Prepared For Prepared By
AOA San Marcos, LLC
709 Randolph Avenue
Costa Mesa, CA 92626
CR Associates
3900 Fifth Avenue, Suite 310
San Diego, CA 92103
SAN MARCOS ARTIST’S
VILLAGE
MAY 2023
FINAL
Local Transportation Analysis
San Marcos Artist’s Village Project
Local Transportation Analysis
ES-1
Executive Summary
Project Setting and Description
The Project is a mixed-use development on 11.08 acres (5.03 acres of residential uses and 6.05 acres of office/retail uses) located at the northwest corner of Linda Vista Road and Grand Avenue in the City of San Marcos. The Project proposes to construct 102 multi-family dwelling units (on west end of project) as well as 7 live/work units (on east end of project) on approximately 5.03 acres.
Live/work units are units consisting of a residential and commercial/office component, where a resident is able to both live and work. Additionally, the Project proposes to construct 7,658 square feet (SF) of office space and 49,266 SF of specialty retail space on approximately 6.05 acres. It should be noted that the office space is intended for single tenant and the retail space is not intended to be occupied by grocery store uses or similar uses.
The property is bordered by Grand Avenue on the northeast side, Linda Vista Road on the southeast side, and industrial land uses to the west. Per the City’s General Plan, the site is designated as a Commercial (C) land use and thus the Project, being a mixed-use development, is inconsistent with the General Plan and zoning designation. However, the project applicant is processing a General Plan Amendment (GPA) to adjust the zoning to “Mixed-Use” in order to be consistent with the General Plan. The Project’s assumed opening year is Year 2024.
The Project will provide the following four new side-street stop-controlled driveways and roadway improvements:
Project Driveway #1 – This new, full-access driveway will be located approximately 900 feet northwest of Linda Vista Drive
Project Driveway #2 – This new, full-access driveway will be located approximately 300 feet northwest of Linda Vista Drive
Project Driveway #3 – This new, full-access driveway will be located approximately 700 feet southwest of Grand Avenue
Project Driveway #4 – This new, full-access driveway will be located approximately 250 feet southwest of Grand Avenue
Construction of raised median at Grand Avenue along Project Frontage. Median breaks will be present to allow for full access of the driveways along Grand Avenue.
Based on the preliminary review of the project site plan, the Project would not conflict with existing or planned transit, bicycle, or pedestrian facilities. The Project will construct a landscaped buffer and a Class I bike path with a separate pedestrian path adjacent to it along the segments of Linda Vista Drive and Grand Avenue fronting the Project. Additionally, the Project will reconstruct curb ramps located along project driveways, including detectable surface warning tactiles (yellow truncated domes). Implementation of the recommendation above should enhance the overall bicycle and pedestrian environment.
San Marcos Artist’s Village Project
Local Transportation Analysis
ES-2
Per the City’s Transportation Analysis Guidelines (TIAG), trip generation rates were derived from SANDAG’s (not so) Brief Guide to Vehicular Traffic Generation Rates for the San Diego Region (April 2002).
The Project is anticipated to generate a net total of 2,241 daily trips, including 126 trips (60-in/62- out) during the AM peak hour and 189 (101-in/89-out) during the PM peak hour.
The following roadway segments and intersections were included for analysis:
Roadway Segments
Via Vera Cruz, between Grand Avenue and Linda Vista Drive Via Vera Cruz, between Linda Vista Drive and West San Marcos Boulevard Grand Avenue, between Las Posas Road and Via Vera Cruz Grand Avenue, between Via Vera Cruz and Linda Vista Drive Grand Avenue, between Linda Vista Drive and West San Marcos Boulevard Linda Vista Drive, between Via Vera Cruz and Grand Avenue West San Marcos Boulevard, between Via Vera Cruz and South Bent Avenue West San Marcos Boulevard, between South Bent Avenue and Grand Avenue Intersections
1. South Las Posas Road & Grand Avenue
2. SR-78 EB Ramps/Via Vera Cruz & Grand Avenue
3. Via Vera Cruz & Linda Vista Drive
4. Linda Vista Drive & Grand Avenue
5. South Bent Avenue & Grand Avenue
6. Via Vera Cruz & West San Marcos Boulevard
7. Grand Avenue & West San Marcos Boulevard
8. Project Driveway #1 & Grand Avenue
9. Project Driveway #2 & Grand Avenue
10. Project Driveway #3 & Linda Vista Drive
11. Project Driveway #4 & Linda Vista Drive
San Marcos Artist’s Village Project
Local Transportation Analysis
ES-3
LOS Deficiencies and Improvement Requirements
Determination of the Need for Off-Site Improvements to Accommodate Project Traffic – Near-Term Year 2024 with Project Conditions
Roadway Segment Analysis
No improvements required.
Intersection Analysis
No improvements required.
Determination of the Need for Off-Site Improvements to Accommodate Project Traffic – Horizon Year 2050 with Project Conditions
Roadway Segment Analysis
No improvements required.
Intersection Analysis
Because implementation of the Project would further deteriorate traffic operations and increase the delay at an intersection already operating at LOS E or F by more than 2.0 seconds, the Project would cause an inconsistency with Policy M-1.4 at the following intersection:
Linda Vista Drive & Grand Avenue – To improve operations at this intersection, the Project shall provide a fair share contribution to install a traffic signal. It should be noted the intersection already operates at substandard LOS E without the Project, indicating the Project does not directly cause the inconsistency. Upon implementation of this improvement, the intersection would operate at acceptable LOS and better than pre-project conditions.
The total number of vehicle trips passing through this intersection during the PM peak hour is 1,811, of which 101 (or 5.6% of the total volume) are vehicle trips generated by the Project. Thus, the Project would be responsible for 5.6% of the cost to implement this improvement.
San Marcos Artist’s Village Project
Local Transportation Analysis
Page i
Table of Contents
Executive Summary .............................................................................................................................. ES-1 Project Setting and Description .................................................................................................................ES-1 LOS Deficiencies and Improvement Requirements ...................................................................................ES-3
1.0 Introduction ........................................................................................................................................ 1 Project Description ............................................................................................................................... 1 Report Organization ............................................................................................................................. 4
2.0 Analysis Methodology .......................................................................................................................... 5 Level of Service (LOS) Definition .......................................................................................................... 5 Roadway Segment LOS Standards and Thresholds ............................................................................. 5 Peak Hour Intersection LOS Standards and Thresholds ...................................................................... 6 Determination of Project Study Area .................................................................................................... 8 City of San Marcos LOS Standards ....................................................................................................... 9
3.0 Project Traffic ................................................................................................................................... 10 Project Trip Generation ..................................................................................................................... 10 Project Trip Distribution and Assignment .......................................................................................... 10 Project Study Area ............................................................................................................................. 23
4.0 Active Transportation Evaluation ........................................................................................................ 25 Transit Access ................................................................................................................................... 25 Bicycle ............................................................................................................................................... 25 Pedestrian ......................................................................................................................................... 26
5.0 Existing Conditions ............................................................................................................................ 27 Existing Transportation Network ....................................................................................................... 27 Existing Intersection Volumes ........................................................................................................... 27 Existing Traffic Conditions ................................................................................................................. 27
6.0 Near-Term Year 2024 Conditions ....................................................................................................... 36 Cumulative Project Traffic ................................................................................................................. 36 Cumulative Project Trip Generation................................................................................................... 37 Near-Term Year 2024 Base Roadway Network and Traffic Volumes ................................................ 41 Near-Term Year 2024 Base Traffic Conditions .................................................................................. 41 Near-Term Year 2024 Base with Project Roadway Network and Traffic Volumes ............................. 46 Near-Term Year 2024 Base with Project Traffic Conditions .............................................................. 46
7.0 Horizon Year 2050 Conditions ............................................................................................................ 52 Horizon Year 2050 Roadway Network and Traffic Volumes .............................................................. 52 Horizon Year 2050 Traffic Conditions ............................................................................................... 55 Horizon Year 2050 with Project Roadway Network and Traffic Volumes .......................................... 58 Horizon Year 2050 with Project Traffic Conditions ............................................................................ 58
8.0 LOS Deficiencies and Improvement Requirements ............................................................................... 64 Determination of the Need for Off-Site Improvements to Accommodate Project Traffic – Near-Term Year 2024 with Project Conditions .............................................................................................................. 64 Determination of the Need for Off-Site Improvements to Accommodate Project Traffic – Horizon Year 2050 with Project Conditions ...................................................................................................................... 64 San Marcos Artist’s Village Project
Local Transportation Analysis
Page ii
Table of Contents (continued)
9.0 Site Access and Circulation ................................................................................................................ 66 Driveway Access ................................................................................................................................ 66 Internal Circulation ............................................................................................................................ 68 Appendices
Appendix A - Grand Avenue Offsite Improvement Plans
Appendix B - Scoping Memorandum
Appendix C - Signal Timings
Appendix D - Trip Distribution Technical Memorandum
Appendix E - Internal Capture Calculations
Appendix F - Traffic Counts
Appendix G - LOS Calculation Worksheets Existing Conditions Appendix H - Cumulative Project Information
Appendix I - LOS Calculation Worksheets Near-Term Year 2024 Base Conditions Appendix J - LOS Calculation Worksheets Near-Term Year 2024 Base with Project Conditions Appendix K - Transportation Forecast Information Center (TFIC) Volumes and Horizon Year 2050 Volume Development
Appendix L - LOS Calculation Worksheets Horizon Year 2050 Conditions Appendix M - LOS Calculation Worksheets Horizon Year 2050 with Project Conditions Appendix N - LOS Calculation Worksheets Horizon Year 2050 with Project with Mitigation Conditions Appendix O - Traffic Signal Warrant
Appendix P - Intersection Queueing Reports
Appendix Q - Sight Distance Exhibit
San Marcos Artist’s Village Project
Local Transportation Analysis
Page iii
Figures
Figure 1.1 - Project Regional Location ................................................................................................................... 2 Figure 1.2 - Project Site Plan ................................................................................................................................. 3 Figure 3.1A - Project Trip Distribution – Residential (Roadway) ......................................................................... 13 Figure 3.1B - Project Trip Distribution – Residential (Intersection) .................................................................... 14 Figure 3.2A - Project Trip Distribution – Office and Retail (Roadway) ................................................................ 15 Figure 3.2B - Project Trip Distribution – Office and Retail (Intersection) ............................................................ 16 Figure 3.3A - Project Trip Assignment – Residential (Roadway) ......................................................................... 17 Figure 3.3B - Project Trip Assignment – Residential (Intersection) .................................................................... 18 Figure 3.4A - Project Trip Assignment – Office and Retail (Roadway) ................................................................ 19 Figure 3.4B - Project Trip Assignment – Office and Retail (Intersection) ............................................................ 20 Figure 3.5A - Project Trip Assignment (Roadway) ............................................................................................... 21 Figure 3.5B - Project Trip Assignment (Intersection) .......................................................................................... 22 Figure 3.6 - Project Study Area ........................................................................................................................... 24 Figure 5.1 - Functional Classifications – Existing Conditions ............................................................................. 28 Figure 5.2 - Intersection Geometrics – Existing Conditions ................................................................................ 29 Figure 5.3A - Traffic Volumes – Existing Conditions (Roadway).......................................................................... 30 Figure 5.3B - Traffic Volumes – Existing Conditions (Intersection) ..................................................................... 31 Figure 6.1 - Cumulative Projects Location .......................................................................................................... 38 Figure 6.2A - Cumulative Project Trip Assignment (Roadway) ............................................................................ 39 Figure 6.2B - Cumulative Project Trip Assignment (Intersection) ....................................................................... 40 Figure 6.3A - Traffic Volumes – Near-Term Year 2024 Base Conditions (Roadway) .......................................... 42 Figure 6.3B - Traffic Volumes – Near-Term Year 2024 Base Conditions (Intersection) ..................................... 43 Figure 6.4A - Traffic Volumes – Near-Term Year 2024 Base with Project Conditions (Roadway) ....................... 47 Figure 6.4B - Traffic Volumes – Near-Term Year 2024 Base with Project Conditions (Intersection) .................. 48 Figure 7.1A - Traffic Volumes – Horizon Year 2050 Conditions (Roadway) ........................................................ 53 Figure 7.1B - Traffic Volumes – Horizon Year 2050 Conditions (Intersection) ................................................... 54 Figure 7.2A - Traffic Volumes – Horizon Year 2050 with Project Conditions (Roadway) .................................... 59 Figure 7.2B - Traffic Volumes – Horizon Year 2050 with Project Conditions (Intersection) ............................... 60 San Marcos Artist’s Village Project
Local Transportation Analysis
Page iv
Tables
Table 2.1 - LOS Definitions .................................................................................................................................... 5 Table 2.2 - Roadway Segment Daily Capacity and LOS Standards ........................................................................ 6 Table 2.3 - Signalized Intersection LOS Operational Analysis Method .................................................................. 7 Table 2.4 - LOS Criteria for Stop Controlled Unsignalized Intersections ................................................................ 8 Table 3.1 - Project Trip Generation ..................................................................................................................... 12 Table 5.1 - Existing Transportation Network Characteristics .............................................................................. 32 Table 5.2 - Roadway Segment LOS Results – Existing Conditions ..................................................................... 33 Table 5.3 - Peak Hour Intersection LOS Results – Existing Conditions .............................................................. 35 Table 6.1 - Cumulative Project Trip Generation .................................................................................................. 37 Table 6.2 - Roadway Segment LOS Results – Near-Term Year 2024 Base Conditions ...................................... 44 Table 6.3 - Peak Hour Intersection LOS Results – Near-Term Year 2024 Base Conditions ............................... 45 Table 6.4 - Roadway Segment LOS Results – Near-Term Year 2024 Base with Project Conditions .................. 49 Table 6.5 - Peak Hour Intersection LOS Results – Near-Term Year 2024 Base with Project Conditions ........... 51 Table 7.1 - Roadway Segment LOS Results – Horizon Year 2050 Conditions.................................................... 56 Table 7.2 - Peak Hour Intersection LOS Results – Horizon Year 2050 Conditions............................................. 57 Table 7.3 - Roadway Segment LOS Results – Horizon Year 2050 with Project Conditions ................................ 61 Table 7.4 - Peak Hour Intersection LOS Results – Horizon Year 2050 with Project Conditions ......................... 63 Table 8.1 - Peak Hour Intersection LOS Results – Horizon Year 2050 with Project with Mitigation Conditions ...................................................................................................................................... 65 Table 9.1 - Project Driveway Queue Analysis Results ......................................................................................... 67 San Marcos Artist’s Village Project
Local Transportation Analysis
1.0 Introduction
The purpose of this Local Transportation Analysis (LTA) is to document the effect the San Marcos Artist’s Village project (the “Project”) would have on the circulation network and to determine if improvements are required. Per the City’s Transportation Impact Analysis Guidelines (TIAG), the City strives to maintain intersection and roadway segment operations based on LOS standards outlined in the General Plan Mobility Element. Improvements should be identified for any study facilities that do not meet City LOS standards to increase performance to acceptable or pre-project conditions.
Project Description
The Project is a mixed-use development on 11.08 acres (5.03 acres of residential uses and 6.05 acres of office/retail uses) located at the northwest corner of Linda Vista Road and Grand Avenue in the City of San Marcos. The Project proposes to construct 102 multi-family dwelling units (on west end of project) as well as 7 live/work units (on east end of project) on approximately 5.03 acres.
Live/work units are units consisting of a residential and commercial/office component, where a resident is able to both live and work. Additionally, the Project proposes to construct 7,658 square feet (SF) of office space and 49,266 SF of specialty retail space on approximately 6.05 acres. It should be noted that the office space is intended for single tenant and the retail space is not intended to be occupied by grocery store uses or similar uses.
The property is bordered by Grand Avenue on the northeast side, Linda Vista Road on the southeast side, and industrial land uses to the west. Per the City’s General Plan, the site is designated as a Commercial (C) land use and thus the Project, being a mixed-use development, is inconsistent with the General Plan and zoning designation. However, the project applicant is processing a General Plan Amendment (GPA) to adjust the zoning to “Mixed-Use” in order to be consistent with the General Plan. The Project’s assumed opening year is Year 2024.
The Project will provide the following four new side-street stop-controlled driveways and roadway improvements:
Project Driveway #1 – This new, full-access driveway will be located approximately 900 feet northwest of Linda Vista Drive
Project Driveway #2 – This new, full-access driveway will be located approximately 300 feet northwest of Linda Vista Drive
Project Driveway #3 – This new, full-access driveway will be located approximately 700 feet southwest of Grand Avenue
Project Driveway #4 – This new, full-access driveway will be located approximately 250 feet southwest of Grand Avenue
Construction of raised medians at Grand Avenue along Project Frontage. Median breaks will be present to allow for full access of the driveways along Grand Avenue. See Appendix A for improvement plan.
Figure 1.1 displays the Project’s regional location. Figure 1.2 displays the project site plan. ·|}þ78
City of Vista
City of
Carlsbad
City of
Encinitas
City of
Escondido
City of
Escondido
County of
San Diego
County of
San Diego
County of
San Diego
County of
San Diego
County of
San Diego
City of
San Diego
City of
San Marcos
N
Figure 1.1
Project Regional Location
San Marcos Artist's Village
Local Transportation Analysis
0 1 2 Miles
Project Site
^
Figure
Project Site Plan
San Marcos Artist's Village
Local Transportation Analysis
ARTISTS VILLAGE CIVIL SITE PLAN
JOB NO. DRAWN BY:
San Marcos Artist’s Village Project
Local Transportation Analysis
Report Organization
Following this introductory chapter, this report is organized into the following chapters:
2. Analysis Methodology – This chapter reviews the methods utilized to evaluate any potential General Plan inconsistencies and LOS deficiencies associated with the implementation of the Project, as required by the TIAG.
3. Project Traffic - This chapter describes the Project’s land uses and associated trip generation. Additional information such as trip distribution patterns and project trip assignment are also included in this chapter, which is used to determine the project study area.
4. Existing Conditions – This chapter describes and evaluates the existing transportation network. Vehicular operations within the study area are evaluated. LOS analysis results are also provided for existing vehicular traffic conditions.
5. Near-Term Year 2024 Conditions – This chapter describes near-term developments anticipated to generate additional study area trips and establishes a near-term baseline against which traffic generated by the Project can be compared to at the project opening day, assumed to be Year 2024. LOS analysis results are also provided for Near-Term Year 2024 Base and Near-Term Year 2024 Base with Project vehicular traffic conditions.
6. Horizon Year 2050 Conditions – This chapter describes projected long-range conditions of the transportation network within the study area. Horizon Year 2050 scenario analysis is required per the City’s TIAG. LOS analysis results are also provided for Horizon Year 2050 and Horizon Year 2050 with Project vehicular traffic conditions.
7. LOS Deficiencies and Improvement Requirements - This chapter identifies any substandard facilities and provides improvement requirements to improve substandard facilities to acceptable LOS or pre-project conditions.
8. Site Access & Circulation – This chapter addresses access to the project site and discusses the functionality of the Project’s internal circulation.
San Marcos Artist’s Village Project
Local Transportation Analysis
2.0 Analysis Methodology
This study was performed in accordance with the standards and requirements in the TIAG. All analysis assumptions were documented within a scoping agreement memorandum, provided in Appendix B, and approved by the City of San Marcos. The following sections describe the analysis methods outlined in the TIAG to evaluate the traffic effect as a result of the Project in relation to LOS.
Level of Service (LOS) Definition
Level of Service (LOS) is a quantitative measure describing operational conditions within a traffic stream, and the motorist’s and/or passengers’ perception of operations. A LOS definition generally describes these conditions in terms of such factors as delay, speed, travel time, freedom to maneuver, interruptions in traffic flow, queuing, comfort, and convenience. Table 2.1 describes generalized definitions of the various LOS categories (A through F) as applied to roadway operations.
Table 2.1 - LOS Definitions
LOS Definition of Operation
A
This LOS represents a completely free-flow condition, where the operation of vehicles is virtually unaffected by the presence of other vehicles and only constrained by the geometric features of the highway and by driver preferences.
B
This LOS represents a relatively free-flow condition, although the presence of other vehicles becomes noticeable. Average travel speeds are the same as in LOS A, but drivers have slightly less freedom to maneuver.
C
At this LOS, the influence of traffic density on operations becomes marked. The ability to maneuver within the traffic stream is clearly affected by other vehicles.
D
At this LOS, the ability to maneuver is notably restricted due to traffic congestion, and only minor disruptions can be absorbed without extensive queues forming and the service deteriorating.
E
This LOS represents operations at or near capacity. LOS E is an unstable level, with vehicles operating with minimum spacing for maintaining uniform flow. At LOS E, disruptions cannot be dissipated readily thus causing deterioration down to LOS F.
F
At this LOS, forced or breakdown of traffic flow occurs, although operations appear to be at capacity, queues form behind these breakdowns. Operations within queues are highly unstable, with vehicles experiencing brief periods of movement followed by stoppages.
Source: Highway Capacity Manual (HCM) 6th Edition
Roadway Segment LOS Standards and Thresholds
Roadway segment LOS standards and thresholds provide the basis for analysis of arterial roadway segment performance. The analysis of roadway segment LOS is based on the functional classification of the roadway, the maximum capacity, roadway geometrics, and existing or forecast Average Daily Traffic (ADT) volumes. Table 2.2 displays roadway segment capacity standards found in the City’s TIAG. The actual capacity of a roadway facility varies according to its physical attributes.
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 2.2 - Roadway Segment Daily Capacity and LOS Standards Street Classification
LOS/ADT Thresholds
A B C D E
Expressway (6-lane) < 30,000 < 42,000 < 60,000 < 70,000 < 80,000 Prime Arterial (6-lane) < 25,000 < 35,000 < 50,000 < 55,000 < 60,000 Major Arterial (6-lane, divided) < 20,000 < 28,000 < 40,000 < 45,000 < 50,000 Major Arterial (4-lane, divided) < 15,000 < 21,000 < 30,000 < 35,000 < 40,000 Major Arterial (3-lane, one-way) < 12,500 < 16,500 < 22,500 < 25,000 < 27,500 Major Arterial (2-lane, one-way) <10,000 <13,000 <17,500 <20,000 <22,500 Secondary Arterial/Collector
(4-lane w/ center lane) < 10,000 < 14,000 < 20,000 < 25,000 < 30,000 Collector (4-lane w/o center lane) < 5,000 < 7,000 < 10,000 < 13,000 < 15,000 Collector
(2-lane w/ continuous left-turn lane) < 5,000 < 7,000 < 10,000 < 13,000 < 15,000 Collector (2-lane no fronting property) < 4,000 < 5,500 < 7,500 < 9,000 < 10,000 Collector (2-lane w/commercial fronting) < 2,500 < 3,500 < 5,000 < 6,500 < 8,000 Collector (2-lane w/multi-family) < 2,500 < 3,500 < 5,000 < 6,500 < 8,000 Collector (3-lane, one-way) < 11,000 < 14,000 < 19,000 < 22,500 < 26,000 Collector (2-lane, one-way) < 7,500 < 9,500 < 12,500 < 15,000 < 17,500 Collector (1-lane, one-way) < 2,500 < 3,500 < 5,000 < 6,500 < 7,500 Sub-Collector (2-lane single family) - - < 2,200 - -
Source: City of San Marcos Transportation Impact Analysis Guidelines (November 2020) Note:
Bold number indicates the ADT thresholds for acceptable LOS.
These standards are generally used as long-range planning guidelines to determine the functional classification of roadways. The actual capacity of a roadway varies according to its physical attributes. Typically, the performance and LOS of a roadway segment is heavily influenced by the ability of its intersections to accommodate peak hour traffic volumes. For the purposes of this traffic analysis, LOS D or better is considered acceptable for circulation element roadway segments.
Peak Hour Intersection LOS Standards and Thresholds
This section presents the methodologies used to perform peak hour intersection capacity analyses at signalized and unsignalized intersections within the study area. The following assumptions were utilized in conducting all intersection LOS analyses:
Peak Hour Factor (PHF) – Field-collected PHF for Existing and Near-Term Year 2024 Base Conditions. A PHF of 0.95 was assumed for Horizon Year 2050 analysis, except where the field-collected PHF exceeds 0.95.
Lane Utilization Factor – HCM 6th Edition defaults were used for all scenarios. Conflicting Pedestrians/Bicycles – Existing pedestrian and bicycle counts are utilized for all scenarios.
Signal Timing – Based on existing signal timing plans (as of June 2022 and July 2022), provided in Appendix C.
Heavy Vehicle Factor (HVF) – 2% for all approaches, except where designated truck routes are present. HVF for truck route approaches are based on Caltrans truck percentage data.
San Marcos Artist’s Village Project
Local Transportation Analysis
2.3.1 Signalized Intersections
The analysis of signalized intersections utilized the operational analysis procedure as outlined in the Highway Capacity Manual (HCM) 6th Edition signalized (Chapter 19) intersection analysis methodology. This method defines LOS in terms of delay, or more specifically, average stopped delay per vehicle. Delay is a measure of driver and/or passenger discomfort, frustration, fuel consumption and lost travel time. This technique uses 1,900 vehicles per hour per lane (VPHPL) as the maximum saturation volume of an intersection. This saturation volume is adjusted to account for lane width, on-street parking, pedestrians, traffic composition (i.e., percentage trucks) and shared lane movements (i.e., through and right-turn movements originating from the same lane). The LOS criteria used for the analysis of signalized intersections are described in Table 2.3, identifying the thresholds of control delays and the associated LOS. The computerized analysis of intersection operations was performed utilizing the Synchro Version 11 traffic analysis software by Trafficware Ltd.
Table 2.3 - Signalized Intersection LOS Operational Analysis Method Average Stopped
Delay Per Vehicle
(Seconds)
LOS Characteristics
<10
LOS A describes operations with very low delay. This occurs when progression is extremely favorable, and most vehicles do not stop at all. Short cycle lengths may also contribute to low delay.
>10– 20 LOS B describes operations with generally good progression and/or short cycle lengths. More vehicles stop than for LOS A, causing higher levels of average delay. >20 – 35
LOS C describes operations with higher delays, which may result from fair progression and/or longer cycle lengths. Individual cycle failures may begin to appear at this level.
The number of vehicles stopping is significant at this level, although many still pass through the intersection without stopping.
>35– 55
LOS D describes operations with high delay, resulting from some combination of unfavorable progression, long cycle lengths, or high volumes. The influence of congestion becomes more noticeable, and individual cycle failures are noticeable. >55 – 80 LOS E is considered the limit of acceptable delay. Individual cycle failures are frequent occurrences.
>80
LOS F describes a condition of excessively high delay, considered unacceptable to most drivers. This condition often occurs when arrival flow rates exceed the LOS D capacity of the intersection. Poor progression and long cycle lengths may also be major contributing causes to such delay.
Source: HCM 6th Edition
San Marcos Artist’s Village Project
Local Transportation Analysis
2.3.2 Unsignalized Intersections
Unsignalized intersections were analyzed using the Highway Capacity 6th Edition side-street stop (Chapter 20) and all-way stop (Chapter 21) intersection analysis methodology. The computerized analysis of intersection operations was performed utilizing the Synchro Version 11 traffic analysis software by Trafficware Ltd.
LOS was determined as follows:
All-way stop intersections: Reported for the entire intersection as an average value Side-street stop intersections: Reported for the worst-case movement The LOS criteria used for the analysis of unsignalized intersections are described in Table 2.4.
Table 2.4 - LOS Criteria for Stop Controlled Unsignalized Intersections Average Stopped Delay Per Vehicle
(Seconds) LOS
0-10 A
> 10-15 B
> 15-25 C
> 25-35 D
> 35-50 E
> 50 F
Source: HCM 6th Edition
Determination of Project Study Area
Per the City’s TIAG, the study area was defined using the following criteria:
Signalized and unsignalized intersections along and adjacent to the project site Site access driveways
Any classified (non-residential) roadway segments that are linked to the intersections that are being studied
San Marcos Artist’s Village Project
Local Transportation Analysis
City of San Marcos LOS Standards
This section outlines the Mobility Element Policies that are relevant to the Project. The City of San Marcos strives to maintain intersection and roadway segment operations LOS standards based on the following policy:
Policy M-1.4: LOS D or better for Vehicles as a prioritized mode – Generally provides facilities that have minimum vehicle congestion during peak periods. Most motorists are delayed less than 55 seconds at a signal (or less than one signalized cycle).
Based on the policy listed above, LOS D or better is considered acceptable for study roadway segments and intersections. The TIAG provides the following thresholds to determine if the Project is required provide improvements for study area facilities:
Implementation of the Project triggers a roadway segment operating at acceptable LOS to operate at unacceptable LOS and increases the volume/capacity (V/C) ratio by more than
0.02. Implementation of the Project increases the V/C ratio for a study roadway segment that is already operating at unacceptable LOS by more than 0.02. Implementation of the Project triggers an intersection operating at acceptable LOS to operate at unacceptable LOS and increases the average delay per vehicle by more than 2.0 seconds. Implementation of the Project increases the average delay for a study intersection that is already operating at unacceptable LOS by more than 2.0 seconds.
Improvements should be identified to increase performance to acceptable or pre-project conditions under each scenario.
San Marcos Artist’s Village Project
Local Transportation Analysis
3.0 Project Traffic
This chapter describes the Project’s trip generation, trip distribution patterns, and trip assignment.
Project Trip Generation
Per the City’s TIAG, trip generation rates were derived from SANDAG’s (not so) Brief Guide to Vehicular Traffic Generation Rates for the San Diego Region (April 2002). It should be noted that the office space is intended for single tenant and the retail space is not intended to be occupied by grocery store uses or similar uses. Table 3.1 displays the projected daily, as well as AM and PM peak hour, project trip generation.
As shown, the Project is anticipated to generate a net total of 2,241 daily trips, including 126 trips (60-in/62-out) during the AM peak hour and 189 (101-in/89-out) during the PM peak hour.
Project Trip Distribution and Assignment
The project trip distribution was manually developed based on the following:
Existing travel patterns obtained from big data (Replica1) and Census data Geographical location of the Project, surrounding land uses, and knowledge of the City’s traffic patterns.
Appendix D includes a technical memorandum detailing the development of the project trip distribution. Since the Project features different land uses, separate trip distributions were developed. The office and retail components of the Project are assumed to have the same trip distribution since trips associated with these land uses would utilize Project Driveways #2, #3, and #4.
The residential component of the Project differs in trip distribution as it has different travel patterns than those associated with office and retail land uses. The Project proposes to construct 102 multifamily residential units that would be accessed via Project Driveway #1 along the west side (residential area) of the Project and 7 live/work units would be accessed along the east side (officeretail area) of the Project via Project Driveway #3. Although the seven live/work units are located within the office-retail area of the Project, the units are anticipated to have similar travel patterns as the typical residential units on the east side. Therefore, the trips associated with live/work units were assumed to be strictly residential trips and not included as part of the office or retail component of the Project. Figure 3.1A and Figure 3.1B display the regional trip distribution patterns for the residential component of the Project. Figure 3.2A and Figure 3.2B display the regional trip distribution patterns for the office and retail component of the Project.
Based upon the project trip distribution patterns, daily and AM/PM peak hour project trips were assigned to the adjacent roadway network. Figure 3.3A and Figure 3.3B display the project trip 1 Replica is a data provider that produces large-scale models to represent mobility throughout the United States. For more information, please visit the following: https://replicahq.com/.
San Marcos Artist’s Village Project
Local Transportation Analysis
assignment for the residential component of the Project. Figure 3.4A and Figure 3.4B display the project trip assignment for the office and retail component of the Project. Figure 3.5A and Figure
3.5B display the project trip assignment for the combined land uses (total trip assignment).
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 3.1 - Project Trip Generation
Land Use Units Trip
Rate ADT
AM Peak Hour PM Peak Hour
% Trips Split In Out % Trips Split In Out
Residential
Multi-Family
(>20 DU/acre) 109 DU 6/DU 654 8% 53 2:8 11 42 9% 59 7:3 41 18 Employment/Office
Single Tenant Office 7,658 SF 14/KSF 108 15% 17 9:1 15 2 15% 17 2:8 3 14 Commercial/Retail
Specialty Retail
Center/Strip Commercial 49,266 SF 40/KSF 1,971 3% 60 6:4 36 24 9% 178 5:5 89 89 Subtotal 2,733 - 130 - 62 68 - 254 - 133 121
Internal Capture1 (18%2) -492 - -4 - -2 -2 - -64 - -32 -32 Net Total 2,241 - 126 - 60 62 - 189 - 101 89
Source: CR Associates (2022)
Notes:
1 Internal capture was calculated using ITE’s trip reduction calculator, which is based on the NCHRP Report 664 Enhancing Internal Trip Capture Estimation for Mixed-Use Developments. See Appendix E for more details.
2 1 - [(AMNet Total + PMNet Total)/(AMSubtotal + PMSubtotal)] = 1 - [(126 + 189)/(130 + 254)] = 18% DU = Dwelling Unit.
KSF = 1,000 Square Feet
2%
70%
Project Site
20%
15%
42%
5%
25%
25%
15%
10%
15%
25%
10%
28%
20%
5%
20%
5%
5%
20%
10%
10%
10%
8 9
6 1
2 7
5 4
3 11
10 San Marcos Artist's Village
Local Transportation Analysis
Figure 3.1A
Project Trip Distribution
Residential
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 500 1,000 Feet
S Las Posas Rd
Via Vera Cruz
Discovery St
Armorlite Dr
78 Trip Distribution
Study Intersection
Study Roadway
Project Site
#
XX%
Project
Dwy #1 Project
Dwy #1
Project
Dwy #1
Project
Dwy #1
28%
70%
70%
30%
40%
40%
42%
98%
2%
8 9
4 11
10 Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard
5%
1%4%
30%
25%
26%
70%
20%
15%
40%
28%
10%
41%
28%
10%
20%
1%
1%
15%
41%
1%
15%5%
1%
26%
70%
5%
40%
1%
20%
5%
5%
25%
25%
70%
5%
70%
40%
1%
1%
20%
30%
25%
5%
1%
15%
40%
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 3.1B
Project Trip Distribution
Residential
Study Intersection
Peak Hour Trip
Distribution
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
15%
15%
Project Site
20%
15%
55%
5%
25%
25%
15%
10%
15%
25%
10%
15%
20%
5%
20%
5%
5%
20%
10%
10%
10%
8 9
6 1
2 7
5 4
3 11
10 San Marcos Artist's Village
Local Transportation Analysis
Figure 3.2A
Project Trip Distribution
Office and Retail
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 500 1,000 Feet
S Las Posas Rd
Via Vera Cruz
Discovery St
Armorlite Dr
78 Trip Distribution
Study Intersection
Study Roadway
Project Site
#
XX%
Project
Dwy #1
Project
Dwy #2
Project
Project Dwy #4
Dwy #3
15%
15%
25%
30%
40%
40%
55%
20%
40%
40%
8 9
4 11
10 Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard
6%
2%
3% 5%
23%
22%20%
18%
33%
15%
13%
12%
25%
24%
17%
10%
29%
5%
17%
6%
5%
18%
20%
25%
29%
3%
12%
15%
10%
15%
2%
3%
23%
15%
22%
15%
25%
3%
22%
25%
5%
5%
18%
33%
15%
12% 15%
22%
20%
15%
20%
18%
13%
5%
12%
24%
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 3.2B
Project Trip Distribution
Office and Retail
Study Intersection
Peak Hour Trip
Distribution
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
375
11 Project Site
107
80 225
27 134
134
81 53
80 134
54 150
107
27 107
27 27
107
54 53
54 8
9 6
1 2
7 5
4 3
11 10
San Marcos Artist's Village
Local Transportation Analysis
Figure 3.3A
Project Trip Assignment
Residential
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 500 1,000 Feet
S Las Posas Rd
Via Vera Cruz
Discovery St
Armorlite Dr
78 150
375
375
161
214
214
225
525
11 Project
Dwy #1
Project
Dwy #2
Project
Project Dwy #4
Dwy #3
8 9
4 11
10 Trip Assignment
Study Intersection
Study Roadway
Project Site
#
XXX
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard 9 / 2 1 / 0
2 / 1
2 / 6
2 / 8
2 / 9
3 / 9
4 / 1
6 / 2
1 / 4
1 / 3
1 / 1
0 / 1
7 / 20 15 / 5
6 / 13
6 / 20
4 / 12
5 / 12
16 / 6
27 / 8
11 / 3
27 / 9
11 / 4
9 / 2
2 / 1
16 / 6
1 / 4 11 / 3
6 / 2
0 / 1
1 / 1
2 / 8
1 / 0
2 / 1
11 / 3
2 / 8
2 / 6
0 / 1
1 / 1
1 / 1
0 / 1
2 / 1
0 / 1
11 / 3
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 3.3B
Project Trip Assignment
Residential
Study Intersection
Peak Hour Trip
Assignment
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
255
256
Project Site
341
256
937
85 427
426
255
171
256
426
170
256
341
85 341
86 85
341
170
171
170
8 9
6 1
2 7
5 4
3 11
10 San Marcos Artist's Village
Local Transportation Analysis
Figure 3.4A
Project Trip Assignment
Office and Retail
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 500 1,000 Feet
S Las Posas Rd
Via Vera Cruz
Discovery St
Armorlite Dr
78 #
Project
Dwy #1
Project
Dwy #2
Project
Project Dwy #4
Dwy #3
256
256
426
512
682
682
937
341
682
682
8 9
4 11
10 Trip Assignment
Study Intersection
Study Roadway
Project Site
#
XXX
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard
0 / 1
7 / 9 2 / 5 1 / 3
6 / 8
3 / 9
3 / 8
1 / 2
3 / 4
2 / 2
1 / 5
5 / 7
1 / 4
3 / 3
6 / 18
6 / 17
5 / 15
4 / 12
4 / 11
7 / 22
7 / 14
9 / 13
7 / 10
7 / 13
4 / 10
8 / 11
8 / 14
6 / 19
14 / 20
10 / 14
13 / 18
12 / 17
13 / 17
11 / 15
8 / 11
3 / 8
13 / 17
6 / 8
6 / 18
10 / 14
4 / 11
4 / 11
4 / 11
3 / 3
3 / 4
1 / 4
8 / 11
3 / 3
1 / 4
7 / 10 5 / 15
4 / 12
3 / 8
5 / 7
7 / 13
6 / 19
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 3.4B
Project Trip Assignment
Office and Retail
Study Intersection
Peak Hour Trip
Assignment
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
266
631
Project Site
448
336
1,162
112
561
560
336
224
336
560
224
406
448
112
448
113
112
448
224
224
224
8 9
6 1
2 7
5 4
3 11
10 San Marcos Artist's Village
Local Transportation Analysis
Figure 3.5A
Project Trip Assignment
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 500 1,000 Feet
S Las Posas Rd
Via Vera Cruz
Discovery St
Armorlite Dr
78 #
Project
Dwy #1
Project
Dwy #2
Project
Project Dwy #4
Dwy #3
406
631
801
673
896
896
1,162
341
693
682
525
8 9
4 11
10 Trip Assignment
Study Intersection
Study Roadway
Project Site
#
XXX
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard 3 / 5
7 / 9
1 / 3
6 / 8
2 / 2
3 / 9
3 / 8
3 / 4
1 / 1
2 / 5
1 / 5
3 / 3
5 / 12
5 / 10
13 / 8
8 / 12
5 / 13
4 / 12
9 / 17
6 / 17
9 / 13
8 / 22
6 / 207 / 19
7 / 10
27 / 8
9 / 15
6 / 10
4 / 11
11 / 4
12 / 20
14 / 21
10 / 13
10 / 28
23 / 19
12 / 17
12 / 25
13 / 27
14 / 17
21 / 23
15 / 14
15 / 25
17 / 30
17 / 22
10 / 12
11 / 15
24 / 20
32 / 16
9 / 153 / 5
17 / 22
7 / 10
12 / 20
3 / 43 / 4
4 / 11
7 / 9
3 / 4
14 / 17
15 / 25
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 3.5B
Project Trip Assignment
Study Intersection
Peak Hour Trip
Assignment
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
San Marcos Artist’s Village Project
Local Transportation Analysis
Project Study Area
Based on the study area criteria previously outlined in Chapter 2, the project trip assignment shown in Figures 3.5A and 3.5B, and the preliminary project scoping with City of San Marcos staff, the following roadway segments and intersections were included for analysis:
Roadway Segments
Via Vera Cruz, between Grand Avenue and Linda Vista Drive Via Vera Cruz, between Linda Vista Drive and West San Marcos Boulevard Grand Avenue, between Las Posas Road and Via Vera Cruz Grand Avenue, between Via Vera Cruz and Linda Vista Drive Grand Avenue, between Linda Vista Drive and West San Marcos Boulevard Linda Vista Drive, between Via Vera Cruz and Grand Avenue West San Marcos Boulevard, between Via Vera Cruz and South Bent Avenue West San Marcos Boulevard, between South Bent Avenue and Grand Avenue Intersections
1. South Las Posas Road & Grand Avenue
2. SR-78 EB Ramps/Via Vera Cruz & Grand Avenue
3. Via Vera Cruz & Linda Vista Drive
4. Linda Vista Drive & Grand Avenue
5. South Bent Avenue & Grand Avenue
6. Via Vera Cruz & West San Marcos Boulevard
7. Grand Avenue & West San Marcos Boulevard
8. Project Driveway #1 & Grand Avenue
9. Project Driveway #2 & Grand Avenue
10. Project Driveway #3 & Linda Vista Drive
11. Project Driveway #4 & Linda Vista Drive
Figure 3.6 displays the overall project study area.
8 9
6 1
2 7
5 4
3 11
10 San Marcos Artist's Village
Local Transportation Analysis
Figure 3.6
Project Study Area
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 250 500 Feet
Study Intersection
Study Roadway
Project Site
S Las Posas Rd
Via Vera Cruz
Armorlite Dr
Project
Dwy #2
Project Project Dwy #4 Dwy #3
Project
Dwy #1
78 #
San Marcos Artist’s Village Project
Local Transportation Analysis
4.0 Active Transportation Evaluation
This section discusses the project site’s active transportation modes.
Transit Access
The project site is within one half mile of the transit lines serviced by North County Transit District (NCTD) described below:
Bus Route 347 – This bus route is serviced along West Mission Road and North Las Posas Road within the project study area. This bus route connects the Palomar College Transit Center to the CSU San Marcos SPRINTER Station. Operations starts at 5:31 AM and ends at 7:21 PM between Monday and Friday with 30-minute intervals. On Saturdays, operations start at 7:22 AM and ends at 7:08 PM with 60-minute intervals. This route does not operate on Sundays.
Bus Route 445 – This bus route is serviced along West Mission Road and North Las Posas Road within the project study area. This bus route connects the Palomar College Transit Center to the Carlsbad Poinsettia Station (COASTER Connection). Between Monday and Friday, operations start at 6:34 AM and ends at 10:19 AM with 30-minute intervals for the morning period. Similarly, between Monday and Friday, operates start at 3:36 PM and ends at 7:19 PM with 30-minutes intervals for the afternoon period. This route does not operate on Saturdays or Sundays.
SPRINTER – This light rail line runs between Oceanside Transit Center and Escondido Transit Center (eastbound and westbound direction). The nearest stop to the project site is the Palomar College Transit Center. Operation starts at 4:17 AM and ends at 9:10 PM between Monday and Sunday with 30-minute intervals.
Based on the preliminary review of the project site plan, the Project would not conflict with existing or planned transit facilities and would not result in any impacts to transit facilities.
Bicycle
Under Existing conditions, there are no Class II bicycle facilities along project frontage. However, per the City of San Marcos General Plan, there are planned Class II bicycle facilities along the segments of Grand Avenue and Linda Vista Drive fronting the Project. Based on the preliminary review of the project site plan, the Project would construct a Class I bike path at its project frontage along the segments of Linda Vista Drive and Grand Avenue.
San Marcos Artist’s Village Project
Local Transportation Analysis
Pedestrian
Sidewalks are proposed along the segments of Grand Avenue and Linda Vista Drive fronting the Project. Sidewalks are also proposed throughout the internal roadways providing direct access to dwelling units, office and commercial buildings, and other on-site amenities.
Based on the preliminary review of the project site plan, the following recommendation is provided:
Reconstruct curb ramps located along project driveways, if needed, to include detectable surface warning tactiles (yellow truncated domes) and meet all ADA requirements.
Implementation of the recommendation above should enhance the walkability and safety of the overall pedestrian environment and would not result in any impacts to pedestrian facilities.
San Marcos Artist’s Village Project
Local Transportation Analysis
5.0 Existing Conditions
This chapter provides a qualitative description of the transportation facilities located in the project study area. A LOS analysis of the existing operations of the local transportation network facilities is also provided for study roadway segments and intersections.
Existing Transportation Network
Access to the Project from the regional transportation network will be provided via California State Route 78 (SR-78) freeway, Via Vera Cruz, Grand Avenue, Linda Vista Drive, and West San Marcos Boulevard. These facilities will either provide a direct connection to the Project, via a project driveway, or will provide a critical link between the Project and the regional transportation network.
Table 5.1 summarizes the existing physical characteristics of roadways within the study area. Figure
5.1 displays the functional classifications for study roadway segments and Figure 5.2 displays the intersection geometrics for study intersections under Existing conditions.
Existing Intersection Volumes
Traffic counts for study roadway segments and intersections were conducted on May 19, 2022, by Elite Traffic Dynamics, LLC. Traffic count worksheets are provided in Appendix F. To ensure that current travel patterns reflect traffic conditions prior to the COVID-19 restrictions, a count validation was conducted by comparing May 2022 traffic counts with historical traffic counts from November 2017 and May 2018. Historical traffic counts were obtained from the traffic study for the Bent Avenue Panera Bread project prepared by Linscott, Law & Greenspan, Engineers in December 2018.
Based on the comparison it was determined that May 2022 traffic counts were greater than historical traffic counts. Thus, the May 2022 traffic counts were deemed appropriate to use for Existing conditions. Figure 5.3A displays existing daily traffic volumes for study roadway segments and Figure 5.3B displays the AM/PM peak hour turning movements for study intersections.
Existing Traffic Conditions
LOS analyses under Existing conditions were conducted using the methodologies described in Chapter 2. Roadway segment and intersection LOS analysis results are discussed below.
5.3.1 Roadway Segment Analysis
Table 5.2 displays roadway segment and LOS analysis results for study roadway segments under Existing conditions.
As shown, all study roadway segments currently operate at acceptable LOS D or better under Existing conditions, with the exception of the following roadway segment:
West San Marcos Boulevard, between Via Vera Cruz and South Bent Avenue – LOS E. 216
2-Ln
Collector
4-Ln
Collector
5-Ln
Major Arterial
4-Ln
Major Arterial
4-Ln
Collector
4-Ln
Collector
4-Ln
Collector
4-Ln
Collector
8 9
6 1
2 7
5 4
3 11
10 San Marcos Artist's Village
Local Transportation Analysis
Figure 5.1
Functional Classifications
Existing Conditions
Linda Vista Dr
Bent Ave
Grand Ave
W San Marcos Bl
0 250 500 Feet Functional Classification
S Las Posas Rd
Via Vera Cruz
Armorlite Dr
78 #
X-Ln
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard
5 6 7
1 2 3 4
San Marcos Artist's Village
Local Transportation Analysis
Figure 5.2
Intersection Geometrics
Existing Conditions
Stop Sign
*Names of North-South
cross-streets always
listed first NOT TO SCALE
Study Intersection
Signalized Intersection
Lane Geometry
X
38,635
4,168
7,846
8,258
11,093
10,169
20,993
38,635
6 1
2 7
5 4
3 San Marcos Artist's Village
Local Transportation Analysis
Figure 5.3A
Traffic Volumes
Existing Conditions
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 250 500 Feet
S Las Posas Rd
Via Vera Cruz
Armorlite Dr
78 #
XXX Daily Traffic Volumes
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard
8 / 8
9 / 15
8 / 384 / 14
4 / 538 / 74
33 / 77
44 / 9813 / 68
44 / 43
15 / 20
16 / 24
42 / 76
37 / 88
19 / 72
21 / 33
21 / 35
21 / 38
22 / 42
22 / 45
33 / 70
34 / 2610 / 41
19 / 24
17 / 60
14 / 52
109 / 61 11 / 17 156 / 92 95 / 236 39 / 177
45 / 134
82 / 295
61 / 146
56 / 206
50 / 187
53 / 174
54 / 205
85 / 222
92 / 17337 / 13832 / 118
96 / 186
130 / 84
104 / 237
254 / 614
112 / 344
130 / 170
163 / 128 148 / 309
174 / 300
186 / 355
191 / 553
368 / 611
357 / 459
258 / 876
251 / 273
245 / 390
108 / 311
255 / 249242 / 303
271 / 771
238 / 206
359 / 310
202 / 366 453 / 260 621 / 525
427 / 294
851 / 1282
1250 / 1104
1055 / 1359
1364 / 1103
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 5.3B
Traffic Volumes
Existing Conditions
Study Intersection
Peak Hour Volumes
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 5.1 - Existing Transportation Network Characteristics Roadway Segment Number of
Lanes
Median
Type
Posted
Speed Limit Sidewalk? Bike lanes? TransitRoute
Via Vera Cruz Grand Avenue to Linda
Vista Drive 2 NB / 2 SB CLTL/RM 40 Contiguous Class IIBike Lanes None Via Vera Cruz Linda Vista Drive to West
San Marcos Boulevard 2 NB / 2 SB CLTL 40
East Side:
Intermittently contiguous
West Side:
Contiguous
Class II
Bike Lanes None
Grand Avenue Las Posas Road to Via
Vera Cruz 2 EB / 2 WB Striped 45
North Side:
None
South Side:
Contiguous
None None
Grand Avenue Via Vera Cruz to Linda
Vista Drive 2 EB / 2 WB CLTL 45
North Side:
None
South Side:
Intermittently contiguous
None None
Grand Avenue Linda Vista Drive to West
San Marcos Boulevard 2 EB / 2 WB CLTL 45
North Side:
None
South Side:
Intermittently contiguous
None None
Linda Vista Drive Via Vera Cruz to Grand
Avenue 1 EB / 1 WB None 40 Intermittently Contiguous None None West San Marcos
Boulevard
Via Vera Cruz to South
Bent Avenue 2 EB / 2 WB RM 40 Contiguous Class IIBikes Lanes 347 West San Marcos
Boulevard
South Bent Avenue to
Grand Avenue 3 EB / 2 WB RM 40 Contiguous Class IIBikes Lanes 347 Source: CR Associates (2022)
Notes:
RM = Raised Median
CLTL = Center Left-Turn Lane
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 5.2 - Roadway Segment LOS Results – Existing Conditions Roadway Segment Functional Classification Roadway
Capacity
Daily
Volume V/C LOS
Via Vera Cruz Grand Avenue to Linda Vista Drive 4-Lane Secondary Arterial/Collector 30,000 8,258 0.275 A
Via Vera Cruz Linda Vista Drive to West San Marcos
Boulevard
4-Lane Secondary
Arterial/Collector 30,000 7,846 0.262 A
Grand Avenue South Las Posas Road to Via Vera Cruz 4-Lane Secondary Arterial/Collector 30,000 20,993 0.700 D
Grand Avenue Via Vera Cruz to Linda Vista Drive 4-Lane Secondary Arterial/Collector 30,000 10,169 0.339 B
Grand Avenue Linda Vista Drive to West San Marcos
Boulevard
4-Lane Secondary
Arterial/Collector 30,000 11,093 0.370 B
Linda Vista Drive Via Vera Cruz to Grand Avenue 2-Lane Collector (Commercial/Industrial Fronting) 8,000 4,168 0.521 B
West San Marcos
Boulevard Via Vera Cruz to South Bent Avenue 4-Lane Major Arterial 40,000 38,750 0.966 E West San Marcos
Boulevard South Bent Avenue to Grand Avenue 5-Lane Major Arterial 50,000 38,750 0.773 D Source: CR Associates (2022)
San Marcos Artist’s Village Project
Local Transportation Analysis
5.3.2 Intersection Analysis
Table 5.3 displays intersection LOS and average vehicle delay results for the study intersections under Existing conditions. LOS calculation worksheets for Existing conditions are provided in Appendix G.
As shown, all study intersections currently operate at acceptable LOS D or better under Existing conditions, with the exception of the following intersection:
SR-78 EB Ramps/Via Vera Cruz & Grand Avenue – LOS E during the PM peak hour.
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 5.3 - Peak Hour Intersection LOS Results – Existing Conditions # Intersection Control Type Peak Hour Avg. Delay (sec.) LOS 1 South Las Posas Road & Grand Avenue Signal AM 31.6 C
PM 39.1 D
2 SR-78 EB Ramps/Via Vera Cruz & Grand Avenue Signal AM 49.0 D PM 57.6 E
3 Via Vera Cruz & Linda Vista Drive Signal AM 16.4 B
PM 19.9 B
4 Linda Vista Drive & Grand Avenue SSSC AM 10.2 B
PM 19.3 C
5 South Bent Avenue & Grand Avenue Signal AM 7.8 A
PM 11.3 B
6 Via Vera Cruz & West San Marcos Boulevard Signal AM 18.8 B PM 50.8 D
7 Grand Avenue & West San Marcos Boulevard Signal AM 34.2 C PM 46.7 D
Source: CR Associates (2022)
Notes:
Bold indicates LOS E or F.
SSSC = Side-Street Stop-Controlled. For SSSC intersections, the delay shown is the worst delay experienced by any of the approaches.
San Marcos Artist’s Village Project
Local Transportation Analysis
6.0 Near-Term Year 2024 Conditions
This section provides an analysis of Near-Term Year 2024 Base traffic conditions both with and without the Project. The scenarios analyzed in this section include:
Near-Term Year 2024 Base
Near-Term Year 2024 Base with Project
Cumulative Project Traffic
The following ten (10) projects were identified by City of San Marcos staff as cumulative projects, since they are anticipated to contribute traffic within the project study area by the Project’s opening year:
1. Pacific Commercial – This project is located at the northeast corner of the Grand Avenue and Pacific Street intersection. This project proposes to construct a 122-room hotel.
2. San Marcos Highlands – This project is located at the north end of Las Posas Road. This project proposes to construct 187 single-family residential dwelling units as well as a 21.68- acre passive park.
3. El Dorado II Specific Plan – This project is located at the southwest corner of the Richmar Avenue and Pleasant Way intersection. This project proposes to construct 72 multi-family dwelling units as well as 2,000 square feet of specialty retail.
4. Villa Serena – This project is located the northwest corner of the Richmar Avenue and Marcos Street intersection. This project proposes to construct 12 multi-family dwelling units.
5. Mariposa (Phase 1) – This project is located at the northeast corner of the Richmar Avenue and Los Olivos Drive intersection. This project proposes to develop 60 multi-family dwelling units.
6. Murai Subdivision – This project is located at the north end of Las Posas Road. This project proposes to construct 89 single-family residential dwelling units.
7. Pacifica San Marcos – This project is located at the southeast corner of the Rancho Santa Fe Road and 9th Street intersection. This project proposes to construct 31 multi-family dwelling units as well as 4,375 square feet of commercial use.
8. Karl Strauss Brewery – This project is located at the southeast corner of the North Las Posas Road and Armorlite Drive intersection. This project proposes to construct 10,528 square feet of uses that include a tasting room, commercial kitchen, and entertainment room.
9. Gran Vista Multi-Family – This project is located 250 feet northwest of the West Mission Road & North Las Posas Road intersection. This project proposes to construct 120 multifamily dwelling units.
10. Hughes Circuits – This project is located 650 feet south of the South Pacific Street & Linda Vista Drive intersection. This project proposes to construct 8,000 SF of office, 44,410 SF of warehouse, and 15,000 SF of manufacturing.
San Marcos Artist’s Village Project
Local Transportation Analysis
The traffic generated from the projects listed above was included in the Near-Term Year 2024 Base scenario. Figure 6.1 displays the location of the cumulative projects identified above.
Cumulative Project Trip Generation
Cumulative project traffic was assigned to the project study area as identified within their respective traffic studies provided by the City of San Marcos. Cumulative project traffic for cumulative projects without completed traffic studies were estimated and assigned to the project study area utilizing the same methodology used for the Project, described in Chapter 3.0, consistent with the City’s TIAG.
Based on the obtained and assumed trip distribution patterns, only a few cumulative projects carry trips through the project study area. These trips primarily travel along S Las Posas Road, Grand Avenue, and W San Marcos Boulevard. Table 6.1 displays the projected trip generation for the cumulative projects. Figure 6.2A displays the daily cumulative project trip assignment for study roadway segments and Figure 6.2B displays the AM/PM peak hour cumulative project trip assignment for study intersections. Relevant excerpts from the source of information regarding the cumulative project are provided in Appendix H.
Table 6.1 - Cumulative Project Trip Generation
Cumulative Project Land Use Daily
Trips
AM Peak Hour
(In/Out)
AM Peak Hour
(In/Out)
Pacific Commercial Hotel 854 69
(28-in/41-out)
77 (46-in/31-out)
San Marcos
Highlands1
Single Family Residential/Passive
Park 1,998 165(52-in/113-out)
199
(137-in/62-out)
El Dorado II Specific
Plan
Multi-Family Residential/Specialty
Retail 512 38(9-in/29-out)
47 (31-in/16-out)
Villa Serena Multi-Family Residential 96 8
(2-in/6-out)
10 (7-in/3-out)
Mariposa (Phase 1) Multi-Family Residential 360 29
(6-in/23-out)
33 (23-in/10-out)
Murai Subdivision2 Single Family Residential 890 71
(21-in/50-out)
89 (62-in/27-out)
Pacifica San Marcos Multi-Family Residential/Specialty
Retail 361 21(7-in/14-out)
33 (20-in/13-out)
Karl Strauss
Brewery Brewery/Restaurant 1,685 135(68-in/67-out)
135
(81-in/54-out)
Gran Vista MultiFamily3 Multi-Family Residential 960 77 (15-in/62-out)
96 (67-in/29-out)
Hughes Circuits4 Office, Warehouse, Manufacturing 348 38 (32-in/6-out)
43 (9-in/34-out)
Total 8,064 651
(240-in/411-out)
762
(483-in/279-out)
Source: SANDAG (not so) Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region (April 2002) Notes:
1 Trip generation obtained from the San Marcos Highlands Traffic Impact Analysis Report prepared by RBF Consulting (February 2015) 2 Trip generation obtained from the Murai Subdivision Traffic Impact Analysis Report prepared by STC Traffic Inc (April 2017) 3 Trip generation obtained from the Gran Vista Multi-Family Transportation Impact Analysis Report prepared by CR Associates (February 2023)
4 Trip generation obtained from the Hughes Circuits Transportation Impact Analysis Report prepared by CR Associates (March 2023) S Las Posas Rd
Grand Av
W Mission Rd
W Borden Rd
W San Marcos Bl
N Las Posas Rd
Linda Vista Dr
S Santa Fe Av
S Bent Av
DISCOVERY ST
Glendale Av
San Marcos Artist's Village
Local Transportation Analysis
Figure 6.1
Cumulative Project Locations
0 1,000 2,000 Feet
78 Cumulative Project Location
Project Site
Karl Strauss
Brewery
Pacific San Marcos Pacific Commercial
Mariposa (Phase 1)
Villa Serena
El Dorado II
Specific Plan
Murai Subdivision
San Marcos Highlands
Gran Vista Multi-Family
Hughes Circuits
90 145
108
1,506
108
90 145
6 1
2 7
5 4
3 San Marcos Artist's Village
Local Transportation Analysis
Figure 6.2A
Cumulative Project Trip Assignment
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 250 500 Feet
S Las Posas Rd
Via Vera Cruz
Armorlite Dr
78 #
XXX Cumulative Project Trip Assignment
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard
7 / 3
1 / 4
1 / 5
1 / 8
6 / 92 / 7
8 / 6
3 / 2
73 / 52
43 / 93 24 / 52
16 / 2143 / 27
19 / 17
73 / 4650 / 91
3 / 2
6 / 9 1 / 4
1 / 8
3 / 2
7 / 3
2 / 7 1 / 4
7 / 3
1 / 4
2 / 7
7 / 3 7 / 3
8 / 6
3 / 2
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 6.2B
Cumulative Project Trip Assignment
Study Intersection
Peak Hour Trip
Assignment
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
San Marcos Artist’s Village Project
Local Transportation Analysis
As shown, the cumulative projects are anticipated to generate 8,064 daily trips, including 651 trips during the AM peak hour and 762 trips during the PM peak hour, that will be dispersed throughout the San Marcos community and beyond the project study area.
Near-Term Year 2024 Base Roadway Network and
Traffic Volumes
Roadway segment functional classifications and intersection geometrics under Near-Term Year 2024 Base conditions were assumed to be identical to Existing conditions (Figure 5.1 and Figure 5.2). The Near-Term Year 2024 Base scenario traffic volumes were derived by adding the additional trips generated by the cumulative projects listed in Section 6.1 (Figure 6.2A and Figure 6.2B) to the existing traffic volumes (Figure 5.3A and Figure 5.3B). Figure 6.3A displays projected daily traffic volumes for study roadway segments and Figure 6.3B displays the projected AM/PM peak hour turning movements for study intersections under Near-Term Year 2024 Base conditions.
Near-Term Year 2024 Base Traffic Conditions
LOS analyses under Near-Term Year 2024 Base conditions were conducted using the methodologies described in Chapter 2. Roadway segment and intersection LOS analysis results are discussed below.
6.4.1 Roadway Segment Analysis
Table 6.2 displays roadway segment LOS analysis results for study roadway segments under NearTerm Year 2024 Base conditions.
As shown, all study roadway segments are projected to operate at acceptable LOS D or better under Near-Term Year 2024 Base conditions, with the exception of the following roadway segment:
West San Marcos Boulevard, between Via Vera Cruz and South Bent Avenue – LOS E.
6.4.2 Intersection Analysis
Table 6.3 displays intersection LOS and average vehicle delay results for the study intersections under Near-Term Year 2024 Base conditions. LOS calculation worksheets for Near-Term Year 2024 Base conditions are provided in Appendix I.
As shown, all study intersections are projected to operate at acceptable LOS D or better under NearTerm Year 2024 Base conditions, with the exception of the following intersection:
SR-78 EB Ramps/Via Vera Cruz & Grand Avenue – LOS E during the AM peak hour and LOS F during the PM peak hour.
38,750
4,170
8,000
8,410
11,190
10,260
22,500
38,750
6 1
2 7
5 4
3 San Marcos Artist's Village
Local Transportation Analysis
Figure 6.3A
Traffic Volumes
Near-Term Year 2024 Base Conditions
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 250 500 Feet
S Las Posas Rd
Via Vera Cruz
Armorlite Dr
78 #
XXX Daily Traffic Volumes
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard
8 / 8
9 / 15
8 / 384 / 14
6 / 608 / 74
44 / 98
44 / 91
13 / 68
15 / 20
44 / 4316 / 24
42 / 76
19 / 72
21 / 33
21 / 35
22 / 45 21 / 38
33 / 77
28 / 51
33 / 70
22 / 58
34 / 26
19 / 24
17 / 60
11 / 17
10 / 41
109 / 6196 / 241156 / 92
39 / 177
45 / 134
84 / 302
61 / 146
58 / 21353 / 174
53 / 189
54 / 205
85 / 222
92 / 17337 / 13833 / 122
96 / 186
130 / 84
104 / 237
112 / 344
252 / 277
137 / 173
169 / 137 149 / 313
177 / 302
187 / 359
191 / 553
430 / 511
411 / 704 282 / 928
127 / 328 257 / 616 255 / 249 249 / 306
274 / 773
245 / 390
238 / 206
210 / 372 469 / 281 664 / 552
432 / 356477 / 385
852 / 1290
1257 / 1107
1056 / 1367
1371 / 1106
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 6.3B
Traffic Volumes
Near-Term Year 2024 Base Conditions
Study Intersection
Peak Hour Volumes
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 6.2 - Roadway Segment LOS Results – Near-Term Year 2024 Base Conditions Roadway Segment Functional Classification Roadway
Capacity
Daily
Volume V/C LOS
Via Vera Cruz Grand Avenue to Linda Vista Drive 4-Lane Secondary Arterial/Collector 30,000 8,260 0.275 A
Via Vera Cruz Linda Vista Drive to West San Marcos
Boulevard
4-Lane Secondary
Arterial/Collector 30,000 7,850 0.262 A
Grand Avenue South Las Posas Road to Via Vera Cruz 4-Lane Secondary Arterial/Collector 30,000 22,500 0.750 D
Grand Avenue Via Vera Cruz to Linda Vista Drive 4-Lane Secondary Arterial/Collector 30,000 10,170 0.339 B
Grand Avenue Linda Vista Drive to West San Marcos
Boulevard
4-Lane Secondary
Arterial/Collector 30,000 11,100 0.370 B
Linda Vista Drive Via Vera Cruz to Grand Avenue 2-Lane Collector (Commercial/Industrial Fronting) 8,000 4,170 0.521 C
West San Marcos
Boulevard Via Vera Cruz to South Bent Avenue 4-Lane Major Arterial 40,000 38,750 0.969 E West San Marcos
Boulevard South Bent Avenue to Grand Avenue 5-Lane Major Arterial 50,000 38,750 0.775 D Source: CR Associates (2022)
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 6.3 - Peak Hour Intersection LOS Results – Near-Term Year 2024 Base Conditions # Intersection Control Type Peak Hour Avg. Delay (sec.) LOS 1 South Las Posas Road & Grand Avenue Signal AM 31.7 C
PM 39.8 D
2 SR-78 EB Ramps/Via Vera Cruz & Grand Avenue Signal AM 65.3 E PM 89.2 F
3 Via Vera Cruz & Linda Vista Drive Signal AM 16.4 B
PM 19.9 B
4 Linda Vista Drive & Grand Avenue SSSC AM 10.1 B
PM 17.9 C
5 South Bent Avenue & Grand Avenue Signal AM 7.8 A
PM 11.3 B
6 Via Vera Cruz & West San Marcos Boulevard Signal AM 19.3 B PM 51.2 D
7 Grand Avenue & West San Marcos Boulevard Signal AM 34.2 C PM 47.2 D
Source: CR Associates (2022)
Notes:
Bold indicates LOS E or F.
SSSC = Side-Street Stop-Controlled. For SSSC intersections, the delay shown is the worst delay experienced by any of the approaches.
San Marcos Artist’s Village Project
Local Transportation Analysis
Near-Term Year 2024 Base with Project Roadway
Network and Traffic Volumes
Roadway segment functional classifications and intersection geometrics under Near-Term Year 2024 Base with Project conditions were assumed to be identical to Near-Term Year 2024 Base conditions.
Traffic volumes for Near-Term Year 2024 Base with Project conditions were derived by combining the project trips (Figure 3.5A and Figure 3.5B) to the Near-Term Year 2024 Base traffic volumes (Figure
6.3A and Figure 6.3B). Figure 6.4A displays the projected daily traffic volumes for study roadway segments and Figure 6.4B displays the projected AM/PM peak hour turning movements for study intersections under Near-Term Year 2024 Base with Project conditions.
Near-Term Year 2024 Base with Project Traffic
Conditions
LOS analyses under Near-Term Year 2024 Base with Project conditions were conducted using the methodologies described in Chapter 2. Roadway segment and intersection LOS analysis results are discussed below.
6.6.1 Roadway Segment Analysis
Table 6.4 displays roadway segment LOS analysis results for study roadway segments under NearTerm Year 2024 Base with Project conditions.
As shown, all study roadway segments are projected to operate at acceptable LOS D or better under Near-Term Year 2024 Base with Project conditions, with the exception of the following roadway segment:
West San Marcos Boulevard, between Via Vera Cruz and South Bent Avenue – The roadway segment is projected to operate at LOS E under Near-Term Year 2024 Base with Project conditions. The roadway segment is already operating at substandard LOS under Near-Term Year 2024 Base conditions and the Project does not add any daily traffic along this segment.
This roadway segment is projected to operate at unacceptable LOS prior to the implementation of the Project. Project traffic would not increase the V/C ratio for this roadway segment by more than
0.02. Therefore, no study roadway segments are anticipated to degrade in LOS to unacceptable levels with implementation of the Project and no improvements will be required. 38,750
5,316
8,573
8,639
11,763
10,718
23,188
4,972
4,858
10,718
38,750
10,718
8 9
6 1
2 7
5 4
3 11
10 San Marcos Artist's Village
Local Transportation Analysis
Figure 6.4A
Traffic Volumes
Near-Term Year 2024 Base with Project Conditions
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 250 500 Feet
S Las Posas Rd
Via Vera Cruz
Armorlite Dr
Project
Dwy #2
Project Project Dwy #4 Dwy #3
Project
Dwy #1
78 #
XXX Daily Traffic Volumes
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard
8 / 8
7 / 9
3 / 9
0 / 0
3 / 4
1 / 5
9 / 13
8 / 22
7 / 10
5 / 104 / 126 / 17
6 / 20
4 / 11
9 / 648 / 7411 / 427 / 8
58 / 60
11 / 17 13 / 68
14 / 21
16 / 24
16 / 39
47 / 96
44 / 98
19 / 72
21 / 33
21 / 35
21 / 38
42 / 76
38 / 39
23 / 63
34 / 65
28 / 51
33 / 77
33 / 70
34 / 26
28 / 39
23 / 35
11 / 15
17 / 60
17 / 51
22 / 58
56 / 194
61 / 146
109 / 61
54 / 177
45 / 134
39 / 177
96 / 24161 / 22184 / 302
54 / 205
140 / 96 36 / 126
88 / 225
95 / 17737 / 138
98 / 191
113 / 252
119 / 363
267 / 302
133 / 388 129 / 385
143 / 181
164 / 327
168 / 109
176 / 146
186 / 319
192 / 136
192 / 372
430 / 511
196 / 386
201 / 401
205 / 570
421 / 717 282 / 928
280 / 648
127 / 328 270 / 624 256 / 250
250 / 226
249 / 306
245 / 390
291 / 795
304 / 652
216 / 382
195 / 133
469 / 281664 / 552441 / 371477 / 385
852 / 1290
1257 / 1107
1056 / 1367
1371 / 1106
0 / 0
0 / 0
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 6.4B
Traffic Volumes
Near-Term Year 2024 Base with Project Conditions
Study Intersection
Peak Hour Volumes
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 6.4 - Roadway Segment LOS Results – Near-Term Year 2024 Base with Project Conditions Roadway Segment Functional
Classification
Roadway
Capacity
Near-Term Year 2024 with
Project
Near-Term Year 2024
without Project
Δ V/C
Daily
Volume V/C LOS DailyVolume V/C LOS
Via Vera Cruz
Grand Avenue to Linda
Vista Drive
4-Lane Secondary
Arterial/Collector 30,000 8,676 0.289 A 8,260 0.275 A 0.009 Via Vera Cruz
Linda Vista Drive to West
San Marcos Boulevard
4-Lane Secondary
Arterial/Collector 30,000 8,560 0.285 A 7,850 0.262 A 0.019 Grand Avenue
South Las Posas Road to
Via Vera Cruz
4-Lane Secondary
Arterial/Collector 30,000 23,060 0.769 D 22,500 0.750 D 0.019 Grand Avenue
Via Vera Cruz to Project
Driveway #1
4-Lane Secondary
Arterial/Collector 30,000 10,666 0.356 B 10,170 0.339 B 0.014 Grand Avenue
Project Driveway #1 to
Project Driveway #2
4-Lane Secondary
Arterial/Collector 30,000 10,891 0.363 B 10,170 0.339 B 0.021 Grand Avenue
Project Driveway #2 to
Linda Vista Drive
4-Lane Secondary
Arterial/Collector 30,000 11,061 0.369 B 10,170 0.339 B 0.027 Grand Avenue
Linda Vista Drive to West
San Marcos Boulevard
4-Lane Secondary
Arterial/Collector 30,000 11,863 0.395 B 11,100 0.370 B 0.022 Linda Vista Drive
Via Vera Cruz to Project
Driveway #3
2-Lane Collector
(Commercial/Industrial
Fronting)
8,000 5,332 0.667 D 4,170 0.521 C 0.145
Linda Vista Drive
Project Driveway #3 to
Project Driveway #4
2-Lane Collector
(Commercial/Industrial
Fronting)
8,000 5,066 0.633 D 4,170 0.521 C 0.112
Linda Vista Drive
Project Driveway #4 to
Grand Avenue
2-Lane Collector
(Commercial/Industrial
Fronting)
8,000 5,066 0.633 D 4,170 0.521 C 0.112
West San Marcos
Boulevard
Via Vera Cruz to South
Bent Avenue 4-Lane Major Arterial 40,000 38,750 0.775 E 38,750 0.775 E 0.000 West San Marcos
Boulevard
South Bent Avenue to
Grand Avenue 5-Lane Major Arterial 50,000 38,750 0.969 D 38,750 0.969 D 0.000 Source: CR Associates (2022)
San Marcos Artist’s Village Project
Local Transportation Analysis
6.6.2 Intersection Analysis
Table 6.5 displays intersection LOS and average vehicle delay results for study area intersections under Near-Term Year 2024 Base with Project Conditions. LOS calculation worksheets for Near-Term Year 2024 Base with Project conditions are provided in Appendix J.
As shown, all study intersections are projected to operate at acceptable LOS D or better under NearTerm Year 2024 Base with Project conditions, with the exception of the following intersection:
SR-78 EB Ramps/Via Vera Cruz & Grand Avenue – LOS E during the AM peak hour and LOS F during the PM peak hour. The intersection is already operating at substandard LOS under Near-Term Year 2024 Base conditions and the Project adds 0.7 seconds of delay during the AM peak hour and 0.1 seconds of delay during the PM peak hour.
This intersection is projected to operate at unacceptable LOS prior to the implementation of the Project. Project traffic would not increase the overall average delay at this intersection by more than
2.0 seconds. Therefore, no study intersections are anticipated to degrade in LOS to unacceptable levels with implementation of the Project and no improvements will be required.
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 6.5 - Peak Hour Intersection LOS Results – Near-Term Year 2024 Base with Project Conditions # Intersection Control Type Peak
Hour
Near-Term Year 2024
with Project
Near-Term Year 2024
without Project
Δ Delay
Avg. Delay
(sec.) LOS Avg. Delay(sec.) LOS
1 South Las Posas Road & Grand
Avenue Signal AM 31.8 C 31.7 C 0.1PM 40.6 D 39.8 D 0.8
2 SR-78 EB Ramps/Via Vera Cruz &
Grand Avenue Signal AM 66.0 E 65.3 E 0.7PM 89.3 F 89.2 F 0.1 3 Via Vera Cruz & Linda Vista Drive Signal AM 16.9 B 16.4 B 0.5 PM 21.3 C 19.9 B 1.4
4 Linda Vista Drive & Grand Avenue SSSC AM 11.1 B 10.1 B 1.0 PM 24.0 C 17.9 C 6.1
5 South Bent Avenue & Grand Avenue Signal AM 7.9 A 7.8 A 0.1 PM 11.3 B 11.3 B 0.0
6 Via Vera Cruz & West San Marcos
Boulevard Signal AM 21.2 C 19.3 B 1.9PM 52.5 D 51.2 D 1.3 7 Grand Avenue & West San Marcos
Boulevard Signal AM 34.6 C 34.2 C 0.4PM 49.1 D 47.2 D 2.9 8 Project Driveway #1 & Grand Avenue SSSC AM 10.2 B N/A N/A 10.2 PM 14.0 B N/A N/A 14.0
9 Project Driveway #2 & Grand Avenue SSSC AM 9.7 A N/A N/A 9.7 PM 12.4 B N/A N/A 12.4
10 Project Driveway #3 & Linda Vista
Drive SSSC AM 10.1 B N/A N/A 10.1PM 10.7 B N/A N/A 10.7 11 Project Driveway #4 & Linda Vista
Drive SSSC AM 10.4 B N/A N/A 10.4PM 11.7 B N/A N/A 11.7 Source: CR Associates (2022)
Notes:
Bold indicates LOS E or F.
SSSC = Side-Street Stop-Controlled. For SSSC intersections, the delay shown is the worst delay experienced by any of the approaches.
N/A = Not Applicable.
San Marcos Artist’s Village Project
Local Transportation Analysis
7.0 Horizon Year 2050 Conditions
This section provides an analysis of Horizon Year 2050 traffic conditions both with and without the Project. The scenarios analyzed in this section include:
Horizon Year 2050
Horizon Year 2050 with Project
Horizon Year 2050 Roadway Network and Traffic
Volumes
Roadway segment functional classifications and intersection geometrics under Horizon Year 2050 Conditions were assumed to be identical to Existing conditions, as previously shown in Figure 5.1 and Figure 5.2.
Horizon Year 2050 ADT forecasts were obtained from the SANDAG Series 14 ABM2+/2021 RP forecast year 2050 model (scenario ID#459). Any study roadway segments with Near-Term Year 2024 Base ADT greater than forecasted TFIC ADT were adjusted using growth rates observed between existing and forecasted TFIC ADT for adjacent segments.
Intersection turning movement volumes were developed utilizing the projected study roadway segment volumes and the National Cooperative Highway Research Program (NCHRP) Report 255 methodology. This methodology describes the use of growth factors by comparing existing and estimated/forecasted daily roadway segment volumes. These factors are then applied to existing peak hour intersection approach and departure volumes to derive future intersection turning movement traffic volumes. Manual adjustments were also made to ensure that traffic volumes among adjacent intersections were reasonably balanced. Details on counts collected from TFIC and forecasted intersection turning movement volume calculations are provided in Appendix K.
Figure 7.1A displays projected daily traffic volumes for study roadway segments and Figure 7.1B displays the AM/PM peak hour turning movements for study intersections under Horizon Year 2050 conditions.
39,500
4,400
9,200
12,200
12,600
12,000
23,000
39,500
6 1
2 7
5 4
3 San Marcos Artist's Village
Local Transportation Analysis
Figure 7.1A
Traffic Volumes
Horizon Year 2050 Conditions
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 250 500 Feet
S Las Posas Rd
Via Vera Cruz
Armorlite Dr
78 #
XXX Daily Traffic Volumes
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard 5 / 55
40 / 65
50 / 65
15 / 7015 / 5015 / 45
50 / 60
45 / 75
25 / 50
45 / 60
30 / 55
30 / 60
30 / 65
30 / 85
35 / 35
40 / 80
35 / 7510 / 75
25 / 65
25 / 30
50 / 45
20 / 65
120 / 75 15 / 20 45 / 105 45 / 195 55 / 18060 / 110
60 / 210
70 / 250
75 / 125
90 / 310
95 / 180
95 / 17575 / 27575 / 27095 / 355
135 / 90
105 / 260
280 / 305
415 / 505
400 / 670
125 / 375
145 / 200
155 / 235
170 / 345
110 / 250
175 / 140
190 / 135
190 / 315
205 / 590
290 / 690
220 / 400
285 / 920
120 / 215
285 / 280250 / 310
210 / 375
305 / 270
310 / 870
355 / 495
125 / 325 470 / 280 665 / 560
415 / 345470 / 360120 / 260
870 / 1310
1280 / 1135
1075 / 1385
1425 / 1160
15 / 50
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 7.1B
Traffic Volumes
Horizon Year 2050 Conditions
Study Intersection
Peak Hour Volumes
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
San Marcos Artist’s Village Project
Local Transportation Analysis
Horizon Year 2050 Traffic Conditions
LOS analyses under Horizon Year 2050 Conditions were conducted using the methodologies described in Chapter 2. Study roadway segment and intersection LOS analysis results are discussed below.
7.2.1 Roadway Segment Analysis
Table 7.1 displays roadway segment LOS analysis results for study roadway segments under Horizon Year 2050 conditions.
As shown, all study roadway segments are projected to operate at acceptable LOS D or better under Horizon Year 2050 conditions, with the exception of the following roadway segment:
West San Marcos Boulevard, between Via Vera Cruz and South Bent Avenue – LOS E.
7.2.2 Intersection Analysis
Table 7.2 displays intersection LOS and average vehicle delay results for study area intersections under Horizon Year 2050 Conditions. LOS calculation worksheets for Horizon Year 2050 Conditions are provided in Appendix L.
As shown, all study intersections are projected to operate at acceptable LOS D or better under Horizon Year 2050 Conditions, with the exception of the following intersection:
SR-78 EB Ramps/Via Vera Cruz & Grand Avenue – LOS E during the AM peak hour and LOS F during the PM peak hour.
Grand Avenue & West San Marcos Boulevard – LOS E during the PM peak hour.
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 7.1 - Roadway Segment LOS Results – Horizon Year 2050 Conditions Roadway Segment Functional Classification Roadway
Capacity
Daily
Volume V/C LOS
Via Vera Cruz Grand Avenue to Linda Vista Drive 4-Lane Secondary Arterial/Collector 30,000 12,600 0.420 B
Via Vera Cruz Linda Vista Drive to West San Marcos
Boulevard
4-Lane Secondary
Arterial/Collector 30,000 9,200 0.307 A
Grand Avenue South Las Posas Road to Via Vera Cruz 4-Lane Secondary Arterial/Collector 30,000 23,000 0.767 D
Grand Avenue Via Vera Cruz to Linda Vista Drive 4-Lane Secondary Arterial/Collector 30,000 12,000 0.400 B
Grand Avenue Linda Vista Drive to West San Marcos
Boulevard
4-Lane Secondary
Arterial/Collector 30,000 12,200 0.407 B
Linda Vista Drive Via Vera Cruz to Grand Avenue 2-Lane Collector (Commercial/Industrial Fronting) 8,000 4,400 0.550 C
West San Marcos
Boulevard Via Vera Cruz to South Bent Avenue 4-Lane Major Arterial 40,000 39,500 0.988 E West San Marcos
Boulevard South Bent Avenue to Grand Avenue 5-Lane Major Arterial 50,000 39,500 0.790 D San Marcos Artist’s Village Project
Local Transportation Analysis
Table 7.2 - Peak Hour Intersection LOS Results – Horizon Year 2050 Conditions # Intersection Control Type Peak Hour Avg. Delay (sec.) LOS 1 South Las Posas Road & Grand Avenue Signal AM 32.2 C
PM 40.8 D
2 SR-78 EB Ramps/Via Vera Cruz & Grand Avenue Signal AM 65.7 E PM 90.4 F
3 Via Vera Cruz & Linda Vista Drive Signal AM 16.8 B
PM 20.9 C
4 Linda Vista Drive & Grand Avenue SSSC AM 11.2 B
PM 37.3 E
5 South Bent Avenue & Grand Avenue Signal AM 8.5 A
PM 13.3 B
6 Via Vera Cruz & West San Marcos Boulevard Signal AM 21.1 C PM 52.0 D
7 Grand Avenue & West San Marcos Boulevard Signal AM 36.6 D PM 58.3 E
Source: CR Associates (2022)
Notes:
Bold indicates LOS E or F.
SSSC = Side-Street Stop-Controlled. For SSSC intersections, the delay shown is the worst delay experienced by any of the approaches.
San Marcos Artist’s Village Project
Local Transportation Analysis
Horizon Year 2050 with Project Roadway Network and
Traffic Volumes
Roadway segment functional classifications and intersection geometrics under the Horizon Year 2050 with Project Conditions were assumed to be identical to the Horizon Year 2050 conditions, as previously discussed in Chapter 6.1.
Traffic volumes for the Horizon Year 2050 with Project Conditions were derived by combining the project trips (as previously shown in Figure 3.5A and Figure 3.5B) to the Horizon Year 2050 traffic volumes (as previously shown in Figure 7.1A and Figure 7.1B). Figure 7.2A displays projected daily traffic volumes for study roadway segments and Figure 7.2B displays projected AM/PM peak hour turning movements for study intersections under Horizon Year 2050 with Project conditions.
Horizon Year 2050 with Project Traffic Conditions
LOS analyses under Horizon Year 2050 with Project conditions were conducted using the methodologies described in Chapter 2. Study roadway segment and intersection LOS analysis results are discussed below.
7.4.1 Roadway Segment Analysis
Table 7.3 displays roadway segment LOS analysis results for study roadway segments under Horizon Year 2050 with Project conditions.
As shown, all study roadway segments are projected to operate at acceptable LOS D or better under Horizon Year 2050 with Project conditions, with the exception of the following roadway segment:
West San Marcos Boulevard, between Via Vera Cruz and South Bent Avenue – The roadway segment is projected to operate at LOS E under Horizon Year 2050 with Project conditions.
The roadway segment is already operating at substandard LOS under Horizon Year 2050 conditions and the Project does not add any daily traffic along this segment.
This roadway segment is projected to operate at unacceptable LOS prior to the implementation of the Project. Project traffic would not increase the V/C ratio for this roadway segment by more than
0.02. Therefore, no study roadway segments are anticipated to degrade in LOS to unacceptable levels with implementation of the Project and no improvements will be required. 39,500
5,543
9,773
12,773
12,458
12,829
23,688
5,205
5,088
12,458
39,500
12,458
8 9
6 1
2 7
5 4
3 11
10 San Marcos Artist's Village
Local Transportation Analysis
Figure 7.2A
Traffic Volumes
Horizon Year 2050 with Project Conditions
Linda Vista Dr
S Bent Ave
Grand Ave
W San Marcos Bl
0 250 500 Feet
S Las Posas Rd
Via Vera Cruz
Armorlite Dr
Project
Dwy #2
Project Project Dwy #4 Dwy #3
Project
Dwy #1
78 #
XXX Daily Traffic Volumes
Legend
S Bent Avenue & Grand Avenue
S Las Posas Road & Grand Avenue SR-78 EB Ramps & Grand Avenue Via Vera Cruz & Linda Vista Drive Linda Vista Drive & Grand Avenue Project Driveway #2 & Grand Avenue
Project Driveway #1 & Grand Avenue
Project Driveway #3
& Linda Vista Drive
Project Driveway #4
& Linda Vista Drive
Grand Avenue
& W San Marcos Boulevard
Via Vera Cruz
& W San Marcos Boulevard
7 / 9
3 / 9
0 / 0
3 / 4
1 / 5
6 / 20
8 / 225 / 10
9 / 134 / 12
7 / 10
6 / 17
11 / 427 / 8
4 / 11
64 / 7730 / 60
57 / 95
14 / 21
15 / 70
73 / 84
45 / 60
25 / 50
40 / 80
25 / 85
27 / 70
40 / 65
35 / 35
30 / 6530 / 75
32 / 57
32 / 42
35 / 7510 / 75
40 / 35
29 / 41
25 / 65
22 / 60
13 / 64
11 / 15
20 / 65
120 / 75
75 / 125
45 / 195
95 / 180
90 / 310
48 / 110
56 / 183
60 / 110
73 / 255
63 / 223
98 / 17975 / 27578 / 27495 / 355
105 / 260
119 / 265
261 / 224
430 / 515
425 / 718
132 / 394
348 / 767
151 / 208
153 / 447
155 / 235
157 / 450
182 / 149 180 / 359
194 / 332
202 / 152
303 / 698
219 / 607
225 / 413
240 / 458
245 / 473
295 / 330 285 / 930
264 / 221
122 / 220
286 / 281250 / 310
216 / 385
317 / 290
327 / 892
145 / 102
355 / 495
372 / 771
130 / 330 470 / 285 665 / 555
444 / 375480 / 385123 / 263
870 / 1310
1280 / 1135
1075 / 1385
1425 / 1160
9 5 6 7 8
1 2 3 4
10 11
San Marcos Artist's Village
Local Transportation Analysis
Figure 7.2B
Traffic Volumes
Horizon Year 2050 with Project Conditions
Study Intersection
Peak Hour Volumes
Turn Movements
*Names of North-South
cross-streets always
listed first
AM / PM
NOT TO SCALE
X
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 7.3 - Roadway Segment LOS Results – Horizon Year 2050 with Project Conditions Roadway Segment Functional
Classification
Roadway
Capacity
Horizon Year 2050
with Project
Horizon Year 2050
without Project Δ V/C
Daily Volume V/C LOS Daily Volume V/C LOS
Via Vera
Cruz
Grand Avenue to Linda
Vista Drive
4-Lane Secondary
Arterial/Collector 30,000 12,866 0.429 B 12,600 0.420 B 0.009 Via Vera
Cruz
Linda Vista Drive to West
San Marcos Boulevard
4-Lane Secondary
Arterial/Collector 30,000 9,760 0.325 A 9,200 0.307 A 0.019 Grand
Avenue
South Las Posas Road to
Via Vera Cruz
4-Lane Secondary
Arterial/Collector 30,000 23,560 0.785 D 23,000 0.767 D 0.019 Grand
Avenue
Via Vera Cruz to Project
Driveway #1
4-Lane Secondary
Arterial/Collector 30,000 12,406 0.414 B 12,000 0.400 B 0.014 Grand
Avenue
Project Driveway #1 to
Project Driveway #2
4-Lane Secondary
Arterial/Collector 30,000 12,631 0.421 B 12,000 0.400 B 0.021 Grand
Avenue
Project Driveway #2 to
Linda Vista Drive
4-Lane Secondary
Arterial/Collector 30,000 12,801 0.427 B 12,000 0.400 B 0.027 Grand
Avenue
Linda Vista Drive to West
San Marcos Boulevard
4-Lane Secondary
Arterial/Collector 30,000 12,873 0.429 B 12,200 0.407 B 0.022 Linda
Vista
Drive
Via Vera Cruz to Project
Driveway #3
2-Lane Collector
(Commercial/Industrial
Fronting)
8,000 5,562 0.695 D 4,400 0.550 C 0.145
Linda
Vista
Drive
Project Driveway #3 to
Project Driveway #4
2-Lane Collector
(Commercial/Industrial
Fronting)
8,000 5,296 0.662 D 4,400 0.550 C 0.112
Linda
Vista
Drive
Project Driveway #4 to
Grand Avenue
2-Lane Collector
(Commercial/Industrial
Fronting)
8,000 5,296 0.662 D 4,400 0.550 C 0.112
West San
Marcos
Boulevard
Via Vera Cruz to South
Bent Avenue 4-Lane Major Arterial 40,000 39,500 0.988 E 39,500 0.988 E 0.000 West San
Marcos
Boulevard
South Bent Avenue to
Grand Avenue 5-Lane Major Arterial 50,000 39,500 0.790 D 39,500 0.790 D 0.000 Source: CR Associates (2022)
San Marcos Artist’s Village Project
Local Transportation Analysis
7.4.2 Intersection Analysis
Table 7.4 displays intersection LOS and average vehicle delay results for the key study area intersections under Horizon Year 2050 with Project conditions. LOS calculation worksheets for Horizon Year 2050 with Project Conditions are provided in Appendix M.
As shown, all study intersections are projected to operate at acceptable LOS D or better under Horizon Year 2050 with Project conditions, with the exception of the following intersection:
SR-78 EB Ramps/Via Vera Cruz & Grand Avenue – LOS E during the AM peak hour and LOS F during the PM peak hour. The intersection is already operating at substandard LOS under Horizon Year 2050 without Project conditions and the Project adds 1.1 seconds of delay during the AM peak hour and 0.8 seconds of delay during the PM peak hour. Linda Vista Drive & Grand Avenue – LOS F during the PM peak hour. The Project adds 32.9 seconds of delay and causes the LOS at this intersection to degrade from LOS E to LOS F during the PM peak hour.
Grand Avenue & West San Marcos Boulevard – LOS E during the PM peak hour. The Project adds 1.1 seconds of delay to this intersection already operating at substandard LOS E under Horizon Year 2050 without Project conditions.
Implementation of the Project would cause an inconsistency with Policy M-1.4 at the intersection of Linda Vista Drive & Grand Avenue since it would increase the delay at an intersection already operating at LOS E or F by more than 2.0 seconds. In contrast, the intersections of SR-78 EB Ramps/Via Vera Cruz & Grand Avenue and Grand Avenue & West San Marcos Boulevard, which operate at LOS E or F during the PM peak hour, would experience an increase in delay less than 2.0 seconds and thus would not result in substantial effects to traffic operations.
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 7.4 - Peak Hour Intersection LOS Results – Horizon Year 2050 with Project Conditions # Intersection Control
Type
Peak
Hour
Horizon Year
2050
with Project
Horizon Year
2050
without Project
Δ Delay
Avg.
Delay
(sec.)
LOS
Avg.
Delay
(sec.)
LOS
1 South Las Posas Road &
Grand Avenue Signal AM 32.1 C 32.1 C 0.0
PM 41.1 D 40.9 D 0.2
2 SR-78 EB Ramps/Via Vera
Cruz & Grand Avenue Signal AM 71.9 E 70.8 E 1.1
PM 101.8 F 101.0 F 0.8
3 Via Vera Cruz & Linda Vista
Drive Signal AM 17.1 B 16.6 B 0.5
PM 22.4 C 20.9 C 1.5
4 Linda Vista Drive & Grand
Avenue SSSC AM 12.3 B 11.2 B 1.1
PM 70.2 F 37.3 E 32.9
5 South Bent Avenue &
Grand Avenue Signal AM 8.5 A 8.5 A 0.0
PM 13.6 B 13.3 B 0.3
6 Via Vera Cruz & West San
Marcos Boulevard Signal AM 22.8 C 21.1 C 1.7
PM 52.3 D 52.1 D 0.2
7 Grand Avenue & West San
Marcos Boulevard Signal AM 36.8 D 36.6 D 0.2
PM 59.4 E 58.3 E 1.1
8 Project Driveway #1 &
Grand Avenue SSSC AM 10.2 B N/A N/A 10.2
PM 13.1 B N/A N/A 13.1
9 Project Driveway #2 &
Grand Avenue SSSC AM 9.9 A N/A N/A 9.9
PM 13.0 B N/A N/A 13.0
10 Project Driveway #3 &
Linda Vista Drive SSSC AM 10.6 B N/A N/A 10.6
PM 11.6 B N/A N/A 11.6
11 Project Driveway #4 &
Linda Vista Drive SSSC AM 10.9 B N/A N/A 10.9
PM 12.9 B N/A N/A 12.0
Source: CR Associates (2022)
Notes:
Bold indicates LOS E or F.
SSSC = Side-Street Stop-Controlled. For SSSC intersections, the delay shown is the worst delay experienced by any of the approaches.
N/A = Not Applicable.
San Marcos Artist’s Village Project
Local Transportation Analysis
8.0 LOS Deficiencies and Improvement
Requirements
This chapter provides improvements requirements needed to increase LOS to acceptable or preproject conditions for any roadway segments or intersections found to operate unacceptably with implementation of the Project.
Determination of the Need for Off-Site Improvements to
Accommodate Project Traffic – Near-Term Year 2024
with Project Conditions
This section identifies required improvements for any study roadway segments or intersections that are associated with the Project under Near-Term Year 2024 Base with Project conditions.
Roadway Segment Analysis
No improvements required.
Intersection Analysis
No improvements required.
Determination of the Need for Off-Site Improvements to
Accommodate Project Traffic – Horizon Year 2050 with
Project Conditions
This section identifies required improvements for any study roadway segments or intersections that are associated with the Project under Horizon Year 2050 with Project conditions.
Roadway Segment Analysis
No improvements required.
Intersection Analysis
Because implementation of the Project would further deteriorate traffic operations and increase the delay at an intersection already operating at LOS E or F by more than 2.0 seconds, the Project would cause an inconsistency with Policy M-1.4 at the following intersection:
Linda Vista Drive & Grand Avenue – To improve operations at this intersection, the Project shall provide a fair share contribution to install a traffic signal. It should be noted the intersection already operates at substandard LOS E without the Project, indicating the Project does not directly cause the inconsistency. Upon implementation of this improvement, the intersection would operate at acceptable LOS and better than pre-project conditions.
San Marcos Artist’s Village Project
Local Transportation Analysis
The total number of vehicle trips passing through this intersection during the PM peak hour is 1,811, of which 101 (or 5.6% of the total volume) are vehicle trips generated by the Project. Thus, the Project would be responsible for 5.6% of the cost to implement this improvement.
Table 8.1 displays intersection LOS and average vehicle delay results under Horizon Year 2050 with Project with Mitigation conditions. LOS calculation worksheets and signal timing inputs are provided in Appendix N.
Table 8.1 - Peak Hour Intersection LOS Results – Horizon Year 2050 with Project with Mitigation Conditions # Intersection Peak
Hour
Control
Type
Horizon Year 2050 with
Project and Mitigation Control
Type
Horizon Year 2050
without Project and
Mitigation Δ
Delay
Avg. Delay (sec.) LO
S
Avg. Delay
(sec.) LOS
4 Linda Vista
Drive &
Grand
Avenue
AM
Signal
5.8 A
SSSC
11.2 B -5.6
PM 12.8 B 37.3 E -24.5
Source: CR Associates (2022)
As shown, the recommended improvement would decrease the delay by 5.6 seconds during the AM peak hour and 24.5 seconds during the PM peak hour. Thus, the intersection would operate at acceptable LOS and better than pre-project conditions.
Traffic Signal Warrant
A traffic signal warrant analysis was conducted to determine if a signal would be warranted at the intersection of Linda Vista Drive & Grand Avenue. The ADT-based signal warrant (Figure 4C-103) of the California Manual on Uniform Traffic Control devices (CA MUTCD) was selected for this analysis.
Based on the projected Horizon Year 2050 traffic volumes, the intersection of Linda Vista Drive & Grand Avenue would meet the requirements to satisfy the traffic signal warrant. The traffic signal warrant is provided in Appendix O.
San Marcos Artist’s Village Project
Local Transportation Analysis
9.0 Site Access and Circulation
This chapter addresses access to the project site and discusses the functionality of the project’s internal circulation.
Driveway Access
Project site access will be provided via the following four new project driveways:
Project Driveway #1 – This new, full-access driveway will be located along the south side of Grand Avenue approximately 900 feet northwest of Linda Vista Drive. This driveway will be a new side-street stop-controlled intersection with Grand Avenue as the uncontrolled approach and the project driveway as the stop-controlled approach. This driveway will serve as the main entry point for residents and is projected to operate at LOS B or better under all study scenarios.
Project Driveway #2 – This new, full-access driveway will be located along the south side of Grand Avenue approximately 300 feet northwest of Linda Vista Drive. This driveway will be a new side-street stop-controlled intersection with Grand Avenue as the uncontrolled approach and the project driveway as the stop-controlled approach. This driveway will serve as one of three entry points for the retail and office components of the Project and is projected to operate at LOS B or better under all study scenarios.
Project Driveway #3 – This new, full-access driveway will be located along the north side of Linda Vista Drive approximately 700 feet southwest of Grand Avenue. This driveway will be a new side-street stop-controlled intersection with Linda Vista Drive as the uncontrolled approach and the project driveway as the stop-controlled approach. This driveway will serve as one of three entry points for the retail and office components of the Project and is projected to operate at LOS B or better under all study scenarios. Project Driveway #4 – This new, full-access driveway will be located along the north side of Linda Vista Drive approximately 250 feet southwest of Grand Avenue. This driveway will be a new side-street stop-controlled intersection with Linda Vista Drive as the uncontrolled approach and the project driveway as the stop-controlled approach. This driveway will serve as one of three entry points for the retail and office components of the Project and is projected to operate at LOS B or better under all study scenarios.
A 95th percentile queue analysis was conducted to determine the extent of queueing at the project driveway intersections under Near-Term Year 2024 Base with Project conditions and Horizon Year 2050 with Project conditions. The queue analysis was conducted for the proposed project driveways and the offsite turning movements along Grand Avenue and Linda Vista Drive. Table 9.1 displays the 95th percentile queue analysis results for project driveway intersections under both analysis scenarios. Intersection queueing reports are provided in Appendix P. A sight distance exhibit displaying line-of-sight at each of the proposed driveways is included in Appendix Q.
As shown, the 95th percentile queues at project driveway intersections are projected to fit within the available storage and would not impede circulation of traffic at the driveways or adjacent roadway system.
San Marcos Artist’s Village Project
Local Transportation Analysis
Table 9.1 - Project Driveway Queue Analysis Results
# Intersection Control
Type
Turning
Movement
Peak
Hour
Available
Storage1 (ft)
Near-Term Year 2024
with Project Conditions
Horizon Year 2050
with Project Conditions
95th Percentile
Queue (ft)
Excess
Queue (ft)
95th Percentile
Queue (ft)
Excess
Queue (ft)
8 Project Driveway #1 &
Grand Avenue SSSC
EBR AM 1,250 0 0 0 0
PM 0 0 0 0
WBL AM 900 0 0 0 0
PM 25 0 25 0
9 Project Driveway #2 &
Grand Avenue SSSC
EBR AM 1,850 0 0 0 0
PM 0 0 0 0
WBL AM 300 25 0 25 0
PM 25 0 25 0
10 Project Driveway #3 &
Linda Vista Drive SSSC
EBL AM 1,050 25 0 25 0
PM 25 0 25 0
WBR AM 450 0 0 0 0
PM 0 0 0 0
11 Project Driveway #4 &
Linda Vista Drive SSSC
EBL AM 450 25 0 25 0
PM 25 0 25 0
WBR AM 250 0 0 0 0
PM 0 0 0 0
Source: CR Associates (2022)
Notes:
1 Measured from project driveway to upstream intersection.
SSSC = Side-Street Stop-Controlled.
EBR = Eastbound Right, EBL = Eastbound Left
WBR = Westbound Right, WBL = Westbound Left
San Marcos Artist’s Village Project
Local Transportation Analysis
After further review of the project site plan, the following recommendations are provided:
Driveways are recommended to be constructed in accordance with City standards Install stop signs (R1-1) at project driveways
Internal Circulation
Internal roadways on the project site allow for two-way flow of vehicle traffic. For the residential component, dead-end aisles between buildings provide direct access to garages for each dwelling unit. Guest parking is also provided at the project site.
Based upon review of the project site plan, the following recommendations are provided:
Appropriate signage to warn drivers of pedestrian foot traffic.
Appendix A - Grand Avenue Offsite
Improvement Plans
PARCEL F1 APN 219-152-70-00 PARCEL F2 DOC 2019-0160631 APN 219-152-70-00 MARCOS PROJECT GRAND AVENUE OFFSITE IMPROVEMENT PLANJOB NO. DRAWN BY: SHEET 1 of 2 E N G I N E E R I N G 6390 Greenwich Dr., Suite 170 San Diego, California 92122 tel 858.554.1500 fax 858.597.0335 www.fuscoe.com PARCEL D OF COC REC DOC NO. 2019-0545336 APN 219-152-78-00 PARCEL 4 DOC 2019-0254641 APN 219-152-51-00 PARCEL 1 DOC 2019-0254641 APN 219-152-42-00 PARCEL 3 DOC 2019-0254641 APN 219-152-45-00 PARCEL 2 DOC 2019-0254641 APN 219-152-44-00 MARCOS PROJECTJOB NO. DRAWN BY: SHEET E N G I N E E R I N G 6390 Greenwich Dr., Suite 170 San Diego, California 92122 tel 858.554.1500 fax 858.597.0335 www.fuscoe.com KEY MAP MARCOS PROJECT LINDA VISTA DR. OFFSITE IMPROVEMENT PLANJOB NO. DRAWN BY: SHEET2 of 2 E N G I N E E R I N G 6390 Greenwich Dr., Suite 170 San Diego, California 92122 tel 858.554.1500 fax 858.597.0335 www.fuscoe.com PARCEL A OF COC REC DOC NO. 2019-0160631 APN 219-152-75-00 PARCEL 5 DOC 2019-0254641 APN 219-152-61-00 PARCEL D OF COC REC DOC NO. 2019-0545336 APN 219-152-78-00 PARCEL 5 DOC 2019-0254641 APN 219-152-61-00 PARCEL 1 DOC 2019-0254641 APN 219-152-42-00 PARCEL 3 DOC 2019-0254641 APN 219-152-45-00 PARCEL 2 DOC 2019-0254641 APN 219-152-44-00 KEY MAP Appendix B - Scoping Memorandum
3900 5th Avenue, Suite 310 San Diego, CA 92103 619-795-6086 www.CRAmobility.com
TO: Jonathan Quezada, Assistant Engineer; City of San Marcos Chris Garcia, Associate Planner; City of San Marcos
FROM: Jonathan Sanchez, PE, TE, PTOE; CR Associates
DATE: June 10, 2022
RE: San Marcos Artist’s Village Project – Memorandum of Approach (MOA)
This memorandum serves to document the assumptions that will be used to conduct both a Transportation Impact Analysis (TIA) and a Local Transportation Analysis (LTA), for the San Marcos Artist’s Village project (the “Proposed Project”). The vehicle miles traveled (VMT) analysis for the TIS and level of service (LOS) analysis for the LTA will be performed in accordance with the City of San Marcos Transportation Impact Analysis Guidelines, November 2020 (TIA Guidelines).
Project Description
The Proposed Project proposes to construct 102 multi-family dwelling units, 15,086 square feet of office, and 49,266 square feet (s.f.) of specialty retail at the northwest corner of Linda Vista Road and Grand Avenue, in the City of San Marcos. The Project will provide the following four new sidestreet stopped controlled driveways:
Project Driveway #1 – This new driveway will be located approximately 900 feet northwest of Linda Vista Drive
Project Driveway #2 – This driveway will be located approximately 300 feet northwest of Linda Vista Drive
Project Driveway #3 – This driveway will be located approximately 700 feet southwest of Grand Avenue
Project Driveway #4 – This driveway will be located approximately 250 feet southwest of Grand Avenue
Figure 1 displays the Project’s regional location. Figure 2 displays the Project’s current site plan.
VMT Analysis
According to the City of San Marcos TIA Guidelines, a VMT analysis is required if the following criteria for screening projects are not met: (1) small project screening, (2) affordable housing screening, (3) local-serving retail or public facility screening, (3) High Quality Transit Area (HQTA) screening, (4) low VMT area screening.
Since the Proposed Project is composed of a mix of land uses, each component must be evaluated independently and apply the significant threshold for each land use type, incorporating internalization reductions. Therefore, the VMT analysis for the project would be as follows:
Residential Component – Per Section 2.1.2.5, the Proposed Project is located in an efficient VMT/Capita area. Therefore, the residential component is deemed to have a less-thansignificant impact and no further VMT analysis is required. Office Component – Per Section 2.1.2.5, the Proposed Project is NOT located in an efficient VMT/Employee area. Therefore, a detailed VMT analysis is required. ·|}þ78
City of Vista
City of
Carlsbad
City of
Encinitas
City of
Escondido
City of
Escondido
County of
San Diego
County of
San Diego
County of
San Diego
County of
San Diego
County of
San Diego
City of
San Diego
City of
San Marcos
N
Figure 1
Project Regional Location
San Marcos Artist’s Village
Memorandum of Approach
0 1 2 Miles
Project Site
^
Figure 2
Project Site Plan
San Marcos Artist’s Village
Memorandum of Approach
N
ARTISTS VILLAGE
CIVIL SITE PLAN
JOB NO.
DRAWN BY:
E N G I N E E R I N G
6390 Greenwich Dr Suite 170
Site Plan
San Marcos Artist’s Village Page 4
Memorandum of Approach
Retail Component – Per Section 2.1.2.3, the Proposed Project is less than 50,000 square feet and considered “local-serving retail”. Therefore, the retail component is deemed to have a less-than-significant impact and no further VMT analysis is required.
As described above, the VMT/Employee associated with the office component of the project does not meet any of the screening criteria and it requires a detailed VMT analysis to be conducted. The VMT analysis will be calculated using the SANDAG Online VMT Tool, as the office component of the project would generate less than 2,400 daily trips. The TIA will include discussions of VMT results, identify impacts, and make recommendations, as needed.
Local Transportation Analysis
The purpose of the LTA is to evaluate how the Project will affect the surrounding local transportation network, as well as to determine if additional transportation improvements will be needed. The LTA analysis will evaluate the following five (5) scenarios:
1. Existing Conditions (2022) - This scenario is utilized to establish the existing baseline of traffic operations within the study area.
2. Near-Term 2024 Base Conditions – This scenario establishes a near-term baseline against which traffic generated by the Proposed Project can be compared to at the project opening day, anticipated to be Year 2024. Ambient growth rates or addition of cumulative projects’ traffic will be used to develop the Opening Year 2024 Base Conditions.
3. Near-Term 2024 Base with Project Conditions – This scenario represents the Opening Year traffic conditions with the addition of traffic generated by the Proposed Project.
4. Horizon Year 2050 Base Conditions – This scenario represents projected long-range baseline traffic conditions for Year 2050.
5. Horizon Year 2050 Base with Project Conditions – This scenario represents Year 2050 base traffic conditions with the addition of traffic generated by the Proposed Project.
Trip Generation
Project trip generation estimates were derived utilizing SANDAG’s (not so) Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region (SANDAG, April 2002). Table 1 displays daily, as well as AM and PM peak hour project trip generation.
As shown in the table, the Project is anticipated to generate a total net of 2,292 daily trips, including 117 (61-in / 54-out) trips during the AM peak hour and 218 trips (110-in / 108-out) during the PM peak hour.
San Marcos Artist’s Village Page 5
Memorandum of Approach
Table 1 Project Trip Generation
Land Use Units Trip Rate ADT AM Peak Hour PM Peak Hour
% Trips Split In Out % Trips Split In Out
Residential
Multi-family 102 DU 6 / DU 612 8% 49 2:8 10 39 9% 56 7:3 39 17 Subtotal 612 49 - 10 39 56 39 17
Employment/Office
Single Tenant Office 15,086 SF 14 / KSF 212 15% 34 9:1 29 3 15% 32 2:8 6 26 Subtotal 824 83 - 39 42 - 88 - 45 43
Commercial/Retail
Specialty Retail
Center / Strip
Commercial
49,266 SF 40 / KSF 1,971 3% 60 6:4 36 24 9% 178 5:5 89 89 Subtotal 2,795 143 75 66 266 134 132
Gross Total 2,795 - 143 75 66 266 134 132
Internal Capture (18%)1 -503 - -26 - -14 -12 -48 - -24 -24 Net Total Project Trips 2,292 117 61 54 218 110 108
Source: SANDAG (not so) Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region, April 2002 Notes:
DU = Dwelling Unit.
KSF = Thousand Square Feet. 1Internal Capture reduction was calculated using ITE’s trip reduction calculator, which is based on the NCHRP Report 664 Enhancing Internal Trip Capture Estimation for Mixed-Use Developments. See Attachment A for more details.
San Marcos Artist’s Village Page 6
Memorandum of Approach
Project Trip Distribution
The trip distribution for the Project was developed based on the geographical location of the Project, as well as the characteristics of the surrounding land uses. The Project’s trip distribution patterns are identified in Figure 3.
Project Trip Assignment
Based upon the Project’s trip generation (Table 1) and distribution (Figure 3), daily project trips and AM/PM peak hour were assigned to the adjacent roadway network. Figures 4 & 5 display daily trip assignment for the residential and retail components, respectively, while Figure 6 displays the AM/PM peak hour trip assignment.
Project Study Area
The following roadway segments and intersections will be included in the project study area:
Roadway Segments
Via Vera Cruz, between Grand Avenue and Linda Vista Drive Via Vera Cruz, between Linda Vista Drive and West San Marcos Blvd Grand Avenue, between Las Posas Road and Via Vera Cruz Grand Avenue, between Via Vera Cruz and Linda Vista Drive Grand Avenue, between Linda Vista Drive and West San Marcos Blvd Linda Vista Drive, between Via Vera Cruz and Grand Avenue West San Marcos Blvd, between Via Vera Cruz and San Marcos Blvd Intersections
1. Las Posas Road & Grand Avenue
2. Via Vera Cruz & Grand Avenue
3. Via Vera Cruz & Linda Vista Drive
4. Grand Avenue & Linda Vista Drive
5. South Bent Avenue & Grand Avenue
6. Via Vera Cruz & West San Marcos Blvd
7. Grand Avenue & West San Marcos Blvd
8. Project Driveway #1 & Grand Avenue
9. Project Driveway #2 & Grand Avenue
10. Project Driveway #3 & Linda Vista Drive
11. Project Driveway #4 & Linda Vista Drive
The LTA will include a section regarding operational characteristics of the project driveways. Figure 7 displays the project study area.
Traffic Volume Development
Traffic counts will be conducted along the study roadway segments and intersections listed above.
To ensure that current travel patterns reflect traffic conditions prior to the COVID-19 restrictions, a count validation will be conducted. Historical counts will be compared against the new traffic counts.
If current travel patterns are observed to be similar (less than 5% variations) to pre-COVID-19 conditions, the new traffic counts will be deemed appropriate to utilize for this TIA. Otherwise, these counts will be adjusted to account for reduced traffic conditions. 20%
15%
50%
5%
35%
25%
10%
30%
30%
20%
10%
15%
25%
10%
20%
20%
5%
20%
5%
5%
20%
10%
10%
10%
8 9
6 1
2 7
5 4
3 11
10 SanMarcosArtist’sVillage
MemorandumofApproach
Figure 3
Trip Distribution
Project
Site
Linda Vista Dr
Bent Ave
Grand Ave
San Marcos Bl
0 500 1,000 Feet
Trip Distribution
Study Intersection
Study Roadway
Project Site
#
Las Posas Rd
Via Vera Cruz
Discovery St
Armorlite Dr
XX%
Project
Dwy #2
Project
Dwy #4 Project
Dwy #3
Project
Dwy #1
78 25
25 25
25 504
403
403 151
50 101
76 252
252
51 101
50 76
252
50 125
101
126
151
101
50 101
101
51 8
9 6
1 2
7 5
4 3
11 10
SanMarcosArtist’sVillage
MemorandumofApproach
Figure 4
Trip Assignment (Residents)
Project
Site
Linda Vista Dr
Bent Ave
Grand Ave
San Marcos Bl
0 500 1,000 Feet
Trip Assignment
Study Intersection
Study Roadway
Project Site
#
Las Posas Rd
Via Vera Cruz
Discovery St
Armorlite Dr
XX
Project
Dwy #2
Project
Dwy #4 Project
Dwy #3
Project
Dwy #1
78 90
90 90
90 597
358
716 538
596 597
179
358
269
895
895
179
358
358
269
895
179
448
358
448
537
358
179
358
358
179
8 9
6 1
2 7
5 4
3 11
10 SanMarcosArtist’sVillage
MemorandumofApproach
Figure 5
Trip Assignment (Retail)
Project
Site
Linda Vista Dr
Bent Ave
Grand Ave
San Marcos Bl
0 500 1,000 Feet
Trip Assignment
Study Intersection
Study Roadway
Project Site
#
Las Posas Rd
Via Vera Cruz
Discovery St
Armorlite Dr
XX
Project
Dwy #2
Project
Dwy #4 Project
Dwy #3
Project
Dwy #1
78 Legend
SR-78EB Ramps & Grand Avenue Via VeraCruz & Linda Vista Drive Grand Avenue & Linda Vista Drive South Bent Avenue & Grand Avenue
Grand Avenue & Project Driveway#2
Via VeraCruz & San Marcos Boulevard Grand Avenue & Project Driveway#1 South LasPosas Road & Grand Avenue
Project Driveway#3
& Linda Vista Drive
Project Driveway#4
& Linda Vista Drive
Grand Avenue
&WestSan Marcos Boulevard
3/6
6/3
2/63/4
3/54/6
1/6
5/13
3/164/16
4/17
9/13
8/18
6/10
6/11
6/26
7/24
5/12
4/21
9/17
9/41
32/22
10/23
10/24
11/20
12/15
12/20
10/21
17/28
16/44
26/11
24/39
22/41
15/43
16/27 13/22
14/26
14/24
14/20
26/34
29/36
13/12 9/17
9/13
6/11
9/13
5/12
3/5
6/10
9/13
3/5
4/16
6/10
3/5
3/16
5/12
9/17
9 5 6 7 8
1 2 3 4
10 11
SanMarcosArtist’sVillage
MemorandumofApproach
Figure 6
Project Trip Assignment - Intersection
Study Intersection
Peak Hour Volumes
Turn Movements
*Names of North-South
cross-streets always
listed first
AM /PM
NOTTO SCALE
X
8 9
6 1
2 7
5 4
3 11
10 SanMarcosArtist’sVillage
MemorandumofApproach
Figure 7
Project Study Area
Bent Ave
Grand Ave
San Marcos Bl
0 500 1,000 Feet
Study Intersection
Study Roadway
Project Site
#
Las Posas Rd
Via Vera Cruz
Discovery St
Armorlite Dr
Project
Site
Linda Vista Dr
Project
Dwy #2
Project
Dwy #4 Project
Dwy #3
Project
Dwy #1
78 San Marcos Artist’s Village Page 12
Memorandum of Approach
Proposed Table of Contents
VMT Analysis
Executive Summary
1. Introduction
2. Project Setting
3. Analysis Methodology
4. Analysis Metrics
5. Screening Evaluation
6. VMT Analysis
7. Significant Impacts & Mitigation Measures
LTA
Executive Summary
1. Introduction
2. Project Setting
a. Pedestrian, Bicycle, and Transit Facilities (discussion of potential impacts to multi-modal transportation)
3. Analysis Methodology
4. LTA - Existing Conditions
5. LTA - Near-Term 2024 Base Conditions
6. LTA - Near-Term 2024 Base with Project Conditions
7. LTA - Horizon Year 2050 Base Conditions
8. LTA - Horizon Year 2050 Base with Project Conditions
9. Deficiencies & Mitigation Measures
10. Site Access & On-Site Circulation
a. Driveway Sight Distance
b. Parking
c. Vehicle Queueing
San Marcos Artist’s Village Attachments
Memorandum of Approach
Attachment A - Internal Trip Capture Estimation
for Mixed-Use Developments
Project Name:
Analysis Period:
Veh. Occ. Vehicle-Trips Person-Trips* Veh. Occ. Vehicle-Trips Person-Trips* Office 1.00 29 29 1.00 3 3
Retail 1.00 36 36 1.00 24 24
Restaurant 1.00 0 0 1.00 0 0
Cinema/Entertainment 1.00 0 0 1.00 0 0
Residential 1.00 10 10 1.00 39 39
Hotel 1.00 0 0 1.00 0 0
Office Retail Restaurant Residential Hotel
Office 1 2 0 0
Retail 7 3 3 0
Restaurant 0 0 0 0
Cinema/Entertainment 0 0 0 0 0
Residential 1 0 8 0
Hotel 0 0 0 0
Office Retail Restaurant Residential Hotel
Office 12 0 0 0
Retail 1 0 0 0
Restaurant 4 3 1 0
Cinema/Entertainment 0 0 0 0 0
Residential 1 6 0 0
Hotel 1 1 0 0
Internal External Total Vehicles1 Transit2 Non-Motorized2 Office 2 27 29 27 0 0
Retail 1 35 36 35 0 0
Restaurant 0 0 0 0 0 0
Cinema/Entertainment 0 0 0 0 0 0
Residential 0 10 10 10 0 0
Hotel 0 0 0 0 0 0
All Other Land Uses3 00 0 0 0 0
Internal External Total Vehicles1 Transit2 Non-Motorized2 Office 1 2 3 2 0 0
Retail 1 23 24 23 0 0
Restaurant 0 0 0 0 0 0
Cinema/Entertainment 0 0 0 0 0 0
Residential 1 38 39 38 0 0
Hotel 0 0 0 0 0 0
All Other Land Uses3 00 0 0 0 0
Land Use Table 7-A (D): Entering Trips
2 Person-Trips
Person-Trip Estimates
San Marcos Artist's Village
AM Street Peak Hour
Table 9-A (D): Internal and External Trips Summary (Entering Trips) Table 8-A (O): Internal Person-Trip Origin-Destination Matrix (Computed at Origin) Origin (From) Destination (To)
Cinema/Entertainment
Table 7-A: Conversion of Vehicle-Trip Ends to Person-Trip Ends Table 7-A (O): Exiting Trips
0 0
0 Table 8-A (D): Internal Person-Trip Origin-Destination Matrix (Computed at Destination) Origin (From)
Origin Land Use Person-Trip Estimates External Trips by Mode* External Trips by Mode*
1 Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-A 0 *Indicates computation that has been rounded to the nearest whole number. 0 0
0 0
0 Destination (To)
Cinema/Entertainment
0 3
Total estimate for all other land uses at mixed-use development site-not subject to internal trip capture computations in this estimator Destination Land Use
Table 9-A (O): Internal and External Trips Summary (Exiting Trips) Project Name:
Analysis Period:
Veh. Occ. Vehicle-Trips Person-Trips* Veh. Occ. Vehicle-Trips Person-Trips* Office 1.00 6 6 1.00 26 26
Retail 1.00 89 89 1.00 89 89
Restaurant 1.00 0 0 1.00 0 0
Cinema/Entertainment 1.00 0 0 1.00 0 0
Residential 1.00 39 39 1.00 17 17
Hotel 1.00 0 0 1.00 0 0
Office Retail Restaurant Residential Hotel
Office 5 1 1 0
Retail 2 26 23 4
Restaurant 0 0 0 0
Cinema/Entertainment 0 0 0 0 0
Residential 1 7 4 1
Hotel 0 0 0 0
Office Retail Restaurant Residential Hotel
Office 7 0 2 0
Retail 2 0 18 0
Restaurant 2 45 6 0
Cinema/Entertainment 0 4 0 2 0
Residential 3 9 0 0
Hotel 0 2 0 0
Internal External Total Vehicles1 Transit2 Non-Motorized2 Office 3 3 6 3 0 0
Retail 12 77 89 77 0 0
Restaurant 0 0 0 0 0 0
Cinema/Entertainment 0 0 0 0 0 0
Residential 19 20 39 20 0 0
Hotel 0 0 0 0 0 0
All Other Land Uses3 000 0 0 0
Internal External Total Vehicles1 Transit2 Non-Motorized2 Office 6 20 26 20 0 0
Retail 20 69 89 69 0 0
Restaurant 0 0 0 0 0 0
Cinema/Entertainment 0 0 0 0 0 0
Residential 8 9 17 9 0 0
Hotel 0 0 0 0 0 0
All Other Land Uses3 000 0 0 0
0 0
0 0
0 3
Total estimate for all other land uses at mixed-use development site-not subject to internal trip capture computations in this estimator Table 9-P (O): Internal and External Trips Summary (Exiting Trips) Origin Land Use Person-Trip Estimates External Trips by Mode* Person-Trip Estimates External Trips by Mode*
0 Table 8-P (D): Internal Person-Trip Origin-Destination Matrix (Computed at Destination) Origin (From)
2 Person-Trips
0 0
Table 9-P (D): Internal and External Trips Summary (Entering Trips) Destination Land Use
*Indicates computation that has been rounded to the nearest whole number.
San Marcos Artist's Village
PM Street Peak Hour
Table 7-P: Conversion of Vehicle-Trip Ends to Person-Trip Ends Land Use Table 7-P (D): Entering Trips Table 7-P (O): Exiting Trips Table 8-P (O): Internal Person-Trip Origin-Destination Matrix (Computed at Origin) Origin (From) Destination (To)
Destination (To)
Cinema/Entertainment
Cinema/Entertainment
0 4
1 Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-P
INTERNAL CAPTURE CALCULATION
Land Use Rate Type Units Type Trip Rate Per ADT % Trips In Out % Trips In Out RESIDENTIAL ‐ Multi‐Family (Over 20 DU/acre) Driveway 102 DU 6 Unit 612 8% 49 2 : 8 10 39 9% 56 7 : 3 39 17 OFFICE ‐ Corporate Headquarters/Single Tenant Office Driveway 15,086 KSF 14 KSF 212 15% 32 9 : 1 29 3 15% 32 2 : 8 6 26 COMMERCIAL‐RETAIL ‐ Specialty Retail Center/Strip Commercial Driveway 49,266 KSF 40 KSF 1971 3% 60 6 : 4 36 24 9% 178 5 : 5 89 89 GROSS TOTAL 2795 141 75 66 266 134 132
Mixed Use Internalization 18% ‐503 ‐25 ‐14 ‐11 ‐48 ‐24 ‐24 NET TOTAL 2292 116 61 55 218 110 108
Total In Out Total In Out
135 72 63 198 100 98
Internal Capture 4% 26%
Total In Out
333 172 161
18%
AM & PM Combined Internal Capture
AM PM
Split Split
AM Reduced Trips PM Reduced Trips
Appendix C - Signal Timings
Phase Timing and Options
Unit Information Phase Timing Phase Options
1 2 3 4 5 6 7 8
X X X X X X X X
. . . X . . . X
. X . . . X . .
X X X X X X X X
. X . . . X . .
. . . . . . . .
Unit Parameters . . . . . . . .
. . . . . . . .
. . . X . . . X
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. X . X . X . .
Phase Configuration Global Phase Recalls Notes
1 2 3 4 5 6 7 8
. . . . . . . .
. . . . . . . .
. . . . . . . .
City of San Marcos
Las Posas @ Grand
Phase
Enable
Non Lock Detector
Min Vehicle Recall
Max Vehicle Recall
Ped Recall
0 0
8 0 5 0 5 0 0
0 27 0 23 0
1 2 4
6 4
2 Phase
1 7
8 EB Left
Phase
Min
Max
Ped
Green No Walk
Phase Not On
Phase Not On WB
Green No Walk
SB
Phase Not On
Description
SB Left
Startup
Phase Not On
Phase Not On
Added Initial
Maximum Initial
Time B4 Reduction
Cars B4 Reduction
Time To Reduce
Reduce By
Minimum Gap
Advance Walk
Delayed Ped
EB
NB Left
All Red Flash Sns
5 MCE Enable
Free Sequence
Start Yel. Override
Start Red Override
1 NB
WB Left
6 0 0
Disable
Phase Not On
0 0
0 0
Local CVM Fash Disable
3 All Red Flash Exit
Enable
0.0 0.0
0 No Ped Startup Call
Max Green 2
0 0
0 0.0
0 Add Initial Calculation
Ped Clear During Yellow
Ped Clear During Red Clr
Yellow Min Override
0 Red Clear
25 4.5
2.0 0
Max Green 1
Yellow Change 4.5 4.5 4.5
2.0 2.0 2.0
0.0 0.0 0.0
Soft Vehicle Recall
Dual Entry
Sim. Gap Disable
0 0 0
0.0 0 0 0 0
0 0 0
0 0 0 0
0.0 4.5
No Startup Call
2.0 Actuated Rest in Walk
Conditional Svc Enable
Auto Ped Clear
0 Passage
0 0.0
0 0.0 0.0 0.0
0.0 0 0
0 0.0
0 0
Man. Control Seq. 1
Startup All Red 6
83 Intelight MAXTIME 2.X
Las Posas
Grand
Startup Flash
Controller Number
0 25
Phase 3
Software
Main Street
Side Street
IP Address
Min Green 2 0
Description
SB
Left
Walk
Ped Clear
Min Green
Passage 2
Extended Mode
10 3.0
40 4.5
2.0 0.0
0 0 0
4.5 4.5
0.0 2.0 2.0
0.0 0.0 0.0 0.0
9 7
Min Green 2
0.0 0 0
0.0 0 0 Red Rest
0 0 Ped Recycle
5 6 7 8
0 0 0
0.0 0.0 0.0
0 0.0 0.0 0.0
0 0
0 3.0 3.0 3.0
0 0
9 0
7 10
5 Auto Flash Entry
Auto Flash Exit
Max Green 2 0 0 0 0 0 0 0 0
Steady Don't Walk 0 0 0
9 3.0 3.0 3.0
WB
0 0
NB WB
Left EB NB Left SB EB Left
29 0
0.0 0.0 0.0 0.0
All Dark Flash Sns Disable
0 0 0 0
40 25 40 25 40
3.0 0.0
0.0 Red Revert
Backup Time
Disable
Enable
6.0 600
Printed on: 3/25/2021
Sequences
Sequence 1 Sequence 2 Sequence 3 Sequence 4 Sequence 5 Sequence 6 Sequence 7 Sequence 8 Sequence 9 Sequence 10 Sequence 11 Sequence 12 Sequence 13 Sequence 14 Sequence 15 Sequence 16
Standard Overlaps
. . . . .
0 0 0 0 0
0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
. . . . .
. . . . .
0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
6 Disabled Disabled Disabled Disabled Disabled
Off Off Off Off Off
2 3 4 5
Call for Svc
1 Disabled
Off
0 0.0
0.0 0
0 0.0
.
.
.
Startup Call
Recall
4 4
3 2,1,a,4,3,b
Ring Sequence Ring Sequence Ring Sequence
1 2,1,a,3,4,b
3 4 4
4 3
4 3
4 3
4 3
4 2 6,5,a,8,7,b 2 6,5,a,8,7,b 2 6,5,a,8,7,b
1 1,2,a,4,3,b 1
2 6,5,a,8,7,b
Ring Sequence
1 1,2,a,3,4,b
Trail Red
Walk
Ped Clear
Delay
Overlap
Negative Phs
Negative Ovlp
Negative Ped
Green Suppr
Trail Green
Trail Yellow
Modifier Phs
Type
Included Phs
1 1,2,a,4,3,b
2 6,5,a,7,8,b
3 4
3 2 5,6,a,7,8,b
Ring Sequence
4 2 6,5,a,7,8,b 2 5,6,a,8,7,b
Ring Sequence Ring Sequence
1 2,1,a,3,4,b
2 5,6,a,8,7,b
3 4
Ring Sequence
1 1,2,a,3,4,b
2 5,6,a,7,8,b
Ring Sequence
1 1,2,a,3,4,b
2 5,6,a,7,8,b
Overlaps
Enabled
Description
3 4
3 3
4 3
4 3
4 1 1,2,a,3,4,b 1 2,1,a,3,4,b 1 2,1,a,4,3,b 1 2,1,a,4,3,b Ring Sequence Ring Sequence Ring Sequence
3 Ring Sequence
2 5,6,a,7,8,b 2 5,6,a,7,8,b 2 5,6,a,7,8,b
Ring Sequence Ring Sequence Ring Sequence
2 5,6,a,8,7,b 2 5,6,a,8,7,b
3 1 2,1,a,4,3,b 1 1,2,a,3,4,b 1 1,2,a,4,3,b 1 2,1,a,4,3,b Printed on: 3/25/2021
Backup Prevention / No Serve Phases
Sequence 1 Sequence 2 Sequence 3
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 4 Sequence 5 Sequence 6
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 7 Sequence 8 Sequence 9
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Serve Phase 1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Printed on: 3/25/2021
Detector Configuration
Vehicle Detectors Pedestrian Detectors
Global Vehicle Detector Parameters
Global Ped Detector Parameters
Vehicle Detection Options
Detector Reset Enable Enabled Addtnl Call PH No Act Max Pres 4 None
None
None
None
None
None
None
None Erratic Count
2 Failed Recall Call PH Call O/L
None
None
None
None
None
None
None
None
Global Failed Recall
Global No Activity
Global Max Pres.
1 2
2 3
5 6
None
None
20 Max Recall
None 5
None
None
None
None
None
None
None
None
None
6 C1-43
J-4
J-5
J-6U
J-6L
J-7U
J-7L
J-8
J-9U C1-59
Global Erratic Ct
7 ------- -------
3 ------- -------
Global No Activity
Global Max Presence
Global Erratic Count
8 X X X X . X X X X X X X . X X X X X
I-1
Added Initial X X X X X . X
J-9L
6 6
6 6
8 8
8 8
5 7
27 28 Detector
2 4
6 8
1 2
3 4
5 6
7 8
9 10
11 12
13 14
1 5
26 I-2U
I-2L
I-3U
I-3L
I-4
I-5
I-6U
I-6L
I-7U
I-7L
I-8
I-9U
I-9L
J-1
J-2U
J-2L
J-3U
J-3L
C1-58
C1-41
C1-49
C1-55
C1-44
C1-64
C1-63
C1-46
C1-50
C1-57
C1-79
C1-66
C1-62
C1-77
C1-40
C1-48
C1-42 Slot
I-12U C1 Pin Number
C1-67
I-12L
I-13U
I-13L
C1-69
C1-68
C1-70
------- -------
------- -------
C1-56
C1-39
2 2
2 3
4 4
4 4
C1-76
C1-47
C1-78
24 25
15 16
17 18
19 20
21 22
23 C1-45
C1-65
4 1
Detector
C1-61
C1-60
6 7 8 9
Yellow Lock Call
Occupancy
Volume
10 11 12 13 14 15 16 17 18 19 20 21
.
. . .
1 2 3 4 5
.
X
X
25 26 27 28
. . .
. . . .
.
.
X X
.
.
23 24
. . . . . . . . . .
. .
Call
Queue
Extend
Red Lock Call
22 . . . . . . . . . . . .
.
X X X X X X
. . . . .
. . . . . . . . . . . . . . . .
. .
X
. . . . . . . .
X X X X X X X
. . . . . . . . . . . . . . . .
X X
X X X X X X X X X X X X X X X X X X
. .
. .
. .
X X
. .
. . . . . . . . .
. . .
. . . . . .
. .
. .
. . .
X X X X X X
. .
X X
. . .
X X X X X X X X
. .
.
.
.
X
.
X
. . .
. . .
. . . Detector Slot C1 Pin Number Call Phase Addtnl Call PH Switch Phase Delay Extend Queue Limit No Activity Max Pres. Erratic Count Fail Time Description . . . . .
7 8 Call O/L
Min Green 2 . . . . . . . . . . . . . . . . . . . . . . .
Passage 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Printed on: 3/25/2021
Coordination Configuration
Coordination Parameters Patterns
Split 1 Split 2 Split 3
Split 4 Split 5 Split 6
9 Yellow Auto Permissive Fixed Max Inhibit
Fixed
Fixed
Mode
None
None
None
None
Mode
8 Yellow Auto Permissive Fixed Max Inhibit 1 1 1 1
7 Yellow Auto Permissive Fixed Max Inhibit 1
Description
Auto Permissive
Coord Mode
Auto Permissive
Auto Permissive
Auto Permissive
Auto Permissive
Auto Permissive
Patt. Cycle Offset 1 Split Seq Reference FO Mode
Fixed
Fixed
1 Fixed
Fixed
Fixed
Yellow Fixed
1 1
Max Inhibit
.
18 .
26 OL
Pln
1 1
1 1
1 1 1 1
Phs Det Ped
1 1 1
1 Max Mode Pln Pln Pln
Max Inhibit
Max Inhibit
Max Inhibit
Max Inhibit
1 4
1 Fixed None
18 26
Fixed None 1
FO Mode Mode
7 PH. Time Min Max
2 1 1
FO Mode
Fixed
Fixed
1 .
XCoord Phase
Fixed None X
Time
24 42
FO Mode PH.
1 Max Inhibit
Min Max
1 1
1 1 1 1
Fixed None
Fixed None
. . Fixed None
Fixed None
7 . Fixed None
Fixed None
.
4 . .
6 . .
8 5
.
.
. .
.
X 30
Yellow
6 Yellow
Yellow Coord Phase
1 20 Fixed . . None 1 22
Min Cyc Limit % 25
Split Parameters
Max Dwell
Trans. Cover Ped
0 Pattern
.
.
.
.
3 . None 3 .
.
PH. Max Mode PH. Time Min Coord Phase Ref Phase FO Mode 2 36 X Fixed None 2
None
None
None
None
.
Fixed None
FO Mode Mode
Fixed Coord
6 40
16 28
5 16 . None 5
4 . None 4
. Fixed
. Fixed None
.
. None 6
1 2
Time Max Min
.
Fixed
Fixed
Fixed
Fixed Phase Ref Phase
.
.
. .
X
.
.
Fixed None
28 .
Yellow
Yellow
X
16 X
2 1 3
Max Cyc Limit %
Fixed
Fixed
Fixed
Fixed
Fixed Phase
2 3
.
.
36 17
Operational Mode
Coord Mode
Maximum Mode
Force Mode
Correction Mode
2 100 3
Automatic
Full Permissive
Per Pattern
4 Per Pattern
Shortway (Auto)
25 5
1 3 110
100 24 1 1
1 1 1
.
.
Fixed None
. Fixed None
. Fixed None Ref Phase
.
Fixed None .
.
3 Ref
X
16 .
32 .
5 8
6 20
46 31
Fixed None
2 PH. Time Min Max FO Mode Mode Phase Ref Phase
8 7 . None 7
X
1 . . Fixed None Coord Phase Ref Phase
16 . None 8
2 . . Fixed None
3 . . Fixed None
4 . . Fixed None
Fixed None
6 . . Fixed None
7 . . Fixed None
8 . . Fixed None
PH. Time Min Max Coord
1 .
2 .
3 .
5 . .
4 6
5 .
.
Fixed None
. Fixed None
3 . Fixed None
.
.
.
.
. None
8 . Fixed None
. Fixed None
7 . Fixed None
.
.
.
Printed on: 3/25/2021
Split 7 Split 8 Split 9
Advanced Coord Options
Ring Plan 1 Ring Plan 2 Ring Plan 3 Ring Plan 4 Ring Plan 5 Ring Plan 6 Ring Plan 7 Ring Plan 8 Ring Plan 9
3 0 0
Ring Offset Early Gap
1 0 0
2 0 0
4 0 0
Offset Early Gap
0 0
0 0
0 0
0 0
Ring
1 2
3 3 0 0
4 0 0
1 0 0
1 0 0
4 2 0 0
2 0 0
3 0
0 0
Ring Offset Early Gap
1 0 0
2 0 0
3 . .
4 3 0 0
3 0 0
4 0 0
4 0 0
Ring Offset Early Gap
1 4 0 0
Ring Offset Early Gap
Ring Offset Early Gap
0 2
0 3 0 0
Ring Offset
.
Ring Offset Early Gap
1 0 0
2 0 0
3 0 0
0 4 0 0
Early Gap
1 0 0
2 0 0
4 Offset Early Gap
0 0
0 0
0 0
0 0
Ring Plans
Ring
1 2
3 0
0 7 . . Fixed None
8 . . Fixed None
. Fixed None
6 . . Fixed None
.
None
4 . . Fixed None
. Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode Phase
8 . . Fixed None Coord
1 .
3 .
5 . Fixed
. . Fixed None Coord Phase Ref Phase
5 . . Fixed None
6 . . Fixed None
3 Fixed None . .
4 . . Fixed None
1 . . Fixed None
2 . . Fixed None
7 . . Fixed None
8 . . Fixed None
5 . . Fixed None
6 . . Fixed None
. . Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode FO Mode Mode Coord Phase Ref Phase PH. Time Min Max Phase Ref . .
. .
.
8 .
.
9 Fixed None
Fixed None
7 7
.
. . .
Allow Split Underrun .
4 5 6
Allow Split Overrun .
Ring Plan
. .
4 . .
1 .
Allow No Coord Phase . . . . . .
Coord Now . . . . . .
.
.
.
.
.
.
Pattern 1 2 3
.
Printed on: 3/25/2021
Scheduler Configuration
Schedule 1
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 2
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 3
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2 3 1 2 3 4 5 6 7 8
Day Plan 1 Day Plan 2 Day Plan 3 . . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
9 None
10 None
13 None
14 None
15 None
11 None
12 None
19 None
6 None
7 None
8 None
1 2
3 4
5 None
None
None
None
None
Action
Action Commands
Command Action Command Index Action Command Index Index Action Command Index Month of Year Days of Week Days of Month
J F M A M J J A S O N D T W T F S
0 0
4 Pattern
Pattern 1
Description Day Plan 0
S M
0 0
3 Pattern 3
4 Pattern 4
Weekend Plan 0
Special Functions
Event HR MIN ACT Description
Actions
.
Aux
Pattern 2
Action
1 2
. . .
None
12 None
19 None
0 6
Pattern 9
5 Pattern 7
Pattern 8
Pattern 5
Pattern 6
0 Pattern 10
64 Free
20 None
13 None
14 None
20 None
17 None
18 None
15 None
None 16 None
0 0
8 9 0 11
7 7
0 9
10 0
20 0
0 17 None
18 None
0 0
16 5 0
6 0 0
10 30 1
30 2
4 0 0 0
0 0
0 0
0 0
8 0
Day Plans
HR MIN
.
4 8
Description
AM Peak
MD Peak
PM Peak
Free
0 0
64 0
0 0
0 Status Enabled
Status Enabled
HR
6 9
14 MIN ACT
Status Disabled
. . . . . .
Event
1 2
3 30 3
64 Free
1 ACT Description
2 3
2 Event
.
S
X
Description Weekday
. .
20 0
0 0
1 9 0
2 3
0 X X
A
Day Plan
8 1
Month of Year Days of Week Days of Month
J F M A M J J A S O N
0 0
. . . . .
10 5
6 7
10 9
6 7
0 0
9 0 0 0
0 5
0 0
0 D S M T W T F S
X . X X X X X .
Month of Year Days of Week
J
X
F M
X
X X X X X X X X
X X X X X X X X
M J J A S
Weekend
Days of Month
X X X X . . . . .
M T
Description Day Plan 2
O N D S F W T
Printed on: 3/25/2021
Preempt Configuration
Preemption Configuration Preemption Options
Preemption Parameters Preempt Parameters
Track Overlap
Track 2 Overlap
Dwell Ped
Dwell Overlap
Cycling Phase
Cycling Ped
Cycling Overlap
Recovery Exit Omit
Preempt
Enabled
Type
Description
Dwell Phase
Exit Phase
Exit Overlaps
Track Phase
Track 2 Phases
.
.
.
.
6 .
.
.
.
.
.
.
.
.
.
.
.
5 .
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
4 .
.
.
.
.
.
.
.
.
1 25.5 25.5
Dwell Green
Exit Ped Clear
Exit Yellow Change
Exit Red Clear
0 3 4 5 6
25.5 25.5
255 255
Max Presence
Max Presence Action
Preempt
.
.
.
.
.
.
.
6 0
Preempt 1 2
Link
Delay
Min Duration
Min Presence
1 .
.
.
Exit Phases
25.5 25.5
255 255
0 Exit Type
25.5 0
0.0 255
0 Disabled
0 Disabled Disabled
0 0
0 25.5
25.5 25.5
1 .
.
.
.
2 3
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
Enter Min Walk
Enter Ped Clear
Track Green
Track Yellow Change
Track Red Clear
Track 2 Green
Track 2 Yellow
Track 2 Red
Track Ext. Gate Down
Enter Min Green
Enter Yellow Change
Enter Red Clear
Exit Max Mode
Exit Max Apply Time
Veh Exit Calls
Ped Exit Calls
0 0.0
0 Terminate
0 25.5
25.5 Terminate
0.0 0.0 0.0 0.0
0 255 255 255
0 Dwell Ext Time
Max Exit Green
255
25.5 25.5
0 0
25.5 0 0 0
255
25.5 25.5
25.5 25.5
0 0
Terminate Terminate Terminate Terminate
0 0 0 0
25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 0 0 0 0
255
0 0 0 0
0 1 1
25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 25.5 25.5
0 0 0
. .
Require All Red Entry
Require Gate Down Track Exit
Require Gate Up Dwell Exit
Use Normal On/Normal Off Input
Immediate Ped Clear
Dwell Only Status Output
All Red Flash Dwell
Allow All Overlaps
Ped Recycle in Dwell Cycle
X
.
.
.
.
.
Preempt
Non Lock Mem
Not Overide Flash
Not Overide Next Preempt
Flash Dwell
1 Enabled
Rail Road
BBS Flash
0 0
0 0
Exit Phases Exit Phases Exit Phases Exit Phases Exit Phases Disabled Disabled
0 0 0
Disabled
1 2 3 4 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0
0 0 255 255 255
0 0 0 0 0
0 0 0 0 0
25.5 25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5 25.5
2 3 4 5 6
Disabled Enabled Enabled Enabled Enabled
Rail Road Emergency Veh Emergency Veh Emergency Veh Emergency Veh 2,5 4,7 1,6 3,8
2,6 4,8 2,6 4,8
Printed on: 3/25/2021
Advanced I/O Configuration
Channel Configuration Concurrency Mode
Auto Concurrency
Channel Options
Cabinet Configuration
IO Modules
Input Points
C11-12 Not Active
Not Active
25 Idx
15 23
14 40
22 Not Active
C11-25
4 42
43 44
45 C1-76 5
C1-77
11 25
41 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
19 C1-48
C11-29
C11-30
C11-26
C11-27
C11-28
Not Active
Not Active
Vehicle Det Call Not Active
C11-13
Not Active
Not Active
Not Active
26 27
28 29
C1-54
C1-49
C11-16
C1-66 C1-82
C1-79
C1-80
C1-81
C1-72
C11-22
C11-17
C11-18
C11-19
C11-20
C11-21
58 59
60 61
54 C11-11
C1-78
C1-62
C1-75 C11-23
C11-24
56 57
Preempt Input
Not Active
C1-58
Vehicle Det Call C1-68
6 17
9 23
6 24
37 C1-73
C1-74
19 20
55 C11-10
3 4
C1-70
C1-71
C1-41
C1-42
Idx C1 Pin
2 16
8 22
3 C1-56
Input Type
Vehicle Det Call
Input Type
C1-43
C1-46
C1-47
5 Vehicle Det Call
Preempt Input
Preempt Input
Preempt Input
Vehicle Det Call
Ch
1 2
3 4
7 8
5 6
7 8
Control Type
Phase Vehicle
Phase Vehicle
Phase Vehicle
Phase Vehicle
Vehicle Det Call
Phase Ped
Phase Ped
Phase Ped
12 . .
14 IO Module
1 X
1 2 3 4
. .
X X
Type
4 6
5 6 7 8
Phase Vehicle
Phase Vehicle
Phase Vehicle
Phase Vehicle
Control Type
None
None
None
None
Phase Ped
Source
2 Input
C1-39
C1-40
Ch
9 10
11 12
13 C1 Pin
17 18
Channel
Flash Yellow
Flash Red
Flash Alternate Half Hertz
.
Source
1 2
3 4
5 6
Caltrans 332
X
. . . .
X X
15 .
X
. . X
16 X
X
C1 Pin
C11-15
C1-57 C1-69
C1 Pin
C1-55
C1-59 Input Input
21 7
Idx
2 6
4 8
C1-67 Input33
Input Type
Ped Det Call
50 51
52 49
C1-60
C1-61
34 35
36 38
39 Ped Det Call
Ped Det Call
Ped Det Call
27 13
28 1
53 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Not Active
Not Active
Not Active
Not Active
Input Type Idx
Not Active
Not Active
Not Active
Not Active
Not Active
30 31
32 46
47 48
62 63
64 Unit Interval Advance
Unit Local Flash Sense
Unit Stop Time
18 C1-65 10
24 14 1
15 16
21 Not Active
20 2
1 10
11 12
13 12
1 2
3 4
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
5 6
7 8
9 C1-44
C1-45
Vehicle Det Call
Vehicle Det Call
Preempt Input
Preempt Input
Unit Manual Control Enable
Not Active
1 1
C1-51
C1-52
C1-53
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
26 1
C1-50
C1-63
C1-64
15 16
Not Active
14 14,16
Ch
1 2
3 4
5 6
7 8
. . 9
.
.
8 9 10 11 15 16
. . . . . . .
. . .
13 14
14 15
16 X . . 10
11 12
13 X . . . . . . . .
Concurrency Mode
Auto
Concurrency
5,6,15
5,6,13,15
7,8,16
7,8,14,16
13 13,15
Printed on: 3/25/2021
Cabinet Configuration
Output Points
C1 Pin C1 Pin
Not Active
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Output Type
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Detector Reset
Watchdog
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
64 C11-8
C11-1
5 6
6 6
5 5
C11-4
61 62
63 15
C11-3
18 18
C1-98
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
12 11
11 10
10 10
9 9
C1-88
C1-89
C11-7
3 13
13 15
14 16
3 18
11 1
14 C1-101
C1-102
34 C1-36
37 C1-100
38 42
36 C1-84
9 17
17 17
12 12
39 C1-91
50 C1-93
51 C1-94
7 8
8 8
7 7
15 C11-6
44 C1-86
45 C1-87
60 49
C11-5
48 C1-90
47 2
1 1
1 46
1Output Output Type Idx
14 15
16 2
3 4
5 C1-2
2 2
4 4
4 3
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
6 7
8 9
10 11
12 13
14 C1-3
C1-4
C1-5
C1-6
C1-7
C1-8
C1-9
C1-10
C1-11
17 C1-19 16
28 C1-30
25 C1-27
26 C1-28
27 C1-29
22 C1-24
23 C1-25
18 C1-20
21 C1-23
20 C1-22
19 16
Channel Red Do Not Walk Driver
31 C1-33
32 C1-34
29 C1-31
30 C1-32
24 C1-26
C1-21
58 C11-2
59 40 C1-103
41 C1-83
56 C1-99
57 52 C1-95
53 C1-96
54 C1-97
55 C1-12
C1-13
C1-15
C1-16
C1-17
C1-18
43 C1-85
35 C1-37
C1-38
Idx
13 Output
33 C1-35
Printed on: 3/25/2021
User Programs
Program 1
Enabled
40 None 0 None None None 0.0 0.0
None 0.0 0.0
None 0.0 0.0
39 None 0 None None
38 None 0 None None
None 0.0 0.0
None 0.0 0.0
37 None 0 None None
36 None 0 None None
None 0.0 0.0
None 0.0 0.0
35 None 0 None None
34 None 0 None None
None 0.0 0.0
None 0.0 0.0
33 None 0 None None
32 None 0 None None
None 0.0 0.0
None 0.0 0.0
31 None 0 None None
30 None 0 None None
None 0.0 0.0
None 0.0 0.0
29 None 0 None None
28 None 0 None None
None 0.0 0.0
None 0.0 0.0
27 None 0 None None
26 None 0 None None
None 0.0 0.0
None 0.0 0.0
25 None 0 None None
24 None 0 None None
None 0.0 0.0
None 0.0 0.0
23 None 0 None None
22 None 0 None None
None 0.0 0.0
None 0.0 0.0
21 None 0 None None
20 None 0 None None
None 0.0 0.0
None 0.0 0.0
19 None 0 None None
18 None 0 None None
None 0.0 0.0
None 0.0 0.0
17 None 0 None None
16 None 0 None None
None 0.0 0.0
None 0.0 0.0
15 None 0 None None
14 None 0 None None
None 0.0 0.0
None 0.0 0.0
13 None 0 None None
12 None 0 None None
None 0.0 0.0
None 0.0 0.0
11 None 0 None None
10 None 0 None None
None 0.0 0.0
None 0.0 0.0
9 None 0 None None
8 None 0 None None
None 0.0 0.0
0 None 0.0 0.0
7 None 0 None None
6 None 0 None None
None 0.0 0.0
None 0.0 0.0
5 None 0 None None
4 None 0 None None
3 None 0 None None None 0.0 0.0
None None
None 0.0 0.0 Aux switch stop time
Parameter B Idx Dly Ext Description
1 Unit Stop Time 1 Result=A Aux Switch State
Line Result Idx Operation Parameter A Idx
2 None None 0.0 0.0
Printed on: 3/25/2021
Do Not Reproduce
Do Not Reproduce
Do Not Reproduce
Do Not Reproduce
Do Not Reproduce
Phase Timing and Options
Unit Information Phase Timing Phase Options
1 2 3 4 5 6 7 8
X X X X X X X X
. . . X . . . X
. X . . . X . .
X X X X X X X X
. X . . . X . .
. . . . . . . .
Unit Parameters . . . . . . . .
. . . . . . . .
. . . X . . . X
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. X . X . X . X
Phase Configuration Global Phase Recalls Notes
1 2 3 4 5 6 7 8
. . . . . . . .
. . . . . . . .
. . . . . . . .
City of San Marcos
Via Vera Cruz @ Linda Vista
Phase
Enable
Non Lock Detector
Min Vehicle Recall
Max Vehicle Recall
Ped Recall
0 0
6 0 5 0 5 0 5
0 23 0 18 0
1 2 4
6 4
2 Phase
1 7
8 EB Left
Phase
Min
Max
Ped
Green No Walk
Phase Not On
Phase Not On WB
Green No Walk
SB
Phase Not On
Description
SB Left
Startup
Phase Not On
Phase Not On
Added Initial
Maximum Initial
Time B4 Reduction
Cars B4 Reduction
Time To Reduce
Reduce By
Minimum Gap
Advance Walk
Delayed Ped
EB
NB Left
All Red Flash Sns
5 MCE Enable
Free Sequence
Start Yel. Override
Start Red Override
1 NB
WB Left
6 0 0
Disable
Phase Not On
0 0
0 0
Local CVM Fash Disable
3 All Red Flash Exit
Enable
0.0 0.0
0 No Ped Startup Call
Max Green 2
0 0
0 0.0
0 Add Initial Calculation
Ped Clear During Yellow
Ped Clear During Red Clr
Yellow Min Override
0 Red Clear
25 4.5
1.5 0
Max Green 1
Yellow Change 4.5 4.5 4.5
1.5 1.5 1.5
0.0 0.0 0.0
Soft Vehicle Recall
Dual Entry
Sim. Gap Disable
0 0 0
0.0 0 0 0 0
0 0 0
0 0 0 0
0.0 4.5
No Startup Call
1.5 Actuated Rest in Walk
Conditional Svc Enable
Auto Ped Clear
0 Passage
0 0.0
0 0.0 0.0 0.0
0.0 0 0
0 0.0
0 0
Man. Control Seq. 1
Startup All Red 6
89 Intelight MAXTIME 2.X
Via Vera Cruz
Linda Vista
Startup Flash
Controller Number
0 25
Phase 3
Software
Main Street
Side Street
IP Address
Min Green 2 0
Description
SB
Left
Walk
Ped Clear
Min Green
Passage 2
Extended Mode
7 3.0
40 4.5
1.5 0.0
0 0 0
4.5 4.5
0.0 1.5 1.5
0.0 0.0 0.0 0.0
6 7
Min Green 2
0.0 0 0
0.0 0 0 Red Rest
0 0 Ped Recycle
5 6 7 8
0 0 0
0.0 0.0 0.0
0 0.0 0.0 0.0
0 0
0 3.0 3.0 3.0
0 0
7 0
5 7
5 Auto Flash Entry
Auto Flash Exit
Max Green 2 0 0 0 0 0 0 0 0
Steady Don't Walk 0 0 0
6 3.0 3.0 3.0
WB
0 0
NB WB
Left EB NB Left SB EB Left
18 23
0.0 0.0 0.0 0.0
All Dark Flash Sns Disable
0 0 0 0
30 25 40 25 30
3.0 0.0
0.0 Red Revert
Backup Time
Disable
Enable
6.0 600
Printed on: 3/25/2021
Sequences
Sequence 1 Sequence 2 Sequence 3 Sequence 4 Sequence 5 Sequence 6 Sequence 7 Sequence 8 Sequence 9 Sequence 10 Sequence 11 Sequence 12 Sequence 13 Sequence 14 Sequence 15 Sequence 16
Standard Overlaps
. . . . .
0 0 0 0 0
0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
. . . . .
. . . . .
0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
6 Disabled Disabled Disabled Disabled Disabled
Off Off Off Off Off
2 3 4 5
Call for Svc
1 Disabled
Off
0 0.0
0.0 0
0 0.0
.
.
.
Startup Call
Recall
4 4
3 2,1,a,4,3,b
Ring Sequence Ring Sequence Ring Sequence
1 2,1,a,3,4,b
3 4 4
4 3
4 3
4 3
4 3
4 2 6,5,a,8,7,b 2 6,5,a,8,7,b 2 6,5,a,8,7,b
1 1,2,a,4,3,b 1
2 6,5,a,8,7,b
Ring Sequence
1 1,2,a,3,4,b
Trail Red
Walk
Ped Clear
Delay
Overlap
Negative Phs
Negative Ovlp
Negative Ped
Green Suppr
Trail Green
Trail Yellow
Modifier Phs
Type
Included Phs
1 1,2,a,4,3,b
2 6,5,a,7,8,b
3 4
3 2 5,6,a,7,8,b
Ring Sequence
4 2 6,5,a,7,8,b 2 5,6,a,8,7,b
Ring Sequence Ring Sequence
1 2,1,a,3,4,b
2 5,6,a,8,7,b
3 4
Ring Sequence
1 1,2,a,3,4,b
2 5,6,a,7,8,b
Ring Sequence
1 1,2,a,3,4,b
2 5,6,a,7,8,b
Overlaps
Enabled
Description
3 4
3 3
4 3
4 3
4 1 1,2,a,3,4,b 1 2,1,a,3,4,b 1 1,2,a,4,3,b 1 2,1,a,4,3,b Ring Sequence Ring Sequence Ring Sequence
3 Ring Sequence
2 5,6,a,7,8,b 2 5,6,a,7,8,b 2 5,6,a,7,8,b
Ring Sequence Ring Sequence Ring Sequence
2 5,6,a,8,7,b 2 5,6,a,8,7,b
3 1 2,1,a,4,3,b 1 1,2,a,3,4,b 1 1,2,a,4,3,b 1 2,1,a,4,3,b Printed on: 3/25/2021
Backup Prevention / No Serve Phases
Sequence 1 Sequence 2 Sequence 3
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 4 Sequence 5 Sequence 6
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 7 Sequence 8 Sequence 9
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Serve Phase 1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Printed on: 3/25/2021
Detector Configuration
Vehicle Detectors Pedestrian Detectors
Global Vehicle Detector Parameters
Global Ped Detector Parameters
Vehicle Detection Options
Detector Reset Enable Enabled Addtnl Call PH No Act Max Pres 4 None
None
None
None
None
None
None
None Erratic Count
2 Failed Recall Call PH Call O/L
None
None
None
None
None
None
None
None
Global Failed Recall
Global No Activity
Global Max Pres.
1 2
2 3
5 6
None
None
20 Max Recall
None 5
None
None
None
None
None
None
None
None
None
6 C1-43
J-4
J-5
J-6U
J-6L
J-7U
J-7L
J-8
J-9U C1-59
Global Erratic Ct
7 ------- -------
3 ------- -------
Global No Activity
Global Max Presence
Global Erratic Count
8 X X X X . X X X X X X X . X X X X X
I-1
Added Initial X X X X X . X
J-9L
6 6
6 6
8 8
8 8
5 7
27 28 Detector
2 4
6 8
1 2
3 4
5 6
7 8
9 10
11 12
13 14
1 5
26 I-2U
I-2L
I-3U
I-3L
I-4
I-5
I-6U
I-6L
I-7U
I-7L
I-8
I-9U
I-9L
J-1
J-2U
J-2L
J-3U
J-3L
C1-58
C1-41
C1-49
C1-55
C1-44
C1-64
C1-63
C1-46
C1-50
C1-57
C1-79
C1-66
C1-62
C1-77
C1-40
C1-48
C1-42 Slot
I-12U C1 Pin Number
C1-67
I-12L
I-13U
I-13L
C1-69
C1-68
C1-70
------- -------
------- -------
C1-56
C1-39
2 2
2 3
4 4
4 4
C1-76
C1-47
C1-78
24 25
15 16
17 18
19 20
21 22
23 C1-45
C1-65
4 1
Detector
C1-61
C1-60
6 7 8 9
Yellow Lock Call
Occupancy
Volume
10 11 12 13 14 15 16 17 18 19 20 21
.
. . .
1 2 3 4 5
.
X
X
25 26 27 28
. . .
. . . .
.
.
X X
.
.
23 24
. . . . . . . . . .
. .
Call
Queue
Extend
Red Lock Call
22 . . . . . . . . . . . .
.
X X X X X X
. . . . .
. . . . . . . . . . . . . . . .
. .
X
. . . . . . . .
X X X X X X X
. . . . . . . . . . . . . . . .
X X
X X X X X X X X X X X X X X X X X X
. .
. .
. .
X X
. .
. . . . . . . . .
. . .
. . . . . .
. .
. .
. . .
X X X X X X
. .
X X
. . .
X X X X X X X X
. .
.
.
.
X
.
X
. . .
. . .
. . . Detector Slot C1 Pin Number Call Phase Addtnl Call PH Switch Phase Delay Extend Queue Limit No Activity Max Pres. Erratic Count Fail Time Description . . . . .
7 8 Call O/L
Min Green 2 . . . . . . . . . . . . . . . . . . . . . . .
Passage 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Printed on: 3/25/2021
Coordination Configuration
Coordination Parameters Patterns
Split 1 Split 2 Split 3
Split 4 Split 5 Split 6
9 Yellow Auto Permissive Fixed Max Inhibit
Fixed
Fixed
Mode
None
None
None
None
Mode
8 Yellow Auto Permissive Fixed Max Inhibit 1 1 1 1
7 Yellow Auto Permissive Fixed Max Inhibit 1
Description
Auto Permissive
Coord Mode
Auto Permissive
Auto Permissive
Auto Permissive
Auto Permissive
Auto Permissive
Patt. Cycle Offset 1 Split Seq Reference FO Mode
Fixed
Fixed
1 Fixed
Fixed
Fixed
Yellow Fixed
1 1
Max Inhibit
.
.
OL
Pln
1 1
1 1
1 1 1 1
Phs Det Ped
1 1 1
1 Max Mode Pln Pln Pln
Max Inhibit
Max Inhibit
Max Inhibit
Max Inhibit
1 4
1 Fixed None
Fixed None 1
FO Mode Mode
7 PH. Time Min Max
2 1 1
FO Mode
Fixed
Fixed
1 .
.Coord Phase
Fixed None .
FO Mode PH. Time
1 Max Inhibit
Min Max
1 1
1 1 1 1
Fixed None
Fixed None
. . Fixed None
Fixed None
7 . Fixed None
Fixed None
.
4 . .
6 . .
8 5
.
.
. .
.
.
Yellow
6 Yellow
Yellow Coord Phase
1 . . Fixed None 1
Min Cyc Limit % 25
Split Parameters
Max Dwell
Trans. Cover Ped
0 Pattern
.
.
.
.
3 . None 3 .
.
PH. Max Mode PH. Time Min Coord Phase Ref Phase FO Mode 2 . Fixed None 2
None
None
None
None
.
Fixed None
FO Mode Mode
Fixed Coord
6 5 . None 5
4 . None 4
. Fixed
. Fixed None
.
. None 6
Time Max Min
.
Fixed
Fixed
Fixed
Fixed Phase Ref Phase
.
.
. .
.
.
.
Fixed None
.
Yellow
Yellow
.
.
Max Cyc Limit %
Fixed
Fixed
Fixed
Fixed
Fixed Phase
.
.
Operational Mode
Coord Mode
Maximum Mode
Force Mode
Correction Mode
2 Manual Free
Full Permissive
Per Pattern
4 Per Pattern
Shortway (Auto)
25 5
1 3
1 1
1 1 1
.
.
Fixed None
. Fixed None
. Fixed None Ref Phase
.
Fixed None .
.
3 Ref
.
.
.
5 8
6 Fixed None
2 PH. Time Min Max FO Mode Mode Phase Ref Phase
8 7 . None 7
.
1 . . Fixed None Coord Phase Ref Phase
. None 8
2 . . Fixed None
3 . . Fixed None
4 . . Fixed None
Fixed None
6 . . Fixed None
7 . . Fixed None
8 . . Fixed None
PH. Time Min Max Coord
1 .
2 .
3 .
5 . .
4 6
5 .
.
Fixed None
. Fixed None
3 . Fixed None
.
.
.
.
. None
8 . Fixed None
. Fixed None
7 . Fixed None
.
.
.
Printed on: 3/25/2021
Split 7 Split 8 Split 9
Advanced Coord Options
Ring Plan 1 Ring Plan 2 Ring Plan 3 Ring Plan 4 Ring Plan 5 Ring Plan 6 Ring Plan 7 Ring Plan 8 Ring Plan 9
3 0 0
Ring Offset Early Gap
1 0 0
2 0 0
4 0 0
Offset Early Gap
0 0
0 0
0 0
0 0
Ring
1 2
3 3 0 0
4 0 0
1 0 0
1 0 0
4 2 0 0
2 0 0
3 0
0 0
Ring Offset Early Gap
1 0 0
2 0 0
3 . .
4 3 0 0
3 0 0
4 0 0
4 0 0
Ring Offset Early Gap
1 4 0 0
Ring Offset Early Gap
Ring Offset Early Gap
0 2
0 3 0 0
Ring Offset
.
Ring Offset Early Gap
1 0 0
2 0 0
3 0 0
0 4 0 0
Early Gap
1 0 0
2 0 0
4 Offset Early Gap
0 0
0 0
0 0
0 0
Ring Plans
Ring
1 2
3 0
0 7 . . Fixed None
8 . . Fixed None
. Fixed None
6 . . Fixed None
.
None
4 . . Fixed None
. Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode Phase
8 . . Fixed None Coord
1 .
3 .
5 . Fixed
. . Fixed None Coord Phase Ref Phase
5 . . Fixed None
6 . . Fixed None
3 Fixed None . .
4 . . Fixed None
1 . . Fixed None
2 . . Fixed None
7 . . Fixed None
8 . . Fixed None
5 . . Fixed None
6 . . Fixed None
. . Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode FO Mode Mode Coord Phase Ref Phase PH. Time Min Max Phase Ref . .
. .
.
8 .
.
9 Fixed None
Fixed None
7 7
.
. . .
Allow Split Underrun .
4 5 6
Allow Split Overrun .
Ring Plan
. .
4 . .
1 .
Allow No Coord Phase . . . . . .
Coord Now . . . . . .
.
.
.
.
.
.
Pattern 1 2 3
.
Printed on: 3/25/2021
Scheduler Configuration
Schedule 1
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 2
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 3
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2 3 1 2 3 4 5 6 7 8
Day Plan 1 Day Plan 2 Day Plan 3 . . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
9 None
10 None
13 None
14 None
15 None
11 None
12 None
19 None
6 None
7 None
8 None
1 2
3 4
5 None
None
None
None
None
Action
Action Commands
Command Action Command Index Action Command Index Index Action Command Index Month of Year Days of Week Days of Month
J F M A M J J A S O N D T W T F S
0 0
4 Pattern
Pattern 1
Description Day Plan 0
S M
0 0
3 Pattern 3
4 Pattern 4
0 Special Functions
Event HR MIN ACT Description
Actions
.
Aux
Pattern 2
Action
1 2
. . .
None
12 None
19 None
0 6
Pattern 9
5 Pattern 7
Pattern 8
Pattern 5
Pattern 6
0 Pattern 10
64 Free
20 None
13 None
14 None
20 None
17 None
18 None
15 None
None 16 None
0 0
8 9 0 11
7 7
0 9
10 0
0 0
0 17 None
18 None
0 0
16 5 0
6 0 0
10 0
0 4
0 0 0
0 0
0 0
0 0
8 0
Day Plans
HR MIN
.
4 8
Description
0 0
0 0
0 0
Status Enabled
Status Enabled
HR
0 0
0 MIN ACT
Status Disabled
. . . . . .
Event
1 2
3 0
1 ACT Description
3 2
Event
.
S
X
Description Weekday
. .
0 0
0 0
1 0 0
2 3
0 X X
A
Day Plan
8 1
Month of Year Days of Week Days of Month
J F M A M J J A S O N
0 0
. . . . .
10 5
6 7
10 9
6 7
0 0
9 0 0 0
0 5
0 0
0 D S M T W T F S
X . X X X X X .
Month of Year Days of Week
J
X
F M
X
X X X X X X X X
X X X X X X X X
M J J A S
Weekend
Days of Month
X X X X . . . . .
M T
Description Day Plan 2
O N D S F W T
Printed on: 3/25/2021
Preempt Configuration
Preemption Configuration Preemption Options
Preemption Parameters Preempt Parameters
Track Overlap
Track 2 Overlap
Dwell Ped
Dwell Overlap
Cycling Phase
Cycling Ped
Cycling Overlap
Recovery Exit Omit
Preempt
Enabled
Type
Description
Dwell Phase
Exit Phase
Exit Overlaps
Track Phase
Track 2 Phases
.
.
.
.
6 .
.
.
.
.
.
.
.
.
.
.
.
5 .
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
4 .
.
.
.
.
.
.
.
.
1 25.5 25.5
Dwell Green
Exit Ped Clear
Exit Yellow Change
Exit Red Clear
0 3 4 5 6
25.5 25.5
255 255
Max Presence
Max Presence Action
Preempt
.
.
.
.
.
.
.
6 0
Preempt 1 2
Link
Delay
Min Duration
Min Presence
1 .
.
.
Exit Phases
25.5 25.5
255 255
0 Exit Type
25.5 0
0.0 255
0 Disabled
0 Disabled Disabled
0 0
0 25.5
25.5 25.5
1 .
.
.
.
2 3
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
Enter Min Walk
Enter Ped Clear
Track Green
Track Yellow Change
Track Red Clear
Track 2 Green
Track 2 Yellow
Track 2 Red
Track Ext. Gate Down
Enter Min Green
Enter Yellow Change
Enter Red Clear
Exit Max Mode
Exit Max Apply Time
Veh Exit Calls
Ped Exit Calls
0 0.0
0 Terminate
0 25.5
25.5 Terminate
0.0 0.0 0.0 0.0
0 255 255 255
0 Dwell Ext Time
Max Exit Green
255
25.5 25.5
0 0
25.5 0 0 0
255
25.5 25.5
25.5 25.5
0 0
Terminate Terminate Terminate Terminate
0 0 0 0
25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 0 0 0 0
255
0 0 0 0
0 1 1
25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 25.5 25.5
0 1 1
. .
Require All Red Entry
Require Gate Down Track Exit
Require Gate Up Dwell Exit
Use Normal On/Normal Off Input
Immediate Ped Clear
Dwell Only Status Output
All Red Flash Dwell
Allow All Overlaps
Ped Recycle in Dwell Cycle
X
.
.
.
.
.
Preempt
Non Lock Mem
Not Overide Flash
Not Overide Next Preempt
Flash Dwell
1 Enabled
Rail Road
BBS Flash
1 1
0 0
Exit Phases Exit Phases Exit Phases Exit Phases Exit Phases Disabled Disabled
0 0 0
Disabled
1 2 3 4 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0
0 0 255 255 255
0 0 0 0 0
0 0 0 0 0
25.5 25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5 25.5
2 3 4 5 6
Disabled Enabled Enabled Enabled Enabled
Rail Road Emergency Veh Emergency Veh Emergency Veh Emergency Veh 2,5 4,7 1,6 3,8
2,6 4,8 2,6 4,8
Printed on: 3/25/2021
Advanced I/O Configuration
Channel Configuration Concurrency Mode
Auto Concurrency
Channel Options
Cabinet Configuration
IO Modules
Input Points
C11-12 Not Active
Not Active
25 Idx
15 23
14 40
22 Not Active
C11-25
4 42
43 44
45 C1-76 5
C1-77
11 25
41 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
19 C1-48
C11-29
C11-30
C11-26
C11-27
C11-28
Not Active
Not Active
Vehicle Det Call Not Active
C11-13
Not Active
Not Active
Not Active
26 27
28 29
C1-54
C1-49
C11-16
C1-66 C1-82
C1-79
C1-80
C1-81
C1-72
C11-22
C11-17
C11-18
C11-19
C11-20
C11-21
58 59
60 61
54 C11-11
C1-78
C1-62
C1-75 C11-23
C11-24
56 57
Preempt Input
Not Active
C1-58
Vehicle Det Call C1-68
6 17
9 23
6 24
37 C1-73
C1-74
19 20
55 C11-10
3 4
C1-70
C1-71
C1-41
C1-42
Idx C1 Pin
2 16
8 22
3 C1-56
Input Type
Vehicle Det Call
Input Type
C1-43
C1-46
C1-47
5 Vehicle Det Call
Preempt Input
Preempt Input
Preempt Input
Vehicle Det Call
Ch
1 2
3 4
7 8
5 6
7 8
Control Type
Phase Vehicle
Phase Vehicle
Phase Vehicle
Phase Vehicle
Vehicle Det Call
Phase Ped
Phase Ped
Phase Ped
12 . .
14 IO Module
1 X
1 2 3 4
. .
X X
Type
4 6
5 6 7 8
Phase Vehicle
Phase Vehicle
Phase Vehicle
Phase Vehicle
Control Type
None
None
None
None
Phase Ped
Source
2 Input
C1-39
C1-40
Ch
9 10
11 12
13 C1 Pin
17 18
Channel
Flash Yellow
Flash Red
Flash Alternate Half Hertz
.
Source
1 2
3 4
5 6
Caltrans 332
X
. . . .
X X
15 .
X
. . X
16 X
X
C1 Pin
C11-15
C1-57 C1-69
C1 Pin
C1-55
C1-59 Input Input
21 7
Idx
2 6
4 8
C1-67 Input33
Input Type
Ped Det Call
50 51
52 49
C1-60
C1-61
34 35
36 38
39 Ped Det Call
Ped Det Call
Ped Det Call
27 13
28 1
53 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Not Active
Not Active
Not Active
Not Active
Input Type Idx
Not Active
Not Active
Not Active
Not Active
Not Active
30 31
32 46
47 48
62 63
64 Unit Interval Advance
Unit Local Flash Sense
Unit Stop Time
18 C1-65 10
24 14 1
15 16
21 Not Active
20 2
1 10
11 12
13 12
1 2
3 4
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
5 6
7 8
9 C1-44
C1-45
Vehicle Det Call
Vehicle Det Call
Preempt Input
Preempt Input
Unit Manual Control Enable
Not Active
1 1
C1-51
C1-52
C1-53
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
26 1
C1-50
C1-63
C1-64
15 16
Not Active
14 14,16
Ch
1 2
3 4
5 6
7 8
. . 9
.
.
8 9 10 11 15 16
. . . . . . .
. . .
13 14
14 15
16 X . . 10
11 12
13 X . . . . . . . .
Concurrency Mode
Auto
Concurrency
5,6,15
5,6,13,15
7,8,16
7,8,14,16
13 13,15
Printed on: 3/25/2021
Cabinet Configuration
Output Points
C1 Pin C1 Pin
Not Active
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Output Type
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Detector Reset
Watchdog
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
64 C11-8
C11-1
5 6
6 6
5 5
C11-4
61 62
63 15
C11-3
18 18
C1-98
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
12 11
11 10
10 10
9 9
C1-88
C1-89
C11-7
3 13
13 15
14 16
3 18
11 1
14 C1-101
C1-102
34 C1-36
37 C1-100
38 42
36 C1-84
9 17
17 17
12 12
39 C1-91
50 C1-93
51 C1-94
7 8
8 8
7 7
15 C11-6
44 C1-86
45 C1-87
60 49
C11-5
48 C1-90
47 2
1 1
1 46
1Output Output Type Idx
14 15
16 2
3 4
5 C1-2
2 2
4 4
4 3
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
6 7
8 9
10 11
12 13
14 C1-3
C1-4
C1-5
C1-6
C1-7
C1-8
C1-9
C1-10
C1-11
17 C1-19 16
28 C1-30
25 C1-27
26 C1-28
27 C1-29
22 C1-24
23 C1-25
18 C1-20
21 C1-23
20 C1-22
19 16
Channel Red Do Not Walk Driver
31 C1-33
32 C1-34
29 C1-31
30 C1-32
24 C1-26
C1-21
58 C11-2
59 40 C1-103
41 C1-83
56 C1-99
57 52 C1-95
53 C1-96
54 C1-97
55 C1-12
C1-13
C1-15
C1-16
C1-17
C1-18
43 C1-85
35 C1-37
C1-38
Idx
13 Output
33 C1-35
Printed on: 3/25/2021
User Programs
Program 1
Enabled
40 None 0 None None None 0.0 0.0
None 0.0 0.0
None 0.0 0.0
39 None 0 None None
38 None 0 None None
None 0.0 0.0
None 0.0 0.0
37 None 0 None None
36 None 0 None None
None 0.0 0.0
None 0.0 0.0
35 None 0 None None
34 None 0 None None
None 0.0 0.0
None 0.0 0.0
33 None 0 None None
32 None 0 None None
None 0.0 0.0
None 0.0 0.0
31 None 0 None None
30 None 0 None None
None 0.0 0.0
None 0.0 0.0
29 None 0 None None
28 None 0 None None
None 0.0 0.0
None 0.0 0.0
27 None 0 None None
26 None 0 None None
None 0.0 0.0
None 0.0 0.0
25 None 0 None None
24 None 0 None None
None 0.0 0.0
None 0.0 0.0
23 None 0 None None
22 None 0 None None
None 0.0 0.0
None 0.0 0.0
21 None 0 None None
20 None 0 None None
None 0.0 0.0
None 0.0 0.0
19 None 0 None None
18 None 0 None None
None 0.0 0.0
None 0.0 0.0
17 None 0 None None
16 None 0 None None
None 0.0 0.0
None 0.0 0.0
15 None 0 None None
14 None 0 None None
None 0.0 0.0
None 0.0 0.0
13 None 0 None None
12 None 0 None None
None 0.0 0.0
None 0.0 0.0
11 None 0 None None
10 None 0 None None
None 0.0 0.0
None 0.0 0.0
9 None 0 None None
8 None 0 None None
None 0.0 0.0
0 None 0.0 0.0
7 None 0 None None
6 None 0 None None
None 0.0 0.0
None 0.0 0.0
5 None 0 None None
4 None 0 None None
3 None 0 None None None 0.0 0.0
None None
None 0.0 0.0 Aux switch stop time
Parameter B Idx Dly Ext Description
1 Unit Stop Time 1 Result=A Aux Switch State
Line Result Idx Operation Parameter A Idx
2 None None 0.0 0.0
Printed on: 3/25/2021
Phase Timing and Options
Unit Information Phase Timing Phase Options
1 2 3 4 5 6 7 8
X X . . . X . X
. . . . . . . X
. X . . . X . .
X X . . . X . X
. X . . . X . .
. . . . . . . .
Unit Parameters . . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. X . . . . . .
Phase Configuration Global Phase Recalls Notes
1 2 3 4 5 6 7 8
. . . . . . . .
. . . . . . . .
. . . . . . . .
City of San Marcos
Grand @ Bent
Phase
Enable
Non Lock Detector
Min Vehicle Recall
Max Vehicle Recall
Ped Recall
0 0
6 0 0 0 0 0 0
0 0 0 0 0
1 2 4
6 4
2 Phase
1 7
8 Phase
Min
Max
Ped
Green No Walk
None
Phase Not On NB
Green No Walk
WB
Phase Not On
Description
WB Left
Startup
None
None
Added Initial
Maximum Initial
Time B4 Reduction
Cars B4 Reduction
Time To Reduce
Reduce By
Minimum Gap
Advance Walk
Delayed Ped
All Red Flash Sns
5 MCE Enable
Free Sequence
Start Yel. Override
Start Red Override
1 EB
6 0 0
Disable
None
0 0
0 0
Local CVM Fash Disable
3 All Red Flash Exit
Enable
0.0 0.0
0 No Ped Startup Call
Max Green 2
0 0
0 0.0
0 Add Initial Calculation
Ped Clear During Yellow
Ped Clear During Red Clr
Yellow Min Override
0 Red Clear
5 4.0
1.2 0
Max Green 1
Yellow Change 3.0 4.8 3.0
0.0 1.0 0.0
0.0 0.0 0.0
Soft Vehicle Recall
Dual Entry
Sim. Gap Disable
0 0 0
0.0 0 0 0 0
0 0 0
0 0 0 0
0.0 4.0
No Startup Call
1.0 Actuated Rest in Walk
Conditional Svc Enable
Auto Ped Clear
0 Passage
0 0.0
0 0.0 0.0 0.0
0.0 0 0
0 0.0
0 0
Man. Control Seq. 1
Startup All Red 6
115
Intelight MAXTIME 2.X
Grand
Bent
Startup Flash
Controller Number
0 0
Phase 3
Software
Main Street
Side Street
IP Address
Min Green 2 0
Description
WB
Left
Walk
Ped Clear
Min Green
Passage 2
Extended Mode
15 3.0
23 4.8
1.0 0.0
0 0 0
3.0 3.0
0.0 0.0 0.0
0.0 0.0 0.0 0.0
0 0
Min Green 2
0.0 0 0
0.0 0 0 Red Rest
0 0 Ped Recycle
5 6 7 8
0 0 0
0.0 0.0 0.0
0 0.0 0.0 0.0
0 0
0 0.0 0.0 0.0
0 0
7 0
0 15
5 Auto Flash Entry
Auto Flash Exit
Max Green 2 0 0 0 0 0 0 0 0
Steady Don't Walk 0 0 0
0 3.0 0.0 3.0
NB
0 0
EB WB
18 0
0.0 0.0 0.0 0.0
All Dark Flash Sns Disable
0 0 0 0
0 0 13 0 25
3.0 0.0
0.0 Red Revert
Backup Time
Disable
Enable
6.0 600
Printed on: 3/25/2021
Sequences
Sequence 1 Sequence 2 Sequence 3 Sequence 4 Sequence 5 Sequence 6 Sequence 7 Sequence 8 Sequence 9 Sequence 10 Sequence 11 Sequence 12 Sequence 13 Sequence 14 Sequence 15 Sequence 16
Standard Overlaps
. . . . .
0 0 0 0 0
0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
. . . . .
. . . . .
0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
6 Disabled Disabled Disabled Disabled Disabled
Off Off Off Off Off
2 3 4 5
Call for Svc
1 Disabled
Off
0 0.0
0.0 0
0 0.0
.
.
.
Startup Call
Recall
4 4
3 2,1,a,4,3,b
Ring Sequence Ring Sequence Ring Sequence
1 2,1,a,3,4,b
3 4 4
4 3
4 3
4 3
4 3
4 2 6,5,a,8,7,b 2 6,5,a,8,7,b 2 6,5,a,8,7,b
1 1,2,a,4,3,b 1
2 6,5,a,8,7,b
Ring Sequence
1 1,2,a,3,4,b
Trail Red
Walk
Ped Clear
Delay
Overlap
Negative Phs
Negative Ovlp
Negative Ped
Green Suppr
Trail Green
Trail Yellow
Modifier Phs
Type
Included Phs
1 1,2,a,4,3,b
2 6,5,a,7,8,b
3 4
3 2 5,6,a,7,8,b
Ring Sequence
4 2 6,5,a,7,8,b 2 5,6,a,8,7,b
Ring Sequence Ring Sequence
1 2,1,a,3,4,b
2 5,6,a,8,7,b
3 4
Ring Sequence
1 1,2,a,b
2 6,a,8,b
Ring Sequence
1 1,2,a,b
2 6,a,8,b
Overlaps
Enabled
Description
3 4
3 3
4 3
4 3
4 1 1,2,a,b 1 2,1,a,3,4,b 1 1,2,a,4,3,b 1 2,1,a,4,3,b
Ring Sequence Ring Sequence Ring Sequence
3 Ring Sequence
2 6,a,8,b 2 5,6,a,7,8,b 2 5,6,a,7,8,b
Ring Sequence Ring Sequence Ring Sequence
2 5,6,a,8,7,b 2 5,6,a,8,7,b
3 1 2,1,a,4,3,b 1 1,2,a,3,4,b 1 1,2,a,4,3,b 1 2,1,a,4,3,b Printed on: 3/25/2021
Backup Prevention / No Serve Phases
Sequence 1 Sequence 2 Sequence 3
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 4 Sequence 5 Sequence 6
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 7 Sequence 8 Sequence 9
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Serve Phase 1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Printed on: 3/25/2021
Detector Configuration
Vehicle Detectors Pedestrian Detectors
Global Vehicle Detector Parameters
Global Ped Detector Parameters
Vehicle Detection Options
Detector Reset Enable Enabled Addtnl Call PH No Act Max Pres 4 None
None
None
None
None
None
None
None Erratic Count
2 Failed Recall Call PH Call O/L
None
None
None
None
None
None
None
None
Global Failed Recall
Global No Activity
Global Max Pres.
1 2
2 3
5 6
None
None
20 Max Recall
None 5
None
None
None
None
None
None
None
None
None
6 C1-43
J-4
J-5
J-6U
J-6L
J-7U
J-7L
J-8
J-9U C1-59
Global Erratic Ct
7 ------- -------
3 ------- -------
Global No Activity
Global Max Presence
Global Erratic Count
8 X X X X . X X X X X X X . X X X X X
I-1
Added Initial X X X X X . X
J-9L
6 6
6 6
8 8
8 8
5 7
27 28 Detector
2 4
6 8
1 2
3 4
5 6
7 8
9 10
11 12
13 14
1 5
26 I-2U
I-2L
I-3U
I-3L
I-4
I-5
I-6U
I-6L
I-7U
I-7L
I-8
I-9U
I-9L
J-1
J-2U
J-2L
J-3U
J-3L
C1-58
C1-41
C1-49
C1-55
C1-44
C1-64
C1-63
C1-46
C1-50
C1-57
C1-79
C1-66
C1-62
C1-77
C1-40
C1-48
C1-42 Slot
I-12U C1 Pin Number
C1-67
I-12L
I-13U
I-13L
C1-69
C1-68
C1-70
------- -------
------- -------
C1-56
C1-39
2 2
2 3
4 4
4 4
C1-76
C1-47
C1-78
24 25
15 16
17 18
19 20
21 22
23 C1-45
C1-65
4 1
Detector
C1-61
C1-60
6 7 8 9
Yellow Lock Call
Occupancy
Volume
10 11 12 13 14 15 16 17 18 19 20 21
.
. . .
1 2 3 4 5
.
X
X
25 26 27 28
. . .
. . . .
.
.
X X
.
.
23 24
. . . . . . . . . .
. .
Call
Queue
Extend
Red Lock Call
22 . . . . . . . . . . . .
.
X X X X X X
. . . . .
. . . . . . . . . . . . . . . .
. .
X
. . . . . . . .
X X X X X X X
. . . . . . . . . . . . . . . .
X X
X X X X X X X X X X X X X X X X X X
. .
. .
. .
X X
. .
. . . . . . . . .
. . .
. . . . . .
. .
. .
. . .
X X X X X X
. .
X X
. . .
X X X X X X X X
. .
.
.
.
X
.
X
. . .
. . .
. . . Detector Slot C1 Pin Number Call Phase Addtnl Call PH Switch Phase Delay Extend Queue Limit No Activity Max Pres. Erratic Count Fail Time Description . . . . .
7 8 Call O/L
Min Green 2 . . . . . . . . . . . . . . . . . . . . . . .
Passage 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Printed on: 3/25/2021
Coordination Configuration
Coordination Parameters Patterns
Split 1 Split 2 Split 3
Split 4 Split 5 Split 6
9 Yellow Auto Permissive Fixed Max Inhibit
Fixed
Fixed
Mode
None
None
None
None
Mode
8 Yellow Auto Permissive Fixed Max Inhibit 1 1 1 1
7 Yellow Auto Permissive Fixed Max Inhibit 1
Description
Auto Permissive
Coord Mode
Auto Permissive
Auto Permissive
Auto Permissive
Auto Permissive
Auto Permissive
Patt. Cycle Offset 1 Split Seq Reference FO Mode
Fixed
Fixed
1 Fixed
Fixed
Fixed
Yellow Fixed
1 1
Max Inhibit
.
.
OL
Pln
1 1
1 1
1 1 1 1
Phs Det Ped
1 1 1
1 Max Mode Pln Pln Pln
Max Inhibit
Max Inhibit
Max Inhibit
Max Inhibit
1 4
1 Fixed None
Fixed None 1
FO Mode Mode
7 PH. Time Min Max
2 1 1
FO Mode
Fixed
Fixed
1 .
.Coord Phase
Fixed None .
FO Mode PH. Time
1 Max Inhibit
Min Max
1 1
1 1 1 1
Fixed None
Fixed None
. . Fixed None
Fixed None
7 . Fixed None
Fixed None
.
4 . .
6 . .
8 5
.
.
. .
.
.
Yellow
6 Yellow
Yellow Coord Phase
1 . . Fixed None 1
Min Cyc Limit % 25
Split Parameters
Max Dwell
Trans. Cover Ped
0 Pattern
.
.
.
.
3 . None 3 .
.
PH. Max Mode PH. Time Min Coord Phase Ref Phase FO Mode 2 . Fixed None 2
None
None
None
None
.
Fixed None
FO Mode Mode
Fixed Coord
6 5 . None 5
4 . None 4
. Fixed
. Fixed None
.
. None 6
Time Max Min
.
Fixed
Fixed
Fixed
Fixed Phase Ref Phase
.
.
. .
.
.
.
Fixed None
.
Yellow
Yellow
.
.
Max Cyc Limit %
Fixed
Fixed
Fixed
Fixed
Fixed Phase
.
.
Operational Mode
Coord Mode
Maximum Mode
Force Mode
Correction Mode
2 Manual Free
Full Permissive
Per Pattern
4 Per Pattern
Shortway (Auto)
25 5
1 3
1 1
1 1 1
.
.
Fixed None
. Fixed None
. Fixed None Ref Phase
.
Fixed None .
.
3 Ref
.
.
.
5 8
6 Fixed None
2 PH. Time Min Max FO Mode Mode Phase Ref Phase
8 7 . None 7
.
1 . . Fixed None Coord Phase Ref Phase
. None 8
2 . . Fixed None
3 . . Fixed None
4 . . Fixed None
Fixed None
6 . . Fixed None
7 . . Fixed None
8 . . Fixed None
PH. Time Min Max Coord
1 .
2 .
3 .
5 . .
4 6
5 .
.
Fixed None
. Fixed None
3 . Fixed None
.
.
.
.
. None
8 . Fixed None
. Fixed None
7 . Fixed None
.
.
.
Printed on: 3/25/2021
Split 7 Split 8 Split 9
Advanced Coord Options
Ring Plan 1 Ring Plan 2 Ring Plan 3 Ring Plan 4 Ring Plan 5 Ring Plan 6 Ring Plan 7 Ring Plan 8 Ring Plan 9
3 0 0
Ring Offset Early Gap
1 0 0
2 0 0
4 0 0
Offset Early Gap
0 0
0 0
0 0
0 0
Ring
1 2
3 3 0 0
4 0 0
1 0 0
1 0 0
4 2 0 0
2 0 0
3 0
0 0
Ring Offset Early Gap
1 0 0
2 0 0
3 . .
4 3 0 0
3 0 0
4 0 0
4 0 0
Ring Offset Early Gap
1 4 0 0
Ring Offset Early Gap
Ring Offset Early Gap
0 2
0 3 0 0
Ring Offset
.
Ring Offset Early Gap
1 0 0
2 0 0
3 0 0
0 4 0 0
Early Gap
1 0 0
2 0 0
4 Offset Early Gap
0 0
0 0
0 0
0 0
Ring Plans
Ring
1 2
3 0
0 7 . . Fixed None
8 . . Fixed None
. Fixed None
6 . . Fixed None
.
None
4 . . Fixed None
. Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode Phase
8 . . Fixed None Coord
1 .
3 .
5 . Fixed
. . Fixed None Coord Phase Ref Phase
5 . . Fixed None
6 . . Fixed None
3 Fixed None . .
4 . . Fixed None
1 . . Fixed None
2 . . Fixed None
7 . . Fixed None
8 . . Fixed None
5 . . Fixed None
6 . . Fixed None
. . Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode FO Mode Mode Coord Phase Ref Phase PH. Time Min Max Phase Ref . .
. .
.
8 .
.
9 Fixed None
Fixed None
7 7
.
. . .
Allow Split Underrun .
4 5 6
Allow Split Overrun .
Ring Plan
. .
4 . .
1 .
Allow No Coord Phase . . . . . .
Coord Now . . . . . .
.
.
.
.
.
.
Pattern 1 2 3
.
Printed on: 3/25/2021
Scheduler Configuration
Schedule 1
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 2
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 3
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2 3 1 2 3 4 5 6 7 8
Day Plan 1 Day Plan 2 Day Plan 3 . . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
9 None
10 None
13 None
14 None
15 None
11 None
12 None
19 None
6 None
7 None
8 None
1 2
3 4
5 None
None
None
None
None
Action
Action Commands
Command Action Command Index Action Command Index Index Action Command Index Month of Year Days of Week Days of Month
J F M A M J J A S O N D T W T F S
0 0
4 Pattern
Pattern 1
Description Day Plan 0
S M
0 0
3 Pattern 3
4 Pattern 4
0 Special Functions
Event HR MIN ACT Description
Actions
.
Aux
Pattern 2
Action
1 2
. . .
None
12 None
19 None
0 6
Pattern 9
5 Pattern 7
Pattern 8
Pattern 5
Pattern 6
0 Pattern 10
64 Free
20 None
13 None
14 None
20 None
17 None
18 None
15 None
None 16 None
0 0
8 9 0 11
7 7
0 9
10 0
0 0
0 17 None
18 None
0 0
16 5 0
6 0 0
10 0
0 4
0 0 0
0 0
0 0
0 0
8 0
Day Plans
HR MIN
.
4 8
Description
0 0
0 0
0 0
Status Enabled
Status Enabled
HR
0 0
0 MIN ACT
Status Disabled
. . . . . .
Event
1 2
3 0
1 ACT Description
3 2
Event
.
S
X
Description Weekday
. .
0 0
0 0
1 0 0
2 3
0 X X
A
Day Plan
8 1
Month of Year Days of Week Days of Month
J F M A M J J A S O N
0 0
. . . . .
10 5
6 7
10 9
6 7
0 0
9 0 0 0
0 5
0 0
0 D S M T W T F S
X . X X X X X .
Month of Year Days of Week
J
X
F M
X
X X X X X X X X
X X X X X X X X
M J J A S
Weekend
Days of Month
X X X X . . . . .
M T
Description Day Plan 2
O N D S F W T
Printed on: 3/25/2021
Preempt Configuration
Preemption Configuration Preemption Options
Preemption Parameters Preempt Parameters
Track Overlap
Track 2 Overlap
Dwell Ped
Dwell Overlap
Cycling Phase
Cycling Ped
Cycling Overlap
Recovery Exit Omit
Preempt
Enabled
Type
Description
Dwell Phase
Exit Phase
Exit Overlaps
Track Phase
Track 2 Phases
.
.
.
.
6 .
.
.
.
.
.
.
.
.
.
.
.
5 .
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
4 .
.
.
.
.
.
.
.
.
1 25.5 25.5
Dwell Green
Exit Ped Clear
Exit Yellow Change
Exit Red Clear
0 3 4 5 6
25.5 25.5
255 255
Max Presence
Max Presence Action
Preempt
.
.
.
.
.
.
.
6 0
Preempt 1 2
Link
Delay
Min Duration
Min Presence
1 .
.
.
Exit Phases
25.5 25.5
255 255
0 Exit Type
25.5 0
0.0 255
1 Disabled
0 Disabled Disabled
0 0
0 25.5
25.5 25.5
1 .
.
.
.
2 3
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
Enter Min Walk
Enter Ped Clear
Track Green
Track Yellow Change
Track Red Clear
Track 2 Green
Track 2 Yellow
Track 2 Red
Track Ext. Gate Down
Enter Min Green
Enter Yellow Change
Enter Red Clear
Exit Max Mode
Exit Max Apply Time
Veh Exit Calls
Ped Exit Calls
0 0.0
0 Terminate
0 25.5
25.5 Terminate
0.0 0.0 0.0 0.0
0 255 0 255
0 Dwell Ext Time
Max Exit Green
255
25.5 25.5
0 0
25.5 0 0 0
255
25.5 25.5
25.5 25.5
0 0
Terminate Terminate Terminate Terminate
0 0 0 0
25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 0 0 0 0
255
0 0 0 0
0 1 0
25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 25.5 25.5
0 5 0
. .
Require All Red Entry
Require Gate Down Track Exit
Require Gate Up Dwell Exit
Use Normal On/Normal Off Input
Immediate Ped Clear
Dwell Only Status Output
All Red Flash Dwell
Allow All Overlaps
Ped Recycle in Dwell Cycle
X
.
.
.
.
.
Preempt
Non Lock Mem
Not Overide Flash
Not Overide Next Preempt
Flash Dwell
1 Enabled
Rail Road
BBS Flash
5 5
0 0
Exit Phases Exit Phases Exit Phases Exit Phases Exit Phases Disabled Disabled
0 0 0
Disabled
1 2 3 4 5
0 0 0 0 0
0 0 1 0 1
0 0 0 0
0 0
0 0 255 255 255
0 0 0 0 0
0 0 0 0 0
25.5 25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5 25.5
2 3 4 5 6
Disabled Enabled Disabled Enabled Enabled
Rail Road Emergency Veh Emergency Veh Emergency Veh Emergency Veh 2 1,6 8
2,6 2,6 8
Printed on: 3/25/2021
Advanced I/O Configuration
Channel Configuration Concurrency Mode
Auto Concurrency
Channel Options
Cabinet Configuration
IO Modules
Input Points
C11-12 Not Active
Not Active
25 Idx
15 23
14 40
22 Not Active
C11-25
4 42
43 44
45 C1-76 5
C1-77
11 25
41 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
19 C1-48
C11-29
C11-30
C11-26
C11-27
C11-28
Not Active
Not Active
Vehicle Det Call Not Active
C11-13
Not Active
Not Active
Not Active
26 27
28 29
C1-54
C1-49
C11-16
C1-66 C1-82
C1-79
C1-80
C1-81
C1-72
C11-22
C11-17
C11-18
C11-19
C11-20
C11-21
58 59
60 61
54 C11-11
C1-78
C1-62
C1-75 C11-23
C11-24
56 57
Preempt Input
Not Active
C1-58
Vehicle Det Call C1-68
6 17
9 23
6 24
37 C1-73
C1-74
19 20
55 C11-10
3 4
C1-70
C1-71
C1-41
C1-42
Idx C1 Pin
2 16
8 22
3 C1-56
Input Type
Vehicle Det Call
Input Type
C1-43
C1-46
C1-47
5 Vehicle Det Call
Preempt Input
Preempt Input
Preempt Input
Vehicle Det Call
Ch
1 2
3 4
7 8
5 6
7 8
Control Type
Phase Vehicle
Phase Vehicle
Phase Vehicle
Phase Vehicle
Vehicle Det Call
Phase Ped
Phase Ped
Phase Ped
12 . .
14 IO Module
1 X
1 2 3 4
. .
X X
Type
4 6
5 6 7 8
Phase Vehicle
Phase Vehicle
Phase Vehicle
Phase Vehicle
Control Type
None
None
None
None
Phase Ped
Source
2 Input
C1-39
C1-40
Ch
9 10
11 12
13 C1 Pin
17 18
Channel
Flash Yellow
Flash Red
Flash Alternate Half Hertz
.
Source
1 2
3 4
5 6
Caltrans 332
X
. . . .
X X
15 .
X
. . X
16 X
X
C1 Pin
C11-15
C1-57 C1-69
C1 Pin
C1-55
C1-59 Input Input
21 7
Idx
2 6
4 8
C1-67 Input33
Input Type
Ped Det Call
50 51
52 49
C1-60
C1-61
34 35
36 38
39 Ped Det Call
Ped Det Call
Ped Det Call
27 13
28 1
53 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Not Active
Not Active
Not Active
Not Active
Input Type Idx
Not Active
Not Active
Not Active
Not Active
Not Active
30 31
32 46
47 48
62 63
64 Unit Interval Advance
Unit Local Flash Sense
Unit Stop Time
18 C1-65 10
24 14 1
15 16
21 Not Active
20 2
1 10
11 12
13 12
1 2
3 4
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
5 6
7 8
9 C1-44
C1-45
Vehicle Det Call
Vehicle Det Call
Preempt Input
Preempt Input
Unit Manual Control Enable
Not Active
1 1
C1-51
C1-52
C1-53
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
26 1
C1-50
C1-63
C1-64
15 Not Active
16 Ch
1 2
3 4
5 6
7 8
. . 9
.
.
8 9 10 11 15 16
. . . . . . .
. . .
13 14
14 15
16 X . . 10
11 12
13 X . . . . . . . .
Concurrency Mode
Auto
Concurrency
6,15
6,13,15
14 13,15
Printed on: 3/25/2021
Cabinet Configuration
Output Points
C1 Pin C1 Pin
Not Active
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Output Type
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Detector Reset
Watchdog
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
64 C11-8
C11-1
5 6
6 6
5 5
C11-4
61 62
63 15
C11-3
18 18
C1-98
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
12 11
11 10
10 10
9 9
C1-88
C1-89
C11-7
3 13
13 15
14 16
3 18
11 1
14 C1-101
C1-102
34 C1-36
37 C1-100
38 42
36 C1-84
9 17
17 17
12 12
39 C1-91
50 C1-93
51 C1-94
7 8
8 8
7 7
15 C11-6
44 C1-86
45 C1-87
60 49
C11-5
48 C1-90
47 2
1 1
1 46
1Output Output Type Idx
14 15
16 2
3 4
5 C1-2
2 2
4 4
4 3
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
6 7
8 9
10 11
12 13
14 C1-3
C1-4
C1-5
C1-6
C1-7
C1-8
C1-9
C1-10
C1-11
17 C1-19 16
28 C1-30
25 C1-27
26 C1-28
27 C1-29
22 C1-24
23 C1-25
18 C1-20
21 C1-23
20 C1-22
19 16
Channel Red Do Not Walk Driver
31 C1-33
32 C1-34
29 C1-31
30 C1-32
24 C1-26
C1-21
58 C11-2
59 40 C1-103
41 C1-83
56 C1-99
57 52 C1-95
53 C1-96
54 C1-97
55 C1-12
C1-13
C1-15
C1-16
C1-17
C1-18
43 C1-85
35 C1-37
C1-38
Idx
13 Output
33 C1-35
Printed on: 3/25/2021
User Programs
Program 1
Enabled
40 None 0 None None None 0.0 0.0
None 0.0 0.0
None 0.0 0.0
39 None 0 None None
38 None 0 None None
None 0.0 0.0
None 0.0 0.0
37 None 0 None None
36 None 0 None None
None 0.0 0.0
None 0.0 0.0
35 None 0 None None
34 None 0 None None
None 0.0 0.0
None 0.0 0.0
33 None 0 None None
32 None 0 None None
None 0.0 0.0
None 0.0 0.0
31 None 0 None None
30 None 0 None None
None 0.0 0.0
None 0.0 0.0
29 None 0 None None
28 None 0 None None
None 0.0 0.0
None 0.0 0.0
27 None 0 None None
26 None 0 None None
None 0.0 0.0
None 0.0 0.0
25 None 0 None None
24 None 0 None None
None 0.0 0.0
None 0.0 0.0
23 None 0 None None
22 None 0 None None
None 0.0 0.0
None 0.0 0.0
21 None 0 None None
20 None 0 None None
None 0.0 0.0
None 0.0 0.0
19 None 0 None None
18 None 0 None None
None 0.0 0.0
None 0.0 0.0
17 None 0 None None
16 None 0 None None
None 0.0 0.0
None 0.0 0.0
15 None 0 None None
14 None 0 None None
None 0.0 0.0
None 0.0 0.0
13 None 0 None None
12 None 0 None None
None 0.0 0.0
None 0.0 0.0
11 None 0 None None
10 None 0 None None
None 0.0 0.0
None 0.0 0.0
9 None 0 None None
8 None 0 None None
None 0.0 0.0
0 None 0.0 0.0
7 None 0 None None
6 None 0 None None
None 0.0 0.0
None 0.0 0.0
5 None 0 None None
4 None 0 None None
3 None 0 None None None 0.0 0.0
None None
None 0.0 0.0 Aux switch stop time
Parameter B Idx Dly Ext Description
1 Unit Stop Time 1 Result=A Aux Switch State
Line Result Idx Operation Parameter A Idx
2 None None 0.0 0.0
Printed on: 3/25/2021
Phase Timing and Options
Unit Information Phase Timing Phase Options
1 2 3 4 5 6 7 8
X X X X X X X X
. . . X . . . X
. X . . . X . .
X X X X X X X X
. X . . . X . .
. . . . . . . .
Unit Parameters . . . . . . . .
. . . . . . . .
. . . X . . . X
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. X . X . X . X
Phase Configuration Global Phase Recalls Notes
1 2 3 4 5 6 7 8
. . . . . . . .
. . . . . . . .
. . . . . . . .
City of San Marcos
San Marcos @ Via Vera Cruz
Phase
Enable
Non Lock Detector
Min Vehicle Recall
Max Vehicle Recall
Ped Recall
0 0
6 0 5 0 5 0 5
0 27 0 21 0
1 2 4
6 4
2 Phase
1 7
8 SB Left
Phase
Min
Max
Ped
Green No Walk
Phase Not On
Phase Not On NB
Green No Walk
WB
Phase Not On
Description
WB Left
Startup
Phase Not On
Phase Not On
Added Initial
Maximum Initial
Time B4 Reduction
Cars B4 Reduction
Time To Reduce
Reduce By
Minimum Gap
Advance Walk
Delayed Ped
SB
EB Left
All Red Flash Sns
5 MCE Enable
Free Sequence
Start Yel. Override
Start Red Override
1 EB
NB Left
6 0 0
Disable
Phase Not On
0 0
0 0
Local CVM Fash Disable
3 All Red Flash Exit
Enable
0.0 0.0
0 No Ped Startup Call
Max Green 2
0 0
0 0.0
0 Add Initial Calculation
Ped Clear During Yellow
Ped Clear During Red Clr
Yellow Min Override
0 Red Clear
30 4.5
2.0 0
Max Green 1
Yellow Change 4.5 4.5 4.0
2.0 2.0 2.5
0.0 0.0 0.0
Soft Vehicle Recall
Dual Entry
Sim. Gap Disable
0 0 0
0.0 0 0 0 0
0 0 0
0 0 0 0
0.0 4.0
No Startup Call
2.5 Actuated Rest in Walk
Conditional Svc Enable
Auto Ped Clear
0 Passage
0 0.0
0 0.0 0.0 0.0
0.0 0 0
0 0.0
0 0
Man. Control Seq. 1
Startup All Red 6
7 Intelight MAXTIME 2.X
San Marcos
Via Vera Cruz
Startup Flash
Controller Number
0 30
Phase 3
Software
Main Street
Side Street
IP Address
Min Green 2 0
Description
WB
Left
Walk
Ped Clear
Min Green
Passage 2
Extended Mode
15 3.0
50 4.5
2.0 0.0
0 0 0
4.0 4.0
0.0 2.0 2.5
0.0 0.0 0.0 0.0
8 7
Min Green 2
0.0 0 0
0.0 0 0 Red Rest
0 0 Ped Recycle
5 6 7 8
0 0 0
0.0 0.0 0.0
0 0.0 0.0 0.0
0 0
0 3.0 3.0 3.0
0 0
7 0
6 15
5 Auto Flash Entry
Auto Flash Exit
Max Green 2 0 0 0 0 0 0 0 0
Steady Don't Walk 0 0 0
7 3.0 3.0 3.0
NB
0 0
EB NB
Left SB EB Left WB SB Left
23 27
0.0 0.0 0.0 0.0
All Dark Flash Sns Disable
0 0 0 0
30 30 50 40 30
3.0 0.0
0.0 Red Revert
Backup Time
Disable
Enable
6.0 600
Printed on: 3/25/2021
Sequences
Sequence 1 Sequence 2 Sequence 3 Sequence 4 Sequence 5 Sequence 6 Sequence 7 Sequence 8 Sequence 9 Sequence 10 Sequence 11 Sequence 12 Sequence 13 Sequence 14 Sequence 15 Sequence 16
Standard Overlaps
. . . . .
0 0 0 0 0
0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
. . . . .
. . . . .
0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
6 Disabled Disabled Disabled Disabled Disabled
Off Off Off Off Off
2 3 4 5
Call for Svc
1 Disabled
Off
0 0.0
0.0 0
0 0.0
.
.
.
Startup Call
Recall
4 4
3 2,1,a,4,3,b
Ring Sequence Ring Sequence Ring Sequence
1 2,1,a,3,4,b
3 4 4
4 3
4 3
4 3
4 3
4 2 6,5,a,8,7,b 2 6,5,a,8,7,b 2 6,5,a,8,7,b
1 1,2,a,4,3,b 1
2 6,5,a,8,7,b
Ring Sequence
1 1,2,a,3,4,b
Trail Red
Walk
Ped Clear
Delay
Overlap
Negative Phs
Negative Ovlp
Negative Ped
Green Suppr
Trail Green
Trail Yellow
Modifier Phs
Type
Included Phs
1 1,2,a,4,3,b
2 6,5,a,7,8,b
3 4
3 2 5,6,a,7,8,b
Ring Sequence
4 2 6,5,a,7,8,b 2 5,6,a,8,7,b
Ring Sequence Ring Sequence
1 2,1,a,3,4,b
2 5,6,a,8,7,b
3 4
Ring Sequence
1 1,2,a,3,4,b
2 5,6,a,7,8,b
Ring Sequence
1 1,2,a,3,4,b
2 5,6,a,7,8,b
Overlaps
Enabled
Description
3 4
3 3
4 3
4 3
4 1 1,2,a,3,4,b 1 2,1,a,3,4,b 1 1,2,a,4,3,b 1 2,1,a,4,3,b Ring Sequence Ring Sequence Ring Sequence
3 Ring Sequence
2 5,6,a,7,8,b 2 5,6,a,7,8,b 2 5,6,a,7,8,b
Ring Sequence Ring Sequence Ring Sequence
2 5,6,a,8,7,b 2 5,6,a,8,7,b
3 1 2,1,a,4,3,b 1 1,2,a,3,4,b 1 1,2,a,4,3,b 1 2,1,a,4,3,b Printed on: 3/25/2021
Backup Prevention / No Serve Phases
Sequence 1 Sequence 2 Sequence 3
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 4 Sequence 5 Sequence 6
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 7 Sequence 8 Sequence 9
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Serve Phase 1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Printed on: 3/25/2021
Detector Configuration
Vehicle Detectors Pedestrian Detectors
Global Vehicle Detector Parameters
Global Ped Detector Parameters
Vehicle Detection Options
Detector Reset Enable Enabled Addtnl Call PH No Act Max Pres 4 None
None
None
None
None
None
None
None Erratic Count
2 Failed Recall Call PH Call O/L
None
None
None
None
None
None
None
None
Global Failed Recall
Global No Activity
Global Max Pres.
1 2
2 2
5 6
None
None
60 45
Max Recall
None 5
None
None
None
None
None
None
None
None
None
6 C1-43
J-4
J-5
J-6U
J-6L
J-7U
J-7L
J-8
J-9U C1-59
Global Erratic Ct
7 ------- -------
3 ------- -------
Global No Activity
Global Max Presence
Global Erratic Count
8 X X X X . X X X X X X X . X X X X X
I-1
Added Initial X X X X X . X
J-9L
6 6
6 6
8 8
8 8
6 6
27 28 Detector
2 4
6 8
1 2
3 4
5 6
7 8
9 10
11 12
13 14
1 5
26 I-2U
I-2L
I-3U
I-3L
I-4
I-5
I-6U
I-6L
I-7U
I-7L
I-8
I-9U
I-9L
J-1
J-2U
J-2L
J-3U
J-3L
C1-58
C1-41
C1-49
C1-55
C1-44
C1-64
C1-63
C1-46
C1-50
C1-57
C1-79
C1-66
C1-62
C1-77
C1-40
C1-48
C1-42 Slot
I-12U C1 Pin Number
C1-67
I-12L
I-13U
I-13L
C1-69
C1-68
C1-70
------- -------
------- -------
1.0 1.0
C1-56
C1-39
2 2
2 3
7 4
4 4
C1-76
C1-47
C1-78
24 25
15 16
17 18
19 20
21 22
23 C1-45
C1-65
4 2
Detector
C1-61
C1-60
6 7 8 9
Yellow Lock Call
Occupancy
Volume
10 11 12 13 14 15 16 17 18 19 20 21
.
. . .
1 2 3 4 5
.
X
X
25 26 27 28
. . .
. . . .
.
.
X X
.
.
23 24
. . . . . . . . . .
. .
Call
Queue
Extend
Red Lock Call
22 . . . . . . . . . . . .
.
X X X X X X
. . . . .
. . . . . . . . . . . . . . . .
. .
X
. . . . . . . .
X X X X X X X
. . . . . . . . . . . . . . . .
X X
X X X X X X X X X X X X X X X X X X
. .
. .
. .
X X
. .
. . . . . . . . .
. . .
. . . . . .
. .
. .
. . .
X X X X X X
. .
X X
. . .
X X X X X X X X
. .
.
.
.
X
.
X
. . .
. . .
. . . Detector Slot C1 Pin Number Call Phase Addtnl Call PH Switch Phase Delay Extend Queue Limit No Activity Max Pres. Erratic Count Fail Time Description . . . . .
7 8 Call O/L
Min Green 2 . . . . . . . . . . . . . . . . . . . . . . .
Passage 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Printed on: 3/25/2021
Coordination Configuration
Coordination Parameters Patterns
Split 1 Split 2 Split 3
Split 4 Split 5 Split 6
9 Yellow Auto Permissive Fixed Max Inhibit
Fixed
Fixed
Mode
None
None
None
None
Mode
8 Yellow Auto Permissive Fixed Max Inhibit 1 1 1 1
7 Yellow Auto Permissive Fixed Max Inhibit 1
Description
Full Permissive
Coord Mode
Full Permissive
Auto Permissive
Auto Permissive
Auto Permissive
Auto Permissive
Patt. Cycle Offset 1 Split Seq Reference FO Mode
Fixed
Fixed
1 Fixed
Fixed
Fixed
Yellow Fixed
1 1
Max Inhibit
.
20 .
36 OL
Pln
1 1
1 1
1 1 1 1
Phs Det Ped
1 1 1
1 Max Mode Pln Pln Pln
Max Inhibit
Max Inhibit
Max Inhibit
Max Inhibit
1 4
1 Fixed None
25 31
Fixed None 1 24
FO Mode Mode
7 PH. Time Min Max
2 58
1 1
FO Mode
Fixed
Fixed
1 .
XCoord Phase
Fixed None .
Time
17 57
FO Mode PH.
1 Max Inhibit
Min Max
1 1
1 1 1 1
Fixed None
Fixed None
. . Fixed None
Fixed None
7 20 . Fixed None
Fixed None
.
4 43 . .
6 42 X .
8 43
5 25
.
.
20 . .
X
X 42
5 140 6 Yellow
6 140 30
Yellow
6 Yellow Coord Phase
1 22 Fixed . . None 1 24
Min Cyc Limit % 25
Split Parameters
Max Dwell
Trans. Cover Ped
0 Pattern
.
.
.
.
3 . None 3 .
.
PH. Max Mode PH. Time Min Coord Phase Ref Phase FO Mode 2 22 . Fixed None 2
None
None
None
None
.
Fixed None
FO Mode Mode
Fixed Coord
6 44
22 32
5 22 . None 5
4 . None 4
. Fixed
. Fixed None
.
X None 6
1 4
13 Time Max Min
.
Fixed
Fixed
Fixed
Fixed Phase Ref Phase
.
X
. .
X
.
.
Fixed None
32 X
Yellow
Yellow
X
1 2
24 X
2 104 3
Max Cyc Limit %
Fixed
Fixed
Fixed
Fixed
Fixed Phase
5 1
.
.
42 22
Operational Mode
Coord Mode
Maximum Mode
Force Mode
Correction Mode
2 120 103
Automatic
Full Permissive
Per Pattern
4 Per Pattern
Shortway (Auto)
25 5
1 3 130
120 83
150 24
1 1
1 1 1
.
.
Fixed None
. Fixed None
. Fixed None
1 Ref Phase
.
Fixed None .
.
3 Ref
X
22 .
32 .
5 8
6 16
58 32
Fixed None
2 PH. Time Min Max FO Mode Mode Phase Ref Phase
8 7 . None 7
X
1 24 . . Fixed None Coord Phase Ref Phase
22 . None 8
2 58 X X Fixed None
3 25 . . Fixed None
4 33 . . Fixed None
Fixed None
6 58 X X Fixed None
7 25 . . Fixed None
8 33 . . Fixed None
PH. Time Min Max Coord
1 23 .
2 64 X
3 .
5 24 . .
4 33
6 58
5 24 .
.
Fixed None
X Fixed None
3 25 . Fixed None
X
.
.
.
. None
8 33 . Fixed None
X Fixed None
7 25 . Fixed None
X
.
.
Printed on: 3/25/2021
Split 7 Split 8 Split 9
Advanced Coord Options
Ring Plan 1 Ring Plan 2 Ring Plan 3 Ring Plan 4 Ring Plan 5 Ring Plan 6 Ring Plan 7 Ring Plan 8 Ring Plan 9
3 0 0
Ring Offset Early Gap
1 0 0
2 0 0
4 0 0
Offset Early Gap
0 0
0 0
0 0
0 0
Ring
1 2
3 3 0 0
4 0 0
1 0 0
1 0 0
4 2 0 0
2 0 0
3 0
0 0
Ring Offset Early Gap
1 0 0
2 0 0
3 . .
4 3 0 0
3 0 0
4 0 0
4 0 0
Ring Offset Early Gap
1 4 0 0
Ring Offset Early Gap
Ring Offset Early Gap
0 2
0 3 0 0
Ring Offset
.
Ring Offset Early Gap
1 0 0
2 0 0
3 0 0
0 4 0 0
Early Gap
1 0 0
2 0 0
4 Offset Early Gap
0 0
0 0
0 0
0 0
Ring Plans
Ring
1 2
3 0
0 7 . . Fixed None
8 . . Fixed None
. Fixed None
6 . . Fixed None
.
None
4 . . Fixed None
. Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode Phase
8 . . Fixed None Coord
1 .
3 .
5 . Fixed
. . Fixed None Coord Phase Ref Phase
5 . . Fixed None
6 . . Fixed None
3 Fixed None . .
4 . . Fixed None
1 . . Fixed None
2 . . Fixed None
7 . . Fixed None
8 . . Fixed None
5 . . Fixed None
6 . . Fixed None
. . Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode FO Mode Mode Coord Phase Ref Phase PH. Time Min Max Phase Ref X .
. .
.
8 .
.
9 Fixed None
Fixed None
7 7
.
. . .
Allow Split Underrun X
4 5 6
Allow Split Overrun .
Ring Plan
. .
4 . .
1 .
Allow No Coord Phase . . . . . .
Coord Now . . . . . .
.
.
.
.
.
.
Pattern 1 2 3
.
Printed on: 3/25/2021
Scheduler Configuration
Schedule 1
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 2
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 3
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2 3 1 2 3 4 5 6 7 8
Day Plan 1 Day Plan 2 Day Plan 3 . . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
9 None
10 None
13 None
14 None
15 None
11 None
12 None
19 None
6 None
7 None
8 None
1 2
3 4
5 None
None
None
None
None
Action
Action Commands
Command Action Command Index Action Command Index Index Action Command Index Month of Year Days of Week Days of Month
J F M A M J J A S O N D T W T F S
0 0
4 Pattern
Pattern 1
Description Day Plan 0
S M
0 0
3 Pattern 3
4 Pattern 4
0 Special Functions
Event HR MIN ACT Description
Actions
.
Aux
Pattern 2
Action
1 2
. . .
None
12 None
19 None
0 6
Pattern 9
5 Pattern 7
Pattern 8
Pattern 5
Pattern 6
0 Pattern 10
64 Free
20 None
13 None
14 None
20 None
17 None
18 None
15 None
None 16 None
0 0
8 9 0 11
7 7
0 9
10 0
19 0
21 17 None
18 None
0 0
16 5 0
6 0 0
10 30 1
0 2
4 0 0 0
0 0
0 0
0 0
8 0
Day Plans
HR MIN
.
4 8
Description
Free
0 0
2 0 64
0 0
0 Status Enabled
Status Enabled
HR
6 9
14 MIN ACT
Status Disabled
. . . . . .
Event
1 2
3 0 5
64 Free
1 ACT Description
2 3
2 Event
.
S
X
Description Weekday
. .
19 0
0 0
1 8 0
2 3
0 X X
A
Day Plan
8 1
Month of Year Days of Week Days of Month
J F M A M J J A S O N
0 0
. . . . .
10 5
6 7
10 9
6 7
0 0
9 0 0 0
0 5
0 0
0 D S M T W T F S
X . X X X X X .
Month of Year Days of Week
J
X
F M
X
X X X X X X X X
X X X X X X X X
M J J A S
Weekend
Days of Month
X X X X . . . . .
M T
Description Day Plan 2
O N D S F W T
Printed on: 3/25/2021
Preempt Configuration
Preemption Configuration Preemption Options
Preemption Parameters Preempt Parameters
Track Overlap
Track 2 Overlap
Dwell Ped
Dwell Overlap
Cycling Phase
Cycling Ped
Cycling Overlap
Recovery Exit Omit
Preempt
Enabled
Type
Description
Dwell Phase
Exit Phase
Exit Overlaps
Track Phase
Track 2 Phases
.
.
.
.
6 .
.
.
.
.
.
.
.
.
.
.
.
5 .
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
4 .
.
.
.
.
.
.
.
.
1 25.5 25.5
Dwell Green
Exit Ped Clear
Exit Yellow Change
Exit Red Clear
0 3 4 5 6
25.5 25.5
255 255
Max Presence
Max Presence Action
Preempt
.
.
.
.
.
.
.
6 0
Preempt 1 2
Link
Delay
Min Duration
Min Presence
1 .
.
.
Exit Phases
25.5 25.5
255 255
0 Exit Type
25.5 0
0.0 255
0 Disabled
0 Disabled Disabled
0 0
0 25.5
25.5 25.5
1 .
.
.
.
2 3
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
Enter Min Walk
Enter Ped Clear
Track Green
Track Yellow Change
Track Red Clear
Track 2 Green
Track 2 Yellow
Track 2 Red
Track Ext. Gate Down
Enter Min Green
Enter Yellow Change
Enter Red Clear
Exit Max Mode
Exit Max Apply Time
Veh Exit Calls
Ped Exit Calls
0 0.0
0 Terminate
0 25.5
25.5 Terminate
0.0 0.0 0.0 0.0
0 255 255 255
0 Dwell Ext Time
Max Exit Green
255
25.5 25.5
0 0
25.5 0 0 0
255
25.5 25.5
25.5 25.5
0 0
Terminate Terminate Terminate Terminate
0 0 0 0
25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 0 0 0 0
255
0 0 0 0
0 1 1
25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 25.5 25.5
0 0 0
. .
Require All Red Entry
Require Gate Down Track Exit
Require Gate Up Dwell Exit
Use Normal On/Normal Off Input
Immediate Ped Clear
Dwell Only Status Output
All Red Flash Dwell
Allow All Overlaps
Ped Recycle in Dwell Cycle
X
.
.
.
.
.
Preempt
Non Lock Mem
Not Overide Flash
Not Overide Next Preempt
Flash Dwell
1 Enabled
Rail Road
BBS Flash
0 0
0 0
Exit Phases Exit Phases Exit Phases Exit Phases Exit Phases Disabled Disabled
0 0 0
Disabled
1 2 3 4 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0
0 0 255 255 255
0 0 0 0 0
0 0 0 0 0
25.5 25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5 25.5
2,6
2 3 4 5 6
Disabled Enabled Enabled Enabled Enabled
Rail Road Emergency Veh Emergency Veh Emergency Veh Emergency Veh 2,5 4,7 1,6 3,8
2,6 4,8 2,6 4,8
Printed on: 3/25/2021
Advanced I/O Configuration
Channel Configuration Concurrency Mode
Auto Concurrency
Channel Options
Cabinet Configuration
IO Modules
Input Points
C11-12 Not Active
Not Active
25 Idx
15 23
14 40
22 Not Active
C11-25
4 42
43 44
45 C1-76 5
C1-77
11 25
41 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
19 C1-48
C11-29
C11-30
C11-26
C11-27
C11-28
Not Active
Not Active
Vehicle Det Call Not Active
C11-13
Not Active
Not Active
Not Active
26 27
28 29
C1-54
C1-49
C11-16
C1-66 C1-82
C1-79
C1-80
C1-81
C1-72
C11-22
C11-17
C11-18
C11-19
C11-20
C11-21
58 59
60 61
54 C11-11
C1-78
C1-62
C1-75 C11-23
C11-24
56 57
Preempt Input
Not Active
C1-58
Vehicle Det Call C1-68
6 17
9 23
6 24
37 C1-73
C1-74
19 20
55 C11-10
3 4
C1-70
C1-71
C1-41
C1-42
Idx C1 Pin
2 16
8 22
3 C1-56
Input Type
Vehicle Det Call
Input Type
C1-43
C1-46
C1-47
5 Vehicle Det Call
Preempt Input
Preempt Input
Preempt Input
Vehicle Det Call
Ch
1 2
3 4
7 8
5 6
7 8
Control Type
Phase Vehicle
Phase Vehicle
Phase Vehicle
Phase Vehicle
Vehicle Det Call
Phase Ped
Phase Ped
Phase Ped
12 . .
14 IO Module
1 X
1 2 3 4
. .
X X
Type
4 6
5 6 7 8
Phase Vehicle
Phase Vehicle
Phase Vehicle
Phase Vehicle
Control Type
None
None
None
None
Phase Ped
Source
2 Input
C1-39
C1-40
Ch
9 10
11 12
13 C1 Pin
17 18
Channel
Flash Yellow
Flash Red
Flash Alternate Half Hertz
.
Source
1 2
3 4
5 6
Caltrans 332
X
. . . .
X X
15 .
X
. . X
16 X
X
C1 Pin
C11-15
C1-57 C1-69
C1 Pin
C1-55
C1-59 Input Input
21 7
Idx
2 6
4 8
C1-67 Input33
Input Type
Ped Det Call
50 51
52 49
C1-60
C1-61
34 35
36 38
39 Ped Det Call
Ped Det Call
Ped Det Call
27 13
28 1
53 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Not Active
Not Active
Not Active
Not Active
Input Type Idx
Not Active
Not Active
Not Active
Not Active
Not Active
30 31
32 46
47 48
62 63
64 Unit Interval Advance
Unit Local Flash Sense
Unit Stop Time
18 C1-65 10
24 14 1
15 16
21 Not Active
20 2
1 10
11 12
13 12
1 2
3 4
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
5 6
7 8
9 C1-44
C1-45
Vehicle Det Call
Vehicle Det Call
Preempt Input
Preempt Input
Unit Manual Control Enable
Not Active
1 1
C1-51
C1-52
C1-53
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
26 1
C1-50
C1-63
C1-64
15 16
Not Active
14 14,16
Ch
1 2
3 4
5 6
7 8
. . 9
.
.
8 9 10 11 15 16
. . . . . . .
. . .
13 14
14 15
16 X . . 10
11 12
13 X . . . . . . . .
Concurrency Mode
Auto
Concurrency
5,6,15
5,6,13,15
7,8,16
7,8,14,16
13 13,15
Printed on: 3/25/2021
Cabinet Configuration
Output Points
C1 Pin C1 Pin
Not Active
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Output Type
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Detector Reset
Watchdog
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
64 C11-8
C11-1
5 6
6 6
5 5
C11-4
61 62
63 15
C11-3
18 18
C1-98
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
12 11
11 10
10 10
9 9
C1-88
C1-89
C11-7
3 13
13 15
14 16
3 18
11 1
14 C1-101
C1-102
34 C1-36
37 C1-100
38 42
36 C1-84
9 17
17 17
12 12
39 C1-91
50 C1-93
51 C1-94
7 8
8 8
7 7
15 C11-6
44 C1-86
45 C1-87
60 49
C11-5
48 C1-90
47 2
1 1
1 46
1Output Output Type Idx
14 15
16 2
3 4
5 C1-2
2 2
4 4
4 3
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
6 7
8 9
10 11
12 13
14 C1-3
C1-4
C1-5
C1-6
C1-7
C1-8
C1-9
C1-10
C1-11
17 C1-19 16
28 C1-30
25 C1-27
26 C1-28
27 C1-29
22 C1-24
23 C1-25
18 C1-20
21 C1-23
20 C1-22
19 16
Channel Red Do Not Walk Driver
31 C1-33
32 C1-34
29 C1-31
30 C1-32
24 C1-26
C1-21
58 C11-2
59 40 C1-103
41 C1-83
56 C1-99
57 52 C1-95
53 C1-96
54 C1-97
55 C1-12
C1-13
C1-15
C1-16
C1-17
C1-18
43 C1-85
35 C1-37
C1-38
Idx
13 Output
33 C1-35
Printed on: 3/25/2021
User Programs
Program 1
Enabled
40 None 0 None None None 0.0 0.0
None 0.0 0.0
None 0.0 0.0
39 None 0 None None
38 None 0 None None
None 0.0 0.0
None 0.0 0.0
37 None 0 None None
36 None 0 None None
None 0.0 0.0
None 0.0 0.0
35 None 0 None None
34 None 0 None None
None 0.0 0.0
None 0.0 0.0
33 None 0 None None
32 None 0 None None
None 0.0 0.0
None 0.0 0.0
31 None 0 None None
30 None 0 None None
None 0.0 0.0
None 0.0 0.0
29 None 0 None None
28 None 0 None None
None 0.0 0.0
None 0.0 0.0
27 None 0 None None
26 None 0 None None
None 0.0 0.0
None 0.0 0.0
25 None 0 None None
24 None 0 None None
None 0.0 0.0
None 0.0 0.0
23 None 0 None None
22 None 0 None None
None 0.0 0.0
None 0.0 0.0
21 None 0 None None
20 None 0 None None
None 0.0 0.0
None 0.0 0.0
19 None 0 None None
18 None 0 None None
None 0.0 0.0
None 0.0 0.0
17 None 0 None None
16 None 0 None None
None 0.0 0.0
None 0.0 0.0
15 None 0 None None
14 None 0 None None
None 0.0 0.0
None 0.0 0.0
13 None 0 None None
12 None 0 None None
None 0.0 0.0
None 0.0 0.0
11 None 0 None None
10 None 0 None None
None 0.0 0.0
None 0.0 0.0
9 None 0 None None
8 None 0 None None
None 0.0 0.0
0 None 0.0 0.0
7 None 0 None None
6 None 0 None None
None 0.0 0.0
None 0.0 0.0
5 None 0 None None
4 None 0 None None
3 None 0 None None None 0.0 0.0
None None
None 0.0 0.0
Parameter B Idx Dly Ext Description
1 Unit Stop Time 1 Result=A Aux Switch State
Line Result Idx Operation Parameter A Idx
2 None None 0.0 0.0
Printed on: 3/25/2021
Phase Timing and Options
Unit Information Phase Timing Phase Options
1 2 3 4 5 6 7 8
X X X X X X X X
. . . X . . . X
. X . . . X . .
X X X X X X X X
. . . . . . . .
. . . . . . . .
Unit Parameters . . . . . X . X
. X . . . X . .
. . X . . . . X
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. . . . . . . .
. X . X . X . X
Phase Configuration Global Phase Recalls Notes
1 2 3 4 5 6 7 8
. . . . . . . .
. . . . . . . .
. . . . . . . .
City of San Marcos
San Marcos @ Grand
Phase
Enable
Non Lock Detector
Min Vehicle Recall
Max Vehicle Recall
Ped Recall
0 0
7 0 5 0 5 0 5
0 33 0 24 0
1 2 4
6 4
2 Phase
1 7
8 SB Left
Phase
Min
Max
Ped
Green No Walk
Phase Not On
Phase Not On NB
Green No Walk
EB
Phase Not On
Description
EB Left
Startup
Phase Not On
Phase Not On
Added Initial
Maximum Initial
Time B4 Reduction
Cars B4 Reduction
Time To Reduce
Reduce By
Minimum Gap
Advance Walk
Delayed Ped
SB
WB Left
All Red Flash Sns
5 MCE Enable
Free Sequence
Start Yel. Override
Start Red Override
9 WB
NB Left
6 0 0
Disable
Phase Not On
0 0
0 0
Local CVM Fash Disable
3 All Red Flash Exit
Enable
0.0 0.0
0 No Ped Startup Call
Max Green 2
0 0
0 0.0
0 Add Initial Calculation
Ped Clear During Yellow
Ped Clear During Red Clr
Yellow Min Override
0 Red Clear
40 4.5
2.0 20
Max Green 1
Yellow Change 4.5 4.5 4.5
2.5 2.0 2.5
0.0 2.5 0.0
Soft Vehicle Recall
Dual Entry
Sim. Gap Disable
0 0 0
0.0 0 0 0 0
0 20 0
0 0 0 0
0.0 4.0
No Startup Call
3.0 Actuated Rest in Walk
Conditional Svc Enable
Auto Ped Clear
0 Passage
0 0.0
0 0.0 0.0 0.0
0.0 0 0
0 0.0
0 0
Man. Control Seq. 1
Startup All Red 6
5 Intelight MAXTIME 2.X
San Marcos
Grand
Startup Flash
Controller Number
0 30
Phase 3
Software
Main Street
Side Street
IP Address
Min Green 2 0
Description
EB
Left
Walk
Ped Clear
Min Green
Passage 2
Extended Mode
15 3.0
60 4.5
2.5 2.5
0 0 0
4.0 4.5
0.0 3.0 2.5
0.0 0.0 0.0 0.0
10 10
Min Green 2
0.0 0 0
0.0 0 0 Red Rest
0 0 Ped Recycle
5 6 7 8
0 0 0
0.0 0.0 0.0
0 0.0 0.0 0.0
0 0
0 3.0 3.0 3.0
0 0
10 0
7 15
5 Auto Flash Entry
Auto Flash Exit
Max Green 2 0 0 0 0 0 0 0 0
Steady Don't Walk 0 0 0
9 3.0 3.0 3.0
NB
0 0
WB NB
Left SB WB Left EB SB Left
27 10
0.0 0.0 0.0 0.0
All Dark Flash Sns Disable
0 0 0 0
30 30 45 40 30
3.0 0.0
0.0 Red Revert
Backup Time
Disable
Enable
6.0 600
Printed on: 3/25/2021
Sequences
Sequence 1 Sequence 2 Sequence 3 Sequence 4 Sequence 5 Sequence 6 Sequence 7 Sequence 8 Sequence 9 Sequence 10 Sequence 11 Sequence 12 Sequence 13 Sequence 14 Sequence 15 Sequence 16
Standard Overlaps
. . . . .
0 0 0 0 0
0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
. . . . .
. . . . .
0 0 0 0 0
4.3 3.2 4.3 4.3 4.3
1.0 1.0 1.0 1.0 1.0
6 Enabled Enabled Enabled Enabled Enabled
SB NB Left NB EB Right
Normal Normal Normal Normal Normal
4,6 3 2,8 3 8
2 3 4 5
Call for Svc
1 Enabled
SB Left
Normal
1,7
2 3.2
1.0 0
0 0.0
.
.
.
Startup Call
Recall
4 4
3 2,1,a,4,3,b
Ring Sequence Ring Sequence Ring Sequence
1 2,1,a,3,4,b
3 4 4
4 3
4 3
4 3
4 3
4 2 6,5,a,8,7,b 2 6,5,a,8,7,b 2 6,5,a,8,7,b
1 1,2,a,4,3,b 1
2 6,5,a,8,7,b
Ring Sequence
1 1,2,a,3,4,b
Trail Red
Walk
Ped Clear
Delay
Overlap
Negative Phs
Negative Ovlp
Negative Ped
Green Suppr
Trail Green
Trail Yellow
Modifier Phs
Type
Included Phs
1 1,2,a,4,3,b
2 6,5,a,7,8,b
3 4
3 2 5,6,a,7,8,b
Ring Sequence
4 2 6,5,a,7,8,b 2 5,6,a,8,7,b
Ring Sequence Ring Sequence
1 2,1,a,3,4,b
2 5,6,a,8,7,b
3 4
Ring Sequence
1 1,2,a,3,4,b
2 5,6,a,7,8,b
Ring Sequence
1 1,2,a,3,4,b
2 5,6,a,7,8,b
Overlaps
Enabled
Description
3 4
3 3
4 3
4 3
4 1 1,2,a,3,4,b 1 2,1,a,3,4,b 1 1,2,a,4,3,b 1 2,1,a,4,3,b Ring Sequence Ring Sequence Ring Sequence
3 Ring Sequence
2 5,6,a,7,8,b 2 5,6,a,7,8,b 2 5,6,a,7,8,b
Ring Sequence Ring Sequence Ring Sequence
2 5,6,a,8,7,b 2 5,6,a,8,7,b
3 1 2,1,a,4,3,b 1 1,2,a,3,4,b 1 1,2,a,4,3,b 1 2,1,a,4,3,b Printed on: 3/25/2021
Backup Prevention / No Serve Phases
Sequence 1 Sequence 2 Sequence 3
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 4 Sequence 5 Sequence 6
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Sequence 7 Sequence 8 Sequence 9
Backup Protection Plan Backup Protection Plan Backup Protection Plan Call Phs No Serve Call Phs No Serve Call Phs No Serve
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv Serve Phase 1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 7 3 3 3 7 3 3 3 7
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 7 3 3 3 7 3 3 3 7
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
Backup phase Backup phase Backup phase
Ph Call Ph Ph No Srv Ph Call Ph Ph No Srv
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Ph Call Ph Ph No Srv Serve Phase
1 1 1 Serve Phase1 1 1 Serve Phase1 1 1
2 2 2 2
3 3 3 7 3 3 3 7 3 3 3 7
2 2 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5
4 4 4 4 4 4
6 6 6
7 7 7 7 7 7 7 7 7
6 6 6 6 6 6
8 8 8
Thru Red No Thru Red No Thru Red No
8 8 8 8 8 8
Printed on: 3/25/2021
Detector Configuration
Vehicle Detectors Pedestrian Detectors
Global Vehicle Detector Parameters
Global Ped Detector Parameters
Vehicle Detection Options
Detector Reset Enable Enabled
20 Addtnl Call PH No Act Max Pres
4 None
None
None
None
None
None
None
None Erratic Count
2 Failed Recall Call PH Call O/L
None
None
None
None
None
None
None
None
Global Failed Recall
Global No Activity
Global Max Pres.
1 2
2 4
3 5
6 1.0
None
None
5 45
Max Recall
None 5
None
None
None
None
None
None
None
None
None
6 C1-43
J-4
J-5
J-6U
J-6L
J-7U
J-7L
J-8
J-9U C1-59
20 Global Erratic Ct
7 ------- -------
3 ------- -------
Global No Activity
Global Max Presence
Global Erratic Count
8 X X X X . X X X X X X X . X X X . .
I-1
Added Initial X X X . X . X
J-9L
6 6
6 6
8 8
1 27
28 Detector
2 4
6 8
1 2
3 4
5 6
7 8
9 10
11 12
13 14
1 5
26 I-2U
I-2L
I-3U
I-3L
I-4
I-5
I-6U
I-6L
I-7U
I-7L
I-8
I-9U
I-9L
J-1
J-2U
J-2L
J-3U
J-3L
C1-58
C1-41
C1-49
C1-55
C1-44
C1-64
C1-63
C1-46
C1-50
C1-57
C1-79
C1-66
C1-62
C1-77
C1-40
C1-48
C1-42 Slot
I-12U C1 Pin Number
C1-67
I-12L
I-13U
I-13L
C1-69
C1-68
C1-70
------- -------
------- -------
1.0 1.0
C1-56
C1-39
5.0 2
2 3
4 4
4 4
C1-76
C1-47
C1-78
24 25
8.0 15
16 17
18 19
20 21
22 23
C1-45
C1-65
4 1
Detector
C1-61
C1-60
6 7 8 9
Yellow Lock Call
Occupancy
Volume
10 11 12 13 14 15 16 17 18 19 20 21
.
. . .
1 2 3 4 5
.
X
X
25 26 27 28
. . .
. . . .
.
.
. X
.
X
23 24
. . . . . . . . . .
. .
Call
Queue
Extend
Red Lock Call
22 . . . . . . . . . . . .
.
X X X X X X
. . . . .
. . . . . . . . . . . . . . . .
. .
X
. . . . . . . .
X X X X X X X
X . . . . . . . X . . . . . . .
X X
X X X X X X X X X X X X X X X X X X
. .
. .
. .
X X
. .
. . . . . . . . .
. . .
. . . . . .
. .
. .
. . .
X X X X X X
. .
X X
. . .
X X X X X X X X
X .
.
.
.
X
.
X
. . .
. . .
. . . Detector Slot C1 Pin Number Call Phase Addtnl Call PH Switch Phase Delay Extend Queue Limit No Activity Max Pres. Erratic Count Fail Time Description . . . . .
7 8 Call O/L
Min Green 2 . . . . . . . . . . . . . . . . . . . . . . .
Passage 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Printed on: 3/25/2021
Coordination Configuration
Coordination Parameters Patterns
Split 1 Split 2 Split 3
Split 4 Split 5 Split 6
9 Yellow Auto Permissive Fixed Max Inhibit
Fixed
Fixed
Mode
None
None
None
None
Mode
8 Yellow Auto Permissive Fixed Max Inhibit 1 1 1 1
7 Yellow Auto Permissive Fixed Max Inhibit 1
Description
Auto Permissive
Coord Mode
Auto Permissive
Full Permissive
Auto Permissive
Auto Permissive
Auto Permissive
Patt. Cycle Offset 1 Split Seq Reference FO Mode
Fixed
Fixed
1 Fixed
Fixed
Fixed
Yellow Fixed
1 1
Max Inhibit
.
.
OL
Pln
1 1
1 1
1 1 1 1
Phs Det Ped
1 1 1
1 Max Mode Pln Pln Pln
Max Inhibit
Max Inhibit
Max Inhibit
Max Inhibit
1 4
1 Fixed None
Fixed None 1
FO Mode Mode
7 PH. Time Min Max
2 1 1
FO Mode
Fixed
Fixed
1 .
.Coord Phase
Fixed None .
FO Mode PH. Time
1 Max Inhibit
Min Max
1 1
1 1 1 1
Fixed None
Fixed None
. . Fixed None
Fixed None
7 26 . Fixed None
Fixed None
.
4 47 . .
6 51 X .
8 38
5 15
.
.
17 . .
X
X 40
5 150 32 Yellow
6 Yellow
Yellow Coord Phase
1 15 Fixed . . None 1 23
Min Cyc Limit % 25
Split Parameters
Max Dwell
Trans. Cover Ped
0 Pattern
.
.
.
.
3 . None 3 .
.
PH. Max Mode PH. Time Min Coord Phase Ref Phase FO Mode 2 42 X Fixed None 2
None
None
None
None
.
Fixed None
FO Mode Mode
Fixed Coord
6 42
17 46
5 15 . None 5
4 . None 4
. Fixed
. Fixed None
.
. None 6
1 4
Time Max Min
.
Fixed
Fixed
Fixed
Fixed Phase Ref Phase
.
.
. .
.
.
.
Fixed None
43 .
Yellow
Yellow
X
13 10
18 X
2 Max Cyc Limit %
Fixed
Fixed
Fixed
Fixed
Fixed Phase
9 9
.
.
45 27
Operational Mode
Coord Mode
Maximum Mode
Force Mode
Correction Mode
2 120 54
Automatic
Full Permissive
Per Pattern
4 Per Pattern
Shortway (Auto)
25 5
1 3
120 30
130 11
1 1
1 1 1
.
.
Fixed None
. Fixed None
. Fixed None Ref Phase
.
Fixed None .
.
3 Ref
X
17 .
40 .
5 8
6 30
Fixed None
2 PH. Time Min Max FO Mode Mode Phase Ref Phase
8 7 . None 7
X
1 26 . . Fixed None Coord Phase Ref Phase
20 . None 8
2 43 X . Fixed None
3 18 . . Fixed None
4 45 . . Fixed None
Fixed None
6 69 X X Fixed None
7 42 . . Fixed None
8 21 . . Fixed None
PH. Time Min Max Coord
1 20 .
2 46 X
3 .
5 18 . .
4 6
5 .
.
Fixed None
. Fixed None
3 . Fixed None
.
.
.
.
. None
8 . Fixed None
. Fixed None
7 . Fixed None
.
.
.
Printed on: 3/25/2021
Split 7 Split 8 Split 9
Advanced Coord Options
Ring Plan 1 Ring Plan 2 Ring Plan 3 Ring Plan 4 Ring Plan 5 Ring Plan 6 Ring Plan 7 Ring Plan 8 Ring Plan 9
3 0 0
Ring Offset Early Gap
1 0 0
2 0 0
4 0 0
Offset Early Gap
0 0
0 0
0 0
0 0
Ring
1 2
3 3 0 0
4 0 0
1 0 0
1 0 0
4 2 0 0
2 0 0
3 0
0 0
Ring Offset Early Gap
1 0 0
2 0 0
3 . .
4 3 0 0
3 0 0
4 0 0
4 0 0
Ring Offset Early Gap
1 4 0 0
Ring Offset Early Gap
Ring Offset Early Gap
0 2
0 3 0 0
Ring Offset
.
Ring Offset Early Gap
1 0 0
2 0 0
3 0 0
0 4 0 0
Early Gap
1 0 0
2 0 0
4 Offset Early Gap
0 0
0 0
0 0
0 0
Ring Plans
Ring
1 2
3 0
0 7 . . Fixed None
8 . . Fixed None
. Fixed None
6 . . Fixed None
.
None
4 . . Fixed None
. Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode Phase
8 . . Fixed None Coord
1 .
3 .
5 . Fixed
. . Fixed None Coord Phase Ref Phase
5 . . Fixed None
6 . . Fixed None
3 Fixed None . .
4 . . Fixed None
1 . . Fixed None
2 . . Fixed None
7 . . Fixed None
8 . . Fixed None
5 . . Fixed None
6 . . Fixed None
. . Fixed None
2 . . Fixed None
PH. Time Min Max FO Mode Mode FO Mode Mode Coord Phase Ref Phase PH. Time Min Max Phase Ref . .
. .
X
8 .
.
9 Fixed None
Fixed None
7 7
.
. . .
Allow Split Underrun .
4 5 6
Allow Split Overrun .
Ring Plan
. .
4 . .
1 .
Allow No Coord Phase . . . . . .
Coord Now . . . . . .
.
.
.
.
.
.
Pattern 1 2 3
.
Printed on: 3/25/2021
Scheduler Configuration
Schedule 1
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 2
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Schedule 3
1 2 3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2 3 1 2 3 4 5 6 7 8
Day Plan 1 Day Plan 2 Day Plan 3 . . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
9 None
10 None
13 None
14 None
15 None
11 None
12 None
19 None
6 None
7 None
8 None
1 2
3 4
5 None
None
None
None
None
Action
Action Commands
Command Action Command Index Action Command Index Index Action Command Index Month of Year Days of Week Days of Month
J F M A M J J A S O N D T W T F S
0 0
4 Pattern
Pattern 1
Description Day Plan 0
S M
0 0
3 Pattern 3
4 Pattern 4
0 Special Functions
Event HR MIN ACT Description
Actions
.
Aux
Pattern 2
Action
1 2
. . .
None
12 None
19 None
0 6
Pattern 9
5 Pattern 7
Pattern 8
Pattern 5
Pattern 6
0 Pattern 10
64 Free
20 None
13 None
14 None
20 None
17 None
18 None
15 None
None 16 None
0 0
8 9 0 11
7 7
0 9
10 0
19 0
21 17 None
18 None
0 0
16 5 0
6 0 0
10 30 1
0 2
4 0 0 0
0 0
0 0
0 0
8 0
Day Plans
HR MIN
.
4 8
Description
Free
0 0
2 0 64
0 0
0 Status Enabled
Status Enabled
HR
6 9
14 MIN ACT
Status Disabled
. . . . . .
Event
1 2
3 0 4
64 Free
1 ACT Description
2 3
2 Event
.
S
X
Description Weekday
. .
19 0
0 0
1 8 0
2 3
0 X X
A
Day Plan
8 1
Month of Year Days of Week Days of Month
J F M A M J J A S O N
0 0
. . . . .
10 5
6 7
10 9
6 7
0 0
9 0 0 0
0 5
0 0
0 D S M T W T F S
X . X X X X X .
Month of Year Days of Week
J
X
F M
X
X X X X X X X X
X X X X X X X X
M J J A S
Weekend
Days of Month
X X X X . . . . .
M T
Description Day Plan 2
O N D S F W T
Printed on: 3/25/2021
Preempt Configuration
Preemption Configuration Preemption Options
Preemption Parameters Preempt Parameters
Track Overlap
Track 2 Overlap
Dwell Ped
Dwell Overlap
Cycling Phase
Cycling Ped
Cycling Overlap
Recovery Exit Omit
Preempt
Enabled
Type
Description
Dwell Phase
Exit Phase
Exit Overlaps
Track Phase
Track 2 Phases
.
.
.
.
6 .
.
.
.
.
.
.
.
.
.
.
.
5 .
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
4 .
.
.
.
.
.
.
.
.
1 25.5 25.5
Dwell Green
Exit Ped Clear
Exit Yellow Change
Exit Red Clear
0 3 4 5 6
25.5 25.5
255 255
Max Presence
Max Presence Action
Preempt
.
.
.
.
.
.
.
6 0
Preempt 1 2
Link
Delay
Min Duration
Min Presence
1 .
.
.
Exit Phases
25.5 25.5
255 255
0 Exit Type
25.5 0
0.0 255
0 Disabled
0 Disabled Disabled
0 0
0 25.5
25.5 25.5
1 .
.
.
.
2 3
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
Enter Min Walk
Enter Ped Clear
Track Green
Track Yellow Change
Track Red Clear
Track 2 Green
Track 2 Yellow
Track 2 Red
Track Ext. Gate Down
Enter Min Green
Enter Yellow Change
Enter Red Clear
Exit Max Mode
Exit Max Apply Time
Veh Exit Calls
Ped Exit Calls
0 0.0
0 Terminate
0 25.5
25.5 Terminate
0.0 0.0 0.0 0.0
0 255 255 255
0 Dwell Ext Time
Max Exit Green
255
25.5 25.5
0 0
25.5 0 0 0
255
25.5 25.5
25.5 25.5
0 0
Terminate Terminate Terminate Terminate
0 0 0 0
25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 0 0 0 0
255
0 0 0 0
0 1 1
25.5 25.5 25.5
25.5 25.5 25.5 25.5
25.5 25.5 25.5
0 0 0
. .
Require All Red Entry
Require Gate Down Track Exit
Require Gate Up Dwell Exit
Use Normal On/Normal Off Input
Immediate Ped Clear
Dwell Only Status Output
All Red Flash Dwell
Allow All Overlaps
Ped Recycle in Dwell Cycle
X
.
.
.
.
.
Preempt
Non Lock Mem
Not Overide Flash
Not Overide Next Preempt
Flash Dwell
1 Enabled
Rail Road
BBS Flash
0 0
0 0
Exit Phases Exit Phases Exit Phases Exit Phases Exit Phases Disabled Disabled
0 0 0
Disabled
1 2 3 4 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0
0 0 255 255 255
0 0 0 0 0
0 0 0 0 0
25.5 25.5 25.5 25.5 25.5
25.5 25.5 25.5 25.5 25.5
2 3 4 5 6
Disabled Enabled Enabled Enabled Enabled
Rail Road Emergency Veh Emergency Veh Emergency Veh Emergency Veh 2,5 4,7 1,6 3,8
2,6 4,8 2,6 4,8
Printed on: 3/25/2021
Advanced I/O Configuration
Channel Configuration Concurrency Mode
Auto Concurrency
Channel Options
Cabinet Configuration
IO Modules
Input Points
C11-12 Not Active
Not Active
25 Idx
15 23
14 40
22 Not Active
C11-25
4 42
43 44
45 C1-76 5
C1-77
11 25
41 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
19 C1-48
C11-29
C11-30
C11-26
C11-27
C11-28
Not Active
Not Active
Vehicle Det Call Not Active
C11-13
Not Active
Not Active
Not Active
26 27
28 29
C1-54
C1-49
C11-16
C1-66 C1-82
C1-79
C1-80
C1-81
C1-72
C11-22
C11-17
C11-18
C11-19
C11-20
C11-21
58 59
60 61
54 C11-11
C1-78
C1-62
C1-75 C11-23
C11-24
56 57
Preempt Input
Not Active
C1-58
Vehicle Det Call C1-68
6 17
9 23
6 24
37 C1-73
C1-74
19 20
55 C11-10
3 4
C1-70
C1-71
C1-41
C1-42
Idx C1 Pin
2 16
8 22
3 C1-56
Input Type
Vehicle Det Call
Input Type
C1-43
C1-46
C1-47
5 Vehicle Det Call
Preempt Input
Preempt Input
Preempt Input
Vehicle Det Call
Ch
1 2
3 4
7 6
5 6
7 8
Control Type
Phase Vehicle
Phase Vehicle
Overlap
Phase Vehicle
Vehicle Det Call
Phase Ped
Phase Ped
Phase Ped
12 X X
14 IO Module
1 X
1 2 3 4
. .
X X
Type
4 6
5 6 7 8
Phase Vehicle
Phase Vehicle
Phase Vehicle
Overlap
Control Type
Overlap
Overlap
Overlap
Overlap
Phase Ped
Source
1 2
3 4
2 Input
C1-39
C1-40
Ch
9 10
11 12
13 C1 Pin
17 18
Channel
Flash Yellow
Flash Red
Flash Alternate Half Hertz
.
Source
1 2
5 4
5 6
Caltrans 332
X
. . . .
X X
15 .
X
. . X
16 X
X
C1 Pin
C11-15
C1-57 C1-69
C1 Pin
C1-55
C1-59 Input Input
21 7
Idx
2 6
4 8
C1-67 Input33
Input Type
Ped Det Call
50 51
52 49
C1-60
C1-61
34 35
36 38
39 Ped Det Call
Ped Det Call
Ped Det Call
27 13
28 1
53 Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Not Active
Not Active
Not Active
Not Active
Input Type Idx
Not Active
Not Active
Not Active
Not Active
Not Active
30 31
32 46
47 48
62 63
64 Unit Interval Advance
Unit Local Flash Sense
Unit Stop Time
18 C1-65 10
24 14 1
15 16
21 Not Active
20 2
1 10
11 12
13 12
1 2
3 4
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
5 6
7 8
9 C1-44
C1-45
Vehicle Det Call
Vehicle Det Call
Preempt Input
Preempt Input
Unit Manual Control Enable
Not Active
1 1
C1-51
C1-52
C1-53
Vehicle Det Call
Vehicle Det Call
Vehicle Det Call
26 1
C1-50
C1-63
C1-64
16 14,15
15 16
Not Active
9,10,14
12,14,15
14,15
13,16
Ch
1 2
3 4
5 6
7 8
. . 9
.
X
8 9 10 11 15 16
. . . . . . .
X . .
13 14
14 15
16 X . . 10
11 12
13 X . . . . . . . .
Concurrency Mode
Auto
Concurrency
5,6,9,10,15
5,6,10,12,13,15
7,8,9,10,12,14,16
9,12,13
9,10,12,13,15
Printed on: 3/25/2021
Cabinet Configuration
Output Points
C1 Pin C1 Pin
Not Active
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Not Active
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Output Type
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Channel Yellow Ped Clear Driver
Detector Reset
Watchdog
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
64 C11-8
C11-1
5 6
6 6
5 5
C11-4
61 62
63 15
C11-3
18 18
C1-98
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
11 17
17 10
10 10
9 9
C1-88
C1-89
C11-7
3 13
13 15
14 16
3 18
17 1
14 C1-101
C1-102
34 C1-36
37 C1-100
38 42
36 C1-84
9 12
12 12
11 11
39 C1-91
50 C1-93
51 C1-94
7 8
8 8
7 7
15 C11-6
44 C1-86
45 C1-87
60 49
C11-5
48 C1-90
47 2
1 1
1 46
1Output Output Type Idx
14 15
16 2
3 4
5 C1-2
2 2
4 4
4 3
Channel Red Do Not Walk Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
Channel Red Do Not Walk Driver
Channel Yellow Ped Clear Driver
Channel Green Walk Driver
6 7
8 9
10 11
12 13
14 C1-3
C1-4
C1-5
C1-6
C1-7
C1-8
C1-9
C1-10
C1-11
17 C1-19 16
28 C1-30
25 C1-27
26 C1-28
27 C1-29
22 C1-24
23 C1-25
18 C1-20
21 C1-23
20 C1-22
19 16
Channel Red Do Not Walk Driver
31 C1-33
32 C1-34
29 C1-31
30 C1-32
24 C1-26
C1-21
58 C11-2
59 40 C1-103
41 C1-83
56 C1-99
57 52 C1-95
53 C1-96
54 C1-97
55 C1-12
C1-13
C1-15
C1-16
C1-17
C1-18
43 C1-85
35 C1-37
C1-38
Idx
13 Output
33 C1-35
Printed on: 3/25/2021
User Programs
Program 1
Enabled
40 None 0 None None None 0.0 0.0
None 0.0 0.0
None 0.0 0.0
39 None 0 None None
38 None 0 None None
None 0.0 0.0
None 0.0 0.0
37 None 0 None None
36 None 0 None None
None 0.0 0.0
None 0.0 0.0
35 None 0 None None
34 None 0 None None
None 0.0 0.0
None 0.0 0.0
33 None 0 None None
32 None 0 None None
None 0.0 0.0
None 0.0 0.0
31 None 0 None None
30 None 0 None None
None 0.0 0.0
None 0.0 0.0
29 None 0 None None
28 None 0 None None
None 0.0 0.0
None 0.0 0.0
27 None 0 None None
26 None 0 None None
None 0.0 0.0
None 0.0 0.0
25 None 0 None None
24 None 0 None None
None 0.0 0.0
None 0.0 0.0
23 None 0 None None
22 None 0 None None
None 0.0 0.0
None 0.0 0.0
21 None 0 None None
20 None 0 None None
None 0.0 0.0
None 0.0 0.0
19 None 0 None None
18 None 0 None None
None 0.0 0.0
None 0.0 0.0
17 None 0 None None
16 None 0 None None
None 0.0 0.0
None 0.0 0.0
15 None 0 None None
14 None 0 None None
None 0.0 0.0
None 0.0 0.0
13 None 0 None None
12 None 0 None None
None 0.0 0.0
None 0.0 0.0
11 None 0 None None
10 None 0 None None
None 0.0 0.0
None 0.0 0.0
9 None 0 None None
8 None 0 None None
None 0.0 0.0
0 None 0.0 0.0
7 None 0 None None
6 None 0 None None
None 0.0 0.0
None 0.0 0.0
5 None 0 None None
4 None 0 None None
3 None 0 None None None 0.0 0.0
None None
None 0.0 0.0
Parameter B Idx Dly Ext Description
1 Unit Stop Time 1 Result=A Aux Switch State
Line Result Idx Operation Parameter A Idx
2 None None 0.0 0.0
Printed on: 3/25/2021
Appendix D - Trip Distribution Technical
Memorandum
3900 5th Avenue, Suite 310 San Diego, CA 92103 619-795-6086 www.CRAmobility.com
TO: Jonathan Quezada, Assistant Engineer; City of San Marcos Chris Garcia, Associate Planner; City of San Marcos
Joe Shultz, PE; Kimley-Horn and Associates, Inc.
FROM: Jonathan Sanchez, PE, TE, PTOE; CR Associates
DATE: February 3, 2023
RE: San Marcos Artist’s Village Project – Response to Comment #15 (2nd Review of TIA) Trip Distribution
The project trip distribution was manually developed based on the following:
Existing Travel Patterns based on big data (Replica1) and Census data. Geographical location of Project, surrounding land uses and knowledge of the City’s traffic patterns.
The Project land uses consist of two components, approximately 70% retail/ employment and 30% residential land uses. The retail/ employment component of the Project are likely to attract residents from nearby developments (University District, Santa Fe Hills, etc.), whereas the residential component is likely to end up at professional jobs within the area (CSU San Marcos, Hughes Circuits, etc.).
Trip distribution for the Project was developed based on a Select Zone analysis, using data from Replica. Figure 1 displays the current origin and destination pattern of the Traffic Analysis Zone (TAZ) where the Project is located.
Figure 1 – Big Data Travel Patterns
1 Replica is a data provider that produces large-scale models to represent mobility throughout the United States. For more information, please visit the following: https://replicahq.com/ San Marcos Artist’s Village Page 2
Memorandum of Approach
As seen in Figure 1 above, the yellow areas represent the TAZs where the highest concentration of trips originate and end up in the TAZ where the project is located. These TAZs are mainly composed of residential areas, which is consistent with the areas the project would attract trips from being that approximately 70 percent of the proposed project has commercial/retail and office land uses.
In order to understand the trip patterns associated with the remaining residential component of the Project; an analysis was conducted using data from US Census (2019). Figure 2 below displays where residents that live within the selected area (orange area) work. As seen, the highest concentrations of employment are within San Marcos, Carlsbad, and southern Vista. Figure 3 displays the same information but also shows the concentration of employment in the County of San Diego.
Figure 2 – Where Residents Work within Selected Area
San Marcos Artist’s Village Page 3
Memorandum of Approach
Figure 3 - Where Residents Work within Selected Area
As seen in these two figures, the majority of the trips are anticipated to stay within San Marcos or travel to Carlsbad and southern Vista using San Marcos’ transportation network. This can further be demonstrated by requesting directions from google maps, which is a widely used navigation platform. Figures 4 and 5 display google maps directions to the areas with higher employment density.
San Marcos Artist’s Village Page 4
Memorandum of Approach
Figure 4 – Preferred Routes to Carlsbad
Figure 5 – Preferred Route to Southern Vista
Additionally, CRA has have extensive experience working on other development projects within the City of San Marcos, such as the Urge, Baypoint Academy, Block C, PIMA, Discovery South, and others.
Our experience with development projects allows us to understand the traffic patterns within the City. For example, trips traveling to and from I-5, especially toward Encinitas, Del Mar, and even the City of San Diego, sometimes prefer to use local roads such as Twin Oaks Valley Road instead of SR78, mostly due to the longer driving distance along SR-78, as well as the congestion at the SR-78/I-5 interchange. Figure 6 displays the travel times between three different routes from the Project’s site to Moonlight State Beach (a popular destination) in the City of Encinitas.
San Marcos Artist’s Village Page 5
Memorandum of Approach
Figure 6 – Preferred Route to Moonlight State Beach
As shown in Figure 6, it would take 26 minutes to travel to Moonlight State Beach via Rancho Santa Fe vs. the 28 minutes that it would takes via SR-78.
All of the information presented above supports the trip distribution assumptions shown in the approved MOA and the TIA. The trip distribution assumed that approximately 80 percent (80%) of the total trips of the project would remain within the City or travel to adjacent jurisdictions via the City’s transportation network. The remainder of trips, approx. 20 percent, would utilize the freeway to travel to other parts of the County.
Appendix E - Internal Capture Calculations
INTERNAL CAPTURE CALCULATION
Land Use Rate Type Units Type Trip Rate Per ADT % Trips In Out % Trips In Out RESIDENTIAL - Multi-Family (Over 20 DU/acre) Driveway 109 DU 6 Unit 654 8% 53 2 : 8 11 42 9% 59 7 : 3 41 18OFFICE - Corporate Headquarters/Single Tenant Office Driveway 7,658 KSF 14 KSF 108 15% 17 9 : 1 15 2 15% 17 2 : 8 3 14COMMERCIAL-RETAIL - Specialty Retail Center/Strip Commercial Driveway 49,266 KSF 40 KSF 1971 3% 60 6 : 4 36 24 9% 178 5 : 5 89 89 GROSS TOTAL 2733 130 62 68 254 133 121
Mixed Use Internalization 18% -492 -23 -11 -12 -46 -24 -22 NET TOTAL 2241 107 51 56 208 109 99
Total In Out Total In Out
126 60 66 190 101 89
Internal Capture 3% 25%
Total In Out
316 161 155
18%
AM & PM Combined Internal Capture
AM PM
Split Split
AM Reduced Trips PM Reduced Trips
1 - [(126+189)/(130+254)]=18.0%
Project Name: Organization:
Project Location: Performed By:
Scenario Description:Trip Generation Date:
Analysis Year: Checked By:
Analysis Period: Date:
ITE LUCs1 Quantity Units Total Entering Exiting
Office 17 15 2
Retail 60 36 24
Restaurant 0 00
Cinema/Entertainment 0
Residential 53 11 42
Hotel 0
All Other Land Uses2 0
Total 130 62 68
Veh. Occ. % Transit % Non-Motorized Veh. Occ. % Transit % Non-Motorized Office
Retail
Restaurant
Cinema/Entertainment
Residential
Hotel
All Other Land Uses2
Office Retail Restaurant Residential Hotel
Office
Retail
Restaurant
Cinema/Entertainment
Residential
Hotel
Office Retail Restaurant Residential Hotel
Office 1 0 0 0
Retail 1 0 0 0
Restaurant 0 0 0 0
Cinema/Entertainment 0 0 0 0 0
Residential 0 0 0 0
Hotel 0 0 0 0
Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 130 62 68 Office 7% 50%
Internal Capture Percentage 3% 3% 3% Retail 3% 4%
Restaurant N/A N/A
External Vehicle-Trips3 126 60 66 Cinema/Entertainment N/A N/A External Transit-Trips4 0 0 0 Residential 0% 0%
External Non-Motorized Trips4 0 0 0 Hotel N/A N/A
San Marcos
AM Street Peak Hour
2022
Estimation Tool Developed by the Texas Transportation Institute Table 5-A: Computations Summary Table 6-A: Internal Trip Capture Percentages by Land Use 2 Total estimate for all other land uses at mixed-use development site-not subject to internal trip capture computations in this estimator 3 Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-A 1 Land Use Codes (LUCs) from Trip Generation Informational Report , published by the Institute of Transportation Engineers. 4 Person-Trips
*Indicates computation that has been rounded to the nearest whole number.
Table 2-A: Mode Split and Vehicle Occupancy Estimates
Table 4-A: Internal Person-Trip Origin-Destination Matrix* Destination (To) Origin (From)
Origin (From) Destination (To)
Cinema/Entertainment
Land Use Entering Trips Exiting Trips
Table 3-A: Average Land Use Interchange Distances (Feet Walking Distance) NCHRP 8-51 Internal Trip Capture Estimation Tool
Table 1-A: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) 0 0
Cinema/Entertainment
Development Data (For Information Only )
0 0
0 Estimated Vehicle-Trips Land Use
San Marcos Artist's Village
Project Name:
Analysis Period:
Veh. Occ. Vehicle-Trips Person-Trips* Veh. Occ. Vehicle-Trips Person-Trips* Office 1.00 15 15 1.00 2 2
Retail 1.00 36 36 1.00 24 24
Restaurant 1.00 0 0 1.00 0 0
Cinema/Entertainment 1.00 0 0 1.00 0 0
Residential 1.00 11 11 1.00 42 42
Hotel 1.00 0 0 1.00 0 0
Office Retail Restaurant Residential Hotel
Office 1 1 0 0
Retail 7 3 3 0
Restaurant 0 0 0 0
Cinema/Entertainment 0 0 0 0 0
Residential 1 0 8 0
Hotel 0 0 0 0
Office Retail Restaurant Residential Hotel
Office 12 0 0 0
Retail 1 0 0 0
Restaurant 2 3 1 0
Cinema/Entertainment 0 0 0 0 0
Residential 0 6 0 0
Hotel 0 1 0 0
Internal External Total Vehicles1 Transit2 Non-Motorized2 Office 1 14 15 14 0 0
Retail 1 35 36 35 0 0
Restaurant 0 0 0 0 0 0
Cinema/Entertainment 0 0 0 0 0 0
Residential 0 11 11 11 0 0
Hotel 0 0 0 0 0 0
All Other Land Uses3 00 0 0 0 0
Internal External Total Vehicles1 Transit2 Non-Motorized2 Office 1 1 2 1 0 0
Retail 1 23 24 23 0 0
Restaurant 0 0 0 0 0 0
Cinema/Entertainment 0 0 0 0 0 0
Residential 0 42 42 42 0 0
Hotel 0 0 0 0 0 0
All Other Land Uses3 00 0 0 0 0
Land Use Table 7-A (D): Entering Trips
2 Person-Trips
Person-Trip Estimates
San Marcos Artist's Village
AM Street Peak Hour
Table 9-A (D): Internal and External Trips Summary (Entering Trips) Table 8-A (O): Internal Person-Trip Origin-Destination Matrix (Computed at Origin) Origin (From) Destination (To)
Cinema/Entertainment
Table 7-A: Conversion of Vehicle-Trip Ends to Person-Trip Ends Table 7-A (O): Exiting Trips
0 0
0 Table 8-A (D): Internal Person-Trip Origin-Destination Matrix (Computed at Destination) Origin (From)
Origin Land Use Person-Trip Estimates External Trips by Mode* External Trips by Mode*
1 Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-A 0 *Indicates computation that has been rounded to the nearest whole number. 0 0
0 0
0 Destination (To)
Cinema/Entertainment
0 3
Total estimate for all other land uses at mixed-use development site-not subject to internal trip capture computations in this estimator Destination Land Use
Table 9-A (O): Internal and External Trips Summary (Exiting Trips) Project Name: Organization:
Project Location: Performed By:
Scenario Description:Trip Generation Date:
Analysis Year: Checked By:
Analysis Period: Date:
ITE LUCs1 Quantity Units Total Entering Exiting
Office 17 3 14
Retail 178 89 89
Restaurant 0
Cinema/Entertainment 0
Residential 59 41 18
Hotel 0
All Other Land Uses2 0
Total 254 133 121
Veh. Occ. % Transit % Non-Motorized Veh. Occ. % Transit % Non-Motorized Office
Retail
Restaurant
Cinema/Entertainment
Residential
Hotel
All Other Land Uses2
Office Retail Restaurant Residential Hotel
Office
Retail
Restaurant
Cinema/Entertainment
Residential
Hotel
Office Retail Restaurant Residential Hotel
Office 3 0 0 0
Retail 1 0 19 0
Restaurant 0 0 0 0
Cinema/Entertainment 0 0 0 0 0
Residential 1 8 0 0
Hotel 0 0 0 0
Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 254 133 121 Office 67% 21%
Internal Capture Percentage 25% 24% 26% Retail 12% 22%
Restaurant N/A N/A
External Vehicle-Trips3 190 101 89 Cinema/Entertainment N/A N/A External Transit-Trips4 0 0 0 Residential 46% 50%
External Non-Motorized Trips4 0 0 0 Hotel N/A N/A
1 Land Use Codes (LUCs) from Trip Generation Informational Report , published by the Institute of Transportation Engineers. 2 Total estimate for all other land uses at mixed-use development site-not subject to internal trip capture computations in this estimator 3 Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-P *Indicates computation that has been rounded to the nearest whole number.
Table 5-P: Computations Summary Table 6-P: Internal Trip Capture Percentages by Land Use 4 Person-Trips
Estimation Tool Developed by the Texas Transportation Institute 0 0
0 Origin (From) Destination (To)
Cinema/Entertainment
0 0
Table 4-P: Internal Person-Trip Origin-Destination Matrix* Origin (From) Destination (To)
Cinema/Entertainment
Table 2-P: Mode Split and Vehicle Occupancy Estimates
Land Use Entering Trips Exiting Trips
Table 3-P: Average Land Use Interchange Distances (Feet Walking Distance) 2022
PM Street Peak Hour
Table 1-P: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) Land Use Development Data (For Information Only ) Estimated Vehicle-Trips NCHRP 8-51 Internal Trip Capture Estimation Tool
San Marcos Artist's Village
San Marcos
Project Name:
Analysis Period:
Veh. Occ. Vehicle-Trips Person-Trips* Veh. Occ. Vehicle-Trips Person-Trips* Office 1.00 3 3 1.00 14 14
Retail 1.00 89 89 1.00 89 89
Restaurant 1.00 0 0 1.00 0 0
Cinema/Entertainment 1.00 0 0 1.00 0 0
Residential 1.00 41 41 1.00 18 18
Hotel 1.00 0 0 1.00 0 0
Office Retail Restaurant Residential Hotel
Office 3 1 0 0
Retail 2 26 23 4
Restaurant 0 0 0 0
Cinema/Entertainment 0 0 0 0 0
Residential 1 8 4 1
Hotel 0 0 0 0
Office Retail Restaurant Residential Hotel
Office 7 0 2 0
Retail 1 0 19 0
Restaurant 1 45 7 0
Cinema/Entertainment 0 4 0 2 0
Residential 2 9 0 0
Hotel 0 2 0 0
Internal External Total Vehicles1 Transit2 Non-Motorized2 Office 2 1 3 1 0 0
Retail 11 78 89 78 0 0
Restaurant 0 0 0 0 0 0
Cinema/Entertainment 0 0 0 0 0 0
Residential 19 22 41 22 0 0
Hotel 0 0 0 0 0 0
All Other Land Uses3 000 0 0 0
Internal External Total Vehicles1 Transit2 Non-Motorized2 Office 3 11 14 11 0 0
Retail 20 69 89 69 0 0
Restaurant 0 0 0 0 0 0
Cinema/Entertainment 0 0 0 0 0 0
Residential 9 9 18 9 0 0
Hotel 0 0 0 0 0 0
All Other Land Uses3 000 0 0 0
0 0
0 0
0 3
Total estimate for all other land uses at mixed-use development site-not subject to internal trip capture computations in this estimator Table 9-P (O): Internal and External Trips Summary (Exiting Trips) Origin Land Use Person-Trip Estimates External Trips by Mode* Person-Trip Estimates External Trips by Mode*
0 Table 8-P (D): Internal Person-Trip Origin-Destination Matrix (Computed at Destination) Origin (From)
2 Person-Trips
0 0
Table 9-P (D): Internal and External Trips Summary (Entering Trips) Destination Land Use
*Indicates computation that has been rounded to the nearest whole number.
San Marcos Artist's Village
PM Street Peak Hour
Table 7-P: Conversion of Vehicle-Trip Ends to Person-Trip Ends Land Use Table 7-P (D): Entering Trips Table 7-P (O): Exiting Trips Table 8-P (O): Internal Person-Trip Origin-Destination Matrix (Computed at Origin) Origin (From) Destination (To)
Destination (To)
Cinema/Entertainment
Cinema/Entertainment
0 4
1 Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-P Appendix F - Traffic Counts
DATE: LOCATION: SAN MARCOS PROJECT #: ETD22-0520-01
5/19/22 NORTH & SOUTH: LAS POSAS LOCATION #: 1
THURSDAY EAST & WEST: GRAND CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X X
7:00 AM 2 32 15 67 107 60 9 32 4 15 25 68 436 0
7:15 AM 1 43 19 80 126 68 12 27 5 25 18 76 500 0
7:30 AM 1 36 15 88 125 100 17 23 5 28 31 91 560 0
7:45 AM 5 80 16 84 187 126 25 40 3 30 42 103 741 0
8:00 AM 3 63 29 90 156 128 30 27 4 26 57 94 707 0
8:15 AM 3 54 29 84 151 128 30 71 2 29 32 69 682 1 1
8:30 AM 11 61 21 101 127 71 23 64 5 24 32 102 642 0
8:45 AM 8 28 24 88 136 70 20 42 10 13 29 86 554 0
VOLUMES 34 397 168 682 1,115 751 166 326 38 190 266 689 4,822 0 0 0 1 1 APPROACH % 6% 66% 28% 27% 44% 29% 31% 62% 7% 17% 23% 60% APP/DEPART 599 / 1,252 2,548 / 1,343 530 / 1,176 1,145 / 1,051 0
BEGIN PEAK HR
VOLUMES 22 258 95 359 621 453 108 202 14 109 163 368 2,772 APPROACH % 6% 69% 25% 25% 43% 32% 33% 62% 4% 17% 25% 58% PEAK HR FACTOR 0.928 0.902 0.786 0.904 0.935
APP/DEPART 375 / 734 1,433 / 744 324 / 656 640 / 638 0
4:00 PM 12 246 65 64 108 63 86 92 15 14 37 156 958 0
4:15 PM 7 225 63 88 158 71 65 95 9 15 30 131 957 0
4:30 PM 10 214 44 67 125 70 73 87 13 14 34 165 916 0
4:45 PM 13 191 64 91 134 56 87 92 15 18 27 159 947 0
5:00 PM 15 209 71 67 123 57 79 101 8 10 37 172 949 0
5:15 PM 12 199 37 50 129 68 80 85 11 19 58 170 918 0
5:30 PM 14 200 32 58 108 52 71 97 10 15 49 181 887 0
5:45 PM 7 187 52 76 105 41 62 78 9 10 38 173 838 1 1
VOLUMES 90 1,671 428 561 990 478 603 727 90 115 310 1,307 7,370 1 0 0 0 1 APPROACH % 4% 76% 20% 28% 49% 24% 42% 51% 6% 7% 18% 75% APP/DEPART 2,189 / 3,581 2,029 / 1,195 1,420 / 1,716 1,732 / 878 0
BEGIN PEAK HR
VOLUMES 42 876 236 310 525 260 311 366 52 61 128 611 3,778 APPROACH % 4% 76% 20% 28% 48% 24% 43% 50% 7% 8% 16% 76% PEAK HR FACTOR 0.893 0.864 0.939 0.939 0.986
APP/DEPART 1,154 / 1,798 1,095 / 638 729 / 912 800 / 430 0
LAS POSAS
NORTH SIDE
GRAND WEST SIDE EAST SIDE GRAND
SOUTH SIDE
LAS POSAS
N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 1 1 1 3 0 4 4
7:15 AM 2 2 0 1 1
7:30 AM 1 1 0 2 1 3
7:45 AM 1 1 2 0 1 1
8:00 AM 1 1 0 0
8:15 AM 0 0 1 1
8:30 AM 1 1 0 1 3 1 5
8:45 AM 2 2 0 1 1
TOTAL 0 2 8 2 12 0 0 0 0 0 0 1 7 8 16
4:00 PM 4 4 0 2 2 4
4:15 PM 1 1 0 1 4 5
4:30 PM 1 2 1 1 5 0 1 1
4:45 PM 2 2 4 0 1 2 1 4
5:00 PM 1 4 5 10 0 2 2
5:15 PM 1 4 1 6 0 1 2 3
5:30 PM 3 3 0 1 2 3
5:45 PM 1 1 0 0
TOTAL 1 7 19 7 34 0 0 0 0 0 0 4 15 3 22
BICYCLE CROSSINGS
AM PM AM
7:45 AM
PM
4:00 PM
PEDESTRIAN CROSSINGS PEDESTRIAN ACTIVATIONS
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
INCLUDES BIKE & PED
U-TURNS
LAS POSAS LAS POSAS GRAND GRAND
DATE: LOCATION: SAN MARCOS PROJECT #: ETD22-0520-01
5/19/22 NORTH & SOUTH: VIA VERA CRUZ & 78 RAMPS LOCATION #: 2 THURSDAY EAST & WEST: GRAND CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X X
7:00 AM 4 8 4 11 33 81 81 20 10 7 21 1 281 0
7:15 AM 3 9 1 15 49 89 79 19 30 1 25 1 321 0
7:30 AM 13 12 0 18 52 110 70 29 23 3 38 4 372 0
7:45 AM 12 12 3 19 92 145 80 35 28 8 32 2 468 0
8:00 AM 13 10 5 21 58 105 91 34 22 10 41 1 411 0
8:15 AM 15 12 1 23 61 82 91 50 41 3 41 4 424 0
8:30 AM 16 19 4 22 44 95 95 55 39 21 34 2 446 0
8:45 AM 17 10 3 24 50 76 84 34 37 15 41 3 394 0
VOLUMES 93 92 21 153 439 783 671 276 230 68 273 18 3,117 0 0 0 0 0 APPROACH % 45% 45% 10% 11% 32% 57% 57% 23% 20% 19% 76% 5% APP/DEPART 206 / 781 1,375 / 737 1,177 / 450 359 / 1,149 0
BEGIN PEAK HR
VOLUMES 56 53 13 85 255 427 357 174 130 42 148 9 1,749
APPROACH % 46% 43% 11% 11% 33% 56% 54% 26% 20% 21% 74% 5% PEAK HR FACTOR 0.782 0.749 0.874 0.873 0.934
APP/DEPART 122 / 419 767 / 427 661 / 272 199 / 631 0
4:00 PM 54 48 12 51 58 69 100 77 41 18 85 6 619 0
4:15 PM 39 47 23 70 67 77 125 81 43 18 67 3 660 0
4:30 PM 52 38 11 58 74 73 95 63 38 22 80 4 608 1 1
4:45 PM 50 40 18 52 63 70 110 86 53 25 82 2 651 0
5:00 PM 65 49 16 42 45 74 129 70 36 11 80 6 623 0
5:15 PM 46 48 12 43 52 84 84 48 38 17 114 5 591 0
5:30 PM 39 34 21 44 54 106 91 52 41 18 117 5 622 1 1
5:45 PM 38 51 18 46 67 95 102 63 43 28 88 8 647 1 1
VOLUMES 383 355 131 406 480 648 836 540 333 157 713 39 5,021 3 0 0 0 3 APPROACH % 44% 41% 15% 26% 31% 42% 49% 32% 19% 17% 78% 4% APP/DEPART 869 / 1,230 1,534 / 970 1,709 / 1,077 909 / 1,744 0
BEGIN PEAK HR
VOLUMES 206 174 68 222 249 294 459 300 170 76 309 15 2,542 APPROACH % 46% 39% 15% 29% 33% 38% 49% 32% 18% 19% 77% 4% PEAK HR FACTOR 0.862 0.894 0.933 0.917 0.963
APP/DEPART 448 / 648 765 / 495 929 / 590 400 / 809 0
VIA VERA CRUZ & 78 RAMPS
NORTH SIDE
GRAND WEST SIDE EAST SIDE GRAND
SOUTH SIDE
VIA VERA CRUZ & 78 RAMPS
N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 0 0 0
7:15 AM 0 0 0
7:30 AM 0 0 0
7:45 AM 0 0 0
8:00 AM 0 0 0
8:15 AM 0 0 0
8:30 AM 0 0 0
8:45 AM 0 0 0
TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 PM 1 1 0 0
4:15 PM 0 0 0
4:30 PM 2 2 0 0
4:45 PM 1 1 0 1 1
5:00 PM 1 1 0 0
5:15 PM 1 1 0 0
5:30 PM 0 0 0
5:45 PM 0 0 0
TOTAL 0 6 0 0 6 0 0 0 0 0 0 1 0 0 1
BICYCLE CROSSINGS
AM PM AM
7:45 AM
PM
4:15 PM
PEDESTRIAN CROSSINGS PEDESTRIAN ACTIVATIONS
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
INCLUDES BIKE & PED
U-TURNS
VIA VERA CRUZ & 78 RAMPS VIA VERA CRUZ & 78 RAMPS GRAND GRAND DATE: LOCATION: SAN MARCOS PROJECT #: ETD22-0520-01
5/19/22 NORTH & SOUTH: VIA VERA CRUZ LOCATION #: 3
THURSDAY EAST & WEST: LINDA VISTA CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X X
7:00 AM 6 6 1 3 22 5 4 10 5 2 21 4 89 0
7:15 AM 4 8 2 4 45 9 5 10 2 2 21 4 116 0
7:30 AM 6 17 0 2 50 4 4 22 5 6 27 2 145 0
7:45 AM 6 13 3 0 83 10 6 29 6 4 33 2 195 1 1
8:00 AM 4 20 1 1 46 8 0 22 7 1 30 9 149 0
8:15 AM 6 18 3 5 61 8 6 31 9 4 37 4 192 0
8:30 AM 5 31 1 4 52 8 7 22 11 2 30 4 177 0
8:45 AM 4 25 6 7 63 8 3 20 8 3 20 4 171 0
VOLUMES 41 138 17 26 422 60 35 166 53 24 219 33 1,234 0 1 0 0 1 APPROACH % 21% 70% 9% 5% 83% 12% 14% 65% 21% 9% 79% 12% APP/DEPART 196 / 206 508 / 499 254 / 209 276 / 320 0
BEGIN PEAK HR
VOLUMES 21 82 8 10 242 34 19 104 33 11 130 19 713
APPROACH % 19% 74% 7% 3% 85% 12% 12% 67% 21% 7% 81% 12% PEAK HR FACTOR 0.750 0.769 0.848 0.889 0.914
APP/DEPART 111 / 120 286 / 286 156 / 122 160 / 185 0
4:00 PM 8 64 20 7 57 5 25 68 17 7 16 3 297 0
4:15 PM 5 56 12 15 79 9 17 53 20 5 24 6 301 0
4:30 PM 11 79 9 15 79 9 18 61 16 2 16 8 323 0
4:45 PM 11 71 9 6 73 7 16 71 12 6 23 2 307 0
5:00 PM 8 89 8 5 72 1 21 52 29 4 21 8 318 0
5:15 PM 11 78 8 2 69 6 20 56 9 4 18 4 285 0
5:30 PM 10 80 7 7 58 8 11 43 15 2 22 4 267 0
5:45 PM 3 60 3 8 83 9 10 54 12 7 17 4 270 0
VOLUMES 67 577 76 65 570 54 138 458 130 37 157 39 2,368 0 0 0 0 0 APPROACH % 9% 80% 11% 9% 83% 8% 19% 63% 18% 16% 67% 17% APP/DEPART 720 / 754 689 / 737 726 / 599 233 / 278 0
BEGIN PEAK HR
VOLUMES 35 295 38 41 303 26 72 237 77 17 84 24 1,249
APPROACH % 10% 80% 10% 11% 82% 7% 19% 61% 20% 14% 67% 19% PEAK HR FACTOR 0.876 0.898 0.946 0.893 0.967
APP/DEPART 368 / 391 370 / 397 386 / 316 125 / 145 0
VIA VERA CRUZ
NORTH SIDE
LINDA VISTA WEST SIDE EAST SIDE LINDA VISTA
SOUTH SIDE
VIA VERA CRUZ
N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 0 0 0
7:15 AM 0 0 0
7:30 AM 0 0 1 1
7:45 AM 1 1 0 1 1
8:00 AM 0 0 0
8:15 AM 0 0 1 1
8:30 AM 0 0 1 1
8:45 AM 1 1 0 0
TOTAL 0 0 0 2 2 0 0 0 0 0 0 1 0 3 4
4:00 PM 8 8 0 0
4:15 PM 1 1 0 0
4:30 PM 1 1 2 0 2 2
4:45 PM 1 1 11 13 0 0
5:00 PM 1 1 0 0
5:15 PM 0 0 0
5:30 PM 0 0 2 2
5:45 PM 0 0 0
TOTAL 2 1 0 22 25 0 0 0 0 0 0 2 0 2 4
BICYCLE CROSSINGS
AM PM AM
7:45 AM
PM
4:15 PM
PEDESTRIAN CROSSINGS PEDESTRIAN ACTIVATIONS
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
INCLUDES BIKE & PED
U-TURNS
VIA VERA CRUZ VIA VERA CRUZ LINDA VISTA LINDA VISTA
DATE: LOCATION: SAN MARCOS PROJECT #: ETD22-0520-01
5/19/22 NORTH & SOUTH: LINDA VISTA LOCATION #: 5
THURSDAY EAST & WEST: GRAND CONTROL: STOP
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X X
7:00 AM 0 17 31 4 29 21 102 0
7:15 AM 4 10 33 2 36 22 107 0
7:30 AM 7 26 43 3 35 37 151 0
7:45 AM 2 19 57 2 49 34 163 0
8:00 AM 1 19 55 5 39 44 163 0
8:15 AM 1 36 63 3 39 35 177 0
8:30 AM 0 26 76 4 37 48 191 0
8:45 AM 2 31 60 3 41 59 196 0
VOLUMES 17 0 184 0 0 0 0 418 26 305 300 0 1,250 0 0 0 0 0 APPROACH % 8% 0% 92% 0% 0% 0% 0% 94% 6% 50% 50% 0%
APP/DEPART 201 / 0 0 / 331 444 / 602 605 / 317 0
BEGIN PEAK HR
VOLUMES 4 0 112 0 0 0 0 254 15 156 186 0 727
APPROACH % 3% 0% 97% 0% 0% 0% 0% 94% 6% 46% 54% 0%
PEAK HR FACTOR 0.784 0.000 0.841 0.855 0.927
APP/DEPART 116 / 0 0 / 171 269 / 366 342 / 190 0
4:00 PM 4 92 129 4 20 83 332 0
4:15 PM 5 84 173 1 24 67 354 0
4:30 PM 3 88 146 5 19 104 365 0
4:45 PM 2 95 140 11 24 97 369 0
5:00 PM 4 77 155 3 25 87 351 0
5:15 PM 1 64 108 4 21 130 328 0
5:30 PM 0 52 128 3 23 125 331 0
5:45 PM 3 72 120 6 23 119 343 0
VOLUMES 22 0 624 0 0 0 0 1,099 37 179 812 0 2,773 0 0 0 0 0 APPROACH % 3% 0% 97% 0% 0% 0% 0% 97% 3% 18% 82% 0%
APP/DEPART 646 / 0 0 / 216 1,136 / 1,723 991 / 834 0
BEGIN PEAK HR
VOLUMES 14 0 344 0 0 0 0 614 20 92 355 0 1,439
APPROACH % 4% 0% 96% 0% 0% 0% 0% 97% 3% 21% 79% 0%
PEAK HR FACTOR 0.923 0.000 0.911 0.909 0.975
APP/DEPART 358 / 0 0 / 112 634 / 958 447 / 369 0
LINDA VISTA
NORTH SIDE
GRAND WEST SIDE EAST SIDE GRAND
SOUTH SIDE
LINDA VISTA
N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 1 1 0 0
7:15 AM 1 1 0 0
7:30 AM 0 0 0
7:45 AM 0 0 1 1
8:00 AM 1 1 0 0
8:15 AM 0 0 0
8:30 AM 0 0 0
8:45 AM 0 0 0
TOTAL 0 3 0 0 3 0 0 0 0 0 0 0 1 0 1
4:00 PM 0 0 0
4:15 PM 0 0 0
4:30 PM 0 0 0
4:45 PM 0 0 0
5:00 PM 0 0 0
5:15 PM 1 1 0 0
5:30 PM 0 0 0
5:45 PM 1 1 0 0
TOTAL 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0
BICYCLE CROSSINGS
AM PM AM
8:00 AM
PM
4:15 PM
PEDESTRIAN CROSSINGS PEDESTRIAN ACTIVATIONS
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
INCLUDES BIKE & PED
U-TURNS
LINDA VISTA LINDA VISTA GRAND GRAND
DATE: LOCATION: SAN MARCOS PROJECT #: ETD22-0520-01
5/19/22 NORTH & SOUTH: BENT AVE LOCATION #: 6
THURSDAY EAST & WEST: GRAND CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X X
7:00 AM 14 3 33 16 7 35 108 0
7:15 AM 13 5 28 15 7 45 113 0
7:30 AM 17 3 57 11 4 56 148 0
7:45 AM 20 7 64 13 1 62 167 0
8:00 AM 14 2 59 16 5 70 166 0
8:15 AM 21 5 78 20 4 53 181 0
8:30 AM 20 5 79 24 5 64 197 0
8:45 AM 37 5 55 36 7 64 204 0
VOLUMES 156 0 35 0 0 0 0 453 151 40 449 0 1,284 0 0 0 0 0 APPROACH % 82% 0% 18% 0% 0% 0% 0% 75% 25% 8% 92% 0%
APP/DEPART 191 / 0 0 / 191 604 / 488 489 / 605 0
BEGIN PEAK HR
VOLUMES 92 0 17 0 0 0 0 271 96 21 251 0 748
APPROACH % 84% 0% 16% 0% 0% 0% 0% 74% 26% 8% 92% 0%
PEAK HR FACTOR 0.649 0.000 0.891 0.907 0.917
APP/DEPART 109 / 0 0 / 117 367 / 288 272 / 343 0
4:00 PM 36 11 169 52 5 68 341 0
4:15 PM 30 20 206 53 8 60 377 0
4:30 PM 54 15 191 42 10 70 382 0
4:45 PM 45 12 185 50 9 75 376 0
5:00 PM 44 13 189 41 6 68 361 0
5:15 PM 53 19 140 31 9 100 352 0
5:30 PM 41 11 154 28 9 106 349 0
5:45 PM 42 17 162 30 5 100 356 0
VOLUMES 345 0 118 0 0 0 0 1,396 327 61 647 0 2,894 0 0 0 0 0 APPROACH % 75% 0% 25% 0% 0% 0% 0% 81% 19% 9% 91% 0%
APP/DEPART 463 / 0 0 / 388 1,723 / 1,514 708 / 992 0
BEGIN PEAK HR
VOLUMES 173 0 60 0 0 0 0 771 186 33 273 0 1,496
APPROACH % 74% 0% 26% 0% 0% 0% 0% 81% 19% 11% 89% 0%
PEAK HR FACTOR 0.844 0.000 0.924 0.911 0.979
APP/DEPART 233 / 0 0 / 219 957 / 831 306 / 446 0
BENT AVE
NORTH SIDE
GRAND WEST SIDE EAST SIDE GRAND
SOUTH SIDE
BENT AVE
N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 0 0 0
7:15 AM 0 0 0
7:30 AM 0 0 0
7:45 AM 1 1 0 0
8:00 AM 0 0 0
8:15 AM 0 0 0
8:30 AM 1 1 0 1 1
8:45 AM 0 0 0
TOTAL 0 0 0 2 2 0 0 0 0 0 0 0 0 1 1
4:00 PM 0 0 0
4:15 PM 2 2 0 0
4:30 PM 0 0 0
4:45 PM 0 0 0
5:00 PM 0 0 0
5:15 PM 0 0 0
5:30 PM 0 0 0
5:45 PM 0 0 0
TOTAL 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
INCLUDES BIKE & PED
U-TURNS
BENT AVE BENT AVE GRAND GRAND
BICYCLE CROSSINGS
AM PM AM
8:00 AM
PM
4:15 PM
PEDESTRIAN CROSSINGS PEDESTRIAN ACTIVATIONS
DATE: LOCATION: SAN MARCOS PROJECT #: ETD22-0520-01
5/19/22 NORTH & SOUTH: VIA VERA CRUZ LOCATION #: 4
THURSDAY EAST & WEST: SAN MARCOS BL CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X X
7:00 AM 5 2 4 2 34 0 2 129 9 6 268 11 472 2 2
7:15 AM 4 0 1 9 4 12 3 168 1 5 313 15 535 1 1 2
7:30 AM 4 3 3 10 9 6 5 242 3 9 363 9 666 1 3 4
7:45 AM 13 0 3 5 11 11 2 220 1 12 306 16 600 5 4 9
8:00 AM 12 1 1 15 13 15 12 221 3 18 268 21 600 7 7
8:15 AM 10 0 4 20 14 9 9 212 4 11 211 23 527 2 2
8:30 AM 6 0 6 23 5 14 7 290 4 11 257 20 643 4 5 9
8:45 AM 6 0 4 20 3 11 15 204 6 9 261 28 567 8 8
VOLUMES 60 6 26 104 93 78 55 1,686 31 81 2,247 143 4,610 0 1 11 31 43 APPROACH % 65% 7% 28% 38% 34% 28% 3% 95% 2% 3% 91% 6%
APP/DEPART 92 / 204 275 / 205 1,772 / 1,816 2,471 / 2,385 0
BEGIN PEAK HR
VOLUMES 33 4 8 39 37 44 22 851 8 44 1,250 61 2,401
APPROACH % 73% 9% 18% 33% 31% 37% 2% 97% 1% 3% 92% 5%
PEAK HR FACTOR 0.703 0.698 0.881 0.889 0.901
APP/DEPART 45 / 87 120 / 89 881 / 898 1,355 / 1,327 0
4:00 PM 13 4 17 47 19 14 15 284 42 21 187 43 706 11 11
4:15 PM 12 13 19 41 19 21 9 224 8 19 221 32 638 5 5
4:30 PM 15 8 11 52 19 12 13 271 8 1 251 36 697 1 10 11
4:45 PM 11 6 11 41 20 11 7 264 17 28 235 42 693 4 4
5:00 PM 14 12 20 40 24 15 9 344 0 17 281 35 811 6 6
5:15 PM 22 15 24 42 25 12 10 312 2 25 279 43 811 6 6
5:30 PM 19 19 17 44 25 6 14 312 3 28 250 36 773 7 7
5:45 PM 15 7 13 51 14 10 12 314 3 28 294 32 793 4 4
VOLUMES 121 84 132 358 165 101 89 2,325 83 167 1,998 299 5,922 0 0 1 53 54 APPROACH % 36% 25% 39% 57% 26% 16% 4% 93% 3% 7% 81% 12% APP/DEPART 337 / 472 624 / 415 2,497 / 2,815 2,464 / 2,220 0
BEGIN PEAK HR
VOLUMES 70 53 74 177 88 43 45 1,282 8 98 1,104 146 3,188 APPROACH % 36% 27% 38% 57% 29% 14% 3% 96% 1% 7% 82% 11% PEAK HR FACTOR 0.807 0.975 0.945 0.952 0.983
APP/DEPART 197 / 244 308 / 194 1,335 / 1,533 1,348 / 1,217 0
VIA VERA CRUZ
NORTH SIDE
SAN MARCOS BL WEST SIDE EAST SIDE SAN MARCOS BL
SOUTH SIDE
VIA VERA CRUZ
N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 1 2 3 0 1 1
7:15 AM 1 1 0 0
7:30 AM 2 2 0 2 2 1 1 6
7:45 AM 0 0 1 1
8:00 AM 0 0 0
8:15 AM 1 1 0 1 1 2
8:30 AM 3 2 5 0 0
8:45 AM 0 0 0
TOTAL 4 5 3 0 12 0 0 0 0 0 4 3 1 2 10
4:00 PM 2 2 0 1 1
4:15 PM 1 2 3 0 0
4:30 PM 1 1 0 0
4:45 PM 0 0 0
5:00 PM 1 1 0 0
5:15 PM 1 1 2 0 1 1
5:30 PM 1 1 2 0 0
5:45 PM 1 1 0 0
TOTAL 2 6 1 3 12 0 0 0 0 0 1 1 0 0 2
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
INCLUDES BIKE & PED
U-TURNS
VIA VERA CRUZ VIA VERA CRUZ SAN MARCOS BL SAN MARCOS BL
BICYCLE CROSSINGS
AM PM AM
7:15 AM
PM
5:00 PM
PEDESTRIAN CROSSINGS PEDESTRIAN ACTIVATIONS
DATE: LOCATION: SAN MARCOS PROJECT #: ETD22-0520-01
5/19/22 NORTH & SOUTH: GRAND LOCATION #: 7
THURSDAY EAST & WEST: SAN MARCOS BL CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X X
7:00 AM 7 2 8 25 5 7 4 193 4 32 340 39 666 2 2
7:15 AM 7 6 16 24 8 3 1 188 4 24 355 38 674 0
7:30 AM 8 5 13 28 9 5 6 250 12 31 362 32 761 1 1
7:45 AM 7 10 15 44 19 9 4 240 7 38 364 53 810 4 4
8:00 AM 1 5 21 41 8 2 7 242 7 43 361 56 794 6 6
8:15 AM 9 4 6 70 14 5 6 244 11 79 271 55 774 11 11
8:30 AM 9 12 15 55 16 6 4 328 8 53 375 72 953 7 1 8
8:45 AM 18 11 12 25 12 3 4 241 19 70 357 55 827 9 9
VOLUMES 66 55 106 312 91 40 36 1,926 72 370 2,785 400 6,259 0 0 39 2 41 APPROACH % 29% 24% 47% 70% 21% 9% 2% 95% 4% 10% 78% 11% APP/DEPART 227 / 491 443 / 533 2,034 / 2,344 3,555 / 2,891 0
BEGIN PEAK HR
VOLUMES 37 32 54 191 50 16 21 1,055 45 245 1,364 238 3,348 APPROACH % 30% 26% 44% 74% 19% 6% 2% 94% 4% 13% 74% 13% PEAK HR FACTOR 0.750 0.722 0.824 0.924 0.878
APP/DEPART 123 / 291 257 / 340 1,121 / 1,300 1,847 / 1,417 0 4:00 PM 26 29 48 167 30 1 7 323 31 119 233 41 1,055 2 1 3 4:15 PM 30 28 65 171 42 10 7 326 27 87 262 29 1,084 0
4:30 PM 40 29 57 164 52 6 9 307 26 79 274 33 1,076 2 2
4:45 PM 33 32 59 149 47 10 11 362 33 105 256 36 1,133 7 7 5:00 PM 40 28 63 156 51 6 14 335 44 86 238 32 1,093 6 6 5:15 PM 34 25 53 125 40 5 16 325 27 99 274 67 1,090 4 1 5 5:30 PM 26 33 47 130 41 9 4 335 31 97 289 55 1,097 4 4
5:45 PM 38 32 42 142 55 4 4 364 32 108 302 52 1,175 3 1 4 VOLUMES 267 236 434 1,204 358 51 72 2,677 251 780 2,128 345 8,803 0 0 28 3 31 APPROACH % 28% 25% 46% 75% 22% 3% 2% 89% 8% 24% 65% 11% APP/DEPART 937 / 653 1,613 / 1,389 3,000 / 4,315 3,253 / 2,446 0
BEGIN PEAK HR
VOLUMES 138 118 205 553 187 24 38 1,359 134 390 1,103 206 4,455 APPROACH % 30% 26% 44% 72% 24% 3% 2% 89% 9% 23% 65% 12% PEAK HR FACTOR 0.880 0.897 0.957 0.919 0.948
APP/DEPART 461 / 362 764 / 711 1,531 / 2,117 1,699 / 1,265 0 GRAND
NORTH SIDE
SAN MARCOS BL WEST SIDE EAST SIDE SAN MARCOS BL
SOUTH SIDE
GRAND
N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 2 2 0 1 1
7:15 AM 0 0 0
7:30 AM 1 3 4 0 1 1 2
7:45 AM 0 0 1 1
8:00 AM 1 1 1 3 0 1 1
8:15 AM 3 2 1 6 0 1 1
8:30 AM 2 2 4 0 0
8:45 AM 3 4 7 0 0
TOTAL 10 0 14 2 26 0 0 0 0 0 0 1 3 2 6
4:00 PM 4 4 1 9 0 1 1 1 3
4:15 PM 1 4 5 0 1 1
4:30 PM 2 3 1 6 0 0
4:45 PM 1 1 2 0 1 1 2
5:00 PM 3 3 0 0 1 1
5:15 PM 3 1 4 0 1 1
5:30 PM 1 1 0 0
5:45 PM 1 1 0 1 1
TOTAL 8 0 20 3 31 0 0 0 0 0 2 0 4 3 9
BICYCLE CROSSINGS
AM PM AM
8:00 AM
PM
5:00 PM
PEDESTRIAN CROSSINGS PEDESTRIAN ACTIVATIONS
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
INCLUDES BIKE & PED
U-TURNS
GRAND GRAND SAN MARCOS BL SAN MARCOS BL
THURSDAY - MAY 19, 2022 AREA: SAN MARCOS PROJECT:
VIA VERA CRUZ - GRAND AVE TO LINDA VISTA
AM NB SB EB WB PM NB SB EB WB
00:00 3 5 12:00 83 78
00:15 1 2 12:15 93 78
00:30 3 1 12:30 78 118
00:45 3 10 3 11 21 12:45 79 333 117 391 724
01:00 5 0 13:00 90 98
01:15 0 0 13:15 80 89
01:30 3 1 13:30 81 76
01:45 0 8 0 1 9 13:45 66 317 83 346 663
02:00 0 3 14:00 93 65
02:15 0 1 14:15 78 89
02:30 0 0 14:30 86 84
02:45 0 0 0 4 4 14:45 94 351 88 326 677
03:00 0 0 15:00 70 82
03:15 0 0 15:15 78 74
03:30 2 0 15:30 122 83
03:45 0 2 2 2 4 15:45 104 374 104 343 717
04:00 0 4 16:00 93 79
04:15 1 6 16:15 79 104
04:30 3 0 16:30 105 99
04:45 7 11 9 19 30 16:45 90 367 89 371 738
05:00 2 5 17:00 118 75
05:15 6 6 17:15 102 75
05:30 8 12 17:30 93 73
05:45 17 33 20 43 76 17:45 75 388 100 323 711
06:00 10 19 18:00 67 81
06:15 13 22 18:15 55 89
06:30 14 29 18:30 51 75
06:45 15 52 41 111 163 18:45 37 210 73 318 528
07:00 16 30 19:00 48 56
07:15 18 64 19:15 36 58
07:30 23 55 19:30 42 35
07:45 23 80 96 245 325 19:45 27 153 47 196 349
08:00 29 53 20:00 36 39
08:15 30 73 20:15 26 29
08:30 43 60 20:30 22 32
08:45 33 135 78 264 399 20:45 31 115 37 137 252
09:00 46 65 21:00 34 24
09:15 47 52 21:15 27 22
09:30 54 60 21:30 16 13
09:45 49 196 58 235 431 21:45 22 99 19 78 177
10:00 50 62 22:00 49 13
10:15 65 64 22:15 13 10
10:30 58 61 22:30 11 8
10:45 69 242 69 256 498 22:45 9 82 4 35 117
11:00 74 67 23:00 11 12
11:15 78 64 23:15 6 8
11:30 73 65 23:30 4 10
11:45 84 309 76 272 581 23:45 9 30 4 34 64
Total Vol. 1078 1463 2541 2819 2898 5717
NB SB EB WB Combined
3897 4361 8258
Split % 42.4% 57.6% 30.8% 49.3% 50.7% 69.2%
Peak Hour 11:45 11:45 11:45 16:30 12:30 15:30
Volume 338 350 688 415 422 768
P.H.F. 0.91 0.74 0.88 0.91 0.89 0.92
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
AM PM
Daily Totals
ETD22-0520-01
THURSDAY - MAY 19, 2022 AREA: SAN MARCOS PROJECT:
VIA VERA CRUZ - LINDA VISTA TO SAN MARCOS BL
AM NB SB EB WB PM NB SB EB WB
00:00 3 5 12:00 86 77
00:15 1 0 12:15 97 83
00:30 1 1 12:30 76 114
00:45 1 6 1 7 13 12:45 82 341 115 389 730
01:00 1 1 13:00 82 92
01:15 0 0 13:15 74 79
01:30 1 0 13:30 75 78
01:45 0 2 0 1 3 13:45 61 292 77 326 618
02:00 0 2 14:00 76 65
02:15 1 1 14:15 77 81
02:30 0 0 14:30 70 76
02:45 0 1 0 3 4 14:45 76 299 91 313 612
03:00 0 1 15:00 70 76
03:15 0 0 15:15 75 70
03:30 0 1 15:30 105 81
03:45 0 0 2 4 4 15:45 92 342 111 338 680
04:00 0 3 16:00 96 85
04:15 3 4 16:15 79 104
04:30 6 1 16:30 92 96
04:45 3 12 1 9 21 16:45 93 360 88 373 733
05:00 3 3 17:00 106 105
05:15 5 3 17:15 98 79
05:30 4 5 17:30 95 73
05:45 6 18 10 21 39 17:45 66 365 95 352 717
06:00 6 8 18:00 60 83
06:15 5 10 18:15 43 85
06:30 11 23 18:30 46 67
06:45 10 32 29 70 102 18:45 30 179 64 299 478
07:00 13 29 19:00 38 55
07:15 15 46 19:15 34 60
07:30 24 59 19:30 42 40
07:45 21 73 93 227 300 19:45 27 141 45 200 341
08:00 26 52 20:00 34 42
08:15 29 71 20:15 22 34
08:30 38 65 20:30 22 29
08:45 36 129 71 259 388 20:45 29 107 37 142 249
09:00 42 61 21:00 33 29
09:15 41 48 21:15 22 20
09:30 50 62 21:30 18 15
09:45 55 188 59 230 418 21:45 22 95 18 82 177
10:00 54 58 22:00 51 14
10:15 58 55 22:15 11 13
10:30 45 69 22:30 10 10
10:45 69 226 67 249 475 22:45 9 81 4 41 122
11:00 63 67 23:00 12 12
11:15 74 68 23:15 6 8
11:30 62 63 23:30 1 9
11:45 75 274 88 286 560 23:45 10 29 4 33 62
Total Vol. 961 1366 2327 2631 2888 5519
NB SB EB WB Combined
3592 4254 7846
Split % 41.3% 58.7% 29.7% 47.7% 52.3% 70.3%
Peak Hour 11:45 11:45 11:45 16:45 12:15 16:15
Volume 334 362 696 392 404 763
P.H.F. 0.86 0.79 0.92 0.93 0.88 0.90
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
AM PM
Daily Totals
ETD22-0520-01
THURSDAY - MAY 19, 2022 AREA: SAN MARCOS PROJECT:
GRAND AVE - LAS POSAS TO VIA VERA CRUZ
AM NB SB EB WB PM NB SB EB WB
00:00 12 25 12:00 184 161
00:15 10 9 12:15 202 188
00:30 3 11 12:30 199 207
00:45 5 30 9 54 84 12:45 185 770 227 783 1553
01:00 7 12 13:00 178 197
01:15 5 13 13:15 189 153
01:30 0 7 13:30 175 153
01:45 2 14 17 49 63 13:45 183 725 147 650 1375
02:00 3 8 14:00 188 166
02:15 8 9 14:15 180 185
02:30 3 10 14:30 237 169
02:45 7 21 6 33 54 14:45 221 826 198 718 1544
03:00 8 13 15:00 188 194
03:15 10 16 15:15 222 207
03:30 5 14 15:30 214 209
03:45 12 35 20 63 98 15:45 235 859 213 823 1682
04:00 16 20 16:00 223 212
04:15 10 12 16:15 232 186
04:30 27 9 16:30 206 207
04:45 24 77 22 63 140 16:45 241 902 199 804 1706
05:00 27 16 17:00 225 232
05:15 43 20 17:15 166 246
05:30 72 52 17:30 200 266
05:45 71 213 63 151 364 17:45 199 790 224 968 1758
06:00 78 63 18:00 172 161
06:15 82 67 18:15 178 166
06:30 92 65 18:30 148 157
06:45 103 355 118 313 668 18:45 158 656 143 627 1283
07:00 108 109 19:00 127 135
07:15 133 122 19:15 129 112
07:30 125 155 19:30 105 104
07:45 150 516 189 575 1091 19:45 114 475 109 460 935
08:00 152 160 20:00 83 87
08:15 183 134 20:15 105 82
08:30 188 149 20:30 87 81
08:45 161 684 136 579 1263 20:45 71 346 77 327 673
09:00 124 121 21:00 86 89
09:15 131 140 21:15 68 64
09:30 141 112 21:30 64 72
09:45 162 558 156 529 1087 21:45 57 275 72 297 572
10:00 144 118 22:00 52 82
10:15 151 125 22:15 38 44
10:30 147 134 22:30 33 40
10:45 156 598 154 531 1129 22:45 12 135 38 204 339
11:00 169 166 23:00 11 39
11:15 211 136 23:15 15 26
11:30 169 162 23:30 12 21
11:45 207 756 157 621 1377 23:45 6 44 25 111 155
Total Vol. 3857 3561 7418 6803 6772 13575
NB SB EB WB Combined
10660 10333 20993
Split % 52.0% 48.0% 35.3% 50.1% 49.9% 64.7%
Peak Hour 11:45 11:45 11:45 15:30 17:00 16:45
Volume 792 713 1505 904 968 1775
P.H.F. 0.96 0.86 0.93 0.96 0.91 0.95
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
AM PM
Daily Totals
ETD22-0520-01
THURSDAY - MAY 19, 2022 AREA: SAN MARCOS PROJECT:
GRAND - VIA VERA CRUZ TO LINDA VISTA
AM NB SB EB WB PM NB SB EB WB
00:00 6 3 12:00 87 98
00:15 4 1 12:15 119 107
00:30 3 2 12:30 164 93
00:45 1 14 2 8 22 12:45 162 532 108 406 938
01:00 5 5 13:00 130 90
01:15 3 3 13:15 79 98
01:30 1 0 13:30 84 83
01:45 6 15 7 15 30 13:45 75 368 75 346 714
02:00 0 3 14:00 88 97
02:15 3 2 14:15 80 102
02:30 0 4 14:30 111 106
02:45 1 4 3 12 16 14:45 135 414 102 407 821
03:00 0 3 15:00 113 104
03:15 2 1 15:15 135 97
03:30 1 1 15:30 157 98
03:45 2 5 1 6 11 15:45 155 560 109 408 968
04:00 1 0 16:00 141 114
04:15 1 1 16:15 181 91
04:30 4 1 16:30 139 114
04:45 7 13 5 7 20 16:45 154 615 106 425 1040
05:00 14 2 17:00 134 106
05:15 9 6 17:15 108 157
05:30 9 16 17:30 138 136
05:45 34 66 11 35 101 17:45 126 506 128 527 1033
06:00 28 20 18:00 82 88
06:15 29 25 18:15 58 84
06:30 22 25 18:30 54 76
06:45 31 110 42 112 222 18:45 49 243 64 312 555
07:00 37 30 19:00 60 63
07:15 37 28 19:15 44 54
07:30 48 46 19:30 41 53
07:45 57 179 47 151 330 19:45 38 183 61 231 414
08:00 60 52 20:00 32 57
08:15 73 55 20:15 40 33
08:30 80 54 20:30 26 38
08:45 60 273 67 228 501 20:45 28 126 28 156 282
09:00 42 52 21:00 35 37
09:15 54 61 21:15 25 28
09:30 63 68 21:30 28 31
09:45 73 232 88 269 501 21:45 28 116 20 116 232
10:00 71 63 22:00 18 24
10:15 57 60 22:15 15 17
10:30 73 77 22:30 13 16
10:45 75 276 85 285 561 22:45 5 51 14 71 122
11:00 70 105 23:00 9 15
11:15 89 82 23:15 10 8
11:30 72 97 23:30 5 9
11:45 71 302 80 364 666 23:45 3 27 10 42 69
Total Vol. 1489 1492 2981 3741 3447 7188
NB SB EB WB Combined
5230 4939 10169
Split % 49.9% 50.1% 29.3% 52.0% 48.0% 70.7%
Peak Hour 11:45 11:30 11:45 15:30 17:00 15:30
Volume 441 382 819 634 527 1046
P.H.F. 0.67 0.89 0.80 0.88 0.84 0.96
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
AM PM
Daily Totals
ETD22-0520-01
THURSDAY - MAY 19, 2022 AREA: SAN MARCOS PROJECT:
GRAND - BENT TO SAN MARCOS BL
AM NB SB EB WB PM NB SB EB WB
00:00 7 2 12:00 109 93
00:15 4 1 12:15 138 92
00:30 3 3 12:30 188 91
00:45 2 16 1 7 23 12:45 177 612 102 378 990
01:00 4 5 13:00 137 83
01:15 4 2 13:15 90 101
01:30 1 0 13:30 102 91
01:45 2 11 11 18 29 13:45 92 421 78 353 774
02:00 1 3 14:00 106 81
02:15 2 2 14:15 86 76
02:30 0 1 14:30 128 83
02:45 0 3 3 9 12 14:45 165 485 93 333 818
03:00 1 6 15:00 151 82
03:15 3 7 15:15 172 84
03:30 3 2 15:30 205 84
03:45 3 10 4 19 29 15:45 172 700 92 342 1042
04:00 4 1 16:00 180 89
04:15 6 5 16:15 232 78
04:30 5 5 16:30 208 88
04:45 6 21 15 26 47 16:45 194 814 86 341 1155
05:00 4 9 17:00 198 82
05:15 3 31 17:15 162 123
05:30 8 31 17:30 167 117
05:45 25 40 47 118 158 17:45 180 707 107 429 1136
06:00 14 39 18:00 129 78
06:15 15 42 18:15 87 73
06:30 28 49 18:30 69 64
06:45 41 98 63 193 291 18:45 62 347 59 274 621
07:00 35 45 19:00 64 57
07:15 32 58 19:15 49 46
07:30 65 65 19:30 53 49
07:45 74 206 79 247 453 19:45 48 214 54 206 420
08:00 57 78 20:00 42 46
08:15 87 68 20:15 36 38
08:30 83 74 20:30 33 27
08:45 57 284 78 298 582 20:45 36 147 25 136 283
09:00 52 52 21:00 40 31
09:15 60 60 21:15 27 24
09:30 63 69 21:30 26 18
09:45 72 247 79 260 507 21:45 32 125 20 93 218
10:00 74 51 22:00 15 22
10:15 78 42 22:15 19 15
10:30 78 67 22:30 16 14
10:45 85 315 85 245 560 22:45 8 58 19 70 128
11:00 82 118 23:00 10 14
11:15 98 80 23:15 12 12
11:30 90 89 23:30 5 8
11:45 87 357 96 383 740 23:45 6 33 10 44 77
Total Vol. 1608 1823 3431 4663 2999 7662
NB SB EB WB Combined
6271 4822 11093
Split % 46.9% 53.1% 30.9% 60.9% 39.1% 69.1%
Peak Hour 11:45 11:00 11:45 16:15 17:00 16:15
Volume 522 383 894 832 429 1166
P.H.F. 0.69 0.81 0.80 0.90 0.87 0.94
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
AM PM
Daily Totals
ETD22-0520-01
THURSDAY - MAY 19, 2022 AREA: SAN MARCOS PROJECT:
LINDA VISTA - VIA VERA CRUZ TO GRAND
AM NB SB EB WB PM NB SB EB WB
00:00 1 1 12:00 56 26
00:15 0 0 12:15 57 43
00:30 0 0 12:30 61 37
00:45 1 2 1 2 4 12:45 44 218 35 141 359
01:00 1 0 13:00 37 27
01:15 1 0 13:15 26 36
01:30 2 1 13:30 47 30
01:45 1 5 0 1 6 13:45 45 155 23 116 271
02:00 1 1 14:00 43 21
02:15 0 0 14:15 48 30
02:30 3 1 14:30 67 39
02:45 0 4 0 2 6 14:45 66 224 33 123 347
03:00 1 0 15:00 43 32
03:15 0 2 15:15 64 33
03:30 1 2 15:30 79 31
03:45 1 3 1 5 8 15:45 75 261 24 120 381
04:00 1 1 16:00 99 24
04:15 1 2 16:15 83 28
04:30 1 3 16:30 94 27
04:45 1 4 5 11 15 16:45 97 373 32 111 484
05:00 3 5 17:00 69 23
05:15 2 18 17:15 62 21
05:30 9 17 17:30 58 24
05:45 10 24 27 67 91 17:45 61 250 27 95 345
06:00 7 25 18:00 47 27
06:15 8 18 18:15 33 26
06:30 16 29 18:30 22 19
06:45 18 49 38 110 159 18:45 21 123 11 83 206
07:00 12 33 19:00 18 9
07:15 19 38 19:15 13 9
07:30 28 35 19:30 12 8
07:45 35 94 49 155 249 19:45 12 55 7 33 88
08:00 22 43 20:00 19 13
08:15 41 42 20:15 7 9
08:30 29 36 20:30 7 7
08:45 39 131 42 163 294 20:45 18 51 9 38 89
09:00 32 23 21:00 10 4
09:15 25 13 21:15 6 1
09:30 25 17 21:30 6 1
09:45 33 115 28 81 196 21:45 6 28 2 8 36
10:00 32 22 22:00 4 1
10:15 35 20 22:15 4 1
10:30 30 24 22:30 2 3
10:45 25 122 29 95 217 22:45 2 12 1 6 18
11:00 40 43 23:00 3 4
11:15 34 28 23:15 1 2
11:30 47 35 23:30 2 0
11:45 26 147 31 137 284 23:45 1 7 2 8 15
Total Vol. 700 829 1529 1757 882 2639
NB SB EB WB Combined
2457 1711 4168
Split % 45.8% 54.2% 36.7% 66.6% 33.4% 63.3%
Peak Hour 11:45 07:45 11:45 16:00 12:15 16:00
Volume 200 170 337 373 142 484
P.H.F. 0.82 0.87 0.84 0.94 0.83 0.94
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
AM PM
Daily Totals
ETD22-0520-01
THURSDAY - MAY 19, 2022 AREA: SAN MARCOS PROJECT:
SAN MARCOS BL - VIA VERA CRUZ TO GRAND
AM NB SB EB WB PM NB SB EB WB
00:00 68 15 12:00 276 322
00:15 56 18 12:15 296 294
00:30 24 13 12:30 292 305
00:45 15 163 4 50 213 12:45 326 1190 331 1252 2442
01:00 25 11 13:00 300 299
01:15 18 17 13:15 335 253
01:30 18 15 13:30 319 276
01:45 16 77 13 56 133 13:45 330 1284 296 1124 2408
02:00 30 7 14:00 355 299
02:15 19 11 14:15 364 305
02:30 10 27 14:30 368 331
02:45 11 70 25 70 140 14:45 375 1462 299 1234 2696
03:00 13 21 15:00 330 294
03:15 11 14 15:15 335 303
03:30 19 41 15:30 382 267
03:45 15 58 38 114 172 15:45 359 1406 272 1136 2542
04:00 20 49 16:00 349 264
04:15 24 62 16:15 296 304
04:30 35 109 16:30 327 321
04:45 32 111 146 366 477 16:45 344 1316 305 1194 2510
05:00 44 103 17:00 363 321
05:15 35 183 17:15 335 348
05:30 84 285 17:30 380 327
05:45 81 244 271 842 1086 17:45 344 1422 380 1376 2798
06:00 97 237 18:00 325 344
06:15 127 226 18:15 307 281
06:30 170 360 18:30 324 276
06:45 185 579 285 1108 1687 18:45 279 1235 231 1132 2367 07:00 183 338 19:00 263 195
07:15 181 350 19:15 287 177
07:30 247 388 19:30 275 198
07:45 214 825 356 1432 2257 19:45 242 1067 171 741 1808 08:00 243 305 20:00 233 147
08:15 268 288 20:15 213 142
08:30 322 322 20:30 186 139
08:45 258 1091 356 1271 2362 20:45 232 864 134 562 1426 09:00 204 290 21:00 225 142
09:15 242 299 21:15 180 102
09:30 226 364 21:30 171 120
09:45 242 914 287 1240 2154 21:45 152 728 111 475 1203
10:00 239 273 22:00 123 83
10:15 248 300 22:15 118 71
10:30 258 285 22:30 125 60
10:45 250 995 279 1137 2132 22:45 90 456 48 262 718
11:00 242 353 23:00 102 37
11:15 315 299 23:15 73 27
11:30 274 364 23:30 83 25
11:45 297 1128 321 1337 2465 23:45 70 328 22 111 439
Total Vol. 6255 9023 15278 12758 10599 23357
NB SB EB WB Combined
19013 19622 38635
Split % 40.9% 59.1% 39.5% 54.6% 45.4% 60.5%
Peak Hour 11:15 07:00 11:15 14:00 17:15 17:00
Volume 1162 1432 2468 1462 1399 2798
P.H.F. 0.92 0.92 0.97 0.97 0.92 0.97
PREPARED BY: ELITE TRAFFIC DYNAMICS, LLC
AM PM
Daily Totals
ETD22-0520-01
Turn Count Summary
Accurate Video Counts Inc
[email protected]
(619) 987-5136
@
0 / 1
279 / 493
19 / 25 /
/
221 / 1,015
110 / 239
0 / 1
/
//
/
Grand Avenue
Grand Avenue Bent Avenue
Location:
Date of Count:
Analysts:
Weather:
AVC Proj No:
0 0
Time Period
8:00 AM - 9:00 AM
5:00 PM - 6:00 PM 0 0PHF
0.85 0.94
0 0
2 0 229 59 8014
Grand Avenue Bent Avenue
Tuesday, November 28, 2017
LV/CD
Sunny
17-0786
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 12/3/2017 Vehicular Count
Accurate Video Counts Inc
[email protected]
(619) 987-5136
Location: @
Thru Left Right Left Right Thru TOTAL
7:00 AM 45 0 2 7 11 22 87
7:15 AM 73 1 1 11 10 33 129
7:30 AM 79 3 2 12 17 41 154
7:45 AM 73 1 3 17 14 32 140
8:00 AM 83 3 3 16 19 46 170
8:15 AM 68 3 3 18 22 54 168
8:30 AM 50 4 4 18 37 60 173
8:45 AM 78 9 4 28 32 61 212
Total 549 24 22 127 162 349 1,233
Intersection PHF : 0.85
Thru Left Right Left Right Thru
Volume 279 19 14 80 110 221 723
PHF 0.84 0.53 0.88 0.71 0.74 0.91 0.85
Movement PHF 0.85
Thru Left Right Left Right Thru TOTAL
4:00 PM 84 7 15 60 62 230 458
4:15 PM 103 7 11 65 61 274 521
4:30 PM 103 11 19 60 62 206 461
4:45 PM 137 3 19 62 60 232 513
5:00 PM 108 9 18 76 53 263 527
5:15 PM 114 5 11 50 57 258 495
5:30 PM 140 3 15 57 64 213 492
5:45 PM 131 8 15 46 65 281 546
Total 920 53 123 476 484 1,957 4,013
Intersection PHF : 0.94
Thru Left Right Left Right Thru
Volume 493 25 59 229 239 1015 2060
PHF 0.88 0.694 0.819 0.753 0.919 0.903 0.94
Movement PHF 0.94
PM Period (4:00 PM - 6:00 PM)
TOTAL
TOTAL
Westbound Northbound Eastbound
Eastbound
0.86 0.73 0.85
5:00 PM - 6:00 PM
Westbound Northbound
0.91 0.77 0.91
Westbound Northbound Eastbound
PM Intersection Peak Hour :
AM Intersection Peak Hour :
AM Period (7:00 AM - 9:00 AM)
Westbound Eastbound
Grand Avenue
8:00 AM - 9:00 AM
Bent Avenue
Northbound
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 12/3/2017
Appendix G - LOS Calculation Worksheets
Existing Conditions
HCM 6th Signalized Intersection Summary Existing Conditions 1: Las Posas Rd & Grand Ave AM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 108 202 14 109 163 368 22 258 95 359 621 453 Future Volume (veh/h) 108 202 14 109 163 368 22 258 95 359 621 453 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 115 215 13 116 173 263 23 274 90 382 661 376 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 555555555555
Cap, veh/h 237 365 22 141 221 1662 53 426 130 1651 1984 975 Arrive On Green 0.07 0.11 0.11 0.08 0.12 0.12 0.03 0.11 0.11 0.49 0.57 0.57 Sat Flow, veh/h 3374 3321 199 1739 1826 2723 1739 3754 1151 3374 3469 1514 Grp Volume(v), veh/h 115 112 116 116 173 263 23 240 124 382 661 376 Grp Sat Flow(s),veh/h/ln 1687 1735 1786 1739 1826 1362 1739 1662 1581 1687 1735 1514 Q Serve(g_s), s 4.1 7.7 7.8 8.3 11.6 1.6 1.6 8.7 9.5 8.2 12.7 14.9 Cycle Q Clear(g_c), s 4.1 7.7 7.8 8.3 11.6 1.6 1.6 8.7 9.5 8.2 12.7 14.9 Prop In Lane 1.00 0.11 1.00 1.00 1.00 0.73 1.00 1.00
Lane Grp Cap(c), veh/h 237 191 196 141 221 1662 53 377 179 1651 1984 975 V/C Ratio(X) 0.49 0.59 0.59 0.82 0.78 0.16 0.43 0.64 0.69 0.23 0.33 0.39 Avail Cap(c_a), veh/h 428 385 397 221 406 1938 221 949 452 1651 1984 975 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.96 0.96 0.96 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 56.4 53.3 53.4 57.0 53.8 2.9 60.0 53.4 53.7 18.5 14.3 10.7 Incr Delay (d2), s/veh 1.5 2.8 2.8 12.6 5.8 0.0 5.4 8.0 19.6 0.1 0.5 1.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.8 3.5 3.6 4.0 5.6 0.6 0.8 4.0 4.7 3.2 5.1 4.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 57.9 56.2 56.2 69.6 59.6 3.0 65.4 61.4 73.3 18.6 14.7 11.9 LnGrp LOS EEEEEAEEEBBB
Approach Vol, veh/h 343 552 387 1419
Approach Delay, s/veh 56.8 34.7 65.4 15.0
Approach LOS E C E B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 68.2 20.8 16.7 20.3 10.4 78.6 15.3 21.7 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 20.0 36.0 16.0 28.0 16.0 40.0 16.0 28.0 Max Q Clear Time (g_c+I1), s 10.2 11.5 10.3 9.8 3.6 16.9 6.1 13.6 Green Ext Time (p_c), s 1.0 2.1 0.1 1.0 0.0 6.4 0.2 1.6 Intersection Summary
HCM 6th Ctrl Delay 31.6
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Existing Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave AM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 357 174 130 42 148 9 56 53 13 85 255 427 Future Volume (veh/h) 357 174 130 42 148 9 56 53 13 85 255 427 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 384 187 108 45 159 9 58 59 12 91 274 351 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 405 703 479 136 559 250 186 195 165 687 287 368 Arrive On Green 0.12 0.20 0.20 0.08 0.16 0.16 0.11 0.11 0.11 0.39 0.39 0.39 Sat Flow, veh/h 3374 3469 1547 1739 3469 1547 1739 1826 1547 1739 727 931 Grp Volume(v), veh/h 384 187 108 45 159 9 58 59 12 91 0 625 Grp Sat Flow(s),veh/h/ln1687 1735 1547 1739 1735 1547 1739 1826 1547 1739 0 1658 Q Serve(g_s), s 11.3 4.5 5.2 2.4 4.0 0.5 3.1 3.0 0.7 3.3 0.0 36.6 Cycle Q Clear(g_c), s 11.3 4.5 5.2 2.4 4.0 0.5 3.1 3.0 0.7 3.3 0.0 36.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.56
Lane Grp Cap(c), veh/h 405 703 479 136 559 250 186 195 165 687 0 655 V/C Ratio(X) 0.95 0.27 0.23 0.33 0.28 0.04 0.31 0.30 0.07 0.13 0.00 0.95 Avail Cap(c_a), veh/h 405 703 479 261 559 250 278 292 248 715 0 682 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.82 0.82 0.82 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 43.7 33.6 25.6 43.6 36.9 35.4 41.3 41.2 40.2 19.3 0.0 29.4 Incr Delay (d2), s/veh 28.0 0.8 0.9 0.5 1.3 0.3 0.4 0.3 0.1 0.0 0.0 23.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln6.1 1.9 2.3 1.0 1.7 0.2 1.3 1.3 0.3 1.3 0.0 18.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 71.7 34.3 26.5 44.1 38.1 35.7 41.6 41.5 40.3 19.4 0.0 52.4 LnGrp LOS E CCDDDDDDBAD
Approach Vol, veh/h 679 213 129 716
Approach Delay, s/veh 54.2 39.3 41.4 48.2
Approach LOS DDDD
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s12.5 27.1 44.6 16.7 22.9 15.8
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 15 6.2 41.1 * 12 9.2 16.0 Max Q Clear Time (g_c+I1), s 4.4 7.2 38.6 13.3 6.0 5.1
Green Ext Time (p_c), s 0.0 0.0 0.9 0.0 0.1 0.2
Intersection Summary
HCM 6th Ctrl Delay 49.0
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Existing Conditions 3: Via Vera Cruz & Linda Vista Dr AM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 19 104 33 11 130 19 21 82 8 10 242 34 Future Volume (veh/h) 19 104 33 11 130 19 21 82 8 10 242 34 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 21 114 33 12 143 19 23 90 8 11 266 33 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 54 246 71 33 521 68 49 603 53 30 546 67
Arrive On Green 0.03 0.18 0.18 0.02 0.17 0.17 0.03 0.19 0.19 0.02 0.18 0.18 Sat Flow, veh/h 1739 1356 393 1739 3084 403 1739 3226 283 1739 3104 381 Grp Volume(v), veh/h 21 0 147 12 79 83 23 48 50 11 147 152 Grp Sat Flow(s),veh/h/ln1739 0 1749 1739 1735 1753 1739 1735 1775 1739 1735 1750 Q Serve(g_s), s 0.5 0.0 3.0 0.3 1.6 1.7 0.5 0.9 1.0 0.3 3.1 3.2 Cycle Q Clear(g_c), s 0.5 0.0 3.0 0.3 1.6 1.7 0.5 0.9 1.0 0.3 3.1 3.2 Prop In Lane 1.00 0.22 1.00 0.23 1.00 0.16 1.00 0.22
Lane Grp Cap(c), veh/h 54 0 317 33 293 296 49 324 332 30 305 308 V/C Ratio(X) 0.39 0.00 0.46 0.37 0.27 0.28 0.47 0.15 0.15 0.37 0.48 0.49 Avail Cap(c_a), veh/h 1079 0 1302 1079 1292 1306 1079 1722 1762 1079 1722 1737 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 19.1 0.0 14.7 19.5 14.6 14.6 19.3 13.7 13.7 19.6 14.9 15.0 Incr Delay (d2), s/veh 4.5 0.0 1.1 6.8 0.5 0.5 6.8 0.2 0.2 7.3 1.2 1.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.2 0.0 1.1 0.2 0.5 0.6 0.3 0.3 0.3 0.1 1.0 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 23.6 0.0 15.8 26.3 15.1 15.1 26.1 13.9 13.9 26.9 16.1 16.2 LnGrp LOS C A B C B B C B B C B B
Approach Vol, veh/h 168 174 121 310
Approach Delay, s/veh 16.8 15.9 16.2 16.5
Approach LOS BBBB
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s6.7 13.5 6.8 13.3 7.1 13.1 7.3 12.8 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 2.3 3.0 2.3 5.0 2.5 5.2 2.5 3.7 Green Ext Time (p_c), s 0.0 0.5 0.0 0.8 0.0 1.7 0.0 0.8 Intersection Summary
HCM 6th Ctrl Delay 16.4
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Existing Conditions
4: Linda Vista Dr & Grand Ave AM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Intersection
Int Delay, s/veh 3.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 254 15 156 186 4 112
Future Vol, veh/h 254 15 156 186 4 112
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 5 55555
Mvmt Flow 273 16 168 200 4 120
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 289 0 717 145
Stage 1 - - - - 281 -
Stage 2 - - - - 436 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 1248 - 358 867
Stage 1 - - - - 733 -
Stage 2 - - - - 611 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1248 - 310 867
Mov Cap-2 Maneuver - - - - 310 -
Stage 1 - - - - 733 -
Stage 2 - - - - 529 -
Approach EB WB NB
HCM Control Delay, s 0 3.8 10.2
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 816 - - 1248 -
HCM Lane V/C Ratio 0.153 - - 0.134 -
HCM Control Delay (s) 10.2 - - 8.3 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.5 - - 0.5 -
HCM 6th Signalized Intersection Summary Existing Conditions 5: S Bent Ave & Grand Ave AM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 271 96 21 251 92 17
Future Volume (veh/h) 271 96 21 251 92 17
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826
Adj Flow Rate, veh/h 295 93 23 273 100 13
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 555555
Cap, veh/h 1055 326 59 2008 226 201
Arrive On Green 0.40 0.40 0.03 0.58 0.13 0.13
Sat Flow, veh/h 2700 807 1739 3561 1739 1547
Grp Volume(v), veh/h 194 194 23 273 100 13
Grp Sat Flow(s),veh/h/ln 1735 1681 1739 1735 1739 1547
Q Serve(g_s), s 2.8 2.9 0.5 1.3 2.0 0.3
Cycle Q Clear(g_c), s 2.8 2.9 0.5 1.3 2.0 0.3
Prop In Lane 0.48 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 702 680 59 2008 226 201
V/C Ratio(X) 0.28 0.28 0.39 0.14 0.44 0.06
Avail Cap(c_a), veh/h 1076 1043 281 2008 1172 1043
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.4 7.4 17.5 3.6 14.9 14.2
Incr Delay (d2), s/veh 0.2 0.2 4.1 0.0 1.4 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.6 0.2 0.1 0.7 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 7.6 7.7 21.6 3.6 16.3 14.3
LnGrp LOS A A C A B B
Approach Vol, veh/h 388 296 113
Approach Delay, s/veh 7.6 5.0 16.0
Approach LOS A A B
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 6.5 20.8 27.3 9.8
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 2.5 4.9 3.3 4.0
Green Ext Time (p_c), s 0.0 1.9 1.1 0.3
Intersection Summary
HCM 6th Ctrl Delay 7.8
HCM 6th LOS A
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Existing Conditions 6: Via Vera Cruz & W San Marcos Blvd AM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 22 851 8 44 1250 61 33 4 8 39 37 44 Future Volume (veh/h) 22 851 8 44 1250 61 33 4 8 39 37 44 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 24 946 8 49 1389 57 37 4 8 43 41 43 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 48 2227 19 70 2187 90 82 116 102 150 55 58
Arrive On Green 0.03 0.63 0.63 0.04 0.64 0.64 0.05 0.07 0.07 0.04 0.07 0.07 Sat Flow, veh/h 1739 3525 30 1739 3394 139 1739 1735 1524 3374 809 849 Grp Volume(v), veh/h 24 466 488 49 709 737 37 4 8 43 0 84 Grp Sat Flow(s),veh/h/ln1739 1735 1820 1739 1735 1798 1739 1735 1524 1687 0 1658 Q Serve(g_s), s 1.6 16.2 16.2 3.3 29.5 29.6 2.5 0.3 0.6 1.5 0.0 6.0 Cycle Q Clear(g_c), s 1.6 16.2 16.2 3.3 29.5 29.6 2.5 0.3 0.6 1.5 0.0 6.0 Prop In Lane 1.00 0.02 1.00 0.08 1.00 1.00 1.00 0.51
Lane Grp Cap(c), veh/h 48 1096 1150 70 1118 1159 82 116 102 150 0 113 V/C Ratio(X) 0.50 0.42 0.42 0.70 0.63 0.64 0.45 0.03 0.08 0.29 0.00 0.74 Avail Cap(c_a), veh/h 225 1096 1150 225 1118 1159 232 369 324 436 0 352 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.00 0.99 Uniform Delay (d), s/veh 57.5 11.1 11.1 56.9 12.8 12.9 55.6 52.4 52.5 55.5 0.0 54.9 Incr Delay (d2), s/veh 7.9 1.2 1.2 11.9 2.7 2.7 3.8 0.1 0.3 1.0 0.0 9.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.8 5.9 6.2 1.7 10.8 11.2 1.2 0.1 0.2 0.6 0.0 2.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 65.4 12.3 12.3 68.8 15.6 15.5 59.5 52.5 52.8 56.5 0.0 63.9 LnGrp LOS E BBEBBEDDEAE
Approach Vol, veh/h 978 1495 49 127
Approach Delay, s/veh 13.6 17.3 57.8 61.4
Approach LOS BBEE
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s11.3 82.3 11.7 14.7 9.8 83.8 11.8 14.5 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 15.5 15.5 16.0 25.5 15.5 37.5 15.5 25.5 Max Q Clear Time (g_c+I1), s 5.3 18.2 4.5 8.0 3.6 31.6 3.5 2.6 Green Ext Time (p_c), s 0.0 0.0 0.0 0.3 0.0 4.0 0.1 0.0 Intersection Summary
HCM 6th Ctrl Delay 18.8
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Existing Conditions 7: Grand Ave & W San Marcos Blvd AM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 21 1055 45 245 1364 238 37 32 54 191 50 16 Future Volume (veh/h) 21 1055 45 245 1364 238 37 32 54 191 50 16 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.96 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 24 1199 40 278 1550 213 42 36 50 217 57 12 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 56 2632 946 225 2825 999 281 165 237 275 162 134 Arrive On Green 0.03 0.53 0.53 0.07 0.57 0.57 0.08 0.09 0.09 0.08 0.09 0.09 Sat Flow, veh/h 1739 4985 1547 3374 4985 1540 3374 1826 1480 3374 1826 1515 Grp Volume(v), veh/h 24 1199 40 278 1550 213 42 36 50 217 57 12 Grp Sat Flow(s),veh/h/ln1739 1662 1547 1687 1662 1540 1687 1826 1480 1687 1826 1515 Q Serve(g_s), s 1.6 17.9 1.2 8.0 23.5 1.7 1.4 2.2 2.5 7.6 3.5 0.9 Cycle Q Clear(g_c), s 1.6 17.9 1.2 8.0 23.5 1.7 1.4 2.2 2.5 7.6 3.5 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 56 2632 946 225 2825 999 281 165 237 275 162 134 V/C Ratio(X) 0.43 0.46 0.04 1.24 0.55 0.21 0.15 0.22 0.21 0.79 0.35 0.09 Avail Cap(c_a), veh/h 123 2632 946 225 2825 999 281 548 547 365 593 492 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 57.0 17.6 9.3 56.0 16.3 2.1 51.1 50.6 22.6 54.1 51.4 50.2 Incr Delay (d2), s/veh 5.1 0.6 0.1 138.4 0.8 0.5 0.2 0.7 0.4 8.2 1.3 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.8 6.5 0.4 7.6 8.4 1.0 0.6 1.0 1.1 3.4 1.6 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 62.1 18.2 9.4 194.4 17.1 2.5 51.3 51.3 23.0 62.3 52.8 50.5 LnGrp LOS E B A F B A D D C E D D
Approach Vol, veh/h 1263 2041 128 286
Approach Delay, s/veh 18.7 39.7 40.2 59.9
Approach LOS B D D E
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s10.4 75.0 17.0 17.6 15.0 70.4 16.8 17.8 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 * 7 7.0 7.0 Max Green Setting (Gmax), s 8.5 35.0 10.0 39.0 8.0 * 36 13.0 36.0 Max Q Clear Time (g_c+I1), s 3.6 25.5 3.4 5.5 10.0 19.9 9.6 4.5 Green Ext Time (p_c), s 0.0 6.7 0.0 0.3 0.0 7.1 0.2 0.3 Intersection Summary
HCM 6th Ctrl Delay 34.2
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Existing Conditions 1: Las Posas Rd & Grand Ave PM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 311 366 52 61 128 611 42 876 236 310 525 260 Future Volume (veh/h) 311 366 52 61 128 611 42 876 236 310 525 260 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 314 370 48 62 129 375 42 885 213 313 530 202 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 555555555555
Cap, veh/h 353 455 59 121 206 1043 80 1099 263 915 1736 918 Arrive On Green 0.10 0.15 0.15 0.02 0.04 0.04 0.05 0.28 0.28 0.27 0.50 0.50 Sat Flow, veh/h 3374 3082 396 1739 1826 2702 1739 3990 955 3374 3469 1510 Grp Volume(v), veh/h 314 207 211 62 129 375 42 736 362 313 530 202 Grp Sat Flow(s),veh/h/ln 1687 1735 1744 1739 1826 1351 1739 1662 1622 1687 1735 1510 Q Serve(g_s), s 10.1 12.7 12.9 3.9 7.7 2.8 2.6 22.7 22.9 8.2 9.9 6.7 Cycle Q Clear(g_c), s 10.1 12.7 12.9 3.9 7.7 2.8 2.6 22.7 22.9 8.2 9.9 6.7 Prop In Lane 1.00 0.23 1.00 1.00 1.00 0.59 1.00 1.00
Lane Grp Cap(c), veh/h 353 256 257 121 206 1043 80 915 447 915 1736 918 V/C Ratio(X) 0.89 0.81 0.82 0.51 0.63 0.36 0.53 0.80 0.81 0.34 0.31 0.22 Avail Cap(c_a), veh/h 353 307 309 182 324 1217 213 1072 523 915 1736 918 HCM Platoon Ratio 1.00 1.00 1.00 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.81 0.81 0.81 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 48.6 45.4 45.5 51.9 50.7 9.7 51.3 37.1 37.2 32.2 16.2 9.9 Incr Delay (d2), s/veh 23.3 12.6 13.7 2.7 2.5 0.2 5.2 7.5 14.7 0.2 0.5 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.3 6.2 6.4 1.8 3.7 1.6 1.2 9.7 10.5 3.4 4.0 2.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 71.9 58.0 59.2 54.6 53.2 9.9 56.5 44.6 51.8 32.4 16.6 10.5 LnGrp LOS E E E D D A E D D C B B
Approach Vol, veh/h 732 566 1140 1045
Approach Delay, s/veh 64.3 24.7 47.3 20.2
Approach LOS E C D C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 36.3 36.8 14.1 22.7 11.6 61.6 18.0 18.9 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 17.5 35.5 11.5 19.5 13.5 39.5 11.5 19.5 Max Q Clear Time (g_c+I1), s 10.2 24.9 5.9 14.9 4.6 11.9 12.1 9.7 Green Ext Time (p_c), s 0.7 4.9 0.0 0.9 0.0 4.6 0.0 1.6 Intersection Summary
HCM 6th Ctrl Delay 39.1
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Existing Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave PM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 459 300 170 76 309 15 206 174 68 222 249 294 Future Volume (veh/h) 459 300 170 76 309 15 206 174 68 222 249 294 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 478 312 135 79 322 11 198 205 55 231 259 181 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 571 1220 741 158 948 423 231 242 205 395 227 159 Arrive On Green 0.17 0.35 0.35 0.09 0.27 0.27 0.13 0.13 0.13 0.23 0.23 0.23 Sat Flow, veh/h 3374 3469 1523 1739 3469 1547 1739 1826 1547 1739 1001 699 Grp Volume(v), veh/h 478 312 135 79 322 11 198 205 55 231 0 440 Grp Sat Flow(s),veh/h/ln1687 1735 1523 1739 1735 1547 1739 1826 1547 1739 0 1700 Q Serve(g_s), s 15.1 7.0 5.5 4.8 8.2 0.6 12.3 12.1 3.5 13.0 0.0 25.0 Cycle Q Clear(g_c), s 15.1 7.0 5.5 4.8 8.2 0.6 12.3 12.1 3.5 13.0 0.0 25.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.41
Lane Grp Cap(c), veh/h 571 1220 741 158 948 423 231 242 205 395 0 386 V/C Ratio(X) 0.84 0.26 0.18 0.50 0.34 0.03 0.86 0.85 0.27 0.58 0.00 1.14 Avail Cap(c_a), veh/h 1043 1220 741 237 948 423 269 282 239 395 0 386 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.72 0.72 0.72 1.00 1.00 1.00 0.92 0.92 0.92 1.00 0.00 1.00 Uniform Delay (d), s/veh 44.2 25.4 16.0 47.6 32.0 29.2 46.7 46.6 42.9 37.9 0.0 42.5 Incr Delay (d2), s/veh 2.4 0.4 0.4 0.9 1.0 0.1 17.5 15.2 0.2 1.5 0.0 89.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln6.3 2.8 2.5 2.0 3.4 0.2 6.3 6.4 1.3 5.7 0.0 19.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 46.7 25.8 16.4 48.5 33.0 29.4 64.2 61.8 43.1 39.4 0.0 131.7 LnGrp LOS D C B D C C E E D D A F
Approach Vol, veh/h 925 412 458 671
Approach Delay, s/veh 35.2 35.9 60.6 99.9
Approach LOS D D E F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s14.7 45.5 30.1 23.3 36.9 19.7
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 15 31.3 25.0 * 34 12.3 17.0 Max Q Clear Time (g_c+I1), s 6.8 9.0 27.0 17.1 10.2 14.3 Green Ext Time (p_c), s 0.0 1.3 0.0 1.5 0.3 0.3
Intersection Summary
HCM 6th Ctrl Delay 57.6
HCM 6th LOS E
Notes
User approved pedestrian interval to be less than phase max green.
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Existing Conditions 3: Via Vera Cruz & Linda Vista Dr PM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 72 237 77 17 84 24 35 295 38 41 303 26 Future Volume (veh/h) 72 237 77 17 84 24 35 295 38 41 303 26 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 74 244 69 18 87 20 36 304 34 42 312 22 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 135 340 96 46 555 124 69 565 63 93 634 44
Arrive On Green 0.08 0.25 0.25 0.03 0.20 0.20 0.04 0.18 0.18 0.05 0.19 0.19 Sat Flow, veh/h 1739 1369 387 1739 2817 628 1739 3148 349 1739 3279 230 Grp Volume(v), veh/h 74 0 313 18 53 54 36 166 172 42 164 170 Grp Sat Flow(s),veh/h/ln1739 0 1756 1739 1735 1711 1739 1735 1763 1739 1735 1775 Q Serve(g_s), s 2.0 0.0 8.0 0.5 1.2 1.3 1.0 4.2 4.3 1.1 4.1 4.2 Cycle Q Clear(g_c), s 2.0 0.0 8.0 0.5 1.2 1.3 1.0 4.2 4.3 1.1 4.1 4.2 Prop In Lane 1.00 0.22 1.00 0.37 1.00 0.20 1.00 0.13
Lane Grp Cap(c), veh/h 135 0 436 46 342 337 69 311 316 93 335 343 V/C Ratio(X) 0.55 0.00 0.72 0.39 0.15 0.16 0.52 0.53 0.54 0.45 0.49 0.50 Avail Cap(c_a), veh/h 892 0 1080 892 1067 1053 892 1423 1447 892 1423 1456 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.6 0.0 16.8 23.3 16.2 16.2 23.0 18.2 18.2 22.4 17.5 17.5 Incr Delay (d2), s/veh 3.4 0.0 2.2 5.2 0.2 0.2 6.0 1.4 1.4 3.4 1.1 1.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.9 0.0 3.1 0.2 0.4 0.4 0.5 1.6 1.6 0.5 1.5 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 25.0 0.0 19.0 28.6 16.4 16.5 29.0 19.6 19.6 25.8 18.6 18.6 LnGrp LOS C A B C B B C B B C B B
Approach Vol, veh/h 387 125 374 376
Approach Delay, s/veh 20.2 18.2 20.5 19.4
Approach LOS C B C B
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s8.6 14.8 7.3 18.1 7.9 15.4 9.8 15.6 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 3.1 6.3 2.5 10.0 3.0 6.2 4.0 3.3 Green Ext Time (p_c), s 0.1 1.9 0.0 1.8 0.1 1.9 0.2 0.5 Intersection Summary
HCM 6th Ctrl Delay 19.9
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Existing Conditions
4: Linda Vista Dr & Grand Ave PM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Intersection
Int Delay, s/veh 5.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 614 20 92 355 14 344
Future Vol, veh/h 614 20 92 355 14 344
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 5 55555
Mvmt Flow 627 20 94 362 14 351
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 647 0 1006 324
Stage 1 - - - - 637 -
Stage 2 - - - - 369 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 914 - 233 663
Stage 1 - - - - 481 -
Stage 2 - - - - 661 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 914 - 209 663
Mov Cap-2 Maneuver - - - - 209 -
Stage 1 - - - - 481 -
Stage 2 - - - - 593 -
Approach EB WB NB
HCM Control Delay, s 0 1.9 19.3
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 611 - - 914 -
HCM Lane V/C Ratio 0.598 - - 0.103 -
HCM Control Delay (s) 19.3 - - 9.4 -
HCM Lane LOS C - - A -
HCM 95th %tile Q(veh) 4 - - 0.3 -
HCM 6th Signalized Intersection Summary Existing Conditions 5: S Bent Ave & Grand Ave PM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 771 186 33 273 173 60
Future Volume (veh/h) 771 186 33 273 173 60
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826
Adj Flow Rate, veh/h 787 170 34 279 177 46
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 555555
Cap, veh/h 1115 241 82 1977 279 248
Arrive On Green 0.39 0.39 0.05 0.57 0.16 0.16
Sat Flow, veh/h 2929 613 1739 3561 1739 1547
Grp Volume(v), veh/h 481 476 34 279 177 46
Grp Sat Flow(s),veh/h/ln 1735 1716 1739 1735 1739 1547
Q Serve(g_s), s 9.3 9.3 0.8 1.5 3.8 1.0
Cycle Q Clear(g_c), s 9.3 9.3 0.8 1.5 3.8 1.0
Prop In Lane 0.36 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 682 674 82 1977 279 248
V/C Ratio(X) 0.71 0.71 0.41 0.14 0.64 0.19
Avail Cap(c_a), veh/h 997 986 261 1977 1086 966
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 10.2 10.2 18.5 4.0 15.7 14.5
Incr Delay (d2), s/veh 1.4 1.4 3.3 0.0 2.4 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.4 2.4 0.3 0.2 1.4 0.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 11.6 11.6 21.8 4.1 18.1 14.9
LnGrp LOS B B C A B B
Approach Vol, veh/h 957 313 223
Approach Delay, s/veh 11.6 6.0 17.4
Approach LOS B A B
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 7.1 21.5 28.6 11.4
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 2.8 11.3 3.5 5.8
Green Ext Time (p_c), s 0.0 4.4 1.1 0.6
Intersection Summary
HCM 6th Ctrl Delay 11.3
HCM 6th LOS B
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Existing Conditions 6: Via Vera Cruz & W San Marcos Blvd PM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 45 1282 8 98 1104 146 70 53 74 177 88 43 Future Volume (veh/h) 45 1282 8 98 1104 146 70 53 74 177 88 43 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 46 1308 7 100 1127 134 71 54 71 181 90 39 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 59 1349 7 517 2013 239 89 140 124 227 121 52 Arrive On Green 0.03 0.38 0.38 0.30 0.64 0.64 0.05 0.08 0.08 0.07 0.10 0.10 Sat Flow, veh/h 1739 3538 19 1739 3123 371 1739 1735 1542 3374 1204 522 Grp Volume(v), veh/h 46 641 674 100 625 636 71 54 71 181 0 129 Grp Sat Flow(s),veh/h/ln1739 1735 1822 1739 1735 1759 1739 1735 1542 1687 0 1726 Q Serve(g_s), s 3.9 54.4 54.4 6.4 30.0 30.2 6.1 4.4 6.7 7.9 0.0 10.9 Cycle Q Clear(g_c), s 3.9 54.4 54.4 6.4 30.0 30.2 6.1 4.4 6.7 7.9 0.0 10.9 Prop In Lane 1.00 0.01 1.00 0.21 1.00 1.00 1.00 0.30
Lane Grp Cap(c), veh/h 59 662 695 517 1118 1134 89 140 124 227 0 173 V/C Ratio(X) 0.78 0.97 0.97 0.19 0.56 0.56 0.80 0.39 0.57 0.80 0.00 0.75 Avail Cap(c_a), veh/h 214 665 698 517 1118 1134 162 422 375 304 0 420 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.00 0.95 Uniform Delay (d), s/veh 71.9 45.5 45.5 39.3 14.8 14.8 70.4 65.4 66.4 68.9 0.0 65.6 Incr Delay (d2), s/veh 19.0 28.2 27.4 0.2 2.0 2.0 14.7 1.7 4.1 9.8 0.0 6.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln2.0 27.8 29.0 2.8 11.6 11.8 3.0 2.0 2.7 3.7 0.0 5.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 90.9 73.7 73.0 39.5 16.8 16.9 85.1 67.2 70.5 78.7 0.0 71.6 LnGrp LOS F E E D B B F EEEAE
Approach Vol, veh/h 1361 1361 196 310
Approach Delay, s/veh 73.9 18.5 74.9 75.8
Approach LOS EBEE
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s51.1 63.7 13.7 21.5 11.6 103.2 16.6 18.6 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 16.5 57.5 14.0 36.5 18.5 35.5 13.5 36.5 Max Q Clear Time (g_c+I1), s 8.4 56.4 8.1 12.9 5.9 32.2 9.9 8.7 Green Ext Time (p_c), s 0.1 0.8 0.1 0.6 0.1 2.2 0.2 0.6 Intersection Summary
HCM 6th Ctrl Delay 50.8
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Existing Conditions 7: Grand Ave & W San Marcos Blvd PM Peak Hour
Existing Conditions Synchro 11 Report
Existing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 38 1359 134 390 1103 206 138 118 205 553 187 24 Future Volume (veh/h) 38 1359 134 390 1103 206 138 118 205 553 187 24 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 40 1431 109 411 1161 175 145 124 174 582 197 20 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 66 2077 748 422 2511 1075 225 153 317 645 380 318 Arrive On Green 0.04 0.42 0.42 0.13 0.50 0.50 0.07 0.08 0.08 0.19 0.21 0.21 Sat Flow, veh/h 1739 4985 1547 3374 4985 1547 3374 1826 1478 3374 1826 1525 Grp Volume(v), veh/h 40 1431 109 411 1161 175 145 124 174 582 197 20 Grp Sat Flow(s),veh/h/ln1739 1662 1547 1687 1662 1547 1687 1826 1478 1687 1826 1525 Q Serve(g_s), s 3.4 35.2 2.9 18.2 22.6 1.6 6.3 10.0 0.0 25.3 14.4 1.6 Cycle Q Clear(g_c), s 3.4 35.2 2.9 18.2 22.6 1.6 6.3 10.0 0.0 25.3 14.4 1.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 66 2077 748 422 2511 1075 225 153 317 645 380 318 V/C Ratio(X) 0.61 0.69 0.15 0.97 0.46 0.16 0.64 0.81 0.55 0.90 0.52 0.06 Avail Cap(c_a), veh/h 226 2077 748 422 2511 1075 247 170 331 787 463 386 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 71.1 35.8 7.6 65.4 24.1 2.0 68.3 67.5 52.9 59.3 52.7 47.6 Incr Delay (d2), s/veh 8.7 1.9 0.4 37.1 0.6 0.3 4.9 22.7 1.7 12.0 1.1 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.7 14.2 1.4 9.9 8.8 0.9 2.9 5.7 6.1 11.7 6.6 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 79.8 37.7 8.0 102.4 24.7 2.3 73.2 90.3 54.6 71.3 53.8 47.7 LnGrp LOS E D A F C A E F D E D D
Approach Vol, veh/h 1580 1747 443 799
Approach Delay, s/veh 36.7 40.7 70.7 66.4
Approach LOS D D E E
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s12.2 82.6 17.0 38.2 25.8 69.0 35.7 19.6 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 6.5 7.0 7.0 Max Green Setting (Gmax), s 19.5 36.0 11.0 38.0 11.0 62.5 35.0 14.0 Max Q Clear Time (g_c+I1), s 5.4 24.6 8.3 16.4 20.2 37.2 27.3 12.0 Green Ext Time (p_c), s 0.0 6.0 0.1 1.0 0.0 11.4 1.4 0.3 Intersection Summary
HCM 6th Ctrl Delay 46.7
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
Appendix H - Cumulative Project Information
Appendix I - LOS Calculation Worksheets
Near-Term Year 2024 Base
Conditions
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 1: Las Posas Rd & Grand Ave AM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 127 210 22 109 169 411 28 282 96 432 664 469 Future Volume (veh/h) 127 210 22 109 169 411 28 282 96 432 664 469 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 135 223 21 116 180 309 30 300 91 460 706 393 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 239 370 35 141 230 1644 63 456 130 1612 1946 959 Arrive On Green 0.07 0.12 0.12 0.08 0.13 0.13 0.04 0.12 0.12 0.48 0.56 0.56 Sat Flow, veh/h 3374 3202 299 1739 1826 2723 1739 3826 1092 3374 3469 1514 Grp Volume(v), veh/h 135 120 124 116 180 309 30 258 133 460 706 393 Grp Sat Flow(s),veh/h/ln 1687 1735 1766 1739 1826 1362 1739 1662 1595 1687 1735 1514 Q Serve(g_s), s 4.9 8.3 8.4 8.3 12.0 2.0 2.1 9.3 10.1 10.4 14.1 16.3 Cycle Q Clear(g_c), s 4.9 8.3 8.4 8.3 12.0 2.0 2.1 9.3 10.1 10.4 14.1 16.3 Prop In Lane 1.00 0.17 1.00 1.00 1.00 0.68 1.00 1.00
Lane Grp Cap(c), veh/h 239 201 204 141 230 1644 63 396 190 1612 1946 959 V/C Ratio(X) 0.57 0.60 0.61 0.82 0.78 0.19 0.48 0.65 0.70 0.29 0.36 0.41 Avail Cap(c_a), veh/h 428 385 393 221 406 1906 221 949 456 1612 1946 959 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.96 0.96 0.96 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 56.7 52.9 53.0 57.0 53.4 3.1 59.6 53.0 53.3 19.9 15.3 11.5 Incr Delay (d2), s/veh 2.1 2.8 2.9 12.6 5.6 0.1 5.5 8.1 19.2 0.1 0.5 1.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 3.7 3.9 4.0 5.8 0.7 1.0 4.3 5.0 4.1 5.7 5.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 58.8 55.8 55.9 69.6 59.0 3.2 65.1 61.1 72.6 20.0 15.8 12.8 LnGrp LOS E E E E E A E E E B B B
Approach Vol, veh/h 379 605 421 1559
Approach Delay, s/veh 56.9 32.5 65.0 16.3
Approach LOS E C E B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 66.7 21.5 16.7 21.1 11.1 77.2 15.4 22.4 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 20.0 36.0 16.0 28.0 16.0 40.0 16.0 28.0 Max Q Clear Time (g_c+I1), s 12.4 12.1 10.3 10.4 4.1 18.3 6.9 14.0 Green Ext Time (p_c), s 1.1 2.2 0.1 1.1 0.0 6.7 0.2 1.8 Intersection Summary
HCM 6th Ctrl Delay 31.7
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave AM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 430 177 137 42 149 9 58 53 13 85 255 477 Future Volume (veh/h) 430 177 137 42 149 9 58 53 13 85 255 477 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 462 190 115 45 160 9 60 60 12 91 274 384 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 405 648 455 136 504 225 186 196 166 714 282 396 Arrive On Green 0.12 0.19 0.19 0.08 0.15 0.15 0.11 0.11 0.11 0.41 0.41 0.41 Sat Flow, veh/h 3374 3469 1547 1739 3469 1547 1739 1826 1547 1739 688 964 Grp Volume(v), veh/h 462 190 115 45 160 9 60 60 12 91 0 658 Grp Sat Flow(s),veh/h/ln1687 1735 1547 1739 1735 1547 1739 1826 1547 1739 0 1652 Q Serve(g_s), s 12.0 4.7 5.7 2.4 4.1 0.5 3.2 3.0 0.7 3.3 0.0 39.0 Cycle Q Clear(g_c), s 12.0 4.7 5.7 2.4 4.1 0.5 3.2 3.0 0.7 3.3 0.0 39.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.58
Lane Grp Cap(c), veh/h 405 648 455 136 504 225 186 196 166 714 0 678 V/C Ratio(X) 1.14 0.29 0.25 0.33 0.32 0.04 0.32 0.31 0.07 0.13 0.00 0.97 Avail Cap(c_a), veh/h 405 648 455 261 504 225 278 292 248 715 0 679 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.74 0.74 0.74 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 44.0 35.0 26.9 43.6 38.3 36.7 41.3 41.2 40.2 18.3 0.0 28.9 Incr Delay (d2), s/veh 83.7 0.8 1.0 0.5 1.7 0.3 0.4 0.3 0.1 0.0 0.0 27.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln9.5 2.0 2.5 1.0 1.8 0.2 1.4 1.3 0.3 1.3 0.0 19.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 127.7 35.8 27.9 44.1 39.9 37.1 41.6 41.5 40.2 18.4 0.0 55.9 LnGrp LOS F D C D D D D D D B A E
Approach Vol, veh/h 767 214 132 749
Approach Delay, s/veh 90.0 40.7 41.5 51.3
Approach LOS F D D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s12.5 25.5 46.1 16.7 21.3 15.8
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 15 6.2 41.1 * 12 9.2 16.0 Max Q Clear Time (g_c+I1), s 4.4 7.7 41.0 14.0 6.1 5.2
Green Ext Time (p_c), s 0.0 0.0 0.0 0.0 0.1 0.2
Intersection Summary
HCM 6th Ctrl Delay 65.3
HCM 6th LOS E
Notes
User approved pedestrian interval to be less than phase max green.
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 3: Via Vera Cruz & Linda Vista Dr AM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 19 104 33 11 130 19 21 84 8 10 249 34 Future Volume (veh/h) 19 104 33 11 130 19 21 84 8 10 249 34 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 21 114 33 12 143 19 23 92 8 11 274 33 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 54 246 71 33 521 68 49 604 52 30 548 65
Arrive On Green 0.03 0.18 0.18 0.02 0.17 0.17 0.03 0.19 0.19 0.02 0.18 0.18 Sat Flow, veh/h 1739 1356 393 1739 3084 403 1739 3233 278 1739 3115 371 Grp Volume(v), veh/h 21 0 147 12 79 83 23 49 51 11 151 156 Grp Sat Flow(s),veh/h/ln1739 0 1749 1739 1735 1753 1739 1735 1776 1739 1735 1752 Q Serve(g_s), s 0.5 0.0 3.0 0.3 1.6 1.7 0.5 0.9 1.0 0.3 3.2 3.2 Cycle Q Clear(g_c), s 0.5 0.0 3.0 0.3 1.6 1.7 0.5 0.9 1.0 0.3 3.2 3.2 Prop In Lane 1.00 0.22 1.00 0.23 1.00 0.16 1.00 0.21
Lane Grp Cap(c), veh/h 54 0 317 33 293 296 49 324 332 30 305 308 V/C Ratio(X) 0.39 0.00 0.46 0.37 0.27 0.28 0.47 0.15 0.15 0.37 0.50 0.51 Avail Cap(c_a), veh/h 1079 0 1302 1079 1292 1306 1079 1722 1763 1079 1722 1739 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 19.1 0.0 14.7 19.5 14.6 14.6 19.3 13.7 13.7 19.6 15.0 15.0 Incr Delay (d2), s/veh 4.5 0.0 1.1 6.8 0.5 0.5 6.8 0.2 0.2 7.3 1.2 1.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.2 0.0 1.1 0.2 0.5 0.6 0.3 0.3 0.3 0.1 1.1 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 23.6 0.0 15.8 26.3 15.1 15.1 26.1 13.9 13.9 26.9 16.2 16.3 LnGrp LOS C A B C B B C B B C B B
Approach Vol, veh/h 168 174 123 318
Approach Delay, s/veh 16.8 15.9 16.2 16.6
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s6.7 13.5 6.8 13.3 7.1 13.1 7.3 12.8 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 2.3 3.0 2.3 5.0 2.5 5.2 2.5 3.7 Green Ext Time (p_c), s 0.0 0.5 0.0 0.8 0.0 1.7 0.0 0.8 Intersection Summary
HCM 6th Ctrl Delay 16.4
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Near Term Year 2024 Base Conditions
4: Linda Vista Dr & Grand Ave AM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Intersection
Int Delay, s/veh 3.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 257 15 156 187 4 112
Future Vol, veh/h 257 15 156 187 4 112
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 276 16 168 201 4 120
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 292 0 721 146
Stage 1 - - - - 284 -
Stage 2 - - - - 437 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 1245 - 356 865
Stage 1 - - - - 730 -
Stage 2 - - - - 610 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1245 - 308 865
Mov Cap-2 Maneuver - - - - 413 -
Stage 1 - - - - 730 -
Stage 2 - - - - 528 -
Approach EB WB NB
HCM Control Delay, s 0 3.8 10.1
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 834 - - 1245 -
HCM Lane V/C Ratio 0.15 - - 0.135 -
HCM Control Delay (s) 10.1 - - 8.3 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.5 - - 0.5 -
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 5: S Bent Ave & Grand Ave AM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 274 96 21 252 92 17
Future Volume (veh/h) 274 96 21 252 92 17
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826
Adj Flow Rate, veh/h 298 93 23 274 100 13
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 5 5 5 5 5 5
Cap, veh/h 1058 324 59 2008 226 201
Arrive On Green 0.40 0.40 0.03 0.58 0.13 0.13
Sat Flow, veh/h 2707 801 1739 3561 1739 1547
Grp Volume(v), veh/h 196 195 23 274 100 13
Grp Sat Flow(s),veh/h/ln 1735 1682 1739 1735 1739 1547
Q Serve(g_s), s 2.8 2.9 0.5 1.3 2.0 0.3
Cycle Q Clear(g_c), s 2.8 2.9 0.5 1.3 2.0 0.3
Prop In Lane 0.48 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 702 680 59 2008 226 201
V/C Ratio(X) 0.28 0.29 0.39 0.14 0.44 0.06
Avail Cap(c_a), veh/h 1076 1043 281 2008 1172 1043
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.4 7.4 17.5 3.6 14.9 14.2
Incr Delay (d2), s/veh 0.2 0.2 4.1 0.0 1.4 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.6 0.2 0.1 0.7 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 7.6 7.7 21.6 3.6 16.3 14.3
LnGrp LOS A A C A B B
Approach Vol, veh/h 391 297 113
Approach Delay, s/veh 7.6 5.0 16.0
Approach LOS A A B
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 6.5 20.8 27.3 9.8
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 2.5 4.9 3.3 4.0
Green Ext Time (p_c), s 0.0 1.9 1.1 0.3
Intersection Summary
HCM 6th Ctrl Delay 7.8
HCM 6th LOS A
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 6: Via Vera Cruz & W San Marcos Blvd AM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 22 852 8 44 1257 61 33 6 8 39 44 44 Future Volume (veh/h) 22 852 8 44 1257 61 33 6 8 39 44 44 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 24 947 8 49 1397 57 37 7 8 43 49 43 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 48 2210 19 70 2172 88 82 124 109 150 65 57
Arrive On Green 0.03 0.63 0.63 0.04 0.64 0.64 0.05 0.07 0.07 0.04 0.07 0.07 Sat Flow, veh/h 1739 3525 30 1739 3395 138 1739 1735 1524 3374 890 781 Grp Volume(v), veh/h 24 466 489 49 712 742 37 7 8 43 0 92 Grp Sat Flow(s),veh/h/ln1739 1735 1820 1739 1735 1799 1739 1735 1524 1687 0 1671 Q Serve(g_s), s 1.6 16.4 16.4 3.3 30.1 30.3 2.5 0.5 0.6 1.5 0.0 6.5 Cycle Q Clear(g_c), s 1.6 16.4 16.4 3.3 30.1 30.3 2.5 0.5 0.6 1.5 0.0 6.5 Prop In Lane 1.00 0.02 1.00 0.08 1.00 1.00 1.00 0.47
Lane Grp Cap(c), veh/h 48 1088 1141 70 1110 1151 82 124 109 150 0 122 V/C Ratio(X) 0.50 0.43 0.43 0.70 0.64 0.64 0.45 0.06 0.07 0.29 0.00 0.75 Avail Cap(c_a), veh/h 225 1088 1141 225 1110 1151 232 369 324 436 0 355 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.00 0.99 Uniform Delay (d), s/veh 57.5 11.4 11.4 56.9 13.2 13.3 55.6 51.9 52.0 55.5 0.0 54.6 Incr Delay (d2), s/veh 7.9 1.2 1.2 11.9 2.9 2.8 3.8 0.2 0.3 1.0 0.0 9.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.8 6.0 6.3 1.7 11.1 11.6 1.2 0.2 0.2 0.6 0.0 3.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 65.4 12.6 12.6 68.8 16.1 16.0 59.5 52.1 52.3 56.5 0.0 63.5 LnGrp LOS E B B E B B E D D E A E
Approach Vol, veh/h 979 1503 52 135
Approach Delay, s/veh 13.9 17.8 57.4 61.3
Approach LOS B B E E
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s11.3 81.7 11.7 15.3 9.8 83.3 11.8 15.1 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 15.5 15.5 16.0 25.5 15.5 37.5 15.5 25.5 Max Q Clear Time (g_c+I1), s 5.3 18.4 4.5 8.5 3.6 32.3 3.5 2.6 Green Ext Time (p_c), s 0.0 0.0 0.0 0.3 0.0 3.6 0.1 0.0 Intersection Summary
HCM 6th Ctrl Delay 19.3
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 7: Grand Ave & W San Marcos Blvd AM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 21 1056 45 245 1371 238 37 33 54 191 53 16 Future Volume (veh/h) 21 1056 45 245 1371 238 37 33 54 191 53 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.96 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 24 1200 40 278 1558 213 42 38 50 217 60 12 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 56 2632 946 225 2825 999 281 165 237 275 162 134 Arrive On Green 0.03 0.53 0.53 0.07 0.57 0.57 0.08 0.09 0.09 0.08 0.09 0.09 Sat Flow, veh/h 1739 4985 1547 3374 4985 1540 3374 1826 1480 3374 1826 1515 Grp Volume(v), veh/h 24 1200 40 278 1558 213 42 38 50 217 60 12 Grp Sat Flow(s),veh/h/ln1739 1662 1547 1687 1662 1540 1687 1826 1480 1687 1826 1515 Q Serve(g_s), s 1.6 18.0 1.2 8.0 23.6 1.7 1.4 2.3 2.5 7.6 3.7 0.9 Cycle Q Clear(g_c), s 1.6 18.0 1.2 8.0 23.6 1.7 1.4 2.3 2.5 7.6 3.7 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 56 2632 946 225 2825 999 281 165 237 275 162 134 V/C Ratio(X) 0.43 0.46 0.04 1.24 0.55 0.21 0.15 0.23 0.21 0.79 0.37 0.09 Avail Cap(c_a), veh/h 123 2632 946 225 2825 999 281 548 547 365 593 492 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 57.0 17.6 9.3 56.0 16.4 2.1 51.1 50.7 22.6 54.1 51.5 50.2 Incr Delay (d2), s/veh 5.1 0.6 0.1 138.4 0.8 0.5 0.2 0.7 0.4 8.2 1.4 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.8 6.6 0.4 7.6 8.4 1.0 0.6 1.1 1.1 3.4 1.7 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 62.1 18.2 9.4 194.4 17.2 2.5 51.3 51.4 23.0 62.3 52.9 50.5 LnGrp LOS E B A F B A D D C E D D
Approach Vol, veh/h 1264 2049 130 289
Approach Delay, s/veh 18.7 39.7 40.4 59.8
Approach LOS B D D E
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s10.4 75.0 17.0 17.6 15.0 70.4 16.8 17.8 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 * 7 7.0 7.0 Max Green Setting (Gmax), s 8.5 35.0 10.0 39.0 8.0 * 36 13.0 36.0 Max Q Clear Time (g_c+I1), s 3.6 25.6 3.4 5.7 10.0 20.0 9.6 4.5 Green Ext Time (p_c), s 0.0 6.6 0.0 0.3 0.0 7.1 0.2 0.3 Intersection Summary
HCM 6th Ctrl Delay 34.2
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 1: Las Posas Rd & Grand Ave PM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 328 372 58 61 137 704 51 928 241 356 552 281 Future Volume (veh/h) 328 372 58 61 137 704 51 928 241 356 552 281 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 331 376 54 62 138 469 52 937 218 360 558 223 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 353 458 65 121 211 1020 88 1140 264 876 1710 906 Arrive On Green 0.10 0.15 0.15 0.02 0.04 0.04 0.05 0.28 0.28 0.26 0.49 0.49 Sat Flow, veh/h 3374 3038 433 1739 1826 2702 1739 4019 931 3374 3469 1510 Grp Volume(v), veh/h 331 213 217 62 138 469 52 774 381 360 558 223 Grp Sat Flow(s),veh/h/ln 1687 1735 1736 1739 1826 1351 1739 1662 1627 1687 1735 1510 Q Serve(g_s), s 10.7 13.1 13.3 3.9 8.2 3.6 3.2 23.9 24.1 9.7 10.7 7.7 Cycle Q Clear(g_c), s 10.7 13.1 13.3 3.9 8.2 3.6 3.2 23.9 24.1 9.7 10.7 7.7 Prop In Lane 1.00 0.25 1.00 1.00 1.00 0.57 1.00 1.00
Lane Grp Cap(c), veh/h 353 261 262 121 211 1020 88 943 462 876 1710 906 V/C Ratio(X) 0.94 0.82 0.83 0.51 0.65 0.46 0.59 0.82 0.82 0.41 0.33 0.25 Avail Cap(c_a), veh/h 353 307 308 182 324 1186 213 1072 525 876 1710 906 HCM Platoon Ratio 1.00 1.00 1.00 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.78 0.78 0.78 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 48.9 45.2 45.3 51.9 50.7 10.6 51.1 36.8 36.8 33.7 16.9 10.5 Incr Delay (d2), s/veh 32.4 13.6 15.0 2.6 2.7 0.3 6.2 8.0 15.4 0.3 0.5 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.0 6.5 6.7 1.8 4.0 2.2 1.5 10.3 11.1 4.0 4.3 2.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 81.3 58.9 60.3 54.5 53.4 10.8 57.3 44.8 52.2 34.0 17.4 11.1 LnGrp LOS F E E D D B E D D C B B
Approach Vol, veh/h 761 669 1207 1141
Approach Delay, s/veh 69.0 23.7 47.6 21.4
Approach LOS E C D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 35.1 37.7 14.1 23.1 12.1 60.7 18.0 19.2 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 17.5 35.5 11.5 19.5 13.5 39.5 11.5 19.5 Max Q Clear Time (g_c+I1), s 11.7 26.1 5.9 15.3 5.2 12.7 12.7 10.2 Green Ext Time (p_c), s 0.7 4.8 0.0 0.9 0.0 4.9 0.0 1.9 Intersection Summary
HCM 6th Ctrl Delay 39.8
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave PM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 511 302 173 76 313 15 213 174 68 222 249 385 Future Volume (veh/h) 511 302 173 76 313 15 213 174 68 222 249 385 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 532 315 138 79 326 11 202 210 55 231 259 297 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 627 1213 741 158 883 394 235 246 209 395 176 202 Arrive On Green 0.19 0.35 0.35 0.09 0.25 0.25 0.13 0.13 0.13 0.23 0.23 0.23 Sat Flow, veh/h 3374 3469 1523 1739 3469 1547 1739 1826 1547 1739 776 890 Grp Volume(v), veh/h 532 315 138 79 326 11 202 210 55 231 0 556 Grp Sat Flow(s),veh/h/ln1687 1735 1523 1739 1735 1547 1739 1826 1547 1739 0 1666 Q Serve(g_s), s 16.8 7.1 5.7 4.8 8.5 0.6 12.5 12.4 3.5 13.0 0.0 25.0 Cycle Q Clear(g_c), s 16.8 7.1 5.7 4.8 8.5 0.6 12.5 12.4 3.5 13.0 0.0 25.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.53
Lane Grp Cap(c), veh/h 627 1213 741 158 883 394 235 246 209 395 0 379 V/C Ratio(X) 0.85 0.26 0.19 0.50 0.37 0.03 0.86 0.85 0.26 0.58 0.00 1.47 Avail Cap(c_a), veh/h 1043 1213 741 237 883 394 269 282 239 395 0 379 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.70 0.70 0.70 1.00 1.00 1.00 0.92 0.92 0.92 1.00 0.00 1.00 Uniform Delay (d), s/veh 43.3 25.6 16.1 47.6 33.7 30.8 46.6 46.5 42.7 37.9 0.0 42.5 Incr Delay (d2), s/veh 2.5 0.4 0.4 0.9 1.2 0.1 18.4 16.5 0.2 1.5 0.0 224.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln7.0 2.9 2.6 2.0 3.6 0.2 6.5 6.6 1.3 5.7 0.0 33.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 45.8 26.0 16.5 48.5 34.9 30.9 65.0 63.0 42.9 39.4 0.0 267.4 LnGrp LOS D C B D C C E E D D A F
Approach Vol, veh/h 985 416 467 787
Approach Delay, s/veh 35.3 37.4 61.5 200.4
Approach LOS D D E F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s14.7 45.2 30.1 25.2 34.8 19.9
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 15 31.3 25.0 * 34 12.3 17.0 Max Q Clear Time (g_c+I1), s 6.8 9.1 27.0 18.8 10.5 14.5 Green Ext Time (p_c), s 0.0 1.4 0.0 1.7 0.2 0.3
Intersection Summary
HCM 6th Ctrl Delay 89.2
HCM 6th LOS F
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 3: Via Vera Cruz & Linda Vista Dr PM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 72 237 77 17 84 24 35 302 38 41 306 26 Future Volume (veh/h) 72 237 77 17 84 24 35 302 38 41 306 26 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 74 244 69 18 87 20 36 311 34 42 315 22 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 135 340 96 46 555 124 69 569 62 93 637 44
Arrive On Green 0.08 0.25 0.25 0.03 0.20 0.20 0.04 0.18 0.18 0.05 0.19 0.19 Sat Flow, veh/h 1739 1369 387 1739 2817 628 1739 3156 342 1739 3282 228 Grp Volume(v), veh/h 74 0 313 18 53 54 36 170 175 42 166 171 Grp Sat Flow(s),veh/h/ln1739 0 1756 1739 1735 1711 1739 1735 1764 1739 1735 1775 Q Serve(g_s), s 2.0 0.0 8.0 0.5 1.2 1.3 1.0 4.3 4.4 1.1 4.2 4.2 Cycle Q Clear(g_c), s 2.0 0.0 8.0 0.5 1.2 1.3 1.0 4.3 4.4 1.1 4.2 4.2 Prop In Lane 1.00 0.22 1.00 0.37 1.00 0.19 1.00 0.13
Lane Grp Cap(c), veh/h 135 0 436 46 341 337 69 313 318 93 337 345 V/C Ratio(X) 0.55 0.00 0.72 0.39 0.15 0.16 0.52 0.54 0.55 0.45 0.49 0.50 Avail Cap(c_a), veh/h 890 0 1079 890 1066 1051 890 1421 1445 890 1421 1454 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.7 0.0 16.8 23.4 16.2 16.3 23.0 18.2 18.2 22.4 17.5 17.5 Incr Delay (d2), s/veh 3.4 0.0 2.2 5.2 0.2 0.2 6.0 1.5 1.5 3.4 1.1 1.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.9 0.0 3.1 0.2 0.4 0.4 0.5 1.6 1.6 0.5 1.5 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 25.1 0.0 19.0 28.6 16.4 16.5 29.0 19.6 19.7 25.8 18.6 18.7 LnGrp LOS C A B C B B C B B C B B
Approach Vol, veh/h 387 125 381 379
Approach Delay, s/veh 20.2 18.2 20.6 19.4
Approach LOS C B C B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s8.6 14.8 7.3 18.1 7.9 15.5 9.8 15.6 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 3.1 6.4 2.5 10.0 3.0 6.2 4.0 3.3 Green Ext Time (p_c), s 0.1 2.0 0.0 1.8 0.1 1.9 0.2 0.5 Intersection Summary
HCM 6th Ctrl Delay 19.9
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Near Term Year 2024 Base Conditions
4: Linda Vista Dr & Grand Ave PM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Intersection
Int Delay, s/veh 5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 616 20 92 359 14 344
Future Vol, veh/h 616 20 92 359 14 344
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 629 20 94 366 14 351
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 649 0 1010 325
Stage 1 - - - - 639 -
Stage 2 - - - - 371 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 913 - 231 662
Stage 1 - - - - 480 -
Stage 2 - - - - 659 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 913 - 207 662
Mov Cap-2 Maneuver - - - - 335 -
Stage 1 - - - - 480 -
Stage 2 - - - - 591 -
Approach EB WB NB
HCM Control Delay, s 0 1.9 17.9
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 638 - - 913 -
HCM Lane V/C Ratio 0.573 - - 0.103 -
HCM Control Delay (s) 17.9 - - 9.4 -
HCM Lane LOS C - - A -
HCM 95th %tile Q(veh) 3.6 - - 0.3 -
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 5: S Bent Ave & Grand Ave PM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 773 186 33 277 173 60
Future Volume (veh/h) 773 186 33 277 173 60
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826
Adj Flow Rate, veh/h 789 170 34 283 177 46
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 5 5 5 5 5 5
Cap, veh/h 1117 241 82 1979 278 248
Arrive On Green 0.39 0.39 0.05 0.57 0.16 0.16
Sat Flow, veh/h 2930 612 1739 3561 1739 1547
Grp Volume(v), veh/h 482 477 34 283 177 46
Grp Sat Flow(s),veh/h/ln 1735 1716 1739 1735 1739 1547
Q Serve(g_s), s 9.4 9.4 0.8 1.5 3.8 1.0
Cycle Q Clear(g_c), s 9.4 9.4 0.8 1.5 3.8 1.0
Prop In Lane 0.36 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 682 675 82 1979 278 248
V/C Ratio(X) 0.71 0.71 0.41 0.14 0.64 0.19
Avail Cap(c_a), veh/h 996 985 260 1979 1085 966
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 10.2 10.2 18.5 4.0 15.7 14.6
Incr Delay (d2), s/veh 1.4 1.4 3.3 0.0 2.4 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.4 2.4 0.3 0.2 1.4 0.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 11.6 11.6 21.9 4.1 18.1 14.9
LnGrp LOS B B C A B B
Approach Vol, veh/h 959 317 223
Approach Delay, s/veh 11.6 6.0 17.5
Approach LOS B A B
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 7.1 21.6 28.6 11.4
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 2.8 11.4 3.5 5.8
Green Ext Time (p_c), s 0.0 4.4 1.2 0.6
Intersection Summary
HCM 6th Ctrl Delay 11.3
HCM 6th LOS B
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 6: Via Vera Cruz & W San Marcos Blvd PM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 45 1290 8 98 1107 146 70 60 74 177 91 43 Future Volume (veh/h) 45 1290 8 98 1107 146 70 60 74 177 91 43 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 46 1316 7 100 1130 134 71 61 71 181 93 39 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 59 1353 7 513 2009 238 89 143 127 227 124 52 Arrive On Green 0.03 0.38 0.38 0.29 0.64 0.64 0.05 0.08 0.08 0.07 0.10 0.10 Sat Flow, veh/h 1739 3538 19 1739 3124 370 1739 1735 1542 3374 1218 511 Grp Volume(v), veh/h 46 645 678 100 626 638 71 61 71 181 0 132 Grp Sat Flow(s),veh/h/ln1739 1735 1822 1739 1735 1759 1739 1735 1542 1687 0 1729 Q Serve(g_s), s 3.9 54.9 54.9 6.5 30.3 30.4 6.1 5.0 6.6 7.9 0.0 11.1 Cycle Q Clear(g_c), s 3.9 54.9 54.9 6.5 30.3 30.4 6.1 5.0 6.6 7.9 0.0 11.1 Prop In Lane 1.00 0.01 1.00 0.21 1.00 1.00 1.00 0.30
Lane Grp Cap(c), veh/h 59 663 697 513 1115 1131 89 143 127 227 0 176 V/C Ratio(X) 0.78 0.97 0.97 0.20 0.56 0.56 0.80 0.43 0.56 0.80 0.00 0.75 Avail Cap(c_a), veh/h 214 665 698 513 1115 1131 162 422 375 304 0 421 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.00 0.95 Uniform Delay (d), s/veh 71.9 45.6 45.6 39.6 15.0 15.0 70.4 65.5 66.2 68.9 0.0 65.5 Incr Delay (d2), s/veh 19.0 28.9 28.1 0.2 2.0 2.0 14.7 2.0 3.8 9.8 0.0 6.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln2.0 28.1 29.4 2.8 11.7 11.9 3.0 2.3 2.7 3.7 0.0 5.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 90.9 74.5 73.7 39.8 17.0 17.0 85.1 67.5 70.0 78.7 0.0 71.6 LnGrp LOS F E E D B B F E E E A E
Approach Vol, veh/h 1369 1364 203 313
Approach Delay, s/veh 74.6 18.7 74.5 75.7
Approach LOS E B E E
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s50.7 63.8 13.7 21.7 11.6 102.9 16.6 18.8 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 16.5 57.5 14.0 36.5 18.5 35.5 13.5 36.5 Max Q Clear Time (g_c+I1), s 8.5 56.9 8.1 13.1 5.9 32.4 9.9 8.6 Green Ext Time (p_c), s 0.1 0.5 0.1 0.6 0.1 2.0 0.2 0.7 Intersection Summary
HCM 6th Ctrl Delay 51.2
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base Conditions 7: Grand Ave & W San Marcos Blvd PM Peak Hour
Near Term Year 2024 Base Conditions Synchro 11 Report
Near Term.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 38 1367 134 390 1106 206 138 122 205 553 189 24 Future Volume (veh/h) 38 1367 134 390 1106 206 138 122 205 553 189 24 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.96 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 40 1439 109 411 1164 175 145 128 174 582 199 20 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 5 5 5 5 5 5 5 5 5 5 5 5
Cap, veh/h 66 2077 748 416 2503 1073 225 156 317 645 383 320 Arrive On Green 0.04 0.42 0.42 0.12 0.50 0.50 0.07 0.09 0.09 0.19 0.21 0.21 Sat Flow, veh/h 1739 4985 1547 3374 4985 1547 3374 1826 1479 3374 1826 1525 Grp Volume(v), veh/h 40 1439 109 411 1164 175 145 128 174 582 199 20 Grp Sat Flow(s),veh/h/ln1739 1662 1547 1687 1662 1547 1687 1826 1479 1687 1826 1525 Q Serve(g_s), s 3.4 35.5 2.9 18.2 22.7 1.6 6.3 10.3 0.0 25.3 14.5 1.6 Cycle Q Clear(g_c), s 3.4 35.5 2.9 18.2 22.7 1.6 6.3 10.3 0.0 25.3 14.5 1.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 66 2077 748 416 2503 1073 225 156 317 645 383 320 V/C Ratio(X) 0.61 0.69 0.15 0.99 0.46 0.16 0.64 0.82 0.55 0.90 0.52 0.06 Avail Cap(c_a), veh/h 226 2077 748 416 2503 1073 247 170 329 787 463 386 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 71.1 35.9 7.6 65.6 24.2 2.0 68.3 67.5 52.9 59.3 52.5 47.4 Incr Delay (d2), s/veh 8.7 1.9 0.4 40.6 0.6 0.3 4.9 24.6 1.8 12.0 1.1 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.7 14.4 1.4 10.1 8.8 0.9 2.9 5.9 6.0 11.7 6.7 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 79.8 37.8 8.1 106.3 24.9 2.4 73.2 92.1 54.7 71.3 53.6 47.5 LnGrp LOS E D A F C A E F D E D D
Approach Vol, veh/h 1588 1750 447 801
Approach Delay, s/veh 36.8 41.7 71.4 66.3
Approach LOS D D E E
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s12.2 82.3 17.0 38.5 25.5 69.0 35.7 19.8 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 6.5 7.0 7.0 Max Green Setting (Gmax), s 19.5 36.0 11.0 38.0 11.0 62.5 35.0 14.0 Max Q Clear Time (g_c+I1), s 5.4 24.7 8.3 16.5 20.2 37.5 27.3 12.3 Green Ext Time (p_c), s 0.0 6.0 0.1 1.0 0.0 11.4 1.4 0.2 Intersection Summary
HCM 6th Ctrl Delay 47.2
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
Appendix J - LOS Calculation Worksheets
Near-Term Year 2024 Base with
Project Conditions
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 1: Las Posas Rd & Grand Ave AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 127 216 22 109 176 421 28 282 96 441 664 469 Future Volume (veh/h) 127 216 22 109 176 421 28 282 96 441 664 469 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 135 230 21 116 187 320 30 300 91 469 706 393 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 555555555555
Cap, veh/h 239 385 35 141 237 1644 63 456 130 1598 1932 953 Arrive On Green 0.07 0.12 0.12 0.08 0.13 0.13 0.04 0.12 0.12 0.47 0.56 0.56 Sat Flow, veh/h 3374 3212 291 1739 1826 2723 1739 3826 1092 3374 3469 1514 Grp Volume(v), veh/h 135 123 128 116 187 320 30 258 133 469 706 393 Grp Sat Flow(s),veh/h/ln 1687 1735 1768 1739 1826 1362 1739 1662 1595 1687 1735 1514 Q Serve(g_s), s 4.9 8.5 8.6 8.3 12.5 2.1 2.1 9.3 10.1 10.7 14.3 16.5 Cycle Q Clear(g_c), s 4.9 8.5 8.6 8.3 12.5 2.1 2.1 9.3 10.1 10.7 14.3 16.5 Prop In Lane 1.00 0.16 1.00 1.00 1.00 0.68 1.00 1.00
Lane Grp Cap(c), veh/h 239 208 212 141 237 1644 63 396 190 1598 1932 953 V/C Ratio(X) 0.57 0.59 0.60 0.82 0.79 0.19 0.48 0.65 0.70 0.29 0.37 0.41 Avail Cap(c_a), veh/h 428 385 393 221 406 1895 221 949 456 1598 1932 953 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.94 0.94 0.94 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 56.7 52.5 52.6 57.0 53.1 3.2 59.6 53.0 53.3 20.3 15.5 11.8 Incr Delay (d2), s/veh 2.1 2.7 2.8 12.4 5.4 0.1 5.5 8.1 19.2 0.1 0.5 1.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 3.8 3.9 4.0 6.0 0.7 1.0 4.3 5.0 4.3 5.7 5.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 58.8 55.2 55.4 69.4 58.6 3.2 65.1 61.1 72.6 20.4 16.1 13.1 LnGrp LOS EEEEEAEEECBB
Approach Vol, veh/h 386 623 421 1568
Approach Delay, s/veh 56.5 32.1 65.0 16.6
Approach LOS E C E B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 66.2 21.5 16.7 21.6 11.1 76.7 15.4 22.9 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 20.0 36.0 16.0 28.0 16.0 40.0 16.0 28.0 Max Q Clear Time (g_c+I1), s 12.7 12.1 10.3 10.6 4.1 18.5 6.9 14.5 Green Ext Time (p_c), s 1.1 2.2 0.1 1.1 0.0 6.7 0.2 1.9 Intersection Summary
HCM 6th Ctrl Delay 31.8
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 430 186 143 42 164 11 61 54 13 88 256 477 Future Volume (veh/h) 430 186 143 42 164 11 61 54 13 88 256 477 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 462 200 122 45 176 11 62 64 12 95 275 395 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 405 645 454 136 501 223 187 197 167 715 278 400 Arrive On Green 0.12 0.19 0.19 0.08 0.14 0.14 0.11 0.11 0.11 0.41 0.41 0.41 Sat Flow, veh/h 3374 3469 1547 1739 3469 1547 1739 1826 1547 1739 678 973 Grp Volume(v), veh/h 462 200 122 45 176 11 62 64 12 95 0 670 Grp Sat Flow(s),veh/h/ln1687 1735 1547 1739 1735 1547 1739 1826 1547 1739 0 1651 Q Serve(g_s), s 12.0 5.0 6.0 2.4 4.6 0.6 3.3 3.2 0.7 3.4 0.0 40.2 Cycle Q Clear(g_c), s 12.0 5.0 6.0 2.4 4.6 0.6 3.3 3.2 0.7 3.4 0.0 40.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.59
Lane Grp Cap(c), veh/h 405 645 454 136 501 223 187 197 167 715 0 678 V/C Ratio(X) 1.14 0.31 0.27 0.33 0.35 0.05 0.33 0.33 0.07 0.13 0.00 0.99 Avail Cap(c_a), veh/h 405 645 454 261 501 223 278 292 248 715 0 678 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.70 0.70 0.70 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 44.0 35.2 27.1 43.6 38.6 36.9 41.3 41.3 40.1 18.3 0.0 29.2 Incr Delay (d2), s/veh 82.8 0.9 1.0 0.5 1.9 0.4 0.4 0.4 0.1 0.0 0.0 31.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln9.5 2.1 2.6 1.0 2.0 0.2 1.4 1.4 0.3 1.4 0.0 21.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 126.8 36.0 28.1 44.1 40.5 37.3 41.7 41.6 40.2 18.4 0.0 60.5 LnGrp LOS F DCDDDDDDBAE
Approach Vol, veh/h 784 232 138 765
Approach Delay, s/veh 88.3 41.0 41.5 55.2
Approach LOS F D D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s12.5 25.4 46.2 16.7 21.2 15.9
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 15 6.2 41.1 * 12 9.2 16.0 Max Q Clear Time (g_c+I1), s 4.4 8.0 42.2 14.0 6.6 5.3
Green Ext Time (p_c), s 0.0 0.0 0.0 0.0 0.1 0.2
Intersection Summary
HCM 6th Ctrl Delay 66.0
HCM 6th LOS E
Notes
User approved pedestrian interval to be less than phase max green.
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 3: Via Vera Cruz & Linda Vista Dr AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 19 113 33 28 140 23 21 84 23 17 249 34 Future Volume (veh/h) 19 113 33 28 140 23 21 84 23 17 249 34 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 21 124 33 31 154 23 23 92 24 19 274 33 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 54 233 62 76 548 80 49 476 120 50 542 65
Arrive On Green 0.03 0.17 0.17 0.04 0.18 0.18 0.03 0.17 0.17 0.03 0.17 0.17 Sat Flow, veh/h 1739 1385 369 1739 3035 446 1739 2744 692 1739 3115 371 Grp Volume(v), veh/h 21 0 157 31 87 90 23 57 59 19 151 156 Grp Sat Flow(s),veh/h/ln1739 0 1754 1739 1735 1746 1739 1735 1701 1739 1735 1752 Q Serve(g_s), s 0.5 0.0 3.3 0.7 1.8 1.8 0.5 1.1 1.2 0.4 3.2 3.3 Cycle Q Clear(g_c), s 0.5 0.0 3.3 0.7 1.8 1.8 0.5 1.1 1.2 0.4 3.2 3.3 Prop In Lane 1.00 0.21 1.00 0.26 1.00 0.41 1.00 0.21
Lane Grp Cap(c), veh/h 54 0 295 76 313 315 49 301 295 50 302 305 V/C Ratio(X) 0.39 0.00 0.53 0.41 0.28 0.29 0.47 0.19 0.20 0.38 0.50 0.51 Avail Cap(c_a), veh/h 1062 0 1285 1062 1271 1280 1062 1695 1663 1062 1695 1712 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 19.4 0.0 15.6 19.1 14.5 14.5 19.6 14.5 14.5 19.5 15.3 15.3 Incr Delay (d2), s/veh 4.5 0.0 1.5 3.5 0.5 0.5 6.9 0.3 0.3 4.8 1.3 1.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.2 0.0 1.3 0.3 0.6 0.6 0.3 0.4 0.4 0.2 1.1 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 23.9 0.0 17.1 22.6 14.9 15.0 26.5 14.8 14.8 24.3 16.6 16.7 LnGrp LOS C A B C B B C B B C B B
Approach Vol, veh/h 178 208 139 326
Approach Delay, s/veh 17.9 16.1 16.7 17.1
Approach LOS BBBB
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s7.2 13.1 7.8 12.9 7.2 13.1 7.3 13.4 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 2.4 3.2 2.7 5.3 2.5 5.3 2.5 3.8 Green Ext Time (p_c), s 0.0 0.6 0.0 0.9 0.0 1.7 0.0 0.9 Intersection Summary
HCM 6th Ctrl Delay 16.9
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 4: Linda Vista Dr & Grand Ave AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 3.7
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 270 38 168 192 16 119
Future Vol, veh/h 270 38 168 192 16 119
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 5 55555
Mvmt Flow 290 41 181 206 17 128
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 331 0 776 166
Stage 1 - - - - 311 -
Stage 2 - - - - 465 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 1204 - 328 840
Stage 1 - - - - 707 -
Stage 2 - - - - 590 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1204 - 279 840
Mov Cap-2 Maneuver - - - - 388 -
Stage 1 - - - - 707 -
Stage 2 - - - - 502 -
Approach EB WB NB
HCM Control Delay, s 0 4 11.1
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 738 - - 1204 -
HCM Lane V/C Ratio 0.197 - - 0.15 -
HCM Control Delay (s) 11.1 - - 8.5 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.7 - - 0.5 -
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 5: S Bent Ave & Grand Ave AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 291 98 21 267 95 17
Future Volume (veh/h) 291 98 21 267 95 17
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826
Adj Flow Rate, veh/h 316 96 23 290 103 13
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 555555
Cap, veh/h 1063 317 59 2005 229 203
Arrive On Green 0.40 0.40 0.03 0.58 0.13 0.13
Sat Flow, veh/h 2724 786 1739 3561 1739 1547
Grp Volume(v), veh/h 206 206 23 290 103 13
Grp Sat Flow(s),veh/h/ln 1735 1684 1739 1735 1739 1547
Q Serve(g_s), s 3.0 3.1 0.5 1.4 2.0 0.3
Cycle Q Clear(g_c), s 3.0 3.1 0.5 1.4 2.0 0.3
Prop In Lane 0.47 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 700 680 59 2005 229 203
V/C Ratio(X) 0.29 0.30 0.39 0.14 0.45 0.06
Avail Cap(c_a), veh/h 1074 1043 281 2005 1170 1041
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.5 7.5 17.6 3.6 14.9 14.1
Incr Delay (d2), s/veh 0.2 0.2 4.1 0.0 1.4 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.7 0.2 0.1 0.7 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 7.7 7.8 21.7 3.6 16.3 14.3
LnGrp LOS A A C A B B
Approach Vol, veh/h 412 313 116
Approach Delay, s/veh 7.7 5.0 16.1
Approach LOS A A B
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 6.5 20.8 27.3 9.9
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 2.5 5.1 3.4 4.0
Green Ext Time (p_c), s 0.0 2.0 1.2 0.3
Intersection Summary
HCM 6th Ctrl Delay 7.9
HCM 6th LOS A
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 6: Via Vera Cruz & W San Marcos Blvd AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 34 852 8 44 1257 61 33 9 8 39 47 58 Future Volume (veh/h) 34 852 8 44 1257 61 33 9 8 39 47 58 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 38 947 8 49 1397 57 37 10 8 43 52 58 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 62 2168 18 70 2102 86 82 162 113 150 66 74
Arrive On Green 0.04 0.61 0.61 0.04 0.62 0.62 0.05 0.08 0.08 0.04 0.09 0.09 Sat Flow, veh/h 1739 3525 30 1739 3395 138 1739 1938 1355 3374 782 872 Grp Volume(v), veh/h 38 466 489 49 713 741 37 9 9 43 0 110 Grp Sat Flow(s),veh/h/ln1739 1735 1820 1739 1735 1799 1739 1735 1558 1687 0 1654 Q Serve(g_s), s 2.6 17.0 17.0 3.3 31.8 32.0 2.5 0.6 0.7 1.5 0.0 7.8 Cycle Q Clear(g_c), s 2.6 17.0 17.0 3.3 31.8 32.0 2.5 0.6 0.7 1.5 0.0 7.8 Prop In Lane 1.00 0.02 1.00 0.08 1.00 0.87 1.00 0.53
Lane Grp Cap(c), veh/h 62 1067 1119 70 1074 1114 82 145 130 150 0 141 V/C Ratio(X) 0.61 0.44 0.44 0.70 0.66 0.67 0.45 0.06 0.07 0.29 0.00 0.78 Avail Cap(c_a), veh/h 225 1067 1119 225 1074 1114 232 369 331 436 0 351 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.00 0.99 Uniform Delay (d), s/veh 57.0 12.2 12.2 56.9 14.8 14.8 55.6 50.6 50.7 55.5 0.0 53.8 Incr Delay (d2), s/veh 9.2 1.3 1.2 11.9 3.2 3.2 3.8 0.2 0.2 1.0 0.0 9.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.3 6.3 6.6 1.7 12.0 12.5 1.2 0.2 0.3 0.6 0.0 3.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 66.2 13.5 13.4 68.8 18.0 17.9 59.5 50.8 50.9 56.5 0.0 62.8 LnGrp LOS E BBEBBEDDEAE
Approach Vol, veh/h 993 1503 55 153
Approach Delay, s/veh 15.5 19.6 56.6 61.0
Approach LOS BBEE
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s11.3 80.3 11.7 16.7 10.8 80.8 11.8 16.5 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 15.5 15.5 16.0 25.5 15.5 37.5 15.5 25.5 Max Q Clear Time (g_c+I1), s 5.3 19.0 4.5 9.8 4.6 34.0 3.5 2.7 Green Ext Time (p_c), s 0.0 0.0 0.0 0.4 0.0 2.5 0.1 0.0 Intersection Summary
HCM 6th Ctrl Delay 21.2
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 7: Grand Ave & W San Marcos Blvd AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 21 1056 45 245 1371 250 37 36 54 205 56 16 Future Volume (veh/h) 21 1056 45 245 1371 250 37 36 54 205 56 16 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.96 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 24 1200 40 278 1558 227 42 41 50 233 64 12 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 56 2609 939 225 2802 999 281 165 237 291 170 141 Arrive On Green 0.03 0.52 0.52 0.07 0.56 0.56 0.08 0.09 0.09 0.09 0.09 0.09 Sat Flow, veh/h 1739 4985 1547 3374 4985 1540 3374 1826 1480 3374 1826 1515 Grp Volume(v), veh/h 24 1200 40 278 1558 227 42 41 50 233 64 12 Grp Sat Flow(s),veh/h/ln1739 1662 1547 1687 1662 1540 1687 1826 1480 1687 1826 1515 Q Serve(g_s), s 1.6 18.1 1.3 8.0 23.9 1.8 1.4 2.5 2.4 8.1 4.0 0.9 Cycle Q Clear(g_c), s 1.6 18.1 1.3 8.0 23.9 1.8 1.4 2.5 2.4 8.1 4.0 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 56 2609 939 225 2802 999 281 165 237 291 170 141 V/C Ratio(X) 0.43 0.46 0.04 1.24 0.56 0.23 0.15 0.25 0.21 0.80 0.38 0.08 Avail Cap(c_a), veh/h 123 2609 939 225 2802 999 281 548 547 365 593 493 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 57.0 17.9 9.5 56.0 16.7 2.1 51.1 50.8 22.3 53.8 51.1 49.7 Incr Delay (d2), s/veh 5.1 0.6 0.1 138.4 0.8 0.5 0.2 0.8 0.4 9.8 1.4 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.8 6.6 0.4 7.6 8.5 1.0 0.6 1.2 1.1 3.8 1.8 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 62.1 18.5 9.6 194.4 17.5 2.6 51.3 51.6 22.8 63.6 52.5 50.0 LnGrp LOS E B A F B A D D C E D D
Approach Vol, veh/h 1264 2063 133 309
Approach Delay, s/veh 19.1 39.7 40.6 60.8
Approach LOS B D D E
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s10.4 74.5 17.0 18.2 15.0 69.8 17.3 17.8 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 * 7 7.0 7.0 Max Green Setting (Gmax), s 8.5 35.0 10.0 39.0 8.0 * 36 13.0 36.0 Max Q Clear Time (g_c+I1), s 3.6 25.9 3.4 6.0 10.0 20.1 10.1 4.5 Green Ext Time (p_c), s 0.0 6.5 0.0 0.3 0.0 7.1 0.2 0.4 Intersection Summary
HCM 6th Ctrl Delay 34.6
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 8: Project Dwy #1 & Grand Ave AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 0.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 280 3 6 196 11 27
Future Vol, veh/h 280 3 6 196 11 27
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 50 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 55555
Mvmt Flow 304 3 7 213 12 29
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 307 0 427 154
Stage 1 - - - - 306 -
Stage 2 - - - - 121 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 1229 - 548 855
Stage 1 - - - - 711 -
Stage 2 - - - - 882 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1229 - 545 855
Mov Cap-2 Maneuver - - - - 545 -
Stage 1 - - - - 711 -
Stage 2 - - - - 877 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 10.2
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 734 - - 1229 -
HCM Lane V/C Ratio 0.056 - - 0.005 -
HCM Control Delay (s) 10.2 - - 7.9 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.2 - - 0 -
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 9: Project Dwy #2 & Grand Ave AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 304 3 7 201 1 4
Future Vol, veh/h 304 3 7 201 1 4
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 50 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 55555
Mvmt Flow 330 3 8 218 1 4
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 333 0 457 167
Stage 1 - - - - 332 -
Stage 2 - - - - 125 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 1202 - 525 839
Stage 1 - - - - 690 -
Stage 2 - - - - 878 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1202 - 521 839
Mov Cap-2 Maneuver - - - - 580 -
Stage 1 - - - - 690 -
Stage 2 - - - - 872 -
Approach EB WB NB
HCM Control Delay, s 0 0.3 9.7
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 770 - - 1202 -
HCM Lane V/C Ratio 0.007 - - 0.006 -
HCM Control Delay (s) 9.7 - - 8 -
HCM Lane LOS A - - A -
HCM 95th %tile Q(veh) 0 - - 0 -
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 10: Linda Vista Dr & Project Dwy #3 AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 14 133 192 7 5 8
Future Vol, veh/h 14 133 192 7 5 8
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 55555
Mvmt Flow 15 145 209 8 5 9
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 217 0 - 0 388 213
Stage 1 - - - - 213 -
Stage 2 - - - - 175 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - - - 5.45 -
Critical Hdwy Stg 2 - - - - 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 1335 - - - 610 820
Stage 1 - - - - 815 -
Stage 2 - - - - 848 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1335 - - - 603 820
Mov Cap-2 Maneuver - - - - 603 -
Stage 1 - - - - 805 -
Stage 2 - - - - 848 -
Approach EB WB SB
HCM Control Delay, s 0.7 0 10.1
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1335 - - - 720
HCM Lane V/C Ratio 0.011 - - - 0.02
HCM Control Delay (s) 7.7 0 - - 10.1
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - - - 0.1
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 11: Linda Vista Dr & Project Dwy #4 AM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 0.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 9 129 195 11 6 4
Future Vol, veh/h 9 129 195 11 6 4
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 55555
Mvmt Flow 10 140 212 12 7 4
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 224 0 - 0 378 218
Stage 1 - - - - 218 -
Stage 2 - - - - 160 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - - - 5.45 -
Critical Hdwy Stg 2 - - - - 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 1327 - - - 618 814
Stage 1 - - - - 811 -
Stage 2 - - - - 861 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1327 - - - 613 814
Mov Cap-2 Maneuver - - - - 613 -
Stage 1 - - - - 805 -
Stage 2 - - - - 861 -
Approach EB WB SB
HCM Control Delay, s 0.5 0 10.4
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1327 - - - 680
HCM Lane V/C Ratio 0.007 - - - 0.016
HCM Control Delay (s) 7.7 0 - - 10.4
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - - - 0
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 1: Las Posas Rd & Grand Ave PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 328 382 58 61 146 717 51 928 241 371 552 281 Future Volume (veh/h) 328 382 58 61 146 717 51 928 241 371 552 281 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1634 1826 1826 1826 1826 Adj Flow Rate, veh/h 331 386 54 62 147 482 52 937 218 375 558 223 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 555555555555
Cap, veh/h 353 466 65 121 215 977 88 1077 250 816 1702 902 Arrive On Green 0.10 0.15 0.15 0.12 0.20 0.20 0.05 0.30 0.30 0.24 0.49 0.49 Sat Flow, veh/h 3374 3050 423 1739 1826 2703 1739 3597 834 3374 3469 1510 Grp Volume(v), veh/h 331 218 222 62 147 482 52 774 381 375 558 223 Grp Sat Flow(s),veh/h/ln 1687 1735 1738 1739 1826 1351 1739 1487 1457 1687 1735 1510 Q Serve(g_s), s 10.7 13.4 13.6 3.7 8.2 4.2 3.2 27.1 27.3 10.4 10.7 7.7 Cycle Q Clear(g_c), s 10.7 13.4 13.6 3.7 8.2 4.2 3.2 27.1 27.3 10.4 10.7 7.7 Prop In Lane 1.00 0.24 1.00 1.00 1.00 0.57 1.00 1.00
Lane Grp Cap(c), veh/h 353 265 266 121 215 977 88 890 436 816 1702 902 V/C Ratio(X) 0.94 0.82 0.83 0.51 0.68 0.49 0.59 0.87 0.87 0.46 0.33 0.25 Avail Cap(c_a), veh/h 353 307 308 182 324 1138 213 960 470 816 1702 902 HCM Platoon Ratio 1.00 1.00 1.00 1.67 1.67 1.67 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.77 0.77 0.77 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 48.9 45.1 45.2 46.9 42.3 9.3 51.1 36.5 36.6 35.6 17.0 10.6 Incr Delay (d2), s/veh 32.4 14.5 15.8 2.6 2.9 0.3 6.2 11.3 20.9 0.4 0.5 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.0 6.7 6.9 1.6 3.6 2.0 1.5 10.7 11.7 4.3 4.3 2.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 81.3 59.7 61.1 49.4 45.2 9.6 57.3 47.8 57.4 36.0 17.5 11.2 LnGrp LOS F E E D D A E D E D B B
Approach Vol, veh/h 771 691 1207 1156
Approach Delay, s/veh 69.4 20.8 51.2 22.3
Approach LOS E C D C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 33.1 39.4 14.1 23.3 12.1 60.5 18.0 19.5 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 17.5 35.5 11.5 19.5 13.5 39.5 11.5 19.5 Max Q Clear Time (g_c+I1), s 12.4 29.3 5.7 15.6 5.2 12.7 12.7 10.2 Green Ext Time (p_c), s 0.6 3.5 0.0 0.9 0.0 4.9 0.0 1.9 Intersection Summary
HCM 6th Ctrl Delay 40.6
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 511 319 181 76 327 17 221 177 68 225 250 385 Future Volume (veh/h) 511 319 181 76 327 17 221 177 68 225 250 385 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 532 332 147 79 341 13 207 216 55 234 260 298 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 627 1206 742 158 877 391 239 251 213 394 176 201 Arrive On Green 0.19 0.35 0.35 0.09 0.25 0.25 0.14 0.14 0.14 0.23 0.23 0.23 Sat Flow, veh/h 3374 3469 1523 1739 3469 1547 1739 1826 1547 1739 776 890 Grp Volume(v), veh/h 532 332 147 79 341 13 207 216 55 234 0 558 Grp Sat Flow(s),veh/h/ln1687 1735 1523 1739 1735 1547 1739 1826 1547 1739 0 1666 Q Serve(g_s), s 16.8 7.6 6.1 4.8 9.0 0.7 12.8 12.7 3.5 13.2 0.0 24.9 Cycle Q Clear(g_c), s 16.8 7.6 6.1 4.8 9.0 0.7 12.8 12.7 3.5 13.2 0.0 24.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.53
Lane Grp Cap(c), veh/h 627 1206 742 158 877 391 239 251 213 394 0 377 V/C Ratio(X) 0.85 0.28 0.20 0.50 0.39 0.03 0.87 0.86 0.26 0.59 0.00 1.48 Avail Cap(c_a), veh/h 1043 1206 742 237 877 391 270 284 241 394 0 377 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.66 0.66 0.66 1.00 1.00 1.00 0.87 0.87 0.87 1.00 0.00 1.00 Uniform Delay (d), s/veh 43.3 25.9 16.1 47.6 34.0 31.0 46.4 46.4 42.4 38.0 0.0 42.6 Incr Delay (d2), s/veh 2.4 0.4 0.4 0.9 1.3 0.2 18.3 16.9 0.2 1.7 0.0 229.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln6.9 3.1 2.7 2.0 3.8 0.3 6.6 6.8 1.3 5.8 0.0 34.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 45.6 26.3 16.5 48.5 35.3 31.1 64.8 63.3 42.6 39.7 0.0 272.3 LnGrp LOS D C B D D C E E D D A F
Approach Vol, veh/h 1011 433 478 792
Approach Delay, s/veh 35.0 37.6 61.6 203.6
Approach LOS D D E F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s14.7 45.0 30.0 25.2 34.6 20.2
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 15 31.3 24.9 * 34 12.3 17.1 Max Q Clear Time (g_c+I1), s 6.8 9.6 26.9 18.8 11.0 14.8 Green Ext Time (p_c), s 0.0 1.4 0.0 1.7 0.2 0.3
Intersection Summary
HCM 6th Ctrl Delay 89.3
HCM 6th LOS F
Notes
User approved pedestrian interval to be less than phase max green.
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 3: Via Vera Cruz & Linda Vista Dr PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 72 252 77 39 96 35 35 302 63 51 306 26 Future Volume (veh/h) 72 252 77 39 96 35 35 302 63 51 306 26 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 74 260 69 40 99 31 36 311 60 53 315 22 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 131 351 93 88 598 180 68 519 99 107 660 46
Arrive On Green 0.08 0.25 0.25 0.05 0.23 0.23 0.04 0.18 0.18 0.06 0.20 0.20 Sat Flow, veh/h 1739 1390 369 1739 2626 790 1739 2907 554 1739 3282 228 Grp Volume(v), veh/h 74 0 329 40 64 66 36 184 187 53 166 171 Grp Sat Flow(s),veh/h/ln1739 0 1759 1739 1735 1681 1739 1735 1726 1739 1735 1775 Q Serve(g_s), s 2.2 0.0 9.0 1.2 1.6 1.7 1.1 5.1 5.2 1.5 4.4 4.5 Cycle Q Clear(g_c), s 2.2 0.0 9.0 1.2 1.6 1.7 1.1 5.1 5.2 1.5 4.4 4.5 Prop In Lane 1.00 0.21 1.00 0.47 1.00 0.32 1.00 0.13
Lane Grp Cap(c), veh/h 131 0 444 88 395 383 68 310 308 107 349 357 V/C Ratio(X) 0.56 0.00 0.74 0.46 0.16 0.17 0.53 0.59 0.61 0.50 0.47 0.48 Avail Cap(c_a), veh/h 828 0 1005 828 991 960 828 1321 1315 828 1321 1352 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.4 0.0 18.0 24.2 16.3 16.3 24.8 19.8 19.9 23.9 18.5 18.6 Incr Delay (d2), s/veh 3.8 0.0 2.4 3.6 0.2 0.2 6.4 1.8 1.9 3.5 1.0 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.0 0.0 3.5 0.5 0.5 0.6 0.5 1.9 2.0 0.7 1.6 1.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 27.2 0.0 20.5 27.9 16.5 16.5 31.1 21.6 21.8 27.4 19.5 19.6 LnGrp LOS C A C C B B CCCCBB
Approach Vol, veh/h 403 170 407 390
Approach Delay, s/veh 21.7 19.2 22.6 20.6
Approach LOS C B C C
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s9.2 15.4 8.7 19.3 8.0 16.6 10.0 18.0 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 3.5 7.2 3.2 11.0 3.1 6.5 4.2 3.7 Green Ext Time (p_c), s 0.1 2.1 0.1 1.9 0.1 1.9 0.2 0.6 Intersection Summary
HCM 6th Ctrl Delay 21.3
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 4: Linda Vista Dr & Grand Ave PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 6.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 624 39 109 372 39 363
Future Vol, veh/h 624 39 109 372 39 363
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 5 55555
Mvmt Flow 637 40 111 380 40 370
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 677 0 1069 339
Stage 1 - - - - 657 -
Stage 2 - - - - 412 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 891 - 211 648
Stage 1 - - - - 469 -
Stage 2 - - - - 628 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 891 - 185 648
Mov Cap-2 Maneuver - - - - 315 -
Stage 1 - - - - 469 -
Stage 2 - - - - 550 -
Approach EB WB NB
HCM Control Delay, s 0 2.2 24
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 588 - - 891 -
HCM Lane V/C Ratio 0.698 - - 0.125 -
HCM Control Delay (s) 24 - - 9.6 -
HCM Lane LOS C - - A -
HCM 95th %tile Q(veh) 5.5 - - 0.4 -
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 5: S Bent Ave & Grand Ave PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 795 191 33 302 177 60
Future Volume (veh/h) 795 191 33 302 177 60
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826
Adj Flow Rate, veh/h 811 175 34 308 181 46
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 555555
Cap, veh/h 1133 245 82 1993 277 246
Arrive On Green 0.40 0.40 0.05 0.57 0.16 0.16
Sat Flow, veh/h 2929 612 1739 3561 1739 1547
Grp Volume(v), veh/h 496 490 34 308 181 46
Grp Sat Flow(s),veh/h/ln 1735 1716 1739 1735 1739 1547
Q Serve(g_s), s 9.7 9.7 0.8 1.7 4.0 1.0
Cycle Q Clear(g_c), s 9.7 9.7 0.8 1.7 4.0 1.0
Prop In Lane 0.36 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 693 685 82 1993 277 246
V/C Ratio(X) 0.72 0.72 0.42 0.15 0.65 0.19
Avail Cap(c_a), veh/h 983 973 257 1993 1072 954
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 10.2 10.2 18.8 4.0 16.0 14.8
Incr Delay (d2), s/veh 1.4 1.5 3.3 0.0 2.6 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.5 2.5 0.3 0.2 1.5 0.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 11.7 11.7 22.1 4.1 18.6 15.1
LnGrp LOS B B C A B B
Approach Vol, veh/h 986 342 227
Approach Delay, s/veh 11.7 5.9 17.9
Approach LOS B A B
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 7.1 22.0 29.1 11.5
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 2.8 11.7 3.7 6.0
Green Ext Time (p_c), s 0.0 4.5 1.3 0.6
Intersection Summary
HCM 6th Ctrl Delay 11.3
HCM 6th LOS B
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 6: Via Vera Cruz & W San Marcos Blvd PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 65 1290 8 98 1107 146 70 64 74 177 96 60 Future Volume (veh/h) 65 1290 8 98 1107 146 70 64 74 177 96 60 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 66 1316 7 100 1130 134 71 65 71 181 98 56 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 84 1353 7 490 1924 228 89 165 147 227 125 71 Arrive On Green 0.05 0.38 0.38 0.28 0.62 0.62 0.05 0.10 0.10 0.07 0.11 0.11 Sat Flow, veh/h 1739 3538 19 1739 3124 370 1739 1735 1543 3374 1087 621 Grp Volume(v), veh/h 66 645 678 100 626 638 71 65 71 181 0 154 Grp Sat Flow(s),veh/h/ln1739 1735 1822 1739 1735 1759 1739 1735 1543 1687 0 1708 Q Serve(g_s), s 5.6 54.9 54.9 6.6 32.6 32.7 6.1 5.3 6.5 7.9 0.0 13.2 Cycle Q Clear(g_c), s 5.6 54.9 54.9 6.6 32.6 32.7 6.1 5.3 6.5 7.9 0.0 13.2 Prop In Lane 1.00 0.01 1.00 0.21 1.00 1.00 1.00 0.36
Lane Grp Cap(c), veh/h 84 663 697 490 1068 1084 89 165 147 227 0 196 V/C Ratio(X) 0.79 0.97 0.97 0.20 0.59 0.59 0.80 0.39 0.48 0.80 0.00 0.79 Avail Cap(c_a), veh/h 214 665 698 490 1068 1084 162 422 375 304 0 416 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.94 0.00 0.94 Uniform Delay (d), s/veh 70.6 45.6 45.6 41.1 17.3 17.4 70.4 63.8 64.3 68.9 0.0 64.6 Incr Delay (d2), s/veh 15.0 28.9 28.1 0.2 2.4 2.3 14.7 1.5 2.4 9.7 0.0 6.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln2.8 28.1 29.4 2.8 12.9 13.2 3.0 2.4 2.7 3.7 0.0 6.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 85.6 74.5 73.7 41.3 19.7 19.7 85.1 65.3 66.8 78.6 0.0 71.0 LnGrp LOS F E E D B B F EEEAE
Approach Vol, veh/h 1389 1364 207 335
Approach Delay, s/veh 74.6 21.3 72.6 75.1
Approach LOS E C E E
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s48.8 63.8 13.7 23.7 13.7 98.9 16.6 20.8 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 16.5 57.5 14.0 36.5 18.5 35.5 13.5 36.5 Max Q Clear Time (g_c+I1), s 8.6 56.9 8.1 15.2 7.6 34.7 9.9 8.5 Green Ext Time (p_c), s 0.1 0.5 0.1 0.7 0.1 0.5 0.2 0.7 Intersection Summary
HCM 6th Ctrl Delay 52.5
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Near Term Year 2024 Base with Project Conditions 7: Grand Ave & W San Marcos Blvd PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 38 1367 134 390 1106 226 138 126 205 570 194 24 Future Volume (veh/h) 38 1367 134 390 1106 226 138 126 205 570 194 24 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.96 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 1826 Adj Flow Rate, veh/h 40 1439 109 411 1164 196 145 133 174 600 204 20 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 5 55555555555
Cap, veh/h 66 2077 748 393 2468 1070 225 160 309 662 396 331 Arrive On Green 0.04 0.42 0.42 0.12 0.50 0.50 0.07 0.09 0.09 0.20 0.22 0.22 Sat Flow, veh/h 1739 4985 1547 3374 4985 1547 3374 1826 1480 3374 1826 1525 Grp Volume(v), veh/h 40 1439 109 411 1164 196 145 133 174 600 204 20 Grp Sat Flow(s),veh/h/ln1739 1662 1547 1687 1662 1547 1687 1826 1480 1687 1826 1525 Q Serve(g_s), s 3.4 35.5 3.0 17.5 23.1 1.8 6.3 10.8 0.0 26.1 14.8 1.6 Cycle Q Clear(g_c), s 3.4 35.5 3.0 17.5 23.1 1.8 6.3 10.8 0.0 26.1 14.8 1.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 66 2077 748 393 2468 1070 225 160 309 662 396 331 V/C Ratio(X) 0.61 0.69 0.15 1.05 0.47 0.18 0.64 0.83 0.56 0.91 0.51 0.06 Avail Cap(c_a), veh/h 226 2077 748 393 2468 1070 247 170 318 787 463 386 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 71.1 35.9 7.8 66.3 24.9 2.1 68.3 67.4 53.6 58.9 51.8 46.6 Incr Delay (d2), s/veh 8.7 1.9 0.4 58.2 0.6 0.4 4.9 27.1 2.1 12.7 1.0 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.7 14.4 1.4 10.6 9.0 1.0 2.9 6.2 6.1 12.1 6.8 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 79.8 37.8 8.2 124.5 25.6 2.5 73.2 94.5 55.7 71.7 52.8 46.7 LnGrp LOS E D A F C A E F E E D D
Approach Vol, veh/h 1588 1771 452 824
Approach Delay, s/veh 36.8 46.0 72.7 66.4
Approach LOS D D E E
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s12.2 81.3 17.0 39.5 24.5 69.0 36.4 20.1 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 6.5 7.0 7.0 Max Green Setting (Gmax), s 19.5 36.0 11.0 38.0 11.0 62.5 35.0 14.0 Max Q Clear Time (g_c+I1), s 5.4 25.1 8.3 16.8 19.5 37.5 28.1 12.8 Green Ext Time (p_c), s 0.0 5.9 0.1 1.0 0.0 11.4 1.3 0.2 Intersection Summary
HCM 6th Ctrl Delay 49.1
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 8: Project Dwy #1 & Grand Ave PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 648 9 20 386 4 8
Future Vol, veh/h 648 9 20 386 4 8
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 50 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 55555
Mvmt Flow 704 10 22 420 4 9
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 714 0 963 357
Stage 1 - - - - 709 -
Stage 2 - - - - 254 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 862 - 248 631
Stage 1 - - - - 441 -
Stage 2 - - - - 756 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 862 - 242 631
Mov Cap-2 Maneuver - - - - 242 -
Stage 1 - - - - 441 -
Stage 2 - - - - 736 -
Approach EB WB NB
HCM Control Delay, s 0 0.5 14
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 411 - - 862 -
HCM Lane V/C Ratio 0.032 - - 0.025 -
HCM Control Delay (s) 14 - - 9.3 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.1 - - 0.1 -
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 9: Project Dwy #2 & Grand Ave PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 652 4 10 401 5 11
Future Vol, veh/h 652 4 10 401 5 11
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 50 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 55555
Mvmt Flow 709 4 11 436 5 12
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 713 0 951 357
Stage 1 - - - - 711 -
Stage 2 - - - - 240 -
Critical Hdwy - - 4.2 - 6.9 7
Critical Hdwy Stg 1 - - - - 5.9 -
Critical Hdwy Stg 2 - - - - 5.9 -
Follow-up Hdwy - - 2.25 - 3.55 3.35
Pot Cap-1 Maneuver - - 863 - 253 631
Stage 1 - - - - 440 -
Stage 2 - - - - 768 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 863 - 250 631
Mov Cap-2 Maneuver - - - - 354 -
Stage 1 - - - - 440 -
Stage 2 - - - - 758 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 12.4
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 507 - - 863 -
HCM Lane V/C Ratio 0.034 - - 0.013 -
HCM Control Delay (s) 12.4 - - 9.2 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.1 - - 0 -
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 10: Linda Vista Dr & Project Dwy #3 PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 0.9
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 21 388 136 9 10 22
Future Vol, veh/h 21 388 136 9 10 22
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 55555
Mvmt Flow 23 422 148 10 11 24
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 158 0 - 0 621 153
Stage 1 - - - - 153 -
Stage 2 - - - - 468 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - - - 5.45 -
Critical Hdwy Stg 2 - - - - 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 1403 - - - 446 885
Stage 1 - - - - 868 -
Stage 2 - - - - 624 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1403 - - - 437 885
Mov Cap-2 Maneuver - - - - 437 -
Stage 1 - - - - 850 -
Stage 2 - - - - 624 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 10.7
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1403 - - - 670
HCM Lane V/C Ratio 0.016 - - - 0.052
HCM Control Delay (s) 7.6 0 - - 10.7
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0.1 - - - 0.2
HCM 6th TWSC Near Term Year 2024 Base with Project Conditions 11: Linda Vista Dr & Project Dwy #4 PM Peak Hour
Near Term Year 2024 Base with Project Conditions Synchro 11 Report NT+P.syn
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 13 385 133 15 17 12
Future Vol, veh/h 13 385 133 15 17 12
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 55555
Mvmt Flow 14 418 145 16 18 13
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 161 0 - 0 599 153
Stage 1 - - - - 153 -
Stage 2 - - - - 446 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - - - 5.45 -
Critical Hdwy Stg 2 - - - - 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 1400 - - - 460 885
Stage 1 - - - - 868 -
Stage 2 - - - - 639 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1400 - - - 454 885
Mov Cap-2 Maneuver - - - - 454 -
Stage 1 - - - - 857 -
Stage 2 - - - - 639 -
Approach EB WB SB
HCM Control Delay, s 0.2 0 11.7
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1400 - - - 569
HCM Lane V/C Ratio 0.01 - - - 0.055
HCM Control Delay (s) 7.6 0 - - 11.7
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - - - 0.2
Appendix K - Transportation Forecast
Information Center (TFIC) Volumes
and Horizon Year 2050 Volume
Development
Year 2025
Year 2050
INTID Name NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR N S E W N Leg S Leg E Leg W Leg N Leg S Leg E Leg W Leg N Leg S Leg E Leg W Leg NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 S Las Posas Rd & Grand Ave 22 258 95 359 621 453 108 202 14 109 163 368 1433 375 640 324 44200 21000 14500 19500 45000 22100 15000 20000 1.02 1.05 1.03 1.03 29 264 102 368 630 462 111 205 21 117 170 3752 SR-78 Ramps/Via Vera Cruz & Grand Ave 56 53 13 85 255 427 357 174 130 42 148 9 767 122 199 661 20800 12500 9600 14500 23200 12600 12000 15000 1.12 1.01 1.25 1.03 56 53 13 119 282 455 365 182 145 58 164 273 Via Vera Cruz & Linda Vista Drive 21 82 8 10 242 34 19 104 33 11 130 19 286 111 160 156 11700 8400 7900 7300 12200 9200 8400 7800 1.04 1.10 1.06 1.07 25 85 12 14 246 38 22 108 36 14 133 224 Grand Ave & Linda Vista Drive 4 0 112 0 0 0 0 254 15 156 186 0 0 116 342 269 0 5800 11900 8700 0 6700 14100 10700 0.00 1.16 1.18 1.23 13 0 121 0 0 0 0 285 46 187 219 0 5 Grand Ave & S Bent Ave 92 0 17 0 0 0 0 271 96 21 251 0 0 109 272 367 0 5900 8900 11900 0 6000 10600 14100 0.00 1.02 1.19 1.18 93 0 18 0 0 0 0 308 120 45 279 0 6 Via Vera Cruz & W San Marcos Bl 33 4 8 39 37 44 22 851 8 44 1250 61 120 45 1355 881 5600 7100 37700 38200 6400 7200 40000 40500 1.14 1.01 1.06 1.06 33 4 8 45 43 50 41 868 34 70 1277 907 Grand Ave & W San Marcos Bl 37 32 54 191 50 16 21 1055 45 245 1364 238 257 123 1847 1121 10500 11600 49900 34700 12200 22500 56200 36600 1.16 1.94 1.13 1.05 73 72 93 202 70 27 38 1071 152 354 1423 303 NCHRP Calculations for Intersection Turning Movements - Horizon Year 2024 (AM Peak) Existing Movement Volume Directional volume Exisitng ADT Future ADT Growth (%) Future Movement INTID Name NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR N S E W N Leg S Leg E Leg W Leg N Leg S Leg E Leg W Leg N Leg S Leg E Leg W Leg NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 S Las Posas Rd & Grand Ave 42 876 236 310 525 260 311 366 52 61 128 611 1095 1154 800 729 44200 21000 14500 19500 45000 22100 15000 20000 1.02 1.05 1.03 1.00 62 896 256 317 532 267 311 366 61 70 137 6202 SR-78 Ramps/Via Vera Cruz & Grand Ave 206 174 68 222 249 294 459 300 170 76 309 15 765 448 400 929 20800 12500 9600 14500 23200 12600 12000 15000 1.12 1.01 1.25 1.03 207 175 69 256 276 322 470 312 200 108 342 503 Via Vera Cruz & Linda Vista Drive 35 295 38 41 303 26 72 237 77 17 84 24 370 368 125 386 11700 8400 7900 7300 12200 9200 8400 7800 1.04 1.10 1.06 1.07 47 307 50 46 308 31 81 246 80 20 87 274 Grand Ave & Linda Vista Drive 14 0 344 0 0 0 0 614 20 92 355 0 0 358 447 634 0 5800 11900 8700 0 6700 14100 10700 0.00 1.16 1.18 1.23 42 0 371 0 0 0 0 688 61 132 398 0 5 Grand Ave & S Bent Ave 173 0 60 0 0 0 0 771 186 33 273 0 0 233 306 957 0 5900 8900 11900 0 6000 10600 14100 0.00 1.02 1.19 1.18 175 0 62 0 0 0 0 866 213 60 304 0 6 Via Vera Cruz & W San Marcos Bl 70 53 74 177 88 43 45 1282 8 98 1104 146 308 197 1348 1335 5600 7100 37700 38200 6400 7200 40000 40500 1.14 1.01 1.06 1.06 71 54 75 192 102 58 74 1309 34 124 1131 1757 Grand Ave & W San Marcos Bl 138 118 205 553 187 24 38 1359 134 390 1103 206 764 461 1699 1531 10500 11600 49900 34700 12200 22500 56200 36600 1.16 1.94 1.13 1.05 275 269 351 587 245 56 61 1381 232 490 1157 266 NCHRP Calculations for Intersection Turning Movements - Horizon Year 2024 (PM Peak) Existing Movement Volume Directional volume Exisitng ADT Future ADT Growth (%) Future Movement Appendix L - LOS Calculation Worksheets
Horizon Year 2050 Conditions
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 1: Las Posas Rd & Grand Ave AM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 125 210 25 120 175 400 30 285 105 415 665 470 Future Volume (veh/h) 125 210 25 120 175 400 30 285 105 415 665 470 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 132 221 24 126 184 295 32 300 100 437 700 390 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 244 358 38 152 235 1682 67 459 143 1650 1990 981 Arrive On Green 0.07 0.11 0.11 0.09 0.13 0.13 0.04 0.12 0.12 0.48 0.56 0.56 Sat Flow, veh/h 3456 3231 347 1781 1870 2790 1781 3827 1195 3456 3554 1551 Grp Volume(v), veh/h 132 120 125 126 184 295 32 265 135 437 700 390 Grp Sat Flow(s),veh/h/ln 1728 1777 1801 1781 1870 1395 1781 1702 1618 1728 1777 1551 Q Serve(g_s), s 4.7 8.1 8.3 8.8 12.0 1.8 2.2 9.3 10.1 9.5 13.6 15.6 Cycle Q Clear(g_c), s 4.7 8.1 8.3 8.8 12.0 1.8 2.2 9.3 10.1 9.5 13.6 15.6 Prop In Lane 1.00 0.19 1.00 1.00 1.00 0.74 1.00 1.00
Lane Grp Cap(c), veh/h 244 197 199 152 235 1682 67 408 194 1650 1990 981 V/C Ratio(X) 0.54 0.61 0.62 0.83 0.78 0.18 0.48 0.65 0.70 0.26 0.35 0.40 Avail Cap(c_a), veh/h 439 395 400 226 416 1952 226 973 462 1650 1990 981 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.97 0.97 0.97 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 56.6 53.4 53.5 56.7 53.5 3.1 59.4 52.9 53.2 19.7 15.2 11.5 Incr Delay (d2), s/veh 1.9 3.1 3.2 14.3 5.5 0.0 5.3 7.7 18.8 0.1 0.5 1.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 3.8 3.9 4.5 5.9 0.7 1.1 4.3 5.0 3.9 5.6 5.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 58.4 56.5 56.7 71.0 59.0 3.2 64.7 60.6 72.1 19.8 15.7 12.7 LnGrp LOS E E E E E A E E E B B B
Approach Vol, veh/h 377 605 432 1527
Approach Delay, s/veh 57.2 34.3 64.5 16.1
Approach LOS E C E B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 66.7 21.6 17.3 20.5 11.2 77.1 15.4 22.3 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 20.0 36.0 16.0 28.0 16.0 40.0 16.0 28.0 Max Q Clear Time (g_c+I1), s 11.5 12.1 10.8 10.3 4.2 17.6 6.7 14.0 Green Ext Time (p_c), s 1.1 2.3 0.1 1.1 0.0 6.7 0.2 1.8 Intersection Summary
HCM 6th Ctrl Delay 32.2
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave AM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 415 190 145 60 170 30 60 55 15 120 285 470 Future Volume (veh/h) 415 190 145 60 170 30 60 55 15 120 285 470 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 437 200 121 63 179 31 60 61 14 126 300 369 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 415 767 512 162 663 296 191 201 170 657 282 346 Arrive On Green 0.12 0.22 0.22 0.09 0.19 0.19 0.11 0.11 0.11 0.37 0.37 0.37 Sat Flow, veh/h 3456 3554 1585 1781 3554 1585 1781 1870 1585 1781 763 938 Grp Volume(v), veh/h 437 200 121 63 179 31 60 61 14 126 0 669 Grp Sat Flow(s),veh/h/ln1728 1777 1585 1781 1777 1585 1781 1870 1585 1781 0 1701 Q Serve(g_s), s 12.0 4.7 5.6 3.3 4.3 1.6 3.1 3.0 0.8 4.8 0.0 36.9 Cycle Q Clear(g_c), s 12.0 4.7 5.6 3.3 4.3 1.6 3.1 3.0 0.8 4.8 0.0 36.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.55
Lane Grp Cap(c), veh/h 415 767 512 162 663 296 191 201 170 657 0 628 V/C Ratio(X) 1.05 0.26 0.24 0.39 0.27 0.10 0.31 0.30 0.08 0.19 0.00 1.07 Avail Cap(c_a), veh/h 415 767 512 267 663 296 271 284 241 657 0 628 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.78 0.78 0.78 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 44.0 32.6 24.8 42.8 34.8 33.7 41.2 41.2 40.2 21.4 0.0 31.6 Incr Delay (d2), s/veh 54.0 0.6 0.8 0.6 1.0 0.7 0.3 0.3 0.1 0.1 0.0 54.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln8.0 2.0 2.5 1.4 1.9 0.7 1.3 1.4 0.3 2.0 0.0 24.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 98.0 33.2 25.6 43.4 35.8 34.5 41.6 41.5 40.3 21.5 0.0 86.2 LnGrp LOS F C C D D C D D D C A F
Approach Vol, veh/h 758 273 135 795
Approach Delay, s/veh 69.3 37.4 41.4 75.9
Approach LOS E D D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s13.8 28.4 42.0 16.7 25.5 15.8
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 15 11.2 36.9 * 12 14.2 15.2 Max Q Clear Time (g_c+I1), s 5.3 7.6 38.9 14.0 6.3 5.1
Green Ext Time (p_c), s 0.0 0.3 0.0 0.0 0.4 0.2
Intersection Summary
HCM 6th Ctrl Delay 65.7
HCM 6th LOS E
Notes
User approved pedestrian interval to be less than phase max green.
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 3: Via Vera Cruz & Linda Vista Dr AM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 30 110 40 15 135 25 25 90 15 15 250 50 Future Volume (veh/h) 30 110 40 15 135 25 25 90 15 15 250 50 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 32 116 39 16 142 24 26 95 15 16 263 49 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 80 249 84 43 508 84 56 560 87 43 522 96
Arrive On Green 0.04 0.19 0.19 0.02 0.17 0.17 0.03 0.18 0.18 0.02 0.17 0.17 Sat Flow, veh/h 1781 1334 449 1781 3051 506 1781 3084 477 1781 2990 548 Grp Volume(v), veh/h 32 0 155 16 82 84 26 54 56 16 155 157 Grp Sat Flow(s),veh/h/ln1781 0 1783 1781 1777 1779 1781 1777 1785 1781 1777 1761 Q Serve(g_s), s 0.7 0.0 3.2 0.4 1.7 1.7 0.6 1.1 1.1 0.4 3.2 3.3 Cycle Q Clear(g_c), s 0.7 0.0 3.2 0.4 1.7 1.7 0.6 1.1 1.1 0.4 3.2 3.3 Prop In Lane 1.00 0.25 1.00 0.28 1.00 0.27 1.00 0.31
Lane Grp Cap(c), veh/h 80 0 333 43 296 296 56 323 324 43 310 308 V/C Ratio(X) 0.40 0.00 0.47 0.37 0.28 0.29 0.47 0.17 0.17 0.37 0.50 0.51 Avail Cap(c_a), veh/h 1082 0 1299 1082 1295 1297 1082 1726 1734 1082 1726 1711 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 19.1 0.0 14.9 19.8 15.0 15.0 19.6 14.2 14.2 19.8 15.4 15.4 Incr Delay (d2), s/veh 3.2 0.0 1.0 5.1 0.5 0.5 6.0 0.2 0.3 5.1 1.2 1.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.3 0.0 1.2 0.2 0.6 0.6 0.3 0.4 0.4 0.2 1.1 1.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 22.4 0.0 15.9 24.9 15.5 15.5 25.6 14.5 14.5 24.9 16.6 16.7 LnGrp LOS C A B C B B C B B C B B
Approach Vol, veh/h 187 182 136 328
Approach Delay, s/veh 17.0 16.3 16.6 17.1
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s7.0 13.5 7.0 13.7 7.3 13.2 7.8 12.9 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 2.4 3.1 2.4 5.2 2.6 5.3 2.7 3.7 Green Ext Time (p_c), s 0.0 0.6 0.0 0.8 0.0 1.8 0.0 0.8 Intersection Summary
HCM 6th Ctrl Delay 16.8
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Horizon Year 2050 Conditions
4: Linda Vista Dr & Grand Ave AM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Intersection
Int Delay, s/veh 3.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 290 50 190 220 15 125
Future Vol, veh/h 290 50 190 220 15 125
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 305 53 200 232 16 132
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 358 0 848 179
Stage 1 - - - - 332 -
Stage 2 - - - - 516 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - - 1197 - 300 833
Stage 1 - - - - 699 -
Stage 2 - - - - 564 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1197 - 250 833
Mov Cap-2 Maneuver - - - - 363 -
Stage 1 - - - - 699 -
Stage 2 - - - - 470 -
Approach EB WB NB
HCM Control Delay, s 0 4 11.2
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 732 - - 1197 -
HCM Lane V/C Ratio 0.201 - - 0.167 -
HCM Control Delay (s) 11.2 - - 8.6 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.7 - - 0.6 -
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 5: S Bent Ave & Grand Ave AM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 310 120 45 280 95 20
Future Volume (veh/h) 310 120 45 280 95 20
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 326 115 47 295 100 16
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 1013 351 110 2092 231 205
Arrive On Green 0.39 0.39 0.06 0.59 0.13 0.13
Sat Flow, veh/h 2682 897 1781 3647 1781 1585
Grp Volume(v), veh/h 222 219 47 295 100 16
Grp Sat Flow(s),veh/h/ln 1777 1709 1781 1777 1781 1585
Q Serve(g_s), s 3.3 3.4 1.0 1.4 2.0 0.3
Cycle Q Clear(g_c), s 3.3 3.4 1.0 1.4 2.0 0.3
Prop In Lane 0.52 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 695 669 110 2092 231 205
V/C Ratio(X) 0.32 0.33 0.43 0.14 0.43 0.08
Avail Cap(c_a), veh/h 1066 1026 279 2092 1162 1034
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 8.1 8.1 17.3 3.5 15.4 14.7
Incr Delay (d2), s/veh 0.3 0.3 2.6 0.0 1.3 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.8 0.8 0.4 0.1 0.7 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 8.4 8.4 20.0 3.6 16.7 14.8
LnGrp LOS A A B A B B
Approach Vol, veh/h 441 342 116
Approach Delay, s/veh 8.4 5.8 16.4
Approach LOS A A B
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 7.6 20.8 28.4 10.0
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 3.0 5.4 3.4 4.0
Green Ext Time (p_c), s 0.0 2.2 1.2 0.3
Intersection Summary
HCM 6th Ctrl Delay 8.5
HCM 6th LOS A
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 6: Via Vera Cruz & W San Marcos Blvd AM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 45 870 35 75 1280 95 35 5 10 45 45 50 Future Volume (veh/h) 45 870 35 75 1280 95 35 5 10 45 45 50 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 47 916 36 79 1347 89 37 5 10 47 47 48 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 70 2122 83 101 2118 140 84 126 111 160 62 64 Arrive On Green 0.04 0.61 0.61 0.06 0.63 0.63 0.05 0.07 0.07 0.05 0.07 0.07 Sat Flow, veh/h 1781 3482 137 1781 3381 223 1781 1777 1561 3456 841 859 Grp Volume(v), veh/h 47 467 485 79 706 730 37 5 10 47 0 95 Grp Sat Flow(s),veh/h/ln1781 1777 1842 1781 1777 1826 1781 1777 1561 1728 0 1700 Q Serve(g_s), s 3.1 16.7 16.7 5.3 29.6 29.8 2.4 0.3 0.7 1.6 0.0 6.6 Cycle Q Clear(g_c), s 3.1 16.7 16.7 5.3 29.6 29.8 2.4 0.3 0.7 1.6 0.0 6.6 Prop In Lane 1.00 0.07 1.00 0.12 1.00 1.00 1.00 0.51
Lane Grp Cap(c), veh/h 70 1083 1123 101 1113 1145 84 126 111 160 0 126 V/C Ratio(X) 0.67 0.43 0.43 0.78 0.63 0.64 0.44 0.04 0.09 0.29 0.00 0.75 Avail Cap(c_a), veh/h 230 1083 1123 230 1113 1145 238 378 332 446 0 361 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.00 0.99 Uniform Delay (d), s/veh 56.8 12.4 12.4 55.9 13.9 13.9 55.6 51.9 52.1 55.3 0.0 54.5 Incr Delay (d2), s/veh 10.3 1.3 1.2 12.2 2.8 2.7 3.6 0.1 0.3 1.0 0.0 8.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.6 6.4 6.6 2.6 11.3 11.6 1.2 0.1 0.3 0.7 0.0 3.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 67.2 13.7 13.6 68.1 16.6 16.6 59.2 52.1 52.5 56.3 0.0 63.2 LnGrp LOS E B B E B B E D D E A E
Approach Vol, veh/h 999 1515 52 142
Approach Delay, s/veh 16.2 19.3 57.2 60.9
Approach LOS B B E E
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s13.3 79.6 11.7 15.4 11.2 81.7 12.0 15.0 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 15.5 15.5 16.0 25.5 15.5 37.5 15.5 25.5 Max Q Clear Time (g_c+I1), s 7.3 18.7 4.4 8.6 5.1 31.8 3.6 2.7 Green Ext Time (p_c), s 0.1 0.0 0.0 0.4 0.0 3.9 0.1 0.0 Intersection Summary
HCM 6th Ctrl Delay 21.1
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 7: Grand Ave & W San Marcos Blvd AM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 40 1075 155 355 1425 305 75 75 95 205 70 30 Future Volume (veh/h) 40 1075 155 355 1425 305 75 75 95 205 70 30 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.96 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1826 1870 1870 1870 1870 1826 1870 1870 1870 Adj Flow Rate, veh/h 42 1132 152 374 1500 268 79 79 89 216 74 27 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 5 2 2 2 2 5 2 2 2
Cap, veh/h 78 2570 930 309 2835 1005 288 169 276 281 165 137 Arrive On Green 0.04 0.50 0.50 0.09 0.56 0.56 0.08 0.09 0.09 0.08 0.09 0.09 Sat Flow, veh/h 1781 5106 1585 3374 5106 1577 3456 1870 1480 3456 1870 1552 Grp Volume(v), veh/h 42 1132 152 374 1500 268 79 79 89 216 74 27 Grp Sat Flow(s),veh/h/ln1781 1702 1585 1687 1702 1577 1728 1870 1480 1728 1870 1552 Q Serve(g_s), s 2.8 17.0 5.3 11.0 22.2 2.4 2.6 4.8 4.3 7.4 4.5 1.9 Cycle Q Clear(g_c), s 2.8 17.0 5.3 11.0 22.2 2.4 2.6 4.8 4.3 7.4 4.5 1.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 78 2570 930 309 2835 1005 288 169 276 281 165 137 V/C Ratio(X) 0.54 0.44 0.16 1.21 0.53 0.27 0.27 0.47 0.32 0.77 0.45 0.20 Avail Cap(c_a), veh/h 126 2570 930 309 2835 1005 288 499 536 461 592 491 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 56.2 19.0 11.3 54.5 16.8 2.3 51.6 51.8 21.4 54.0 51.9 50.7 Incr Delay (d2), s/veh 5.6 0.6 0.4 120.5 0.7 0.7 0.5 2.0 0.7 4.4 1.9 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.3 6.4 1.9 9.7 8.2 1.3 1.1 2.4 1.9 3.3 2.2 0.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.8 19.6 11.7 175.0 17.5 2.9 52.1 53.8 22.0 58.5 53.8 51.4 LnGrp LOS E B B F B A D D C E D D
Approach Vol, veh/h 1326 2142 247 317
Approach Delay, s/veh 20.0 43.2 41.8 56.8
Approach LOS C D D E
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s11.8 73.6 17.0 17.6 18.0 67.4 16.7 17.9 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 * 7 7.0 7.0 Max Green Setting (Gmax), s 8.5 36.0 10.0 38.0 11.0 * 34 16.0 32.0 Max Q Clear Time (g_c+I1), s 4.8 24.2 4.6 6.5 13.0 19.0 9.4 6.8 Green Ext Time (p_c), s 0.0 7.8 0.1 0.4 0.0 6.7 0.4 0.7 Intersection Summary
HCM 6th Ctrl Delay 36.6
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 1: Las Posas Rd & Grand Ave PM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 325 375 65 75 140 670 65 920 260 345 560 280 Future Volume (veh/h) 325 375 65 75 140 670 65 920 260 345 560 280 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 342 395 63 79 147 452 68 968 248 363 589 232 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 361 475 75 133 234 1029 99 1165 298 846 1700 906 Arrive On Green 0.10 0.15 0.15 0.02 0.04 0.04 0.06 0.29 0.29 0.24 0.48 0.48 Sat Flow, veh/h 3456 3063 484 1781 1870 2770 1781 4027 1029 3456 3554 1546 Grp Volume(v), veh/h 342 228 230 79 147 452 68 818 398 363 589 232 Grp Sat Flow(s),veh/h/ln 1728 1777 1770 1781 1870 1385 1781 1702 1652 1728 1777 1546 Q Serve(g_s), s 10.8 13.7 13.9 4.8 8.5 3.4 4.1 24.7 24.8 9.8 11.4 8.1 Cycle Q Clear(g_c), s 10.8 13.7 13.9 4.8 8.5 3.4 4.1 24.7 24.8 9.8 11.4 8.1 Prop In Lane 1.00 0.27 1.00 1.00 1.00 0.62 1.00 1.00
Lane Grp Cap(c), veh/h 361 275 274 133 234 1029 99 985 478 846 1700 906 V/C Ratio(X) 0.95 0.83 0.84 0.60 0.63 0.44 0.69 0.83 0.83 0.43 0.35 0.26 Avail Cap(c_a), veh/h 361 315 314 186 332 1174 219 1099 533 846 1700 906 HCM Platoon Ratio 1.00 1.00 1.00 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.80 0.80 0.80 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 48.9 45.0 45.1 52.0 50.2 10.8 51.0 36.6 36.6 35.0 17.9 11.3 Incr Delay (d2), s/veh 33.7 14.8 16.3 3.4 2.2 0.2 8.1 8.1 15.6 0.3 0.6 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.2 7.0 7.2 2.3 4.2 2.2 2.0 10.9 11.6 4.1 4.7 2.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 82.6 59.9 61.5 55.4 52.5 11.0 59.1 44.7 52.2 35.4 18.5 11.9 LnGrp LOS F E E E D B E D D D B B
Approach Vol, veh/h 800 678 1284 1184
Approach Delay, s/veh 70.1 25.2 47.8 22.4
Approach LOS E C D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 33.4 38.3 14.7 23.5 12.6 59.1 18.0 20.2 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 17.5 35.5 11.5 19.5 13.5 39.5 11.5 19.5 Max Q Clear Time (g_c+I1), s 11.8 26.8 6.8 15.9 6.1 13.4 12.8 10.5 Green Ext Time (p_c), s 0.7 4.7 0.1 0.9 0.1 5.2 0.0 1.8 Intersection Summary
HCM 6th Ctrl Delay 40.8
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave PM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 505 315 200 110 345 55 210 180 70 260 280 360 Future Volume (veh/h) 505 315 200 110 345 55 210 180 70 260 280 360 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 532 332 169 116 363 53 205 211 58 274 295 274 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 630 1256 765 173 953 425 240 252 214 387 194 180 Arrive On Green 0.18 0.35 0.35 0.10 0.27 0.27 0.13 0.13 0.13 0.22 0.22 0.22 Sat Flow, veh/h 3456 3554 1560 1781 3554 1585 1781 1870 1585 1781 892 829 Grp Volume(v), veh/h 532 332 169 116 363 53 205 211 58 274 0 569 Grp Sat Flow(s),veh/h/ln1728 1777 1560 1781 1777 1585 1781 1870 1585 1781 0 1721 Q Serve(g_s), s 16.4 7.3 6.8 6.9 9.2 2.8 12.4 12.1 3.6 15.7 0.0 23.9 Cycle Q Clear(g_c), s 16.4 7.3 6.8 6.9 9.2 2.8 12.4 12.1 3.6 15.7 0.0 23.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.48
Lane Grp Cap(c), veh/h 630 1256 765 173 953 425 240 252 214 387 0 374 V/C Ratio(X) 0.84 0.26 0.22 0.67 0.38 0.12 0.85 0.84 0.27 0.71 0.00 1.52 Avail Cap(c_a), veh/h 1068 1256 765 243 953 425 293 308 261 387 0 374 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.68 0.68 0.68 1.00 1.00 1.00 0.90 0.90 0.90 1.00 0.00 1.00 Uniform Delay (d), s/veh 43.5 25.4 16.1 48.0 32.8 30.5 46.5 46.4 42.7 39.8 0.0 43.1 Incr Delay (d2), s/veh 2.2 0.3 0.5 1.7 1.2 0.6 14.4 11.9 0.2 5.0 0.0 248.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln6.9 3.0 3.2 3.1 3.9 1.1 6.3 6.3 1.4 7.3 0.0 35.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 45.7 25.7 16.6 49.6 34.0 31.1 60.9 58.3 43.0 44.8 0.0 291.0 LnGrp LOS D C B D C C E E D D A F
Approach Vol, veh/h 1033 532 474 843
Approach Delay, s/veh 34.5 37.1 57.6 211.0
Approach LOS C D E F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s15.4 45.7 29.0 24.8 36.3 19.9
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 15 31.3 23.9 * 34 12.3 18.1 Max Q Clear Time (g_c+I1), s 8.9 9.3 25.9 18.4 11.2 14.4 Green Ext Time (p_c), s 0.1 1.5 0.0 1.7 0.2 0.5
Intersection Summary
HCM 6th Ctrl Delay 90.4
HCM 6th LOS F
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 3: Via Vera Cruz & Linda Vista Dr PM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 85 250 80 20 90 30 50 310 50 50 310 45 Future Volume (veh/h) 85 250 80 20 90 30 50 310 50 50 310 45 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 89 263 73 21 95 27 53 326 48 53 326 42 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 149 358 99 54 552 151 92 588 86 110 629 80
Arrive On Green 0.08 0.25 0.25 0.03 0.20 0.20 0.05 0.19 0.19 0.06 0.20 0.20 Sat Flow, veh/h 1781 1408 391 1781 2754 754 1781 3112 454 1781 3155 402 Grp Volume(v), veh/h 89 0 336 21 60 62 53 185 189 53 182 186 Grp Sat Flow(s),veh/h/ln1781 0 1799 1781 1777 1732 1781 1777 1789 1781 1777 1781 Q Serve(g_s), s 2.5 0.0 8.8 0.6 1.4 1.5 1.5 4.9 5.0 1.5 4.7 4.8 Cycle Q Clear(g_c), s 2.5 0.0 8.8 0.6 1.4 1.5 1.5 4.9 5.0 1.5 4.7 4.8 Prop In Lane 1.00 0.22 1.00 0.44 1.00 0.25 1.00 0.23
Lane Grp Cap(c), veh/h 149 0 457 54 356 347 92 336 338 110 354 355 V/C Ratio(X) 0.60 0.00 0.73 0.39 0.17 0.18 0.58 0.55 0.56 0.48 0.51 0.52 Avail Cap(c_a), veh/h 862 0 1045 862 1032 1006 862 1376 1386 862 1376 1380 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.8 0.0 17.7 24.6 17.1 17.1 23.9 19.0 19.0 23.4 18.4 18.5 Incr Delay (d2), s/veh 3.8 0.0 2.3 4.5 0.2 0.2 5.6 1.4 1.5 3.2 1.2 1.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.1 0.0 3.5 0.3 0.5 0.5 0.7 1.8 1.9 0.7 1.8 1.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 26.6 0.0 20.0 29.1 17.3 17.4 29.5 20.4 20.4 26.6 19.6 19.7 LnGrp LOS C A B C B B C C C C B B
Approach Vol, veh/h 425 143 427 421
Approach Delay, s/veh 21.4 19.1 21.5 20.5
Approach LOS C B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s9.2 15.8 7.6 19.1 8.7 16.3 10.3 16.4 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 3.5 7.0 2.6 10.8 3.5 6.8 4.5 3.5 Green Ext Time (p_c), s 0.1 2.1 0.0 2.0 0.1 2.1 0.2 0.6 Intersection Summary
HCM 6th Ctrl Delay 20.9
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Horizon Year 2050 Conditions
4: Linda Vista Dr & Grand Ave PM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Intersection
Int Delay, s/veh 10
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 690 65 135 400 45 375
Future Vol, veh/h 690 65 135 400 45 375
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 726 68 142 421 47 395
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 794 0 1255 397
Stage 1 - - - - 760 -
Stage 2 - - - - 495 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - - 823 - 164 602
Stage 1 - - - - 422 -
Stage 2 - - - - 578 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 823 - 136 602
Mov Cap-2 Maneuver - - - - 266 -
Stage 1 - - - - 422 -
Stage 2 - - - - 478 -
Approach EB WB NB
HCM Control Delay, s 0 2.6 37.3
HCM LOS E
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 530 - - 823 -
HCM Lane V/C Ratio 0.834 - - 0.173 -
HCM Control Delay (s) 37.3 - - 10.3 -
HCM Lane LOS E - - B -
HCM 95th %tile Q(veh) 8.5 - - 0.6 -
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 5: S Bent Ave & Grand Ave PM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 870 215 60 305 175 65
Future Volume (veh/h) 870 215 60 305 175 65
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 916 205 63 321 184 52
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 1202 269 130 2156 266 237
Arrive On Green 0.42 0.42 0.07 0.61 0.15 0.15
Sat Flow, veh/h 2979 645 1781 3647 1781 1585
Grp Volume(v), veh/h 564 557 63 321 184 52
Grp Sat Flow(s),veh/h/ln 1777 1754 1781 1777 1781 1585
Q Serve(g_s), s 12.0 12.0 1.5 1.7 4.3 1.3
Cycle Q Clear(g_c), s 12.0 12.0 1.5 1.7 4.3 1.3
Prop In Lane 0.37 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 740 730 130 2156 266 237
V/C Ratio(X) 0.76 0.76 0.48 0.15 0.69 0.22
Avail Cap(c_a), veh/h 923 911 241 2156 1005 895
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 11.0 11.1 19.7 3.8 17.9 16.6
Incr Delay (d2), s/veh 3.0 3.0 2.8 0.0 3.2 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.6 3.6 0.6 0.2 1.7 0.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 14.0 14.1 22.5 3.8 21.1 17.0
LnGrp LOS B B C A C B
Approach Vol, veh/h 1121 384 236
Approach Delay, s/veh 14.0 6.9 20.2
Approach LOS B A C
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 8.4 24.2 32.7 11.6
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 3.5 14.0 3.7 6.3
Green Ext Time (p_c), s 0.0 4.4 1.3 0.6
Intersection Summary
HCM 6th Ctrl Delay 13.3
HCM 6th LOS B
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 6: Via Vera Cruz & W San Marcos Blvd PM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 75 1310 35 125 1135 180 75 55 75 195 105 60 Future Volume (veh/h) 75 1310 35 125 1135 180 75 55 75 195 105 60 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 79 1379 36 132 1195 173 79 58 74 205 111 58 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 98 1435 37 443 1868 269 98 178 158 249 139 72 Arrive On Green 0.06 0.41 0.41 0.25 0.60 0.60 0.06 0.10 0.10 0.07 0.12 0.12 Sat Flow, veh/h 1781 3536 92 1781 3117 449 1781 1777 1580 3456 1154 603 Grp Volume(v), veh/h 79 692 723 132 679 689 79 58 74 205 0 169 Grp Sat Flow(s),veh/h/ln1781 1777 1851 1781 1777 1789 1781 1777 1580 1728 0 1756 Q Serve(g_s), s 6.6 56.9 57.1 9.0 37.2 37.6 6.6 4.6 6.6 8.8 0.0 14.0 Cycle Q Clear(g_c), s 6.6 56.9 57.1 9.0 37.2 37.6 6.6 4.6 6.6 8.8 0.0 14.0 Prop In Lane 1.00 0.05 1.00 0.25 1.00 1.00 1.00 0.34
Lane Grp Cap(c), veh/h 98 721 751 443 1065 1073 98 178 158 249 0 211 V/C Ratio(X) 0.80 0.96 0.96 0.30 0.64 0.64 0.80 0.33 0.47 0.82 0.00 0.80 Avail Cap(c_a), veh/h 122 729 759 443 1065 1073 131 380 338 265 0 388 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 0.00 0.90 Uniform Delay (d), s/veh 70.1 43.4 43.4 45.7 19.5 19.6 70.0 62.8 63.7 68.6 0.0 64.2 Incr Delay (d2), s/veh 25.8 25.1 24.8 0.4 2.9 3.0 22.6 1.1 2.2 16.1 0.0 6.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln3.7 29.1 30.3 4.0 15.3 15.6 3.6 2.1 2.7 4.4 0.0 6.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 95.9 68.5 68.2 46.1 22.4 22.5 92.6 63.9 65.9 84.8 0.0 70.5 LnGrp LOS F E E D C C F E E F A E
Approach Vol, veh/h 1494 1500 211 374
Approach Delay, s/veh 69.8 24.5 75.3 78.3
Approach LOS E C E E
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s43.8 67.4 14.3 24.5 14.8 96.4 17.3 21.5 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 18.9 61.5 11.0 33.1 10.3 70.1 11.5 32.1 Max Q Clear Time (g_c+I1), s 11.0 59.1 8.6 16.0 8.6 39.6 10.8 8.6 Green Ext Time (p_c), s 0.2 1.8 0.0 0.7 0.0 10.6 0.0 0.6 Intersection Summary
HCM 6th Ctrl Delay 52.0
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Horizon Year 2050 Conditions 7: Grand Ave & W San Marcos Blvd PM Peak Hour
Horizon Year 2050 Conditions Synchro 11 Report
Horizon Year.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 65 1385 235 495 1160 270 275 270 355 590 250 60 Future Volume (veh/h) 65 1385 235 495 1160 270 275 270 355 590 250 60 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.97 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1826 1870 1870 1870 1870 1826 1870 1870 1870 Adj Flow Rate, veh/h 68 1458 215 521 1221 242 289 284 332 621 263 58 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 5 2 2 2 2 5 2 2 2
Cap, veh/h 86 1549 633 564 2155 975 333 287 489 667 467 391 Arrive On Green 0.05 0.30 0.30 0.17 0.42 0.42 0.10 0.15 0.15 0.19 0.25 0.25 Sat Flow, veh/h 1781 5106 1585 3374 5106 1585 3456 1870 1501 3456 1870 1563 Grp Volume(v), veh/h 68 1458 215 521 1221 242 289 284 332 621 263 58 Grp Sat Flow(s),veh/h/ln1781 1702 1585 1687 1702 1585 1728 1870 1501 1728 1870 1563 Q Serve(g_s), s 5.7 41.8 7.0 22.8 27.2 2.5 12.4 22.7 2.9 26.5 18.4 4.3 Cycle Q Clear(g_c), s 5.7 41.8 7.0 22.8 27.2 2.5 12.4 22.7 2.9 26.5 18.4 4.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 86 1549 633 564 2155 975 333 287 489 667 467 391 V/C Ratio(X) 0.79 0.94 0.34 0.92 0.57 0.25 0.87 0.99 0.68 0.93 0.56 0.15 Avail Cap(c_a), veh/h 150 1549 633 564 2155 975 346 287 489 691 474 396 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 70.6 50.9 11.6 61.5 32.9 4.3 66.8 63.4 44.1 59.6 49.1 43.8 Incr Delay (d2), s/veh 14.6 12.6 1.5 21.2 1.1 0.6 19.9 50.3 3.8 19.1 1.5 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln2.9 19.1 2.6 11.3 11.2 1.7 6.4 14.8 11.3 13.2 8.7 1.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 85.3 63.6 13.1 82.7 34.0 4.9 86.7 113.7 47.9 78.6 50.6 44.0 LnGrp LOS F E B F C A F F D E D D
Approach Vol, veh/h 1741 1984 905 942
Approach Delay, s/veh 58.2 43.2 81.0 68.7
Approach LOS E D F E
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s13.8 70.3 21.4 44.5 32.1 52.0 35.9 30.0 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 6.5 7.0 7.0 Max Green Setting (Gmax), s 12.6 56.9 15.0 38.0 24.0 45.5 30.0 23.0 Max Q Clear Time (g_c+I1), s 7.7 29.2 14.4 20.4 24.8 43.8 28.5 24.7 Green Ext Time (p_c), s 0.0 10.3 0.1 1.4 0.0 1.4 0.4 0.0 Intersection Summary
HCM 6th Ctrl Delay 58.3
HCM 6th LOS E
Notes
User approved pedestrian interval to be less than phase max green.
Appendix M - LOS Calculation Worksheets
Horizon Year 2050 with Project
Conditions
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 1: Las Posas Rd & Grand Ave AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 130 216 25 120 182 425 30 285 105 444 665 470 Future Volume (veh/h) 130 216 25 120 182 425 30 285 105 444 665 470 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 137 227 24 126 192 321 32 300 100 467 700 390 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 222222222222
Cap, veh/h 245 375 39 152 244 1682 67 459 143 1633 1973 973 Arrive On Green 0.07 0.12 0.12 0.09 0.13 0.13 0.04 0.12 0.12 0.47 0.56 0.56 Sat Flow, veh/h 3456 3241 339 1781 1870 2790 1781 3827 1195 3456 3554 1551 Grp Volume(v), veh/h 137 123 128 126 192 321 32 265 135 467 700 390 Grp Sat Flow(s),veh/h/ln 1728 1777 1803 1781 1870 1395 1781 1702 1618 1728 1777 1551 Q Serve(g_s), s 4.8 8.3 8.5 8.8 12.5 2.0 2.2 9.3 10.1 10.4 13.8 15.8 Cycle Q Clear(g_c), s 4.8 8.3 8.5 8.8 12.5 2.0 2.2 9.3 10.1 10.4 13.8 15.8 Prop In Lane 1.00 0.19 1.00 1.00 1.00 0.74 1.00 1.00
Lane Grp Cap(c), veh/h 245 206 209 152 244 1682 67 408 194 1633 1973 973 V/C Ratio(X) 0.56 0.60 0.61 0.83 0.79 0.19 0.48 0.65 0.70 0.29 0.35 0.40 Avail Cap(c_a), veh/h 439 395 401 226 416 1938 226 973 462 1633 1973 973 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.97 0.97 0.97 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 56.6 52.9 53.0 56.7 53.1 3.2 59.4 52.9 53.2 20.3 15.5 11.8 Incr Delay (d2), s/veh 2.0 2.8 2.9 14.3 5.4 0.1 5.3 7.7 18.8 0.1 0.5 1.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 3.8 4.0 4.5 6.1 0.7 1.1 4.3 5.0 4.2 5.7 5.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 58.6 55.7 55.9 71.0 58.5 3.2 64.7 60.6 72.1 20.4 16.0 13.0 LnGrp LOS EEEEEAEEECBB
Approach Vol, veh/h 388 639 432 1557
Approach Delay, s/veh 56.8 33.2 64.5 16.6
Approach LOS E C E B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 66.0 21.6 17.3 21.1 11.2 76.4 15.4 22.9 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 20.0 36.0 16.0 28.0 16.0 40.0 16.0 28.0 Max Q Clear Time (g_c+I1), s 12.4 12.1 10.8 10.5 4.2 17.8 6.8 14.5 Green Ext Time (p_c), s 1.1 2.3 0.1 1.1 0.0 6.7 0.2 1.9 Intersection Summary
HCM 6th Ctrl Delay 32.1
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 430 194 151 60 180 32 63 56 15 123 286 480 Future Volume (veh/h) 430 194 151 60 180 32 63 56 15 123 286 480 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 453 204 127 63 189 33 62 64 14 129 301 379 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 22222222222
Cap, veh/h 425 801 528 162 687 306 192 202 171 639 270 340 Arrive On Green 0.12 0.23 0.23 0.09 0.19 0.19 0.11 0.11 0.11 0.36 0.36 0.36 Sat Flow, veh/h 3456 3554 1585 1781 3554 1585 1781 1870 1585 1781 752 947 Grp Volume(v), veh/h 453 204 127 63 189 33 62 64 14 129 0 680 Grp Sat Flow(s),veh/h/ln1728 1777 1585 1781 1777 1585 1781 1870 1585 1781 0 1700 Q Serve(g_s), s 12.3 4.7 5.8 3.3 4.5 1.7 3.2 3.2 0.8 5.0 0.0 35.9 Cycle Q Clear(g_c), s 12.3 4.7 5.8 3.3 4.5 1.7 3.2 3.2 0.8 5.0 0.0 35.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.56
Lane Grp Cap(c), veh/h 425 801 528 162 687 306 192 202 171 639 0 610 V/C Ratio(X) 1.07 0.25 0.24 0.39 0.28 0.11 0.32 0.32 0.08 0.20 0.00 1.11 Avail Cap(c_a), veh/h 425 801 528 267 687 306 324 340 288 639 0 610 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.74 0.74 0.74 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 43.9 31.8 24.2 42.8 34.4 33.2 41.2 41.2 40.2 22.1 0.0 32.1 Incr Delay (d2), s/veh 56.3 0.6 0.8 0.6 1.0 0.7 0.4 0.3 0.1 0.1 0.0 72.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln8.4 2.0 2.6 1.4 2.0 0.7 1.4 1.4 0.3 2.1 0.0 26.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 100.1 32.4 25.0 43.4 35.4 33.9 41.6 41.5 40.2 22.2 0.0 104.0 LnGrp LOS F CCDDCDDDCAF
Approach Vol, veh/h 784 285 140 809
Approach Delay, s/veh 70.3 37.0 41.4 91.0
Approach LOS E D D F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s13.8 29.3 41.0 17.0 26.1 15.9
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 15 9.2 35.9 * 12 11.9 18.2 Max Q Clear Time (g_c+I1), s 5.3 7.8 37.9 14.3 6.5 5.2
Green Ext Time (p_c), s 0.0 0.2 0.0 0.0 0.3 0.2
Intersection Summary
HCM 6th Ctrl Delay 71.9
HCM 6th LOS E
Notes
User approved pedestrian interval to be less than phase max green.
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 3: Via Vera Cruz & Linda Vista Dr AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 25 119 40 32 145 29 25 90 30 22 250 40 Future Volume (veh/h) 25 119 40 32 145 29 25 90 30 22 250 40 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 26 125 39 34 153 29 26 95 31 23 263 38 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 22222222222
Cap, veh/h 67 228 71 84 529 98 56 452 142 60 537 77
Arrive On Green 0.04 0.17 0.17 0.05 0.18 0.18 0.03 0.17 0.17 0.03 0.17 0.17 Sat Flow, veh/h 1781 1362 425 1781 2992 555 1781 2663 834 1781 3114 444 Grp Volume(v), veh/h 26 0 164 34 90 92 26 62 64 23 149 152 Grp Sat Flow(s),veh/h/ln1781 0 1787 1781 1777 1770 1781 1777 1720 1781 1777 1782 Q Serve(g_s), s 0.6 0.0 3.5 0.8 1.8 1.9 0.6 1.2 1.3 0.5 3.1 3.2 Cycle Q Clear(g_c), s 0.6 0.0 3.5 0.8 1.8 1.9 0.6 1.2 1.3 0.5 3.1 3.2 Prop In Lane 1.00 0.24 1.00 0.31 1.00 0.48 1.00 0.25
Lane Grp Cap(c), veh/h 67 0 299 84 314 313 56 302 292 60 306 307 V/C Ratio(X) 0.39 0.00 0.55 0.41 0.28 0.30 0.47 0.21 0.22 0.38 0.49 0.50 Avail Cap(c_a), veh/h 1080 0 1300 1080 1293 1288 1080 1724 1669 1080 1724 1729 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 19.4 0.0 15.7 19.1 14.7 14.7 19.6 14.7 14.8 19.5 15.4 15.4 Incr Delay (d2), s/veh 3.7 0.0 1.6 3.2 0.5 0.5 6.0 0.3 0.4 4.0 1.2 1.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.3 0.0 1.3 0.3 0.6 0.6 0.3 0.4 0.4 0.2 1.1 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 23.0 0.0 17.3 22.2 15.2 15.3 25.6 15.1 15.1 23.5 16.6 16.7 LnGrp LOS C A B C B B C B B C B B
Approach Vol, veh/h 190 216 152 324
Approach Delay, s/veh 18.1 16.3 16.9 17.1
Approach LOS BBBB
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s7.4 13.0 7.9 12.9 7.3 13.1 7.5 13.3 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 2.5 3.3 2.8 5.5 2.6 5.2 2.6 3.9 Green Ext Time (p_c), s 0.0 0.7 0.0 0.9 0.0 1.7 0.0 0.9 Intersection Summary
HCM 6th Ctrl Delay 17.1
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Horizon Year 2050 with Project Conditions
4: Linda Vista Dr & Grand Ave AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 3.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 303 73 202 225 27 132
Future Vol, veh/h 303 73 202 225 27 132
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 319 77 213 237 28 139
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 396 0 903 198
Stage 1 - - - - 358 -
Stage 2 - - - - 545 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - - 1159 - 277 810
Stage 1 - - - - 678 -
Stage 2 - - - - 545 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1159 - 226 810
Mov Cap-2 Maneuver - - - - 341 -
Stage 1 - - - - 678 -
Stage 2 - - - - 445 -
Approach EB WB NB
HCM Control Delay, s 0 4.2 12.3
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 657 - - 1159 -
HCM Lane V/C Ratio 0.255 - - 0.183 -
HCM Control Delay (s) 12.3 - - 8.8 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 1 - - 0.7 -
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 5: S Bent Ave & Grand Ave AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 327 122 45 295 98 20
Future Volume (veh/h) 327 122 45 295 98 20
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 344 117 47 311 103 16
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222
Cap, veh/h 1021 342 110 2088 233 208
Arrive On Green 0.39 0.39 0.06 0.59 0.13 0.13
Sat Flow, veh/h 2708 875 1781 3647 1781 1585
Grp Volume(v), veh/h 232 229 47 311 103 16
Grp Sat Flow(s),veh/h/ln 1777 1713 1781 1777 1781 1585
Q Serve(g_s), s 3.5 3.6 1.0 1.5 2.0 0.3
Cycle Q Clear(g_c), s 3.5 3.6 1.0 1.5 2.0 0.3
Prop In Lane 0.51 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 694 669 110 2088 233 208
V/C Ratio(X) 0.33 0.34 0.43 0.15 0.44 0.08
Avail Cap(c_a), veh/h 1064 1026 278 2088 1160 1032
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 8.2 8.2 17.4 3.6 15.4 14.6
Incr Delay (d2), s/veh 0.3 0.3 2.6 0.0 1.3 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.8 0.8 0.4 0.2 0.8 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 8.5 8.5 20.0 3.6 16.7 14.8
LnGrp LOS AABABB
Approach Vol, veh/h 461 358 119
Approach Delay, s/veh 8.5 5.8 16.4
Approach LOS A A B
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 7.6 20.8 28.4 10.0
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 3.0 5.6 3.5 4.0
Green Ext Time (p_c), s 0.0 2.3 1.3 0.3
Intersection Summary
HCM 6th Ctrl Delay 8.5
HCM 6th LOS A
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 6: Via Vera Cruz & W San Marcos Blvd AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 57 870 35 75 1280 95 35 13 10 45 48 64 Future Volume (veh/h) 57 870 35 75 1280 95 35 13 10 45 48 64 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 60 916 36 79 1347 89 37 14 10 47 51 62 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 22222222222
Cap, veh/h 78 2082 82 101 2065 136 84 171 109 160 65 79 Arrive On Green 0.04 0.60 0.60 0.06 0.61 0.61 0.05 0.08 0.08 0.05 0.09 0.09 Sat Flow, veh/h 1781 3482 137 1781 3381 223 1781 2074 1314 3456 762 926 Grp Volume(v), veh/h 60 467 485 79 706 730 37 12 12 47 0 113 Grp Sat Flow(s),veh/h/ln1781 1777 1842 1781 1777 1826 1781 1777 1611 1728 0 1688 Q Serve(g_s), s 4.0 17.2 17.2 5.3 30.8 31.1 2.4 0.7 0.8 1.6 0.0 7.9 Cycle Q Clear(g_c), s 4.0 17.2 17.2 5.3 30.8 31.1 2.4 0.7 0.8 1.6 0.0 7.9 Prop In Lane 1.00 0.07 1.00 0.12 1.00 0.82 1.00 0.55
Lane Grp Cap(c), veh/h 78 1062 1101 101 1085 1116 84 147 133 160 0 145 V/C Ratio(X) 0.77 0.44 0.44 0.78 0.65 0.65 0.44 0.08 0.09 0.29 0.00 0.78 Avail Cap(c_a), veh/h 230 1062 1101 230 1085 1116 238 378 342 446 0 359 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.00 0.99 Uniform Delay (d), s/veh 56.8 13.2 13.2 55.9 15.1 15.1 55.6 50.8 50.9 55.3 0.0 53.8 Incr Delay (d2), s/veh 14.7 1.3 1.3 12.2 3.0 3.0 3.6 0.2 0.3 1.0 0.0 8.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln2.1 6.6 6.9 2.6 11.9 12.3 1.2 0.3 0.3 0.7 0.0 3.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 71.5 14.5 14.4 68.1 18.1 18.1 59.2 51.1 51.2 56.3 0.0 62.5 LnGrp LOS E BBEBBEDDEAE
Approach Vol, veh/h 1012 1515 61 160
Approach Delay, s/veh 17.9 20.7 56.0 60.7
Approach LOS B C E E
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s13.3 78.2 11.7 16.8 11.7 79.8 12.0 16.4 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 15.5 15.5 16.0 25.5 15.5 37.5 15.5 25.5 Max Q Clear Time (g_c+I1), s 7.3 19.2 4.4 9.9 6.0 33.1 3.6 2.8 Green Ext Time (p_c), s 0.1 0.0 0.0 0.4 0.1 3.1 0.1 0.1 Intersection Summary
HCM 6th Ctrl Delay 22.8
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 7: Grand Ave & W San Marcos Blvd AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 40 1075 155 355 1425 317 75 78 95 219 73 30 Future Volume (veh/h) 40 1075 155 355 1425 317 75 78 95 219 73 30 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.96 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1826 1870 1870 1870 1870 1826 1870 1870 1870 Adj Flow Rate, veh/h 42 1132 152 374 1500 281 79 82 89 231 77 27 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 22522225222
Cap, veh/h 78 2550 924 309 2814 1005 288 169 276 295 173 143 Arrive On Green 0.04 0.50 0.50 0.09 0.55 0.55 0.08 0.09 0.09 0.09 0.09 0.09 Sat Flow, veh/h 1781 5106 1585 3374 5106 1577 3456 1870 1480 3456 1870 1552 Grp Volume(v), veh/h 42 1132 152 374 1500 281 79 82 89 231 77 27 Grp Sat Flow(s),veh/h/ln1781 1702 1585 1687 1702 1577 1728 1870 1480 1728 1870 1552 Q Serve(g_s), s 2.8 17.1 5.3 11.0 22.4 2.6 2.6 5.0 4.3 7.9 4.7 1.9 Cycle Q Clear(g_c), s 2.8 17.1 5.3 11.0 22.4 2.6 2.6 5.0 4.3 7.9 4.7 1.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 78 2550 924 309 2814 1005 288 169 276 295 173 143 V/C Ratio(X) 0.54 0.44 0.16 1.21 0.53 0.28 0.27 0.48 0.32 0.78 0.45 0.19 Avail Cap(c_a), veh/h 126 2550 924 309 2814 1005 288 499 536 461 592 492 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 56.2 19.3 11.6 54.5 17.1 2.3 51.6 51.9 21.2 53.8 51.6 50.3 Incr Delay (d2), s/veh 5.6 0.6 0.4 120.5 0.7 0.7 0.5 2.1 0.7 4.6 1.8 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.3 6.5 1.9 9.7 8.3 1.4 1.1 2.5 1.9 3.5 2.2 0.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.8 19.9 11.9 175.0 17.8 3.0 52.1 54.1 21.8 58.4 53.4 50.9 LnGrp LOS E B B F B A D D C E D D
Approach Vol, veh/h 1326 2155 250 335
Approach Delay, s/veh 20.3 43.2 42.0 56.7
Approach LOS C D D E
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s11.8 73.1 17.0 18.1 18.0 66.9 17.2 17.9 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 * 7 7.0 7.0 Max Green Setting (Gmax), s 8.5 36.0 10.0 38.0 11.0 * 34 16.0 32.0 Max Q Clear Time (g_c+I1), s 4.8 24.4 4.6 6.7 13.0 19.1 9.9 7.0 Green Ext Time (p_c), s 0.0 7.8 0.1 0.4 0.0 6.7 0.4 0.7 Intersection Summary
HCM 6th Ctrl Delay 36.8
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th TWSC Horizon Year 2050 with Project Conditions
8: Project Driveway #1 & Grand Ave AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 0.7
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 348 3 6 240 11 27
Future Vol, veh/h 348 3 6 240 11 27
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 50 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 366 3 6 253 12 28
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 369 0 507 185
Stage 1 - - - - 368 -
Stage 2 - - - - 139 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - - 1186 - 495 826
Stage 1 - - - - 670 -
Stage 2 - - - - 873 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1186 - 493 826
Mov Cap-2 Maneuver - - - - 560 -
Stage 1 - - - - 670 -
Stage 2 - - - - 869 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 10.2
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 726 - - 1186 -
HCM Lane V/C Ratio 0.055 - - 0.005 -
HCM Control Delay (s) 10.2 - - 8.1 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.2 - - 0 -
HCM 6th TWSC Horizon Year 2050 with Project Conditions
9: Project Driveway #2 & Grand Ave AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 372 3 7 245 1 4
Future Vol, veh/h 372 3 7 245 1 4
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 50 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 392 3 7 258 1 4
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 395 0 537 198
Stage 1 - - - - 394 -
Stage 2 - - - - 143 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - - 1160 - 474 810
Stage 1 - - - - 650 -
Stage 2 - - - - 869 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1160 - 471 810
Mov Cap-2 Maneuver - - - - 542 -
Stage 1 - - - - 650 -
Stage 2 - - - - 864 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 9.9
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 737 - - 1160 -
HCM Lane V/C Ratio 0.007 - - 0.006 -
HCM Control Delay (s) 9.9 - - 8.1 -
HCM Lane LOS A - - A -
HCM 95th %tile Q(veh) 0 - - 0 -
HCM 6th TWSC Horizon Year 2050 with Project Conditions
10: Linda Vista Dr & Project Driveway #3 AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 0.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 14 157 261 7 5 8
Future Vol, veh/h 14 157 261 7 5 8
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 15 165 275 7 5 8
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 282 0 - 0 474 279
Stage 1 - - - - 279 -
Stage 2 - - - - 195 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1280 - - - 549 760
Stage 1 - - - - 768 -
Stage 2 - - - - 838 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1280 - - - 542 760
Mov Cap-2 Maneuver - - - - 542 -
Stage 1 - - - - 758 -
Stage 2 - - - - 838 -
Approach EB WB SB
HCM Control Delay, s 0.6 0 10.6
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1280 - - - 658
HCM Lane V/C Ratio 0.012 - - - 0.021
HCM Control Delay (s) 7.8 0 - - 10.6
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - - - 0.1
HCM 6th TWSC Horizon Year 2050 with Project Conditions
11: Linda Vista Dr & Project Driveway #4 AM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 9 153 264 11 6 4
Future Vol, veh/h 9 153 264 11 6 4
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 9 161 278 12 6 4
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 290 0 - 0 463 284
Stage 1 - - - - 284 -
Stage 2 - - - - 179 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1272 - - - 557 755
Stage 1 - - - - 764 -
Stage 2 - - - - 852 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1272 - - - 553 755
Mov Cap-2 Maneuver - - - - 553 -
Stage 1 - - - - 758 -
Stage 2 - - - - 852 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 10.9
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1272 - - - 619
HCM Lane V/C Ratio 0.007 - - - 0.017
HCM Control Delay (s) 7.9 0 - - 10.9
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - - - 0.1
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 1: Las Posas Rd & Grand Ave PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 330 385 65 75 149 718 65 930 260 375 555 285 Future Volume (veh/h) 330 385 65 75 149 718 65 930 260 375 555 285 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 347 405 63 79 157 503 68 979 248 395 584 237 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 222222222222
Cap, veh/h 361 483 75 133 238 1025 99 1174 297 834 1693 902 Arrive On Green 0.10 0.16 0.16 0.02 0.04 0.04 0.06 0.29 0.29 0.24 0.48 0.48 Sat Flow, veh/h 3456 3075 474 1781 1870 2770 1781 4037 1020 3456 3554 1546 Grp Volume(v), veh/h 347 233 235 79 157 503 68 825 402 395 584 237 Grp Sat Flow(s),veh/h/ln 1728 1777 1772 1781 1870 1385 1781 1702 1653 1728 1777 1546 Q Serve(g_s), s 11.0 14.0 14.2 4.8 9.1 3.8 4.1 25.0 25.1 10.8 11.3 8.3 Cycle Q Clear(g_c), s 11.0 14.0 14.2 4.8 9.1 3.8 4.1 25.0 25.1 10.8 11.3 8.3 Prop In Lane 1.00 0.27 1.00 1.00 1.00 0.62 1.00 1.00
Lane Grp Cap(c), veh/h 361 279 278 133 238 1025 99 990 481 834 1693 902 V/C Ratio(X) 0.96 0.83 0.85 0.60 0.66 0.49 0.69 0.83 0.84 0.47 0.34 0.26 Avail Cap(c_a), veh/h 361 315 314 186 332 1164 219 1099 534 834 1693 902 HCM Platoon Ratio 1.00 1.00 1.00 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.78 0.78 0.78 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 49.0 45.0 45.1 52.0 50.4 11.2 51.0 36.5 36.6 35.7 18.0 11.4 Incr Delay (d2), s/veh 36.9 15.7 17.2 3.3 2.4 0.3 8.1 8.2 15.7 0.4 0.6 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.5 7.2 7.4 2.3 4.5 2.5 2.0 11.0 11.7 4.6 4.7 2.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 85.9 60.7 62.3 55.3 52.8 11.5 59.1 44.7 52.3 36.2 18.6 12.1 LnGrp LOS F E E E D B E D D D B B
Approach Vol, veh/h 815 739 1295 1216
Approach Delay, s/veh 71.9 24.9 47.8 23.0
Approach LOS E C D C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 33.0 38.5 14.7 23.8 12.6 58.9 18.0 20.5 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 17.5 35.5 11.5 19.5 13.5 39.5 11.5 19.5 Max Q Clear Time (g_c+I1), s 12.8 27.1 6.8 16.2 6.1 13.3 13.0 11.1 Green Ext Time (p_c), s 0.6 4.7 0.1 0.8 0.1 5.2 0.0 1.9 Intersection Summary
HCM 6th Ctrl Delay 41.1
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 2: Via Vera Cruz/SR-78 Ramps & Grand Ave PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 515 332 208 110 359 57 223 183 70 263 281 385 Future Volume (veh/h) 515 332 208 110 359 57 223 183 70 263 281 385 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1851 1851 1851 Adj Flow Rate, veh/h 542 349 177 116 378 55 214 222 58 277 296 300 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 22222222222
Cap, veh/h 614 1247 765 173 961 429 245 257 218 383 183 186 Arrive On Green 0.18 0.35 0.35 0.10 0.27 0.27 0.14 0.14 0.14 0.22 0.22 0.22 Sat Flow, veh/h 3456 3554 1560 1781 3554 1585 1781 1870 1585 1763 843 854 Grp Volume(v), veh/h 542 349 177 116 378 55 214 222 58 277 0 596 Grp Sat Flow(s),veh/h/ln1728 1777 1560 1781 1777 1585 1781 1870 1585 1763 0 1697 Q Serve(g_s), s 16.8 7.8 7.2 6.9 9.6 2.9 13.0 12.8 3.6 16.1 0.0 23.9 Cycle Q Clear(g_c), s 16.8 7.8 7.2 6.9 9.6 2.9 13.0 12.8 3.6 16.1 0.0 23.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50
Lane Grp Cap(c), veh/h 614 1247 765 173 961 429 245 257 218 383 0 369 V/C Ratio(X) 0.88 0.28 0.23 0.67 0.39 0.13 0.87 0.86 0.27 0.72 0.00 1.62 Avail Cap(c_a), veh/h 701 1247 765 183 961 429 257 270 229 383 0 369 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.65 0.65 0.65 1.00 1.00 1.00 0.85 0.85 0.85 1.00 0.00 1.00 Uniform Delay (d), s/veh 44.1 25.7 16.2 48.0 32.8 30.3 46.5 46.4 42.5 40.0 0.0 43.1 Incr Delay (d2), s/veh 8.0 0.4 0.5 6.6 1.2 0.6 21.7 19.3 0.2 5.8 0.0 289.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln7.6 3.2 3.3 3.3 4.1 1.1 7.1 7.2 1.4 7.5 0.0 39.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.1 26.1 16.7 54.6 34.0 30.9 68.3 65.8 42.7 45.7 0.0 332.7 LnGrp LOS D C B D C C E E D D A F
Approach Vol, veh/h 1068 549 494 873
Approach Delay, s/veh 37.7 38.0 64.1 241.7
Approach LOS D D E F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s15.4 45.4 29.0 24.3 36.5 20.2
Change Period (Y+Rc), s* 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s * 11 37.2 23.9 * 22 26.2 15.9 Max Q Clear Time (g_c+I1), s 8.9 9.8 25.9 18.8 11.6 15.0 Green Ext Time (p_c), s 0.0 1.6 0.0 0.7 1.3 0.1
Intersection Summary
HCM 6th Ctrl Delay 101.8
HCM 6th LOS F
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 3: Via Vera Cruz & Linda Vista Dr PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 85 265 80 42 102 41 50 310 75 60 310 35 Future Volume (veh/h) 85 265 80 42 102 41 50 310 75 60 310 35 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 89 279 73 44 107 38 53 326 74 63 326 32 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 22222222222
Cap, veh/h 144 370 97 95 601 204 90 531 119 120 655 64
Arrive On Green 0.08 0.26 0.26 0.05 0.23 0.23 0.05 0.18 0.18 0.07 0.20 0.20 Sat Flow, veh/h 1781 1429 374 1781 2601 884 1781 2885 646 1781 3259 317 Grp Volume(v), veh/h 89 0 352 44 72 73 53 199 201 63 176 182 Grp Sat Flow(s),veh/h/ln1781 0 1803 1781 1777 1708 1781 1777 1754 1781 1777 1800 Q Serve(g_s), s 2.7 0.0 9.9 1.3 1.8 1.9 1.6 5.7 5.8 1.9 4.8 4.9 Cycle Q Clear(g_c), s 2.7 0.0 9.9 1.3 1.8 1.9 1.6 5.7 5.8 1.9 4.8 4.9 Prop In Lane 1.00 0.21 1.00 0.52 1.00 0.37 1.00 0.18
Lane Grp Cap(c), veh/h 144 0 467 95 411 395 90 327 323 120 357 362 V/C Ratio(X) 0.62 0.00 0.75 0.46 0.17 0.19 0.59 0.61 0.62 0.52 0.49 0.50 Avail Cap(c_a), veh/h 810 0 983 810 969 932 810 1292 1276 810 1292 1309 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.4 0.0 18.8 25.3 16.9 17.0 25.6 20.6 20.7 24.8 19.5 19.5 Incr Delay (d2), s/veh 4.2 0.0 2.5 3.5 0.2 0.2 6.0 1.8 2.0 3.5 1.1 1.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.2 0.0 4.0 0.6 0.6 0.7 0.8 2.2 2.2 0.8 1.8 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 28.7 0.0 21.3 28.7 17.1 17.2 31.6 22.5 22.6 28.3 20.6 20.6 LnGrp LOS C A C C B B CCCCCC
Approach Vol, veh/h 441 189 453 421
Approach Delay, s/veh 22.8 19.9 23.6 21.7
Approach LOS C B C C
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s9.7 16.1 8.9 20.2 8.8 17.1 10.5 18.7 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 25.0 40.0 25.0 30.0 25.0 40.0 25.0 30.0 Max Q Clear Time (g_c+I1), s 3.9 7.8 3.3 11.9 3.6 6.9 4.7 3.9 Green Ext Time (p_c), s 0.1 2.3 0.1 2.0 0.1 2.0 0.2 0.7 Intersection Summary
HCM 6th Ctrl Delay 22.4
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Horizon Year 2050 with Project Conditions
4: Linda Vista Dr & Grand Ave PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 18.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 698 84 152 413 70 394
Future Vol, veh/h 698 84 152 413 70 394
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 65 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 735 88 160 435 74 415
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 823 0 1317 412
Stage 1 - - - - 779 -
Stage 2 - - - - 538 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - - 803 - 149 589
Stage 1 - - - - 413 -
Stage 2 - - - - 549 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 803 - 119 589
Mov Cap-2 Maneuver - - - - 249 -
Stage 1 - - - - 413 -
Stage 2 - - - - 440 -
Approach EB WB NB
HCM Control Delay, s 0 2.9 70.2
HCM LOS F
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 488 - - 803 -
HCM Lane V/C Ratio 1.001 - - 0.199 -
HCM Control Delay (s) 70.2 - - 10.6 -
HCM Lane LOS F - - B -
HCM 95th %tile Q(veh) 13.6 - - 0.7 -
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 5: S Bent Ave & Grand Ave PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 892 220 60 330 179 65
Future Volume (veh/h) 892 220 60 330 179 65
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 939 211 63 347 188 52
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222
Cap, veh/h 1213 272 129 2165 268 239
Arrive On Green 0.42 0.42 0.07 0.61 0.15 0.15
Sat Flow, veh/h 2977 647 1781 3647 1781 1585
Grp Volume(v), veh/h 578 572 63 347 188 52
Grp Sat Flow(s),veh/h/ln 1777 1754 1781 1777 1781 1585
Q Serve(g_s), s 12.6 12.6 1.5 1.9 4.5 1.3
Cycle Q Clear(g_c), s 12.6 12.6 1.5 1.9 4.5 1.3
Prop In Lane 0.37 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 748 738 129 2165 268 239
V/C Ratio(X) 0.77 0.77 0.49 0.16 0.70 0.22
Avail Cap(c_a), veh/h 909 897 238 2165 990 881
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 11.2 11.2 20.0 3.8 18.1 16.8
Incr Delay (d2), s/veh 3.4 3.5 2.8 0.0 3.3 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.9 3.8 0.6 0.3 1.8 0.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 14.6 14.7 22.9 3.8 21.4 17.2
LnGrp LOS B B C A C B
Approach Vol, veh/h 1150 410 240
Approach Delay, s/veh 14.6 6.8 20.5
Approach LOS B A C
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 8.5 24.7 33.2 11.8
Change Period (Y+Rc), s * 5.2 5.8 5.8 5.0
Max Green Setting (Gmax), s * 6 23.0 15.0 25.0
Max Q Clear Time (g_c+I1), s 3.5 14.6 3.9 6.5
Green Ext Time (p_c), s 0.0 4.3 1.5 0.6
Intersection Summary
HCM 6th Ctrl Delay 13.6
HCM 6th LOS B
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 6: Via Vera Cruz & W San Marcos Blvd PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 95 1310 35 125 1135 180 75 64 75 195 110 77 Future Volume (veh/h) 95 1310 35 125 1135 180 75 64 75 195 110 77 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 100 1379 36 132 1195 173 79 67 74 205 116 76 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 22222222222
Cap, veh/h 121 1459 38 408 1788 258 98 201 179 249 140 92 Arrive On Green 0.07 0.41 0.41 0.23 0.57 0.57 0.06 0.11 0.11 0.07 0.13 0.13 Sat Flow, veh/h 1781 3536 92 1781 3117 449 1781 1777 1581 3456 1052 689 Grp Volume(v), veh/h 100 692 723 132 679 689 79 67 74 205 0 192 Grp Sat Flow(s),veh/h/ln1781 1777 1851 1781 1777 1789 1781 1777 1581 1728 0 1741 Q Serve(g_s), s 8.3 56.2 56.4 9.3 39.6 40.0 6.6 5.2 6.5 8.8 0.0 16.1 Cycle Q Clear(g_c), s 8.3 56.2 56.4 9.3 39.6 40.0 6.6 5.2 6.5 8.8 0.0 16.1 Prop In Lane 1.00 0.05 1.00 0.25 1.00 1.00 1.00 0.40
Lane Grp Cap(c), veh/h 121 733 764 408 1019 1027 98 201 179 249 0 232 V/C Ratio(X) 0.83 0.94 0.95 0.32 0.67 0.67 0.80 0.33 0.41 0.82 0.00 0.83 Avail Cap(c_a), veh/h 122 752 784 408 1019 1027 131 380 338 265 0 384 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.89 0.00 0.89 Uniform Delay (d), s/veh 69.1 42.4 42.4 48.2 22.1 22.2 70.0 61.3 61.9 68.6 0.0 63.3 Incr Delay (d2), s/veh 35.4 22.1 21.8 0.5 3.4 3.5 22.6 1.0 1.5 16.0 0.0 6.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln4.9 28.2 29.4 4.1 16.6 16.9 3.6 2.4 2.7 4.4 0.0 7.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 104.4 64.5 64.3 48.6 25.5 25.7 92.6 62.3 63.4 84.6 0.0 69.9 LnGrp LOS F E E D C C F E E F A E
Approach Vol, veh/h 1515 1500 220 397
Approach Delay, s/veh 67.0 27.6 73.6 77.5
Approach LOS E C E E
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s40.8 68.4 14.3 26.5 16.7 92.6 17.3 23.5 Change Period (Y+Rc), s 6.5 6.5 6.0 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s 16.9 63.5 11.0 33.1 10.3 70.1 11.5 32.1 Max Q Clear Time (g_c+I1), s 11.3 58.4 8.6 18.1 10.3 42.0 10.8 8.5 Green Ext Time (p_c), s 0.1 3.5 0.0 0.8 0.0 10.3 0.0 0.7 Intersection Summary
HCM 6th Ctrl Delay 52.3
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project Conditions 7: Grand Ave & W San Marcos Blvd PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 65 1385 235 495 1160 290 275 274 355 607 255 60 Future Volume (veh/h) 65 1385 235 495 1160 290 275 274 355 607 255 60 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.97 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1826 1870 1870 1870 1870 1826 1870 1870 1870 Adj Flow Rate, veh/h 68 1458 215 521 1221 263 289 288 332 639 268 58 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 22522225222
Cap, veh/h 86 1583 644 528 2135 975 333 287 472 680 475 397 Arrive On Green 0.05 0.31 0.31 0.16 0.42 0.42 0.10 0.15 0.15 0.20 0.25 0.25 Sat Flow, veh/h 1781 5106 1585 3374 5106 1585 3456 1870 1501 3456 1870 1563 Grp Volume(v), veh/h 68 1458 215 521 1221 263 289 288 332 639 268 58 Grp Sat Flow(s),veh/h/ln1781 1702 1585 1687 1702 1585 1728 1870 1501 1728 1870 1563 Q Serve(g_s), s 5.7 41.4 7.1 23.1 27.4 2.7 12.4 23.0 5.0 27.3 18.7 4.3 Cycle Q Clear(g_c), s 5.7 41.4 7.1 23.1 27.4 2.7 12.4 23.0 5.0 27.3 18.7 4.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 86 1583 644 528 2135 975 333 287 472 680 475 397 V/C Ratio(X) 0.79 0.92 0.33 0.99 0.57 0.27 0.87 1.00 0.70 0.94 0.56 0.15 Avail Cap(c_a), veh/h 150 1583 644 528 2135 975 346 287 472 691 475 397 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 70.6 50.0 11.4 63.1 33.4 4.4 66.8 63.5 45.5 59.3 48.7 43.4 Incr Delay (d2), s/veh 14.6 10.3 1.4 35.7 1.1 0.7 19.9 54.2 4.7 20.6 1.5 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln2.9 18.6 2.6 12.4 11.3 1.9 6.4 15.3 11.5 13.7 8.8 1.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 85.3 60.3 12.8 98.9 34.5 5.0 86.7 117.7 50.2 79.9 50.3 43.5 LnGrp LOS F E B F C A F F D E D D
Approach Vol, veh/h 1741 2005 909 965
Approach Delay, s/veh 55.4 47.4 83.2 69.5
Approach LOS E D F E
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s13.8 69.7 21.4 45.1 30.5 53.0 36.5 30.0 Change Period (Y+Rc), s 6.5 7.0 7.0 7.0 7.0 6.5 7.0 7.0 Max Green Setting (Gmax), s 12.6 56.9 15.0 38.0 23.0 46.5 30.0 23.0 Max Q Clear Time (g_c+I1), s 7.7 29.4 14.4 20.7 25.1 43.4 29.3 25.0 Green Ext Time (p_c), s 0.0 10.4 0.1 1.4 0.0 2.5 0.2 0.0 Intersection Summary
HCM 6th Ctrl Delay 59.4
HCM 6th LOS E
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Horizon Year 2050 with Project Conditions
8: Project Driveway #1 & Grand Ave PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 767 9 20 458 4 8
Future Vol, veh/h 767 9 20 458 4 8
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 50 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 807 9 21 482 4 8
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 816 0 1095 408
Stage 1 - - - - 812 -
Stage 2 - - - - 283 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - - 807 - 208 593
Stage 1 - - - - 397 -
Stage 2 - - - - 740 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 807 - 203 593
Mov Cap-2 Maneuver - - - - 314 -
Stage 1 - - - - 397 -
Stage 2 - - - - 721 -
Approach EB WB NB
HCM Control Delay, s 0 0.4 13.1
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 457 - - 807 -
HCM Lane V/C Ratio 0.028 - - 0.026 -
HCM Control Delay (s) 13.1 - - 9.6 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.1 - - 0.1 -
HCM 6th TWSC Horizon Year 2050 with Project Conditions
9: Project Driveway #2 & Grand Ave PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 771 4 10 473 5 11
Future Vol, veh/h 771 4 10 473 5 11
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 50 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 812 4 11 498 5 12
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 816 0 1085 408
Stage 1 - - - - 814 -
Stage 2 - - - - 271 -
Critical Hdwy - - 4.14 - 6.84 6.94
Critical Hdwy Stg 1 - - - - 5.84 -
Critical Hdwy Stg 2 - - - - 5.84 -
Follow-up Hdwy - - 2.22 - 3.52 3.32
Pot Cap-1 Maneuver - - 807 - 211 593
Stage 1 - - - - 396 -
Stage 2 - - - - 750 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 807 - 208 593
Mov Cap-2 Maneuver - - - - 317 -
Stage 1 - - - - 396 -
Stage 2 - - - - 740 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 13
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 466 - - 807 -
HCM Lane V/C Ratio 0.036 - - 0.013 -
HCM Control Delay (s) 13 - - 9.5 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.1 - - 0 -
HCM 6th TWSC Horizon Year 2050 with Project Conditions
10: Linda Vista Dr & Project Driveway #3 PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 21 450 224 9 10 22
Future Vol, veh/h 21 450 224 9 10 22
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 22 474 236 9 11 23
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 245 0 - 0 759 241
Stage 1 - - - - 241 -
Stage 2 - - - - 518 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1321 - - - 374 798
Stage 1 - - - - 799 -
Stage 2 - - - - 598 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1321 - - - 365 798
Mov Cap-2 Maneuver - - - - 365 -
Stage 1 - - - - 781 -
Stage 2 - - - - 598 -
Approach EB WB SB
HCM Control Delay, s 0.3 0 11.6
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1321 - - - 582
HCM Lane V/C Ratio 0.017 - - - 0.058
HCM Control Delay (s) 7.8 0 - - 11.6
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0.1 - - - 0.2
HCM 6th TWSC Horizon Year 2050 with Project Conditions
11: Linda Vista Dr & Project Driveway #4 PM Peak Hour
Horizon Year 2050 with Project Conditions Synchro 11 Report HY+P.syn
Intersection
Int Delay, s/veh 0.6
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 13 447 221 15 17 12
Future Vol, veh/h 13 447 221 15 17 12
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 14 471 233 16 18 13
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 249 0 - 0 740 241
Stage 1 - - - - 241 -
Stage 2 - - - - 499 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1317 - - - 384 798
Stage 1 - - - - 799 -
Stage 2 - - - - 610 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1317 - - - 379 798
Mov Cap-2 Maneuver - - - - 379 -
Stage 1 - - - - 788 -
Stage 2 - - - - 610 -
Approach EB WB SB
HCM Control Delay, s 0.2 0 12.9
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1317 - - - 484
HCM Lane V/C Ratio 0.01 - - - 0.063
HCM Control Delay (s) 7.8 0 - - 12.9
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - - - 0.2
Appendix N - LOS Calculation Worksheets
Horizon Year 2050 with Project with
Mitigation Conditions
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project with Mitigation Conditions 4: Linda Vista Dr & Grand Ave AM Peak Hour
Horizon Year 2050 with Project with Mitigation Conditions Synchro 11 Report HY+P+M (Signal).syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 303 73 202 225 27 132
Future Volume (veh/h) 303 73 202 225 27 132
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 319 77 213 237 28 139
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222
Cap, veh/h 1275 303 698 1590 39 195
Arrive On Green 0.45 0.45 0.45 0.45 0.15 0.15
Sat Flow, veh/h 2941 678 988 3647 269 1337
Grp Volume(v), veh/h 197 199 213 237 168 0
Grp Sat Flow(s),veh/h/ln 1777 1748 988 1777 1616 0
Q Serve(g_s), s 1.5 1.6 3.8 0.9 2.2 0.0
Cycle Q Clear(g_c), s 1.5 1.6 5.4 0.9 2.2 0.0
Prop In Lane 0.39 1.00 0.17 0.83
Lane Grp Cap(c), veh/h 795 783 698 1590 235 0
V/C Ratio(X) 0.25 0.25 0.31 0.15 0.71 0.00
Avail Cap(c_a), veh/h 4459 4387 2736 8917 1863 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 3.8 3.8 5.5 3.6 9.0 0.0
Incr Delay (d2), s/veh 0.2 0.2 0.2 0.0 4.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.0 0.1 0.0 0.6 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 4.0 4.0 5.7 3.7 13.0 0.0
LnGrp LOS AAAABA
Approach Vol, veh/h 396 450 168
Approach Delay, s/veh 4.0 4.6 13.0
Approach LOS A A B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 7.7 14.4 14.4
Change Period (Y+Rc), s 4.5 4.5 4.5
Max Green Setting (Gmax), s 25.5 55.5 55.5
Max Q Clear Time (g_c+I1), s 4.2 3.6 7.4
Green Ext Time (p_c), s 0.5 2.3 2.6
Intersection Summary
HCM 6th Ctrl Delay 5.8
HCM 6th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
HCM 6th Signalized Intersection Summary Horizon Year 2050 with Project with Mitigation Conditions 4: Linda Vista Dr & Grand Ave PM Peak Hour
Horizon Year 2050 with Project with Mitigation Conditions Synchro 11 Report HY+P+M (Signal).syn
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 698 84 152 413 70 394
Future Volume (veh/h) 698 84 152 413 70 394
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 735 88 160 435 74 415
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222
Cap, veh/h 1544 185 352 1717 85 478
Arrive On Green 0.48 0.48 0.48 0.48 0.35 0.35
Sat Flow, veh/h 3289 382 665 3647 244 1366
Grp Volume(v), veh/h 408 415 160 435 490 0
Grp Sat Flow(s),veh/h/ln 1777 1802 665 1777 1612 0
Q Serve(g_s), s 8.3 8.3 11.4 3.9 15.3 0.0
Cycle Q Clear(g_c), s 8.3 8.3 19.8 3.9 15.3 0.0
Prop In Lane 0.21 1.00 0.15 0.85
Lane Grp Cap(c), veh/h 858 870 352 1717 564 0
V/C Ratio(X) 0.48 0.48 0.45 0.25 0.87 0.00
Avail Cap(c_a), veh/h 1601 1623 630 3202 974 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 9.3 9.3 16.0 8.2 16.3 0.0
Incr Delay (d2), s/veh 0.4 0.4 0.9 0.1 4.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.3 2.3 1.5 1.1 5.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 9.8 9.7 16.9 8.3 20.7 0.0
LnGrp LOS AABACA
Approach Vol, veh/h 823 595 490
Approach Delay, s/veh 9.7 10.6 20.7
Approach LOS A B C
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 23.3 30.5 30.5
Change Period (Y+Rc), s 4.5 4.5 4.5
Max Green Setting (Gmax), s 32.5 48.5 48.5
Max Q Clear Time (g_c+I1), s 17.3 10.3 21.8
Green Ext Time (p_c), s 1.6 5.3 4.2
Intersection Summary
HCM 6th Ctrl Delay 12.8
HCM 6th LOS B
Notes
User approved volume balancing among the lanes for turning movement.
Appendix O - Traffic Signal Warrant
COUNT DATE
Major St: # of Lanes:
Minor St: # of Lanes:
Speed limit or critical speed on major street traffic > 64 km/h (40 mph) ….. or RURAL (R)
In built up area of isolated community of < 10,000 population……………………
URBAN (U)
Major St ADT (Total): 12801 Roadway Type: Urban
Minor Street ADT (Highest Direction): 2648
CONDITION A - Minimum Vehicular Volume
Satisfied X Not Satisfied
Number of lanes for moving traffic on each approach
Major Street Minor Street
1 1
2 or more 1
2 or more 2 or more
1 2 or more
CONDITION B - Interruption of Continuous Traffc
Satisfied Not Satisfied X
Number of lanes for moving traffic on each approach
Major Street Minor Street
1 1
2 or more 1
2 or more 2 or more
1 2 or more
Combination of CONDITIONS A+B
Satisfied X Not Satisfied
No one condition satisfied, but following conditions
fulfilled 80% or More 110% 89%
A B
Note:
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
To be used only for NEW INTERSECTIONS or other locations where it is not reasonable to count 12,000 8,400 1,600 1,120
2 CONDITIONS
80%
2 CONDITIONS
80%
12,000 8,400 1,200 850
14,400 10,080 1,200 850
14,400 10,080 1,600 1,120
8,000 5,600 3,200 2,240
Vehicles Per Day
on Major Street
(Total of Both Approaches)
Vehicles Per Day on
Higher-Volume
Minor Street Approach
(One Direction Only)
Urban Rural Urban Rural
8000 5,600 2,400 1,680
9,600 6,720 2,400 1,680
9,600 6,720 3,200 2,240
(Based on Estimated Average Daily Traffic - See Note)
Minimum Requirements EADT
Vehicles Per Day
on Major Street
(Total of Both Approaches)
Vehicles Per Day on
Higher-Volume
Minor Street Approach
(One Direction Only)
Urban Rural Urban Rural
Linda Vista Drive 1
Figure 4C-103 (CA). Traffic Signal Warrants Worksheet
(Average Traffic Estimate Form)
Horizon + Project
Grand Avenue 2 or more
Appendix P - Intersection Queueing Reports
Near-Term Year 2024 Base with Project Conditions
Project Driveway #1 & Grand Avenue
AM Peak Hour
PM Peak Hour
Project Driveway #2 & Grand Avenue
AM Peak Hour
PM Peak Hour
Project Driveway #3 & Linda Vista Drive
AM Peak Hour
PM Peak Hour
Project Driveway #4 & Linda Vista Drive
AM Peak Hour
PM Peak Hour
Horizon Year 2050 Base with Project Conditions
Project Driveway #1 & Grand Avenue
AM Peak Hour
PM Peak Hour
Project Driveway #2 & Grand Avenue
AM Peak Hour
PM Peak Hour
Project Driveway #3 & Linda Vista Drive
AM Peak Hour
PM Peak Hour
Project Driveway #4 & Linda Vista Drive
AM Peak Hour
PM Peak Hour
Appendix Q - Sight Distance Exhibit
CITY OF SAN MARCOS
PARCEL APN 219-152-74-00
PARCEL C OF COC REC DOC
NO 2019-0160631 APN 219-152-77-00PARCEL B OF COC REC DOC NO 2019-0160631 APN 219-152-76-00
MARCOS PROJECT
DRIVEWAY SIGHT DISTANCE
EXHIBIT
JOB NO.
DRAWN BY:
SHEET
1 of 1
E N G I N E E R I N G
6390 Greenwich Dr., Suite 170
San Diego, California 92122
tel 858.554.1500 fax 858.597.0335
www.fuscoe.com
MARCOS PROJECT
JOB NO.
DRAWN BY:
SHEET
E N G I N E E R I N G
6390 Greenwich Dr., Suite 170
San Diego, California 92122
tel 858.554.1500 fax 858.597.0335
www.fuscoe.com