Cities Index.
Attachment D - Mitigated Negative Declaration and 2018 addendum adopted with the Loma San Marcos Specific Plan (SP 19-0003) / Conditional Use Permit (CUP 18-0004)

San Marcos City Council
July 26, 2022

Document
Attachment D - Mitigated Negative Declaration and 2018 addendum adopted with the Loma San Marcos Specific Plan (SP 19-0003) / Conditional Use Permit (CUP 18-0004)
Meeting
July 26, 2022
Body
San Marcos City Council
Pages
27
Original file
8.7 MB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

Attachment 2 – SANTEC/ITE Roadway Capacity Table

Page 23 of 25 ends

Attachment 3 – Peak hour intersection analysis reports
– Existing Conditions (weekday & weekend day)

Existing AM (weekday)
1: Project Driveway & San Elijo Road 07/17/2018
Existing_AM 05/17/2018 Baseline Synchro 9 Report

Page 1 ends

Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1164 0 2 2111 0 1
Future Vol, veh/h 1164 0 2 2111 0 1
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - Free - None - None
Storage Length - 250 100 - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 68 68 90 90 25 25
Heavy Vehicles, % 2 22222
Mvmt Flow 1712 0 2 2346 0 4
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 - 1712 0 2889 856
Stage 1 - - - - 1712 -
Stage 2 - - - - 1177 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - 0 367 - 13 301
Stage 1 - 0 - - 131 -
Stage 2 - 0 - - 255 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 367 - 13 301
Mov Cap-2 Maneuver - - - - 13 -
Stage 1 - - - - 131 -
Stage 2 - - - - 254 -
Approach EB WB NB
HCM Control Delay, s 0 0 17.1

HCM LOS C
Minor Lane/Major Mvmt NBLn1 NBLn2 EBT WBL WBT
Capacity (veh/h) - 301 - 367 -
HCM Lane V/C Ratio - 0.013 - 0.006 -
HCM Control Delay (s) 0 17.1 - 14.9 -
HCM Lane LOS A C - B -
HCM 95th %tile Q(veh) - 0 - 0 -
Existing AM (weekday)
2: Cooke Street/Baker Street & San Elijo W 07/17/2018
Existing_AM 05/17/2018 Baseline Synchro 9 Report

Page 2 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 8 67 150 40000 2 3 1873 13
Future Volume (veh/h) 0 8 67 150 40000 2 3 1873 13
Number 7 4 14 3 8 18 1 6 16
Initial Q (Qb), veh 000000 000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 0 1863 1900 1900 1863 0 1900 1863 1900 Adj Flow Rate, veh/h 0 12 100 242 6 0 24 1951 14
Adj No. of Lanes 010010 020
Peak Hour Factor 0.67 0.67 0.67 0.62 0.62 0.62 0.96 0.96 0.96 Percent Heavy Veh, % 022220 020
Cap, veh/h 0 46 385 346 7 0 25 2166 16
Arrive On Green 0.00 0.27 0.27 0.27 0.27 0.00 0.59 0.59 0.59 Sat Flow, veh/h 0 172 1437 998 25 0 43 3648 27
Grp Volume(v), veh/h 0 0 112 248 0 0 1041 0 948
Grp Sat Flow(s),veh/h/ln 0 0 1609 1023 0 0 1861 0 1858
Q Serve(g_s), s 0.0 0.0 4.9 16.9 0.0 0.0 46.5 0.0 38.1
Cycle Q Clear(g_c), s 0.0 0.0 4.9 21.9 0.0 0.0 46.5 0.0 38.1 Prop In Lane 0.00 0.89 0.98 0.00 0.02 0.01
Lane Grp Cap(c), veh/h 0 0 431 353 0 0 1105 0 1103
V/C Ratio(X) 0.00 0.00 0.26 0.70 0.00 0.00 0.94 0.00 0.86 Avail Cap(c_a), veh/h 0 0 447 366 0 0 1116 0 1115
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 0.66 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 25.9 34.5 0.0 0.0 16.9 0.0 15.2 Incr Delay (d2), s/veh 0.0 0.0 0.1 3.8 0.0 0.0 16.4 0.0 8.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 2.2 6.4 0.0 0.0 28.5 0.0 21.9 LnGrp Delay(d),s/veh 0.0 0.0 26.0 38.4 0.0 0.0 33.2 0.0 23.9 LnGrp LOS C D C C
Approach Vol, veh/h 112 248 1989
Approach Delay, s/veh 26.0 38.4 28.8
Approach LOS C D C
Timer 12345678
Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 29.1 59.4 29.1
Change Period (Y+Rc), s 5.0 6.0 5.0
Max Green Setting (Gmax), s 25.0 54.0 25.0
Max Q Clear Time (g_c+I1), s 6.9 48.5 23.9
Green Ext Time (p_c), s 2.0 5.0 0.3
Intersection Summary
HCM 2010 Ctrl Delay 29.7
HCM 2010 LOS C
Existing AM (weekday)
3: Baker Street & San Elijo E 07/17/2018
Existing_AM 05/17/2018 Baseline Synchro 9 Report

Page 3 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 8 24 0 0 143 25 10 1014 23 0 0 0 Future Volume (veh/h) 8 24 0 0 143 25 10 1014 23 0 0 0
Number 7 4 14 3 8 18 5 2 12
Initial Q (Qb), veh 0 00000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1900 1863 0 0 1863 1900 1900 1863 1900 Adj Flow Rate, veh/h 11 33 0 0 201 35 11 1152 26
Adj No. of Lanes 0 10010020
Peak Hour Factor 0.73 0.73 0.73 0.71 0.71 0.71 0.88 0.88 0.88 Percent Heavy Veh, % 2 20022020
Cap, veh/h 65 155 0 0 252 44 24 2645 63
Arrive On Green 0.16 0.16 0.00 0.00 0.16 0.16 0.74 0.74 0.74 Sat Flow, veh/h 94 951 0 0 1546 269 33 3591 85
Grp Volume(v), veh/h 44 0000 2 3 6 6 2 50 5 6 4
Grp Sat Flow(s),veh/h/ln1045 0000 1815 1861 0 1848
Q Serve(g_s), s 0.2 0.0 0.0 0.0 0.0 11.3 12.0 0.0 10.4
Cycle Q Clear(g_c), s 11.4 0.0 0.0 0.0 0.0 11.3 12.0 0.0 10.4 Prop In Lane 0.25 0.00 0.00 0.15 0.02 0.05
Lane Grp Cap(c), veh/h 221 0000 2 9 6 1371 0 1361
V/C Ratio(X) 0.20 0.00 0.00 0.00 0.00 0.80 0.46 0.00 0.41 Avail Cap(c_a), veh/h 414 0000 5 1 4 1371 0 1361
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.97 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 32.5 0.0 0.0 0.0 0.0 36.2 4.7 0.0 4.5 Incr Delay (d2), s/veh 0.4 0.0 0.0 0.0 0.0 4.9 1.1 0.0 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 0.0 0.0 0.0 6.0 6.5 0.0 5.5 LnGrp Delay(d),s/veh 32.9 0.0 0.0 0.0 0.0 41.1 5.8 0.0 5.4 LnGrp LOS C D A A
Approach Vol, veh/h 44 236 1189
Approach Delay, s/veh 32.9 41.1 5.6
Approach LOS C D A
Timer 1 2345678
Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 70.8 19.2 19.2
Change Period (Y+Rc), s 4.5 4.5 4.5
Max Green Setting (Gmax), s 55.5 25.5 25.5
Max Q Clear Time (g_c+I1), s 14.0 13.4 13.3
Green Ext Time (p_c), s 11.3 1.3 1.3
Intersection Summary
HCM 2010 Ctrl Delay 12.1
HCM 2010 LOS B
Existing PM (weekday)
1: Project Driveway & San Elijo Road 01/18/2018
Existing PM (weekday) 01/18/2018 Baseline Synchro 9 Report

Page 1 ends

Intersection
Int Delay, s/veh 0.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1821 2 0 1012 1 1
Future Vol, veh/h 1821 2 0 1012 1 1
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - Free - None - None
Storage Length - 200 100 - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 96 96 50 50
Heavy Vehicles, % 2 22222
Mvmt Flow 2023 2 0 1054 2 2
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 - 2023 0 2550 1012
Stage 1 - - - - 2023 -
Stage 2 - - - - 527 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - 0 277 - 22 237
Stage 1 - 0 - - 88 -
Stage 2 - 0 - - 557 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 277 - 22 237
Mov Cap-2 Maneuver - - - - 22 -
Stage 1 - - - - 88 -
Stage 2 - - - - 557 -
Approach EB WB NB
HCM Control Delay, s 0 0 102.4

HCM LOS F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBT WBL WBT
Capacity (veh/h) 22 237 - 277 -
HCM Lane V/C Ratio 0.091 0.008 - - -
HCM Control Delay (s) 184.4 20.3 - 0 -
HCM Lane LOS F C - A -
HCM 95th %tile Q(veh) 0.3 0 - 0 -
Existing PM (weekday)
2: Cooke Street/Baker Street & San Elijo W 05/18/2018
Existing_PM 05/17/2018 Baseline Synchro 9 Report

Page 1 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 9 16 35 31 0 0 0 0 81 987 20
Future Volume (veh/h) 0 9 16 35 31 0 0 0 0 81 987 20
Number 7 4 14 3 8 18 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 0 1863 1900 1900 1863 0 1900 1863 1900 Adj Flow Rate, veh/h 0 13 23 40 36 0 84 1028 21
Adj No. of Lanes 0 1 0 0 1 0 0 2 0
Peak Hour Factor 0.69 0.69 0.69 0.87 0.87 0.87 0.96 0.96 0.96 Percent Heavy Veh, % 0 2 2 2 2 0 0 2 0
Cap, veh/h 0 47 83 108 62 0 106 1365 29
Arrive On Green 0.00 0.08 0.08 0.08 0.08 0.00 0.41 0.41 0.41 Sat Flow, veh/h 0 605 1070 608 800 0 262 3366 72
Grp Volume(v), veh/h 0 0 36 76 0 0 593 0 540
Grp Sat Flow(s),veh/h/ln 0 0 1674 1408 0 0 1850 0 1850
Q Serve(g_s), s 0.0 0.0 1.8 3.1 0.0 0.0 25.2 0.0 22.0
Cycle Q Clear(g_c), s 0.0 0.0 1.8 5.0 0.0 0.0 25.2 0.0 22.0 Prop In Lane 0.00 0.64 0.53 0.00 0.14 0.04
Lane Grp Cap(c), veh/h 0 0 130 170 0 0 750 0 751
V/C Ratio(X) 0.00 0.00 0.28 0.45 0.00 0.00 0.79 0.00 0.72 Avail Cap(c_a), veh/h 0 0 465 483 0 0 1110 0 1110
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 0.71 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 39.1 40.7 0.0 0.0 23.4 0.0 22.4 Incr Delay (d2), s/veh 0.0 0.0 0.4 1.3 0.0 0.0 8.3 0.0 5.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.9 1.9 0.0 0.0 14.6 0.0 12.5 LnGrp Delay(d),s/veh 0.0 0.0 39.6 42.0 0.0 0.0 31.7 0.0 28.3 LnGrp LOS D D C C
Approach Vol, veh/h 36 76 1133
Approach Delay, s/veh 39.6 42.0 30.1
Approach LOS D D C
Timer 1 2 3 4 5 6 7 8
Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 12.0 42.5 12.0
Change Period (Y+Rc), s 5.0 6.0 5.0
Max Green Setting (Gmax), s 25.0 54.0 25.0
Max Q Clear Time (g_c+I1), s 3.8 27.2 7.0
Green Ext Time (p_c), s 0.5 9.3 0.4
Intersection Summary
HCM 2010 Ctrl Delay 31.1
HCM 2010 LOS C
Notes
Existing PM (weekday)
3: Baker Street & San Elijo E 05/18/2018
Existing_PM 05/17/2018 Baseline Synchro 9 Report

Page 3 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 16 83 0 0 36 110 30 1669 59 0 0 0 Future Volume (veh/h) 16 83 0 0 36 110 30 1669 59 0 0 0 Number 7 4 14 3 8 18 5 2 12
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1900 1863 0 0 1863 1900 1900 1863 1900 Adj Flow Rate, veh/h 17 90 0 0 44 136 32 1776 63
Adj No. of Lanes 0 1 0 0 1 0 0 2 0
Peak Hour Factor 0.92 0.92 0.92 0.81 0.81 0.81 0.94 0.94 0.94 Percent Heavy Veh, % 2 2 0 0 2 2 0 2 0
Cap, veh/h 58 182 0 0 59 181 46 2646 98
Arrive On Green 0.15 0.15 0.00 0.00 0.15 0.15 0.75 0.75 0.75 Sat Flow, veh/h 76 1248 0 0 402 1242 61 3509 130
Grp Volume(v), veh/h 107 0 0 0 0 180 980 0 891
Grp Sat Flow(s),veh/h/ln 1325 0 0 0 0 1644 1860 0 1840
Q Serve(g_s), s 0.2 0.0 0.0 0.0 0.0 9.5 24.7 0.0 20.8
Cycle Q Clear(g_c), s 9.7 0.0 0.0 0.0 0.0 9.5 24.7 0.0 20.8 Prop In Lane 0.16 0.00 0.00 0.76 0.03 0.07
Lane Grp Cap(c), veh/h 240 0 0 0 0 240 1402 0 1387
V/C Ratio(X) 0.45 0.00 0.00 0.00 0.00 0.75 0.70 0.00 0.64 Avail Cap(c_a), veh/h 475 0 0 0 0 466 1402 0 1387
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.99 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 34.9 0.0 0.0 0.0 0.0 36.9 5.8 0.0 5.3 Incr Delay (d2), s/veh 1.3 0.0 0.0 0.0 0.0 4.7 2.9 0.0 2.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 0.0 0.0 0.0 0.0 4.6 13.4 0.0 11.3 LnGrp Delay(d),s/veh 36.2 0.0 0.0 0.0 0.0 41.5 8.7 0.0 7.6 LnGrp LOS D D A A
Approach Vol, veh/h 107 180 1871
Approach Delay, s/veh 36.2 41.5 8.2
Approach LOS D D A
Timer 1 2 3 4 5 6 7 8
Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 72.4 17.6 17.6
Change Period (Y+Rc), s 4.5 4.5 4.5
Max Green Setting (Gmax), s 55.5 25.5 25.5
Max Q Clear Time (g_c+I1), s 26.7 11.7 11.5
Green Ext Time (p_c), s 19.4 1.5 1.5
Intersection Summary
HCM 2010 Ctrl Delay 12.3
HCM 2010 LOS B
Existing PM (weekend)
1: Project Driveway & San Elijo Road 01/18/2018
Existing PM (weekend) 01/18/2018 Baseline Synchro 9 Report

Page 1 ends

Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 861 0 14 813 0 14
Future Vol, veh/h 861 0 14 813 0 14
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - Free - None - None
Storage Length - 200 100 - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 96 96 50 50
Heavy Vehicles, % 2 22222
Mvmt Flow 957 0 15 847 0 28
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 - 957 0 1410 478
Stage 1 - - - - 957 -
Stage 2 - - - - 453 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - 0 714 - 129 534
Stage 1 - 0 - - 333 -
Stage 2 - 0 - - 607 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 714 - 126 534
Mov Cap-2 Maneuver - - - - 126 -
Stage 1 - - - - 333 -
Stage 2 - - - - 594 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 12.1

HCM LOS B
Minor Lane/Major Mvmt NBLn1 NBLn2 EBT WBL WBT
Capacity (veh/h) - 534 - 714 -
HCM Lane V/C Ratio - 0.052 - 0.02 -
HCM Control Delay (s) 0 12.1 - 10.1 -
HCM Lane LOS A B - B -
HCM 95th %tile Q(veh) - 0.2 - 0.1 -

Page 24 of 25 ends

Attachment 4 – Peak hour intersection analysis reports
– Existing + Project Conditions (weekday & weekend
day)
Existing + Project PM (weekday) - Scenario A
1: Project Driveway & San Elijo Road 01/18/2018
Existing + Project PM (weekday) 01/18/2018 Baseline Synchro 9 Report

Page 1 ends

Intersection
Int Delay, s/veh 1.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1821 35 8 1012 0 60
Future Vol, veh/h 1821 35 8 1012 0 60
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - Free - None - None
Storage Length - 200 100 - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 96 96 50 50
Heavy Vehicles, % 2 22222
Mvmt Flow 2023 39 8 1054 0 120
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 - 2023 0 - 1012
Stage 1 - -----
Stage 2 - -----
Critical Hdwy - - 4.14 - - 6.94
Critical Hdwy Stg 1 - -----
Critical Hdwy Stg 2 - -----
Follow-up Hdwy - - 2.22 - - 3.32
Pot Cap-1 Maneuver - 0 277 - 0 237
Stage 1 - 0 - - 0 -
Stage 2 - 0 - - 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 277 - - 237
Mov Cap-2 Maneuver - -----
Stage 1 - -----
Stage 2 - -----
Approach EB WB NB
HCM Control Delay, s 0 0.1 34.8

HCM LOS D
Minor Lane/Major Mvmt NBLn1 EBT WBL WBT
Capacity (veh/h) 237 - 277 -
HCM Lane V/C Ratio 0.506 - 0.03 -
HCM Control Delay (s) 34.8 - 18.4 -
HCM Lane LOS D - C -
HCM 95th %tile Q(veh) 2.6 - 0.1 -
Existing + Project PM (weekday) - Scenario A
2: Cooke Street/Baker Street & San Elijo W 05/18/2018
Existing_Plus_Project_PM 05/17/2018 Baseline Synchro 9 Report

Page 1 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 9 16 81 31 0 0 0 0 81 987 20
Future Volume (veh/h) 0 9 16 81 31 0 0 0 0 81 987 20
Number 7 4 14 3 8 18 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 0 1863 1900 1900 1863 0 1900 1863 1900 Adj Flow Rate, veh/h 0 13 23 93 36 0 84 1028 21
Adj No. of Lanes 0 1 0 0 1 0 0 2 0
Peak Hour Factor 0.69 0.69 0.69 0.87 0.87 0.87 0.96 0.96 0.96 Percent Heavy Veh, % 0 2 2 2 2 0 0 2 0
Cap, veh/h 0 75 132 180 55 0 106 1365 29
Arrive On Green 0.00 0.12 0.12 0.12 0.12 0.00 0.41 0.41 0.41 Sat Flow, veh/h 0 605 1070 899 445 0 262 3366 72
Grp Volume(v), veh/h 0 0 36 129 0 0 593 0 540
Grp Sat Flow(s),veh/h/ln 0 0 1674 1344 0 0 1850 0 1850
Q Serve(g_s), s 0.0 0.0 1.7 6.9 0.0 0.0 25.2 0.0 22.0
Cycle Q Clear(g_c), s 0.0 0.0 1.7 8.6 0.0 0.0 25.2 0.0 22.0 Prop In Lane 0.00 0.64 0.72 0.00 0.14 0.04
Lane Grp Cap(c), veh/h 0 0 207 235 0 0 750 0 751
V/C Ratio(X) 0.00 0.00 0.17 0.55 0.00 0.00 0.79 0.00 0.72 Avail Cap(c_a), veh/h 0 0 465 463 0 0 1110 0 1110
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 0.71 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 35.3 38.7 0.0 0.0 23.4 0.0 22.4 Incr Delay (d2), s/veh 0.0 0.0 0.1 1.4 0.0 0.0 8.3 0.0 5.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.8 3.2 0.0 0.0 14.6 0.0 12.5 LnGrp Delay(d),s/veh 0.0 0.0 35.5 40.1 0.0 0.0 31.7 0.0 28.3 LnGrp LOS D D C C
Approach Vol, veh/h 36 129 1133
Approach Delay, s/veh 35.5 40.1 30.1
Approach LOS D D C
Timer 1 2 3 4 5 6 7 8
Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 16.1 42.5 16.1
Change Period (Y+Rc), s 5.0 6.0 5.0
Max Green Setting (Gmax), s 25.0 54.0 25.0
Max Q Clear Time (g_c+I1), s 3.7 27.2 10.6
Green Ext Time (p_c), s 0.8 9.3 0.7
Intersection Summary
HCM 2010 Ctrl Delay 31.2
HCM 2010 LOS C
Notes
Existing + Project PM (weekday) - Scenario A
3: Baker Street & San Elijo E 05/18/2018
Existing_Plus_Project_PM 05/17/2018 Baseline Synchro 9 Report

Page 3 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 16 83 0 0 36 110 76 1681 59 0 0 0 Future Volume (veh/h) 16 83 0 0 36 110 76 1681 59 0 0 0 Number 7 4 14 3 8 18 5 2 12
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1900 1863 0 0 1863 1900 1900 1863 1900 Adj Flow Rate, veh/h 17 90 0 0 44 136 81 1788 63
Adj No. of Lanes 0 1 0 0 1 0 0 2 0
Peak Hour Factor 0.92 0.92 0.92 0.81 0.81 0.81 0.94 0.94 0.94 Percent Heavy Veh, % 2 2 0 0 2 2 0 2 0
Cap, veh/h 58 182 0 0 59 181 112 2580 95
Arrive On Green 0.15 0.15 0.00 0.00 0.15 0.15 0.75 0.75 0.75 Sat Flow, veh/h 76 1248 0 0 402 1242 149 3421 126
Grp Volume(v), veh/h 107 0 0 0 0 180 1012 0 920
Grp Sat Flow(s),veh/h/ln 1325 0 0 0 0 1644 1855 0 1841
Q Serve(g_s), s 0.2 0.0 0.0 0.0 0.0 9.5 26.5 0.0 22.1
Cycle Q Clear(g_c), s 9.7 0.0 0.0 0.0 0.0 9.5 26.5 0.0 22.1 Prop In Lane 0.16 0.00 0.00 0.76 0.08 0.07
Lane Grp Cap(c), veh/h 240 0 0 0 0 240 1399 0 1388
V/C Ratio(X) 0.45 0.00 0.00 0.00 0.00 0.75 0.72 0.00 0.66 Avail Cap(c_a), veh/h 475 0 0 0 0 466 1399 0 1388
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 34.9 0.0 0.0 0.0 0.0 36.9 6.0 0.0 5.4 Incr Delay (d2), s/veh 1.3 0.0 0.0 0.0 0.0 4.7 3.3 0.0 2.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 0.0 0.0 0.0 0.0 4.6 14.5 0.0 12.0 LnGrp Delay(d),s/veh 36.2 0.0 0.0 0.0 0.0 41.5 9.3 0.0 8.0 LnGrp LOS D D A A
Approach Vol, veh/h 107 180 1932
Approach Delay, s/veh 36.2 41.5 8.6
Approach LOS D D A
Timer 1 2 3 4 5 6 7 8
Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 72.4 17.6 17.6
Change Period (Y+Rc), s 4.5 4.5 4.5
Max Green Setting (Gmax), s 55.5 25.5 25.5
Max Q Clear Time (g_c+I1), s 28.5 11.7 11.5
Green Ext Time (p_c), s 19.3 1.5 1.5
Intersection Summary
HCM 2010 Ctrl Delay 12.6
HCM 2010 LOS B
Existing + Project PM (weekend) - Scenario A
1: Project Driveway & San Elijo Road 01/18/2018
Existing + Project PM (weekend) 01/18/2018 Baseline Synchro 9 Report

Page 1 ends

Intersection
Int Delay, s/veh 1.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 861 32 22 813 0 72
Future Vol, veh/h 861 32 22 813 0 72
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - Free - None - None
Storage Length - 200 100 - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 96 96 50 50
Heavy Vehicles, % 2 22222
Mvmt Flow 957 36 23 847 0 144
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 - 957 0 - 478
Stage 1 - -----
Stage 2 - -----
Critical Hdwy - - 4.14 - - 6.94
Critical Hdwy Stg 1 - -----
Critical Hdwy Stg 2 - -----
Follow-up Hdwy - - 2.22 - - 3.32
Pot Cap-1 Maneuver - 0 714 - 0 534
Stage 1 - 0 - - 0 -
Stage 2 - 0 - - 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 714 - - 534
Mov Cap-2 Maneuver - -----
Stage 1 - -----
Stage 2 - -----
Approach EB WB NB
HCM Control Delay, s 0 0.3 14.2

HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT WBL WBT
Capacity (veh/h) 534 - 714 -
HCM Lane V/C Ratio 0.27 - 0.032 -
HCM Control Delay (s) 14.2 - 10.2 -
HCM Lane LOS B - B -
HCM 95th %tile Q(veh) 1.1 - 0.1 -
Existing + Project AM - Scenario B
1: Project Driveway & San Elijo Road 07/17/2018
Existing_Plus_Project_AM 05/17/2018 Baseline Synchro 9 Report

Page 1 ends

Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1164 46 13 2116 0 7
Future Vol, veh/h 1164 46 13 2116 0 7
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - Free - None - None
Storage Length - 250 100 - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 68 68 90 90 25 25
Heavy Vehicles, % 2 22222
Mvmt Flow 1712 68 14 2351 0 28
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 - 1712 0 - 856
Stage 1 - -----
Stage 2 - -----
Critical Hdwy - - 4.14 - - 6.94
Critical Hdwy Stg 1 - -----
Critical Hdwy Stg 2 - -----
Follow-up Hdwy - - 2.22 - - 3.32
Pot Cap-1 Maneuver - 0 367 - 0 301
Stage 1 - 0 - - 0 -
Stage 2 - 0 - - 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 367 - - 301
Mov Cap-2 Maneuver - -----
Stage 1 - -----
Stage 2 - -----
Approach EB WB NB
HCM Control Delay, s 0 0.1 18.2

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT WBL WBT
Capacity (veh/h) 301 - 367 -
HCM Lane V/C Ratio 0.093 - 0.039 -
HCM Control Delay (s) 18.2 - 15.2 -
HCM Lane LOS C - C -
HCM 95th %tile Q(veh) 0.3 - 0.1 -
Existing + Project AM - Scenario B
2: Cooke Street/Baker Street & San Elijo W 07/17/2018
Existing_Plus_Project_AM 05/17/2018 Baseline Synchro 9 Report

Page 2 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 8 67 155 40000 2 3 1884 13
Future Volume (veh/h) 0 8 67 155 40000 2 3 1884 13
Number 7 4 14 3 8 18 1 6 16
Initial Q (Qb), veh 000000 000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 0 1863 1900 1900 1863 0 1900 1863 1900 Adj Flow Rate, veh/h 0 12 100 250 6 0 24 1962 14
Adj No. of Lanes 010010 020
Peak Hour Factor 0.67 0.67 0.67 0.62 0.62 0.62 0.96 0.96 0.96 Percent Heavy Veh, % 022220 020
Cap, veh/h 0 48 399 360 7 0 25 2170 16
Arrive On Green 0.00 0.28 0.28 0.28 0.28 0.00 0.59 0.59 0.59 Sat Flow, veh/h 0 172 1437 1011 24 0 43 3649 27
Grp Volume(v), veh/h 0 0 112 256 0 0 1047 0 953
Grp Sat Flow(s),veh/h/ln 0 0 1609 1035 0 0 1861 0 1858
Q Serve(g_s), s 0.0 0.0 4.9 17.4 0.0 0.0 47.0 0.0 38.4
Cycle Q Clear(g_c), s 0.0 0.0 4.9 22.2 0.0 0.0 47.0 0.0 38.4 Prop In Lane 0.00 0.89 0.98 0.00 0.02 0.01
Lane Grp Cap(c), veh/h 0 0 447 367 0 0 1106 0 1105
V/C Ratio(X) 0.00 0.00 0.25 0.70 0.00 0.00 0.95 0.00 0.86 Avail Cap(c_a), veh/h 0 0 447 367 0 0 1116 0 1115
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 0.66 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 25.2 33.9 0.0 0.0 16.9 0.0 15.2 Incr Delay (d2), s/veh 0.0 0.0 1.3 3.8 0.0 0.0 16.9 0.0 8.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 2.3 6.6 0.0 0.0 29.0 0.0 22.1 LnGrp Delay(d),s/veh 0.0 0.0 26.6 37.7 0.0 0.0 33.8 0.0 24.1 LnGrp LOS C D C C
Approach Vol, veh/h 112 256 2000
Approach Delay, s/veh 26.6 37.7 29.2
Approach LOS C D C
Timer 12345678
Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 30.0 59.5 30.0
Change Period (Y+Rc), s 5.0 6.0 5.0
Max Green Setting (Gmax), s 25.0 54.0 25.0
Max Q Clear Time (g_c+I1), s 6.9 49.0 24.2
Green Ext Time (p_c), s 2.1 4.6 0.2
Intersection Summary
HCM 2010 Ctrl Delay 30.0
HCM 2010 LOS C
Existing + Project AM - Scenario B
3: Baker Street & San Elijo E 07/17/2018
Existing_Plus_Project_AM 05/17/2018 Baseline Synchro 9 Report

Page 3 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 8 24 0 0 143 25 15 1015 23 0 0 0 Future Volume (veh/h) 8 24 0 0 143 25 15 1015 23 0 0 0
Number 7 4 14 3 8 18 5 2 12
Initial Q (Qb), veh 0 00000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1900 1863 0 0 1863 1900 1900 1863 1900 Adj Flow Rate, veh/h 11 33 0 0 201 35 17 1153 26
Adj No. of Lanes 0 10010020
Peak Hour Factor 0.73 0.73 0.73 0.71 0.71 0.71 0.88 0.88 0.88 Percent Heavy Veh, % 2 20022020
Cap, veh/h 65 155 0 0 252 44 37 2632 62
Arrive On Green 0.16 0.16 0.00 0.00 0.16 0.16 0.74 0.74 0.74 Sat Flow, veh/h 94 951 0 0 1546 269 50 3573 85
Grp Volume(v), veh/h 44 0000 2 3 6 6 2 80 5 6 8
Grp Sat Flow(s),veh/h/ln1045 0000 1815 1860 0 1848
Q Serve(g_s), s 0.2 0.0 0.0 0.0 0.0 11.3 12.1 0.0 10.5
Cycle Q Clear(g_c), s 11.4 0.0 0.0 0.0 0.0 11.3 12.1 0.0 10.5 Prop In Lane 0.25 0.00 0.00 0.15 0.03 0.05
Lane Grp Cap(c), veh/h 221 0000 2 9 6 1370 0 1361
V/C Ratio(X) 0.20 0.00 0.00 0.00 0.00 0.80 0.46 0.00 0.42 Avail Cap(c_a), veh/h 414 0000 5 1 4 1370 0 1361
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.98 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 32.5 0.0 0.0 0.0 0.0 36.2 4.7 0.0 4.5 Incr Delay (d2), s/veh 0.4 0.0 0.0 0.0 0.0 4.9 1.1 0.0 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 0.0 0.0 0.0 6.0 6.5 0.0 5.6 LnGrp Delay(d),s/veh 32.9 0.0 0.0 0.0 0.0 41.1 5.8 0.0 5.4 LnGrp LOS C D A A
Approach Vol, veh/h 44 236 1196
Approach Delay, s/veh 32.9 41.1 5.6
Approach LOS C D A
Timer 1 2345678
Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 70.8 19.2 19.2
Change Period (Y+Rc), s 4.5 4.5 4.5
Max Green Setting (Gmax), s 55.5 25.5 25.5
Max Q Clear Time (g_c+I1), s 14.1 13.4 13.3
Green Ext Time (p_c), s 11.4 1.3 1.3
Intersection Summary
HCM 2010 Ctrl Delay 12.1
HCM 2010 LOS B
Existing + Project PM - Scenario B
1: Project Driveway & San Elijo Road 07/17/2018
Existing_Plus_Project_PM 05/17/2018 Baseline Synchro 10 Report

Page 1 ends

Intersection
Int Delay, s/veh 1.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1821 13 3 1056 0 56
Future Vol, veh/h 1821 13 3 1056 0 56
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - Free - None - None
Storage Length - 250 100 - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 96 96 50 50
Heavy Vehicles, % 2 22222
Mvmt Flow 2023 14 3 1100 0 112
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 - 2023 0 - 1012
Stage 1 - -----
Stage 2 - -----
Critical Hdwy - - 4.14 - - 6.94
Critical Hdwy Stg 1 - -----
Critical Hdwy Stg 2 - -----
Follow-up Hdwy - - 2.22 - - 3.32
Pot Cap-1 Maneuver - 0 277 - 0 237
Stage 1 - 0 - - 0 -
Stage 2 - 0 - - 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 277 - - 237
Mov Cap-2 Maneuver - -----
Stage 1 - -----
Stage 2 - -----
Approach EB WB NB
HCM Control Delay, s 0 0.1 33.1

HCM LOS D
Minor Lane/Major Mvmt NBLn1 EBT WBL WBT
Capacity (veh/h) 237 - 277 -
HCM Lane V/C Ratio 0.473 - 0.011 -
HCM Control Delay (s) 33.1 - 18.1 -
HCM Lane LOS D - C -
HCM 95th %tile Q(veh) 2.3 - 0 -
Existing + Project PM - Scenario B
2: Cooke Street/Baker Street & San Elijo W 07/17/2018
Existing_Plus_Project_PM 05/17/2018 Baseline Synchro 10 Report

Page 2 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 9 16 79 31 0000 8 1 9 9 0 2 0
Future Volume (veh/h) 0 9 16 79 31 0000 8 1 9 9 0 2 0
Number 7 4 14 3 8 18 1 6 16
Initial Q (Qb), veh 000000 000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 0 1863 1900 1900 1863 0 1900 1863 1900 Adj Flow Rate, veh/h 0 13 23 91 36 0 84 1031 21
Adj No. of Lanes 010010 020
Peak Hour Factor 0.69 0.69 0.69 0.87 0.87 0.87 0.96 0.96 0.96 Percent Heavy Veh, % 022220 020
Cap, veh/h 0 74 131 178 55 0 106 1369 29
Arrive On Green 0.00 0.12 0.12 0.12 0.12 0.00 0.41 0.41 0.41 Sat Flow, veh/h 0 605 1070 892 454 0 261 3367 72
Grp Volume(v), veh/h 0 0 36 127 0 0 595 0 541
Grp Sat Flow(s),veh/h/ln 0 0 1674 1346 0 0 1850 0 1850
Q Serve(g_s), s 0.0 0.0 1.7 6.8 0.0 0.0 25.3 0.0 22.1
Cycle Q Clear(g_c), s 0.0 0.0 1.7 8.5 0.0 0.0 25.3 0.0 22.1 Prop In Lane 0.00 0.64 0.72 0.00 0.14 0.04
Lane Grp Cap(c), veh/h 0 0 204 233 0 0 752 0 752
V/C Ratio(X) 0.00 0.00 0.18 0.55 0.00 0.00 0.79 0.00 0.72 Avail Cap(c_a), veh/h 0 0 465 463 0 0 1110 0 1110
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 0.71 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 35.4 38.8 0.0 0.0 23.4 0.0 22.4 Incr Delay (d2), s/veh 0.0 0.0 0.2 1.4 0.0 0.0 8.3 0.0 5.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.8 3.2 0.0 0.0 14.6 0.0 12.5 LnGrp Delay(d),s/veh 0.0 0.0 35.6 40.2 0.0 0.0 31.7 0.0 28.3 LnGrp LOS D D C C
Approach Vol, veh/h 36 127 1136
Approach Delay, s/veh 35.6 40.2 30.0
Approach LOS D D C
Timer 12345678
Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 16.0 42.6 16.0
Change Period (Y+Rc), s 5.0 6.0 5.0
Max Green Setting (Gmax), s 25.0 54.0 25.0
Max Q Clear Time (g_c+I1), s 3.7 27.3 10.5
Green Ext Time (p_c), s 0.8 9.3 0.7
Intersection Summary
HCM 2010 Ctrl Delay 31.2
HCM 2010 LOS C
Notes
Existing + Project PM - Scenario B
3: Baker Street & San Elijo E 07/17/2018
Existing_Plus_Project_PM 05/17/2018 Baseline Synchro 10 Report

Page 4 ends

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 16 83 0 0 36 110 74 1680 59 0 0 0 Future Volume (veh/h) 16 83 0 0 36 110 74 1680 59 0 0 0 Number 7 4 14 3 8 18 5 2 12
Initial Q (Qb), veh 0 00000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1900 1863 0 0 1863 1900 1900 1863 1900 Adj Flow Rate, veh/h 17 90 0 0 44 136 79 1787 63
Adj No. of Lanes 0 10010020
Peak Hour Factor 0.92 0.92 0.92 0.81 0.81 0.81 0.94 0.94 0.94 Percent Heavy Veh, % 2 20022020
Cap, veh/h 58 182 0 0 59 181 109 2582 95
Arrive On Green 0.15 0.15 0.00 0.00 0.15 0.15 0.75 0.75 0.75 Sat Flow, veh/h 76 1248 0 0 402 1242 145 3425 126
Grp Volume(v), veh/h 107 0000 1 8 0 1010 0 919
Grp Sat Flow(s),veh/h/ln1325 0000 1644 1855 0 1840
Q Serve(g_s), s 0.2 0.0 0.0 0.0 0.0 9.5 26.5 0.0 22.1
Cycle Q Clear(g_c), s 9.7 0.0 0.0 0.0 0.0 9.5 26.5 0.0 22.1 Prop In Lane 0.16 0.00 0.00 0.76 0.08 0.07
Lane Grp Cap(c), veh/h 240 0000 2 4 0 1399 0 1388
V/C Ratio(X) 0.45 0.00 0.00 0.00 0.00 0.75 0.72 0.00 0.66 Avail Cap(c_a), veh/h 475 0000 4 6 6 1399 0 1388
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 34.9 0.0 0.0 0.0 0.0 36.9 6.0 0.0 5.4 Incr Delay (d2), s/veh 1.3 0.0 0.0 0.0 0.0 4.7 3.3 0.0 2.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 0.0 0.0 0.0 0.0 4.6 14.5 0.0 11.9 LnGrp Delay(d),s/veh 36.2 0.0 0.0 0.0 0.0 41.5 9.2 0.0 7.9 LnGrp LOS D D A A
Approach Vol, veh/h 107 180 1929
Approach Delay, s/veh 36.2 41.5 8.6
Approach LOS D D A
Timer 1 2345678
Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 72.4 17.6 17.6
Change Period (Y+Rc), s 4.5 4.5 4.5
Max Green Setting (Gmax), s 55.5 25.5 25.5
Max Q Clear Time (g_c+I1), s 28.5 11.7 11.5
Green Ext Time (p_c), s 19.3 1.5 1.5
Intersection Summary
HCM 2010 Ctrl Delay 12.6
HCM 2010 LOS B

Page 25 of 25 ends