Appendix I
Noise Technical Report

Noise Technical Report
Gran Vista Project
FEBRUARY 2023
Prepared for:

CITY OF SAN MARCOS
1 Civic Center Drive
San Marcos, California 92069
Prepared by:

605 Third Street
Encinitas, California 92024
Contact: Connor Burke, INCE

Printed on 30% post-consumer recycled material.

13528 i FEBRUARY 2023

Table of Contents
SECTION PAGE NO.

Acronyms and Abbreviations ............................................................................................................................................ iii 1 Introduction .......................................................................................................................................................... 1

1.1 Report Purpose and Scope .................................................................................................................... 1

1.2 Regional and Local Setting .................................................................................................................... 1

1.3 Project Description ................................................................................................................................. 1

1.4 Fundamentals of Noise and Vibration ................................................................................................... 1

1.4.1 Sound, Noise, and Acoustics .................................................................................................... 1

1.4.2 Sound Pressure Levels and Decibels ...................................................................................... 2

1.4.3 A-Weighted Sound Level ........................................................................................................... 7

1.4.4 Human Response to Changes in Noise Levels ....................................................................... 8

1.4.5 Noise Descriptors...................................................................................................................... 8

1.4.6 Sound Propagation ................................................................................................................... 8

1.4.7 Groundborne Vibration Fundamentals .................................................................................... 8 2 Regulatory Setting ............................................................................................................................................. 11

2.1 Federal ................................................................................................................................................. 11

2.2 State ..................................................................................................................................................... 11

2.2.1 California Code of Regulations, Title 24 ............................................................................... 11

2.2.2 California Department of Health Services Guidelines ......................................................... 11

2.2.3 California Department of Transportation ............................................................................. 11

2.3 Local ..................................................................................................................................................... 12

2.3.1 Noise Ordinance .................................................................................................................... 12

2.3.2 General Plan Noise Element ................................................................................................. 13 3 Existing Conditions ............................................................................................................................................ 15 4 Thresholds of Significance ............................................................................................................................... 19 5 Impact Discussion ............................................................................................................................................. 21 6 Summary of Findings ........................................................................................................................................ 31 7 References Cited ............................................................................................................................................... 33 TABLES
1 Typical Sound Levels in the Environment and Industry ..................................................................................... 7 2 City of San Marcos Exterior Noise Standards by Zone ................................................................................... 12 3 Measured Baseline Outdoor Ambient Noise Levels ........................................................................................ 15

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 ii FEBRUARY 2023

4 Typical Construction Equipment Maximum Noise Levels ............................................................................... 21 5 Estimated Distances between Construction Activities and the Nearest Noise-sensitive Receptors ........... 22 6 Predicted Construction Noise Levels per Activity Phase ................................................................................ 23 7 Roadway Traffic Noise Modeling Results ........................................................................................................ 24 8 Future Ambient Noise Levels at Residential Facades .................................................................................... 25 9 Predicted Net Sound Transmission Class of Occupied Room Façade........................................................... 27

FIGURES
1 Project Location ................................................................................................................................................... 3 2 Site Plan ................................................................................................................................................................ 5 3 Noise Measurement Locations ........................................................................................................................ 17

APPENDICES
A Baseline Noise Measurement Field Data
B Construction Noise Modeling Input and Output
C Traffic Noise Modeling Input and Output
D Transmission Loss Prediction
E Residential HVAC Noise Prediction

13528 iii FEBRUARY 2023

Acronyms and Abbreviations
Acronym/Abbreviation Definition
Caltrans California Department of Transportation
CEQA California Environmental Quality Act
City City of San Marcos
CNEL Community Noise Equivalent Level
CNMP construction noise management plan
dB decibel
dBA A-weighted decibel
FTA Federal Transit Administration
ips inches per second
Ldn day–night average noise level
Leq equivalent noise level
Lmax maximum sound level
Lmin minimum sound level
Gran Vista proposed project
PPV peak particle velocity
RCNM Roadway Construction Noise Model
SLM Sound level meter
SPA Specific Plan Area
SPL Sound pressure level
ST Short-term
STC Sound Transmission Class
TL Transmission Loss
VdB Velocity Decibel

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 iv FEBRUARY 2023

INTENTIONALLY LEFT BLANK

13528 1 FEBRUARY 2023

1 Introduction

1.1 Report Purpose and Scope
The purpose of this technical report is to assess the potential noise impacts associated with construction and operation of the Gran Vista project (project). This analysis uses the significance thresholds in Appendix G of the California Environmental Quality Act (CEQA) Guidelines (14 CCR 15000 et seq.).

1.2 Regional and Local Setting
The site is located in the land use jurisdictions of both the City of San Marcos (City) an d the County of San Diego (County); however, it is proposed to be annexed into the City of San Marcos. The site is located at the southeastern portion of the City of San Marcos, bordering the City of Escondido to the east and unincorporated County of San Diego lands to the south . The project site is bounded by Las Posas Road along the eastern boundary, W. Mission Road along the southwest boundary, an existing CVS store to the south, and existing single -family residential development to the west/northwest (Figure 1, Project Location) . Nearby land uses in the vicinity of the project site include industrial and commercial uses to the west on the other side of W. Mission Road, the Santa Fe Hills residential community to the north, and Palomar College approximate ly half a mile to the east. The project site is comprised of Assessor’s Parcel Numbers (APNs) 219 -121-1500 and 219-121-1600.

1.3 Project Description
The residential component of the Project consists of 120 townhomes, a mix of 2- and 3-bedroom units. The project includes approximately 148,297 square feet of recreation area on-site and up to 198 square feet of private open space per unit (Figure 2, Site Plan). Amenities on site would include tot lots and recreational areas, a dog park, a community garden, and a landscaped pedestrian path along the Las Posas Road frontage. The project would include two points of entry: one off N. Las Posas Road, and the other off of W. Mission Road. A total of 264 parking spaces would be provided for the total residential dwelling units, including 20 new guest spaces. Existing spaces on the project site will meet the remaining guest parking requirements. The project site is curr ently zoned for Commercial (C) use with an existing General Plan designation of Commercial and is within the City’s General Plan Neighborhood College area. The project proposes a General Plan and Zoning Amendment to change the land use designation to Specific Plan Area (SPA).

1.4 Fundamentals of Noise and Vibration
The following is a brief discussion of fundamental noise concepts and terminology.

1.4.1 Sound, Noise, and Acoustics
Sound is actually a process that consists of three components: the sound source, sound path, and sound receiver.

All three components must be present for sound to exist. Without a source to produce sound, there is no sound.

Similarly, without a medium to transmit sound pressure waves, there is no sound. Finally, sound must be received; a hearing organ, sensor, or object must be present to perceive, register, or be affected by sound or noise. In most

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 2 FEBRUARY 2023

situations, there are many different sound sources, paths, and receptors rather than just one of each. Acoustics is the field of science that deals with the production, propagation, reception, effects, and control of sound. Noise is defined as sound that is loud, unpleasant, unexpected, or undesired.

1.4.2 Sound Pressure Levels and Decibels
The amplitude of a sound determines its loudness. Loudness of sound increases with increasing amplitude. Sound pressure amplitude is measured in units of micronewton per square meter, also called micropascal. One micropascal is approximately one-hundred billionth (0.00000000001) of normal atmospheric pressure. The pressure of a very loud sound may be 200 million micropascals, or 10 million times the pressure of the weakest audible sound. Because expressing sound levels in terms of micropascal would be very cumbersome, sound pressure level in logarithmic units is used instead to describe the ratio of actual sound pressure to a reference pressure squared. These units are called Bels. To provide a finer resolution, a Bel is subdivided into 10 decibels (dB).

Date: 6/28/2022 - Last saved by: hmcomber - Path: Z:\Projects\j1352801\MAPDOC\DOCUMENT\Noise\Figure1_ProjectLocation.mxd

MISSION

SANTA FE

RANCHO SANTA FE

LAS POSAS

MISSION
SR-78 EB

MISSION
BORDEN
SR-78 EB
SR-78 WB
GRAND
78 Project Location
Gran Vista, Las Posas Project
SOURCE: SanGIS 2020
01 ,000500
Feet
Project Boundary
FIGURE 1
San Clemente
Dana
Point Temecula
Murrieta
Chula
Vista
Solana Beach
Encinitas
San
Diego
Carlsbad
Oceanside
La Mesa
El Cajon
Santee
Poway
San Marcos
Escondido
Vista
Imperial
Beach
Del Mar
Coronado
Riverside
County
San Diego
County
905
52 54
163
188
125
274
111195
56 86
78 74
67 76
94 79
8 15
215
8 805
5 Project Site

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 4 FEBRUARY 2023

INTENTIONALLY LEFT BLANK
Date: 6/28/2022 - Last saved by: hmcomber - Path: Z:\Projects\j1352801\MAPDOC\DOCUMENT\Noise\Figure2_ProjectSite.mxd

PALMAC ST

GRANITE RD

PALM RD

PALOMARCOS AVE
N

LASPOSAS
RD

N PACIFIC ST

W MISSION RD
SOURCE: SANGIS 2020, 2021; GMP 2021
0 15075
Feet
Project Boundary
FIGURE 2
Site Plan
Gran Vista, Las Posas Project

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 6 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 7 FEBRUARY 2023

1.4.3 A-Weighted Sound Level
Sound pressure level alone is not a reliable indicator of loudness. The frequency, or pitch, of a sound also has a substantial effect on how humans will respond. Although the intensity (energy per unit area) of the sound is a purely physical quantity, the loudness, or human response, is determined by the characteristics of the human ear.

Human hearing is limited not only in the range of audible frequencies, but also in the way it perceives the sound in that range. In general, the healthy human ear is most sensitive to sounds between 1,000 and 5,000 hertz, and it perceives a sound within that range as more intense than a sound of higher or lower frequency with the same magnitude. To approximate the frequency response of the human ear, a series of sound level adjustments is usually applied to the sound measured by a sound level meter. The adjustments (referred to as a weighting network) are frequency-dependent.

The A-scale weighting network approximates the frequency response of the average young ear when list ening to ordinary sounds. When people make judgments about the relative loudness or annoyance of a sound, their judgments correlate well with the A -scale sound levels of those sounds. Other weighting networks have been devised to address high noise levels or other special situations (e.g., B-scale, C-scale, D-scale), but these scales are rarely used in conjunction with most environmental noise. Noise levels are typically reported in terms of A-weighted sound levels. All sound levels discussed in this report are A-weighted decibels (dBA). Examples of typical noise levels for common indoor and outdoor activities are depicted in Table 1.

Table 1. Typical Sound Levels in the Environment and Industry Common Outdoor Activities Noise Level (dB) Common Indoor Activities — 110 Rock band
Jet fly over at 300 meters
(1,000 feet)
100 —
Gas lawn mower at 1 meter (3 feet) 90 —
Diesel truck at 15 meters (50 feet),
at 80 kilometers per hour
(50 miles per hour)
80 Food blender at 1 meter (3 feet); garbage
disposal at 1 meter (3 feet)
Noisy urban area, daytime; gas lawn
mower at 30 meters (100 feet)
70 Vacuum cleaner at 3 meters (10 feet)
Commercial area; heavy traffic at
90 meters (300 feet)
60 Normal speech at 1 meter (3 feet)
Quiet urban, daytime 50 Large business office; dishwasher next room Quiet urban, nighttime 40 Theater; large conference room (background) Quiet suburban, nighttime 30 Library
Quiet rural, nighttime 20 Bedroom at night; concert hall (background) — 10 Broadcast/Recording studio
Lowest threshold of human hearing 0 Lowest threshold of human hearing Source: Caltrans 2013.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 8 FEBRUARY 2023

1.4.4 Human Response to Changes in Noise Levels
Under controlled conditions in an acoustics laboratory, the trained, healthy human ear is able to discern changes in sound levels of 1 dBA when exposed to steady, single-frequency signals in the mid-frequency range. Outside such controlled conditions, the trained ear can detect changes of 2 dBA in normal environmental noise. It is widely accepted that the average healthy ear, however, can barely perceive noise level changes of 3 dBA. A change of 5 dBA is readily perceptible, and a change of 10 dBA is perceived as twice (if a gain) or half (if a loss) as loud. A doubling of sound energy results in a 3-dBA increase in sound, which means that a doubling of sound energy (e.g., doubling the volume of traffic on a road) would result in a barely perceptible change in sound level.

1.4.5 Noise Descriptors
Additional units of measure have been developed to evaluate the long -term characteristics of sound. The energy- equivalent sound level (Leq) is also referred to as the time-average sound level. It is the equivalent steady-state or constant sound level that in a stated period of time would contain the same acoustical energy as the time-varying sound level during the same time period. For instance, the 1-hour A-weighted equivalent sound level, Leq(h), is the energy average of the A -weighted sound levels occurring during a 1 -hour period, and is the basis for most of the County Noise Ordinance standards.

People are generally more sensitive to and thus potentially more annoyed by noise occurring during the evening and nighttime hours. Hence, another noise descriptor used in community noise assessments—the community noise equivalent level (CNEL)—represents a time-weighted, 24-hour average noise level based on the A -weighted sound level. However, unlike an unmodified 24 hour Leq value, the CNEL descriptor accounts for increased noise sensitivity during the evening (7 p.m. to 10 p.m.) and nighttime (10 p.m. to 7 a.m.) by adding 5 dBA and 10 dBA, respectively, to the average sound levels occurring during these defined hours within a 24-hour period.

1.4.6 Sound Propagation
Sound propagation (i.e., the traverse of sound from a noise emission source position to a receiver location) is influenced by multiple factors that include geometric spreading, ground absorption, atmospheric effects, and occlusion by natural terrain and/or features of the built environment.

Sound levels attenuate (or diminish) geometrically at a rate of approximately 6 dBA per doubling of distance from an outdoor point-type source due to the spherical spreading of sound energy with increasing distance travelled. The effects of a tmospheric conditions such as humidity, temperature, and wind gradients are typically distance - dependent and can also temporarily either increase or decrease sound levels measured or perceived at a receptor location. In general, the greater the distance the receiver is from the source of sound emission, the greater the potential for variation in sound levels at the receptor due to these atmospheric effects. Additional attenuation can result from sound path occlusion and diffraction due to intervention of natural (ridgelines, dense forests, etc.) and built features (such as solid walls, buildings and other structures).

1.4.7 Groundborne Vibration Fundamentals
Groundborne vibration is fluctuating or oscillatory motion transmitted through the ground mass (i.e., soils, clays, and rock strata). The strength of groundborne vibration attenuates rapidly over distance. Some soil types transmit vibration quite efficiently; other types (primarily sandy soils) do not. Several basic measurement units are commonly

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 9 FEBRUARY 2023

used to describe the intensity of ground vibration. The descriptors used by the Federal Transit Administration (FTA) are peak particle velocity (PPV), in units of inches per second (ips), and velocity decibel (VdB) that is based on a root-mean square (RMS) of the vibration signal magnitude. The calculation to determine PPV at a given distance is as follows:

PPVdistance = PPVref*(25/D)^1.5
Where:

PPVdistance = the peak particle velocity in inches per second of the equipment adjusted for distance PPVref = the reference vibration level in inches per second at 25 feet D = the distance from the equipment to the receiver

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 10 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

13528 11 FEBRUARY 2023

2 Regulatory Setting

2.1 Federal
In its Transit Noise and Vibration Impact Assessment guidance manual, the Federal Transit Administration (FTA) recommends a daytime construction noise level threshold of 80 dBA L eq over an 8-hour period (FTA 2018) when detailed construction noise assessmen ts are performed to evaluate potential impacts to community residences surrounding a project. Although this FTA guidance is not a regulation, it can serve as a quantified standard in the absence of such noise limits at the state and local jurisdictional levels.

2.2 State

2.2.1 California Code of Regulations, Title 24
Title 24 of the California Code of Regulations sets standards that new development in California must meet.

According to Title 24, interior noise levels are not to exceed 45 dBA CNEL in any habitable room (ICC 2019).

2.2.2 California Department of Health Services Guidelines The California Department of Health Services has developed guidelines of community noise acceptability for use by local agencies (OPR 2017). Selected relevant levels are listed here:
▪ Below 60 dBA CNEL: normally acceptable for low-density residential use ▪ 50 to 70 dBA: conditionally acceptable for low-density residential use ▪ Below 65 dBA CNEL: normally acceptable for high-density residential use and transient lodging ▪ 60 to 70 dBA CNEL: conditionally acceptable for high -density residential, transient lodging, churches, educational, and medical facilities
The normally acceptable exterior noise level for high-density residential use is up to 65 dBA CNEL. Additionally, this exterior noise level limit is consistent with the City of Chula Vista General Plan Noise Element, which considers multi- family unit noise-sensitive land uses.

2.2.3 California Department of Transportation
In its Transportation and Const ruction Vibration Guidance Manual (Caltrans 2020), the California Department of Transportation (Caltrans) recommends 0.5 ips PPV as a threshold for the avoidance of structural damage to typical newer residential buildings exposed to continuous or frequent intermittent sources of groundborne vibration. For transient vibration events, such as blasting, the damage risk threshold would be 1.0 ips PPV (Caltrans 2020) at the same type of newer residential structures. For older structures, these guidance thresholds would be more stringent:

0.3 ips PPV for continuous/intermittent vibration sources, and 0.5 ips PPV for transient vibration events. With respect to human annoyance, Caltrans guidance indicates that building occupants exposed to continuous groundborne vibration in the range of 0.2 -0.6 ips PPV would find it “unpleasant or “annoying” and thus a likely significant impact. Although these Caltrans guidance thresholds are not regulations, they can serve as quantified standards in the absence of such limits at the local jurisdictional level.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 12 FEBRUARY 2023

2.3 Local

2.3.1 Noise Ordinance
San Marcos Municipal Code Chapter 10.24.020.b.9 addresses construction activity, with exemption from chapter provisions between 7:00 a.m. and 6:00 p.m. Monday through Friday and on Saturdays from 8:00 a.m. to 5:00 p.m. (City of San Marcos 2017) . The Municipal Codes does not set noise limits on construction activities; however, on occasion the City of San Marcos has adopted the County of San Diego’s Noise Ordinance noise limit of 75 dBA Leq (8-hour average) attributed to construction activities as received by an occupied property.

Section 20.300.070.E from the City of San Marcos Municipal Code describes exterior noise limits as reproduced in Table 2. Allowable decibel increases from what appears in Table 2 are based on duration, such as +5 dBA for up to a cumulative duration of 15 minutes in an hour (City of San Marcos 2017).

Table 2. City of San Marcos Exterior Noise Standards by Zone Zone Allowable Noise Level (dBA L eq) Measured from the Property Line Single -Family Residential (A, R -1, R -2) 1, 2
7 a.m. to 10 p.m. (daytime) 60
10 p.m. to 7 a.m. (overnight) 50
Multifamily Residential (R -3) 1, 2
7 a.m. to 10 p.m. (daytime) 65
10 p.m. to 7 a.m. (overnight) 55
Commercial (C, O -P, SR) 3
7 a.m. to 10 p.m. (daytime) 65
10 p.m. to 7 a.m. (overnight) 55
Industrial
7 a.m. to 10 p.m. (daytime) 65
10 p.m. to 7 a.m. (overnight) 60
Source: San Marcos 2017 (Table 20.300-4)
Notes:
1 For single-family detached dwelling units, the "exterior noise level" is defined as the noise level measured at an outdoor living area which adjoins and is on the same lot as the dwelling, and which contains at least the following minimum net lot area: (i) for lots less than 4,000 s quare feet in area, the exterior area shall include 400 square feet, (ii) for lots between 4,000 square feet to 10 acres in area, the exterior area shall include 10 percent of the lot area; (iii) for lots over 10 acres in area, the exterior area shall include 1 acre.
2 For all other residential land uses, "exterior noise level" is defined as noise measured at exterior areas which are provided for private or group usable open space purposes. "Private Usable Open Space" is defined as usable open space intende d for use of occupants of one dwelling unit, normally including yards, decks, and balconies. When the noise limit for Private Usable Open Space cannot be met, then a Group Usable Open Space that meets the exterior noise level standard shall be provided. "G roup Usable Open Space" is defined as usable open space intended for common use by occupants of a development, either privately owned and maintained or dedicated to a public agency, normally including swimming pools, recreation courts, patios, open landscaped areas, and greenbelts with pedestrian walkways and equestrian and bicycle trails, but not including off-street parking and loading areas or driveways.
3 For non-residential noise sensitive land uses, exterior noise level is defined as noise measured at the exterior area provided for public use.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 13 FEBRUARY 2023

With respect to vibration, Section 20.300.070 of the Performance Standards also indicates that “no person or use shall create, maintain, or cause ground vibration that is discernible without instruments to a person of normal sensitivity at any point on a property that is adjacent to the property of the vibration source. The ground vibration caused by moving vehicles, trains, aircraft, or temporary construction or demolition is exempted.” Due to these exemptions, vibration due to construction of the proposed project, or vibration from nearby roads and rail received by new buildings or its occupants associated with the proposed project would be compatible with these City standards.

2.3.2 General Plan Noise Element
To control transportation related noise sources such as arterial roads, freeways, airports, and railroads, the City of San Marcos has established guidelines for acceptable community noise levels in the Noise Element of the General Plan (San Marco s 2012). For noise sensitive rural and single family residential uses, schools , libraries, parks and recreational areas the City Noise Element requires an exterior noise levels of less than 60 dBA CNEL for outdoor usable area. For multi -family developments the standard is 65 dBA CNEL and a standard of 70 dBA CNEL is typically applied to commercial uses. The City has also established an interior noise limit of 45 dBA CNEL for all residential uses.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 14 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

13528 15 FEBRUARY 2023

3 Existing Conditions
SPL measurements were conducted near the proposed project site on April 26, 2022, to quantify and characterize the existing outdoor ambient sound levels. Table 3 provides the locatio n, date, and time period at which these baseline noise level measurements were performed by an attending Dudek field investigator using a Rion-branded Model NL-52 sound level meter (SLM) equipped with a 0.5 inch, pre-polarized condenser microphone with pre - amplifier. The SLM meets the current American National Standards Institute standard for a Type 1 (Precision Grade) sound level meter. The accuracy of the SLM was verified using a field calibrator before and after the measurements, and the measurements were conducted with the microphone positioned approximately 5 feet above the ground.

Four (4) short -term (ST) noise level measurement locations (ST1 –ST4) that represent existing noise -sensitive receivers were selected on and near the proposed project site. These locations are depicted as receivers ST1–ST4 on Figure 3, Noise Measurement Locations. The measured L eq and Lmax noise levels are provided in Table 3. The primary noise sources at the sites identified in Table 3 consisted of traffic along adjacent roadways, the sounds of leaves rustling, and birdsong. As shown in Table 3, the measured SPL ranged from approximately 47.3 dBA Leq at ST4 to 64.2 dBA Leq at ST1. Beyond the summarized information presented in Table 3, detailed noise measurement data is included in Appendix A, Baseline Noise Measurement Field Data.

Table 3. Measured Baseline Outdoor Ambient Noise Levels Site Location/Address Date/Time Leq (dBA) Lmax (dBA) ST1 Southwest in CVS Parking Lot 2022-04-26, 04:00 PM to 04:10 PM 64.2 73.6 ST2 Northern boundary of CVS
Parking Lot
2022-04-26, 04:20 PM to 04:30 PM 63.5 74.5
ST3 In dirt lot, west of Property at 1333
Granite Road, San Marcos CA,
92069, east of N Las Posas Road
2022-04-26, 04:40 PM to 04:50 PM 60.2 68.5
ST4 Front yard of 389 Palmac St,
San Marcos, CA 92069
2022-04-26, 05:00 PM to 05:10 PM 47.3 58.1
Source: Appendix A.

Notes: L eq = equivalent continuous sound level (time -averaged sound level); L max = maximum sound level during the measurement interval; dBA = A-weighted decibels; ST = short-term noise measurement locations.

Generally, the measured samples of daytime Leq agree with expectations: ST1, ST2, and ST3 Leq values are above 60 dBA due largely to proximity to Mission Boulevard and /or N. Las Posas Road that are major roadways; ST4, however, is behind residential walls west of the western boundary of the proposed project and more distant from these sources of roadway traffic noise, which results in a substantially lower sampled Leq value.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 16 FEBRUARY 2023

INTENTIONALLY LEFT BLANK
Date: 6/28/2022 - Last saved by: hmcomber - Path: Z:\Projects\j1352801\MAPDOC\DOCUMENT\Noise\Figure3_NoiseMeasurementLocati ons.mxd

PALMAC ST

GRANITE RD

PALM RD

PALOMARCOS AVE

NLASPOSASRD

N PACIFIC ST

WMISSIONRD
ST3
ST4
ST2
ST1
OS-1
OS-2
M1
M2
M3 M4
M5
M6
Noise Measurement Locations
Gran Vista, Las Posas Project
SOURCE: SANGIS 2020, 2021
0 15075
Feet
Project Boundary
Noise Measurement and Modeling Locations
Modeled Receptor
Open Space
Short Term Measurement
FIGURE 3

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 18 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

13528 19 FEBRUARY 2023

4 Thresholds of Significance
The following significance criteria are based on Appendix G of the California Environmental Quality Act Guidelines (14 CCR 15000 et seq.) and will be used to determine the significance of potential noise and vibration impacts.

Impacts associated with noise and vibration would be significant if the proposed project would result in:
▪ Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies.
▪ Generation of excessive groundborne vibration or groundborne noise levels. ▪ Expose people residing or working in the project area to excessive noise levels (for a project located within the vicinity of a private airstrip or an airport land use plan, or where such a plan has not been adopted, within 2 miles of a public airport or public use airport).

In light of these above significance criteria, this analysis uses the following standards to evaluate potential noise and vibration impacts.
▪ Construction noise –the City has adopted the County threshold for construction equipment noise, which must not exceed an eight-hour Leq value of 75 dBA Leq when assessed at an occupied property. Construction shall only occur between the hours of 7:00 a.m. through 6:00 p.m., Monday through Friday, and after 8:00 a.m. through 5:00 p.m. on Saturday.
• Off-site project-attributed transportation noise – For purposes for this analysis, a direct roadway noise impact would be considered significant if increases in roadway traffic noise levels attributed to the proposed project were greater than 3 dBA CNEL at an existing noise-sensitive land use. • Off-site project-attributed stationary noise – For purposes for this analysis, a noise impact would be considered significant if noise from typical operation of heating, ventilation, and air conditioning and other electro-mechanical systems associated with the proposed project exceeded the following:
- 60 dBA hourly Leq at the property line of an offsite single -family residence from 7:00 a.m. to 10:00 p.m., and 50 dBA hourly Leq from 10:00 p.m. to 7:00 a.m.; and - 65 dBA hourly Leq at the property line of an offsite commercial land use from 7:00 a.m. to 10:00 p.m., and 55 dBA hourly Leq from 10:00 p.m. to 7:00 a.m.
▪ Construction vibration – Although exempted by the City, guidance from Caltrans indicates that a vibration velocity level of 0.2 ips PPV received at a structure would be considered annoying by occupants within (Caltrans 2020). As for the receiving structure itself, aforementioned Caltrans guidance from Section 2 recommends that a vibration level of 0.3 ips PPV would represent the threshold for building damage risk.

For purposes of disclosure, since current CEQA noise criteria listed above do not consider it, this analysis also evaluates compatibility of on-site traffic noise exposure levels with the City of San Marcos exterior and interior noise standards of 65 dBA CNEL and 45 dBA CNEL, respectively.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 20 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

13528 21 FEBRUARY 2023

5 Impact Discussion
Potential noise and vibration impacts attributed to project construction and operation are studied in the following subsections that are categorized by the CEQA Guidelines Appendix G significance for noise. a) Would the project result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Short -Term Construction
Construction noise and vibration are temporary phenomena, with emission levels varying from hour to hour and day to day, depending on the equipment in use, the operations performed, and the distance between the source and receptor. Equipment that would be in use duri ng construction would include, in part, graders, backhoes, rubber-tired dozers, loaders, cranes, forklifts, pavers, rollers, and air compressors. The typical maximum noise levels at a distance of 50 feet from various pieces of construction equipment and activities anticipated for use on the proposed project site are presented in Table 4. Note that the equipment noise levels presented in Table 4 are maximum noise levels. Usually, construction equipment operates in alternating cycles of full power and low power, producing average noise levels over time that are less than the maximum noise level. The average sound level of construction activity also depends on the amount of time that the equipment operates and the intensity of construction activities during that time.

Table 4. Typical Construction Equipment Maximum Noise Levels Equipment Type Typical Equipment ( Lmax , dBA at 50 Feet) All Other Equipment > 5 HP 85
Backhoe 78
Compressor (air) 78
Concrete Saw 90
Crane 81
Dozer 82
Excavator 81
Flat Bed Truck 74
Front End Loader 79
Generator 72
Grader 85
Man Lift 75
Paver 77
Roller 80
Scraper 84
Welder / Torch 73
Source: DOT 2006.

Note: Lmax = maximum sound level; dBA = A-weighted decibels.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 22 FEBRUARY 2023

Aggregate noise emission from proposed project construction activities, broken down by sequential phase, was predicted at two evaluation distances to the nearest existing noise -sensitive receptor: 1) from the nearest position of the construction site boundary and 2) from the geographic center of the construction site, which serves as the time -averaged location or geographic acoustical centroid of active construction equipment for the phase under study. The intent of the former distance is to help evaluate anticipated construction noise from a limited quantity of equipment or vehicle activity expected to be at the boundary for some period of time, which would be most appropriate for phases such as site preparation, grading, and paving. The latter distance is used in a manner similar to the general assessment technique as described in the FTA guidance for construction noise assessment, when the location of individual equipment for a given construction phase is uncertain over some extent of (or the entirety of) the construction site area. In this studied scenario, because of the equipment location uncertainty, all the equipment for a construction phase is assumed to operate—on average—from the acoustical centroid position. Table 5 summarizes these two distances to the apparent closest noise-sensitive receptor for each of the seven sequential construction phases. At the site boundary, this analysis assumes that up to only one piece of equipment of each listed type per phase will be involved in the construction activity for a limited portion of the 8-hour period. In other words, at such proximity, the operating equipment cannot “stack” or crowd the vicinity and still operate. For the acoustical centroid case, which intends to be a geographic average position for all equipment during the indicated phase, this analysis assumes that the equipment may be operating up to all 8 hours per day.

Table 5. Estimated Distances between Construction Activities and the Nearest Noise-sensitive Receptors
Construction Phase
(and Equipment
Types Involved)
Distance from Nearest Noise -
Sensitive Receptor to Construction
Site Boundary (Feet)
Distance from Nearest Noise -
Sensitive Receptor to Acoustical
Centroid of Site (Feet)
Demolition (concrete
saw, backhoe, dozer)
80 160
Site Preparation (grader,
scraper, backhoe)
80 160
Grading (grader,
dozer, backhoe)
80 160
Building construction
(crane, man-lift,
generator,
backhoe, welder)
80 160
Paving (paver, roller,
concrete mixer truck)
80 160
Architectural Coating
(compressor)
80 160

A Microsoft Excel –based noise prediction model emulating and using reference data from the Federal Highway Administration Roadway Construction Noise Model (RCNM) (FHWA 2008) was used to estimate construction noise levels at the nearest occupied noise-sensitive land use. (Although the RCNM was funded and promulgated by the Federal Highway Administration, it is often used for non-roadway projects, because the same types of construction equipment used for roadway projects are often used for other types of construction.) Input variables for the predictive modeling consist of the equipment type and number of each

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 23 FEBRUARY 2023

(e.g., two graders, a loader, a tractor), the duty cycle for each piece of equipment (e.g., percentage of time within a specific time period, such as an hour, when the equipment is expected to operate at full power or capacity and thus make noise at a level comparable to what is presented in Table 4), and the distance from the noise-sensitive receiver. The predictive model also considers how many hours that equipment may be on site and operating (or idling) within an established work shift. Conservatively, n o topographical or structural shielding was assumed in the modeling. The RCNM has default duty-cycle values for the various pieces of equipment, which were derived from an extensive study of typical construction activity patterns.

Those default duty -cycle va lues were used for this noise analysis , which is detailed in Appendix B, Construction Noise Modeling Input and Output, and produce the predicted results displayed in Table 6.

Table 6. Predicted Construction Noise Levels per Activity Phase Construction Phase (and
Equipment Types Involved)
8-Hour L eq at Nearest Noise -
Sensitive Receptor to Construction
Site Boundary (dBA)
8-Hour L eq at Nearest Noise -
Sensitive Receptor to Acoustical
Centroid of Site (dBA)
Demolition (concrete saw,
backhoe, dozer)

74.8 71.6
Site Preparation (grader,
scraper, backhoe)

74.2 70.3
Grading (grader, dozer,
backhoe)

73.5 70.0
Building construction (crane,
man-lift, generator, backhoe,
welder)

68.5 67.1
Paving (paver, roller, concrete
mixer truck)

70.3 67.1
Architectural Coating
(compressor)

62.6 59.1
Notes: Leq = equivalent noise level; dBA = A-weighted decibels.

As presented in Table 6, the highest estimated construction noise levels are predicted to stay below 75 dBA Leq over an 8-hour period at the nearest exi sting residences (as close as 80 feet away) when demolition activities take place near the western project boundaries . Note that these estimated noise levels at a source-to-receiver distance of 80 feet would only occur when noted pieces of heavy equipment would each operate for a cumulative period of up to 2 hours a day. By way of example, a grader might make multiple passes on site that are this close to a receiver; but, for the remaining time during the day, the gr ader is sufficiently farther away, performing work at a more distant location, or simply not operating.

Should operation of construction equipment and processes be sufficiently proximate to the project’s western boundary for greater than 2 hours a day , construction activity noise levels might exceed an 8 hour Leq value of 75 dBA Leq and thereby exceed the City’s adopted daytime threshold for construction noise exposure at an occupied property. Therefore, the following suggested practices would be incorporated into the project’s construction program as project design features:
▪ Administrative controls (e.g., reduce operating time of equipment and/or prohibit usage of equipment type[s] within certain distances).
▪ Engineering controls (upgrade noise controls, such as install better engine exhaust mufflers).

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 24 FEBRUARY 2023

▪ Install noise abatement on the site boundary fencing (or within, as practical and appropriate) in the form of sound blankets or comparable temporary barriers to occlude construction noise emission between the site (or specific equipment operation as the situation may define) and offsite noise- sensitive receptor(s) of concern.
▪ At the outset of a project construction activity, an unattended noise level monitor might be deployed onsite to measure and document that noise exposure levels attributed to project construction activity at adjacent offsite sensitive receptors are in conformance with the 75 dBA 8 hour Leq threshold.

The above design features would be implemented as site conditions may warrant. Proper application of temporary noise barriers or comparable sound abatement can feasibly reduce noise levels by at least 5 dB due to direct path occlusion between the noise source and receptor.

In summary, daytime construction noise would not exceed the City’s 75 dBA threshold and Thus, temporary construction-related noise impacts would be considered less than significant.

Long -Term Operational
Off-Site Traffic Noise Exposure
The proposed project would result in the creation of additional vehicle trips on local arterial roadways (i.e., Mission Boulevard and N. Las Posas Road), which could result in increased traffic noise levels at adjacent noise-sensitive land uses. Appendix C, Traffic Noise Modeling Input and Output, contains a spreadsheet with traffic volume data (average daily traffic) for Mission Boulevard and N. Las Posas Road. In particular, the proposed project would create additional traffic along N. Las Posas Road, which according to the Traffic Impact Assessment prepared for the proposed project (CR Associates, 2022) would add 960 total average daily trips to adjacent to the project site.

Potential noise effects from vehicular traffic were assessed using the Federal Highway Administration’s Traffic Noise Model version 2.5 (FHWA 2004). Information used in the model included the roadway geometry, existing (year 2022), existing plus project, near-term (opening day) and near-term (opening day) plus project traffic volumes and posted traffic speeds. Noise levels were modeled at representative noise -sensitive receivers ST1 through ST4, as shown in Figure 3. The receivers were modeled to be 5 feet above the local ground elevation. The noise model results are summarized in Table 7. Based on results of the model, implementation of the proposed project would not result in readily perceptible increases in traffic noise.

Table 7. Roadway Traffic Noise Modeling Results
Modeled
Receiver
No.

Existing
(2022)
Noise
Level
Existing
with
Project
Noise
Level
Near -Term
(Opening
Day) without
Project
Noise Level
Near-Term
(Opening
Day) with
Project
Noise Level
Horizon
(2050)
without
Project
Noise
Level
Horizon
(2050)
with
Project
Noise
Level
Maximum
Project -
Related
Noise Level
Increase
(dBA
CNEL)
(dBA
CNEL) (dBA CNEL) (dBA CNEL)
(dBA
CNEL)
(dBA
CNEL) (dB)
ST1 68.3 68.3 68.6 68.6 69.4 69.4 0.0
ST2 69.0 69.2 69.6 69.8 70.2 70.4 0.2

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 25 FEBRUARY 2023

Table 7. Roadway Traffic Noise Modeling Results
Modeled
Receiver
No.

Existing
(2022)
Noise
Level
Existing
with
Project
Noise
Level
Near -Term
(Opening
Day) without
Project
Noise Level
Near-Term
(Opening
Day) with
Project
Noise Level
Horizon
(2050)
without
Project
Noise
Level
Horizon
(2050)
with
Project
Noise
Level
Maximum
Project -
Related
Noise Level
Increase
(dBA
CNEL)
(dBA
CNEL) (dBA CNEL) (dBA CNEL)
(dBA
CNEL)
(dBA
CNEL) (dB)
ST3 66.5 66.7 67.1 67.2 67.7 67.9 0.2
ST4 52.7 51.2 53.2 51.7 53.9 52.4 < 0*
Source: Appendix C.

Notes: dBA = A-weighted decibel; CNEL = community noise equivalent level; dB = decibel. *Noise level change is negative.

Table 7 shows that at all four listed representative receivers, the addition of proposed project traffic to the roadway network would result in an increase in the CNEL of less than 3 dB, which is below the discernible level of change for the average healthy human ear. Thus, a less-than-significant impact is expected for proposed project-related off-site traffic noise increases affecting existing residences in the vicinity.

On-site Traffic Interior Noise Exposure
Aside from exposure to aviation traffic noise, current CEQA noise-related guidelines at the state level do not require an assessment of exterior -to-interior noise intrusion, environmental noise exposure to occupants of newly -created project residences, or environmental noise exposure to exterior non -residential uses attributed to the development of the proposed project. Nevertheless, the City’s General Plan and the California Building Code requires that interior background noise levels not exceed a CNEL of 45 dB within habitable rooms. Hence, the following predictive analysis of traffic noise exposure at the exteriors of occupied residences and outdoor living areas is provided below.

In addition to the prediction results presented in Table 7, the FHWA TNM software was also used to predict the Horizon-with-project scenario traffic noise levels at multiple on-site exterior areas, as listed in Table 8.

These on-site modeled receptor locations, which appear in Figure 3 and in the Appendix C isometric view of the modeled TNM space, include representative positions for the exteriors of multiple floors and positions of six of the proposed project building facades. Predicted exterior sound levels presented in Table 8 that are higher than 65 dBA CNEL indicate locations where an exterior -to-interior noise analysis should be performed for the proximate occupied residential unit.

Table 8. Future Ambient Noise Levels at Residential Facades Modeled Receptor
Predicted Noise Level ( A-weighted CNEL)
1st Floor 2nd Floor 3rd Floor
M1–1 65 65 65
M1–2 64 64 64
M2–1 58 60 60
M2–2 62 63 63

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 26 FEBRUARY 2023

Table 8. Future Ambient Noise Levels at Residential Facades Modeled Receptor
Predicted Noise Level ( A-weighted CNEL)
1st Floor 2nd Floor 3rd Floor
M3–1 56 59 59
M3–2 58 60 61
M4–1 64 65 65
M5–1 61 62 62
M5–2 65 65 65
M6–1 68 69 68
M6–2 68 68 68
OS–1 65
OS–2 65

The prediction results from Table 8 indicate that future traffic noise levels would not exceed 69 dBA CNEL.

With the 45 dBA CNEL interior background sound level limit, this means the minimum composite sound transmission class (STC) rating for the exterior shell separating the habitable interior space from the outdoor sound level should be at least 24. The composite STC rating for the portion of a building shell that separates an interior space from the outdoors is calculated from the area -dependent contributions of its elements: windows, wall assemblies, and doors.

Many of the residential units feature porches or balconies on the 1st or 2nd floor, for which access would likely be provided by single-panel, out-swing fiberglass French doors with hinges compar able to a Milgard Essence series model (or similar from another manufacturer). Alternately, they could be a sliding door type. For purposes of this analysis, either of these patio/balcony door design styles are assumed to feature a dual -pane glazing system similar to a standard residential window assembly (i.e., two 1/8” - thick glass panes separated by a 3/8” wide airgap) in narrow -perimeter frames compatible with modern thermal insulation (and thus energy conserving) design. The analysis also assumes that t hese door products feature good seals and related hardware, so that when closed, the effective sound insulating performance is represented by the glass. Viracon data indicates that such glazing should demonstrate an STC rating of 31 (Viracon 2019).

This study further assumes an exterior wall assembly that includes: one layer of 5/8” gypsum wallboard (GWB) on the interior-facing side, 2”x4” wood studs, glass fiber batt insulation in the stud cavities, and a dual-layer of 5/8” GWB on the exterior -facing side. Acoustical transmission loss (TL) data is available on this representative assembly (Halliwell 1998), and is used as part of estimating the composite STC ratings reported herein. For purposes of this analysis, the dual-layer GWB on the exterior surface approximates the mass and solidity of what may be other approved material options as determined by the Project architect, such as cement fiber siding panels, brick masonry veneer, or cement plaster attached to layers of fiberglass mat sheathing and plywood sheathing.

Table 9 summarizes the calculated noise levels after applying the STC ratings for a set of studied occupied room facades that are anticipated to be exposed to predicted exterior noise levels greater than 60 dBA CNEL. Details of these calculations that account for the façade surface area and its composite areas of exterior wall assembly and windows appear in Appendix D.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 27 FEBRUARY 2023

Clearly, an open window or open door to an adjoining patio or balcony greatly compromises the sound insulation performance of the façade wall assembly, as presented for the sample units appearing in Table 9.

However, when such windows and doors are closed, all facades are anticipated to exhibit a predicted STC rating of at least 35, and thus would provide sufficient exterior-to-interior sound insulation from outdoor traffic noise to yield interior background sound levels that are less than 45 dBA CNEL and thus compliant with the City and state standards. Recall that none of the predicted exterior traffic noise levels at the studied receptor locations exceeded 69 dBA CNEL; thus, the STC rating value (for closed windows and doors) subtracted from these exterior noise values must result in interior noise levels of less than 45 dBA CNEL (e.g., 69 – 35 = 34 dBA CNEL, which is less than 45). This apparent requirement for closed windows and doors means that the design of these habitable rooms should feature mechanical ventilation or an air-conditioning system to provide interior comfort of the occupants. Detailed transmission loss data is included in Appendix D, Transmission Loss Predictions. Thus, the City’s threshold of 45 dB CNEL within habitable rooms would not be exceeded and thus demonstrates expected project compliance with this standard.

Table 9. Predicted Net Sound Transmission Class of Occupied Room Façade Occupied Room Facade
Predicted Net Sound Transmission Class (STC)
for Scenario
Closed Window(s)
and Door *
Open Window(s) and
Closed French Door*
1st floor living room w/ porch, eastern facade 35 6
2nd floor living room w/ balcony, eastern Façade 35 6
3rd floor Bedroom, eastern Façade 38 15
Notes:
n/a = not applicable
* Doors are only modeled for scenarios that contain the balcony door.

Open Space and Balconies
Where predicted exterior noise levels exceed 65 dBA CNEL proximate to shared or common usable outdoor space, and such space would count towards the outdoor usable space associated with the project, according to the City’s General Plan , feasible noise reduc tion techniques should be analyzed and incorporated to make the outdoor activities acceptable at locations that are currently above the City’s 65 dBA CNEL standard. With the implementation of project design feature PDF-1, the resultant exterior noise levels would meet the City’s exterior noise standard of 65 dBA CNEL.

PDF-1: Where exterior noise levels are predicted to exceed 65 dBA CNEL at useable open space areas, the project should install noise -reducing features external to or upon the useable open space areas (or within, as practical and appropriate) in the form of sound walls, fencing, landscape berms, or similarly performing barriers to occlude incoming roadway traffic noise.

For proposed project residential units that feature patios or balconies expected as outdoor useable areas, predicted future traffic noise exposure levels presented in Table 8 suggest that up to 4 dBA of noise reduction would be needed to keep sound on such balconies at levels below the 65 dBA CNEL compatibility

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 28 FEBRUARY 2023

standard. With the implementation of project design feature PDF-2, the resultant exterior noise levels would meet the City’s exterior noise standard of 65 dBA CNEL.

PDF-2: Residential unit patios or balconies along roadway-facing building facades predicted to be exposed to external noise levels in excess of 65 A-weighted decibels community noise equivalent level shall feature railings or other partial-height barriers comprising sufficiently solid and dense materials (e.g., acrylic, glass, wood, etc. that exhibits a sound transmission class rating of at least 20) and of a 42-inch minimum height (from floor or deck of the balcony surface) that occludes direct sound path from the noise -producing roadway of concern and a seated patio or balcony occupant.

Stationary Noise Sources
The incorporation of new multi -family homes and a mix of open space uses attributed to development of the proposed project will add a variety of noise-producing electro-mechanical equipment that include those presented and discussed in the following paragraphs. Most of these noise-producing equipment or sound sources would be considered stationary, or limited in mobility to a defined area. Using a Microsoft Excel – based outdoor sound propagation prediction model, project -attributed operational noise at nearby community receptors was predicted using several assumptions:
▪ Treatment of exposed patio air-cooled condensing units as point-type sound emission sources; and, ▪ Point-source sound propagation (i.e., 6 dB per doubling of distance) that conservatively ignores acoustical absorption from atmospheric and ground surface effects.

Please see Appendix E for quantitative details of the inputs and outputs that form the basis of the following assessment presentations.

Residential Unit Heating, Ventilation, and Air Conditioning Noise For purposes of this analysis, each of the new occupied residential units would be expected to feature a split-system type air-conditioning unit, with an air-cooled refrigeration (2-ton capacity) condenser unit in the patio area as currently depicted by the site plan (dated June 24, 2020).

Assuming each condenser unit has an SPL of 68 dBA at 3 feet based on available data from a likely manufacturer (Carrier 2012), the site plan suggests that these condenser units would generally be installed near the patio (i.e., apparent “front porch”). Therefore, the closest existing noise-sensitive residential receptor to the west of the proposed project’s westernmost unit would be as close as 90 horizontal feet to the nearest of these condenser units. However, due to the 6 foot tall property line wall proposed along the western property boundary, the predicted sound emission level from the combination of all eight operating condenser units as received by this offsite single-family home would be 46 dBA Leq and thus be compliant with the City’s nighttime threshold of 50 dBA hourly Leq. Under such conditions, the operation of residential air-conditioning units would result in a less-than-significant noise impact.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 29 FEBRUARY 2023

b) Would the project result in generation of excessive groundborne vibration or groundborne noise levels? Construction activities may expose persons to excessive groundborne vibration, causing a potentially significant impact. Caltrans has collected groundborne vibration information related to construction activities (Caltrans 2020). Information from Caltrans indicates that continuous vibrations with a PPV of approximately 0.2 ips is considered “annoying.” For context, heavier pieces of con struction equipment, such as a bulldozer that may be expected on the project site, have peak particle velocities of approximately

0.089 ips or less at a reference distance of 25 feet (DOT 2006).

Groundborne vibration attenuates rapidly —even over short dis tances. And when groundborne vibration encounters a building foundation, a coupling loss occurs depending on the mass and design. For typical wood- framed houses, like those near the proposed project, this coupling loss is 5 vibration velocity decibels according to FTA guidance (FTA 2006). The attenuation of groundborne vibration as it propagates from source to receptor through intervening soils and rock strata can be estimated with expressions found in FTA and Caltrans guidance. By way of example, for a bulldozer operating on site and as close as the western project boundary (that is 80 feet from the nearest receiving sensitive land use) the estimated vibration velocity level would be 0.024 ips and thus no greater than the annoyance threshold recommended by Caltrans. Therefore, vibration-induced annoyance to occupants of nearby existing homes would be less than significant.

Construction vibration, at sufficiently high levels, can also present a building damage risk. However, anticipated construction vibratio n from conventional heavy equipment associated with this proposed project would not yield levels that surpass this risk. Per Caltrans, the recommended PPV threshold for newer residential structures is 0.5 ips and 0.3 ips for older residential structures—both of which are less stringent that the aforementioned threshold to annoy occupants of such structures; thus vibration damage risk to nearby structures is considered less than significant.

Once operational, the proposed project would not be expected to feature major producers of groundborne vibration. Anticipated mechanical systems like heating, ventilation, and air-conditioning units are designed and manufactured to feature rotating (fans, motors) and reciprocating (compressors) components that are well-balanced with isolated vibration within or external to the equipment casings. On this basis, vibration due to proposed project operation should be less than significant.

C) For a project located within the vicinity of a private airstrip or an airport land us e plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? There are no private airstrips within the vicinity of the project site. The closest airport to the proposed project site is the McClellan-Palomar Airport, approximately 5 miles west southwest of the site and would therefore not expose people residing or working in the project area to excessive noise levels. Impacts would be less than significant .

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 30 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

13528 31 FEBRUARY 2023

6 Summary of Findings
This noise report was conducted for the proposed project. The results indicate that potential impacts during construction would be less than significant ; nevertheless, construction best practices that incorporate noise reduction techniques would be incorporated into the project construction process. Noise impacts due to operation of the proposed project (including traffic noise) would be less than significant, with project design features PDF-1 and PDF-2 offered to reduce exterior noise intrusion to project outdoor spaces . No noise and vibration mitigation measures are anticipated at this time.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 32 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

13528 33 FEBRUARY 2023

7 References Cited
Caltrans (California Department of Transportation). 2013. Technical Noise Supplement to the Traffic Noise Analysis Protocol. September.

Caltrans. 2020. Transportation and Construction Vibration Guidance Manual. Division of Environmental Analysis, Environmental Engineering, Hazardous Waste, Air, Noise, Paleontology Office. Sacramento, California. April.

Carrier. 2012. CA16NA 018-061 Single-Stage Air Conditioner w/ Puron Refrigerant. Catalog No: CA16NA-06PD. https://resource.carrierenterprise.com/is/content/Watscocom/carrier_ca16na03600g_article_ 1404816 230548_en_ss?_ga=2.123164302.489492439.1570570581-792571132.1570570581 DOT (U.S. Department of Transportation). 2006. FHWA Roadway Construction Noise Model: User’s Guide. Final Report. FHWA-HEP-06-015. DOT-VNTSC-FHWA-06-02. Cambridge, Massachusetts: DOT, Research and Innovative Technology Administration. Final Report. August.

Federal Highway Administration (FHWA). 2004. Traffic Noise Model (version 2.5).

FHWA. December 8, 2008. Roadway Construction Noise Model (RCNM), Software Version 1.1. U.S. Department of Transportation, Research and Innovative Technology Administration, John A. Volpe National Transportation Systems Center, Environmental Measurement and Modeling Division. Washington, D.C.

FTA (Federal Transit Administration). 2018. Transit Noise and Vibration Impact Assessment. FTA Report No. 0123. September.

Halliwell, R.E., Nightingale, T.R.T., Warnock, A.C.C., Birta, J.A. 1998. “Gypsum Board Walls: Transmission Loss Data”. Internal Report IRC-IR-761. NRC-CNRC. March.

OPR (Governor’s Office of Planning and Research). 2003. State of California General Plan Guidelines. October.

San Marcos, City of. 2017. City of San Marcos Municipal Code.

San Marcos, City of. 2012. City of San Marcos General Plan. Chapter 7.0, Noise Element. February 2012.

Viracon. 2019. http://www.viracon.com/pdf/ViraconAcousticPerfDataTables.pdf.

GRAN VISTA PROJECT / NOISE TECHNICAL REPORT

13528 34 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

Appendix A
Baseline Noise Measurement Field Data

Field Noise Measurement Data
Record: 1422
Project Name Gran Vista
Observer(s) Connor Burke
Date 2022-04-26

Instrument and Calibrator Information
Instrument Name List (ENC) Rion NL-52
Instrument Name (ENC) Rion NL-52
Instrument Name Lookup Key (ENC) Rion NL-52
Manufacturer Rion
Model NL-52
Serial Number 553896
Calibrator Name (ENC) LD CAL150
Calibrator Name (ENC) LD CAL150
Calibrator Name Lookup Key (ENC) LD CAL150
Calibrator Manufacturer Larson Davis
Calibrator Model LD CAL150
Calibrator Serial # 5152
Pre-Test (dBA SPL) 94
Post-Test (dBA SPL) 94
Windscreen Yes
Weighting? A-WTD
Slow/Fast? Slow
ANSI? Yes

Monitoring
Record # 1
Site ID ST1
Site Location Lat/Long 33.149330, -117.190025
Begin (Time) 16:00:00
End (Time) 16:10:00
Leq 64.2
Lmax 73.6
Lmin 53.3
Other Lx? L90, L50, L10
L90 54.7
L50 61.6
L10 68.20
Other Lx (Specify Metric) L
Primary Noise Source Traffic
Other Noise Sources (Background) Birds, Distant Aircraft, Distant Traffic, Rustling Leaves Is the same instrument and calibrator being used
as previously noted?
Yes
Are the meteorological conditions the same as
previously noted?
Yes

Page 1 ends

Description / Photos

Site Photos
Photo

Monitoring
Record # 2
Site ID ST2
Site Location Lat/Long 33.150105, -117.188957
Begin (Time) 16:20:00
End (Time) 16:30:00
Leq 63.5
Lmax 74.5
Lmin 51.3
Other Lx? L90, L50, L10
L90 52.10
L50 58.4
L10 67.7
Other Lx (Specify Metric) L
Primary Noise Source Traffic
Other Noise Sources (Background) Birds, Distant Aircraft, Rustling Leaves Other Noise Sources Additional Description Distant rail noise Is the same instrument and calibrator being used
as previously noted?
Yes
Are the meteorological conditions the same as
previously noted?
Yes

Page 2 ends

Description / Photos

Site Photos
Photo

Monitoring
Record # 3
Site ID ST3
Site Location Lat/Long 33.151010, -117.188464
Begin (Time) 16:40:00
End (Time) 16:50:00
Leq 60.2
Lmax 68.5
Lmin 50.4
Other Lx? L90, L50, L10
L90 52.5
L50 56.7
L10 64.3
Other Lx (Specify Metric) L
Primary Noise Source Traffic
Other Noise Sources (Background) Birds, Distant Aircraft, Distant Traffic, Rustling Leaves Is the same instrument and calibrator being used
as previously noted?
Yes
Are the meteorological conditions the same as
previously noted?
Yes

Page 3 ends

Description / Photos

Site Photos
Photo

Monitoring
Record # 3
Site ID ST3
Site Location Lat/Long 33.151010, -117.188464
Begin (Time) 16:40:00
End (Time) 16:50:00
Leq 60.2
Lmax 68.5
Lmin 50.4
Other Lx? L90, L50, L10
L90 52.5
L50 56.7
L10 64.3
Other Lx (Specify Metric) L
Primary Noise Source Traffic
Other Noise Sources (Background) Birds, Distant Aircraft, Distant Traffic, Rustling Leaves Is the same instrument and calibrator being used
as previously noted?
Yes
Are the meteorological conditions the same as
previously noted?
Yes

Page 3 ends

Description / Photos

Site Photos
Photo

Monitoring
Record # 4
Site ID ST4
Site Location Lat/Long 33.150680, -117.190914
Begin (Time) 17:00:00
End (Time) 17:10:00
Leq 47.3
Lmax 58.1
Lmin 42.9
Other Lx? L90, L50, L10
L90 44.1
L50 46.5
L10 50.20
Other Lx (Specify Metric) L
Primary Noise Source Distant traffic
Other Noise Sources (Background) Birds, Rustling Leaves Is the same instrument and calibrator being used
as previously noted?
Yes
Are the meteorological conditions the same as
previously noted?
Yes

Page 4 ends

Description / Photos

Site Photos
Photo
Comments / Description

Powered by TCPDF (www.tcpdf.org)

Page 5 ends

Appendix B
Construction Noise Modeling Input and Output

Gran Vista
Acoustical Analysis Report
Attachment B -- Construction Noise Prediciton Model Worksheets To User: bordered cells are inputs, unbordered cells have formulae 75 allowable hours over which Leq is to be averaged = 8 = temporary barrier (TB) of input height inserted between source and receptor Construction Activity Equipment Total
Equipment Qty
AUF % (from

FHWA RCNM)
Reference
Lmax @ 50 ft.
from FHWA
RCNM
Client Equipment Description, Data
Source and/or Notes
Source to NSR
Distance (ft.)
Temporary Barrier
Insertion Loss (dB)
Additional Noise
Reduction
Distance-
Adjusted Lmax
Allowable
Operation Time
(hours)
Allowable
Operation Time
(minutes)
Predicted 8-
hour Leq
Source
Elevation (ft)
Receiver
Elevation (ft)
Barrier
Height (ft)
Source to
Barr. ("A")
Horiz. (ft)
Rcvr. to Barr.
("B") Horiz.
(ft)
Source to
Rcvr. ("C")
Horiz. (ft)
"A" (ft) "B" (ft) "C" (ft) Path Length
Diff. "P" (ft) Abarr (dB) Heff (with
barrier)
Heff (wout
barrier)
G (with
barrier)
G (without
barrier) ILbarr (dB)
Demolition concrete saw 1 20 90 80 0.1 84.6 2 120 72 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 dozer 1 40 82 80 0.1 76.6 2 120 67 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 80 0.1 72.6 2 120 63 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 concrete saw 1 20 90 160 0.1 76.3 6 360 68 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 dozer 1 40 82 160 0.1 68.3 6 360 63 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 160 0.1 64.3 6 360 59 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Demolition Phase: 74.8
Site Preparation grader 1 40 85 80 0.1 79.6 2 120 70 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 scraper 1 40 84 80 0.1 78.6 2 120 69 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 80 0.1 72.6 2 120 63 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 grader 1 40 85 160 0.1 71.3 6 360 66 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 scraper 1 40 84 160 0.1 70.3 6 360 65 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 160 0.1 64.3 6 360 59 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Site Preparation Phase: 74.2
Grading grader 1 40 85 80 0.1 79.6 2 120 70 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 dozer 1 40 82 80 0.1 76.6 2 120 67 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 80 0.1 72.6 2 120 63 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 grader 1 40 85 160 0.1 71.3 6 360 66 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 dozer 1 40 82 160 0.1 68.3 6 360 63 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 160 0.1 64.3 6 360 59 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Grading Phase: 73.5
Building Construction crane 1 16 81 80 0.1 75.6 2 120 62 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 man lift 1 20 75 80 0.1 69.6 2 120 57 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 generator 1 50 72 80 0.1 66.6 2 120 58 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 80 0.1 72.6 2 120 63 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 welder / torch 1 40 73 80 0.1 67.6 2 120 58 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 crane 1 16 81 160 0.1 67.3 6 360 58 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 man lift 1 20 75 160 0.1 61.3 6 360 53 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 generator 1 50 72 160 0.1 58.3 6 360 54 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 160 0.1 64.3 6 360 59 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 welder / torch 1 40 73 160 0.1 59.3 6 360 54 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Building Construction Phase: 68.5
Paving concrete mixer truck 1 40 79 80 0.1 73.6 2 120 64 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 paver 1 50 77 80 0.1 71.6 2 120 63 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 80 0.1 72.6 2 120 63 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 roller 1 20 80 80 0.1 74.6 2 120 62 5 5 0 75 5 80 75.2 7.1 80.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 concrete mixer truck 1 40 79 160 0.1 65.3 6 360 60 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 paver 1 50 77 160 0.1 63.3 6 360 59 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 160 0.1 64.3 6 360 59 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 roller 1 20 80 160 0.1 66.3 6 360 58 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Paving Phase: 70.3
noise level limit for construction phase at "occupied property", per County of San Diego 36.409 = RCNM-emulator-with-barrier_cb Dudek Project No. 12859 Nearest Receiver Gran Vista
Acoustical Analysis Report
Attachment B -- Construction Noise Prediciton Model Worksheets To User: bordered cells are inputs, unbordered cells have formulae 75 allowable hours over which Leq is to be averaged = 8 = temporary barrier (TB) of input height inserted between source and receptor Construction Activity Equipment Total
Equipment Qty
AUF % (from

FHWA RCNM)
Reference
Lmax @ 50 ft.
from FHWA
RCNM
Client Equipment Description, Data
Source and/or Notes
Source to NSR
Distance (ft.)
Temporary Barrier
Insertion Loss (dB)
Additional Noise
Reduction
Distance-
Adjusted Lmax
Allowable
Operation Time
(hours)
Allowable
Operation Time
(minutes)
Predicted 8-
hour Leq
Source
Elevation (ft)
Receiver
Elevation (ft)
Barrier
Height (ft)
Source to
Barr. ("A")
Horiz. (ft)
Rcvr. to Barr.
("B") Horiz.
(ft)
Source to
Rcvr. ("C")
Horiz. (ft)
"A" (ft) "B" (ft) "C" (ft) Path Length
Diff. "P" (ft) Abarr (dB) Heff (with
barrier)
Heff (wout
barrier)
G (with
barrier)
G (without
barrier) ILbarr (dB)
Demolition concrete saw 1 20 90 160 0.1 76.3 8 480 69 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 dozer 1 40 82 160 0.1 68.3 8 480 64 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 3 40 78 160 0.1 64.3 8 480 65 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Demolition Phase: 71.6
Site Preparation grader 1 40 85 160 0.1 71.3 8 480 67 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 scraper 1 40 84 160 0.1 70.3 8 480 66 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 160 0.1 64.3 8 480 60 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Site Preparation Phase: 70.3
Grading grader 1 40 85 160 0.1 71.3 8 480 67 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 dozer 1 40 82 160 0.1 68.3 8 480 64 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 2 40 78 160 0.1 64.3 7 420 63 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Grading Phase: 70.0
Building Construction crane 1 16 81 160 0.1 67.3 8 480 59 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 man lift 2 20 75 160 0.1 61.3 7 420 57 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 generator 1 50 72 160 0.1 58.3 8 480 55 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 3 40 78 160 0.1 64.3 6 360 64 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 welder / torch 3 40 73 160 0.1 59.3 8 480 60 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Building Construction Phase: 67.1
Paving concrete mixer truck 1 40 79 160 0.1 65.3 8 480 61 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 paver 1 50 77 160 0.1 63.3 8 480 60 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 backhoe 1 40 78 160 0.1 64.3 8 480 60 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 roller 2 20 80 160 0.1 66.3 8 480 62 5 5 0 155 5 160 155.1 7.1 160.0 0.00 0.1 5.0 5.0 0.7 0.7 0.1 Total for Paving Phase: 67.2
noise level limit for construction phase at "occupied property", per County of San Diego 36.409 = RCNM-emulator-with-barrier_cb Dudek Project No. 12859 Acoustical Center Gran Vista
Acoustical Analysis Report
Attachment B -- Construction Noise Prediciton Model Worksheets Equipment Description Impact
Device?
Acoustical
Use Factor
(%)
Lesser of or
available
Lmax
Spec. 721
Lmax
Measured
Lmax @50ft
(dBA, slow)
All Other Equipment > 5 HP No 50 85 85 -- N/A --
Auger Drill Rig No 20 84 85 84
Backhoe No 40 78 80 78
Bar Bender No 20 80 80 -- N/A --
Blasting Yes -- N/A -- 94 94 -- N/A --
Boring Jack Power Unit No 50 80 80 83
Chain Saw No 20 84 85 84
Clam Shovel (dropping) Yes 20 87 93 87
Compactor (ground) No 20 80 80 83
Compressor (air) No 40 78 80 78
Concrete Batch Plant No 15 83 83 -- N/A --
Concrete Mixer Truck No 40 79 85 79
Concrete Pump Truck No 20 81 82 81
Concrete Saw No 20 90 90 90
Crane No 16 81 85 81
Dozer No 40 82 85 82
Drill Rig Truck No 20 79 84 79
Drum Mixer No 50 80 80 80
Dump Truck No 40 76 84 76
Excavator No 40 81 85 81
Flat Bed Truck No 40 74 84 74
Front End Loader No 40 79 80 79
Generator No 50 72 72 81
Generator (<25KVA, VMS signs) No 50 70 70 73
Gradall No 40 83 85 83
Grader No 40 85 85 -- N/A --
Grapple (on backhoe) No 40 85 85 87
Horizontal Boring Hydr. Jack No 25 80 80 82
Hydra Break Ram Yes 10 90 90 -- N/A --
Impact Pile Driver Yes 20 95 95 101
Jackhammer Yes 20 85 85 89
Man Lift No 20 75 85 75
Mounted Impact Hammer (hoe ram) Yes 20 90 90 90
Pavement Scarafier No 20 85 85 90
Paver No 50 77 85 77
Pickup Truck No 40 55 55 75
Pneumatic Tools No 50 85 85 85
Pumps No 50 77 77 81
Refrigerator Unit No 100 73 82 73
Rivit Buster/chipping gun Yes 20 79 85 79
Rock Drill No 20 81 85 81
Roller No 20 80 85 80
Sand Blasting (Single Nozzle) No 20 85 85 96
Scraper No 40 84 85 84
Shears (on backhoe) No 40 85 85 96
Slurry Plant No 100 78 78 78
Slurry Trenching Machine No 50 80 82 80
Soil Mix Drill Rig No 50 80 80 -- N/A --
Tractor No 40 84 84 -- N/A --
Vacuum Excavator (Vac-truck) No 40 85 85 85
Vacuum Street Sweeper No 10 80 80 82
Ventilation Fan No 100 79 85 79
Vibrating Hopper No 50 85 85 87
Vibratory Concrete Mixer No 20 80 80 80
Vibratory Pile Driver No 20 95 95 101
Warning Horn No 5 83 85 83
Welder / Torch No 40 73 73 74
RCNM-emulator-with-barrier_cb Dudek Project No. 12859 RCNM_UG_Table1_data Gran Vista
Acoustical Analysis Report
Attachment B -- Construction Noise Prediciton Model Worksheets Sourceelev 5.0 Ahoriz 24.0 A 25.0
Receiverelev 10.0 Bhoriz 38.0 B 38.1
C 62.2 Choriz 62.0
P 0.85
Barrierelev 12
Abarr 12.3
Sources: Transit Noise & Vibration Impact Assessment (FTA 2006) The above calculations, refering to inputs from the figure at right, helps a user estimate what barrier attenuation (Abarr) to expect (i.e., up to 15 per formula to right) based upon source height (above grade), barrier height, and receiver height, and the horizontal distances between the source and receiver to the barrier. The FTA-based formula in the worksheets use these path length (P) and Abarr values to determine the barrier's insertion loss.

RCNM-emulator-with-barrier_cb Dudek Project No. 12859 barr_height_guide

Appendix C
Traffic Noise Modeling Input and Output

INPUT: ROADWAYS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: ROADWAYS Average pavement type shall be used unless PROJECT/CONTRACT: Gran Vista a State highway agency substantiates the use RUN: Existing of a different type with the approval of FHWA Roadway Points
Name Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Mission West 35.0 point1 1 6,809,942.5 1,513,504.1 0.00 Average point2 2 6,809,884.0 1,513,538.4 0.00 Average
point3 3 6,809,766.5 1,513,623.8 0.00 Average
point4 4 6,809,644.0 1,513,727.1 0.00 Average
point5 5 6,809,520.0 1,513,842.2 0.00 Average
point6 6 6,809,443.0 1,513,908.5 0.00 Average
point7 7 6,809,344.0 1,513,996.6 0.00 Average
point8 8 6,809,256.0 1,514,071.6 0.00 Average
point9 9 6,809,153.0 1,514,165.4 0.00 Average
point10 10 6,809,112.5 1,514,204.1 0.00 Average
point11 11 6,809,007.5 1,514,293.1 0.00 Average
point12 12 6,808,960.5 1,514,316.9 0.00
Mission East 35.0 point13 13 6,808,953.0 1,514,294.1 0.00 Average point14 14 6,808,996.0 1,514,268.8 0.00 Average
point15 15 6,809,054.5 1,514,213.2 0.00 Average
point16 16 6,809,087.5 1,514,185.1 0.00 Average
point17 17 6,809,168.0 1,514,111.6 0.00 Average
point18 18 6,809,247.5 1,514,036.6 0.00 Average
point19 19 6,809,335.5 1,513,955.8 0.00 Average
point20 20 6,809,454.0 1,513,846.0 0.00 Average
point21 21 6,809,556.0 1,513,755.4 0.00 Average
point22 22 6,809,646.0 1,513,672.0 0.00 Average
point23 23 6,809,734.5 1,513,596.1 0.00 Average
point24 24 6,809,928.5 1,513,450.4 0.00
Las Posas North 40.0 point36 36 6,810,059.5 1,513,488.5 0.00 Average C:\TNM25\Projects\Gran Vista\Existing 1 30 June 2022
INPUT: ROADWAYS Gran Vista
point35 35 6,810,117.0 1,513,692.0 0.00 Average
point34 34 6,810,132.5 1,513,874.2 0.00 Average
point33 33 6,810,127.5 1,513,962.0 0.00 Average
point32 32 6,810,118.5 1,514,057.0 0.00 Average
point31 31 6,810,074.5 1,514,231.1 0.00 Average
point30 30 6,810,015.0 1,514,384.4 0.00 Average
point29 29 6,809,941.0 1,514,567.1 0.00 Average
point28 28 6,809,910.5 1,514,712.5 0.00 Average
point27 27 6,809,889.5 1,514,898.2 0.00 Average
point26 26 6,809,870.5 1,515,139.8 0.00 Average
point25 25 6,809,868.0 1,515,213.2 0.00
Las Posas South 40.0 point48 48 6,809,811.0 1,515,209.5 0.00 Average point47 47 6,809,823.0 1,514,958.5 0.00 Average
point46 46 6,809,847.0 1,514,713.8 0.00 Average
point45 45 6,809,881.5 1,514,547.5 0.00 Average
point44 44 6,809,921.0 1,514,450.5 0.00 Average
point43 43 6,809,993.5 1,514,273.4 0.00 Average
point42 42 6,810,046.0 1,514,124.4 0.00 Average
point41 41 6,810,070.0 1,513,990.0 0.00 Average
point40 40 6,810,071.0 1,513,878.8 0.00 Average
point39 39 6,810,064.0 1,513,722.1 0.00 Average
point38 38 6,810,034.5 1,513,597.0 0.00 Average
point37 37 6,810,008.0 1,513,505.1 0.00
Roadway5 35.0 point49 49 6,810,912.5 1,513,110.2 0.00 Average point50 50 6,810,575.5 1,513,229.6 0.00 Average
point51 51 6,810,349.0 1,513,312.6 0.00 Average
point52 52 6,810,082.0 1,513,426.1 0.00
Roadway6 35.0 point58 58 6,810,071.0 1,513,379.0 0.00 Average point57 57 6,810,276.5 1,513,294.0 0.00 Average
point56 56 6,810,455.5 1,513,227.5 0.00 Average
point55 55 6,810,608.5 1,513,177.6 0.00 Average
point54 54 6,810,786.0 1,513,109.2 0.00 Average
point53 53 6,810,968.0 1,513,046.2 0.00
Roadway7 40.0 point59 59 6,809,817.0 1,512,914.1 0.00 Average point60 60 6,810,024.0 1,513,397.9 0.00
Roadway8 40.0 point62 62 6,809,967.5 1,513,429.8 0.00 Average point61 61 6,809,755.5 1,512,933.4 0.00
C:\TNM25\Projects\Gran Vista\Existing 2 30 June 2022
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: TRAFFIC FOR LAeq1h Volumes
PROJECT/CONTRACT: Gran Vista
RUN: Existing
Roadway Points
Name Name No. Segment
Autos MTrucks HTrucks Buses Motorcycles

V S V S V S V S V S
veh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph
Mission West point1 1 863 40 17 40 8 40 0 0 0 0
point2 2 863 40 17 40 8 40 0 0 0 0
point3 3 863 40 17 40 8 40 0 0 0 0
point4 4 863 40 17 40 8 40 0 0 0 0
point5 5 863 40 17 40 8 40 0 0 0 0
point6 6 863 40 17 40 8 40 0 0 0 0
point7 7 863 40 17 40 8 40 0 0 0 0
point8 8 863 40 17 40 8 40 0 0 0 0
point9 9 863 40 17 40 8 40 0 0 0 0
point10 10 863 40 17 40 8 40 0 0 0 0
point11 11 863 40 17 40 8 40 0 0 0 0
point12 12
Mission East point13 13 863 40 17 40 8 40 0 0 0 0
point14 14 863 40 17 40 8 40 0 0 0 0
point15 15 863 40 17 40 8 40 0 0 0 0
point16 16 863 40 17 40 8 40 0 0 0 0
point17 17 863 40 17 40 8 40 0 0 0 0
point18 18 863 40 17 40 8 40 0 0 0 0
point19 19 863 40 17 40 8 40 0 0 0 0
point20 20 863 40 17 40 8 40 0 0 0 0
point21 21 863 40 17 40 8 40 0 0 0 0
point22 22 863 40 17 40 8 40 0 0 0 0
point23 23 863 40 17 40 8 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\Existing 1 30 June 2022
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point24 24
Las Posas North point36 36 868 45 17 45 8 45 0 0 0 0
point35 35 868 45 17 45 8 45 0 0 0 0
point34 34 868 45 17 45 8 45 0 0 0 0
point33 33 868 45 17 45 8 45 0 0 0 0
point32 32 868 45 17 45 8 45 0 0 0 0
point31 31 868 45 17 45 8 45 0 0 0 0
point30 30 868 45 17 45 8 45 0 0 0 0
point29 29 868 45 17 45 8 45 0 0 0 0
point28 28 868 45 17 45 8 45 0 0 0 0
point27 27 868 45 17 45 8 45 0 0 0 0
point26 26 868 45 17 45 8 45 0 0 0 0
point25 25
Las Posas South point48 48 868 45 17 45 8 45 0 0 0 0
point47 47 868 45 17 45 8 45 0 0 0 0
point46 46 868 45 17 45 8 45 0 0 0 0
point45 45 868 45 17 45 8 45 0 0 0 0
point44 44 868 45 17 45 8 45 0 0 0 0
point43 43 868 45 17 45 8 45 0 0 0 0
point42 42 868 45 17 45 8 45 0 0 0 0
point41 41 868 45 17 45 8 45 0 0 0 0
point40 40 868 45 17 45 8 45 0 0 0 0
point39 39 868 45 17 45 8 45 0 0 0 0
point38 38 868 45 17 45 8 45 0 0 0 0
point37 37
Roadway5 point49 49 863 40 17 40 8 40 0 0 0 0
point50 50 863 40 17 40 8 40 0 0 0 0
point51 51 863 40 17 40 8 40 0 0 0 0
point52 52
Roadway6 point58 58 863 40 17 40 8 40 0 0 0 0
point57 57 863 40 17 40 8 40 0 0 0 0
point56 56 863 40 17 40 8 40 0 0 0 0
point55 55 863 40 17 40 8 40 0 0 0 0
point54 54 863 40 17 40 8 40 0 0 0 0
point53 53
Roadway7 point59 59 106 40 2 40 1 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\Existing 2 30 June 2022
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point60 60
Roadway8 point62 62 106 40 2 40 1 40 0 0 0 0
point61 61
C:\TNM25\Projects\Gran Vista\Existing 3 30 June 2022
INPUT: RECEIVERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: RECEIVERS
PROJECT/CONTRACT: Gran Vista
RUN: Existing
Receiver
Name No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,809,622.5 1,513,799.1 0.00 4.92 64.20 66 10.0 8.0 Y ST2 2 1 6,810,016.5 1,514,042.0 0.00 4.92 63.50 66 10.0 8.0 Y ST3 3 1 6,810,064.5 1,514,464.4 0.00 4.92 60.20 66 10.0 8.0 Y ST4 4 1 6,809,396.0 1,514,259.4 0.00 4.92 47.30 66 10.0 8.0 Y C:\TNM25\Projects\Gran Vista\Existing 1 30 June 2022
INPUT : BARRIERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: BARRIERS
PROJECT/CONTRACT: Gran Vista
RUN: Existing
Barrier Points
Name Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? Reflec- Area Vol. Length ment tions?
ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,809,527.5 1,514,236.2 0.00 8.00 0.00 0 0 point2 2 6,809,492.0 1,514,149.5 0.00 8.00 0.00 0 0
point3 3 6,809,279.0 1,514,341.5 0.00 8.00
C:\TNM25\Projects\Gran Vista\Existing 1 30 June 2022
RESULTS: SOUND LEVELS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELS
PROJECT/CONTRACT: Gran Vista
RUN: Existing
BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.

Receiver
Name No. #DUs Existing No Barrier With Barrier
LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 64.2 68.3 66 4.1 10 Snd Lvl 68.3 0.0 8 -8.0
ST2 2 1 63.5 69.0 66 5.5 10 Snd Lvl 69.0 0.0 8 -8.0
ST3 3 1 60.2 66.5 66 6.3 10 Snd Lvl 66.5 0.0 8 -8.0
ST4 4 1 47.3 52.7 66 5.4 10 ---- 52.7 0.0 8 -8.0
Dwelling Units # DUs Noise Reduction
Min Avg Max
dB dB dB
All Selected 4 0.0 0.0 0.0
All Impacted 3 0.0 0.0 0.0
All that meet NR Goal 0 0.0 0.0 0.0
C:\TNM25\Projects\Gran Vista\Existing 1 30 June 2022
INPUT: ROADWAYS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: ROADWAYS Average pavement type shall be used unless PROJECT/CONTRACT: Gran Vista a State highway agency substantiates the use RUN: Existing Plus Project of a different type with the approval of FHWA Roadway Points
Name Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Mission West 35.0 point1 1 6,809,942.5 1,513,504.1 0.00 Average point2 2 6,809,884.0 1,513,538.4 0.00 Average
point3 3 6,809,766.5 1,513,623.8 0.00 Average
point4 4 6,809,644.0 1,513,727.1 0.00 Average
point5 5 6,809,520.0 1,513,842.2 0.00 Average
point6 6 6,809,443.0 1,513,908.5 0.00 Average
point7 7 6,809,344.0 1,513,996.6 0.00 Average
point8 8 6,809,256.0 1,514,071.6 0.00 Average
point9 9 6,809,153.0 1,514,165.4 0.00 Average
point10 10 6,809,112.5 1,514,204.1 0.00 Average
point11 11 6,809,007.5 1,514,293.1 0.00 Average
point12 12 6,808,960.5 1,514,316.9 0.00
Mission East 35.0 point13 13 6,808,953.0 1,514,294.1 0.00 Average point14 14 6,808,996.0 1,514,268.8 0.00 Average
point15 15 6,809,054.5 1,514,213.2 0.00 Average
point16 16 6,809,087.5 1,514,185.1 0.00 Average
point17 17 6,809,168.0 1,514,111.6 0.00 Average
point18 18 6,809,247.5 1,514,036.6 0.00 Average
point19 19 6,809,335.5 1,513,955.8 0.00 Average
point20 20 6,809,454.0 1,513,846.0 0.00 Average
point21 21 6,809,556.0 1,513,755.4 0.00 Average
point22 22 6,809,646.0 1,513,672.0 0.00 Average
point23 23 6,809,734.5 1,513,596.1 0.00 Average
point24 24 6,809,928.5 1,513,450.4 0.00
Las Posas North 40.0 point36 36 6,810,059.5 1,513,488.5 0.00 Average C:\TNM25\Projects\Gran Vista\E+P 1 30 June 2022
INPUT: ROADWAYS Gran Vista
point35 35 6,810,117.0 1,513,692.0 0.00 Average
point34 34 6,810,132.5 1,513,874.2 0.00 Average
point33 33 6,810,127.5 1,513,962.0 0.00 Average
point32 32 6,810,118.5 1,514,057.0 0.00 Average
point31 31 6,810,074.5 1,514,231.1 0.00 Average
point30 30 6,810,015.0 1,514,384.4 0.00 Average
point29 29 6,809,941.0 1,514,567.1 0.00 Average
point28 28 6,809,910.5 1,514,712.5 0.00 Average
point27 27 6,809,889.5 1,514,898.2 0.00 Average
point26 26 6,809,870.5 1,515,139.8 0.00 Average
point25 25 6,809,868.0 1,515,213.2 0.00
Las Posas South 40.0 point48 48 6,809,811.0 1,515,209.5 0.00 Average point47 47 6,809,823.0 1,514,958.5 0.00 Average
point46 46 6,809,847.0 1,514,713.8 0.00 Average
point45 45 6,809,881.5 1,514,547.5 0.00 Average
point44 44 6,809,921.0 1,514,450.5 0.00 Average
point43 43 6,809,993.5 1,514,273.4 0.00 Average
point42 42 6,810,046.0 1,514,124.4 0.00 Average
point41 41 6,810,070.0 1,513,990.0 0.00 Average
point40 40 6,810,071.0 1,513,878.8 0.00 Average
point39 39 6,810,064.0 1,513,722.1 0.00 Average
point38 38 6,810,034.5 1,513,597.0 0.00 Average
point37 37 6,810,008.0 1,513,505.1 0.00
Roadway5 35.0 point49 49 6,810,912.5 1,513,110.2 0.00 Average point50 50 6,810,575.5 1,513,229.6 0.00 Average
point51 51 6,810,349.0 1,513,312.6 0.00 Average
point52 52 6,810,082.0 1,513,426.1 0.00
Roadway6 35.0 point58 58 6,810,071.0 1,513,379.0 0.00 Average point57 57 6,810,276.5 1,513,294.0 0.00 Average
point56 56 6,810,455.5 1,513,227.5 0.00 Average
point55 55 6,810,608.5 1,513,177.6 0.00 Average
point54 54 6,810,786.0 1,513,109.2 0.00 Average
point53 53 6,810,968.0 1,513,046.2 0.00
Roadway7 40.0 point59 59 6,809,817.0 1,512,914.1 0.00 Average point60 60 6,810,024.0 1,513,397.9 0.00
Roadway8 40.0 point62 62 6,809,967.5 1,513,429.8 0.00 Average point61 61 6,809,755.5 1,512,933.4 0.00
C:\TNM25\Projects\Gran Vista\E+P 2 30 June 2022
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: TRAFFIC FOR LAeq1h Volumes
PROJECT/CONTRACT: Gran Vista
RUN: Existing Plus Project
Roadway Points
Name Name No. Segment
Autos MTrucks HTrucks Buses Motorcycles

V S V S V S V S V S
veh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph
Mission West point1 1 872 40 17 40 8 40 0 0 0 0
point2 2 872 40 17 40 8 40 0 0 0 0
point3 3 872 40 17 40 8 40 0 0 0 0
point4 4 872 40 17 40 8 40 0 0 0 0
point5 5 872 40 17 40 8 40 0 0 0 0
point6 6 872 40 17 40 8 40 0 0 0 0
point7 7 872 40 17 40 8 40 0 0 0 0
point8 8 872 40 17 40 8 40 0 0 0 0
point9 9 872 40 17 40 8 40 0 0 0 0
point10 10 872 40 17 40 8 40 0 0 0 0
point11 11 872 40 17 40 8 40 0 0 0 0
point12 12
Mission East point13 13 872 40 17 40 8 40 0 0 0 0
point14 14 872 40 17 40 8 40 0 0 0 0
point15 15 872 40 17 40 8 40 0 0 0 0
point16 16 872 40 17 40 8 40 0 0 0 0
point17 17 872 40 17 40 8 40 0 0 0 0
point18 18 872 40 17 40 8 40 0 0 0 0
point19 19 872 40 17 40 8 40 0 0 0 0
point20 20 872 40 17 40 8 40 0 0 0 0
point21 21 872 40 17 40 8 40 0 0 0 0
point22 22 872 40 17 40 8 40 0 0 0 0
point23 23 872 40 17 40 8 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\E+P 1 30 June 2022
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point24 24
Las Posas North point36 36 900 45 18 45 9 45 0 0 0 0
point35 35 900 45 18 45 9 45 0 0 0 0
point34 34 900 45 18 45 9 45 0 0 0 0
point33 33 900 45 18 45 9 45 0 0 0 0
point32 32 900 45 18 45 9 45 0 0 0 0
point31 31 900 45 18 45 9 45 0 0 0 0
point30 30 900 45 18 45 9 45 0 0 0 0
point29 29 900 45 18 45 9 45 0 0 0 0
point28 28 900 45 18 45 9 45 0 0 0 0
point27 27 900 45  0 45 9 45 0 0 0 0
point26 26 900 45 18 45 9 45 0 0 0 0
point25 25
Las Posas South point48 48 900 45 18 45 9 45 0 0 0 0
point47 47 900 45 18 45 9 45 0 0 0 0
point46 46 900 45 18 45 9 45 0 0 0 0
point45 45 900 45 18 45 9 45 0 0 0 0
point44 44 900 45 18 45 9 45 0 0 0 0
point43 43 900 45 18 45 9 45 0 0 0 0
point42 42 900 45 18 45 9 45 0 0 0 0
point41 41 900 45 18 45 9 45 0 0 0 0
point40 40 900 45 18 45 9 45 0 0 0 0
point39 39 900 45 18 45 9 45 0 0 0 0
point38 38 900 45 18 45 9 45 0 0 0 0
point37 37
Roadway5 point49 49 877 40 18 40 9 40 0 0 0 0
point50 50 877 40 18 40 9 40 0 0 0 0
point51 51 877 40 18 40 9 40 0 0 0 0
point52 52
Roadway6 point58 58 877 40 18 40 9 40 0 0 0 0
point57 57 877 40 18 40 9 40 0 0 0 0
point56 56 877 40 18 40 9 40 0 0 0 0
point55 55 877 40 18 40 9 40 0 0 0 0
point54 54 877 40 18 40 9 40 0 0 0 0
point53 53
Roadway7 point59 59 125 40 2 40 1 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\E+P 2 30 June 2022
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point60 60
Roadway8 point62 62 125 40 2 40 1 40 0 0 0 0
point61 61
C:\TNM25\Projects\Gran Vista\E+P 3 30 June 2022
INPUT: RECEIVERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: RECEIVERS
PROJECT/CONTRACT: Gran Vista
RUN: Existing Plus Project
Receiver
Name No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,809,622.5 1,513,799.1 0.00 4.92 64.20 66 10.0 8.0 Y ST2 2 1 6,810,016.5 1,514,042.0 0.00 4.92 63.50 66 10.0 8.0 Y ST3 3 1 6,810,064.5 1,514,464.4 0.00 4.92 60.20 66 10.0 8.0 Y ST4 4 1 6,809,396.0 1,514,259.4 0.00 4.92 47.30 66 10.0 8.0 Y C:\TNM25\Projects\Gran Vista\E+P 1 30 June 2022
INPUT : BARRIERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: BARRIERS
PROJECT/CONTRACT: Gran Vista
RUN: Existing Plus Project
Barrier Points
Name Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? Reflec- Area Vol. Length ment tions?
ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,809,527.5 1,514,236.2 0.00 8.00 0.00 0 0 point2 2 6,809,492.0 1,514,149.5 0.00 8.00 0.00 0 0
point3 3 6,809,279.0 1,514,341.5 0.00 8.00
Barrier2 W 0.00 99.99 0.00 0.00 point4 4 6,809,874.0 1,514,398.5 0.00 30.00 0.00 0 0 point77 77 6,809,867.0 1,514,411.8 0.00 30.00 0.00 0 0
point5 5 6,809,855.5 1,514,407.6 0.00 30.00 0.00 0 0
point6 6 6,809,825.5 1,514,498.5 0.00 30.00 0.00 0 0
point7 7 6,809,789.0 1,514,482.0 0.00 30.00 0.00 0 0
point8 8 6,809,828.0 1,514,378.9 0.00 30.00 0.00 0 0
point9 9 6,809,874.0 1,514,398.5 0.00 30.00
Barrier3 W 0.00 99.99 0.00 0.00 point10 10 6,809,777.5 1,514,317.9 0.00 30.00 0.00 0 0 point78 78 6,809,794.5 1,514,277.6 0.00 30.00 0.00 0 0
point11 11 6,809,901.5 1,514,322.5 0.00 30.00 0.00 0 0
point12 12 6,809,887.0 1,514,359.1 0.00 30.00 0.00 0 0
point13 13 6,809,777.5 1,514,317.9 0.00 30.00
Barrier4 W 0.00 99.99 0.00 0.00 point14 14 6,809,807.5 1,514,251.0 0.00 30.00 0.00 0 0 point79 79 6,809,825.5 1,514,215.8 0.00 30.00 0.00 0 0
point15 15 6,809,926.5 1,514,252.0 0.00 30.00 0.00 0 0
point16 16 6,809,910.5 1,514,292.2 0.00 30.00 0.00 0 0
point17 17 6,809,807.5 1,514,251.0 0.00 30.00
Barrier5 W 0.00 99.99 0.00 0.00 point18 18 6,809,829.5 1,514,185.1 0.00 30.00 0.00 0 0 point80 80 6,809,846.5 1,514,147.4 0.00 30.00 0.00 0 0
point19 19 6,809,953.0 1,514,186.1 0.00 30.00 0.00 0 0
point20 20 6,809,937.0 1,514,225.5 0.00 30.00 0.00 0 0
point21 21 6,809,829.5 1,514,185.1 0.00 30.00
Barrier6 W 0.00 99.99 0.00 0.00 point22 22 6,809,861.0 1,514,123.9 0.00 30.00 0.00 0 0 point81 81 6,809,869.5 1,514,083.9 0.00 30.00 0.00 0 0
point23 23 6,809,975.5 1,514,102.0 0.00 30.00 0.00 0 0
point24 24 6,809,968.0 1,514,145.0 0.00 30.00 0.00 0 0
point25 25 6,809,861.0 1,514,123.9 0.00 30.00
Barrier7 W 0.00 99.99 0.00 0.00 point26 26 6,809,874.0 1,514,050.5 0.00 30.00 0.00 0 0 point82 82 6,809,884.0 1,514,008.4 0.00 30.00 0.00 0 0
point27 27 6,809,995.0 1,514,032.8 0.00 30.00 0.00 0 0
point28 28 6,809,988.0 1,514,075.5 0.00 30.00 0.00 0 0
point29 29 6,809,874.0 1,514,050.5 0.00 30.00
C:\TNM25\Projects\Gran Vista\E+P 1 30 June 2022
INPUT : BARRIERS Gran Vista
Barrier8 W 0.00 99.99 0.00 0.00 point30 30 6,809,654.0 1,514,228.5 0.00 30.00 0.00 0 0 point31 31 6,809,741.5 1,514,194.5 0.00 30.00 0.00 0 0
point32 32 6,809,758.0 1,514,238.8 0.00 30.00 0.00 0 0
point33 33 6,809,671.0 1,514,269.2 0.00 30.00 0.00 0 0
point34 34 6,809,654.0 1,514,228.5 0.00 30.00
Barrier9 W 0.00 99.99 0.00 0.00 point35 35 6,809,624.0 1,514,160.1 0.00 30.00 0.00 0 0 point36 36 6,809,731.5 1,514,123.8 0.00 30.00 0.00 0 0
point37 37 6,809,744.5 1,514,168.0 0.00 30.00 0.00 0 0
point38 38 6,809,637.5 1,514,205.6 0.00 30.00 0.00 0 0
point39 39 6,809,624.0 1,514,160.1 0.00 30.00
Barrier10 W 0.00 99.99 0.00 0.00 point40 40 6,809,596.5 1,514,093.1 0.00 30.00 0.00 0 0 point41 41 6,809,701.5 1,514,051.1 0.00 30.00 0.00 0 0
point42 42 6,809,717.5 1,514,097.0 0.00 30.00 0.00 0 0
point43 43 6,809,612.5 1,514,132.0 0.00 30.00 0.00 0 0
point44 44 6,809,596.5 1,514,093.1 0.00 30.00
Barrier11 W 0.00 99.99 0.00 0.00 point45 45 6,809,566.5 1,514,028.6 0.00 30.00 0.00 0 0 point46 46 6,809,676.0 1,513,988.5 0.00 30.00 0.00 0 0
point47 47 6,809,690.5 1,514,031.8 0.00 30.00 0.00 0 0
point48 48 6,809,584.0 1,514,068.1 0.00 30.00 0.00 0 0
point49 49 6,809,566.5 1,514,028.6 0.00 30.00
Barrier12 W 0.00 99.99 0.00 0.00 point50 50 6,809,539.5 1,513,964.1 0.00 30.00 0.00 0 0 point51 51 6,809,646.0 1,513,921.0 0.00 30.00 0.00 0 0
point52 52 6,809,660.0 1,513,960.9 0.00 30.00 0.00 0 0
point53 53 6,809,553.5 1,514,003.4 0.00 30.00 0.00 0 0
point54 54 6,809,539.5 1,513,964.1 0.00 30.00
Barrier13 W 0.00 99.99 0.00 0.00 point55 55 6,809,714.0 1,513,995.4 0.00 30.00 0.00 0 0 point56 56 6,809,758.0 1,513,981.6 0.00 30.00 0.00 0 0
point57 57 6,809,810.5 1,514,109.8 0.00 30.00 0.00 0 0
point58 58 6,809,771.5 1,514,125.0 0.00 30.00 0.00 0 0
point59 59 6,809,714.0 1,513,995.4 0.00 30.00
Barrier14 W 0.00 99.99 0.00 0.00 point60 60 6,809,722.5 1,513,840.9 0.00 30.00 0.00 0 0 point61 61 6,809,716.5 1,513,956.4 0.00 30.00 0.00 0 0
point62 62 6,809,756.0 1,513,958.5 0.00 30.00 0.00 0 0
point63 63 6,809,769.0 1,513,844.2 0.00 30.00 0.00 0 0
point64 64 6,809,722.5 1,513,840.9 0.00 30.00
Barrier15 W 0.00 99.99 0.00 0.00 point65 65 6,809,799.5 1,513,854.2 0.00 30.00 0.00 0 0 point66 66 6,809,786.5 1,513,964.2 0.00 30.00 0.00 0 0
point67 67 6,809,829.0 1,513,968.4 0.00 30.00 0.00 0 0
point68 68 6,809,846.5 1,513,859.9 0.00 30.00 0.00 0 0
point69 69 6,809,799.5 1,513,854.2 0.00 30.00
Barrier16 W 0.00 99.99 0.00 0.00 point70 70 6,809,891.5 1,513,877.8 0.00 30.00 0.00 0 0 point71 71 6,809,883.0 1,513,928.4 0.00 30.00 0.00 0 0
point72 72 6,809,932.0 1,513,934.4 0.00 30.00 0.00 0 0
point73 73 6,809,935.5 1,513,920.5 0.00 30.00 0.00 0 0
point74 74 6,809,921.5 1,513,917.6 0.00 30.00 0.00 0 0
point75 75 6,809,931.5 1,513,880.1 0.00 30.00 0.00 0 0
point76 76 6,809,891.5 1,513,877.8 0.00 30.00
C:\TNM25\Projects\Gran Vista\E+P 2 30 June 2022
RESULTS: SOUND LEVELS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELS
PROJECT/CONTRACT: Gran Vista
RUN: Existing Plus Project
BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.

Receiver
Name No. #DUs Existing No Barrier With Barrier
LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 64.2 68.3 66 4.1 10 Snd Lvl 68.3 0.0 8 -8.0
ST2 2 1 63.5 69.2 66 5.7 10 Snd Lvl 69.2 0.0 8 -8.0
ST3 3 1 60.2 66.7 66 6.5 10 Snd Lvl 66.7 0.0 8 -8.0
ST4 4 1 47.3 51.2 66 3.9 10 ---- 51.2 0.0 8 -8.0
Dwelling Units # DUs Noise Reduction
Min Avg Max
dB dB dB
All Selected 4 0.0 0.0 0.0
All Impacted 3 0.0 0.0 0.0
All that meet NR Goal 0 0.0 0.0 0.0
C:\TNM25\Projects\Gran Vista\E+P 1 30 June 2022
INPUT: ROADWAYS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: ROADWAYS Average pavement type shall be used unless PROJECT/CONTRACT: Gran Vista a State highway agency substantiates the use RUN: Near Term of a different type with the approval of FHWA Roadway Points
Name Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Mission West 35.0 point1 1 6,809,942.5 1,513,504.1 0.00 Average point2 2 6,809,884.0 1,513,538.4 0.00 Average
point3 3 6,809,766.5 1,513,623.8 0.00 Average
point4 4 6,809,644.0 1,513,727.1 0.00 Average
point5 5 6,809,520.0 1,513,842.2 0.00 Average
point6 6 6,809,443.0 1,513,908.5 0.00 Average
point7 7 6,809,344.0 1,513,996.6 0.00 Average
point8 8 6,809,256.0 1,514,071.6 0.00 Average
point9 9 6,809,153.0 1,514,165.4 0.00 Average
point10 10 6,809,112.5 1,514,204.1 0.00 Average
point11 11 6,809,007.5 1,514,293.1 0.00 Average
point12 12 6,808,960.5 1,514,316.9 0.00
Mission East 35.0 point13 13 6,808,953.0 1,514,294.1 0.00 Average point14 14 6,808,996.0 1,514,268.8 0.00 Average
point15 15 6,809,054.5 1,514,213.2 0.00 Average
point16 16 6,809,087.5 1,514,185.1 0.00 Average
point17 17 6,809,168.0 1,514,111.6 0.00 Average
point18 18 6,809,247.5 1,514,036.6 0.00 Average
point19 19 6,809,335.5 1,513,955.8 0.00 Average
point20 20 6,809,454.0 1,513,846.0 0.00 Average
point21 21 6,809,556.0 1,513,755.4 0.00 Average
point22 22 6,809,646.0 1,513,672.0 0.00 Average
point23 23 6,809,734.5 1,513,596.1 0.00 Average
point24 24 6,809,928.5 1,513,450.4 0.00
Las Posas North 40.0 point36 36 6,810,059.5 1,513,488.5 0.00 Average C:\TNM25\Projects\Gran Vista\near term 1 30 June 2022 INPUT: ROADWAYS Gran Vista
point35 35 6,810,117.0 1,513,692.0 0.00 Average
point34 34 6,810,132.5 1,513,874.2 0.00 Average
point33 33 6,810,127.5 1,513,962.0 0.00 Average
point32 32 6,810,118.5 1,514,057.0 0.00 Average
point31 31 6,810,074.5 1,514,231.1 0.00 Average
point30 30 6,810,015.0 1,514,384.4 0.00 Average
point29 29 6,809,941.0 1,514,567.1 0.00 Average
point28 28 6,809,910.5 1,514,712.5 0.00 Average
point27 27 6,809,889.5 1,514,898.2 0.00 Average
point26 26 6,809,870.5 1,515,139.8 0.00 Average
point25 25 6,809,868.0 1,515,213.2 0.00
Las Posas South 40.0 point48 48 6,809,811.0 1,515,209.5 0.00 Average point47 47 6,809,823.0 1,514,958.5 0.00 Average
point46 46 6,809,847.0 1,514,713.8 0.00 Average
point45 45 6,809,881.5 1,514,547.5 0.00 Average
point44 44 6,809,921.0 1,514,450.5 0.00 Average
point43 43 6,809,993.5 1,514,273.4 0.00 Average
point42 42 6,810,046.0 1,514,124.4 0.00 Average
point41 41 6,810,070.0 1,513,990.0 0.00 Average
point40 40 6,810,071.0 1,513,878.8 0.00 Average
point39 39 6,810,064.0 1,513,722.1 0.00 Average
point38 38 6,810,034.5 1,513,597.0 0.00 Average
point37 37 6,810,008.0 1,513,505.1 0.00
Roadway5 35.0 point49 49 6,810,912.5 1,513,110.2 0.00 Average point50 50 6,810,575.5 1,513,229.6 0.00 Average
point51 51 6,810,349.0 1,513,312.6 0.00 Average
point52 52 6,810,082.0 1,513,426.1 0.00
Roadway6 35.0 point58 58 6,810,071.0 1,513,379.0 0.00 Average point57 57 6,810,276.5 1,513,294.0 0.00 Average
point56 56 6,810,455.5 1,513,227.5 0.00 Average
point55 55 6,810,608.5 1,513,177.6 0.00 Average
point54 54 6,810,786.0 1,513,109.2 0.00 Average
point53 53 6,810,968.0 1,513,046.2 0.00
Roadway7 40.0 point59 59 6,809,817.0 1,512,914.1 0.00 Average point60 60 6,810,024.0 1,513,397.9 0.00
Roadway8 40.0 point62 62 6,809,967.5 1,513,429.8 0.00 Average point61 61 6,809,755.5 1,512,933.4 0.00
C:\TNM25\Projects\Gran Vista\near term 2 30 June 2022 INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: TRAFFIC FOR LAeq1h Volumes
PROJECT/CONTRACT: Gran Vista
RUN: Near Term
Roadway Points
Name Name No. Segment
Autos MTrucks HTrucks Buses Motorcycles

V S V S V S V S V S
veh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph
Mission West point1 1 906 40 18 40 9 40 0 0 0 0
point2 2 906 40 18 40 9 40 0 0 0 0
point3 3 906 40 18 40 9 40 0 0 0 0
point4 4 906 40 18 40 9 40 0 0 0 0
point5 5 906 40 18 40 9 40 0 0 0 0
point6 6 906 40 18 40 9 40 0 0 0 0
point7 7 906 40 18 40 9 40 0 0 0 0
point8 8 906 40 18 40 9 40 0 0 0 0
point9 9 906 40 18 40 9 40 0 0 0 0
point10 10 906 40 18 40 9 40 0 0 0 0
point11 11 906 40 18 40 9 40 0 0 0 0
point12 12
Mission East point13 13 906 40 18 40 9 40 0 0 0 0
point14 14 906 40 18 40 9 40 0 0 0 0
point15 15 906 40 18 40 9 40 0 0 0 0
point16 16 906 40 18 40 9 40 0 0 0 0
point17 17 906 40 18 40 9 40 0 0 0 0
point18 18 906 40 18 40 9 40 0 0 0 0
point19 19 906 40 18 40 9 40 0 0 0 0
point20 20 906 40 18 40 9 40 0 0 0 0
point21 21 906 40 18 40 9 40 0 0 0 0
point22 22 906 40 18 40 9 40 0 0 0 0
point23 23 906 40 18 40 9 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\near term 1 30 June 2022 INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point24 24
Las Posas North point36 36 988 45 20 45 10 45 0 0 0 0 point35 35 988 45 20 45 10 45 0 0 0 0
point34 34 988 45 20 45 10 45 0 0 0 0
point33 33 988 45 20 45 10 45 0 0 0 0
point32 32 988 45 20 45 10 45 0 0 0 0
point31 31 988 45 20 45 10 45 0 0 0 0
point30 30 988 45 20 45 10 45 0 0 0 0
point29 29 988 45 20 45 10 45 0 0 0 0
point28 28 988 45 20 45 10 45 0 0 0 0
point27 27 988 45 20 45 10 45 0 0 0 0
point26 26 988 45 20 45 10 45 0 0 0 0
point25 25
Las Posas South point48 48 988 45 20 45 10 45 0 0 0 0 point47 47 988 45 20 45 10 45 0 0 0 0
point46 46 988 45 20 45 10 45 0 0 0 0
point45 45 988 45 20 45 10 45 0 0 0 0
point44 44 988 45 20 45 10 45 0 0 0 0
point43 43 988 45 20 45 10 45 0 0 0 0
point42 42 988 45 20 45 10 45 0 0 0 0
point41 41 988 45 20 45 10 45 0 0 0 0
point40 40 988 45 20 45 10 45 0 0 0 0
point39 39 988 45 20 45 10 45 0 0 0 0
point38 38 988 45 20 45 10 45 0 0 0 0
point37 37
Roadway5 point49 49 907 40 18 40 9 40 0 0 0 0
point50 50 907 40 18 40 9 40 0 0 0 0
point51 51 907 40 18 40 9 40 0 0 0 0
point52 52
Roadway6 point58 58 907 40 18 40 9 40 0 0 0 0
point57 57 907 40 18 40 9 40 0 0 0 0
point56 56 907 40 18 40 9 40 0 0 0 0
point55 55 907 40 18 40 9 40 0 0 0 0
point54 54 907 40 18 40 9 40 0 0 0 0
point53 53
Roadway7 point59 59 1178 40 24 40 12 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\near term 2 30 June 2022 INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point60 60
Roadway8 point62 62 1178 40 24 40 12 40 0 0 0 0
point61 61
C:\TNM25\Projects\Gran Vista\near term 3 30 June 2022 INPUT: RECEIVERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: RECEIVERS
PROJECT/CONTRACT: Gran Vista
RUN: Near Term
Receiver
Name No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,809,622.5 1,513,799.1 0.00 4.92 64.20 66 10.0 8.0 Y ST2 2 1 6,810,016.5 1,514,042.0 0.00 4.92 63.50 66 10.0 8.0 Y ST3 3 1 6,810,064.5 1,514,464.4 0.00 4.92 60.20 66 10.0 8.0 Y ST4 4 1 6,809,396.0 1,514,259.4 0.00 4.92 47.30 66 10.0 8.0 Y C:\TNM25\Projects\Gran Vista\near term 1 30 June 2022 INPUT : BARRIERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: BARRIERS
PROJECT/CONTRACT: Gran Vista
RUN: Near Term
Barrier Points
Name Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? Reflec- Area Vol. Length ment tions?
ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,809,527.5 1,514,236.2 0.00 8.00 0.00 0 0 point2 2 6,809,492.0 1,514,149.5 0.00 8.00 0.00 0 0
point3 3 6,809,279.0 1,514,341.5 0.00 8.00
C:\TNM25\Projects\Gran Vista\near term 1 30 June 2022 RESULTS: SOUND LEVELS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELS
PROJECT/CONTRACT: Gran Vista
RUN: Near Term
BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.

Receiver
Name No. #DUs Existing No Barrier With Barrier
LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 64.2 68.6 66 4.4 10 Snd Lvl 68.6 0.0 8 -8.0
ST2 2 1 63.5 69.6 66 6.1 10 Snd Lvl 69.6 0.0 8 -8.0
ST3 3 1 60.2 67.1 66 6.9 10 Snd Lvl 67.1 0.0 8 -8.0
ST4 4 1 47.3 53.2 66 5.9 10 ---- 53.2 0.0 8 -8.0
Dwelling Units # DUs Noise Reduction
Min Avg Max
dB dB dB
All Selected 4 0.0 0.0 0.0
All Impacted 3 0.0 0.0 0.0
All that meet NR Goal 0 0.0 0.0 0.0
C:\TNM25\Projects\Gran Vista\near term 1 30 June 2022 INPUT: ROADWAYS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: ROADWAYS Average pavement type shall be used unless PROJECT/CONTRACT: Gran Vista a State highway agency substantiates the use RUN: Near Term + Project of a different type with the approval of FHWA Roadway Points
Name Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Mission West 35.0 point1 1 6,809,942.5 1,513,504.1 0.00 Average point2 2 6,809,884.0 1,513,538.4 0.00 Average
point3 3 6,809,766.5 1,513,623.8 0.00 Average
point4 4 6,809,644.0 1,513,727.1 0.00 Average
point5 5 6,809,520.0 1,513,842.2 0.00 Average
point6 6 6,809,443.0 1,513,908.5 0.00 Average
point7 7 6,809,344.0 1,513,996.6 0.00 Average
point8 8 6,809,256.0 1,514,071.6 0.00 Average
point9 9 6,809,153.0 1,514,165.4 0.00 Average
point10 10 6,809,112.5 1,514,204.1 0.00 Average
point11 11 6,809,007.5 1,514,293.1 0.00 Average
point12 12 6,808,960.5 1,514,316.9 0.00
Mission East 35.0 point13 13 6,808,953.0 1,514,294.1 0.00 Average point14 14 6,808,996.0 1,514,268.8 0.00 Average
point15 15 6,809,054.5 1,514,213.2 0.00 Average
point16 16 6,809,087.5 1,514,185.1 0.00 Average
point17 17 6,809,168.0 1,514,111.6 0.00 Average
point18 18 6,809,247.5 1,514,036.6 0.00 Average
point19 19 6,809,335.5 1,513,955.8 0.00 Average
point20 20 6,809,454.0 1,513,846.0 0.00 Average
point21 21 6,809,556.0 1,513,755.4 0.00 Average
point22 22 6,809,646.0 1,513,672.0 0.00 Average
point23 23 6,809,734.5 1,513,596.1 0.00 Average
point24 24 6,809,928.5 1,513,450.4 0.00
Las Posas North 40.0 point36 36 6,810,059.5 1,513,488.5 0.00 Average C:\TNM25\Projects\Gran Vista\near term + project 1 30 June 2022 INPUT: ROADWAYS Gran Vista
point35 35 6,810,117.0 1,513,692.0 0.00 Average
point34 34 6,810,132.5 1,513,874.2 0.00 Average
point33 33 6,810,127.5 1,513,962.0 0.00 Average
point32 32 6,810,118.5 1,514,057.0 0.00 Average
point31 31 6,810,074.5 1,514,231.1 0.00 Average
point30 30 6,810,015.0 1,514,384.4 0.00 Average
point29 29 6,809,941.0 1,514,567.1 0.00 Average
point28 28 6,809,910.5 1,514,712.5 0.00 Average
point27 27 6,809,889.5 1,514,898.2 0.00 Average
point26 26 6,809,870.5 1,515,139.8 0.00 Average
point25 25 6,809,868.0 1,515,213.2 0.00
Las Posas South 40.0 point48 48 6,809,811.0 1,515,209.5 0.00 Average point47 47 6,809,823.0 1,514,958.5 0.00 Average
point46 46 6,809,847.0 1,514,713.8 0.00 Average
point45 45 6,809,881.5 1,514,547.5 0.00 Average
point44 44 6,809,921.0 1,514,450.5 0.00 Average
point43 43 6,809,993.5 1,514,273.4 0.00 Average
point42 42 6,810,046.0 1,514,124.4 0.00 Average
point41 41 6,810,070.0 1,513,990.0 0.00 Average
point40 40 6,810,071.0 1,513,878.8 0.00 Average
point39 39 6,810,064.0 1,513,722.1 0.00 Average
point38 38 6,810,034.5 1,513,597.0 0.00 Average
point37 37 6,810,008.0 1,513,505.1 0.00
Roadway5 35.0 point49 49 6,810,912.5 1,513,110.2 0.00 Average point50 50 6,810,575.5 1,513,229.6 0.00 Average
point51 51 6,810,349.0 1,513,312.6 0.00 Average
point52 52 6,810,082.0 1,513,426.1 0.00
Roadway6 35.0 point58 58 6,810,071.0 1,513,379.0 0.00 Average point57 57 6,810,276.5 1,513,294.0 0.00 Average
point56 56 6,810,455.5 1,513,227.5 0.00 Average
point55 55 6,810,608.5 1,513,177.6 0.00 Average
point54 54 6,810,786.0 1,513,109.2 0.00 Average
point53 53 6,810,968.0 1,513,046.2 0.00
Roadway7 40.0 point59 59 6,809,817.0 1,512,914.1 0.00 Average point60 60 6,810,024.0 1,513,397.9 0.00
Roadway8 40.0 point62 62 6,809,967.5 1,513,429.8 0.00 Average point61 61 6,809,755.5 1,512,933.4 0.00
C:\TNM25\Projects\Gran Vista\near term + project 2 30 June 2022 INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: TRAFFIC FOR LAeq1h Volumes
PROJECT/CONTRACT: Gran Vista
RUN: Near Term + Project
Roadway Points
Name Name No. Segment
Autos MTrucks HTrucks Buses Motorcycles

V S V S V S V S V S
veh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph
Mission West point1 1 916 40 18 40 9 40 0 0 0 0
point2 2 916 40 18 40 9 40 0 0 0 0
point3 3 916 40 18 40 9 40 0 0 0 0
point4 4 916 40 18 40 9 40 0 0 0 0
point5 5 916 40 18 40 9 40 0 0 0 0
point6 6 916 40 18 40 9 40 0 0 0 0
point7 7 916 40 18 40 9 40 0 0 0 0
point8 8 916 40 18 40 9 40 0 0 0 0
point9 9 916 40 18 40 9 40 0 0 0 0
point10 10 916 40 18 40 9 40 0 0 0 0
point11 11 916 40 18 40 9 40 0 0 0 0
point12 12
Mission East point13 13 916 40 18 40 9 40 0 0 0 0
point14 14 916 40 18 40 9 40 0 0 0 0
point15 15 916 40 18 40 9 40 0 0 0 0
point16 16 916 40 18 40 9 40 0 0 0 0
point17 17 916 40 18 40 9 40 0 0 0 0
point18 18 916 40 18 40 9 40 0 0 0 0
point19 19 916 40 18 40 9 40 0 0 0 0
point20 20 916 40 18 40 9 40 0 0 0 0
point21 21 916 40 18 40 9 40 0 0 0 0
point22 22 916 40 18 40 9 40 0 0 0 0
point23 23 916 40 18 40 9 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\near term + project 1 30 June 2022 INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point24 24
Las Posas North point36 36 1021 45 21 45 10 45 0 0 0 0 point35 35 1021 45 21 45 10 45 0 0 0 0
point34 34 1021 45 21 45 10 45 0 0 0 0
point33 33 1021 45 21 45 10 45 0 0 0 0
point32 32 1021 45 21 45 10 45 0 0 0 0
point31 31 1021 45 21 45 10 45 0 0 0 0
point30 30 1021 45 21 45 10 45 0 0 0 0
point29 29 1021 45 21 45 10 45 0 0 0 0
point28 28 1021 45 21 45 10 45 0 0 0 0
point27 27 1021 45 21 45 10 45 0 0 0 0
point26 26 1021 45 21 45 10 45 0 0 0 0
point25 25
Las Posas South point48 48 1021 45 21 45 10 45 0 0 0 0 point47 47 1021 45 21 45 10 45 0 0 0 0
point46 46 1021 45 21 45 10 45 0 0 0 0
point45 45 1021 45 21 45 10 45 0 0 0 0
point44 44 1021 45 21 45 10 45 0 0 0 0
point43 43 1021 45 21 45 10 45 0 0 0 0
point42 42 1021 45 21 45 10 45 0 0 0 0
point41 41 1021 45 21 45 10 45 0 0 0 0
point40 40 1021 45 21 45 10 45 0 0 0 0
point39 39 1021 45 21 45 10 45 0 0 0 0
point38 38 1021 45 21 45 10 45 0 0 0 0
point37 37
Roadway5 point49 49 921 40 19 40 9 40 0 0 0 0
point50 50 921 40 19 40 9 40 0 0 0 0
point51 51 921 40 19 40 9 40 0 0 0 0
point52 52
Roadway6 point58 58 921 40 19 40 9 40 0 0 0 0
point57 57 921 40 19 40 9 40 0 0 0 0
point56 56 921 40 19 40 9 40 0 0 0 0
point55 55 921 40 19 40 9 40 0 0 0 0
point54 54 921 40 19 40 9 40 0 0 0 0
point53 53
Roadway7 point59 59 1191 40 24 40 12 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\near term + project 2 30 June 2022 INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point60 60
Roadway8 point62 62 1191 40 24 40 12 40 0 0 0 0
point61 61
C:\TNM25\Projects\Gran Vista\near term + project 3 30 June 2022 INPUT: RECEIVERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: RECEIVERS
PROJECT/CONTRACT: Gran Vista
RUN: Near Term + Project
Receiver
Name No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,809,622.5 1,513,799.1 0.00 4.92 64.20 66 10.0 8.0 Y ST2 2 1 6,810,016.5 1,514,042.0 0.00 4.92 63.50 66 10.0 8.0 Y ST3 3 1 6,810,064.5 1,514,464.4 0.00 4.92 60.20 66 10.0 8.0 Y ST4 4 1 6,809,396.0 1,514,259.4 0.00 4.92 47.30 66 10.0 8.0 Y C:\TNM25\Projects\Gran Vista\near term + project 1 30 June 2022 INPUT : BARRIERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: BARRIERS
PROJECT/CONTRACT: Gran Vista
RUN: Near Term + Project
Barrier Points
Name Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? Reflec- Area Vol. Length ment tions?
ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,809,527.5 1,514,236.2 0.00 8.00 0.00 0 0 point2 2 6,809,492.0 1,514,149.5 0.00 8.00 0.00 0 0
point3 3 6,809,279.0 1,514,341.5 0.00 8.00
Barrier2 W 0.00 99.99 0.00 0.00 point4 4 6,809,874.0 1,514,398.5 0.00 30.00 0.00 0 0 point77 77 6,809,867.0 1,514,411.8 0.00 30.00 0.00 0 0
point5 5 6,809,855.5 1,514,407.6 0.00 30.00 0.00 0 0
point6 6 6,809,825.5 1,514,498.5 0.00 30.00 0.00 0 0
point7 7 6,809,789.0 1,514,482.0 0.00 30.00 0.00 0 0
point8 8 6,809,828.0 1,514,378.9 0.00 30.00 0.00 0 0
point9 9 6,809,874.0 1,514,398.5 0.00 30.00
Barrier3 W 0.00 99.99 0.00 0.00 point10 10 6,809,777.5 1,514,317.9 0.00 30.00 0.00 0 0 point78 78 6,809,794.5 1,514,277.6 0.00 30.00 0.00 0 0
point11 11 6,809,901.5 1,514,322.5 0.00 30.00 0.00 0 0
point12 12 6,809,887.0 1,514,359.1 0.00 30.00 0.00 0 0
point13 13 6,809,777.5 1,514,317.9 0.00 30.00
Barrier4 W 0.00 99.99 0.00 0.00 point14 14 6,809,807.5 1,514,251.0 0.00 30.00 0.00 0 0 point79 79 6,809,825.5 1,514,215.8 0.00 30.00 0.00 0 0
point15 15 6,809,926.5 1,514,252.0 0.00 30.00 0.00 0 0
point16 16 6,809,910.5 1,514,292.2 0.00 30.00 0.00 0 0
point17 17 6,809,807.5 1,514,251.0 0.00 30.00
Barrier5 W 0.00 99.99 0.00 0.00 point18 18 6,809,829.5 1,514,185.1 0.00 30.00 0.00 0 0 point80 80 6,809,846.5 1,514,147.4 0.00 30.00 0.00 0 0
point19 19 6,809,953.0 1,514,186.1 0.00 30.00 0.00 0 0
point20 20 6,809,937.0 1,514,225.5 0.00 30.00 0.00 0 0
point21 21 6,809,829.5 1,514,185.1 0.00 30.00
Barrier6 W 0.00 99.99 0.00 0.00 point22 22 6,809,861.0 1,514,123.9 0.00 30.00 0.00 0 0 point81 81 6,809,869.5 1,514,083.9 0.00 30.00 0.00 0 0
point23 23 6,809,975.5 1,514,102.0 0.00 30.00 0.00 0 0
point24 24 6,809,968.0 1,514,145.0 0.00 30.00 0.00 0 0
point25 25 6,809,861.0 1,514,123.9 0.00 30.00
Barrier7 W 0.00 99.99 0.00 0.00 point26 26 6,809,874.0 1,514,050.5 0.00 30.00 0.00 0 0 point82 82 6,809,884.0 1,514,008.4 0.00 30.00 0.00 0 0
point27 27 6,809,995.0 1,514,032.8 0.00 30.00 0.00 0 0
point28 28 6,809,988.0 1,514,075.5 0.00 30.00 0.00 0 0
point29 29 6,809,874.0 1,514,050.5 0.00 30.00
C:\TNM25\Projects\Gran Vista\near term + project 1 30 June 2022 INPUT : BARRIERS Gran Vista
Barrier8 W 0.00 99.99 0.00 0.00 point30 30 6,809,654.0 1,514,228.5 0.00 30.00 0.00 0 0 point31 31 6,809,741.5 1,514,194.5 0.00 30.00 0.00 0 0
point32 32 6,809,758.0 1,514,238.8 0.00 30.00 0.00 0 0
point33 33 6,809,671.0 1,514,269.2 0.00 30.00 0.00 0 0
point34 34 6,809,654.0 1,514,228.5 0.00 30.00
Barrier9 W 0.00 99.99 0.00 0.00 point35 35 6,809,624.0 1,514,160.1 0.00 30.00 0.00 0 0 point36 36 6,809,731.5 1,514,123.8 0.00 30.00 0.00 0 0
point37 37 6,809,744.5 1,514,168.0 0.00 30.00 0.00 0 0
point38 38 6,809,637.5 1,514,205.6 0.00 30.00 0.00 0 0
point39 39 6,809,624.0 1,514,160.1 0.00 30.00
Barrier10 W 0.00 99.99 0.00 0.00 point40 40 6,809,596.5 1,514,093.1 0.00 30.00 0.00 0 0 point41 41 6,809,701.5 1,514,051.1 0.00 30.00 0.00 0 0
point42 42 6,809,717.5 1,514,097.0 0.00 30.00 0.00 0 0
point43 43 6,809,612.5 1,514,132.0 0.00 30.00 0.00 0 0
point44 44 6,809,596.5 1,514,093.1 0.00 30.00
Barrier11 W 0.00 99.99 0.00 0.00 point45 45 6,809,566.5 1,514,028.6 0.00 30.00 0.00 0 0 point46 46 6,809,676.0 1,513,988.5 0.00 30.00 0.00 0 0
point47 47 6,809,690.5 1,514,031.8 0.00 30.00 0.00 0 0
point48 48 6,809,584.0 1,514,068.1 0.00 30.00 0.00 0 0
point49 49 6,809,566.5 1,514,028.6 0.00 30.00
Barrier12 W 0.00 99.99 0.00 0.00 point50 50 6,809,539.5 1,513,964.1 0.00 30.00 0.00 0 0 point51 51 6,809,646.0 1,513,921.0 0.00 30.00 0.00 0 0
point52 52 6,809,660.0 1,513,960.9 0.00 30.00 0.00 0 0
point53 53 6,809,553.5 1,514,003.4 0.00 30.00 0.00 0 0
point54 54 6,809,539.5 1,513,964.1 0.00 30.00
Barrier13 W 0.00 99.99 0.00 0.00 point55 55 6,809,714.0 1,513,995.4 0.00 30.00 0.00 0 0 point56 56 6,809,758.0 1,513,981.6 0.00 30.00 0.00 0 0
point57 57 6,809,810.5 1,514,109.8 0.00 30.00 0.00 0 0
point58 58 6,809,771.5 1,514,125.0 0.00 30.00 0.00 0 0
point59 59 6,809,714.0 1,513,995.4 0.00 30.00
Barrier14 W 0.00 99.99 0.00 0.00 point60 60 6,809,722.5 1,513,840.9 0.00 30.00 0.00 0 0 point61 61 6,809,716.5 1,513,956.4 0.00 30.00 0.00 0 0
point62 62 6,809,756.0 1,513,958.5 0.00 30.00 0.00 0 0
point63 63 6,809,769.0 1,513,844.2 0.00 30.00 0.00 0 0
point64 64 6,809,722.5 1,513,840.9 0.00 30.00
Barrier15 W 0.00 99.99 0.00 0.00 point65 65 6,809,799.5 1,513,854.2 0.00 30.00 0.00 0 0 point66 66 6,809,786.5 1,513,964.2 0.00 30.00 0.00 0 0
point67 67 6,809,829.0 1,513,968.4 0.00 30.00 0.00 0 0
point68 68 6,809,846.5 1,513,859.9 0.00 30.00 0.00 0 0
point69 69 6,809,799.5 1,513,854.2 0.00 30.00
Barrier16 W 0.00 99.99 0.00 0.00 point70 70 6,809,891.5 1,513,877.8 0.00 30.00 0.00 0 0 point71 71 6,809,883.0 1,513,928.4 0.00 30.00 0.00 0 0
point72 72 6,809,932.0 1,513,934.4 0.00 30.00 0.00 0 0
point73 73 6,809,935.5 1,513,920.5 0.00 30.00 0.00 0 0
point74 74 6,809,921.5 1,513,917.6 0.00 30.00 0.00 0 0
point75 75 6,809,931.5 1,513,880.1 0.00 30.00 0.00 0 0
point76 76 6,809,891.5 1,513,877.8 0.00 30.00
C:\TNM25\Projects\Gran Vista\near term + project 2 30 June 2022 RESULTS: SOUND LEVELS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELS
PROJECT/CONTRACT: Gran Vista
RUN: Near Term + Project
BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.

Receiver
Name No. #DUs Existing No Barrier With Barrier
LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 64.2 68.6 66 4.4 10 Snd Lvl 68.6 0.0 8 -8.0
ST2 2 1 63.5 69.8 66 6.3 10 Snd Lvl 69.8 0.0 8 -8.0
ST3 3 1 60.2 67.2 66 7.0 10 Snd Lvl 67.2 0.0 8 -8.0
ST4 4 1 47.3 51.7 66 4.4 10 ---- 51.7 0.0 8 -8.0
Dwelling Units # DUs Noise Reduction
Min Avg Max
dB dB dB
All Selected 4 0.0 0.0 0.0
All Impacted 3 0.0 0.0 0.0
All that meet NR Goal 0 0.0 0.0 0.0
C:\TNM25\Projects\Gran Vista\near term + project 1 30 June 2022 INPUT: ROADWAYS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: ROADWAYS Average pavement type shall be used unless PROJECT/CONTRACT: Gran Vista a State highway agency substantiates the use RUN: Horizon of a different type with the approval of FHWA Roadway Points
Name Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Mission West 35.0 point1 1 6,809,942.5 1,513,504.1 0.00 Average point2 2 6,809,884.0 1,513,538.4 0.00 Average
point3 3 6,809,766.5 1,513,623.8 0.00 Average
point4 4 6,809,644.0 1,513,727.1 0.00 Average
point5 5 6,809,520.0 1,513,842.2 0.00 Average
point6 6 6,809,443.0 1,513,908.5 0.00 Average
point7 7 6,809,344.0 1,513,996.6 0.00 Average
point8 8 6,809,256.0 1,514,071.6 0.00 Average
point9 9 6,809,153.0 1,514,165.4 0.00 Average
point10 10 6,809,112.5 1,514,204.1 0.00 Average
point11 11 6,809,007.5 1,514,293.1 0.00 Average
point12 12 6,808,960.5 1,514,316.9 0.00
Mission East 35.0 point13 13 6,808,953.0 1,514,294.1 0.00 Average point14 14 6,808,996.0 1,514,268.8 0.00 Average
point15 15 6,809,054.5 1,514,213.2 0.00 Average
point16 16 6,809,087.5 1,514,185.1 0.00 Average
point17 17 6,809,168.0 1,514,111.6 0.00 Average
point18 18 6,809,247.5 1,514,036.6 0.00 Average
point19 19 6,809,335.5 1,513,955.8 0.00 Average
point20 20 6,809,454.0 1,513,846.0 0.00 Average
point21 21 6,809,556.0 1,513,755.4 0.00 Average
point22 22 6,809,646.0 1,513,672.0 0.00 Average
point23 23 6,809,734.5 1,513,596.1 0.00 Average
point24 24 6,809,928.5 1,513,450.4 0.00
Las Posas North 40.0 point36 36 6,810,059.5 1,513,488.5 0.00 Average C:\TNM25\Projects\Gran Vista\Future 1 30 June 2022
INPUT: ROADWAYS Gran Vista
point35 35 6,810,117.0 1,513,692.0 0.00 Average
point34 34 6,810,132.5 1,513,874.2 0.00 Average
point33 33 6,810,127.5 1,513,962.0 0.00 Average
point32 32 6,810,118.5 1,514,057.0 0.00 Average
point31 31 6,810,074.5 1,514,231.1 0.00 Average
point30 30 6,810,015.0 1,514,384.4 0.00 Average
point29 29 6,809,941.0 1,514,567.1 0.00 Average
point28 28 6,809,910.5 1,514,712.5 0.00 Average
point27 27 6,809,889.5 1,514,898.2 0.00 Average
point26 26 6,809,870.5 1,515,139.8 0.00 Average
point25 25 6,809,868.0 1,515,213.2 0.00
Las Posas South 40.0 point48 48 6,809,811.0 1,515,209.5 0.00 Average point47 47 6,809,823.0 1,514,958.5 0.00 Average
point46 46 6,809,847.0 1,514,713.8 0.00 Average
point45 45 6,809,881.5 1,514,547.5 0.00 Average
point44 44 6,809,921.0 1,514,450.5 0.00 Average
point43 43 6,809,993.5 1,514,273.4 0.00 Average
point42 42 6,810,046.0 1,514,124.4 0.00 Average
point41 41 6,810,070.0 1,513,990.0 0.00 Average
point40 40 6,810,071.0 1,513,878.8 0.00 Average
point39 39 6,810,064.0 1,513,722.1 0.00 Average
point38 38 6,810,034.5 1,513,597.0 0.00 Average
point37 37 6,810,008.0 1,513,505.1 0.00
Roadway5 35.0 point49 49 6,810,912.5 1,513,110.2 0.00 Average point50 50 6,810,575.5 1,513,229.6 0.00 Average
point51 51 6,810,349.0 1,513,312.6 0.00 Average
point52 52 6,810,082.0 1,513,426.1 0.00
Roadway6 35.0 point58 58 6,810,071.0 1,513,379.0 0.00 Average point57 57 6,810,276.5 1,513,294.0 0.00 Average
point56 56 6,810,455.5 1,513,227.5 0.00 Average
point55 55 6,810,608.5 1,513,177.6 0.00 Average
point54 54 6,810,786.0 1,513,109.2 0.00 Average
point53 53 6,810,968.0 1,513,046.2 0.00
Roadway7 40.0 point59 59 6,809,817.0 1,512,914.1 0.00 Average point60 60 6,810,024.0 1,513,397.9 0.00
Roadway8 40.0 point62 62 6,809,967.5 1,513,429.8 0.00 Average point61 61 6,809,755.5 1,512,933.4 0.00
C:\TNM25\Projects\Gran Vista\Future 2 30 June 2022
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: TRAFFIC FOR LAeq1h Volumes
PROJECT/CONTRACT: Gran Vista
RUN: Horizon
Roadway Points
Name Name No. Segment
Autos MTrucks HTrucks Buses Motorcycles

V S V S V S V S V S
veh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph
Mission West point1 1 1081 40 22 40 11 40 0 0 0 0
point2 2 1081 40 22 40 11 40 0 0 0 0
point3 3 1081 40 22 40 11 40 0 0 0 0
point4 4 1081 40 22 40 11 40 0 0 0 0
point5 5 1081 40 22 40 11 40 0 0 0 0
point6 6 1081 40 22 40 11 40 0 0 0 0
point7 7 1081 40 22 40 11 40 0 0 0 0
point8 8 1081 40 22 40 11 40 0 0 0 0
point9 9 1081 40 22 40 11 40 0 0 0 0
point10 10 1081 40 22 40 11 40 0 0 0 0
point11 11 1081 40 22 40 11 40 0 0 0 0
point12 12
Mission East point13 13 1081 40 22 40 11 40 0 0 0 0
point14 14 1081 40 22 40 11 40 0 0 0 0
point15 15 1081 40 22 40 11 40 0 0 0 0
point16 16 1081 40 22 40 11 40 0 0 0 0
point17 17 1081 40 22 40 11 40 0 0 0 0
point18 18 1081 40 22 40 11 40 0 0 0 0
point19 19 1081 40 22 40 11 40 0 0 0 0
point20 20 1081 40 22 40 11 40 0 0 0 0
point21 21 1081 40 22 40 11 40 0 0 0 0
point22 22 1081 40 22 40 11 40 0 0 0 0
point23 23 1081 40 22 40 11 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\Future 1 30 June 2022
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point24 24
Las Posas North point36 36 1139 45 23 45 11 45 0 0 0 0 point35 35 1139 45 23 45 11 45 0 0 0 0
point34 34 1139 45 23 45 11 45 0 0 0 0
point33 33 1139 45 23 45 11 45 0 0 0 0
point32 32 1139 45 23 45 11 45 0 0 0 0
point31 31 1139 45 23 45 11 45 0 0 0 0
point30 30 1139 45 23 45 11 45 0 0 0 0
point29 29 1139 45 23 45 11 45 0 0 0 0
point28 28 1139 45 23 45 11 45 0 0 0 0
point27 27 1139 45 23 45 11 45 0 0 0 0
point26 26 1139 45 23 45 11 45 0 0 0 0
point25 25
Las Posas South point48 48 1139 45 23 45 11 45 0 0 0 0 point47 47 1139 45 23 45 11 45 0 0 0 0
point46 46 1139 45 23 45 11 45 0 0 0 0
point45 45 1139 45 23 45 11 45 0 0 0 0
point44 44 1139 45 23 45 11 45 0 0 0 0
point43 43 1139 45 23 45 11 45 0 0 0 0
point42 42 1139 45 23 45 11 45 0 0 0 0
point41 41 1139 45 23 45 11 45 0 0 0 0
point40 40 1139 45 23 45 11 45 0 0 0 0
point39 39 1139 45 23 45 11 45 0 0 0 0
point38 38 1139 45 23 45 11 45 0 0 0 0
point37 37
Roadway5 point49 49 1134 40 23 40 11 40 0 0 0 0
point50 50 1134 40 23 40 11 40 0 0 0 0
point51 51 1134 40 23 40 11 40 0 0 0 0
point52 52
Roadway6 point58 58 1134 40 23 40 11 40 0 0 0 0
point57 57 1134 40 23 40 11 40 0 0 0 0
point56 56 1134 40 23 40 11 40 0 0 0 0
point55 55 1134 40 23 40 11 40 0 0 0 0
point54 54 1134 40 23 40 11 40 0 0 0 0
point53 53
Roadway7 point59 59 1542 40 31 40 15 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\Future 2 30 June 2022
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point60 60
Roadway8 point62 62 1542 40 31 40 15 40 0 0 0 0
point61 61
C:\TNM25\Projects\Gran Vista\Future 3 30 June 2022
INPUT: RECEIVERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: RECEIVERS
PROJECT/CONTRACT: Gran Vista
RUN: Horizon
Receiver
Name No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,809,622.5 1,513,799.1 0.00 4.92 64.20 66 10.0 8.0 Y ST2 2 1 6,810,016.5 1,514,042.0 0.00 4.92 63.50 66 10.0 8.0 Y ST3 3 1 6,810,064.5 1,514,464.4 0.00 4.92 60.20 66 10.0 8.0 Y ST4 4 1 6,809,396.0 1,514,259.4 0.00 4.92 47.30 66 10.0 8.0 Y C:\TNM25\Projects\Gran Vista\Future 1 30 June 2022
INPUT : BARRIERS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
INPUT: BARRIERS
PROJECT/CONTRACT: Gran Vista
RUN: Horizon
Barrier Points
Name Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? Reflec- Area Vol. Length ment tions?
ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,809,527.5 1,514,236.2 0.00 8.00 0.00 0 0 point2 2 6,809,492.0 1,514,149.5 0.00 8.00 0.00 0 0
point3 3 6,809,279.0 1,514,341.5 0.00 8.00
C:\TNM25\Projects\Gran Vista\Future 1 30 June 2022
RESULTS: SOUND LEVELS Gran Vista
Dudek 30 June 2022
CB TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELS
PROJECT/CONTRACT: Gran Vista
RUN: Horizon
BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.

Receiver
Name No. #DUs Existing No Barrier With Barrier
LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 64.2 69.4 66 5.2 10 Snd Lvl 69.4 0.0 8 -8.0
ST2 2 1 63.5 70.2 66 6.7 10 Snd Lvl 70.2 0.0 8 -8.0
ST3 3 1 60.2 67.7 66 7.5 10 Snd Lvl 67.7 0.0 8 -8.0
ST4 4 1 47.3 53.9 66 6.6 10 ---- 53.9 0.0 8 -8.0
Dwelling Units # DUs Noise Reduction
Min Avg Max
dB dB dB
All Selected 4 0.0 0.0 0.0
All Impacted 3 0.0 0.0 0.0
All that meet NR Goal 0 0.0 0.0 0.0
C:\TNM25\Projects\Gran Vista\Future 1 30 June 2022
INPUT: ROADWAYS Gran Vista
Dudek 8 December 2022
CB TNM 2.5
INPUT: ROADWAYS Average pavement type shall be used unless PROJECT/CONTRACT: Gran Vista a State highway agency substantiates the use RUN: Horizon + Project of a different type with the approval of FHWA Roadway Points
Name Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Mission West 35.0 point1 1 6,809,942.5 1,513,504.1 -10.00 Average point2 2 6,809,884.0 1,513,538.4 -10.00 Average
point3 3 6,809,766.5 1,513,623.8 -10.00 Average
point4 4 6,809,644.0 1,513,727.1 -10.00 Average
point5 5 6,809,520.0 1,513,842.2 -10.00 Average
point6 6 6,809,443.0 1,513,908.5 -10.00 Average
point7 7 6,809,344.0 1,513,996.6 -10.00 Average
point8 8 6,809,256.0 1,514,071.6 -10.00 Average
point9 9 6,809,153.0 1,514,165.4 -10.00 Average
point10 10 6,809,112.5 1,514,204.1 -10.00 Average
point11 11 6,809,007.5 1,514,293.1 -10.00 Average
point12 12 6,808,960.5 1,514,316.9 -10.00
Mission East 35.0 point13 13 6,808,953.0 1,514,294.1 -10.00 Average point14 14 6,808,996.0 1,514,268.8 -10.00 Average
point15 15 6,809,054.5 1,514,213.2 -10.00 Average
point16 16 6,809,087.5 1,514,185.1 -10.00 Average
point17 17 6,809,168.0 1,514,111.6 -10.00 Average
point18 18 6,809,247.5 1,514,036.6 -10.00 Average
point19 19 6,809,335.5 1,513,955.8 -10.00 Average
point20 20 6,809,454.0 1,513,846.0 -10.00 Average
point21 21 6,809,556.0 1,513,755.4 -10.00 Average
point22 22 6,809,646.0 1,513,672.0 -10.00 Average
point23 23 6,809,734.5 1,513,596.1 -10.00 Average
point24 24 6,809,928.5 1,513,450.4 -10.00
Las Posas North 40.0 point36 36 6,810,059.5 1,513,488.5 0.00 Average C:\TNM25\Projects\Gran Vista\Future + Project 1 8 December 2 INPUT: ROADWAYS Gran Vista
point35 35 6,810,117.0 1,513,692.0 0.00 Average
point34 34 6,810,132.5 1,513,874.2 0.00 Average
point33 33 6,810,127.5 1,513,962.0 0.00 Average
point32 32 6,810,118.5 1,514,057.0 0.00 Average
point31 31 6,810,074.5 1,514,231.1 0.00 Average
point30 30 6,810,015.0 1,514,384.4 0.00 Average
point29 29 6,809,941.0 1,514,567.1 0.00 Average
point28 28 6,809,910.5 1,514,712.5 0.00 Average
point27 27 6,809,889.5 1,514,898.2 0.00 Average
point26 26 6,809,870.5 1,515,139.8 0.00 Average
point25 25 6,809,868.0 1,515,213.2 0.00
Las Posas South 40.0 point48 48 6,809,811.0 1,515,209.5 0.00 Average point47 47 6,809,823.0 1,514,958.5 0.00 Average
point46 46 6,809,847.0 1,514,713.8 0.00 Average
point45 45 6,809,881.5 1,514,547.5 0.00 Average
point44 44 6,809,921.0 1,514,450.5 0.00 Average
point43 43 6,809,993.5 1,514,273.4 0.00 Average
point42 42 6,810,046.0 1,514,124.4 0.00 Average
point41 41 6,810,070.0 1,513,990.0 0.00 Average
point40 40 6,810,071.0 1,513,878.8 0.00 Average
point39 39 6,810,064.0 1,513,722.1 0.00 Average
point38 38 6,810,034.5 1,513,597.0 0.00 Average
point37 37 6,810,008.0 1,513,505.1 0.00
Roadway5 35.0 point49 49 6,810,912.5 1,513,110.2 0.00 Average point50 50 6,810,575.5 1,513,229.6 0.00 Average
point51 51 6,810,349.0 1,513,312.6 0.00 Average
point52 52 6,810,082.0 1,513,426.1 0.00
Roadway6 35.0 point58 58 6,810,071.0 1,513,379.0 0.00 Average point57 57 6,810,276.5 1,513,294.0 0.00 Average
point56 56 6,810,455.5 1,513,227.5 0.00 Average
point55 55 6,810,608.5 1,513,177.6 0.00 Average
point54 54 6,810,786.0 1,513,109.2 0.00 Average
point53 53 6,810,968.0 1,513,046.2 0.00
Roadway7 40.0 point59 59 6,809,817.0 1,512,914.1 0.00 Average point60 60 6,810,024.0 1,513,397.9 0.00
Roadway8 40.0 point62 62 6,809,967.5 1,513,429.8 0.00 Average point61 61 6,809,755.5 1,512,933.4 0.00
C:\TNM25\Projects\Gran Vista\Future + Project 2 8 December 2 INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
Dudek 8 December 2022
CB TNM 2.5
INPUT: TRAFFIC FOR LAeq1h Volumes
PROJECT/CONTRACT: Gran Vista
RUN: Horizon + Project
Roadway Points
Name Name No. Segment
Autos MTrucks HTrucks Buses Motorcycles

VS VS VS VS VS
veh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph
Mission West point1 1 1090 40 22 40 11 40 0 0 0 0
point2 2 1090 40 22 40 11 40 0 0 0 0
point3 3 1090 40 22 40 11 40 0 0 0 0
point4 4 1090 40 22 40 11 40 0 0 0 0
point5 5 1090 40 22 40 11 40 0 0 0 0
point6 6 1090 40 22 40 11 40 0 0 0 0
point7 7 1090 40 22 40 11 40 0 0 0 0
point8 8 1090 40 22 40 11 40 0 0 0 0
point9 9 1090 40 22 40 11 40 0 0 0 0
point10 10 1090 40 22 40 11 40 0 0 0 0
point11 11 1090 40 22 40 11 40 0 0 0 0
point12 12
Mission East point13 13 1090 40 22 40 11 40 0 0 0 0
point14 14 1090 40 22 40 11 40 0 0 0 0
point15 15 1090 40 22 40 11 40 0 0 0 0
point16 16 1090 40 22 40 11 40 0 0 0 0
point17 17 1090 40 22 40 11 40 0 0 0 0
point18 18 1090 40 22 40 11 40 0 0 0 0
point19 19 1090 40 22 40 11 40 0 0 0 0
point20 20 1090 40 22 40 11 40 0 0 0 0
point21 21 1090 40 22 40 11 40 0 0 0 0
point22 22 1090 40 22 40 11 40 0 0 0 0
point23 23 1090 40 22 40 11 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\Future + Project 1 8
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point24 24
Las Posas North point36 36 1172 45 24 45 12 45 0 0 0 0 point35 35 1172 45 24 45 12 45 0 0 0 0
point34 34 1172 45 24 45 12 45 0 0 0 0
point33 33 1172 45 24 45 12 45 0 0 0 0
point32 32 1172 45 24 45 12 45 0 0 0 0
point31 31 1172 45 24 45 12 45 0 0 0 0
point30 30 1172 45 24 45 12 45 0 0 0 0
point29 29 1172 45 24 45 12 45 0 0 0 0
point28 28 1172 45 24 45 12 45 0 0 0 0
point27 27 1172 45 24 45 12 45 0 0 0 0
point26 26 1172 45 24 45 12 45 0 0 0 0
point25 25
Las Posas South point48 48 1172 45 24 45 12 45 0 0 0 0 point47 47 1172 45 24 45 12 45 0 0 0 0
point46 46 1172 45 24 45 12 45 0 0 0 0
point45 45 1172 45 24 45 12 45 0 0 0 0
point44 44 1172 45 24 45 12 45 0 0 0 0
point43 43 1172 45 24 45 12 45 0 0 0 0
point42 42 1172 45 24 45 12 45 0 0 0 0
point41 41 1172 45 24 45 12 45 0 0 0 0
point40 40 1172 45 24 45 12 45 0 0 0 0
point39 39 1172 45 24 45 12 45 0 0 0 0
point38 38 1172 45 24 45 12 45 0 0 0 0
point37 37
Roadway5 point49 49 1148 40 23 40 11 40 0 0 0 0
point50 50 1148 40 23 40 11 40 0 0 0 0
point51 51 1148 40 23 40 11 40 0 0 0 0
point52 52
Roadway6 point58 58 1148 40 23 40 11 40 0 0 0 0
point57 57 1148 40 23 40 11 40 0 0 0 0
point56 56 1148 40 23 40 11 40 0 0 0 0
point55 55 1148 40 23 40 11 40 0 0 0 0
point54 54 1148 40 23 40 11 40 0 0 0 0
point53 53
Roadway7 point59 59 1560 40 32 40 16 40 0 0 0 0
C:\TNM25\Projects\Gran Vista\Future + Project 2 8
INPUT: TRAFFIC FOR LAeq1h Volumes Gran Vista
point60 60
Roadway8 point62 62 1560 40 32 40 16 40 0 0 0 0
point61 61
C:\TNM25\Projects\Gran Vista\Future + Project 3 8
INPUT: RECEIVERS Gran Vista
Dudek 8 December 2022
CB TNM 2.5
INPUT: RECEIVERS
PROJECT/CONTRACT: Gran Vista
RUN: Horizon + Project
Receiver
Name No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,809,622.5 1,513,799.1 0.00 4.92 64.20 66 10.0 8.0 Y ST2 2 1 6,810,016.5 1,514,042.0 0.00 4.92 63.50 66 10.0 8.0 Y ST3 3 1 6,810,064.5 1,514,464.4 0.00 4.92 60.20 66 10.0 8.0 Y ST4 4 1 6,809,396.0 1,514,259.4 0.00 4.92 47.30 66 10.0 8.0 Y M1-1-1 18 1 6,809,552.0 1,513,954.1 0.00 4.92 0.00 66 10.0 8.0 Y M1-1-2 19 1 6,809,552.0 1,513,954.1 0.00 14.92 0.00 66 10.0 8.0 Y M1-1-3 20 1 6,809,552.0 1,513,954.1 0.00 24.92 0.00 66 10.0 8.0 Y M1-2-1 21 1 6,809,615.5 1,513,930.4 0.00 4.92 0.00 66 10.0 8.0 Y M1-2-2 22 1 6,809,615.5 1,513,930.4 0.00 14.92 0.00 66 10.0 8.0 Y M1-2-3 23 1 6,809,615.5 1,513,930.4 0.00 24.92 0.00 66 10.0 8.0 Y M2-1-1 24 1 6,809,714.5 1,513,935.5 0.00 4.92 0.00 66 10.0 8.0 Y M2-1-2 25 1 6,809,714.5 1,513,935.5 0.00 14.92 0.00 66 10.0 8.0 Y M2-1-3 26 1 6,809,714.5 1,513,935.5 0.00 24.92 0.00 66 10.0 8.0 Y M2-2-1 27 1 6,809,717.0 1,513,861.1 0.00 4.92 0.00 66 10.0 8.0 Y M2-2-2 28 1 6,809,717.0 1,513,861.1 0.00 14.92 0.00 66 10.0 8.0 Y M2-2-3 29 1 6,809,717.0 1,513,861.1 0.00 24.92 0.00 66 10.0 8.0 Y M3-1-1 30 1 6,809,832.0 1,513,958.4 0.00 4.92 0.00 66 10.0 8.0 Y M3-1-2 31 1 6,809,832.0 1,513,958.4 0.00 14.92 0.00 66 10.0 8.0 Y M3-1-3 32 1 6,809,832.0 1,513,958.4 0.00 24.92 0.00 66 10.0 8.0 Y M3-2-1 33 1 6,809,846.5 1,513,884.8 0.00 4.92 0.00 66 10.0 8.0 Y M3-2-2 34 1 6,809,846.5 1,513,884.8 0.00 14.92 0.00 66 10.0 8.0 Y M3-2-3 35 1 6,809,846.5 1,513,884.8 0.00 24.92 0.00 66 10.0 8.0 Y C:\TNM25\Projects\Gran Vista\Future + Project 1 8
INPUT: RECEIVERS Gran Vista
M4-1-1 36 1 6,809,927.5 1,513,905.0 0.00 4.92 0.00 66 10.0 8.0 Y M4-1-2 37 1 6,809,927.5 1,513,905.0 0.00 14.92 0.00 66 10.0 8.0 Y M4-1-3 38 1 6,809,927.5 1,513,905.0 0.00 24.92 0.00 66 10.0 8.0 Y M5-1-1 39 1 6,809,908.0 1,514,011.6 0.00 4.92 0.00 66 10.0 8.0 Y M5-1-2 40 1 6,809,908.0 1,514,011.6 0.00 14.92 0.00 66 10.0 8.0 Y M5-1-3 41 1 6,809,908.0 1,514,011.6 0.00 24.92 0.00 66 10.0 8.0 Y M5-2-1 42 1 6,809,969.5 1,514,025.2 0.00 4.92 0.00 66 10.0 8.0 Y M5-2-2 43 1 6,809,969.5 1,514,025.2 0.00 14.92 0.00 66 10.0 8.0 Y M5-2-3 44 1 6,809,969.5 1,514,025.2 0.00 24.92 0.00 66 10.0 8.0 Y M6-1-1 45 1 6,809,834.5 1,514,485.4 0.00 4.92 0.00 66 10.0 8.0 Y M6-1-2 46 1 6,809,834.5 1,514,485.4 0.00 14.92 0.00 66 10.0 8.0 Y M6-1-3 47 1 6,809,834.5 1,514,485.4 0.00 24.92 0.00 66 10.0 8.0 Y M6-2-1 48 1 6,809,855.0 1,514,422.0 0.00 4.92 0.00 66 10.0 8.0 Y M6-2-2 49 1 6,809,855.0 1,514,422.0 0.00 14.92 0.00 66 10.0 8.0 Y M6-2-3 50 1 6,809,855.0 1,514,422.0 0.00 24.92 0.00 66 10.0 8.0 Y OS-1 - Dog Park 51 1 6,809,765.5 1,514,552.8 5.00 4.92 0.00 66 10.0 8.0 Y OS-2 - Turf Area 52 1 6,809,583.0 1,513,916.0 0.00 4.92 0.00 66 10.0 8.0 Y C:\TNM25\Projects\Gran Vista\Future + Project 2 8
INPUT: BARRIERS Gran Vista
Dudek 8 December 2022
CB TNM 2.5
INPUT: BARRIERS
PROJECT/CONTRACT: Gran Vista
RUN: Horizon + Project
Barrier Points
Name Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? Reflec- Area Vol. Length ment tions?
ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,809,527.5 1,514,236.2 0.00 8.00 0.00 0 0 point2 2 6,809,492.0 1,514,149.5 0.00 8.00 0.00 0 0
point3 3 6,809,279.0 1,514,341.5 0.00 8.00
Barrier2 W 0.00 99.99 0.00 0.00 point4 4 6,809,874.0 1,514,398.5 0.00 30.00 0.00 0 0 point77 77 6,809,867.0 1,514,411.8 0.00 30.00 0.00 0 0
point5 5 6,809,855.5 1,514,407.6 0.00 30.00 0.00 0 0
point6 6 6,809,825.5 1,514,498.5 0.00 30.00 0.00 0 0
point7 7 6,809,789.0 1,514,482.0 0.00 30.00 0.00 0 0
point8 8 6,809,828.0 1,514,378.9 0.00 30.00 0.00 0 0
point9 9 6,809,874.0 1,514,398.5 0.00 30.00
Barrier3 W 0.00 99.99 0.00 0.00 point10 10 6,809,777.5 1,514,317.9 0.00 30.00 0.00 0 0 point78 78 6,809,794.5 1,514,277.6 0.00 30.00 0.00 0 0
point11 11 6,809,901.5 1,514,322.5 0.00 30.00 0.00 0 0
point12 12 6,809,887.0 1,514,359.1 0.00 30.00 0.00 0 0
point13 13 6,809,777.5 1,514,317.9 0.00 30.00
Barrier4 W 0.00 99.99 0.00 0.00 point14 14 6,809,807.5 1,514,251.0 0.00 30.00 0.00 0 0 point79 79 6,809,825.5 1,514,215.8 0.00 30.00 0.00 0 0
point15 15 6,809,926.5 1,514,252.0 0.00 30.00 0.00 0 0
point16 16 6,809,910.5 1,514,292.2 0.00 30.00 0.00 0 0
point17 17 6,809,807.5 1,514,251.0 0.00 30.00
Barrier5 W 0.00 99.99 0.00 0.00 point18 18 6,809,829.5 1,514,185.1 0.00 30.00 0.00 0 0 point80 80 6,809,846.5 1,514,147.4 0.00 30.00 0.00 0 0
point19 19 6,809,953.0 1,514,186.1 0.00 30.00 0.00 0 0
point20 20 6,809,937.0 1,514,225.5 0.00 30.00 0.00 0 0
point21 21 6,809,829.5 1,514,185.1 0.00 30.00
Barrier6 W 0.00 99.99 0.00 0.00 point22 22 6,809,861.0 1,514,123.9 0.00 30.00 0.00 0 0 point81 81 6,809,869.5 1,514,083.9 0.00 30.00 0.00 0 0
point23 23 6,809,975.5 1,514,102.0 0.00 30.00 0.00 0 0
point24 24 6,809,968.0 1,514,145.0 0.00 30.00 0.00 0 0
point25 25 6,809,861.0 1,514,123.9 0.00 30.00
Barrier7 W 0.00 99.99 0.00 0.00 point26 26 6,809,874.0 1,514,050.5 0.00 30.00 0.00 0 0 point82 82 6,809,884.0 1,514,008.4 0.00 30.00 0.00 0 0
point27 27 6,809,995.0 1,514,032.8 0.00 30.00 0.00 0 0
point28 28 6,809,988.0 1,514,075.5 0.00 30.00 0.00 0 0
point29 29 6,809,874.0 1,514,050.5 0.00 30.00
C:\TNM25\Projects\Gran Vista\Future + Project 1 8 December 2022 INPUT: BARRIERS Gran Vista
Barrier8 W 0.00 99.99 0.00 0.00 point30 30 6,809,654.0 1,514,228.5 0.00 30.00 0.00 0 0 point31 31 6,809,741.5 1,514,194.5 0.00 30.00 0.00 0 0
point32 32 6,809,758.0 1,514,238.8 0.00 30.00 0.00 0 0
point33 33 6,809,671.0 1,514,269.2 0.00 30.00 0.00 0 0
point34 34 6,809,654.0 1,514,228.5 0.00 30.00
Barrier9 W 0.00 99.99 0.00 0.00 point35 35 6,809,624.0 1,514,160.1 0.00 30.00 0.00 0 0 point36 36 6,809,731.5 1,514,123.8 0.00 30.00 0.00 0 0
point37 37 6,809,744.5 1,514,168.0 0.00 30.00 0.00 0 0
point38 38 6,809,637.5 1,514,205.6 0.00 30.00 0.00 0 0
point39 39 6,809,624.0 1,514,160.1 0.00 30.00
Barrier10 W 0.00 99.99 0.00 0.00 point40 40 6,809,596.5 1,514,093.1 0.00 30.00 0.00 0 0 point41 41 6,809,701.5 1,514,051.1 0.00 30.00 0.00 0 0
point42 42 6,809,717.5 1,514,097.0 0.00 30.00 0.00 0 0
point43 43 6,809,612.5 1,514,132.0 0.00 30.00 0.00 0 0
point44 44 6,809,596.5 1,514,093.1 0.00 30.00
Barrier11 W 0.00 99.99 0.00 0.00 point45 45 6,809,566.5 1,514,028.6 0.00 30.00 0.00 0 0 point46 46 6,809,676.0 1,513,988.5 0.00 30.00 0.00 0 0
point47 47 6,809,690.5 1,514,031.8 0.00 30.00 0.00 0 0
point48 48 6,809,584.0 1,514,068.1 0.00 30.00 0.00 0 0
point49 49 6,809,566.5 1,514,028.6 0.00 30.00
Barrier12 W 0.00 99.99 0.00 0.00 point50 50 6,809,539.5 1,513,964.1 0.00 30.00 0.00 0 0 point51 51 6,809,646.0 1,513,921.0 0.00 30.00 0.00 0 0
point52 52 6,809,660.0 1,513,960.9 0.00 30.00 0.00 0 0
point53 53 6,809,553.5 1,514,003.4 0.00 30.00 0.00 0 0
point54 54 6,809,539.5 1,513,964.1 0.00 30.00
Barrier13 W 0.00 99.99 0.00 0.00 point55 55 6,809,714.0 1,513,995.4 0.00 30.00 0.00 0 0 point56 56 6,809,758.0 1,513,981.6 0.00 30.00 0.00 0 0
point57 57 6,809,810.5 1,514,109.8 0.00 30.00 0.00 0 0
point58 58 6,809,771.5 1,514,125.0 0.00 30.00 0.00 0 0
point59 59 6,809,714.0 1,513,995.4 0.00 30.00
Barrier14 W 0.00 99.99 0.00 0.00 point60 60 6,809,722.5 1,513,840.9 0.00 30.00 0.00 0 0 point61 61 6,809,716.5 1,513,956.4 0.00 30.00 0.00 0 0
point62 62 6,809,756.0 1,513,958.5 0.00 30.00 0.00 0 0
point63 63 6,809,769.0 1,513,844.2 0.00 30.00 0.00 0 0
point64 64 6,809,722.5 1,513,840.9 0.00 30.00
Barrier15 W 0.00 99.99 0.00 0.00 point65 65 6,809,799.5 1,513,854.2 0.00 30.00 0.00 0 0 point66 66 6,809,786.5 1,513,964.2 0.00 30.00 0.00 0 0
point67 67 6,809,829.0 1,513,968.4 0.00 30.00 0.00 0 0
point68 68 6,809,846.5 1,513,859.9 0.00 30.00 0.00 0 0
point69 69 6,809,799.5 1,513,854.2 0.00 30.00
Barrier16 W 0.00 99.99 0.00 0.00 point70 70 6,809,891.5 1,513,877.8 0.00 30.00 0.00 0 0 point71 71 6,809,883.0 1,513,928.4 0.00 30.00 0.00 0 0
point72 72 6,809,932.0 1,513,934.4 0.00 30.00 0.00 0 0
point73 73 6,809,935.5 1,513,920.5 0.00 30.00 0.00 0 0
point74 74 6,809,921.5 1,513,917.6 0.00 30.00 0.00 0 0
point75 75 6,809,931.5 1,513,880.1 0.00 30.00 0.00 0 0
point76 76
6,809,891.5 1,513,877.8 0.00 30.00
C:\TNM25\Projects\Gran Vista\Future + Project 2 8 December 2022 RESULTS: SOUND LEVELS Gran Vista
Dudek 8 December 2022
CB TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELS
PROJECT/CONTRACT: Gran Vista
RUN: Horizon + Project
BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.

Receiver
Name No. #DUs Existing No Barrier With Barrier
LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 64.2 69.6 66 5.4 10 Snd Lvl 69.6 0.0 8 -8.0
ST2 2 1 63.5 70.4 66 6.9 10 Snd Lvl 70.4 0.0 8 -8.0
ST3 3 1 60.2 67.9 66 7.7 10 Snd Lvl 67.9 0.0 8 -8.0
ST4 4 1 47.3 52.0 66 4.7 10 ---- 52.0 0.0 8 -8.0
M1-1-1 18 1 0.0 64.8 66 64.8 10 ---- 64.8 0.0 8 -8.0
M1-1-2 19 1 0.0 65.2 66 65.2 10 ---- 65.2 0.0 8 -8.0
M1-1-3 20 1 0.0 65.3 66 65.3 10 ---- 65.3 0.0 8 -8.0
M1-2-1 21 1 0.0 63.7 66 63.7 10 ---- 63.7 0.0 8 -8.0
M1-2-2 22 1 0.0 64.1 66 64.1 10 ---- 64.1 0.0 8 -8.0
M1-2-3 23 1 0.0 64.4 66 64.4 10 ---- 64.4 0.0 8 -8.0
M2-1-1 24 1 0.0 57.6 66 57.6 10 ---- 57.6 0.0 8 -8.0
M2-1-2 25 1 0.0 59.6 66 59.6 10 ---- 59.6 0.0 8 -8.0
M2-1-3 26 1 0.0 59.8 66 59.8 10 ---- 59.8 0.0 8 -8.0
M2-2-1 27 1 0.0 62.3 66 62.3 10 ---- 62.3 0.0 8 -8.0
M2-2-2 28 1 0.0 63.0 66 63.0 10 ---- 63.0 0.0 8 -8.0
M2-2-3 29 1 0.0 63.2 66 63.2 10 ---- 63.2 0.0 8 -8.0
M3-1-1 30 1 0.0 55.6 66 55.6 10 ---- 55.6 0.0 8 -8.0
M3-1-2 31 1 0.0 58.9 66 58.9 10 ---- 58.9 0.0 8 -8.0
M3-1-3 32 1 0.0 59.1 66 59.1 10 ---- 59.1 0.0 8 -8.0
M3-2-1 33 1 0.0 57.5 66 57.5 10 ---- 57.5 0.0 8 -8.0
M3-2-2 34 1 0.0 60.3 66 60.3 10 ---- 60.3 0.0 8 -8.0
M3-2-3 35 1 0.0 60.5 66 60.5 10 ---- 60.5 0.0 8 -8.0
M4-1-1 36 1 0.0 63.7 66 63.7 10 ---- 63.7 0.0 8 -8.0
M4-1-2 37 1 0.0 64.7 66 64.7 10 ---- 64.7 0.0 8 -8.0
C:\TNM25\Projects\Gran Vista\Future + Project 1 8 December 2022 RESULTS: SOUND LEVELS Gran Vista
M4-1-3 38 1 0.0 64.9 66 64.9 10 ---- 64.9 0.0 8 -8.0
M5-1-1 39 1 0.0 61.0 66 61.0 10 ---- 61.0 0.0 8 -8.0
M5-1-2 40 1 0.0 62.2 66 62.2 10 ---- 62.2 0.0 8 -8.0
M5-1-3 41 1 0.0 62.4 66 62.4 10 ---- 62.4 0.0 8 -8.0
M5-2-1 42 1 0.0 64.6 66 64.6 10 ---- 64.6 0.0 8 -8.0
M5-2-2 43 1 0.0 65.0 66 65.0 10 ---- 65.0 0.0 8 -8.0
M5-2-3 44 1 0.0 65.0 66 65.0 10 ---- 65.0 0.0 8 -8.0
M6-1-1 45 1 0.0 68.3 66 68.3 10 Snd Lvl 68.3 0.0 8 -8.0 M6-1-2 46 1 0.0 68.5 66 68.5 10 Snd Lvl 68.5 0.0 8 -8.0 M6-1-3 47 1 0.0 68.3 66 68.3 10 Snd Lvl 68.3 0.0 8 -8.0 M6-2-1 48 1 0.0 67.6 66 67.6 10 Snd Lvl 67.6 0.0 8 -8.0 M6-2-2 49 1 0.0 67.8 66 67.8 10 Snd Lvl 67.8 0.0 8 -8.0 M6-2-3 50 1 0.0 67.6 66 67.6 10 Snd Lvl 67.6 0.0 8 -8.0 OS-1 - Dog Park 51 1 0.0 65.4 66 65.4 10 ---- 65.4 0.0 8 -8.0 OS-2 - Turf Area 52 1 0.0 65.2 66 65.2 10 ---- 65.2 0.0 8 -8.0 Dwelling Units # DUs Noise Reduction
Min Avg Max
dB dB dB
All Selected 39 0.0 0.0 0.0
All Impacted 9 0.0 0.0 0.0
All that meet NR Goal 0 0.0 0.0 0.0
C:\TNM25\Projects\Gran Vista\Future + Project 2 8 December 2022

M1-1 M1-2 M2-1
M2-2
M3-1
M3-2 M4
M5-2
M5-1
M6-1
M6-2
Mission
Blvd
N Las
Posas
OS-1
OS-2
Appendix C:

Modeled Receptor Positions

Appendix D
Transmission Loss Prediction

Project #: 13528 Gran Vista Appendix D
Source: Owens Corning. 2004. Noise Control Design Guide. December. https://www2.owenscorning.com/quietzonepro/pdfs/NoiseControlDesignGuide.pdf printed 6/30/2022 Acoustical Assessment - DRAFT - Appendix D prepared by Dudek

Project #: 13528 Gran Vista Appendix D
Interior Space Studied: Exterior-to-Interior Scenario: Calculation per Owens Corning NCDG (pg. 16):

Living Room Closed Window(s) and Door(s) 68.5 = exterior noise level (dBA CNEL) 35 = approximate net STC of assembly
Room absorption conditions: 3 = incidence adj. ("G+3") per OC NCDG Table 3 length width (hard, standard, soft, very soft?) 4 = source adj. ("F") per OC NCDG Table 4 15 10 0.8 -1 = absorption adj. per OC NCDG Table 5

39.3 = interior noise level (dBA CNEL)
Calculation of net STC:
qty width height square feet description
material or element #1 33
material or element #2 1 3 5 15
material or element #3 2 3 7 42
material or element #4 0
total surface 10 9 90 arbitrary total surface area
TL Data Source 125 250 500 1000 2000 4000
NRC-CNRC IC-IR-761 (p. 25: G16_WS90(406)_MFB90_2G16) exterior wall assembly 16 40 41 48 43 52 2 x 5/8" GWB, 2"x4" wood, 24" o.c., fiber batt fill, 1 x 5/8" GWB material #1 t 0.025119 0.0001 7.94E-05 1.58E-05 5.01E-05 6.31E-06 available TL data for comparable assembly: vinyl window (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #2 t 0.005012 0.005012 0.001995 0.000316 2E-05 0.000251 available TL data for comparable assembly: entry door glazing (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #3 t 0.005012 0.005012 0.001995 0.000316 2E-05 0.000251 opening 0 0 0 0 0 0
material #4 t 1 1 1 1 1 1
composite TL 19 25 29 37 45 38
enter desired STC value 35 prospective STC curve 19 28 35 38 39 39 sum of negative differentials -11 differentials 0 -3 -6 -1 6 -1 Interior Space Studied: Exterior-to-Interior Scenario: Calculation per Owens Corning NCDG (pg. 16):

Living Room Open Window 68.5 = exterior noise level (dBA CNEL) 14 = approximate net STC of assembly
Room absorption conditions: 3 = incidence adj. ("G+3") per OC NCDG Table 3 length width (hard, standard, soft, very soft?) 4 = source adj. ("F") per OC NCDG Table 4 15 10 0.8 -1 = absorption adj. per OC NCDG Table 5

60.3 = interior noise level (dBA CNEL)
Calculation of net STC:
qty width height square feet description
material or element #1 33
material or element #2 1 3 4 12
material or element #3 2 3 7 42
material or element #4 1 3 1 3
total surface 10 9 90 arbitrary total surface area
TL Data Source 125 250 500 1000 2000 4000
NRC-CNRC IC-IR-761 (p. 25: G16_WS90(406)_MFB90_2G16) exterior wall assembly 16 40 41 48 43 52 2 x 5/8" GWB, 2"x4" wood, 24" o.c., fiber batt fill, 1 x 5/8" GWB material #1 t 0.025119 0.0001 7.94E-05 1.58E-05 5.01E-05 6.31E-06 available TL data for comparable assembly: vinyl window (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #2 t 0.005012 0.005012 0.001995 0.000316 2E-05 0.000251 available TL data for comparable assembly: entry door glazing (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #3 t 0.005012 0.005012 0.001995 0.000316 2E-05 0.000251 opening 0 0 0 0 0 0
material #4 t 1 1 1 1 1 1
composite TL 13 14 15 15 15 15
enter desired STC value 14 prospective STC curve -2 7 14 17 18 18 sum of negative differentials -9 differentials 15 7 1 -2 -3 -3 Interior Space Studied: Exterior-to-Interior Scenario: Calculation per Owens Corning NCDG (pg. 16):

Living Room Open Door 68.5 = exterior noise level (dBA CNEL) 6 = approximate net STC of assembly
Room absorption conditions: 3 = incidence adj. ("G+3") per OC NCDG Table 3 length width (hard, standard, soft, very soft?) 4 = source adj. ("F") per OC NCDG Table 4 15 10 0.8 -1 = absorption adj. per OC NCDG Table 5

68.3 = interior noise level (dBA CNEL)
Calculation of net STC:
qty width height square feet description
material or element #1 33
material or element #2 1 3 5 15
material or element #3 1 3 7 21
material or element #4 1 3 7 21
total surface 10 9 90 arbitrary total surface area
TL Data Source 125 250 500 1000 2000 4000
NRC-CNRC IC-IR-761 (p. 25: G16_WS90(406)_MFB90_2G16) exterior wall assembly 16 40 41 48 43 52 2 x 5/8" GWB, 2"x4" wood, 24" o.c., fiber batt fill, 1 x 5/8" GWB material #1 t 0.025119 0.0001 7.94E-05 1.58E-05 5.01E-05 6.31E-06 available TL data for comparable assembly: vinyl window (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #2 t 0.005012 0.005012 0.001995 0.000316 2E-05 0.000251 available TL data for comparable assembly: entry door glazing (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #3 t 0.005012 0.005012 0.001995 0.000316 2E-05 0.000251 opening 0 0 0 0 0 0
material #4 t 1 1 1 1 1 1
composite TL 6 6 6 6 6 6
enter desired STC value 6 prospective STC curve -10 -1 6 9 10 10 sum of negative differentials -10 differentials 16 7 0 -3 -4 -4 Octave Band Center Frequency (OBCF, Hz)
Room dimensions:
exterior wall assembly
vinyl window (dual pane)
entry door glazing (dual pane)
opening
Octave Band Center Frequency (OBCF, Hz)
Room dimensions:
exterior wall assembly
vinyl window (dual pane)
entry door glazing (dual pane)
opening
Octave Band Center Frequency (OBCF, Hz)
Room dimensions:
exterior wall assembly
vinyl window (dual pane)
entry door glazing (dual pane)
opening
printed 6/30/2022 Acoustical Assessment - DRAFT - Appendix D prepared by Dudek

Project #: 13528 Gran Vista Appendix D
Interior Space Studied: Exterior-to-Interior Scenario: Calculation per Owens Corning NCDG (pg. 16):

Living Room Closed Window(s) and Door(s) 68.5 = exterior noise level (dBA CNEL) 35 = approximate net STC of assembly
Room absorption conditions: 3 = incidence adj. ("G+3") per OC NCDG Table 3 length width (hard, standard, soft, very soft?) 4 = source adj. ("F") per OC NCDG Table 4 15 10 0.8 -1 = absorption adj. per OC NCDG Table 5

39.3 = interior noise level (dBA CNEL)
Calculation of net STC:
qty width height square feet description
material or element #1 33
material or element #2 1 3 5 15
material or element #3 2 3 7 42
material or element #4 0
total surface 10 9 90 arbitrary total surface area
TL Data Source 125 250 500 1000 2000 4000
NRC-CNRC IC-IR-761 (p. 25: G16_WS90(406)_MFB90_2G16) exterior wall assembly 16 40 41 48 43 52 2 x 5/8" GWB, 2"x4" wood, 24" o.c., fiber batt fill, 1 x 5/8" GWB material #1 t 0.02512 0.0001 7.9E-05 1.6E-05 5E-05 6.3E-06 available TL data for comparable assembly: vinyl window (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #2 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 available TL data for comparable assembly: entry door glazing (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #3 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 opening 0 0 0 0 0 0
material #4 t 1 1 1 1 1 1
composite TL 19 25 29 37 45 38
enter desired STC value 35 prospective STC curve 19 28 35 38 39 39 sum of negative differentials -11 differentials 0 -3 -6 -1 6 -1 Interior Space Studied: Exterior-to-Interior Scenario: Calculation per Owens Corning NCDG (pg. 16):

Living Room Open Window 68.5 = exterior noise level (dBA CNEL) 13 = approximate net STC of assembly
Room absorption conditions: 3 = incidence adj. ("G+3") per OC NCDG Table 3 length width (hard, standard, soft, very soft?) 4 = source adj. ("F") per OC NCDG Table 4 15 10 0.8 -1 = absorption adj. per OC NCDG Table 5

61.3 = interior noise level (dBA CNEL)
Calculation of net STC:
qty width height square feet description
material or element #1 33
material or element #2 1 3 4 12
material or element #3 2 3 7 42
material or element #4 1 3 1 3
total surface 10 9 90 arbitrary total surface area
TL Data Source 125 250 500 1000 2000 4000
NRC-CNRC IC-IR-761 (p. 25: G16_WS90(406)_MFB90_2G16) exterior wall assembly 16 40 41 48 43 52 2 x 5/8" GWB, 2"x4" wood, 24" o.c., fiber batt fill, 1 x 5/8" GWB material #1 t 0.02512 0.0001 7.9E-05 1.6E-05 5E-05 6.3E-06 available TL data for comparable assembly: vinyl window (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #2 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 available TL data for comparable assembly: entry door glazing (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #3 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 opening 0 0 0 0 0 0
material #4 t 1 1 1 1 1 1
composite TL 13 14 15 15 15 15
enter desired STC value 13 prospective STC curve -3 6 13 16 17 17 sum of negative differentials -6 differentials 16 8 2 -1 -2 -2 Interior Space Studied: Exterior-to-Interior Scenario: Calculation per Owens Corning NCDG (pg. 16):

Living Room Open Door 68.5 = exterior noise level (dBA CNEL) 6 = approximate net STC of assembly
Room absorption conditions: 3 = incidence adj. ("G+3") per OC NCDG Table 3 length width (hard, standard, soft, very soft?) 4 = source adj. ("F") per OC NCDG Table 4 15 10 0.8 -1 = absorption adj. per OC NCDG Table 5

68.3 = interior noise level (dBA CNEL)
Calculation of net STC:
qty width height square feet description
material or element #1 33
material or element #2 1 3 5 15
material or element #3 1 3 7 21
material or element #4 1 3 7 21
total surface 10 9 90 arbitrary total surface area
TL Data Source 125 250 500 1000 2000 4000
NRC-CNRC IC-IR-761 (p. 25: G16_WS90(406)_MFB90_2G16) exterior wall assembly 16 40 41 48 43 52 2 x 5/8" GWB, 2"x4" wood, 24" o.c., fiber batt fill, 1 x 5/8" GWB material #1 t 0.02512 0.0001 7.9E-05 1.6E-05 5E-05 6.3E-06 available TL data for comparable assembly: vinyl window (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #2 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 available TL data for comparable assembly: entry door glazing (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #3 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 opening 0 0 0 0 0 0
material #4 t 1 1 1 1 1 1
composite TL 6 6 6 6 6 6
enter desired STC value 6 prospective STC curve -10 -1 6 9 10 10 sum of negative differentials -10 differentials 16 7 0 -3 -4 -4 entry door glazing (dual pane)
opening
Octave Band Center Frequency (OBCF, Hz)
Room dimensions:

Room dimensions:
opening
Octave Band Center Frequency (OBCF, Hz)
exterior wall assembly
vinyl window (dual pane)
exterior wall assembly
vinyl window (dual pane)
entry door glazing (dual pane)
exterior wall assembly
vinyl window (dual pane)
entry door glazing (dual pane)
opening
Octave Band Center Frequency (OBCF, Hz)
Room dimensions:
printed 6/30/2022 Acoustical Assessment - DRAFT - Appendix D prepared by Dudek

Project #: 13528 Gran Vista Appendix D
Interior Space Studied: Exterior-to-Interior Scenario: Calculation per Owens Corning NCDG (pg. 16):

Bedroom Closed Window(s) and Door(s) 68.5 = exterior noise level (dBA CNEL) 38 = approximate net STC of assembly
Room absorption conditions: 3 = incidence adj. ("G+3") per OC NCDG Table 3 length width (hard, standard, soft, very soft?) 4 = source adj. ("F") per OC NCDG Table 4 10 10 0.8 1 = absorption adj. per OC NCDG Table 5

38.0 = interior noise level (dBA CNEL)
Calculation of net STC:
qty width height square feet description
material or element #1 75
material or element #2 1 3 5 15
material or element #3 0
material or element #4 0
total surface 10 9 90 arbitrary total surface area
TL Data Source 125 250 500 1000 2000 4000
NRC-CNRC IC-IR-761 (p. 25: G16_WS90(406)_MFB90_2G16) exterior wall assembly 16 40 41 48 43 52 2 x 5/8" GWB, 2"x4" wood, 24" o.c., fiber batt fill, 1 x 5/8" GWB material #1 t 0.02512 0.0001 7.9E-05 1.6E-05 5E-05 6.3E-06 available TL data for comparable assembly: vinyl window (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #2 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 available TL data for comparable assembly: entry door glazing (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #3 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 opening 0 0 0 0 0 0
material #4 t 1 1 1 1 1 1
composite TL 17 30 34 42 43 43
enter desired STC value 38 prospective STC curve 22 31 38 41 42 42 sum of negative differentials -10 differentials -5 -1 -4 1 1 1 Interior Space Studied: Exterior-to-Interior Scenario: Calculation per Owens Corning NCDG (pg. 16):

Bedroom Open Window 68.5 = exterior noise level (dBA CNEL) 15 = approximate net STC of assembly
Room absorption conditions: 3 = incidence adj. ("G+3") per OC NCDG Table 3 length width (hard, standard, soft, very soft?) 4 = source adj. ("F") per OC NCDG Table 4 10 10 0.8 1 = absorption adj. per OC NCDG Table 5

61.0 = interior noise level (dBA CNEL)
Calculation of net STC:
qty width height square feet description
material or element #1 75
material or element #2 1 3 4 12
material or element #3 0
material or element #4 1 3 1 3
total surface 10 9 90 arbitrary total surface area
TL Data Source 125 250 500 1000 2000 4000
NRC-CNRC IC-IR-761 (p. 25: G16_WS90(406)_MFB90_2G16) exterior wall assembly 16 40 41 48 43 52 2 x 5/8" GWB, 2"x4" wood, 24" o.c., fiber batt fill, 1 x 5/8" GWB material #1 t 0.02512 0.0001 7.9E-05 1.6E-05 5E-05 6.3E-06 available TL data for comparable assembly: vinyl window (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #2 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 available TL data for comparable assembly: entry door glazing (dual pane) 23 23 27 35 47 36 Viracon 5/8" overall - 1/8" glass + 3/8" airspace + 1/8" glass material #3 t 0.00501 0.00501 0.002 0.00032 2E-05 0.00025 opening 0 0 0 0 0 0
material #4 t 1 1 1 1 1 1
composite TL 13 15 15 15 15 15
enter desired STC value 15 prospective STC curve -1 8 15 18 19 19 sum of negative differentials -12 differentials 14 7 0 -3 -4 -4 Octave Band Center Frequency (OBCF, Hz)
Room dimensions:
exterior wall assembly
vinyl window (dual pane)
entry door glazing (dual pane)
opening
Octave Band Center Frequency (OBCF, Hz)
Room dimensions:
exterior wall assembly
vinyl window (dual pane)
entry door glazing (dual pane)
opening
printed 6/30/2022 Acoustical Assessment - DRAFT - Appendix D prepared by Dudek

Appendix E
Residential HVAC Noise Prediction

Gran Vista Project
SOURCE: Dudek 2021
0 148 296 Feet
Appendix E
Residential HVAC Noise Prediction
Color High Low
80 75
75 70
70 65
65 60
60 55
55 50
50 45
45 40
40 35
35 30
dBA range
Predicted Aggregate Sound
Pressure Level (SPL)