Park
MOISTURE-DENSITY COMPACTION TEST ASTM D 1557-12 (Modified) PROCEDURE USED: B September 8, 2022
PREPARATION METHOD: Moist Boring #1 @ 0.0 - 5.0'
RAMMER TYPE: Mechanical Light Brown Sandy Fat Clay (CH) SPECIFIC GRAVITY: 2.70 (assumed)
SIEVE DATA: MAXIMUM DRY DENSITY: 116.7 pcf
Sieve Size % Retained (Cumulative) OPTIMUM MOISTURE: 12.9% 3/4" 0
3/8" 3 ENTER OVERSIZE CORRECTION DATA
#4 11
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 DRY DENSITY, pcf MOISTURE CONTENT, percent
Compaction Curve Zero Air Voids Curve

Page 344 of 493 ends

City of SLO 305559-001
North Broad Street Park
DIRECT SHEAR ASTM D 3080/D3080M-11 (modified for consolidated, undrained conditions) September 8, 2022
Boring #1 @ 6.0 - 6.5' INITIAL DRY DENSITY: 97.7 pcf
Sandy Fat Clay (CH) INITIAL MOISTURE CONTENT: 17.2 %
Ring sample, saturated PEAK SHEAR ANGLE (Ø): 41°
COHESION (C): 919 psf
0 500
1,000
1,500
2,000
2,500
3,000
0 500 1,000 1,500 2,000 2,500 SHEAR STRESS, psf
NORMAL STRESS, psf
SHEAR vs. NORMAL STRESS

Page 345 of 493 ends

City of SLO 305559-001
North Broad Street Park
DIRECT SHEAR continued ASTM D 3080/D3080M-11 (modified for consolidated, undrained conditions) Boring #1 @ 6.0 - 6.5' September 8, 2022
Sandy Fat Clay (CH)
Ring sample, saturated SPECIFIC GRAVITY: 2.70 (assumed) SAMPLE NO.: 1 2 3 AVERAGE

INITIAL
WATER CONTENT, % 17.2 17.2 17.2 17.2
DRY DENSITY, pcf 95.3 98.2 99.5 97.7
SATURATION, % 60.4 64.9 67.1 64.1
VOID RATIO 0.768 0.716 0.693 0.726
DIAMETER, inches 2.410 2.410 2.410
HEIGHT, inches 1.00 1.00 1.00

AT TEST
WATER CONTENT, % 32.7 30.0 29.3
DRY DENSITY, pcf 99.0 107.5 110.2
SATURATION, % 100.0 100.0 100.0
VOID RATIO 0.701 0.567 0.528
HEIGHT, inches 0.96 0.91 0.90
0 500
1,000
1,500
2,000
2,500
3,000

0.00 0.05 0.10 0.15 0.20 0.25 SHEAR STRESS, psf
HORIZONTAL DEFORMATION, inches
486 psf
971 psf
1,942 psf

Page 346 of 493 ends

City of SLO 305559-001
North Broad Street Park
CONSOLIDATION TEST ASTM D 2435/D2435M-11(2020)
September 8, 2022
Boring #1 @ 16.0 - 16.5' DRY DENSITY: 81.2 pcf
Sandy Lean Clay (CL) MOISTURE CONTENT: 39.1%
Ring Sample SPECIFIC GRAVITY: 2.70 (assumed)
INITIAL VOID RATIO: 1.075
VOID RATIO vs. NORMAL PRESSURE DIAGRAM
calculated initial void ratio

0.600

0.650

0.700

0.750

0.800

0.850

0.900

0.950

1.000

1.050

1.100

0.1 1 10 100
V
O
I
D
R
A
T
I
O
VERTICAL EFFECTIVE STRESS, ksf
Saturated

Page 347 of 493 ends

APPENDIX

APPENDIX
6 APPENDIX E – CALTRANS ENCROACHMENT PERMIT

Page 348 of 493 ends

APPENDIX

APPENDIX
7 APPENDIX F – COLUMBIA CASCADE / TIMBERFORM AND SHADE-N-NET

SPECIFICATIONS, AND CUT SHEETS, AND INSTALLATION GUIDE

Page 349 of 493 ends

APPENDIX

APPENDIX
8 APPENDIX G – FIBAR ENGINEERED WOOD FIBER (EWF) – SYSTEM 300

PRODUCT SPECIFICATION

Page 350 of 493 ends

Fibar® Engineered Wood Fiber- System 300
Product Specification
Part I – General Information
To download specifications and drawings in CAD format, go to http://microsite.caddetails.com/312 Quality Control, Applicable Testing Certifications and Sustainability  IPEMA Certification – www.ipema.org
o IPEMA provides a Third Party Certification Service where an independent laboratory provides written validation of a participants’ certification of conformance to certain safety standards for their products. o These certifications include ASTM F1292-18 and ASTM F2075-20. o The Third Party Certification Service has randomly selected and tested some of the products of the participating company.
o The Third Party Certification Service has performed a plant and/or home office inspection, involving a review of the participants’ Quality Assurance Program, installation instructions, and compliant follow up systems. o The list of IPEMA certified products is maintained exclusively by TUV Laboratory.  ASTM F1292
o Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment. o Test results must be for Engineered Wood Fiber.
o Test results for Engineered Wood Fiber must show G-max values of less than 200G for a 12” system with a 12’ drop height, and HIC values less than 1,000.
o Test results for mats must show G-max values of less than 200G and HIC values of less than 1,000 for a 3’ drop height.
 ASTM F1951
o Standard Specification for Determination of Accessibility of Surface Systems Under and Around Playground Equipment.
o Must meet the intent of the Americans with Disabilities Act (ADA).  ASTM F2075
o Standard Specification for Engineered Wood Fiber for Use as a Playground Safety Surface Under and Around Playground Equipment.
o Material must undergo the test method described in Section 9.0 to determine the presence of tramp metal particles. Metal particles embedded or mixed in Engineered Wood Fiber may cause injury if a child were to fall on/or come in contact with them. The limit for tramp metal was set to reduce the potential of injury. o Standard wood chips, bark mulch or materials from recycled pallets will not be acceptable.  LEED® Credits
o Products assist in obtaining LEED® (Leadership in Energy and Environmental Design) credits for projects. o Sustainability Analysis performed by a LEED Green Associate. o Recycled Content, Regional Materials, and Construction Waste Management, along with others, are available for use in LEED project certification.

Part II – Material Data
 Engineered Wood Fiber
o Shredded wood fiber consisting of randomly sized pieces.  Virgin wood fiber. Must not contain recycled ground pallets.  The particles generally are ten (10) times longer than they are wide and frequently have whiskery strands on all faces of the fiber. Hardly any two fibers are identical in all dimensions and appearance.  The species of woods that are used are comprised of, but are not limited to; White Oak, Red Oak, Maple, Ash, Douglas Fir, Lodge Pole Pine, Cedar, Yellow Pine, or Poplar.  Contains no more than 15% fines to aid in compaction.  Drainage System – Patented under U.S. Patent numbers 4,679,963; 5,026,207 and 5,076,726, and other patents pending. o FibarDrain
 Drainage matrix that channels water away from playground.  Minimum flow rate of 10 gpm/ft.
 Needle-punched 100% non-woven geotextile sleeve encasing a monofilament nylon mesh.  Laid out on 6’-0 centers in the direction of the grade.

Page 351 of 493 ends

 Prevents deterioration of Fibar Engineered Wood Fiber. o FibarFelt
 Needle-punched 100% non-woven geotextile fabric that separates the Engineered Wood Fiber from soil below.
 Material allows water to flow through, and prevents rock and soil contamination of the Engineered Wood Fiber.
 Designed to cover the sub-grade and drainage matrix to ensure proper drainage.  Seams should be overlapped 3”.
 Accessory Items
o FibarMat
 3’ x 3’ x 1.5” with beveled edges (ADA compliant) on all sides.  Placed under each swing seat, tire swing, slide exit, and sliding poles.  Prevents excessive wear under swings and slides.
 Recommended to be placed on top of the Engineered Wood Fiber. o ADA Wheelchair Access Ramp
 Crafted from High-Density Polyethylene.
 Won’t fade, splinter or crack.
 Wide enough for motorized wheelchairs.
o FibarGuard Borders
 Crafted from High-Density Polyethylene.
 Won’t fade, splinter or crack.
 Rounded corners prevent injury.
 Four feet long and 12” high.

Part III – Site Preparation and System 300 -Installation PLEASE NOTE: In accordance with standard design and construction practices, The Fibar Group LLC and its Representatives recommend using the services of a certified engineer, architect, or landscape architect who is familiar with local soil and climate conditions to evaluate and interpret any information provided by The Fibar Group LLC and its Representatives. The Fibar Group LLC assumes no responsibility for determining the size of the playground or the safety zone between the equipment and the border. Installer must thoroughly examine the site and specifications, carefully checking the dimensions before starting work. All instructions are subject to equipment manufacturers’ installation specifications and in accordance with the licensing requirements of The Fibar Group, LLC, these specifications, and conformance with the dimensions, notes and details shown on the plans.  In-Ground Installation (Exiting at Grade Level)
o Excavate area to proper depth, based on Critical Fall Height. o Minimum 1% downward grade to ensure proper drainage to FibarDrain Strip. o On grades of greater than 10% - use of FibarSystems is not recommended. o Remove all roots, stones, and vegetation.
o Accurately grade and firmly compact entire area, especially where fill materials have been utilized. o Excavate trench 2” wide x 6” deep, perpendicular to grade at lowest point of playground area. o Install FibarDrain and connect low end of strip to storm drain or similar device to remove collected water. o Install playground equipment.
o Install retaining border or curb.
o Install FibarDrain strips at 6’ centers in direction of grade. o Cover sub-grade and drainage trench with FibarFelt.
 Allowing 3” overlap at all seams.
 Slit to fit around footings of equipment.
 Overlap all slits with either next piece of FibarFelt or scrap piece, to ensure complete coverage. o Permanently mark, with paint or other type of permanent marker, all the legs of the playground equipment with the compacted system design depth.
o Spread Fibar® Wood Fiber using a Bobcat, small front-end loader or our Express Blower Trucks.  Care should be taken when driving over FibarDrain.
 Do not make sharp turns on FibarFelt or FibarDrain.
o Install all materials delivered.
 Additional materials are supplied to account for natural compaction.  Feather edges to make smooth transition to grade or border. o Install FibarMat wear on top of the Fibar EWF.
o Hand-rake for a smooth & level finished surface. Natural compaction will occur over time and is dependent on the amount of playground use and environmental conditions.  To accelerate the compaction process, Fibar Engineered Wood Fiber can be mechanically compacted at an additional cost. The Fibar can be compacted in the accessible route to the equipment or the entire surface area. To mechanically compact the Fibar, install in 5” lifts using a plate compactor or other

Page 352 of 493 ends

mechanical device. Change direction 90 degrees between each layer. Optional: Wet the surface before compacting. Repeat these steps until the desired level finished thickness is achieved. This accelerated compaction method, without wetting the surface, was used in the laboratory for the ASTM F1951 test procedure.
o After 2 weeks, surface should be raked and leveled. Continue to rake the surface level as needed. o Consumer Product Safety Commission (CPSC) and ASTM recommends Use Zones of at least 6 feet around all equipment, except:
 Swings – Use zone equal to 2 times the height of top rail is needed in front and behind swings.  Slides – Use zone equal to height of slide plus 4 feet, extending a minimum of 6 feet, in front of slide exits.
o Complete information on use zones can be found at CPSC and ASTM.  Above-Ground Installation (Exiting at Border or Curb Level) o Minimum 1% downward grade to ensure proper drainage to FibarDrain Strip. FibarDrain Strip should be installed so that it discharges outside of playground borders. o On grades of greater than 10% - use of FibarSystems is not recommended. o Remove all roots, stones, and vegetation.
o Accurately grade and firmly compact entire area, especially where fill materials have been utilized. o Install playground equipment.
o Install retaining border or curb.
o Install FibarDrain strips at 6’ centers in direction of grade. o Cover sub-grade and drainage trench with FibarFelt.
 Allowing 3” overlap at all seams.
 Slit to fit around footings of equipment.
 Overlap all slits with either next piece of FibarFelt or scrap piece, to ensure complete coverage. o Permanently mark, with paint or other type of permanent marker, all the legs of the playground equipment with the compacted system design depth
o Spread Fibar® Wood Fiber using a Bobcat, small front-end loader or our Express Blower Trucks.  Care should be taken when driving over FibarDrain.
 Do not make sharp turns on FibarFelt or FibarDrain.
o Install all materials delivered.
 Additional materials are supplied to account for natural compaction.  Feather edges to make smooth transition to grade or border. o Install FibarMat wear on top of the Fibar EWF.
o Hand-rake for a smooth & level finished surface. Natural compaction will occur over time and is dependent on the amount of playground use and environmental conditions.  To accelerate the compaction process, Fibar Engineered Wood Fiber can be mechanically compacted at an additional cost. The Fibar can be compacted in the accessible route to the equipment or the entire surface area. To mechanically compact the Fibar, install in 5” lifts using a plate compactor or other mechanical device. Change direction 90 degrees between each layer. Optional: Wet the surface before compacting. Repeat these steps until the desired level finished thickness is achieved. This accelerated compaction method, without wetting the surface, was used in the laboratory for the ASTM F1951 test procedure
o After 2 weeks, surface should be raked and leveled. Continue to rake the surface level as needed. o Consumer Product Safety Commission (CPSC) and ASTM recommends Use Zones of at least 6 feet around all equipment, except:
 Swings – Use zone equal to 2 times the height of top rail is needed in front and behind swings.  Slides – Use zone equal to height of slide plus 4 feet, extending a minimum of 6 feet, in front of slide exits.
o Complete information on use zones can be found at CPSC and ASTM.

Part IV – Warranty & Insurance
 Manufacturer’s Limited Warranty
o The Fibar Group, LLC provides a written 25-year warranty against loss of resiliency for the Fibar System 300. o The Fibar Group, LLC provides a written lifetime warranty on the FibarFelt geotextile fabric material. o The Fibar Group, LLC provides a written lifetime warranty on the FibarDrain drainage matrix. o The Fibar Group, LLC provides a written 3-year warranty on the FibarMat wear pads.  Product Liability Insurance Certificate with project owner named as certificate holder.

Page 353 of 493 ends

o The Fibar Group, LLC is a member of IPEMA, the International Play Equipment Manufacturers Association.

IPEMA is a member-driven organization whose mission is to assist in providing creative, fun, and safe play environments for children.

Part V – Memberships & Certifications
 Memberships
o The Fibar Group, LLC is a member of IPEMA, the International Play Equipment Manufacturers Association.

IPEMA is a member-driven organization whose mission is to assist in providing creative, fun, and safe play environments for children.

Certificate of Compliance
Part VI – Details & Drawings

Page 354 of 493 ends

Part VII- Other Information
The Fibar Group, LLC   80 Business Park Drive, Suite 300   Armonk   NY  10504 800‐342‐2721  [email protected]   www.fibar.com

Page 355 of 493 ends
Page 356 of 493 ends

R ______
RESOLUTION NO. _____ (2023 SERIES)

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS

OBISPO, CALIFORNIA, AUTHORIZING USE OF CAPITAL PROJECTS

RESERVE FUND TO SUPPORT NORTH BROAD STREET
NEIGHBORHOOD PARK SPECIFICATION NUMBER 91683
WHEREAS, in June of 2018, City Council approved the 2017-19 Financial Plan Supplement 2018-19 Adopted Budget, which identified the North Broad Street Neighborhood Park (Project) with the budget of $75,000 to support design efforts; and WHEREAS, in June of 2019, City Council approved the 2019-21 Financial Plan – Capital Improvement Program, which identified the Project with the budget of $665,000 to support design and construction efforts; and
WHEREAS, in January of 2020, the City Manager approved a budget transfer of $43,000 from the Parkland Development Fund Undesignated Capital account to the North Broad Street Neighborhood Park project account to support the environmental review process; and
WHEREAS, in June of 2021, City Council approved the 2021-23 Financial Plan – Capital Improvement Program, which identified the Project with additional budget of $175,000 to support implementation of the work; and
WHEREAS, to provide funding to support the total construction contract for the Project, staff is recommending City Council approve the use of an additional $200,000 from the Capital Projects Reserve Fund; and
WHEREAS, a balance of $1,918,708 available from the Capital Projects Reserve Fund; and
WHEREAS, there is a concurrent Capital Reserve Fund request of $1.5 Million for the San Luis Obispo Creek Repair Project, subject to Council approval.

NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo as follows:

Page 357 of 493 ends

Resolution No. _____ (2023 Series) Page 2
R ______
SECTION 1. The City Council authorizes staff to transfer $200,000 from the Capital Projects Reserve Fund to the North Broad Street Neighborhood Park project account 91683.

Upon motion of _______________________, seconded by
_______________________, and on the following roll call vote:

AYES:

NOES:

ABSENT:

The foregoing resolution was adopted this _____ day of _____________________ 2023. ___________________________
Mayor Erica A. Stewart
ATTEST:
__________________________
Teresa Purrington
City Clerk
APPROVED AS TO FORM:
__________________________
J. Christine Dietrick
City Attorney
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, on ______________________. ___________________________
Teresa Purrington
City Clerk

Page 358 of 493 ends

Item 6e
Department: Utilities
Cost Center: 6001
For Agenda of: 2/7/2023
Placement: Consent
Estimated Time: N/A
FROM: Aaron Floyd, Utilities Director
Prepared By: Mychal Boerman, Utilities Deputy Director - Water SUBJECT: ROADMAP FOR MAXIMIZATION OF RECYCLED WATER

RECOMMENDATION
Receive and file an update related to the City’s timing and strategy for maximization of recycled water.

POLICY CONTEXT
Policies and restrictions on delivery of recycled water outside of City limits are outlined in the General Plan Land Use Element Policy 1.13.2 Recycled Water:

Provision of recycled water outside of City limits may only be considered in compliance with Water and Wastewater Element Policy A 7.3.4 and the following findings:

A. Non-potable/recycled water is necessary to support continued agricultural operations.

B. Provision of non-potable/recycled water will not be used to increase development potential of property being served.

C. Non-potable/recycled water will not be further treated to make it potable.

D. Prior to provision of non-potable/recycled water, the property to be served will record a conservation, open space, Williamson Act, or other easement instrument to maintain the area being served in agricultural and open space while recycled water is being provided.

Policy A 7.3.4, referenced above, reads as follows:

Consider the potential to deliver available recycled water supplies to customers outside the City limits, including analysis of policy issues, technical concerns, and cost recovery, provided it is found to be consistent with the General Plan.

Page 359 of 493 ends

Item 6e

DISCUSSION
Background
On November 15, 2022 the City Council held a study session to discuss opportunities for expansion of the use of recycled water in order to maximize the use of this resource. At this meeting, staff provided the City Council with long-term and short-term opportunities for maximization of recycled water. Long-term strategies included utilizing available resources to recharge the groundwater basin, either through injection wells, or percolation, and short-term strategies included expanding in-City recycled water irrigation, exchanging recycled water for a reduction in groundwater pumping by agricultural parties within the SLO Valley Subarea, and selling recycled water outside City limits during periods in which it had no feasible use within the City.

The City Council provided general feedback that staff should continue to pursue longterm use of recycled water for recharge of groundwater or surface water reservoirs and that all three short-term options should be considered in order to maximize supplies. The City Council also provided direction that staff should develop a transparent process and roadmap for recycled water sales that would be legally compliant, recover costs, and be consistent with existing City policies. Additionally, City staff were directed to coordinate with County of San Luis Obispo staff on creation and submission of a grant application that would provide the City and County Groundwater Sustainability Agencies with funding to complete elements of the Groundwater Sustainability Plan that are precursors to delivering recycled water outside of City limits. This grant application was submitted and includes a request for funding to support expansion of the groundwater monitoring network, a groundwater extraction measurement program, a pumping fee program for the Edna Valley, a supplemental water feasibility analysis, and various other activities.

Recycled Water Roadmap
Following the study session and at the direction of Council, staff began developing a Roadmap for Maximization of Recycled Water (Attachment A). This roadmap is a flowchart or process diagram which includes all short-term and long-term maximization options discussed during the study session. The roadmap details the sequential steps that that would be required prior to expanding the use of the City’s recycled water resources, specifically outlining a series of steps that are needed as part of the process to sell recycled water outside of City limits. Because parties that are interested in purchasing recycled water are attempting to understand when recycled water may be available for sale and use, the Estimated Recycled Water Delivery Timeline (Attachment B) provides projected timelines for completion of each step in the sales process, as well as additional narrative.

Previous Council or Advisory Body Action
On March 21, 2017, the City Council approved the 2017 Recycled Water Master Plan which outlined the City’s expansion strategy for recycled water use, including plans to ultimately utilize recycled water as a potable water supply in the future. On November 15, 2022, the City Council participated in a study session to provide staff with feedback regarding long-term and short-term strategies to maximize recycled water use.

Page 360 of 493 ends

Item 6e
Public Engagement
In addition to the November 2022 study session regarding recycled water maximization, staff also met with a County Supervisor, County of San Luis Obispo staff, Cal Poly staff, and the Edna Valley Growers in January 2023 regarding the availability of recycled water for short-term sales. These meetings included details related to the sales process, as well as projected timelines for delivery.

CONCURRENCE
This report has been reviewed by Utilities staff who are involved with the production and delivery of recycled water. As this project is focused within the Utilities Department, and does not impact other City departments, concurrence from other City departments is not required at this point.

ENVIRONMENTAL REVIEW
Receiving an update regarding recycled water maximization does not constitute a “Project” under State CEQA Guidelines Sec. 15378. CEQA may be required for future expansion projects and projects will be analyzed on a case-by-case basis to determine environmental review requirements.

FISCAL IMPACT
Budgeted: NA Budget Year: 2021-23
Funding Identified: NA
Fiscal Analysis:

Updates to the City Council related to recycled water maximization do not directly result in a fiscal impact. Requests for resources associated with maximization of recycled water may be brought forward as part of the 2023-25 Financial Plan. Resources required to complete maximize the City’s recycled water resources are estimated to be less than one FTE.

ALTERNATIVES
The City Council could request that staff modify projected timelines or specific work efforts associated with the Recycled Water Roadmap. Staff believe that the actions shown in the Recycled Water Roadmap and the proposed timeline are feasible for completion by staff and required to meet legal requirements associated with this project.

ATTACHMENTS
A - Roadmap for Maximization of Recycled Water
B - Estimated Recycled Water Delivery Timeline

Page 361 of 493 ends
Page 362 of 493 ends

City Council Study Session

1.0 - Long Term Use 3.0 - Short Term Use

1.1 Potable Reuse
Road Map
(Carrollo
Engineering)

3.3 Deliver Recycled
Water Outside of
City Limits

3.2 Expand In-City
Irrigation

3.1 - Offset In-Basin
Groundwater
Pumping

3.1a Identify Largest
Exchange
Opportunities that
Require Minimal
Infrastructure

3.1b Meet with
Large Exchange
Partners to Gauge
Interest

3.1c Interested in an
Exchange

3.d Not Interested in
an Exchange

3.1e Review
Specifics with Water
Rights Attorney

3.1g Negotiate and
Develop Contract

3.1f Refocus Efforts
on Outside-City
Sales & In-City
Expansion

3.2a Utilize Existing
CIP Process to
Identify and Pursue
Largest Sites Only

3.2b Expand to
Large Developments
through Existing
Development
Process

3.3a Develop &
Release Request For
Interested Parties
(RFIP)

3.3i Update
Interested Parties /
Gather Additional
Information/Clarity

3.3j Refine Pricing
Based on Received
Proposals and
Negotiation Terms

3.3k Meet With
Parties for Go/No
Go Based on
Estimated Pricing &
Negotiation
Parameters -
Require Letter of
Intent if Interested

3.3l Interested 3.3m Not Interested

3.3q Focus on in-City
Expansion and InBasin Pumping
Offset

3.3p Env. and
Infrastructure
Impact Analysis

3.3n Full 218
Analysis

3.3o Full Legal
Analysis

3.3r Refine Costs
and Negotiate
Contract Terms

3.3s Begin
Construction/
Delivery
(2025)
Completed /
Ongoing Work
Efforts
Legend/Key
Need Additional
Resources /
Staffing
Will Utilize
Existing Staffing

3.3b Develop
Baseline Pricing
(rough estimate of
minimum cost)

1.2 Surface Water
Augmentation

1.3 In-City
Groundwater
Recharge

1.4 Outside-City
Groundwater
Recharge

1.5 TBD - Soonest
Completion 2029 3.3d If
Oversubscribed
(Based on RFIP
Interest)

3.3c If Not
Oversubscribed
(Based on RFIP
Interest)

3.3f Develop
Competitive
Selection Criteria
(Price, Alignment
with City Goals, env
benefit, etc.)

3.3g Return to
Council to
Determine
Negotiation
Parameters

3.3h Return to
Council to Review/
Approve Criteria &
Determine
Negotiation
Parameters

3.3e Refine Pricing
Model
Roadmap for Maximization of Recycled Water

Page 363 of 493 ends
Page 364 of 493 ends

'HYHORS 5HOHDVH5),3
&RPSOHWH 5HYLHZ5),3VDQG'HYHORS5DQNLQJ&ULWHULD 5HYLHZ5DQNLQJ&ULWHULD 'HWHUPLQH1HJRWLDWLQJ3DUDPHWHUV (VWLPDWHG5HF\FOHG:DWHU'HOLYHU\7LPHOLQH
'HYHORS5HTXHVWIRU,QWHUHVWHG3DUWLHV
5),3
WRLGHQWLI\ORFDOSDUWLHVZKRDUHLQWHUHVWHGLQSXUFKDVLQJUHF\FOHGZDWHU5HTXHVWZLOOLQFOXGHWKH&LW\¶VHVWLPDWHGPLQLPXPSULFHDQGZLOOFRQWDLQWDEOHVWRJDWKHUPRUHLQIRUPDWLRQVXFKDVYROXPHQHHGHGH[LVWLQJLQIUDVWUXFWXUHPLQLPXPFRQWUDFWHWF 3DUWLHVWRFRPSOHWH5),3V&LW\WRUHYLHZ5),3VDQG&LW\WRGHYHORSUDQNLQJFULWHULDLIPXOWLSOHLQWHUHVWHGSDUWLHVUHVXOWLQFRPSHWLQJUHTXHVWV 5HYLHZUDQNLQJFULWHULDDQGGHWHUPLQHQHJRWLDWLQJSDUDPHWHUVZLWK&LW\&RXQFLO 0HHWDQG8SGDWH,QWHUHVWHG3DUWLHV
0HHWDQGXSGDWHLQWHUHVWHGSDUWLHVUHJDUGLQJQHJRWLDWLRQSDUDPHWHUVDQGUHYLHZ5),3VXEPLWWDOVWRHQVXUHFRPPRQXQGHUVWDQGLQJ 5HILQHSULFLQJEDVHGRQFRQWHQWRISURSRVDOV
YROXPHUHTXHVWHGWLPHRI\HDUORFDWLRQHWF
DQG&LW\&RXQFLOGHILQHGQHJRWDWLRQSDUDPHWHUV
0HHWZLWKLQWHUHVWHGSDUWLHVIRUJRQRJREDVHGRQUHILQHGSULFLQJHVWLPDWHVDQGQHJRWDWLRQSDUDPHWHUV5HTXLUHD/HWWHURI,QWHQWIURPLQWHUHVWHGSDUWLHVLQRUGHUWRSURFHHG 5HTXHVW/HWWHURI,QWHQW
0DUFK-XQH

-XO\
2FWREHU

1RYHPEHU

-DQXDU\

)HEUXDU\
0DUFK
$SULO0D\

-XQH
5HILQH3ULFLQJ%DVHGRQ5HFHLYHG3URSRVDOV
-XO\
2FWREHU

&RQGXFWIXOOOHJDODQDO\VLVSURSRVLWLRQDQDO\VLVHQYLURQPHQWDODQDO\VLVDQGLQIUDVWUXFWXUHXSJUDGHDQDO\VLV5HILQHFRVWVEDVHGRQDQDO\VLV &RQGXFW)XOO3URMHFW6SHFLILF$QDO\VLV
8SGDWHFRVWVEDVHGRQSURMHFWVSHFLILFDQDO\VLVDQGQHJRWLDWHFRQWUDFWWHUPV 1RYHPEHU
'HFHPEHU

)LQDOL]H&RQWUDFW7HUPV

Page 365 of 493 ends
Page 366 of 493 ends

City of San Luis Obispo, Council Memorandum
City of San Luis Obispo
Council Agenda Correspondence
DATE: February 7, 2023
TO: Mayor and Council
FROM: Emily Jackson, Finance Director
VIA: Derek Johnson, City Manager
SUBJECT: ITEM 7a – FISCAL YEAR 2022-23 MID-YEAR BUDGET REVIEW Staff received the request to provide a comprehensive list of one-time budget allocations that were made during the 2021-23 Financial Plan. Table 1 below shows the allocations approved with the 2021-23 Financial Plan adoption. Table 2 shows the one-time allocations approved at the 2021-22 Mid-Year Review. Items highlighted in blue have already been approved and budgeted as ongoing via previous Council action.

Continued on next page
Table 1: 2021-23 Approved One-time General Fund Budget Allocations Sum of 21-22 Sum of 22-23 1 Admin/IT $ 1,260,263 $ 938,211
2 "Undocu-Friendly" Logo - create. Part of effort to support undocumented community $ 1,000 $ - 3 Administrative Support for MCG Efforts $ 30,555 $ 34,158 4 Arts, Culture and Community Partner Support $ 50,000 $ 25,000 5 Better Buildings SLO, Phase II - Demonstration Project Implementation/Targeted Grant (4.2.e) 6 Business Promotions and Communication Support(1.2) $ 80,000 7 Business Retention/Recovery Programs $ 500,000 $ 250,000 8 City 101/Community Academy - development & pilot $ 15,000 $ 15,000 9 Community-based Multicultural Center feasibility study $ 40,000 $ 2,500 10 Comprehensive DEI Strategic Planning $ 35,000
11 DEI Civic Spark Fellows $ 30,000
12 DEI Consultant/subject matter expert $ 30,000 $ 15,000 13 DEI High Impact Grants - community programs $ 150,000 $ 150,000 14 DEI Interns $ 13,586 $ 15,187
15 Economic Development Program Support (1.1.) $ 50,000 $ 25,000 16 Economic Development Recovery scorecard (1.1.) $ 30,000 $ 30,000 17 ECOSLO partnership - SLO Stewards, Tree Planting & Maint., Green Business, Creek Clean Up (4.3.c) $ 20,000 $ 20,000 18 Focused efforts to attract & retain businesses owned by minorities and underrepresented communities. Support businesses se$ 150,000 19 Micro Community Collaborative (MCC) Initiative $ 20,000 20 Microgrid Feasibility Study $ 20,000
21 Minor Office Retrofits $ 10,000
22 New Economic Development Strategic Plan (1.1.) $ 100,000 23 Open Space Winter Hours of Use - CEQA and technical studies (if directed to proceed) (4.3i) $ 75,000 24 PEN Manual Update to enhance input from underrepresented groups $ 15,000 $ - 25 Sustainability & Natural Resources Analyst (4.1.a) $ 62,753 $ 62,753 26 Sustainability & Natural Resources Intern/ Urban Forest Master Plan Intern (4.1.b) $ 12,368 $ 13,613

Page 367 of 493 ends

Item 7a. Staff Agenda Correspondence Page 2
Continued on next page
Table 1: 2021-23 Approved One-time General Fund Budget Allocations Sum of 21-22 Sum of 22-23 27 CDD $ 905,826 $ 345,826
28 919 Office Reconfiguration $ 150,000 $ 50,000
29 Homelessness Strategic Plan $ 35,000 $ -
30 Housing Element Program Implementation; Consultant Support $ 140,000 $ 115,000 31 Pilot: Housing and Homelessness Major City Goal (25% Expansion of 40 Prado HSC Beds) - Proportions City share to County cont$ 63,826 $ 63,826 32 Pilot: Housing and Homelessness Major City Goal (Consultant Contract) $ 117,000 $ 117,000 33 Safety Element Environmental Review
$ 25,000 $ -
34 TIPP Fast 2.0 - Utilize $250k from $2 million restricted $ 250,000 $ - 35 Zoning Regulations Update for Downtown Uses and Flexible Use of Outdoor Spaces Citywide $ 125,000 $ - 36 City Attorney $ 187,253
37 Department Org Assessment $ 60,000
38 Part-time Asst. City Attorney $ 108,646
39 Short-term, Full-time Legal Asst. 1 $ 7,552
40 Short-term, Part-time Legal Asst. 2 $ 11,055
41 Community Services $ 105,000
42 Community Workforce Agreement Study $ 105,000
43 Finance $ 34,017 $ 35,568
44 MOTION Subject Matter Expert (.5 FTE Supplemental) $ 34,017 $ 35,568 45 Fire $ 418,905 $ 380,196
46 Emergency Management Services $ 30,000 $ 30,000
47 Emergency Response Live-Fire Training Improvements $ 20,045 $ 17,570 48 Fire Intern Program $ 22,691 $ 23,257
49 Pilot: Mobile Crisis Unit $ 300,000 $ 300,000
50 Recruit Academy Support (Contract Services) $ 9,000 $ - 51 Recruit Academy Support (Equipment) $ 20,000 $ -
52 Technical Rescue Team Expansion (Equipment) $ 6,000 $ - 53 Training and Permit Compliance Software $ 11,169 $ 9,369 54 Human Resources $ 121,005 $ 56,364
55 Compensation Study $ 30,000
56 Intern Funding $ 16,005 $ 16,364
57 Office furniture and equipment to support new staff $ 14,000 58 Office furniture to support Contract to Regular Staff $ 20,000 59 Pay Equity Audit $ 30,000
60 Professional Recruiter $ 40,000
61 Transition to electronic files $ 11,000
62 Parks & Rec $ 110,188 $ 57,375
63 Aquatics Resources to Implement COVID-19 Safety Protocols $ 62,000 $ - 64 Fire Fuel Reduction Crew Tools and PPE $ 4,500
65 Open SLO Downtown Dining Resources (MCG 1.4a) $ 13,688 $ 27,375 66 SLO Swim Center Minor Capital Maintenance $ 30,000 $ 30,000 67 Police $ 21,900
68 One time costs for Social Worker position $ 6,500
69 Spillman RIPA Module $ 15,400

Page 368 of 493 ends

Item 7a. Staff Agenda Correspondence Page 3
Table 1: 2021-23 Approved One-time General Fund Budget Allocations Sum of 21-22 Sum of 22-23 70 Public Works $ 660,560 $ 576,433
71 CIP Interns $ 5,000 $ 5,900
72 Continue supplmental Accessabilty and Process Improvement Manager for Project Completion $ 34,000 $ 12,000 73 Contract Heavy Equipment Mechanic $ 85,220 $ 89,065
74 Fleet Intern $ 17,991 $ 18,398
75 Mobility as a Service Study $ 25,000
76 Office Modifications $ - $ 20,000
77 One Time Tools and City uniforms - Mechanic interns $ 3,000 $ - 78 Payment Correction Hwy 227 Signals/Street Lights $ 60,000 $ - 79 Pilot: Contract Services for increased trash and recycling services in Public Spaces $ 125,000 $ 125,000 80 Supplemental Street and Parklet Sweeping $ 250,000 $ 250,000 81 Transportation Interns $ 30,350 $ 31,071
82 Variable Electricity Costs until Solar Costs are Known at Swim Center $ 25,000 $ 25,000 83 Utilities - Solid Waste $ 29,000 $ -
84 Civic Spark Fellow $ 29,000 $ -
85 Utilities - Stormwater $ 93,506 $ 97,945
86 Stormwater Inspector $ 93,506 $ 97,945
87 Grand Total $ 3,947,423 $ 2,487,918
Table 2: 2021-22 Mid-Year One-time Budget Allocations 2021-22 2022-23 1 Administration $ 105,000 $ -
2 Bob Jones Bike Trail Vegetation Management $ 25,000 $ - 3 Council Hearing Room - Auto Tracking Camera $ 30,000 $ - 4 Crisis Communications Planning $ 50,000 $ -
5 CDD $ 104,633 $ 80,000
6 CAPSLO Programming - Railroad Square Safe Parking $ 64,633 $ - 7 Housing/Homelessness Contract Position $ 40,000 $ 80,000 8 City Attorney $ 120,000 $ -
9 Litigation Support $ 120,000 $ -
10 Non-dept $ 10,000 $ -
11 Transfer of Mitigation Fee Payment $ 10,000 $ -
12 P&R $ 152,850 $ 101,508
13 Contract Volunteer Coordinator (1 FTE) $ 32,850 $ 101,508 14 Golf Course Pro Shop Flood Damage Repairs $ 120,000 $ - 15 Police $ 14,200 $ -
16 Mobile Data Computers $ 14,200 $ -
17 PW $ 275,000 $ -
18 Mission Plaza Landscape and Lighting Improvements Construction $ 275,000 $ - 19 Grand Total $ 781,683 $ 181,508

Page 369 of 493 ends
Page 370 of 493 ends

Item 7a
Department: Finance
Cost Center: 2002
For Agenda of: 2/7/2023
Placement: Business
Estimated Time: 90 Minutes
FROM: Derek Johnson, City Manager
Emily Jackson, Finance Director
Prepared By: Natalie Harnett, Principal Budget Analyst
SUBJECT: FISCAL YEAR 2022-23 MID-YEAR BUDGET REVIEW

RECOMMENDATION

1. Receive and discuss the Mid-Year Budget report based on revised projections for all major funds at the mid-point of the 2022-23 fiscal year; and

2. Adopt a Draft Resolution entitled, “A Resolution of the Council of the City of San Luis Obispo, California, approving amendments to the adopted 2022-23 Budget Appropriations” and approve the one-time allocations as stated in the Mid-year Budget Report; and

3. Provide direction on whether the one-time budget allocations from the 2021-23 Financial Plan listed in Attachment A – Appendix B should be considered as ongoing expense and included in the base budget for 2023-25.

POLICY CONTEXT
The City’s budget policies require that the City Council review the City’s budget and financial condition at least every six months. The mid-year review is part of the ongoing quarterly reporting process and fulfills that purpose. The review allows the Council to adjust revenue and expenditure assumptions should the need arise. The accompanying Mid-Year Budget report for 2022-23 provides a comprehensive overview of the City’s financial condition half-way through the fiscal year and summarizes current financial trends since the adoption of the 2021-23 Financial Plan Supplement in June 2022.

DISCUSSION
Mid-Year Report Organization
The report’s focus is on the General Fund and each of the City’s enterprise funds. The mid-year budget report also provides an update on departmental performance measures, work programs, the Capital Improvement Plan, and Major City Goals. The report (included as Attachment A) includes the following sections:

Page 371 of 493 ends

Item 7a
Section A – General Fund Summary: This section provides a narrative overview of the City’s current General Fund financial condition and current revenue and expenditure trends as of December 31, 2022. In summary, major tax revenues are exceeding projections and have been adjusted upward accordingly. Expenditures are on track with where they should be at this point in the year; however the recent storm expenditures are not included in the mid-year financials. The revised five-year forecast is also provided and includes the estimated cost for the projected $9 million in storm expenditures and the anticipated amount and timing of reimbursement under state and federal programs.

Section B –Mid-Year Recommendations: This section outlines the proposed mid-year expenditure budget changes as well as one-time allocations of the FY 2021-22 unassigned fund balance. All of the budget changes are administrative or mission critical in nature and no new programs or services are being recommended. The recommended additional discretionary payments (ADP) to CalPERs are discussed in the next section of this Council Agenda Report and detailed in the fiscal impact section.

Section C – Enterprise Fund Summary: This section provides a narrative update of the City’s enterprise funds’ financial conditions, including any recommended budget changes.

Year-to-date expenditures and revenues are on track for all funds. Revised long-term forecasts are included.

Section D – Department Performance Measures and Work Program Updates: This section provides an evaluation on the performance measures and an update on core objectives of each operating program. All of the 74 total operating programs manage workload within budget and meet core objectives.

Section E – Capital Improvement Plan (CIP) Update: This section provides an update on active and ongoing CIP projects.

Section F – Major City Goal Update: This section provides an update on Major City Goal tasks that were either scheduled for completion in 2022-23 or are listed as “ongoing”.

Several tasks were delayed, but most were completed or are scheduled to be completed before year end.

Appendix A – Detailed Financials: This section provides a closer look at year-to-date actuals for the major funds and the recommended revenue budget adjustments.

CalPERs Additional Discretionary Payments (ADP)
With the 2018-19 Budget Adoption, Council adopted the “Fiscal Health Response Plan” to help balance the long-term forecast and begin an ambitious schedule to pay down the City’s pension obligations over 20 years instead of 30 years. This was based on the commitment to use available unassigned fund balance mainly for this purpose. In addition to the planned payment of $2 million (General Fund portion) for FY 2022-23, staff recommend allocating an additional $1.3 million of unassigned General Fund balance (due to over realized revenue) which will help offset the 6.1% investment losses that CalPERs experienced last year. For future planned payments above the regular CalPERS contributions, see the updated long-term forecasts.

Page 372 of 493 ends

Item 7a
Storm Response and Activation of the Fiscal Health Contingency Plan The City has done initial damage assessments related to the storms, but identification of the scope of the repairs needed is still in the beginning stages. Staff estimate there will be at least $2 to $3 million of operating costs associated with staff overtime, supplies, and contracted services. On top of that, Public Works continues to estimate the cost for Capital repairs which are likely to exceed $5 to $8 million. Given the magnitude of damages, the City Manager has activated the Fiscal Health Contingency Plan (Attachment C). The Fiscal Health Contingency Plan is not intended to be a specific “recipe” for expenditure cuts or revenue increases, but a framework in responding to adverse fiscal circumstances, such as natural disasters.

Since the storm related costs were unbudgeted, the City Manager requests authorization through the attached resolution to use the General Fund reserve to pay for storm-related costs through the end of the fiscal year. Given the updated revenue projections, there will likely be revenues over expenditures available at year-end to reimburse the reserve; however these revenues have not yet been realized.

Staff will continue to provide Council with storm-related updates and the broader fiscal impacts will be considered during the 2023-25 Financial Plan development. 2022-2023 One Time Expenses
As part of the development of the 2021-2023 Financial Plan, the City allocated one-time budget to fund critical services in support of Major City Goal objectives. The total amount of expenditures and the details are included as Attachment A – Appendix B. Staff has reviewed the list and reduced it to what staff believes are essential and critical items that support operations and Major City Goal objectives. Staff recommends that the Council provide direction on whether to add some or all of the costs to the ongoing budget.

Approximately $1.8 million has been assumed in the forecast for ongoing expenses related to these or other ongoing needs. Determining whether to include these specific one-time costs in the budget or whether to leave a budget “placeholder” to fund potential other needs will be useful in terms of how to weigh other competing expenditures. If Council elects to put the identified list of costs into the ongoing budget, staff will return with a budget resolution on consent at a future meeting to memorialize Council’s action.

Public Engagement
Public comment on the item can be provided to the City Council through written correspondence prior to the meeting and through public testimony at the meeting. The Mid-Year Report will also be posted on the City’s website for public review.

CONCURRENCE
The City’s internal Financial Plan Steering Committee has met on multiple occasions and concurs with the recommendations included in this report.

Page 373 of 493 ends

Item 7a

ENVIRONMENTAL REVIEW
The California Environmental Quality Act (CEQA) does not apply to the recommended action in this report, because the action does not constitute a “Project” under CEQA Guidelines Sec. 15378.

FISCAL IMPACT
Budgeted: Yes Budget Year: 2022-23
Funding Identified: Yes
Table 1: FY 2022-23 Mid-Year Revenue Budget Changes
Fund Initial Budget Revised Budget Variance
General Fund $ 120,576,641 $ 124,826,187 $ 4,249,546
Gas Tax Fund $ 1,245,024 $ 1,305,634 $ 60,610
TDA - Bikeway Fund $ 45,000 $ 76,869 $ 31,869
Tourism Bid Fund $ 1,727,202 $ 2,122,800 $ 395,598
SB1 Road Repair 2017 $ 1,049,877 $ 1,019,914 $ (29,963) Water Fund $ 26,036,569 $ 26,477,592 $ 441,023
Sewer Fund $ 19,645,382 $ 51,737,274 $ 32,091,892
Transit Fund $ 10,489,921 $ 15,560,414 $ 5,070,493
Total $ 180,815,616 $ 223,126,683 $ 42,311,068
Table 2: FY 2022-23 Mid-Year Expenditure Budget Allocations General Fund $ 395,000
Water Fund $ 377,676
Sewer Fund $ 329,471
CASp Fund $ (70,823)
TDA Fund $ 31,869
Total $ 1,063,193
Table 3: Recommended FY 2022-23 CalPERs ADP1
Fund Planned ADP
(per forecast)
One-time ADP (FY
2021-22 Balance)
Total ADP for
FY 2022-23
1 General Fund $ 2,000,000 $ 1,300,000 $ 3,300,000
2 Water $ 164,840 $ 107,146 $ 271,986
3 Sewer $ 169,419 $ 110,122 $ 279,542
4 Parking $ 61,003 $ 39,652 $ 100,654
5 Transit $ 12,555 $ 8,161 $ 20,716
6 Whale Rock $ 21,417 $ 13,921 $ 35,339
7 TBID $ 7,976 $ 5,184 $ 13,161
8 Total All Funds $ 2,437,211 $ 1,584,187 $ 4,021,398

1 Payment will be made in April 2023

Page 374 of 493 ends

Item 7a

ALTERNATIVES
The Council could direct staff to not implement the proposed budget change recommendations. Should the adjustments not be approved, the budget will remain unchanged at the adopted budget levels. Staff does not recommend an unchanged budget due changing needs of the community and the City organization.

ATTACHMENTS
A - FY 2022-23 Mid-Year Budget Report
B - Draft Resolution approving an amendment to the 2022-23 Budget Allocation C - Fiscal Health Contingency Plan

Page 375 of 493 ends
Page 376 of 493 ends

Mid-Year Budget Review
FISCAL YEAR 2022-23
The City’s Budget and Fiscal Policies (Financial Plan Purpose and Organization, G – Mid-Year Budget Reviews) call for a formal financial status report to the Council based on the first six months of each fiscal year. The Mid-Year Budget Review fulfills this requirement and allows the Council to take a broader look at the City’s financial picture and progress on Major City Goals or strategic initiatives shortly after the midpoint of the fiscal year.

The mid-year budget review is particularly important during a financial planning year because it gives Council a first look at the five-year fiscal forecast which will be used to help staff in developing the preliminary budget for the 2023-25 Financial Plan.

This report focuses on the current fiscal year and provides an analysis of adopted budget revenues and expenditure appropriations. It also outlines the achievements and the potential challenges for each department and the City organization as a whole and provides an update on adopted Major City Goals.

Based on the review and accompanying analysis, the City remains financially sound with most revenues tracking ahead of budget and operating program expenditures remaining within budgeted allocations.

Section Description Page
Section A General Fund Summary 2
Revenues 2
Expenditures 4
Revised GF Long-Term Forecast 6
Section B Mid-Year Changes 8
Section C Enterprise Fund Updates 11
Water 11
Sewer 16
Parking 20
Transit 24
Section D Department Performance Measure and Work Program Updates 27 Section E CIP Update 61
Section F Major City Goal Update 63
Appendix A Detailed Financials 76
Appendix B One-time budget allocations to be considered for the 2023-25 Financial Plan
83 Budget Report Pg. 1

Page 377 of 493 ends

General Fund Summary
A: GENERAL FUND SUMMARY
Revenue
The table below shows the updated revenue forecast for the General Fund (all revenue consolidated).

Detailed year-to-date actuals and mid-year changes by revenue type can be found in Appendix A.

Table 1 – General Fund Revenue
Sales Tax revenue remains incredibly strong through the first half of FY 2022-23, particularly in the restaurants and hotels category. The updated budget for FY 2022-23 is based on the City’s sales tax consultant, HdL’s forecasts. Growth factors reflect ongoing pandemic dynamics on sales plus inflationary pressures on the prices of goods. Based upon projections from HdL, no recession is included in the forecast. The Bradley Burns assumption includes a negative $600,000 adjustment to account for a misallocation of revenue by the California Department of Tax and Fee Administration (CDTFA) that should have been allocated to another County agency. However, this administrative adjustment is not reflective of the sales tax performance and the 4.9% increase forecasted in FY 2023-24 will return the tax revenue back to “normal” levels. The Local Revenue Measure, not impacted the administrative adjustment, is expected to see 3.9% growth in FY 2022-23. The majority of this growth coming from the “Restaurants and Hotels” and “General Consumer Goods” industry groups.

Property Tax forecasts have been increased by about $700,000 to reflect the latest forecast (September 2022) from the County Assessor’s Office. Although the housing market shows signs of cooling, it is General Fund Revenue FY 2021-22
Actual Budget Actuals YTD Variance % Received
Midyear
Revised
Budget
Total Midyear
Changes
1 Tax and Franchise Revenue $ 96,490,763 $ 92,451,288 $ 30,930,203 $ (61,521,085) 33% $ 98,267,347 $ 5,816,059 2 Sales Tax (Bradley Burns) 22,201,225 21,789,000 7,365,867 (14,423,133) 34% 21,524,304 (264,696) 3 Local Revenue Measure G20* 29,172,258 27,049,000 10,170,239 (16,878,761) 38% 30,141,532 3,092,532 4 Safety Prop 172 529,299 497,000 185,147 (311,853) 37% 497,000 - 5 Property Tax 20,970,984 20,746,387 1,453,618 (19,292,769) 7% 21,473,397 727,010 6 Transient Occupancy Tax 10,650,762 8,636,000 4,599,391 (4,036,609) 53% 10,704,000 2,068,000 7 Utility User Tax 5,085,292 5,544,000 2,074,128 (3,469,872) 37% 5,544,000 - 8 Business Tax 2,861,863 2,889,000 3,179,269 290,269 110% 3,157,566 268,566 9 Franchise Fees 1,978,295 1,606,000 634,937 (971,063) 40% 1,800,000 194,000 10 Gas Tax* 1,130,063 1,245,024 735,743 (509,281) 59% 1,305,634 60,610 11 Gas Tax (SB1)* 911,849 1,049,877 162,439 (887,438) 15% 1,019,914 (29,963) 12 Cannabis Tax 998,875 1,400,000 369,425 (1,030,575) 26% 1,100,000 (300,000) 13 Service Fees and Other Revenue $ 11,917,323 $ 12,967,312 $ 5,806,903 $ (7,160,409) 45% $ 11,531,447 $ (1,435,866) 14 Development Review 5,970,996 6,361,554 2,981,911 (3,379,643) 47% 6,361,554 - 15 Fire 1,502,356 1,576,322 572,210 (1,004,112) 36% 1,582,847 6,525 16 Parks & Recreation 1,694,241 1,984,802 729,906 (1,254,897) 37% 1,988,802 4,000 17 Police 561,909 641,529 213,357 (428,173) 33% 628,139 (13,390) 18 Business Licenses (Incl Cannabis) 625,468 655,911 629,788 (26,123) 96% 622,911 (33,000) 19 Other Revenue (466,315) 1,070,555 (210,689) (1,281,244) -20% (429,445) (1,500,000) 20 Grants & Subventions 2,028,668 776,638 890,421 213,782 132% 776,638 - 21 Grand Total $ 108,408,086 $ 105,518,600 $ 36,737,106 $ (68,681,495) 35% $ 109,798,793 $ 4,280,193 FY 2022-23
How to read the budget tables in this report
Budget: Adopted budget plus any encumbrances from prior year(s) or approved budget adjustments made throughout the year.

Actual: Actual expenditures plus any encumbrances or obligated funds as of December 31, 2022.

Budget Report Pg. 2

Page 378 of 493 ends

General Fund Summary
expected that property tax will remain one of the City’s most stable revenue streams with 2-3% annual growth over the next five years.

Transient Occupancy Tax (TOT) revenue continued to hit record highs for the first half of the fiscal year; however, things are starting to level out. Based on forecasts from Visit SLO Cal, the City’s FY 2022-23 forecast has been revised upward significantly compared to the original budget. Occupancy rates are expected to stay flat however a slight dip in the Average Daily Rate (ADR) will likely result in a flattening or slight decline in TOT revenue over the next several years.

Business Tax has been adjusted upward to account for the actual revenue received this year. Business Licenses are renewed at the beginning of the fiscal year; therefore, all the revenue for FY 2022-23 has been collected.

Cannabis Tax and Operator License revenue has been adjusted downward based on delayed opening of businesses.

Gas Tax and SB1 forecasts have been adjusted based on the State’s forecast from May 2022.

Fees for Service have been marginally adjusted to account for actual year-to-date revenue or trends identified over the last six months. Specific revenue budget changes can be found in Appendix A.

Other Revenue has been adjusted downward by $1.5 million to account for a reduction in interest earnings due to the Fair Market Value (FMV) of the City’s financial assets.

Grants and Subventions are trending high because of Mutual Aid Reimbursements. This revenue helps offset expenditures and is not budgeted for.

Development Services Designation1
Based on 2021-22 audited financials and usage during the current fiscal year, the following table shows the current balance of the development services designation:

Table 2: Development Services Designation
22-23 Beginning Balance $ 530,657
Contract Administrative Assistant $ (66,521)
Current Balance $ 464,136
1 On June 17, 2014, the City Council revised the fiscal policies to provide for the City Manager to allocate up to 75% of Development Services over-realized revenues to acquire temporary resources for the timely processing of development applications and other permit processing activities. The policy calls for the allocated revenues to be reported to the City Council on a semi-annual basis as part of the mid-year and annual budget presentations.

Budget Report Pg. 3

Page 379 of 493 ends

General Fund Summary
Table 4: General Fund Operating Expenditures by Type
At Mid-Year, departmental budgets should typically be about 50% expended, though this can vary for departments that budget for significant non-salary expenditures that do not always follow even expenditure patterns throughout the year. Overall, the General Fund is on track with its expenditure budgets at both the department and the category level. Some notable variances include:

Non-Departmental/Support Services are cost centers for expenditures that are not department specific.

The majority of this budget includes the contingency budget for estimated wage increases based on approved Council parameters. This budget is historically kept separate because negotiations are not finalized before budget development. Based on year-to-date actuals, staff expect the entire FY 2022-23 contingency budget to be used by year end.

The Solid Waste division has significant savings due to vacant Solid Waste Manager and Coordinator positions and carryover contract services budget that has not yet been used.

The detailed financial reports included in Appendix A provide year-to-date expenditure information by department. The data presented in the table includes committed and encumbered services General Fund Operating Expenditures by
Department
FY 2021-22 Actual Budget Year-to-date
Actual
% Expended
1 Internal Services $ 15,909,988 $ 21,295,666 $ 10,498,315 49% 2 Admin/IT $ 9,594,922 $ 11,908,823 $ 6,976,822 59%
3 City Attorney $ 1,374,705 $ 1,583,981 $ 910,548 57%
4 Finance $ 2,384,733 $ 2,392,085 $ 1,155,993 48%
5 Human Resources $ 1,901,906 $ 1,951,560 $ 1,232,360 63% 6 Non-Dept/Support Services $ 653,721 $ 3,459,216 $ 222,591 6% 7 Community Services $ 29,228,367 $ 31,525,305 $ 17,246,376 55% 8 CSG Admin $ 654,889 $ 761,286 $ 381,399 50%
9 Community Development Department 7,781,004 $ $ 7,839,080 $ 4,126,153 53% 10 Parks & Recreation $ 5,106,833 $ 5,304,336 $ 2,595,305 49% 11 Public Works $ 15,499,759 $ 17,175,448 $ 10,025,233 58% 12 Solid Waste $ 185,882 $ 445,155 $ 118,285 27%
13 Public Safety $ 39,650,003 $ 35,903,857 $ 21,139,680 59% 14 Fire $ 17,086,220 $ 14,672,305 $ 8,764,728 60%
15 Police $ 22,563,783 $ 21,231,552 $ 12,374,952 58%
16 Total $ 84,788,358 $ 88,724,828 $ 48,884,370 55%
FY 2022-23
General Fund Operating Expenditures by
Type
FY 2021-22 Actual Budget Year-to-date
Actual
% Expended
1 Salaries $ 38,636,808 $ 44,266,024 $ 20,124,670 45%
2 Retirement/Benefits $ 7,370,806 $ 9,812,079 $ 3,879,195 40% 3 Contract Services $ 9,861,326 $ 13,494,499 $ 8,660,797 64% 4 Utilities $ 2,761,025 $ 3,125,941 $ 1,764,592 56%
5 Other Operating Expenditures $ 4,527,029 $ 5,347,042 $ 2,601,083 49% 6 PERS Unfunded Liability/Retiree Healthcare$ 21,631,364 $ 12,679,244 $ 11,854,034 93% 7 Grand Total $ 84,788,358 $ 88,724,828 $ 48,884,370 55% FY 2022-23
Expenditures Through the December 31, 2022
Table 3: General Fund Operating Expenditures by Department Budget Report Pg. 4

Page 380 of 493 ends

General Fund Summary
Revised General Fund Long Term Forecast
The long‐term forecast is an essential planning tool for the City and its ongoing service delivery. While the City adopts a two‐year Financial Plan that must be balanced, the outer years of the forecast are presented to show the City’s financial condition and availability of resources into the future.  The forecast is updated every six months which gives staff the opportunity to alert Council of looming imbalances and strategize proper actions to be taken.

Key takeaways
Overall,  the General  fund is in a good  financial  condition and stays balanced  throughout  the  five‐year forecast at current service levels. Current assumptions are conservatively optimistic, and the forecast only assumes a cooling of the current economic activity (not a recession). The impacts of high inflation on the City’s forecast are still not entirely known.

Revenue  forecasts  can  be  very  volatile  but  are  easy  to  update  every  six  months  based  on  the  latest economic data or trends. Expenditure budget forecasts are usually less volatile but only updated on an annual basis for a number of reasons: (1) not all expenditures increase at the same rate, (2) staffing costs can fluctuate based on the incumbents within the roles, and (3) CIP project budgets require significant staff time to re‐estimate. Departments will begin preparation of base budgets for the 2023‐25 Financial Plan  this month; however, staff have included some assumptions  for expenditures in order  to provide Council with a realistic outlook.

Assumptions

1. Tax revenues have been updated as noted in the revenue section of this report and fees for service are inflated by 3% in FY 2023‐24, followed by 2% annually after that.

2. The Capital Budget allocation was increased 19% in FY 2023‐24 to account for construction cost index (CCI) increases, followed by 2% annual increases. Additionally the forecast assumes an estimated $5.2 million one‐time allocation towards the Infrastructure Investment Fund to repay potential use of funds in the current year to acquire office and future public facilities space for organizational needs.  The source of this repayment is use of an unassigned balance in the debt service fund that is not needed to service debt, and projected one‐time revenues over expenditures from FY 2022‐23.

3. High level estimates for staffing from FY 2023‐24 through FY 2026‐27. These numbers will be refined with the 2023‐25 Financial Plan.

4. One‐time budget  allocations have been removed with the  exception of  a placeholder (i.e. $1.822 million) to account for staff’s estimate of items that Council will choose to make ongoing with the 2023‐25 Financial Plan.

5. A 3% inflator included for non‐staffing budgets in FY 2023‐24, followed by 2% annually after that.

This is subject to change during base budget development.

6. The City will use part of its operating reserve in FY 2022‐23 and FY 2024‐24 to offset storm costs but will replenish it back to the 20% reserve level, consistent with policy requirements, in FY 2024‐25.

Looking Forward
The forecast is an important planning tool (i.e. it is not a budget) to consider during the 2023‐25 Financial Planning  process;  however,  the February  11,  2023 goal  setting workshop  should  not  focus  on  specific numbers. Council should assume that the forecast is going to be very tight and in order to fully fund the CIP and existing operating services, there will be minimal, if any, available fund balance. Staff will take the feedback from the goal‐setting workshop and work with program managers to determine how Major City Goal work programs can be incorporated into the big picture. The preliminary budget presented in April will include the updated expenditure forecasts and outline all new budget additions or changes.

Budget Report Pg. 5

Page 381 of 493 ends

Table L1: General Fund Long Term Forecast
In Thousands Footnote (A)
Actual
2021-22
(B)
Budget
2022-23
(C)
Revised
2022-23
(D)
Projected
2023-24
(E)
Projected
2024-25
(F)
Projected
2025-26
(G)
Projected
2026-27
Tax & Franchise Revenue
1 Sales & Use Tax 51,665 49,335 52,163 53,340 54,573 55,988 57,465 2 Sales Tax General 22,247 21,789 21,524 22,579 23,166 23,768 24,410 3 Public Safety (Prop 172) 529 497 497 499 509 519 530
4 Measure G20 28,889 27,049 30,142 30,262 30,898 31,701 32,525 5 Property Tax 20,711 20,746 21,473 22,000 22,660 23,340 24,040 6 Transient Occupancy Tax 10,651 8,636 10,704 10,704 10,918 11,136 11,359 7 Utility Users Tax 5,420 5,544 5,544 5,710 5,882 6,058 6,240 8 Franchise Fees 1,978 1,606 1,800 1,854 1,910 1,967 2,026 9 Business Tax Certificates 2,823 2,889 3,158 3,252 3,317 3,384 3,451 10 Cannabis Tax 999 1,400 1,100 1,650 1,700 1,750 1,803 11 Total Tax & Franchise Revenue $ 94,247 $ 90,156 $ 95,942 $ 98,510 $ 100,959 $ 103,624 $ 106,384 Fees for Service & Other Revenue
12 Police Services 571 632 688 651 664 678 691
13 Fire Services 1,498 1,576 1,458 1,624 1,656 1,689 1,723 14 Development Review 6,117 5,918 6,335 6,095 6,278 6,466 6,660 15 Parks & Recreation 1,698 1,979 1,969 2,018 2,059 2,100 2,142 16 General Government 498 446 446 459 468 478 487
17 Cannabis 127 210 210 216 223 229 236
18 Other Revenues 474 2,063 711 2,106 2,134 2,162 2,192 19 Subventions & Grants 2,068 587 777 440 440 440 441
20 Federal Stimulus Funding (ARPA) 6,782
21 FEMA Storm Reimbursment - ESTIMATE 1 4,208 4,208
22 Total Fees & Other Revenue $ 13,052 $ 20,194 $ 12,593 $ 17,817 $ 18,130 $ 14,243 $ 14,573 23 Total Revenue $ 107,299 $ 110,349 $ 108,535 $ 116,328 $ 119,088 $ 117,866 $ 120,957 Use of Funds
14 Staffing $ 67,639 $ 64,618 $ 65,401 $ 67,648 $ 71,191 $ 73,177 $ 75,302 25 Contract Services $ 7,836 $ 7,816 $ 9,575 $ 6,772 $ 6,907 $ 7,045 $ 7,186 26 Other Operating Expenditures $ 9,555 $ 9,058 $ 9,976 $ 9,096 $ 9,478 $ 9,667 $ 9,861 27 Cost Allocation $ (4,717) $ (4,462) $ (4,462) $ (4,819) $ (4,963) $ (5,112) $ (5,265) 28 Total Operating Expenditure $ 80,313 $ 77,031 $ 80,491 $ 78,697 $ 82,613 $ 84,778 $ 87,083 29 Debt Service $ 1,997 $ 1,992 $ 1,992 $ 1,843 $ 1,758 $ 1,751 $ 1,540 30 Capital $ 30,575 $ 25,632 $ 22,484 $ 31,771 $ 27,102 $ 27,644 $ 28,197 31 Transfers Out/(In) $ 923 $ 296 $ 296 $ (2,208) $ 125 $ 269 $ 276 32 Total Expenditure $ 113,808 $ 104,950 $ 105,263 $ 110,102 $ 111,598 $ 114,441 $ 117,096 33 PROJECTED Ongoing Budget Additions (see Appendix B) $ 1,823 $ 1,877 $ 1,934 $ 1,992 34 Beginning Fund Balance $ 47,118 $ 30,067 $ 37,309 $ 34,082 $ 31,985 $ 35,598 $ 35,089 35 CalPERS Downpayments 2 $ (3,300) $ (2,000) $ (2,000) $ (2,000) $ (2,000) $ (2,000) $ (2,000) 36 Revenue Over/(Under) Expenses $ (9,809) $ 3,399 $ 1,272 $ 2,403 $ 3,613 $ (508) $ (131) 37 Ending Fund Balance $ 37,309 $ 33,466 $ 38,582 $ 36,485 $ 35,598 $ 35,089 $ 34,958 38 ARPA Expenditures 3 (3,664)
39 Storm Expenditures - ESTIMATE 1 (4,500) (4,500)
40 Ending Fund Balance $ 37,309 $ 29,801 $ 34,082 $ 31,985 $ 35,598 $ 35,089 $ 34,958 41 Policy Reserve Level - 20% 12,014 13,035 13,071 11,985 13,821 14,162 14,527 42 Revenue Stabilization Reserve 2,000 2,000 2,000 2,000 2,000 2,000 43 115 Pension Trust Fund 2,000 3,000 3,000 3,000 3,000 3,000 3,000 44 Restricted based on Audit 19,232 13,465 16,010 15,000 15,000 15,000 15,000 45 Undesignated Fund Balance $ 2,064 $ 301 $ 0 $ 0 $ 1,777 $ 927 $ 431 Revised with Mid Year
Budget Report Pg. 6

Page 382 of 493 ends

Table L1: General Fund Long Term Forecast
Long Term Forecast Footnotes:
1 – Unplanned storm response expenditures will be paid for out of the General Fund reserve with the assumption that any revenue above expenditures will be used to replenish the reserve. The forecast also assumes that 93.5% of costs will be reimbursed by FEMA (cell D21 & E21). This amount is merely an estimate. Staff will provide an update with the third quarter budget report. 2 – FY 2022-23 includes the additional discretionary payment of $1.3 M recommended in the Mid-Year Report (See cell A35).
3 – In the revised Mid-Year Column “C”, ARPA funds are removed from both the revenues and expenditures. Since the revenue was actually received in FY 2021-22, it was deposited directly into the corresponding funds as allocated by Council (R-11333). This is an administrative accounting adjustment and has no impact on the General Fund balance.

Budget Report Pg. 7

Page 383 of 493 ends

Mid-Year Expenditure Budget Changes
B. Mid-Year Expenditure Budget Changes
This section includes any changes to expenditure budgets, including:

1. Updated Transportation Development Act (TDA) Bikeways allocation for FY 2022-23

2. Reappropriation of Certified Access Specialist (CASp) Fees

3. Appropriation of one-time CalPERS Additional Discretionary Payments (ADP)

4. General Fund Operating Budget Changes

5. Enterprise Fund Operating Budget Changes

1. Transportation Development Act (TDA) Article 3 Funding The State of California has designated 1/4% of the sales tax levied statewide for local transportation purposes. Funding for this program was provided during the 1971 legislative session with the enactment of the Transportation Development Act, which extended the State sales tax to include purchases of gasoline. Revenues allocated to the City of San Luis Obispo under this program are divided into two categories: Article 3 funds, which are restricted for the improvement and maintenance of street systems including pedestrian and bicycle facilities; and Article 4 funds, which are restricted for public transit systems and are recorded directly in the Transit Fund. Under the City’s Financial Plan policies, all TDA Article 3 revenues are allocated for alternative transportation purposes.

During budget development, staff include a conservative TDA revenue forecast which is then programmed towards an eligible capital project. The purpose of this adjustment is to update the revenue and expenditure budgets based on the actual 2022-23 TDA allocation.

Table 5: TDA Bikeways Article 3 Funding Allocation Original Budget Updated Variance
Transportation Plan Implementation – Pedestrian Facility Improvements (Project #1000502-01)
$ 45,000 $ 76,869 $ 31,869

2. SB1186 CASP Certify Funding (CASp)
The CASp fund was established by Senate Bill 1186 (2012) which requires local agencies to collect an additional fee when issuing a permit for the purpose of increasing certified access specialist (CASp) services and compliance with construction-related accessibility requirements. The first priority is to spend the funds on the training and retention of CASps in order to meet the needs of the public in the jurisdiction. The funds may also be spent on activities or programs that facilitate accessibility compliance.

The City’s Deputy Building Official is CASp certified and has been expanding the City’s CASp program. In reviewing the fund and current budget allocations, the Deputy Building Official identified that the FY 2021- 22 budget allocation was not in line with the Department of the State Architect (DSA) 2 recommendations.

These funds have not been spent and staff recommend removing them from the project budget in order to facilitate accessibility compliance programs and trainings more in line with the bill language. Some 2 The Department of the State Architect (DSA) does not advise the use of funds from the SB 1186 fee by local jurisdictions to directly fund construction projects, nor accessibility work that is not construction-related, as these activities are not clearly permissible in law (see Government Code Section 4467).

Budget Report Pg. 8

Page 384 of 493 ends

Mid-Year Expenditure Budget Changes
operating expenditures have been identified in FY 2022-23 and the remaining funds will be programmed as part of the 2023-25 Financial Plan.

Table 6: CASp Funding
1 FY 2021-22 CASp Fund Balance $ 112,056
2 Assigned to Sidewalk Replacement and Installation Project (#90849) $ 85,461 3 Remaining Balance $ 26,595
CASp Funding: Mid Year Recommendations
4 Remove budget from Project 90849 $ (85,461)
5 Allocation towards current eligible 2022-23 staff expenditures3 :
6 CASp Certification (Application, Exams, Certificate) $ 1,200 7 CASp Training @ CCAIA (6 employees) $ 646
8 CASp Training @ CALBO (Registration, Per Diem, Mileage) $ 774 9 Access Toolkit (1 employee) $ 199
10 CASp Training @ CASI (Registration, Per Diem, Mileage) $ 919 11 Additional Planned 2022-23 Expenditures
12 Casp Certification (2 employees) $ 2,400
13 Training/Test Prep software (2 employees) $ 1,000
14 Access Toolkit (5 employees) $ 1,500
15 National ADA Symposium (May 2023) (2 employees) $ 6,000 16 Remaining Balance $ 97,417

3. CalPERs Additional Discretionary Payments (ADP)
With the 2018-19 Budget Adoption, Council adopted the “Fiscal Health Response Plan” to help balance the long-term forecast and begin an ambitious schedule to pay down pension obligation over 20 years instead of 30 years. This was based on the commitment to use available unassigned fund balance mainly for this purpose. In addition to the planned payment of $2 million (General Fund portion) for FY 2022-23, staff recommend allocating an additional $1.3 million of unassigned General Fund balance (due to over realized revenue) which will help offset the 6.1% investment losses that CalPERs experienced last year.

For future planned payments above the regular CalPERS contributions, see the updated long-term forecasts.

Table 7: 2021-22 General Fund Unassigned Fund Balance
1 Unassigned General Fund Balance (2021-22 ACFR Pg. xv) $ 8,356,724 2 City Manager Approved Year End Carryover $ (2,857,159) 3 Revenue Stabilization Reserve4 $ (2,000,000)
4 Required for Balanced Forecast $ (2,095,000)
5 Remaining FY 2021-22 Year End Balance $ 1,404,565
6 Recommended CalPERs ADP (Recommendation – See table 8) $ 1,300,000 7 Unassigned fund balance $ 104,565
3 Expenses incurred in FY 2022-23 were paid out of the General Fund but will be reimbursed by the CASp fund. 4 Allocated by Council on October 4, 2022 (R-11367)
Budget Report Pg. 9

Page 385 of 493 ends

Mid-Year Expenditure Budget Changes
Table 8: Recommended FY 2022-23 CalPERs Additional Discretionary Payments (ADP) 5 Fund Planned ADP (per
forecast)
One-time ADP (FY 2021-
22 Balance)
Total ADP for FY
2022-23
1 General Fund $ 2,000,000 $ 1,300,000 $ 3,300,000
2 Water $ 164,840 $ 107,146 $ 271,986
3 Sewer $ 169,419 $ 110,122 $ 279,542
4 Parking $ 61,003 $ 39,652 $ 100,654
5 Transit $ 12,555 $ 8,161 $ 20,716
6 Whale Rock $ 21,417 $ 13,921 $ 35,339
7 TBID $ 7,976 $ 5,184 $ 13,161
8 Total All Funds $ 2,437,211 $ 1,584,187 $ 4,021,398

4. Operating Budget Changes
The following budget adjustments are either mission critical or administrative in nature. No new programs or services are being recommended.

Table 9: Recommended FY 2022-23 Mid Year Budget Changes Budget General
Fund
Swim Center Boiler Replacement - This funding will repair the heat exchange components on the current boiler system. This was determined to be an issue following an inspection and diagnosis of the boiler system. $20,000
General
Fund
Staffing Contingency – Additional budget necessary to cover anticipated staffing expenditures through the end of FY 2022-23. If any portion of contingency is not activated, it will be returned to fund balance at the end of the year.
$375,000
Water
Fund*
Staffing Contingency - Administrative Adjustment for Bargaining Unit Parameters resulting from Compensation Study Salary Increases6 $377,676 Sewer
Fund*
Staffing Contingency - Administrative Adjustment for Bargaining Unit Parameters resulting from Compensation Study Salary Increases $329,471
Total $1,102,147
*Also included in Enterprise Fund Summaries (Section C) 5 Payment will be made in April 2023
6 This covers the required amounts to cover bargaining parameters for SLOCEA that were not part of the original budget; however can be absorbed out of the funds’ working capital on an ongoing basis.

Budget Report Pg. 10

Page 386 of 493 ends

Enterprise Funds: Water
C: Enterprise Funds
The City’s financial structure is separated into governmental funds and business activities or Enterprise funds. Business activities are distinguished from governmental funds by their similarity to private sector enterprises and are financed largely through user service charges. The City has four unique funds that fall into this category:

WATER FUND SUMMARY________________________________________________________ Revenue
Water sales are trending on track with revenue projections and revenues in prior fiscal years. At the time of writing this report, revenues only reflect four months (or 33%) of water sales because of the timing of billings. Water sales, base charges, salesto Cal Poly, and other miscellaneous utilities set up fees comprise over 90% of anticipated revenues.

Table 10: Water Fund Revenue
Typically, water consumption trends higher in the summer months, due to increased irrigation demands caused by hotter, drier weather. During the first few years of drought, water consumption usually starts high, then tapers off when the public becomes more aware of drought conditions. While water supplies are secure in the City, per-capita residential water use has decreased slightly in comparison with the first two years of the current drought (2020 and 2021) as residents and businesses have complied with the Governor’s Orders on this topic.

Water Sewer Parking Transit
Budget Report Pg. 11

Page 387 of 493 ends

Enterprise Funds: Water
Graph A: Residential Gallons per Capita per Day (RGPCD) Other major sources of revenue in the Water Fund include $697,500 received through the Cal OES Hazard Mitigation Grant Program and $265,949 received through the Tetrachloroethylene Plume Characterization Planning Grant. The Water Fund has not received these funds yet because they are contingent on project timelines for the Water Treatment Plant Emergency Power (Public Safety Power Shutoff) project and the Groundwater Contamination Characterization Project.

The fund remains on track to meet revenue targets and short-term operational, capital expenditure, and reserve needs.

Operating Expenses
As projected in the Adopted Supplemental Budget 2022-23, costs related to chemicals, electricity, and capital project delivery continue to increase. Industry-specific increases have exceeded general inflation and are not anticipated to normalize this fiscal year. Chemical and electricity cost increases will continue to impact the Water Fund, as these expenses amount to more than 15% of the annual operating budget.

The City’s Water Treatment Plant and reservoirs are located in the unincorporated area and are currently not subject to Central Coast Community Energy (3CE) pricing. The recent compensation study also contributed to higher expenditures. Operating expenses are on track with appropriated budget allocations.

Table 11: Water Fund Operating Expenditures
Water Fund Operating Expenditures FY 2021-22 Actual Budget Year-to-date Actual % Expended
Salaries $ 2,881,761 $ 3,407,456 $ 1,547,931 45%
Retirement/Benefits $ 644,812 $ 799,220 $ 357,536 45%
Contract Services $ 9,933,688 $ 11,970,558 $ 9,202,161 77% Utilities $ 526,965 $ 698,125 $ 352,591 51%
Other Operating Expenditures $ 942,986 $ 1,524,493 $ 846,667 56% PERS Unfunded Liability/Retiree Healthcare 1,648,106 $ $ 754,930 $ 698,149 92% Transfers Out $ 2,517,178 $ 2,311,753 $ 1,155,877 50%
Total $ 19,095,496 $ 21,466,535 $ 14,160,912 66%
FY 2022-23
Budget Report Pg. 12

Page 388 of 493 ends

Enterprise Funds: Water
Mid-Year Budget Changes: One mid-year budget adjustment is being requested as outlined below. This request can be absorbed within the fund’s working capital.

Table 12: Water Mid-year Operating Budget Request Current Amount Budgeted
Amount
Requested New Total
Administrative Adjustment for Bargaining Unit Parameters resulting from Compensation Study Salary Increases7 $129,622 $248,054 $377,676 The Water Fund Long Term Forecast: Challenges and Considerations Industry-specific increases, general inflation, and increased staffing costs continue to impact the Water Fund. Additionally, deferral of rate increases has resulted in substantial reduction in revenues. Early analysis indicates that proposed rate increases in the next financial plan may exceed historic averages.

Industry-Specific Increases
Some of the most substantial increases in cost of operations were industry-specific increases in capital projects, electricity, and chemicals. For capital projects and electricity, costs have risen as much as 20%.

Chemicals are more variable and extreme, with some chemicals exceeding 100% cost increases.

Table 13: Chemical Cost Increases
Chemical 2021-22 Contract 2022-23 Contract8 % Increase
Alum $336 ton $450 ton +34%
Fluoride $1,760 ton $3,211.40 ton +82%
Chlorine (Cl2) $0.68 gal $1.40 gal +106%
Sodium Hydroxide (NaOH) $0.76 gal $1.28 gal +68%
Polymer $0.68 lb $0.95 lb +40%
Liquid Oxygen (Lox) $1.28 gal $1.30 gal +2%
For FY 2022-23, budgets have been approved contingencies that are anticipated to be sufficient to accommodate these increases. It is uncertain when these cost increases will stabilize, and it is unlikely that costs will return to historic averages.

General Inflation
Several indices corroborate what the Utilities Department is seeing reflected in the cost of operations.

The Municipal Cost Index (MCI), an index designed to reflect the effects of inflation on providing municipal services, peaked at a 12.51% annual increase in April 2022. For comparison, the year-over-year percent changes for MCI as of September for the last seven years are in the table below.

Table 14: Municipal Cost Index (MCI) Year-over-year
7 The initial amount was only a partial amount of the bargaining parameters and was insufficient to meet negotiated parameters.
8 One-year contract with an option to re-negotiate in 6 months due to volatile markets.

Budget Report Pg. 13

Page 389 of 493 ends

Enterprise Funds: Water
Increased Staffing Costs
The completion of the Benchmark Compensation Study resulted in more competitive salaries for City staff.

While this helps with recruitment and retention of qualified staff, it results in increased costs to provide water services. In addition to increased compensation of direct Utilities staff, the Utilities Department expects substantial increases in contributions to the Cost of Service and Cost Allocation Plan, due the expansion of internal services provided by the City. The full impact of related salary increases will be better understood once the Cost of Service and Cost Allocation Plan are completed.

Deferred Rate Increases
On June 18, 2019, Resolution No. 11023 was approved by the City Council, authorizing annual water rate increases of 5.5% , effective July 1, 2019 and July 1, 2020 respectively. The July 1, 2020 water rate increase was deferred to February 1, 2021 and reduced to 3.6% (Resolution No. 11202). The deferral and reduction of the proposed rate increases was enacted to accommodate community members who had been economically impacted by the COVID-19 pandemic.

Through four months of billings in FY 2022-23, it is estimated that revenues are $175,000 less than anticipated due to the deferred and reduced rate increase outlined in Resolution No. 11202. Cumulatively, since the deferral occurred on July 1, 2020, Water Fund revenues are estimated to be $1.58 million less than originally anticipated.

Calendar Year MCI YoY % Change (September)
2022 9.14%
2021 10.80%
2020 1.04%
2019 0.55%
2018 3.24%
2017 3.41%
2016 1.13%
Budget Report Pg. 14

Page 390 of 493 ends

Enterprise Funds: Water
Water Fund Long Term Forecast
(A)
2021-22
(B)
2022-23
(C)
2022-23
(D)
2023-24
(E)
2024-25
(F)
2025-26
(G)
2026-27
Actual Budget Revised Projected Projected Projected Projected

REVENUES BY TYPE
1 Water Service Sales (Charges) $ 16,110 $ 16,329 $ 16,329 $ 17,472 $ 18,695 $ 19,349 $ 20,026 2 Utilities Base Fee Charges $ 5,615 $ 5,754 $ 5,754 $ 6,157 $ 6,588 $ 6,819 $ 7,057 3 Sales to Cal Poly $ 1,140 $ 1,045 $ 1,045 $ 1,096 $ 1,174 $ 1,285 $ 1,389 4 Cal Poly Capacity & Resilience $ 114 $ 259 $ 259 $ 249 $ 249 $ 266 $ 273 5 Reclaimed Water Sales (Recycled Water) $ 1,210 $ 995 $ 995 $ 1,065 $ 1,140 $ 1,180 $ 1,221 6 Development Impact Fees $ 5,162 $ 1,370 $ 1,370 $ 800 $ 800 $ 800 $ 800 7 Investment and Property Revenue $ 207 $ 50 $ 50 $ 50 $ 50 $ 50 $ 50 8 Long Term Debt Proceeds $ 2,397 $ - $ 873 $ 873 $ - $ 8,000 $ - 9 Grants and Subventions $ 1,849 $ 1,395 $ 963 $ 698 $ - $ - $ - 10 Miscellaneous (Other) Revenue $ (706) $ 309 $ 309 $ 239 $ 250 $ 239 $ 239 11 Rate Assistance Subsidy $ (15) $ (100) $ (100) $ (100) $ (100) $ (100) $ (100) 12 TOTAL $ 33,084 $ 27,407 $ 27,848 $ 28,598 $ 28,845 $ 37,887 $ 30,955 13 EXPENDITURE BY CATEGORY
14 Salaries & Benefits $ 5,175 $ 4,968 $ 5,249 $ 5,525 $ 5,784 $ 5,963 $ 6,147 15 Operating Expenditures $ 11,449 $ 13,532 $ 13,593 $ 13,990 $ 14,328 $ 14,648 $ 14,943 16 Capital Outlay $ 5,706 $ 5,085 $ 16,882 $ 6,905 $ 5,348 $ 11,977 $ 5,793 17 Debt Service $ 2,307 $ 2,443 $ 2,443 $ 1,870 $ 1,869 $ 1,866 $ 2,391 18 Transfers Out $ 2,517 $ 2,312 $ 2,312 $ 2,620 $ 2,970 $ 3,321 $ 3,488 19 TOTAL $ 27,154 $ 28,340 $ 40,479 $ 30,911 $ 30,299 $ 37,776 $ 32,761 20 EXPENDITURE BY FUNCTION
21 General Government $ 2,517 $ 2,312 $ 2,312 $ 2,620 $ 2,970 $ 3,321 $ 3,488 22 Debt Service $ 2,307 $ 2,443 $ 2,443 $ 1,870 $ 1,869 $ 1,866 $ 2,391 23 Capital Carryover $ 10,199
24 Water Source of Supply $ 11,072 $ 10,969 $ 10,969 $ 11,175 $ 11,559 $ 12,261 $ 11,809 25 Water Treatment $ 4,593 $ 4,795 $ 4,796 $ 5,760 $ 6,042 $ 5,103 $ 6,562 26 Water Distribution $ 3,772 $ 5,442 $ 5,610 $ 6,374 $ 4,433 $ 11,311 $ 5,222 27 Water Resources $ 501 $ 571 $ 571 $ 589 $ 607 $ 625 $ 645 28 Water Administration $ 1,355 $ 1,370 $ 1,433 $ 1,455 $ 1,500 $ 1,546 $ 1,593 30 Utilities Revenue (Billing) $ 266 $ 308 $ 308 $ 317 $ 327 $ 337 $ 347 31 Non Departmental* $ 772 $ 130 $ 1,838 $ 750 $ 993 $ 1,405 $ 706 32 TOTAL $ 27,154 $ 28,340 $ 40,479 $ 30,911 $ 30,299 $ 37,776 $ 32,761 33 CHANGES IN FINANCIAL POSITION
34 Working Capital - Beginning 28,503$ 17,478$ 34,725$ 21,930$ 19,452$ 17,833$ 17,780$ 35 Revenues over (under) Expenditures 5,930$ $ (12,631)$ (933) $ (2,313) $ (1,454) $ (1,806) 112 $ 36 Working Capital - Year End before CalPERS 34,705$ 16,545$ 22,095$ 19,617$ 17,998$ 17,945$ 15,974$ 37 CALPERS Down Payment $ 272 $ 165 $ 165 $ 165 $ 165 $ 165 $ 165 38 Working Capital - Year End 34,433$ 16,380$ 21,930$ 19,452$ 17,833$ 17,780$ 15,810$ 39 Operating Reserve 4,290$ 4,651$ 4,719$ 4,801$ 4,990$ 5,160$ 5,394$ 40 Assigned to Encumbrances $ 594
41 Rate Stabilization 2,286$ 2,313$ 2,313$ 2,472$ 2,646$ 2,745$ 2,847$ 41 Other Reserves (i.e. UFL Trust Fund) $ 166 $ 176 $ 176 $ 176 $ 176 $ 176 $ 176 43 Unreserved Working Capital - Year End 27,098$ 9,240$ 14,722$ 12,003$ 10,022$ 9,700$ 7,393$ * Staffing contingency, miscellaneous CIP expenditures, and assigned project balances. ** Includes carrover balances for multi-year CIP projects Table L2: Water Fund Five-Year Forecast
(in thousands)
Revised with Mid year
Budget Report Pg. 15

Page 391 of 493 ends

Enterprise Funds: Sewer
SEWER FUND SUMMARY___________ _____________________________________________ Revenue
Sewer sales are trending on track with revenue projections and revenues in prior fiscal years. At the time of writing this report, revenues only reflect three months (or 25%) of sewersales because of billing timing.

Sewer service charges, base charges, sales to Cal Poly, and other miscellaneous utilities set up fees comprise about 95% of anticipated revenues.

Table 15: Sewer Fund Revenue
Sales to Cal Poly is trending lower after inflated September 2021 billings, when Cal Poly drained a tank that resulted in 1.48 million gallons of billable outflow. Sales to Cal Poly also tends to have higher billings in the last half of the fiscal year because during the beginning of the fiscal year Cal Poly is not in session.

Other major sources of revenue in the Sewer Fund include $728,888 through the Cal OES Hazard Mitigation Grant Programs and $657,265 through the Proposition 1 Integrated Regional Water Management Implementation Grant. The Sewer Fund has not received these funds yet because they are contingent on WRRF project (SLO Water Plus) timelines.

The fund remains on track to meet revenue targets and short-term operational, capital expenditure, and reserve needs.

Operating Expenses
As projected in the Adopted Supplemental Budget 2022-23, costs related to chemicals, electricity, and capital project delivery continue to increase. Industry-specific increases have exceeded general inflation and are not anticipated to normalize this fiscal year. Chemical and electricity cost increases will continue to impact the Sewer Fund, as these expenses amount to more than 18% of the annual operating budget.

The recent compensation study also contributed to higher expenditures. Operating expenses are on track with appropriated budget allocations.

Budget Report Pg. 16

Page 392 of 493 ends

Enterprise Funds: Sewer
Table 16: Sewer Fund Operating Expenditures
Mid-Year Budget Changes: One mid-year budget adjustment is being requested as outlined below:

Table 17: Water Mid-year Operating Budget Request Current Amount Budgeted
Amount
Requested
New Total
Administrative Adjustment for Bargaining Unit Parameters resulting from Compensation Study Salary Increases9
$102,654 $226,817 $329,471
The Sewer Fund Long Term Forecast: Challenges and Considerations Industry-specific increases, general inflation, and increased staffing costs continue to impact the Sewer Fund. Additionally, deferral of rate increases has resulted in substantial reduction in revenues. Early analysis indicates that proposed rate increases in the next financial plan may exceed historic averages.

Industry-Specific Increases
Some of the most substantial increases in cost of operations were industry-specific increases in capital projects, electricity, and chemicals. For capital projects and electricity, costs have risen as much as 20%.

Chemicals are more variable and extreme, with some chemicals exceeding 100% cost increases.

Table 18: Chemical Cost Increases
Chemical 2021-22 Contract 2022-23
Contract10
% Increase
Sodium Hypochlorite (NaClO) 0.74/gallon 1.55/gallon 109% Ferrous Chloride (FeCl2) 1.31/gallon 3.85/gallon 194%
Sodium Bisulfite (NaHSO3) 0.95/gallon 1.28/gallon 35%
Sodium Hydroxide (NaOH) 0.79/gallon 1.39/gallon 76%
Polymer 1.25/gallon 1.65/gallon 32%
For FY 2022-23, budgets have been approved with contingencies that are anticipated to be sufficient to accommodate these increases. It is uncertain when these cost increases will stabilize, and it is unlikely that costs will return to historic averages.
9 The initial amount was only a partial amount of the bargaining parameters and was insufficient to meet negotiated parameters.
10 One-year contract with an option to re-negotiate in 6 months due to volatile markets.

Sewer Fund Operating Expenditures FY 2021-22 Actual Budget Year-to-date Actual % Expended
Salaries $ 2,878,352 $ 3,415,564 $ 1,480,538 43%
Retirement/Benefits $ 644,084 $ 794,925 $ 339,436 43%
Contract Services $ 696,410 $ 1,510,102 $ 976,175 65%
Utilities $ 541,456 $ 942,423 $ 349,100 37%
Other Operating Expenditures $ 1,433,539 $ 1,681,054 $ 1,265,094 75% PERS Unfunded Liability/Retiree Healthcare 1,661,196 $ $ 780,400 $ 722,419 93% Transfers Out $ 2,368,064 $ 2,573,783 $ 1,286,892 50%
Total $ 10,223,100 $ 11,698,250 $ 6,419,653 55%
FY 2022-23
Budget Report Pg. 17

Page 393 of 493 ends

Enterprise Funds: Sewer
General Inflation
Several indices corroborate what the Utilities Department is seeing reflected in the cost of operations.

The Municipal Cost Index (MCI), an index designed to reflect the effects of inflation on providing municipal services, peaked at a 12.51% annual increase in April 2022. For comparison, the year-over-year percent changes for MCI as of September for the last seven years are in the table below.

Table 19: Municipal Cost Index (MCI) Year-over-year
Increased Staffing Costs
The completion of the Benchmark Compensation Study resulted in more competitive salaries for City staff.

While this helps with recruitment and retention of qualified staff, it results in increased costs to provide wastewater services. In addition to increased compensation of direct Utilities staff, the Utilities Department expects substantial increases in contributions to the Cost of Service and Cost Allocation Plan, due the expansion of internal services provided by the City. The full impact of related salary increases will be better understood once the Cost of Service and Cost Allocation Plan are completed.

Deferred Rate Increases
On June 18, 2019, Resolution No. 11023 was approved by the City Council, authorizing annual sewer rate increases of 5.5% and 5%, effective July 1, 2019 and July 1, 2020 respectively. The July 1, 2020 sewer rate increase was deferred to February 1, 2021 and reduced to 3.6% (Resolution No. 11202). The deferral and reduction of the proposed rate increases was enacted to accommodate community members who had been economically impacted by the COVID-19 pandemic.

Through four months of billings in FY 2022-23, it is estimated that revenues are $93,000 less than anticipated due to the deferred and reduced rate increase through Resolution No. 11202. Cumulatively, since the deferral occurred on July 1, 2020, Sewer Fund revenues are estimated to be $950,000 less than originally anticipated.

Calendar Year MCI YoY % Change (September)
2022 9.14%
2021 10.80%
2020 1.04%
2019 0.55%
2018 3.24%
2017 3.41%
2016 1.13%
Budget Report Pg. 18

Page 394 of 493 ends

Enterprise Funds: Sewer
Sewer Fund Long Term Forecast
(A)
2021-22
(B)
2022-23
(C)
2022-23
(D)
2023-24
(E)
2024-25
(F)
2025-26
(G)
2026-27
Actual Budget Revised Projected Projected Projected Projected

REVENUES BY TYPE
1 Sewer Service Charges $ 13,342 $ 12,792 $ 12,792 $ 13,240 $ 13,703 $ 14,183 $ 14,679 2 Utilities Base Charges $ 4,893 $ 4,816 $ 4,816 $ 4,984 $ 5,159 $ 5,339 $ 5,526 3 Sales to Cal Poly $ 1,147 $ 1,026 $ 1,026 $ 1,008 $ 998 $ 974 $ 961 4 Cal Poly Capacity & Resilience $ 244 $ 244 $ 244 $ 473 $ 473 $ 473 $ 473 5 Development Impact Fees $ 3,826 $ 1,190 $ 1,190 $ 600 $ 600 $ 600 $ 600 6 Industrial User Permits $ 86 $ 85 $ 85 $ 85 $ 85 $ 85 $ 85 7 Investment & Property Revenue $ 257 $ 50 $ 50 $ 50 $ 50 $ 50 $ 50 8 Long Term Debt Proceeds $ 46,556 $ 427 $ 31,132 $ 31,132 $ - $ - $ - 9 Grants and Subventions $ 97 $ - $ 1,386 $ 1,386 $ - $ - $ - 10 Miscellaneous Revenue $ (762) $ 306 $ 306 $ 359 $ 359 $ 359 $ 359 11 Rate Assistance Subsidy $ (13) $ (100) $ (100) $ (100) $ (100) $ (100) $ (100) 12 TOTAL $ 69,672 $ 20,836 $ 52,927 $ 53,217 $ 21,326 $ 21,962 $ 22,633 13 EXPENDITURE BY CATEGORY
14 Salaries & Benefits $ 5,184 $ 4,889 $ 5,245 $ 5,515 $ 5,764 $ 5,942 $ 6,125 15 Operating Expenditures $ 2,668 $ 3,542 $ 3,632 $ 3,878 $ 4,059 $ 4,213 $ 4,340 16 Capital Outlay $ 41,240 $ 5,738 $ 76,895 $ 9,797 $ 2,446 $ 7,891 $ 1,408 17 Debt Service $ 1,380 $ 1,381 $ 1,381 $ 1,382 $ 7,006 $ 7,099 $ 7,090 18 Transfers Out $ 2,368 $ 2,574 $ 2,574 $ 2,906 $ 3,283 $ 3,645 $ 3,827 19 TOTAL $ 52,840 $ 18,125 $ 89,727 $ 23,479 $ 22,557 $ 28,789 $ 22,791 20 EXPENDITURE BY FUNCTION
21 General Government $ 2,368 $ 2,574 $ 2,574 $ 2,906 $ 3,283 $ 3,645 $ 3,827 22 Debt Service $ 1,380 $ 1,381 $ 1,381 $ 1,382 $ 7,006 $ 7,099 $ 7,090 23 Capital Carryover $ 70,540
24 Wastewater Collection $ 4,506 $ 5,796 $ 6,319 $ 9,952 $ 3,453 $ 6,807 $ 2,461 25 Environmental Compliance $ 265 $ 282 $ 282 $ 291 $ 300 $ 309 $ 319 26 Water Resource Recovery $ 41,607 $ 5,429 $ 5,445 $ 5,272 $ 4,946 $ 7,422 $ 5,468 27 Utilities Revenue $ 272 $ 310 $ 310 $ 320 $ 329 $ 339 $ 349 28 Water Quality Lab $ 698 $ 832 $ 922 $ 950 $ 980 $ 1,010 $ 1,041 29 Wastewater Administration $ 1,366 $ 1,399 $ 1,398 $ 1,434 $ 1,478 $ 1,523 $ 1,570 30 Non Departmental* $ 378 $ 122 $ 555 $ 972 $ 782 $ 635 $ 665 31 TOTAL $ 52,840 $ 18,125 $ 89,727 $ 23,479 $ 22,557 $ 28,789 $ 22,791 32 CHANGES IN FINANCIAL POSITION
33 Working Capital - Beginning $ 35,237 $ 24,589 $ 47,774 $ 10,806 $ 40,374 $ 38,973 $ 31,977 34 Revenues over (under) Expenditures $ 16,832 $ 2,711 $ (36,799) $ 29,737 $ (1,231) $ (6,827) $ (158) 35 Working Capital - Year End before CalPERS $ 52,348 $ 27,300 $ 10,975 $ 40,543 $ 39,143 $ 32,146 $ 31,819 36 CALPers Additional Discretionary Payment $ 280 $ 169 $ 169 $ 169 $ 169 $ 169 $ 169 37 Working Capital - Year End $ 52,069 $ 27,131 $ 10,806 $ 40,374 $ 38,973 $ 31,977 $ 31,650 38 Operating Reserve $ 2,320 $ 2,477 $ 2,566 $ 2,736 $ 4,022 $ 4,180 $ 4,276 39 Assigned to Encumbrances $ 496
40 Rate Stabilization $ 969 $ 932 $ 932 $ 962 $ 993 $ 1,025 $ 1,058 41 Other Reserves (i.e. UFL Trust Fund, SRF
Loan) $ 20,768$ 171 3,134$ 6,087$ 6,087$ 6,087$ 6,087$
42 Unreserved Working Capital - Year End 48,112$ 20,588$ 4,174$ 30,588$ 27,871$ 20,685$ 20,228$ * Staffing contingency, miscellaneous CIP expenditures, and assigned project balances. ** Includes carrover balances for multi-year CIP rojects Revised with Mid-Year
Table L3: Sewer Fund Five-Year Forecast
(in thousands)
Budget Report Pg. 19

Page 395 of 493 ends

Enterprise Funds: Parking
PARKING FUND SUMMARY___________ ____________________________________ ______ Revenue
In recent years, Parking revenue has very much been in flux due to the impacts of COVID-19. However, based on revenue data for the first half of FY 2022-23, the Parking Fund is proposing no revisions to its revenue projections as part of the mid-year process. When preparing revenue estimates for the year, staff used a conservative approach considering a return to normalcy following the COVID-19 pandemic, lost parking spaces due to the parklet program, and the impacts of newer bike lanes that reduce or minimize metered parking. Staff also took into consideration rate increases and corresponding revenues, which are effective as of January 1, 2023.

Based upon available information, trends, and financial forecast, the fund is currently positioned to sustain planned operating and capital expenditures, meet reserve requirements, and cover anticipated debt payments associated with the Cultural Arts District Parking Structure. This is attributable to the adoption of additional revenue enhancement strategies and rate increases, additional enforcement staff, and strategic capital project planning. Overall, the Parking Fund has collected approximately 50 percent of projected revenues to date although there will be a dip in revenue during the holiday and spring season.

Based on revenue to date, there is no proposed revenue adjustment as part of the mid-year process.

Table 20: Parking Fund Revenue
Overall, the Parking Fund has realized approximately 56% of its projected revenues. Most revenue items are near or above the 50 percent mark, as anticipated at the mid-year point. Staff will continue to monitor revenues throughout the remainder of the fiscal year with attention to the impacts of rate increases and technology improvements such as gateless entry and exit being made available. It is important to note that some capital projects may have a short-term negative impact on parking revenues, although this revenue loss will be made up for in the long run with the improvements.

Long Term Parking – 40 percent of this revenue item has been collected, which is nearrevenue projections expected to date. This revenue is primarily based on long term parking for City and County employees, which are typically billed quarterly. This also captures downtown residents and employees who pay for monthly parking.

Other Revenue – 64 percent of this revenue item has been collected, which is consistent with revenue projections expected to date. Other revenue includes rent and lease payments, miscellaneous revenue, parking in lieu, and is primarily captured in the beginning of the given fiscal year.

Budget Report Pg. 20

Page 396 of 493 ends

Enterprise Funds: Parking
Parking Fines – 55 percent of this revenue item has been collected, which is consistent with revenue projections expected to date. An increase in enforcement efforts has led to a slight increase in citation revenue but this will likely dip over the holidays and spring seasons.

Parking Meters – 51 percent of this revenue item has been collected, which is consistent with revenue projections expected to date. Staff believes an increase in meter revenue may be realized with the implementation of credit card capable meters throughout the city – rather than coin only meters.

Parking Structures - 47 percent of this revenue item has been collected, which is consistent with revenue projections expected to date. Structure revenue has seemed to return to pre-COVID levels beginning in May 2021 when the Farmer’s Market was reestablished and non-City staff who work in the downtown area began to utilize the long-term parking program. These are positive indicators of a Parking Fund moving toward fiscal sustainability. Revenue close to expected to date.

Transfers In – This revenue item accounts for a one-time transfer of $700,000 of American Rescue Plan Act (ARPA) funds to offset revenue that would have been realized by keeping the first hour or parking free.

Operating Expenditures
The Parking Fund is trending in line with the FY 2022-23 operating budget. Throughout the fiscal year, the Parking Program has been closely monitoring operating expenses to ensure a strong fund balance to support the Cultural Arts District Parking Structure, which is actively seeking a loan in the amount of approximately $47 million. A major piece in securing this loan is meeting debt ratio requirements which considers revenues in relation to operational expenses. To date, the parking fund has been successful in carrying out core services while managing operating expenses.

Table 21: Parking Fund Operating Expenditures
Salaries and Benefits – To date, the program has expended approximately 37 percent and 31 percent of the annual budget on salaries and benefits, respectively, and will likely see salary savings across the year.

There are current vacancies in the Parking Supervisor position, as well as vacancies in the Enforcement Officer classification. Staffing shortages continue to have significant financial impacts on the Parking Fund through unrealized revenues and w a major effort is underway to build out appropriate staffing in combination with new technologies. If salary savings are realized at year end, this funding will help support the fund balance to aid long term debt obligations.

Parking Fund Operating Expenditures FY 2021-22 Actual Budget Year-to-date Actual % Expended
Salaries $ 880,347 $ 1,358,826 $ 498,396 37%
Retirement/Benefits $ 165,521 $ 315,712 $ 98,661 31%
Contract Services $ 713,922 $ 882,592 $ 595,731 67%
Utilities $ 170,905 $ 221,933 $ 101,353 46%
Other Operating Expenditures $ 373,041 $ 367,107 $ 247,332 67% PERS Unfunded Liability/Retiree Healthcare 528,186 $ $ 243,382 $ 227,997 94% Transfers Out $ 1,105,120 $ 1,263,622 $ 631,811 50%
Total $ 3,937,043 $ 4,653,174 $ 2,401,281 52%
FY 2022-23
Budget Report Pg. 21

Page 397 of 493 ends

Enterprise Funds: Parking
Contract Services – The Parking Program has been conscious of spending for contract services over the first part of the fiscal year, expending 67 percent of its budget. This amount includes obligated funds that will be utilized for services throughout the remainder of the fiscal year. While still responding to deferred maintenance, repairs, and infrastructure failures, in addition to cost escalation and supply chain issues, the parking fund has balanced immediate needs while maintaining spending.

Other Operating Expenses – To date, the parking fund has expended 67 percent of its annual budget.

Again, this amount includes obligated funds that will be utilized for services throughout the remainder of the fiscal year. Last fiscal year, the program experienced excess spending in contract services primarily due to unanticipated increases in credit card merchant fees around payment transactions, print and reproduction materials for citation and parking receipts, as well as materials and supplies for day-to-day activities. The program also had to address daily impacts of transient activities in the structures including vandalism, graffiti, and debris left behind.

Budget Report Pg. 22

Page 398 of 493 ends

Enterprise Funds: Parking
Parking Fund Long Term Forecast
* Includes rate adjustments beginning in January 2023
** One time transfer of State & Local Recovery Funds to continue the first hour of free parking in the parking structures through June 30, 2023
Budget Report Pg. 23

Page 399 of 493 ends

Enterprise Funds: Transit
TRANSIT FUND SUMMARY___________ __________________ ________________________ Revenue
The City secured grant funding from the American Rescue Plan Act (ARPA) for 100 percent of operational costs beginning in FY 2022-23 for three fiscal years that will provide emergency funding to recover from operational impacts from COVID-19. These ARPA funds will supplement driver wages and lost fare revenue. FTA 5307 funds will be used to purchase additional zero emission buses and support other capital projects. The reduction in service levels resulted in cost savings that helped to offset lost revenues.

The unused balance of annual allocations of Federal 5307 and TDA Funds have were deferred for use in FY 2022-23.

Ridership is a critical component of the on-going health of the Transit Fund. Necessary to secure State Transit Development Act (TDA) funds is a requirement that 20 percent of the programs’ operating budget be generated from local revenue – fares, bus passes, and payment for Cal Poly. During the previous fiscal year and into this year, the Transit Program has experienced a dramatic increase in ridership and fare revenue.

Staff have received updated allocation amounts from various sources and as a result, revenues have been revised as outlined below. The increase in revenue now accountsfor new, unanticipated discretionary FTA 5339 Funds that will support six (6) new buses estimated at $4.8 million. In addition, the fund is expected to realize an additional $1 million of STA funds based on updated and actual apportionments. However, there is often a delay in the posting of revenues because much funding is allocated from state and federal programs which have varied funding cycles. At this time, the Transit Fund is on tracking as expected for its annual revenues.

Table 22: Transit Fund Revenue
Operating Expenditures
The Transit Program is realizing savings in staffing as it is temporarily operating with reduced staffing levels. In addition, the program is also operating with reduced service levels due to driver shortages. This has resulted in savings in purchased transportation and maintenance. To date, the Transit Fund has expended approximately 25 percent of its operating budget and as a result, no operating budget changes are being requested. Transit will continue to monitor operations and match expenditures to revenues and take a conservative approach to managing the fund.

Table 23: Transit Fund Operating Expenditures
Transit Fund Revenue Budget Actuals YTD Variance % Received Midyear
Revised
Total Midyear
Changes
1 Federal 7,248,297 (7,248,297) - 0% 11,547,838 4,299,541 2 State 850,000 377,282 (472,718) 44% 850,000 -
3 Local (Bus Fare) 350,683 283,204 (67,479) 81% 499,496 148,813 4 Other Revenue/ Interest 2,040,941 1,527,196 (513,745) 75% 2,663,080 622,139 5 Total $ 10,489,921 $ 2,187,682 $ (8,302,239) 21% 15,560,414$ $ 5,070,493 FY 2022-23
Budget Report Pg. 24

Page 400 of 493 ends

Enterprise Funds: Transit
Long Term Forecast
There are several large pending items looming in the Transit Program’s future that could have a significant impact to the fund. Staff recently completed negotiations with Cal Poly University for a new long-term Transit Service Agreement reflective of all operational costs, which extended the agreement for a twoyear term. The Transit Program outsources its Operations & Maintenance to a third-party vendor (First Transit) and the current contract extension ends next year. The Transit fleet has six buses at the end of their useful life and the program is focused on electric bus procurement, with delivery of new buses estimated later this year. Federal funds made available via the use of Coronavirus Aid, Relief, and Economic Security (CARES) funds for operating costs were used for the purchase of two electric buses.

The cost hurdle of transitioning to an electric fleet is being addressed with federal and state funding.

Transit Fund Operating Expenditures FY 2021-22 Actual Budget Year-to-date Actual % Expended
Salaries $ 186,668 $ 244,470 $ 71,249 29%
Retirement/Benefits $ 22,601 $ 27,717 $ 7,964 29%
Contract Services $ 2,660,140 $ 3,648,029 $ 3,138,045 86% Other Operating Expenditures $ 333,990 $ 379,049 $ 320,439 85% PERS Unfunded Liability/Retiree Healthcare 125,469 $ $ 33,928 $ 29,477 87% Transfers Out $ 226,183 $ 365,544 $ 182,772 50%
Total $ 3,555,050 $ 4,698,738 $ 3,749,946 80%
FY 2022-23
Budget Report Pg. 25

Page 401 of 493 ends

Enterprise Funds: Transit
Transit Fund Long Term Forecast
Table L5: Long-Term Forecast (in thousands)
(A)
Actual
2021-22
(B)
Budget
2022-23
(C)
Revised
2022-23
(D)
Projected
2023-24
(E)
Projected
2024-25
(F)
Projected
2025-26
(G)
Projected
2026-27

REVENUES
1 Federal - 5307 Operating $ 1,679 $ 2,946 $ - $ - $ - $ 1,694 1,728 2 Federal -5307 Preventative Maintenance $ 199 $ 203 $ - $ - $ - $ 211 215 3 Federal - 5307 Capital $ - $ - $ 1,795 $ 1,800 $ 1,800 $ - - 4 Federal - Cares Act $ - $ - $ - $ - $ - $ - -
5 Federal - ARP (American Rescue Plan)
Formula $ 898
$ - $ - $ - $ - $ -
-
6 State TDA (Transportation Development Act)
STA $ 305
$ 312 $ 359 $ 367 $ 374 $ 381
389
7 State TDA LTF $ 2,084 $ 1,729 $ 2,648 $ 2,701 $ 2,755 $ 2,810 2,866 8 State TDA Allocated to RTA, SLOCOG and
Other Off-the-Top Obligations* $ 537
$ 646 $ - $ - $ - $ -
-
9 State - APCD (Air Pollution Control District) $ - $ - $ 500 $ - $ - $ - - 10 PG&E Grant $ - $ 50 $ 142 $ - $ - $ - -
11 Farebox Revenue $ 173 $ 200 $ 200 $ 240 $ 250 $ 260 260 12 Cal Poly Agreement $ 538 $ 650 $ 650 $ 900 $ 900 $ 900 900 13 State - SB1 $ - $ - $ 9 $ 100 $ 100 $ 100 100
14 State - LCTOP (Low Carbon Transit
Operations Program) $ -
$ 291 $ 344 $ - $ - $ -
-
15 ARPA Discretionary $ - $ 4,100 $ 4,100 $ 4,100 $ 4,100 $ - - 16 FTA 5339 B Discretionary $ - $ - $ 4,800 $ - $ - $ - - 17 Interest on Investment $ 31 $ 7 $ 13 $ 14 $ 14 $ 14 14 18 TOTAL REVENUES $ 6,443 $ 11,133 $ 15,560 $ 10,221 $ 10,293 $ 6,370 $ 6,472 Expenditures & Obligations
19 Staffing $ 336 $ 299 $ 299 $ 314 $ 330 $ 346 363
20 Contract Services $ 2,799 $ 2,896 $ 2,896 $ 2,983 $ 3,072 $ 3,164 3,259 21 Fuel $ 321 $ 320 $ 320 $ 352 $ 352 $ 352 352
22 Maintenance $ 244 $ 240 $ 240 $ 257 $ 275 $ 294 315
23 Other Operating Expenditures $ 39 $ 125 $ 125 $ 131 $ 137 $ 144 151 24 Cost Allocation $ 226 $ 366 $ 366 $ 402 $ 410 $ 418 427 25 RTA, SLOCOG and Other Off-The-Top
Contributions from TDA
$ - $ - $ - $ - $ - $ -
-
26 Transfers Out $ - $ - $ - $ - $ - $ - -
27 Capital $ 2,634 $ 4,410 $ 4,410 $ 2,055 $ 2,115 $ 2,175 2,175 28 TOTAL Expenditures & Obligations: $ 6,600 $ 8,655 $ 8,655 $ 6,493 $ 6,691 $ 6,894 $ 7,042

CHANGES IN FINANCIAL POSITION
29 Beginning Fund Balance $ 2,716 $ 2,538 $ 2,538 $ 9,432 $ 13,147 $ 16,736 $ 16,200 30 Revenue Over/(Under) Expenses $ (157) $ 6,906 $ 6,906 $ 3,728 $ 3,602 $ (524) (570) 31 Ending Fund Balance before CalPERS $ 2,559 $ 9,444 $ 9,444 $ 13,159 $ 16,748 $ 16,212 $ 15,630 32 CalPERS Downpayment $ 21 $ 13 $ 13 $ 13 $ 13 $ 13 13 33 Ending Fund Balance $ 2,538 $ 9,432 $ 9,432 $ 13,147 $ 16,736 $ 16,200 $ 15,617 34 Policy Reserve Level - 20% $ 740 $ 849 $ 849 $ 888 $ 915 $ 944 973 35 Undesignated Fund Balance $ 3,411 $ 4,373 $ 4,373 $ 12,259 $ 15,821 $ 15,256 $ 14,644 2021-23 Financial Plan
Revised with Mid-Year
Budget Report Pg. 26

Page 402 of 493 ends

Department Updates
D: Department Performance Measure and Work Program Updates Departments constantly operate in an environment of knowns and unknowns and the budget preparation considers that type of environment. Most day-to-day tasks fall into the category of known tasks with known workload associated. In addition to day-to-day activities, departments expect and budget for some level of unknown or emergent priorities. When unexpected issues arise and unknown workload emerges, divisions may experience a resource imbalance and thus slow progress on projects or strategic initiatives.

The workload assessment below took place in advance of the recent storm-related emergencies and as such those impacts are not reflected.

The COVID-19 pandemic greatly increased the number of unknowns while requiring immediate action to respond to the community’s needs. Additionally, retaining and recruiting employees has become progressively more difficult. Almost all departments are experiencing staffing challenges, illnesses and vacancies, which lead to increased workload and re-prioritization of tasks for positions that are staffed.

As part of the mid-year review, departments evaluated the core objectives of each program’s performance on the following scale:

Green indicates that the program is managing workload with the appropriated budget for current work program tasks.

Yellow indicates that a program is managing workload with the appropriated resources but may need additional resources or objective recalibration in the future to maintain long-term work programs. This could be due to higher-than-normal activity and does not necessarily indicate ongoing need. These programs will be monitored closely over the next quarter.

Red indicates that a program is not currently meeting objectives and needs either additional resources or recalibration to manage workload. This could be due to higher-than-normal activity or may indicate ongoing need. Solutions are provided for each of these programs. 83%
17%
GRAPH D-1: OPERATING PROGRAM STATUS OVERVIEW
Green - 62 programs Yellow - 13 programs
Budget Report Pg. 27

Page 403 of 493 ends
← All documents from this meeting