ATTACHMENT D
MITIGATED NEGATIVE DECLARATION
APPENDIX F
STORMWATER QUALITY MANAGEMENT PLAN
Page
1 of
41 City of San Marcos PDP SWQMP Template Date: March 15, 2016
PDP SWQMP Preparation Date:
October
2021
, Revised: March
& April, 2022
CITY OF SAN MARCOS
PRIORITY DEVELOPMENT PROJECT
(
PDP)
STORM WATER QUALITY MANAGEMENT PLAN (SWQMP)
FOR
SAN MARCOS RESIDENCES
29 72 & 2982
S SANTA FE AVENUE
SAN MARCOS, CA 92069
ASSESSOR'S PARCEL NUMBER(S):
217
-
161
-
18 & 217
-
161
-
19 ENGINEER OF WORK:
___________________________________________________________________________________
WILLIAM J. SUITER, RCE 68964
PREPARED FOR:
SANTA FE FLORES LP
P.O. BOX 903
RANCHO SANTA FE, CA 92067
(858) 888
-
2488
PDP SWQMP
PREPARED BY:
PASCO LARET SUITER & ASSOCIATES
27127 CALLE ARROYO, SUITE 1904
SAN JUAN CAPISTRANO, CA 92675
(949) 661
-
6695
DATE
OF SWQMP
:
OCTOBER
2021
REVISED: MARCH 2022
REVISED: APRIL 2022
GRADING
PLANS PREPARED BY:
PASCO LARET SUITER & ASSO
CIATES
27127 CALLE ARROYO, SUITE 1904
SAN JUAN CAPISTRANO, CA 92675
(949) 661
-
6695
Page
2 of
41 City of San Marcos PDP SWQMP Template Date: March 15, 2016
PDP SWQMP Preparation Date:
October
2021
, Revised: March
& April
, 2022
P
age intentionally left blank
Page
3 of
41 City of San Marcos PDP SWQMP Template Date: March 15, 2016
PDP SWQMP Preparation Date:
October
2021
, Revised: March
& April
, 2022
TABLE OF CONTENTS
TABLE OF CONTENTS
................................
................................
................................
................................
.....
3 ACRONYMS
................................
................................
................................
................................
...................
4 PDP SWQMP PREPARER'S CERTI
FICATION PAGE
................................
................................
..........................
5 PDP SWQMP PROJECT OWNER'S CERTIFICATION PAGE
................................
................................
...............
7 SUBMITTAL RECORD
................................
................................
................................
................................
.....
9 PROJECT VICINITY MAP
................................
................................
................................
...............................
10 FORM I
-
1 APPLICABILITY OF STORM WATER BMP REQUIREMENTS
................................
..........................
11 FORM I
-
2 PROJECT TYPE DETERMINATION CHECKLIST
................................
................................
..............
13 FORM I
-
3B SITE INFORMATION CHECK
LIST FOR PDPS
................................
................................
................
15 FORM I
-
4 SOURCE CONTROL BMP CHECKLIST FOR ALL DEVELOPMENT PROJECTS
................................
...
25 FORM I
-
5 SITE DESIGN BMP CHECKLIST FOR ALL DEVELOPMENT PROJECTS
................................
.............
27 FORM I
-
6 SUMMARY OF PDP STRUCTURAL BMPS
................................
................................
.....................
29 ATTACHMENT 1 BACKUP FOR PDP POLLUTANT CONTROL BMPS
................................
..............................
35 ATTACHMENT 2 BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES
................................
....
37 ATTACHMENT 3 STRUCTURAL BMP MAINTENANCE INFORMATION
................................
.........................
39 ATTACHMENT 4 COPY OF PLAN SHEETS WITH PERMANENT STORM WATER BMPS
................................
.
41 Page
4 of
41 City of San Marcos PDP SWQMP Template Date: March 15, 2016
PDP SWQMP Preparation Date:
October
2021
, Revised: March
& April
, 2022
ACRONYMS
APN
Assessor's Parcel Number
BMP
Best Management Practice
HMP
Hydromodification Management Plan
HSG
Hydrologic Soil Group
MS4
Municipal Separate Storm Sewer System
N/A
Not Applicable
NRCS
Natural Resources
Conservation Service
PDP
Priority Development Project
PE
Professional Engineer
SC
Source Control
SD
Site Design
SDRWQCB
San Diego Regional Water Quality Control Board
SIC
Standard Industrial Classification
SWQMP
Storm Water Quality Management Plan
Page
5 of
41 City of San Marcos PDP SWQMP Template Date: March 15, 2016
PDP SWQMP Preparation Date:
October
2021
, Revised: March
& April
, 2022
PDP SWQMP PREPARER'S
CERTIFICATION PAGE
Project
Name:
San Marcos Residences
Permit Application Number: [Insert Permit Application Number]
PREPARE
R'S CERTIFICATION
I hereby declare that I am the Engineer
in Responsible Charge
of
design of storm water
best
management practices (BMPs)
for
this project
,
and that I have exercised responsible charge over the
design of the
BMPs
as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the
PD
P
requirements of the
City of San Marcos
BMP Design Manual,
which is a design
manual for compliance with local
City of San Marcos
and regional MS4 Permit (California Regional Water
Quality Control Board Sa
n Diego Region Order No. R9
-
2015
-
01 00
) requirements
for storm water
management.
I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities , as described in the BMP Design
Manual
. I certify that this
PDP
SWQMP has been completed to the best of my ability and accurately reflects the project bei
ng proposed and the applicable
BMPs proposed to minimize the potentially
negative impacts of this project's land developme
nt activities on water quality.
I unders
tand and
acknowledge that the plan check review of this
PDP
SWQMP by the City Engineer is confined to a review
and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project
design.
________________________________________________________
Engineer of Work'
s
Signature, PE Number & Expiration Date
W. Justin Suiter
________________________________________________________
Print Name
Pasco Laret Suiter & Associates
________________________________________________________
Company
____________________________
Date
Engineer's Seal:
Page
6 of
41 City of San Marcos PDP SWQMP Template Date: March 15, 2016
PDP SWQMP Preparation Date:
October
2021
, Revised: March
& April
, 2022
Page
intentionally blank
Page
7 of
41 City of San Marcos PDP SWQMP Template Date: March 15, 2016
PDP SWQMP Preparation Date:
October
2021
, Revised: March
& April
, 2022
PDP SWQMP PROJECT OWNER'S CERTIFICATION PAGE
Project Name:
San Marcos Residences
Permit Application Number: [Insert Permit Application Number]
PROJECT OWNER'S CERTIFICATION
This PDP SWQMP has been prepared for
Santa Fe Flores,
LP
by
Pasco Laret Suiter & Associates.
The PDP
SWQMP is intended to comply with the PDP requirements of the City of San Marcos
BMP Design
Manual, which is a design manual for compliance with local City of San Marcos
and regional MS4 Permit
(California Regi
onal Water Quality Control Board San Diego Region Order No. R9 -
201
5 -
01 00
)
requirements for storm water management.
The undersigned, while it owns the subject property, is responsible for the implementation of the provisions of this plan. Once the undersig
ned transfers its interests in the property, its successor -
in
-
interest shall bear the aforementioned responsibility to implement the best management practices (BMPs) described within this plan, including ensuring
on
-
going
operation and maintenance of structural
BMPs. A signed copy of this document shall be available on the subject property into perpetuity.
________________________________________________________
Project Owner's Signature
Paul Mayer
____________________
____________________________________
Print Name
Santa Fe Flores LP
________________________________________________________
Company
____________________________
Date
Page
8 of
41 City of San Marcos PDP SWQMP Template Date: March 15, 2016
PDP SWQMP Preparation Date:
October
2021
, Revised: March
& April
, 2022
Page intentionally blank
Page
9 of
41 City of San Marcos PDP SWQMP Template Date: March 15, 2016
PDP SWQMP Preparation Date:
October
2021
, Revised: March
& April
, 2022
SUBMITTAL RECORD
Use this Table to keep a record of
submittals of this PDP SWQMP.
Each time the PDP SWQMP is re
-
submitted, provide the date and status of the project. In column 4 summarize the
changes that have
been made or indicate if response to
plancheck
comments is included
. When applicable, insert resp
onse
to
plancheck
comments
behind this page
.
Submittal
Number
Date
Project Status
Summary of
Changes
1 October
2021
Preliminary Design /
Planning/ CEQA