RESOLUTION No. 2023-9105
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN MARCOS FOR THE APPROVAL OF A SITE DEVELOPMENT PLAN TO ALLOW THE CONSTRUCTION OF A TWO-STORY COMMERCIAL/OFFICE BUILDING OF 32,969 SQUARE FEET IN THE SPECIFIC PLAN AREA (SPA) ZONE SDP19-0003
North Coast Church
WHEREAS, on March 26, 2019, the City received an application from RJ Realty Investors, LLC/North Coast Church requesting a Site Development Plan to allow the construction of a two-story, 32,969 square-foot commercial/office building on a 2.59-acre site located at 2355 and 2375 Montiel Road in the Specific Plan Area (SPA) Zone in the Richland Neighborhood more particularly described as:
A portion of Lot 16 of Block 7 of Rancho Los Vallecitos de San Marcos, in the City of San Marcos, County of San Diego, State of California, according to Map thereof No. 806, filed in the Office of the County Recorder of San Diego County, December 21, 1895.
Assessor’s Parcel Number(s): 228-370-20-00 & 228-370-39-00; and WHEREAS, the Site Development Plan is being requested in conjunction with a Specific Plan (SP19-0001), which will guide the orderly development on the project site; and WHEREAS, the Development Services Department did study said request, and recommends approval of said request; and WHEREAS, on November 18, 2021, the City held a public workshop to provide an informational overview of the proposed project to the general public; and WHEREAS, on November 7, 2022, the Planning Commission held a duly noticed public hearing and recommended approval of said request and the appropriate environmental document for said request to the City Council by a 7-0 vote, in favor request; and WHEREAS, on January 24, 2023, the City Council held a duly noticed public hearing in the manner prescribed by law to consider said request; and WHEREAS, the City Council did review and consider a Mitigated Negative Declaration (ND21-005 & SCH No. 2021120298) for said request pursuant to the California Environmental Quality Act (CEQA) NOW, THEREFORE, the City Council does hereby resolve as follows:
The foregoing recitals are true and correct, and are hereby incorporated by reference into this Resolution.
The City Council hereby approves this Site Development Plan per the submitted plans date stamped November 7, 2022 (32,969 square-foot, two-story, commercial/office building) except as modified herein, and subject to compliance with the conditions of approval in Exhibit A attached hereto and incorporated by reference and made a part of this Resolution as though fully set forth herein.
This Site Development Plan is approved in conjunction with the submitted Specific Plan (SP19-0001) and all conditions of approval specified in Ordinance No. 2023-XXXX, which document is incorporated herein by this reference; and the mitigation measures in Mitigated Negative Declaration (ND21-005 & SCH No. 2021120298) are hereby incorporated by reference and made a part of this Resolution with the same force and effect as though fully set forth herein.
The City Council’s decision is based on the following findings and determinations:
The Site Development Plan conforms with the City’s General Plan and all provisions of the San Marcos Municipal Code (SMMC) in that the subject property has a designation of Specific Plan Area (SPA), which requires the property to be developed under a Specific Plan. The proposed Specific Plan (SP19-0001 & Resolution PC22-4975) will allow for commercial/office uses with approval of a Site Development Plan. The project, as designed, complies with all applicable standards in the Montiel Commercial Office Building Specific Plan.
As feasible, the Site Development Plan preserves mature trees and will not unnecessarily remove trees and natural vegetation in that the site currently contains 38 trees and other poorly maintained landscaping. The existing trees will be removed and replaced with approximately 74 trees, resulting in a total increase in trees and enhanced site landscaping.
The Site Development Plan will preserve natural landforms and ridgelines, does not include excessive or unsightly grading of hillsides, and otherwise will not adversely affect the natural setting in that the project site is generally void of any topographical features and as a result, the proposed Site Development Plan will not have any impact on natural landforms and ridgelines nor will it include excessive or unsightly grading of hillsides or otherwise adversely affect the natural setting of the project site.
The Site Development Plan provides adequate buffering between residential and non-residential uses, and otherwise is in the best interests of the public health, safety, and general welfare in that the proposed structure will be located over 250 feet from the existing residential land uses across Montiel Road to the north. The properties located immediately to the east and west are developed with similar uses that are commercial in nature.
The structure(s), Site Development Plan, and landscaping are in scale and harmonious with existing and future development and with the landforms and vegetation adjacent to and in the vicinity of the site in that the size, scale, and finish materials of the proposed building are similar to the development of other commercial sites in the vicinity of the project site and the proposal complies with the development standards of the proposed Specific Plan (SP19-0001) including building setbacks, height limit, building coverage and landscape requirements.
The structure(s), Site Development, and landscaping create an internal sense of order, provide a visually pleasing setting for occupants, visitors, and the general community, are appropriate to the function of the site, and provide safe and convenient access to the property for pedestrians, cyclists, and vehicles in that in that the site provides pedestrian access from the public sidewalk, bike racks for guests and employees, and landscaping throughout the development.
The design and location of architecture and signs are consistent with the character and scale of the buildings to which they were attached or that are located on the same site, in that no unpermitted signage exists at the site, any new signage will be unified in appearance and will be consistent with the character and scale of the buildings The Site Development Plan provides all required on-site and off-site public improvements, in compliance with City adopted Design Manuals and guidelines, as deemed necessary by the City Engineer.
The Site Development Plan provides open space, parking areas, and landscaping consistent with the Zoning Ordinance and in a manner that visually enhances the physical use of the property in that the project will provide parking spaces on site for employees and customers and landscaping is designed with a mixture of plant material to beautify the neighborhood.
All requirements of CEQA have been met, in that a Mitigated Negative Declaration has been prepared for the project (ND21-005 & SCH No. 2021120298). The document has been properly noticed pursuant to CEQA and was published for public review from December 15, 2021 to January 17, 2022.
This Site Development Plan is within the scope of the Final Mitigated Negative Declaration (ND21-005 & SCH No. 2021120298) and the mitigation monitoring and reporting program, and both are hereby recommended to the City Council for adoption pursuant to CEQA.
Within thirty (30) days of the approval of the Site Development Plan (SDP19-0003), the approved site plan, architectural elevations, floor plans, and conceptual landscape plan shall be submitted as a digital file on a CD including this Resolution number on the title page. The title page shall include the statement “I (we), ______________, the applicant/owner(s) or the applicant/owner’s representative, have read, understand and agree to the conditions of Resolution No. 2022-0007.” Immediately following this statement shall appear a signature block for the owner or the owner’s representative, which shall be signed. Signature blocks for the Project Planner and the Project Civil Engineer shall also appear on this title page. The digital copy shall be approved by the City prior to submittal of any grading plan, improvement plan, or building permit.
This Site Development Plan approval shall lapse and be null and void one (1) year following the date upon which the plans and drawings were approved by the review authority unless prior to the expiration of one (1) year, a grading and/or building permit is issued and construction is commenced and diligently pursued toward completion.
The applicant/developer shall comply with all provisions and requirements set forth in the San Marcos Municipal Code, and all City ordinances, resolutions, policies and procedures, and as authorized by Specific Plan SP 19-0001, and with all applicable state and federal regulations, as may be amended from time to time, whether or not such provisions or requirements have been specifically set forth in these conditions, all of which are now incorporated by reference and made a part of this Resolution with the same force and effect as though fully set forth herein.
To the extent feasible and as permitted by law, developers and contractors are requested to first consider the use of San Marcos businesses for any supplies, materials, services, or equipment needed, and the hiring of local residents to stimulate the San Marcos economy to the greatest extent possible.
To the extent permitted by law, the applicant/developer shall defend and hold the City of San Marcos, its agents and employees harmless from liability from: (i) any and all actions, claims, damages, injuries, challenges and/or costs of liabilities arising from the City's approval of any and all entitlements or permits arising from the project as defined in the conditions of approval, or issuance of grading or building permits; (ii) any damages, liability and/or claim of any kind for any injury to or death of any person, or damage or injury of any kind to property which may arise from or be related to the direct or indirect operations of the applicant/developer or its contractors, subcontractors, agents, employees or other persons acting on applicant/developer's behalf which relate to the project; and (iii) any and all damages, liability and/or claims of any kind arising from operation of the project. The applicant/developer further agrees that such indemnification and hold harmless shall include all defense related fees and costs associated with the defense of City by counsel selected by the City. This indemnification shall not terminate upon expiration of the conditions of approval or completion of the project, but shall survive in perpetuity.
PASSED, APPROVED AND ADOPTED by the City Council of the City of San Marcos, California, at a regular meeting thereof, held on this 24th day of January, 2023, by the following roll call vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
APPROVED:
Rebecca D. Jones, Mayor
ATTEST:
Phillip Scollick, City Clerk
Attachment(s):
EXHIBIT A – Conditions of Approval
EXHIBIT A
RESOLUTION 2023-xxxx
SDP19-0003
Conditions of Approval
General Provisions
All of the terms, covenants and conditions contained herein shall run with the land and be binding on and inure to the benefit of the heirs, successors, assigns, and representatives of the applicant/developer as to any and all of the property.
If any of the terms, covenants or conditions contained herein shall fail to occur or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City of San Marcos (City) shall have the right to revoke or modify all approvals herein granted including issuance of building permits, deny, or further condition the subsequent approvals that are derived from the approvals herein granted, institute and prosecute litigation to compel their compliance with said conditions or see damages for their violation. The applicant/developer shall be notified ten (10) days in advance prior to any of the above actions being taken by the City and shall be given the opportunity to remedy any deficiencies identified by the City.
The applicant/developer shall be responsible for bearing the costs of all grading activities, on-site and off-site improvements, labor, design, mitigation, and other costs associated with, but not limited to, the project’s planning, engineering, construction and/or architecture for the project.
The proposed new development may be subject to the payment of development fees and in-lieu fees as required by the City’s Fee Ordinance at the time an application is submitted or prior to the issuance of permits as determined by the City.
The development must comply with the storm water regulations applicable at the time of approval of the corresponding grading permit application.
All design requirements and mitigation measures of Mitigated Negative Declaration (ND21-005 & SCH No. 2021120298) shall be implemented.
Future tenant improvements for each building shall require issuance of a building permit(s). Tenant improvement plans for each building shall include a parking calculation to substantiate that the subject parcel contains the required amount of parking spaces for the proposed use in accordance with the City’s Off-Street Parking Ordinance (SMMC Ch. 20.340).
Prior to issuance of any grading permit, the applicant/developer shall comply with the following conditions.
Land Development Division
The applicant/developer shall apply for a public improvement permit compliant with SMMC Chapter 14.16. All plans submitted for public improvements shall conform to applicable codes and engineering handouts, unless explicitly superseded by the conditions contained herein. All appropriate fees shall be paid for the processing of the permit.
A copy of the existing recorded access agreement titled “Agreement for grant of license to permit pedestrian access, traffic access and parking rights” shall be provided to the City’s Planning Division.
Line of sight easements, if necessary, shall be delineated on all grading plans as approved by the City Engineer. Adequate sight distance for all intersections, driveways and access points shall be provided per latest edition of the California Department of Transportation (Caltrans) Highway Design manual and the American Association of State Highways and Transportation Officials (AASHTO) Geometric Design of Highways and Streets.
A certificate of compliance for property merger/boundary adjustment shall be recorded for the properties (APNs: 228-370-20-00 & 228-370-39-00) within the project boundary.
The applicant/developer shall enter into a Development Improvement Agreement with the City to complete all required public improvements prior to permit issuance. Securities and applicable fees for the construction of the public improvements shall be submitted to and approved by the City in accordance with the SMMC Sections 19.16.070 and 19.16.080.
The applicant/developer shall submit plans and appropriate construction notes for improvement of all streets, right of way and drainage facilities to the City Engineer for approval. Plans shall include all off-site improvements as specified by the City Engineer. In addition, a signage and striping plan shall be included with the improvement plans utilizing Caltrans standards and shall be acceptable to the City Engineer.
The design of all private streets and/or drainage systems for this project shall be approved by the City Engineer. The structural section of all private streets shall conform to City standards based on R-value tests. All private streets and/or drainage systems shall be inspected by the City, and the standard plan check fees and inspection fees shall be paid and appropriate bonds shall be posted with the City prior to approval of the Final Map or Grading Permit issuance.
The exact depth of any new or improved street structural section and subgrade requirement shall be determined based on subgrade "R" value tests and the appropriate Traffic Index for the type of street as described in the City's "Urban Street Design Criteria" and “Street Excavation Ordinance”. Tests shall be taken by a qualified engineer at locations approved by the Director of Public Works.
Improvement plans shall delineate street alignments and grades including the change of any existing or proposed street alignments and grades required by the City Engineer and the City’s “Urban Street Design Criteria” in effect at the time of project approval.
A light emitting diode street lighting system shall be shown on the street improvement plans and shall be installed at locations specified by the City Engineer at no cost to the public. All installations shall be compliant with the City’s Street Lighting Standards.
The applicant/developer shall pay all applicable fees and deposit with the City a sum of money sufficient to energize, operate and maintain the public street landscaping (medians and parkways) and lighting system for a period of eighteen (18) months.
All utilities fronting, abutting or within the project shall be undergrounded with the exception of sixty-nine (69) KVA or greater power lines. All utility undergrounding must be completed prior to the surfacing of the streets. Undergrounding must accommodate all pad mounted and pedestal equipment consistent with General Plan Goal LU 17.3. Where the underground of such equipment is not possible due to safety or lack of standards for such undergrounding, the applicant/developer shall provide an underground vault, in-building vault room, architecturally integrated screen wall around equipment, or other option approved by the Planning Division Manager.
The applicant/developer shall be responsible for acquiring all associated easements required by the utility companies for such work. The permanent placement of large meter services, detector checks, fire hydrants, etc., along circulation element streets shall be placed outside of the ultimate right-of-way and if applicable, trail easement, to avoid reconstruction or modification of same.
The applicant/developer may choose to pay an in-lieu fee rather than complete the undergrounding of the existing overhead utilities. The applicant/developer shall make an in-lieu payment based upon the linear feet of utilities to be deferred at the rate then in effect as established and published by the City Engineer.
The applicant/developer shall comply with all rules, regulations and design requirements of the respective sewer, water, utility, regional, federal or other approving agency regarding the installation, modification, development, improvement or protection of facilities within the project boundaries. It shall be the applicant/developer’s responsibility to determine all agencies with rights of approval for the proposed development.
Development proposes to discharge stormwater runoff to an existing Caltrans drainage easement. Caltrans written concurrence and/or a permit will be required for any proposed work or drainage impacts within Caltrans Right-of-Way.
The applicant/developer shall mitigate for impacts on City services related to emergency response, traffic congestion, landscaping, and infrastructure maintenance. The mitigation shall be met through the execution of applications to annex the real property of the project into the following Community facilities Districts (CFD):
CFD 98-01: Improvement Area No. 1 (Police Only).
CFD 98-02: Lighting, Landscaping, Open Space and Preserve Maintenance.
CFD 2001-01: Fire and Paramedic.
CFD 2011-01: Congestion Management.
No building permit will be issued without receipt of a petition for annexation and consent and waiver executed by the property owners for each of the above-referenced CFDs for the establishment of the special taxes. In lieu of annexation, the applicant/developer may pay a fee for each CFD consentient with the pre-payment option laid out in each CFD’s formation documents. The applicant/developer shall be responsible for compliance with all rules, regulations, policies and practices established by State Law and/or the City with respect to the CFD including, without limitation, requirements for notice and disclosure to future owners and/or residents.
The applicant/developer shall post securities to the City, in amounts approved by the City Attorney and the City Engineer or their designees, for the construction of all public and private improvements including but not limited to the following: grading and erosion control, street improvements, storm drain facilities, water quality BMP's, landscaping, and off-site street repair. Said security shall be in a form acceptable to the City and shall remain in force until completion of the project and final approval by the City. Said security shall insure the construction of the "approved" public improvements within a period to be specified in the Subdivision Improvement Agreement. For grading securities, the City may require 10% of said securities to be in the form of cash.
The applicant/developer shall submit an application for a grading permit in accordance with SMMC Chapter 17.32 and all related Engineering Division handouts. All applicable fees and securities shall be paid prior to grading permit issuance.
Grading plans and activities shall be based on a comprehensive investigation of surface and subsurface conditions. Results of this investigation and recommendations arising therefrom shall be submitted in the form of a report written by a registered geotechnical engineer or registered engineering geologist.
The applicant/developer shall secure letters of permission from adjacent property owners for all graded slopes crossing property lines. In lieu of such permission, grading plans shall conform to the required grading setbacks as provided in the City's Grading Ordinance.
Erosion control and/or sediment control details shall be submitted with/on the grading plans to the Land Development Division for review and approval. The details shall conform to City standards, codes and ordinances, and San Diego Regional Water Quality Control Board (SDRWQCB) Municipal Storm Water Permit requirements. The details shall include landscaping and temporary irrigation systems on exposed slopes to be approved by the City Engineer and Planning Manager.
A hydrology and hydraulic report, including calculations, shall be prepared for the project to determine the existing and post-development runoff for the 100-year storm conditions. Storm drains and drainage structures shall be sized for build-out according to the approved hydrology report. All surface runoff originating within the project and all surface waters that may flow onto the project from adjacent properties shall be accommodated by the drainage system. The report shall also determine the project’s build-out runoff into existing off-site natural drainage swales and storm drain systems, and shall address any need for off-site improvements, including upsizing of existing facilities. Blocking, concentrating, lowering or diverting of natural drainage from or onto adjacent property shall not be allowed without written approval of the affected property owner(s).
The applicant/developer shall be responsible for mitigating impacts created by changes in drainage runoff course, concentration, or quantity to the satisfaction of the City Engineer for both on-site and off-site drainage. This may require the applicant/developer to provide all necessary easements and improvements to accommodate drainage and flood control structures extending beyond the boundaries of the project.
The applicant/developer shall execute a “Hold Harmless” Agreement with the City regarding drainage across the adjacent property.
A Storm Water Quality Management Plan (SWQMP) shall be submitted in accordance with the most current version of the City adopted BMP design manual and meet the most current requirements of SDRWQCB.
The applicant/developer shall enter into a Storm Water Management and Discharge Control Maintenance Agreement and Easement for the maintenance of all structural post-construction storm water management improvements. The agreement and easement shall be in a form acceptable to the City Attorney.
Proof of coverage under the State of California’s General Construction Permit shall be provided to the Engineering Division. A copy of the Storm Water Pollution Prevention Plan (SWPPP) submitted with the State’s permit shall be submitted.
All construction and grading related Best Management Plans (BMPs) shall be shown in detail on the construction plans submitted to the City for review and approval.
The applicant/developer shall be responsible for acquiring all associated easements required by the utility companies for such work. The permanent placement of large meter services, detector checks, fire hydrants, etc., along circulation element streets shall be placed outside of the ultimate right-of-way and if applicable, trail easement, to avoid reconstruction or modification of same.
The applicant/developer shall submit “will-serve” letters from all affected public service and utilities agencies prior to issuance of grading permit.
Planning Division
Under separate permit application, the applicant/developer shall submit construction landscape plans to the Planning Division for review and approval per the following requirements:
Final landscape and irrigation plans shall be prepared by a licensed landscape architect.
Separate landscape plans shall be submitted for the on-site (private) landscape areas and the off-site (CFD) landscape areas. CFD landscape plans shall be submitted to the Land Development Division as part of the street improvement plan set. Private landscape plans shall be submitted separately to the Planning Division.
This project is subject to the payment of a landscape permit and inspection fee. The landscape permit and inspection fee shall be four and one-half percent (4.5%) of the landscape architect’s estimate for the completion of all landscaping shown on approved mylars. All submitted estimates shall be stamped and signed by the landscape architect, and estimate the cost of plant and irrigation materials only.
Landscape plans shall contain a mixture of trees, shrubs, and ground cover, and be provided with an irrigation system. The irrigation system shall include an automatic rain sensor switch, master valve, stainless steel enclosure for the backflow device, and stainless steel controller cabinet if in public view. The irrigation system shall be designed to prevent water run-off onto the sidewalk or street. The landscape plan shall list the quantities of each plant type, including a legend indicating what each symbol represents; height and spread of trees (in accordance with City Minimum Tree Standards handout, City Council Resolution 2001-5747); and method of installation and irrigation.
The landscape plans, including plant material and irrigation design, shall comply with the City’s landscape water efficiency ordinance, SMMC Chapter 20.330, in addition to State of California water efficiency requirements.
All permanent Best Management Practices (BMPs) per the approved grading plan shall be shown on the landscape plans. Landscape plans shall be reviewed and signed by the engineer-of-work that the proposed landscape design complies with the requirements of the Storm Water Quality Management Plans (SWQMP).
The applicant/developer shall submit a fencing plan, in conjunction with the landscape plan, which proposes a consistent type and style of fences and/or walls. The fencing plan shall include decorative fencing with a detail of each proposed fence/wall type, and shall not include chain link fencing.
Landscaping for the proposed project shall avoid the use of invasive plant species. Invasive plants shall be those identified on Lists A and B of the California Exotic Plant Council’s List of Exotic Plants of Greatest Ecological Concern in California, as of October 1999, and updated if applicable.
Plant material shall be fire and drought tolerant and acceptable for defensible space in fire prone areas.
The landscape permit shall require that prior to installation, the proposed plants shall be inspected and approved by the Planning Division for plant quality and compliance with minimum size requirements. The placement of plants shall be installed in accordance with the approved landscape plans. Upon completion of installation, all landscaping/irrigation shall be inspected and approved by the Planning Division. The applicant/developer shall be responsible to contact the Planning Division for landscaping inspections.
All CFD landscaping/irrigation shall be inspected and approved by the Public Works Landscape Inspector for installation in accordance with the approved CFD landscape plans. The applicant/developer shall be responsible to contact the Public Works Department for CFD landscaping inspections.
All exposed retaining walls shall be constructed of earth tone colored keystone, split-face, or similar textured block. The applicant/developer shall submit a material sample to the Planning Division for review and approval prior to issuance of grading permit.
The applicant shall provide at a minimum, two Level 2 EV chargers on-site.
North Coast Church, which is located on the adjacent site, can utilize parking on the project site on weekends or after business hours of on-site office/commercial uses. Allowance of shared parking with the Church use shall not result in parking deficiency for on-site uses at any time.
If proposed for grading operations, the use of a rock crusher(s) on site shall require approval of a Conditional Use Permit (CUP) prior to issuance of grading permit.
The applicant/developer shall comply with the following conditions regarding cultural resources:
Pre-Excavation Agreement: Prior to the issuance of a Grading Permit, or ground disturbing activities, the Applicant/Owner shall enter into a Tribal Cultural Resources Treatment and Repatriation Agreement (Pre-Excavation Agreement) with a Traditionally and Culturally Affiliated Native American Tribe (TCA Tribe), identified in consultation with the City. The purpose of the Pre-Excavation Agreement shall be to formalize protocols and procedures between the Applicant/Owner and the TCA Tribe for the protection, treatment, and repatriation of Native American human remains, funerary objects, cultural and/or religious landscapes, ceremonial items, traditional gathering areas, and other tribal cultural resources. Such resources may be located within and/or discovered during ground disturbing and/or construction activities for the proposed project, including any additional culturally appropriate archaeological studies, excavations, geotechnical investigations, grading, preparation for wet and dry infrastructure, and other ground disturbing activities. Any project-specific Monitoring Plans and/or excavation plans prepared by the project archaeologist shall include the TCA Tribe requirements for protocols and protection of tribal cultural resources that were agreed to during the tribal consultation.
The landowner shall relinquish ownership of all non-burial related tribal cultural resources collected during construction monitoring and from any previous archaeological studies or excavations on the project site to the TCA Tribe for proper treatment and disposition per the Pre-Excavation Agreement, unless ordered to do otherwise by responsible agency or court of competent jurisdiction. The requirement and timing of such release of ownership, and the recipient thereof, shall be reflected in the Pre-Excavation Agreement. If the TCA Tribe does not accept the return of the cultural resources, then the cultural resources will be subject to curation.
Construction Monitoring: Prior to the issuance of a Grading Permit or ground disturbing activities, the Applicant/Owner or Grading Contractor shall provide written documentation (either as signed letters, contracts, or emails) to the City’s Planning Division stating that a Qualified Archaeologist and Traditionally and Culturally Affiliated Native American monitor (TCA Native American monitor) have been retained at the Applicant/Owner or Grading Contractor’s expense to implement the construction monitoring program, as described in the Pre-Excavation Agreement.
The Qualified Archaeologist and TCA Native American monitor shall be invited to attend all applicable pre-construction meetings with the General Contractor and/or associated subcontractors to present the construction monitoring program. The Qualified Archaeologist and TCA Native American monitor shall be present on site during grubbing, grading, trenching, and/or other ground disturbing activities that occur in areas of native soil or other permeable natural surfaces that have the potential to unearth any evidence of potential archaeological resources or tribal cultural resources. In areas of artificial paving, the Qualified Archaeologist and TCA Native American monitor shall be present on site during grubbing, grading, trenching, and/or other ground disturbing activities that have the potential to disturb more than six inches below the original pre-project ground surface to identify any evidence of potential archaeological or tribal cultural resources. No monitoring of fill material, existing or imported, will be required if the General Contractor or developer can provide documentation to the satisfaction of the City that all fill materials being utilized at the site are either: 1) from existing commercial (previously permitted) sources of materials; or 2) are from private or other non-commercial sources that have been determined to be absent of tribal cultural resources by the Qualified Archaeologist and TCA Native American monitor.
The Qualified Archaeologist and TCA Native American monitor shall maintain ongoing collaborative coordination with one another during all ground disturbing activities. The requirement for the construction monitoring program shall be noted on all applicable construction documents, including demolition plans, grading plans, etc. The Applicant/Owner or Grading Contractor shall provide written notice to the Planning Division and the TCA Tribe, preferably through e-mail, of the start and end of all ground disturbing activities.
Prior to the release of any grading bonds, or prior to the issuance of any project Certificate of Occupancy, an archaeological monitoring report, which describes the results, analysis, and conclusions of the construction monitoring shall be submitted by the Qualified Archaeologist, along with any TCA Native American monitor’s notes and comments received by the Qualified Archaeologist, to the Planning Division Manager for approval. Once approved, a final copy of the archaeological monitoring report shall be retained in a confidential City project file and may be released, as a formal condition of Assembly Bill (AB) 52 consultation, to TCA Tribe or any parties involved in the project specific monitoring or consultation process. A final copy of the report, with all confidential site records and appendices, will also be submitted to the South Coastal Information Center after approval by the City.
Unanticipated Discovery Procedures: Both the Qualified Archaeologist and the TCA Native American monitor may temporarily halt or divert ground disturbing activities if potential archaeological resources or tribal cultural resources are discovered during construction activities. Ground disturbing activities shall be temporarily directed away from the area of discovery for a reasonable amount of time to allow a determination of the resource’s potential significance. Isolates and clearly non-significant archaeological resources (as determined by the Qualified Archaeologist, in consultation with the TCA Native American monitor) will be minimally documented in the field. All unearthed archaeological resources or tribal cultural resources will be collected, temporarily stored in a secure location (or as otherwise agreed upon by the Qualified Archaeologist and the TCA Tribe), and repatriated according to the terms of the Pre-Excavation Agreement, unless ordered to do otherwise by responsible agency or court of competent jurisdiction.
If a determination is made that the archaeological resources or tribal cultural resources are considered potentially significant by the Qualified Archaeologist, the TCA Tribe, and the TCA Native American monitor, then the City and the TCA Tribe shall determine, in consultation with the Applicant/Owner and the Qualified Archaeologist, the culturally appropriate treatment of those resources.
If the Qualified Archaeologist, the TCA Tribe, and the TCA Native American monitor cannot agree on the significance or mitigation for such resources, these issues will be presented to the Planning Division Manager for decision. The Planning Division Manager shall make a determination based upon the provisions of CEQA and California Public Resources Code Section 21083.2(b) with respect to archaeological resources and California Public Resources Section 21704 and 21084.3 with respect to tribal cultural resources, and shall take into account the religious beliefs, cultural beliefs, customs, and practices of the TCA Tribe.
All sacred sites, significant tribal cultural resources, and/or unique archaeological resources encountered within the project area shall be avoided and preserved as the preferred mitigation. If avoidance of the resource is determined to be infeasible by the City as the Lead Agency, then the City shall require additional culturally appropriate mitigation to address the negative impact to the resource, such as, but not limited to, the funding of an ethnographic study and/or a data recovery plan, as determined by the City in consultation with the Qualified Archaeologist and the TCA Tribe. The TCA Tribe shall be notified and consulted regarding the determination and implementation of culturally appropriate mitigation and the drafting and finalization of any ethnographic study and/or data recovery plan, and/or other culturally appropriate mitigation. Any archaeological isolates or other cultural materials that cannot be avoided or preserved in place as the preferred mitigation shall be temporarily stored in a secure location on site (or as otherwise agreed upon by the Qualified Archaeologist and TCA Tribe), and repatriated according to the terms of the Pre-Excavation Agreement, unless ordered to do otherwise by responsible agency or court of competent jurisdiction. The removal of any artifacts from the project site will be inventoried with oversight by the TCA Native American monitor.
If a data recovery plan is authorized as indicated above and the TCA Tribe does not object, then an adequate artifact sample to address research avenues previously identified for sites in the area will be collected using professional archaeological collection methods. If the Qualified Archaeologist collects such resources, the TCA Native American monitor must be present during any testing or cataloging of those resources. Moreover, if the Qualified Archaeologist does not collect the cultural resources that are unearthed during the ground disturbing activities, the TCA Native American monitor may, at their discretion, collect said resources for later reburial or storage at a local curation facility, as described in the Pre-Excavation Agreement.
In the event that curation of archaeological resources or tribal cultural resources is required by a superseding regulatory agency, curation shall be conducted by an approved local facility within San Diego County and the curation shall be guided by California State Historical Resources Commission’s Guidelines for the Curation of Archaeological Collections. The City shall provide the Applicant/Owner final curation language and guidance on the project grading plans prior to issuance of the grading permit, if applicable, during project construction. The Applicant/Owner shall be responsible for all repatriation and curation costs and provide to the City written documentation from the TCA Tribe or the curation facility, whichever is most applicable, that the repatriation and/or curation have been completed.
Human Remains: As specified by California Health and Safety Code Section 7050.5, if human remains, or remains that are potentially human, are found on the project site during ground disturbing activities or during archaeological work, the person responsible for the excavation, or his or her authorized representative, shall immediately notify the San Diego County Medical Examiner’s Office by telephone. No further excavation or disturbance of the discovery or any nearby area reasonably suspected to overlie adjacent remains (as determined by the Qualified Archaeologist and/or the TCA Native American monitor) shall occur until the Medical Examiner has made the necessary findings as to origin and disposition pursuant to Public Resources Code 5097.98.
If such a discovery occurs, a temporary construction exclusion zone shall be established surrounding the area of the discovery so that the area would be protected (as determined by the Qualified Archaeologist and/or the TCA Native American monitor), and consultation and treatment could occur as prescribed by law. As further defined by State law, the Medical Examiner will determine within two working days of being notified if the remains are subject to his or her authority. If the Medical Examiner recognizes the remains to be Native American, and not under his or her jurisdiction, then he or she shall contact the Native American Heritage Commission by telephone within 24 hours. The Native American Heritage Commission will make a determination as to the Most Likely Descendent, who shall be afforded 48 hours from the time access is granted to the discovery site to make recommendations regarding culturally appropriate treatment.
If suspected Native American remains are discovered, the remains shall be kept in situ (in place) until after the Medical Examiner makes its determination and notifications, and until after the Most Likely Descendent is identified, at which time the archaeological examination of the remains shall only occur on site in the presence of the Most Likely Descendent. The specific locations of Native American burials and reburials will be proprietary and not disclosed to the general public. According to California Health and Safety Code, six or more human burials at one location constitute a cemetery (Section 8100), and disturbance of Native American cemeteries is a felony (Section 7052). In the event that the Applicant/Owner and the Most Likely Descendant are in disagreement regarding the disposition of the remains, State law will apply, and the mediation process will occur with the NAHC. In the event that mediation is not successful, the landowner shall rebury the remains at a location free from future disturbance (see Public Resources Code Section 5097.98(e) and 5097.94(k)).
Prior to grading the site or causing any impact to the site, grading and/or construction activities on site must be avoided during the nesting season which extends from February 1st to September 15th to prevent potential impacts to nesting of any migratory, songbirds, or raptors. In order to begin grading or construction activities within the nesting season, a nesting survey from a qualified biologist or other expert in the field must be submitted to the Planning Division to verify there are no active nests on the subject site. This survey must be submitted prior to any disturbance or impact of the site. If any active nests are detected, the area shall be flagged and mapped on the construction plans along with a minimum of a twenty-five (25) foot buffer and up to a maximum buffer of 300 feet for raptors, as determined by the project biologist, and shall be avoided until the nesting cycle is complete.
Building Division
If the project is to be phased, the applicant/developer shall submit a phasing plan to the Building Division for review and approval. Said phasing plan shall graphically depict the order in which the buildings (including models) will be occupied and depict which public and private infrastructure and amenities will be completed prior to each building occupancy. Once approved, any deviations from the phasing plan must be reviewed and approved by the Building Division, Planning Division, Land Development Division, Fire Department and the Public Works Construction Inspection Division.
The project is subject to the approval of the applicable water/sewer district(s) for water and sewer services and all applicable fees and charges shall be paid to the satisfaction of the water/sewer district(s) prior to issuance of grading or building permit.
The applicant/developer shall obtain a demolition permit from the Building Division prior to demolition of the existing structures on site.
Fire Department
Any new development, which necessitates updating of emergency response maps by virtue of new structures, hydrants, roadways or similar features, shall be required to provide map updates. Provide geo-referenced building plan in CAD (.dwg) format using the following coordinate system: NAD_1983_StatePlan_California_VI_FIPS_0406_Feet. Produce a fire preplan in (ESRI) GIS format using the pre-configured GIS Starter Package provided by City of San Marcos. A completed fire preplan shall include the GIS data and output PDF for use by San Marcos Fire Department. Data deliverables (CAD and GIS) shall specifically include a site plan, building plan, all Utility shut-offs, fire sprinkler risers and shut-off valves, the fire department connection for sprinkler and class-I standpipe, all standpipe hose outlets, all stairwells, retail spaces, living units -numbers /locations, fire alarm panels, elevators, fire hydrants and all Knox boxes and key switch locations.
Prior to delivery of combustible building construction materials to the project site; the following conditions shall be completed to satisfaction of the Fire Dept.:
Fire Hydrant(s) shall be installed, approved and usable.
Fire Lane or Access Roads shall be in place and provide a permanent all weather surface for emergency vehicles that support weight of fire apparatus (75,000 lbs).
Install bronze industrial fire hydrant. Minimum GPM shall 1500 GPM or per CFC Appendix B, whichever is greater. Industrial fire hydrants shall have Two 4 inch ports and One 2.5 inch port. Installation shall be as per local Water District specifications. Hydrant Type shall be Clow Model number 865. All fire hydrants shall be color coded per NFPA 291. Maximum spacing from one hydrant to another cannot exceed 300 feet from another. Maximum distance from a fire hydrant to any fire department connection cannot exceed 50 feet.
Fire apparatus access roads shall have an unobstructed improved width of not less than 24 feet (curb line to curb line), and an unobstructed vertical clearance of not less than 13 feet 6 inches. Access roads shall be all weather surface and designed to support imposed loads of not less than 75,000 pounds in accordance with California Fire Code (CFC) Section 503.2.1, SMMC Section 17.64.120.
Fire Alarm system or monitoring system shall be installed in compliance with 2019 CFC and the most current edition NFPA 72.
An Automatic Fire Sprinkler System shall be installed in compliance with 2019 CFC and the most current edition of NFPA 13.
Underground private service mains shall be installed per NFPA 24 and approved by the Fire Department.
Elevators shall meet the following conditions of CFC section 607 and CBC Chapter 30 which shall accommodate the loading and transport use of a gurney.
Knox Key Box shall be provided. A master key for entry to all gates, enclosures and equipment rooms or areas is required. Knox box shall be mounted in area approved by fire dept. at height of 60 to 66 inches above grade. Knox Box shall be type with side hinged door. Minimum of three knox boxes will be required.
New structure is located in a high fire zone and is required to be designed using state fire marshal standards for fire resistive construction features per 2019 CBC, Chapter 7A.
Prior to issuance of any building permit, the applicant/developer shall comply with the following conditions:
Land Development Division
The approved precise grading plans shall be attached to the building plans.
Prior to submittal of any building plans, the grading and public improvement plan sets shall be submitted for the second plan check and deemed substantially complete by the Land Development Engineer. Prior to issuance of any building permits, the public improvement plans shall be approved by the City Engineer and appropriate securities accepted.
All public improvements required at the time of development shall be under construction to the satisfaction of the City Engineer prior to the issuance of the first production building permit, excluding retaining wall permits and model units.
All grading shall be observed by a licensed geotechnical engineer, who shall prepare a written report to the satisfaction of the City Engineer certifying that the work has been performed in compliance with the recommendations contained within the geotechnical report and on the approved project plans. If not so done, the report shall describe the actual work performed and any deficiencies observed. The final report shall specifically detail conditions and remedial work performed that was not specifically identified in the initial report of subsurface conditions.
A certification of line and grade for the building pad, signed and stamped by the engineer of work, shall be provided to the Public Works Inspector. The certification shall be in a form acceptable to the City Engineer.
The base lift of asphalt on all roads serving the area under construction shall be completed. All proposed fire hydrants shall be operational prior to the delivery of combustible materials to the project site.
Planning Division
Future tenant improvements shall require issuance of a building permit(s). Tenant improvement plans shall include a parking calculation to substantiate that the subject parcel contains the required amount of parking spaces for the proposed use in accordance with the City’s Off-Street Parking Ordinance (SMMC Ch. 20.340).
All exterior lighting shall comply with City standards for high energy-efficient fixtures, except for low-wattage architectural lighting. All exterior fixtures shall be approved by the City.
All exterior lighting shall use cut-off fixtures and shielded in order to direct the illumination downward and reduce the visibility of any glare.
Architectural lighting plan shall be included with the building plans that show the type, style, and location of all exterior building and parking lot lights. Plans shall include photo of fixture and manufacturer specifications indicating dimensions, materials, colors, bulb type, etc.
The applicant/developer shall submit a comprehensive sign program to the Planning Division for review and approval. Following review and approval of the comprehensive sign program, all proposed signage requires approval of a separate sign permit.
All rooftop mechanical units, vents, ducts, etc. shall be screened by parapet walls or other architectural features from street grade view and adjacent properties as approved by the Planning Division Manager. A roof plan and cross sections showing lines of sight shall be submitted with construction drawings illustrating that roof equipment will be screened. Screening plan shall be approved by the Planning Division prior to issuance of a building permit.
Rain gutter downspouts shall be internal or architecturally screened from view where feasible as determined by the Planning Division.
The trash enclosure (minimum dimensions of fourteen (14) feet wide by ten (10) feet deep by six (6) feet high) for trash and recycling containers shall be constructed to match the main buildings in color and texture. In addition, the enclosure shall have solid view-obscuring, double swinging gates; must have a flat impervious, concrete slab designed not to allow run-on from adjoining areas; contain attached lids on all trash and recycling containers; and a solid roof to minimize direct precipitation. Trash enclosures shall be architecturally compatible with the proposed buildings.
Building Division
New buildings and remodeled structures shall be designed to conform to the latest design standards adopted by the State of California in the California Building Code (CBC), Part 2, Title 24, California Code of Regulations.
Building plans and instruments of service submitted with a building permit application shall be signed and sealed by a California licensed design professional as required by the State Business and Professions Code.
The City is located in Seismic Design Category “D”. Buildings and structures shall be designed to adequately transmit the dynamic lateral forces in accordance with the requirements of the latest adopted California Building Code.
The proposed development shall comply with the latest adopted California Green Building Code Standards. The City has adopted the mandatory standards and does not enforce the voluntary standards.
The handling, storage, use and disposal of hazardous, toxic or flammable materials shall be clearly indicated on all floor plans submitted for a building permit and shall be in compliance with any and all Federal, State, County and City rules, regulations, and requirements for hazardous waste control, including but not limited to the Hazardous Waste Control Act of 1973 (HWCA) (Health & S C §25100 et seq.), as may be amended from time to time, whether or not such provisions or requirements have been specifically set forth in these conditions, all of which are now incorporated by reference and made a part hereof with the same force and effect as though fully set forth herein.
The project shall comply with the latest Federal Law, Americans with Disabilities Act, and State Law, California Code of Regulations, Title 24, for accessibility standards.
The applicant/developer shall pay Public Facilities Fees as established by the latest adopted Public Facilities Fee, based on the proposed land use, and shall be paid prior to the issuance of the first permit for the development.
The project is subject to the payment of school fees as required by law. The applicant/developer shall submit a Certificate of Compliance from the school district prior to the issuance of the first building permit from the City.
Roof drain systems shall be designed for 3-inches of rainwater per hour. Rain gutters, down drains and other devices shall be installed to prevent erosion at the point of discharge and shall discharge to landscaped areas when feasible. Interceptor drains, yard drains and drainage devices shall be installed to mitigate erosion and create positive drainage away from foundations. Roof drainage shall comply with the City's storm water management measures.
The applicant/developer shall contact the Delivery Retail Analyst for the branch of the U.S. Postal Service to determine the type and location of centralized delivery equipment required.
A phasing plan shall be submitted to Development Services Department for review and approval prior to the issuance of any building permits for projects with phased construction. The phasing plan shall identify the extent of on-site and off-site improvements and the location of all buildings in each phase. Occupancies shall not be approved until the City and other agencies have accepted the improvements in compliance with these conditions of approval.
Sewer and water utilities shall be located wholly on the lot that serves the building in accordance with the latest adopted edition of the California Plumbing Code.
The outer boundary of schools (grades K through 12) as listed in the current California Private School Directory shall comply with Education Code Section 33190 relating to the location of a school facility within 1,000 feet of businesses that are regulated for the storage, use and handling of hazardous materials as defined by the California Health and Safety Code.
Fire Department
Any new development, which necessitates updating of emergency response maps by virtue of new structures, hydrants, roadways or similar features, shall be required to provide map updates. The applicant/developer shall provide a copy of building plans in Geo-Referenced format to be used by the Fire Department for pre-fire planning purposes.
The project shall include an automatic fire extinguishing system in accordance with the latest adopted California Building Code, California Residential Code and/or San Marcos Fire Code Ordinance. Fire suppression systems shall conform to the standards adopted by the National Fire Protection Association and the San Marcos Fire Marshal.
The applicant/developer shall provide a Construction Staging/Site Phasing Plan for approval prior to permit issuance.
Access roads shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building.
A lighted directory map, meeting current Fire Department standards, shall be installed at each driveway entrance to new multiple unit residential projects.
A fuel management zone shall be required from the perimeter of all structures. Due to a reduction in the fuel management zone as approved by the City Fire Marshal, building construction shall incorporate fire-resistant design features and materials in accordance with the City’s Urban-Wildland Interface Area standards.
The proposed development is subject to the requirements of the City Fire Code Mid-Rise Ordinance (SMMC Section 17.64.210).
Building plans shall indicate where elevators are installed, and shall meet the following conditions of California Fire Code (CFC) Section 607 and California Building Code (CBC) Chapter 30 which comply with the following:
At least one (1) elevator that extends to the top floor of a structure shall accommodate the loading and transport of an ambulance gurney or stretcher (maximum size 24 inches by 76 inches) in the horizontal position.
The elevator car shall be of such a size and arrangement to accommodate a 24-inch by 84-inch ambulance gurney or stretcher in the horizontal, open position, shall be provided with a minimum clear distance between walls or between walls and door excluding return panels not less than 80 inches by 54 inches, and a minimum distance from wall to return panel not less than 51 inches with a 42-inch side slide door.
A minimum of four (4) keys shall be provided for fire dept. use.
During the grading and construction phase, the applicant/developer shall comply with the following conditions:
Engineering Inspection Division
Prior to any construction activities, a pre-construction meeting shall be held with the Public Works Construction Inspection Division. The applicant/developer shall provide the inspector with a detailed construction schedule which depicts when building occupancy or occupancies will occur and when key public and private infrastructure improvements will be completed. Schedule updates shall be provided to the Building and Public Works Inspectors at a minimum monthly basis throughout the life of the project.
Grading, excavation or other related earth moving operations, including warm-up and maintenance activities, shall be limited to the hours of 7:00 a.m. to 4:30 p.m., Monday through Friday. No work shall be allowed on Saturdays, Sundays and holidays.
During construction activities, the applicant/developer shall maintain public and private driveway and/or road access to neighboring properties at all times unless previous arrangements have been made with the private parties affected. Copies of said agreements shall be provided to the City Engineer.
The applicant/developer shall submit a traffic control plan to the Public Works Inspector for all phases of construction for approval by the City Engineer. Said plan shall include all traffic control devices including traffic signals as required.
Construction haul routes must be designed to avoid noise sensitive uses (e.g., residences, convalescent homes, etc.), to the extent feasible.
At the discretion of the Public Works Inspector, the applicant/developer shall document the pre-construction condition of existing roads or offsite properties which may be impacted by construction activities. The applicant/developer shall be responsible in repairing any construction related damages prior to occupancy.
A Right-of-Way permit shall be required prior to commencement of any work within the City right- of-way.
The applicant/developer shall implement and maintain storm water pollution prevention measures as required on the approved plans. Violations of the City’s Storm Water Management Ordinance (Ch. 14.15 S.M.M.C.) will result in Stop Work Orders, Notices of Violations and/or citations with fines. Work on the project may be delayed until the City determines that compliance with storm water requirements has been achieved.
Planning Division
At least one copy of the approved plans, approval letters and conditions of approval shall be available for review at the job site at all times.
Landscaping of slopes, in accordance with the approved landscape plans, shall commence at time of completion of grading activities.
The project shall comply with Regional Air Quality Standards.
A test sample of the proposed exterior colors shall be applied to a mock-up with an area large enough to be representative of the finished color scheme and exposed to direct sunlight. This sample shall be inspected and approved by the Planning Division prior to painting of the buildings. If determined necessary upon inspection, the color scheme may be required to be modified at the discretion of the Planning Division Manager. The applicant/developer shall be responsible to contact the Planning Division for inspection.
Building Division
The applicant/developer shall obtain the required OSHA permits for blasting, construction, demolition, excavation, grading operations, rock drilling and the construction of buildings over 3 stories in height in accordance with the California Code of Regulations, Title 8, Section 1503.
Water wells shall be reconstructed or abated in strict compliance with SMMC Sections 8.44.130 through 8.44.170 and the latest adopted State Water Code and Health and Safety Code Section 24400. Water well permits are issued by County of San Diego Environment Health Department.
Dust and dust producing materials shall be controlled within the maximum acceptable concentrations for silica and silicates in accordance with the California Code of Regulations, Title 8, Section 5155. Water and dust palliative shall be used to prevent excessive dust during blasting, construction and grading operations. Projects are required to comply with the Air Pollution Control District’s standards for mitigating fugitive dust during all phases of construction.
The demolition of buildings shall not commence until the proper testing of asbestos, lead paint and hazardous materials has been performed and the abatement of the hazardous materials has been completed. The recycling of materials shall comply with state law and all utilities shall be disconnected and safely abandoned.
All construction operations authorized by building permits, including the delivery, setup and use of equipment must be conducted on premises during the hours of 7:00 AM and 6:00 PM on Monday through Friday, and on Saturday between 8:00 AM and 5:00 PM. No work shall be conducted on Sundays or Holidays observed by the City. Failure to comply will result in the issuance of STOP WORK NOTICES, REVOCATION OF PERMITS and the issuance of citations and fines as appropriate. Citation for hours of work violations requires a mandatory court appearance in North County Superior Court.
During construction the applicant/developer shall implement and maintain the storm water pollution prevention measures as required on the approved plans. Violations of the City’s Storm Water Management Ordinance will result in Stop Work Orders, Notices of Violation and citations with fines. Work on the project may be delayed until the City determines that the project is in compliance with the storm water requirements.
Fire Department
Prior to the delivery of combustible building construction materials to the project site, the following conditions shall be completed to satisfaction of the Fire Department: 1) fire hydrants(s) shall be installed, approved, and usable, and 2) fire lane or access roads shall be in place and provide a permanent all weather surface for emergency vehicles that support weight of fire apparatus (75,000 lbs.).
Prior to the occupancy of any structure, the applicant/developer shall comply with the following conditions:
Land Development Division
All improvements including underground conversion of overhead utilities shall be completed in accordance with the approved project plans prior to issuance of the any Certificate of Occupancy. Applicant/developer may choose to pay an in-lieu fee rather than complete the undergrounding of the existing overhead utilities.
All applicable easements and agreements shall be recorded prior to occupancy, if not required sooner by these conditions.
Prior to the issuance of any certificates of use and occupancy, the applicant/developer shall provide evidence to the Building Official, that the Department of Real Estate has been notified that the project area is within the boundaries of a Community Facilities District (CFD), and will be subject to special taxes for public facilities and/or services.
Redline As-Built drawings shall be submitted to the Engineering Division for review and approval. All improvements identified on the plans and all undergrounding of utilities shall be completed in accordance with the project plans and these conditions of approval. Record drawing mylar plans shall be submitted and approved prior to the release of any project securities.
Any existing broken pavement, concrete curb, gutter or sidewalk or any other facilities damaged during construction of the project, shall be repaired or replaced as directed by the Public Works Inspector.
Water and sewer improvements in accordance with the project water/sewer study shall be constructed for the project as determined necessary by the applicable water/sewer district(s).
Prior to the issuance of any certificates of use and occupancy, the applicant/developer shall not grant any easements over any property subject to a requirement of dedication or irrevocable offer to the City, unless such easements are expressly made subordinate to the easements to be offered for dedication to the City. Prior to granting any of said easements, the applicant/developer shall furnish a copy of the proposed easement to the Land Development Engineer for review and approval. Further, a copy of the approved easement shall be furnished to the Land Development Engineer prior to issuance of any certificate of use and occupancy.
Planning Division
All rooftop mechanical units, vents, ducts, etc. shall be screened from view from street grade & adjacent properties. Said screening mechanism shall be inspected by the Planning Division, and if determined necessary, additional screening may be required, as determined acceptable by the Planning Division Manager.
All landscaping shall be installed, inspected, and approved by the Planning Division. Landscaping shall be established and flourishing in a healthy manner.
All CFD landscaping shall be installed, inspected, and approved by the Public Works Department. Landscaping shall be established and flourishing in a healthy manner.
The applicant/developer shall submit a Certificate of Completion by the landscape architect and engineer-of-work to the Planning Division certifying that the plant materials and irrigation system have been installed in accordance with the approved landscape plans and the Water Quality Technical Report, respectively.
The applicant/developer shall disclose to future owners/tenants of the project that the property is located within the Airport Influence Area of McClellen-Palomar Airport, and may be subject to some of the annoyances or inconveniences, if any, associated with proximity to airport operations (i.e.: noise, vibration, or odors). Disclosure shall be recorded with the County Recorder’s Office prior to building occupancy.
Building Division
The applicant/developer shall obtain approval from all City departments and other agencies before requesting a Certificate of Occupancy from the Building Official. For phased developments, the conditions of approval shall be satisfied prior to requesting the first occupancy in the phase.
Fire Department
Building addresses shall be clearly labeled for day and night-time emergency responses. In addition, adequate lighting shall be provided to deter potential criminal activities (i.e.: vehicle burglaries, prowlers, loitering, etc.
The applicant/developer shall comply with the Fire Department for hydrants and on-site access for emergency vehicles.
The project shall include “NO PARKING FIRE LANE” signs. The number of, placement and wording for all fire lane signs and/or red curbs shall be as required by California Vehicle Code, Sections 22500.l and 22658(a) and San Marcos Fire Department Standards.
Ongoing Advisory Conditions
Use of the site must be conducted so as not to become obnoxious by reason of noise, odor, refuse, parking impacts, or maintenance of grounds and in such a manner as will not detrimentally affect adjoining properties and uses.
All trees and landscaping shall be maintained in a healthy, thriving manner. If any trees/landscaping shall die or become diseased, the trees/landscaping shall be replaced in numbers and quantity to provide the same landscaping and screening value.
Resolution No. 2023-xxxx
SDP19-0003
January 24, 2023