Cities Index.
Item A - TSM Resolution No. 2023-9219 (GPA22-0005 Pico Place)

San Marcos City Council
October 24, 2023

Document
Item A - TSM Resolution No. 2023-9219 (GPA22-0005 Pico Place)
Meeting
October 24, 2023
Body
San Marcos City Council
Pages
5
Original file
102 KB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

RESOLUTION NO. 2023-9219
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN MARCOS APPROVING A TENTATIVE SUBDIVISION MAP TO CONSOLIDATE TWO PARCELS INTO ONE LOT AND CREATE UP TO 16 RESIDENTIAL CONDOMINIUM UNITS IN THE MULTIFAMILY RESIDENTIAL (R-3-6) ZONE TSM22-0005
Pico Investments 7, LLC.

WHEREAS, on December 1, 2022, the City received an application from Pico Investments 7, LLC. requesting a Tentative Subdivision Map to consolidate two parcels into one lot and create up to 16 residential condominium units on a 0.68-acre site located at 236 and 244 Pico Ave in the Multi-Family Residential (R-3-6) Zone in the Richmar Neighborhood more particularly described as:

Brief Legal Description:

Parcel 1:

The Northeasterly 150.00 feet of the Southeasterly 100.00 feet of all that portion of Lot 2, Block 61, Rancho Los Vallecitos De San Marcos, in the City of San Marcos, County of San Diego, State of California, according to the map thereof No. 806, filed in the office of the County Recorder of San Diego County, December 21, 1895, described as follows:

Commencing at the Northeasterly corner of said Lot 2; thence Southwesterly along the Northerly line of said Lot, 573.7 feet to the Northwesterly corner thereof; thence Southeasterly along the Westerly line of said Lot, 362.9 feet to a point; thence Northeasterly parallel with the Northerly line of said Lot 573.7 feet to a point on the Easterly line of said Lot; thence Northwesterly along said Easterly line 362.9 feet to point of commencement.

Parcel 2:

That portion of Lot 2 in Block 61 of Rancho Los Vallecitos De San Marcos, in the City of San Marcos, County of San Diego, State of California, according to Map thereof No. 806, filed in the office of the County Recorder of said San Diego County, December 21, 1895, described as follows:

Beginning at a point on the Easterly line of said Lot 2, distant thereon 362.9 feet Southerly from the most Northerly corner of said Lot 2; thence continuing Southerly along said Easterly line 120 feet; thence Westerly parallel with the Northerly line of said Lot, 120 feet; thence Northerly parallel with the Easterly line of said Lot, 120 feet; thence Easterly parallel with the Northerly line, 120 feet to the point of beginning.

Assessor’s Parcel Numbers: 220-140-16-00, 220-140-05-00, and 220-140-06-00; and WHEREAS, the Tentative Subdivision Map is being requested in conjunction with General Plan Amendment (GPA22-0005) to change the land use of one parcel from “Commercial” to “Medium High Density Residential”; a Rezone (R22-0004) to change the zone of one parcel from Commercial (C) to Multi-Family Residential (R-3-6); and a Multi-Family Site Development Plan (MFS22-0006), which will guide the orderly development of 16 residential condominium units on the project site; and WHEREAS, the Development Services Department did study said request, and recommends approval of said request; and WHEREAS, on August 31, 2023, the City held a public workshop to provide an informational overview of the proposed project to the general public; and WHEREAS, on September 18, 2023, the San Marcos Planning Commission held a duly noticed public hearing and recommended approval of said request and the appropriate environmental document for said request to the City Council by a 7-0 vote, in favor; and WHEREAS, on October 24, 2023, the City Council held a duly noticed public hearing in the manner prescribed by law to consider said request; and WHEREAS, the City Council did review and consider an Mitigated Negative Declaration (ND23-013 / SCH No. 2023070468) for said request pursuant to the California Environmental Quality Act (CEQA); and WHEREAS, the City Council did consider said Tentative Subdivision Map and the recommendation by City staff, including but not limited to the City Engineer, the Director of Public Health, the Director of the Department of Sanitation and Flood Control, and the Chief of the San Marcos Fire Department and Fire Protection District with respect thereto; and WHEREAS, the applicant/developer proposes to file a Final Map of said subdivision.

NOW, THEREFORE, the City Council does hereby resolve as follows:

The foregoing recitals are true and correct, and are hereby incorporated by reference into this Resolution.

The City Council hereby approves this Tentative Subdivision Map pursuant to the City Subdivision Ordinance (SMMC Title 19), and no waiver of any requirement of said Ordinance is intended or implied except as specifically set forth in this resolution, and subject to compliance with the conditions of approval in Exhibit A attached hereto and incorporated by reference and made a part of this Resolution as though fully set forth herein.

This Tentative Subdivision Map is approved in conjunction with the submitted GPA22-0005, R22-0004, MFS22-0006 and all conditions of approval specified in Resolution No. 2023-9218, Ordinance No. 2023-1536, and Resolution No. 2023-9220, respectively, which documents are incorporated herein by this reference; and the mitigation measures in Mitigated Negative Declaration (ND23-013 / SCH No. 2023070468) are hereby incorporated by reference and made a part of this Resolution with the same force and effect as though fully set forth herein.

The City Council’s decision is based on the following findings and determinations:

The conditions of approval in the attached Exhibit A, and the findings below are necessary to insure that the subdivision and the improvements thereof will conform with all ordinances, plans, rules, standards, and improvements and design requirements of the City.

The Tentative Subdivision Map is consistent with the City’s adopted General Plan, in that it provides a Multi-Family development in an area of the City designated for Medium High Density Residential with a density not to exceed 30 du/ac, and is compatible with the objectives, policies, general land uses, and programs specified in the General Plan, in that the project:

Compliments adjacent land uses by considering compatibility of activities, development patterns and architectural character elements and access to various mobility choices. (LU-1.1) Provides a diversity of mixed land uses in strategic locations within the City that place housing adjacent to employment. (LU-1.3) Promotes compact development patterns that reduce air pollution and automobile dependence and facilitate walking, bicycling, and transit use. (LU-2.1) Supports walkable, development along main transit and transportation corridors. (LU-7.1) The design or improvement of the proposed subdivision is consistent with the City’s adopted General Plan, in that the General Plan Amendment (GPA22-0005) expands the existing Medium High Residential Density designation and the project provides for residential development in a density consistent with that designation.

The site is physically suitable for this type of development, in that the site is relatively flat, previously disturbed, and adjacent to existing utilities and public streets already improved to ultimate conditions.

The site is physically suitable for the proposed density of development, in that the project conforms to all relevant development standards of the Multifamily Residential Zone (R-3-6) have been met, pursuant to the conditions of approval of the Multifamily Site Development Plan (MFS22-0006 / Resolution No. PC 23-5058).

The design of this subdivision and improvements is not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat, in that a Mitigated Negative Declaration (ND23-013 / SCH No. 2023070468) was prepared for the project and determined no significant environmental impacts would occur with implementation of mitigation measures incorporated into the resolution.

The design of this subdivision and type of improvements is not likely to cause serious public health problems, in that in that water and sanitary sewer services are provided to the site and the project is required to comply with all applicable federal, state, and local laws regarding the development of the project.

The design of this subdivision or the type of improvements will not conflict with any easements, acquired by the public at large, for access through or use of, property within the proposed subdivision.

The Tentative Subdivision Map, as conditioned, will not be detrimental to the public health, morals, safety, and welfare in that adequate public facilities and infrastructure including fire, water, sewer, and drainage will be provided.

The property is not subject to a Williamson Act contract, an open space easement, a conservation easement, or an agricultural conservation easement.

The design of the subdivision provides, to the extent feasible, for future passive or natural heating or cooling in the subdivision.

The City Council considered the effect of the development on the housing needs of the region and the balancing of those needs against the public service needs of residents and available fiscal and environmental resources.

As a common interest development, prospective buyers will be provided the required notices and reports pursuant to applicable law.

All requirements of CEQA and the environmental protection provision of the City’s Subdivision Ordinance (SMMC Title 19) have been met in that this Tentative Subdivision Map, as conditioned, the project will not have a significant effect on the environment, as reviewed and analyzed in the Mitigated Negative Declaration (ND23-013 / SCH No. 2023070468) and the mitigation monitoring and reporting program, in that mitigation measures related to biological resources, tribal/cultural resources, noise, hazards and hazardous materials, public services have been incorporated into the conditions of approval of this Tentative Subdivision Map (TSM22-0005) and MFS22-0006 (Resolution No. 2023-9220).

This Tentative Subdivision Map is within the scope of the Mitigated Negative Declaration (ND23-013 / SCH No. 2023070468) and the mitigation monitoring and reporting program, and both are hereby recommended to the City Council for adoption pursuant to CEQA.

The Tentative Subdivision Map complies with the requirements of the City’s Subdivision Ordinance and the State’s Subdivision Map Act.

The approval of this Tentative Subdivision Map shall expire within twenty-four (24) months from date of City Council approval. The Final Map, conforming to this conditionally approved Tentative Subdivision Map, shall be filed with the City Council in time so that the Council may approve said map before its expiration, unless prior to that date, the Planning Commission or City Council subsequently grants a time extension for the filing of the Final Map, as provided for in the City’s Subdivision Ordinance and the State’s Subdivision Map Act. It is the applicant/developer’s responsibility to track the expiration date. Failure to request an extension will result in a re-filing of the Tentative Subdivision Map and new processing of the map.

Within thirty (30) days of the approval of the Tentative Subdivision Map (TSM22-0005) the approved plans (i.e.: tentative subdivision map, landscape plans, etc.) shall be submitted as a digital file on a CD including this Resolution as the title page. This title page shall include the statement "I (we), ______ , the applicant/owner(s) or the applicant/owner's representative, have read, understand and agree to the conditions of Resolution No. 2023-9219.” Immediately following this statement shall appear a signature block for the owner or the owner's representative which shall be signed. Signature blocks for the Project Planner and the Project Civil Engineer shall also appear on this title page. The digital copy shall be approved by the City prior to any Final Map, grading plan, improvement plan, or building permit.

The applicant/developer shall comply with all provisions and requirements set forth in the San Marcos Municipal Code, and all City ordinances, resolutions, policies and procedures, and with all applicable state and federal regulations, as may be amended from time to time, whether or not such provisions or requirements have been specifically set forth in these conditions, all of which are now incorporated by reference and made a part of this Resolution with the same force and effect as though fully set forth herein.

The applicant/developer shall comply with all rules, regulations and design requirements of the respective sewer, water, utility, regional, federal or other approving agency regarding the installation, modification, development, improvement or protection of facilities within the boundaries. It shall be the applicant/developer’s responsibility to determine all agencies with rights of approval for the proposed development.

To the extent feasible and as permitted by law, developers and contractors are requested to first consider the use of San Marcos businesses for any supplies, materials, services, equipment needed, and the hiring of local residents to stimulate the San Marcos economy to the greatest extent possible.

To the extent permitted by law, the applicant/developer shall defend and hold the City of San Marcos, its agents and employees harmless from liability from: (i) any and all actions, claims, damages, injuries, challenges and/or costs of liabilities arising from the City's approval of any and all entitlements or permits arising from the project as defined in the conditions of approval, or issuance of grading or building permits; (ii) any damages, liability and/or claim of any kind for any injury to or death of any person, or damage or injury of any kind to property which may arise from or be related to the direct or indirect operations of the applicant/developer or its contractors, subcontractors, agents, employees or other persons acting on applicant/developer's behalf which relate to the project; and (iii) any and all damages, liability and/or claims of any kind arising from operation of the project. The applicant/developer further agrees that such indemnification and hold harmless shall include all defense related fees and costs associated with the defense of City by counsel selected by the City. This indemnification shall not terminate upon expiration of the conditions of approval or completion of the project, but shall survive in perpetuity.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of San Marcos, California, at a regular meeting thereof, held on this 24th day of October, 2023, by the following roll call vote:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS:

APPROVED:

Rebecca D. Jones, Mayor
ATTEST:

Phillip Scollick, City Clerk
Attachment(s):

EXHIBIT A – Conditions of Approval

EXHIBIT A
RESOLUTION No. 2023-9219
TSM22-0005
Conditions of Approval
General Provisions
All of the terms, covenants and conditions contained herein shall run with the land and be binding on and inure to the benefit of the heirs, successors, assigns, and representatives of the applicant/developer as to any and all of the property.

If any of the terms, covenants or conditions contained herein shall fail to occur or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City of San Marcos (City) shall have the right to revoke or modify all approvals herein granted including issuance of building permits; deny or further condition the subsequent approvals that are derived from the approvals herein granted; institute and prosecute litigation to compel compliance with said conditions or see damages for their violation. The applicant/developer shall be notified ten (10) days in advance prior to any of the above actions being taken by the City and shall be given the opportunity to remedy any deficiencies identified by the City.

The applicant/developer shall be responsible for bearing the costs of all grading activities, on-site and off-site improvements, labor, design, mitigation, and other costs associated with, but not limited to, the project’s planning, engineering, construction and/or architecture for the project.

The proposed new development may be subject to the payment of development fees and in-lieu fees as required by the City’s Fee Ordinance at the time an application is submitted or prior to the issuance of permits as determined by the City.

The development must comply with the storm water regulations applicable at the time of approval of the corresponding grading permit application.

All design requirements and mitigation measures of Mitigated Negative Declaration (ND23-013 / SCH No. 2023070468) shall be implemented.

Prior to submittal of any Final Map, the applicant/developer shall comply with the following conditions:

Land Development Division
The Final Map shall show the gross and net acreage of all lots created.

The Final Map shall use the California Coordinate System for its “Basis of Bearing” and express all measured and calculated bearing values in terms of said system. The angle of grid divergence from a true meridian (theta or mapping angle) and the north point of said map shall appear on each sheet thereof. Establishment of said Basis of Bearings may be by use of existing Horizontal Control stations or astronomic observations. “Basis of Bearings” means the source of uniform orientation of all measured bearings shown on the map. Unless otherwise approved, this source will be the California Coordinate System, Zone 6, North American Datum of 1983 (NAD 83).

Lot lines shall be as near radial as possible to street right-of-way at cul-de-sacs and knuckles, and shall not exceed more than ten (10) degrees from radial except as approved by the City Engineer.

Planning Division
The minimum lot size (net) for the residential lot shall be 6,000-square feet per the provisions of the Multifamily Residential (R-3-6) Zone.

Side yards shall have a minimum of three (3) feet of level open space between the building footprint and any slope or retaining wall in conjunction with the required building setback of the applicable Zone.

Prior to or concurrent with the recordation of a Final Map, the applicant/developer shall comply with the following conditions:

Land Development Division
The applicant/developer shall apply for a public improvement permit compliant with SMMC Chapter 14.16. All plans submitted for public improvements shall conform to applicable codes and engineering handouts, unless explicitly superseded by the conditions contained herein. All appropriate fees shall be paid for the processing of the permit.

The applicant/developer shall dedicate to the City 1-foot of right-of-way for Pico Avenue as a public street, utility, and drainage easement; an easement for emergency access purposes; and all other interests in real property required by these conditions and as shown on the tentative map. All property or property interests shall be granted to the City free and clear of all liens and encumbrances and without cost to the City and free of environmental hazards, hazardous materials or hazardous wastes.

The applicant/developer shall also dedicate to the City 3-foot of right-of-way as an irrevocable offer of dedication for public street purposes as shown on the tentative map.

The applicant/developer shall provide a copy of an executed and recorded easement for a minimum 10’ wide private drainage easement to the property owner of APN 220-140-26-00 as shown on the Tentative Map. This easement shall cover the alignment of the bypass storm drain line which benefits the aforementioned property. Any changes in the drain alignment incurred during final engineering will result in an appropriate adjustment to the easement limits and must provide a copy of an amended, executed and recorded private drainage easement.

Prior to the recordation of a Final Map (except maps for financing and conveyance purposes only), the applicant/developer shall not grant any easements over any property subject to a requirement of dedication or irrevocable offer to the City, unless such easements are expressly made subordinate to the easements to be offered for dedication to the City. Prior to granting any of said easements, the applicant/developer shall furnish a copy of the proposed easement to the Land Development Engineer for review and approval.

The Final Map shall include a statement to indicate that all streets, drainage, streetlights, street signage and striping improvements within the interior of this subdivision designated as private shall remain private and be maintained by a homeowners association (HOA).

The applicant/developer shall develop Covenants, Conditions and Restrictions (CC&Rs) for the proposed project to assure the continued maintenance and operation of all open space and common areas, recreational facilities, and private improvements.

At a minimum, the CC&Rs shall describe the property manager and/or HOA maintenance responsibilities, parking restrictions, fuel modification maintenance, water quality Best Management Practices (BMPs), City reporting responsibilities, and any regulatory agency permit responsibilities. The CC&Rs shall include an exhibit and/or written description depicting the HOA maintenance responsibilities.

The applicant/developer shall submit a draft copy of the CC&Rs for review and comment by the City. Final form of the CC&Rs shall be to the satisfaction of the City Attorney. A fully executed copy of the CC&Rs shall be provided to the City for recordation with the Final Map.

The CC&Rs shall include the provision that garages shall be utilized for the parking of vehicles, to be enforced by the HOA.

Maintenance of private open space areas and slopes shall be the responsibility of the HOA. All remaining open space lots, improvements and slopes that the City agrees to maintain must comply with City's criteria for maintenance for the Community Facility District No. 98-02 (Lighting, Landscaping, Open Space and Preserve Maintenance).

If the project is to be phased, a phasing plan shall be submitted and approved by the City Engineer and Planning Division Director prior to approval of the Final Map. The phasing plan may be subject to further conditions. Should the applicant/developer decide to develop phases out of numerical sequence with the approved phasing as shown on the plan, all conditions required of the proceeding phases shall be completed unless otherwise approved by the City Engineer and the Planning Division Director. Other conditions may be imposed by the City Engineer and Planning Division Director to allow out-of-phase construction.

Line of sight easements, if necessary, shall be dedicated on the Final Map and delineated on all improvement and grading plans as approved by the City Engineer. Adequate sight distance for all intersections, driveways and access points shall be provided per latest edition of the California Department of Transportation (Caltrans) Highway Design manual and the American Association of State Highways and Transportation Officials (AASHTO) Geometric Design of Highways and Streets.

The applicant/developer shall enter into a Subdivision Improvement Agreement with the City to complete all required public improvements prior to permit issuance. Securities and applicable fees for the construction of the public improvements shall be submitted to and approved by the City in accordance with SMMC Sections 19.16.070 and 19.16.080.

The applicant/developer shall submit plans and appropriate construction notes for improvement of all streets, right of way and drainage facilities to the City Engineer for approval. Plans shall include all off-site improvements as specified by the City Engineer and as shown on the tentative map and conceptual grading plan, including but not limited to:

Approximately 130-ft of public storm drain within Pico Avenue; Removal of an existing 8-inch public storm drain in Pico Avenue; Replacement in kind of existing curb, gutter, sidewalk, and appurtenant improvements which were removed or damaged; and Replacement and/or reconstruction of pedestrian facilities including pedestrian ramps to meet current Americans with Disability Act (ADA) provisions.

A signage and striping plan shall be included with the improvement plans utilizing Caltrans’ standards and shall be acceptable to the City Engineer.

The design of all private streets and/or drainage systems for this project shall be approved by the City Engineer. The structural section of all private streets shall conform to City standards based on R-value tests. All private streets and/or drainage systems shall be inspected by the City, and the standard plan check fees and inspection fees shall be paid and appropriate bonds shall be posted with the City prior to approval of the Final Map for each Map Unit.

The exact depth of any new or improved street structural section and subgrade requirement shall be determined based on subgrade “R” value tests and the appropriate Traffic Index for the type of street as described in the City's “Urban Street Design Criteria” and “Street Excavation Ordinance”. Tests shall be taken by a qualified engineer at locations approved by the Director of Public Works.

Improvement plans shall delineate street alignments and grades including the change of any existing or proposed street alignments and grades required by the City Engineer and the City’s “Urban Street Design Criteria” in effect at the time of project approval.

If applicable, all utilities fronting, abutting or within the project shall be undergrounded with the exception of sixty-nine (69) KVA or greater power lines. All utility undergrounding must be completed prior to the surfacing of the streets. Undergrounding must accommodate all pad mounted and pedestal equipment consistent with General Plan Goal LU 17.3. Where the underground of such equipment is not possible due to safety or lack of standards for such undergrounding, the applicant/developer shall provide an underground vault, in-building vault room, architecturally integrated screen wall around equipment, or other option approved by the Planning Division Director.

The applicant/developer shall be responsible for acquiring all associated easements required by the utility companies for such work. The permanent placement of large meter services, detector checks, fire hydrants, etc., along circulation element streets shall be placed outside of the ultimate right-of-way and if applicable, trail easement, to avoid reconstruction or modification of same.

The applicant/developer shall comply with all rules, regulations and design requirements of the respective sewer, water, utility, regional, federal or other approving agency regarding the installation, modification, development, improvement or protection of facilities within the project boundaries. It shall be the applicant/developer’s responsibility to determine all agencies with rights of approval for the proposed development.

The applicant/developer shall mitigate for impacts on City services related to emergency response, traffic congestion, landscaping, and infrastructure maintenance. The mitigation shall be met through the execution of applications to annex the real property of the project into the following Community Facilities Districts (CFD):

CFD 98-01: Improvement Area No. 1 (Police Only)
CFD 98-02: Lighting, Landscaping, Open Space and Preserve Maintenance CFD 2001-01: Fire and Paramedic
CFD 2011-01: Congestion Management
No building permit will be issued without receipt of a petition for annexation and consent and waiver executed by the property owners for each of the above-referenced CFDs for the establishment of the special taxes. In lieu of annexation, the applicant/developer may pay a fee for each CFD consentient with the pre-payment option laid out in each CFD formation document. The applicant/developer shall be responsible for compliance with all rules, regulations, policies and practices established by State Law and/or the City with respect to the CFD including, without limitation, requirements for notice and disclosure to future owners and/or residents. (MM PS-1, PS-2, and PS-4) The applicant/developer shall post securities to the City, in amounts approved by the City Attorney and the City Engineer or their designees, for the construction of all public and private improvements including but not limited to the following: grading and erosion control, street improvements, traffic signals, storm drain facilities, water quality BMPs, landscaping, and off-site street repair. Said security shall be in a form acceptable to the City and shall remain in force until completion of the project and final approval by the City. Said security shall insure the construction of the “approved” public improvements within a period to be specified in the Subdivision Improvement Agreement. For grading securities, the City may require 10% of said securities to be in the form of cash.

Prior to issuance of any grading permit or demolition permit for the removal of existing structures, the applicant/developer shall comply with the following conditions.

Land Development Division
The applicant/developer shall submit an application for a grading permit in accordance with SMMC Chapter 17.32 and all related Engineering Division handouts. All applicable fees and securities shall be paid prior to grading permit issuance.

Grading plans and activities shall be based on a comprehensive investigation of surface and subsurface conditions. Results of this investigation and recommendations arising therefrom shall be submitted in the form of a report written by a registered geotechnical engineer or registered engineering geologist.

The applicant/developer shall secure letters of permission from adjacent property owners for all graded slopes crossing property lines. In lieu of such permission, grading plans shall conform to the required grading setbacks as provided in the City’s Grading Ordinance.

Erosion control and/or sediment control details shall be submitted with/on the grading plans to the Land Development Division for review and approval. The details shall conform to City standards, codes and ordinances, and San Diego Regional Water Quality Control Board (SDRWQCB) Municipal Storm Water Permit requirements. The details shall include landscaping and temporary irrigation systems on exposed slopes to be approved by the City Engineer and Planning Division Director.

A hydrology and hydraulic report, including calculations, shall be prepared for the project to determine the existing and post-development runoff for the 100-year storm conditions. Storm drains and drainage structures shall be sized for build-out according to the approved hydrology report. All surface runoff originating within the project and all surface waters that may flow onto the project from adjacent properties shall be accommodated by the drainage system. The report shall also determine the project’s build-out runoff into existing off-site natural drainage swales and storm drain systems, and shall address any need for off-site improvements, including upsizing of existing facilities. Blocking, concentrating, lowering or diverting of natural drainage from or onto adjacent property shall not be allowed without written approval of the affected property owner(s).

The applicant/developer shall be responsible for mitigating impacts created by changes in drainage runoff course, concentration, or quantity to the satisfaction of the City Engineer for both on-site and off-site drainage. This may require the applicant/developer to provide all necessary easements and improvements to accommodate drainage and flood control structures extending beyond the boundaries of the project.

An Encroachment Removal and Maintenance Agreement shall be executed and recorded for the connection of the project’s private storm drain system to the public storm drain in Pico Ave.

The applicant/developer shall execute a “Hold Harmless” Agreement with the City regarding drainage across adjacent property.

A Storm Water Quality Management Plan (SWQMP) shall be submitted in accordance with the most current version of the City adopted BMP design manual and meet the most current requirements of SDRWQCB.

The applicant/developer shall enter into a Storm Water Management and Discharge Control Maintenance Agreement and Easement for the maintenance of all structural post-construction storm water management improvements. The agreement and easement shall be in a form acceptable to the City Attorney.

All construction and grading related Best Management Practices (BMPs) shall be shown in detail on the construction plans submitted to the City for review and approval.

The applicant/developer shall submit “will-serve” letters from all affected public service and utilities agencies prior to issuance of grading permit.

Planning Division
Under separate landscape permit application, the applicant/developer shall submit construction landscape plans to the Planning Division for review and approval per the following requirements:

Final landscape and irrigation plans shall be prepared by a licensed landscape architect.

Separate landscape plans shall be submitted for the on-site (private) landscape areas and the off-site (CFD) landscape areas. CFD landscape plans shall be submitted to the Land Development Division as part of the street improvement plan set. Private landscape plans shall be submitted separately to the Planning Division.

This project is subject to the payment of a landscape permit and inspection fee. The landscape permit and inspection fee shall be four and one-half percent (4.5%) of the landscape architect’s estimate for the completion of all landscaping shown on approved mylars. All submitted estimates shall be stamped and signed by the landscape architect, and estimate the cost of plant and irrigation materials only.

Landscape plans shall contain a mixture of trees, shrubs, and ground cover, and be provided with an irrigation system. The irrigation system shall include an automatic rain sensor switch, master valve, stainless steel enclosure for the backflow device, and stainless steel controller cabinet if in public view. The irrigation system shall be designed to prevent water run-off onto the sidewalk or street. The landscape plan shall list the quantities of each plant type, including a legend indicating what each symbol represents; height and spread of trees (in accordance with City Minimum Tree Standards handout, City Council Resolution 2001-5747); and method of installation and irrigation.

The landscape plans, including plant material and irrigation design, shall comply with the City’s landscape water efficiency ordinance, SMMC Chapter 20.330, in addition to State of California water efficiency requirements.

All permanent Best Management Practices (BMPs) per the approved grading plan shall be shown on the landscape plans. Landscape plans shall be reviewed and signed by the engineer-of-work that the proposed landscape design complies with the requirements of the Storm Water Quality Management Plans (SWQMP).

The applicant/developer shall submit a fencing plan, in conjunction with the landscape plan, which proposes a consistent type and style of fences and/or walls. The fencing plan shall include decorative fencing with a detail of each proposed fence/wall type, and shall not include chain link fencing. Pilasters shall be located at the corners of all wall segments and additional pilasters shall be spaced evenly on wall segments between corners.

Landscaping for the proposed project shall avoid the use of invasive plant species. Invasive plants shall be those identified on Lists A and B of the California Exotic Plant Council’s List of Exotic Plants of Greatest Ecological Concern in California, as of October 1999, and updated if applicable.

The landscape permit shall require that prior to installation, the proposed plants shall be inspected and approved by the Planning Division for plant quality and compliance with minimum size requirements. The placement of plants shall be installed in accordance with the approved landscape plans. Upon completion of installation, all landscaping/irrigation shall be inspected and approved by the Planning Division. The applicant/developer shall be responsible to contact the Planning Division for landscaping inspections.

The applicant/developer shall submit conceptual architectural elevations with a minimum of three (3) distinct architectural styles for each floor plan to the Planning Division for architectural review and approval prior to issuance of grading permit. Typical features associated with the architectural style shall be represented on all sides of the building. In addition, each architectural style shall have additional enhancements on the front building elevation. The proposed residences shall be architectural compatible with each other and the surrounding neighborhood. The submittal shall include a color/materials board for the proposed residences.

All exposed retaining walls shall be constructed of earth tone colored keystone, split-face, or similar textured block. The applicant/developer shall submit a material sample to the Planning Division for review and approval prior to issuance of grading permit.

If proposed for grading operations, the use of a rock crusher(s) on site shall require approval of a Conditional Use Permit (CUP) prior to issuance of grading permit.

The applicant/developer shall comply with the following conditions regarding cultural resources:

Pre-Excavation Agreement: Prior to the issuance of a Grading Permit, or ground disturbing activities, the Applicant/Owner shall enter into a Tribal Cultural Resources Treatment and Repatriation Agreement (Pre-Excavation Agreement) with a Traditionally and Culturally Affiliated Native American Tribe (TCA Tribe), identified in consultation with the City. The purpose of the Pre-Excavation Agreement shall be to formalize protocols and procedures between the Applicant/Owner and the TCA Tribe for the protection, treatment, and repatriation of Native American human remains, funerary objects, cultural and/or religious landscapes, ceremonial items, traditional gathering areas, and other tribal cultural resources. Such resources may be located within and/or discovered during ground disturbing and/or construction activities for the proposed project, including any additional culturally appropriate archaeological studies, excavations, geotechnical investigations, grading, preparation for wet and dry infrastructure, and other ground disturbing activities. Any project-specific Monitoring Plans and/or excavation plans prepared by the project archaeologist shall include the TCA Tribe requirements for protocols and protection of tribal cultural resources that were agreed to during the tribal consultation.

The landowner shall relinquish ownership of all non-burial related tribal cultural resources collected during construction monitoring and from any previous archaeological studies or excavations on the project site to the TCA Tribe for proper treatment and disposition per the Pre-Excavation Agreement, unless ordered to do otherwise by responsible agency or court of competent jurisdiction. The requirement and timing of such release of ownership, and the recipient thereof, shall be reflected in the Pre-Excavation Agreement. If the TCA Tribe does not accept the return of the cultural resources, then the cultural resources will be subject to curation. (MM CUL-1) Construction Monitoring: Prior to the issuance of a Grading Permit or ground disturbing activities, the Applicant/Owner or Grading Contractor shall provide written documentation (either as signed letters, contracts, or emails) to the City’s Planning Division stating that a Qualified Archaeologist and Traditionally and Culturally Affiliated Native American monitor (TCA Native American monitor) have been retained at the Applicant/Owner or Grading Contractor’s expense to implement the construction monitoring program, as described in the Pre-Excavation Agreement.

The Qualified Archaeologist and TCA Native American monitor shall be invited to attend all applicable pre-construction meetings with the General Contractor and/or associated subcontractors to present the construction monitoring program. The Qualified Archaeologist and TCA Native American monitor shall be present on site during grubbing, grading, trenching, and/or other ground disturbing activities that occur in areas of native soil or other permeable natural surfaces that have the potential to unearth any evidence of potential archaeological resources or tribal cultural resources. In areas of artificial paving, the Qualified Archaeologist and TCA Native American monitor shall be present on site during grubbing, grading, trenching, and/or other ground disturbing activities that have the potential to disturb more than six inches below the original pre-project ground surface to identify any evidence of potential archaeological or tribal cultural resources. No monitoring of fill material, existing or imported, will be required if the General Contractor or developer can provide documentation to the satisfaction of the City that all fill materials being utilized at the site are either: 1) from existing commercial (previously permitted) sources of materials; or 2) are from private or other non-commercial sources that have been determined to be absent of tribal cultural resources by the Qualified Archaeologist and TCA Native American monitor.

The Qualified Archaeologist and TCA Native American monitor shall maintain ongoing collaborative coordination with one another during all ground disturbing activities. The requirement for the construction monitoring program shall be noted on all applicable construction documents, including demolition plans, grading plans, etc. The Applicant/Owner or Grading Contractor shall provide written notice to the Planning Division and the TCA Tribe, preferably through e-mail, of the start and end of all ground disturbing activities.

Prior to the release of any grading bonds, or prior to the issuance of any project Certificate of Occupancy, an archaeological monitoring report, which describes the results, analysis, and conclusions of the construction monitoring shall be submitted by the Qualified Archaeologist, along with any TCA Native American monitor’s notes and comments received by the Qualified Archaeologist, to the Planning Division Director for approval. Once approved, a final copy of the archaeological monitoring report shall be retained in a confidential City project file and may be released, as a formal condition of Assembly Bill (AB) 52 consultation, to consulting Tribes or any parties involved in the project specific monitoring or consultation process. A final copy of the report, with all confidential site records and appendices, will also be submitted to the South Coastal Information Center after approval by the City. (MM CUL-2) Unanticipated Discovery Procedures: Both the Qualified Archaeologist and the TCA Native American monitor may temporarily halt or divert ground disturbing activities if potential archaeological resources or tribal cultural resources are discovered during construction activities. Ground disturbing activities shall be temporarily directed away from the area of discovery for a reasonable amount of time to allow a determination of the resource’s potential significance. Isolates and clearly non-significant archaeological resources (as determined by the Qualified Archaeologist, in consultation with the TCA Native American monitor) will be minimally documented in the field. All unearthed archaeological resources or tribal cultural resources will be collected, temporarily stored in a secure location (or as otherwise agreed upon by the Qualified Archaeologist and the TCA Tribe), and repatriated according to the terms of the Pre-Excavation Agreement, unless ordered to do otherwise by responsible agency or court of competent jurisdiction.

If a determination is made that the archaeological resources or tribal cultural resources are considered potentially significant by the Qualified Archaeologist, the TCA Tribe, and the TCA Native American monitor, then the City and the TCA Tribe shall determine, in consultation with the Applicant/Owner and the Qualified Archaeologist, the culturally appropriate treatment of those resources.

If the Qualified Archaeologist, the TCA Tribe, and the TCA Native American monitor cannot agree on the significance or mitigation for such resources, these issues will be presented to the Planning Division Director for decision. The Planning Division Director shall make a determination based upon the provisions of CEQA and California Public Resources Code Section 21083.2(b) with respect to archaeological resources and California Public Resources Section 21704 and 21084.3 with respect to tribal cultural resources, and shall take into account the religious beliefs, cultural beliefs, customs, and practices of the TCA Tribe.

All sacred sites, significant tribal cultural resources, and/or unique archaeological resources encountered within the project area shall be avoided and preserved as the preferred mitigation. If avoidance of the resource is determined to be infeasible by the City as the Lead Agency, then the City shall require additional culturally appropriate mitigation to address the negative impact to the resource, such as, but not limited to, the funding of an ethnographic study and/or a data recovery plan, as determined by the City in consultation with the Qualified Archaeologist and the TCA Tribe. The TCA Tribe shall be notified and consulted regarding the determination and implementation of culturally appropriate mitigation and the drafting and finalization of any ethnographic study and/or data recovery plan, and/or other culturally appropriate mitigation. Any archaeological isolates or other cultural materials that cannot be avoided or preserved in place as the preferred mitigation shall be temporarily stored in a secure location on site (or as otherwise agreed upon by the Qualified Archaeologist and TCA Tribe), and repatriated according to the terms of the Pre-Excavation Agreement, unless ordered to do otherwise by responsible agency or court of competent jurisdiction. The removal of any artifacts from the project site will be inventoried with oversight by the TCA Native American monitor.

If a data recovery plan is authorized as indicated above and the TCA Tribe does not object, then an adequate artifact sample to address research avenues previously identified for sites in the area will be collected using professional archaeological collection methods. If the Qualified Archaeologist collects such resources, the TCA Native American monitor must be present during any testing or cataloging of those resources. Moreover, if the Qualified Archaeologist does not collect the cultural resources that are unearthed during the ground disturbing activities, the TCA Native American monitor may, at their discretion, collect said resources for later reburial or storage at a local curation facility, as described in the Pre-Excavation Agreement.

In the event that curation of archaeological resources or tribal cultural resources is required by a superseding regulatory agency, curation shall be conducted by an approved local facility within San Diego County and the curation shall be guided by California State Historical Resources Commission’s Guidelines for the Curation of Archaeological Collections. The City shall provide the Applicant/Owner final curation language and guidance on the project grading plans prior to issuance of the grading permit, if applicable, during project construction. The Applicant/Owner shall be responsible for all repatriation and curation costs and provide to the City written documentation from the TCA Tribe or the curation facility, whichever is most applicable, that the repatriation and/or curation have been completed. (MM CUL-3) Human Remains: As specified by California Health and Safety Code Section 7050.5, if human remains, or remains that are potentially human, are found on the project site during ground disturbing activities or during archaeological work, the person responsible for the excavation, or his or her authorized representative, shall immediately notify the San Diego County Medical Examiner’s Office by telephone. No further excavation or disturbance of the discovery or any nearby area reasonably suspected to overlie adjacent remains (as determined by the Qualified Archaeologist and/or the TCA Native American monitor) shall occur until the Medical Examiner has made the necessary findings as to origin and disposition pursuant to Public Resources Code 5097.98.

If such a discovery occurs, a temporary construction exclusion zone shall be established surrounding the area of the discovery so that the area would be protected (as determined by the Qualified Archaeologist and/or the TCA Native American monitor), and consultation and treatment could occur as prescribed by law. As further defined by State law, the Medical Examiner will determine within two working days of being notified if the remains are subject to his or her authority. If the Medical Examiner recognizes the remains to be Native American, and not under his or her jurisdiction, then he or she shall contact the Native American Heritage Commission by telephone within 24 hours. The Native American Heritage Commission will make a determination as to the Most Likely Descendent, who shall be afforded 48 hours from the time access is granted to the discovery site to make recommendations regarding culturally appropriate treatment.

If suspected Native American remains are discovered, the remains shall be kept in situ (in place) until after the Medical Examiner makes its determination and notifications, and until after the Most Likely Descendent is identified, at which time the archaeological examination of the remains shall only occur on site in the presence of the Most Likely Descendent. The specific locations of Native American burials and reburials will be proprietary and not disclosed to the general public. According to California Health and Safety Code, six or more human burials at one location constitute a cemetery (Section 8100), and disturbance of Native American cemeteries is a felony (Section 7052). In the event that the Applicant/Owner and the Most Likely Descendant are in disagreement regarding the disposition of the remains, State law will apply, and the mediation process will occur with the NAHC. In the event that mediation is not successful, the landowner shall rebury the remains at a location free from future disturbance (see Public Resources Code Section 5097.98(e) and 5097.94(k)). (MM CUL-4) No grubbing, trimming, or clearing of vegetation from the project site shall occur during the general bird breeding season (February 1 to September 15) to prevent potential impacts to nesting birds, including raptors. If grubbing, trimming, or clearing of vegetation cannot feasibly occur outside the general bird breeding season, a qualified biologist, as approved by the City of San Marcos, shall perform a preconstruction nesting bird survey no more than 72 hours before the start of vegetation grubbing, trimming, or clearing to determine if active bird nests are present in the affected areas and must be submitted to the Planning Division to verify there are no active nests on the subject property. If one or more active nests are found during the pre-construction survey, the area shall be flagged and mapped on the construction plans along with a minimum of a 25-foot buffer and up to a maximum buffer of 300 feet for raptors, or as determined by the project biologist, and shall be avoided until the nesting cycle is complete. If no nesting birds (including nest building or other breeding or nesting behavior) are on the project site, grubbing, trimming, or clearing shall proceed. When construction occurs during the bird breeding season, a qualified biologist shall conduct a weekly nest survey of the area within 100 feet of construction to survey for nesting migratory birds and raptors. (MM BIO-1) Prior to the issuance of any Grading or Demolition Permit to allow for the removal or demolition of trees and existing structures within the survey area, a qualified monitoring biologist shall conduct clearance surveys to flush out any wildlife species nesting, roosting, or otherwise occupying the trees or structures. If wildlife species are encountered within any of the trees or structures (outside the general bird nesting season), the qualified monitoring biologist shall remove them, if possible, or provide them with a means of escape and allow the species to disperse. If tree-roosting bats are suspected, slow removal by gently pushing the tree over with heavy equipment is required. (MM BIO-2) Prior to demolition of the existing structures on the project site, a hazardous materials evaluation shall be conducted. If hazardous materials, such as lead and/or asbestos, are found to be present in the structures, the applicant shall ensure the proper handling and disposal of hazardous materials occurs prior to demolition of the structures. (MM HAZ-1) For construction activities within 180 feet of sensitive receptors, the construction contractor shall implement the following measures:

The construction contractor shall provide written notification to the daycare center at least 3 weeks prior to the start of construction activities, informing them of the estimated start date and duration of construction activities. This notification shall include information warning the potential for impacts related to vibration-sensitive equipment. The City shall provide a phone number for the affected businesses to call if they have vibration-sensitive equipment on their sites.

Construction activities that could generate high noise levels within 180 feet of the daycare center (such as simultaneous use of multiple pieces of equipment in one area) or high vibration levels within 60 feet (such as use of a vibratory roller) shall be scheduled during times that would have the least impact on learning. This could include restricting construction activities in the areas of potential impact, such as limiting activity during typical quiet time hours at the daycare center.

Stationary construction noise sources, such as temporary generators, shall be placed more than 180 feet from nearby noise-sensitive receptors, whenever feasible.

Trucks shall be prohibited from idling along streets serving the construction site where noise-sensitive residences are.

Construction equipment shall be outfitted with properly maintained, manufacturer approved, or recommended sound abatement means on air intakes, combustion exhausts, heat dissipation vents, and interior surfaces of engine hoods and power train enclosures.

Construction laydown and vehicle staging areas shall be positioned (to the extent practical) as far from noise-sensitive land uses as feasible.

Simultaneous operation of construction equipment shall be limited, or construction time shall be limited to within an hour to reduce the hourly average noise level.

Temporary noise barriers shall be installed around the southern and western perimeters of the construction area to minimize construction noise. (MM NOI-1) Building Division
If the project is to be phased, the applicant/developer shall submit a phasing plan to the Building Division for review and approval.  Said phasing plan shall graphically depict the order in which the buildings (including models) will be occupied and depict which public and private infrastructure and amenities will be completed prior to each building occupancy.  Once approved, any deviations from the phasing plan must be reviewed and approved by the Building Division, Planning Division, Land Development Division, Fire Department and the Public Works Construction Inspection Division.

The project is subject to the approval of the applicable water/sewer district(s) for water and sewer services and all applicable fees and charges shall be paid to the satisfaction of the water/sewer district(s) prior to issuance of grading or building permit.

The applicant/developer shall obtain a demolition permit from the Building Division prior to demolition of the existing structures on site.

Fire Department
Fire apparatus access roads shall have an unobstructed improved width of not less than 24 feet (curb line to curb line), and an unobstructed vertical clearance of not less than 13 feet 6 inches. Access roads shall be all weather surface and designed to support imposed loads of not less than 75,000 pounds in accordance with California Fire Code (CFC) Section 503.2.1, SMMC Section 17.64.120. For single-family residential driveways serving no more than one single-family dwelling, access roads shall have minimum width of 16 feet (curb line to curb line).

All roads in the project shall have adequate turn radius to accommodate all Fire Department apparatus including frontline and reserve fire engines and frontline and reserve trucks (engine and tiller ladder trucks). The required inside turn radius shall be 28 feet for engine and tiller ladder truck. No curb deflection or other features shall interfere with fire apparatus ability to navigate any street. The Land Development Division shall maintain the proper templates for turn radius of all Fire Department apparatus.

Prior to issuance of any building permit, the applicant/developer shall comply with the following conditions:

Land Development Division
The Final Map shall be recorded prior to building permit issuance.

The approved precise grading plans shall be attached to the building plans.

Prior to submittal of any building plans, the grading and public improvement plan sets shall be submitted for the second plan check and deemed substantially complete by the Land Development Engineer. Prior to issuance of any building permits, the public improvement plans shall be approved by the City Engineer and appropriate securities accepted.

All public improvements required at the time of subdivision and/or development shall be under construction to the satisfaction of the City Engineer prior to the issuance of the first production building permit, excluding retaining wall permits and model units.

All grading shall be observed by a licensed geotechnical engineer, who shall prepare a written report to the satisfaction of the City Engineer certifying that the work has been performed in compliance with the recommendations contained within the geotechnical report and on the approved project plans. If not so done, the report shall describe the actual work performed and any deficiencies observed. The final report shall specifically detail conditions and remedial work performed that was not specifically identified in the initial report of subsurface conditions.

A certification of line and grade for the building pad, signed and stamped by the engineer of work, shall be provided to the Engineering Inspector. The certification shall be in a form acceptable to the City Engineer.

Planning Division
All exterior lighting shall comply with City standards for high energy-efficient fixtures, except for low-wattage architectural lighting. All exterior fixtures shall be approved by the City.

All exterior lighting shall use cut-off fixtures and shielded in order to direct the illumination downward and reduce the visibility of any glare.

Residential structures shall comply with the California Building Code regarding interior noise levels for residential dwelling units.

All tot lot recreational amenities and playground equipment shall comply with all C.P.S.C. and A.D.A. accessibility standards. Plans shall include a detail of each of the play areas with the proposed play equipment and specifications of said equipment. Final design shall be approved by the Parks and Recreation Director and Planning Division Director.

Building Division
New buildings and remodeled structures shall be designed to conform to the latest design standards adopted by the State of California in the California Building Code (CBC), Part 2, Title 24, California Code of Regulations.

Building plans and instruments of service submitted with a building permit application shall be signed and sealed by a California licensed design professional as required by the State Business and Professions Code.

The City is located in Seismic Design Category “D”. Buildings and structures shall be designed to adequately transmit the dynamic lateral forces in accordance with the requirements of the latest adopted California Building Code.

The proposed development shall comply with the latest adopted California Green Building Code Standards. The City has adopted the mandatory standards and does not enforce the voluntary standards.

Residential structures shall be designed to comply with the crime prevention measures approved by the City, including such items as: reinforced door jambs; one-piece door stops; 16-gauge strike plate for deadbolts; locking hardware for garage doors; two locking devices for wide garage doors; 1-3/4 inch solid exterior doors; laminated safety glass; wide-angle peep hole for exterior doors; no louvered windows; and address numbers easily visible from the street.

The project shall comply with the latest Federal Law, Americans with Disabilities Act, and State Law, California Code of Regulations, Title 24, for accessibility standards.

Health and Safety Code Section 17959.6 requires developers of new residential housing developments to provide buyers with a list of specified universal accessibility features that would make specific areas of the home accessible to persons with disabilities. The applicant/developer shall indicate which features are standard, limited, optional, or not available, and the point of construction by which they must be requested.

The applicant/developer shall comply with the City’s Inclusionary Housing Ordinance that is in effect at the time of building permit issuance.

The applicant/developer shall pay Public Facilities Fees as established by the latest adopted Public Facilities Fee, based on the proposed land use, and shall be paid prior to the issuance of the first permit for the development.

The project is subject to the payment of school fees as required by law. The applicant/developer shall submit a Certificate of Compliance from the school district prior to the issuance of the first building permit from the City. (MM PS-3) Roof drain systems shall be designed for 3-inches of rainwater per hour. Rain gutters, down drains and other devices shall be installed to prevent erosion at the point of discharge and shall discharge to landscaped areas when feasible. Interceptor drains, yard drains and drainage devices shall be installed to mitigate erosion and create positive drainage away from foundations. Roof drainage shall comply with the City’s storm water management measures.

The applicant/developer shall contact the Delivery Retail Analyst for the branch of the U.S. Postal Service to determine the type and location of centralized delivery equipment required.

A phasing plan shall be submitted to Development Services Department for review and approval prior to the issuance of any building permits for projects with phased construction. The phasing plan shall identify the extent of on-site and off-site improvements and the location of all buildings in each phase. Occupancies shall not be approved until the City and other agencies have accepted the improvements in compliance with these conditions of approval.

Sewer and water utilities shall be located wholly on the lot that serves the building in accordance with the latest adopted edition of the California Plumbing Code.

Fire Department
Any new development which necessitates updating of emergency response maps by virtue of new structures, hydrants, roadways or similar features, shall be required to provide map updates. The applicant/developer shall provide a copy of building plans in Geo-Referenced format to be used by the Fire Department for pre-fire planning purposes.

The project shall include an automatic fire extinguishing system in accordance with the latest adopted California Building Code, California Residential Code and/or San Marcos Fire Code Ordinance. Fire suppression systems shall conform to the standards adopted by the National Fire Protection Association and the San Marcos Fire Marshal.

New dwellings shall be designed using State Fire Marshal standards for fire resistive construction features per 2016 CBC, Chapter 7A.  Ember resistant style vents shall be installed.

The applicant/developer shall provide a Construction Staging/Site Phasing Plan for approval prior to permit issuance.

A lighted directory map, meeting current Fire Department standards, shall be installed at each driveway entrance to new multiple unit residential projects.

During the grading and construction phase, the applicant/developer shall comply with the following conditions:

Construction Engineering Inspection Division
Prior to any construction activities, a pre-construction meeting shall be held with the Public Works Construction Engineering Inspection Division.  The applicant/developer shall provide the inspector with a detailed construction schedule which depicts when building occupancy or occupancies will occur and when key public and private infrastructure improvements will be completed.   Schedule updates shall be provided to the Building and Engineering Inspectors at a minimum monthly basis throughout the life of the project.

Grading, excavation or other related earth moving operations, including warm-up and maintenance activities, shall be limited to the hours of 7:00 a.m. to 4:30 p.m., Monday through Friday. No work shall be allowed on Saturdays, Sundays and holidays.

During construction activities, the applicant/developer shall maintain public and private driveway and/or road access to neighboring properties at all times unless previous arrangements have been made with the private parties affected. Copies of said agreements shall be provided to the City Engineer.

The applicant/developer shall submit a traffic control plan to the Engineering Inspector for all phases of construction for approval by the City Engineer. Said plan shall include all traffic control devices including traffic signals as required.

Construction haul routes must be designed to avoid noise sensitive uses (e.g., residences, convalescent homes, etc.), to the extent feasible.

At the discretion of the Engineering Inspector, the applicant/developer shall document the pre-construction condition of existing roads or offsite properties which may be impacted by construction activities. The applicant/developer shall be responsible in repairing any construction related damages prior to occupancy.

A Right-of-Way permit shall be required prior to commencement of any work within the City right-of-way.

The applicant/developer shall implement and maintain storm water pollution prevention measures as required on the approved plans. Violations of the City’s Storm Water Management Ordinance (SMMC Chapter 14.15) will result in Stop Work Orders, Notices of Violations and/or citations with fines. Work on the project may be delayed until the City determines that compliance with storm water requirements has been achieved.

Planning Division
At least one copy of the approved plans, approval letters and conditions of approval shall be available for review at the job site at all times.

Landscaping of slopes, in accordance with the approved landscape plans, shall commence at time of completion of grading activities.

The project shall comply with Regional Air Quality Standards.

Building Division
The applicant/developer shall obtain the required OSHA permits for blasting, construction, demolition, excavation, grading operations, rock drilling and the construction of buildings over 3 stories in height in accordance with the California Code of Regulations, Title 8, Section 1503.

Water wells shall be reconstructed or abated in strict compliance with SMMC Sections 8.44.130 through 8.44.170 and the latest adopted State Water Code and Health and Safety Code Section 24400. Water well permits are issued by County of San Diego Environment Health Department.

Dust and dust producing materials shall be controlled within the maximum acceptable concentrations for silica and silicates in accordance with the California Code of Regulations, Title 8, Section 5155. Water and dust palliative shall be used to prevent excessive dust during blasting, construction and grading operations. The project is required to comply with the Air Pollution Control District’s standards for mitigating fugitive dust during all phases of construction.

The demolition of buildings shall not commence until the proper testing of asbestos, lead paint and hazardous materials has been performed and the abatement of the hazardous materials has been completed. The recycling of materials shall comply with state law and all utilities shall be disconnected and safely abandoned.

All construction operations authorized by building permits, including the delivery, setup and use of equipment must be conducted on premises during the hours of 7:00 AM and 6:00 PM on Monday through Friday, and on Saturday between 8:00 AM and 5:00 PM. No work shall be conducted on Sundays or Holidays observed by the City. Failure to comply will result in the issuance of STOP WORK NOTICES, REVOCATION OF PERMITS and the issuance of citations and fines as appropriate. Citation for hours of work violations requires a mandatory court appearance in North County Superior Court.

During construction the applicant/developer shall implement and maintain the storm water pollution prevention measures as required on the approved plans. Violations of the City’s Storm Water Management Ordinance will result in Stop Work Orders, Notices of Violation and citations with fines. Work on the project may be delayed until the City determines that the project is in compliance with the storm water requirements.

Fire Department
Prior to the delivery of combustible building construction materials to the project site, the following conditions shall be completed to satisfaction of the Fire Department: 1) fire hydrants(s) shall be installed, approved, and usable, and 2) fire lane or access roads shall be in place and provide a permanent all weather surface for emergency vehicles that support weight of fire apparatus (75,000 lbs.).

Prior to the occupancy of any structure, the applicant/developer shall comply with the following conditions:

Land Development Division
All improvements including underground conversion of overhead utilities shall be completed in accordance with the approved project plans prior to issuance of the first market rate Certificate of Occupancy.

All applicable easements, covenants, and agreements shall be recorded prior to occupancy if not required sooner by these conditions.

Prior to the issuance of any certificates of use and occupancy, the applicant/developer shall provide evidence to the Building Official, that the Department of Real Estate has been notified that the project area is within the boundaries of a Community Facilities District (CFD), and will be subject to special taxes for public facilities and/or services.

Redline As-Built drawings shall be submitted to the Engineering Division for review and approval. Record drawing mylar plans shall be submitted and approved prior to the release of any project securities.

Any existing broken pavement, concrete curb, gutter or sidewalk or any other facilities damaged during construction of the project, shall be repaired or replaced as directed by the Public Works Inspector.

Water and sewer improvements in accordance with the project water/sewer study shall be constructed for the project as determined necessary by the applicable water/sewer district(s).

Planning Division
All landscaping shall be installed, inspected, and approved by the Planning Division. Landscaping shall be established and flourishing in a healthy manner.

Common landscape areas shall not be transferred over to the responsibility of the HOA until inspected and approved by the City.

All CFD landscaping shall be installed, inspected, and approved by the Public Works Department. Landscaping shall be established and flourishing in a healthy manner.

Landscape maintenance for publicly dedicated open space, multi trail systems, and parks shall be accomplished by the applicant/developer or HOA for a minimum period of two (2) years, which may be extended at the sole discretion of the City, until such time as accepted by the City. Prior to acceptance by the City, the applicant/developer shall be required to submit a detailed irrigation and maintenance schedule and a detailed estimate of the anticipated annual costs for maintenance and utilities. The purpose of this provision is to ensure that landscaping is well established and thriving prior to the City accepting maintenance responsibilities. As a condition to begin this period, the applicant/developer shall provide the City with a signed copy of the maintenance contract to cover the two-year requirement and also provide the City with a Maintenance Bond to cover 150% of the maintenance contract amount.

The applicant/developer shall submit a Certificate of Completion by the landscape architect and engineer-of-work to the Planning Division certifying that the plant materials and irrigation system have been installed in accordance with the approved landscape plans and the Water Quality Technical Report, respectively.

The applicant/developer shall have completed the installation of the playground equipment and outdoor furniture in accordance with the manufacturer’s standards. The applicant/developer shall submit for each phase a letter by the installation contractor indicating that the playground equipment has been installed per the manufacturer’s specifications.

The applicant/developer shall disclose to future owners/tenants of the project that the property is located within the Airport Influence Area of McClellen-Palomar Airport, and may be subject to some of the annoyances or inconveniences, if any, associated with proximity to airport operations (i.e.: noise, vibration, or odors). Disclosure shall be recorded with the County Recorder’s Office prior to building occupancy.

Building Division
The applicant/developer shall obtain approval from all City departments and other agencies before requesting a Certificate of Occupancy from the Building Official. For phased developments, the conditions of approval shall be satisfied prior to requesting the first occupancy in the phase.

Fire Department
Building addresses shall be clearly labeled for day and nighttime emergency responses. In addition, adequate lighting shall be provided to deter potential criminal activities (i.e.: vehicle burglaries, prowlers, loitering, etc.).

The applicant/developer shall comply with the Fire Department for hydrants and on-site access for emergency vehicles.

The project shall include “NO PARKING FIRE LANE” signs. The number of, placement and wording for all fire lane signs and/or red curbs shall be as required by California Vehicle Code Sections 22500.l and 22658(a) and San Marcos Fire Department Standards.

Resolution No. 2023-9219
TSM22-0005
October 24, 2023

Page 5 of 30 ends
← All documents from this meeting